Loading...
HomeMy WebLinkAbout4710 Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments: 4710 RH2 ENGINEERING INC Consultant - Sheldon Boulevard Sewer Replacement Engineering LEG 12-1 04/10/2008 10/31/2008 02/15/2011 01/01/2011 Letter of Termination 1/09 PUBLIC WORKS & UTILITIES Engineering Division January 5, 2009 Mike Pleasants, P.E. RH2 Engineering 2021 Myhre Road, Suite 107 SilverdaJe, WA 98383 Re: Sheldon Boulevard Sewer Dear Mike, Per our conversation, the City of Bremerton hereby requests RH2 to suspend all work for the above project. The Professional Services Agreement is being terminated by the City in accordance with Section IX of the contract. Please forward copies of all files and drawings, including electronic copies of the base map to this office by January 15, 2009. If there are any questions, please call me at (360) 473-2354. Sincerely, ~ Gunnar Fridriksson, P.L.S., P.E. Civil Engineer II gf/aw cc: Michael Mecham, P.E., Project Manager Wayne Hamilton, Utility Operations Manager Carol Etgen, City Clerk File . 0109-02 ' Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments: 4710 RH2 ENGINEERING INC Consultant - Sheldon Boulevard Sewer Replacement Engineering LEG 12-1 04/10/2008 10/31/2008 10/01/2008 ORIGINAL.lPAGE NO-LOF ~PAGES PROFESSIONAL SERVICES AGREEMENT Sheldon Boulevard Sewer Replacement The City of Bremerton ("City") and RH2 Engineering Inc ("Consultant"), referred to collectively as the "Parties," enter into the following Agreement for professional services: I. Scope: The Consultant agrees to perform the services more specifically described in the Scope of Work, dated March 5, 2008, including any attachments thereto, attached hereto as Exhibit A, which is incorporated by reference herein. The Scope of Work may be modified only pursuant to Section VII.G. of this Agreement. If the Scope of Work provides for unspecified additional services such services shall only be performed upon the express written request of the City. Consultant further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices in effect at the time such services are performed. II. Term: The City and the Consultant agree that work will begin on the tasks described in Exhibit A immediately upon execution of this Agreement. The parties agree that the work described in Exhibit A is to be completed as provided for in the work schedule attached hereto as Exhibit B; provided however, that additional time shall be granted by the City for excusable delays or extra work as provided for in section IX (A) of this agreement. III. Compensation: In consideration of the services provided pursuant to this Agreement, the City shall pay Consultant in an amount not to exceed $67,678.00. Consultant's charges and bills shall conform to the fee schedule attached hereto as Exhibit C and incorporated herein by this reference. The Consultant shall submit regular billing statements detailing work performed and amount charged on each task or portion thereof. The descriptions shall conform to and fall within the categories set out in the Scope of Work and/or Fee Schedule. Upon receipt of a conforming billing statement, the City shall promptly process payment. PROVIDED, HOWEVER, the City reserves the right to prioritize scoped work and accelerate and/or delay work tasks under the time frame set forth in Section II herein. The Consultant's labor rates and billing fees shall be as delineated in Exhibit C. Consultant shall not perform work beyond the Scope of Work, nor shall be compensated for such work, unless the Scope of Work or amount of compensation is modified pursuant to this Agreement. Consultant shall only be compensated for additional services if requested pursuant to Section I and, if not otherwise provided, such compensation shall be in accordance with Exhibit C. If a billing statement does not conform to this Agreement, the City may withhold payment until the statement is brought into compliance. Such withholding does not relieve Consultant of its obligations under this Agreement. BremertonlRH2 Engineers, Inc Sheldon Boulevard Sewer Page 1 of6 ORIGINAL I PAGE NO ~OF \3 PAGES - -- IV. Relationship of Parties: Consultant represents that it is skilled in the matters addressed in the Scope of Work and is performing independent functions and responsibilities within its field of expertise. Consultant and its personnel