Loading...
HomeMy WebLinkAbout06/16/2008 AGENDA FILE CITY COUNCIL 345 6th Street, Suite 600, Bremerton, WA 98337-1873 D (360) 473-5280 MONDAY, JUNE 16, 2008 CITY COUNCIL SPECIAL MEETING AGENDA 1. BRIEFING: 5:00 - 5:30 P.M. in COUNCIL CONFERENCE ROOM 603 A. General Council Business 2. CALL TO ORDER: 5:30 P.M. in FIRST FLOOR CHAMBERS A. Pledge of Allegiance B. Invocation 3. MAYOR'S REPORT 4. ANNOUNCEMENTS & PUBLIC RECOGNITION 5. CONSENT AGENDA A. Claims & Check Register (#AB08-143) B. Minutes of Meeting - June 4,2008 (#AB08-144) C. Minutes of Meeting - June 11,2008 (#AB08-145) D. Renewal of Monitoring Well Lease with U.S. Navy at N.A.D. Park (#AB08-146) E. Contract Award for Construction of Southwest Bremerton Residential Sewer Extension Pump Station to PIVETTA BROTHERS CONSTRUCTION, INC. (#AB08-147) 6. GENERAL BUSINESS A. Contract Award for Construction of Harlow Drive Pedestrian Improvements to SERPANOK CONSTRUCTION (#AB08-148) B. Resolution No. 3062, authorizing expenditures of funds received from the 2008 Emergency Medical Services (EMS) Levy Ballot Measure (#AB08-149) C. Resolution No. 3063 (North) and Resolution No. 3064 (South), approving annexation proceedings for two territories in the South Kitsap Industrial Area (SKIA) (#AB08-150) 7. COUNCIL MEMBER REPORTS 8. ADJOURNMENT OF CITY COUNCIL BUSINESS MEETING I Americans with Disabilities Act (ADA) accommodations provided upon request. Those requiring special accommodations should contact the City Clerk's Office at (360) 473-5323. CITY COUNCIL MEETING SPEAKERS LIST PLEASE NOTE THAT ALL REQUESTS FOR INFORMATION FROM THE CITY OF BREMERTON MUST BE SUBMITTED IN WRITING. THANK YOU. PLEASE PRINT YOUR NAME BELOW IF YOU PLAN TO SPEAK DURING THE COUNCIL MEETING TONIGHT D \ DATE SUBMITTED: 6/16/2008 BILL # AB08-143 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SA ...........................................................................................1 SUBJECT: Committee Meeting Date: COUNCIL MEETING Date: June 16, 2008 Department: Financial Services Presenter: Cathy Johnson Phone: 473-5296 Claims & Check Register SUMMARY: Consent Agenda item. Approval of checks and electronic fund transfers. ATTACHMENTS: Check Register. FISCAL IMPACTS (Include Budgeted Amount): APPROVALS: DEPARTMENT DIRECTOR: CITY ATTORNEY: FINANCE DIRECTOR: MAYOR: COMMITTEE CHAIR COUNCIL PRESIDENT: ~~#. CONSENT AGENDA [gJ GENERAL BUSINESS 0 PUBLIC HEARING 0 RECOMMENDED MOTION: 1) Check #'s 325077 through 325378 and EFT's 7906 through 7929 in the amount of$2,255,697.81. 2) Regular Payroll for the pay period ending May 31, 2008 in the amount of $774,208. 71. COUNCIL ACTION: [gJ Approve 0 Deny 0 Table o Continue 0 No Action J ).\11 .'1! .1l\lIIIIP: III J I. . 08 -/41- '~8 ."'." ,~ 1 . .\CF:\\)r\ BILL CIIY OF BIH:rvl LRT00J CTI,)' COl :\('11" .......................................................................................1 SLBJE(T: City (\HlIlCil \Ikcting ivlilll1lL'.'i II)r Il1CL't i ng or J u VI e.... -4 I .2.0 0 ~ C \1111111itkc \kctillg D~lk: N!\ . C () l ; ;\ (' 1 I. ~'II ~ I II N <. j j)~ I k: _-~iliqndQ.=i.--j-~-~-e-~l (p i 200 8 Lkpartlllcl1t:.City (~olln~~____. Presenter: 'vV ill ivl aupi n, COllncil President Phol1e: (360) 473-5280 Slil\IMARY: Attached is a sllmmary or the City COllncil J\1ccting held ~v nL 4 I 200 g ATTACHMENTS: Meeting Minutes for ::rV ne.... 4 I 2,..00 S FISCAL IMPACTS (Include Budgeted Amount): N/A APPROVALS: DEPARTMENT DIRECTOR: C ITY ATTORNEY: FINANCE DIRECTOR: MA YOR: Council President N/A N/A N/A COMMITTEE CHAIR COUNCIL PRESIDENT: ~ ... ~flYo;L~ CONSENT AGENDA [B" GENERAL BUSINESS 0 PUBLIC HEARINCr 0 RECOl\IMENDED !\IOTION: Move to approve the Consent Agenda as presented. ('O(i!\i('II. ACTION: [] /\pprO\c [-J IkllY II"! Tallie [) COldlllllC [] No i\dJ(JIl DIGITAL RECORDING CITY COUNCIL MEETING MINUTES Wednesday, June 4,2008 The weekly meeting of the City Council of the City of Bremerton was called to order in the City Council Chambers, of the NORM DICKS GOVERNMENT CENTER 345 6tl1 Street, Bremerton, Washington, Wednesday, June 4, 2008, at 5:30 PM, with Council President Will Maupin presiding. Council Members present were Nick Wofford, Carol Arends, Dianne Robinson, Mike Shepherd, Roy Runyon, Adam Brockus, Cecil McConnell, and Brad Gehring. Also present were Assistant City Attorney Ken Bagwell; City Clerk Carol Etgen; and Legislative Assistant Lori Smith. The Pledge of Allegiance was led by Council Member Brad GehrinQ followed by the invocation provided by Associate Pastor Bob Westfall of Bremerton First Church of the Nazarene. President Maupin announced that prior to the meeting, a Pre-Council Session was held to discuss General Council Business. MAYOR'S REPORT . Was pleased that the Grand Opening of the new Bremerton Marina exceeded all their expectations; and thanked the Port of Bremerton for providing a "world class marina"; . Thanked City Finance Director Laura Lyon, Public Works Director Phil Williams, and Community Development Director Andrea Spencer for their work on the proposed SKIA annexation; and also the work of Ms. Lyon on the LIFT proposal; . Commented that a lot of new activity should soon be kicking in at the museum; and lastly, . Mentioned that progress has been made toward finding a positive solution for the relocation of the Municipal Court building. PUBLIC RECOGNITION & ANNOUNCEMENTS Adam Brockus encouraged the public to attend the 1 sl Public Outreach Meeting for the Manette Business District Sub-Area Plan on Tuesday, June 10, 2008 from 6:00 to 8:00 PM in the Chambers of the Norm Dicks Government Center. Roy Runyon announced that the next District 4 Meeting would be held on Tuesday, June 17, 2008 beginning at 5:30 PM in the Council Conference Room of the Norm Dicks Government Center. The program would be "Pets in the City" with Rance McEntyre of the Kitsap Humane Society. Brad GehrinQ reminded citizens to attend the Bremerton Farmers Market every Thursday until October 9, from 4:00 to 7:30 PM in the Seaside Church parking lot across from Evergreen Park. Nick Wofford invited the public to attend the First Friday Art Walk events scheduled this week in Charleston, Downtown, and in the Manette area. CONSENT AGENDA A. Check Numbers 324823 through 325076; and EFT-7873 through EFT-7905 in the amount of $2,815,722.86; Reissue of a final pension check in the amount of $109.48; and Retiree Payroll in the amount $78.531.10 for the pay-period ending May 31,2008 (#AB08-132) B. Minutes of Meeting - May 21,2008 (#AB08-133) C. Minutes of Meeting - May 28,2008 (#AB08-134) D. Re-Appointment of Eric Anderson to the Bremerton Housing Authority Board of Commissioners (#AB08-135) City Council Reg. Mtg. Minutes Wednesday, June 4, 2008 Page 2 of 5 E. Approval of Remedial Action Grant Agreement with the Department of Ecology for the former Chevron property (#AB08-136) F. Approval of a 10-year Land Lease Agreement between the City of Bremerton and Donna Hammargren for Sewage Pump Station EB-4 (#AB08-137) G. Contract Award for Construction of Reservoir Seismic Valve Upgrade to STAN PALMER CONSTRUCTION (#AB08-138) H. Resolution No. 3061, authorizing an application to the Washington State Recreation and Conservation Office for a Lions Park Grant (#AB08-139) There were no comments from the public. . . 05:40:15 M/S/C (Runyon/Wofford) Move to approve the CONSENT AGENDA as presented. Voted in favor of Motion: Gehring, McConnell, Runyon, Shepherd, Robinson, Arends, Wofford, Maupin Abstained: Brockus Motion carried: 8-Yes; 1-Abstention GENERAL BUSINESS 6A - REDEVELOPMENT GRANT CONTRACT WITH WASHINGTON STATE DEPARTMENT OF ECOLOGY FOR LIONS PARK (#AB08-140): Parks & Recreation Director Wyn Birkenthal stated that the grant agreement with the Department of Ecology will provide one million dollars toward the redevelopment of Lions Park. Under the agreement, the City will use Low Impact Development Techniques (LID) to construct a new Park restroom, improve parking, use of native plantings to stop shoreline erosion, create a waterfront trail, and construct a child-friendly play meadow at the north end of the park. The project has been endorsed by the Bremerton Central Lions Club and has been reviewed by the Park Board, Council Finance Committee, and the Parks & Public Safety Committee. The 25% grant match will be provided by the Parks portion of real estate excise tax and in-kind services including planting, site preparation, project design and project management. Richard Nerf and Bill North, members of the Parks Commission, provided comments in support of this request, and also discussed highlights of what this grant would provide for the Park. John Starton liked the plan, but was concerned that there was a potential for losing too many needed parking spaces. Mr. Birkenthal explained that by re-striping the current parking lot, and increasing the parking in the upper area, there was only a net-loss of 4 parking spaces with the implementation of this plan. 05:54:45 M/S/C/U (Arends/Runyon) Move to authorize the Mayor to enter into the Lions Park Redevelopment Grant Contract with the Department of Ecology; and to finalize and execute the agreement with substantially the same terms and conditions as presented. 6B - AGREEMENT WITH THE U.S. GOLF ASSOCIATION FOR THE 2011 JUNIOR AMATEUR CHAMPIONSHIP TOURNAMENT (#AB08-141): Daryl Metheney, Head Golf Pro at Gold Mountain Golf Course, explained that following the success of the 2006 U.S. Public Links Championship at Bremerton's Gold Mountain Golf Course, the City's golf professionals with the support and encouragement of the Gold Mountain Board of Directors and staff pursued bringing an additional major tournament to Bremerton. The agreement with the U.S. Golf Association outlines the conditions and terms for the 2011 Junior Amateur Championship. The agreement is similar to the one executed for the 2006 Public Links event. The event to be held July 18-23, City Council Reg. Mtg. Minutes Wednesday, June 4,2008 Page 3 of 5 2011, will raise the profile of Gold Mountain within the national golf community and bring a healthy economic boost to Bremerton's hotels, restaurants, and retail stores owing to the influx of golfers and attendees from out of town. Local fund raising will be needed to put on the event and the Golf Professionals have obtained a great deal of positive interest from the sponsors of the 2006 Public Links Championship. The agreement has been reviewed by the City Attorney, and endorsed in principal by the Gold Mountain Board of Directors at their April 2008 meeting. Mr. Metheney provided a POWERPOINT@ presentation to provide further highlights and benefits of bringing such a high profile championship tournament to our area, and added that the event will be televised. 06:08:55 M/S/C/U (McConnell/Brockus) Move to approve the agreement with the U.S. Golf Association for the 2011 U.S. Junior Amateur Championship Tournament at Gold Mountain; and authorize the Mayor to execute the agreement in substantially the same form as presented. PUBLIC HEARINGS 7 A - ORDINANCE NO. 5052. CREATING THE BREMERTON HARBORSIDE REVENUE DEVELOPMENT AREA (#AB08.142): Laura Lyon, Financial Services Director, provided a POWERPOINT@ presentation to provide further details as she explained that Washington State enacted legislation creating the Local Infrastructure Financing Tool (LIFT). The LIFT Legislation creates an opportunity to redirect existing revenue sources to projects that benefit the local community by designating a Revenue Development Area (RDA). The City must obtain permission form the State to use this authority. To secure the State's permission, the City must participate in a process specified by law and compete against other interested government agencies throughout the state. The selection of Bremerton would authorize the City (within the approved and established RDA) to finance certain economic development public infrastructure improvements through the reallocation of various existing property and excise taxes. Use of LIFT does not increase property or sales tax rates. The estimated period in which local infrastructure. financing is contemplated to be used is twenty- five (25) years. If the City is selected by the State for this program, LIFT would commence as early as July 1, 2011 and conclude no later than June 30, 2039. Staff has completed the required notification procedures and ensured all conditions of the proposed Revenue Development Area meet the eligibility criteria and therefore recommend that the City Council approve the ordinance creating the Bremerton Harborside Revenue Development Area. Mark Saterthwait was not so concerned with the tax rate, but the fact that property taxes will escalate; and was also concerned with the lack of information that has been provided so far to the public. Joe Hudson, owner of Evergreen Trophies was concerned that at least 25% of businesses will be negatively affected, and would also like additional information. John Starton would like to have the mitigation plan explained in further detail. Pat ROQers provided comments in support of this plan, noting that it fits the City's Comprehensive Plan; and applauds what the City has done so far. Fred lash read from a list of questions. Mike Walton speaking as a representative of Kitsap Public Facilities District asked about the displacement of sales tax. Terry Boyle applauds this effort and encouraged the Council to vote in support of the LIFT. City Council Reg. Mtg. Minutes Wednesday, June 4,2008 Page 4 of 5 Ms. Lvon addressed the issue of increased property values, stating that it was a goal of the City with or without the LIFT; agreed that only a summary was provided tonight, but that additional information would be included in the analysis that would be provided as part of the application and would be made readily available to the public on the City's website. She addressed the issues of growth assumption; how many low income multi-family units would be available, stated that quite a bit of growth in the downtown area is part of the City's growth management plan; explained that the mitigation plan is included in Exhibit E of the ordinance; discussed that the Small Business Development Center offers assistance to small businesses to help them be successful; and there is also the multi-tax abatement program that offers tax incentives; and that customized work force training programs are all available to help mitigate some of the impact that might occur. She also listed several organizations and programs that assist people with locating low-income housing and aid if they are displaced. Ms. Lvon further added that the LIFT funding is not dependent on the Boardwalk Project funding; the LIFT is not tied to the upgrade of the Manette Bridge; and she is not aware of any other cities in the County who have applied for this funding, but explained that they are also not required to disclose that information. For those cities that are competing this year, it may be the last group unless the Legislature approves additional funding. $2.5 million has been made available per year, for 25-years, and it 500 new multi-family residential units are expected 2009 through 2039, but it is unknown how many of them would be low income. Mr. Maupin pointed out that the tax abatement program provides incentives for multi-family, low-income housing. Director of Public Works & Utilities Phil Williams addressed in further detail the questions related to the Boardwalk project; and stated the State has funding set aside for replacing the Manette Bridge between 2010 and 2012 and it is the hope of the City to have funding available for the Boardwalk project between 2010 and 2011. Property owners are encouraged to contact the Public Works Department to discuss any additional concerns. 7:13:13 to 7:33:48 Council Members asked for clarification, expressed concern, and provided comments in support of the proposed LlFT... 07:33:48 M/S/C/U (Robinson/Arends) Move to approve Ordinance No. 5052 creating a Revenue Development Area (RDA) to be known as the Bremerton Harborside Revenue Development Area. COUNCIL MEMBER REPORTS Adam Brockus reiterated information about the first public workshop on the Manette Sub Area Plan; and commented that he had a wonderful time at the grand opening of the Marina. Rov Runvon echoed the positive comments about the grand opening of the Marina; and commented on the Parking & Animal Control Committee meeting held last evening and thanked the citizens who attended to provide comment. Mike Shepherd further commented on the Parking & Animal Control Committee meeting; as well as the meeting to discuss the upcoming Evergreen Park Birthday celebration. Carol Arends reminded citizens to attend the First Friday Artwalk activities; and that it was cold in here tonight! Nick Wofford thanked citizens who volunteer their time to serve on committees. City Council Reg. Mtg. Minutes Wednesday, June 4, 2008 Page 5 of 5 With no further business, President Maupin adjourned the Council Meeting at 7:38 PM. Prepared and Submitted by: ~\itr~ Legislative Assistant Attest: CAROL ETGEN, City Clerk WILL MAUPIN, City Council President WM:CE:ls:cg DATE SUBMITTED: BILL # ()8- /45 AGENDA BILL CITY OF BREMERTON 5 It CITY COUNCIL \..., .....................................................................0.................. Committee Meeting Date: N/ A COUNCIL MEETING Date: MoY\d.Q.V.~Jn~ 1(0 2co~ Department: City COullcil ( Presenter: Will Maupin, Council President Phone: (360) 473-5280 SUMMARY: Attached is a summary of the City Council Meeting held ~vV\e... \l .I .=Loo 8 SUBJECT: City Council Meeting Minutes for meeting of ~uy\e, l1, 200 S ATTACHMENTS: Meeting Minutes for :f"Vf'\e.. tl, :;2.008 FISCAL IMPACTS (Include Budgeted Amount): N/A APPROVALS: DEPARTMENT DIRECTOR: CITY ATTORNEY: FINANCE DIRECTOR: MAYOR: Council President N/A N/A N/A COMMITTEE CHAIR COUNCIL PRESIDENT: ~ ~4p-/- CONSENT AGENDA [t] GENERAL BUSINESS D PUBLIC HEARING D RECOMMENDED MOTION: Move to approve the Consent Agenda as presented. COUNCIL ACTION: D Approve D Deny D Table D Continue D No Action DIGITAL RECORDING CITY COUNCIL STUDY SESSION MINUTES Wednesday, June 11, 2008 The weekly meeting of the City Council of the City of Bremerton was called to order in the City Council Conference Room in Room 603 of the NORM DICKS GOVERNMENT CENTER located at 345 6th Street, Bremerton, Washington, Wednesday, June 11, 2008, at 5:00 PM, with Council President Will Maupin presiding. Council members present were Nick Wofford, Carol Arends, Dianne Robinson, Mike Shepherd, Roy Runyon, Adam Brockus, Cecil McConnell, and Brad Gehring. Legislative Assistant Lori Smith was also present to provide staff support to the Council. President Maupin announced that the Study Session was for the Council to hear presentations on upcoming agenda items. It was further announced that this Study Session was open to the public, but there would be no opportunities for input or participation; that no action will be taken, and the content of these items is subject to change. A. NO DISCUSSION PLANNED - The following are budgeted items or have been reviewed by the appropriate Council Committee; and will be placed on the next Council Meeting Agenda for action: 1. Renewal of Monitoring Well Lease with U.S. Navy at N.A.D. Park - Wyn Birkenthal, Director of Parks & Recreation; and Brad Gehring, Chair of Public Safety & Parks Committee Consent 2. Contract Award for Construction of Southwest Bremerton Residential Sewer Extension Pump Station to PIVETTA BROTHERS CONSTRUCTION, INC. - City Engineer Michael Mecham, Public Works & Utilities; and Cecil McConnell, Chair of Public Works Committee Consent 3. Contract Award for Construction of Harlow Drive Pedestrian Improvements to SERPANOK CONSTRUCTION - City Engineer Michael Mecham, Public Works & Utilities; and Cecil McConnell, Chair of Public Works Committee General Business 4. Approval of Commuto Trip Reduction PI::m City Enginoor Mich3el Mech3m, pLJl;)lic VVorks & Utilities; 3nd Cecil McConnell, Chair of Public '-'\,forks Committee Item delayed until July 9... B. FULL DISCUSSION ITEMS 5. Proposed resolution authorizing expenditures of funds received from the 2008 Emergency Medical Services (EMS) Levy Ballot Measure - Chief AI Duke, Bremerton Fire Department; and Brad Gehring, Chair of Public Safety & Parks Committee General Business 6. Proposed resolutions (2) approving annexation proceedings for two territories in the South Kitsap Industrial Area (SKIA) - Andrea Spencer, Director of Community Development; and Dianne Robinson, Chair of the Planning Committee General Business C. GENERAL COUNCIL BUSINESS It was announced that the Admiral Theater Board of Directors invited the Council Members to attend a reception to meet new members of Board immediately following the Council Meeting on Wednesday, June 25,2008... Council Members were reminded that the next City Council Study Session Minutes VVednesday, June 11, 2008 Page 2 of 2 Council Meeting would be held on Monday, June 16, 2008 due to the AVVC Annual Conference in Yakima, VVA June 17 to 20,2008; and that information for the Conference has been distributed. VVith no further business, President Maupin adjourned the Council Study Session at 8:00 PM. p~ LORI SMITH Legislative Assistant Attest: CAROL ETGEN, City Clerk VVILL MAUPIN, City Council President VVM:CE:ls:cg DATE SUBMITTED: June 3, 2008 AGENDA BILL CITY OF BREMERTON CITY COUNCIL BILL # o~- (4?P 5D ........................................................................................ Committee Meeting Date: June 11 th.2008 COUNCIL MEETING Date: June Ht 2008 Department: Parks Presenter: Wyn Birkenthal Phone: 473-5752 SUBJECT: Renewal of monitoring well lease with u.s. Navy at N.A.D. Park SUMMARY: Navy lease N4425598RPOOGll provides for the operation and monitoring of2 existing water monitoring wells at NAD Park. One well is situated at the north end of the park, the second well at the south portion. The Navy wishes to extend the lease for a 5 year period of time to June 18th 2013. The compensation to the City is $100 per year. The wells do not effect recreational use ofNAD Park and serve to carefully monitor the condition of groundwater for any potential degradation. A minor amendment to the existing lease will update the City of Bremerton's business address to 345 6th Street. ATTACHMENTS: 1) Lease with u.s. Navy 2) Map depicting well locations FISCAL IMPACTS (Include Budgeted Amount): $500 in revenue over the term of the renewed lease. COMMITTEE CHAIR COUNCIL PRESIDENT: APPROVALS: DEPARTMENT DIRECTOR: CITY ATTORNEY: FINA~CE DIRECTOR: MAYOR: CONSENT AGENDA D( GENERAL BUSINESS 0 PUBLIC HEARING 0 RECOMMENDED MOTION: I move to extend the Navy's monitoring well lease for property in NAD Park for an additional term of 5 years and authorize the Mayor to execute the lease document with minor changes as may be required. COUNCIL ACTION: 0 Approve 0 Deny 0 Table D Continue 0 No Action ...... 11. CONTRACT 10 CODE I PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 I 2 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVF DATE 4. REQUISITION/PURCHASE REQ. NO. 15. PROJECT NO. (If ap~lIcabl.) Six (6) 1 June 2008 797634 6. ISSUED BY CODE RES 7. ADMINISTERED BY (If other than Item 6) CODE Commanding Officer Naval Facilities Engineering Command Northwest 1101 Tautog Circle Silverdale, WA 98315-1101 8. NAME AND ADDRESS OF CONTRACTOR (No., street. county, State and Zip Code) -1& 9A. AMENDMENT OF SOLICITATION NO. City of Bremerton Financial Services 9B. DATED (SEE ITEM 11) 345 6th Street Suite 600 Bremerton, WA 98337-1873 lOA. MODIFICATION OF CONTRACT/ORDER NO. N4425598RPOOG11 10B. DATED (SEE ITEM 11) CODE I FACILITY CODE As of 1 June 1998 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. Is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate leller or telegram which includes a reference to the solicitation and emendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or leller, provided each telegram or leller makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 12. ACCOUNTING;.ND APPROPRIATION DATA (If required) AL 17 08081804 KU2E 0252 62470 P 068732 20 ROOOP5 AL8RPOOG11 ER $100.00 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM lOA. B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR.l03(b). C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: .; D. OTHER (Specify type of modification and authority) E. IMPORTANT: Contractor is not, I is required to sign this document and return 4 copies to the issuing office~ 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, Including solicitation/contract subject matter where feasible.) Modification Six (6) is issued to make two changes: 1. Change the notification address for the City of Bremerton 2. Amend Paragraph 5 of the Lease to extend the term an additional five years Both as shown on the attached continuation sheet Exceot as orovided herein, all tenns and conditions of the document referenced in Item 9A or 10A, as heretofore chanoed, remains unchanoed and in full force and effect. 15A. NAME AND TITLE OF SIGNERITvoe or orinl 16A. NAME AND TITLE OF CONTRACTING OFFICER fTvDe or print) MICHAEL D. BRADY REAL ESTATE CONTRACTING OFFICER 158. CONTRACTOR/OFFEROR 15C. DATE SIGNED 168. UNITED STATES OF AMERICA 16C. DATE SIGNED (Signature of person authorized to sign) (Signature of Contracting Officer) NSN 7540.01.152.8070 Previous edition unusable STANDARD FORM 30 (Rev. 10-83) PreSCribed by GSA FAR (48 CFR) 53.243 ,.."" INSTRUCTIONS Instructions for items other than those that are self-explanatory, are as rollows: (a) Item 1 (Contract 10 Code). Insert the contract type identification code that appears in the title block of the contract being modified. (b) Item 3 (Effective date). (1) For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change. (2) For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties. (3) For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice. (4) For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default. (5) For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision. (c) Item 6 (Issued Bv). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block. (d) Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification. (e) Item 9. (Amendment of Solicitation No; - Dated), and 10. (Modification of Contract/Order No. - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order. (f) Item 12 (Accountinq and Appropriation Data). When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries. (1) Accounting classification Net increase $ (2) Accounting classification Net decrease $ NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet". (g) Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.) (h) Item 14 (Description of Amendment/Modification) . (1) Organize amendments or modifications undel the appropriate Uniform Contract Format (UCF: section headings from the applicable solicitatior or contract. The UCF table of contents, however, shall not be set forth in this document (2) Indicate the impact of the modification on the overall total contract price by inserting one 01 the following entries: (i) Total contract price increased by $ (ii) Total contract price decreased by $ (iii) Total contract price unchanged. (3) State reason for modification. (4) When removing, reinstating, or adding funds, identify the contract items and accounting classifications. (5) When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contrac1 terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to -- (i) A reference to the letter determination; and (ii) A statement of the net amount determined to be due in settlemert of the contract. (6) Include subject matter or short title 01 solicitation/contract where feasible. (i) Item 168. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements. . STANDARD FORM 30 (REV. 10-83) BACK .. ~ Continuation Sheet Modification 6 to Lease N4425598RPOOG 11 Page 2 of2 Change l. Change City of Bremerton address: From: City of Bremerton 239 4th Street Bremerton, WA 98337-1812 To: City of Bremerton Financial Services 345 6th Street, Suite 600 Bremerton, W A 98337-1873 Change 2. Extend the term of the lease as follows: This lease may be renewed, at the option of the Government, for the following terms at the following rentals. Period Covered Payment Due Amount 1 Jun 08- 31 May 09 1 June 09 $100.00 1 Jun 09-31 May 10 1 June 10 $100.00 I Jun 10-31 May 11 1 June 11 $100.00 1 Jun 11-31 May 12 1 June 12 $100.00 1 Jun 12-31 May 13 1 June 13 $100.00 Provided notice be given in writing to the lessor at least 30 days before the end of the original term or any renewal term: all other terms and conditions of this lease shall remain the same during any renewal term. Said notice shall be computed commencing with the date of mailing. This lease is hereby renewed for the period 1 June 2008 through 21 May 2009 Doc: 98G-ll continuation NOTICE OF RENEWAL OF GOVERNMENT LEASE 1. FROM: Commanding Officer (Code RES) Naval Facilities Engineering Command Northwest 1101 Tautog Circle Silverda1e, W A 98315-1101 TO: City of Bremerton 239 Fourth Street Bremerton, W A 98310 DUNS 556846970, CAGE Code 04DN7 2. CONTRACT NO. N4425598RPOOG II 3. 4. You are hereby notified that under the provisions of the Government lease described below, the United States of America elects to renew the said lease as the same may have been amended, and does hereby renew, extend, and adopt the said lease and all the terms, conditions, and general provisions thereof for the period beginning I June 2001 and ending 31 May 2008. 5. REQUIRING ACTIVITY: Commanding Officer, Naval Facilities Engineering Command Northwest, 110 I Tautog Circle, Silverdale, W A 98315-1101 6. DESCRIPTION OF LEASE: Navy Lease N4425598RPOOG II provides for the installation, operation, and maintenance of two monitoring wells, one each on two plots of land, one on the north end and one on the south end of Naval Ammunition DepotM~ne Park, Bremerton,. Washington... . ....--. .... "'" ~-"--"'-'__"__"_,",______' ....__...._.. ~: " :::'~ I 1" ;,_ ; n. ~I: ; ~ ,,:: j ~ f;;~. \jy,:O"..fj I I"': 1 0"'''":.';.. r'",,:. .~(n' :'.. ;~{h~L.t!)l~:: 1 ;....{ , !..: ~;~J'PC : l" I ..... .~. ---'-.' ..., -,' ...,-...-... ~. ": ' \ (?:..: . .,-..... ...-..... ....--. ....~. '.,'" .... ~ , . . Copy to: !. ..-. .-.... -.. -.. _.!....;.~~ ..- . _. " -_."-"~"'''. ...-- NA VF AC NW Muniments (Original) NA VF AC NW Lease File . .' ., ':;. ,.:;:!... DFAS Cleveland (via CIMAGE) NA VFAC SW Code 05B~ . NA VFAC NWCode 05ER.SB NA VFAC NW Code 05ER.DT MICHAEL D. BRADY Director, Real Estate Real Estate C:ontracting Officer ~~;" Naval Facilities Engineering Command Acting under direction of the Secretary of the Navv DATE 7. NAME, POSITION, AND TITLE MAY 2 120m 8. NAVY ACCOUNTING DATA: PAYMENT TO BE MADE BY: DFAS Cleveland.. Norfolk Accounts Payable,})O Box 998022,Cleveland, OH 44199 AMOUNT $100.00 ,i': I" .,) ACCOUNTING CLASSIFICATION TO BE CHARGED IDlSBURSEMENTl . A: .. B.APPROPRlA.' .. C.SUB... ....D.OBJ... E.BU-. F.. ._ G........... .H.. .......L...... ..L_...._J:.........._.. ACRN llON HEAD CLASS CONTROL SA AM IT PAA COST CODE K. . -- "-AMOUNT'" BOO ". ; AK 17071804 KU2E 0252 62470 P 068732 2D AKOOP5 AK8RPOOGllER $100.00 Per Annum (I ,F. '),' ',1.:1:,;:: ", ': :'1, -:'~l ~,::,.~i;'~'...;"..f)...J.;,>} >""...~~:""'::~;I'.tJj.:.t,.~.: ;:" ': r . . .,; ~ .;;; ~ . OUPUCf\1E OR\G\N~l .' ..~ ~ ,- .'-' ....' Vendor Subject Department Status Code Amount Begin Date End Date Review Date Insurance Comments Contract Number 3927 NAVAL FACILITIES ENGINEERING COMMAND NW NAD Marine Park Parks LAN $100.00 06/01/98 05/31/2007 05/01/2007 GL $ AL $ E&O Insurance Total $ Insurance Review Date (US NAVY) N44225598RPOOG11 May be renewed in 1 yr terms thru 5/31/08 AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CONTRACT 10 CODE I PAGE OF PAGES 1 I 1 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 15. PROJECT NO. (If applicable) Five (5) 6/01/2006 6. ISSUED BY CODE 05LR 7. ADMINISTERED BY (If other than Item 6) CODE I Commanding Officer Naval Facilities Engineering Command Northwest 1101 Tautog Circle Silverdale, WA 98315-1101 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) ~ 9A. AMENDMENT OF SOLICITATION NO. City of Bremerton 239 Fourth Street 9B. DATED (SEE ITEM 11) Bremerton, WA 98310 DUNS 556846970, CAGE Code 04DN7 lOA. MODIFICATION OF CONTRACT/ORDER NO. N4425598RPOOG11 t/ lOB. DATED (SEE ITEM 11) CODE I FACILITY CODE as of 1 June 1998 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified In the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or leller, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 12. ACCOUNTING AND APPROPRIATION DATA (If required) CHECK ONE 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM lOA. t/ B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes In paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR.l03(b). C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: D. OTHER (Specify type of modification and authority) E. IMPORTANT: Contractor \lis not, is required to sign this document and return copies to the issuing office. 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) Modification Five (5) is issued to change the name and address of the using activity and paying office. Name And Address of Using Activity Paying Office: Naval Facilities Engineering Command Northwest Defense Finance and Accounting Service, NorfOlk (Code FPV) 1101 Tautog Circle 1837 Morris Street, Suite 1401 Silverdale WA 98315-1101 PO Box 429100 , Norfolk, VA 23511-3431 This lease is hereby renewed for the period 1 June 2006 through 31 May 2007. AJ 1706061804 KU2E 0252 62470 P 0687352 2D AJOOP5 AJ8RPOOG11 ER $100.00 Exce t as rovided herein, all terms and conditions of the document referenced in Item 9A or lOA, as heretofore chan ed, remains unchan ad and in full force and effect. 15A. NAME AND TITLE OF SIGNER T e or rint 16A. NAME AND TITLE OF CONTRACTING OFFICER T e or rint 15B. CONTRACTORJOFFEROR 15C. DATE SIGNED 16C. DATE SIGNED (Signature of person authorized to sign) MAY 1 9 2006 NSN 7540-01-152-6070 Previous edition unusable STANDARD FORM 30 (Rev. 10-63) Prescribed by GSA FAR (48 CFR) 53.243 DUPLICATE ORIG\NAL . .~' , , ,~, . ..'~. '. .' "''; ',. :,'t..." I', ..... ".':. . , t. ,.... ~. ': ~ . .....,~.~.,... ..!....",.,.;,.~....~~. !...~.....\...,.....'i' . ....7 ,.".......:...{. . .INSTRUCTIONS... '. .... '..~ .".' .~" "t,::. .', ",.., ~ .:.' , ....'.. .:.::'. '~.,h~;. .::.'~.i.; ',f InstructioNS for iteITls :other than those thi:1tare self~'~xpi~hat6ry~: arias follows:: (a) Iteni1 (Contract 10 Code). Insert the confr~dtyp~ '.: ':~:'~\;<::'- '<?)Accounting,.9!aSs!fi,s~~iQn identification code that appears in the title block of' ,'i'/i'., ;i, ;:t;J.et decrease $ ," t~e ~~~t~act be,~~9. '!1?difi~d, ,::'.,NOTE:. ;.If.the'reare.:ch~nges.~to>multip!eaccounting : :._':,' ,,;'.. ""':' q:,,; ..,," ',' , . .' " ,'t': C1assifications'that cailiiOfbEf'pla8e'ct'iii" block 12, insert (b),}tem ~ ,'(~~~?tiv,~,9~~e),.~..,: i:'" '.. ..,,',:, ';y,- an~steris~, al1(;Lth~words:::$ee continuation sheet", ~ (1 )"F.or a,.~~J!c:it~,t!9,n.~m~I1,9.~e.r:1t,! .~hange order, or (g) Item 13. Check the appropriate box to indicate the ': ,.' .~d~i~istra!iVl:l ~Mr;lg.~, m~.'~fftc!!ye"d,~,t~,,~h.all.b,~. '",j J';"::" ;type pf ,.:I1)Q.clJf!GptiQ.f!.'" Im5en .in tD,e .corr~spo~di~g th~ J~~~~ dat~,qfJh.~,~fl1e!ldm~,~t,'..Qoh~t:lge pr<:f~,r,. ;: :.. ....~I.cm,~. ~h~ ,a~.~h<?nty.:und~L'<<~.Ich the modlficatlo~ IS ; .Clr~p.m.mlstr~t1ve.,:~,ha[Jge,"::''':~:G i' /,::~t'\> !.'~" (; ",' ..> if ) \;'.; i.:;.I~~!l/,!,d:, y C;;hEJP~;~h~~~e,f, or:rl.ot,cqDt~~gtor must sign ;"(2)iFo't a ~u'ppiern~Ata'('~~i~~';';"~nt: 'th;€t~ffJ~ti~e' 'c..,,," : ;' ,th!::;}j9curn~9.tl<(~,~:~ll}~.,4>9) 03)., date Shall be the date agreed to by the (h) Item 14 (Description of Amendment/Modification) , :' contracting parties;>: 1:.;,:.1<.::'.'," .' :" ' '. . " . ,", ',' .,-..... ./"':" '." ." ""'>, ::": ,,:,.!,.: 'T.':"'" '.::',;c:.. ." ". L,.:' '..:......,',.: ....~,,::.;','. :" 'Ii:':' '. ,,' ,:,,\'!i..:,~;( '::.:;,~.>,,;,: (1)brg~rllte' amehdmelilts"::(W"mddific~dions under .,,(,,) Fora modification Issued .as ,an..lmbal".or th'" ". tU 'f' "'C ..t., 't.F.....' .,.t'(UCF) confirming notice of termination for the e ~ppropn~ e nI orm on r~c erma.. . convenience 'of the', Government 'lheeffective section headmgs from the. applicable soliCitation d~:lte' anchthe modification";number.>of..'the'~'; .. ::;"::".. or. ,contract... The' UCFlable'bf 'contents, "', confirming' notice ;:shall ::be,'rthe ,'same:.;as',the(;:r;i,,'I~', ,.,;,h~wever, shall not be set forth in this document effectivedcite'.and'modification nurnber'offhe" ..,. . ,... .....d'. '.. ....-.. .. initial notfC'e'::L"""~:';;;":'>": .~~;!;,,~;:::~';,>;!..:~.,)';',,"':;~' :.";:~'L:"':.".; l" , · .:.:(2t1~~1il}et~&i"~6:~~~~t9.~'f~~~;:hy?~~~~~:~~' ~'~et~~ (4) For.a modification converting a termination for the following entries: default 1..t9.i .'. a termina,tiol) for the .. d..,:,.::. '. c.onvenienc~L .Qt"th~L:..:'::~ciY~mm.elJt,'i!_5:<t~~:~.;.. ::/ ..h :. ./ (i) Totalcoiitract:pricelncrease(fbyr'$';\~'\'~'.~; ,.',......,,,,,.,:.".,, ,,;.ff;,~!(~;~~~t~~fi!~:'~~;~~:o~R~h;f~r~~i~t1!:<~!Z~):;'?~G~\:,:~E:;>.i;'\;~;~:;:':"'~:(ii;:~~t~;I;ci~~i'k.~t:;iii'g~. decreased' b'Y"$""" ."",.',.,"'" ,..(5), ,-FQr:..,.a..rnodification :.confirming.",the contacting tjll '., dofficer~s'dete'rminatioi'-"oftneariiount due" 'in" . (iii)Total c6Jitract priceunchari'ged:" .,. .... ;.. ;'~"o'~' ::.:~$ett!~,m~'!"t 'Af'::'a:',,_:C9fitra~eJ~r.mi.r;1~tlo)).<~f!1e., ;', ,; ". ',1\.:',. .',', '. '.. "'.: ", . :.,".".:."" ! .-'l' . "":"W; ><;i""""'-" :.' .\:;0.". ",,', ..',,'.,,';, effective, date,,'shall :'i.be., 1.the.,,-,same',iclsn!the,; :..'" ,...... (3) State reaS6rffor n19djficatl~n>, ;, ,i'; . ":i" ~...::r :.+i:". "effectivEfdate:ofthe initial decision'::'i."..." '"',J',;,:'':''''' . ,,,, . .,.., ... "''';;<..,;1-.'''' " >"..."..1)'....,"'.' ~,::. ...._'.~~J. '1:".1... .',1' ~', '~.:.~.'. :.,..,'..~":.:.. :.~..'...; '. ~..:;,:C.,\l,...'<': I" ",.,:.., ....,....'\. :'.' ,..:'~.r:~., t.. .!'.,...~\'..,.,.,. .'t"'ll-' (dj;ttE;m6'.(jssJ'~d':~;B\h."~~~rt:th~ 'ri'~~~':;a'~'d'i:~ddress':;:"', :",: :"";. (4) '.Wh~n 'Jet~oVhj9, /Eji~'st~tJlIl9, ,9~..,addding fUnt~S, _, of the. issuing office.. ., If applica.b!~"ins~(1Jh,~. .,,'. identi.fy. . e. ,~~:>nJac ,'"e!ll;3. an accoun Ing "";.;",,,,t;!PPmprJ~t.e..i~slJjng ,offlce;co(;feJrlJb~';c6.qe,'J;)loCl(.:;..;i,L;,. ,.';:.": ,., :. '..,~*:t~,~IT!9~11.C?~,~t:'.:;:;.;", "~'''' "."" ,,,. "<'.."..",,,, .,.... ,", ,,"........; ,',.; r:;';;..-!..: ; IY:", '. ",.'.:"i~}~ ! -. . ""1 ~. ~~"l" ...... '(d) item f3(Nameimd Address c)f'Coritractor). For (5) Wh,en the SF "'3'0' "is':;'>i.Jsed to reflect a modifications to a contract or order, enter the determJnati.on by ,~h,~.. c:olltr~c.ting officer of the contractor's name, address, and code as shown in amount :due':iil..,"settlenient '"oL'a''' contract - J ." "l....\.', -.... ~ ,.,.;:. '; t r. i~'..'''' J.'.~ t i -; the original contract or order, unless changed by terminated . for: '1'.the,',I6'6nve.tlien'ce of the this or a previous modification. Gov~rnrrient, tt,le'. ,~r;ltry.. in)t~IT,l ..14. .9f the modification may be limited tc)":'::'/Y" . '. .,~... .' (i) A reference to the letter determination; and (e) 'Item 9. (Amendment of Solicitation No. - Dated), , and, 10, ((Modification of ContracUOrder No. - ;',' Dated): Check th~ . appropriate box and in the ..', corresponding blanks insert the number and date . of the original solicitation, contract, or order. ~,: ~\'~'.;:,'!.;. "":'.,. ..' ..i': '.'r. .:, . .' :,':" "iL(~.:~::.~"IV, ~~~~~~i~' iI'd.:}. .:..,;'.... .,,''::; :.. :}:~' :.:.: ., ...,.... ~;'(.. y' ~ '..;. , " . , . . . . ~, . ~~. ~ . .' (ii) A statement of the net amount determined to be due in s~ttl~mel)t ()f th.e..contract. , . . .... '. . -h,~{t\.,~~;;.'. "'~.,~;..\i ~'. .,:':i.;:./:':,'''~. ..... (6) Include subject matter or short title of solicitation/contract where feasible. (i) Item 168. The contracting officer's signature is not required on solicitation amendments. The : contracting officer's .signature i.s normally affixed'last on supplemental agreerri~nts, . .. . "- .... . STANDARD FORM ;30 (REV.1D-S3) BACK :;:~ .'..r.;:::: \ ""';':'j';' ~ ~::~':..'4';"": .l~'< ,"\:: ::','!,-' :." (1) Accoun.ting .c1assification Net increase . $ :..'( ;-; I\:'::;';;'~{ ~: .: . J ~, ;)...,,' _ . ..,.... ,.-:.' '.'. ~~'.:', .'. ""t,.', .'. .:.' ;'... ... ',.'. ., ....:'.; '...:' -. 'j t', :~. t. ~. ...- ..~:J..':"""."_ . "f';". "'j ';.'....: . ','i" - . ',' .I't' ... '. .'. ',. . '.' ;:"'\ '..... , .. ':"'-",~''','-. "....: '..: . '''.' " -.'~''- .".... ... '. +--------------------------------------------------------------------------+ =rEnter Search Criteria, Press Esc Key to Transmit ,. =rPress Del Key to Terminate Delete Mode i CHANGE Contract Transactions Contract Number 3927 ENGINEERING FIELD ACTIVITY NW (US NAVY) ,.Subject NAD MARINE PARK ,.Department PARKS tStatus Code LAN + Amount $100.00 Begin Date 06/01/1998 t Insurance End Date 05/31/2006 t l Type Amount Review Date 05/01/2006 t I Insurance Total $0.00 + + Comments ~;2;~5;:~~~~~'~N 1 YR :::::a:::uR:::::o:ate i ,. ,. +--------------------------------------------------------------------------+ NOTICE OF RENEWAL OF GOVERNMENT LEASE I I I I I I I I I I I I 1. FROM: 2. CONTRACT NO. Commanding Officer (Code 05LR) Engineering Field Activity. Northwest N4425598RPOOG 11 19917 7th Avenue NE Poulsbo. WA 98370-7570 3. TO: City of Brernerton 2394th Street Brernerton. WA 98331-1812 4. You are hereby notified that under the provisions of the Government lease described below. the United States of America elects to renew the said lease as the same may have been amended, and does hereby renew, extend, and adopt the said lease and all the terms, conditions, and general provisions thereof for the period beginning 1 June 2005 and ending 31 May 2006. 