Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
4708
, Contract Number: 4708 Vendor: PEASE & SONS INC Subject: WWTP Wet Weather Facilities Upgrade Department: Engineering �'ile Class: LEG 12-1 Begin Date: 04/08/2008 � End Date: 12/31/2009 Review Date: 02/15/2012 Vault Date: O1/O1/2012 � Comments: Change Order #1-2/09 #2-6/09 #3-1/10 ACCEPTANCE OF COMPENSATION & RELEASE OF ALL CLAIMS Bremerton WWTP Wet Weather Facilities Upgrade Project Number 5020 — Contract Number 4708 Pease and Sons, Inc. hereby indicates agreement with, and acceptance of, the final Contract Payment of $143,443.41, total retainage of $177,827.27, the total Contract Price of $3,862,407.83, including Washington State sales and /or use taxes, and the final Contract Time of 601 days, as full and final compensation for all Work performed in connection with Contract Number 4708, and does hereby release the City of Bremerton from all claims, liability, demands, damages and actions of any kind whatsoever, arising from performance of that Contract. Pease and S s, Inc. ' By: Date: Title: Certificate of Notary Subscribed and sworn to before me this I ' day of G6 , � A p v. � NbV t a • au►�� �� 0 Was Nx� AFFIDAVIT OF PUBLICATION Account # 42742 AD# 259618 'STATE OF WASHINGTON__ COUNTY OF KITSAP 1, Laura Wessels, being fast -duly sworn on oath, deposes and says:`That she is now, and at all times embraced in the publication herein mentioned was the principal clerk of the printers and publishers of KITSAP SUN; that said newspaper has been approved as a legal newspaper by order of the Superior Court of the County of Kitsap, in which County it is published and is now and has been for more than six months prior to the date of the publication hereinafter referred to, published in the English language continually as a daily, newspaper in Bremerton, Kitsap County, Washington, a we newspaper in Kitsap County, Washington and is now and during all of said time, was printed in an office maintained in the aforesaid place of publication of said newspaper; that the following is a true text of an advertisement as it was published in regular issues (and.not in supplement forth) of said newspaper on the following date, to wit: A April 13, 2010 that such newspaper was regularly distributed to its subscribers during all of said period. The full amount-of the fee charged for the foregoing publication is the sum of $31.34. This amount has not been paid in-full. (Sign o P ' 20erk Subscribed and sworn to before me this day of April 23, 20 CASAPA5 ic Stagfon My C Expires Notary Public in and for the State of Washington, Kitsap C NOTICE OF COMPLETION Notice of Completion has been issued to Pease and Sons Inc, on Contract No. 4708, for the Bremerton WWTP Wet Weather Facilities Upgrade project. Any parties having a claim for material, labor or damages related to this Contract have forty -five (45) days from the date of first publication of this notice to file a claim. April 13, 2010 ............................Ad #20099396 Washington State t C)rp or[wov 01 Department of Revenue e Box 47474 Olympia, WA 98504 -7474 278040964 Certificate of Payment of State Excise Taxes by Public Works Contractor PEASE AND SONS INC CITY OF BREMERTON PUBLIC WORKS PO BOX 44100 NED LEVER TACOMA WA 98444 0100 3027 OLYMPUS DR BREMERTON WA 98310 4799 We hereby certify that taxes, increases and penalties due or to become due from the above -named contractor under Chapter 180, Laws of 1935, as amended, with respect to the following public works contract: CITY OF BREMERTON PUBLIC WORKS 4708, WWTP WET WEATHER FACIL UPGRADE together with all other taxes, increases and penalties due from such contractor, have been paid in full or that they are, in the Department's opinion, readily. collectible without.recourse to the state's lien on the retained percentage. This certificate is issued pursuant to the provision of Chapter 60.28 Revised Code of Washington for the sole purpose of informing the state, county, or municipal officer charged with the duty of disbursing or authorizing the payment of public funds to said contractor that the Department of Revenue hereby releases the state's lien on the retained percentage provided by this Chapter for excise taxes due from said contractor. This certificate does not release said contractor from liability for additional tax that may be later determined to be due with respect to the above - mentioned contract or other activities. Dated S� /v�� at Olympia, Washington, State of Washington Department of Revenue . " j Certifyiq Officer i .aar,a © r��, � For tax assistance, visit dor.wa.gov or call -800- 647 -7706. To inquire about the availability of this documen imp at f6;gt`fbi the v tsyally, i mpaired, please call (360) 705 -6715. Teletype (TTY) users may call 1- 800 - 451 -7985. fj� REV 310028'(10- 01 -02) ® �pY 1 12010 ENGINEEfi =fir CI " SICI`J ;I ArF � 0 9 �Y H� ieeu STATE OF WASHINGTON DEPARTMENT OF LABOR AND INDUSTRIES CITY OF BREMERTON R E C E TE ATTN: NED LEVER 3072 OLYMPUS DR JUi� o 8 1 010 BREMERTON WA 98310 DNCiNEERIIIG DIVISION Certificate of Release of the State's Lien on Public Works Contracts With this letter, the Washington State Department of Labor & Industries approves of your release or payment of the contract amount retained from the following contractor - -- PEASE & SONS INC 120,413 -00 278 040 964 PO BOX 44100 TACOMA WA 98448 -0100 - -- related to the following public works contract: BREMERTON WWTP WET WEATHER FACILITIES UPGRADE 4708 In our opinion, all workers' compensation insurance premiums, increases, and penalties due to L &I from this contractor have been paid in full or are readily collectible without recourse to the state's lien on the retained percentage. ** This letter's sole purpose is to communicate our release of the state's lien to the public official responsible for paying or authorizing the payment of public funds to the contractor named above. If we later determine that the contractor owes additional premiums related to the above - mentioned contract or other activities, the contractor is still liable for payment. Dated June 2, 2010 at Olympia, Washington. State of Washington De f�j� industries Txb�z s Contract Release Specialist PATRICIA MCLAIN 360- 902 -5385 or MCLP235@LNI.WA.GOV ** Title 51 RCW authorizes L &I to collect workers' compensation insurance premiums, increases, and penalties. Chapter 60.28 RCW establishes L &I's priority regarding this lien. Etinaployment Security Department WASHINGTON STATE CONTRACTOR: PEASE & SONS INC ) CERTIFICATE OF OP BOX 44100 ) PAYMENT OF CONTRIBUTIONS TACOMA, WA 98444 ) PENALTIES AND INTEREST ON PUBLIC WORKS CONTRACT P �e T ES Reference No. 251924-004 TO: CI IY OF BREMERTON` 3027 OLYMPUS DR BREMERTON, WA 98310 The Employment Security Department hereby certifies those contributions, penalties and interest due from the above named contractor under the Employment Security Act have been paid in full or provided for with respect to the following public works contract: 4708 The Employment Security Department hereby certifies that it has no claim pursuant to RCW 50.24.130 again 'st the public body named above for tax attributable to service performed for said public body by the above named contractor on the above described contract. The Employment Security Department releases its lien on the retained percentage, which is provided by RCW 60.28.040 for contributions, penalties and interest due from said contractor. This certificate does not release said contractor from liability for additional contributions, penalties and interest which may be later determined to be due with respect to the above mentioned contract. Dated at Olympia, Washington on April 23, 2010. COMMISSIONER E YMENT SECURITY DEPARTMENT B (Authorized Represe tive) Original— Disbursing Officer Duplicate — Employer Trip licate— Centrai Office Files EMS 8449 760 R3 -98 I i I ;:; a ^spy. _ '.hN '�,�; 9 •'Iii - 'Jl�nt'rx f.. %! •it - ^•y'IH .,y� l_:.11 �I _z r. Ii _ __ 'r: c: ,.. ' _ •_ - :V.1,; ay.;. �k Yek,:; '4 it r'—', �eRJ— �'16vn7 {ddaa"t�,li��_ -� -y I PUBLIC WORKS & UTILITIES ADMINISTRATION •,'IUQc��jl�t @k`Ba�:J4v�k�:'; cfi,�•�`F; June 9, 2010 Union Bank of California Attn: Cindy DeKruyf, Assistant Vice President 1980 Saturn Street Monterey Park, CA 91755 RE: Release of Retainage for Public Works Contract Pease & Sons, Inc. Escrow No: 22836 Account # 9141002510 Dear Ms. DeKruyf, Pease & Sons, Inc. has completed all work required under contract for the construction of the Public Works project: Bremerton WWTP Wet Weather Facilities Upgrade. Please release the retainage of One Hundred Seventy -Seven Thousand Eight Hundred Twenty - Seven and 27/100 ($177,827.27) that you are holding in account # 9141002510 (Escrow # 22836) to the contractor. Thank you for your prompt attention to this matter. Sincerely, 4 11 11a4 Mildred H. Vellegas, CPA PW & U Financial Manager cc: Ann Wagner, Controller, Pease & Sons, Inc. Carol Etgen, City Clerk Ned Lever, P.E., Project Manager Contract file F': ... Fes.. �•^'",:%•- $._ ^, � [� 1�0 v7.a.vf 88y.I1V��•cY�'- +4'�'M� PUBLIC WORKS & UMIMS ADMINISTRATION June 9, 2010 Union Bank of California Attn: Cindy DeKruyf, Assistant Vice President 1980 Saturn Street Monterey Park, CA 91755 RE: Release of Retainage for Public Works Contract Pease & Sons, Inc. Escrow No: 22836 Account* 9141002510 Dear Ms. DeKruyf, Pease & Sons, Inc. has completed all work required under contract for the construction of the Public Works project: Bremerton WWTP Wet Weather Facilities Upgrade. Please release the retainage of One Hundred Seventy -Seven Thousand Eight Hundred Twenty - Seven and 27/100 ($177,827.27) that you are holding in account # 9141002510 (Escrow # 22836) to the contractor. Thank you for your prompt attention to this matter. Sincerely, Mildred H. VelIegas, CPA PW & U Financial Manager cc: Ann Wagner, Controller, Pease & Sons, Inc. Carol Etgen, City Clerk Ned Lever, P.E., Project Manager Contract file .• � AFFIDAVIT OF PUBLICATION Account # 42742 AD# 259618 , STATE OF WASHINGTON � COUNTY OF KITSAP i I, Laura Wessels, being first duly sworn on oath, deposes and says: That she is now, and at all times embraced in the publication herein mentioned was the principal clerk of the printers and publishers of KITSAP SLJN; that said newspaper has been approved as a�legal newspaper by order of the Superior Court of the County of Kitsap, in which County it is published and is now and has been for more than six months prior to the date of the publication hereinafter referred to, published in the English language continually as a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County, Washington and is now and during all of said time, was printed in an office maintained in the aforesaid place of publication of said newspaper; that the following is a true text of an advertisement as it was published in regular issues (and not in supplement form) of said newspaper on the following date, to wit: A April 13, 2010 that such newspaper was regularly distributed to its subscribers during all of said period. The full amount of the fee charged for the foregoing publication is the sum of $31.34. This amount has not been paid in full. � (Signa '�l'`� CASSANDRA A CAPAS Subscribed and sworn to before me this day of April 23, 201 Notary Public State of Washington My Commissfon Expires Notary Public in and for the State of Washington, Kitsap Co l� NOTICE OF COMPLETION Notice of Completion has been issued to Pease and Sons Inc, on Contract No. 4708, for the Bremerton WWTP Wet Weather Facilities Upgrade project. Any parties having a claim for material, labor or damages related to this Contract have forty-five (45) days from the date of first publication of this notice to file a claim. i April 13, 2010 ............................Ad#20099396 � , � i I I I � I I CITY OF BREMERTON � CHAIVGE ORDER CONTRACT CHANGE ORDER NO: Thr@g PROJECT NAME: WWTP Wet Weather Facilities Upgrade PROJECT NO: 5020 � CONTRACTOR: Pease and Sons ORIGINAL CONTRACT AMOUNT: $3,229,728.00 DAYS: 447 PREVIOUSLY APPROVED CHANGES: $330,706.27 DAYS: 72 THIS CHANGE: ($3,889.31) DAYS: 82 REVISED CONTRACT AMOUNT: $3,556,544.96 DAYS: 601 (Excluding Sales Tax) This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below does not include applicable sales taxes. DESCRIPTION OF CHANGES INCREASE IN (DECREASE) IN CONTRACT CONTRACT CONTRACT TIME � n AMOUNT AMOUNT EXTENSION � � °' °-' ($) ($) (DAYS:) � � � � X Work Change Directive 2— Modify the Centrate piping for the $1,618.29 centrifuge. X Work Change Directive 19 — Equipment Delay-Generator $4,845:92 X Work Change Directive 24 — Modify alignment of TWAS $4,947.57 discharge piping to allow flow splitting to each digester. X Work Change Directive 26 —WAS Piping to RDT's: Modify $8,124.32 alignment of WAS piping feeding the two new RDT's to allow relocation of the new polymer injection rings immediately ,adjacent to each RDT. Wash water Routing: Route wash water to RDT's through adjacent stairwell to avoid routing through wet well. X Work Change Directive 29 —WAS Pump Piping: Suction piping $6,357.13 changed from 4" to 6" to allow better flow. Added Polymer Line: Added Polymer line from pump to RDT injection ring to allow dedicated pump and piping to individual RDT's. WAS piping Gate Valves: Installed owner provided gate valves at WAS pumps. X Work Change Directive 30— Polymer Flow meters: Install owner $724.54 provided polymer flow meters for polymer flow to RDT's. � CONTRACT CHANGE ORDER NO: Thl'@@ , PROJECT NAME: VWVfP Wet Weather Facilities Upgrade X Work Change Directive 31 —Stair Nosing's: Add stair nosing's at $620.35 landing to Thickener Building. X Work Change Directive 32—Fiberglass Doors & Jambs: Change $2,701.49 from hollow metal doors and jambs to fiberglass for corrosion resistance. X Work Change Directive 33 — Polymer Check Valves: Install $588.15 check valves on each polymer line to stop backflow of sludge into polymer lines. _ X Work Change Directive 34 —OA Duct to Centrifuge: Modify OA $4,863.65 duct to Centrifuge and/or add SS fume hood over Centrate - sump. Also includes core drilling into TWAS pit and flashing for roof OA pipe penetration. X Work Change Directive 35 — Demolition Changes: Added scope $3,752.83 to demolition at Thickener Building, to include; Demo and wall patch associated with beach, saw cutting wall to level new building, and patching wall penetrations from existing or previously demolished equipment. X Work Change Directive 36 —TWAS Valves: Install (2) owner $2,277.13 ' provided valves on TWAS discharge piping. X Work Change Directive 37 —Boiler Pad: Demo and replace $1,983.18 existing boiler pad. X Work Change Directive 38 —Grinder Panel Replacement: Demo $558.25 and patch existing recirculation pump pad in solids handling building. X Work Change Directive 39 and 40—Recirculation Pump Pad: $4,696.67 Demo and patch existing recirculation pump pad in solids handling building. Polymer Blending System: Install required piping, electrical, and concrete for installation of polymer " blending system. X Work Change Directive 41 — Install finro E-stop Switches: $2,192.47 Provide and install wiring and conduit necessary for two E-stop switches for the boiler emergency shutdown. X Work Change Directive 42 — Install 8" Isolation Valve in DGA: $877.86 Provide and install one isolation valve in the digester gas piping to allow maintenance of the gas meter WWTP Wet Weather Facilities Upgrade Page 2 of 4 Change Order No. 3 _ CONTRACT CHANGE ORDER NO: Tht'@@ PROJECT NAME: WWTP Wet Weather Facilities Upgrade X Work Change Directive 43 — Provide Chain wheel actuator for $419.50 additional TWAS valve. Natural gas consumption during valve failure. ($1,600.00) Deduct for unutilized force account cost from CO2 gate ($54,438.61) installation work (WCD 22). Additional days due to gate production/delivery and weather 82 da s. NET CHANGE IN CONTRACT AMOUNT ($3,889.31) 82 INCREASE OR (DECREASE) ESTIMATED SALES TAX (8.6%) (334.48) ESTIMATED TOTAL INCLUDING SALES TAX ($4,223.79) Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for past performance. The undersigned �ontractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. , � WWTP Wet Weather Facilities Upgrade Page 3 of 4 Change Order No. 3 CONTRACT CHANGE ORDER N0: T�e PR�JECT NAME WWTP Wet Weather Facilities Upgrade The parties whose names appear below warrant that they are authorized to enter into a change order that is binding an the parties of this contract. ln additian, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate ac#ion to modify any bonds required under the cantract #o address this change. RECOMMENDED: � � �� �� PR4 CT R Dat ` ` ZO�I p RECOMMENDED: CITY ENGINEER / DIRECT�R OF PUBLIC WORKS Date � q ��., , ,�-.o� ACCEPTED: � � C TRACT Da#e � APPROVED: �J � � �� MAYOR D te APPROVED AS TO FORM: ATTEST: � re erton ity Attorney City Clerk � WWTP Wet Weather Facilities Upgrade Page 4 of 4 Change Order No. 3 CITY OF BREMERTON WORK CHANGE DIRECTIVE , WCD#: Two Page 1 Of 1 , PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: August 1, 2008 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Modify the centrate piping for the centrifuge. ATTACHMENT(S): RFI 15 Sketch If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Sfandard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Price ❑ Contractor's Records � Lump Sum ❑ Engineer's Records ❑ Time & Materials ❑ Other: ❑ Other: Estimafed increase (decrease} in Contract Price: Estimated increase (decrease) in Contract Times: $ 1,618.29 Substantial Completion: , " 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization. are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR CITY OF BREMERTON By: B � �,, I , ab, FORMS, Work Change Directive, 3-00 I BREMERTON W1NTP 8570 Change Proposal - Lump Sum Basis Ref : Sedion 01250 DESCRIPTION: Supply and install Sched. 80 PVC drain to centrifuge sump per attached details. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD 2 RFI # PEASE & SONS LABOR HOURS HOURLY RATE EST. COST ON 01031 Projed Supenniendent 1.0 $ 88.21 $ 88.21 Carpenter Foreman 0.0 $ 85.58 $ - Carpenter 0 0$ 79 64 $ - Laborer 0.0 $ 66.86 $ - MilNvright 0.0 $ 81.36 $ - $ - i TOTAL - Pease 8 Sons Labor gg,2� r PEASE & SONS EQUIPMENT (HOURS HOURLY RATE EST. COST ForkliR 0 $ 10.10 $ - Boom Truck 0 $ 22.00 $ - , 4Gas Monitor ' 0 $ 5.63 $ - Job Truck 0 $ 9.00 $ - TOTAL - Pease & Sons Equipment � $ - MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST Materials Attached $ 357.44 $ - I $ - $ - TOTAL - Material and Major Equipment Suppliers S 357.44 i SUBCONTRACTORS ' EST.COST Pease Pipmg, Inc. $ 888.40 ' $ - $ - TOTAL - Subcontractors � $ ggg.qp SUBTOTAL - DIRECT COSTS (less labor) ' EST. COST SUBTOTAL - DIRECT COSTS � $ 1,245 84 BOND & INSURANCE 1.5% � $ 78.69 SUBTOTAL � , $ 1,26453 OVERHEAD & PROFIT 21% � $ 265 55 TOTAL - Direct Costs $ 1,530.08 � � , i I i i , , ' 12/23/2009 _ i Page 1 of 2 6:05 AM i i I � BREMERTON W1NTP 8570 ' � Change Proposal - Lump Sum Basis i . Ref : Section 01250 I , DESCRIPTION: Supply and install Sched. 80 PVC drain to centrifuge sump per attached details, i WORK AREA: . CO5T CODE PEASE ISSUE #: Owner Chng # WCD 2 RFI # � CONTINUED FROM PAGE 1 of 2 TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: TIME EXTENSION REQUESTED - CALENDAR' DAYS: CPM ACTIVITY NUMBERS AFFECTED: � EXTENDED FIELD OVERHEAD (rate per woric dayp VALUE OF EXTENDED FIELD OVERHEAD � $ _ HOME OFFICE OVERHEAD, BONDS AND INSURANCE � 16.5% $ _ SUBTOTAL ; $ _ PROFIT � 10% ' $ _ TOTAL - Time Extension and Related Costs � $ . TOTAL CHANGE ORDER REQUEST: $ 1,618.29 i This cost proposal is based on the cost elements ident'rfied Pease & Sons reserves ali nghts to additional compensation and time extension for work elemeMS ident'rfied, unless soec�callv neaotiated as part of this Change Proposal. Work wiil proceed in acc;ordance wdh the contract documents until the Owner edher provides wrrtten acceptance of this change proposal or a written directive to proceed in accordance with this proposal Fadure to accept this proposal within the proposal time may resutt in cost escalation and possible addrtional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not IimRed to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or • time have been spe�cally included and negotiated � � i 23De�09 06Jan-10 PEASE & SONS DATE SUBMfTTED PROPOSAL VALID UNTIL i Bryan Hillemann Projed Mgr. � � ! �, � I � f i ' � i I � i I i � � � vzsizoos � Page 2 of 2 � 6:05 AM � ; I � , i BREMERTON WWTP 8570 ; Change Proposal - Lump Su►n Basis _ i DESCRIPTION: � #VALUEI � PEASE ISSUE #: 00 i Owner Chnc WCD 2 RFI # BILL OF MATERIALS (Pease & Sons) ' ITEM DESCRIPTION • QN UNIT OF LABOR MATERIAL MEASURE UNITS TOTAL UNIT TOTAL 4"X1/8" Full Faced Gasket 3 EA - 5.00 15.00 316 SS Cap Screw 16 EA � - 2.45 39.20 316 SS Hex Bolt 8 EA - 3.10 24.80 316 SS Hex Nut ' 8 EA - 1.25 10.00 316 SS Long Thread Quick Bolt � 4 EA - 7.10 28.40 316 SS Hex Nut 4 EA - 0.65 2.60 316 SS Flat Washer 4 EA - 0.36 1.44 4" PVC Van Stone Flange � 3 EA - 25.00 75.00 4" Sched. 80 PVC 90 � 2 EA - 18.00 36.00 Sched. 