are independent Consultants and not employees of the City. Consultant and its personnel have no authority to bind the City or to control the City's employees and other Consultants. None of the benefits provided by the City to its employees, including, but not limited to, compensation, insurance, and unemployment insurance are available from the City to the employees, agents, representatives, or sub-Consultants of the Consultant. Consultant will be solely and entirely responsible for its acts and for the acts of Consultant's agents, employees, representatives and sub-Consultants during the performance of this Agreement. The City may, during the term of this Agreement, engage other independent Consultants to perform the same or similar work. As an independent Consultant, Consultant is responsible for its own management. The City's administration and enforcement of this Agreement shall not be deemed an exercise of managerial control over Consultant or its personnel. As an independent Consultant, Consultant is responsible for payment of all taxes and licensing fees necessary to perform its obligations under this Agreement. These taxes and fees include but are not limited to State industrial insurance, Business & Occupation, State professional licensing, and City business licensing. If any taxes or fees due the City have been declared delinquent, the City may withhold the delinquent amount, plus any additional charges arising from the delinquency, from any payments due Consultant. V. Indemnification: Consultant shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the performance of this Agreement, except for that portion ofthe injuries and damages caused by the City's sole negligence. The City's review or acceptance of any of the work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSL Y UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSUL T ANT'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HA VE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this Agreement. Bremerton/RH2 Engineers, Inc Sheldon Boulevard Sewer Page 2 of6 ORIGINAL..LPAGE N02-0F RPAGES VI. Insurance: The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, employees, sub-consultants or sub-Consultants. Before beginning work on the project described in this Agreement, the Consultant shall provide a Certificate of Insurance evidencing: 1. Automobile Liability insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and 2. Commercial General Liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and general aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCD) if applicable; and employer's liability; and 3. Excess Liability insurance with limits not less than 1,000,000 limit per occurrence and aggregate. 4. Professional Liability insurance with limits no less than $1,000,000 limit per occurrence/claim. Any payment of deductible or self insured retention shall be the sole responsibility of the Consultant. All required policies shall be provided on an "occurrence" basis except professional liability insurance (if required), which may be provided on a "claims-made" basis. The City shall be named as an additional insured on the CommerCial General Liability insurance policy, as respects work performed by or on behalf of the Consultant and a copy of an endorsement that is acceptable to the City, which names the City as an additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all the required insurance policies and endorsements. The City further reserves the right to reject any unacceptable policies and/or endorsements. The Consultant's Commercial General Liability insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. The Consultant's insurance shall be primary insurance as respects the City and the City shall be given thirty (30) days prior written notice by certified mail, return receipt requested, of any cancellation, suspension or material change in coverage. The City also reserves its unqualified right to require at any time and for any reason, proof of coverage in the form of a duplicate of the insurance policy with all endorsements as evidence of coverage. Bremerton/RH2 Engineers, Inc Sheldon Boulevard Sewer Page 3 of6 ORIGINAL1-PAGE NO~OF ~Pt VII. General Conditions: A. Reports and Information: When requested by the City, Consultant shall furnish periodic reports and documents on matters covered by this