5. REQUIRING ACTIVITY: Commanding Officer. Engineering Field Activity. Northwest, Naval Facilities Engineering Command. ]9917 7th Avenue NE. Poulsbo. WA 98370-7570 6. DESCRIPTION OF LEASE: Navy Lease N4425598RPOOG 11 provides for the installation, operation, and maintenance of two monitoring wells, one each on two plots of land, one on the north end and one on the south end of Naval Ammunition Depot Marine Park, Bremerton, Washington Copy to: ENGfLDACf NW Muniments (Original) DFAS San Diego (AIBAB-EFD) ENGFLDACf NW (05ER.CO) ENGfLDACf NW Lease File SWOW (Code 05BP) ENGFlDACT NW (0330Mf) SOUTHWESTDIV (Code FM22C) 7. NAME, POSITION, AND TIlLE SIGNAl1lRE ~ DATE MICHAEL D. BRADY B~!Command , APR 2 1 2005 Director, Real Estate Real Estate Contracting Officer Naval Facilities Engineering Command Acting under direction of the Secretary of the Navy 8. NAVY ACCOUNTING DATA: PAYMENT TO BE MADE BY: AMOUNT Defense Finance and Accounting Service, Oakland via DFAS (Code AIBAB-EFD), P.O. $100.00 Box 429100, San Diego, CA 92142 ACCOUNTING CLASSIFICA nON TO BE CHARGED IDISBURSEMEN1 A B. APPROPRIA- C. SUB- D.OBJ. I!.BU- F. G. H J. J. K. ACRN nON HI!AD CLASS CONTROL SA AAA IT PM COST CODE AMOUNT AH 1105051804 KU2E 0252 68711 P 068732 2D AHOOP5 AH8RPOOG llER $100.00 Per Annum DUPLICATE ORIGINAL +--------------------------------------------------------------------------+ Enter Search Criteria, Press Ese Key to Transmit + Press Del Key to Terminate Delete Mode + CHANGE Contract Transactions + Contract Number 3927 + t Vendor Name Subject Department Status Code t i Comments ENGINEERING FIELD ACTIVITY NW NAD MARINE PARK PARKS LAN (US NAVY) $100.00 06/01/1998 05/31/2005 04/01/2005 Insurance Type Amount Amount Begin Date End Date Review Date $0.00 i I +--------------------------------------------------------------------------+ Insurance Total Insurance Review Date N44225598RPOOG11 MAY BE RENEWED IN 1 YR TERMS THRU 5/31/08 NOTICE OF RENEWAL OF GOVERNMENT LEASE 1. FROM: 2. CONTRACT NO. Commanding Officer (Code 05LR) N4425598RPOOG 11 Engineering Field Activity, Northwest 19917 7th Avenue NE Poulsbo, W A' 98370-7570 3. TO: City of Bremerton 239 Fourth Street Bremerton, W A 98337 -1812 4. You are hereby notified that under the provisions of the Government lease described below, the United States of America elects to renew the said lease as the same may have been amended, and does hereby renew, extend, and adopt the said lease and all the terms, conditions. and general provisions thereof for the period beginning I June 2004 and ending 31 May 2005. 5. REQUIRING ACTIVITY: Commanding Officer, Engineering Field Activity, Northwest, Naval Facilities Engineering Command, 19917 7th A venue NE, Poulsbo, W A 98370-7570. 6. DESCRIPTION OF LEASE: Navy Lease N4425598RPOOG II provides for the installation, operation, and maintenance of two monitoring wells, one each on two plots of land, one on the north end and one on the south end of Naval Ammunition Depot Marine Park, Bremerton, Washington. Copy to: ENGFLDACT NW (Muniments) DFAS San Diego (AIBAB-EFD) ENGFLDACT NW (05ER.CO) ENGFLDACT NW (Lease File) SOUTHWESTDIV (05BP) ENGFLDACT NW (0330MT) ENGFLDACT NW (Contract Admin File) SOUTHWESTDIV (0 I CAJR) 7. NAME, POSITION, AND TITLE SIGNATURE .U DATE ~~~~J.~a MICHAEL D. BRADY Director, Real Estate By direction of the Commander, Real Estate Contracting Officer Naval Facilities Engineering Command APR 16 2004 Acting under direction of the Secretary of the Navy 8. NAVY ACCOUNTING DATA: PA YMENT TO BE MADE BY: AMOUNT Defense Finance and Accounting Service, Oakland via DFAS (Code AIBAB-EFD), P.O. $100.00 Box 429100, San Diell;o, CA 92142. ACCOUNTING CLASSIFlCA nON TO BE CHARGED (DISBURSEMENT) A. B. APPROPRJA- C. SUB. D.OBJ. E. BU. F. G. H. I. 1. K. ACRN TION HEAD CLASS CONTROL SA AAA IT PAA COST CODE AMOUNT AG 1704041804 KU2E 0252 68711 P 068732 2D AGOOP5 AG8RPOOG II ER $100.00 Per Annum DUPLICATE ORIGINAL - ' '-.' 11. CONTRACT 10 CODE I PAGE OF PAGES AME:'NDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 12 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITlONIPURCHASE REQ. NO. I ~ PROJECT NO. (If applicable) Four (4) l' June 2003 6. ISSUED BY CODE 05LR 7. ADMINISTERED BY Of other than Item 6) CODE T Commanding Officer Engineering Field Activity, Northwest 19917 7th Avenue NE Poulsbo, WA 98370-7570 8. NAME AND ADDRESS OF CONTRACTOR (NO., street, county, State and Zip Code) ~ 9A. AMENDMENT OF SOLICITATION NO. City of Bremerton r C/O Parks and Recreation Department 98. DATED (SEE ITEM 11) 680 Lebo Boulevard Bremerton, WA 98310 lOA. MODIFICATION OF CONTRACT/ORDER NO. N4425598RPOOG 11 R! 10B. DATED (SEE ITEM 11) As of 1 June 1998 COOE I FACILITY CODE 1 t. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS o The above numbered solicitation is emended es set forth in Item 14. The hour and dale spacllled for receipt of Offers 0 Is extended, 0 1& not extended. OffeJ'6 must acknowledge receipt of this emendment prior to the hour and dele spedlled in the aollcitetJon or e8 amended, by one of the following methods: (a) By completing items 6 and 15, and returning _ _ copies of the amendment; (b) By acknowledging receipt of this amendment on e8dl copy of the offer submitted: Of (c) By separate letter or telegram which Includes a reference to the solicitation and amendment numbel'l. FAilURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR ANO DATE SPECIFIED MAY RESUlT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation IInd this amendment, and is received prior to the opening hour and dele spacifled. 12. ACCOUNTING AND APPROPRIATION DATA (If required) AF 17 03031804 KU2E 0252 68711 P 068732 20 AFOOP5 AF8RPOOG11ER $100.00 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN rrEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN rrEM lOA. o B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes In paying ofnc&, appropriation date. etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR.103(b}. C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: D. OTHER (Specify type of modification and authority) E. IMPORTANT: Contractor 0 is not, I8l is required to sign this document and return 4 copies to the issuing office. 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) AMENDS PARAGRAPH 5 OF THE LEASE TO READ AS FOLLOWS: SEE ATTACHED CONTINUATION SHEET 15C. DATE SIGNED l6C. DATE SIGNED .s.~.!I"o.s As of 31 May 03 NSN 7540-01-152-8070 Previous edition unusable DUPLICATE ORIGINAL STANDARD FORM 30 (Rev. l0-83) Prescribed by GSA FAR (46 CFR) 53.243 Page 2 of2 Modification 4 N4425598RPOOG II Payment Schedule Navy Lease N4425598RPOOGIl With City of Bremerton This lease may be renewed, at the option of the Government, for the following terms at the following rentals Period Covered Due Amount I Iun 03-31 May 04 I Iun 04 $ 100.00 1 Iun 04-31 May 05 1 Iun 05 $ 100.00 I 100 05-31 May 06 I Iun 06 $ 100.00 1 100 06-31 May 07 1 Iun 07 $ 100.00 I Iun 07-31 May 08 1 Iun 08 $ 100.00 Provided notice be given in writing to the Lessor at least 30 days before the end of the original term or any renewal tenn; all other terms and conditions of this lease shall remain the same during any renewal tenn. Said notice shall be computed commencing with the date of mailing. This lease is hereby renewed for the period I Iune 2003 through 31 May 2004 +--------------------------------------------------------------------------+ +Browse; Next Previous First Last Update Delete Restart X - Exit + +Retrieve the Next record + +Found: 5 Record(s) MAINTAIN Contract Transactions + + Contract Number 3927 + + + +Vendor Name ENGINEERING FIELD ACTIVITY NW (US NAVY) + +Subject NAD MARINE PARK + +Department PARKS + +Status Code LAN + + + + + + + + + + + + + + +--------------------------------------------------------------------------+ Insurance Type Amount Amount Begin Date End Date Review Date $100.00 + 06/01/1998 + 05/31/2003 + 04/01/2003 + + + Insurance Total Insurance Review Date + $0.00 + + + + + + Comments N4422559BRPOOG11 NOTICE OF RENEWAL OF GOVERNMENT LEASE ~~ ~~. ~,..~ 1. FROM: 2. CONTRACT NO. Commanding Officer (Code 05LR) N4425598RPOOG 11 Engineering Field Activity, Northwest 19917 7th Avenue NE Poulsbo, WA 98370-7570 3. TO: City of Bremerton c/o Parks and Recreation Department 680 Lebo Boulevard Bremerton, WA 98310-3308 4. You are hereby notified that under the provisions of the Government lease described below, the United States of America elects to renew the said lease as the same may have been amended, and does hereby renew, extend, and adopt the said lease and all the terms, conditions, and general provisions thereof for the period beginning 1 June 2002 and ending 31 May 2003. 5. REQUIRING ACTIVITY: Commanding Officer, Engineering Field Activity, Northwest, Naval Facilities Engineering Command, 19917 7th A venue NE, Poulsbo, W A 98370-7570. 6. DESCRIPTION OF LEASE: Navy Lease N4425598RPOOG t t provides for the installation, operation, and maintenance of two monitoring wells, one each on two plots ofland, one on the north end and one on the south end of Naval Ammunition Depot Marine Park, Bremerton, Washington. Copy to: ENGFLDACT NW (Muniments) DFAS Oakland ENGFLDACT NW (05ER.KH) ENGFLDACT NW (Lease File) DF AS San Diego (AIBAB-EFD) ENGFLDACT NW (0330MT) ENGFLDACT NW (Contract Admin File) SOUTHWESTDIV (05BP) SOUTHWESTDIV (OICA.JR) 7. NAME, POSITION, AND TITLE SIGNATURE ~ DATE MICHAEL D. BRADY U')1, "ft..,* 0 Director, Real Estate By direction of the Commander, WR 2 9 2002 Real Estate Contracting Officer Naval Facilities Engineering Command Acting under direction of the Secretarv of the Navy 8. NAVY ACCOUNTING DATA: PA YMENT TO BE MADE BY: AMOUNT Defense Finance and Accounting Service, Oakland via DFAS (Code AIBAB-EFD), P.O. $100.00 Box 429100, San Diego, CA 92142. ACCOUNTING CLASSIFICATION TO BE CHARGED (DISBURSEMENT) A. B. APPROPRIA- C. SUB- D.OBJ. E.BU- F. G. H. 1. J. K. ACRN TION HEAD CLASS CONTROL SA AAA TT PAA COST CODE AMOUNT AI:' I 702021804 KU2E 0252 6871 J P 068732 2D AEOOP5 AE8RPOOGIIER $100.00 Per Annwn DUPLICATE ORiGINAL AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT !. CONTRACT ID COOE 2. AMENDMENT /....OOIFICA TION NO. Three (3) 6. ISSUED BY 3. EFFECTIVE DA TE 1 Dee 00 CODE 05LR 4. REOUISITlON/PURCHASE REO. NO. 7. ADMINISTERED BY (If other Ihan Ilem 6) Commanding Officer Engineering Field Activity, Northwest Naval Facilities Engineering command 19917 7th Avenue NE Poulsbo, WA 98370-7570 8. NAME AND ADDRESS OF CONTRACTOR IIA. AMENDMENT OF SOLICIT A TlON NO. 'ode) T DER City of Bremerton c/o Parks and Recreation Department 680 Lebo Boulevard Bremerton, WA 98310-3308 NO. X N4425S98RPOOGll 109.0'" TED t EE ) CODE FACILITY CODE As of 1 Jun 98 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS o The above ~umbered eollcitatlon Ie amended a. let forth in Item 14. The hour and dale lpeclfied for receipt of Offe,. D il extended, 0 II not ex. tended. Oftllrl mUll acknowledge receipt 0' !hie amendment prior to the hOUI and date epecifled In the eollcitation or ae amended, by one of the following melhods: (a) By complellnlt Iteme 8 and 1 S. and returning _ coplel of the amendment; (bl By acknowledging receipt of thla amelldment on each copy 01 the ofter submitted; Of (c) By .eparate letter or telegram which includel a reference to the .01lcitaUon and amendment numbe,.. FAILURE OF YOUR ACKNOWLEDGE. MENT TO BE RECBVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. "by virtue 0' thle amendment you dellre to change an offer already eubmilled, euch change may be made by telegram or letler, provided .ach teleg~am or lelter makel ret.rence to lhe lollcllatlon and !hIe amendment, and Ie received prior to the opening hour and date specified. 12. ACCOUNTfNG AND APPROPRI... TlON DA T... fJI requtrttl) 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT~/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITl:M 14. (~ A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Sp<</fy auzhorlry) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON. ---'-'- TRACT ORDER NO. IN 1TEt.A lOA. . X B. THE ABOVE NUMBERED CONTRACT/ORDER 18 MODIFIED TO REFLECT THE ADM'NISTRATIVE CHANGES (Jum as mOll,eJ //1 Pay/Ill office, apP1'OpriDtWn dtlte, etc.) SET FORTH IN ITEM 14. PURSUANT TO THE AUTHORITY OF FAR 43.103(b). C. THIS SUPPLEMENT AL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITV OF: D. OTHER (SP<<ifI rype of modjfiCGtioll and aullrDrlry) E. IMPORTANT: Contractor [!] Is not. D Is required to sign this document and return. copies to the Issuing office. 14. DESCRIPTION OF AMENDMENT /WODIFICA flON (Or,an/uti by UCF seaioll htodilllJ, lru:llldtlll sollclraliOlllcolllf'lta sllbject marrer where feasible.) Modification Three (3) is issued to include DUNS Number 556846970 and CAGB Code 04DN7 and to change the address of the Payee as follows: From: City of Bremerton c/o Parks and Recreation Department 680 Lebo Boulevard Bremerton, WA 98310-3308 To: City of Bremerton 239 Fourth Street Bremerton, WA 98337 Except .. provided "-rein, .11 terms and concltlons 0' In. documenl relerencec:l in Ilem 9,1, or lOA. at heretofore changed. rllmains unchanged .ndin full 'Ol'Cll and e"eel. 15,1,. NAME AND TITLE OF SIGNER (l'ype or prilll) 16A. NAME AND TITLE OF CONTRACTING OFFICER (l'ype or prilll) MICHAEL D. BRADY Real Estate Contr~cting Officer 159. CONTRACTOR/OFFEROR 15C. OA TE SIGNED 168. UNIT 0 $T AT OF AMERIC 16C. 0'" TE SIGNED BY [(' 0 5 2000 STANDARD FORM 30 (Rev. 10-83) Preaci'fbed by GSA FAR (48 CFR) 53.243 (Si,nature of pemln aulhoriud ro sl,lI) NSN 7140-01-152-'070 PREVIOUS EDITION UNUSABLE 30-105-02 DUPLICATE ORIGINAL INSTRUCTIONS Instructions for items other than those that are self-explanatory, are as follows: (a) Item 1 (Contract 10 Code). Insert the contract type identification code that appears in the title block of the contract being modified. (b) Item 3 (Effective date). (1) For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change. (2) For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties. (3) For a modification issued as an initial or confirm- ing notice of termination for the convenience of the Government, the effective date and the modi- fication number of the confirming notice shall be the same as the effective date and modification number of the initial notice. (4) For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default. (5) For a modification confirming the contracting officer's determination of the amount due in settlement of a oontract termination, the effec- tive date shall be the same as the effective date of the initial decision. (c) Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block. (d) Item 8 (Name and Address of Contractor). For modi- fications to a contract or order, enter the contractor's name, address, and code as shown in the original con- tract or order, unless ohanged by this or a previous modification. (e) Items 9, (Amendment of Solicitation No. -- Dated), and 10. (Modification of Contract/Order No.-- Dated). Check the appropriate box and in the corres- ponding blanks insert the number and date of the original solicitation, contract, or order. (f) Item 12 (Accounting and Appropriation Data). When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries: ( 1) Accounting clas~ification Net increase $... ..................... ..... (2) Accounting classification Net decrease $ ............................ NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12. insert an asterisk and the words "See continuation sheet". (g) Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.) (h) Item 14 (Description of Amendment/Modification). (1) Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) , section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth In this document. (2) Indicate the impact of the modification on the overall total contract price by inserting one of the following entries: (i) Total contract price increased by' $ (ii) Total contract price decreased by $ (ill) Total contract price unohanged. (3) State reason for modification. (4) When removing, reinstating, or adding funds, identify the contract Items and accounting classi- fications. (5) When the SF30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the con- venience of the Government, the entry in Item 14 of the modification may be limited to -- (i) A reference to the letter determination; and (ii) A statement of the net amount determined to be due in settlement of the contract. (6) Include subject matter or short. title of solicita- tion/contract where feasible. (I) Item 16B. The contracting offioer's signature is not required on solioitation amendments. The contracting officer's signature is normally affixed last on supple- mental agreements. STANDARD FORM 30 BACK (Rell. 10-83) 19M - 242-450/90156 .AMENbMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT 10 CODE 2. AMENDMENT IMODIFICA TlON NO. One (1) 6. ISSUED BY 3. EFFECTIVE Oil. TE 1 Feb 2000 CODe OSLR 4. REOUISITION/PURCHASE REO. NO. 7. ADMINISTERED BY (lJotherthatl /ttm 6) Commanding Officer Engineering Field Activity, Northwest Naval Facilities Engineering Command 19917 7th Avenue NE poulsbo, WA 98370-7570 8. NAME AND ADDRESS OF CONTRACTOR 0., strut. county. Stat~ and ZIP 'od~) 'i) 9A. AMENDMENT OF SOLICIT A TION NO. City of Bremerton c/o Parks and Recreation Department 680 Lebo Avenue Bremerton, WA 98310-3308 9B. Oil. TED (SEE mM iI) X N4425598RPOOGll lOB. Oil.. TED (SEE M H) CODe FACILITY CODE As of 1 Jun 98 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS o Ttle above numbered aoUcltation i. amended aa Bet forth in Item 14. The hour and date specified for receipt of Offer. 0 Is extended, 0 ill not ex. tended. Offers must acknowledge receipt of this amendment prior to the hour and date specified In tile aolleit.tion or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returnlng_ copiea of tile amendment: (b) By acknowledging receipt of this amendment on each copy of the otter submitted; or (c) By .apatate letter or telegram which includes a relerenca to tile solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGE. MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. II by virtue of this amendment you desire to change an otter already submitted, such change may be made by telegram or leller, provided each telegram or letter make. reference to the solicitation and this amendment. and 18 received prior to the opening hour and date 8peclfied. 12. ACCOUNTING A NO APPROPRIA nON Oil. T A <<f nquir<</) 13. THIS ITEM APPLIES ONLY TO MODIFICjTIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER N"O. AS DESCRIBED IN ITEM 14. M A. 'THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Sp~cifJ Qushoriry) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON. ~ TRACT ORGER NO. IN ITEM tOA. X Public Law 104-134 B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as cJwng~s i/l payillg offlc~. appropriarioll dat~. ~fC.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). C. THIS SUPPLEMENT AL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: O. OTHER (Sptcify lyp~ of modlficatioll alld alllhority) E. IMPORTANT: Contractor 0 Is not. [!J Is required to Bign this document and return 3 copies to the issuing office. 14. DESCRIPTION OF AMENDMENT/MODIFICATION (OrganiZN by UCF ua/on h~ad/ngs, Including sollcitation/colllract subjtd IIItllttr whu~ f~tU/blt.) Navy Lease Contract N4425598RPOOG11 is hereby amended to add the following clauses, which are attached hereto and made a part hereof: a. FAR 52.232-33 - Payment by Electronic Funds Transfer - Central Contractor Registration (May 1999) b. DFAR 252.204-7004 - Required Central Contractor Registration (March 1998) 15C. DA TE SIGNED Officer 16C. Oil. TE SIGNED BY NOV ? q 2000 (Signature of persall Quthori~N 10 sign) NSN 7540-01-152-1070 PREVIOUS EDITION UNUSABLE 3o-rMUCATE ORIGINAL STANDARD FORM 30 (Rev. 10-83) Pr88crlbed b.Y GSA FAR (48 CFR) 53.243 INSTRUCTIONS " Instructions for items other than those that are self-explanatory, are as follows: (a) Item 1 (Contract 10 Code). Insert the contract type identification code that appears in the title block of the contract being modified. (b) Item 3 (EHective date). (1) For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change. (2) For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties. (3) For a modification issued as an initial or confirm- ing notice of termination for the convenience of the Government, the effective date and the modi- fication number of the confirming notice shall be the same as the effective date and modification number of the initial notice. (4) For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default. (5) For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effec- tive date shall be the same as the effective date of the initial decision. (c) Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block. (d) Item 8 (Name and Address of Contractor). For modi- fications to a contract or order, enter the contractor's name, address, and code as shown in the original con- tract or order, unless changed by thIs or a previous modification. (e) Items 9, (Amendment of Solicitation No. -- Dated), and 10, (Modification of Contract/Order No.-- Dated). Check the appropriate box and in the corres- ponding blanks insert the number and date of the original solicitation, contract, or order. (f) Item 12 (Accounting and Appropriation Data). When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries: (1) Accounting classification Net increase $ ............................. (2) Accounting classification Net decrease $ ............... ............. NOTE: If there are changes to multiple accounting classifications that cannot be placed in blOCk 12, insert an asterisk and the words "See continuation sheet" . (g) Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.) (h) Item 14 (Description of Amendment/Modification). (1) Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however. shall not be set forth in this document. (2) Indicate the impact of the modification on the overall total contract price by inserting one of the following entries: lf (i) Total contract price increased by $ (Ii) Total contract price decreased by $ (ill) Total contract price unchanged. (3) State reason for modification. (4) When removing, reinstating. or adding funds, identify the contract items and accounting classi- fications. (5) When the SF30 is used to reflect a determination by the contracting Officer of the amount due in settlement. of a contract terminated for the con- venience of the Government, the entry in Item 14 of the modification may be limited to -- (I) A reference to the letter determination; and (ii) A statement of the net amount determined to be due in settlement of the contract. (6) Include subject matter or short title of solicita- tion/contract where feasible. (i) Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supple- mental agreements, '! t . ".. .., .. STANDARD FORM 30 BACK (Rev. 10-83) 1988 - 242-450/90156 FAR 52.232-33 - Payment by Electronic Funds Transfer - Central Contractor Registration (May 1999) (a) Method of payment. (I) All payments by the Government under this contract shall be made by electronic funds transfer (EFT). except as provided in paragraph (a)(2) of this clause. As used in this ' clause, the term "EFT" refers to the funds transfer and may also include the payment information transfer. (2) In the event the Government is unable to release one or more payments by EFT, the Lessor agrees to either- (i) Accept payment by check or some other mutually agreeable method of payment; or (ii) Request the Government to extend the payment due date until such time as the Government can make payment by EFT (but see paragraph (d) of this clause). (b) Lessor's EFT information. The Government shall make payment to the Lessor using the EFT information contained in the Central Contractor Registration (CCR) database. In the event that the EFT information changes, the Lessor ~all be responsible for providing the updated information to the CCR database. (c) Mechanisms for EFT payment. The Government may make payment by EFT through either the Automated Clearing House (ACH) network, subject to the rules of the National Automated Clearing House Association, or the Fedwire Transfer System. The rules governing Federal payments through the ACH are contained in 31 CFR part 210. (d) Suspension of payment. If the Lessor's EFT information in the CCR database is incorrect, then the Government need not make payment to the Lessor under this contract until correct EFT information is entered into the CCR database; and any invoice or contract financing request shall be deemed not to be a proper invoice for the purpose of prompt payment under this contract. The prompt payment terms of the contract regarding notice of an improper invoice and delays in accrual of interest penalties apply. (e) Lessor EFT arrangements. If the Lessor has identified multiple payment receiving points (i.e., more than one remittance address and/or EFT information set) in the CCR database, and the Lessor has not notified the Government of the payment receiving point applicable to this contract, the Government shall make payment to the first payment receiving point (EFT information set or remittance address as applicable) listed in the CCR database. (f) Liability for uncompleted or erroneous transfers. (1) If an uncompleted or erroneous transfer occurs because the Govermnent used the Lessor's EFT information incorrectly, the Government remains responsible for- (i) Making a correct payment; (ii) Paying any prompt payment penalty due; and (Hi) Recovering any erroneously directed funds. (2) If an uncompleted or erroneous transfer occurs because the Lessor's EFT information was incorrect, or was revised within 30 days of Government release of the EFT payment transaction instruction to the Federal Reserve System, and- (i) If the funds are no longer under the control of the payment office, the Government is deemed to have made payment and the Lessor is responsible for recovery of any erroneously directed funds; or (ii) If the funds remain under the control of the payment office, the Government shall not make payment, and the provisions of paragraph (d) of this clause shall apply. (g) EFT and prompt payment. A payment shan be deemed to have been made in a timely manner in accordance with the prompt payment terms of this contract if, in the EFT payment transaction instruction released to the Federal Reserve System, the date specified for settlement of the payment is on or before the prompt payment due date, provided the specified payment date is a valid date under the rules of the Federal Reserve System. (h) EFT and assignment of claims. If the Lessor assigns the proceeds of this contract as provided for in the assignment of claims terms of this contract, the Lessor shall require as a cond.ition of any such assignment, that the assignee shall register in the CCR database and shall be paid by EFT in accordance with the tenns of this clause. In all respects, the requirements of this clause shall apply to the assignee as if it were the Lessor. EFT information that shows the ultimate recipient of the transfer to be other than the Lessor, in the absence of a proper assignment of claims acceptable to the Government, is incorrect EFT information within the meaning of paragraph (d) of this clause. (i) Liability for change of EFT information by financial agent. The Government is not liable for errors resulting from changes to EFT information made by the Lessor's financial agent. 0) Payment information. The payment or disbursing office shall forward to the Lessor available payment information that is suitable for transmission as of the date of release of the EFT instruction to the Federal Reserve System. The Government may request the Lessor to designate a desired format and methodes) for delivery of payment information from a list of formats and methods the payment office is capable of executing. However, the Government does 2 not guarantee that any particular format or method of delivery is available at any particular payment office and retains the latitude to use the format and delivery method most convenient to the Government. If the Government makes payment by check in accordance with paragraph (a) of this clause, the Government shall mail the payment information to the remittance address contained in the CCR database. :- 3 DF AR 252.204-7004 - Required Central Contractor Registration (Mar 1998) (a) Definitions. As used in this clause- (1) "Central Contractor Registration (CCR) database" means the primary 000 repository for contractor information required for the conduct of business with DOD. (2) "Data Universal Number System (DUNS) number" means the 9-digit number assigned by Dun and Bradstreet Information Services to identify unique business entities. (3) "Data Universal Numbering System +4 (DUNS+4) number" means the DUNS number assigned by Dun and Bradstreet plus a 4-digit suffix that may be assigned by a parent (controlling) business concern. This 4-digit suffix may be assigned at the discretion of the parent business concern for such purposes as identifying subunits or affiliates of the parent business concern. (4) "Registered in the CCR database" means that all mandatory information, including the DUNS number or the DUNS+4 number, if applicable, and the corresponding Commercial and Government Entity (CAGE) code, is in the CCR database; the DUNS number and the CAGE code have been validated; and all edits have been successfully completed. (b) .', (1) The lessor acknowledges the requirement of registration in the CCR database prior to award, during performance, and through final payment of any contract. (2) The lessor shall provide its DUNS or, if applicable, its DUNS+4 number, which will be used by the Contracting Officer to verify that the lessor is registered in the CCR database. (3) Lack of registration in the CCR database will make a lessor ineligible for award. (4) DOD has established a goal of registering an applicant in the CCR database within 48 hours after receipt of a complete and accurate application via the Internet. However, registration of an applicant submitting an application through a method other than the Internet may take up to 30 days. Therefore, lessors that are not registered should consider applying for registration immediately. (c) The Lessor is responsible for the accuracy and completeness of the data within the CCR, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Lessor is required to confirm on an annual basis that its information in the CCR database is accurate and complete. (d) Lessors may obtain information on registration and annual confirmation requirements by calling 1-888-227-2423, or via the Internet at http://ccr.edLdisa.mil. / NOTICE OF RENEWAL OF GOVERNMENT LEASE l. FROM: 2. CONTRACT NO. Commanding Officer (Code 05LR.LM) N4425598RPOOGII Engineering Field Activity, Northwest 19917 7th Avenue NE Pou~bo, WA 98370-7570 , 3. TO: City ofBremerton c/o Parks and Recreation Department 680 Lebo Boulevard Bremerton, W A 98310-3308 4. You are hereby notified that under the provisions of the Government lease described below, the United States of America elects to renew the said lease as the same may have been amended, and does hereby renew, extend, and adopt the said lease and all the terms, conditions, and general provisions thereof for the period beginning I June 2000 and ending 31 May 200 I. 5. REQUIRING ACTIVITY: Commanding Officer, Engineering Field Activity, Northwest, Naval Facilities Engineering Command, 19917 7th A venue NE, Poulsbo, W A 98370-7570. 6. DESCRIPTION OF LEASE: Navy Lease N4425598RPOOG II provides for the installation, operation, and maintenance of two monitoring wells, one each on two plots of land, one on the north end and one on the south end of Naval Ammunition Depot Marine Park, Bremerton, Washington. Copy to: ENGFLDACT NW (Muniments) DFAS Op Loc Oakland (FPV) ENGFLDACT NW (05ER) ENGFLDACT NW (Lease File) DF AS Op Loc San Diego ENGFLDACT NW (0330MT) ENGFLDACT NW (Contract Admin File) (FPVBB-EFD) SOUTHWESTDIV (0131) SOUTHWESTDIV (04MG.NO) 7. NAME, POSITION, AND TlTI..E SIGNATURE DATE MICHAEL D. BRADY l-f'tL.J AA 1'/ . &, a, Director, Real Estate By direction of the Commander, Real Estate Contracting Officer Naval Facilities Engineering Command APR ,) ~ 200e Acting under direction of the Secretary of the Navy 8. NAVY ACCOUNTING DATA: PAYMENT TO BE MADE BY: AMOUNT Defense Finance and Accounting Service, Operating Location Oakland (Code FPV), P.O. $100.00 Box 23870, Oakland, CA 94623.3870 (via DFAS Op Loc San Diego (Code FPVBB-EFD)). ACCOUN IlNG CLASSIFICA nON TO BE CHARGED (DISBURSEMENT) A, B. APPRQPRJA- C.SUB- 0.OB1. E.BU- F. G. H. l. J. K. ACRN TION HEAD CLASS CONTROL SA AAA TT PAA COST CODE AMOUNT AC 17??oo1804 KU1E 0232 44233 P 061711 2D ACOOP3 AClRPO 11 C03 l $100.00 Pcr AAnwn DUPLICATE ORIGINAL TAHDA 0 FORM 2-8 =::..-:- U.S. Government DATE NO. ::..:.':.... Lease for Real Property (Short Form) AS OF 01 JUNE 98 N4425598RPOOG11 This LESSOR leaslS to the UNITeD STATES OF AMERICA, hereinafter called the GOVERNMENT, the described premises on the terms stated herein, Includin the conditfons attached hereto. 1. LOCATION OF LEASED PREMISES NAD MARINE PAR BREMERTON. WASHINGTON 2. DESCRIPTION OF LEASED PREMISES TWO PLOTS OF LAND, ONE ON THE NORTH END AND ONE ON THE SOUTH END OF THE PARK. PLOTS MEASURE APPROXIMATELY 36 SQUARE FEET EACH AND WILL BE usee FOR THE INSTALLATION, OPERATION, AND MAINTENANCE OF ONE MONITORING WELL AT EACH LOCATION. MONITORING vveLl.S WILL BE "FLUSH MOUNT. TYPE. LOCATION OF THE PLOTS ON THE ATTACHED EXHIBIT 'AN W11LL BE DETERMINED AT SITE VISIT BElWEEN NAVY CONTRACT DRILLER AND CITY OF BREMERTON OFFICIAL. 3. TeRM. To have and to hold: For the term beginnIng 1 JUNE 1998 through 30 MAY 1999 From year to ye8r.thereafter; bUt not beyond 30 MAY 2003 this lease MAY BE RENEWED BY THE GOVERNMENT BY GIVING AT LEAST 30 DAYS NOTICE IN WRITING TO THE LESSOR BEFORE THE LEASE WOULD OTHERWISE EXPIRE, SAID NOTICE TO BE COMPUTED COMMENCING WITH THE CAY AFTER THE DATE OF MAILING. 4. TERMINATION. The Government m8Y terminate this lease at 8ny time by giving at least 30 days notice to the Le..or. Said notice shall be cem uted cemmencin with the da alter the datil of melll . 5. RENTAL. The Government shall pay the Lessor annual rent of $100.00 at the rete of $100.00 In arrears. Rent for a lesser period shall be prorated. Rent checks shall be made payable to: AIR CONOmONING ELeVATOR SERVICE W1NDOWWASHIMQ (all.n.dy) JANrrOR SERVIC! AHD SUPPLIES (11) INrrlALI..A/dPS. TU8ES, BAllASTS AHD REPLACEMENTS (12) MeCHANICAl. VENTILATION ------ GENERAL CLAUSES (GSA FORM 3517A) and REPRESENTATIONS AND CERTIFICATIONS (GSA FORM 3518A) ARE ATTACHED HERETO AND MADE A PART HEREOF. NAME AND ADDRESS OF USING ACTIVITY ENGINEERING FIELD ACTIVITY, NORTHWEST 19917 'PH AVE NUE N.E. POULSBO WA 98370-7570 PAYING OFFICE DFAS OP LQC OAKLAND (Code Fpv) P.O.BOX23870 OAKLAND, CA 94823-3870 vIa: DFAS OP LOC SANDIEGO (Code FPVBS-EFO) P.O. BOX 429100 SAN DIEGO CA 92142-9100 LESSOR CITY OF BREMERTON c/o PARKS AND RECREATION DEPARTMENT 880 l..EIO AVE B I!R r o c: Director, Real Estate Division Real Batate Contracting Officer m~ BY MOt A. AON AA J. COlT coos AA8RPGIIC031 AMOUNT S100.00 CUPUCATE ORIGINAL GENERAL CLAUSES (Simplified Leases) (Acquisition of Leasehold Interests in Real Property for Leases Up to $100,000 Annual Rent) 1. The Government reserves the right, at any time after the lease is signed and during the term of the lease, to inspect the leased premises and all other areas of the building to which access is necessary to ensure a safe and healthy work environment for the Government tenants and the Lessor's performance under this lease. 2. If the building is partially or totally destroyed or damaged by fire or other casualty so that the leased space is untenantable as determined by the Government, the Government may terminate the lease . upon 15 calendar days written notice to the Lessor and no further rental will be due. 3. The Lessor shall maintain the demised premises, including the building, building systems, and all equipment, fixtures, and appurtenances furnished by the Lessor under this lease, in good repair and tenantable condition. Upon request of the Contracting Officer, the Lessor shall provide written documentation that building systems have been maintained, tested, and are operational. 4. In the event the Lessor fails to perform any service, to provide any item, or meet any requirement of this lease, the Government may perform the service, provide the item, or meet the requirement, either directly or through a contract The Government may deduct any costs incurred for the service or item, including administrative costs, from the rental payments. 5. 52.252-2 CLAUSES INCORPORATED BY REFERENCE (VARIATION) (JUN 1988) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available or the full text may be found on the Internet at http://www.gsa.gov/pbs/pe/standcfa/standcfa.htm. 6. The following clauses are incorporated by reference: GSAR 552-203-5 C;;SAR 552-203-73 FAR 52.209-6 FAR 52.219-9 FAR 52.219-16 FAR 52.222-24 FAR 52.222-26 FAR 52.222-35 FAR 52.222-36 INITIALS: ..:t:I }./ LESSOR COVENANT AGAINST CONTINGENT FEES (FEB 1990) PRICE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (SEP 1990) (Applicable to leases over $100,000.) PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED. OR PROPOSED FOR DEBARMENT (AUG 1995) (Applicable to leases over $25,000.) SMALL, SMALL DISADVANTAGED AND WOMEN-OWNED SMALL BUSINESS SUBCONTRACTING PLAN (AUG 1996) (Applicable to leases over $500,000.) LIQUIDATED DAMAGES - SMALL BUSINESS SUBCONTRACTING PLAN (OCT 1995) (Applicable to leases over $500,000.) PREAWARD EQUAL OPPORTUNITY COMPLIANCE REVIEW (APR 1984) (Applicable to leases over $1 million.) EQUAL OPPORTUNITY (APR 1984) (Applicable to leases over $10,000.) AFFIRMATIVE ACTION FOR SPECIAL DISABLED AND VIETNAM ERA VETERANS (APR 1984). (AppHcable to leases over $10,000.) AFFIRMATIVE ACTION FOR HANDICAPPED WORKERS (APR 1984) (Applicable to leases over $2,500.) & ~ ~ GSA FORM 3517A PAGE 1 (REV 1/97) FAR 52.222-37 FAR 52.232-23 GSAR 552.232-71 F AC 90-33 EMPLOYMENT REPORTS ON SPECIAL DISABLED VETERANS AND VETERANS OF THE VIETNAM ERA (JAN 1988) (Applicable to leases over $10,000.) ASSIGNMENT OF CLAIMS (JAN 1986) PROMPT PAYMENT (APR 1989) NAVY CONTRACT DISPUTES (MAY 1996) FAR 52.215-22 THE FOLLOWING APPL Y WHEN COST OR PRICING DA TA IS SUBMITTED: FAR 52.215-24 PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA (JAN 1991) (Applicable when cost or pricing data Is required for work or services exceeding $500,000.) SUBCONTRACTOR COST OR PRICING DATA (OCT 1995) (Applicable when the clause 52.215-22 is applicable.) The information collection requirements contained in this sollcJtation/contract, that are not required by regulation, have been approved by the Office of Management and Budget pursuant to the Paperwork Reduction Act and assigned the OMB Control No. 3090-0163. INITIALS: ~]-I LESSOR & IL GOVERNMENT GSA FORM 3517A PAGE 2 (REV 1197) REPRESENTATIONS AND CERTIFICATIONS (Short Form) (Simplified Acguisition of Leasehold Interests in Real Property for leases Up to :ji1 00,000 Annual Rent) Solicitation Number Dated Complete appropriate boxes, sign the form, and attach to offer. The Offeror makes the fO/lowing Representations and Certifications. NO TE: The "Offeror," as used on this form, fs the owner of the property offered, not an individual or agent representfng the owner. 1. SMALL BUSINESS REPRESENTATION (JAN 1997) (a) It [ ] Is, M Is not a small business, .Small" means a concern, including Its affiliates, that Is Independently owned and operatelfs not dominant in the field of operation, and has average annual gross revenues of $15 million or less for the preceding three fiscal years. . (b) It [ J Is, W'is not a small disadvantaged business. (See 48 CFR 52.219-1 for definitions.) (c) It [ ] is, >4 is not a women-owned small business. (See 48 CFR 52.219-1 for definitions,) 2. 52.222-22 - PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (APR 1984) (Applicable to leases which exceed $10,000.) The Offeror represents that -- (a) It r ] hasl M has not participated in a previous contract or subcontract subject either to the Equal Opportunity clause of thfs sollctt~n, the clause originally contained in Section 310 of Executive Order No. 10925, or the clause contained in SectJon 201 of executive Order No. 11114; . (b) It r ] has, ~ has not filed all required compliance reports; and (c) Representations indicating submission of required compliance report~1 signed b~ QrClposed subcontractors, will be obfained before subcontract awards. (Approved by OM B under Control Number 1215-0072.) 3. 52.222-25 - AFFIRMATIVE ACTION COMPLIANCE (APR 1984) (Applicable to leases whIch exceed $10,000,) (Applicable to contracts whIch include the clause at FAR 52.222-26, Equal Opportunity.) The Offeror represents that -- (a) It I ] has developed and has on file, ( ] has not developed and does not have on f1le,L at each establishment affirmative adion programs required by the rules and regulations.o the Secretary of Labor (41 CrR 60-1 and 60-2), or (b) It ( I has not preViOUSly had contracts subject to the written affirmative actIon programs requirement of the rules and regulations of the Secretary of Labor. (Approved by OMS under Control Number 12f5-0072.) 4. 