80 PVC Pipe � 10 LF - 12.50 125.00 � - - i _ _ i - ' � i - - � - - I ' ' ' � - - � ' ' - - i � - - TOTALS , MANHOURS: - COST: $ 357.44 � , I i , Page 2 BREMERTON WWTP 8570 . Change Proposal - Lump Sum Basis Pease Piping � ' DESCRIPTION: #VALUE! PEASE ISSUE #: 00 TCF/PC CL # WCD 2 RFI: PEASE PIPING LABOR HOURS HOURLY RATE EST. COST • Pipe Fitter Foreman 8.0 $ 96.56 $ 772.52 Pipe Fitter $ 80.42 $ - Plumber 0.0 $ 80.42 $ - . $ _ $ - TOTAL - Pease Piping Labor 772.52 PEASE PIPING EQUIPMENT HOURS HOURLY RATE EST. COST Forklift $ 24.54 $ - Boom Truck $ 73 08 $ - Compressor $ 14 36 $ - Weldmg Machine $ 10.34 $ - Generator / Light Plant $ 12.70 $ - Laser $ 11.55 $ - TOTAL - Pease Piping Equipment $ - ' MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST $ - $ - $ , $ - TOTAL - Material and Major Equipment 5uppliers $ - SUBCONTRACTORS EST.COST $ - $ - $ - , $ TOTAL - Subcontractors $ . GENERAL RELATED COSTS HOURS HOURLY RATE EST. COST Change Order Processing Fee Lump Sum $ 75.00 Estimating $ 75.00 $ - AsBuilt Drawings 1 $ 55.00 TOTAL - General Related Costs $ . SUBTOTAL - DIRECT COSTS EST. COST • SUBTOTAL - DIRECT COSTS $ 772.52 OVERHEAD & PROFIT @ 15% $ 115.88 TOTAL - Direct Costs $ 888.40 TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS. TIME EXTENSION REQUESTED - CAIENDAR DAYS: ' CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day) VALUE OF EXTENDED FIELD OVERHEAD $ - EXTENDED FIELD OVERHEAD @ 15% $ - SUBTOTAL $ _ PROFIT @ 10% $ _ TOTAL - Time Extension and Related Costs $ - TOTAL CHANGE ORDER REQUEST: $ 888.40 � This cost proposal is based on the cost elements identified Pease & Sons reserves all rights to additional compensation and time extension for work elements identified, unless specifiplly negoiated as part of this Change Proposal. Work wdl proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time will result in cost escalation and possible additional delays PEASE & SONS DATE SUBMITTED PROPOSAL VALID TIL GORDON PEASE - PROJECT MANAGER Page 1 REQUEST FOR INFORMATION Pease & Sons R.F.I. No.: 015 Project Name BREMERTON WWTP WET WEATHER FACILITIES UPGRADE �Ob NO' $ Engineer CH2M HILL iNC. Contract No: Date: 07/28 08 Response Needed By: 08/01/OS Potential Cost Item: � YES ❑ NO Drawing Sheet #: Spec #: Issue: Grid Ref: Subject: Proposed Sump Location Please clarify location of 2'-6"x4'-0" proposed sump on the centrifuge sump.sketch sent to Pease 7/22/08 by Ned Lever. North dimension is 6'-6 5/8" from where? East dimension is 7'-0 13/16" from where? This is extra work and there is a cost impact. PEASE & SONS, INC. 8/4/2008 MAUREEN MORROW CONTRACTOR DATE PEASE & SONS, INC. ATfACHED SHEEfS ❑ YES � NO LIST: RE PLY: �ate: � u ly 28, 2008 Modify dimensions per attached sketch. � ARCHITECT / ENGINEER / OWNER DATE NOTE: This is not an authorization to proceed with work involving additional costs and/or time. Notification must be given in accordance with the Contract Documents if any response causes changes to the Contracted scope of work. � 221' ° �j � � O" �j GC.�- — -- __. ._.__.�_._.__ _ � - ---'------- --� � ,� Co�.-� s?Zu�(10,= �vbE oF ��� , .t o c..�r TI�E�t �N �D ��'ti r_.: ,�_. _._....._...H..�. _ INLET � . ! � _� � �� ��� I �} uF i 4 � � SOLIDS DISCiiAR E e �'t� o � j; � u ` � � PLATFORM F� , � r �L e1 �� ._.— , � � . ,r . � � �LO� ° I -o , �,�..� x !S-b' K 2 ¢ ' ` T►-f'i c�. � , � S� ----------- 'f -- ` ,--- _� u� � - - �---- °-- CE- 1 c�� � GRA IN�..� � - ,.�. — -._ ,_ .-�q,�,a�,,- �_ ��.p 131 �� IXI !NG 3" SUMP � i � DRAIN L1NE EXISTING 4° / �p " i �� DRAIN LINE � �'- O , �� ��� � • ��`� —} LtQUIDS DI C AR E x" J o �,., 4� � 0 � k � , � . U � f � � � � � � � � �`-�-� � � �.� 3�I�u�j7af iNLEf PIPE SNIPS LADDER '� '` � ?'��;; � +.c.t � .� � .�..ti,. J v , � `�' � t . �,.1 � � `�w--' S,�—�---�--� r • ,� �v�n� ►�r��r�� N�r�°�`��- I��� � ,: �"o ,�,�� 1,� �J �° a � l �:� wJ t�1 �`�.���;;�. i �� v�Ew { �` D��lt� �l..�t�i�.:� ��/�"-,��� � �" k'' I��., �jtJ t� k�, 1,.� � 4' , '�'""` � PUMP SlOP �'_.."'r'.;�,._..--''..._._..�'E-__.--' GRATING , , CAKE DIVERSION LIQU{DS DISCHARGE SLAB EL 155.0 8° CEM'RATE BENCHING IE 153.26 A 5t1MP SECTION NOTES: 1. ALL PIPED CONNECTIONS IN1T0 SUMP SHAl.L BE FLANGED OR GRQOVED END (VICTAULIC TYPE) TO ALLOW COMPLE7E REMpVAL bF PIPING FftdM SUMP. 2. PROViDE FtBERGLASS FOOT TRAFF►C GRATING WITH PIPE PENEfRATIONS CUT THROUGH GRATING. IF PENETRATIONS COMPROMlSE STRENGTH OF GiiATING, PROVfDE ADDITIONAI. REMOVABLE SUPPORT BEAMS ACROSS SUMP TO STIFFEN GRATING. 3. MOUNT GRATING ON 57AINI.ESS STEEL LEDGER ANGLE AND ANCHOR LEDGER INTO CONCRETE WITH STAINLESB S'CEEL EXPfWS10H ANCHORS. CENTftIFUGE SUMP SKETCH . Ms CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Nineteen -; Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons � Date: December 28, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Equipment Delay-Generator. Cost for change of condition related to concrete encased primary power conduit. There was also a one day delay in the work to complete the cut in of the power. ATTACHMENT(S): � Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Price ❑ Contractor's Records � Lump Sum ❑ Engineer's Records ❑ Time & Materials ❑ Other: ❑ Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 4,845.92 Substantial Completion: 0 days; , . If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization. are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR CITY OF BREMERTON By . � B �� I A ab, FORMS, Work Change Directive, 3-00 BREMERTON W1NTP 8570 Change Proposal - Lump Sum Basis Ref : Section 01250 Cost for change of conditions at generator. Includes equipment cost for digging through DESCRIPTION: hard pan, delay cost for switch gear shut down rescheduling requirement, supply of light plant for shut down, form and pour C�DF at base of transformer vault, and supply and install pea gravel at vaults. � I WORK AREA: ; COST CODE PEASE ISSUE #: Ovmer Chng # WCD 19 RFI # � PEASE 8 SONS LABOR HOURS HOURLY RATE EST. COST OH 01031 Pro�ed Superintendent 3.0 $ I 88.21 $ 264.62 Carpenter Foreman 0.0 $ � 85.58 $ - Carpenter 3.0 $ I 79.64 $ 238 93 Laborer 0.0 $ I 66.86 $ - Millwright 0.0 $ � 81.36 $ - � $ - TOTAL - Pease & Sons Labor I 503.56 � PEASE 8 SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklrft 0 $ I 10.10 $ - Boom Truck 0$ � 22.00 $ - 4-Gas Monitor 0$ I 5.63 $ - Job Truck 0$ j 9.00 $ - TOTAL - Pease 8 Sons Equipment � S - MATERIAL AND MAJOR EQUIPMENT SUPPLIERS j EST. COST Matenals Attached � $ - Star Rentals � $ 205 49 Sound ExcavaUon � I $ 275.00 Fred Hill Materials j $ 780.00 TOTAL - Material and Major Equipment Suppliers , ! $ 1,260.49 I SUBCONTRACTORS � EST.COST PSW Electric � $ 2,275.20 i $ " � S - TOTAL - Subcontractors I $ 2,275.20 SUBTOTAL DIRECT COSTS (less labor) I EST. COST SUBTOTAL - DIRECT COSTS � $ 3,535.69 BOND 8 INSURANCE 1.5% $ 53 04 SUBTOTAL $ 3,588.73 OVERHEAD & PROFIT 21 % $ 753 63 TOTAL - Direct Costs $ 4,342.36 12/23/2009 Page 1 of 2 6:00 AM BREMERTON W1NTP 8570 Change Proposal - Lump Sum Basis Ref : Section 01250 Cost for change of conditions at generator. Includes equipment cost for digging through DESCRIPTION: hard pan, delay cost for switch gear shut down rescheduling requirement, supply of light plant for shut down, form and pour CDF at base of transformer vault, and supply and install pea gravel at vaults. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD 19 RFI # CONTI'NUED FROM PAGE 1 of 2 TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: TIME EXTENSION REQUESTED - CALENOAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ _ HOME OFFICE OVERHEAD, BONDS AND INSURANCE (c�j 16.5°h $ _ SUBTdTA� $ _ PROFIT � 10% $ _ TOTAL - Time Extension and Related Costs $ . TOTAL CHANGE ORDER REQUEST: $ 4,845.92 This cost proposal is based on the cost elements identfied Pease & Sons reserves all rights to additional compensatio� and time extension for work elemeMs idenYrfied, unless soeaficallv neaotiated as part of this Change Proposal. Work wdl proceed in accordance wdh the contract documents uMil the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal Failure to accept this proposal within the proposal time may result in cost escalation and possible additional detays This change proposal must be included as an attachment to Owner change order. NOTICE is hereby prowded that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limded to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. • 23-Deo-09 06-Jan-10 PEASE 8 SONS DATE SUBMITTED PROPOSAL VALID UNTIL Bryan Hillemann Project Mgr. I 12/23/2009 Page 2 of 2 6.00 AM Wafca Group, inc. ������� l 1307 222ttd Ave. Ct. E. Date lnvoice # Buckley, WA 9832 ] t u��zaos ooi3 y Bill To Ship To I'S�'V Electric P.O. Hox 5G15 Bremcrton, WA 98312 P.O. Number Terms Rep Ship Via F.O.B, Project Duc on reccipt 1 UG/200R Quantity Item Code Descriptian Price Each Amount 1 G 1 iouts 435 Bob�at Sf�ut<lby Cost due to Cai�ceIlation 43,45 G95,20 16 Huttrs Bacichoe Staudby Cost due to Cauce{lation 32.75 524.00 1 G Hours liydro Breaicer Stnndby Cost due to Csu�cellatiai 66.00 1,OSG.OU 'TO�a� $2,275.20 �1�.... «; .........r...�...... , ..� ` �. .v��.n-�..—�....�..� �.��� w,'..-- -r-._� ...�. .� .-�.�• .... ..✓ ..�r'«.....-..�sti^....-.Y ..q. ��`� � � � �� �IL,LING C(7PY �,` �`�� � � i� Y � 4..• . . . � . � � � ' ���� * � ������� • . [(�, � • . � �.: ��;,��� Preferred�Sup�H� ��"� 'to the West's Best Contr,actors� . � � ,::.: , . . . . � =.T�flM�: :.-�. � �.;;�._ � . . . ,. . . . . . , : . . . . . � ....;*.:,�°��� . . . . �:..::�,:, ,.:,. �: � � � �o ..,_ ,: _ ��� . ; : $ppnLE � �� �EI,tEVpE ���� . ., �� .Y 4 . �..� � PA8C0.. ..: � : N111SB080 -•: ._. Net •i01h of ihe monlh ; ' , : ;; < �P08�822-7880 4E6�8Q6•5622 . c� ��SS� 1a1b 609•646•85�1 G03�617r7900 .. ���$� ��� �': 1ACO�IA AUBUfl� �S��I�A WEMATCHEE PQftTLAtiq EUR�N� � '� �, 253�474+0577 283�9�4-9�2 3E0•49t•41E1 609�863•OOBd 809-231•7300 641-72�8876 .�$iarRentels •• . E'; �• Repariment 128 ��'�• � . � ' �'`� EVERER � BAEtA�HTON LOFIQV{BW S�ONAH� VARBOtIVER SALEM P4 Box 34A39 • .' �` 428�348•9989 380�478•0081 360•B76•9000 8U9•824•8480 360•2b4•8800 BD3•A86•1822 Sealtte,WA 96524-'E93E '1"i-1�: 43'fi��2 �'fU�l�k; �-l��� ��.��i�l !� '-�.3' `(3'�It•.li3L.� E][�' f.�ltJ(�L.��''� F�IUI� • af�::1�V]:�::F f='C,1Ft C1Vc F2' �?c��l� V�fdl�:3 � � �'E�C;f���: U�:�:tl` Cfi,lf� i�JC����X"i;C= vlEn1&J� ���'AF�I��'!W1'l1L.�7„ C:c'Jr"�'1 . , .� , ' .?I�.�F :�ib?�f 34 #�d'3F 3f• • i:'il�7 u .'.7�','3�"�L'4c' 7�' 1�'7�"JS' �I •�'rdb i!� � df �`A#•Y,� �,u•i6 �#l��li��� � •k� � X� ��� �Ye 4F r� ��}'r �3I�?s��r �`t� 31'r4� i��ik•#t�3f'A'� sF4E �Yr s�'�2��}F'd��Fl��if'i: �lE� �ti�.�Yi'3F•ii� •� LvW��"�f'��:Ft �.�', F�t��.Ei..Y• F?E:�f��cJtV�:t'�.-�L.t� Ft:1C� 'f'i�•iF�" ��C;l.tF2�"I"4r [71° f1�..[., fdE�t��"f'f71.. ?'1"f:h�� �,• � � t � �t� � � �f�l•4f:;. �kJl��t� (�I�,h1"Cf�l, }�I�I.l7:C�'i���it!'f' !:H �F�GI)��:I? �'{�2ClF�Pw�2i..Y Wi-t�i� 4Jl�fii�"f'"1+1��[�I7L•::X� � ,� . �ii��t�,�i^H�3I���FF'ri���'�'�'.,�>F9F�Y��+�r?� d i���9:�}�c.� � 5'h C �F,I�Y' �,��e:xrt�:taqemzrs:�,�:ct�:::�� 4 ria:xr«r:�T•ra�rxar.�^�.n;�r+aM.rasai�.�a7:s�:..r.:�:��-.�.�n_Mz.�::�::::a:ana »c_x:[;L11'1'��t'id�: )��►.IIA�l�F' ����::�a ,.. � . • , . . . . . � Ci�hl'f FZta[;l S ,�„Cl:� a: }�E�.n � � � L:,�~�►A�uEs4�;• _:r,�ccsc+��r.m �::£Mf� ..,,...s5:��ss����s:c........:�:...^rce�:�::;:e.::�e::�.�:;a�a: »�a��e�:5r. sxosxrs».._._:��:,...�:r.tia..........aac:'�xr:: �x�:�e: tra�31�?f�i/����'3 � �_. , V ��k�t�3E� �� c>C11�1�; . 4'[:.t'�i:�l.. �t �CEi�t� Iw'Cl [3t�X !i•�r1�7J�7� . � F�C1 l�C]X � •,� S, �.rRl • � 1"��;t�t+��1 �ff� LTE3�a�a�t)�til! � �.�� � ���F��:n�Y�� ��� r ���t�F�"��f���;�V� ' ` . ,;;.,�:-� � _...`.�"�,,','�,_»���.3�k-��l.ifl.t4�,.......,........._»w.�,..........�..,._.�,,..,,� _...........,»._.�_..,,...... ,..;::.,.: .:........:......�.......,.. t ... .,,.........,�«�.�..,. �.,...., . , . I��/I� 1��ltrtfk7k.�'t` a�,'k3r.�i�r%, '''�`°'" 1� 1'� "`� }��t"'�Itl1 'ftrfU tdGJ/f��•l��l �b1 �►1��� �;c,�t�,����x�,r��; � t.L, ��r=�.t:,�ra` . , . �':� . . . . r» + ��, �� �y � ``�:.' .. ��ttifi't.l ° �" �;l �1�.�1`��J���4 �.�f.��'. F3'1"F2L:�?'T � ��'.�'�:bdEC� ��•'1'E-���'1"�IF'i�i`i` �'1..��3l�!`1" . ' C;.�'f Y�� ��i��:i�l�f-21'p1�ti F�"1' t�;�l i' �, f' � " q.�fi��'41:.�;1.� F"a7`�' ..::...::...:.....:.....,:.,:..:.�......._........:.'. :..:. ....... .. _, . . ., , . . . . .. . . .... . .. _... ... . , . ..... ..... , .��.. . . ..,... ,. . . . i�l.�'3'[�► .f-�:f �N< � t.)f�� n1��E�L)�t�i ' . • . . ' , . . � .... �...�.�.�.._... �.._..:.,..�,�._....,...�.__..,...____.....�_......_._._._..,....�..�._._.._„_....._M_.��..�.__.�._,,.�..._..,......._.�......._._...r ._.w�_.......� :s.�'L�IlI.._�[),r.�c�ar.,n;�!'�y/c:��jL�4+CY't��:7,i711txr.:eteus.r,:�»rx;�,r»:�:r::t�c:e��c.1'�;`M'� �.Tl�'Clm��:'zcw=:uy:.�:::��s�xi:r5_t:(}�i.1.ti��'��?t�L�l'1C�t�C� �,�tw �u� ' � � ' :� L.6�h1�� '!'EJW�'t'�2f�., ��;• � l�l/t:,l-:4J t��:t�l� �:h� " i'H . . ;1..��s�„ i��� �, 4.�aa 'V.ti�+ :3�i��-t��2.;i � • 4=,C�t:�h; `Cl�ilM�+r�v'cGa�.i. sr•.r:�3.�:�1 r,ui�ikaar� e "I'h9L:�i7•��`�L� = � � F2���: s� a � � 1 �YV�a f�r.ht d ��c��;, r7�rnle�s �3F1�� �tU/ ���t M�:� i� s�! tif, u .. �.: i?� �5t"� �� c�'a�: ;:i;::;,:� � i, r� ! x K x>c ' t�3 y�t7t?i�E r�„ ��i�� �t�'l ,��--�xi�r;�'iZE ' . ���„,�a �� TJ�•�'�a�:l.. C7�'f:._��Gi-1�.7 7 s;a� �.;�h � , ra �±� , , � � �1Q 7w° � � � . � . ..�3a ].t� a�`� tt � f�'t�7 ��J/�r5�ilViF.', i�+;:;,� �l�Fa . . _: i"�.i,� �� . �- ,�,�� . " � � `�I �� � ��;a,,,. �„ _.,_,._: .X�.� ,,..,���BJ. . °�- C� �� ��:'W''��-�'� � � �t�, c `' � � j;!�''� r� .....m. .,_... �._.. � .. ..� ., . � ni."rl_�..t.• «t.::: ,n , , ��1�=� `��1�x;'.,.,...,...,..,�.`; �;<x�r;r{ ...�,�: w "' i C:19:iL'.::.CY.i:Y'.'C':1:;::.'.7."'.+'M^IL w�CLL:�'.K,:G7'.. :�7�w:3G:C:w'O.r..4:YC7Y":It�.'.h�:C.::�iiYJ'.'.:...:,Y'�I:.t.....•iC6'.:)L'CYJt��'lit'.�R:G^Tt:� :�. «'��1j 1��'3�'CrC��iS1�{�.�• nn atir`:::::i. i L7«7i:l�r�F'w'�".'3L;Ci:: .�� . .... � ` � .x r �� '.. ...y....�,.........w�...,.w....t������ ��� �i .:�E_EITllllc'1F r -........��...-..�...........-.,r�... ......�..�..�........�.���-......�...�.......�a..7U����i�'.����� iYS�.:�..�...�...�. l,-'�.�.....^"'�" rr'„f ..����"iG ��C-!� •�'�'���rlf�S;:� . {�k�{' f�?iita�_�r�� ��k����l r l+c:�11►� �,".�,!��i/fll�l t�+ a L".t�t�t�rao � i�?�1'wi� faca Clk.-� liT�l:��k:l.._ �.�?„ l�' }i)>>F�n�t,� IJu•r. .�t;ti�� :i►wv 7t:Q^ . �;?��.,�rC) ��ic��;«�/�i�+�.xu�!�^y i��o�;xi 'i"c�tal Ur�����i�l thi� t;u►�s�r���:c:+� 4 �:iz►'.:►. �}�. Wf� w�'�' �e �^/4 .�t?„��� .. � if��;l-�-���tE�C�EE ?� �' � . . �. • „ .� � . , � 'Cc� t; � Y ' �'����� ��f� .. . � . .• . . . . � � . . . � TNS R�U�flB� Riq� RF TNIB FQR��I� ' �' �' . � , `� � • . r3 � F POEI�11 OP� BNMS A�ID CONDl1lON� OP Tfll3 qqNTAitOT llp� S� . AADITIQP�AI� ) ricU�Ap TtE F MERCNANYA81LI7Y ALR WAAHANTtEB OF FliNH99 FOR A pAA , sataima •AU. WAAAAN 6 C � i 8tar pentsle an8 8a1ea dl . . E 8 Afl�9S QA IMPLIGD . � S IN E RBNCE OR INFiiINOEfdEh1'I AHD A4L OTH�H WARMNTI 8, X � RUAPO$6, AL�. WARRAPiTIEe AOAIN T T RP a li' 1e to tlro e u Med!'rentad•o� dol��'No lurlher warranly eheN be Implied by law :'rh�s ooniraat oontalne addiuona� �I __ pp oab a 1P =— WARpANTY DfBCLAINpft8, LIMI7ATlONS Op LIAEII.iTYAND UhiI�ATI0t�3 flR AE�1EtiiE3, &ee paragraph 11 on ihe reti�ezse skte ox thls form� •Customar's StgnatuiQ ,. ! NAVB IiRR�� UPi��R�TpOD AN9 AAIi�� TO �iI�.Y�RTiIS OP tiil8 abliTAaAr� �� � THIS 18 A D4PiTi111RT� N�AG 90fi1 StURB dEFOB� SIQNIHi If{O1,UAINQ 1NR DI8CLAIHIGR OF V�ARRANTI�8 S�Y FA��iE R90N�. !' �,�u,i, � ' � ' E, (Yi;i�t�l�11�'l..� �1'Flf�! 4 � ��'� � ;�L�l�f2a ,��f�-•�/¢f:�C-,st��j.-.�'jlt. ,�i�' ' �� ���� ._. �i1`/Ol�� �t � Waka Gaoup, Inc. j � � 11307 222nd Ave. Ct. E. � �� � � . �����5 pate Invoice# Buckfey, WA 98321 . ���, iii ��'i�� >>���zoos � oa�4 � � 5• ���� � ` B(II To Ship To PSW Eiectric P,p. Box 5615 � Bremerton, ��'A 98312 Shi Via F.0.6. Project P,O. Number Terms Rep P. Due on receipt 11/6/2008 Descrip6on Price Each Amount Quantity Item Code 706.2G 1 22 Specialty T7elays Associafed with The City of Brenierton 70G.26 _ ���,IGv �(r� ��� ' , �l�c� c � �- c����-��. �. - � ,9. ..���.I�� ,���( u�-- ��'�. . � , ,; . , � - � , �� � � . . ��" � � ����-����-� C��.�n - �� ; , . , =:� _ ; (�j�`� . - � L � y�-�✓ $706.26 . -- j� - � T`ota� � ,. i .. I � � - _ ! . ---- - - - • �nne ; 3020 W. Sherman Heights Rd. SE-y ���� oate invoice # ( ' Bremerton, WA 98312 ��� .��"''"� g/Zg�2008 _ 5435 � 360-373-1613 Bill To � Pease & Soizs,lnc. PO Box �4100 �������� ; Tacoma WA 98448-0100 ,��� O 4���� 1 � , � � $� �9' ����� ���a t i 1 '� i P.�. No. ms f'roject E _� $1788 ,� � `,�:NG�30=:��:n:=1"� T-0832 ;�_-- � Quaniity Description Rate Amount 110.OQ 880.0� T 8 07/29/08 SoSo . 110.00 � 275.0� � 2,5 08/25/08 Solo 1 t0.00 275.0 • 2.5 08/22/OS SoSo g,(po/ 0.0 Bremerton � � � __. - -`. • • � d � � -- - - •.- . !' - _ . . - i �� � m� � � � � ! � � �, �� �, �� ! � .0 � � I F S 1 ' To�ai � $t,a3o � ; i � . . � � // , /� �' _-_- -= `�'T�ASSI�RHPROPFR'CR�t�ll'k'L`E ,./ � 1 / I /{ : - 3�MITTANC�COP_Y_W17H �AYMEI�'f-TQ:.,:�,' .::� :;. �, � •: d� d 4i � � � � , ��������� l � A a ���� Fred Hil[ Materials, Inc. .. ��� � � P.O. �.ox 6 �� Good Nelghbars Slnce T946 ����� ���. Poulsbo, WA 98374 OFFICE TQLL FREE: 1-800•422-5Qi0 � � pC)ULSBO; (360) 779-443i P7. TOWNSENb: (�G0��4100 9AINSBRIDGE: (206) 842-6100 BREM�RTON: (36Q) 674-3131 SEtiUINi: (380) 883-7977 SHINE:1-800-506-3437 JV�ICE ����,�� S��' . , - . --- •4NVN0:;;•`.:_-' - =CFIIVINO�`•;-�'•:' ;i'AG��,' ;.it" ' �'C.�IV�i ��� ����� - t�, v �•'�'•f�r;4 7 i� 1 ';#�'� ,j ` •:;a':.'.i���,� 1 .Flr:iF-.� t4 �� ,: __. � F � ''�� �r . r, , � I • '�`!•, iS� }yfli, �-14•��.k'�EL1 � --f°' � _ . - , ��t;�;,.�•.•�(� �:ti? {�i;� -_ 'GUS�nIb.� .- �-�:�'_ :�a, J'�o,;'�;�_- _ _ _ `o�o°t�o,.-�;<` � j �(,j`i 'vd!r;'I�r �7 - Y : - . . � I�E li1 -- �. - - ;i).',:O:�tj�lSIN��Fi: ';,` _- - - ..CrUS•,JC?S iJO=, - �; :;:D�itY�P.Y'AD�RE$S��- . : - ' - - �:. '' _ � .4S�T-/8L)f - _ ' ZA .4�:. �. -�°: • - - +.3`P�1'i�:.C? I:S;�S� ;1l'1:' f3t"3i��1'l�„ ,'��'+' ' �l;'i'+_'•%, 3 a,:,,. � :.D �E�>' '.�: 'Q(JANT[i•Y�,� - - :-1JOM= `;PRO�UCT-�'• -',, - ' -_ - .DE$CRfPTiON,: - --_ - - _'�UN#7:PRC _ �X - :EXT,pFi�;�;�- � ��tAl �.��3� �i. t?s�:t !„� ` �S ?�r1�4�;1?I� �,�..•• 5 l.,fiZ . � i'jt��: %;•�� �tt'��� ''t r'�>.a E�1lc� ,:.[,h�'� v1t�t „ -• - r� } �� c , p � 1;1... s. �� .; ;�� 6r�tCl ;. �.;�: fr);r �,+i�/� �,l?I 1:ie }( !'f ss'•i•:JC� 1'�l�;.i. ,_i�.��7��j•�(•ll��,?�:, t•v!_ —' --'. s i :i l: r?:t ,rE ►'ll�i � ��C.'�. �liili �Z�q/'I�i c�'„ t'.s�i �'�� ) �:'tvi',�':;1i� t��� !:C)!` i ... '7 � , i,r t: t= !'>-'• •`•� l�!.+�+• '.'+ (7��:� ej., I; i ����/�.�. ...���1l,1 �' �.•r,,Yi:� � t��•,�. .xff� 'i � . t�•'r . . . f t ��� �ii;�— 'F ,._ �_�_._. .a��i`}, — . ��•. :T._1 xszvn ,- _ r} " " m�mu ' -,. _ _' _ � . ) � � t���� � - � _ . � _ ". _ .. - a-r;.. ._`�"i•v ��..-.Y.. , ���� , � �� ` � r .. . . . � .�7• ♦ . •• � • . � �, � � . � . �.. � . , .� i. t . • . i ' � • . . . . . .. � .•r.}' ��f ��,t.If�•1�1t;+.� r� �.::!i ..li }� _Y:4' ! t-{ e � � �F E�M's�. = . _ , _ , _ � . -_ _ -.. �_��aufw � _ : 'PAYTHIS` �U�I'i'::�,: . . f��7y:."�stEi .'.`�y` '1fL� , _`' ', . - '` °`'��•�:.- y:.;, • . . s��� • _ - .. - � �7}�(�.�kt' • • • + • •� TAX INCLt1DED IF ANY � �� - , _ _, �� a �� /i _ '._:ytiT9�ASS RE"PAOPER CREDIT PL�ASE RETU�iiV• -• •", -•. � .. ' . _ � � ,�, •�O l --� ��� �i^ ' ,+ � : '�E_N1(�'i'�f�fCE'COPY 1MTH PAYMENT70: ' . � 1 � L 'Aa�T . ��', ` - ��-� ' ' � � �, � Y , �red Hill Materials, Inc. ° ° P.O. [3ox 6 �� Good Nelc�hbors Sfncs 7946 Poulsbo, WA 98370 O�FICE TOLL FREE: 1-800-422•5U70 POUL,SBO: {360) 779-4431 PT. TOWTI5END: (360) 385-4100 BAWSBRIDC3E: {206} 842-6100 BR�M�RTON: (360) 67M3131 SEt�UIM: (360) 683-7877 SHINE:1-800-506-3437 VVOICE �. �-' INy DATE,`.': ': :; ., '�"• ° � �-'CRM NO - . : PAOE :,' r a - — (� r. ��. io °• � � • r• r • + , �I..1 � i� •l. . � ��'•l:` . j t: 'j �:I . ' il':fi��.�i} i < �'� v k. � � :. � I j� � , y ? J �:4 � � • I 1 i . F J t � i ;-;i.t'4'il � �•Is 1 `.!�.' �; � � ��C�J$ NO: ';1 ''_ _ PRQJ �JO - . . ORD NO • � !.',`F;'. •r�,� 'i' , _�pELl1l�RY�i4bpAESS,;-' - - - ,- LOT•/BLK; '- ': ZONE Na� _`�.'--. _ '�>�,0. NUAhBER�.':c•.:•..'' - - _�CUSJOB'NO`,_ - -- .'•'�'_i��i�'. :';i� �i'�•,. `iF?!�.t�'i. + :�� � — - , _ � t .ij ��`_��i ' . '' �"� ''-� .� /`; /\ r '�PATE.��•.-: - � Q1fANTITY� - - ''U�M_; ; , .°.PFiObUCT '--_ - . --- - - - -- - - QE$Cfi1RTION�`"- - - - ` - -- UNIT�PRC.: . .. � EXTPRC. �- .M i• �7 � �:� i.L' •,. • I;; ;.� �.. ?�.:! � :•; � '�)4� 'Se ... , i.,. ; :}ij '�r�•:ii:..,� - ,1. L / 4 �`�, ,�,J .';.��_,, ci':j �'��.7% i.�:�! . :��'F ,! i,i��;�; � �:ill'i?i_�ri�i':['ft' '4'1�:li�� `E .,%!��.i �.�.!ri�;i . it•. : ' ' 1':,.• 4 �� r• �' r,.' t r� 1 �t�? ; 7i'S a". �,_;;l � U• . :.{ j'_r!_.i r1' •e�: 5 �,�t: , , • l F'�. �1�!`� ! ..� , !•_iit. `;} i i� � . ,. "� . . r It. l '.�� j i�.ii�i., ,f �ti{I: f: , ' � .. `i '! �.,. %:�iJi � "r. ; . � ( l � E � (` { i j f ' � � _ . . f I + � �r - , I � I J )`���� ! i �. I�. � � . � � � - . ; � I {I � . � . � :�. .:� , . . .,, . .._.,.,�... �...,..,�,.. ....,, , , :� . y s ; , ,. ! �-,F 1!, . : ��i�?';1.. I � ; .., : „<<I, I `.;i���i..��.... �i�f f;: � I , y ;;;!. :FiM$� : - - - -,, , _ - - - _-- ` __ ,.-, ' _.RUANl'i71�S�'-_�- - ,_ , - . - � PI�Y.T�'{IS ��OU��' • � i�i:: u 'f�.i LI,I !.i� , .. ` — ' � . , � ` _ " e. ., i . . — ',I i`t�i.�S�y�. +��«��� "`+. .. � 4 ,i� • — , — • — . , � , . 0 0 � - o e � � TAX {NCLUI]EI7 IF AIVY . —..— - -- - -. -- . . _� �� , - ---. -- -.__.,. . , � S � POULSBO: 779-4431 BAIIVBRIDG�: (206) 942-6100 `� t�i ;��, ��� K� � � PT. 70WNSEND: (36Uj 385•4700 lfiM: (360) 6@3-7977 / � , CEN�.KITSAP I BREMERTON / SO.KI75AP: (360) 674-3131 "Good Natghbors Slrtce i9A6 www.#redhi[Imaferials.com 1-800-422-5010 i � WAT�R ADDED AT Concrete Tesied D Yes �z[�!o L07 # . e I �' CUS70NEER'S REQUEST ' - Cylinders Taken ❑ Yas .�-.No '� 1 lqemittance Address �•v'�-���`_ gals. ta fuli load t' � 9�� .1'�.