Agreement. The reports and documents shall be furnished in the time and form requested. Consultant shall maintain accounting records in accordance with Generally Accepted Accounting Principles (GAAP) to substantiate all billed amounts. B. Ownership and Use of Records and Documents: Original documents, drawings, designs and reports, including those in electronic format, developed under this Agreement are the property of the City. All written information submitted by the City to the Consultant in connection with the services performed by the Consultant under this Agreement will be safeguarded by the Consultant to at least the same extent as the Consultant safeguards like information relating to its own business. If such information is publicly available or is already in Consultant's possession or known to it, or is rightfully obtained by the Consultant from third parties, Consultant shall bear no responsibility for its disclosure, inadvertent or otherwise. All data, documents and files created by Consultant under this Agreement may be stored at Consultant's office in Port Orchard, Washington. Consultant shall make such data, documents, and files available to the City upon its request at all reasonable times for the purpose of editing, modifying and updating as necessary until such time as the City is capable of storing such information in the City's offices. Duplicate copies of this information shall be provided to the City upon its request, and at reasonable cost. All documents, including all reports, drawings, specifications, computer software or other items prepared or furnished by Consultant pursuant to this Agreement, are instruments of service with respect to the project and are the property of the City. Any reuse by the City for other than the specific purpose intended will be at City's sole risk. C. Work Performed at Consultant's Risk: Consultant shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and sub-consultants in the performance of the work hereunder and shall utilize all protection necessary for that purpose. All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. D. Place of Work: The Consultant shall perform the work authorized under this Agreement at its offices in Port Orchard, Washington. Meetings with the City staff as described in Exhibit A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed upon by the parties. E. Entire Agreement: This Agreement and its Exhibits constitutes the entire agreement between the Parties, and the Parties acknowledge that there are no other agreements, written or oral, that have not been set forth in the text of this Agreement. BremertonlRH2 Engineers, Inc Sheldon Boulevard Sewer Page 4 of6 ORIGINAL~PAGE NOlOF J~.PAGES F. Severability: Should any part of this Agreement be found void, the balance of the Agreement shall remain in full force and effect. G. Modification: This Agreement may only be modified by written instrument signed by both Parties. H. Written Notices: All communications regarding this Agreement shall be sent to the parties at the addresses listed below by registered or 1 st class mail, or by personal service, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. City Address Michael Mecham City of Bremerton 3027 Olympus Drive Bremerton, W A 98310 Consultant Address Mike Pleasants RH2 Engineers, Inc 600 Kitsap St, Suite 101 Port Orchard, W A 98366 I. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a waiver of that provision. Waiver of any right or power arising out of this Agreement shall not be deemed waiver of any other right or power. J. Non-Waiver of Breach: The failure of the City to insist upon strict performance of any of the covenants and agreements contained herein, or to exercise any option herein conferred in one or more instances shall not be construed to be a waiver or relinquishment of said covenants, agreements or options, and the same shall be and remain in full force and effect. K. Compliance with Laws: Consultant shall comply with all applicable Federal, State, and local laws in performing its obligations under this Agreement. L. Choice of Law and Venue: This Agreement shall be interpreted according to the laws of the State of Washington. Any judicial action to resolve disputes arising out of this Agreement shall be brought in Kitsap County Superior Court. M. Attorneys' Fees: In the event of litigation