52.222-21 - CERTIFICATION OF NONSEGREGATED FACILITIES (APR 1984) (Applicable to leases which exceed $10,000.) (a) "Segregated facilities," as used in this provision, means any waiting rooms, work areas, rest rooms and wash rooms, restaurants and other eatIng areas, time clocks locker rooms and otlier stora.;e or dressing areas, parking lata, drinking fountains, recreation or entertainment areas, \ransportatlonL and housing ficilltles proVloed for employees, that are segregated by explicit directive or are In fact segregated on tne basis of race, color, religIon, or national origin because of Iiablt. local custom, or otherwise. . (b) By the submission of this offer, the Offeror certifies that it does not and will not maintain or provide for ita employees any segregated facilities at any of its establishments, and that it does not and will not permit lfs employees toperlbrm their services at any. location under its COntrol where segre:gated facilities are maintained. The Offeror agrees that 8 breach of this certification is a violatIon of the Equal Opportunify clause In the contract. (c) The Offeror further agrees that (except where it has obtained identical certifications from proposed subcontractors for specific time periods) It will- (1) Obtain Identical certifications from ~roPQsed subcontractors before the award of subcontracts under which the subcontractor will be subject to the Equal Opportunity clause; (32) Retain the certifications in the flle8; and ( ) Forward the following notice to the proposed subcontractors (except if the proposed subcontractors have submitted identical cert~catlons for specific time periods). NOTICE TO PROSPECTIVE SUBCONTRACTORS OF REQUIREMENT FOR CERTIFICATIONS OF NONSEGREGATED FACILITIES. A Certification of Nons~regBted Facilities must be submItted before the award of a subcontract uncler which the subcontractor will be subject to the equal Opportunity clause. The certitlcation may be submitted either for each subcontract or for all subcontracfs during i period (I.e., quarterly, semiannually, or annually). INITIALS: c{3r/ LESSOR & AI GOVERNMENT GSA FORM 3518A PAGE 1 (REV 1/97) NOTE: The penal!)' for making false statements in offers is prescribed in 18 U.S.C. 1001. (Approved by OMS under Con1rol Number 1215-0072.) 5. 52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (APR 1991) (DEVIATION) (Applicable to leases which exceed $100,000.) (a) The definitions and prohibitions contained In the clause, at FAR 52.203-12, limitation on Payments to Influence Certain Federal Transactions, are hereby incorporated by reference in paragraph (b) of this certification. (b) The offero~ by signing its offer, hereby certifies to the best of his or her knowledge and belief that on or after December -,3, 1989, -- '. (1) No Federal 8p-proprlated funds have been paid or will be paid to any person for Influencing or attempting to influence an officer or employee of any agencYj a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress on h s or her behalf In connection with the awarding of a contract resultln~ from this sollcltallon. . (2) If any funds other than Federal arpropriated funds Oncludina profit or fee received under a covered Federal transaction} have been paid, or wll be J:!ald. to any person for influencing or attempting to Influence an officer or employee of any agency, a Member Of Congress, an officer or employee of Congress. or an employee of a Member of Congress on his or her behalf In connection with this solicitation, the offeror shall complete and submit, with its offer, OMS standard form LLL, Disclosure of Lobbying Activities, to the Contracting Officer; and (3) He or she will include the language of this certification in all subcontract awards at any tier ana require that all recipients of subcontract awar(ls in excess of $100,000 shall certify and dIsclose accordingly. (c) Submission o( this certification and disclosure is a prerequisite for making or entering Into this contract Imposed by section 13521 title 31, United States Code. My person who makes an expenditure prohfbited under thIs provision or who (ails to t1 e or amend the disclosure form to be filed or amended by this provision, shall be subject to a civil penalty of not less than $10.000, and not more than $100,000, for each such tallure. 6. 52.204-3 TAXPAYER iDENTIFICATION (SEP 1989) (VARIATION) (a) The Offeror is required to submit taxpayer identification information in order to ccmpl~ with reporting requirements of 26 U.S.C. 6041, 6041A, and 60S0M and Implementing regulations Issued by the Intemal Revenue Servlce (IRS). Failure or refusal by the Offeror to furnish the In(ormatlon may result in a 20 percent reduction of peyments otherwIse due under the contract. Taxpsy:er Information on the payee. It different from the offeror, is also required: hoWever, It may be provIded at the time o( award. (b) Offeror's Taxpayer Identification Number (TIN). )<1 TIN: 91 -('{)OIt2~ I. [1 TIN has been applied for. [1 TIN fs not required. (c) Corporate Status. }(CorporatJon; [] Not a corporate entity: [] Sole proprietorship [J Partnership (d) Common Parent. "Common parentI." as used in this solicitation provision, means that corporate entity thal owns or controls an affilfated group' of corpors-aons that Illes Its Federal income tax returns on a consolidated tiasis, and of which the Offeror Is a member. M Offeror is not owned or controlled by a common parent. ( l Name and TIN of common parent: Name TIN (e) Payee's Taxpayer identification Number. [ 1 TIN: . [] TIN has been applied for. [] TIN is not required. 7. OFFEROR'S DUNS NUMBER (AUO 1995) (enter number, If known): OFFEROR OR AUTHORIZED REPRESENTATIVE Telephone Number . 3"0 'f?V- 'SYI ?-IHf Date INJT1ALS:~ LESSOR & fu GOVERNMENT GSA FORM 351BA PAGE 2 (REV 1/97) - - - O'tSTfl I :BAV -I' " II ,; 'llij. i OSTRICH _ _ _ _ _ SA Y - - - - - -- - .f>#, ~_c;... ':r - ~. , ~ I I MADRON~ PT I J I .J- I I I I I I I I I J i " n _. _ _ .\S I AP j 1 ... -. UAKE (" <0 :,-- ~ ,,' " ~ ..J - u t . . . " .' ~ d :::.' i . ;:.. 'DIII.rll tl 15T ST. DATE SUBMITTED: June 4, 2008 BILL # 08 - /47 AGENDA BILL CITY OF BREMERTON CITY COUNCIL 56" ........................................................................................ SUBJECT: Award Contract for Construction of Southwest Bremerton Residential Sewer Extension Pump Station to Pivetta Brothers Construction Inc. Committee Meeting Date: June 11,2008 COUNCIL MEETING Date: June 16,2008 Department: PW&U, Engineering Presenter: Michael Mecham Phone: 473-5288 SUMMARY: Sealed bids for construction of the project titled "SW Bremerton Residential Sewer Extension Pump Station" were opened on June 3, 2008. The engineer's estimate for construction of the project is $1,100,000. Four bids were received for this project. Pivetta Brothers Construction Inc. was the lowest responsive, responsible bidder with a bid of$I,081,210.74 (including sales tax). ATTACHMENTS: 1. Council Summary; 2. Site and Vicinity Map; 3. Bid Tabulation FISCAL IMPACTS (Include Budgeted Amount): Construction of this project is funded by a revenue bond. The 2008 budget for this project, including construction of the force main, is $4,750,000. COMMITTEE CHAIR COUNCIL PRESIDENT: CONSENT AGENDA GENERAL BUSINESS D PUBLIC HEARING D APPROVALS: DEPARTMENT DIRECTOR: CITY ATTORNEY: FINANCE DIRECTOR: MAYOR: RECOMMENDED MOTION: Move to award a contract in the amount of$I,081,210.74 (including sales tax) with Pivetta Brothers Construction Inc. for construction of the project titled "SW Bremerton Residential Sewer Extension Pump Station" and authorize the Mayor to finalize and execute the necessary contract documents for construction. COUNCIL ACTION: D Approve D Deny D Table D Continue D No Action T:\ALL USERS\ WOODS\Agenda Bills\2008\Award Contract Construction SWBRSE PS\agendabillSWBremSewerPS.doc SW Bremerton Residential Sewer Extension Pump Station (SB-1) Council Summary Contract Summary This project will construct a sewer pump station to intercept waste water flow from developments in SW Bremerton and convey them to the WWTP. Pivetta Brothers Construction Inc. was the low bidder in the amount of $1,081,210.74 (including sales tax). There were 3 other bidders. The construction will be completed within 180 days of Notice to Proceed. The estimated completion date is February 2009. This project is included in the current CIP. Fiscal Summary The project is funded by a revenue bond. The Engineer's Estimate for construction is $1,100,000. The 2008 budget is $4,750,000, which includes budget for the force main which will be constructed separately. City ofBrt!m/!/'lon SlY Bremer/on Sel1'er Pump S'/a/lOn .fune ]()()8 CITY OF BREMERTON BID TABULATION BID TITLE: SW Bremerton Res. Sewer Ext. Pump Station OPENED BY: Carol Etgen DATE OPENED: June 3, 2008 TIME OPENED: 1:05 PM RECORDED BY: Brad Ginn NAME OF BIDDER BOND ITEM 1 ITEM 2 ITEM 3 ITEM 4 ITEM 5 ITEM 6 SALES TOTAL TAX ~_1 f\.lt..Hc.-r ~"""-7t y' , -, i", I7&;,' (, vyr 3 (')- j' (; j 1 ''':'''1 ' - ' ' " j -;--~,-- --- @~i::'.;"'i (<. "_,' \ III. <- Y II cS'i: '-6 7 ~:u I (V Pi 'Ie:. H-c, Dt-'L:l ~ I oJ-I 2.. 10, +'1' I L.t\\I t c. \ L St.'- 1<. (~j,-, ~-+ V- I, J 1../0 ;,-c.;,,' >1 I SUMMARY TOTAL BID COMMENTS I-APPARENT LOW BIDDER ENGINEER ESTIMATE (INC SALES TAX) $ i.~:;f-'I y-r ,::.f "I''-"r Cc..,t.,.'r /, C' '-I i", ~ 1')-, j c, g /, I" :it (; O(.l, ("IL" SECOND lOW BIDDER F' ' ~-) !-t.J S. " v" fiLl I (;.i ;r I , 2 /f..:). l 'I THIRD lOW BIDDER E <=' i ~-.Jt' y I ~Il..- II () S';;' I 'N l /'() , DATE SUBMITTED: June 4, 2008 BILL# OB - 14 B AGENDA BILL CITY OF BREMERTON CITY COUNCIL 'A ........................................................................................ SUBJECT: Contract Award for Construction of Harlow Drive Pedestrian Improvements to Serpanok Construction. Committee Meeting Date: June 11,2008 COUNCIL MEETING Date: June 16, 2008 Department: Engineering Presenter: Michael Mecham Phone: 473-5288 SUMMARY: Sealed bids for construction of the project titled "Harlow Drive Pedestrian Improvements" were opened on June 3,2008. The engineer's estimate for this project is $188,266.40. Two bids were received for this project. Serpanok Construction was the lowest responsive, responsible bidder with a bid of $ 163,435.30 (including sales tax). ' ATTACHMENTS: 1) Council Summary; 2) Aerial Photos; and 3) Bid Tabulation. FISCAL IMPACTS (Include Budgeted Amount): Construction of this project is funded by FHW A. This project is included in the CIP and 2008 budget. The 2008 budget for this project is $290,000. APPROVALS: ~' DEPARTMENT DIRECTOR: . CITY ATTORNEY: FINANCE DIRECTOR: MAYOR: COMMITTEE CHAIR COUNCIL PRESIDENT: CONSENT AGENDA D GENERAL BUSINESS Q( PUBLIC HEARING D RECOMMENDED MOTION: Move to award a contract in the amount of$ 163,435.30 (including sales tax) with Serpanok Construction for construction of the project titled "Harlow Drive Pedestrian Improvements" and authorize the Mayor to finalize and execute the necessary documents for construction. COUNCIL ACTION: D Approve D Deny D Table D Continue D No Action T:\ALL USERS\WOODS\Agenda Bills\2008\Award Contract Construction Harlow Dr Ped Irnprvrnnts\agendabillJorm.doc COUNCIL SUMMARY Harlow Drive Pedestrian Improvements Contract Summary This contract provides for the improvement of Harlow Drive between East Lake Drive and Osprey Circle with the construction of a 4-foot wide asphalt concrete shoulder between East Lake Drive and Lyle A venue, the construction of a monolithic cement concrete sidewalk and curb between Lyle A venue and Osprey Circle, and other work, all in accordance with the Contract Plans, the Special Provisions, and the Standard Specifications. This project, also, consists of removing existing street paving, concrete sidewalk, curb, and gutter, installing permanent signing, and channelization, hydroseeding, and providing traffic control and other work. Fiscal Summary The engineer's estimate for this project is $188,266.40 and the 2008 budget for this project is $290,000. Harlow Drive Pedestrian Improvements Council Summary June 2008 BID TABULATION Harlow Drive Pedestrian Improvements: Osprey Circle to East Lake Drive ENGINEER'S ESTIMATE Serpanok Construction Northern Con-AQQ ITEM NO. DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST TOTAL COST PREPARATION 1 MOBILlZA nON L.S. 1 $20,000.00 $20,000.00 $39,000.00 $39,000.00 $13,200.00 $13,200.00 2 CLEARING AND GRUBBING AC. 0.4 $12,000.00 $4,800.00 $3,500.00 $1,400.00 $7,500.00 $3,000.00 3 REMOVAL OF STRUCTURES AND OBSTRUCTION L.S. 1 $3,000.00 $3,000.00 $5,000.00 $5,000.00 $3,000.00 $3,000.00 4 SAWCUT L.F. 2400 $3.50 $8,400.00 $1.00 $2,400.00 $2.75 $6,600.00 5 REMOVING CEMENT CONC. SIDEWALK S.Y. 22 $37.00 $814.00 $10.00 $220.00 $15.00 $330.00 6 REMOVING CEMENT CONC. CURB AND GUTTER L.F. 40 $20.00 $800.00 $15.00 $600.00 $10.00 $400.00 7 REMOVING ASPHALT CONC. PAVEMENT S.Y. 574 $10.00 $5,740.00 $10.00 $5,740.00 $7.00 $4,018.00 GRADING 8 ROADWAY EXCAVATION INCL. HAUL C.Y. 590 $10.00 $5,900.00 $14.00 $8,260.00 $30.00 $17,700.00 9 EMBANKMENT COMPACTION C.Y. 149 $10.00 $1,490.00 $15.00 $2,235.00 $10.00 $1,490.00 10 GRAVEL BORROW INCL. HAUL C.Y. 149 $30.00 $4,470.00 $17.00 $2,533.00 $35.00 $5,215.00 STORM SEWER 11 CATCH BASIN TYPE 1 EACH 2 $1,500.00 $3,000.00 $600.00 $1,200.00 $1,100.00 $2,200.00 12 STEEL CORRUGATED CULV. PIPE 121N. DIAM. L.F. 10 $35.00 $350.00 $40.00 $400.00 $65.00 $650.00 13 STRUCTURE EXCAVATION CLASS B INCL. HAUL C.Y. 200 $10.00 $2,000.00 $10.00 $2,000.00 $13.00 $2,600.00 SURFACING 14 CRUSHED SURFACING TOP COURSE TON 427 $30.00 $12,810.00 $33.60 $14,347.20 $36.00 $15,372.00 ASPHALT CONCRETE PAVEMENT 15 HMA CL. 1/2", PG 64-22 TON 220 $140.00 $30,800.00 $115.60 $25,432.00 $136.00 $29,920.00 EROSION CONTROL AND PLANTING 16 FINE COMPOST C.Y. 60 $35.00 $2,100.00 $22.00 $1,320.00 $75.00 $4,500.00 17 SEEDING AND FERTILIZING S.Y. 2042 $1.50 $3,063.00 $0.55 $1,123.10 $2.00 $4,084.00 18 BARK MULCH C.Y. 8 $30.00 $240.00 $26.00 $208.00 $130.00 $1,040.00 19 TEMPORARY WATER POLLUTIONIEROSION CONTROL L.S. 1 $3,000.00 $3,000.00 $100.00 $100.00 $4,000.00 $4,000.00 20 TESC PLAN L.S. 1 $1,500.00 $1,500.00 $100.00 $100.00 $500.00 $500.00 TRAFFIC 21 RAISED PAVEMENT MARKER TYPE I HUND 1.77 $170.00 $300.90 $450.00 $796.50 $500.00 $885.00 22 RAISED PAVEMENT MARKER TYPE II HUND 0.59 $450.00 $265.50 $1,250.00 $737.50 $1,500.00 $885.00 23 PAINT LINE L.F. 1440 $0.30 $432.00 $0.55 $792.00 $0.65 $936.00 24 PLASTIC CROSSWALK LINE S.F. 250 $12.50 $3,125.00 $4.00 $1,000.00 $5.00 $1,250.00 25 PERMANENT SIGNING L.S. 1 $5,000.00 $5,000.00 $30.00 $30.00 $1,000.00 $1,000.00 26 PROJECT TEMPORARY TRAFFIC CONTROL L.S. 1 $25,000.00 $25,000.00 $10,000.00 $10,000.00 $12,000.00 $12,000.00 BID TABULATION Harlow Drive Pedestrian Improvements: Osprey Circle to East Lake Drive ENGINEER'S ESTIMATE Seroanok Construction Northern Con-Aqq ITEM NO. DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST TOTAL COST OTHER ITEMS 27 MAILBOX SUPPORT TYPE 2 EACH 2 $450.00 $900.00 $100.00 $200.00 $525.00 $1,050.00 28 MAILBOX SUPPORT TYPE 1 EACH 3 $250.00 $750.00 $150.00 $450.00 $350.00 $1,050.00 29 MONOLITHIC CEMENT CONC. CURB AND SIDEWALK S.Y. 509 $35.00 $17,815.00 $40.00 $20,360.00 $45.00 $22,905.00 30 CEMENT CONC. SIDEWALK RAMP TYPE 1 EACH 2 $2,000.00 $4,000.00 $1,500.00 $3,000.00 $1,200.00 $2,400.00 31 CEMENT CONC. SIDEWALK RAMP TYPE 2 EACH 3 $2,000.00 $6,000.00 $1,500.00 $4,500.00 $1,350.00 $4,050.00 32 CEMENT CONC. DRIVEWAY ENTRANCE S.Y. 70 $70.00 $4,900.00 $45.00 $3,150.00 $47.00 $3,290.00 33 ADJUST VALVE BOX EACH 8 $200.00 $1,600.00 $250.00 $2,000.00 $235.00 $1,880.00 34 ADJUST WATER METER BOX EACH 2 $200.00 $400.00 $250.00 $500.00 $235.00 $470.00 35 ABANDON EXISTING CATCHBASIN EACH 1 $500.00 $500.00 $300.00 $300.00 $300.00 $300.00 36 MINOR CHANGES EST. 1 $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 37 ROADSIDE CLEANUP L.S. 1 $2,000.00 $2,000.00 $1,500.00 $1,500.00 $2,500.00 $2,500.00 38 SPCC PLAN L.S. 1 $1,000.00 $1,000.00 $500.00 $500.00 $500.00 $500.00 I ESTIMATE TOTAL $188,266.401 $163,435.30 I $177,171.001 ~..'JJ,';"-<;; ; ,r-" .......,..,... ' ~ ,.a I .f. .:-< .r ~~-i' . 1ooo.;~'1 'i\~>~~ .:,,~,;~..>l,;/' .~, '. ,r ..~' :,~;,~,'d '.".t," '" ;~"" ,~'",' ' < 1::. ~:l ,. ~ "~I ",,,!?ll "',:'\:,;,;:: " '; I.' ..:, ;:'~- -~.. '. . '- . ... , " . . ;-,---" ~~"~~" " ',',;c;, . ',. II e,., " '," ' '" '" "I, '. :.7'.. ... ''):'' /.... "". '.' , !J:~~ 'Jy:-''''j ~~:;:\1i'\1_;. /-, ':l \. ~\. .. Ii . ),1._ "'~~~~~ "~.~" ,', ~1_ ~,,~." _-""J~l;", 'c{ '. ,v l~ it-'s~ ~ \;t.~:< '~. .'? '~~:,','<:.," ~i~~_,:,;~,~ ,,:>.ft.;>' . . ::-,-.' .':'; .>t;.:}~\.~:~;" ,..;"'........ <. _~,..):.~:: ~:J' ::~;:((f;:.~i~~;: '. -;....~-' > o<\~ 't'..l'.::. _"" .~" :~2:-i..~;, ~: .:~ - -,.'?< ."-",. ........ ...,...' " ~ o z :s a. /' " ~ o / ~ q ii' -< I / I"- o CO N "' ... ~ o '" a. o z :s /' ~ ~ o '" a. /' ,:.: NO, REVISIONS OESC'RIPTION CI TY OF BREMERTON DEPARTMENT OF PUBLIC WORKS & UTILITIES ENGINEERING DIVISION HARLOW DRIVE PEDESTRIAN IMPROVEMENTS SIDEWALK / SHcC)ULDER PLAN AND PROFILE FIELD BOgK 2" 1" o OATE BY TWO INCHES AT FULL SCALE I." NOT ,SCALE Ac:CORDINGL Y SCALE ORAWING NO'I ORAWN BY; S,J, PL4N OATE 04/07 CHECKED BY; WAS;-t, P E. # DESIGN BY: E.A. WASH, P,L # 42260 DATE 0,4/07 ' OATE. HORIZ, 1 "~20' VERT, 1 "~5' ~ z w 13 > 0 '" CL ;;; Z -< ,~ ~ '0 w a. S'H EET w > ii' 13 0 ~I ~ OF 0 -' '" <( :c AGENDA BILL CITY OF BREMERTON CITY COUNCIL BILL # D ra -- 14_ Cf ~B DATE SUBMITTED: 06-03-08 ..................~.................................................................., SUBJECT: Resolution a~~z~ Committee Meeting Date: 06-11-08 expenditures of funds received from the 2008 COUNCIL MEETING Date: 06-16-08 EMS Levy Ballot Measure. Department: Fire Presenter: Al Duke, Fire Chief Phone: 473-5381 SUMMARY: This Resolution will identify where the funds would be expended if the citizens pass the 2008 EMS Levy Ballot Measure. As presentations are starting to be made on the ballot measure, this Resolution will enable them to show where the revenues would be spent. ATTACHMENTS: Resolution No. :3 0 b2... FISCAL IMPACTS (Include Budgeted Amount): None APPROVALS: DEP ARTMENT DIRECTOR: CITY ATTORNEY: FINANCE DIRECTOR: MAYOR: COMMITTEE CHAIR COUNCIL PRESIDENT: CONSENT AGENDA 0 GENERAL BUSINESS ~ PUBLIC HEARING 0 RECOMMENDED MOTION: Move to pass Resolution # 3 0 "':L COUNCIL ACTION: 0 Approve 0 Deny 0 Table o Continue 0 No Action RESOLUTION NO. 3()fo d- A RESOLUTION of the City Council of the City of Bremerton, Washington, detailing authorized expenditures of funds received fhHn the 2008 EMS Levy Ballot Measure. WHEREAS, The City of Bremerton adopted Resolution No. 3059, which contains a proposition to be submitted to the qualified voters of the district for approval or rejection of additional property tax levies to fund emergency medical services; and WHEREAS, if approved, the City of Bremerton will levy additional regular property taxes in the amount of $.50 per $1000 of assessed property value for each of the years 2009-2014; and WHEREAS, revenue collected by this levy may only be used for emergency medical care or services and related costs; and WHEREAS, the City Council desires to clarify and specify the specific uses for the revenue collected by this levy, if any; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. Revenue collected from the property tax levy, if approved by the voters, will be used to fund costs for personnel, training for such personnel, and necessary equipment, supplies, vehicles and structures needed for the provision of emergency medical care or servIces. SECTION 2. The intent of the City Council of the City of Bremerton is that any increase in revenue collected from the property tax levy, if approved by the voters, would not replace current funding levels but would be used to supplement current funding levels, enhancing the ability of the Bremerton Fire Department to provide emergency services. SECTION 3. Severability. If anyone or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect. SECTION 4. Effective Date. This Resolution shall take effect and be in force immediately upon its passage. day of PASSED by the City Council of the City of Bremerton, Washington this'_ ,2008. WILL MAUPIN, Council President 2008 EMS Levy Revenue Use APPROVED AS TO FORM: ROGER A. LUBOVICH, City Attorney R:\Lcgal\Legal\ResollltillI1S\Fin:'2()()X EMS Levy lIse.doc ATTEST: CAROL ETGEN, City Clerk 2 2008 EMS Levy Revenue u.....'e DATE SUBMITTED: June 4, 2008 BILL # 08-/50 AGENDA BILL CITY OF BREMERTON CITY COUNCIL ~c ........................................................................................ SUBJECT: Resolution No. ~ 0 ~and Resolution No.3~approving annexation proceedings for two territories in the South Kitsap Industrial Area (SKIA). Committee Meeting Date: June 11,2008 COUNCIL MEETING Date: June 16, 2008 Department: DCD / PW / Finance Presenter: Andrea L. Spencer Phone: 360.473.5283 SUMMARY: The action before Council is the consideration of two annexation petitions in the South Kitsap Industrial Area (SKIA). The two petitions were presented to the City on April 22, 2008 and are described as the "SKIA North Petition" and the "SKIA South Petition." As required by State Law the petitions include the signatures by owners of not less than 10% of assessed property value in the area proposed for annexation (in fact, the petitions contain the signatures of 100% of the owners). State Law requires that the City Council conduct a meeting with the petitioners within 60 days of petition submittal and staffhas timely scheduled this meeting to occur on June 16,2008. Following the meeting with the Petitioners the City Council has the option to accept, reject, or geographically modify the petitions. Should the Council decide to accept the petitions, the proposed resolutions presented with this report will do so and will allow the annexation to proceed to the next step, gathering of signatures on the "75% Petition." ATTACHMENTS: 1) Resolution No. 3ChS SKIA North petition area 2) Resolution No. 36~ SKIA South petition area 3) SKIA Annexation Financial Assessment Study (attached as separate spiral-bound report) FISCAL IMPACTS (Include Budgeted Amount): Complete cost / benefit analysis is:2~aChed in the SKIA Annexation Financial Assessment Study. APPROVALS: h DEPARTMENT DIRECTOR: /' CITY ATTORNEY: FINANCE DIRECTOR: MAYOR: , j4~6"Jt.- CONSENT AGENDA 0 GENERAL BUSINESS PUBLIC HEARING 0 COMMITTEE CHAIR COUNCIL PRESIDENT: RECOMMENDED MOTION: Move to pass Resolution No. 3o~3 accepting the propo~al to commence annexation proceedings for the territory known as SKIA North, As O""Vh.~erJ. Move to pass Resolution No. 30"4 accepting the proposal to commence annexation proceedings for the territory known as SKIA South) As o.JIY\~ed. COUNCIL ACTION: 0 Approve 0 Deny 0 Table 0 Continue 0 No Action ,oj RESOLUTION NO. 3063 ;;3 .,.., ;:v. /. lrl I A RESOLUTION of the City Council of the City of Bremerton, Washington, accepting the proposal for annexation and authorizing the circulation of a petition for annexation. geographically modifying the area proposed to be annexed by adding a portion of State. Route 3 adiacent to the proposed annexation area, and further requiring the assumption of all of the City's existing indebtedness by the area to be annexed. WHEREAS, on April 22, 2008, the City received a petition for annexation of territory to the City of Bremerton from McCormick Land Co. and Alpine Evergreen Co., Inc.; and WHEREAS, the area proposed by the petitioners for annexation is described and further depicted in the Petition for Annexation of Territory to City of Bremerton attached hereto as Exhibit A and incorporated herein by reference; and WHEREAS, the initiating parties are the owners of one hundred percent (100%) of the property according to the assessed valuation for which annexation is petitioned, which is well in excess ofthe ten percent (10%) in value of the property required to initiate an annexation into the City of Bremerton; and WHEREAS, the initiating parties are the owners of not less than ten percent (10%) of the acreage for which annexation is petitioned; and WHEREAS, on May 1,2008, the City also received a petition for annexation/request to join annexation of approximately 5.67 acres of property to the City of Bremerton from Sylvan Products, Inc. ("Sylvan"), attached hereto as Exhibit B and further identified in the area map also attached hereto as Exhibit B which is incorporated herein by reference; and WHEREAS, the proposed area for annexation is located within an Urban Growth Area (UGA); and WHEREAS, the City Council must meet with the initiating parties not later than 60 days after filing the request for annexation to consider the petition and decide whether it will 1) accept, reject, or geographically modify the proposed annexation; 2) require the simultaneous adoption of the comprehensive plan for the area proposed to be annexed; and 3) require the assumption of all or any portion of City indebtedness by the area to be annexed; and WHEREAS, City Council has set June 16,2008 as the date that it will meet with the initiating parties to consider the petition; and 1 Annexation - SKU North 10% Petition Resolution ,> WHEREAS, the City Council finds that it in the best interest of the City to decline to geographically modify the area proposed to be annexed by adding the Sylvan property as described in Exhibit B in that doing so at this time would create boundaries that are not uniform for the area proposed to be annexed by Petitioners. but to add that portion of State Route 3 adiacent to the proposed annexation area as identified in Exhibit C; and WHEREAS, the area proposed for annexation is described in Exhibit C attached hereto and incorporated herein by reference; and WHEREAS, a comprehensive plan designation for the area proposed to be annexed will not be adopted herein; and WHEREAS, City Council finds that it in the best interest of the City to accept the proposed annexation as presented without any geographic modification to the area proposed to be annexed as geographically modified herein and further to require the assumption of all or any portion of City indebtedness by the area to be annexed; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. The Petition for Annexation of Territory to the City of Bremerton set forth in Exhibit A is hereby accepted as presented with geographic modification to the area proposed to be annexed bv the addition of that portion of State Route 3 adiacent to the proposed annexation area aHEl-as further described in Exhibit C, v/ithout any geographic modification to the area proposed to be annexed,. SECTION 2. The City Council shall require the assumption of all existing City indebtedness by the area to be annexed. SECTION 3. The initiating parties shall be required to submit the appropriate seventy-five percent (75%) annexation petition as required by law to proceed with the proposed annexation. SECTION 4. Severability. If anyone or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect. SECTION 5. Effective Date. This Resolution shall take effect and be in force immediately upon its passage. day of PASSED by the City Council of the City of Bremerton, Washington this _ , 2008. 2 Annexation - SKIA North 10% Petition Resolution " . WILL MAUPIN, Council President APPROVED AS TO FORM: ATTEST: ROGER A. LUBOVICH, City Attorney CAROL ETGEN, City Clerk R:\Legal\Legal\Files\Current Active Files\SKIA \10% Annexation Petition Resolution - SKIA North Final.doc 3 Annexation - SKIA North 10% Petition Resolution EXHIBIT A INTENTION TO COMMENCE ANNEXATION PROCEEDINGS PROPOSED ANNEXATION OF TERRITORY TO CITY OF BREMERTON I-()-@ April 14', 2008 City Council City of Bremelton 345 6th St. Suite 600 Bremerton, W A 98337 iRECEIVED. (llY COUNCil OFFICE" JATE -!:I~8 _ Re: Alpine \ McCormick Land Co. SR-3 Annexation Dear City Councilmembers, We the undersigned, who are the owners of not less than 10% of the value of propelty, according to the assessed valuation records for general taxation purposes of the Assessor of Kitsap County, of the following described real property situated in Kitsap County, Washington, respectfully file this Notice ofIntention to Commence Annexation Proceedings ("Notice") requesting that said real property be annexed to the City of Bremel'ton, Washington and we respectfully state as follows: I. The area proposed to be annexed to the City is more particularly described as per the legal description attached hereto as EXHIBIT A and made part of this Notice. 2. A plat map outlining the boundaries of the real property described is attached hereto as EXHIBIT B and is made a part of this Notice. 3. The said area adjoins the existing boundaries of the City of Brcmerton and is in Kitsap County, and is within an Urban Growth Area. 4. The undersigned Petitioners respectfully request that the City Council of the City of Bremerton enteltain this Notice and fix a date for a meeting with the initiating patties within 60 days of the filing of this Notice as per RCW 35.15.125. The undersigned Petitioners respectfully request that the City Council determine at said meeting whether it \\Till accept, reject or geographically modify the proposed annexation; whether it will require the simultaneous adoption of a comprehensive plan; and whether it will require the assumption of all or any portion of existing city indebtedness by the area to be annexed. Tax Parcel Number(s) 012301-4-015-1004,012301-4-025-1002,122301-1-009-1005, 122301-1-010-1002, 4< 301- - 07-1007,122301-1-008-1006 By: Doug Skrobut, President McCormick Land Company 4978 SW Lake Flora Road P011 Orchard, W A 98367 Tax Parcel Number(s) 012301-4-016-1003,012301-4-013-1006,012301-4-012-1007, 01230] -4-017-1002 By: ~-'-J ..-- ..~ ..c:.. . \:~'O-(f'V \~, I ~_~ (~~ \ Rot> ~JD I \?t%,~ h.-4>tN8 b:\}f:.--t=-~t;:N Go, (TNc.. 7 f;ttf s4.fe.. \~ ~3, .~U0 r'o~ ~~ \ w+\ or6~~7 EXHIBIT A LEGAL DESCRIPTION OF TERRITORY PROPOSED FOR ANNEXATION TO THE CITY OF BREMERTON Parcell THAT PORTION OF THE WEST HALF OF THE SOUTHEAST QUARTER OF SECTION 1, TOWNSHIP 23 NORTH, RANGE 1 WEST, W.M., IN KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: BEGINNING AT THE QUARTER CORNER OF THE EAST LINE OF SAID SECTION 1; THENCE NORTH ALONG THE EAST LINE OF SAID SECTION 755.2 FEET, MORE OR LESS, TO THE CENTER LINE OF HIGHWAY NO. 14; THENCE S44*53'W ALONG SAID CENTER LINE 2863.2 FEET; THENCE S45*07'E 50 FEET TO THE FORMER SOUTHEASTERLY MARGIN OF SAID HIGHWAY AND THE TRUE POINT OF BEGINNING; THENCE S45*07 E TO THE EAST LINE OF SAID SUBDIVISION; THENCE NORTHERLY ALONG SAID EAST LINE TO THE SOUTH MARGIN OF STATE HIGHWAY NO. ]4; THENCE S44*53'W TO THE TRUE POINT OF BEGINNING; EXCEPT THAT PORTION CONTAINED WITHIN STATE HIGHWAY NO. 21 (LOST LAKE TO GORST) CONDEMNED UNDER KITSAP COUNTY SUPERIOR COURT 40135. Parcel II BEG A l' 114 SEC COR ON E LN OF SEC N 755.2FT TO CEN OF HWY NO 14 S44*53'O W ALG SD CEN LN 2863.2FT S45*7'O E 50FT TO SEL Y LN OF RD & TPOB S44*53'0 W 300FT S45*7'0 E TO E LN OF SW1I4 SEl/4 N TO PT WH IS N45*7'0 W OF POB N45*7'O W TO BEG Parcel III , THAT PT OF SW1I4 SE1I4 DES AS FOLS BEG AT 1/4 COR OF E LN OF SD SEC 1 N ALG E LN OF SD SEC 755.2FT MIL TO CEN OF HWY NO]4 S44*50' W ALG SD CEN LN 2863.2FT S45*07' E 50FT TO SEL Y LN OF SD HWY 544*53' W ALG SD SEL Y LN 300FT TO TPOB CONT S44*53' W 300FT 845*07' E 800FT N44*53' E 300FT N45*07' W 800FT TO TPOB Parcel IV THAT PORTION OF THE SOUTHWEST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 1, TOWNSHIP 23 NORTH, RANGE] WEST, W.M., IN KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: BEGINNING AT THE'QUARTER CORNER ON THE EAST LINE OF SAID SECTION 1; THENCE NORTH ALONG THE EAST LINE OF SAID SECTION 755.2 FEET, MORE OR LESS, TO THE CENTER LINE OF HIGHWAY NO. 14; THENCE S44*53'W ALONG SAID CENTER LINE 2863.2 FEET; THENCE S45*07'E 50 FEET TO THE FORMER SOUTHEASTERLY MARGIN OF SAID HIGHWAY; THENCE S44*53'W ALONG SAID SOUTHEASTERLY MARGIN 600 FEET; THENCE S45*07'E 800 FEET TO THE TRUE POINT OF BEGINNING; THENCE N44*53'E 300 FEET; THENCE S45*07'E TO THE EAST LINE OF SAID SUBDIVISION; THENCE SOUTHERLY ALONG SAID SUBDIVISION TO THE SOUTHEAST CORNER THEREOF; THENCE WESTERLY ALONG THE SOUTH LINE THEREOF TO A POINT S45*07'E OF THE TRUE POINT OF BEGINNING; THENCE N45*07'W TO THE TRUE POINT OF BEGINNING. Parcel V THAT PORTION OF THE SOUTHWEST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 1, TOWNSHIP 23 NORTH, RANGE 1 WEST, W.M., IN KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: BEGINNING AT THE QUARTER CORNER ON THE EAST LINE OF SAID SECTION 1; THENCE NORTH ALONG THE EAST LINE OF SAID SECTION 755.2 FEET, MORE OR LESS, TO THE CENTER LINE OF HIGHWAY NO. 14; THENCE S44*53'W ALONG SAID CENTER LINE 2863.2 FEET; THENCE S45*07'E 50 FEET TO THE FORMER SOUTHEASTERLY MARGIN OF SAID HIGH\VAY; THENCE S44*53'W ALONG SAID SOUTHEASTERLY MARGIN 600 FEET TO THE TRUE POINT OF BEGINNING; THENCE S45*07'E TO THE SOUTH LINE OF SAID SECTION 1; THENCE WEST ALONG THE SOUTH LINE OF SAID SECTION TO THE SOUTHEAST CORNER OF A PARCEL OF LAND DELINEATED ON SURVEY RECORDED UNDER AUDITOR FILE NO. 7710310110; THENCE N43*58'23 W 756.98 FEET TO THE SOUTHEASTERLY MARGIN OF HIGHWAY 14; THENCE NORTHEASTERLY ALONG SAID SOUTHEASTERLY MARGIN OF HIGHWAY 14 TO THE POINT OF BEGINNING; EXCEPT ANY PORTION WITHIN STATE HIGHWAY NO. 14. Parcel VI RESULTANT PARCEL A OF BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO. 200505040439, RECORDS OF KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THE NORTH HALF OI<' THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 1, TOWNSHIP 23 NORTH, RANGE 1 WEST, W.M., IN KITSAP COUNTY, WASHINGTON; THE SOUTH HALF OF THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 1, TOWNSHIP 23 NORTH, RANG~ 1 WEST, W.M., IN KITSAP COUNTY, WASHINGTON; EXCEPT THAT PORTION LYING EASTERLY AND NORTHERLY OF THE FOLLOWING DESCRIBED LINE: COMMENCING AT THE NORTHEAST CORNER OF THE SOUTHEAST QUARTER OF SAID SECTION 1 (SOUTH 1/16); THENCE NORTH 85*48'24" WEST, 732.73 FEET ALONG THE NORTH 'LINE OF SAID SUBDIVISION TO THE POINT OF BEGINNING; THENCE SOUTH 8*11 '30" EAST; 110.79 FEET; THENCE SOUTH 36*15'46" EAST, 94.25 FEET; THENCE SOUTH 25*16'38" EAST, 106.42 FEET; THENCE SOUTH 601<39'06" EAST, 73.25 FEET; THENCE SOUTH 24*59'37" EAST, 101.49 FEET; THENCE SOUTH 59*32'22" EAST, 64.82 FEET; THENCE SOUTH 41*19'10" EAST, 49.91 FEET; THENCE SOUTH 14*02'30" EAST, 49.04 FEET; THENCE SOUTH 22*17'19" WEST, 285.52 FEET; THENCE SOUTH 61 *06'30" EAST, 108.47 FEET; THENCE SOUTH 84*41'14" EAST, 71.12 FEET; THENCE NORTH 67*27'10" EAST, 79.96 FEET; THENCE SOUTH 84*54'57" EAST, 51.37 FEET; THENCE SOUTH 57*48'371f EAST, 47.01 FEET; THENCE NORTH 87*59'38" EAST, 130.06 FEET; THENCE SOUTH 47*51'411f EAST, 62.14 FEET TO A POINT ON THE EAST BOUNDARY OF SAID SUBDIVISION THE POINT OF TERMINA TION. Parcel VII RESULTANT PARCEL A OF BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO. 200612260269, RECORDS OF KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 12, TOWNSHIP 23 NORTH, RANGE 1 WEST, W.M., IN KITSAP COUNTY, WASHINGTON; EXCEPT THAT PORTION THEREOF DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHEAST CORNER OF THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SAID SECTION 12; THENCE SOUTH 1 *09'55" WEST ALONG THE EAST LINE THEREOF A DISTANCE OF 300.00 FEET TO THE TRUE POINT OF BEGINNING; THENCE CONTINUING SOUTH 1 *09'55" WEST ALONG SAID EAST LINE A DISTANCE OF 1032.07 FEET TO THE SOUTHEAST CORNER OF SAID NORTHEAST QUARTER OF THE NORTHEAST QUARTER; THENCE NORTH 84*40'00" WEST ALONG THE SOUTH LINE THEREOF A DISTANCE OF 600.00 FEET; THENCE NORTH 32'~21 '22" EAST 1155.48 FEET TO THE TRUE POINT OF BEGINNING; EXCEPT ROADS. Parcel VIII THE NORTH HALF OF THE NORTHWEST QUARTER OF THE NORTHEAST QUARTER OF SECTION 12, TOWNSHIP 23 NORTH, RANGE 1 WEST, W.M., KIT SAP COUNTY, WASHINGTON; EXCEPT ROADS, AND SUBJECT TO RESERV A TIONS, RESTRICTIONS AND EASEMENTS OF RECORD. Parcel IX THE SOUTH HALF OF THE NORTHWEST QUARTER OF THE NORTHEAST QUARTER OF SECTION 12, TOWNSHIP 23 NORTH, RANGE 1 WEST, W.M., KITSAP COUNTY, WASHINGTON; EXCEPT ROADS, AND SUBJECT TO RESERVATIONS, RESTRICTIONS AND EASEMENTS OF RECORD. Parcel X RESULTANT PARCEL B OF BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO. 200612260269, RECORDS OF KITSAP COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: THAT PORTION OF THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 12, TOWNSHIP 23 NORTH, RANGE 1 WEST, W.M., IN KITSAP COUNTY, WASHINGTON; DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTREAST CORNER OF THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SAID SECTION 12; THENCE SOUTH 1 *09'55" WEST ALONG THE EAST LINE THEREOF A DISTANCE OF 300.00 FEET TO THE TRUE POINT OF BEGINNING; THENCE CONTINUING SOUTH 1 *09'55" WEST ALONG SAID EAST LINE A DISTANCE OF 1032.07 FEET TO THE SOUTHEAST CORNER OF SAID NORTHEAST QUARTER OF THE NORTHEAST QUARTER; THENCE NORTH 84*40'00" WEST ALONG THE SOUTH LINE THEREOF A DISTANCE OF 600.00 FEET; THENCE NORTH 32*21'22'1 EAST 1155.48 FEET TO THE TRUE POINT OF BEGINNING. EXHIBIT B PARCEL MAP OF TERRITORY PROPOSED FOR ANNEXATION TO THE CITY OF BREMERTON "!:'::""ff'~: ..' Ill'" ,. ;5 : i.' ~~.J . ---" ! i~j~;tu<': ! . :", ~~~{~~'r-~:-Hi Legend Parcols Road Names Greater Pugllt Sound Hydro Mllltary < ' . \~;1r 1k-. ' '. '''+" '. 'it J7JC ',..: . '_ I .. .. ~:~'.f.l a::..... ....Q ,'" ;r; -'"~::- .-- ~. rn .~. .. ;lJ d TIC . :......;_. ~. ~ . ';~~~.: . ~::': ! ~;:' ;::~ , :S:'i' .~ .--,' :, :.:,:: ':.~. 01~'ftO , Cl"\\ ~. "'-. S'l~ O\..\) I . :.. Co Ii ht @ 2008 Kitsa DISCLAIMER: This map is in/ended for display purposes only and is not intended for any legal representations. EXHIBIT B RE: PETITION FOR ANNEXATION OF TERRITORY TO THE CITY OF BREMERTON April 28, 2008 Lindsey Sehmel City Planner 345 6th Street, Suite 600 Bremerton, WA 98337-1873 Dear lindsey, "RECEIVED DATE -:k~ )~:CIL OFFICE" , II:~ Please submit our application at the proper time so that it does not slow the process or impede the main pending application for the City of Bremerton-SKIA Annexation Proposal. We thank you for the expeditious manner you are doing your work. Sincerely, "/'f} /'----J / , 4J.c~/1<-A./)t..oii:<-7<'..Ii!~ Kenneth and Gloria Haines 3202 96th Street NW Gig Harbor, WA. 98332 253-853-4279 gloria ha i nes@comcast.net rD)g@[gD'Y7@1iY JI} MAY 01 2008 ~ BREMERTOI\)-DEPT OF COMMUNITY DEVELOPMEI\JT PETITION FOR ANNEXATION OF TERITORY TO CITY OF BREMERTON April 28, 2008 City Council City of Bremerton 345 6th St. Suite 600 Bremerton, WA 98337 Re: Property located at 4729 St. HWY 3 SW Dear City Council Members, We the undersigned, who are the owners of not less than 75% of the value of property, according to the assessed valuation records for general taxation purpose of the Assessor of Kitsap County, of the following described real property situated in Kitsap County, Washington, respectfully file this Petition for Annexation of Territory to the City of Bremerton ("Petition") requesting that said real property be annexed to the City of Bremerton, Washington and respectfully state as follows: 1. The area proposed to be annexed to the City is more particularly described as per the legal description attached hereto as EXHIBIT A and made part of this partition. 2. A plat map outlining the boundaries of the real property described is attached hereto as EXHIBIT B and is made a part of this petition. 3. The said area adjoins the existing boundaries of the City of Bremerton and is in Kitsap County, as is within City of Bremerton's Urban Growth Area. 4. The undersigned Petitioners respectfully request the City Council to start the proceedings for Annexation to the City of Bremerton. Kitsap County Tax Parcel No. 0014894 4729 St. HWY 3 SW By: Gary Bozeman, Mayor \D)~@~Q\B@I[)'. UU tv'IAY 01 2008 ~ BREMERTOl\l-DUYf. OF . COMMUNiTY DEVELOPMENl Council take formal action to accept and approve the proposed annexation and to authorize a filing with the Boundary Review Board of a Notice of Intent to Annex the described property. SYLVAN PRODUCTS, INC. Tax Parcel No. 122301-2-001-1001 SYLVAN PRODUCTS, INC. Tax Parcel No. 012301-3-009-1004 EXHIBIT A PROPERTY DESCRIPTION FOR 4729 STATE HIGHWAY 3 SW ACCOUNT NUMBER 122301-2-001-1001 BEG AT NE COR OF NE1/4 NW1/4 S 700FT MIL TO TR CONVEYED OCT 21942 TO HARRY EARL NWL Y ALG SO TR 1040FT MIL TO ST HWY NO.14 E 774.3FT TO TPOB ACCOUNT NUMBER 012301-3-009-1004 THAT PART OF S1/2 DES AS FOLS BEG AT INTERSECTION OF S LN OF SO SEC WITH SEL Y LN OF STATE HWY NO. 14 NEL Y ALG SO HWY 500FT MIL TO WL Y LN TR CONVEYED MARCH 271941 TO EDNA COOK BY AUD FILE NO. 414543 SELY ALG SD COOK TR TO S LN OF SEC 1 W ALG SO S LN TO POB SUBJ TO EASEMENT EXHIBIT 8 Ui /----: // - ~ ,/ .L-...r- ~L \ /j Ii , i , i -"~""'.~ 0' C}'~~ \O~ e< 1e~ f i , I i 122301.2.001.1001 I I 1 I I -9~ rban Gro~th Area I I !' ! i! it-- I ! ~ . ~! r !------i b_ i ~I ~ -J ! , L I I I . W<----i L---, I i ~c- l- I !---, I~- I, \ \ \ \ \, \ , \ , \ \ -, \ \ \--' \ \ ' ~ ~';--- \~ \ i LI .......City limits /. SKI A UGA c=J TaxPareels 600 . L--_cu-' . I Feet o :m i,,: Exhibit "B" . . ,?~ ij ~ ~~ ~~ i~V .' ii Ii ,iY ::; - ,,#'. .,' ii j M.' fi :t'i',,'i: . ,u,,~'! ' .:" " " . .' ~, "'I ".. . U ~ . _ "/lClI/cr:,,,,,. # ~. .... ; ::: ~ :I . 9 .' ", II . .;...~ ;'\:. ;>-',"\,l=HllU II - ,.~. '" il 'fJ"Y ""'."8" ',.; '.,'" " ;."'~. ~ .J, ' ..' . ",~ :~\ ',~>J . vIA" ',:": .11=:11"'":6' . '.', , =&~' '-.. ;" ",yO' ,.' , t ; &'l;_ro~lH./(I=(/I=~'=lII~:"";I'=I"J'" ': \ / ':~~~!1~',> II ' '" / ", ~"4i.t' ',:".'., ': ! ' "/ 10,,~~IJ()11 ~~~ " ~ ~" . r f ~ ~ i ! ~ ~ ~ ~ ~ Jj ~\ ~", . ~", ", ~,~,/' ,,~ / ....\..,~'\. /// ,....#/. ~' / ~~'. ", ",~~ ~I: ,....-#...... '\',\ ~""" ':, #" ""-, "\/ ~... '-." \, ,# ", > ~' / ", ., ,,~ ::....t~\... ~\. <>\ ! ~'v ",,, ,/ II \'" V '" / ~ ~ ~ ~ ii ::; , , D 1.'a:WAtH=atIltIi:UUQI ; :: l~Ia;-lllc:.tll'=tll_llr=jIJ.IU=ltl_lll!J City of Bremerton-SKIA North Haines Request / / 2-HUllu M ii ii""'''''''''''''J~ ~ ~ ~ !! ~ ij"=I~I"'IlJ_'''''''':''''=IJI''L , ' ~ .~ g ~ jj ~ '~ "~ ,,<Ii , ",+' ! ,,+ ,,,4fJ" ,,+' \....?'\; ,,+' ;:r.....?\ ,,?' , ",?' :S:: : " , ' +,,'+ II'" ',' ", ....".~ 1'1/'\0' " , \UiiIIIltJ . ~.:-9 1...:1 1/11>.. .,;("...,11.... ~III__ ",</I ~1Jlliilli.\\1 IIJ' ii ,,-,,/ \, / >, " N A M ! ~ fi ! t~ Haines Request Legend ~lIl_L '"I.,IP SKIA UGA f~fjl/ll.iIt~ ij,"i;H~ City Limits Tho CIty of Bremenon does not Vlarrarlt the accuracy ot thiS informaHon or mapplno. wli~ch Should (1(')1 be relied upon without fndependenl verification of accuracy, The user asswnes all nsks re-Iatec to or arnsmg from the use of this in10rmaliDn or mnpPlng Prepared By: Lindsey SBhmel Printing Oate, June 3, 2008 File: R.ICo:l1munlly DevelopmenllCommunlly DevelopmentlG IS _Archive\Revi ,ed _ Slructure\Bremerton_ Cily\Growlh_Anno,,\SKIA ISKIA MapsISKIA_N_ EXh_ 8, mxd Clly 01 8remerton City of Bremerton-SKIA North Area Proposed for An nexation"~;<~>,;>:", :>;;:;;);.:~.:~ (/ >;",~ ;<>i:: Geog raphically Mod ifit.