�_gals.toz/aload comments `� ����• Fred Fltll Materials, Inc. �����.%' gals. to �la load P.O. BOX 6 S�y. of Rec: water Added Poulsbo, WA 98370 -WARNING- ADDlTIONAL WAT�H ADDED TO THIS �����Y�s �'ER YARD NOT RESPONSIBLE IRAI7AT10N TO THE SKIN AND EYES FREE UNLOADING TIME FOR VARIATfON I!V �eMOo erorfreshymireticoncre!e,graAOrmortermaywuseakin CONCRETE 1N{l.l. REDl10E ITS injury.A�ro�confactwlhWdnandwashexposedsidnareae romptrywdh AllOWED.Addibonalunload- COLOR OR SUR�ACE water.HanycemeMpoa�darormMwegelsl�oeyss, STRENGTH. ANY WA7fR ADDED 1S AT ing time charge at current endre ate�yw��hwaferarNgelpromplmeWWattenGanKeepchP�dren DISCOLORA'TIQl11 e�m gEE BACK CUSTOMER'S OWN RISK. hourly truck rate. _ . =. �.Qp� ' , � . �70.108 _ • , ' ON JOB. • • • - •' BHGIN POUR - � ' FINISH POUR � � 70 PLANT • � . IN YQRD . . / t ✓..� � t�• �. f"" %..' r' �+' J '���''� }i + it. y f�-r '-f r ','+;'' ' i-•+�"y' - i tS�) (.!. _� 6�...�� d. � C S°"w �. 7 �' 'f� � � �{1 �.... :PLANt•: . ORDER # � . • , ,TiCKET #', ' -. LO{!D SIZE : _ , ' � 'MIX '� -� • " , '. Si.Uh7P. - � . .` USE . -� DATE ' .�, ' `c. • :; �-?{t �� u "%°sr,! i �.;i•lt.i�:i:if � i. r �. � `ti� � L �•: =; ' CU8TOMER # �•. , � � � : � CU$TUMER [VAAhE � _ ' ,, - , 'bRDEHED �Y ': " -; -TA7C # I P.Q. � � PROJECT # � i'����3'_ I?! '�''..;;' �; ._4;�•i?: - - ... pj , �,: � rr.��ri: ; J08ADAR8SS • � '. . , ' . ' ' . : . . • � `,20NE# . ' THUCK , PRIVER' �SPAGING , . � �r•• rt t, �;; i:, i" i r � .� .t ,.. , t;"..; • � ��f .. ���:�:'y •F-f �� � . . .. ..1 �l i . ! .... . FSY{�..{�t��� :�1 �f � �'t.�t". 'd� 1, .��_ ! �'.�.� 1_�� . .:t..l �i UVSTRUC7�IQNS . : . . , , . ` . � . . - _ • � . . . ' ' - . . . . . � • ' • • TIME qUE ' ; :'¢"1�;i�:.t''•: 'r = .. [" :' :� ! t'f ;�"6 i I�tici''•i�1� �'°t1S�l'l S �1'••: ; ��! •` . . `LOAD ; ' CUMUI.ATIVE. : '' ORD�RED.. : � . �' ,i?RODUGT " � � . . p�SCRIPTIpN � � U.M. . � . • AMOUN7 � , _ `QUANTITY• " , � QUANTI7Y, . • . ' • 4UANTITY: . : . _: CODE - . . . , 'r'. ;'4!r` i i �� ..;•) ; i?,, �t 1 ��I'.t;aC:�S!'� �.t�•3 #.'.!'1. ` . . ; . , �:_E�,' ���{ !l�.:.. w=�4 :I" �� `s( t!°t:. . � '� . , . , , SIGNATURE OF RECEIPT-CONCRE7E AND ACKNOWLEQGEM�NT OF HAZARD WARPIIN(i � • FREQ HILE PAA7ER(ALS,INC. ��,�I} not assume liability Sor eny property damage or SUB TOTAL ; � _ � •- any equipment damaye for any dallveries beyond the curb line. 7AX , AUTHORiZED BY �TOTAL SHIPMENT SUBJECT TO CONDITIONS ON REVERSE SIDE. . _ � .. � ��..��_••-� ___r-�?v•.-�-t�-___ .-..r_ __� -- .- _ _ .___ .. ' __ -.�' ."'__ _ _ . _' �:..' .__ �_. . . _ ' _. � __ _ � . . �. -J '-- . J---`- - T •-•�, o - T PDULSBO: (36U) 779-4431 � BAtNBRIDGE: 06 842-6100 � r � � /Q z rf ��... � �: a�- .� ` � � .«.` . . ..� ., . �c � �� .�.b �.� s�.. � �.'• 1 B e � PT. 70WNSEND: (360) 3�85-4100 �� UIM: (360) �683-7977 � `"'` CEN'C.KtTSAP / BREI41lER70N / SO.KII��P: (3fi0) 674-3131 www.fred�filmaterials.com 1-800-422-5010 "Qood Neighftora S1nce �94b" �x • �, .. �9 i WA7ER ADDED A7 Concrats Tested ❑ Yes „�']' No � LaT # D CUSTOMER'S REQUEST �ylinders Taken ❑ Yes� C] No � gals. to fuli load _._.••�� AemittanceAddress ` 9sis, to 2 �� ioad Comments �'� Fred hllll Materfals, Inc. gais. to'�s load P.O. BOX 6 Sig. of Rec. WaterAddad POU�SbO, WA 98370 NOT RESPONSIBLE IRRITATION TO 7HE SKiN AND EYES ADD[TfONAL WATER ADDED TO THIS ��»U7ES PGR YA�iD FOR VARIA��ON 1111 cGmempo� CONCRETE WILL REDUCE ITS FREE UNLOAQINfa T1ME Inhuy.A�roidcoMaclw�hskinandwashezposedsldnareasoromptlYwith ALLOWED, Additional unload- CQt,OR OR SURFACE r.ater.KanycemeMpo'adaramtdu�egetsin.roeyss,r�nseGnmedretely STRENGTii. ANY WATER ADDED IS AT in time char e at curroni DISCOLORATION �y� A `��"�'' CUS70MER'S OWN RISK. h rate. SEE BACK -,' ; � ��A�, : ,; � . ' ' . �'�0 d08._ , : • • ' � �'.• PN JO�. � � BEQEN POUR� ; _. ' . '� . F1N1SH PQUFi ' : ' .. " TO QLANT � . . 1N YAiiD � +-`.-...';t;��t"�j�f <11 ; i' '(`.:`.��./�' �„f � ',! ,.'� � .'f ; 1 P,LMfF ' ` � QRDER �" ; . - • TICKET �" • • �LQAQ SIZE ' - . . MIX -_ - . . , , • �SLUi�IIP ._ , •. ` USE .. .;' '..,,., AT&. . •` , � i .i•� .,, .r:jl �t . q'!'. . -.. 't�., �r��ti � �,';(:.t'.if:: 1'i�' _ .. `;'� � i..i . � i;'� . CUS70MER �'.. , • , . . - � �USTOM,ER NAME • . • _ . � � ORRERED BY.• -�_ - : 'tAX # ,' � �. PA, N •• ' ° � PRQJECT � �;�r .�-j '•�;. : ':� , ' .. ' I . '1}:� {.i' ' � .. . _ i i• i �!� :1. . :1 . :J09APDHES$�= ':,,'R''_ , ' .- . . � . - _• _ZONE'# '.- TRUCK ' • . DRIVER.; . . SPACINQ .• �`,:.�r'c'r"-:{'' �':., ,' � , iE i !, { F _ t�Fki::l�ii=:l; (,} ET;.S:= ,�f ,t; r:''.k••:(; . '�INSTBUCTIOHS ' :' ` �. . . - • � • � - ' } .-- - � -- , - �� . ' . ' . - �- - -, � . ' 71h9E D,UE : ''s,: ,'( f. � } . i ,�� •'•� . � � . .•�E f ���_�`•� f �-�E'�F�i p� i;I''A : � . �� LOAD : ,.., .CUMULATIVE ' ORDERED.:' ' �PRdDUCT' � '. '• . bESCHIpTION •' � ; • U.M. . •AMOUNT: �;?' �;' ` . - QUANTITY� •, . � ' ClUAN'tiTY. :" . . QUANTITY : ' COOE � • • ' : �.. i,'tt , t:t�;: „ � `:� 1 ,:,�.3�;3':i �t I.u.� �^s tl:: � . . � .: : . � ', %�}� . 1;•'fi;5 . i _`;i,ti!i.':3 i! l���'. . '•r' � . - - . , . � . _ , . - , • • ' ' . . ' , . "'i , . , _ : . . . . . , , .- - ' ,,. ,. , ! '. SIGNATURE OF RECEIPT-CONCRETE AND ACKNOWLEDOEMENTOF HA2ARD WARNiNO ' - ' ' - FRED FIIlL MATERIALS, INC. �vill not assume Itabllity tor any properEy damage or SUB TOTAL .• '� " ; arty equipment damage for any defiveries beyond the curb IEne TAX - - :,_' __.� AUTHORIZED 8Y " ' TOTAL � ' � ' � SHIPMENT SUBJECT Ta CONDITlONS ON R VERSE 51DE. ' �� ��------ - --•/ -- —'—_/� // ,�� POULSBO: (360} 778-4431 Bl4[N$ ,G�; 6206) 842-6100 � � � � � � O/ � � � ` PT. TOWNSEND: (360) 385-41Q0 �UIM. (360) 683 7977 l s � �^�-�'� SAP / BREMERTON i S0.�17$AP: (360) 674-3131 CENT.KIT www.fredhfllmatHrials.com 1-80d-422-5010 "Good Neigh6ors Slnce i846" " � �'_,� °� `' ;.' ' �` �' , �' .:=� �:�.:, � WATER ADDED AT Concrete Tested ❑ Yes�j]� o LOT # � CIJSTOMER'S REQUEST �j�nders Taken � - + ���� �;;• .; + � �i�a�� .r`"' \ Remittance Address ,�..s'''� als. to fu!► load L �� �` � .. �--s ',..j� . �Q � 7 . �, . ,. ��.: �red Hill Materiats, Inc. ,,, gais. �o a/a load Comments � �,_:., f� �: t��°� �� p,Q. BOX 6 '.�. gals. to Sra load _ Poulsbo, Wl�, 98370 Sig. oi Rec: Water Addad - WARNiNG - ADD1TiONAL WATER ADUED TO THIS ���N�TES 1'EFi YARD NOT RESPON5IBLE fRRlTA7lON TO THE S4tIN AND EYES FREE UNLOADING TIME �OR VARIATlON !N �mg^t�y' m�f0lU�h�ym`xedoonae�e, CONCRETE WILL REDUCE ITS ALLOWED. Adtf�Uorlai uflload- m;ury.A�rok3contaclvnYhskmandwashaxPased ing time charge at current COLOA OR SllRFACE �re�e��� �"�� K°e'vaw�are^ STRE CUSTORAER'S OWN RISKR IS houriy truck raSe. DISCOLORATION away Pr«naatresnNmucedcementDrad�xts• S�flBACK - {�yARD � ' � ON JOB B�(3lN POUR FfNISH P011R � TD �'��T : • �LOAD � . .•TOJ09 ' � t �'% �.- f 1 C:- F s_ �-� �r �." ; ', y �.: � ff'_%.., .. . - pATE ' '_�3'; �'��.'f i.�. t..� ... � . " SLUMP USH TICKHT � - LOAU SIZE � MIX _ PLAN7 ' OR4ER�i � i i i.I y t:�l '_+t� �� !,'��.5 '� ;r:�• l'�. _.. I;;i:' 1 ',�1 �';�'��i� . '! , ' ' P.O. # • PROJECT # CUSTOMER NAME ' ' ORDEFiED BY TAX � CtisTOMER # _ � : ; � : � � •; i : li ! E t� E � ���, � � :�� . (.��':1.:� �.. '.;I_J;'.I� ' . • SPACINQ _. ' - ZONE� 7RUCK DRN�R ' J06 AODHESS • ' ( t I'" tIi i ;•}.i 'r' 4 �# t f, �j :�. �`1 '�I'�`'..��f�!"..,•�'. I',;'t._= �,��+1' �_<1�k1:�C! Er . , ., ��+S;l;f�>I.`.t" 1 • .. , TIMEDUE INSTRUCTkONS� ' � • � � ' ,:;: ���" � i�'' t ( i't" I'I'ii: 1;'I-:E'11 I'•fI. i''4�1 i•'i Sf`t I ; i`.-:{ 1!-' • bESCRlPT14N � • • AMOONT � , � . ,•' [.OAD . " CUMULATIVE OFiOERED : ' � PAODUCT . , U.M: _ ., , . QUANTITY QUANTI'fY • ' QUANTITY CODE - . . . . . �,�, i., i� � ;�.�c f.��„ � •�,i� � � . - , . . . . - , � rE i;% j '.'� , t;'i'li i • � - � : ;� �'f y{ : ' ii�'t''S h i1��'i�:l . . . • i'. ``�� � � ' � _ — • SIGNA7UAE OF RECEIPT-CONCRETE AND ACKNOWLEDG�A4ENT OF HAZARD WARIVING �• SUB TOTAL . � . • FfiED Fi1LL MATERIALS, INC. will not assume ifa6i11ty for any property damage or TAX � ' eny equlpnent damage tor any deftverles beyond tha curb line. , . AurHaRize� sv TOYAL - SHIPMENT SUBJEC7 TO CONOITIONS ON REVERSE S1DE. _ . _ . .. . .. i , � :�t .i: +t `.�i, - S ,r�i:. e • 7� t:t�� .ti i f� r. .t _ � 'S ,:i;��'i � 'i . •�l i; '� . ' - . , . . . �.f .� � � . � . : � � . , . � i l f • . I —___ —. --, _, ., _. :._T-�r_�---_ '_; � v _�-..--___�___--- = - -��-=�--= - -•- -�-_---- -- -•-�- ^ � so; ppllLSB�: (360) 779-4431 BAIN�EiII�,G�: (2a6} 8�42-6100 �� � � � �� ,�i �'' �' O v � j �� pT, TOWNSEND:.{36�) 385-41 U4 .� � IM: ,(360) 683 �� g � �'�"" ' CEKT.KITSAQ / BREMERTON 1 SO.KIT�AP: (360) 674-3131 www.fred�t�Nlmat�t�fals.com 1-800-422-�010 "Good Nelgh6ors 81nce i94S" " ' " '� WATER ADDED AT Concrate Tesied ❑ Yes ❑ No LOT # D • CUSTOMER'S RE�t3EST �y�inders Taken ❑ Yes ❑ No Remittance Address gals, to full load �.Z� �Q � �`? � Fred Hili Materiais, lnc:' gals, to z�3load Comments • p,Q, BOX fi gals. to'r� load � ' ' a_^ j �,� „ ppulsbo, WA 98370 ' t J1.JJl) � • /� 4 Sig. of Rec.-Water Added --- r � , -WARNING- $ MISVUgES P�R YARD 'ADDfTIONAL WATER ADDED 70 THIS �REE UNLOADING TIME NOT RESPONSI�LE IRRITATION T07HE SKIN AND EYES CONCRETE WILL REDUCE 17S - ���W�p, p,d�pional unload- ,, CemeM PclYr"°r or heshb m�xe� cancreta � 9rw1 or mwnar mfi'causa sMn FOR VAR1ATt0t11N p1�ry,AVOidcon:adwiU+sM^anlaashaxposedsl�h�areas mrN�+ ing time charc�e at currenh •- COL.OR OR SURFACE waler.lferryumeMPa+nkrorm�AUre9elsin!ue5eg� S7REN CUSTOMER'S OWN R{SK. IS A hourly truck rate. . and rettaletlly with waler and 9� P�mW m�`�al attenbon, fieep chzd�en DISCOLORATION a SEEBACK • '. INYARD ' ' • ' ON �OB ' $EGIN POUR � � FlNISH POUR .' TO PUINl' • , � 'LOAD . � ' ' TO JOB • _ .: r ! t- ' �• , '-,� -� , � ti � `,;���1•13ti3 ;� `'"; `,� � - ! {� ,� � R11X " SLUMP US� ' . . DATE ! PI.ANr. ORAER � � TICKET #. LOAD SIZE • ` .. ... .! 3 � � ir! - `_; r� {:1 '1,:' i. % .{�'�;�!;;.'. '_S., t��!k`.' I. �`,t.i'•�-�;.;1'•i 7AX� .. PROJECT� '� ,' . .' P.O. � , . ,_ CUSTONiFR �A�E' , ORD�RED BY ' CUS70AAER �• � !. !1 1 ( ( � ' ' ;: �. f .' `:' '1 � 1 ;'i ,t�;e:�,{ • ?: !•tf I}'i ��! _ . SPACIMG 1 ';. t. :20NE � TRUCK ' DRIVEA - � JO,B ADDR�SS ' i : � ' ' ' ' - ..:.,. ' ;.s� ' �'-;!!� 1llt, . „ „ tl{�I_'1:;f'.k� i!'1 1��.�';�.' �I! r• : t:` . � ! t +.?I'ji.' !.i TIME'UilE •'til';'.tif� . I�,i,� ,.•i.' . , 1NST,RUC1'iONS ' � • . ' . . , ,'' I : i i}'� t €;1..i•a ! f' �t f�€ ��'(�i'd � �,,; � ; � �. • 't� i•t�:'i'; . � . � CIESCRIPTION U.M. , . • AMOUNT � � �LPAD.' ... � CUMULATIVE. ORUERED � . PRODUCT . . � QUANTi7Y QUAN7ITY . QUANTITY ' CODE . • • i.: �' �'�; • � . . ���, �,�'!�'� r�.� �ft�'� �t, '-'��, i .'.1••i{'i!� 1}I 1 t � . f � . .. ' . ' - i I t!'�� .;# 1f",`f fl tl?�-;k;• , 3. s ; 4/.1�f5 . , , .. , S�6NA'NPE OF RECEIPT-CANCRETE AND ACKNOWLEDGEhSENTOF F1A7ARD WARNING SUB TOTAL -. ' • FRED H1LL MA7ERIALS, INC. viill not assume liabllity tor any properly damage or T � • • any equipment damage for any deiiveriss beyond the curb Iine. , , AUTHORIZED BY TOTAL � � SH4PMENT SUBJECT TO CQNDITIONS QN REVERSE S10E. - � - � -- .. . . . . . _ ..-• - -"t t,i: f ,1'2�f-'�i it.at4)i ,�.:�,�.1�• •f•f'�1. ''�f S f �� 'd� }�: l�lf':1 . ; � • . ls2(ffi'�"f� '�.f: � .. I ` ':' . .. • � .. . • ' i .+; ., , , i ' . • .. � � .. r, .. � . . t ! Chelsea From: Ray Parks Sent: Friday, September 19, 2008 3:57 PM To: Chelsea Subject: RE: Fred Hill Invoices 392647 & 392533 approved -----Original Message----- �rom: Chelsea Sent; Friday, September 19, 2008 3:50 PM To: Ray Parks Subject: Fred Hilf lnvoices 392647 & 392533 Piease approve the 2 attached invoices, Chelsea Kennedy Pease & Sons, INC. P 253.531.7700 F 253.531.8113 cheisea@peaseandsons.corrt ----Original Message----- From: FrantRicoh@peaseandsons.com [maiito:FrontRicoh@peaseandsons.com} , Sent: Friday, September 19, 2008 3;41 PM To: Chelsea Subject: fred8570 This E-mail was sent from "Front-Ricoh" (Aficio MP '7500), Scan Date: 09.19.2008 15:41:10 (-4700) Querfes to: FrontRicoh@peaseandsons.com , ... . • - )( L� - i X! , .. . , . . ._ , ' � � � • � - ' ' � � PURCNASE ORDER � ..„ ���1�.�. ��■ �A .r���1�y ���o`..»� PAGEIOF �PAGES �A � ns 48� Y .� � �., 10601 WALLER ROAO EAST TACOMA, WA 9844� � P.O.BOXA4100 TACOMA,WA98448•Oi00 j� • 253.53i.7700 FAX:253.537.8113 � � j � I � /� CONT. REG. t�0. CC01-01-PE-AS-ES*362P0 DATE � U� Tnx r�o. cz�a-oao-ssa , p��qS� g� ��NS INC. . --- � � � �/'� � � ` �OR � � � � TQ � ' �. � �OO� ADDRESS �� �, �� � � - ' � �l�L� - cinr � � tl � S � � � �U � � p HOW SNiP Q � SHiP TO PEASE & SONS, INC DATE REQ. � �'� � b� � � 7 � --- � TERNIS ADpRESS QUAMm' PLEASE SUPPLY ITEMS LISTED BELOW UNIT PER PRICE ORDERED RECENED i I��YT�S/'L`:�� z , � (� � --�' �'f'�'taC."��l`� � , 3 4 ' x� �. 3 cv�� --�'; t t . . � s '� uJ 1.� l .�( Jw�y � � 8 - s �� �}�12. � 4 � � so 11 . ,i"iJ 1 r C �� ( 4 I M POR�fANT PL�ASE SEND Z— COPIES OF YOUR INVOSCE WI7H ORIGINAL 81LL OF LADWG OUR ORDER N0. iv{US7 APPEAR ON ALL INVOICES, PACStAGES, ETC. PEASE & SONS, I N� PLEASE NOTIFY US IMME�IA7ELY IF YOU ARE UNABLE 70 SHIP ,,.;, •- COMPLETE ORDER BY DATE SPECIFIED, �' �;;, �""�'= - PURCHASING AGENT y' t WHtTE: ORIGINAL YECLOW: OFfICE PINK: R£CEiVfNG ��; ,�� ' ,;" . • � . "' � , .- ;5=; ' ',-3�,a� . ,:1 Date: - a7� — � �' Dum Fees: ,�'� � . Truck No.: �" Truck Char es: +����' -� SOUnd ExcaVatlOn, InC. priver c�a � Trucic �T e: ''' � Truck Rate• Sub Total: - (3fi0) 373-1613 3020 W. Sherman Heights Rd. Truck Hours: `Add Cha es "- � ��p� 7 9 2_ 5 g� 4 f ax Bremerton,- WA 98312 Driver Hours: TOTAL CHARGES: BilGng Address: � � . . Customer: �. . D `� ' .�. � Job Location: a'-:,r • `� �' : �? r Job ID: - ' ��r' � � � '� . Reason ,: Start ! Q�7' StoP � :�3�'1 Lunch DowMime • CYDS/T�NS AMOUM" MATEREAL FROM - TO � � ,e �}�'! � � . r � - �� , a � � Fuel: Oil: � OTAL MILES: ' OTAL• REMARKS: '� � - . . ------��-'�' - �, `t--�'. ;� `';,,:- ; , , a ;� � ; DRNERS SIGNATURE �� UTHORIZED CO. REP. SIGNATURE: � y ';.\��, ` �' `� ;y `+ �.� .^� :�' i • S'ignature af this tructc irnoice wip be considered your notice of our intent to lien this project, if necessary. Irtterest at 7.5% per N� month vvil! be charged on ali past due accourits. Charges due by the tenth of the morrth following date of this bill'u�g. - •,...,.. _ .,<,�.. � - ` - �=` - - ;; 7:: Yx �3%."� ���= � "rs � �'`" .t" ' _ - - _ _ ' _�:j4` yx ��_: ����;<"'�WCC' ��s!'.. ` :uPt �' �.1 •` _ _ _ Y; .. �2ti _ __- _ "- _ _ , �, _-.,.>"}~`� �ir�},..}y^�.r. X-�s ., �'�i.��;!'_ 2 �Y< `_ _ � � � � ; :* 1 ��`. �. y�'�' ¢ ' - �'.F��Gi��.�,j "Y`/°�.n � .,'. , .' � � �",�it���� � �- _:������;-,�. _ _ - �: =.: . ,-�..:�.:;�:��-, r�.� - -�.,. �-��:;�--.:: � = - _- -_ - ��c���rr�:;�,� �,�::��� M - _T��-� <.:w_��_:.: :=�. , � � � . - - _ - _ . ���; �� ,� x_.• � �� .�:..:-,� -. � ,. `�;�:;�µ._ _ _ ' 360 479=4 � � �� ( ) 65�='= ::= __ Y=��4:�r:Ty���r.?�ai��t�;���ix�-�#�;��"��- (360)a78-�}721 - -- --- ~��r � � ` � �i�t��'� �9$ - --_ �,` ,r,��,`�.. .�. � ��i��� ".-•• _ --_ ,--__-_--_ _ __ _ ____-=--1. • - - " - - - - �:s'.q TT�KET �F3G7 " �- � � ,n ��_---- Tr,uc� z� ��s � c���c�r��� f �,�,.._ _ . _ - ��o�uc� � � �-� �acK ����� ����o �.� - u T�r�� ����� �_� �1 ��� ��o�o t..�+ - ���� �� . o,:� ��c�r� . - �'I�iE 0�•�� F1�°i �5 �l�G U� � �. �� NllM��k �� �� � �� � � , �`���'� Customer Name Job /�.,Gp, �?�uck # Item • D In C:) Qui� y ' , '` �;- _ - TAX ftECE1VED / DELIVEREQ BY 707A1. �....� •e ����++.�- _._. � Kitsap Recfamation & Ma�erials, inc, � ;` RECYCLING AND QUARRY RQCK (360) 479-4659 3020 W. Sherman Heights Rd, '��r (360) 479-4721 FAX B r e merton , WA 98312 '�i ���9�� - rr���� ���n ��r�t�c� �n ��. . _ .. . . � . c�a���r��� �f ,� ���s� sa���� �-'R�DLIL'T �. � �-- �l1CK , ��i5fi '�E3�c� L�t . . � �'ARE ���t�,Q LA ��T 31�6� �,� NET 4 7.5.ba TClf� TII�� 4�7 4�7 (�1�1 "5 ALJfi D� . �f'. �. �Uh1�t�R ��_-�,�.,�,., .. ` �� ► �� ' - '3 V � � � � � _ �'l Custamer Name Job" r�� / T ek� Item ~ OI� out rnx RECEIVED ! OELtVERED BY TOTAL )( .$�id�� Kitsap ReclamatiQn .& Materials,lnc. :° RECYCUNG AND QUARRY ROCK {360) 479-4659 3020 W. Sherman'Heights Rd. : (360) 479-4721 FAX ��-�- Bremerfon, INA 9831 ��r ������ . . TIC,��T GB60 i'l7tICK I�} "a8� ���: (;UBTpM�R 43� PFASE �DNS . FR4DtJGfi 1 w� �w �4CK � Gt��S� �$�24 i.� . K Tf3�E 2b960 LI� �fE7 3�.8G� L� iV��' 1�.93 'TQN � ( T y ��1 ( L � : �� �� A� ��5 AIJr, 0$ -- , t 6 V9 1`��I��� YQ . ,�s. � � �� � �� 1 Customer Name Job ..`Gt-�l9t«e�l f �~ •� V •: Item Dln OOut �� ti . • � . . 7AX r RECEfVED ! DELIVERED BY: T07AL ' X I����•.._ _ � CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Twenty Four Page 1 Of 1 PROJECT: 1NWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: May 5, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHQNGE(S): Modify alignment of TWAS discharge piping to allow flow splitting to each digester. ATTACHMENT(S): Pease and Sons change proposal � If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Price - ❑ Contractor's Records � Lump Sum ❑ Engineer's Records ❑ Time & Materials � ❑ Other: ❑ Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 4,947.57 Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization. are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR CITY OF BREMERTON By: By: �/ ��'�' ab, FORMS, Work Change Directive, 3-00 � � i ' i ■REMERT�N WWTP 8574 Chan e Proposal - Lump Sum Basls � Re(: SectionOt250 �€ t DESCRIPTION: Moditicatlons to TWAS piping to allow for isolatton and supply of pumps io each digester. i WORK ApF.A: I COST CODE pEASB ISSUH H: Owner Chng N WCD 24 �a�� a PEASE & SONS LABOR HOUAS HOURLY RATE EST. COST OH a1031 Project Superintendent 0.0 $ a8.21 S - � , Garpenter Foraman 0.0 $ 85.58 S - ` Carpenter 0.0 $ 79.64 S - � Laborer 0.0 $ 66.86 $ - Millwright 0.0 $ 81.36 3 - $ - TOTAI - Pease & Sons Labor ' ' PEASE & SONS EQUIPMENT HOUR3 HOURLY RATE EST. COST ForkliR 0 $ 10.16 3 - Compressor 0 $ ' 11.25 $ - � BreakeUHose a $ 8 •a� � " - i Job Truck 0$ 9.00 5 - ! TOTAL - Aease & Sons Equipment S ' � i MATHRIAI. AND MAJOR E�UIPMENT SUPPLIERS EST, COST Materlals Attached � 2�03�•94 $ - $ - g - � TOTAL • Material and Ma�or Equipment Suppliers S 2,031.94 , � , I SUBCONTRACTORS EST.COBT ' i Pease Plping, Inc. 5 1,998.53 � 3 - � � - i � TOTAL - Suhcontractors $ 1,998.53 i � i I SUBTOTAI. - DIRECT COSTS pess iabor) EST. COST SUBTOTAL - DIRECT COS7S S 4,028.47 ( BOND 81NSURANCE 7.5% ' S 66.43 i SUB707AL $ 4,088.9U � OVERHFAD 8 PROFIT 21°,6 $ 858.67 � i ° TOTAI - Direct Cosis S 4,947.57 ; E I I � j � ` i • I i i ' I I , ar2� rzoas Page t ot 2 2:52 PM 3 . i ; BREMERTON WWTP 8570 ! Change Proposal - Lump Sum Basls � � Ref : Section 01250 ' i DESCRIP7ION: Modifications to 7WAS piping to allow tor isolation and supply of pumps to each digester. i , WORK AAEA: CO57 CODE PEASE ISSUE N: Owner Chng # , WCD 24 ��� a � I CONTlNUED FROM PAQE i o12 • i I TIME EXTENSfON ANP REIATED COSTS EST. COST i TIA4E EXTENSION REQUESTED - WORKINO DAYS: � � TIME EXTENSION REOUESTEb - CALENDAR DAYS: I CPM ACTNITY NUMBERS AFFECTED: ' � EXTENDED FIELD OVERHEAD {rate per work day): � � VALUE OF EXTENDED FIELD OVEfiHEAD S ' 3 HOME OFFICE OVEHHEAD, BONDS ANO INSURANCE @ 16.b% $ - � SUBTOTAL � ' PFiOFIT @ 10'6 ' � ' i TOTAI - Time Exlens[on and Related Costs 5 - i TOTAL CHANGE ORDER REQUEST: $ 4,947.57 . ! This cost proposel is based on the cosc elemems tdentlfled. Pease & Sons reserves all rights to addNlonal compensatlon and time extension ior work � elements identifled, unless �RQciOcal neaotietest as parl of thls Change Proposal. Work wlll procaed in accordance with the contract documents untll the • Owner either provides written acceptance ot this change proposal or a written direcllve to proceed in accordance vrith this proposal. Failure to accept thfs � proposal within the proposal time may resuR in cosi escalation and poss(b!e additional delays. This change proposal must be included as an aftachment to , . Owner change order. NOTICE is hereby provided that the Contreccor reserves any and all rlghts to recover dlrect, indirect, and consequenUal costs, � including but nol Umlted to the cost of delay and impact related to any work cover by this change or otherwlse aNected by this change unless ths cost and/or � time have been specificaly included and negotiated. � . � � 21•Pec•09 • 04-Jan-10 i PFA3E & SONS DATE SUBMfTTED PROPOSAL VALID UNTIL � � Bryan HIllemann � Pro�ect Mgr. , I I � ' � � I . I � . ; • i 12/21/2009 Page 2 of 2 2:52 PM BREMERTON WWTP 8570 � Change Proposal - Lump Sum Bas�s i i DESCRIPTfON: #VALUEI ? PEASE 1SSUE N: 00 Owner Chnc WCD 24 _ HFI # � i f BILL OF MATERIALS {Pease & Sons) � UNIT OF LABOR MATERIAL ! ITEM DESCRIPTION QTY, � MEASURE UNITS TOTAI. UNIT TOTAL i 4° GLDI {provided by COB) 6 LF - - � 4" 341 V!C Flanges 4 EA - 95.00 380.OD , 316 SS NBG 4 EA - 112.00 448.00 GLDI90's 3 EA - 122.50 367.50 VIC Coupltngs 6 EA � - 105.00 630.00 Hangers 3 EA - 35.00 105.00 5/8" SS Unistrut 6 LF - 11.79 70.74 � 1/2" SS Atl thread 1 LOT - 20.00 20.00 ; Quick Bolts 5 EA - 2.14 10.70 � - - � _ _ � - - � ' " i - - i ' ' . i - - i I - - � _ � . � � i I � � _ - I - - � ' " � TOTALS MANHOURS: - COST: S 2,031.94 i I � � i i . � Page 2 i , i 3 's � BREMERTON WWTP 8570 " i Change Proposa! - Lump Sum Bas►s Pease Plping � DESCHIP710N: JiVAI.UEI PEASE ISSUE #: 00 7CFlPC CL N WCD 24 RFI; PEASE PIPING LABOR HOURS HOURLY RATE EST. COST Plpe Fitter Foreman 2.0 � 96.56 S 193.13 Plpe Firier � 80.42 S - � Plumber 12.0 $ 80.42 $ 965.05 i PlumberApprenttce 8.0 $ 72.24 S 577.94 i � I TOTAL - Pease Piping Labor • ���36•12 i � PEASE PIPING EOUIPMENT HOURS HOURLY RATE EST. CO3T { Forklift $ 24,54 S ' t Boom Truck $ 73.08 S � Compressor $ 14.3& S - ; Welding Machlne $ 10.34 $ - � fienerator/LlghtPlant $ 12.70 3 • � Laser $ 11.55 $ � TOTAL - Pease Piping Equipment S - i MATERIALAND MAJOR E�UEPMENTSUPPLIEHS EST. COST � $ - - ^� - $ - �' $ i _ TOTAL - Material and Major Equipment Suppliers S - F SUBCONTFiACTORS EST.CQST I �u - S - i - S j TOTAL-Subcontractors g ' # � OENERAL RHLATED COSTS HOURS HOURLY RATE EST. COST � Change Order Pracassing Fee L.ump Sum v� 75.00 I Estimating $ 7b.00 S - ; As-BUllt Drawings 1� 55.00 i T07AL - General Related Cosls S � ! SUBTOTAL • DIRECT 60STS EST. COST ' SUBTOTAI - DIRECT CO3T3 $ 1,736.12 , . OVERHEAD 8� PROFIT @ 15% 5 260.42 • TOTAL - Direct Costs $ 1,996.53 TIME EXTENSION AND RELATED COSTS EST. COST � TIME EX7ENSION RE�UESTED - WORKING DAYS: ' 7 TIM� EXTENSION RE�UESTED - CALENDAR DAYS: CPM ACTNI�Y NUMBERS AFFECTED: , EXTENDED FfELD OVERFiEAD (rate per work day): � VALUE OF EXTENDED FIELD OVERHEA� $ - EXTENDED FIELD OVERHEAD � 15% $ - � SUBTOTAL � ' i PROFIT @ 10% $ ' I TOTAL - Tims Exlenslon and Related Costs S ' � TOTAL CHANGE ORDER REQUEST: � $ 1,996.53 � i This cost proposaf Is basad on the cost elements identifled. Pease & Sons reserves all rights to addlUonal compensation and time extension Tor work elements identified, unless speci(icafiy negolated as part of this Change Propasal. Work vrill proCeed in , accordance with the contract documents until the Owner either provtdes written acceptance of this change proposal or a written � directive to proceed in accordance with ihis propasal. Faflure to accept ihls proposal wlthin the proposal time will result in cost i escafaUon and possibla add�lional delays. � PEASE & SONS DATE SUBMfTTED PROPOSAE. VALID Tll. GORDON PEASE - PROJECT MANAGER Page 1 : CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Twenty Six Page 1 Of 1 ` PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: December 28, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): WAS Piping to RDT's:Modify alignment of WAS piping feeding the two new RDT's to allow relocation of the new polymer injection rings immediately adjacent to each RDT. Wash water Routing: Route wash water to RDT's through adjacent stairwell to avoid routing through wet well. ATTACHMENT(Sj: Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon wil! involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Price ❑ Contractor's Records � Lump Sum ❑ Engineer's Records ❑ Time & Materials ❑ Other: ❑ Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 8,124.32 Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization. are not to be exceeded without further authorization. RECOMMENDED: . AUTHORIZED: CONTRACTOR CITY OF BREMERTON By: By: � ab, FORMS, Work Change Directive, 3-00 i i i ; , ' � 3 BREMERTON WWTP 6570 i Chan e Proposal - Lump Sum Basis . � �� Ref : Sectbn 01250 � Modity WAS piping to ADT's to allow tor relocated polymer tnjectlon rings, added 1lushing 'j DESCRIPTlON: ports, and valves at Rb7's. Also inc(udes cost for routing wash water to RDT's through � adJacent stalrwell to avold routing through wet well. � � WOflK AREA: � COST COp� PEASE fSSUE N: Otivner Chng p WCD 26 FlFI ii � , � PEASE & SONS LABOp HOURS HOURLY RATE EST. COST , i QH U10at Pro�ect Superintendent 4.0 $ 88.21 $ 352.83 j I Carpenter Foreman 0.0 $ 85.56 S - i Carpenter 0.0 $ 79.64 $ - � Laborer 0.0 $ 66.86 $ - ! Miltwright U.0 S 81.38 $ - I � • � TOTAL - Pease & Sons Labor 3g2•83 3 1 pEA3H & SON8 EQUIPMENT HOUAS HOUfiLY RATE EST, COS7 � Folklift 0 S 10.70 $ - I Boom Truck 0 S 22.00 S - 4Gas Monitor 0 S 5.63 S - � ` � Job T�uCk 0 S 9.00 S - ; TOTAL - Pease & Sons Equfpment S ' MA7EHIAL AND MAdOR EQUIPMENT SUPPLIERS EST. COST � � Materials Attached $ 3,127.70 � $ - � - � S i � 70TA1- Material and MaJor Equipment Suppliers S 3,127.70 � SUBCONTHACTORS EST.COSF ' � Pease Piping, lnc. $ 3,200.10 ' . g , 3 - TOTAL - Subcontractors 5 3,200.70 i SUB707AL - DIRECT COSTS (less labor) EST. CO3T SUBTOTAL - DIRECT COSTS § 6,327.80 � BOND & IN5URANCE 1.54'0 § 94.92 � SU9TOTAL $ 8,422.72 OVERHEAD&PROFIT21°h S 1,348.77 , 707AL • Dlrect Costs $ �� � i . ' i 3 � i 12/21/2009 Page 1 of 2 2:58 PM i � ' � � ( i i I � BREMERTON WWTP 8570 � ' � Change Proposal - Lump Sum Basis � Ref : Sectlon 65250 Madlfy WAS plping to RDT's to allow for relocated polymer InJectlon rings, added flushing DESCRIPTION: ports, and valves at RDTs. Also Includes cost for routing wash water to RDT's through ad�aceni stairwell to avofd routing through wet wei[. � � WORK AREA: I CDST COOE PEASE ISSUE H: Ownor Chng R WCD 26 A�� � � f CONTINUED FROMPAQE 10!2 � TIME EXTENSION AND RELATED C0873 E3T. COST , f TIME EXTENSION RE�UESTED - WORKING DAYS: 2 � TIME EXTENSION RE�UESTEO - CALENDAR DAYS: 2 I CPivl ACTMTY NUMBERS AFFECTED: � . � EXTENDED FlELD OVERHEAD (raie per work day): " , 3 I VALUE OF EXTENDED FIELD OVERHEAD ; S - � , HOME OFFICE OVERHEAD, BONDS AND INSURANCE � 16.5?6 S - , i SUBTOTAL g ' i PROFIT p 18% $ ' I TOTAI - Time Exlensfon and Related Costs S - j � � TOTAL CHANGE ORDEFi R�QUEST: $ 8,124.32 � i This coat proposal is based on the cost efements Identified. Pease & Sons reserves ali rights to adddianai compensatfon and time extansion lor work ; elements identiBed, unless soeciBcallv neaotfated as part of this Change Proposel. Work witl proCesd in accordance vrilh the contract documents until Ihe 1 Ovmer either provtdes written ecceptance of this change proposal or a written direcY�ve to proceed in aceoMance with thfs proposal. Failure to acoept this propoeal wilhin the proposal ilme may result in cost escalation and possible addillonal delays. This chenge proposal must be included as an attachment to ' Owner change order. NOTfCE is hereby provided that the Contractor reseroes any and all rigMs to recover dfrect, in�rect, and conse�enUa1 costs, � - including but not Ilmfted to the cosl of dalay and tmpact refated to any work cover by this change or otherwise afFected 6y thls changa unless the cost andlor i time have been speciTicaly included and negoUated. i � 25-DeC-09 04-Jart-10 � . � PEFtSE & SONS DATE SUBMITTEO PROPOSAI. VALID UNTIL I � j i Bryan H1llemann ; Pro]ect Mgr. i , I i � i _ i , � a _ _, � , � ' i ; i , � � 12/2112009 ' Page 2 of 2 2:58 PM i � � � . � 3 i BREMERTON WWTP 8570 i Change Proposal - Lump Sum Basis i � DESCRIPTION: #VALUEI i PEASE ISSUE #: 00 ' Owner Chnc WCD 26 RFI N � �ILL 4F �ATERIALS (Pea�e � Sons) ITEM D�SCRIPTION QTr UNIT OF LABOR MATERIAL I MEASURE UNITS TdTAL UNfT TOTAL f' EA 6" RESILIENT SEAT GATE VALVES 2 EA - � 650.00 1,300.00 EA 6" X 1.5" ROMAC 2D2U SERVICE SADDLE 2 EA - 69.75 139.50 EA 1.5" 318 SS BAI.i. VALVE 2 EA - 134.45 268.90 i EA 1.5" X 3° 316 SS IPS NIPPLE 2 EA " 8�3g �$' ` EA 3,5° X 1' CORE DR1LL 1 �A - 300.�0 300.00 i EA LS 300 S LfNK SEAL 5 FA " 5•45 2�'25 � EA 316 SS NBG 2 � - 112.00 224.00 j EA 6" C3LDi VIC 10C 90 ELBOW _ 2 � - 142.50 285.00 � EA 6" VIC 3i COUPI,ING SS HARDWARE 1 � - 105.00 1d5•00 � FT 1.5" SCH 80 I'VC PIPE 30 LF - 0.70 2�•�0 i EA 1.5° SCH 80 PVC 9Q 4 � - 1,70 6.80 i EA 316 SS UNISTRUT SUPPORTS 6° LONG 10 EA - 35,00 350.00 EA 1.5" 316 SS STURT CLAMPS 10 EA - &.05 &0.50 EA 316 SS 3/8" X 3.25" QU[CK BOLTS 10 EA - 2.30 23.00 I - J i 3 - - 4 � _ - i _ _ i - � i - - I _ i _ i _ � - ' I , " $ - - i _ ( i - " I . - - I : _ I _ - i TOTALS MANHOUHS: - COST: S 3,127.70 j 1 � � Page 2 � � F BREMERTON WWTP 8570 ; Change Proposal - Lump Sum Basis Pease PPping � DESCRIPTION: NVALUEI � PEASE IS9UE #: 00 TCFlPC CL!! WCD 26 RFI: � i PEASE PIPING LABOR HOURS HOURLY RATE E9T. COST E t Pipe Fitler Fareman 16.0 S 96.56 $ 1,645.04 � Plpe FRter $ 80.42 3 - Plumber 10.0 3 80.42 $ 804.21 Plumber Apprentice 6.0 $ 72,24 � 433.45 $ TOTAL- Pease Piping Labor 2,782.70 . PEASE PIPING EDUIPMENT HOURS HOURLY RA7E EST, COST ! Forklifl S 24•54 3 - � Boom Truck S 73.08 S - ; Compressor $ tA.36 $ - � Welding Machine $ 10,34 $ - i Generator / Wght Plant S 12.70 $ - ; Laser $ 11.55 $ TOTAL - Pease Piping Equipment • . S - , � MATERIAL AND MAJOR EQUIPMENT SUPALIERS EST. C08T I Attached S i S - I 5 - � � S - � TOTA� - Mate�isl and Major Equlpment Suppllers S - � SUBCONTRACTORS EST�COS7 i $. - $ � S - � S - TOTAL- Subcontractors S - i GENERAL RELA7ED CO3T8 HOURS HOURLY RATE EST. COST Change Order Processing Fee Lum 3um � 75.00 � Estimatlng $ 75.00 S - ! AS-BuIR Drawings 7 $ 55.00 TOTAI - General Relatad Costs S - � SUBTOTAL • DIRECT COS7S EST. COST I SUBTOTAL - DIRECT COSTS $ 2�782•7� � OVERHEAD & PROFIT C�? 15% $ 417.40 � TOTAL- Direcl Costs S 3,200.10 i TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: � � TIME EXTENSION RE�UESTED - CAI.ENDAR DAYS: j CPM ACTIVITY NUMBERS AFFECT�Q: � EXTENDEI? FIELD OVERHEAD (rate perworkday): ' VALUE OF EXTENDED FIEID OVERHEAD $ � EXTENDED FIELD OVERHEAO @ 15% S - � SUBTOTAL $ - j PROFIT � 10% $ - TOTAL - Time Extension and Related Costs $ - � TOTAL CHANGE ORDER REQUEST: $ 3,20�.10 ; This cost proposai is based on the cost elements identitled. Pease 8 Sons reserves all rights to additionel compensation and time e�Aension tor work elements idenUfled, unless specifically negolated as part of ihis Change Proposal. Work will proceed in accordance with lhe contract documents unGl the Owner eilher provldes �vritten acceptence oi this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal wiihin the proposel time v�ill resuft In cost escafation and posslble i additionel delays. � ; � PEASE & SONS bATE SUBMII`fED PROPOSAL VALID TiL GORDON PEASE • PRO.IECT MANAOEA , i Page 1 CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Twenty Nine Page 1 Of 1 PROJECT: W1NTP Upgrade � Project #: 5020 CONTRACTOR: Pease and Sons Date: August 20, 2009 ` YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): WAS Pump Piping: Suction piping changed from 4" to 6" to allow better flow. Added Polymer Line: Added Polymer line from pump to RDT injection Ring to allow dedicated pump and piping to individual RDT's. WAS piping Gate Valves: Installed owner provided gate valves at WAS Pumps. ATTACHMENT(S): Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Sfandard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Price ❑ Contractor's Records � Lump Sum ❑ Engineer's Records ❑ Time & Materials ❑ Other: ❑ Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 6,357.13 Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization. are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR CITY OF BREMERTON _ ____ � By: By: ab, FORMS, Work Change Directive, 3-00 � . i f I BREMERTON WWTP 8570 � Change Proposal - Lump Sum Basis = i Rei : Section 01250 DE5CRIPTION; Change Was piping trom 4" to 6° to allow better ilow. Added polymer Ilne irom Poly pump to RDT InJectlon ring. Install owner provided gate valves at WAS Pumps. WORK AREA: CO5T GpDE PEASE ISSUE N: Owner Chng # WCb 29 pF� � � i PEASE & SQNS U180R HOURS HOURLY RATE ES7. COST QH 01031 Project Superintendent 4.0 $ 88.21 $ 352.83 Carpenter Foreman 0.0 $ B5.58 S - Carpenter 0.0 $ 79.64 $ - � Laborer 0.0 $ 66.86 S - � MilMnight Q.0 3 81.36 S � , ; S' - TOTAL - Pease & Sons Labor � � I PEASE & SONS E�UlPMENT HOUiiS HOURLY RATE EST. COST � Forkfik 0 $ 16.10 S - , BOOm TfuCk 0 S 22.00 $ - � 4•Gas MonRor 0 S 5•� � ' i Job Truck 0 S 9 $ ' ' � ' T47A1- Pease & Sons Equlpment s ' i MATEAIAL ANC MAJOR EaOIPMENT SUPPLIERS EST. COST MaterialsAttached . $ 2�002•30 ) - � � S - $ - � TOTAL - Material end Major Equipment Supp�ers S 2,002,30 � I SUBCONTRACTORB EST.COST { Pease Piping $ 2,886.80 i � I S - i TOTAL - SubconlraCtors S 2,886.60 ! i SUB70TAl- DIRECT COSTS (less labor) EST. COST ; SUBTOTAL - DIRECT COSTS y 4,888.90 � BOND 8 INSURANCE 1.5% $ 73.33 � SUBTOTAL ' $ 4,96223 � j OVERHEAD & PROFlT 2196 $ 1,042.07 i TOTAI. - DireCt Costs S 6,004.30 � i I � � 12l2112009 Page 1 ot 2 3:43 PM � - k BREMERTQN WWTP 8570 j Change Proposa! - Lump Sum Basis � ; Ref : Section 01250 � DESCRIPTION: Change Was p(ping }rom 4° to 6° to allow better tlow. Added polymer line irom Poly pump to RDT injection ring. Install owner provided gate velves at WAS Pumps. YJORK AREA: COST CQUH PEASE ISSUE k: Ownsr Chng N WCD 29 NF1 k � CONTfNUED FROM PAGE f 0/2 ! TIME EXI'ENSION AND RBLATED CO8T8 EST. COSF i I TIME EXTENSiON RE�UES7ED • WORI4NG DAYS: F 71ME EXTENSION REOUESTED - CALENDAR DAYS: � CPM ACTIVITY NUMBERS AFFECTED: � EXTENDED FIELD OVSRHEAD (rete per work day): ' I VALUE OF EXTEN�ED FIELD OVERHEAD S - � HOME OFFICE OVERHEAD, BONDS AND INSUAAtdCE Q 18.5% $ - � SUBTOTAL $ " � PROFIT Q 10% $ ' TOTAL - Time Extension and Related Costs S - ' � � i TOTAL CNANGE ORD�R REQUEST: $ 6,357.13 I Thls cost proposal is based on the oost elemeMS idenified. Rease & Sons reserves aA rights to add'Aional compenaation end time e�Renslon far work I elemenis identified, unless soecificalN negotlated as part of ihle Ghange Proposal. Work will proceed i� acardance with the conVact documents urnil the I Owner eHher provides wrinen acceptance of this change proposat or a written �rective to proceed in accardance with ihis p�oposal. Failure to accept thts propasal within the proposal time may result in cost escalallon and possible edditional delays. 7his change proposal must be inctudetl as an ettachment to i Owner change order. NOTICE is here6y provided that the Contractor reserves any and a}i rlghta to recover diract, ind'uect, and consequential costs, includmg but not runtted to the cosc of delay and Impact related to any work cover by this change or otheiwise aflected by thls change unless the cost andlor I time have been specitically included end negotiated. � 21-D eo-09 04-J3n-10 � PEA3E & SONS DAT6 SUBMI7TED PROPOSAL VALID UNTIL � 6ryan Hillemann Pro�act Mgr. i i . i i � i i i i � iz�2u2oos � Page 2 of 2 3:43 PM � i , BREMERTON WWTP 8570 . ' I Change Proposal - Lump Sum Basis DESCRIPTION: I�VALUE! j PEASE ISSUE N: 00 Owner Chnc WCD_29 _ RFt !� � - � . � �'�� �F iYl/''���RIQI.�v7 {{°"eaSPr � �7on5, ( ITEM D�SCRIPTION Q�y UNIT OF LABOR MATERIAL i MEASURE UNITS TOTAL UNIT TOTAL � &° GLDI TEE 2 E4 - 195.00 390.00 ; 6" GLDI 8 LF - 62.50 500.00 i VIC Couplings 6" 3 EA - 105.00 315.OD VIC �langes 6" 3 EA - 112.00 338.OD � FT 1.5" SCH 80 PVC PIPE 30 LF - 0.70 21.00 I EA 1.5` SCH 80 PVC 90 4 � • 1,70 6.80 � EA 316 SS UNISTRUT SUPPORTS 6° LONG 10 EA - 35.00 350,00 i EA 1.5° 316 SS STURT CLAMPS 10 � - 6.05 60.50 � EA 316 SS 3/8° X 3.25° QU1CK BOLTS 10 EA - 2.30 23•00 " � _ _ - � � s _ . i `s _ _ I _ — � _ . I � = = 1 - , - - � _ _ � _ _ � _ = i _ _ � . � _ - � - - � - - � _ ; - - � _ _ ; - - � TOTALS MANHOURS: - COST: $ 2,002.30 i i ; { Page 2 � � . �, � I i I BREMERTON WWTP 8570 I Change Proposal - Lump Sum Basls Pease pfpfng � � DESCRIPTION: 11VALUEI � PEASE f93UE #; 00 TCF/pC C!. i� WCD 29 RFI: � I . t PEASE PIPING LABOR HOURS HOUHLY RATE EST. COST ; Pipe Fitter Foreman 16.0 $ 96.56 $ 1,845.04 � Pipe Fitter ' $ 80.42 $ - Plumber 12.0 $ 80.42 $ 985.05 I PlumberApprentice $ 72.24 $ - � $ ' � TOTAL- Pease Pipfng Labor 2,670.09 ' ( PEASE PIPINO EQUIPMHNT HOUR9 HOUqLY RATE EST. COST � F Farklift $ 24.64 $ - Boom Truck $ 73.08 $ - Compressor $ 14,38 $ - , Wetding Maohine $ 10.34 $ - Generator J Light Plant $ 12.70 $ - i leset ' $ 11.55 $ - TOTAL- Pease Plping Equipment � S - � MATBRIAL ANp MAJOR EQUIPMENT SUPPLIERS EBT. COST - $ j � - i, � ' � � i TOTAL- Materlal and Ma�or Equfpment Suppffers S • - � SUBCONTRACTORS EST.COST � S ; s - 1 S ' S S � 70TAL - Subcontractors S • i GENERAL RELATED COSTS HOURS HOURLY RATE EST. COST � Change Order Processing Eee Lump Sum $ 75.00 Estlmating $ 76.00 $ - i As-BUllt Drawings 1$ 55,00 i TOTAL- GenBral Related Cosis S ' - ; f SUBTOTAI- pIRECT COS78 EST. COST ' SUBTOTAL - DIRECT COSTS 5 2,510.09 OVERHEAD 8� PROFIT Q 75°� $ 378.51 TOTAL - Ditect Costs S 2,866.60 j I TIME EXTEtJSfOM AND RELATED COBTS EST. COST j TIME EXTENSION REQUESTED - WORKINa DAYS: � TIME fXTENSION REQUESTED - CALENDAR DAYS: � CPM ACTIVITY NUMBERS AFFECTED: � I EXTENOED �IELO OVERHEAD (rate per work day): � VALUE OF EXTENDED FIELO OVERHEAD $ - � EX7ENDED FIELD OVERHEAD Q 1&% S - SUBTOTAL $ - PROFI7 @ 10% S . � TOTAL - 7fine Extenslon and Related Costa $ - � TOTAL CHANGE ORDER REQUEST: $ 2,886.60 � i � Thfs cost proposal is based on the cost elements identlfied. Pease 8 Sons reserves all rights to addiGonal compensatfon end time ' extenslon for work elements IdentitEed, unless speciHcally negoiated as part of this Change Proposal. Wotk will proceed in accordance with the contract documents untll the Owner either provides written acceptance of this change proposal or a wrilten dlrective to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time will resuft In cosl escalation and possible • additional delays. ' PEASE & SONS DATE SUOMlTTED PROPOSAL VALID TIL � OORDON PEASE - PROJECT MAtJAGER ! Page 1 ` . , ' � CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Thirty Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: August 20, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Pofymer Flow meters: install owner provided polymer flow meters for polymer flow to RDT's. ATTACHMENT(S): Pease and Sons change proposal If a claim is made that the above change{s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Price ❑ Contractor's Records � Lump Sum ❑ Engineer's Records ❑ Time & Materials ❑ Other: ❑ Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 724.54 Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization. , are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR CITY OF BREMERTON _._.--� /� g gy . , ab, FORMS, Work Change Directive, 3-00 BREMERTON W1NTP 8570 Change Proposal - Lump Sum Basis Ref : Section 01250 DESCRIPTION: Install flow meters on polymer lines to RDT's. WORK AREA: COST COOE PEASE ISSUE #: Owner Chng # WCD 30 RFI # PEASE 8 SONS LABOR HOURS HOURLY RATE EST. COST OH 01030 Project Manager 0.0 $ 150 00 $ - OH 01031 Pro�ect Superintendent 1.0 $ 8821 $ 88.21 Projed Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 85 58 $ - Carpenter 0 0 $ 79.64 $ - Laborer 0.0 $ 66.86 $ - Millwright 0.0 $ 81.36 $ - $ TOTAL - Pease 8 Sons Labor 88.21 PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklik 0 $ 10.10 $ - Boom Truck 0 $ 22.00 $ - Torch Kd 0 $ 8.00 $ - Job Truck 0$ 9 00 $ - Compressor 0 $ 11 25 $ - Man Retriever 0 $ 7.t3 $ - Core Drill Machine 0$ 7.33 $ - Ventilation Blower 0 $ 2.50 $ - Duct 0 $ 2.75 $ - Hose (50') Section 0$ 0 88 $ - Rwet Buster 0$ 6 25 $ - TOTAL - Pease & Sons Equipment $ - MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST Materials Attached $ - $ - $ - $ -� TOTAL - Matenal and Ma�or Eqwpment Suppliers $ - SUBCONTRACTORS EST.COST Pease Piping, Inc $ 518 12 $ - $ - TOTAL - Subcontractors $ 518.12 10/20/2009 Page 1 of 2 9•25 PM BREMERTON W1NTP 8570 Change Proposal - Lump Sum Basis Ref : Section 01250 DESCRIPTION: Install flow meters on polymer lines to RDTs. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD 30 RPI # CONTINUED FROM PAGE 1 of 2 SUBTOTAL - DIRECT COSTS (less labor) EST. COST SUBTOTAL - DIRECT COSTS $ 518.12 BOND & INSURANCE 1.5% $ 7 77 SUBTOTAL $ 525.89 OVERHEAD 8 PROFIT 21% $ 110 44 TOTAL - Direct Costs $ 636.33 TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: 0 TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day) VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ - SUBTOTAL $ _ PROFIT � 10% $ _ TOTAL - Time Extension and Related Costs $ - TOTAL CHANGE ORDER REQUEST: $ 724.54 This cost proposal is based on the cost elements identified Pease & Sons reserves all rights to add'Aional compensation and time extension for work elements ident�ed, unless specificallv neqotiated as part of this Change Proposal Work will proceed in accordance with the contract documents uMil the Owner either provides`written acceptance of this change proposal or a written drrective to proceed in accordance with lhis proposal Failure to accept this proposal withm the proposal time may result in cost escalation and possible additional delays This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been speafically included and negotiated 2 03Nov-09 PEASE & SONS DATE SUBMITTED PROPOSAL VALID UNTIL Bryan Hillemann Project Mgr 10/20/2009 Page 2 of 2 925 PM � , BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Pease Piping DESCRIPTION: #VALUE! PEASE ISSUE #: 00 TCFIPC CL # WCD 30 RFI: PEASE PIPING LABOR HOURS HOURLY RATE EST. COST Pipe Fitter Foreman 3.0 $ 96 56 $ 289.69 Pipe Fitter $ 80.42 $ - Plumber 2.0 $ 80.42 $ 160 84 $ - $ TOTAL - Pease Piping Labor 450.54 PEASE PIPING EQUIPMENT HOURS HOURLY RATE EST. COST Forklift $ 24.54 $ - $ - Boom Truck $ 73.08 $ - Compressor $ 14 36 $ - Welding Machine $ 10 34 $ - Generator / Light Plant $ 12.70 $ - Laser $ 11.55 $ TOTAL - Pease Piping Equipment S - MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST $ - $ - $ - $ TOTAL - Material and Major Equipment Suppliers $ - SUBCONTRACTORS EST.COST S - S - $ - S - TOTAL - Subcontractors $ - GENERAL RELATED COSTS HOURS HOURLY RATE EST.COST Change Order Processing Fee Lump Sum $ 75.00 Estimating $ 75.00 $ - AsBwlt Drewings � 1$ 55 00 TOTAL - General Related Costs $ ' - SUBTOTAL - DIRECT COSTS EST. COST SUBTOTAL- DIRECT COSTS $ 450.54 OVERHEAD & PROFIT (� 15% $ 67.58 TOTAL - Dvect Costs $ 518.12 71ME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: 0 TIME EXTENSION REQUESTED - CALENDAR DAYS. CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - EXTENDED FIELD OVERHEAD @ 15% $ - SUBTOTAL $ - PROFIT @ 10% $ TOTAL - Time Extension and Related Costs $ - TOTAL CHANGE ORDER REQUEST: $ 518.12 This cost propasal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements ideMified, unless specifically negoiated as part of this Change Proposal Work will proceed in accordance with the contract documents until the Owner either prowdes written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time will result in cost escalation and possible additional delays. PEASE 8 SONS DATE SUBMITTED PROPOSAL VALID TIL GORDON PEASE - PROJECT MANAGER Page 7 CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Thirty One Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: December 28, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Stair Nosings: Add stair nosings at landing to Thickener Building. ATTACHMENT(S): Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods�of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Price ❑ Contractor's Records � Lump Sum ❑ Engineer's Records ❑ Time & Materials ❑ Other: ❑ Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease} in Contract Times: $ 620.35 Substantial Completion:. 