to enforce any of the terms or provisions herein, each party shall pay all its own costs and attorney's fees. N. Assignment: Any assignment of this agreement by the Contractor without the written consent of the City shall be void. VIII. Nondiscrimination: Consultant shall not discriminate in employment or services to the public on the basis of race, color, national origin, sex, religion, age, marital status, disability, or sexual orientation except for employment actions based on bona fide occupational qualification. IX. Termination: This Agreement shall remain in force until completion and acceptance of the services, terminated by written instrument upon mutual consent, or by the City of Bremerton for convenience. This Agreement may be immediately terminated for cause by a Party if the Bremerton/RH2 Engineers, Inc Sheldon Boulevard Sewer Page 5 of6 ORIGINAL-LPAGE NoLoF JiPAGES other Party substantially fails to perform through no fault of the terminating Party, and the non- performing Party does not commence correction of the failure of performance within thirty (30) days of the terminating Party's sending notice to the non-performing Party. Any Notice by Consultant shall include a report showing the status of all items listed in the Scope of Work current through the termination date. If the City receives reimbursement by any federal, state, or other source for work described in Section I herein, and that funding is withdrawn, reduced or limited in any way, or the project is cancelled or substantially reduced after the execution date of this Agreement and prior to the completion of the work, the City may summarily terminate this Agreement. A. Excusable Delays: The right of Consultant to proceed shall not be terminated nor shall Consultant be charged with liquidated damages for any delays in the completion of the work due to: 1) any acts of the federal government in controlling, restricting, or requisitioning materials, equipment, tools, or labor by reason of war, national defense, or other national emergency; 2) any acts of the City, its consultants, or other public agencies causing such delay; and 3) causes not reasonably foreseeable by the parties at the time of the execution of the Agreement that are beyond the control and without the fault or negligence of the Consultant, including, but not restricted to, acts of God, fires, floods, strikes, or weather of unusual severity. PROVIDED, HOWEVER, that the Consultant must promptly notify the City within ten (10) calendar days in writing of the cause of the delay. If, on the basis of the facts and the terms of this Agreement, the delay is properly excusable, the City shall, in writing, extend the time for completing the work for a period of time commensurate with the period of excusable delay. B. Rights Upon Termination: In the event oftermination, the City shall pay for all services performed by the Consultant to the effective date of termination, as described on a final invoice submitted to the City. After termination, the City may take possession of all records and data within the Consultant's possession pertaining to this project which may be used by the City without restriction. Any such use not related to the project which Consultant was contracted to perform shall be without liability or legal exposure to the Consultant. CONSULTANT to form; Attest: (Wd~ CIty Cler Bremerton/RH2 Engineers, Inc Sheldon Boulevard Sewer Page 6 of6 ORIGINALLpAGE NO 1- OF jiPAGES EXHIBIT A City of Bremerton Sheldon Boulevard Sewer Project SCOPE OF WORK Background The existing gravity sewer on Sheldon Boulevard has reached the end of its useful life. It needs to be replaced with a new gravity main. The pump station near the intersection of Sheldon Boulevard and Highland Avenue is being replaced to accommodate a new pressure line being designed for use on the adjacent shoreline. A new pressure line is needed to move the sewer from the pump station to the gravity sewer on Park Avenue. This new pressure sewer main will be installed parallel to the new gravity main. The existing road is aging concrete. Rather than patch the trenches of the sewer lines, this project will remove the old concrete road and replace it with a new asphalt surface per the current City of Bremerton (City) standards. This project includes the replacement of gravity sewer, a new pressure