~F~8)~'9.r99~::~;:~~:qiB~.~~~~~~c~:~{~~~:~~~j<,~.~ i ://~/'i.4/ //,""/~//~'J"'~r,l~~/I"'~tj'/I',/ ~A/-~<f"~/~/~ ~//,,",.r"/",../. -,~~;, J, -ii ,.. ,'.....i J<i , .T./ ," 0' ;" -,,' ~ '., ~ ~ ~'" ,..-' .. J ,/ t ,'". / / /' ,. ... I- " '" ./r.l',f t' ?"-",, "'../' ~ r~ ~~ - :l!". I ..,;-.'//' .."'4-r.~/ "'/~,..,!'..."I ,1,/ ~ /.f /"~" '//// .// f/+" ~B I:/f ~ / / ,J' , ... 1-" ~ / .... j / / >- ,I.. /.,'/ ;' ~ ! '" ~, ..,. ~..I/'~///~ / /' + .. + - //1 "/~. /.F r.fl'./?-.. ~ ~ ,/~ /..t / .,: .,.,.r Ii /~....: ~., /,/',~~'''''...' \ / I =. " !I.' c.' ./" /,./ /',' /",' ././ ~/,/ , 'd/ J_,f,r" ~: f"" I' "/...,fc ,~/~I' 4'-;- f' f ,,1/ r ~ / 4 ,o~ / ,/ 'II' i/ /'" = :: ~v If ",,,.", ~ ~ /r t' / '" "'/ /" ~<t",;E +"'/'~ ..... / /' .. ,,'" f ~" "f ;f.) J'~-' .../ ~-I/ 9/ f__ u.u.i !:..I-+_/l""/-, <</"/{/ ,/,,/r/~~ ":I'/~./,~"""~ //.,f,>^'r/.t' ,/ '-', "/"1./, /', // /,' ^' " .' / . :;/ /, " /".,~ ~1..tfJl,' '" 40-./ ~/-? . / ." / " -9 "r/ /' J~ -;, . ,.. "</, ~."i". >., ( " ~ I / ,<</,,'/ .,',' /:/ c'// /' 1/,.. "~,;,,g _ I ~_>_ ... 1',/'1' /,,",,'4,.(./ S '/""1 \ n- j:1...;~~ J'- r /'./ #"/tf_.f<! ~ ~ I)'" J I _::_ , ......~PlIiIl!,.,Il/IIQRam.... " ," ::'- '; Ram-a. U\ I :: 'i\, D :/ ~ . " ~ /i ~ ji D~1/ -, : n// =, t ! ~ ~ ~--- ~ ~ j ! t ..U ....#..~!' ,,#/ ----1 #~ / #~~// ~.... /' *,# ..#~ft #..~/ #~~/ if"".," #~,~y ..#~~.' ,;;""'-',<\ .~.. '" /'~\ ",,~ "'" '. \~\</ ,", "",.> i'~\. / '".------.1 <.\ #~ ~/......,,~, ~< '. ~. ~ ~ ~ ii " i ii " , , , , ' . , D ~U-fl-l_'ff.llf.I-! i : ! ! ;; 11"'/1""""111".'1'.11'./1.'.11'.11'. ! , --f ------- ii i ~ i ~ ~"I-I/I=,i ! , ~ i = . !'./I'...fII..I' ~ j ~ ~ ~ 'n.f~f"'rl_~!II!IIU_'fI=J. , I, i' _ '---" ' / i-..-.-.... II --;j--~~. \ '-\, -,-~~~!. i------L__ . -L- __~_ _ ;-i -----i .~ --... ----I '''-'-1 ..,~ , ..,,# I ,,# : ,,' ..,' ;' ..--...-..."..,\ ,,,~ ,..# ...j---,.... T' -- __... ,,#' > "....,., I I : \.,\~,.. , i : i ! \,# .> i , ____~_._____wm___._. j-- ___..m;-;\\~' it~ . I , I i ,,\, ._-...~ ///~r-"'T.....L_j""""-i \11_11, i ",# ii" ~II~, 11111".1\1- -tl,.,. ",# -1Ii_U' III~ ~ --.:..:::...::::--- '-... .,............ ',~~ i- ! ,..... --... -..-; ... .'c':-r . i ~ -~r-' REVISED Exhibit "C" -""I" ,', f~~---\,:~ :=..:::..::1 ! -"1-- ",------i i I 1 I -.__,__.1 N A Legend ~ III..... - - SKIA UGA 'II'_II~ ......,. l',,:"',-P City Limits The City of Bremerton does not warrant the accuracy of this information or mapping, which should not be relied upon without independent verification of accuracy. The user assumes all risks related to or arrising from the US9 of this information or mapping, Prepared By: Lindsey Sehmel Printing Date: June 3, 2008 File: R:ICommunity DevelopmentlCommunity DevelopmentIGIS_ArchiveIRevised_StructureIBremerton _ CitylGrowth _AnnexISKIAISKIA MapsISKIA_N_Exh_ C.mxd City of Bremerton RESOLUTION NO. 3064 C~. ~.i""'!i'J>'.41i; r~l('.J1'\ f..] 'If&. ~j ~ ;] 71 ( A RESOLUTION of the City Council of the City of Bremerton, Washington, accepting the proposal for annexation and authorizing the circulation ofa petition for annexation, geographically modifying the area proposed to be annexed by adding approximately eighty (80) acres of property and by adding a portion of Lake Flora Road to the proposed annexation area, and further requiring the assumption of all of the City's existing indebtedness by the area to be annexed. WHEREAS, on April 22, 2008, the City received a petition for annexation of territory to the City Bremerton from Overton & Associates Holdings, LP, the Port ofBremerton, McCormick Land Co., Alpine Evergreen Co., Inc., North Mason Holdings, LP, North Bay Properties Holdings, LP, Coulter Creek Holdings, LP, and Southwest Kitsap Holdings, LP ("Petitioners"); and WHEREAS, the area proposed by the petitioners for annexation is described and further depicted in the Petition for Annexation of Territory to City of Bremerton attached hereto as Exhibit A and incorporated herein by reference; and WHEREAS, the initiating parties are the owners of one hundred percent (100%) of the property according to the assessed valuation for which annexation is petitioned, which is well in excess ofthe ten percent (10%) in value of the property required to initiate an annexation into the City of Bremerton; and WHEREAS, the initiating parties are the owners of not less than ten percent (10%) of the acreage for which annexation is petitioned; and WHEREAS, on April 22, 2008, the City also received a petition for annexation/request to join annexation of approximately eighty (80) acres of property to the City of Bremerton from Paul and Mary Schmidt ("Schmidt"), attached hereto as Exhibit B and further identified in the area map also attached hereto as Exhibit B which is incorporated herein by reference; and WHEREAS, the proposed area for annexation is located within an Urban Growth Area (UGA); and WHEREAS, the City Council must meet with the initiating parties not later than 60 days after filing the request for annexation to consider the petition and decide whether it will . 1) accept, reject, or geographically modify the proposed annexation; 2) require the simultaneous adoption of the comprehensive plan for the area proposed to be annexed; and 3) require the assumption of all or any portion of City indebtedness by the area to be annexed; and 1 Annexation - SKIA South 10% Petition Resolution WHEREAS, City Council has set June 16, 2008 as the date that it will meet with the initiating parties to consider the petition; and WHEREAS, the City Council desires to geographically modify the area proposed to be annexed by adding the Schmidt properties consisting of approximately eighty (80) acres as described in Exhibit B and by adding that portion of Lake Flora Road to the proposed annexation area as identified in Exhibit C; and WHEREAS, as modified herein, the area proposed for annexation is described in Exhibit C attached hereto and incorporated herein by reference; and WHEREAS, a comprehensive plan designation for the area proposed to be annexed will not be adopted herein; and WHEREAS, City Council finds that it in the best interest of the City to accept the proposed annexation as presented as geographically modified herein '.'lith the geographic modification adding the Schmidt properties to the area proposed to be annexed, and further to require the assumption of all or any portion of City indebtedness by the area to be annexed; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. The Petition for Annexation of Territory to the City of Bremerton set forth in Exhibit A is hereby accepted as presented with geographic modification to the area proposed to be annexed by the addition of approximately eighty (80) acres of property described in Exhibit B, and by the addition of that portion of Lake Flora Road to the proposed annexation area as identified in Exhibit C for a total area proposed to be annexed as described in Exhibit C. SECTION 2. The City Council shall require the assumption of all existing City indebtedness by the area to be annexed. SECTION 3. The initiating parties shall be required to submit the appropriate seventy-five percent (75%) annexation petition as required by law to proceed with the annexation. SECTION 4. Severability. If anyone or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion ofthis Resolution and the same shall remain in full force and effect. SECTION 5. Effective Date. This Resolution shall take effect and be in force immediately upon its passage. day of PASSED by the City Council of the City of Bremerton, Washington this _ ,2008. 2 Annexation - SKIA South 10% Petition Resolution WILL MAUPIN, Council President APPROVED AS TO FORM: ATTEST: ROGER A. LUBOVICH, City Attorney CAROL ETGEN, City Clerk R:\Legal\Legal\Files\Current Active Files\SKIA \10% Annexation Petition Resolution - SKIA South Final.doc 3 Annexation - SKU South 10% Petition Resolution EXHIBIT A INTENTION TO COMMENCE ANNEXATION PROCEEDINGS PROPOSED ANNEXATION OF TERRITORY TO CITY OF BREMERTON 'RECEIVED. (ITY COUNCIL OFFICE" JATE l-/!2d)Oj;l 1-:t..e April ~ 2008 I:. City Council City ofBremerton 345 61h St. Suite 600 Brenlcrton, VIA 98337 APF~ (: 2 20lHt Re: South Kitsap Industrial Annexation \1 ;: Deal' City Council members, VIe the undersigned, who are the owners of not less than] 0% ofthe value of property, according to the assessed valuation records for general taxation purposes of the Assessor of Kitsap County, of the follo\:>,i}ng described real property situated in Kitsap Count)', Washington, respectfully file this Notice ofIntention to Commen,-c Annexation Proceedings (''Notice'') requesting that said real property be annexed to the City of Bremerton, Washington and we respectfully state as follows: 1. The area proposed to be annexed to the City is more particularly described as per the legal description attached hefeto as EXHIBIT A and made part of this Notice. 2. A plat map outlining the boundaries of the real property described is attached hereto as EXFIlBIT B and is made a part of this Notice. 3. The said area adjoins the existing boundaries of the City of Bremerton and is in Kitsap Couni}', and is within an Urban Growth Area. 4. The undersigned Petitioners respectfully request that the City Council of the City of Bremel'ton entertain this Notice and fix a date for a meeting with the initiating parties within 60 days Qfthe filing of this Notice as per RCVI 35.15.125. The undersigned Petitioners respectfully request that the City Council determine at said meeting whether it will accept, reject or geographically modify the proposed annexation; w!tether itwill require the simultaneous adoption of a comprehensive plan; and whether it will require the assumption of all or any portion of existing city indebtedness by the area to be annexed. Overton & Associates Holdings, LP Tax Parcel No. 222301-1-004-1008; -1-005-1007; -1-006-1006; -1-007-1005; -1-008-1004; -1-009-1003; -1 -01 0-1000. 222301-2-017-1001;-2-021-1005 222301-3-004-1004; -3-005-1003; -3-006-1002; -3-007-1001; -3-008-1000; -3-009-1009; -3-010-1006. 232301-3-013-10 ; -3-014-1001;-3-016-1009 B : Da E. verton, Managing Partner Overton & Associates Holdings, LLC (General Partner) Port of Bremerton Tax Parcel No. 112301-3-001-1000 1223 1-2-007-1005,-2-008-1004,-2-009-1003 LL--- By: Ceryl Kincer, President Port of Bremerton, Board of Commissioners McConnick Land Co Tax Parcel No. 122301-3-001-1009 132301-3-010-1007;-3-011-1006 132301-4-023-1000;-4-024-1009 232301-1-006-1005;-1-007-1 004;-1-008-1 003;-1-009-1002;-1-010- 1009;-1-011-1008;-1- 012-1007;-1-013-1006 232301-4-001-1 004; -4-002-1003; -4-003 -1002; -4-004-1001 242301-1-010- 008 242301-2-01 ;-2 011-1005;-2-012-1 004;-2-013-1 003;-2-016-1000;-2-017-1009 Alpine Evergreen Co., Inc. Tax Parcel No. South half of 122301-1-003-1001 232301-2-001-1008 --~J4 ~:J By: Rod Reid, President North Mason Holdings. LP Tax Parcel No. 222301-4-002-1004;-4-008-1008 By. Davi '. Ovelton, Managing Partner North Mason Holdings, LLC (General Pmincr) \ By: Davi '. Overton, Managing IJartner Coulter Creek, LLC (General Pmtnel') Southwest Kitsap Holdings, LP Tax Parcel No. 222301-4-005-1001 ~-\ By: avid.Jo Overton, Managing Partner Southwest Kitsap, LLC (General Partner) E)(t..!! 8 H' A LEGf.U. DESCRIPTiON Or;; TERR~TORY PR:OPOSED FOR ANNEXf\TI.ON TO THE: Cr:TY OF BREMt~RTO!\f City of13rc'mcrton will prepare the legal description for the external SKIA nnnexatiol1 botlndar)'. \o~ ...~\~ \'~~. 1 <d.)/o $O~ ~l\\~ ~ \) t\. :& \' ~\t' \?\t' O?Y~ ~\O~ ~ -c?-.\\? \)~S V~O f'V EXHIBIT B PARCEL MAP OF TERRITORY PROPOSED FOR ANNEXATION TO THE CITY OF BREMERTON South Kitsa Industrial Annexation r-rn '-rT~~'Ti-' - ~"'~-f--=rWl'~i::t'.==----=V;{~~:;;~:;::'~--::"~ :;>'-,<;-~-- II "ltj1t!j~_~t" rJT I IllSif:~~2 -,>t/ -,",:.,,~:-~# -- --'f~J{~lk~CoJtff~f~~~-_~;5;t -------- -~---.-+- -.~ f-- ~-~::~t}~d]f{~;;1;;?'~.2C--I_-J. 17 :<5? ~",.CJ~~1,~~~-~~'~i~~~IL_rf1-___~------_1 /<$: ::atA~~",- -~: 1:~::;------1t5 ,.: "~ J~I=':.j1 I 1 [ 1 ,r"'- /'.~.'sJ.,. "f%~- ~. ~r~f~.j ,-~---I--:i-~:(~l~21II!!~li '~~rt~' '='::---:=1- ~---L"" --.~ '~'~/r-Jr-- -- --.- .'!~ /;~~\~~, ';'~:;;<\;\'1\' '1~~: ::.13iL '~-:-T,-=-..,::. ---1 I . ..' jlfu I 'IY7-0-J' ~O-;.: ':\.... . ,-~ -::.: ~)iJ~ ~ '. ~~ l?""""'" ."' . I' 0'4 -. ';;-"-'\;>"E"."".~-(, '-" >". - -.;::.,:,,- ,j! ....... / .~ </\ ,~;., i'~' @/.T ,..:L.~' ;:;:lL.-. .- "..:..........._- '1:" . .. . .' . ;/)/ I, ~'\, ~ -...j . / .', - $:-'--J ..,0' !" '~-_.' .'/. I--\.\. . I. I . , -"-- ,.,P , . ~---.;""& . I' ../ ,-; . '-'.::. --/-- -_1'_._-4- x.~ ~-r- J{" '1/" ''''';0'' // - ---'I - :-'4 - -" "'-~ ," . /1-"'''- / /' -- . '-.. .. "'''\,,,,,, _ j:jJ-- I )' . .1(/~1? 5 I .. '-Lki~ ~/,. _I /j:'~::;":f---O~~l-"~!/:,:./t(<:.... :.."./',6..,' 2. Z~T-~~~.;~= /i'! ... ......:.......(:../......:.:.,..:,-..... .......... .': '.. .:. "_LI~'" .L.L....L-~,T'.,.,~__I '. . ...'..... ..r.'"......".... ...... ,. ......., lr'.~ '!:---"'-r;1<~+--- ~:,:..:.~--:-t;\...~L::::,::~~:~:i~-~~.~~.. ..': .\ 7C:~~ II:~~~ "" ,// 1 11/;/'/'. . .... .... . ...... ./I-=WifT~ - !/tJ~__ ..-..------" --;::?Y',,'. '.' :.:' t.' : /;,/"j-lJ- -j:I:r,,~rT*' /,' I .;: ..... r.. ...j L-l"'::rdl/.:::LL .::/' __..1.----1~-,,--'/.JI . ~ --. .. '. 145'..5 . ..._- =t. =$=-j=tl:'::":r~L, ~ .C': .;:./ >.-, ), ..j' :: . , . .'" ' -:"'J":1. --. '- ...~--~-r:J! h.C /< ""'" "'0::/ \" ': . '], .--:-',' 1'7.3'--' ",- 1 5t~~~>'s . \ '..<../ ... .7i:'~-Ff~~ ~: : ;--(~~:'H-;.......>/~;- ..._-L..........i'~~~..~~J3..+~~. ~::,J:-'~ k:< <<~, . .0/- 12 '''. r.....~. 1 .. ,39, ,)4. I 52 f'" .' " "I" ~ __..I l // ~.. ". ~j ~6<~,/</::1~)f :. ':." .'.': :.12 q4.0.i.~15:-5-:. :~. ~:---..:::.,,::, .5=11' .=::':~.-r--.f:::::~~-::!< .. .. "'". ~....,.,... 43"" c. .,. .... " ,..... . I - ~.......'19f:;:~~<141"3iS-' ~6;1'?~=,1?~ i '.-1 '--- ,'~ ... i":~~.:<I:~~;' eM::,' : '~~;:f ~~.;:... :.!57ci -=-~_~-.- --1 .....--.... ,,-.~jl.--- ---r-- I I ~-r--r"-~ ~~ (" L_".__.J,_,_~ ~---t-~~J=:~-- .. ~_. .. /l'l~/ ~0 ! II -.---- -'-'- ." ,,' - , ....J .-. -.~L ....., -- .,'-~.... I Numbers on parcels correspond to SKIA ownership spreadsheet attached SKIA Ownership Spreadsheet lMap Numoor T3X paroR1 no. U... - T.2xpayar A'Cn!iS Ta""bIo AV PubllcOwMd NQIlProflt - Mark.IVal". 1 PORT OF BREMERTON 112301-3-001-1000 390- Misc, manf. 559,92 [) Y N 16,097,480 2 ALPINE EVERGREEN INC South haff of 122301-1-003-1001 880- Forest land 76,70 9,580 N N 0 3 PORT OF BREMERTON 122301-2-007-1005 910- llndeveloped land 2,64 0 Y N 42,370 4 PORT OF BREMERTON 122301-2-008-1004 910- Undeveloped land 1.40 0 Y N 38,390 5 PORT OF BREMERTON 122301-2-009-1003 430- Aircraft transoort 1090.00 0 Y N 42,304,090 6 MCCORMICK LAND CO 122301-3-00101009 880- Forest land 78,07 10,000 N N 0 7 MCCORMICK LAND CO 132301-3-010-1007 880- Forest land 20.00 2660 N N 0 8 MCCORMICK LAND CO 132301-3-011-1006 880- Forest land 20.00 2,660 N N 0 9 MCCORMICK LAND CO 132301-4--023-1000 860- Forest land 20.00 2,660 N N 0 10 MCCORMICK LAND CO 132301-4-024-1009 8BO- forest land 20.00 2,550 N N 0 11 OVERTON & ASSOC 222301-1-004-1000. 860- Forest land 19.17 2,550 N N 0 12 OVERTON & ASSOC 222301-1.005-1007 880- Forest land 27.26 3630 N N 0 13 OVERTON & ASSOC 222301-1-00B-10a6 880- Forest land 28.21 3750 N N 0 14 OVERTON & ASSOC 222301-1-007-1005 880- Forest land 29.53 3930 N N 0 15 OVERTON & ASSOC 222301-1-008-1004 88D- Forestland 22.40 2,980 N N 0 16 OVERTON & ASSOC 222301-1-009-1003 880- Forest land 22.21 2,950 N N (} 17 OVERTON & ASSOC 222301-1-010-1000 B80- Forest land 22.05 2580 N N 0 is OVERTON & ASSOC 222301.2-017.1001 910. Undevelooed land 1.49 64,900 N N 64,900 19 OVERTON & ASSOC 222301-2-021-1005 880- Forest land 52.86 5,340 N N 0 20 OVERTON & ASSOC 222301-3-004-1 004- 880- Forest land 20.00 234-0 N N 0 21 OVERTON & ASSOC 222301-3-005-1 003 880- Forest land 20.00 2030 N N 0 22 OVERTON & ASSOC 222301-3-006-1002 880- Forest land 20.00 2,340 N N 0 23 OVERTON & ASSOC 22.2301-3-007-1001 880- Forest land 20.00 2,190 N N 0 24 OVERTON & ASSOC 222301-3-008-1000 88D- Forest land 20.00 2090 N N 0 25 OVER.ON & ASSOC 222301-3-009-1009 880- Forestland 20.00 1,820 N N 0 26 OVERTON & ASSOC 222301-3--D10-1006 880- Forest land 51.98 6,630 N N 0 27 NORTH MASON LP 222301~OO2.1004 880- Forest land 20.00 1.980 N N 0 28 NORTH BAY PROPERTIES LP 222301-4-003-1003 8aO- Forest land 20.00 2,660 N N 0 29 COULTER CREEK LP 22230i-4--D04-1002 880- Forest land 19.95 2,650 N N 0 30 SOUTHWEST KITSAP LP 222301-4--005-1001 880- Forest land 18.76 2,500 N N 0 31 CaUL TER CREEK LP 222301-4--006-1000 880- Forest land 20.00 2.660 N N 0 32 SOUTHWEST KITSAP lP 222301~O07-1009 880- Forest land 20.00 2650 N N 0 33 NORTH MASON LP 222301~OO8-1008 880- Forest land 20,00 2,620 N N 0 34 NORTH BAY PROPERTIES LP 222301-4-009-1007 880- Forest land 20.00 2,650 N N 0 35 MCCORMICK LAND CO 232301-1-~1005 880- Forest land 20.00 2,660 N N 0 36 MCCORMICK LAND CO 232301-1-007-1004 880- Forestland 20.00 2,620 N N 0 37 MCCORMICK LAND CO 232301-1-008-1003 380- Forest land 20.00 2,650 N N 0 36 MCCORMICK LAND CO 232301-1-009-1002 880- Forest land 20.00 2,530 N N 0 39 MCCORMICK LAND CO 232301-1.010-1009 380- Forest land 2G.00 2,650 N N 0 40 MCCORMICK LAND CO 23230H-011-1008 880- Forest land 20.00 2,600 N N 0 41 MCCORMICK LAND CO 232301-1-()12-1007 880- Forest land 20.00 2,650 N N 0 42 MCCORMICK LAND CO 232301-1.013-1006 880- Forest land 20.00 2650 N N 0 43 ALPINE EVERGREEN INC 232301-2-001-1008 880- Forest land 150.18 19,710 N N 0 44 OVERTON & ASSOC 232301-3-()13-1002 880- Forest land 18.84 2,510 N N 0 45 OVERTON & ASSOC 232301-3-014-1001 880- Forest land 19.79 2,050 N N 0 4& OVERTON & ASSOC North portion of 232301-3-016-1009 880- Forest land 19.11 1,960 N N 0 47 MCCORMICK LAND CO 232301-4-00HOO4 880- Forest land 32.50 4,270 N N 0 48 MCCORMICK LAND CO 232301-4-002-1003 880- Forest land 19.41 0 Y N 0 49 MCCORMICK LAND CO 232301-4-()Q3-1002 880- Forest land 20.00 2,620 N N 0 50 MCCORMICK LAND CO 232301-4-004-1001 880- Forest land 20.92 2.750 N N 0 51 MCCORMICK lAND CO 242301-1-D10-1008 880- Forest land 37.09 0 y N 0 52 MCCORMICK LAND CO 242301-2:-()10-1D06 880- Forest land 20.00 2.250 N N 0 53 MCCORMICK LAND CO 242301-2-011-1005 880- Forest land 38. 58 5,120 N N 0 54 MCCORMICK LAND CO 242301-2-()12.1004. 881). Forest land 20.00 2,660 N N I) 55 MCCORMICK LAND CO 242301-2-013-1003 880- Forest land 20.00 2,650 N N 0 56 MCCORMICK LAND CO 242301-2-{J16-1000 880- Forest land 20.00 2.220 N N 0 57 MCCORMICK LAND CO 242301-2-017-1009 880- Forest land 26.S!;! 0 y N 0 T alaI acres: 3087.61 234,470 58.547,230 ~B,kj) rvu a me. C 'j) (i <rcVYle;..i 3 If 15 b [:t- >-5Ltv.d~ \S .iv~ ()ty) . "'J?h.fA1/wJ (nL) Lo)it q 9 .3 3 '7 -I !?13 EXHIBIT B "RECElVED, ClrY COUNCIL OFFlCE'~ JATE _ qj'J'J./D 8 _ (i dr (} lffiA'l e.J. 'fh.1-1'J1QgJW, '. CUR. Cl..u. ;l/:ce..-.. C'l.OTUk.{) 0 Q F p/LaV{~~'-'a t:i,.. " at, f""1 fl!-(j2-O /cu cP J,,-_~"'----" J-,-t--x_~ J}y O-(,L---'V'-d.~ (9-.1 .~.. .> -- () ~b-v..;L/L f:\1-tob-lJ ~7'LoLUA7_.hL'a.fl. ~'- ~~ 1.; /5 .1?<Jcy 1"Ja,''-L v-k: s --'[.~,Te.eJ..._., 07L 2' L--. a:tt6e.J201. {} rJ.-l! 'tf----. tv (j~L-~-L o~L.. Lv <t ~ '-1~ J:U~-j'L ~ /"t L (l ~L1j (} /YV-~ a o ~ '~: I db '7b6 ~~ ifJ/-vOr cr'~' D 4A--L-- -.F 7\ 6~.<.~' ' , I l " ~~~~~~~I- tl/'. {~c0ve-CL '--rJ" Sll'.JL4'L ~ D fu erb IG C. (1 . ~/VtCcr 1>-,,- b7rn ,,-.~ RECEIVED APR 2 2 2008 City of Bremerton City Attorney's Office ;~~~? --- AFTER RECORDING MAIL TO: Name paul A. and Marv E. schmidt Addressp .0. Box 2298 City, State, Zip Bremerton, WA 98310 Statutory Warranty Deed LAND TITLE COMPANY OF KITSAP COUNTY E-128967 Escrow No.S-12731-CA 11UEc;~()1l AUTHORITY PROVIDED UNDER KITSAP SUPERIOR COURT CAUSE NO. 96-2-02129-8, JOHN S. MCDONALD, RECEIVER for and in consideration of TEN DOLLARS AND OTHER VALUABLE CONSIDERATION in hand paid, conveys and warrants to PAUL A. SCHMIDT AND MARY E. SCHMIDT, husband and wife. the following described real estate, situated in the County of Kits ap , State of Washington: complete Legal Description attached hereto as Exhibit "A" on page 2. Abbreviated 11egal Description: Quarter: NE,SW & NW,SE Section 13, Township 23 North, Range 1 West Tax Account No.: 132301-3-003-1006, 132301-3-004-1005, 132301-3-005-1004, 132301-3-006-1003, 132301-3-007-1002, 132301-3-008-1001, 132301-3-009-1000, 13 23 01- 4 _ 011-10 04, 132301-4- 012 -1003, 132301- 3 - 013 -1002, 132301- 4 - 014 -100 1, 132301-40015-1000, 132301-4-016-1009, 132301-4-017-1008, 132301-4-018-1007 Dated: jiji~N"s ':"M'CDONALD'," RECE'ivER' 'PURSUANT' '1'0" ... ............... ...... ...... .............. ........ .,. .............. SUPERIOR COURT CAUSE NO. 96-2-02129-8 .. . . . .. .. . .. . . . . . . .. . . .. .. .. .. . .. .. . .. . . . . .. .. . . .. .. . . .. . .. .. . . . . .. .. ............................................................. -- . . . .. . STATE OF COUNTY OF This is to certify that on the date of before me personally appeared JOHN S. MCDONALD, to me known to be the RECEIVER, PURSUANT TO KITSAP SUPERIOR COURT CAUSE NO. 96-2-02129-8 and acknowledged the said instrument to be the free and voluntary act and deed of said RECEIVER for the uses and purposes therein mentioned, and on oath stated that HE WAS authorized to execute the said instrument on behal~ of said partnership. Notary Public in and for the State of Residing at: My Appointment expires: II~tll ~~~~rd~~~~~~~-SKIA South Ii"! Exhibit "B" r" f .- .. I ...... ~;~: .~.,'~, . ..<.' ..' ':.' i'H.. ...... ..........: ........ j.<: ~7 >.':~\"o: "',: .. !;j^/J:(/::~'!:" :>, ,. (. "~~~0;~~:.!:~:: 1~1)":/H<" H,,/i ~:;: . .>:;lZ. .........1,,:' Il>,": .i;/ "'i.' ....-'- ii' .....:i: ...........",,'./~:,;:: >;j':: ":\,:.1/,:.",' ';; ~'..: .:.H. i:" . . ..,.. '.., :.:.........)! ""'.i'."" .<';;>: :.\;',.."t;;:) /} :.'..';:..",. :....: . .'.',"" ." ../i;>;';!;;'!';": .'. " .........' ....... .<.{: ........:. ;;/(:/.i} ...:.....:.:. .......... ......,....... 1: . .......... !;". '''> .....:, ........ .......... '.' .... ............ i.:/,)} :.......... .....,. '.';. I; .... ,- .... '., ......//.................:.. . ,...........'/. ;....:.' : '//',.::}: . ..' : ..'. .... ;,::. :.:</( .,'.:: "u ....:. .... .:..... ':'. . .;. .' ..... ;..~.(;. ,'.' ~7 .. '. ..:...... .... ....: ...:..;...:..:.... in).: j, !.r"'- II .......... ........: ....... "._,.....\ c,:....< ';;. ,,':'; /...',' '.; ..< . '\'.J.;'.'; .. ..:...~:_ ~.;. ......C\,. ......>> . .... ....... .........:.. .,,,,#~:< '.::.::. .....:.::. i.:: ..:.,'.. /.. ~;/i:' ........ .,,: '>>'. ..... ~~/H' ...:...... ....... ;.:. ". ,.;" "/." ....'...; ...... .. .:. ~>>';; . :'. ....... ,:,,)"i: :" . .... ..' .......... ',,).>:,.:',..<.. ;.i. . '~~';i b ';',:,"<,.?>.. ........ '.,'.' ..... .:.. ....... ...... ~,,> . ..... ." ...... . ." ..>,.... .,/.:i. ........ .... ....< <i' ./I~ ........./........... ....\. .... ....., ...... ::..' . /'./.,..1...... ..' .' ...... ,>'J .... /:'>i.:.:7;"~.i .,>~:.,.. ;..:../......1 ... :..,' ..... ')L;~>...>)J ~:-..',.." ..' >c:;. ,.i ..'<:, ;-:.:. ,." .' ''-.: <:.' .,f:'-"~v .,.' :.,. ....... i :'.> .,) i:~<~'-' ". \.:. ....'\ ':":".>. 'i.', . ..,,;'/ t~~~:: " ..... .'~<. 1)1' ..... . .:.;.:>:; ....>..,;;..~,,:J."j...;. f\)>~. !'.. ....... .......' i<.' ~';L\;:...'> /';' I.t>..;~ ;:{ I'- r- ..... >.. ..:........;.; ....... ....../).i.)...' . ......n . ....... .....'[.: ........ ..........;~:;;;. !;ix/ .,;..................>~,'.~v .';:. :.).1. ..... .. ..' ... '" ~:. .lil__Z2~"'<" ..\..... ..,: "',' i...... ...... .'::' :.: .:.... .",. ...... r< : '., ..... .:.... ,.' . i.. . ....... .. ,1\" .,.....,.. .... :.<'; ....... > ;\,.; ~;3! , . \i~ ,-., m '" ;/ N A Legend 9MUI_J.. 'III_II' SKIA UGA l.M:O:~l<.G~::" ji"."J City Limits The City Of Bremerton does not wfiuanlll1e accuracy Of 11",IS Infom,aHon or mapplng, which stlOuld not be relied upon withoul independent verification of accuracy The user assumes al! risl-..S related lO or arrislng from the use of thiS information or mapping. Prepared By. Lindsey Sehmel Prinllng Dale: June 3. 2008 File: RICommllnily Develop"'enl\C ommunily OavelopmenllGI S_Archi velRevised_ Slruclure\Bremerton _ CilylGrowlh_AnnexlS KIAISKIA MapslSKIA _ S _ Exh_. 8. mxd City of Bremenon _11 ;- ~~~a ob~;;::~~~~~~':e~~t~~~ EXh;~::;:~:'/, I . . Geographically Modified to Incorporate:;,'";~;;/:<~;:~:;'~ ,. .'. Schmidt Request ~~d~/PO~i~.~.o.f~a~e~lo~a RO~d ~:i;S;Ql D.... ,f!I<ff' . " .' I ./.' ; "/,' ." " ,,' .' "", .' / ' / .,~ ,/ A I-~.JJ~ . 'I"'" ,-I' ^,/ ,. ,~ .;f ,. , './ ' ,/ \ - ,.-i> ,?,,/' r___'?J <'~ if' l"~F,r "rl /" ~ ~', / _ />-/~,,/,,:/ :/ /.~i" / '>"~./.~ ;'~~ /: <.../ -:..< ,J .' /' ~ / \' :'/1,' / ~ /' . ",,' ,,'/ / ,// ',/ T ' /'j./ //', / i!!!1".. ,,' <'" ....If' / ~/" /r ~<c /~' ,;.r, /,;r.",,.,...# ,~f. /..'"/'"...''' {'4..."" .( '\ \ \" < " . ". ~ ~/ .... >" I' '- -d ./",; /' '" --" f /.. / .r -" .. '", \ \\, . " ./ " / /' /./ /'''' " --' //' '.' --r;~ ",,, '/ :t 1,./ /",' /.//1'<""/,// I '/"~' , j , , " /," I / /"" 1 y/" \. "r~~~~~i- · ,'\, \. " Ii \~ '\ " ,~",>\, - LJ , I :!: Legend REVISED N A _1II1aL 'III_II' SKIA UGA ,...1.. t{;~.j City Limits The City of Bremerton does not warrant the accuracy of this information or mapping, which should not be relied upon without independent verification of accuracy. The user assumes all risks related to or arrising from the use of this information or mapping. CITY OF BREMERTON Follow-Up Information/Updates SKIA Area Annexation Financial Impacts Assessment f'~. lor L H~ by ftJ~ftJlf7e, rXVlQ..~ ~+. City Council was previously provided a "Financial Assessment - SKIA Area Annexation report" which described three growth scenarios and described estimated direct financial impacts under that scenario's assumptions if annexation occurs. The 20 year period analyzed covers 2009 through 2028. Staff presented and summarized this information to the City Council at the regularly scheduled June 11 th study session. It was requested at that time that follow up information be provided on the impacts associated with: - Adding Costs for a Sub Area Planning Process - Adding Some Additional Cost for Administrative/Community Development Staff Support 1) All Scenarios - Added $200,000 in 2009 as a General Fund expense item for a Sub Area Planning Process. The estimated cost includes money for plan preparation, an environmental impact review, and an economic feasibility analysis. 2) Assumed additional General Fund expense equivalent to the amount necessary to staff a full time Building Development Specialist II position ($78,621 in 2008 dollars) plus an additional $25,000 per year (in 2008 dollars) for related expenses. It should be noted that the original analysis did not include these kinds of costs because there are also various permit and inspection fee revenues etc which are expected (in large part) to cover the costs of such expenditures that would also need to be shown. Staff concluded that including the gross revenues and expenditures in the analysis - when they offset one another and affect the General Fund only - did not seem necessary to the decision process. However, recognizing that not all costs are fully recovered from such fees and permits and based on City Council's specific request - this follow-up analysis introduces some additional costs accordingly and continues to ignore related fees and permit revenues for such work. The annual labor costs as described plus expenses are allocated as follows under the three scenarios in this follow-up analysis: Scenario A ("Low Growth") - No allocation of additional annual costs for Administrative/Community Development staff support were added as the growth assumed in this scenario does not warrant such an addition. . Scenario B ("Hiqh Growth") - 25% allocation of additional annual costs for Administrative/Community Development staff support and associated expenses were added based on the level of growth assumed in this scenario. Escalated by 3% in each year thereafter. Scenario C ("SKIA Sub Area Plan") - 50% allocation of additional annual costs for Administrative/Community Development staff support and associated expenses were added based on the level of growth assumed in this scenario. Escalated by 3% in each year thereafter. The tables and information on the next page summarize the results of adding these additional costs into the financial projections for each scenario and compares those results to the original analysis data. p,. ?-crt- 2 Scenario A - "Low Growth" Original Analysis Follow-Up Analysis Average Annual Average Annual Summary Receipts/Expenditures - Average Annual Amounts 2009 - 2028 2009 - 2028 J~it~I~R~ceiptSt;f:'~;t_~~i!(~~~~:'F~;:~iz~~t~:~,;~::~~~:~:~"~,J'~~,~~::~~~jJ~:~~;>~~j2!;Tl: (~.5't~;~':j X$i~4t:{i;'i~",~!Z,f::t;~36~;:26M ':'$F~;{(;:'~~~~1ii;:; :"ii:ri.36~;26~~ Total Ex enditures 310,873 320,873 - - -- 'n -- - , $ - - - $ -' NET AVERAGE ANNUAL RECEIPTS 53,388 43,388 J - --.. - - - -- - - -- - -- -- l -- -- p -Annual Average Net Annual Receipts of $43,388 vs. $53,388 in Original Analysis -General Fund Expends More than Received in the First Three Years Due to Projected Payments to Kitsap County (Revenue Sharing Agreement). Negative Amount in First Year is Higher with the Follow-up Cost Addition. but the Conclusion is Unchanged. -Utility Systems and General Fund (After First Three Years) Are Consistently in a Net Annual Positive Position Throughout the 20-Year Period Forecasted. Conclusion Does Not Change with the Addition of These Follow-up Costs. -Ending Cumulative Financial Impact for the City in this Low Growth Scenario is a Positive $867,766 vs. $1,067,766 in the Original Analysis. Scenario 8 - "High Growth" Original Analysis Follow-Up Analysis Average Annual Average Annual Summary Receipts/Expenditures - Average Annual Amounts 2009 - 2028 2009 - 2028 :r:otal~;Re~ei pts~il~~:,' ~ ~~~~:~~,t~~~~~,:1>~~\~0~~,'~~tr~~~~~:;.~;i~~[;..;;;'f:' ~;~":~) ::j~~i::~fj~? ~~':,;7::::.J'.).;;~:;\ ~~;'.~;~ ~~$)';7~kf.t;,:,;~!':t~~~.~t;7:94~1'28:', ~$_c';;; :~l:~::l$:~: ::,[:~1[,:'7.94;~28j Total Expenditures 1,470,351 1,515,155 , -- ANNUAL -- - -- $ -- -- - - - 323,778 --$ --- - -- ,- - -- - 278,973 NET AVERAGE RECEIPTS r " - -- -' -- -- --- - -- -Annual Average Net Annual Receipts of $278,973 vs. $323,778 in Original Analysis -General Fund Expends More than Received in the First Two Years Due to Projected Payments to Kitsap County (Revenue Sharing Agreement). Negative Amount was Confined to the First Year Only in the Original Impact Analysis. -General Fund (After First Two Years) Is Consistently in a Net Annual Positive Position Throughout the 20-Year Period Forecasted - Positive Cumulative Impact of $5,302,236 vs. $6,198,320 in Original Analysis -Utility Systems Also Generally Experience Net Annual Positive Impacts With the Exception of the Years 2014 and 2020. Which Have Significant Capital Expenditures - Positive Cumulative Impact of $277,232 (No Change) -Ending Cumulative Financial Impact for the Overall City in this High Growth Scenario is a Positive $5,579,468 vs. 6,475,552 in the Original Analysis. Scenario C - "SKIA Sub Area Plan" Original Analysis Average Annual 2009 - 2028 ~$1,:.:f;;{-f,,~i;;:~.\(, 5~91~1';38l,' ;:$'\(:, . 5,542,201 Follow-Up Analysis Average Annual 2009 - 2028 ,:;;;'~,~;'5;911';387,;: 5,621,810 Summa Receipts/Expenditures - Average Annual Amounts ~ota",;~e~eiptS:,:I~<~~)~:'.:~~..1'f~~,',:~i;;-~~\4 i~v~~ ~~;~;;~~::~?;,;'r~i~fX?ii~t.~~ Total Expenditures -Annual Average Net Annual Receipts of $289,577 vs. $369,186 in Original Analysis -General Fund Is Consistently in a Net Annual Positive Position Throughout the 20-Year Period Forecasted With Exception of the First Year Due to the Additional One Time Expenditure Item of the Sub Area Planning Costs and 2016 and 2017 - Which Shows Drawdown of Bond Proceeds Receipted in During 2015 - Positive Cumulative Impact of 58.868.041 vs. 510.460.209 in the Oriqinal Analvsis. -Utility Systems Experience a Mixture of Net Annual Positive and Negative Impacts . Due to Greater Capital Expenditures Over a Longer Period of Time - Negative Cumulative Impact of $3,076,496 (No Change) -Ending Cumulative Financial Impact for the Overall City in this EXTREMELY HIGH Growth Scenario is a Positive $5,791,545 vs. $7,383,713 in the Original Analysis Page 1 of 1 From: Laura Lyon Sent: Friday, June 13, 2008 8:14 AM To: 'Will Maupin'; Phil Williams; Andrea Spencer Cc: City Council Subject: RE: SKIA Annexation Analysis Will, We will do (have done for the most part) the follow-up work requested by City Council and we will try to make sure to address your key points/observations in the course of the presentation. As to item 5. in your list, I will let Phil answer that one directly as I do not personally know the answer to that. I did want to let you know that we (staff) did originally discuss adding costs for the administrative and particularly DCD staff time to manage the permitting, plan review, etc. but did not put it in the analysis because we would also collect fees for such services which are designed to cover those costs (for the most part) and it really did not seem to serve much purpose to have both items that essentially net to zero and impact only the same fund (Gen Fund) added into the analysis - so we left both sides of the picture out. However, recognizing that the fees do not cover absolutely everything we will be running a revision in response to Council's request - with some additional labor and expense for this kind of additional staff support - with no offsetting revenues for permit and building inspection fees etc. - as a placeholder for the costs that would be incurred and not adequately recovered by the various fees imposed. Just wanted to let you know that we had not just ignored this matter. Laura S. Lyon, CPA Director of F:inancial Services City of Bremerton (360) 473-5722 From: Will Maupin [mailto:WiII.Maupin@comcast.net] Sent: Thursday, June 12, 20084:41 PM To: Laura Lyon; Phil Williams; Andrea Spencer Cc: City Council Subject: SKIA Annexation Analysis Laura & Phil, After thinking about the analysis and reading the article in the paper this morning, I have few comments: 1. It seems to me that we are trying to figure out the difference to us financially between annexing and not annexing SKIA. 2. I also think whatever net positive financial result we have will be seen as a loss to the county (and probably Port Orchard). 3. As we discussed last night, I think we should add an expense item for the additional planning and administrative time would be caused by the annexation. 4. We should point out that the utility tax and the PILOT is something that the county would not get if they were providing the service. 5. For water, I assume that we would put in the additional infrastructure to accommodate growth whether or not we annex the area. 6. Our water receipts would actually go down if we annex the area. Will 6/13/2008 Page 1 of 1 From: Mike Shepherd [mike.shepherdlikestrees@gmail.com] Sent: Friday, June 13, 2008 4:33 PM To: City Council Cc: Adam Brockus; Brad Gehring; Carol Arends; Cecil McConnell; Dianne Robinson; Nick Wofford; Roy Runyon; Will Maupin Subject: Re: FW: SKIA Annexation Analysis I believe a key difference for me in the discussion is the subarea planning process. The county approach is to require a master plan by the developers at their cost in advance of any development, whereas if annexed it appears we would do the necessary planning out of general funds, then use the increased revenue to repay the general fund. In my mind I believe it would reduce the concerns of the other parties because the actual revenues for the first few years would actually be offset by the costs of preparing plans and permits. Thus the real difference is about organizational capacity to do the work of serving an approved urbanizing area.. 6/13/2008 Page 1 of 1 From: Andrea Spencer Sent: Monday, June 16, 2008 11 :02 AM To: 'Mike Shepherd' Cc: City Council; Roger Lubovich Subject: RE: SKIA sub area plan Mike- You raise a good question. The SKIA Sub Area Plan is a County adopted document and does 'not run with the land' - if annexed to Bremerton the document would not transfer automatically. If the Council desired to adopt the County's plan, an ordinance would need to be drafted and adopted to enact the SKIA Sub Area Plan for Bremerton. Andrea From: Mike Shepherd [mailto:mike.shepherdlikestrees@gmail.com] Sent: Monday, June 16, 2008 10:38 AM To: Andrea Spencer Cc: City Council Subject: SKIA sub area plan I have reviewed the existing SKlA sub area plan and find it is probably just fine for that area. The County planning commission and County Commissioners put in a lot of work on the plan and it seems pretty comprehensive for what it is designed to be which is a industrial area in a rural part of the county with a considerable amount of wildlife and habitat including critical areas. My question is: If annexed would the existing sub area plan move with the properties as written and continue to be the development standard until the City writes its own new sub area plan? thank you 6/1612008 " , l) .I ,1; l,,) (f) J ~ ~ !;);~-'~)t?y> 11 i: /,;) ~ @ tdf. ~ 3 ~jt<- rtJ_ ~ r~M~~(/D ~O- If: /J~1f;t /JUf71'/J ~/4'5 ~ ~j} a.A?/tJ/. ~<s; .; ",/, :k) 1'- u./~J1?d/ ~ ;1, ~'1cJ) JI.A ~"5 v,"J*o/ w~" t:J/LL.. C7 Tr-- <t. /. . jU)t-V v~ .b/.af io ~ e!J4T ~ $tJAuI\A.("04w~_ ~yfr- rk-.//tikPso ~~-' ~i5ap~ i~ ;~> . (5lbr ItJtJ y;i".... 5-ttr/ M..tVdrN tb.. 9't:' ?fC/Z> rr.{L./ t,~ ( ~ l;;~ "'$. 'ri~ /lAA2Z~t JI. ~G-~J -AIL ~ 7~ ~ S/A.~_/ ~ ~1t3 0 Rf>zyr ~ VA"'!! f)v~~ . Ji1/ aJe& f)vt,Ic,.. '. . Pr:e~ G/t& foB bt C11eK'f l ~\r Y\ceYf POrt--o~ PORT OF BREMERTON 6~" DISCUSSIONS WITH DEVELOPERS'AND DEVELOPMENT PROFESSIONALS April 2 and 3, 2008 1. Assessment of Potential. R.t.~ -f-o :c1&n~ q. Of\. f~e- 3 a. Location remains significant challenge. . Real/perceived advantages of 1-5 corridor hard to overcome. . Growth in industrial, warehousing is flowing south from Seattle along 1-5 - with Kent Valley filling, Fife, DuPont, Lacey are drawing development, but also becoming more selective. Major beneficiary is Centralia area, reinforced by its location between Seattle/Tacoma and Portland. May be somewhat slowed by recent flooding. Frederickson in east/central Pierce County is also an attractive option now, after 20 or so years in waiting. b. POB acreage represents "lifetimes" of land in lower tier market. Even in heart of 1-5 corridor, very few users take more than 100 acres on their own. c. Second Tacoma Narrows Bridge represents major access improvement, but some additional transportation investment still needed for direct site connection to' limited access highway. Also existing local limited access highway is built to planned capacity. We need to include drive times to/from 1-5 in materials. Improved connections also make commuting out of Kitsap for employment elsewhere easier. d. Kitsap constrained in attracting major distributors ~ a large user of industrial land - by having small local market. Number of genuine industrial users is declining as result of larger economic trends. e. Puget Sound region will continue to grow: PSRC projections reasonable regardless of short-term economic conditions. Kitsap will become more attractive as growth is pushed further south along 1-$ for both availability and land cost. f. Because it was acquired with FAA funds for airport-related purposes, the vast bulk of the Port's land may only be leased, not sold. This is a major impediment to development, particularly with more competitive land readily available. Can be somewhat ameliorated by longer term leases (not less than 75 years) and other measures, per below. g. Rail service is an underappreciated asset. " . ,. -1- h. Port investment in infrastructure (utilities and fiber bandwidth) could be key. But see qualifications below regarding relatively greater importance of entitlements and tying infrastructure investment to pace of actual development. 1. General consensus is that long-term future will be more promising. Patience is counseled. 