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization. are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR . CITY OF BREMERTON By: By: � � , ab, FORMS, Work Change Directive, 3-00 BREMERTON W1NTP 8570 Chan e Proposal - Lump Sum Basis Ref Section 01250 � DESCRIPTION: Provide and install stair nosings at RDT building steps. WORK AREA: . COST CODE PEASE ISSUE #: Owner Chng # WCD 31 RFI # PEASE 8 SONS LABOR HOURS HOURLY RATE EST. COST OH 01031 Project Superintendent 2 0$ 88.21 $ 176.42 Carpenter Foreman 0 0$ 85 58 $ - Carpenter 3.0 $ 79.64 $ 238 93 Laborer 0.0 $ 66.86 $ - MilNvright 0.0 $ 81.36 $ - $ - TOTAL - Pease 8 Sons Labor 415.35 PEASE 8 SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift 0 $ 10.10 $ - Compressor 0 $ 11.25 $ - Breaker/Hose 0 $ 8.00 $ - Job Truck 2$ 9.00 $ 18 00 TOTAL - Pease & Sons Eqwpment $ 18.00 MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST Materials Attached $ - Stair Nosings $ 148.92 � $ - $ - TOTAL - Material and Ma�or Equipment Suppliers $ 148.92 SUBCONTRACTORS EST.COST $ - $ - $ - TOTAL - Subcontractors $ - SUBTOTAL - DIRECT COSTS (less labor) EST. COST SUBTOTAL - DIRECT COSTS $ 166 92 BOND & INSURANCE 1.5% $ 2 50 SUBTOTAL $ 169.42 OVERHEAD 8 PROFIT 21 % $ 35.58 - TOTAL - Direct Costs $ 205.00 10/20/2009 Page t of 2 10:08 PM BREMERTON 1NWTP 8570 . Change Proposal - Lump Sum Basis Ref : Section 01250 DESCRIPTION: ' Provide and install stair nosings at RDT building steps. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD 31 RFI # CONTINUED FROM PAGE 1 of 2 TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: 0 TIME EXTENSION REQUESTED - CALENDAR DAYS: 0 • CPM ACTIVITY NUMBERS APFECTED. - EXTENDED FIELD OVERHEAD (rate per work day): � VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE (� 16.5% $ - ' SUBTOTAL $ - PROFIT � 10% $ - TOTAL - Time Extension and Related Costs $ - TOTAL CHANGE ORDER REQUEST: $ 620.35 This cost proposal is based on the cost elements ident�ed. Pease & Sons reserves all rights to addRional compensation and time extension for work elements identrfied, unless speaficallv neqotiated as part of this Change Proposal. Work will proceed in accordance wdh the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed �n accordance wfth this proposal. Failure to accept this proposal wkhin the proposal time may result in cost escalation and possible add'Rional delays. This change proposal must be included as an attachment to Owner change order NOTICE is hereby prowded that the Contractor reserves any and ali nghts to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. 20-Oct-09 03-Nov-09 PEASE & SONS DATE SUBMITTED PROPOSAL VALID UNTIL Bryan Hdlemann Projed Mgr. � ' 10/20/2009 Page 2 of 2 10:08 PM CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Thirty Two Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: December 28, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): , Fiberglass Doors & Jambs: Change from hollow metal doors and jambs to fiberglass for corrosion resistance. ATTACHMENT(S): Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Price ❑ Contractor's Records r � Lump Sum ❑ Engineer's Records ❑ Time & Materials Q Other: ❑ Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 2.701.49 Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization. are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR CITY OF BREMERTON By: gy: ..��----_. ab, FORMS, Work Change Directive, 3-00 I BREMERTON W1NTP 8570 � Change Proposal - Lump Sum Basis Ref � Section 01250 DESCRIPTION: Supply and install Fiberglass Doors 8 Jambs in lieu of the specified HM Doors 8 Jambs. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD 32 RFI # PEASE & SONS LABOR HOURS HOURLY RATE EST. COST OH 01030 Project Manager 0.0 $ 150.00 $ - OH 01031 Pro�ect Superintendent 2.0 $' 88.21 $ 176.42 Project Engineer 0 0$ 95.00 $ - ' Carpenter Foreman 0 0$ 85.58 $ - CarpeMer 0.0 $ 79.64 $ - Laborer � 0.0 $ 66.86 $ - � Millwright 0.0 $ 81 36 $ - $ - TOTAL - Pease 8� Sons Labor , 176.42 AEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forkl�t 0 $ 10.10 $ - Boom Truck 0$ 22 00 $ - Torch Kit 0$ S 00 $ - Job Truck 0 $ 9.00 $ - Compressor 0 $ 11.25 $ - Man Retriever 0$ 7 13 $ - ' Core Drdl Machine 0$ 7.33 $ - VenUlation Blower 0 $ 2.50 $ - Duct 0 $ 2.75 $ - Hose (50') Section 0 $ 0.88 $ - Rivet Buster 0 $ 6.25 $ � - TOTAL - Pease & Sons Equipment $ . MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST , Materials Attached , $ _ Benson Door $ 2,056.00 $ - � $ - TOTAL - Material and Ma�or Eqwpment Suppliers $ 2,056.00 SUBCONTRACTORS EST.COST $ - $ - $ - TOTAL - Subcontractors $ . 10/20/2009 Page 1 of 2 8:44 PM BREMERTON W1NTP 8570 Change Proposal - Lump Sum Basis Ref Section 01250 DESCRIPTION: Supply and install Fiberglass Doors & Jambs in lieu of the specified HM Doors & Jambs. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD S2 RFI # CONTINUED FROM PAGE 1 of 2 SUBTOTAL - DIRECT COSTS (less labor) ES7. COST SUBTOTAL - DIRECT COSTS $ 2,056.00 BOND 8 INSURANCE 1.5% $ 30 84 SUBTOTAL $ 2,086.84 OVERHEAD & PROFIT 21% $ 438.24 TOTAL - Dired Costs $ 2,525.08 TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: 0 TIME EXTENSION REQUESTED - CALENDAR DAYS: 0 CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - • HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16 5% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Related Costs $ - TOTAL CHANGE ORDER REQUEST: $ 2,701.49 This cost proposal is based on the cost elements identified. Pease 8 Sons reserves all rights to additional compensation and time eMension for work elements identified, unless spec'rficaliv neaotiated as part of this Change Proposal Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed m accordance wfth this proposal. Fadure to accept this proposal within the proposal time may result in cost escalation and possible additional delays This change proposal must be included as an attachment to Owner change order NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negot�ated. 20 - O ct-09 03Now09 PEASE & SONS DATE SUBMITTED PROPOSAL VALID UNTIL Bryan Hdlemann Pro�ecl Mgr. 10/20/2009 Page 2 of 2 8.44 PM \ � I Bryan Hillemann _ ; n , From: Rick Petitte [rpetitte�a bensonglobal.com]� ! Sent: Wednesday, June 03, 2009 1:10 PM �� j To: Bryan Hillemann ! Subject: RE: 8570 Sremerton WWTP �`� � t � Bryan, I finally received the quote for the Fiberglass Doors & Frames. The total add to the contract to supply Fiberqlass in lieu of Ho11ow A1eta1 will be $2,05b.00. Please be advised ; that the Fiberglass Doors & Frames will have a 7 caeek lead time after all re�urned and ; approved submittals. Let me know if the Fiberglass is accepted if so we caill proceed with F a submittal package. If you have any questions or require additional information please � feel free to contact me. ; Thanks, i Rick Petitte � i -----Original Message-------- From: Bryan Hillemann [mailto:Bryan@Peaseandsons.com] ; Sent: Friday, May 29, 2009 7:06 AM i To: Rick Peta.tte i Subject� RE: 8570 Bremerton LaWTP i � I Thank you Rick. i . � Bryan Hillemann ' Project Manager/ ' Safety & Health Engineer j Pease & Sons, Inc. i 253-531-7700 ` ; cel7. 253�377-5668 � ; -----Original Message----- _ From: Rick Petitte [mailto:rpetitte@bensonglobal.com] ` j Sent: k'riday, D9ay 29, 2009 7:08 AM To: Bryan Hillemann Subject: RE: 8570 Bremerton WWTP Ok T'll get to work on it. i � I Thanks, I Rick ' � -----Original Message----- , ; From: Bryan Hillemann [mai].to:Bryan@Peaseandsons.com] , Sent: Fri.day, May 29, 2009 7:04 Ari , To: Rick Petitte � Subject: RE: 8570 Bremerton WWTP i i i Rick, Yes, that's no problem. � Thank you, ' Bryan Hillemann Projec� Manager/ Safety & Health Enga.neer < Pease & Sons, InC� . 253-531-7700 cell 253-377-566B . 1 , ' k t 1 I � I -----Ora.qinal Message----- � From: Rick Petitte [mailto:rpetitte@bensonglobal.comJ ! Sent: Friday, rsay 29, 2009 6:53 AM � To: Bryan Hillemann � Subject: RE: 8570 Bremerton WWTP i Bryan, I I can quote the doors and frames fiberglass but I have to send it out for a quote so I ! probably wouldn't be able to have a quote to you until Monday or Tuesday of next week. Is I this ok? � f Thanks, i Rick Petitte � i F -----Original Message----- � From: Bryan Hi7.].emann [mailto:Bryan@Peaseandsons.cam] � Sent: Thursday, May 28, 2009 9:05 PM I To: Rick Petitte Cc: Ray Parks; Maureen Morrow — ; Subject: RE:8570 Bremerton WWTP I Rick, • These came up at the owners meeting yesterday for this project. i . � They asked the question yesterday i£ we could change,the materials of construction from HM ; doors and jambs to fiberglass? j , � They have some concerns over the HM rusting out over time. 5Je don't have a spec, of ; course, so I'm not sure if this is something you can quote? i Please let me know if you can put something together on these with a cut sheet on what you I v�ould propose for materia].s of construction. Or if you do need a spec to quote to, p].ease let me know as ��ell. . � I � Thank you very much, � � } Bryan Hillemann I Project hianager/ Safety & Health Engineer Pease & Sons, Inc. , 253-531-7700 cell 253-377-5666 ; --Original riessage----- ' From: Rick Petitte [mailto:rpetitte@bensonglobal.com] j Sent: Friday, May 22, 2009 10:21 AA1 � To: Bryan Hillemann � Subject: Bremerton WWTP � � Bryan, � Attached is the hardware schedule page for the single door, if you need anything else let ; me knota. ; Thanks agaa.n, j Rick Petitte � i � I z. � CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Thirty Three Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: August 20, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Polymer Check Valves: Install check valves on each polymer line to stop backflow of sludge into polymer lines. ATTACHMENT(S): � Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. . Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Price ❑ Contractor's Records � Lump Sum ❑ Engineer's Records ❑ Time & Materials ❑ Other: ❑ Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 588.15 Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization. are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR CITY OF BREMERTON B • By: .� . ab, FORMS, Work Change Directive, 3-00 BREMERTON WWTP 85?0 Change Proposal - Lump Sum Basis r Ref : Section 01250 DESCRIPTION: Install Polymer check valves at RDT's to prevent backflow of sludge into polymer lines. WORK AREA: - COST CODE PEASE ISSUE #: Owner Chng # WCD 33 ' RFI # � PEASE 8� SONS LABOR HOURS HOURLY RATE EST. COST OH 01030 Pro�ect Manager 0.0 $ 150 00 $ - OH 01031 Pro�ed Superintendent 1 0$ 88.21 $ 88.21 Pro�ect Engineer 0 0$ 95.00 $ - Carpenter Foreman 0.0 $ 85.58 $ - Carpenter 0.0 $ 79 64 $ - Laborer 0.0 $ 66 86 $ - Millwright 0 0 $ 81.36 $ - $ - TOTAL - Pease & Sons Labor 88.27 PEASE 8 SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift 0 $ 10.10 $ - Boom Truck 0$ 22 00 $ - Torch Kit 0$ 8 00 $ - Job Truck 0 $ 9.00 $ - Compressor 0 $ 1125 $ - Man Retriever 0 $ 7.13 $ - Core Drill Machme 0$ 7 33 $ - Ventilation Blower 0$ 2 50 $ - Duct 0 $ 2.75 $ - Hose (50') Section 0 $ 0.88 $ - Rivet Buster 0 $ 6.25 $ - TOTAL - Pease & Sons Eqwpment $ _ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST Materials Attached g _ $ - $ _ $ - TOTAL - Matenal and Ma�or Equipment Suppliers $ _ SUBCONTRACTORS EST.COST Pease Piping, Inc. g 407 07 $ - $ - TOTAL - Subcontractors $ qp7,p� 10/20/2009 Page 1 of 2 9:20 PM BREMERTON 1NWTP 8570 Change Proposal - Lump Sum Basis � ' Ref : Sedian 01250 DESCRIPTION: Install Polymer check valves at RDTs to prevent backflow of sludge into polymer lines. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD 33 RFI # CONTINUED FROM PAGE 1 of 2 ' SUBTOTAL - DIRECT COSTS (less labor) — EST. COST SUBTOTAL - DIRECT COSTS $ 407 07 - BOND & INSURANCE 1.5% $ 6 11 SUBTOTAL $ 413.18 OVERHEAD & PROFIT 21 % $ 86.77 TOTAL - Direct Costs $ 499.94 TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: 0 TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: � EXTENDED FIELD OVERHEAD (rate per work day)� VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE � 16 5% $ - SUBTOTAL $ - PROFIT � 10% $• - , TOTAL - Time Extension and Related Costs $ - TOTAL CHANGE ORDER REQUEST: $ 588.15 This cost proposal is based on the cost elements ident�ed. Pease 8 Sons reserves ali nghts to additional compensation and time extension for work elements identified, unless specificallv neaotiated as part of this Change Proposal. Work wnll proceed in accordance wdh th�e contract documents until the Owner edher prowdes written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time may resuk in cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and ali nghts to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affeeted by this change unless the cost and/or time have been specifically mcluded and negotiated. � 20-Oct-09 03-Nov-09 PEASE & SONS _ DATE SUBMITTED PROPOSAL VALID UNTIL Bryan Hillemann Project Mgr. - 10/20/2009 Page 2 of 2 9:20 PM BREMERTON W1NTP 8570 Change Proposal - Lump Sum Basis Pease Piping , DESCRIPTION: #VALUE! PEASE ISSUE #: 00 TCFIPC CL # WCD 33 RFI: PEASE PIPING LABOR HOURS HOURLY RATE EST. COST Pipe Fitter Foreman 2 0$ 96.56 $ 193.13 Pipe Fitter $ 80.42 $ - Plumber 2 0$ 80.42 $ 160.84 $ - $ - TOTAL - Pease Piping Labor 353.97 PEASE PIPINCa EQUIPMENT HOURS HOURLY RATE EST. COST Forklift $ 24.54 $ - . $ - Boom Truck $ 73 08 $ - Compressor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator / Light Plant $ 12.70 $ - Laser $ 11.55 $ TOTAL - Pease Piping Equipment b - MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST $ - $ - $ - S TOTAL - Matenal and Ma�or Eqwpment Suppliers S - SUBCONTRACTORS EST.COST $ - $ - ' $ - $ _ TOTAL - Subcontradors $ _ GENERAL RELATED COSTS HOURS HOURLY RATE EST.COST Change Order Processing Fee Lump Sum $ 75.00 Estimating $ 75.00 $ - AsBuilt Drawings 1 $ 55.00 TOTAL - General Related Costs $ . SUBTOTAL•DIRECT COSTS EST.COST SUBTOTAL - DIRECT COSTS $ 353.97 OVERHEAD & PROFIT � 15% ', $ 53 10 TOTAL - Direct Casts $ 407.p7 T1ME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: 0 TIME EXTENSION REQUESTED - CALENDAR DAYS CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day). VALUE OF EXTENDED FIELD OVERHEAD $ _ EXTENDED FIELD OVERHEAD @ 15% $ _ - SUBTOTAL g _ PROFIT � 10% $ _ TOTAL - Time Extension and Related Costs $ . TOTAL CHANGE ORDER REQUEST: $ 407.07 This cost proposal is based on the cost elements identified. Pease 8 Sons reserves all rights to additional compensation and time extension for work elements identified, unless specifically negoiated as part of this Change Proposal Work will proceed in accordance with the coMract documents unttl the Owner either prowdes written acceptance of this change proposal or a written direchve to proceed in accordance with this proposal Failure to accept this proposal within the proposal time will result in cost escalation and possibfe additional delays PEASE 8 SONS DATE SUBMITTED PROPOSAL VALID TIL GORDON PEASE - PROJECT MANAGER Page 1 CITY OF BREMERTON , WORK CHANGE DIRECTIVE WCD#: Thirty Four Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: August 20, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): OA Duct to Centrifuge: Modify OA duct to Centrifuge andadd SS fume hood over Centrate sump. ATTACHMENT(S): Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Price ❑ Contractor's Records � Lump Sum ❑ Engineer's Records ❑ Time & Materials ❑ Other: ❑ Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 4,863.65 ' Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization. are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR CITY OF BREMERTON By: By: � ab, FORMS, Work Change Directive, 3-00 i i • i BREMERTON WWTP 8570 . Change Proposa► - Lump Sum Basls Re( : Section 0125U � DESCRIPTION: Pravlde and Install SS hood at centrituge for OA connection per RFI 51 & reroute FRP duct i through sldewall in Ileu of slab penetration. WORK AREA: ! COS7 CODE P�ASE ESSGE q: Owner Chng N WCD 34 fiFl R i I PEA9E & SONS IABOR HOURS HOURLY RAT6 EST. COS7 � Oti 01o3t ProJect Superintendent 2•0 S 8821 3 176.42 ; I Carpenter Foreman 0.0 3 85.58 $ - i Carperter 0.0 $ 79.sa $ - i Laharer 0.0 $ 66.86 $ - � MillwrigM 0.0 $ 87.38 $ - ' I S - I I TOTAL - Pease & Sona Labor 176.42 � , � PEASE & SONS EAUIPMENT HOURS HOURLY RATE EST. COST � I FOritl�t 0 S 10.10 $ ' � Compressor 0$ 11.25 5 - S 8reaker/Hose 0 3 a oo � - j Job Tiuck 0 $ 9.00 $ - ' ? TOTAL - Pease & Sons Equfpment g ' i . � MATERIAL AND MAJOR �QUIPMENT SUPPLIERS H3T. COST i Materials Attached S - I S - $ I . i . $ - � TOTAL - MateriaF and Ma�or Equipment SuppCiers S - • i SUBCONTRACTORS EST.COST i Miller Sheet Metal $ 3,001.50 � Peninsuta Sawing & Driliing S 8i5.00 ; S - � 70TAL - Suboontractore S 3,H16.50 i i SUBTOTAL- DIREC7 COSTS pess labor) ES7. COST SUBTOTAL - DIRECT COS7S $ 3,816.50 ' BOMD & INSURANCE 1.5% $ 57.25 SUBTOTA� $ 3,873.75 � OVERHEAD 8 PROFlT 21% $ 813.49 � 70TAL - Direct Costs S 4,687.23 ' I i i 12I21/2069 Page t ot 2 4;D0 PM � i ( BREMERTON WWTP 8570 Chan e Proposal - Lump Sum Basls Ret : Section Oi 250 ' � � DESCRIpTION: Provlde and instali SS hood at centrituqe tor OA connection per AFI 51 & reroute FRP duct � through sidewall In I{eu of slab penetration. i { WORK AREA: CQST GOf]E PEAS� ISSUE Y: Owner Chng � WCq 34 RFI M I i I CONTfNUEO fHObf PAQE i o12 ' TIME EXTENSION AND RELATED CO37S EST. CO87 I TIME EXTENSION REQUESTED - WORKINO DAYS: � � TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVIN NUMBERS AFF£CTED: � I IXTENDED FIELD OVERHEAD (rate per work day}: j VALUE OF EXTENDED FIELD OVERHEAO $ - j HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5%, 5 - I SUBTOTAL S - I PROFIT � 10% S - � , j TOTAL - Time Extension and Related Costs 5 • € TOTAL CNANGE OROER REQUEST: $ 4,863.65 � i � This cost proposal is based on the cost elemenis ident�ed. Pease & Sons reserves all rights to add'Aional compensaYwn and ame exlension tor v�ork i elements IdeMifled, unless aoecficaliy neootiated as part of ihis Change Proposai. Work wiil procead tn accordance with Ihe oontrect documents unGl the � Owner eilher provfdes written accepcance of this change proposal or a wririen direclive to proceed in accordance wiU� thfs proposal. Failure ro accept lhis ; proposal wkhln the proposal time may result in cast escalatbn and possible add'Akonal da�ays. This change praposal must be included as an attachment to I Owner changa order. NOTICE is hereby provided tltet the CanUactor reserves eny and all rights lo recover direct, indteM, and consequential costs, includ'mg but not fimtted to the cost ot defey and impact related to any work cover by this change or otherwise aHected by this change unless the cost and/or i Gme have been spediicaly included and negotfated. � 21-Dec-0 04-Jan-70 j PEASE & SONS DATE SUBMITTED PROPOSAL VALID UMIL I � Bryan Hillemann � Pro�ed Mgr. � I , � , ; 1 ; I � � �2u2aos Page 2 of 2 4:00 PM ; . � � � � ,. - I � �J1 �� �%� ,.- - -.� ' � 5'70 � �� � ! ; � � � � . �_ d i , �� ���'��oa�� � . ������� ��9�2�� � lFa. # �ILLE31 153MT I 1642 tVavy Yard � W. cusro }.tEfiSOflOERh'O. �ATEORDEREU ' ' Bremerton, WiA 98 12 7 —(o p � (3�9) 47� •17.�' OAUE TAiCEN BY OAT6PROt/iSEO � A,�,L a _ � . �? o P.�,. ? � BILI. TO PH��E � P� � ,ati� �,Ns � AD S$ � A � j�� AIECHANIC F �� � ��� HELPER i � �I � 0�! ' JO NAMHANDLOCAT N � ❑ D�Y WoRIC I r i ❑ corrrrucr DESCRIPTION OF WOAK ❑ eun+n ���s: ❑ co� ��rt�o.:����/�� ��T���io� - � ' OUAPIT. �SCRIPYIONOFMATERIAWSED PRICE AfAOUNT � � c�- i � 3�� � .�77 � �s � b , ' � � �l�t� <1�. �1 Z��t � `� � ,, ; 1�O � s,5, )-4 C�ri c� � � i ICCT ' ° 5 � c' � � GUi'1 �(` �rJ� , , Z � Z . $ � • Z � � � e ■ ; I S, o� �" X' �"�� 1 a���r�_ z% �°? � �� g`� �''�� i 00��(7,�cK. i�r�r�:��f�� �/�' � �_ i r � p � / n ; / � � �'/N � �11lGI'G�r/t6(S d d� . I �!� ' n .vU L� :� � � �U � � � i i �''�.tr��l��'. �.. , ���� � !`d�)'�t �' r:� Lfl�lt� � � I�._ � - ,. �--_�y.�... � � _. _ �..,.�.._M i �"__-�`''i�_ e? t����'��`�, �����,. J `-' ' - • _ , � J • ','l : _. .- ., - .....�... ; r aa�.��i"c�;ri{�� - - -- , � i 1�/e95 ItdTE�€SY WILL 6S CFIARGE� AN PASY DUE ACCOUNYS i HOURS 1A80R AMOUNT TOTAL � MECHANICS Q MATERIALS ,( ��� ��'] i TOTAL / � HELPERS � LABOR ��1.� ' �r��a� Z 9l� �� � , � I hereby acknavledge the satisiactory TOYAL LABOR ; completbn o f the ahove de v:ork. SIGNATUR[ DATE COMPI.ETEU �/��� - i �� � - I � a'���� °° l �� �� � � i , , � ' z } Bryan Hillemann � � ' , - I From: iVed l.ever [Ned.Lever@ci.bremerton.wa.us} i Sent: Friday, October 23, 2009 9:56 AM To: Bryan Hillemann Cc: Ray Parks; Maureen Morrow; Patric Coxon; ,lohn Bykonen; Timothy Hughes � Subject: RE: Bremerton RFI 051 (mod'rfication} ! � i �-�� � � � � Lets move forwaxd with getting this installed. , I � � � Ned Lever, P.E. � � i Project Manager � Direct (360) 473-2398 Fax (360) 473-5398 i ned.lever@ci.bremerton.