sewer main and road replacement. It is located along Sheldon Boulevard from Park Avenue to Highland Avenue. The project length is approximately 1,500 feet. This scope does not include permitting. While the City owns the right-of-way this project will be located in, there will be shoreline permits required as well as others most likely. If assistance will be required for the permitting efforts an amendment to this contract will be made. Task 1- Base Map Development Objective - Collect the information needed to determine the sewer alignment. Approach 1) Collect utility drawing records from the City and other local agencies. Records will be used to verifY the accuracy of the survey. 2) Request underground utility locators or the utilities themselves to locate utilities in the area of anticipated construction. Perform a survey for the surface features, located underground utilities and topography with 2-foot contours. Include all trees and shrubs within the City right-of-way in the survey. 3) Create base sheets and format survey drawing data. Establish stationing for the gravity sewer extension design with reference to a permanent monument. The survey will be based on the State coordinate system. Vertical datum will be in accordance with the City. ORIGINALLpAGE N01-0F H-PAGES Ciry ifBremerton S heMon Boulevard Sewer Prqject Page 2 Scope if Work Task 2 - Geologic Review Objective - Collect the information needed to determine the constructability of the proposed sewers. Approach 1) Conduct a limited geological and hydrogeological exploration USlng test pits to characterize stratigraphy and groundwater conditions. One site visit will be made and two test pits will be analyzed. The City will provide the operator, flaggers, equipment and any other staff required to dig and backftll the tests pits. Depth of test pits will be as low as the proposed trench depth, which is to be determined. RH2 will prepare test pits logs and interpret information. 2) Prepare a draft geologic report with recommendations for excavation, handling of subsurface water, placement of improvements and backftll. 3) Prepare final geologic report to be included with the bid documents. Product - Geologic report, including test pit/bore logs to be incorporated into the construction documents. Task 3 - Determination of Preliminary Layout - 30 Percent Design Objective - Investigation and discussion with City staff about the proposed alignment. Approach 1) Determine the general alignment of the gravity and pressure mains using the base map data, field investigation and discussions with City. Typical cross sections of trenches (gravity and pressure sewers) and roadway replacement will be determined in meeting with City. 2) Prepare overall figure showing the general alignment of the proposed sewer mains. 3) Analyze existing and future use information to determine appropriate size of the proposed gravity and pressure mains. The pump station feeding the pressure main is being designed by others. The City will provide the flow rate for the pressure main design. The City will also provide information on the possible redevelopment of the service area. Product - A figure displaying what the general horizontal layout will be. RH2~ BRM 3/5/2110S J\DATA \BRM\S411\211I1H Shddon Bh'd Se\\'er\Shcldon BJyd Se\\'er sow doc ORIGINAL..LPAGE NO~OF jiPAGES City ofBremerton Sheldon Boulevard Sewer Pro/eel Page 3 Scope of Work Task 4 - Prepare Construction Drawings and Specifications - 60 Percent Design Objective - Prepare construction plans and specifications for the installation of the sewers. It includes sizing both the gravity and the pressure mains for future connections from the south. Approach 1) Prepare plans of the sewer alignments at a scale of 1 "=20' for review and approval by the City. Prepare the proftle based on the approved alignment. 2) Attend 60 percent completion (horizontal and vertical alignment drawings only) design reV1ew meeting for vertical alignment confirmation. 3) Prepare special details not included in City or Ecology standards needed to convey the scope and method of the sewer improvements. Provide general notes in conformance with City standards for construction drawings. 4) Prepare plan displaying the extents of the demolition of the existing road. 5) Prepare special details not included in the City standards needed to convey the scope and method of the roadway restoration improvements. Provide general notes in conformance with City standards for construction drawings. 