2. Development Concepts to Explore. a. Defense-related campus. Generalinterest (both volunteered and in response to questions). Leverages existing driver oflocal economy. Could reinforce military presence and draw additional support activities to area, although PSNS is an "end-user" of supplies and equipment. Development of shared facilities for multiple tenants with suitable structural, technological and security systems may be possible. Port should not self-perform but rely on developer(s) committed to concept. b. Airport-related development. General aviation is experiencing considerable growth in the Puget Sound region. As Paine, SeaTac and Renton reach capacity, there may be greater opportunity for more secondary fields. Bremerton National is little-known, underutilized field. Follow up with promoters of concept at Tacoma Narrows Airport. c. Conventional industrial/distribution uses. . Option up to 200 acres to developer for as long as five years, specific siting subject to POB approval. Perhaps several sites of varying sizes already identified within optioned tract. No monetary compensation, but deliverables/milestones in terms of marketing; entitlements. Expect to pay third-party costs (consultants). Require periodic reporting to sustain option. . . Retain major broker with approach similarto above (although developer above also likely to retain broker). d. Location of essential public services/institutions (e.g., corrections). e. SEED/"green" development/"green" infrastructure. Interesting, likeable concepts, but need to be validated in the marketplace before substantial investments should be made. Should be among concepts tested through marketing. End-uses should be produced by developers, not POB. Sustainable (green) infrastructure may be an attractive, distinguishing attribute but should follow tenant commitment(s) not bet on or be considered lures for tenants, particularly with less competitive location. Study, cost out, even plan for sustainable infrastructure options, but actually construct only after tenants commit. -2- '" 3. General Recommendations. a. Pursue entitlements and planning; : ... . Entitlements more valuable than infrastructure, although infrastructure planning will likely be a feature of entitlement process. (Entitlements are an "if'; infrastructure is a "when."). Would be concurrent with and inform planning. Examples would be updating critical area assessment/constraints; SEP A compliance. . Plan for phased development, identify area(s) as initial priorities, including specific sites of varying sizes. Produce/update overall site plans for marketing purposes. Consider SKIA-wide, voluntary (non-regulatory) planning that could yield shared approaches to infrastructure, wetland preservation/mitigation, other benefits. . Infrastructure planning should assume phased construction consistent with development priorities and pace. . Evaluate role ofPOB as SEPA lead agency; confirm authority, availability; and evaluate against other options (will vary with outcome of annexation). ~ a. Pursue annexation into City of Bremerton. . Bremerton considered among better jurisdictions for speed, consistency and predictability of entitlement process. Considerable recent experience. . Perceived to have greater capacity to and stronger motivation for supporting infrastructure necessary for development ofPOB property. . Cities generally favored over counties (authority, commitment, capacity). b. Consider alternative, probably interim uses of property that may yield revenues and conceivably preserve options going forward: natural resource use (gravel); potentially wetlands mitigation. c. Evaluate, implement measures to overcome lease limitation. Confirm availability of longer term. Consider subordination to developer lenders. Explore substitution or even buyout/withdrawal of FAA restrictions, maybe in conjunction with Defense-related development campus. Be willing to sacrifice rent for flexibility in reducing land commItted or recovery altogether to accommodate changing uses. Review lease form. -3- . d. Additional marketing: regional/generic, possibly in conjunction with other organizations and/or more use/project specific. K:\2066159\00001\20126_BGJ\20126025MA -4- ~:,;,:;c 'if/- -'j, ..J . l" 'illl~ City of B rem erton-S KIA Annexation Proposals Page 1 Legend ....11I. 1.1II.i SKIA UGA ~ City Limits C Tax Parcels _ SKIA North Petitions . Haines Request Letter _ SKIA South Petitions _ Schmidt Request Letter The City of Bremerton Does not warrant the accuracy of this infonnation .or mapping, which should not be relied upon without independent verification or accuracy. The user. assumes all risks related to or arising from the use of this infonnation or mapping. June 5th, 2008 N A , ~ . J ( ~ Financial Assessment - SKIA Annexation June 2008 City of Bremerton, Washington Growth Framework and Annexation The Washington State Growth Management Act (GMA) sets a framework and direction for'coordinated and efficient growth of communities. Under the GMA counties establish Urban Growth Areas (UGAs) wherein population and, employment is expected to be " c':i;"";~!"iJ~5,"<::;;,,;:,,'j;;<coRcentrated~Qv 'r:"time:~;\,UGAs should.ever;ltually.be provided.,urban.lev,elsofservice; ',,,-,,<..: ,.' , ,~) "';"c' :.0:~;t~';?:~~lj;~l~;~~;~~f~A'a~'~1fci~t1Gctcrr ~ "itia;~'h6~ta~~I~~~1I;(~~;fJrb~fi;Jrne~ri'~jt;gfiif~v~ibpm~ii't(t:Tfii~:i'Rt~W~lt90~t~:,';F:f~1:1;i}~~~?\:ji:;!~;~,~ within UGAs allows for areas outside of them td remairirural orresource lands, and , . , ensures protection of the State's natural environment. The South Kitsap Industrial Area (SKIA) UGA was established by Kitsap County more than a decade ago. Generally speaking, state law allows and encourages cities to annex territories within UGAs adjacent to their boundaries. The SKIA UGA is adjacent to only one municipality, the City of Bremerton. This report was prepared in response to the City's receipt of two annexation petitions from property owners within the SKIA UGA. The two petitions were presented to the City on April 22, 2008 and are described as the "SKIA North Petition" and the "SKIA South Petition" please see report page 1 for a map of the proposed annexation area. The means by which annexation is being proposed is the "Seventy-Five Percent Petition Annexation Method" as allowed for by RCW 35.13.125. In summary, this annexation method is a two-s~ep process whereby two petitions (a "10% Petition" and a "75% Petition") must be submitted to a jurisdiction. The first petition or "Initiation Petition" requires signatures from owners of 10% of the assessed property value who are interested in annexing. This petition is then submitted to the governing body to initiate the annexation proceedings. The City Council then responds by meeting with the petitioners within 60 days. Following this meeting with the petitioners, the City Council has the option to accept, reject, or geographically modify the petition, and this decision is usually made in the form of a motion or resolution. If the Council chooses to accept the petition, as presented or modified, then the annexation proceeds to the next step; gathering of the signatures of owners of 75% of the assessed property value of the territory proposed for annexation based on the boundaries set by the City Council as documented in their motion or resolution. As indicated above, the annexation was initiated by submittal of the 10% petition on April 22, 2008. The initiating parties represent the owners of 100% of the property according to the assessed valuation for which annexation is petitioned, which is well in excess of the 10% that is required. The City Council is scheduled to meet with the petitioners on June 16, 2008, which is within the 60-day period allowed by State law that they have to respond to this request. Due to the fact that the initiation petition contains signatures of the owners of 100% of the assessed value, it demonstrates a high degree of support from the property owners for this annexation proposal. If the City Council approves 10% petition it appears to be likely that a 75% petition would be promptly filed with the City. Due to this likelihood, staff utilized the full 60-day period in the early stages of the annexation process to put Page 2 of 10 t I" t " Financial Assessment - SKIA Annexation June 2008 City of Bremerton, Washington significant effort into researching and preparing the fiscal analysis of the potential annexation. This will allow Council to make an informed decision of whether to move the annexation to the next step, the collection of signatures for the 75% Petition. . . . . - Below is 'a table that describes the acres and total assessed values of the two petition requests that have been submitted to the City. In addition to the formal petitions, the City has also received two letters of interest from property owners to join the respective petitions (they are referred to. in the table as the "Schmidt Request" and the "Haines Request"). The annexation petition areas are also depicted on the map on page 1. Total Assessed % Assessed Acres Value. Value South Petition 3,011.59 58,926,984 99.23% Schmidt Reauest 76.8 $459,860 0.77% South Subtotal 3,088.39 $59,386,844 100.00% North Petition 135.11 $1,118,080 71.25% Haines Reauest 5.67 $451,120 28.75% North Subtotal 140.78 $1,569,200 100.00% Future Growth Analysis & Provision of Urban Services This report contains an analysis of assumed future growth and identifies the necessary urban services that are needed to support growth within the potential annexation area. The analysis presented illustrates how the City of Bremerton will provide the necessary "urban services." As defined by the Kitsap County Countywide Planning Policies, these urban services are: 1. Fire Protection & EMS 6. Transportation 2. Police Protection 7. Solid Waste 3. Sewer 8. Utilities: Power, Telecom, Broadband 4. Potable Water 9. Schools 5. Storm Water 10. Parks & Recreation The analysis contained in this report summarizes the costs associated with providing urban services 1 - 6. Items 7 and 8 are provided by third-party purveyors. The City, like the County, has franchise agreements with these purveyors to provide these services and they will continue to provide these services regardless of being located in the County or City and therefore they are not included in this report. Items 9 and 10 are also not analyzed in this report because it is assumed that all growth within SKIA is anticipated to be industrial in nature and therefore there will be no increased impact or need for schools or park and recreation opportunities. Page 3 of 10 10 J -4.. I, Financial Assessment - SKIA Annexation June 2008 City of Bremerton, Washington It should be understood that the analysis presented is dependent upon future events and that actual conditions may (and are likely to) differ from those assumed herein. The report presents three growth scenarios by which to consider the annexation: ; , "Lt~f'~tC'i~al "ir~~fl~~;f~~~t;~~wfi;"J!~rt~~~;l~(~l~rt,:;~~~~~~t~ett..BnH1~~9~~&Jl\~z,~,?:j~~t91i~'Y:~S~rK"~I;~~(;;i,~:t& ',' .' .' ua ':c os~ wma c ' ~~; lIe,;curren ::grOVYLII~pa ,e,rnS?e?CR~r1~nG,tnJW:/1 , 'Jnt ., t\,vi::{rr, Scenario B: ' High Growth - Aggressive growth that is primarily focused within the Port Industrial Park over the 20 year period. Scenario C: SKIA Sub Area Plan Growth - Aggressive growth within the entire SKIA UGA over the 20 year planning horizon. These scenarios provide a reasonable "bookend" approach to determine the full range of financial impacts of the annexation. We believe that the future growth patterns will likely fall somewhere between these scenarios, and as such they are a good demonstration of the full range of potential financial impacts to the City and will help to determine if it is in the City's best interest to accept these annexation petitions. SCENARIO A - LOW GROWTH Scenario A: Low Growth Development Summary This growth model is considered the low end picture of what the City may face if an annexation was completed and growth occurred in this area in the same scope and scale that it has occurred in recent years (this can be viewed as the "status quo development pattern"). Under this scenario it is expected that there will be small business growth within the Port Industrial Park, increasing by two (2) new businesses every five (5) years. It is estimated that this development will occur on small parcels, approximately 1 .5 acres in size, and the businesses will be accommodated in approximately 15,000 square feet. 20-Year Low Growth Summary New Businesses: 8 New Employees: 145 Increase in Commercial Square Feet: 120,000 Increase In Acreage Developed: 12 Page 4 of 10 \~ ~. t Financial Assessment - SKIA Annexation June 2008 City of Bremerton, Washington . Scenario A: Low Growth Provision for Urban Services Summary The following table summarizes the assumptions made to support each of the urban. services under the low growth scenario: Potable Water , :~~,,~~'grQ~~~lq~i~!',SiiE.~,~~~~~rXiG~~~~!I!:&:fi~p!:53~t~~,<t,,~y~~,C),~!~::~i~~I?,;"i _ '~.Fire,\tlifol!i' tiariiintenocaLa -teemenhvitn:'tlie:C' -';i:''\:c:<:\~:~~,~.";';:;:{l_::c:~:;;:. ,- Police service and: coverage of the current sou~hBremertori area; watershed area, and the proposed annexation area is expected in combination to require an increase in staffing of a sector patrol unit. The annexation analysis shows a portion of these costs attributed 10% to the rowth in this scenario. . This scenario does not anticipate any extensive roadway improvements. While there is several transportation facilities within the annexation area, most are owned and maintained by the State of Washington DOT (SR3), and Port of Bremerton (Industrial Park) and therefore the City would not have significant responsibility for roadway improvements. With the low growth expected in this scenario we estimate that there will not be any change to the transportation demands, and furthennore new road construction would not be necessary. Therefore it is assumed that we will only need to su ort road maintenance in a minimal ca acit . This scenario does not anticipate any additional sewer infrastructure improvements for the area. There is sufficient capacity with the Port of Bremerton wastewater collection and treatment system to support ' development in the planning period, and it is assumed in this scenario that the Port would continue to own and operate this system throughout the planning period and therefore the City has no financial expenditures to provide this service. Any required improvements to this system and all maintenance costs are assumed to be provided by Port of Bremerton lease revenues and would not flow through City of Bremerton budgets. As development occurs, projects will be required to construct necessary improvements as re uired durin the develo ment review process. This scenario does not anticipate any additional water system improvements. There is sufficient existing water supply capacity in the zone serving this area to meet current and projected demands, including fire flow under through the 20-year planning horizon. As development occurs, projects will be required to construct necessary im rovements as re uired durin the develo ment review rocess. This scenario does not anticipate any additional stormwater capital improvements, as there are existing facilities in place that serve the needs. As development occurs, projects will be required to mitigate their on-site stormwater impacts through the use of both standard and low im act develo ment techni ues. Transportation Sewer (Wastewater) Storm Water Page 5 of 10 Financial Assessment - SKIA Annexation June 2008 City of Bremerton, Washington Scenario A: Low Gro.wth Financial Summary The full financial analysis for this. scenario and the supporting notes, assumptions, and data tables are provided in the "Scenario A" section of this report. .;~(;i,~;.;,: ",;. :.,; .,~r.;,; .'Thef<fiQaneial~m0gelir;lgJprJhis,s.c~nario: indi.cate~ ,a .net 1?9sitiye..iri1pacUo.Jhe"City,;at, tbe ?;~~t~~*tt'Fri\lf9~~?~;~f~~~E;~fa';t6f~f5~fp~[i(ja~1~yl~witdt(2(j9~~~'02'~~~b~tfit~ffaQiti::~~trl~~~~tffl~Fi~~JG~~~~J{~~~~;~~;':, negatively impacted in years 2009 to 2011 due to the fact the City will need to make' payment to Kitsap County for revenue sharing in accordance with the interlocal agreement for revenue sharing. Throughout the timeframe of twenty years the annual net (General Fund plus Utilities' Fund) return to the City ranges from a negative amount of $16,227 to positive amount of $121,708. In summary, the base annexation picture with the Low Growth Scenario appears to be a positive financial impact for the City based on the assumptions modeled . . and has averaae net annual revenue of just over $50,000 with an ending cumulative 20-year financial gain of $1,067,766. SCENARIO B - HIGH GROWTH Scenario B: High Growth Development Summary This growth model was developed to provide a model of development that fell between the conservative Low Growth model and the aggressively high growth model of the Kitsap County Sub Area Plan. The High Growth model is based on the assumption that only those parcels that are in the Port Industrial Park and to a lesser extent, those parcels that are adjacent to the Highway in the "North" petition area would experience any development in the 20-year horizon, and that the City would focus infrastructure improvements in these areas alone to support this growth. Under this scenario it is expected that there will be fairly aggressive growth, increasing by fifteen (15) new businesses every five (5) years. It is estimated that this development will occur on moderately sized parcels, just under 3.5 acres in size, and the each of the businesses will be accommodated in just over 33,300 square feet. 20-Year High Growth Summary New Businesses: 60 New Employees: 2,424 Increase in Commercial Square Feet: 2,000,000 Increase In Acreage Developed: 200 Page 6 of 10 ~ ,~ ,J" t ,I ~ Financial Assessment - SKIA Annexation June 2008 City of Bremerton, Washington ScenarioS: High Growth Provision for Urban Services Summary The following table summarizes the assumptions made to support each of the urban services under the low growth scenario: - - S~?~ ~:Eilte; . 'r6teCtion':-and~EMS~1sei:Vices.~will';De;i, ,'tovidetti-b' -~~:Solittir'J(' ::il~ ,~itsl;?;~Fife:tffrb[r";~~:EiR:~inl~fr~(j~li~~I';\t~3rri~rlttwiiti~ta7WGif''I~t:~t,,,_ ,,; Police service and coverage ofthecurrenrsouth Brerrierton ' area, watershed area, and the proposed annexation area is expected in combination to require an increase in staffing of a , sector patrol unit. The annexation analysis shows a portion of these costs attributed 25% to the rowth in this scenario. This scenario does not anticipate any extensive roadway improvements. While there is several transportation facilities within the annexation area, most are owned and maintained by the State of Washington DOT (SR3), and Port of Bremerton - (Industrial Park) and therefore the City would not have significant responsibility for roadway improvements. With the growth expected in this scenario we estimate that the transportation demands will be met by the State-owned and Port-owned facilities, and that new road construction by the City would not be necessary. In the early years of the model it is assumed that we will only need to support road maintenance in a minimal capacity, and as development increases over time the Cit will increase its sup ort accordin Iy~ This scenario results in wastewater flows exceeding the capacity of the current Port-owned system (72,500 gpd) by 2014. This scenario assumes the City would develop, fund, design, and construct a Membrane Bio-Reactor (MBR) treatment facility located on the site of the current Port of Bremerton Wastewater Treatment Plant (WWTP) in 2014. . An expansion of this system will be required in 2021. Disposal of treated wastewater will be through methods of water reuse with accom an in ca ital im rovements. This scenario illustrates the increased need for water and requires an additional transmission main from the golf course to the 01 m ic View Industrial Park b 2014. This scenario does not anticipate any additional stormwater capital improvements, as there are existing facilities in place that serve the needs. As development occurs, projects will be required to mitigate their on-site stormwater impacts through the use of both standard and low impact development techni ues. Police Protection' Transportation Sewer (Wastewater) Potable Water Storm Water Page 7 of 10 ~ ~ ,I Financial Assessment - SKIA Annexation June 2008 City of Bremerton, Washington Scenario B: High Growth Financial Summary The full financial analysis for this scenario and the supporting notes, assumptions, and data tables are provided in the "Scenario B" section of this report. . o " ;Jj.1i;~;:j~'~';::~~i~~~o~:~Jl~~~~~J~9.18q~i!~g~~lw:tthi,~; ~.~~.':laJi9d.~(ti,~tE(,~ i:~"<[~~tj~..~si~!y<~. tnW~~J.t!O~~~~'o~JJx,~M~,~;t:~ ',) ;, >} ("<;''''iJ~Y, ';'{"_1"1':''1'en~j",of.~tbe~p.erloa1revleV(ea:(2QOa.72028J:' ;?l;lilel,mQoel"ln~ lcates~ tltat:tI)e'<~en,eral~F:ur:lqJ""": "",;,{ . orilyexperiences one year of negative financial impact, which is caused by the fact that the City will need to make payment to Kitsap County for revenue sharing in accordance . with the interlocal agreement for revenue sharing. For all other years the General Fund experiences growth over time. In most years the Utilities Fund experiences positive financial benefits and in years 2014 and 2020 the model shows investment in capital improvements to support the growth. Throughout the timeframe of twenty years the annual net (General Fund plus Utilities Fund) return to the City ranges from a negative amount of $1,014,207 (due to investment in capital improvements utilizing prior period revenues) to a positive amount of $843,156. In summary, the base annexation picture with the High Growth Scenario appears to be a positive financial impact for the City Ibased on the assumptions modeled and has averaae net annual revenue, of just over $320,000 with an ending cumulative 20-year financial gain of $6,475,552. SCENARIO C - SKIA SUB AREA PLAN GROWTH Scenario C: SKIA Sub Area Plan Growth Development Summary This growth model describes development at an extremely high growth rate based on the "South Kitsap Industrial Area Sub-Area Plan" (SKIA SAP) dated December 8, 2003, developed and researched by Kitsap County Department of Community Development. The SKIA SAP recognizes a significantly high potential growth model for the UGA, with development expected at 550 acres over twenty years (2003-2023) and employment growth of roughly 9,350 new jobs over the same period. These numbers were . calculated with the expectation that infrastructure is available and the regional location of SKIA would draw large industrial and manufacturing companies similar to those found in other industrial areas of the Puget Sound. This scenario is considered a particularly elevated assumption of what the City may face financially if aggressively high growth occurred in this area. Under this scenario it is expected that there will be an increase of twenty-five (25) new businesses every five (5) years. It is estimated that this development will occur on larger sized parcels, approximately 5.5 acres in size, and that each of the businesses will be accommodated in approximately 77,000 square feet. 20-Year SKIA Sub Area Plan Growth Summary New Businesses: 100 .. New Employees: 9,333 Increase in Commercial Square Feet: 7,700,000 Increase In Acreage Developed: 550 Page 8 of 10 ..l, ;. Financial Assessment - SKIA Annexation June 2008 City of Bremerton, Washington Scenario C: SKIA Sub Area Plan Growth Provision for Urban Services Summary The following table summarizes the assumptions made to support each of the urban services under the low growth scenario: .' ' Police Protection ., €lii?thEir~a..r';':-ears~of(thetTloael;;Fire;:'rotec . ., "ancKEMS'servicesI.will l~(,~::" ~~~,~,.:,~.(<"y.~~;~/{'i-, ~,}I;''!.~~~'1''f;,..c,,,.;t.'''~'#'.~;j',r.. :, ~~,/.\, ;;:_.... ~'4\...- '''''!:''V1:'::~''';~ "1~.il' ' ""'"",,,r..,,:.{" .'Ir~':- ,y; ~<;..t -n ","__",:,-'_;0 ~'j"flloir~~>t.i"':' ~D~f: rovide(Uf':Sbuili')Kitsa' ~6ir:eTttiroiifh l'. tErdocara'r:eement~;ft '., " Q ,',''', ,..:,,,.y~ .,."',"""'.. ,p., "',,'''' '","," g" ,'x.. "" .'," ",,,,,,.g,,,., . --, ., "P',,' with the City: Due to the il'JcreasedgroWth demands' of this model, . . . ' . the City of Bremerton fire will transition to providing full service by 2015. This will require the construction of a new fire station with City staffin confi uration. Police service and coverage of the current south Bremerton area, watershed area, and the proposed annexation area is expected in combination to require an increase in staffing of a sector patrol unit. The annexation analysis shows a portion of. these costs attributed 50% to the rowth in this scenario. ' This scenario does not anticipate any extensive roadway improvements. While there is several transportation facilities within the annexation area, most are owned and maintained by the State of Washington DOT (SR3), alid Port of Bremerton (Industrial Park). With the growth expected in this scenario we estimate that the transportation demands will be met by the State-owned and Port- owned facilities, and that any new road construction would be funded by developers. Like the High growth model, the CitY has allocated road maintenance in a minimal capacity each year. As service, ' needs increase over time, with development occurring outside the Port and in the Southern portion of SKIA, more City streets will be created. With this model, capital funding has been allocated to support these new City streets. Transportation Potable Water This scenario models very rapid growth through the planning period, and this growth rate requires significant expansion of wastewater facilities, as the development far exceeds the capacity of an MBR (that was presented in the High Growth Scenario). The scenario assumes construction of City of Bremerton facilities to convey the wastewater from SKIA to the Westside WWTP via pump stations and additional wastewater mains. These improvements will take place in three hases This scenario illustrates the increased need for water and requires additional transmission and storage to be constructed in three hases. The Cit has ade uate source ca acit to serve the needs. This scenario .does not anticipate any additional stormwater capital improvements for the area, as there are existing facilities in place that serve the needs. As development occurs, projects will be required to mitigate their on-site stormwater impacts through the use of both standard and low im act develo ment techni ues. Sewer (Wastewater) Storm Water Page 9 of 10 \ J, Financial Assessment - SKIA Annexation June 2008 City of Bremerton, Washington Scenario C: SKIA Sub Area Plan Growth Financial Summary The full financial analysis for this scenario and the supporting notes, assumptions, and data tables are provided in the "Scenario C" section of this report. , ; , ,'"!1~m.,R~!~m,,q~~in9,iI9,~1.~~~~~m~tYit'!~.9,,,gr.\9~~i'~iei~';1.~I!.C?2n9.!~t~~\~:;9.~~~HR~il!Y~~~;0; "i,"" ~ t"'t""'''tti' "It::"t~"~' 't',rt"''''~''''''<''''' "'f't~' J'~'""'""H ",;;,i' , '''' .' ,,' ,,'" d' "(2008"202'8)-"''T'''' """"""'" 'I~'" '.:.I' "#"t" , ',.,. ~:~9:: -.~~,~/, Y;i\a,)~;!~~eQ~!9),~,~)p,(jlqQ~}X~YJ~W~}_' ,~, ,,~. ."::'~;~~f!/~fQ19":1~;}~H,I98.,~,S,, ' that,the General Fund does not experience any negative finaricialimpacts and iri fact is quite positively impacted throughout the forecast period. However, City utilities incurs substantial capital costs at various points in the modeling time period as they do not have sufficient time to recover from those initial investments in the period of analysis. With growth of this scope and scale, and with significant investments in the latter period of the analysis, it would be useful to model the growth demands over a period in excess of 20 years in order to properly understand the impacts to the Utility system. However this was beyond the scope of this analysis and overall, the citywide financial impact is substantially positive. In summary, the base annexation picture with the SKIA Sub Area Plan Scenario appears to be a positive financial impact for the City based on the assumptions modeled and has averaae net annual revenue of just under $370,000 with an ending cumulative 20-year financial gain of $7,383,713. Page 10 of 10 ~ ;. SKIA Annexation Financial Assessment June 2008 Part II of IV Scenario A "Low Growth" Lall Updftt~ June 4, 2006 Net,Flnanclallmpacb CattiOl,>FOIWard (1.) Be",..t&: Of' Property Tax Revenue (2) Of leasehok' Tal( RlI'IIlInue (3) OF Admllndons Till(' RovenlJe (<4) (if Patking Tax R.'IIenue (5) GF Sai~ Tax R....enue (6) GF B&O Tax Reveno. (7) GF Per Citplta Revenue Diatrlbutions from SUile (8) GF Relll Estate Excise Tax on Propolti Sate. (9) Of UtiUty Tax Revenull ~ ElecITelephlilnel501id.Waate (10) U'f Utility GFC Payments (WaterMlMtewater/stOfm) (11) Of De",elQper P~rnent (12) UT Dovelopor Payment (12) tiT Ulitity Rato R."'fl'IU05. \r\Wer (13) lJ.T lJUIty Rate Rovenlle. ~ Wute...er (13) UT Utifny Rate RfleftUCl- Stormwat.r (13) OF payment In lieu ofTp~WatorUtit((14) G' Payment in lieu of Tax - WasleWlIW Utility (14) GF Payment ift Llou anax ~ Stannweter UtlUty (14) GF Bond,Proceed$. GO Bonds (15) u;r Bond Proc..cis. Revenue BoM1i (15) T__", City 01- BremelteA - SI(IA Area AIll'lexaiion FinaRciaI Assesmeol Fmanciat Impacta Scenario. Annexation (~low GrowW) ~ 2010 imll $ (16,227) S 5,931 8,700 11,486 11,601 47,201 48,988 50.446 62,99B 67,674 63,967 95 96 100 17,1B5 18,2:5& 18,785 21,323 34,505 35,85& 36,934 55,580 58,El79 60,439 2,933 3,0.48 3,139 4,724 <4.1188 5,137 = 2,517 .62.ll 47 579 14,783 53,901 ~ 2015 2016 83,556 S 100,839 $ 160,330 14,931 18,208 18,390 55,495 57,566 59,257 77,033 107 6,713 20,517 311,531 85,684 3,360 5,563 76,210 81,725 80,851 110 113 116 21,133 22,390 23,062 2<4,719 40,717 42,308 43,577 67,655 71,343 73.484 3,461 3,596 3,704 285.461 326,033 308,688 5,751 6,064 6,246 WI 192,420 21,893 61,455 ~ ~ 2020 2021 267,104 S 312,856 $ 344,200 $ 424,692 90,174 22,112 22,333 26,183 26,445 63,248 65,096 67,497 69.457 120 85,823 92,032 98,535 97,636 124 127 131 135 7,782 25,147 25,902 27,402 28,224 28,656 24,415 30.497 45,276 "'6,634 48,033 49,902 51,399 77,448 3,848 6,583 79,772 82,165 86,553 89,150 3,964 4,083 4,2"'2 4,369 6,781 6,984 7,357 7,578 ~ 2023 473.640 $ 567,241 108,561 103,638 30,557 30,863 72,005 74,085 139 143 9,021 29,837 30,732 30,402 53,394 54,996 93,885 96,681 .(,538 4,675 7,979 8,218 2024 ~ 632.486 $ 681,268 110,960 118,627 Financlal,tmpact Scenario AJilMxatian ("LQW Growth") "" 31,172 35,688 76,226 79,010 148 152 31,654 33,442 ~" . 33,221 56,646 58,841 99,581 104,799 4,815 5,001 8,464 8,908 2026 2027 2028 787,272 $ 856,957 $ 978,665 36.045 40,866 41,274 61,263 84,236 66,647 117,717 130,517 124,951 157 161 166 10,458 34,445 36.367 37,458 35,2"'4 60,607 62.951 64,839 107,943 113,546 116,953 5,152 5,351 5,511 9,175 9.651 9,941 E~nd1SUfU: (if Pavment to Kltsap Count)'. Re'llenuo Sharing Agmt (16) Gf Fire/EMS SONice ExpeRY (17) GF PoJiC8 Service Expen5e (18) GF PublicWorkt. & Ul1litlts. Streoti & Bectronics (19) ur Public Works & lJtiIrtiflG - W.ter Expense (20) UT Public Works & Utlktifl$. Wastewater Expenso (20) U:r PublIC Works & utiSties. Stormwater Expense (20) (if Capital Coats. Generai Fund (police} (21) <if Clifli:IaI C061& - SV'oet6 & Etectronic& (22) U1 Capital Com.. Wa'rAr Sy~m (23) U:r Capital Cost&.. W8Stewaier Sylitom (23) U'f Capital Costs - Stonnwator (23) GF Debt Service on GO Debt (15) ltT Debt S",..,.ice on ReYenlJO BondlO (15) TQtato~tures Mmial.Net.Casb,Aow Ending'Cumulathle FlnaflC~.tmpact CM) General Fund Net Financial tmpact Utilffies Net FlI1anclBi Impact Glin.I1liFlllldbom LItilyS1wmllom .. lIT 233,922 270,378 250 549 250148 (16227) 18,227 $ (17,7121 1,486 56,806 57,000 34,629 5,000 33,287 55,302 8,115 2<48,220 22,158 5,1131 $ 37,870 58,710 53,501 5,150 34,603 58,386 1713) 22,871 253 964 (3,415) 2,517 $ (5,009) 1,585 16,935 60,<471 73,475 5,:105 35,641 60,137 11,717 51,949 71,635 103 19,919 22,622 3a,380 63,771 3,262 5,.21 268,979 287,211 64,154 77,9"'9 5,628 38,147 66,079 60.288 5,796 39,292 68,061 82,697 5,970 40,827 70,986 268,541 59,491 160,330 S 32,935 26,556 276 598 32,090 361,709 70,103 65,177 6,14a 42,052 73,117 287,025 74,684 192,420 $ 267.104 $ 30,197 1,893 341,387 346,755 396,458 374,393 72,206 67,733 6,334 43,691 77,061 42,215 32.469 295,636 45,751 312,856 43,720 2,031 74,372 90,365 6,524 45,002 79,373 315,410 31,345 344,200 $ 29,253 2,092 See -NotBS to the SKIA Area AnnBxation (~nnexation -low gro'IAh sc&nario) ~ Financial Impact A5sessment" for key assumptions and explanations. 62,285 75,679 5,464 37,037 63,452 2435117 45062 47,579 $ 20,n8 24,284 251,234 35,977 65,356 67,317 9,407 268 179 17.262 83,556 $ 100,839 $ 34,265 1,712 15,519 1,763 76,603 93,076 6,720 46,352 78,901 95,868 6,921 48,155 81,754 10,906 86,120 315,966 80,492 424,692 $ 49,657 30,835 325,446 48.948 473,640 $ 46,703 2,245 431,2n 413,052 81,268 98,744 7,129 "'9,600 83,706 101,706 7,343 51,525 88,704 93,396 337,676 93,601 567,241 $ 60,861 32,740 86,218 104,758 7,563 53,071 347 807 65,245 632,486 $ 62,B37 2,408 419,666 477,689 88,804 107,900 7,790 54,663 96,198 99,063 12,643 370;883 48,782 681,268 $ 46,302 2,"'81 371.686 106,003 787,272 $ 70,199 35,804 452,523 518,890 498,198 91,466 111,137 8,024 56,782 94,212 114,471 8,264 56,"'86 104,275 107,403 382,837 69.685 856,957 S 67,025 2,861 97.D3e 117,906 8,512 60,748 99,950 121,443 6,768 62,570 112,978 116,368 397182 121708 978,685 83,693 36,015 409096 89100 1.067,766 86,246 2,854 BASE ANNEXATION SCENARIO - LOW GROWTH RETAIL SALES, 8&0, AND PROPERTY TAX INCREASES ESTIMATION (note 2) (note 1) Average 0.125% (note 3) 0.85% 0.125% (note 4) # of Businesses wI # of Businesses wI Taxable Retail Estimated 0.85% Bremerton Development Bremerton Bremerton Total Total Property 3% Revenues Subject Revenues Not Subject Sales Per Taxable Bremerton Retail 8&0 Construction Sales Tax on Retail 8&0 on Bremerton Bremerton Tax Increase Escalation Year To Sales Tax To Sales Tax Total Business Retail Sales Sales Tax Tax Costs Construction Construction Sales Tax Rev 8&0 Tax Rev from Canst Factor 2009 22 18 40 $ 322,434 $ 7,093,539 $ 60,295 Exempt $ 397,600 $ 2,704 Exempt $ 62,999 Exempt 1.0000 2010 22 19 41 332,107 7,306,346 62,104 Exempt 819,056 5,570 Exempt 67,674 Exempt 2,699 1.0300 2011 22 19 41 342,070 7,525,536 63,967 Exempt Exempt 63,967 Exempt 1.0609 2012 23 19 42 352,332 8,103,634 68,881 Exempt 434,468 2,954 Exempt 71,835 Exempt 1.0927 2013 23 19 42 362,902 8,346,743 70,947 Exempt 895,005 6,086 Exempt 77,033 Exempt 2,949 1.1255 2014 23 19 42 373,789 8,597,145 73,076 Exempt 460,927 3,134 Exempt 76,210 Exempt 1.1593 2015 23 20 43 385,003 8,855,060 75,268 Exempt 949,510 6,457 Exempt 81,725 Exempt 3,128 1.1941 2016 23 20 43 396,553 9,120,711 77,526 Exempt 488,998 3,325 Exempt 80,851 Exempt 1.2299 2017 24 20 44 408,449 9,802,782 83,324 Exempt 1,007,336 6,850 Exempt 90,174 Exempt 3,319 1.2668 2018 24 20 44 420,703 10,096,865 85,823 Exempt Exempt 85,823 Exempt 1.3048 2019 24 20 44 433,324 10,399,771 88,398 Exempt 534,341 3,634 Exempt 92,032 Exempt 1.3439 2020 24 21 45 446,324 10,711,765 91,050 Exempt 1,100,743 7,485 Exempt 98,535 Exempt 3,627 1.3842 2021 24 21 45 459,713 11,033,118 93.781 Exempt 566,883 3,855 Exempt 97,636 Exempt 1.4258 2022 25 21 46 473,505 11,837,616 100,620 Exempt 1,167,778 7,941 Exempt 108,561 Exempt 3,848 1.4685 2023 25 21 46 487,710 12,192,744 103,638 Exempt Exempt 103,638 Exempt 1.5126 2024 25 21 46 502,341 12,558,526 106,747 Exempt 619,448 4,212 Exempt 110,960 Exempt 1.5580 2025 25 22 47 517,411 12,935,282 109,950 Exempt 1,276,063 8,677 Exempt 118,627 Exempt 4,204 1.6047 2026 25 22 47 532,934 13,323,341 113,248 Exempt 657,172 4,469 Exempt 117,717 Exempt 1.6528 2027 26 22 48 548,922 14,271,963 121,312 Exempt 1,353,775 9,206 Exempt 130,517 Exempt 4,460 1.7024 2028 26 22 48 565,389 14,700,121 124,951 Exempt Exempt 124,951 Exempt 1.7535 (note 1) there are 40 total estimated businesses currently in the proposed annexation area based on data compiled from the WA Dept of Revenue, the Port of Bremerton. and the Kitsap Economic Development Alliance. Of this total, the WA Dept of Revenue has indicated that 22 businesses in the proposed annexation anea (all located in the South Petition area) had revenues subject to sales tax of $7.1 million in 2007. The remamder represent businesses that produce products or services that are not subject to the retail sales tax. Future business growth is assumed to maintain this same approximate relationship of sales taxable to non-sales taxable businesses - in that it is assumed that every other business added to the area is subject to sales tax. (note 2) initial value of $235,353 average retaIl taxable sales per business in Kitsap County per "Washmgton State Almanac 2006-2007" incneased by a factor of 1.37 in recognition of the type of busInesses anticipated to locate in this area - then escalated by 3% in each year thereafter. The WA State Dept of Revenue confirmed there were 22 businesses in the proposed annexation area which had revenues subject to sales tax of $7. 1 million in 2007. This computes to an average of $322, 727 per business which is just slightly more than the results provided by using the average retail taxable sales per business in Kitsap County per "Washmgton State Almanac 2006-2007" increased by a faclorof 1.37. (note 3) Development of two 1.5 acre industrial/retail business sites on average is assumed every five years adding two business - each having a 15,000 Sq Ft commercial building. The assessed value of these projected business site developments is assumed to be $1, 192,800 (in 2008 dollars) per sIte with 1/3 of the cost in the first year and 213 of the cost in the following year. This is based on $79.52/Sq Ft average cost for industrial faCIlity structures per the International Code Council Building Valuation Data - published January-February 2008. Taxable ccnstruction ccsts are assumed to be 80% of the assessed value for purposes of ccmputing sales tax and B&O tax impacts. (note 4) Property tax increase for construction Is held to today's dollar rate per $1, 000 A V - ignoring decreases in the dollar rate per $1,000 of A V related to property value increases while also ignoring the City's permitted 1% annual property tax amount increase. '. BASE ANNEXATION SCENARIO - LOW GROWTH ... LEASEHOLD TAX ESTIMATION Escalated at 3% (note 1) (note 2) 4.00% Cumulative Leasehold Tax Land Development Bremerton Leasehold Tax Total Estimated 3% Existing Subject to Port Leasehold Tax Additions From Bremerton Escalation Year Businesses Lease Agreements Additional Leases New Development Leasehold Tax Rev Factor 2009 $ 47,201 $ $ $ 47,201 1.0000 2010 48,617 9,270 371 371 48,988 1.0300 2011 50,075 371 50,446 1.0609 2012 51,578 371 51,949 1.0927 2013 53,125 10,130 405 776 53,901 1.1255 2014 54,719 776 55,495 1.1593 2015 56,360 10,746 430 1,206 57,566 1 .1941 2016 58,051 1,206 59,257 1.2299 2017 59,793 11 ,401 456 1,662 61 ,455 1.2668 2018 61,587 1,662 63,248 1.3048 2019 63,434 1,662 65,096 1.3439 2020 65,337 12,458 498 2,160 67,497 1.3842 2021 67,297 2,160 69,457 1.4258 2022 69,316 13,217 529 2,689 72,005 1.4685 2023 71,396 2,689 74,085 1.5126 2024 73,538 2,689 76,226 1.5580 2025 75,744 14,442 578 3,267 79,010 1.6047 2026 78,016 3,267 81,283 1.6528 2027 80,356 15,322 613 3,879 84,236 1 .7024 2028 82,767 3,879 86,647 1.7535 (note 1) Leasehold tax revenue is a state excise tax of 12.84% on rent or lease payments to a public lessor for the right to use publicly owned tax-exempt property for private purposes. The purpose of the tax is to have private users of public tax-exempt property share with fee simple property owners who pay property taxes - the costs of providing governmental services. Of the 12.84% tax imposed by the state, the City receives an allocation of a 4% portion (or 31% of the total) for areas with in the incorporated City. According to the Department of Revenue, the Port of Bremerton paid $151,515 for leasehold excise taxes in 2007. The calculated amount that would have been apportioned to the City had this area been incorporated is $47,201. For purposes of this analysis it is assumed that 2009 revenues from leasehold excise taxes is the same as the amount calculated for 2007 and then escalated by 3% each year thereafter. (note 2) Per Port of Bremerton staff, new development on the Port property would most likely be lease arrangements for the use of Port owned land with the developer paying for the improvements directly - paying property taxes on the improvements portion and the Port withholding leasehold taxes on the land lease payments. New building construction is therefore included in the calculated estimates of future property taxes, while the leasehold tax estimates include an expectation of new land lease arrangements for each new business development in the projected period. Per Port staff the current lease payment amount for unimproved property is $6,000 per year per acre and $12,000 per year per acre for sites that are "pad ready" or improved to a limited extent. For purposes of this analysis it is assumed that each 1.5 acre new development in the forecast period is unimproved property and the rate of $6,000 per year in 2008 dollars is used escalated 3% per year for future periods.. .. I' . {I t 1 NOTES Financial Impact Assessment - SKIA Annexation Low Growth Scenario Notes The City of Bremerton management has prepared projected financial impact assessment information for the descIibed annexation area with an assumption of low future growth in the area. In the preparation of this financial analysis, the City has made certain assumptions with respect to conditions that may occur in the future. It is the City's belief that the projected financial information was prepared on a reasonable basis. The City staff believe this analysis reflects the best currently available estimates and judgments, and presents, to the best of management's knowledge and belief, the expected course of action and the expected future financial impacts of the proposed annexation with the assumption of low or modest future growth in the area. It should be understood that this analysis is dependent upon future events - actual conditions may (and are likely to) differ from those assumed herein. The following pages represent explanatory notes for individual elements of the [mancial assessment analysis, as well as pIincipal considerations and assumptions made by the City in the preparation of the financial impact information. The following are the base and growth assumptions for the Low Growth scenario: Existing Businesses 40 total estimated current businesses in the proposed annexation area based on data compiled from the Washington State Department of Revenue and the Port of Bremerton. Of this total, the Washington State Department of Revenue has indicated that 22 businesses in the proposed annexation area (all located in the South Petition area) had revenues subject to sales tax of$7.1 million in 2007 Existing Households +/- 1 total current residential households in the annexation area Existing Residential Population Assuming 2.5 people on average per household this equates to a population in the proposed annexation area of aooroximately 2.5 +/- currently Future Development Assumption: Assumed development of 2 parcels of 1.5 acres each of Acres & Businesses Increased industry every five years. This results in the addition of two new businesses on average every five years. Future Development Assumption: Development is assumed to be located on Port of Location Bremerton industrial park property only in this scenano. 