�oa.us . I i -----Original Alessage----- ? From: Bryan Hillemann (mailto:Bryan@Peaseandsons.com] � Sent: Friday, October 23, 2009 8:53 AM � To: Ned Lever Cc: Ray Parks; Alaureen Morro4r Subject: �'W: Bremerton RFI 051 (moditication) ' Importance: High � ' Ned, � Actually it's higher than I had indicated to you. I thought it was $2069, it their price i ,is $2690. I apologize, it must have been my dyslexia kicking in. � Please give me a call to discuss if necessary. i Thank you very much, � i i Bryan G. Ha.7.].emann � Safety & Health Engineer/ ' Pzoject Manager • I Pease & Sons, Inc. I bryan@peaseandsons.com ! 253-531-7700 � cell 253-377-5668 , -------O.riginal Message-�---- � From: Fred Price [mailto:fredmsm@comcast.net] ; Sent: Friday, October 23, 2009 8:20 AM Ta: Bryan Ha.J.lemann ' Cc: Peter Harris; Ray Parks ' Subject: RE: Bremerton RFI 051 (modification) i � Bryan, we can field verify, measure, fabricate, and install �he hood for � total: $ 2690.00. Expect six working days total to compie�e this portion of work. ; _ ; The work can proceed direct].y following your approval, at which time we can investigate � the remainder of the work for materials, routing of cannecting ductwor3c, and supports. � I hope that you will find this pricing favorable so far, and we look forward to working ! �aith you guys . i Thanks, let me kno�v. Fred Price � ' � Estimator/Project rSanager ' Miller Sheetmetal, Tnc. . ' 1 / i I I p (360) 479-1737 _ i f (360} 373-5529 -----Original Message----- � From: Bryan Hillemann [mailto:Bryan@Peaseandsons.comj ` Sent: Thursday, October 22, 2009 5:06 PM �, To: Fred Price j Cc: Ray Parks ' Subject: FW: Bremerton RFI 051 (moda.fa.cation) 'j Importance:,High ; Fred, � Attached are some details of work we're doing at the Bremerton WWTP. i I I have a long story to go along with this if you could give me a call to discuss as soon i as you get a chance. 253-377-5668. � 2'm essentially looking for cost to supply/install the hood identified on sheet 3 of the � attachment, and installation of some FRP duct that goes along with this. t I'll talk to you soon. Thank you, � Bryan xillemann Project Manager/ � Safety & Health Engineer , Pease & Sons, Tnc. • � 253-531-7700 cell 253-377-5668 � � � From: Timothy Hughes [mailto:Timothy.Hughes@ci.bremerton.wa.us] � Sent: Wednesday, July 15, 2009 1.0:00 AM � To: Ned Lever Cc: Cara.LOCkrem@CH2M.bom; itay Parks; Bryan Hillemann; Patric Coxon Subject: RE: Bremerton RFI 051 (modifi.cation} i � Ned, here is the modifications made to RFI 051 as reques�ed. Attached are 3 sheets showing � routing of the 8" PVC ventilation duct and fabrication detail of �he stainless steel hood ; that will mount above the centrifuge sump as requested by Pat Coxen. Please review and '; address any questions or concerns. Cara, please revise existing RFI 051 to incJ.ude the attached sketches and note that the City's "regly" to �he RFI was also revised. I Thanks, Tim j i From: Ned I,ever ; Sent: Monday, July 13, 2009 3:11 PM ! To: Timothy Hughes . Cc: 'Cara.I,ockrem@CH2M.com' i Subject: FW: Bremerton RFI 051 for ok to ze�urn � Importance: High � � , I Tim, please take a look at this and modify to reflect the agreement with the contractor. I T.E. single drop with a hood and using PVC pipe off of the initial tee. Once you have ; revised the response please return it to me and I will send it off to Cara. � I Ned Lever, P.E. � Project Manager � Direct (360) 473--2398 Fax (360) 473-5398 � Z i . I . � ned.lever@ci.bremerton.wa.us � � i � From: Cara.Lockrem@CH2M.com [mailto:Cara.Lockrem@CH2M.com] � Sent: Monday, July 13, 2009 2:J.9 PM ; To: Ned Lever i Cc: Kathryn Kelleigh , i Subject: Bremerton RFI 051 for ok to return ; Importance: High � I � Thank you! � � -Cara ' i � . I . - � , ; i , ? , ; � I I � ' I , . ' 1 . j I i i i - � i . ; ; � i i __ ! � � � ; 3 , CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Thirty Five Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: August 20, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Demolition Changes: Added scope to demolition at Thickener Building, to include; Demo and wall patch associated with beach, saw cutting wall to level new building, and patching wall penetrations from existing or previously demolished equipment. ATTACHMENT(S): Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. � Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Price . ❑ Contractor's Records � Lump Sum ❑ Engineer's Records ❑ Time & Materials ❑ Other: ❑ Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 3,752.83 Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization. are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: � CONTRACTOR CITY OF BREMERTON By: By: � � ab, FORMS, Work Change Directive, 3-00 BREMERTON VWVTP 8570 Change Proposal - Lump Sum Basis Ref : Section 01250 DESCRIPTION: Demo and patch wall associated with beach, saw cut wall to level new RDT building, patch penetrations from previously demolished equipment. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD 35 RFI # PEASE & SONS LABOR HOURS HOURLY RATE EST. COST OH 01030 Projed Manager 0 0$ 150 00 $ - OH 01031 Project Superintendent 4 0$ 88.21 $ 352 83 " Pro�ect Engmeer 0.0 $ 95.00 $ - Carpenter Foreman 13.0 $ 85 58 $ 1,112.52 Carpenter 19 0$ 79.64 $ 1,513 25 Laborer 0 0$ 66 86 $ - Millwright 0.0 $ 81.36 $ - $ - TOTAL - Pease & Sons Labor 2,878.60 PEASE 8 SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklrft 4$ 10 10 $ 40 40 Boom Truck 5$ 22.00 $ 110.00 � Torch Kit 10 $ 8.00 $ 80 00 Job Truck 0 $ 9.00 $ - Compressor 0 $ 11.25 $ - Man Retriever 0 $ 7.13 $ - Core Drdl Machine 0$ 7 33 $ - Ventilation Blower 0$ 2 50 $ - Duct 0 $ 2 75 $ - Hose (50') Section 0 $ 0.88 $ - Rivet Buster 0 $ 6.25 $ - TOTAL - Pease & Sons Equipment $ 230.40 MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST Matenals Attached $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ - SUBCONTRACTORS EST.COST Cascade (Wall Patch) $ 400 00 $ - $ - TOTAL - Subcontractors $ 400.00 10/20I2009 Page 1 of 2 837 PM I BREMERTON 1NWTP 8570 � Change Proposal - Lump Sum Basis Ref : Section 01250 DESCRIPTION: Demo and patch wall associated with beach, saw cut wall to level new RDT building, patch penetrations from previously demolished equipment. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD 35 RFI # - CONTINUED FROM PAGE 1 of 2 SUBTOTAL - DIRECT COSTS pess labor) EST. COST SUBTOTAL - DIRECT COSTS $ 630.40 BOND & INSURANCE 1.5% $ 9.46 . SUBTOTAL $ g3g,gg OVERHEAD & PROFIT 21% $ 134 37 TOTAL - Direct Costs $ 774.23 TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS 0 TIME EXTENSION REQUESTED - CALENDAR DAYS: 0 � CPM ACTIVITY NUMBERS AFFECTED , EXTENDED FIELD OVERHEAD (rate per work day). � VALUE OF EXTENDED FIELD OVERHEAD $ - ` HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ - SUBTOTAL $ , _ PROFIT @ 10% $ _ TOTAL - Time Extension and Related Costs $ - ' TOTAL CHANGE ORDER REQUEST: $ 3,752.83 This cost proposal is based on the cost elements identrfied. Pease 8 Sons reserves all rights to addrtional compensation and time extension for work elemeMs identified, unless specificallv neaotiated as part of this Change Proposal Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance wRh this proposal Failure to accept this proposal within the proposal time may resuR m cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change order NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indireet, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been speafically included and negotiated 2 0- O ct-09 03-Nov-09 PEASE 8 SONS DATE SUBMITTED PROPOSAL VALID UNTIL - Bryan Hillemann � Project Mgr. � . 10/20/2009 Page 2 of 2 8.37 PM CITY OF BREMERTON WORK CHANGE DIRECTlVE WCD#: Thirty Six Page 1 Of 1 PROJECT: WWTP Upgrade � Project #: 5020 CONTRACTOR: Pease and Sons Date: August 20, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): TWAS Valves: Install (2) owner provided valves on TWAS discharge piping. ATTACHMENT(S): Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Price ❑ Contractor's Records � Lump Sum ❑ Engineer's Records ❑ Time & Materials ❑ Other: ❑ Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 2,277.13 Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization. are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR CITY OF BREMERTON By: By: ab, FORMS, Work Change Directive, 3-00 . � I BRE�AERTON WWTP 8570 � Chan e Proposa! - Lump Sum BasPs � Ref : Section 01250 I DESCRIPTION: Install (2) owner provided valves at 7WAS. � ' WORK AREA: CbS7 CODE PBASE I5SUE #: Owner Chng N WCD 36 RFl N PEl►SE & SONS LABOF2 HOURS HOURIY RATE EST. COST OH 01031 Project Superintendent 1.0 3 88.21 S 88•21 � Carpenter Foreman 0.0 $ 85.58 S - � � Carpenter 0.0 $ 79.sM1 S - i Laborer 0.0 'S 88.86 $ - � Milh+night 0,0 S 81.36 $ - � , " ' $ ' j TOTAL - Peass & Sons Labor 8821 � i PEASf & SONS EOUlPMENT HOUqS IiOl7RLY RATE EST. COST i Forklift 0 S 10.10 $ - , Boom Truck 0$ 22.00 S - ' 4-Gas Mankor 0$ 5.83 $ - � � Job Ttuck f$ 9.00 S 9.00 i TOTAL • Peass & Sons Equlpment S 9,�d i MATBRIAL AND MAJOR EQUIPMENT SUPPLIER9 � EST. COST , Mater(als Attached 5 - � $ - ? S - i S - j TOTAL - Material and Ma�or Equipment 3uppfiers S - � SUBCONTRACTORS EST.COS7 • a pease Piping, Inc. $ 1,773.29 i $ - i g i TOTAL - Suhcontraciors S 1.773.29 I I i SUB70TAL - DIAECT COSTS (less labor) EST. COST SUBTOTAL - DIRECT COSTS $ 1,782,29 ; � BOND & INSURANCE 1.5% $ 26.73 SUBTOTA� S 1,809.02 OVERHEAD & PROFIT 2t°o 3 379.90 i TO7AL - Direct Costs S Z��se•92 ; I . i ; i � � 2�2u2oos Page 1 of 2 4:06 PM I I BREMERTON 1NWTP 8570 Change Proposal - Lump Sum Bas/s Ref : Seclion 01250 I E DESCAIPTION: Install {2y owner provided valves at TWAS. i , i WORK AREA: � COST CODE PEASE ISSUE �: O�vner Chng N WCD 36 (tFl 11 � i � CONTlNUED FROMPAGE 1 0/2 I TIM6 EXTENSION AND RELATED COSTS EST. C4S7 ( TIME EXTENSION RE�UESTED - WORKING DAYS: 2 ! � TIME EXTENSION REQUE3T�D - CALENDAR DAYS: � CPM ACTNITY NUMBERS AFFEC7ED: ! , EXTENDED FIELO OVERFiEAD (rate per work day): i VALUE OF EXTENDED FVELD OVERNEAD $ - I HOME O�FICE OVERHEAD, BONDS AND INSURANCE @ 36.5% 3 - SUBTOTAL S - PROFIT Q f0% $ - TOTAL - Time Extension and Related Cosis � S - � t i TOTAL CHANGE ORDER AEQUES7: $ 2,277.13 This cost proposai ts based on the cost efements identifled. Pease & Sons reserves aA rights to addNional compensatlon and time extenslon for work � elements identifled, unless suacificalN neaotlated as part of this Change Proposal. Work wili proceed In accordance with the contract documents until the � Owner elther provides wrftten acceptance of this change proposal or e written directive to proceed In accordance with this proposal. Failure to accept this proposal within the proposel time may resuR In cost essalaUOn and possibla add�Eonal delays. This change proposal must be included as en ettachment io Owner change order. NOTICE Is hereby provided that the Contractor reserves any and ail rights to recover direct, indirect, and consequentiaE costs, , I • frtciuding but not limited to the cost of delay and impact related to any work cover 6y this change or othenvtss affected by this change unless the cost and/or time have been speciBcany included and negoUated. 21-Dec-09 04,1an-10 PEASE 8 SONS DATE SUBMITTEO PROPOSAL VALID UN71L � I i Bryan HlAemann � Pro�ect Mqr. ' I _ i � i � . ` i � i � I � � 12/21/2009 Page 2 of 2 4:06 PM BREMERTON WWTP 8570 . � Change Proposa! - Lump Sum Basls Pease Piping � DESCRIPTION; #VALUHI PEASE iSSUE 1!; 00 7CF/PC CL !! WCD 36 RFi: � PEASE PIPING LABOR HOURS HOURLY RA7E EST. COST ( Pipe Fitter Foreman 2.0 $ 96.56 $ 193.13 � Pipe Fltler $ 80.42 $ - � Piumber 5.0 S 80.42 $ 402.10 � Plumber%lpprentice 5.0 $ 72.2a $ 361.21 . • $ 70TAL - F'ease Piping Labor 956.44 PEASE PIP1N0 EQUIPMENT HOURS HOURLY RATf EST, COST Forklift $ 24.54 �u - � Boortl TfUCk 5 73.08 $ i Compressor � 14.36 $ - ' Welding Machlna $ 10.34 $ - . Qenerator / Light Plant S 12.70 S - ( Laser S 11.55 S TOTAL - Pease Piping Equlpment S - MATERIAL ANP MAJOR EQUIPMENT SUPPLIERS EST. CO5T Attached S 685.55 � S - S - � $ ' TOTAL - Material and MaJor Equipment Suppfiers S 585.65 SUBCONTRACTORS EST.COS7 $ - • $ - $ - $ 707A1. - Subcontractore S • � QENERAL RELATED COSTS HOURS HOURLY RATE EST. COST � Change Order Processing Fee Lum Sum $ 7b.00 ? EstlmaUng $ 7b.00 S - As-Bullt Drawings 1$ 66.00 � TOTAL - Cieneral Related Costs � ' I � SUBTOTAL • DIRECT COSTS EST. COST � SUBTOTAL - DIRECT COSTS 3 t,b41.89 ! OVERHEAD & PROFIT @ 15°r6 S 231.30 I TOTAL • Direct Costs $ � ���3•29 � i TIME EXTENSION AND RELA7ED COSTS ESF. COS7 i 71ME EXTENSION REQUES7ED - WORKINO DAYS: # TIME EXTENSION REQUE3TED - CALENDAR DAY3: CPM ACTNITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEP,D (rale per work day}; � VALl1E OF EXTENDED FIEID OVERHEAD $ - ; EXTENDED FIELD OVERHEAD @ 15°,6 5 - � SUBTOTAL 5 ' � PROFIT Q 10% S � TOTAL - Time Extension and Related Cos1s S - j TOTAL CHANGE ORDER REQUEST: $ 1,773.29 ; This cost proposal Is based on the cost elemenis idenUfed, Pease & Sons reserves all rights to additional compensatfon and time exlenslon for work elemenls Identitied, unless specilically negofated as part of this Change ProposaE. Work wlll proceed in , accordance �vith the contract documents until the Owner either provides wr[tten acceplance of this change proposal or a written � dlrective to proceed In accordance wilh this proposal. Failure to accept thls proposal v�ithin the proposal ttme will result in cost escalalion and possible addilional delays. PEASE & SONS DATE SUBMITTED PROPOSAL VALID TIL ' GORDON PEASE • PROJECT MANAGER Page 1 . � � , � . ; _ BREAAERTON WWTP 8570 , � Change Proposal - Lump Sum Basis � ! � ; DESCRIPTION: �/VALUEI ? ' PEASE MOp N0: 00 TCF/PC CL � WCD 36 RFI: ' ; �ILL �F MA1'E�IALS (Pease Piping) � ITENi DESCRIPTION QTY, UNIT OF LAB�R MATERIAL • MEASURE UNITS TOTAL UM1fIT TOTAL � 4° 341 VIC Flanges 3 ea - 94.81 284.43 316 SS Bolts/Nuts 5/8X3 32 ea - 5,37 171.64 4" GLDI 4 If - 32.32 129.28 I - ' � s • _ i - f � _ - , � - - f � - - I _ - I . � - � _ - � i _ -, , - - I , _ � _ � ' - - � i _ _ � TOTALS MANHOURS: - COST: $ 585.55 � � . ; , i � i Page 2 ; CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Thirty Seven Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: August 20, 2009 . YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Boiler Pad: Demo and replace existing boiler pad. ATTAGHMENT(S): Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the' General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Price ❑ Contractor's Records � Lump Sum ❑ Engineer's Records ❑ Time & Materials ❑ Other: ❑ Other: _ Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 1,983.18 Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization. are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR ` CITY OF BREMERTON By: By: .� ab, FORMS, Work Change Directive, 3-00 BREMERTON VWVTP 8570 Change Proposal - Lump Sum Basis Ref Section 01250 DESCRIPTION: Remove and replace existing boiler housekeeping pad. Does not include cost for Natural Gas to operate temporary boiler while this work is pertormed. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD 37 RFt # PEASE 8 SONS LABOR HOURS HOURLY RATE EST. COST OH 01030 Pro�ed Manager 0.0 $ 750.00 $ - OH 01051 Project Superintendent 4.0 $ 88 21 $ 352.83 Projed Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 85.58 $ - Carpenter 10 0$ 79.64 $ 796.45 Laborer 9 0$ 66.86 $ 601 72 Millwright 0.0 $ 81.36 $ - $ - TOTAL - Pease & Sons Labor 1,751.00 PEASE 8 SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklrft 0 $ 10.10 $ - Boom Truck 0 $ 22.00 $ - 4Gas Mondor 0 $ 5.63 $ - Job Truck 0 $ 9.00 $ - Compressor 0 $ 11.25 $ - Man Retnever 0$ 7 13 $ - Core Drill Mach�ne 0$ 7 33 $ - Ventilation Blower 0$ 2 50 $ - Duct 0 $ 2.75 $ - Hose (50') Section , 0$ 0 88 $ - Rivet Buster 0 $ 6.25 $ - TOTAL - Pease & Sons Eqwpment $ - MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST Matenals Attached $ 32 05 Fred Hill Materials $ 157.00 $ - $ - TOTAL - Material and Major Equipment Suppliers a 189.05 SUBCONTRACTORS EST.COST $ - $ - $ - TOTAL - Subcontractors $ - 10/20/2009 Page 1 of 2 7.57 PM BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref . Section 01250 DESCRIPTION: Remove and replace existing boiler housekeeping pad. Does not include cost for Natural Gas to operate temporary boiler while this work is performed. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD 37 RFI # CONTINUED FROM PAGE 1 of 2 SUBTOTAL - DIRECT COSTS (less labor) EST. COST SUBTOTAL - DIREC7 COSTS $ 789.05 BOND & INSURANCE 1.5% $ 2 84 • SUBTOTAL $ 191.89 OVERHEAD 8 PROFIT 21% $ 40.30 TOTAL - Direct Costs $ 232.18 TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS. 0, TIME EXTENSION REQUESTED - CALENDAR DAYS� 0 CPM ACTIVITY NUMBERS AFFECTED. EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ _ HOME OFFICE OVERHEAD, BONDS AND INSURANCE (c� 16.5% $ - SUBTOTAL $ _ PROFIT � 10% $ _ TOTAL - Time Eutension and Related Costs $ - TOTAL CHANGE ORDER REQUEST: $ 1,983.18 This cost proposal is based on the cost elements ident'rfied Pease & Sons reserves ali nghts to additional compensation and time extension for work elements ident�ed, unless soec'rficallv neqotiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner edher provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal Fadure to accept this proposal within the proposal time may resuk in cost escalation and passible addrtional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impad related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. 20-O ct-09 03-NOV-09 PEASE & SONS DATE SUBMITTED PROPOSAL VALID UNTIL Bryan Hillemann Pro�ect Mgr. 10/20/2009 Page 2 of 2 7 57 PM CITY OF BREMERTON � � WORK CHANGE DIRECTIVE WCD#: Thirty Eight Page 1 Of 1 PROJECT: WINTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: August 20, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Grinder Panel Replacement: Demo and patch existing recirculation pump pad in solids handling building. ATTACHMENT(S): Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Price ❑ Contractor's Records � Lump Sum ❑ Engineer's Records ❑ Time & Materials ❑ Other: ❑ Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 558.25 Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization. are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR - CITY OF BREMERTON B � . B y : ab, FORMS, Work Change Directive, 3-00 BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref Section 01250 DESCRIPTION: Cost for installing replacement grinder panels. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD 38 RFI # PEASE & SONS LABOR HOURS HOURLY RATE EST. COST OH 01030 Project Manager 0.0 $ 150.00 $ - OH 01031 Pro�ect Superintendent 0.0 $ 88.21 $ - Projed Engineer ' 0.0 $ 95.00 $ - Carpenter Foreman 0 0$ 85 58 $ - � Carpenter 0.0 $ 79 64 $ - Laborer 0.0 $ 66.86 $ - Millwright 0.0 $ 81.36 $ - $ - TOTAL - Pease & Sons Labor - PEASE 8 SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift 0 $ 1010 $ - ` Boom Truck 0$ 22 00 $ - Torch Kd 0 $ 8.00 $ - Job TruCk 0 $ 9.00 $ - Compressor 0 $ 11.25 $ - Man Retriever 0$ 7 13 $ - Core Dnll Machine 0$ 7.33 $ - Ventilation Blower 0 $ 2.50 $ - Duct 0 $ 2.75 $ - Hose (50') Section 0 $ 0.88 $ - Rivet Buster 0 $ 6.25 $ - � TOTAL - Pease & Sons Equipment ' $ - MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST Materials Attached $ - - $ - ' $ - TOTAL - Matenal and Major Eqwpment Suppliers ffi - SUBCONTRACTORS EST.COST _ PSW Electric $ 500.00 $ - $ - - TOTAL - Subcontractors $ 500.00 10/20/2009 Page 1 of 2 8:49 PM BREMERTON 1NWTP 8570 Change Proposal - Lump Sum Basis Ref Section 01250 DESCRIPTION: Cost for installing replacement grinder panels. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD 38 RFI # CONTINUED FROM PAGE 1 of 2 SUBTOTAL - DIRECT COSTS (less labor) EST. COST SUBTOTAL - DIRECT COSTS $ 500.00 BOND 8 INSURANCE 1.5% $ 7.50 SUBTOTAL $ 507 50 OVERHEAD & PROFIT (10% this change order only) $ 50.75 TOTAL - Direct Costs $ 558.25 TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS 0 TIME EXTENSION REQUESTED - CALENDAR DAYS: 0 • CPM ACTIVITY NUMBERS AFFECTED. EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE (d� 16.5% $ - SUBTOTAL $ - o PROFIT � 10% $ - TOTAL - Time Extension and Related Costs $ - TOTAL CHANGE ORDER REQUEST: $ 558.25 This cost proposal is based on the cost elements ident'rfied Pease & Sons reserves all rights to add�tional compensation and time extension for work elements ident'rfied, unless soecrficallv neaotiated as part of this Change Proposal. Work will proceed m accordance wfth the contract documents until the Owner either provides written acceptance of this change proposal or a wntten directive to proceed m accordance with this proposal. Failure to accept this proposal within the proposal time may resutt in cost escalation and possible addkional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limfted to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. 