6) Prepare traffic control plan displaying detours or alternating one-way traffic options. 7) Prepare construction sequence plan addressing the bypass requirements for side sewers and mains. 8) Field verify the design regarding visible issues of constructability and conformance with design intent. 9) Prepare preliminary estimate of probable cost at 60 percent design. 10) The City will provide the General Sections of their Standard Specifications in a Microsoft Word electronic file. RH2 will prepare the Technical Specifications through reference to and modifications of the current WSDOT / APW A Standard Specifications so as to be compatible with the City and Ecology standards. RH2 will also be prepared to provide, at the direction of City staff, the advertisement to bidders, the bid schedule and the measurement and payment description. Product - One set of 60 percent construction plans and preliminary specifications and bid documents. RH2~ BRM ., / 5 / 200H j.\DXL\ \BRi\1\S411\21108 Sheldon Blycl Se\yer\Shclclon BiYcI Sewer SOW.doc ORIGINALLpAGE NO~OF jlPAGES City ojBremerlon Sheldon Boulevard Sewer Project Page 4 Scope ojWork Task 5 - Finalize Plans, Specifications and Bid Documents Objective - Finalize drawings, specifications and contract documents. Approach 1) RH2 will conduct a quality control review of the bid documents prior to preparation of final bid documents. 2) Submit drawings and specifications to the City at 90 percent completion (drawings and specifications). Meet with City to discuss final design. 3) Perform final edits to drawings and specifications based upon in-house review and City comments. 4) Produce 30 sets of final plans, contract documents and specifications. Deliver to City for distribution for bidding purposes. 5) Prepare final estimate of probable cost prior to advertisement for bid. Product - Thirty sets of bid documents, including drawings, specifications and contract documents. Plan sheets shown at 1 "=20' on ii-inch by 17 -inch sheets. Copy of final cost estimate. Task 6 - Services During Bidding and A ward - Time and Expense Objective - Assist the City with project administration and during the bidding of the project. Approach 1) Respond to bidders and suppliers questions. 2) Issue addenda, if determined necessary to clarify, revise or change construction plans, specifications or contract conditions during the bidding process. 3) Attend the bid opening. 4) Review bid submittals and evaluate responsiveness of low bidder. Compile data from all bidders, prepare a bid tabulation sheet and review bid. Prepare recommendation to the City for project award. Product - Addenda, if necessary. Bid tabulation and written recommendation of award. RH~ BRM 3/5/2008 J\D,\'L\ \BR1vl\S40\2008 Sheldon Bh'd Se\\"er\Shcldon Bh-d Se\\"er SOW,doc ORIGINAL1-PAGE NO~OF jLPAGES Ciry ofBremerton S he/don Boulevard Sewer Project Page 5 Scope of Work Task 7 - Services During Construction - Time and Expense Objective - Assist the City with the administration and enforcement of the contract documents during the construction phase. Approach 1) Attend the pre-construction conference. 2) Review shop drawings and submittals. 3) Provide construction inspection upon request by the City. 4) Review pay requests. 5) Review change orders. 6) Attend a final walkthrough with the City inspector and provide recommendation for final acceptance. 7) Prepare construction record documents. Product - Written responses for shop drawing and submittal reviews, pay requests and change orders. Inspection reports, upon request of service. Letter of recommendation for project acceptance. Two sets of construction record drawings and PDF files of the same on CD. Note: The Scope of Work to accomplish Tasks 1 through 5 can be well defined; therefore, the time requirements can be predicted The time requirements and engineeringfee estimate for Tasks 6 and 7 are difficult to predict, because of several uncontrollable factors that can qffict the time requirements for these activities. Therefore, we propose to petftrm these activities on a direct time and expense basis. We propose to accomplish Tasks 1 through 5 on a time and expense basis, not to exceed the Fee Estimate provided