1 " : I \ .), ) Summary table of Business Growth and Acres Developed over the 20-year time horizon for the Low Growth Scenario: Year 3 Businesses 2 Employees 3 Commercial Sq Ft 4 Acres Developed ~~"i'(r0'8'tii1~~6~~~j;'o-c"ii~~~>i~~~;i1~~~.t~~I~~~3'6iil21;iif )[~~~0~""'~\t~~~~g3~89i' ~6.,,< _;>l ~~~~;g'",_~<:" ~~~~,lf}~A:~","<.1 ~~~{:l%lJ:.IT~""~~""d,J;,_:' u'ii'i~'1.",,,,iii~~;~,,,jl'jf~fiL .,',. ,_..~ 2009 40 438 361,217 493.89 2010 41 456 376,217 495.39 2011 41 456 376,217 495.39 2012 42 474 391,217 496.89 !~"'2"O""'.t"b<i:l"~~~'ro~'..~,*~x;,"" ~~~~'~~';'iA~ ~1iL1'fJl\~~~1i:;:;'~ 'k~-.__,._.:J_~{~~ ~~~1f!~i~~~,~l;t t~~~;~~~;~Af)t ~?~~~~~~~ 2014 42 474 391,217 496.89 2015 43 492 406,217 498.39 2016 43 492 406,217 498.39 2017 44 511 421,217 499.89 i!l;:r-"~ ''=''i'''''''' "," ~'<<~~~'''"i!?&!:''~~ ~"'~ra"rn ~2...>?~&;2.11t7.tIR ~_~~"~j!'i-~~if4.!t~_~~. 2019 421,217 499.89 2020 436,217 501.39 2021 436,217 501.39 2022 46 451,217 502.89 1i@~~~fa~~.,.,,91 2024 46 502.89 2025 47 504.39 2026 47 504.39 2027 48 505.89 Ilit Li~ All data complied to include North and South petitions and requests 2 PSRC assi ns Manufacturin and Industrial emplo ment rowth to 550-1100 Sq Ft/ Employee 3 Growth Factor on average of 2 new businesses every 5 years. With an expected 15,000 Commercial Sq Ft. per 1.5 acres per business. This data was compiled in conjunction with the Port of Bremerton and Kitsap Economic Development alliance. 4 Acres developed were analyzed using 2006 aerial photos with City of Bremerton GIS and includes the airport runway facilities. Notes to Low Growth Financial Assessment spreadsheet: (I) Net financial impacts carried forward represents the prior year's ending cumulative net financial impact. (2) Property tax revenue for 2009 is based upon current assessor information for parcels in the proposed annexation area (2008 valuations and tax rolls). Taxable assessed values in 1,000's of dollars is then multiplied by $2.2181 (City of Bremerton regular levy rate for 2008 of $1.9032/$1,000 A V and EMS levy rate for 2008 of $0.3149/$1,000 A V). The property tax revenue is then increased by 1% each year thereafter starting from the base 2009 year. The property tax amounts in the base annexation area are generally quite low for such a large land area but this is due to the public properties in existence there (Port ofBremerton) which are not subject to a property tax levy - and due to the large proportion of remaining properties being designated as open space or forest land status which substantially reduces the property taxes on those parcels. 2 (3) Leasehold tax revenue is a state excise tax of 12.84% on rent or lease payments to a public lessor for the right to use publicly owned tax-exempt property for private purposes. The purpose of the tax is to have private users of public tax-exempt property share with fee simple property owners who pay property taxes - the costs of providing governmental services. Of the 12.84% tax imposed by the state, the City receives an allocation of a 4% portion (or 31 % of the total) for areas with in the incorporated City. According to the Department of Revenue, the Port of Bremerton paid $151,515 for leasehold excise taxes in 2007. The calculated amount that would have been apportioned to the City had this area been incorporated is $47,201. For purposes of this analysis it is assumed that 2009 revenues from leasehold excise taxes is the same as the amount calculated for 2007 and then escalated by 3 % each year thereafter. In addition, Port of Bremerton staff indicate that new development on the Port property would most likely be lease arrangements for the use of Port owned land with the developer paying for the improvements directly - paying property taxes on the improvements portion and the Port withholding leasehold taxes on the land lease payments. New building construction is therefore included in the calculated estimates of future property taxes, while the leasehold tax estimates include an expectation of new land lease arrangements for each new business development in the projected period. Per Port staff the current lease payment amount for unimproved property is $6,000 per year per acre and $12,000 per year per acre for sites that are "pad ready" or improved to a limited extent. For purposes of this analysis it is assumed that each 1.5 acre new development in the forecast period is unimproved property and the rate of $6,000 per year in 2008 dollars is used and then escalated by 3% each year thereafter. (4) Admissions tax revenue is assumed to be zero. The City is not aware of any current sources of admission revenues that exist or which would be anticipated to be developed - which would be subject to the City's Admission tax. (5) Parking tax is assumed to be zero. The City is not aware of any parking facilities existing in the area or proposed to be developed in the future - which charge for such services and would be subject to the City's Parking tax. (6) Sales tax revenue includes revenues from existing (22 businesses currently reporting taxable retail transactions to the DOR) and projected additional businesses. It is assumed that two businesses on average every five years will be added. There are 40 total estimated businesses currently in the proposed annexation area based on data compiled from the W A Dept of Revenue, and the Port of Bremerton. Of this total, the W A Dept of Revenue has indicated that 22 businesses in the proposed annexation area (all10cated in the South Petition area) had revenues subject to sales tax in 2007. The remainder represents businesses that produce products or services that are not subject to the retail sales tax. Future business growth is assumed to maintain this same approximate relationship of sales taxable to non-sales taxable businesses - in that it is assumed that every other business added to the area is subject to sales tax. 2009 tax revenues are computed using the assumption that taxable revenues would be the same as the DOR reported occurred in 2007 for the area. As growth is modeled to occur in the forecast period, the new businesses assumed to be subject to sales tax are assumed produce taxable revenues equivalent to 1.37 times the average taxable retail sales per business for Kitsap County ($235,353) per the "Washington State Almanac 2006-2007" then escalated by 3% in each year thereafter. Actual results for the 22 businesses verified by the DOR for 2007 - validate the use of this calculated value of retail sales revenue per business as the DOR actual average computes to an average of$322,727 per business in the area- and 1.33 times the , J' , / I' J. 3 A ~l I II .., J. Washington State Almanac infonnation results in an average of$313,019. The City tax rate is .00085 (1 % less .15% administrative fee to the County). The sales tax on construction of future development in the proposed annexation area assumes the projected new businesses result in the addition of a 15,000 square foot Commercial structure on a 1.5 acres parcel per business with construction costs estimated to be $1,192,800 in 2008 dollars based on an average cost of$79.52/Sq Ft for industrial facility structures as published in the January-February 2008 International Code Council Building Valuation Data - of which the taxable construction costs is assumed to be 80% of this amount. Construction values are escalated at 3% per year. (7) B&O tax revenue is assumed to be zero. Recent changes to the City's B&O tax code exempt businesses from the tax if they are located on industrially zoned Port properties and all areas annexed into the City are exempt from B&O tax for a period of three years for businesses located in the area at the time of annexation. This analysis conservatively assumes that all projected growth in this modest/low growth scenario would occur on Port of Bremerton owned property and would therefore be exempt from the City B&O tax. (8) Washington State distributes gas tax, liquor tax, and criminal justice funds to the City on a per capita basis. The City's share of this distribution will increase with any population added by this proposed annexation. The budgeted combined rate for 2008 is $37.88 per the State Department of Revenue. This amount is multiplied by the population initially estimated to be included in the proposed annexation area (2.5). The dollar amount per capita is then increased by 3% each year thereafter. No further population growth is assumed as it is not expected that future development would be residential. (9) Real Estate Excise Tax (REET) revenue in this low growth scenario is assumed to come from very limited sales transactions of privately owned buildings situated on land leased from the Port of Bremerton. Per Port of Bremerton staff, historical experience suggests that approximately 2 such transactions occur in every 10 year period. The 0.5% tax is applied to an assumed sale of a 15,000 square foot building every fifth year in the forecast period with the value estimated conservatively to be $1,192,800 in 2008 dollars based on an average cost to construct of$79.52/Sq Ft for industrial facility structures as published in the January-February 2008 International Code Council Building Valuation Data as then escalated by 3% in each year thereafter. (10) Utility taxes are based on average annual power bills of $2,760 in 2008 dollars for a typical business enterprise located on Port property (per Port of Bremerton staff) and an estimated telephone service annual cost of $1,200 in 2008 dollars, and (per Waste Management staff) an annual solid waste disposal service cost of $80,851 in 2008 dollars for existing businesses located in the proposed annexation area with an average annual rate of $2,995 in 2008 dollars as then each multiplied by the number of businesses projected tobe added in future periods of the forecast and escalated by 3% each year thereafter. Utility tax rates are 6% for electricity and telephone, and 9.5% for solid waste disposal services. No revenue estimate is made for utility taxes on services to residential accounts or for cable television services due to lack of residences identified in the proposed annexation area and no expectation of residential development in the area in the future. (11) The Port of Bremerton owns and operates its own wastewater utility. The wastewater utility has sufficient capacity to serve the increase in demand proposed by the low growth scenario. For the purposes of this analysis it will be assumed that the wastewater utility will continue to be under the jurisdiction of the Port of Bremerton 4 and there will be no expenses or revenues related to wastewater. In accordance with Bremerton Municipal Code (BMC) 15.06.020(a) - A general facility charge (GFC) shall be charged on all new or expanded service connections to the water and storm water utility system. The calculation of the general facility charge for water shall be based on the meter size to be installed for a new or expanded water utility service. The calculation for general facility charges for storm water shall be based on the number of impervious surface units (ISUs) as defined in BMC 15.01.020. The number ofISUs charged shall be based on the total impervious area divided by the amount of impervious area in an ISU. The rates applied are per the current BMC. General Facility Charges (GFC) for this analysis is based on the following assumptions for all industrial use: · Each industrial parcel is assumed to be one and half acres · The water meter sizes are proportional to the existing development in the area .. Each industrial parcel averages 35,000 square feet impervious (12) Based on the growth projections of this low growth scenario, no major infrastructure improvements will be needed. Mitigation costs to be paid by the Developer as determined through the development review process and the BMC. For the purposes of this analysis the water and storm water system capital improvements will be financed by the development or other sources such as CTED grants. (13) Utility system rate revenues are computed in accordance with Chapter 15.06 of the BMC - which establishes and sets forth the current fees, rates and other charges for connection to or utilization of the City's utility systems. The utility rates in this analysis are based on the following assumptions: · The water meter sizes are proportional to the existing development in the area. The rates are based on a basic commercial rates · Each industrial parcel averages 35,000 square feet impervious. The rate is based on the number ofImpervious Surface Units (ISU) (14) The City General Fund imposes on its internal utility systems a payment in lieu of tax - similar to the utility tax imposed on external utilities. The current rate is 8.5% of utility system rate revenues for water, wastewater, and stormwater. This amount represents revenue to the General Fund and is added to annual expenses of the utility systems as noted in (19) below. This is an internal transfer between the City's utility systems and the City's General Fund and is thus shown as both a receipt and an expense in this analysis. (15) This analysis assumes there is no issuance of either government obligation (GO) municipal bond debt or utility system revenue bond debt to fund capital improvements. (16) Payment to Kitsap County for revenue sharing in accordance with the interlocal agreement concerning revenue sharing upon annexation. Revenue Sharing payments are based on three sources of revenue: 1) County's portion of the local retail sales tax levied; 2) Ad Valorem property tax levied by the County pursuant to RCW 36.82.040 for establishment and maintenance of county transportation systems; and 3) Admission tax levied by the County pursuant to Chapter 36.38 RCW. The combined total of the County's collections from all three sources within the annexation area during the calendar year preceding annexation net of the same for the first full calendar year following annexation = "County's Lost Revenue". The amount of I< ," . ,I I" ". 5 j .tl...l~\(~.J payment from Bremerton to the County is based on a three-year soft landing approach with the year 1 payment equal to 75% of the County's Lost Revenue, year 2 payment equal to 50%, and the third and final year being 25%. The estimated amount of County lost revenue for these items is $71,000 of sales tax revenue based on the DOR's reported taxable retail sales in this area of $7,100,000 in 2007, $4,741 in ad valorem property tax levied for County roads per the County 2008 property tax assessments for parcels in the proposed annexation area, and zero dollars for admission tax as the City is not aware of any current sources of admission revenues that exist. (17) Fire and Emergency Medical Service (EMS) assumed to be covered by an lnterlocal Agreement between the Bremerton Fire Department and the South Kitsap Fire and Rescue ('SKFR') during the forecast period. Per information provided by South Kitsap Fire and Rescue dated April 15, 2008, the total annual estimated impacts of the proposed annexation would be a loss of revenue of $57,000 in 2008 dollars. This analysis assumes that the City would negotiate an agreement for continued coverage of this area by SKFR setting an initial compensation level at the estimated lost revenue amount of $57,000 and then providing for cost ofliving increases in years thereafter (which is assumed to be 3% each year thereafter in this analysis). Further cost increases are not assumed in this low growth scenario because service level demand is not anticipated to change dramatically with the modest level of additional development in the proposed annexation area. (18) Police service and coverage of the current south Bremerton area, watershed area, plus the proposed annexation area is expected in combination to require an increase in staffing of a sector patrol unit to cover the entire area - requiring 7 positions at a total annual cost (salary and benefits) of $592,571 (2008 dollars) plus $100,000 in annual estimated associated operational expenses. The proposed annexation area in this scenario while large geographically is expected to be very low in demand for these services due to the low growth assumptions in this analysis and the type of development in the area. A smaller geographical area but an expected higher demand will come from the anticipated large residential development in the existing South Bremerton area. Given those expectations for the purposes of this analysis, 10% of the cost of the added personnel and operational expenses are assumed to be attributed to this proposed annexation area for this low growth scenario. The computed annual expense is then increased by 3 % each year thereafter. 10% of the estimated cost to purchase 2 vehicles and computer equipment for these additional personnel in the years 2009 and the replacement cost of those vehicles every five years thereafter (escalated at 3% per year) is included in the capital costs as noted in (21) below. It is expected that the additional personnel would be based out of the existing police department building. Bringing new police officers on line requires a period of time to recruit and train. It is assumed that in the first year (2009) a ramp up to 50% of this annual expense will occur, rising to 75% in the second year (2010), coming to full new operational levels by the beginning of the third year (2011). (19) An estimate of$5,000 per year (2008 dollars) for electronics and street maintenance costs was provided by the City Engineer. This amount is then escalated by 3% per year for future years in this analysis. (20) Utility system expenses are estimated based upon the 2008 budget relationship of operating expenses to rate revenues charged. For the water, wastewater, and stormwater system this computes to 88%, 74%, and 91 %, respectively. In addition to the computation of operation and maintenance expense the total utility expense was 6 . \. <.. /'~ 1l _. ~, 1 .: increased in each year by the amount of utility PILOT taxes computed to be transferred to the General Fund. (21) General Fund capital costs include police vehicle and equipment purchases necessary to support the additional staffing needed to provide adequate service levels in the proposed annexation area in combination with expanded service demands in the south Bremerton area - as described more fully in note (18) above. Two police vehicles and computer equipment are assumed to cost $81,148 (2008) in total (of which 10% is allocated to this proposed annexation area) and are shown being replaced every fifth year thereafter at an escalated price of 3 % per year. (22) There is no capital costs assumed for transportation improvements in this scenario. All capital cost for transportation facilities would be determined by the nature of the development and would be the financial responsibility of the development and are therefore not included in this financial analysis. (23) Capital costs for growth related infrastructure improvements are assumed to be zero in this low growth scenario as noted in note (12) above. (24) Ending cumulative financial impact represents the beginning net financial impact for the period carried forward from prior periods plus the current period receipts less current period expenditures. 7 .lo I( \ ., J, SKIA Annexation Financial Assessment June 2008 Part III of IV Scenario B "High Growth" City of Bremerton...SKIA Assumed Development Regions N A _11~1/;'.II/.II~~/".III."~ . m_ i ! Legend fIlE) Assumed Development Area ~fllllll~ SKIA UGA m City Limits The City of Bremerton Does not warrant the accuracy of this information or mapping, which should not be relied upon without independent verification or accuracy. The user assumes all risks related to or arising from the use of this infonmation or mapping. May 28th, 2008 SKIA HIGH GROWTH SCENARIO FIGURE X Legend ~~::v New 8" Gravity Main (Developer Installed) --- Existing 8" Gravity Main Existing 8" Water Line (Convert to Reuse Force Main) New 8" Reuse Foree Main Existing Bremerton Sewer Force MQin R:I . a City Boundary ~ Pump Station ~ MBR Treatment Plant e (J 1501,500 ,.... ... 3,000 <."" Filet ID~ ". ;: I. SKIA WATER. HIGH GROWTH SCENARIO FIGURE X Legend .. 16" Water Main - UGA Boundary · .. City Boundary e 0: 150 1,500 ~.OOO 4.500 r FMI Lut Upda~ June 5, 2008 NoHlnanclAl~bDpacts Cauled Forward (1) ..........: GF Property Tax Revenue (2) GF Leasehold Tax Revonue (3) Of Admi&Sio,ns Tax Revenue (-4) Of Parmg Tax Revenue (5) Gf SaSes Tax Revenue (6) OF B&O Tax Revenue (7) Gf Per Capita R~enue Distributions from State (8) Gf Real Estate Excise Tax o,n Propert{ Saleli (9) GF 1Jti1lt{ Tar Rovenue. ElocJToIephono/SoIid Waste (10) UT Ubity GFC Payments (WattlrM'8IitewsterIStorm) (11) GF Oev~opor Payment (12) U-T DO'Y8I-oper Paymont) (12) UT UtIlity loc.allmprovcment Ol&trict (ULlD) Payment (13) liT Grants. WDtor Reuso, EDA, C~ltal COl\tribulion.. (1.) UT Utility Rille R....enuK. Water (15) Vir U1i~ty Rate Revenun. Wast.waler (15) UT Utility Rate Revenu... Stormwater (15) QiF Payment In Lieu af TalC - Water UIiI~ (113) Gf P.ymentm u.u ofTll)( -WO$lewatel Ubllly (16) (if Payment in u.u afTax - Storrnwater UtJbty (16) (if' Bond Proceeds - GO Bond.. (17) OT Bond Proceedli - Revenue Bonds/Loans (17) ToWRec:elpb Expenditures: GF Payment to Kits.ap County. Re....enu. Sharin" Agmt (18) Gf Fire/EMS ServICe Expense (19) GF Police SOIVICO E)(pense (20) Of Public Works & Utlfitio& - Streets & ElectrOlllCS (21) UT Public Works & UtHitios. - Water Exponse (22) U1' Public Works & Utiities . Wastewater Expense (22) U1' Public Works & Utikties. Stormwater Expense (22) GF Capital Costs - Gel\Dral Fund (police) (23) Gf Capital Costs. Stroets & E~tronic5 (24) ur CapItal Cosu; . Water System (25) U,T Caprtal Costs - Wa&tow.r System (25) U1' Capital Costs - Stormwater (25) GF DebtSo,..,.ic., on GO O"bt(17) t:rT Debt Sef\lice on R.".nu., BonctslLoans. (17) TotaI;bpoAdi1Wes Annual Nel Cash-Flow Eftdlng-c~ f.lnanclat tlApact (2G) Genoral Fund Net Financial Impact Utilities. Net Financial Impact Of" GIlnefetFlIflwMoftI UT Ul.1Itt Syullm hem City of Bremertan - SK1A Area AAlilexali0fl Financial AssesmeAl Financial impacts Scenano . Annexation (UHigh Growth") ~ 27,220 49,721 122,554 95 17,898 85,063 35,.32 27,gtJ3 5a,749 3,012 2,372 5,079 <436 097 56,806 57,000 86,571 10,000 34,192 23,020 59.450 20,287 = 88,770 .a,568 53,733 131,876 '6 20,927 111,261 37,.50 61,~O 65,835 3,183 5,227 5,596 543244 37,870 58,710 133,753 10,300 36,139 SO,n9 65,506 l!ll1 Z2n 239,006 $ 395,295 66,682 57,865 138,7.0 100 23,217 11.,599 39,557 67,465 72,232 3,362 5,735 6,1-40 595 694 18,935 60,471 163,687 10,609 38,173 55,659 71,871 87,587 62,120 145,897 103 25,625 118,037 .1,756 73,7.3 78,955 3,&49 6,268 6,711 650 352 62,285 189,198 10,927 40,295 60,838 78,560 23,628 3.7 ,326 393,Ooa .39.05 442,103 1,800,083 88 no 150,236 156,289 208,2.9 367216 88,770 S 239,006 $ 395,295 $ 603,&4. S 970,760 (2,715) 91,485 26,57. 123,662 28,13~L 75,.51 128,151 132,798 1,.50,202 2,167,299 64,154 19.,87. 11,255 .2,510 66,279 85,585 28,138 463,710 819,951 86,69-4 280,522 = 603,544 109,307 66,504 156,443 107 6,713 28,157 121,578 <<,052 80,338 86,015 3,744 6,829 7,311 112,630 2,000,000 <46,-449 87,261 93,.28 3,9,(8 7,.17 7,9.1 <ill 970,760 131,870 71,019 167,491 110 30,817 125,226 1096,374 Lill ~ (.3,447) $ 160,163 155,303 75,670 179,061 113 16,616 33,612 128,982 225,259 48,9.9 109,528 101,208 .,161 9,310 8,603 11.7,760 68,061 206,741 11,941 47,236 90,361 100.702 29,851 337.872 892,765 203,610 160,163 $ 388,731 $ 657,159 165,854 37,756 179,63. 80,.60 191,17. 116 36,547 132,852 225,259 51,558 117,152 109,371 .,382 9,958 9,297 1215146 70,103 212,9<< 12,299 .9,753 96,650 108,824 30,747 337,672 919,192 228,568 337,672 946,717 268,428 ~ 388,731 W! 657,159 ~ 874,8.6 231,105 90,475 209,968 124 7,782 42,860 140,943 225,259 57,116 133,533 126,910 4,855 11,350 10,787 1,361,965 32,619 337,872 1,032492 329,473 1.30.,319 S 1,495,681 See "Noles to the SKIA Area Annexation (annexation. high growth scenario) . Financial Impact Assessment" for key assumptions and explanations. 269,224 60,249 4,350,605 7,236,213 613,079 200,720 11,593 44,823 71,990 92,961 23,518 28,882 1,910,484 5,630,334 168,936 8,250420 1,01.,207 S (.3,447) S 89,723 (1,103,930) 185,.76 43,092 219,81. 48,615 204,891 85,394 200,381 120 39,627 136,837 225,259 5<1,279 125,149 117,933 .,614 10,638 10,024 1,293,067 72,206 219,332 12,668 52,379 103,248 117,343 74,372 225,912 13,048 55,117 110,165 126,275 31,669 337,872 975,380 317,687 974,8-46 263,355 54,332 l!gQ 1,304,319 258,305 95,710 223,634 127 46,251 145,171 225,259 60,076 142,322 136,319 5,106 12,097 11,587 1.441,824 76,603 232,689 13,439 57,973 117,416 135,637 27,264 33,598 214,159 337,872 1,250,462 191,362 339,146 (147,767) 286,525 101,101 2021 ~ ~ 1,495,681 $ 1,910,082 S 2,399244 346,151 112,374 237,931 131 4El,807 149,526 225,259 63,161 151,531 146,179 5,369 12,880 12,425 1,442,635 2,995,628 78,901 239,670 13,842 60,950 125,013 145,448 81,268 246,860 14,258 64,055 132,972 155,725 34,606 1,470,559 12,500 315,795 100,65-4 252,884 135 53,534 15.,012 253,270 66,378 161,178 156,508 5,642 13,700 13,303 1688,016 83,706 254,266 14,685 67,289 141,307 166,488 35,644 268,520 139 20,436 57,440 156,632 281,280 69,730 171,281 167,325 5,927 14,559 14,223 1.766,725 86,218 261,894 15,126 70,661 150,033 177,757 36,713 financial Impacts Scenaria Annexation ("High Growth") 377,626 118,265 2024 2025 2,944.567 $ 3,506,589 410,256 124,333 284,866 143 9,021 61,533 163,391 261,280 73,224 181,858 178,650 6,224 15,458 15.185 1851.505 37,815 88,804 269,751 15,580 7.,175 159,167 189,551 31,606 38,949 301,952 148 65,819 168,293 281,280 76,865 192,930 190,504 6,53. 16,399 16,193 1944,721 91,468 277,843 16,047 77,836 168,726 201,893 ~ 4,155,480 444,078 130,583 315,409 152 70,307 173,342 281,280 80,659 2Q.4,516 202,908 6,856 17,384 17,247 2041,624 94,212 286,179 16,528 81,650 178,725 214,806 40,118 479,130 137.020 lQlI ~ 4,861,785 $ 5,632,396 553,081 150,480 329,401 157 75,006 178,542 281,280 84,611 216,636 215,885 7,H12 18,414 18.350 2,147,015 97,039 294,764 17,024 85,622 189,184 228.311 41,321 515,451 143,651 348,615 363,679 161 166 10,458 85,067 189,415 79,922 183,898 281,280 281,280 88,727 229,31. 229,458 7.542 19,-4n 19,504 93,015 2.2,570 243,652 7,906 20,618 20,710 2,262,298 99,950 303,607 17,535 89,759 200,120 242,434 42,561 43,838 379,886 421,899 421,899 421,899 421,899 421,899 421,899 421,899 2,581 227 1 198,855 1,221402 1,289,483 1 295,830 1,335,319 1,376 -403 1,419 142 414,401 489,162 545,323 562,023 648,891 706,30. 770,611 843,156 1,910.082 $ 2,399,244 $ 2.94-4,567 S 3,506,589 S 4,155,480 S 4,881,785 i 5,632,396 $ 6,-475,552 383,617 30,784 .50,397 38,764 487,269 58,053 .96,943 65,080 576.5.0 72,351 626.429 79,875 682,950 87,562 7-47,437 95,720 .. (note 1) there are 40 total estimated businesses currently in the proposed annexation area based on data compiled from the WA Dept of Revenue, the Port of Bremerton, and the Kitsap Economic Development Alliance. Of this total, the WA Dept of Revenue has indicated that 22 businesses in the proposed annexation area (all located in the South Petition area) had revenues subject to sales tax of $7. 1 million in 2007. The remainder represent businesses that produce products or selVices that are not subject to the retail sales tax. Future business growth is assumed to maintain this same approximate relationship of sales taxable to non-sales taxable businesses - in that it is assumed that eve/}' other business added to the area is subject to sales tax. (note 2) initial value of $235,353 average relail taxable sales per business in Kilsap County per "Washinglon State Almanac 2006-2007" increased by a factor of t.37 in recognition of Ihe type of businesses anticipated to locate in this area - then escalated by 3% in each year thereafter. The WA State Dept of Revenue confirmed there were 22 businesses in the proposed annexation area which had revenues subject to sales tax of $7. 1 million in 2007. This computes to an average of $322, 727 per business which is just slightly more than the results provided by using the average retail taxable sales per business in Kitsap County per 'Washington State Almanac 2006-2007" increased by a factor of 1.37. (note 3) Development of fifteen 3.5 acre industriallretail business sites on average is assumed eve/}' five years adding 15 businesses - each having a 35,000 Sq Ft commercial building. The assessed value of these projected business site developments is assumed to be $2,783,200 (in 2008 dollars) per site. This is based on $79.52/Sq Ft average cost for industrial facility structures per the International Code Council Building Valuation Data - published Janua/}'-Februa/}' 2008. Taxable construction cosls are assumed to be 80% of the assessed value for purposes of computing sales tax and B&O lax impacts. (note 4) Property tax increase for construction is held to tOday's dollar rate per $1, 000 A V - ignoring decreases in the dollar rate per $1,000 of A V related to property value increases while also ignoring the City's permitted 1% annual property tax amount increase. BASE ANNEXA nON SCENARIO - HIGH GROWTH LEASEHOLD TAX ESTIMATION Escalated at 3% (note 1) (note 2) 4.00% Cumulative Leasehold Tax Land Development Bremerton Leasehold Tax Total Estimated 3% Existing Subject to Port Leasehold Tax Additions From Bremerton Escalation Year Businesses Lease Agreements Additional Leases New Development Leasehold Tax Rev Factor 2009 $ 47,201 63,000 $ 2,520 $ 2,520 $ 49,721 1.0000 2010 48,617 64,890 2,596 5,116 53,733 1.0300 2011 50,075 66,837 2,673 7,789 57,865 1.0609 2012 51,578 68,842 2,754 10,543 62,120 1.0927 2013 53,125 70,907 2,836 13,379 66,504 1 .1255 2014 54,719 73,034 2,921 16,300 71,019 1.1593 2015 56,360 75,225 3,009 19,309 75,670 1 .1941 2016 58,051 77 ,482 3,099 22,409 80,460 1.2299 2017 59,793 79,807 3,192 25,601 85,394 1.2668 2018 61,587 82,201 3,288 28,889 90,475 1.3048 2019 63,434 84,667 3,387 32,276 95,710 1.3439 2020 65,337 87,207 3,488 35,764 101,101 1.3842 2021 67,297 89,823 3,593 39,357 106,654 1 .4258 2022 69,316 92,518 3,701 43,058 112,374 1 .4685 2023 71,396 95,293 3,812 46,869 118,265 1.5126 2024 73,538 98,152 3,926 50,795 124,333 1.5580 2025 75,744 101,097 4,044 54,839 130,583 1.6047 2026 78,016 104,129 4,165 59,004 137,020 1.6528 2027 80,356 107,253 4,290 63,295 143,651 1.7024 2028 82,767 110,471 4,419 67,713 150,480 1.7535 (note 1) Leasehold tax revenue is a state excise tax of 12.84% on rent or lease payments to a public lessor for the right to use publicly owned tax-exempt property for private purposes. The purpose of the tax is to have private users of public tax-exempt property share with fee simple property owners who pay property taxes - the costs of providing governmental services. Of the 12.84% tax imposed by the state, the City receives an allocation of a 4% portion (or 31% of the total) for areas with in the incorporated City. According to the Department of Revenue, the Port of Bremerton paid $151,515 for leasehold excise taxes in 2007. The calculated amount that would have been apportioned to the City had this area been incorporated is $47,201. For purposes of this analysis it is assumed that 2009 revenues from leasehold excise taxes is the same as the amount calculated for 2007 and then escalated by 3% each year thereafter. (note 2) Per Port of Bremerton staff, new development on the Port property would most likely be lease arrangements for the use of Port owned land with the developer paying for the improvements directly - paying property taxes on the improvements portion and the Port withholding leasehold taxes on the land lease payments. New building construction is therefore included in the calculated estimates of future property taxes, while the leasehold tax estimates include an expectation of new land lease arrangements for each new business development in the projected period. Per Port staff the current lease payment amount for unimproved property is $6,000 per year per acre and $12,000 per year per acre for sites that are ''pad ready" or improved to a limited extent. For purposes of this analysis it is assumed that each 3.5 acre new developmentjn the forecast period is unimproved property and the rate of $6,000 per year per acre in 2008 dollars is used escalated 3% per year for future periods.. -:. ,- ~ ANNEXATION - "HIGH GROWTH" SCENARIO Water System Estimated Capital Improvements and Costs (Expressed in 2008 Dollars) Construction Bud et - Prelimina ,. 13400 LF 100 $1,340,000 1 LS 5.0% $67,000 1 LS 3.0% $40,200 1 LS 5.0% $67,000 $1,514,200 LS 20.0% $302,840 $1,817,040 LS 8.6% $156,265 $1,973,305 15.0% $23,440 $1,996,745 16" TRANSMISSION MAIN FROM GOLF COURSE TO RESERVOIR Mobilization Tem ora Erosion/Sedimentation Control Traffic Control Subtotal Construction Contin enc Subtotal Construction Costs Sales Tax ANNEXATION - "HIGH GROWTH" SCENARIO Wastewater System Estimated Capital Improvements and Costs PHASE 1 - HIGH GROWTH SCENARIO (Expressed in 2008 Dollars) Item Quantity Unit Unit Cost Total Cost Trench Safety System 6,000 LF $2 $12,000 Complete MBR Plant, 0.5 MGD 100,000 aal $8 $800,000 SK-1 Reuse Pump Station 1 LS $550,000 $550,000 8-in HOPE Reuse Force Main 6,000 LF $140 $840,000 Winter Reuse Disposal 1 LS $1,000,000 $1,000,000 Subtotal $3,202,000 Mobilization/Demobilization 1 LS 5% $160,100 Temporary Erosion/Sedimentation Control 1 LS 3% $96,060 Traffic Control 1 LS 5% $160,100 Subtotal $3,618,260 Construction ContinQency 1 LS 20% $723,652 Subtotal -Construction Costs $4,341,912 Sales Tax 1 LS 8.60% $373,404 Construction Budoet -Preliminary Desion Estimate $4,715,316 Enaineerina Design 1 LS 15% $707,297 Total Estimated Project Budget $5,422,614 Assumptions/Notes: 1) Pipe prices per linear foot include all bedding, backfill, excavation, soil removal, surface restoration, existing utility 2) No easements or land aquistion costs included. Pipelines, pump stations, etc. assumed in public rights of way. , ANNEXATION - "HIGH GROWTH" SCENARIO Wastewater System Estimated Capital Improvements and Costs PHASE 2 - HIGH GROWTH SCENARIO (Expressed in 2008 Dollars) Item Quantitv Unit Unit Cost Total Cost Trench Safety System 0 LF $2 $0 Complete MBR Plant, 0.5 MGD 100,000 qal $8 $800,000 SK-1 Reuse Pump Station 0 LS $550,000 $0 8-in HOPE Reuse Force Main 0 LF $140 $0 Winter Reuse Disposal 0 LS $1,000,000 $0 Subtotal $800,000 Mobilization/Demobilization 1 LS 5% $40,000 Temporary Erosion/Sedimentation Control 1 LS 3% $24,000 Traffic Control 1 LS 5% $40,000 Subtotal $904,000 Construction Continqencv 1 LS 20% $180,800 Subtotal -Construction Costs $1,084,800 Sales Tax 1 LS 8.60% $93,293 Construction Budget -Preliminarv Design Estimate $1,178,093 Enqineerinq Desiqn 1 LS 15% $176,714 Total Estimated Project Budget $1,354,807 Assumptions/Notes: 1) Pipe prices per linear foot include all bedding, backfill, excavation, soil removal, surface restoration, existing utility 2) No easements or land aquistion costs included. Pipelines, pump stations, etc. assumed in public rights of way. ,_,j I')' " NOTES Financial Impact Assessment - SKIA Annexation High Growth Scenario Notes The City of Bremerton management has prepared projected financial impact assessment information for the described annexation area with an assumption of high future growth in the area - but less than the amount Kitsap County modeled in the SKlA Sub Area Plan. In the preparation of this financial analysis, the City has made certain assumptions with respect to conditions that may occur in the future. It is the City's belief that the projected financial information was prepared on a reasonable basis. The City staff believe this analysis reflects the best currently available estimates and judgments, and presents, to the best of management's knowledge and belief, the expected course of action and the expected future financial impacts of the proposed annexation with the assumption of higher future growth in the area. It should be understood that this analysis is dependent upon future events - actual conditions may (and are likely to) differ from those assumed herein. The following pages represent explanatory notes for individual elements of the financial assessment analysis, as well as principal considerations and assumptions made by the City in the preparation of the financial impact information. The following are the base and growth assumptions for the High Growth Scenario: Existing Businesses 40 total estimated current businesses in the proposed annexation area based on data compiled from the Washington State Department of Revenue and the Port of Bremerton. Of this total, the Washington State Department of Revenue has indicated that 22 businesses in the proposed annexation area (all located in the South Petition area) had revenues subject to sales tax of$7.1 million in 2007 Existing Households +/- 1 total current residential households in the annexation area Existing Residential Population Assuming 2.5 people on average per household this equates to a population in the proposed annexation area of approximately 2.5 +/- currently. Future Development Assumption: Assumed development of fifteen parcels of3.5 acres Acres & Businesses Increased each of industry every five years. This results in the addition of fifteen new businesses on average every five years. Future Development Assumption: Development is assumed to be primarily located on Location Port of Bremerton industrial park property with limited development in the north petition area in this scenario. I '. ('. ,," Summary table of Business Growth and Acres Developed over the 20-year time horizon for the High Growth Scenario: All data complied to include North and South petitions and requests 1 High growth City of Bremerton scenario assumes that each new business will develop on an average parcel size of about 3.5 acres. Scenario assumes 15 new businesses every five years with an expected 35,000 Commercial Sq Ft developed per 3.5 acre parcel. Data from KEDA 2007-2008 recruitment leads indicate stron est interest for land develo ment in the 5 acre and below size cate 0 2 Puget Sound Regional Council assigns Manufacturing and Industrial employment growth at an avera e of 1/ 825 SF. A Ran e of 550-1100 3 Records of typical industrial development indicate about 12.000 sq ft per acre 4 Acres developed were analyzed using 2006 aerial photos with City of Bremerton GIS and includes the air ort runwa facilities. Notes to High Growth Financial Assessment spreadsheet: (1) Net fmancial impacts carried forward represents the prior year's ending cumulative net financial impact. (2) Property tax revenue for 2009 is based upon current assessor information for parcels in the proposed annexation area (2008 valuations and tax rolls). Taxable assessed values in 1,000's of dollars is then multiplied by $2.2181 (City of Bremerton regular levy rate for 2008 of$1.9032/$1,000 A V and EMS levy rate for 2008 of $0.3149/$1,000 A V). The property tax revenue is then increased by 1 % each year thereafter starting from the base 2009 year. The property tax amounts in the base annexation area are generally quite low for such a large land area but this is due to the public properties in existence there (Port of Bremerton) which are not subject to a property tax levy - and due to the large proportion of remaining properties being 2 " .:) ~ J designated as open space or forest land status which substantially reduces the property taxes on those parcels. (3) Leasehold tax revenue is a state excise tax of 12.84% on rent or lease payments to a public lessor for the right to use publicly owned tax-exempt property for private purposes. The purpose of the tax is to have private users of public tax-exempt property share with fee simple property owners who pay property taxes - the costs of providing governmental services. Of the 12.84% tax imposed by the state, the City receives an allocation of a 4% portion (or 31 % of the total) for areas with in the incorporated City. According to the Department of Revenue, the Port of Bremerton paid $151,515 for leasehold excise taxes in 2007. The calculated amount that would have been apportioned to the City had this area been incorporated is $47,201. For purposes of this analysis it is assumed that 2009 revenues from leasehold excise taxes is the same as the amount calculated for 2007 and then escalated by 3 % each year thereafter. In addition, Port of Bremerton staff indicates that new development on the Port property would most likely be lease arrangements for the use of Port owned land with the developer paying for the improvements directly and paying property taxes on the improvements portion - and the Port withholding leasehold taxes on the land lease payments. New building construction is therefore included in the calculated estimates of future property taxes, while the lea~ehold tax estimates include an expectation of new land lease arrangements for each new business development in the projected period. Per Port staff the current lease payment amount for unimproved property is $6,000 per year per acre and $12,000 per year per acre for sites that are "pad ready" or improved to a limited extent. For purposes of this analysis it is assumed that each 3.5 acre new development in the forecast period is unimproved property and the rate of $6,000 per acre per year in 2008 dollars is used and then escalated by 3% each year thereafter. (4) Admissions tax revenue is assumed to be zero. The City is not aware of any current sources of admission revenues that exist or which would be anticipated to be developed - which would be subject to the City's Admission tax. (5) Parking tax is assumed to be zero. The City is not aware of any parking facilities existing in the area or proposed to be developed in the future - which charge for such services and would be subject to the City's Parking tax. (6) Sales tax revenue includes revenues from existing (22 businesses currently reporting taxable retail transactions to the DOR) and projected additional businesses. It is assumed that fifteen businesses on average every five years will be added. There are 40 total estimated businesses currently in the proposed annexation area based on data compiled from the W A Dept of Revenue, and the Port of Bremerton. Of this total, the W A Dept of Revenue has indicated that 22 businesses in the proposed annexation area (all located in the South Petition area) had revenues subject to sales tax in 2007. The remainder represents businesses that produce products or services that are not subject to the retail sales tax. Future business growth is assumed to maintain this same approximate relationship of sales taxable to non-sales taxable businesses - in that it is assumed that every other business added to the area is subject to sales tax. 2009 tax revenues are computed using the assumption that taxable revenues would be the same as the DOR reported occurred in 2007 for the area. As growth is modeled to occur in the forecast period, the new businesses assumed to be subject to sales tax are assumed produce taxable revenues equivalent to 1.37 times the average taxable retail sales per business for Kitsap County ($235,353) per the "Washington State Almanac 2006-2007" then escalated by 3% in each year thereafter. Actual results for the 22 businesses verified by the DOR for 2007 - validate the use of this 3 I ~ (', ',,- 'J calculated value of retail sales revenue per business as the DOR actual average computes to an average of$322,727 per business in the area - and 1.37 times the Washington State Almanac information results in an average of$322,434. The City tax rate is .00085 (1 % less .15% administrative fee to the County). The sales tax on construction of future development in the proposed annexation area assumes the projected new businesses result in the addition ofa 35,000 square foot Commercial structure on a 3.5 acres parcel per business with construction costs estimated to be $2,783,200 in 2008 dollars based on an average cost of$79.52/Sq Ft for industrial facility structures as published in the January-February 2008 International Code Council Building Valuation Data - of which the taxable construction costs is assumed to be 80% of this amount. Construction values are escalated at 3% per year. (7) B&O tax revenue is assumed to be zero. Recent changes to the City's B&O tax code exempt businesses from the tax if they are located on industrially zoned Port properties and all areas annexed into the City are exempt from B&O tax for a period of three years for businesses located in the area at the time of annexation. This analysis conservatively assumes that all projected growth in this higher growth scenario would occur on Port of Bremerton owned property and would therefore be exempt from the City B&O tax. (8) Washington State distributes gas tax, liquor tax, and criminal justice funds to the City on a per capita basis. The City's share of this distribution will increase with any population added by this proposed annexation. The budgeted combined rate for 2008 is $37.88 per the State Department of Revenue. This amount is multiplied by the population initially estimated to be included in the proposed annexation area (2.5). The dollar amount per capita is then increased by 3% each year thereafter. No further population growth is assumed as it is not expected that future development would be residential. (9) Real Estate Excise Tax (REET) revenue in this high growth scenario is assumed to come from limited sales transactions of privately owned. buildings situated on land leased from the Port of Bremerton. Per Port of Bremerton staff, historical experience suggests that approximately 2 such transactions occur in every 10 year period. For this high growth scenario it is assumed that in addition to the amount projected in the low growth scenario that one additional larger building is sold in each 10 year period. The 0.5% tax is applied to an assumed sale of a 15,000 square foot building every fifth year in the forecast period with the value estimated conservatively to be $1,192,800 and one 35,000 square foot building every 7 years with the value estimated conservatively at $2,783,200 in 2008 dollars based on an average cost to construct of $79 .52/Sq Ft for industrial facility structures as published in the January- February 2008 International Code Council Building Valuation Data as then escalated by 3% in each year thereafter. (10) Utility taxes are based on average annual power bills of $2,760 in 2008 dollars for a typical business enterprise located on Port property (per Port of Bremerton staff) and an estimated telephone service annual cost of $1 ,200 in 2008 dollars, and (per Waste Management staff) an annual solid waste disposal service total cost of $80,851 in 2008 dollars for all existing businesses located in the proposed annexation area with an average annual rate of $2,995 per business in 2008 dollars as then each multiplied by the number of businesses projected to be added in future periods of the forecast and escalated by 3% each year thereafter. Utility tax rates are 6% for electricity and telephone, and 9.5% for solid waste disposal services. No revenue estimate is made for utility taxes on services to residential accounts or for cable television services due , \....