2QO ct-09 03-Nov-09 PEASE & SONS DATE SUBMITTED •PROPOSAL VALID UNTIL Bryan Hillemann Pro�ect Mgr 10/20/2009 Page 2 of 2 8•49 PM CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Thirty Nine ,. Page 1 Of 1 PROJECT: 1NWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: August 20, 2009 - YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Recirculation Pump Pad: Demo and patch existing recirculation pump pad in solids handling building. Polymer Blending System: Install required piping, electrical, and concrete for installation of polymer blending system. ATTACHMENT(S): Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ _.. Unit Price ❑ Contractor's Records � Lump Sum ❑ Engineer's Records ❑ Time & Materials " ❑ Other: ❑ Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 4,696.67 Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization. are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR CITY OF BREMERTON , g By: � ab, FORMS, Work Change Directive, 3-00 • I � �f BREMERTON WWTP 6570 I Chan e Proposal - Lump Sum Basis Re� : Section 01250 � DESCRIPTION: lnstall owner pravided polymer blending sysiem. I WORK AREA: — ( COST COGE PEASE ISSUE H: Owner Chng U WCD 39 �;�� �1 PEASf & SONS LABOR HUURS HOURLY RATE EST. COST OFi 010.31 Projeci Superintendent 2.0 $ 89.21 $ 178.42 Carpenter Foreman 0.0 5 85.56 S - Carpenter 6.0 $ 79.64 3 477.87 � La6oret B.0 $ 66.86 $ 534.86 � Miilwright 0,0 $ 87.36 S - � S - � 70TAL - Pease & Sons Labor ti�189•16 i ( PEASE & SONS EQU{PMENT HOURS HOl7RLY RA7H EST. COST Forklift 2 $ 10.10 $ 20.20 ( Compressor 6 S 1i.26 $ 67.60 I Breaker/Hose fi$ 8.00 S 48.00 JobTruck 16 $ 9.00 $ 1A4.00 TOTAL - Pease & Sons Equipment 5 279.70 �' . MATEpIAL AkD MAJOR EQUIPMENT SUPPLIERS EST. COST ; Materlals Atlached S - 1 5 - � 3 S - ' � ' � I TOTAL - Material and Ma�or Equipment Suppllers S - � I SUBCONTRACTORS EST.COST ; Peese Piptng, Inc. S 2,576.24 I ! $ - � g - I TOTAL - Subcontractors S z�5�8•24 I a I 9UBTOTAL • �IpECT COSTS (less ta6orj EST. COST � 1 SUBTOTAL - DIRECT COS7S ` $ 2,855.94 ; i 80ND & iNSURANCE 1.5% $ 42.84 i SUBTOTAL $ 2,898.78 OVERHEAD & PRDFIT 25°,6 $ 608.74 TOTAI - DtrBCt COSts $ 3,507.82 I � i , { I , I i i 12(21(2009 Page 1 of 2 4;08 PM i BREMERTON WWTP 857Q � ; Change Proposa! - Lump Sum Basis Ret : Section 01250 DESCRlPTIdN: Install owner provlded polymer blending system. WQRK AREA: CO57 C00� PEA5E 155UE N: Owner Chng N WCD 39 F1F1 N � � I CONtlNUED FROM PAQE i of 2 � TIME EXTENSION AND RELATED COST3 EST. COST � TIME EXTENSION REQUESTED - WORKING DAYS: ' 0 ( TIME EXTENSION RE�UES7ED - CALENDAR DAYS; CPAA ACTIVITY NUMBERS AFFECTED: � EXTENDED FIELD QVERHEAD (rate per vrork dayj: VALUE OF EX7EfVDED FiELD OVERHEAD S ' I HOME OFFICE OVERHEAD, BONDS AND INSUAANCE @ 16.6°h $ - I SU6TOTAL ' � ' � PROFIT @ 10% $ - � TOTAL - Time EMensfon and Related Costa 5 ' TOTAL CHANGE ORDER REGIUEST: $ 4,696.67 . � This cost proposal Is based on the cost elements identifled. Pease & Sons reserves all righis to eddiUonal compensatlon and time exlenalon for work � elements kdentiTied, unless s�qcHice�y neaotiaced as part ot thls Change Proposal. Woik wi9 proceed in accordance wilh the cantract documents until the Owner elther provides written acceptance of this change proposal or a written directive to proceed In accordance with this proposal. Failure to eccept thls proposal within the proposal time may resuR in cost escalation and possible additional delays. This change proposal must be IncNded as an attachment to Owner change order. NOTICE is hereby provided thet the Contractor reserves any and ell rights to recover direct, Indirect, and consequenHal cosis, including but notlimited to the cost of delay and impact related to any work cover by this change or othenvise aHected by this change uniess the cost and/or � time have been specificaly includad and negotlated. I , I I 21-Dec-09 Q4•Jan•10 i PEASE & SON3 DATE SUBMITTED PROPOSAL VALID UNTIL Bryan HIIlemann � Pro�ect Mgr. � � I . , � � . � ' : I ( i i I i . . i 1212il2009 j Page 2 of 2 4:08 PM BREMERTON WWTP 8570 � Change Proposal - Lump Sum Basls Pease Piping i � dESCRIPTION: HVALUEI � PEASE ISSUE 9: QO 7CF/PC CL N WCD 39 RFI: ; PEASE PtPINQ LABOR HOURS IiOURLY RATE PST. COST ; Pipe Firier Foremen ' 2.0 $ 96.56 S 193.13 � Plpe FfYler $ 80.42 S - i Plumber 12.0 S eD.42 $ 965.05 Plumher Apprendce S.0 S 7224 S 577.94 i S TOTAL- Pease Piping Labor ���36•�2 i i PEASE PIPINQ E�UIPMENT HOURS HOURLY RATE EST, COST i Forklifl $ 24.54 $ - �- Boom Truck $ 73.08 S - Compressor $ 14.36 8 - , Welding Machine � 3 10.34 $ - Generator / Llght Plant S 12•�� S � j Laser g 11.6b 5 i TOTAL - Pease Piping Equlpment S •• i MA7ERIAL AND MAJOA EQUIPMENT SUPPLIERS EST. COST � , $ 604.09 � $ � S - � 1 TOTAL - Material and MaJor Equlpment Suppliers S 504.09 a SUBCONTRACTORS EST.COST ! S � S - � S S TO7AL - Subcontractors � ' (iENEHAL RELATED COST& HOUqS HOURLY RATE EST, COST Chenge Order Processing Fee Lump Sum $ 75.00 �stimating $ 75.0o g - As•Bullt Drawfngs t$ 65.00 � TOTAL - General Related Costs S ' � 1 SUBTOTAL - DIRECT COSTS EST. COST ! SUBTOTAL - DIRECT COSTS $ 2,240.21 ) OVSRHEAD & PROFIT @ 159'o y 336.03 � TOTAL - Dtrect Casts $ 2,576.24 i , � TIN[E EXTENSION AND REIATED COSTS ES7. COST � TIME EXTENSION RE�UESTED - WORKING DAYS; 1 1 TIMfE EX7ENSION REQUESTED - GALENDAR DAYS: j CPM ACTNITY NUMBERS AF�ECTED: { EXTE(VDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD � - EXTENDED FIELD OVEfiHEA6 @ i6°o $ ' SUBTOTAI. S " � PROFIT Q 10% S , TO7AL-Time Extension and Related Costs S " , TOTAI. CHANGE ORDER REQUEST: $ 2,576.24 � This cost proposal Is based on the cost elements identifled. Pease & Sons reserves all rights ta additional compensatlon and tfine extension for work elements identified, unless specifically negoiated as part of thfs Change Proposal. Work wiif proceed in � accordance with the cantract documents until tY�e Owner efther provides written acceptence of this change proposal or a v�ririen , directive to proceed in accordance with this proposal. Fallure to accept this proposal withln the proposal time will result In cost � esCalation and possibte additional delays. I PEASE & SONS DATE SUBMI77ED PROPOSAL VAI.ID TIL GORDON PEASE • PROJECT MANAGER Page 1 . i � � ; BREMERTON WWTP 8570 � Change Proposal- Lump Sum Basis � � DESCRIPTION: �IVALUEI ! PEASE MOD NO: 00 TCFlPC CL � WCD 39 RFI: � i �ILL OF MATERIA�S (Pease Piping) � ? I7EM DESCRIPTION QTY, UNIT OF LABOR MATERIAL � MEASURE UNITS TOTAL UfdIT 70TAL � 1 1/2° True Union Ball valve 5 ea - 49,95 249.75 i 1 1/2° SChed, 80 PVC TEE 3 ea - 5,07 15.21 ; 1 1/2" Sched, SO PVC 90 S ea - 1.47 11.76 ' 1 1/2" Sched. 60 PVC 45 4 ea - 3,2A 12.96 1 1!2° Sched. 80 PVC Male Adapter 1 ea - 3.39 3.39 2" X 1 1/2° Sched. 80 PVC 7EE 1 ea - 4.29 4.29 1 1/2° 304 SS Clevis Hanger 5 ea - 8.60 43.00 1 5/8° SS Unistrut 4 If - 11.79 A7.16 3/8 3 3/4" Kwik Bolts 8 ea - 2.14 17,12 1 1!2° Sched. 80 PVC pipe 80 If - 0.86 54.40 � 1/2° SS All Thread 3 If - 3.35 10.05 1 112" SS Hardware 1 Lot - 15.00 15,00 Misc, 3/8° SS Hardware . 1 tot - 20.00 20.00 . � _ - � f + `( - ' � I - ' I I I ' 1 1 _ _ ; - - � _ - �, . � _ - E s _ ; " ` i _ _ ; _ ! TQTALS MANFIOURS: - COST: $ 504.09 I � i 1 � i . I . � I Page 2 i J � 1 8570 Bremerton WWTP Uograde i RECQRD of TIME and MATERlALS WORK PERFORMFD � DESCRIPTION: Install New polymer mbang system i DIRECTION PROVIDEO BV: Ned Lever � DqTB DIRECTION PROVIDED: g(2�(2apg pA7� WORK DON�: pg/2q through 8/28109 � � COST CODE PEASE ISSt1E N� COB Ref 9 Ftf•I: 0 j � PEASE & 80NS LABOR HOURS � Pro}ect Menager ? Project SuperimendaM � � Project Engineer Carpenter Foreman � Carpenter Operator � Le6crer � Irarnvorker - i PEASE PIPINCi LABOR HOUHS � Pipefiller/ plumber Foreman Kirk Pernhem 2.0 � Pipefitter! Plumber Journeyman Shea Budlong/DOn Amundaen 16.0 Pipefitter 1 Plumber Appren6ce PEASE & SONS EaUIPMENT / SUBCONTRACTORS HOURS � f � I DESCRIPTiON OF WORK DONE InsWll new potymer piping, supports and skid par the dRection oi COB ' I � 7 i � i I i i I i � MATERIAL pTY/UM Price 1.5' True unfon ball valve 5 . 1.5' Sch 80 PVC Tee 3 Page 1 of 2 ' , � � , ' 1 l . 7 1 ! � � 8570 Bremerton WWTP Uograde � RECORD of TIME and MATERIALS WORK PERFORMED � DESCRIPTION: Instap New poymer m6dng system i DIRECTION PROVIDEQ BY: Ned Lever � ', ,I DATE DIRECTION PROVIDED: g/21/2009 DATE WORK UONE: OBl241hrough 8/28109 � i I I COST COUH PEASE ISSUE p: COB Re1 I Fit•!; o I I 1.5' SCh 80 PVC 90 8 ' 1.5' SCh 80 PVC M15 4 . p 1.5' Scn 80 PVC male adapt 1 � 2` X 5.5' Sch 80 PVC tee 1 I 1.5° 304SS Clevis hanger 5 � - 1.5" 304 SS Sttut ClampS 8 � 1 5/8' SS UnlsUUt 4' ; : 3/8" 3 3/4" Kwik bolta 8 � 1.5" Sch 8U PVC pipe 80' I 1/2" SS A!I Uvead - 3' � t/2" SS Hardware Lot S15.40 � Misc 3/8' SS harchvere Lol $20.00 , f i I I I , � I pENEqAL RELATED COSTS HOURS I CPM Schedule Check 8� Revisions +; As-Bu1t Dravnngs , TIME EXTENSIdN AND RELA7ED COSTS � � TIME EXTENSION REQUESTED - WORKING DAYS: � TIME EXTEIdSION REpUESTED - CALENOAR DAYS: ! CPM ACTIVITY NUMBERS AFFECTED: � i' Pease & Sons regards the above work as exUa to lhe coMract and reserves all rights to addAional compensation end a Gme extenslon for work performed whlch wa regerd es e'Mer eMra or additionaL ; Kirk W Parnham — 8/28/2009 • , PEASE & SONS DATE PERFORMED � City of BremeAon DATE ACKNOWLSDGED � i , ( � ' i i i � � / Page 2 of 2 ' J CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Forty One Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: August 20, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Supply and install two E-stop switches for the boiler emergency shutdown. ATTACHMENT(S): Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Price ❑ Contractor's Records � Lump Sum ❑ Engineer's Records ❑ Time & Materials ❑ Other: ❑ Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 2,192.47 Substantial Completion: 0 days; If the change involves an increase, the'estimated Ready for final payment: 0 days; , � amount is not to be exceeded without further If the change involves an increase, the estimated times authorization. are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: . , CONTRACTOR CITY OF BREMERTON By: By: � - . ab, FORMS, Work Change DirecGve, 3-00 j € I � I BREMERTON WWTP 8570 ; Change Proposal - Lump Sum Basls � 1 . ! ftet : Sectfon 01250 j DESCRIPTION: Supply and Install(2j Emergency Stop Swiiches as directed tor Boller Emergency Shut ; down. � WOpK Af2EA: COST CODE PEASE ISSUE N: Owner Chng # WCD 41 RFI A . I PEASE & SONS LABOR HOURS HOURLY RATE EST. COST . OH 01031 ProJect Superintendent 2.0 $ 88.21 5 178.42 i Carpentar Foreman U.0 $ 85.5e S - � CarpeMer 0.0 $ 79.64 S - Laborer o.o $ 66.66 5 - Milhvright 0.0 $ 61.3& S - S - TOTAL - Pease & Sons Labor ��6•42 PEASE & SONS EQUIPMENT HOURS HOURLY RATE E3T. COST � Forklift 0 S 10.10 $ - Boom Truck 0 $ 22.00 $ - 4Qas Monttar 0$ 6.63 S - Jo6 Truck 0 $ 9.00 $ • 70TAL - Pease & Sons Equipment S - ( � MATERIAL AhD MAJOR HQUIPMEN7 SUPPL�ERS EST. COST j Materisls Atlached � ' $ - . $ $ - i • TOTAL - Material and Ma�or Equlpment Supptiers s ' � � SUBCONTRAC70RS EST.COST � i PSW Electric � 1 ��� �� S • . � � TOTAL-Subcontractors S ����•� ' � i I SUBTOTAL - DIREC7 COSTS pass labor} EST. COST ; SUBTOTAL-DIRECTCOSTS S 1�641•54 � � BOND & INSURANCE 1.5� $ 24.62 i SUBTOTAL $ 1,666.76 i OVERHEAD & PROFIT 21°5 $ 349.89 1 TOTAL - Direct Costs 5 2,016.a6 ( j i � i 10/20/2009 � Page 1 of 2 10:45 PM . E i � BREMERTON WWTP 6570 � Chan e Proposal - Lump Sum Basis � Ref : Sectlon 01250 Supply and Install (2) Emergency Stop Switches as directed for Boller Emergency Shut ; DESCRIPTION: dOwn. I WORK AREA: i COST CpDE PEASE ISSUE k: Owner Chng 9 WCD 41 H1=1 N � CONTJNUED FROM PAQE i ol2 ( t TIME EXTENSION AND RHLATED COST3 E3T. COST j TIME EX7ENSION RE�UESTED - WORKIN� DAYS: r T1ME EXTF�ISION REQUESTED - CALEMDAR DAYS: I CPAA ACTIVITY NUMBERS AFFECTER: EXTENDED FIELD OVERHFAD (rate per work day): � VAtUE OF EXTFI�DED FlEID OVERHEAD $ - I HOME OFFICE OVEFiHEAD, BONDS AND INSURANCE @ 18.5% $ - ! � SUBTOTAL S - i PRQFlT Q 1096 $ - I TOTAI - Time Extensfon and Related Costs S - I � TOTAL CHANGE ORDER REQUEST: $ 2,192.47 � This cost proposal is based on lhe cost elemerris idenYded. Pease & Sons resenres all rights to adddional campensation and time extension 4or work � elements identtfied, unless soecificallv neaotiated as part ot this Change Proposal. Work will proceed in accordance wilh the contract documents unGl lhe j Owner eNher provides written axepisnce of this change proposal or a writien d'vective to proceed in accordance with this proposal. Failure to accepl lhis � proposal with� tha proposal iime may resutt in cflst escalation and possi6le addilional delays. This change proposal must be included es an attachment to j Owner change order. NOTICE Is hereby provfded that the ConVaclor reserves any arxi all dghts to recover direct, indirect, and consequentfal costs, ( including but not I'unNed to tha cost of delsy and impact related to any work crover by U�is change or othe�wise eHected by this change untess the cost and/or tfine have been specifically lncluded and negotiated. . I � � , 20�Oc t-09 03-Nov-09 � PEASE & 50N5 DATE SUBMITTED PROPOSAL VAUD UNTIL � � i 8ryan Hi!lemann I Project Mgr, � i i . ' ; ! , ; � I i � , { f , ; �012ol2oos , Page 2 ot 2 1 D:45 PM , Bremerton WWTP Wet Weather Facilities Upgrade i . PSW Elecfric Breakdown Summary ; � n�o. � wC� ; Project Number: 165 PR No. i Date Submittecl: 9/1/2099 Generel Contractor: Pease And Sone, ino. . j Scope: 8oiler Emergency Stop Buttons � I 1. ELECTRICIAN LABOR COSTS � � 0.00 HH a. journeyman electrician tabor @ $40.81 0.00 � b. Journeyman burden @ 66.009b ' 4.06 10.t10 HA c. foreman electrlclan Q $44.88 448.90 i d. foreman burden @ 84.004b 242.41 � i.00 HR e. superiniendent electricEan Q $48.97 48.97 : f. superintendent burden (ap 63.0096 25•95 = olaEC7 tABOR suerortu. 788.23 Supervislon g. direct supervislon {NTE 18% of ta-i� 114.93 h. safety {NTE 3% ot Ilnes 1a,b,c,d,e & n 22,99 i I. Dellvery truck and drlver ($60 per hour) 0.00 I i. cRaFr u+eoa cosrs 90�4.15 I 2. MATERIALS CQSTS � a. materlaf costs 4A8.73 I b: quote : 0.00 ' I c. quote: 4.OU � 2. MATEHiAL COSTS 448.73 I 3. EQUIPMENT COSTS a. owned equfpment (per speo approved source) 0.00 b. rental equipment {per Invoices attachecn 0.00 3. EOUIPMEN7 CO378 d.�0 4. SMALL TOOLS ' a. small tools (NTE ORS of 1a, c& e) 0.00 � 4. SMALLTOOLS O.00 I 5. OVERHHAD � SUBTOTAL 1,2,3,&4 13�J2.Sa i E a. NTE 10% portlon of 1,2,3&4 � a.oveRHEan 13529 � 8. ALLOWANCE FOR PROFiT (NTE 109b OF 1,2,3&4 ) � 6. PROFlT 135.29 � 7. SUSCONTRACTORS � a.. d. r.suecoNr�acroRS O.OQ � e. OVERHEAD ON SUBCONTRACTORS (NTE 10% OF 7) ' B.OVEflHEAGONBUBCONTRACTORS O.00 � 9. PAOFIT ON SUBCONTRACTORS (NTE i0% OF 7) ' � 9. PROPR ON SUBCONTRACTORS O�OO 10, INSURANCE I a. payroll drlven Ilability tnsurance (296 ot 1) b. volume driven ifabllity Insurance (0°� of 1 thru 7) , � ,o. iNSUSUwcE 18.08 j 11. BONd � a. bond (0� of 1 thru 10) i It. BOND O.00 � TOTAL COST 7 THRU f 1 $1 ,641.54 � � , i i i . i 1012a12009 �f�65-Bo�ler E•Slop.xls CITY OF BREMERTON WORK CHANGE DIRECTIVE � WCD#: Forty Two Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons __ Date: December 28, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Supply and install one 8" isolation valve in the DGA line. ATTACHMENT(S): Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Price ❑ Contractor's Records � Lump Sum ❑ Engineer's Records ❑ Time & Materials ❑ Other: ❑ Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 877.86 Substantial Completion: 0 days; If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization. are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR � CITY OF BREMERTON By: By: �� ab, FORMS, Work Change Directive, 3-00 BREMERTON 1NWTP 8570 Change Proposal - Lump Sum Basis Ref : Seetion 01250 DESCRIPTION: Supply and install (1) 8" Isolation Valve in DGA Line. WORK AREA: __, COST CODE PEASE ISSUE #: Owner Chng # WCD 42 RFI # PEASE & SONS LABOR HOURS HOURLY RATE EST. COST OH 01031 Projed Supenntendent ; t.0 $ 88.21 $ 88.21 . i Carpenter Foreman 0.0 $ 85.58 $ - ', Carpenter 0.0 $ 79 64 $ - Laborer � 0.0 $ 66 86 $ - Millwright 0 0$ 81 36 $ - _ $ TOTAL - Pease & Sons Labor 88.21 PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift 0 $ 70.10 $ - Boom Truck 0$ 22 00 $ - 4Gas Monitor 0$ 5 63 $ - Job Truck 0$ 9 00 $ - TOTAL - Pease & Sons Equipment $ - ' � MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST MaterialsAttached g �gg,7g , $ - $ - $ - - TOTAL - Matena! and Ma�or Equipment Suppliers $ 198.76 SUBCONTRACTORS EST.COST " Pease Piping, Inc. $ 444 20 $ $ - TOTAL - Subcontractors $ 444.20 � SUBTOTAL - DIRECT COSTS (less labor) EST. COST � " SUBTOTAL - DIRECT COSTS $ 642.96 BOND 8 INSURANCE 1.5°h — $ g,gq SUBTOTAL $ 652.60 OVERHEAD & PROFIT 21% $ 137.05 � TOTAL - Direct Costs � $ 788.65 � , 10/20/2009 Page 1 of 2 8:40 PM BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref : Section 01250 DESCRIPTION: Supply and install (1) 8" Isolation Valve in DGA Line. WORK AREA: COST CODE PEASE ISSUE #: Ovmer Chng # WCD 42 RFI # CONTINUED FROM PAGE 1 of 2 � TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE � 16.5% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Related Costs $ - TOTAL CHANGE ORDER REQUEST: $ 877.86 This cost proposal is based on the cost elements ident�ed Pease 8 Sons reserves ali nghts to additional compensation and time eMension for work elements identified, unless specificallv neqotiated as part of this Change Proposal. Work will proceed in accordance with the contrad documents until the Owner edher provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time may resutt in cost escalation and possible additional delays This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the ConVactor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated 20-Oct-09 03-Nov-09 PEASE & SONS DATE SUBMITTED PROPOSAL VALID UNTIL Bryan Hillemann Project Mgr 10/20/2009 Page 2 of 2 8:40 PM } _ i � , i BREMERTUN WWTP 8570 � Change Proposal - Lump Sum Basis , , DESCRIPTIdN: ` NVALUE! - ; PEASE 1SSUE #• 00 Owner Chn� WCD 42 RFI # i , - . � ; �1LL OF MATERIALS (Pease � Sons) � 1TEM DESCRIPTION QN. UNIT O� LABOR MATERIAL MEASURE UNITS TOTAL UNIT TOTAL 8° Series 50; Wafer; Gast Iron Body; 316 SS Disc 1 ea 4.0 4.0 198.76 198,76 - " f _ - � c_ - � - ' i f - - I I - ' I I S - ' i i _ _ 4 " - ' ' � � _ ' I + _ { ] - - � . - i 3 � � f . I ' � I � � I I � � ^ ' � � � � I � f . - I � - i TOTALS MANHOURS: 4.0 COST: $ 198.76 ' � � � � Page 2 � ; i BREMERTQN WWTP 8570 l. Change Proposal- Lump Sum Basls Pease Plping ' { OESCNIp710N: YVALUEI ! PEASE ISSUE #: 00 7CFJPC C� fl WCD 42 RFh PEASE PIPING LABOR HOURS HOURLY RAT� EST. COST • Pipe Fitter Foreman 4.0 S 98.66 S 386,26 � Pipe Fitter ' S 80.42 S - Plumber 0.0 S 80.42 S - 3 � i TOTAL - Pease Piping Labor 386.26 ! � PEASE PlPINO EQUIPMENT HOURS HOUALY RATE EST. COST � Forklift S 24.64 S - Boom Truck S 73.68 S - Compressor $ 14.36 $ - Welding Machlne $ t0.34 5 - Qenerator / Llght Plant � 12,70 S • � Laser g i t.55 5 t TOTAL - Pease Piping Equipment S - � � � MATERIALAND MAJOR E4UIPMENTSUPPI.IERS EST. COST � � I 5 ' I a - I � I TO7AL • Material and Ma�or Equlpment Suppliers S • � � SUBCONTRACTORS EST.COST f S - ( S - � $ - I S TOTAL - Subcontractors S - � � GENERAL RELATED COSTS HOURS HOURLY RATE EST. COST j Change Order Processing Fee Lump Sum $ 76.00 � Estimating $ 75.00 $ - 3 As-Suilt Drawings 1 g 66.00 � TOTAL - Qeneral Retated Costa � S - SUBT4TAt - DIRECT COSTS EST. COST � SUBTOTAL • DIREC7 COSTS $ 386.26 � OVERHEAD & PROFET @ tb% $ 67.94 I TOTAI - Direct Costs S 444.20 , TIME EXTENSION APID RELATE6 COSTS EST. COST TIME EXTENSION REQUESTED - WORKINQ DAYS: � � TIME EX7ENSION REDUESTED - CALENDAR DAYS: � i CPM ACTNffY NUMBERS AFF£CTED: �CTENDED FIELD OVERHEAD (rate perwark day): ; VALUE OF EXTENDE� FIELD OVERHEAD S - EXTENDED FIELD OVERHEAD @ 16% S - SUBTOTAL S - PROFIT @ 10°k �u � TOTAL • Time Extenslon and Related Costs S - TOTAI, CHANGE ORDER REQUEST: $ 444.20 This cost proposal Is based on iha oost elements Identified. Pease 8 Sons reserves all rights to additional compensation and time , extenslon tor work elements identifled, unless specificaily negolated as part of this Change Proposal. Work will proceed in - accordance with ihe coniract documents until the Owner either provldes vrritten acceplance of this change proposal or a wrlffen � directive to proceed in accordance vrith this proposal. Failure to accept this proposal within the proposal Ume will result In cost • escatation and possible additional delays. PEASE & SONS DATE SUBMITTED PROPOSAL VALID TIL � GORDON PEASE-PFOJECT MANAGER Page 1 CITY OF BREMERTON � WORK CHANGE DIRECTIVE WCD#: Forty Three Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: December 28, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Supply and install one chain wheel actuator at the TWAS valve. ATTACHMENT(S): Pease and Sons change proposal If a claim is made that the above change(s) have aff�cted Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: ❑ Unit Price ❑ Contractor's Records � Lump Sum ❑ Engineer's Records ❑ ' Time & Materials , ❑ Other: ❑ Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 419.50 � Substantial Completion: 0 days; � If the change involves an increase, the estimated Ready for final payment: 0 days; amount is not to be exceeded without further If the change involves an increase, the estimated times authorization. are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR CITY OF BREMERTON By: sy: ab, FORMS, Work Change Directive, 3-00 ' � � � I BREMERTON WWTP 8570 ' � Change Proposal - Lump Sum Bas1s ( Ref : Section 01250 i D�SCRIPTION: Supply and install Chain Wheel actuator at 7WAS Vaive. ' WORK AfiEA: ��� 1 CpST CODE P6ASH ISSUE N: Owner Chng # WCD 42 RFI Y. # i i P6ASE & SONB LA$OR HOURS HOURLY RATE EST. COST � OH o1031 Project Superintendent 0.0 $ 8921 $ - Carpenter Foreman 0.0 $ 85.58 S - Carpenter 0.0 $ 79.84 $ - Laborer O.0 S 66.86 $ - Millwright 0.0 S 81.38 $ - ' S - TOTAL - Pease & Sons Labor - PEASB & SONS EQUIPMENT HOURS HOURLY RATE E8T. COST Fotklift 0 $ 10.10 $ - 3 Boom Truck 0 3 22.00 S - � 4-Gas Monitor . 