RH2#L- BRM 3/5/21J()~ ]:\])1\'1'1\ \BRi\f\S40\200H Sheluon Bini Se\\Tf\Sheluon Bh-u Sewer SOW.uoc Exhibit B City of Bremerton Sheldon Boulevard Sewer Project Preliminary Project Schedule Duration Complenon 2008 Descrionon Weeks Date March Amil Mav Tune Julv Au,"," Sept Oct Nov Dee 1 2 3 4 1 2345123412341234512341 2 3 4 1 23451234 1 2 3 4 5 Base Map Develooment 4 4/11/2008 --I I Geologic Review 4 4/25/2008 _I 30% Design 4 5/9/2008 - 60% Desiro and Soecifications 4 6/6/2008 - Fmal Design and SpecificatIOns 2 6/20/2008 --- Services Durin" Biddin" and Awatd 4 7/18/2008 1 Services During Construction 15 10/31/2008 T J:IDATAIBRM\S40\2008 Sheldon Blvd SewerlSheldon Blvd Fee Estimate.xls 3/512008 o :::0 G) Z :J> Ir::- --0 :J> G) m z o I~ o I~ ~ EXHIBIT C City of Bremerton Sheldon Boulevard Sewer Project Estimate of Time and Expense Description .............................................--.-.-....---....Cia's'siil'c'ation Task 1.1 1.2 1.3 Base Ma Olvela ment Utillt records Site surve Base ma drawl 5 Task 2 2.1 2.2 2.3 eol Ie Review Field investi ation and data collection Pre are draft re rt Pre are final re rt Task 3 31 3.2 3.3 DetenninatJon of Prelimlna L out - 30% Desl n Determine referred construction methods and locations WIth Ci Pre are eneralla ut fi ure Determine size of sewer mains Task 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 5.0 Pre are Construction Drawln sand S clflcations - 60% Desl n 60% desi n meeti with Ci Plan and rofile Ian drawln s at 1" = 20' Sewer 1m vemenl details and notes Roadwa demolition Ian Roadwa restoration details and notes Traffic control Ian Construcbon se uence Ian Plan verification 60% cost estimate Construction contract and 5 ecifications Contract boiler late rovided b Ci Pre are bid schedule and a ent descn tlons Modifications to WSDOT/APWA standard s ecifications Principal ~ Senior Review Staff Engineer ~ Engineering ~ Engr. Geologist~ Word Processor Technician ~ ~ "'Professloria'l'j 'Techn'lc'i'an"iii "']"'p'rofessionai'vi"1'''AiiiTiiriistrati've''ii'I'' Project Manager .......nai..iV Subtotal Subtotal 4 ................4". 8 Task 5 5.1 5.2 5.3 5.4 5.5 Finalize Plans, S clflcatJons and Contract Documents In house review of lans and s cifications Submit plans and s ecifications to Ci and attend desi n review meetin s Perform final edits to plans and contract documents Pre are 30 sets Of bid documents for biddi u ses Final cost estimate ............s...... Subtotal Design Tasks Task 6 6.1 6.2 6.3 6.4 Services Durin Blddln and Award lme and Ex nse Res nd to bidders' and su Iiers' uestions Addenda Attend bid openin Bid tabulation and recommendation Task 7 7.1 7.2 7.3 7.4 7.5 7.6 7.7 Services Durin Construction lme and Ex nse Preconstruction Conference Review submittals/sM drawl s Construction ins ection Review a re uests ReVIew chan e orders Pro'ect acca tance Construction record drawin s Subtotal Bidding and Construction Tasks PROJECT TOTAL J \DATA.\8RM\S40\2008 Sh8ldon Bhd ~ Blwl F.. EltilT8li1.x1l 16 11 10 27 89 48 53 90 37 ..........2m ....... ... .m.. . ... ~.. . Subtotal 10 37 30 6 45 48 70 27 126 120 21 4 17 10 8 8 26 17 23 27 67 21 23 10 54 5 27 18 8 10 10 9 4 6 10 14 15 136 16 $ 16 $ 16 $ 14 $ 5 $ 67 $ 350 I $ 14 $ 9 $ 2 $ 5 $ 30 $ 7 $ 6 $ 10 $ 10 $ 10 $ 5 $ 14 $ 62 $ 92 I $ 442 I $ $ $ $ $ 1,178 $ 878 $ 896 $ 2,952 $ 2,669 $ 3,177 $ 3,847 $ 9,693 $ $ $ $ $ 2,730 $ 2,838 $ 1,328 $ 6,896 $ $ $ $ $ $ $ $ $ $ 580 $ 3,170 $ 2,116 $ 950 $ 1,174 $ 1,174 $ 1,120 $ 564 $ 796 $ 1,124 1,688 1,784 16,250 2,264 $ 1,866 $ 1,534 $ 1,310 $ 620 $ 7,594 $ 43,385 I $ 1,584 1,016 282 568 3,450 853 $ 654 $ 1,160 $ 1,160 $ 1,160 $ 638 $ 1,608 $ 7,233 $ 10,683 I $ 54,068 I $ $ 6,900 $ $ 6,900 $ $ $ $ $ $ $ 6,900 I $ $ $ $ $ $ $ $ $ -1$ 6,900 I $ 161 $ 164 $ 205 $ 530 $ 45 87 87 218 $ $ $ $ 199 $ 264 $ 86 $ 549 $ $ $ $ $ $ $ $ $ $ $ $ $ $ 174 $ 499 $ 264 $ 114 $ 139 $ 139 $ 114 $ 75 $ 19 $ 85 85 110 1.816 225 252 226 1,367 45 2,114 5,227 1 $ $ $ $ $ $ 183 $ 163 $ 25 $ 69 $ 440 $ 45 $ 79 $ 305 $ 104 $ 104 $ 46 $ 359 $ 1,043 $ 1,4831 $ 6,710 I $ 55,512 i 12,1661 67,678 1 3151200s9l1Om 1,339 7,942 1,101 10,382 2.714 3,264 3,934 9,911 2,929 3,102 1.414 7,445 754 3,669 2,380 1,064 1,313 1,313 1,234 639 815 1,209 1,773 1,904 18.066 2,489 2,118 1,760 2,677 665 9,708 o :::0 G) :z ::J> \:.. -U ::J> G) m :z o ~ o t 1,767 1,179 307 637 3,890 898 733 1,465 1,264 1,264 664 1,967 8,276