- - 4 > .' 1)1 \ 4l-' to lack of residences identified in the proposed annexation area and no expectation of residential development in the area in the future. (11) In accordance with Bremerton Municipal Code (BMC) 15.06.020(a) - A general facility charge (GFC) shall be charged on all new or expanded service connections to the water, wastewater, and storm water utility systems. The calculation of the general facility charge for water shall be based on the meter size to be installed for a new or expanded water utility service. The calculation for the general facility charge for wastewater shall be based on the number of equivalent residential unites) (ERU) served. The calculation for general facility charges for stormwater shall be based on the number of impervious surface units (ISUs) as defined in BMC 15.01.020. The number ofISUs charged shall be based on the total impervious area divided by the amount of impervious area in an ISU. The rates applied are per the current BMC. The Port of Bremerton currently owns and operates its own wastewater utility. Under this High Growth Scenario the capacity of the existing system will be exceeded and additional conveyance and treatment facilities are required. It is assumed that the City of Bremerton will assume ownership of the Port of Bremerton wastewater system in 2009 and the City will begin to receive wastewater GFC's. This will allow the City to receive revenue in years prior to any capital expenditures. The calculation ofGFC's are based on the following assumptions. · Water GFC' s are based on the GFC for a 1" water meter. · Wastewater GFC's are based on the Commercial 1 GFC with an estimated average of 4 ERU's per customer. · Stormwater GFC's are based on 35,000 SF of billable impervious area or 14 ISU's per customer. · All GFC's escalated at 3% per year. (12) Mitigation costs to be paid by the Developer as determined through the development review process and the BMC or as needed. For the purposes of this analysis the water, wastewater, and storm water system capital improvements are assumed to be financed through a combination of utility rate revenues, General Facility Charges (see note 11), grant funding (see note 14), and low interest state loans offered by the Public Works Trust Fund (PWTF) and Department of Ecology's DWSRF loan program with a portion of that debt service obligation being covered through the formation of a UUD covering all benefitted, unserved properties within the boundaries of SKIA. No developer payments are assumed to be required for the utility system capital projects in this high growth scenario. (13) This analysis assumes the assumption oflow interest state loans offered by the Public Works Trust Fund (PWTF) and the Department of Ecology. It is assumed that the City's utility systems would provide a 15% local cash match from rate revenues for each of these loans plus it is expected that there will be a grant or other contribution of $2,000,000 with the remainder then financed for 20 years at an interest rate of 1.5%. See Note 17 for additional discussion of the projected debt financings. Of the amount fmanced, it is expected that a UUD will be formed covering all unserved properties benefited by the related capital improvements. It is assumed that 2/3rds of the amount financed is expected to be provided for by the UUD assessments. (14) Grants or other capital contributions of $2,000,000 are assumed in this high growth scenario. There are competitive re-use grants available from Ecology, EDA grants 5 j, 1..-." I.... ;) available through PSRC and CTED, and potential developer contributions to contribute to this $2,000,000 infusion of capital, (15) Utility system rate revenues are computed in accordance with Chapter 15.06 of the BMC which establishes current utility fees, rates, and other charges. The Port of Bremerton currently owns and operates its own wastewater utility. Under this High Growth Scenario it is assumed the City of Bremerton will assume ownership of the Port of Bremerton wastewater system in 2009. At that point the City will begin to receive wastewater rate revenues. The utility rates in this analysis are based on the following assumptions: · Water rates are based on the fixed rate for a I" water meter and an average annual water usage of 180 HCF which is the current average annual usage per customer within the Olympic View Industrial Park. · Stormwater rates are based on 35,000 SF of billable impervious area or 14 ISU's per customer. · Wastewater rates are based on the fixed rate for a Commercial 1 account and an average annual wastewater usage of 180 HCF. · All fixed fees and commodity charges are escalated at 3% per year. (16) The City General Fund imposes on its internal utility systems a payment in lieu of tax - similar to the utility tax imposed on external utilities. The current rate is 8.5% of utility system rate revenues for water, wastewater, and stormwater. This amount represents revenue to the General Fund and is added to annual expenses of the utility systems as noted in (19) below. This is an internal transfer between the City's utility systems and the City's General Fund and is thus shown as both a receipt and an expense in this analysis. (17) This analysis assumes the assumption oflow interest state loans offered by the Public Works Trust Fund (PWTF) and the Department of Ecology. It is assumed that the City's utility 'systems would provide a 15% local cash match from rate revenues for each of these loans with the remainder financed for 20 years at an interest rate of 1.5%. Low-interest loans from the state are competitive and there is no guarantee of continued availability. There is also no certainty that subsidized rates will remain at currently available levels. The City has been very successful in recent years in getting support from these programs and our assumption is that will continue. The back up option to subsidized loans for capital projects in this high growth scenario would be revenue bonds issued by the combined Utility System of the City. The rates on this type of debt vary but could be assumed for this analysis to be approximately 5.75% compared to 1.5% for subsidized loans. For each million in par amount ofloan this potential interest difference results in an additional annual expense of$27,177. Loans in the amount of$1,450,202 and $4,350,605 mid year in 2013 and 2014 respectively, and $ 1,442,635 mid year 2021 are undertaken to cover the City's portion of capital costs incurred net of payments by the Developer as described in note (12), and other grants or capital contributions as described in note (14). Proceeds are assumed to be approximately 100% of the par amount. (18) Payment to Kitsap County for revenue sharing in accordance with the interlocal agreement concerning revenue sharing upon annexation. Revenue Sharing payments are based on three sources of revenue: 1) County's portion of the local retail sales tax levied; 2) Ad Valorem property tax levied by the County pursuant to RCW 36.82.040 for establishment and maintenance of county transportation systems; and 3) Admission tax levied by the County pursuant to Chapter 36.38 RCW. The combined 6 l'. ) ",1 .-',.'.!\' total of the County's collections from all three sources within the annexation area during the calendar year preceding annexation net of the same for the first full calendar year following annexation = "County's Lost Revenue". The amount of payment from Bremerton to the County is based on a three-year soft landing approach with the year 1 payment equal to 75% of the County's Lost Revenue, year 2 payment equal to 50%, and the third and final year being 25%. The estimated amount of County lost revenue for these items is $71,000 of sales tax revenue based on the DOR's reported taxable retail sales in this area of$7,100,000 in 2007, $4,741 in ad valorem property tax levied for County roads per the County 2008 property tax assessments for parcels in the proposed annexation area, and zero dollars for admission tax as the City is not aware of any current sources of admission revenues that exist. (19) Fire and Emergency Medical Service (EMS) assumed to be covered by an Interlocal Agreement between the Bremerton Fire Department and the South Kitsap Fire and Rescue ('SKFR') during the forecast period. Per information provided by South Kitsap Fire and Rescue dated April 15, 2008, the total annual estimated impacts of the proposed annexation would be a loss of revenue of $57,000 in 2008 dollars. This analysis assumes that the City would negotiate an agreement for continued coverage of this area by SKFR setting an initial compens().tion level at the estimated lost revenue amount of $57,000 and then providing for cost of living increases in years thereafter (which is assumed to be 3% each year thereafter in this analysis). Further cost increases are not assumed in this scenario because service level demand is not anticipated to change dramatically with the type of development expected in the proposed annexation area. (20) Police service and coverage of the current south Bremerton area, watershed area, and the proposed annexation area is expected in combination to require an increase in staffmg of a sector patrol unit - requiring 7 positions at a total annual cost (salary and benefits) of$592,571 (2008 dollars) plus $100,000 in annual estimated associated operational expenses. The proposed annexation area in this scenario while large geographically is expected to generally be low in demand for these services due to the type of development in the area. A smaller geographical area but an expected higher demand will come from the anticipated large residential development in the existing South Bremerton area. Given those expectations for the purposes of this analysis, 25% of the cost of the added personnel and operational expenses are assumed to be attributed to this proposed annexation area for this higher growth scenario. The computed annual expense is then increased by 3% each year thereafter. 25% of the estimated cost to purchase 2 vehicles and computer equipment for these additional personnel in the years 2009 and the replacement cost of those vehicles every five years thereafter (escalated at 3% per year) is included in the capital costs as noted in (23) below. It is expected that the additional personnel would be based out of the existing police department building. Bringing new police officers on line requires a period of time to recruit and train. It is assumed that in the first year (2009) a ramp up to 50% of this annual expense will occur, rising to 75% in the second year (2010), coming to full new operational levels by the beginning of the third year (2011). (21) An estimated annual amount of $10,000 in 2008 dollars for electronics and street maintenance costs was provided by the City Engineer. This amount is then escalated by 3% per year for future years in this analysis. (22) Utility system expenses are estimated based upon the 2008 budget relationship of operating expenses to rate revenues charged. For the water, wastewater, and stormwater system this computes to 88%, 74%, and 91 %, respectively. In addition to 7 ) J f I,t II ~~ the computation of operation and maintenance expense the total utility expense was increased in each year by the amount of utility PILOT taxes computed to be transferred to the General Fund. (23) General Fund capital costs include police vehicle and equipment purchases necessary to support the additional staffing needed to provide adequate service levels in the proposed annexation area in combination with expanded service demands in the south Bremerton area - as described more fully in note (20) above. Two police vehicles and computer equipment are assumed to cost $81,148 (2008) in total (of which 25% is allocated to this proposed annexation area) and are shown being replaced every fifth year thereafter at an escalated price of 3 % per year. (24) The proposed SKIA annexation area is served by transportation facilities currently owned, operated and maintained by the State of Washington DOT (SR3), internal streets owned and managed by the Port of Bremerton, and Lake Flora Road which is under County jurisdiction. SR3 was recently reworked and widened by DOT to add additional length to left turn lanes in the vicinity of the Port. The Belfair Bypass project is expected to address the intersection of Lake Flora Rd. and SR3 within SKIA and is a state project. The Port is pursuing the construction of the Cross-SKIA connector Road to link SR3 and the north SKIA properties to Lake Flora Road east of the airport. The first phase of that project is under design and the Port is planning to pursue the issuance of bonds to support the $3.72 M cost of constmcting the first phase in 2010 or 2011. It is assumed the final phase of this improvement would be financed using a similar approach and that no City money would be necessary for completion. Kitsap County is designing an upgrade of Lake Flora Road from SR3 to J.M. Dickenson Road SW. This 3.6 mile improvement includes widening, paving shoulders, and re-surfacing in addition to re-aligning the intersection at J.M. Dickenson. This is an estimated $6.4 M project primarily addressing safety issues and is not being pursued to increase capacity. Funding is expected to come from state contributions, Transportation Impact Fees, and County gas tax. Recent discussions with Kitsap County indicate they would continue to pursue this project independent of potential annexation due to on-going safety concerns and accident history. The County is not expecting contribution_of City revenues to be required on this project. This "High Growth" scenario includes $25,000 (in 2008 dollars) per year in Street and Electronic Capital to [mance any improvements to city streets within SKIA after 2014. This amount is escalated by 3% per year for these future years in the analysis. The length of Lake Flora Road from SR3 to the SKIA boundary may be the only city street within the proposed annexation at the outset. The Cross SKIA connector may become a city street once completed. The $25,000 is a placeholder for any required capital on these facilities. (25) Capital costs for growth related infrastructure improvements are included as follows: . WATER There is sufficient existing water supply capacity in the 517 pressure zone serving the South Kitsap Industrial Area (SKIA) to meet current and projected demands, including fire flow under the "Low Growth" scenario through the 20-year planning horizon. However, this "High Growth" scenario further accelerates demand and requires additional transmission and supply by 2014. The 2008 cost for this new 16-inch line is estimated at $2.0M and has been escalated to the years of design and construction in 2013 and 2014 at 3%. 8 ~) . ['Il' . I It W ASTEW A TER It is assumed in the "Low Growth" scenario that the Port of Bremerton would continue to own, operate, and maintain their wastewater collection and treatment system throughout the planning period. Any required improvements to this system and all maintenance costs are assumed to be provided by Port of Bremerton lease revenues and would not flow through City of Bremerton budgets. In this "High Growth" scenario, wastewater flows are projected to exceed the capacity of the current Port of Bremerton owned system (72,500 gpd) by 2014. This scenario assumes the City would immediately assume responsibility for the operation and maintenance ofthe Port of Bremerton's system and then develop, fund, design, and construct a Membrane Bio-Reactor (MBR) treatment facility located on the site of the current Port of Bremerton Wastewater Treatment Plant (WWTP) in 2014. The initial facility would be designed for 0.10 MGD and expanded to 0.2 MGD by 2021. A new effluent pump station would also be built at this location and highly treated water from this facility woUld be pumped through an 8-inch HDPE force main 6,000 feet to the existing 8-inch City water line currently running from Pump Station 3 to Reservoir 10. This water line would have been replaced by a new l6-inch water transmission main in 2014 and would therefore be available for wastewater service. The treated wastewater would flow to the irrigation pond at Gold Mountain Golf Complex. It is assumed this treated wastewater would be used for irrigating the city's two golf courses during the spring, summer, and fall months. The 0.2 MGD maximum flow in the High- Growth scenario represents approximately 40% of the 0.525 MGD average summer water use for the golf courses. It is assumed the golf course would continue to pay the Wastewater Utility for this water at the then current rate in place for potable water and that revenue is therefore included in projected utility rate revenues. Excess treated water (peaking in the winter months) would either be re-used in another to be determined application, used to augment stream flows in either the Union River or Gorst Creek basins, spray-irrigated on city Utility Lands, or infiltrated into porous soils in the vicinity of the gravel mining operations located on City property near OVIP. The estimated costs for improvements contain one million dollars in capital to develop one or more of those back-up options. The 2008 cost for these capital improvements are estimated at $5.422M (design and construction in 2013 and 2014) and at $1.355M (design and construction in 2020, 2021 and 2022) and has been escalated at a rate of3% per year from 2008. · STORMWATER It is not anticipated that there will be any stormwater capital improvements required for this annexation area. There are existing Stormwater facilities in place that are owned by either the Port of Bremerton or WSDOT. Individual development projects will be required to mitigate their on-site stormwater impacts through the use of both standard and low impact development techniques. There is no apparent need for large-scale regional stormwater conveyance, treatment or detention facilities. Under all anticipated growth scenarios it is assumed that stormwater GFC's and rate revenues would be sufficient to support the City's NPDES Phase II compliance requirements for this new area. 9 . ). _,'./-.l'" (26) Ending cumulative financial impact represents the beginning net financial impact for the period carried forward from prior periods plus the current period receipts less current period expenditures. 10 " 'I I l\. SKIA Annexation Financial Assessment June 2008 Part IV of IV Scenario C "SKIA Sub Area Plan Growth" J" ..' " SKIA SUB-AREA SCENARIO FIGURE X Legend 6" Force Main .... 8" Gravity Main 8" Gravity Main (Developer Ins/ailed) B ::r Il2I 10" Force Main = 10" Gravity Main ~!:.::?.::!l 12" Gravity Main .. .... 14" Force Main - 15" Gravity Main """""" 18" Gravity Main 18" Force Main Existing Bremerton Sewer Force Main - UGA Boundary ...... City Boundary i!EI Pump Station e "0 ''''' 3.000 4,500 F~' ID~ SKIA WATER SUB-AREA PLAN SCENARIO FIGURE X Legend .. 16" Water Main a 1 Million Gallon ~ Reservoir - UGA Boundary · .... City Boundary 9 150 1,500 3,000 4,500 F." . " ... LQ.t Upd.~ Jun~ 6, 2008 Net floanclaUmpa.;ts Corrted.FOI'W8fd (1) Receipts : Gf Property Tax Revenue (2) Qf Los$ehGkl Tax Revenue (3) GF Admt~61on~ Tal( Revenue (<4) OF Parking 1M Revenue (5) Gf Sales Tax Revenue (6) Gf 8&0 Tax Revenue (7) SF Per Capita Revenue Distributions from State (8) Gf Real Estate Excise Tax on Property S.les (8) Gf Ubllty Tax Revenue - ElecJT e:lephoneJSoIld W86te (10) UT UtIlity GFC PlII'Iments (WaterfNas~ewsterIStorm) (11) GF Developer Payment (12) ur Developer PA~ment) (12) UT Utikty Local,lmprovement Di&trict (UUQ) Payment (13) ur Grana - W8ter Reuse, EDA, Capital Cl)lltnbullon~ (14) lIT Utilily Rat. Revenues - Water (15) UT UtIlity Rate Revenue&-Wastewster(15) UT Utility Rati Rev.nUM- Stormwater(15) GF Poyment in Lieu of Tax - Water UtiUty (Hi) GF Payment in Weu o.f TID: - WasteW8tl1r Utility (16) Gf Payment In Lieu of Tax - StGrrl'WMor Utility (16) Gf Bond Proceed& - GO Bond5 (17) UT Bond Procllelds - Revenue Bonda/Loans (17) ToIoII Receipts E>>pcndUwcs: GF PaYlmnt to Kitsap County. R~venulJ Shilling Agmt (18) GF Fire/EMS Setvic:e Expens.e (19) Gf PoJice Service ExpeNoO (20) BE Public Works & Utilities. Streets & Electronics (21) U'f Pubbc Works & UtiiItiOl5 - Water Expense (22) U'r Pub~c Works & Utilitios - Wastewater Expenee (22) ur Public Works & Utillbes - Stormw.ter Expense (22) Gf Capital Co&l& - General Fund (pOliclJ &. fll2'> (23) Gf Capital Cosb;,. Streets & Electronic5 (24) ur Capital Costs - Water Syatem (25) U-T Capital CO$ta - Wastewater System (25) ur Capital COliOlIi ~ Slormwater (25) OF Debt Service 01\ GO Debt (11) lJT Debt Service on Revenue Bond&lLoans (17) TelatlExpendttules Aftnwal:Net Cash Flow Encting CumutaUve JlRanciaI- ~t (~ '" U1 General Fund Net FlnancLallmpact U~ititls Net Finsnclallmpect Go""rIllFWM'em ~S'tl;tem""m City of BremertGn . S~ Area AAnexation FiRaflCial Assesment Financiallrnpact5 Scenario ~ Annexation ("SKIA Sub Artla Plan") lQQi! 2010 $ 378,5lW 1.7,319 50.656 2P.11 ~ 2013 627.337 $ 1,306,058 $ 1,572,346 297,2.8 68,145 290,6.7 98 23,078 267,288 46,680 86,198 112,451 3,968 7,327 9,558 1 192,222 37,870 58,710 267,506 10,300 45,046 71,113 111,889 602,434 220,835 62,315 308,090 100 26,540 275,307 50,539 97,662 127,407 <4,296 a,301 10,830 1,808,130 3,144322 18,935 60,471 367,37<4 10,609 .8,770 80,571 126,770 <450,20<4 1,677,008 13,561 713501 2,878,034 378,504 -1-16,833 478.nl 266.288 378,5Q.4 $ 827,337 $ 1,306,056 $ 1,572,346 $ 76,608 51,161 276,701 95 16,373 259,503 43,003 75,319 Q.6,'258 3,655 6,.02 8,352 917429 1 051 267 164,264 28.,569 183,917 284,804 323,322 I" 30,189 283,566 54.587 109.737 143,168 <4,640 9,328 12.169 11 ,363,437 . 13115190 62,285 378,396 10,927 52,676 90,533 1<42.443 28,138 1,85.,839 11.513,910 383,594 14,562,374 1,-4<47,184 125,162 S 293,535 369,620 (27,2<47) (1,816,805) 376.Ei51 74,149 342,276 107 6,713 3-4,033 292,073 255,742 58,833 122,.48 158,742 5,001 10,408 13,578 2157.167 64,154 389,747 11,255 56,774 101,020 158,943 163,905 767.188 1,835.651 321,516 446.678 249,514 72,002 2014 125.162 459,1-41 80,334 ~ lQ12 2017 2018 1Qli! 1Q1Q 446,678 $ 4,512.537 $ 3,647,466 $ 2,216,854 S 2,019,784 S 1,991.47<4 $ 1,131.774 129,144 358,898 110 38,081 300,836 511,484 63,285 135,823 177,191 5,379 11,545 15,061 67,951 1<49,891 195,5-43 5,776 12,741 16,621 3,860,000 544,617 86,704 379,483 113 16,616 42,340 309,861 511.484 2,493039 68,061 413.483 11.941 65,573 123,660 19<4,565 .19,761 29,851 70,103 425,887 12,298 70,290 135,861 213,762 1,468,069 30,747 633,783 93,265 397,609 116 46,821 319,156 511,48. 72,839 164,680 214,83$ S,191 13,988 16,261 443,623 3,116,633 72,206 438,Ei64 12,668 75,231 148,683 233,935 1,891,644 31,669 521,909 327,609 793,027 4.547,446 726,144 100,023 419,952 120 51,533 328,731 511,484 77,960 180,222 235,111 6,627 15,319 19,964 1,827,726 4,736,855 32,619 2,150,266 327,809 899,484 4,933,925 622,010 106,983 439,703 124 7,782 56,485 338,593 555,585 83,323 196,548 256,410 7,082 16,707 21,795 1,313,084 5,113,799 561,188 451,824 13,048 80,.07 162,152 255,128 578,023 465,379 13,439 85,824 176,295 277 .380 54,528 33,598 609,063 1,544,805 6,219941 66,079 401,4<40 11,593 61,D70 112,05<4 176,305 .7,036 28,982 767.188 2,154,083 3,982,114 63,744 163,905 767.188 3,358110 (960,965) (1,43",957) 95,895 4,345 92,182 (289,252) 327,809 975,966 5,142,110 4,065,658 865,071 1,<430,612 197,069) 28,310 $ 4.512,537 $ 3,647,466 $ 2,216,654 S 2,019,784 S 1.991,47<4 S 138,047 (166,357) See NNotflS to the SKIA Area Annexation (annexation - SKIA Sub Area Plan scenario) - Financial Impact AssessmentN for key assumptions and explanations. 56,806 57,000 173,143 10,000 <41,498 82,138 97,767 40,574 538925 103,624 274,680 921,492 114,153 1,024,707 121,538 463,944 127 61,688 348,751 609,063 650,676 627,335 1,000,527 88,937 213,691 278,774 7,560 18,164 23,696 9,009,240 13,377,<485 34,606 627,335 10,599,106 327,809 1,500,716 14,761.493 1,384,008 607,.466 $ 301,460 (1,685,467) 2021 607,466 $ <485,449 131 67,152 359,213 2,621,773 1,000,527 94,813 231,686 302,250 8,059 19,693 25,691 6,574047 595,364 .79,340 13,6.2 91,495 191.141 300,739 35,644 646,155 1,975,618 327,809 1,500716 6,236,541 337,505 1,242,816 136,978 2022 2Qn 944,972 S 1.435,857 1,357,961 145,047 511,736 135 72,889 369,990 2,700,426 1,000,527 100,962 250,569 326,883 8,582 21,298 27,785 6 a89,042 613,225 493,720 14,258 97.428 206,719 325,249 36,713 665,539 2,034,887 327,809 1,500,716 6,398,157 490,885 535,137 139 20,436 78,910 381,089 2.,781,438 1,GOO,527 107,394 270,375 352,723 9,128 22,982 29,961 7,187330 631,622 506,532 1<4,685 103,635 223,059 350,959 37,815 685,508 2,095,934 327,609 1.500,716 6 565,504 621,626 .r Flnanciallmpaets ScenariQ Annexation ("SIiQA Sub Af'~acPlan") ~. y 1,477,338 153,359 1QM 2.ill 2026 11m ~ 2,057.683 $ 2,751,059 $ 3,661,0169 $ 4727266 $ 5,959,149 1,999,935 189,174 563,628 143 9,021 85,226 392,522 2,864,882 1,000,527 114,121 291,145 379,816 9,700 24,747 32,285 7,495,366 650,570 523,788 15,126 110,127 240,195 377,919 670,087 539.502 1$,580 11S.915 258,157 406,181 63,213 38,949 706,071 2,158,812 1,801,083 161,920 589,077 148 91,650 404,298 2,950,829 1,000,527 121,155 312,918 408,222 10,298 26,598 34,699 7826,587 40,118 727,253 2,223,576 327,609 1,500,716 6,918186 910,411 1,729,~35 170,737 619.843 152 98,795 416.427 3,039,354 1,000,527 128,509 335,735 437,988 10,923 28,537 37,229 8,169.736 690,190 555,687 16,0<47 124,011 276,881 435.798 <41,321 749,071 2,290,283 327,809 1,500,716 7103939 1,065,796 1,862,236 179,819 647,601 157 106,073- 428,919 136,195 359,639 469,173 11,577 30,569 39,880 3.130,534 1,000,527 144,226 384,875 501,834 12,259 32,697 42,658 661,027 725,486 327,809 1,500,716 6801,992 693,376 8.528,139 710,896 572,357 16,528 131,428 296,702 466,627 42,561 771,543 2,358.992 327,809 1,500,716 7.296258 1,231,883 161 166 10,458 121,689 455,041 113,700 441,787 3,224,450 1,000,527 152,616 .'0,890 536,03-4 12,872 34,926 45,563 8.919,927 732,223- 589,528 17,024 139,178 317,357 499,325 754,189 607,214 17,535 147,274 338,984 53~,354 43,838 794,689 2.429,761 327,809 1,500,716 7,495,363- 1,424,564 <418,687 (81,181) 844,972 $ 1.435,857 $ 2,057,683 $ 2,751,058 $ 3,661,489 $ 4.727,266 $ 5,959,149 $ 7,383,713 1,389,784 34,779 557,147 (66,262) 672,650 (50.824) 726,226 (34,850) 926,731 (18,321) 1.067,017 (1,220) 1,215.411 16,472 BASE ANNEXA liON SCENARIO - SKIA SUB AREA PLAN RETAIL SALES, 8&0, AND PROPERTY TAX INCREASES ESTIMATION (note 2) (note 1) Average 0.125% (note 3) 0.85% 0.125% (note 4) # of Businesses wi # of Businesses wi Taxable Retail Estimated 0.85% Bremerton Development Bremerton Bremerton Total Total Property 3% Revenues Subject Revenues Not Subject Sales Per Taxable Bremerton Retail 8&0 Construction Sales Tax on Retail 8&0 on Bremerton Bremerton Tax Increase Escalation Year To Sales Tax To Sales Tax Total Business Retail Sales Sales Tax Tax Costs Construction Construction Sales Tax Rev 8&0 Tax Rev from Const Factor 2009 25 20 45 $ 322.434 $ 8,060,840 68,517 Exempt $ 30,615,200 $ 208,183 Exempt $ 276,701 Exempt $ 67,908 1.0000 2010 27 23 50 332,107 8,966,879 76,218 Exempt 31,533,656 214.429 Exempt 290,647 Exempt 69,945 1.0300 2011 30 25 55 342,070 10,262,095 87,228 Exempt 32.479,666 220,862 Exempt 308,090 Exempt 72,043 1.0609 2012 32 28 60 352,332 11,274,621 95,834 Exempt 33.454,056 227.488 Exempt 323,322 Exempt 74,204 1.0927 2013 35 30 65 362,902 12,701,565 107,963 Exempt 34.457,677 234,312 Exempt 342,276 Exempt 76,431 1.1255 2014 37 33 70 373,789 13,830,190 117,557 Exempt 35,491.408 241.342 Exempt 358,898 Exempt 78,723 1.1593 2015 40 35 75 385,003 15.400,104 130,901 Exempt 36,556,150 248,582 Exempt 379.483 Exempt 81,085 1.1941 2016 42 38 80 396,553 16,655,212 141,569 Exempt 37,652,834 256,039 Exempt 397,609 Exempt 83,518 1.2299 2017 45 40 85 408.449 18,380,216 156,232 Exempt 38,782,419 263,720 Exempt 419,952 Exempt 86,023 1.2668 2018 47 43 90 420,703 19,773,028 168,071 Exempt 39,945,892 271,632 Exempt 439,703 Exempt 88,604 1.3048 2019 50 45 95 433,324 21,666,190 184,163 Exempt 41,144,269 279.781 Exempt 463,944 Exempt 91,282 1.3439 2020 52 48 100 446,324 23,208,823 197.275 Exempt 42,378,597 288,174 Exempt 485,449 Exempt 94,000 1.3842 2021 55 50 105 459,713 25,284,228 214,916 Exempt 43,649,955 296,820 Exempt 511,736 Exempt 96,820 1.4258 2022 57 53 110 473,505 26,989,764 229.413 Exempt 44,959.453 305,724 Exempt 535,137 Exempt 99,725 1.4685 2023 60 55 115 487,710 29,262,586 248,732 Exempt 46,308,237 314,896 Exempt 563,628 Exempt 102,716 1.5126 2024 62 58 120 502,341 31,145,146 264,734 Exempt 47,697,484 324,343 Exempt 589,077 Exempt 105,798 1.5580 2025 65 60 125 517,411 33,631,734 285,870 Exempt 49,128.409 334,073 Exempt 619,943 Exempt 108,972 1.6047 2026 67 63 130 532,934 35,706,553 303,506 Exempt 50,602,261 344,095 Exempt 647,601 Exempt 112,241 1.6528 2027 70 65 135 548,922 38.424,515 326,608 Exempt 52,120,329 354,418 Exempt 681,027 Exempt 115,608 1.7024 2028 75 65 140 565,389 42.404,197 360,436 Exempt 53,683,939 365,051 Exempt 725,486 Exempt 119,076 1.7535 (note 1) there are 40 total estimated businesses currently in the proposed annexation area based on data compiled from the WA Dept of Revenue, the Port of Bremerton, and Ihe Kitsap Economic Development Alliance. Of this total, the WA Dept of Revenue has indicated that 22 businesses In the proposed annexation area (all located in the South Petition area) had revenues subject 10 sales lax of $7. 1 million in 2007. The remainder represent businesses that produce products or services thai are nol subjecllo Ihe retail sales lax. Future business growth is assumed to maintain this same approximate relationship of sales taxable to non-sales laxable businesses - In that It is assumed that every other business added to the area Is SUbject to sales tax. (note 2) initial value of $235,353 average retail taxable sales per business In Kitsap County per "Washington State Almanac 2006-2007" increased by a factor of 1.37 in recognition of the type of busmesses anticipated to locate in this area - then escalated by 3% in each year thereafter. The WA State Dept of Revenue confirmed there were 22 businesses in the proposed annexation area which had revenues subject to sales tax of $7. 1 million In 2007. This computes to an average of $322, 727 per business which IS just slightly more than the results provided by using the average retail taxable sales per business In Kitsap County per "Washington State Almanac 2006-2007" increased by a factor of 1.37. (note 3) Development of twenlyfive 5.5 acre industriallretail business sites on average is assumed every five years adding 25 bllsmesses - each having a 77,000 Sq Ft commercial bUilding. The assessed value of these projected business site developments is assumed to be $6,123,040 (in 2008 dollars) per site. This is based on $79.52/Sq Ft average cost for industrial facility structures per the International Code Council Building Valuation Data - pUblished January-February 2008. Taxable construction costs are assumed to be 80% of the assessed value for purposes of computing sales tax and B&O tax impacts. (note 4) Propelty tax increase for construction is held to today's dollar rate per $1, 000 A V - ignoring decreases in I/le doUar rate per $1.000 of AV related to property value increases while also ignoring the City's permitted 1% annual property tax amount increase. ." 1. '" .r BASE ANNEXATION SCENARIO - SKIA SUB AREA PLAN .. "" LEASEHOLD TAX ESTIMATION Escalated at 3% (note 1) (note 2) 4.00% Cumulative Leasehold Tax Land Development Bremerton Leasehold Tax Total Estimated 3% Existing Subject to Port Leasehold Tax Additions From Bremerton Escalation Year Businesses Lease Agreements Additional Leases New Development Leasehold Tax Rev Factor 2009 $ 47,201 99,000 $ 3,960 $ 3,960 $ 51,161 1.0000 2010 48,617 101,970 4,079 8,039 56,656 1.0300 2011 50,075 105,029 4,201 12,240 62,315 1.0609 2012 51,578 108,180 4,327 16,567 68,145 1.0927 2013 53,125 111 ,425 4,457 21,024 74,149 1.1255 2014 54,719 114,768 4,591 25,615 80,334 1.1593 2015 56,360 118,211 4,728 30,343 86,704 1 .1941 2016 58,051 121,758 4,870 35,214 93,265 1.2299 2017 59,793 125,410 5,016 40,230 100,023 1.2668 2018 61,587 129,173 5,167 45,397 106,983 1 .3048 2019 63,434 133,048 5,322 50,719 114,153 1.3439 2020 65,337 137,039 5,482 56,200 121,538 1.3842 2021 67,297 141,150 5,646 .61,846 129,144 1.4258 2022 69,316 145,385 5,815 67,662 136,978 1.4685 2023 71,396 149,746 5,990 73,652 145,047 1.5126 2024 73,538 154,239 6,170 79,821 153,359 1.5580 2025 75,744 158,866 6,355 86,176 161,920 1.6047 2026 78,016 163,632 6,545 92,721 170,737 1.6528 2027 80,356 168,541 6,742 99,463 179,819 1.7024 2028 82,767 173,597 6,944 106,407 189,174 1.7535 (note 1) Leasehold tax revenue is a state excise tax of 12.84% on rent or lease payments to a public lessor for the right to use publicly owned tax-exempt property for private purposes. The purpose of the tax is to have private users of public tax-exempt property share with fee simple property owners who pay property taxes - the costs of providing governmental services. Of the 12.84% tax imposed by the state, the City receives an allocation of a 4% portion (or 31% of the total) for areas with in the incorporated City. According to the Department of Revenue, the Port of Bremerton paid $151,515 for leasehold excise taxes in 2007. The calculated amount that would have been apportioned to the City had this area been incorporated is $47,201. For purposes of this analysis it is assumed that 2009 revenues from leasehold excise taxes is the same as the amount calculated for 2007 and then escalated by 3% each year thereafter. (note 2) Per Port of Bremerton staff, new development on the Port property would most likely be lease arrangements for the use of Port owned land with the developer paying for the improvements directly - paying property taxes on the improvements portion and the Port withholding leasehold taxes on the land lease payments. New building construction is therefore included in the calculated estimates of future property taxes, while the leasehold tax estimates include an expectation of new land lease arrangements for each new business development in the projected period. Only the number of new businesses modeled in the "High Growth" scenario are considered to be developed on Port of Bremerton Industrial Park properties - the additional business growth beyond that amount in this "SKIA Sub Area Plan" scenario are assumed to be developed outside of the Port of Bremerton properties and therefore are not subject to lease agreements or leasehold tax payments accordingly. Per Port staff the current lease payment amount for unimproved property is $6,000 per year per acre and $12,000 per year per acre for sites that are "pad ready" or improved to a limited extent. For ( t'. ; ANNEXATION - "SKIA SUB AREA PLAN" SCENARIO Water System Estimated Capital Improvements and Costs (Expressed in 2008 Dollars) !t~_ . :. j",@: ~~tilt ~al~~iIfQ~!(~O{_1 16" TRANSMISSION MAIN FROM GOLF COURSE TO RESERVOIR 13400 LF 100 $1,340,000 Mobilization 1 LS 5.0% $67,000 Temporary Erosion/Sedimentation Control 1 LS 3.0% $40,200 Traffic Control 1 LS 5.0% $67,000 Subtotal $1,514,200 Construction Continoency 1 LS 20.0% $302,840 Subtotal Construction Costs $1,817,040 Sales Tax 1 LS 8.6% $156,265 Construction Budget - Preliminary Design Estimate $1,973,305 Engineering Design 15.0% $23,440 Total Estimated Project BudQet $1,996,745 "XL ,~ _J~ NEW STORAGE RESERVOIR 1000000 oal 1.2 $1,200,000 Mobilization 1 LS 5.0% $60,000 Temporary Erosion/Sedimentation Control 1 LS 3.0% $36,000 Traffic Control 1 LS 5.0% $60,000 Subtotal $1,356,000 Construction Contingency 1 LS 20.0% $271,200 Subtotal Construction Costs $1,627,200 Sales Tax 1 LS 8.6% $139,939 Construction Budget - Preliminary Design Estimate $1,767,139 Enoineerino Desion 1 LS 15.0% $265,071 Total Estimated Project Budget $2,032,210 ,_. -~ ;;:!!:L. -. _.~. -- _. 16' DISTRIBUTION LOOP AROUND SOUTH END 29500 LF 100 $2,950,000 Mobilization 1 LS 5.0% $147,500 Temporary Erosion/Sedimentation Control 1 LS 3.0% $88,500 Traffic Control 1 LS 5.0% $147,500 Subtotal $3,333,500 Construction Contingency 1 LS 20.0% $666.700 Subtotal Construction Costs $4,000,200 Sales Tax 1 LS 8.6% $344,017 Construction Budget - Preliminary Design Estimate $4,344,217 Engineering Design 1 LS 15.0% $51,603 Total Estimated Project BudQet $4,395,820 r ANNEXATION. "SKIA SUB AREA PLAN" SCENARIO Wastewater System Estimated Capital Improvements and Costs PHASE 1 . SKIA SUB AREA PLAN (Expressed in 2008 Dollars) ;..- '., SKIA SK-1 Pump Station and Force Main to Gorst 1~~4r:i~Mt&\~~~.IJiii1j'i~~~~t~~~ r~~gKontylr~ ii~~liJiilit~~ ;~!~Jiiit!~A~t~ ~1:;};tl1o.,t~li~O:~t{~~l~ Trench Safety System 28,400 LF $2 $56,800 15-in Gravity PVC Pipe 10,200 LF $170 $1,734,000 18-in Gravity PVC Pioe 5,600 LF $180 $1,008,000 14-in HOPE Sewer Force Main 12,600 LF $170 $2,142,000 48-in Manhole . 50 EA $4,500 $225,000 SK-1 Pumo Station 1 LS $1,700,000 $1,700,000 Mob ilizati on/Demobi lization 1 LS 5% $343,290 Temporary Erosion/Sedimentation Control 1 LS 3% $205,974 Traffic Control 1 LS 3% $205,974 Subtotal $7,621,038 Construction Contingency 1 LS 20% $1,524,208 Subtotal - Construction Costs $9,145,300 Sales Tax 1 LS 8.6% $786,496 Construction Budaet - Preliminary Oesian Estimate $9,932,000 Enqineering Desiqn 1 LS 15% $1,490,000 Total Estimated Project Budget $11,422,000 Assumptions/Notes: 1) Pipe prices per linear foot include all bedding, backfill, excavation, soil removal, surface restoration, existing utility relocation/avoidance allowance, and pipe costs. 2) No easements or land aquistion costs included. Pipelines and pump stations assumed in public rights of way. ANNEXATION - "SKIA SUB AREA PLAN" SCENARIO Wastewater System Estimated Capital Improvements and Costs PHASE 2 - SKIA SUB AREA PLAN (Expressed in 2008 Dollars) SB-3 Pump Station and Garst to WWTP Force Main :~~~~t~S~~~..tfgSi!t'&rn~~"~~iI:~I",'}:?l~~1i\~ ~~tl'uaiitiJy~~ m~~1\J,.Qi(1W~~i~ ~'111U1ilt~R~'i'E ~%r!~mQt~J~~J>:sJ,~3lifii,~ . ~". "', . -.r ., _ _~ ~ >...,~ Trench Safety System 11 ,100 LF $2 $22,200 18-in HOPE Sewer Force Main 11,100 LF $235 $2,608,500 S8-3 Pump Station 1 LS $2,600,000 $2,600,000 Mobilization/Demobilization 1 LS 5% $131,535 Temporary Erosion/Sedimentation Control 1 LS 3% $78,921 Traffic Control 1 LS 10% $263,070 Subtotal $5,704,226 Construction Continoencv 1 LS 20% $1,140,845 Subtotal - Construction Costs $6,845,100 Sales Tax 1 LS 8.6% $588,679 Construction Budget. Preliminary Design Estimate $7,434,000 Engineering Desion 1 LS 15% $1,116,000 Total Estimated Project Budget $8,550,000 Assumptions/Notes: 1) Pipe prices per linear foot include all bedding, backfill, excavation, soil removal, surface restoration, existing utility relocation/avoidance allowance, and pipe costs. 2) No easements or land aquistion costs included. Pipelines and pump stations assumed in public rights of way. .... ~. .... .r ANNEXATION - "SKIA SUB AREA PLAN" SCENARIO Wastewater System Estimated Capital Improvements and Costs PHASE 3 - SKIA SUB AREA PLAN (Expressed in 2008 Dollars) '" SKIA Sewer (fJI~!\i~~~'l1!~~1."~lt~IDj~~~~1i~~ ~1tt~ya'QtftVs:t ~.~_~ftil~'~ I(IJJ.)iitr~p:itll "''''~]''''f''I~~''''''''f'''~~ ~ ,)~ Jt. ,t&S~J&t,;' d . Trench Safety System 39,700 LF $2 $79,400 8-in Gravity PVC Pipe 8,400 LF $150 $1,260,000 10-in Gravity PVC Pipe 9,800 LF $155 $1,519,000 12-in Gravity PVC Pipe 5,900 LF $160 $944,000 15-in Gravity PVC Pipe 4,400 LF $170 $748,000 6-in HDPE Sewer Force Main 3,600 LF $125 $450,000 1 O-in HDPE Sewer Force Main 7,600 LF $150 $1,140,000 48-in Manhole 88 EA $4,500 $396,000 SK-2 Pump Station 1 LS $1,100,000 $1,100,000 SK-3 Pump Station 1 LS $450,000 $450,000 Mobilization/Demobilization 1 LS 5% $404,320 Temoorary Erosion/Sedimentation Control 1 LS 3% $242,592 Traffic Control 1 LS 3% $242,592 Subtotal $8,975,904 Construction Continqency 1 LS 20% $1,795,181 Subtotal - Construction Costs $10,771,100 Sales Tax 1 LS 8.6% $926,315 Construction Budqet - Preliminary Desion Estimate $11,698,000 Enqineerinq Desiqn 1 LS 15% $1,755,000 Total Estimated Project Budqet $13,453,000 Assumptions/Notes: 1) Pipe prices per linear foot include all bedding, backfill, excavation, soil removal, surface restoration, existing utility relocation/avoidance allowance, and pipe costs. 2) No easements or land aquistion costs included. Pipelines and pump stations assumed in public rights of way. NOTES Financial Impact Assessment - SKIA Annexation SKIA Sub Area Plan Growth Scenario Notes The City of Bremerton management has prepared projected financial impact assessment information for the described annexation area with an assumption of high future growth in the area in the amount Kitsap County modeled in the SKIA Sub Area Plan. In the preparation of this financial analysis, the City has made certain assumptions with respect to conditions that may occur in the future. It is the City's belief that the projected financial information was prepared on a reasonable basis. The City staff believe this analysis reflects the best currently available estimates and judgments, and presents, to the best of management's knowledge and belief, the expected course of action and the expected future financial impacts of the proposed annexation with the assumptions of Kit sap County's SKIA Sub Area Plan in the area. It should be understood that this analysis is dependent upon future events - actual conditions may (and are likely to) differ from those assumed herein. The following pages represent explanatory notes for individual elements of the financial assessment analysis, as well as principal considerations and assumptions made by the City in the preparation of the financial impact information. The following are the base and growth assumptions for the SKIA Sub Area Plan Growth Scenario: Existing Businesses 40 total estimated current businesses in the proposed annexation area based on data compiled from the Washington State Department of Revenue and the Port of Bremerton. Of this total, the Washington State Department of Revenue has indicated that 22 businesses in the proposed annexation area (all located in the South Petition area) had revenues subject to sales tax of$7.1 million in 2007 Existing Households +/ - I total current residential households in the annexation area Existing Residential Population Assuming 2.5 people on average per household this equates to a population in the proposed annexation area of approximately 2.5 +/- currently Future Development Assumption: Assumed development of 25 parcels of 5.5 acres each Acres & Businesses Increased of industry every five years. This results in the addition of twenty five new businesses on average every five years. Future Development Assumption: Development in the "High Growth" scenario was Location assumed to be primarily located on Port of Bremerton industrial park property with limited development in the north petition area. Development in this scenario that is over and above the amount modeled in the "High Growth" scenario is assumed to be primarily located outside of the Port of Bremerton industrial park property in areas currently generally designated as open space or forest land status. I ( .' " " ,'" ~ Summary table of Business Growth and Acres Developed over the 20-year time horizon for the SKIA Sub Area Plan Growth Scenario: Year Businesses 2 Employees Commercial Sq Ft 4 Acres Developed %:.~2'QOcili It"':~~~<r~:5J't1ll?ltl"~~ ~!1~~-r4:a~~ ~f~"~~361t'J2!J\7.~ ~llK~[~~ f;1i:~l ";"'&~~",.~4Q~ W~bO """~~~ ~#,. . '''.' _"",.,L:,__.... L~... 2009 45 905 746,217 521.39 2010 50 1,371 1,131,217 548.89 2011 55 1,838 1,516,217 576.39 2012 60 2,305 1,901,217 603.89 ~2011\31 ~'1i~~""~ t~~~2*~1riii!l ~lii\lr"~'."""2r~ _~~~1ft.~1\\ ~'.:':.~65..' ~~;,,:""~. -'.:;, .'~f2Jtl?ti1~ "..,.....""", ..~,-.,~, ~._ ~:f\~ ., ~_., _"'..~..~~ . ~......'..~..l1L~ ;o/__~l~-'" _ ~\ .'.< " ~'\!_.:.:i_.t_~ 2014 70 3,238 2,671,217 658.89 2015 75 3,705 3,056,217 686.39 2016 80 4,171 3,441,217 713.89 2017 85 4,638 3,826,217 741.39 ~1~Q~'Iij~ ~(fl~l';,i;}"_90~ 1~"'~'~.~~~1i'Q&i ~~~2a~1E2ffffi 1r.~~]6'8f8"9:1 ii,,,", '" ,,' ,~m?" _ _ _~, ~ 1~lliji~. k,' J""L...".3 ,,~'~--"A _~. ;tS~.. _-' <I_~' :.i'.~ ,...J,.L._. ". ~.~-.~;&-o&.C ~ ." '. ~ ~.". ",,~_'t" _'--._~"--,........d 2019 95 5,571 4,596,217 796.39 2020 100 6,038 4,981,217 823.89 2021 105 6,505 5,366,217 851.39 2022 110 6,971 5,751,217 878.89 ~~'E2023'j ~1l~~_j~1:s1 ~1W"~..,~1f~4311 ~~~6iWt361'~fi,iI ~~".~~"W'..-~6K...~ .,W~.;". '.:-!If\Iili ~fu..:~, ~. 'C. ~",.::~ ~ . . .gO ~39.. '-I'H"lt ......."il .....j~, <".." ~. , '... __,. .\, . "J. .,~;.,_j.~ . ~."..>><..,_ . ~. ,~~,;e_ .............._ '" 2024 120 7,905 6,521,217 933.89 2025 125 8,371 6,906,217 961.39 2026 130 8,838 7,291,217 988.89 2027 135 9,305 7,676,217 1016.39 '""'~":~"""<l!'''w.i_''~.~''~#''''-~~~~'''_~'>~111''~'''~__ .'. .. .'. ' , .v,' ., . '" ~- <'" _ O;/il' _.J., '" ~ '-. '.' ;v , ... _~ , . ,. , , ~~;w2Q2,8h -. 'f!t",. ~-;:';"i~1~Q,~ ,~!ii~~_:,i:. .' '~':,">?~~;~1f:'1~ [~hl~..,~...::c,"";',,",~.QL. .~~~~ 20 year ~rowth* 100 9,333 7,700,000 550 *This modeling is intended to as closely match Kitsap County SKIA Sub-Area Plan Data of 550 Acres Developed and 9,350 emplovees All data compiled to include North and South petitions and requests 1 The SKIA Sub Area Plan scenario assumes that each new business will develop on an average parcel size of 5.5 acres. Data from KEDA 2007-2008 recruitment leads indicate strongest interest for land development in the 5 acre and below size category but in order to model closely to the growth in the Kitsap County SKIA Sub Area Plan a slightly larger parcel size of 5.5 acres is necessary to yield the same total development expectations over the 20 year period of time. 2 Puget Sound Regional Council assigns Manufacturing and Industrial employment growth at an average of 1/ 825 SF. (A Ranae of 550.1100) 3 Records of typical industrial development indicate about 12,000 sq ft per acre - for this high scenario it was assumed that there is increased opportunity for more intense multi-story buildings to be accommodated on a site and therefore an averaqe of 14,000 Sa ft per acre is assumed. 4 Acres developed were analyzed using 2006 aerial photos with City of Bremerton GIS and includes the airport runway facilities. 2 Notes to SKIA Sub Area Plan Growth Financial Assessment spreadsheet: (I) Net financial impacts carried forward represents the prior year's ending cumulative net financial impact. (2) Property tax revenue for 2009 is based upon current assessor information for parcels in the proposed annexation area (2008 valuations and tax rolls). Taxable assessed values in 1,000's of dollars is then multiplied by $2.2181 (City of Bremerton regular levy rate for 2008 of$1.9032/$1,000 A V and EMS levy rate for 2008 of $0.3149/$1,000 A V). The property tax revenue is then increased by 1 % each year thereafter starting from the base 2009 year. The property tax amounts in the base annexation area are generally quite low for such a large land area but this is due to the public properties in existence there (Port of Bremerton) which are not subject to a property tax levy - and due to the large proportion of remaining properties being designated as open space or forest land status which substantially reduces the property taxes on those parcels. As buildings are constructed in the forecast period property tax is increased as described in note (3). In this scenario growth does occur in areas that are currently designated as open space or forest land status but this financial impact analysis conservatively ignores the potential positive impacts of these lands converting out of these substantially property tax exempt statuses to a fully taxable status. There is insufficient data available to meaningful project the property valuations that would be applied at that time and so it is conservatively ignored in this analysis. (3) Leasehold tax revenue is a state excise tax of 12.84% on rent or lease payments to a public lessor for the right to use publicly owned tax-exempt property for private purposes. The purpose of the tax is to have private users of public tax-exempt property share with fee simple property owners who pay property taxes - the costs of providing governmental services. Of the 12.84% tax imposed by the state, the City receives an allocation of a 4% portion (or 31 % of the total) for areas with in the incorporated City. According to the Department of Revenue, the Port of Bremerton paid $151,515 for leasehold excise taxes in 2007. The calculated amount that would have been apportioned to the City had this area been incorporated is $47,201. For purposes of this analysis it is assumed that 2009 revenues from leasehold excise taxes is the same as the amount calculated for 2007 and then escalated by 3% each year thereafter. In addition, Port of Bremerton staff indicates that new development on the Port property would most likely be lease arrangements for the use of Port owned land with the developer paying for the improvements directly and paying property taxes on the improvements portion - and the Port withholding leasehold taxes on the land lease payments. New building construction is therefore included in the calculated estimates of future property taxes, while the leasehold tax estimates include an expectation of new land lease arrangements for each new business development in the projected period. Only the number of new businesses modeled in the "High Growth" scenario are considered to be developed on Port of Bremerton Industrial Park properties - the additional business growth beyond that amount in this "SKIA Sub Area Plan" scenario are assumed to be developed outside of the Port of Bremerton properties and therefore are not subject to lease agreements or leasehold tax payments accordingly. Per Port staff the CUlTent lease payment amount for unimproved property is $6,000 per year per acre and $12,000 per year per acre for sites that are "pad ready" or improved to a limited extent. For purposes of this analysis it is assumed that there are three 5.5 acre new developments each year on Port of Bremerton industrial park properties in the forecast period and that it is unimproved { " " 3 !~ l, ) property therefore the rate of $6,000 per acre per year in 2008 dollars is used and then escalated by 3 % each year thereafter. (4) Admissions tax revenue is assumed to be zero. The City is not aware of any current sources of admission revenues that exist or which would be anticipated to be developed - which would be subject to the City's Admission tax. (5) Parking tax is assumed to be zero. The City is not aware of any parking facilities existing in the area or proposed to be developed in the future - which charge for such services and would be subject to the City's Parking tax. (6) Sales tax revenue includes revenues from existing (22 businesses currently reporting taxable retail transactions to the DOR) and projected additional businesses. It is assumed that fifteen businesses on average every five years will be added. There are 40 total estimated businesses currently in the proposed annexation area based on data compiled from the W A Dept of Revenue, and the Port of Bremerton. Of this total, the W A Dept of Revenue has indicated that 22 businesses in the proposed annexation area (all located in the South Petition area) had revenues subject to sales tax in 2007. The remainder represents businesses that produce products or services that are not subject to the retail sales tax. Future business growth is assumed to maintain this same approximate relationship of sales taxable to non-sales taxable businesses - in that it is assumed that every other business added to the area is subject to sales tax. 2009 tax revenues are computed using the assumption that taxable revenues would be the same as the DOR reported occurred in 2007 for the area. As growth is modeled to occur in the forecast period, the new businesses assumed to be subject to sales tax are assumed produce taxable revenues equivalent to 1.37 times the average taxable retail sales per business for Kitsap County ($235,353) per the "Washington State Almanac 2006-2007" then escalated by 3% in each year thereafter. Actual results for the 22 businesses verified by the DOR for 2007 -validate the use of this calculated value of retail sales revenue per business as the DOR actual average computes to an average of $322,727 per business in the area - and 1.33 times the Washington State Almanac information results in an average of$313,019. The City tax rate is .00085 (1 % less .15% administrative fee to the County). The sales tax on construction of future development in the proposed annexation area assumes the projected new businesses result in the addition of a 77,000 square foot Commercial structure on a 5.5 acres parcel per business with construction costs estimated to be $6,123,040 in 2008 dollars based on an average cost of$79.52/Sq Ft for industrial facility structures as published in the January-February 2008 International Code Council Building Valuation Data - of which the taxable construction costs is assumed to be 80% of this amount. Construction values are escalated at 3% per year. (7) B&O tax revenue is assumed to be zero. Recent changes to the City's B&O tax code exempt businesses from the tax if they are located on industrially zoned Port properties and all areas annexed into the City are exempt from B&O tax for a period of three years for businesses located in the area at the time of annexation. This analysis conservatively assumes that either the projected growth is occurring on Port of Bremerton owned property and would therefore be exempt from the City B&O tax or that the growth is occurring far enough in the projection period that a substantially higher B&O tax "exemption" level for all entities would be then applied Citywide in accordance with the City's current program of steady and measured increases in amounts exempted from B&O tax. (8) Washington State distributes gas tax, liquor tax, and criminal justice funds to the City on a per capita basis. The City's share of this distribution will increase with any population added by this proposed annexation. The budgeted combined rate for 2008 4 is $37.88 per the State Department of Revenue. This amount is multiplied by the population initially estimated to be included in the proposed annexation area (2.5). The dollar amount per capita is then increased by 3% each year thereafter. No further population growth is assumed as it is not expected that future development would be residential. (9) Real Estate Excise Tax (REET) revenue in this high growth scenario is assumed to come from limited sales transactions of privately owned buildings situated on land leased from the Port of Bremerton. Per Port of Bremerton staff, historical experience suggests that approximately 2 such transactions occur in every 10 year period. For this SKIA Sub Area Plan scenario it is assumed that in addition to the amount projected in the low growth scenario that one additional larger building is sold in each 10 year period. The 0.5% tax is applied to an assumed sale of a 15,000 square foot building every fifth year in the forecast period with the value estimated conservatively to be $1,192,800 and one 35,000 square foot building every 7 years with the value estimated conservatively at $2,783,200 in 2008 dollars based on an average cost to construct of $79 .52/Sq Ft for industrial facility structures as published in the January-February 2008 International Code Council Building Valuation Data as then escalated by 3% in each year thereafter. (10) Utility taxes are based on average annual power bills of$2,760 in 2008 dollars for a typical business enterprise located on Port property (per Port of Bremerton staff) and an estimated telephone service annual cost of $1 ,200 in 2008 dollars, and (per Waste Management staff) an annual solid waste disposal service cost of $80,851 in 2008 dollars for existing businesses located in the proposed annexation area with an average annual rate of $2,995 in 2008 dollars as then each multiplied by the number of businesses projected to be added in future periods of the forecast and escalated by 3% each year thereafter. Utility tax rates are 6% for electricity and telephone, and 9.5% for solid waste disposal services. No revenue estimate is made for utility taxes on services to residential accounts or for cable television services due to lack of residences identified in the proposed annexation area and no expectation of residential development in the area in the future. (11) In accordance with Bremerton Municipal Code (BMC) 15.06.020(a) - A general facility charge (GFC) shall be charged on all new or expanded service connections to the water, wastewater, and storm water utility systems. The calculation of the general facility charge for water shall be based on the meter size to be installed for a new or expanded water utility service. The calculation for the general facility charge for wastewater shall be based on the number of equivalent residential unites) (ERU) served. The calculation for general facility charges for stormwater shall be based on the number of impervious surface units (ISUs) as defined in BMC 15.01.020. The number ofISUs charged shall be based on the total impervious area divided by the amount of impervious area in an ISU. The rates applied are per the current BMC. The Port of Bremerton currently owns and operates its own wastewater utility. Under this SKIA Sub Area Plan scenario the capacity of the existing system will be exceeded and additional conveyance and treatment facilities are required. It is assumed that the City of Bremerton will assume ownership of the Port of Bremerton wastewater system in 2009 and the City will begin to receive wastewater GFC's. This will allow the City to receive revenue in years prior to any capital expenditures. The calculation ofGFC's are based on the following assumptions. It Water GFC's are based on the GFC for a I" water meter. '- /) It) 5 . , J, '. ) · Wastewater GFC's are based on the Commercial 1 GFC with an estimated average of 6 ERU's per customer. · Stormwater GFC's are based on 55,000 SF of billable impervious area or 22 lSU's per customer. . All GFC's escalated at 3% per year. (12) This analysis assumes that Phase 1 and Phase 2 water and wastewater infrastructure improvements are funded utilizing a combination of utility rate revenues and UUD contributions (see Note 13). Phase 3 water and wastewater infrastruchlre improvements are funded through mitigation costs to be paid by the Developer as determined through the development review process and the BMC or as needed. The level of build-out that this SKIA Sub Area Plan scenario describes will require at least one, and perhaps several, much larger businesses to be recruited into SKIA. These would be significantly bigger in size, have a greater number of employees, and higher projected water and wastewater requirements than the current tenants at the Port of Bremerton. It is expected that for projects this size a detailed plan for accommodation would be developed during the SEP A review process and that project specific financial mitigation would be required. This would result in direct payments from specific projects to pay for the expansion of the Phase 3 water and wastewater infrastructure needed between 2019 and 2028. The Sub-Area Plan scenario assumes these contributions would begin in 2019 and extend throughout the balance of the planning period. (13) This analysis assumes that Phase 1 and Phase 2 water and wastewater infrastructure improvements are funded utilizing a combination of utility rate revenue and UUD contributions. Phase 3 improvements will be funded by Developer payments as described in Note (12). For Phase 1 and 2 this analysis assumes the assumption oflow interest state loans offered by the Public Works Trust Fund (PWTF) and the Department of Ecology. It is assumed that the City's utility systems would provide a 15% local cash match from rate revenues for each of these loans with the remainder then financed for 20 years at an interest rate of 1.5%. See Note 17 for additional discussion of the projected debt financings. Of the amount financed, it is expected that a UUD will be formed covering all unserved properties benefited by the related capital improvements. It is assumed that 2/3rds of the amount financed is expected to be provided for by the UUD assessments. (14) No grants or other capital contributions other than developer payments as noted in (12) above are assumed in this SKIA Sub Area Plan scenario. (15) Utility system rate revenues are computed in accordance with Chapter 15.06 of the BMC which establishes current utility fees, rates, and other charges. The Port of Bremerton currently owns and operates its own wastewater utility. Under this SKIA Sub Area Plan scenario it is assumed the City of Bremerton will assume ownership of the Port of Bremerton wastewater system in 2009. At that point the City will begin to receive wastewater rate revenues. The utility rates in this analysis are based on the following assumptions: · Water rates are based on the fixed rate for a 1" water meter and an average annual water usage of 270 RCF which is 1.5 times the current average annual usage per customer within the Olympic View Industrial Park. · Stormwater rates are based on 55,000 SF of billable impervious area or 22 ISU's per customer. 6 . Wastewater rates are based on the fixed rate for a Commercial 1 account and an average annual wastewater usage of 270 RCF. . All fixed fees and commodity charges are escalated at 3 % per year. (16) The City General Fund imposes on its internal utility systems a payment in lieu of tax - similar to the utility tax imposed on external utilities. The current rate is 8.5% of utility system rate revenues for water, wastewater, and stormwater. This amount represents revenue to the General Fund and is added to annual expenses of the utility systems as noted in (22) below. This is an internal transfer between the City's utility systems and the City's General Fund and is thus shown as both a receipt and an expense in this analysis. (17) This analysis assumes the issuance of government obligation (GO) municipal bond debt (par amount of $4,000,000) mid year in 2015 to cover the allocated portion of capital costs to construct and purchase a new fire station and fire equipment as described in note (21). Proceeds are assumed to be approximately 97% of the par amount. The GO bonds are assumed to be 20 year maturity bonds with an interest rate of 5.25%. Debt service is assumed to be level payments over the life of the bonds with the first year assumed to be a Yz year payment. This analysis assumes the assumption of low interest state loans offered by the Public Works Trust Fund (PWTF) and the Department of Ecology for the utility system (water and wastewater) capital improvements. It is assumed that the City's utility systems would provide a 15% local cash match from rate revenues for each of these loans with the remainder financed for 20 years at an interest rate of 1.5%. Low-interest loans from the state are competitive and there is no guarantee of continued availability. There is also no certainty that subsidized rates will remain at currently available levels. The City has been very successful in recent years in getting support from these programs and our assumption is that will continue. The back up option to subsidized loans for capital projects in this SKIA Sub Area Plan scenario would be revenue bonds issued by the combined Utility System ofthe City. The rates on this type of debt vary but could be assumed for this analysis to be approximately 5.75% compared to 1.5% for subsidized loans. For each million in par amount ofloan this potential interest difference results in an additional annual expense of $27,177. Loans in the amount of $1,808,130 and $11,363,437 mid year in 2012 and 2013 respectively, and $443,623, $1,827,726, $1,313,084, and $9,009,240 mid year in 2017,2018,2019, and 2020, respectively, are undertaken to cover the City's portion of capital costs incurred net of payments by the Developer as described in note (12), and other grants or capital contributions as described in note (14). Proceeds are assumed to be approximately 100% of the par amount. (18) Payment to Kitsap County for revenue sharing in accordance with the interlocal agreement concerning revenue sharing upon annexation. Revenue Sharing payments are based on three sources of revenue: 1) County's portion of the local retail sales tax levied; 2) Ad Valorem property tax levied by the County pursuant to RCW 36.82.040 for establishment and maintenance of county transportation systems; and 3) Admission tax levied by the County pursuant to Chapter 36.38 RCW. The combined total of the County's collections from all three sources within the amlexation area during the calendar year preceding annexation net of the same for the first full calendar year following annexation = "County's Lost Revenue". The amount of payment from Bremerton to the County is based on a three-year soft landing approach with the year 1 payment equal to 75% of the County's Lost Revenue, year 2 payment equal to 50%, and the third and final year being 25%. The estimated amount of 7 '- , . " r' , I .... " " County lost revenue for these items is $71,000 of sales tax revenue based on the DOR's reported taxable retail sales in this area of $7,100,000 in 2007, $4,741 in ad valorem property tax levied for County roads per the County 2008 property tax assessments for parcels in the proposed annexation area, and zero dollars for admission tax as the City is not aware of any current sources of admission revenues that exist. (19) Fire and Emergency Medical Service (EMS) assumed to be covered by an Interlocal Agreement between the Bremerton Fire Department and the South Kitsap Fire and Rescue ('SKFR') during the first several years of the forecast period. Per information provided by South Kitsap Fire and Rescue dated April 15, 2008, the total annual estimated impacts of the proposed annexation would be a loss of revenue of $57,000 in 2008 dollars. This analysis assumes that the City would negotiate an agreement for continued coverage of this area by SKFR setting an initial compensation level at the estimated lost revenue amount of$57,000 and then providing for cost ofliving increases in years thereafter (which is assumed to be 3% each year thereafter in this analysis). By 2015 it is assumed that the growth in the proposed annexation areas under this "SKIA Sub Area Plan" scenario would be significant enough and spread over a greater geographical area than in the "High Growth" scenario that the City would need to return to service provisioning directly by City of Bremerton Fire Department staff and results in the need for a new station in that general area and staffing of that station with one engine and one paramedic unit. The engine would be staffed with a lieutenant and a firefighter. The paramedic unit would be staffed with one firefighter/paramedic and one firefighter. This is the current configuration at Bremerton's other stations. Total personnel needed would be 12 for this staffing at a total annual cost (salary and benefits) of $1 ,090,311 (2008 dollars). The projected growth in this "SKIA Sub Area Plan" scenario occurs much sooner than the "High Growth" scenario and demand for services is not only greater overall but spread out over a much greater area within the proposed annexation area. In this scenario it is expected that the demand from this area and from the anticipated large residential development in the existing South Bremerton would result in approximately 1/3 of the time and costs being allocated to the proposed annexation area and 2/3rds to the more residential areas that would be served by this new station. For the purposes of this analysis, 1/3rd of the cost of the added personnel is assumed to be attributed to this proposed annexation area and 1/3rd of the estimated $200,000 (in 2008 dollars) of additional related supplies and operating expenses for those personnel is assumed to be incurred beginning in 2018 upon completion of the construction of the required new fire station. The computed annual expense is then increased by 3% each year thereafter. 1/3rd of the estimated cost to build the new fire station and to purchase the fire engine, paramedic ambulance, and equipment is included in the capital expenditures as noted in (21) below. (20) Police service and coverage of the current south Bremerton area, watershed area, and the proposed annexation area is expected in combination to require an increase in staffing of a sector patrol unit - requiring 7 positions at a total annual cost (salary and benefits) of$592,57l (2008 dollars) plus $100,000 in annual estimated associated operational expenses. The proposed annexation area in this scenario while large geographically is expected to generally be low in demand for these services due to the type of development in the area. A smaller geographical area but an expected higher demand will come from the anticipated large residential development in the existing South Bremerton area. Given those expectations for the purposes of this analysis, 50% of the cost of the added personnel and operational expenses are assumed to be 8 "I I.'~ ,I (1 attributed to this proposed annexation area for this higher growth scenario. The computed annual expense is then increased by 3% each year thereafter. 50% of the estimated cost to purchase 2 vehicles and computer equipment for these additional personnel in the years 2009 and the replacement cost of those vehicles every five years thereafter (escalated at 3 % per year) is included in the capital costs as noted in (21) below. It is expected that the additional personnel would be based out of the existing police department building. Bringing new police officers on line requires a period of time to recruit and train. It is assumed that in the first year (2009) a ramp up to 50% of this annual expense will occur, rising to 75% in the second year (2010), coming to full new operational levels by the beginning of the third year (2011). (21) An estimate of $10,000 per year for electronics and street maintenance costs was provided by the City Engineer. This amount is then escalated by 3% per year for future years in this analysis. (22) Utility system expenses are estimated based upon the 2008 budget relationship of operating expenses to rate revenues charged. For the water, wastewater, and stormwater system this computes to 88%, 74%, and 91 %, respectively. In addition to the computation of operation and maintenance expense the total utility expense was increased in each year by the amount of utility PILOT taxes computed to be transferred to the General Fund. (23) General Fund capital costs include the allocated portion of police and fire vehicle and equipment purchases and the allocated portion of the building of a new fire station necessary to support the additional staffing needed to provide adequate service levels in the proposed annexation area in combination with expanded service demands in the south Bremerton area - as described more fully in note (17) and (18) above. Two police vehicles and computer equipment are assumed to cost $81,148 (2008) in total (of which 50% is allocated to this proposed annexation area) and are shown being replaced every fifth year thereafter at an escalated price of 3% per year. Fire vehicles and equipment are assumed to cost $918,387 in 2017 in total based on current prices to purchase as escalated at 5% per year. A higher escalation factor is used for these equipment purchases due to known upcoming EP A requirements that will drive up the costs in excess of normal inflationary pressures. 1/3rd of the fire equipment cost is attributed to this scenario in 2017. In addition in 2015 - 2017 a total cost of $6,046,618 is estimated for construction of a new fire station in this general area. This is based upon the assumption of constructing a 12,000 square foot facility using $325 a square foot (excludes land purchase) plus $900,000 for the land acquisition costs (all 2008 dollars) - escalated by a factor of8% per year as recommended by the architectural firm Rice Fergus, Miller for building costs. 1/3rd of the cost of the new fire station is attributed to this proposed annexation area. The cost of construction is spread over the three year period with 15% for design & planning in 2015 and the balance of construction occurring evenly over the following two years (2016 & 2017). (24) The proposed SKIA annexation area is served by transportation facilities currently owned, operated and maintained by the State of Washington DOT (SR3), internal streets owned and managed by the Port of Bremerton, and Lake Flora Road which is under County jurisdiction. SR3 was recently reworked and widened by DOT to add additional length to left turn lanes in the vicinity of the Port. The Belfair Bypass project is expected to address the intersection of Lake Flora Rd. and SR3 within SKIA and is a state project. The Port is pursuing the construction of the Cross-SKIA connector Road to link SR3 and the north SKIA properties to Lake Flora Road east of the airport. The first phase of that project is under design and the Port is planning to 9 ". ,.,. 1, II pursue the issuance of bonds to support the $3.72 M cost of constructing the first phase in 2010 or 2011. It is assumed the final phase of this improvement would be financed using a similar approach and that no City money would be necessary for completion. Kitsap County is designing an upgrade of Lake Flora Road from SR3 to J.M. Dickenson Road SW. This 3.6 mile improvement includes widening, paving shoulders, and re-surfacing in addition to re-aligning the intersection at J.M. Dickenson. This is an estimated $6.4 M project primarily addressing safety issues and is not being pursued to increase capacity. Funding is expected to come from state contributions, Transportation Impact Fees, and County gas tax. Recent discussions with Kitsap County indicate they would continue to pursue this project independent of potential annexation due to on-going safety concerns and accident history. The County is not expecting contribution_of City revenues to be required on this project. This "SKIA Sub Area Plan" scenario includes $25,000 (in 2008 dollars) per year in Street and Electronic Capital to finance any improvements to city streets within SKIA after 2014. This amount is escalated by 3% per year for these future years in the analysis. The length of Lake Flora Road from SR3 to the SKIA boundary may be the only city street within the proposed annexation at the outset. The Cross SKIA connector may become a city street once completed. The $25,000 is a placeholder for any required capital on these facilities.. (25) Capital costs for growth related infrastructure improvements are included as follows: . WATER The SKIA Sub Area Plan scenario rapidly accelerates demand and requires a significant amount of additional water infrastructure capital improvements. These capital improvements are projected to occur in three phases. Phase 1 requires the cons.truction of a water transmission main from the golf course to Reservoir lOin 2013. Phase 2 provides for the construction of a 1 MG reservoir to provide additional storage in 2018. Phase 3 provides for the construction of a water distribution system around the south end of the airport between 2019 and 2028. Costs were estimated in 2008 dollars and have been escalated at 3%. The total cost of these improvements is approximately $8.4M in 2008 dollars. . WASTEWATER This SKIA Sub Area Plan scenario includes very rapid growth throughout the entire twenty-year planning horizon. To accommodate that pace of development a rapid expansion of wastewater (and water) infrastructure is required. The ability to handle peak wastewater flow of3.7 MGD from SKIA alone changes the initial direction away from an on-site MBR option with re-use and infiltration (as described in the "High Growth" scenario). Without developing significant amounts of new information regarding soil types, infiltration rates, hydrogeology, and regulatory direction it is not obvious that 3.7 MGD peak flow could be accommodated on-site or within a reasonable distance from SKIA. At these flow rates building a piped system to the City's Westside WWTP appears to be the most cost effective option and one that could, with reasonable certainty, be implemented. This scenario assumes Phase 1 construction of a raw wastewater pump station located at the Port and a force main/gravity main to Gorst in 2013. Phase 2 includes a pump station built in Gorst and an additional force main to the Wests ide WWTP to be constructed in 2020. The force main from Gorst to Bremerton would be built when and if needed. Flow projections in the Southwest Bremerton sewer suggest it does not have the ultimate capacity to take flows from 10 ,\.J \ ~ {' II a full build-out of the Gorst UGA, the Anderson Hill area of the City and the Sub- Area plan flows from SKIA without an additional force main being constructed from Gorst to Bremerton. Phase 3 provides for the expansion of the wastewater collection system throughout the SKIA UGA between 2019 and 2028. The total cost of these improvements is approximately $33.4M in 2008 dollars. e STORMW A TER It is not anticipated that there will be any stormwater capital improvements required for this annexation area. There are existing Stormwater facilities in place that are owned by either the Port of Bremerton or WSDOT. Individual development projects will be required to mitigate their on-site stormwater impacts through the use of both standard and low impact development techniques. There is no apparent need for large-scale regional stormwater conveyance, treatment or detention facilities. Under all anticipated growth scenarios it is assumed that stormwater GFC's and rate revenues would be sufficient to support the City's NPDES Phase II compliance requirements for this new area. (26) Ending cumulative financial impact represents the beginning net financial impact for the period carried forward from prior periods plus the current period receipts less current period expenditures. 11