0$ 5.83 $ - j S Job Truck 0$ 9.00 S • i TOTAL - Pease & Sons Equipment S - � � MATfiR1AL AtJD MAJOR EQUIPMENT St1PPL1ER3 HST. COSF � Malerials Attached 3 176.00 ; � S - � � I q� _ i 70TAL - Malerlal and NSa�ar Equipment Suppliers S 176.00 � " � i SU8CONTRACTORS EST.COST � Pease Piping, Inc. $ 1&6.57 $ - I � $ - TOTAL - Subcontractors ; 168.67 , i SUBTOTAL - DIRECT COSTS Qaes Febor) EST. COST � SU6TOTAL - DIRECT COSTS J $ 341.57 � BOND & INSURANCE 1.5°b S 5•S2 � SUB70TAL S 346.69 i OVERHFJiD 8 PROFIT21°/a i $ 72.81 � TOTAL - Direct Costs S 419.60 ' i � i 1 � � � � ; � . ,2�2,�2��9 Page 1 of 2 4�18 PM ` � � ; C � I I BREMERTON WWTP 8574 � t Change Proposal - Lump Sam Bas/s � Ref : Seclion 07250 � DESCRIPTION: Supply and install Chain Wheel actuator a1 TWAS Valve. � WORK AREA: � 3 � COST CODE PEASE lSSUE tl: Owner Chng t! WCb 42 FiF11? � I � CONTlNUED FROM PAGE f o12 I i T(ME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: TIME EXTENSION REQUESTED - CALENDAR DAYS: � CPM ACTMTY NUMBERS AFFECTED: ` � � EXTENDED FIELD OVERHEAD (rete per work day): �" � VALUE OF EXTfiNDED FIELP OVERHEAD 5 ' ' HOME OFFlCE OVERHEAn, BONDS AND INSURANCE Q 16.5% $ - SUBTOTAL $ ' PROFITp1D90 3 " I TOTAL-Time 6ctension and Related Coats S ' I TOTAL CHANGE ORDER REQUEST: $ 419.50 7his cost proposal is based on the cost elements tdentifled. Pease & Sons reserves all rights to additional compensaQon end time extension for tirork ( elements IdentHied, unless soecNicallv neqg�lated as part ot this Change Proposal. Work will proceed in exordenca with the contract documents until the Owner ekhar providas written acCeptance of this change proposal or a vrtilten directive to proceed in accordance with thla praposel. FaiNre to accept ihis � propoeal within the proposel time may resuR In cost escalation and possible additlonal delays. This change proposal must be Included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and aA rights to recover direci, indirect, and consequential cosls, � incfuding but not limited to the cost of delay and impact reiated to any worlc cover by thls change or otherwise affected by th(s change unless Ihe cosl anNor time have been spectFlcalty IncNded and negotiated, � 21-Dec•09 � 04,1an-70 ( PEASE & SONS DATE SUBMITTED PROPOSAL VALID UN7iL i � Bryan Hfllemann � Pro�ect Mgr. � i ; � i i I � � , � i i, �212�I2oos Page 2 of 2 4:18 PM 3 ' � i ; , � BREMERTON WWTP 8570 � Change Proposal - Lump Sum Basfs � DESCRIPTIpN: #VALUEI I PEASE ISSUE 1!: 00 Owner Chnf WCD 42 RFI 1� 3 � � � �lLL OF �AAT'ERIALS {Pease � Sons} � ITEM DESCRIPTIOE�! Q�r UNIT OF LABOR MATERIAI MEASURE UNITS TOTAL UNIT TO7AL Chain Wheel Acivator 1 ea i.5 1.5 175.00 175,00 i i I _ - � � I 0 f t - - f . - - � . _ " i - - � - - 1 , - - � _ � _ � - - I _ � ' 4 _ - � 1 TOTALS • MANHOURS: 1.S COST: $ 176.00 ' � I . � , i I � Page 2 � i BAEMERTON WWTP 8570 Change Proposal - Lump Sum Basls Pease Piping DESCRIPTION: YVALUE! i PEASE ISSUE �: 00 TCFlPC CL N WCD 42 RF{: j PBAS� PIPINO LABOR HOURS HOURLY RATE EST. COST '� pipe Fitter Foreman i.6 S 96.56 S 144.85 � Pipe Fitter $ 80.42 $ - � Plumber 0.0 S 80.42 5 - � S - S ( TOTAL - Pease Piping Lebor 144,BS i PEASE PIPINQ EQUfPMENT HOURS HOURLY RATE EST. COST , Forklih $ 24.64 $ - � Boom Truck $ 73.08 S - { Compressor $ 14.36 $ - Welding Machine 5 10.34 5 - i Generator / l.ight Plant § 12.70 S - � Laser g 11.55 $ TOTAL - Pease Plping Equlpment S - MATERIALANDMAJOREQUIpMENT3UPPl.IERS EST.COST . � $ - $ $ - $ TOTAL - Materfal and MaJor Equipment Suppllers S - SUBCONTRACTORS EST.COST � . . $ - ' S - S i TOTAL - Su6conUactors S - � GENERAL RELATED COS7S HOURS HOUALY RATE EST. COST Change Order Processing Fee Lump Sum $ 76.00 EStimating $ 75.00 $ - As-Bullt Drawings � $ 55.00 TO7AL - General Relaied Costs S - � SU6TOTAL - DIRECT COS7S E3T. COST SUBTOTAL - DIRECT COSTS $ 140..85 i OVEFiHEAD & PROFIT @ 169'e $ 21.73 � TOTAL - Dlrect Casts S 168.57 TIME EXTENSION AND RELATED COSFS • ES7. COST TIME EXTENSION REQUESTED - WOfiKING DAYS: 1 TIME EXTENSION REQUESTED - CALENDAR DAYS' CPM ACTNITY NUMBERS AFFECTED: , EXTENDED FIELD OVERHEAD (rate per work day): � VALUE OF EXT�NDED FI£LD OVERHEAD S - � EXTENDED FIELD OVERHEAD @ 169'o S - � SUBTOTAL � - � PROFIT Q 10°k $ - TOTAL - Time Extension and Related Costs S - I TOTAL CHANGE ORDER REQUEST: $ 166�57 � . ; 7his cost proposal is based on the cost elements Identified. Pease & Sons reserves all rights to additional compensalion and time extensfon for wark elements fdentified, unless specRically negoiated as part of thls Change Proposal. Work will proceed in � accordance with the contract documenis until the Owner either provides written acceptance of this change proposal or e written � directive to proceed In accordance wftii this proposal. Failure 10 accept this proposal within iha proposal time wfll result In cost � escalatlon and possible additional delays. PEASE & SONS DATE SUBMITTED PROPOSAI. VALfD 71L � OORDON PEASE - PROJECT MANAGER Page 1 �--- ----_----_ =�_- _--_-_- --- -_ - --_- ��A GA� ���,:.-:�.. ��:��,:�E t �.==�� �.. ��1--';;:,---:,�,..;�-" „ . ':;� ; ,,:,� ;, - , Gp [ U vYt�'�1'� /�..3 ,w �, }.,�;, y, , _.; �':' �, ,,.:;, ,,,. f ,- =^^ .: � , N I ��`' : r '-.. 3"�^=:=�,=.�-=�=;__:-_ =%'_,��rt�� � � -- I �il:�;, ',-��=`.� ;'�—�,:� � � VE ��� :,��::,.-.,:,,s-:�,:_�,�:: '� ` �`- .i�_=.µ��.;�; �=� .�.:�� � .- ; �-�- ,, � �--' � �s I , �`'--, ':""';., .%i';���( i tJ �- :�)',::.,- i � 1'Y�;: ;�,'�;-..=.;:-^ ;��; "r J r� ti_�1i'�,.:ir x. I E � � ':t: �i :�... i•(' _ _.._.��---...= �f�:..' �{t i c.. �f S I �4�T='_ .�_.;: _,«: � ��•��.•�;..._ �.'. - � . . , i w' -�' ^%` : '�'— ti:.�,-�.ti t:_ f i r . :: , I = �.��--,.. : 1? =— �'�'�°. " -"„' �I� ''-` �wy'� "�\�_,,.°'u_`.ti�•^`-�y'•.-.._��..��'-;�-.�.==�.;+ I f t-�2'���5{2#��.^i���l; i .,��-,.•... � . �� ',✓_°.'...._..t�__.:- �� .._ ..__.-.._ .._�, - i m _�_:- -'_ ' �. • ___-- � 'v'=.—''i ��^ viele�: F.;��:r,�:�: i�t,3'E,iY:;l'�;d.�� � � i ��"" �� � � i�.,..... .. _�___=._ - _. ..:_! 1 ..._..,�. T ..� . p =:- i ,, .�. -_..�. . pus�ic woR�rs & ur�crriES �:=� r:380,-473=,5400.� ::�=-,:� i� ;;;.;: �= ��s�».�s. �:: -: - WastewaterTireatinentP/anf i;z�:�:-�i-:,�.�:.:�>=-; ,:�:--:�=�;� 18D0 Oyster Baji`l1ve: 8.:`�;':: w_ � :. . , ; Bieirie�#oe,1NA -983i2�, - November 5, 2009 �`—= _ -= --•-�--� L_y.__. Pease & Sons Attn: Bryan Hillemctnn BILI.ING INVOICE Totnl Natural Gas Usage 09/18/2009 to 10/19/2009 $3,722.84 {See nttaehed billing from Cascade Natura) Gas) Less: City of Bremerton usage ($723.06) (Based on 2008 usage for same cycle) Tofia) Due f rom Pense & Sons � EC��-� r�� m� �l6 � :� o / � �� i <� r� e����✓ 1 . CNG 101 (Rev.O?107► ����� CITY OF BREMERTON �. Current Billing �,�'��,.�., �,a.�s 160 0 W OYSTER BAY AVE �� : Past Due After c o a r o n a T i o N Bl2EMERTON WA 9831.2-'G735 . I1/10/2009 Your Account Number Service Per3od Service at: , 17U Ob25-3 3 U9/18/2009 TO 10/19/2009 160� W OYSTER PQaseree�ointormationonreverseslde. Previous bill amount $4,857.77 Payments have been applied through 1�/2212009 774.&2CR .—�' .PAST IIUE AS OF 10/09/2009 ARE DUE NOW �4,0�.�:15 . . ; .� . . , • . „� MeEer �� Type of � Present Previous CCF X Factor X Factor fe = 7herms Number " Billing � Rate _ Reading - Reading = 247020T•REGULAR _ SO4 _ 21D92 .-19141 i951 1.032000 1.673487 3369 Basic Service Charge: $10.00 per month 510.00 De3.3very Charge: � 3,3b9 X$0.23179 per therm 780.90 Average Cost of Gas: -3,369 X+50.80772 per therm 2 721.21 TOTAL therms charge: - � '210.73 CitY tax 6.00 % 53,722.84 TOTAL current billing due bY I1/10/2009 — Balan�•e�. o�. your .account. . . �7,$.0•5:99 - `! ; I`. x-� ; ,�r,: -.�� ��i j�tr, �,...,. f . ./'� _ � _,� y� �-1.. �� t i ;' � ; ~ `� . .� , . � . i1..:� ,� ��� . . . . ; . :iln.`i� � �, �,�,�� � . r_:,,� __ i . . . . ��•<<r� � �.- .ti�� E ..- r � A � ' ..i.� t `..r6' .. '�l ClC. .�1 . � �•I�S;'::7.i:u�at``��t',. Sf i''_-iii'{ ; . 24 Hr - Business � Emergencv: 1-888-522-1130 The current ba.11ing aroaunt i.nc].udes 3.852% state utility tax -�IG3.G0 Rate & Tariff in�Formation�available a www.cngc.com/reg,�ates.asp 3500 . - . . y . � y.� i r y� r� �� 3 0 0 0 � " �: �' ��, ' r �� � r , 2�ee � � : - ,� .� k ; � �, i • y '' � a ' � ' ' ' � � 2a�� �_ Fayments made by check may processed electranicallY and may 15 s 0 --� � be wifhdrawn from our account on the same da . You wiil nat � receive y our check�iack from your financial inst�ution. i00e � For in u"ires ar opt-out optians, please contact CNGC � 1-88& � s e e - � 522-t 1�0. Rayments made by check ar electronically t at are .� 0 .�.dishanared by the bank wlll be assessed a returned payment fee. . a n J� F` M A�M s� � a s o - Manth l y consumpt i on i n THERMS This bill does not extend the due date ot past bilis. Noie: Current charges are due and payabte upon receipt and past due as noted. _ ., ._ _._ . � ��•' Mi,�%S•�t'��;�t;° :.1.� ;s: _ _ •_;j:;=:.: •�,� .i: ,�''-..�: ;;•:... . Y" .; 2 d ' - � `� _; •� : �':. lx�+�� � - ��`'� t �'t •i 7 � _ 3. . - �A w ��, � �;:; �;; ;, '1. � •��� a,• '•' i' �'i� .��• �i`. :`r• 4� x ��:�, F .• - � I i��. �_� ,, � �,��•, .�i; ,: ,k;:z ry j!' ,.a'. .t - � � 'Z �i: �\:�;:,'o,'�'i',' ,.ti, ,.�. �I� - S• ' •i;, : �� �: � � � .:: �;' � '� � '�.• � �, 1• � A., �f �:.� u� ��3 `� 't• �.. ��i . r v Y+� t ^ ' , 'i ' � . '�ti • � �1. �l�'. l'� :°�',' i,'i' - .'-'i :'I� »)1� - i�. - �:.� .}�.'�`• ''i•.•' ..�v'r, •.. :�5i.. :{ .'y.� .,���� I' 1 '� •��"-' '4 . '�`2 � ' al •l� •h� - .l'.i:':i, .t� •S:��i .4. .1. .1:� �A:^• ' l�'!, . �•.{�' � + t; �� �`; wi „ r�•::.• .•�'?,+:: '•�••=.'• � �, ` �;� � • :.>. ;;�. ;:, :��, . t �;:: . L i� 1 :�� :(.: �. � `1. . .'i+. �j� :a:, � . s� '�t`.. ��� :t- �'.i'i• t . . iQ17 '_"�: . `•'e �'i � � i. d '1 : ,`• . �. •`t. „�•�- �� - ��1� i� :ji ;:: ;,`"�)., .: 1•�:�.,: .1b`-r;"• •� �:l'.'.`�:: ..�'�'�.�•': � .� : 1:,•..,: , ..ti .i�S �i±^` '�1 .i. C^5� i I }:'��{'� ,•\: .1, �4C i.'i' .• �!�� ,�.., �,�.;� �„� �� ..N ;:ti'I �' � .t n `<<": •N? �`11 •-E: ,w lw :li f� 1 t':;.n.:'n� .5L � }_!.�:��. . �� -- �i� ,ti�� h i -t:. � `� 1 tiy�: `:nv ;.i;:� •j: n;i a�' .1 � 3� '�.: 4. .`.t•� :,t:^ r{ �1.. � "�iN.. .�i :5•,t. .W ..4:5.�.. �,�,1 ?1, 'i� � ��� �.4 �.S�C .y: • ii'�� i.'1`�. :l. '11'1'.. ..1"' x t`.^:i'.1� � •n ` .-� Q1 .�•JL• •-\�' ° 'S�ii4 .�',. _ .}. :ri - .1.J.... � j`� wT 4 r l•Uµ �.i� ;�BYi , 1`.��• =.i: ' ' ,�y.r;. •.=w-�t���e��:.. 1� .�; }}y '���;i` ; �-r.,•,� �'i > I S� ` �G •.Q:: .,r. .i.1 ;� �-':� � :�,;. •""P��' 1 �L-11�, � 'y�:� t ?� �'l �l�.i 51�i', iTt:•4�:i�. i•h a11�1.'�1li:S, i�lr !� .I - � } :..�{�vi.�l, v� 1 .�� }�'� �-,' „`. 1 + el�� M i�!., >�'�ji?y, +:iy" ;'yti ��u • i;��..'-. , � �.t;i}� '_:t;', .! .ri.:,. ,�i d ; ,7 .}� .:�;.kt:e ::'tF ';4.',�;� ..'7. ::);�F;'.�: ; . tir � Z'n=�'�'•,L�� }��� •..„ �a -� ;�G � � m • :.i ` i.w:i �'S.Lii i ;o.^.� ':,ti v 1�.� �"wD','•., + i. �:�.�.�,,�: �.� _ _ .y fl? t ip` '1'�£, � ,t. �:.�i' • - �,1`� 'i'�t�+`' Mi�;M ' �.lk��tti- ,�`:::�Cl;ii...r��. �J:r`(, c:' .s it:,-'i=• :a " � o \�' y`` �'i +:'..t,� ��i;: .l•�; ��i: _:��'j�7 ' 'E�?�i,:;f,l;�.•$�Ci ; � �li::� :i�`•':"��' .:�;• •t. ,� .•\�:� � •:sw`; ,>= �;�r� '�i��"�•. =l1[ �.s� � i�= Y ';'i1�;c:o,r::),..�..,. - Q . :�� .``';'r:t''�- ..,.;�, : (V �i` ' } r.:'�,'1"i.. (� �\ . .,.� i'i: . . � ��'i- � ��s ��. ;�� �M1��. �y � .,�i:.. � .. ' 14L;. � '�.� �R�1"'��J � ��i:f.� �y.�"'1•r.4v:�� .� 1P F !:n 't•• •I;: ::1�- .c�1�:: .�� :n � ..A�. �li.�F� :b�"Mi 'tie'�::Vti",1•:•1,^,'�: Z 'tti, c'1 c'�4t� 'i:' •����• 'A �`7i',:i:,. �7� - ' r �G� Z i."y ., s a :s•-�:-.�. '.(�•G��r{��.; � � •.� '.i. :.i;•:i�'. .�:.�f..' �i" ���' °:1:�::i" _I.n.�n: ���� :,t:r, 'C: (� ��T ��I:� �:• ;y� •' 1 �4 � ' Ir . :.�':�Z , :I:�A..1�'ryi�.�. '�t`�:' {�} ; S^:::�::.i . �'- � �'v.�4`�.�::�' i.{': � �,S�/a1�'`�� , �'i t',�•� ,�,.,. f';.I�.l ;�';.�.I:,.: .t ;��e:rn'u...,-.�.�_`a14 .5.�(� : C ti�::E:.�;=:i,''� "-,'�`},t�.:..;,::!'•: �•:, r i„>� � ;.�_"� .�.i'.F"•. :-ii�i`•� :.�.. `?! ;sF:i;��t!' :.i ,�,,.;:.. yr .,. .m-d I.at�r r,i Q �v;i�:]`�: :iJ, '�':j `�• - ,�. ,i,:�• .�,::�•,�. ��""'i �.; � � ` '1:' p!it,�'3f.':,'�f , i\ - :'s:� :;1:,i�l:i:;,i;: ..4. i. '.�:.; :i y� �r �j , � .1a: . �,1 •-f• iG :.i:r:.��1!'� .d. ..5. IS.. •1en;: � c, :,irtr ;1t�:� �.�. � i.��.:r !V7�n\Y���:•i� G ..�i,l- ,. ��1�':i:'�i�a,'��j�; ��G;1?i ."iiJl'{:iJ�.�y�, :�� �'� a. ia' 2 O �1, `,q:�i�.�?` _ J.�i�si: ,VUi-. ;""}":E�, :�,i. . t\�H��Z� >.}��� i�iY�,\t:i ily!�r� '� •,Yr.n � Y' ,' "'r:}'�� c•�' �•t:.''•�t1��`.,�,::�"t, q•r:,^;��.' ;L'; il;;{��, �,' '.7 ^ .;:;t'. ��:;"`'r)::`�1Ev_ '��� ;;�t.;4 ,1„ iyj^i:?��.� ,�,.,; �. ��'-r''•� :i,�.���{;:�.'i�;��:. �` ltl :�r,ti b�� 'iti' y� il�ti; �.I. '�'L�; _ ..o.a.1•.'.'�vl :�.=u" .1i;.,. 1 ;4, : .•" �e ��i?` �,{, �,A l �' ` • ;r �w)'.�,"�:'r:;y^°.•.���•:�b l;. �� ,�lyi:eiN�:•: ic: .. , ,_ i7j, ,�. C i � . \' ,.' t ° � M' � ia •'4'..0 �` �. ` � � '�Y'S ��. �i�' ..y:•ir= �:i�: �I��LJ� ''�� ''�ii.'�1:��j .�,. `• �.�7��'��� � �. � 1•.:.�� € .i�_i � ��c:G. .!i' ."f. t;yca,> t �:i••Y:i"•:•', � �:% 1�' <0•.�? � �;',�i.��it:'n%r'�!.' -`t� ` ' '� 1, ._ F"••• � 7 ���r * t'�'� ^ • L.�`•:'<�' y�-t�S �, p p ;Q��;i .>>;, � i:� � _�:.'� ;} � QM� 4 t���ti�'; Y :• • t•:� � ` • ��. �.i� •hY.:. �:( ' �C '� �y �' -:J:y ' ,Q7� _ ;�^. 1 �i••"i' ,'*i.!;e.,.: �i 1< :�`� i�:���i'Y.. .�t�� ti� :'\� � F{fi�.��':::���� � ��Viji+.`:��:�;�� ;' C ;r�l' �� . r.�r iY : ���.�, f.'. SI!: : �{ � _S. :i<;'" ��tT.{'.' r ' rd3-r �'�: • • � a. `S�.C',,. ;1:i ; :�i:S ;,i/l�:i:''i.: !�i: - vt� -!��" I�:�i .I�.q;r::;t},, � e' : Na".{.1.� , I,.,z�7,i;; _ ,a :, , .s,. r�� :.i., -.:��:.�:.;�;i:i•`}', ..., �,�.: ��, � �r r'''' +-� • �. 'L;; j,,,� � '. , ,n'c; �:�:` {�j^;. � .iv�:�"vj,.:. \Q�.�Ys• '" d �-3�: ��i.�S' -;�(��' O: r:: �t�•�����. , r.;�'r_� ;:.... . � i i'. � '�� C �} . }� 1` .� - ;t� ;'��:�<<�.,�,ria .:i�i:v�,:�;`=�;?'•,'iJ.!.ii` :�: ���d':.�,`%,'s�}i,L`?'":, � � �}��'i 1:;11•:"it �•S�r: •�`',' Li;:� t:j , v;: �:r��..f��;,��. �;th:',�,:•: {�. ♦ �' ;c , ; t : �' �'�' •d �Z��;sv;;y��;'.W�:1-(� ,��1{� .;�... �`�a' � a'G,; i�t� �.��..•�"�(sn�u+;' 't il.,t;-1�n��t;i � 'i'�:.' ' ��. 1 . .�., .��. �; i rtl _ •c7{' ,.r:�ii� �..�- 3���' G � , �;':C `�•,.':.1. ��P •cli,` ;i�� .a' i�?..'P'y:jj i.� ( �: 'i �•�. '��'i � '>" ,. .5� :.}:; �:i� � :F:?a :!t"�k<:i�i; • , t, � t�:,-!-'t ,yt ,.� ; V';"`%1,_ r ��i.�r.'�V�i-�t�! Q�.. O:'Q'�w Yie��� .r'�;:,;4,r�f�d''i•. rir ' .pti •": �:i����?;r�.rl;�.. , L:��. L ' T.:Y:�i�„i:,.,s 7i�� x� <<�. ^;s:�xi�,,.r.�?� ati��.�s: :'t. : • `.' :,;. dti;�"� } `:d , ta.:ajs.e�;; : ,.,f0,�:..�,. b„��i��, .ei i4 e<;!!' . i ' 1 '� " it: i,s lC' �: (!yct,�. : A� � " � d�.;�{ � m I`>f�; ` .,�`�', ��r' 'a`cr,:��� ' .a�h�;`C:;,.-e„i;, i';1; ,� !':��=R. :;�.:7F. :'••��,�� �..� '�+:i•� ';F�.•:'�.1�•� ' ,`.Y' :S(,:4--,i,;,�` ��;=ei: .,��^ ;.,�� .��` 1<.'i`''`"(y .:�1 - '�: �4: ;�4�. =:l. `i.�t�i�i'�i.'i::iV',.;,ii ;,\' .{�. '�;Is �\.:�]''.`,S' �/� S:ir.: i:[�;';�:Ir;;�� ` �•ir�l LCl �' M t:� �;'.^ .:i'q; �_e.� t: 1•' r �;.,_i:}�� _.PS '•:iti F�Ptt, C..,�Ls.:;?r::;:, Ie � �Y•.. '�t� �i�.• t�(. :i�pj,. :;�h4 :�t•<i .�i� �'`.� :1�'::��.. ���i1r.iY�:/,��vl.'`i:• �� v�. m .'w'i itr' c' :J'p ; n;r�••�^7�1.h�,.�, i .r,: ,� Y, I�.t�� `i 1•. M Q_ �t:.u- -!, �+':5�;:•+ �..-.3:��;: ',' ' =4-r , �.�.: '.[j:' ,,: ,7', .• �� d`�' � °.4�'r.�oo-J• , 5k�. - lF�r,`�NS..iX3 t`i'�- f ;'"4iw� i ;�' i ti.+t;;F.�,�,«�.y'hs-i�f�`�i�?}•� �1 {J �� I �.r,�5 - y4�»�, r�ly{�a,d;.- � {� �Qa I ��:�t� , ;C�7�=..L:��. c1`�.l�.i.- :i�:,c••,r��i.•��li�•G�. �,s��..��i�l�rLr7`�"��::' i:k �� \L:_ <:`. ','��, .i �i;ir i;l�� �1;���:1.,..;1i`'•7i� l:'�t �f.e+'fi ,:i; .� � y�3.� ''z�F �+F:•.y. +;p��1.��;-� 2I?t;? '� 1 ;'� ��.q',s;, �'�`, -�'� vl,, � J._..,,.t �;:� �itE��� �1 .1 -.�,., �:r,i !:1�:'•�F�: � ,� ti:: �i4•4 �s�?::;'_�.1;4" j' ��" ���,'��}:;;`t:;�,•.;�U., �%: `J �' i/Y F�-\ e iyv,�.r�t+, i �t;, i_:,:: ; (C• `•r �Ql L t"�. �t'�!.•�.:,4�'�_,� •i'�.�;'�"��t. ify,� r: . ;C,.n�t{7i,;..9f� ..}.��i ,. ,cc;i�.'vi,i.z 4 F•- ��F:�s?a. . :,�.Q.. 1 ' 'i?d�, 4'. ':Siv '�E i :!'; ' f:�w ° ' `,'' r:u�..�t. , a :�Si : l',-. M1Z ^p,L!��.� 1t� '� a � a.,. - �. ;�:�;,� � " ,i: ��- , i��; �.s: �: ��uc:_� , ����� • �S: � 7..'i"N.51',� �ik': :4` 1, r .'I-:: ��i' LN=��'�� � �� t iSaw. (!J, 'l,�`t'��- � � j?r'y2l u��• i .7e., b'h:r;`, "a`:, a-;<�l,�t i:�:'�.+f.,,�>:i� .�.i ,�y;r .Jii:i^:i.�li '^;� '�L':e�;�;'��" �i E L �'� '.�:'a,, 4`. 1•i a �j�.ad'�;G' J.. N W :4 � '!.L .� '(JJ;� 'fFM�I`, tl�� � F� ":• t, ���� r k 1 " 1'��. � iur: - `�uw��.: � f�� : 1.l�:" �` � ��1 � ,i� ; �t ,,: >?' •Y • ��;;.. i..��_���e�`^ 1 _ 'J�t 4_. i f �� icj°;:�\�:• . 1 1 �+�;tt.' i•`t3u ;y� :;C :[.�kti: t��;.� 'i;} y:1'`�^' •,i�� ' ~'`.i?..�eR�.�"'..>fg1; �i �k��� . _ I�;��:;;^; y��*.,,d�;.�. : i rh.r'; .Z. � P"'� 1 . r�$ +t \ ;5a m. • �e�2 �. , h.5 �.1 � K'ti• 1,:���iif-. ,.?. � I• a �:�;s_ !;"j „i� � ; ai.v., d� : t ?';�' •.... •.o:. lt�: ' i: ; ;� y: 1"� CI�:.,�; r, ;tl1• " 4�P, ;�: : kwhv �, - �, • ` i•;, S �.'' , u�: �, � .G=` � M V� �i, .:f.�:tv,<< .��tib i;Sl ;..,�. 1 V:�:iy:: 6.;r�r;��•<•�t::,; ..r•�;�,.'�' i b;r t,i ., i ti; a � �:�f-� �a..w.�.;;��.�;� ����";,��.,�;�.,,.: ::ti ,.�,;.,. s_��,:. ,;,.�,;, :�,:"�,�,:: ,��m�•� � �,�n,�.,� 4� „ ,, , ' � „ r-. �'a� ��t : .F, ; ;`' �,:� � i,, K.:- , � . ,; :; :., ,.. ��'{t L ��<� - z• '"' (� � �' `c�• ��i�.� '� •�y;� ..�.iv ?i�. ,} a;i'•.t: i;r.�;r:y:rx{�_'. �L: c � •i�tn '!H ,a�F; .:��.�:,'• -��, �`��t?ti7 �'� :l!'�; 4 �; 4 1 •5 �t�_ i. 7C [ cii�'+.^ ;:�i�:^•T,l'.in' S` "Sl,� s t, ,,t � ,i i,a, ."�'�l• .,+,. �. ,.�>>,a �°: - • �4•� • f �?�:«;-'i'•L: �,:��'.4 ; �,.,. : i!!. i"� �•�tti�,':t;i�: ,;., � � � nWv .ri�, e�y� ��•n� y 4S, ,r 1;�'rf. _ •�itirT'� � .a� . •y. ?�' 4� �,1� 7"'�t' Crn.y� � ,;s�:�.. :r.�<. >,�a•i. 'ir �;ri : t;p}��. � F;, t � . _ '�.i � Fi�r�7c :'4"!'�:;.��;j�:�':b - ,41,,�'�'?';'(�,i ` •` ;,';' �t�;: �,� ..i�F s`7' :�4.}:+� :d . ; h.�;�" �'•','4,C:i `t��' .t.•.t.� � 4' .i� �h:.•7 1.,�t3 Ul � �,{r�,C�� ' i�-ii,'' :\•r^�I�.`z:;� ,�t: �:�k'�>.•; - +:i;:h = , , :i^_� ��v :iC�Y;.;c iL�a �:Cia1y?^c 1 ,C1 , .'.t�, , . ?: • -�.} �I: �V.. i:E�t O, '�..LKAY �.\. [ i,t4,f, �L� �,• : wv ., ��.1� : `i�;.i.•. . �: ( � e� ^11 °.P^;� �' y� �7.��;}.<ad ��.1 � � �J.� Q � di5us^ , ;st SItC":+.�;ii�',i�Yi�••r�v f..'�;' ';(�1IR?�.i ' 1:.�': �11�•��.�-l�i,i!:•':,;; t,��s'�1'✓.� I� ;�- r "`"" 5 � .; �. � ;� , : ?ni�, l•�ip� i 3i%c �`: �»'i�:'.''-'.�': `�I - � iitx�i� � :if; ..1 �4,,Ci.�xr,' �• { rc �.�-i".' � , ;�.i;'��' {,q:�� .1�:i�5,v,:, y��✓l:'4 ��• � �' ;',(avi 1••;:ils. � F"" 3. ,�'ti , - �iK�i2:i�. ;1i1•� i����^" :.�Hi� 1'�,L"�:" , t-• � ��, �'..,:jF;?V 1���s.�, d •. "i., �Li,y�,�,ii' 1rGi'O"�''.?� p ' L.`° .. , L, kd.,. .m.V rdl;k�', ii�F�•�1�+'.•.:.�Rv �t, ',.'ti:�s.�c,. � O 1 }d •�. ���v .,p `,tXd iL� '.1 � ::i •��.i ;F. }tilir F:��iti�ii�}';iYt;?:.y: �::is!'^1�:� • y;'i,•(S`;.r. q �, q,l,�;�`y:;y��:;� • ;;• '� t, a7��'i� � i�} �. ,'S :s{:,`��+)�L..bI�"' d� -r`!iF 4::':'• ' „e `�'^.•,Y.�'� �?.a�4��;�.'t � �.tdL;a:i,{�y.• ':P;;j s.!� .�'`?'��:•�_.� E w t. rr�t?\ I,C7 r �,�`� .�,_•• �'�� ,, � � itr O 7"r n� �'�;.a �:� �li O �`�_.Jt' �il�.;CA' f; ; ��.i;°.iri�J�.J:�l^ S � .i.�:':�. ;b •.1 �(Q;� �C: �C t ty�',�,;.f.,'� �5'�':.:i'�, ��. `�7i.�'r'.�; T� .id- .'•S��yt��:� ��i '� t �.i Y�"c 6 w �( ^ .y 1 " � �Pu ,�.� d. � � • t, �� ° .iiG};lC7ir. �7' � ti. �r ,j'3,j::^� �i�� .V..� '<.if• �_.n,St'.� � '� �.;it; �l:•` � 0 � `iy��j; � e�/:��$'iQil �;i, •,i. :�,,�" :):'+;)bp,� �.,,�;:i�\;1 :;�.Tf��':.if)�;,:1 lL'��!i`{�;4"'r:��r6 �, j ,2;Y'�,. � � ��" . � � � f• �i�• 1�F� ` V. rl l� C;�..:Z�t•.1 L" . 6,��'.�'I�A��:::'F +��� r,d � � y.;� ='�t � �*� .,�.\r;�� ,� ':��� }��i4' r : '1' ;i:� ' j l�V�; �::, l•�i4,_�,. �r: � •:"a t .t ': ^W;4�%::i :1.. .�j i 1 ;�t,�, .;L< " :1�.! r�.,C�p'S��'�f,, i' �i{'�t�•.Y f f ° ''i�,7�i1� .; 1 ;-�� L • ' I!• �R t1.{� !i.1�i ; t1 y?,�,.''�;;C11�;:5!i;S�.d'a;'i;�r�Y b. l'Li' '�'::' nr� '\tii�h''w��:t�,j,�= 1: /�/ �:1 ` �', �i .,}•..�, x r: �t -::� T��' S`w.: U-7�t�.�.L��VJttptt,a. 51 ' ' Q ? Li� ���Q 1 � . i ..�.,• ';�;;,;) ��.I,i•E' `�,i.;;F �?„r�l';" .S ��.,�.,i, iai. 1 ��Lj!:tM,�;,�;: ,,'L.i.�. - �r.!;,, S, t ,eti•' � ,,��s4;•:: {�7.� � � nl•• � +��'; 6it'G:. r '� . J�, �1LrL��:.c qyr d ',��.'r, , 1• �. .y �•d.�:;7'���'A},� � � ���� �,�'..l�,ti��_, . �f. �t:'�\ �.l .�l:��li� ' ' !ti� i5: :`l,�r�y,?fr} C :�- �'Zc::. �' �:1"{� t��.�� ��;" ��1� '"�,1.. " p-,'-A �1. • i: t. gt:�':y .y .;;;" � � "• �. ; , F r` t 7� i,.��•, , \\ t i�'�rv.��:..OV,..�=1._,;� ` , �F .; ��:,�., ��{. � O � � i4 i�i.�i�r.. �i�t�-:�, ^ S ° �i• :F.: ;�'P;:«'-i.a ^:�11'r.. u. r:i _ Y{• �'4:•': �t.-� . c� :i"�,, -� : ' ."�P�,,,,y ` ,. . ,, Zr�.� ^ 'r,;i3 i: � ,.A ;.�, �-' :. �aPL `�S,,i � � .'�t,d-Y ;1,�t;v _i. > '�,t�` • t� . ,'.`+"v_ ,» '1 �S.t(y•t�\l�r � � O L7I CO ±;t1`,a" - ��i�'+i`' ;r' , "a�J , ;;,. ;:).. r�i'• s �. 4;h:,•'%,, �i .,lt;� "y!'" . •�'� ; r . y\ 'Ftn':,�',,.:: (�I:i, �ti'.��i 3:e� �. n? .. y,.� :te;.��r �; �. - �,t `�,�n- �..�4•Y ��! YJ:�R..� z `d' , �{ ' :;y:� , �`y 3 ;.v �:a:e;n:i.�nn.'i W ��O f�.' � . t� _ � s� � r' �"( �o � 2 a ;�; � l;. :; tti.� '�::�t.:: : ;i. �.l�� 4. Y•.. ,�f� �. . „LV ,f,".1:('�.�(.a:L•n�..i� 'tit�:il, ,���aJ�;S.�'��.rF'::;Yt+(t,��„+� " �:��G'�iai�4:4.. ^ y �yU? .P �C �a�01 .ti "a ::1� ` r� �� �i ' •"1:.1 � 4,\;l� - �:1• '�IY S+ ��fE.,il, � L ,. V r[ m O i�t� �;: �.r�v:" �r.,ie�\rJ,�}.� �•�ir. '';' '�:il. ?^.•,r, ;Y;i<�xs'.« •:+„�*'',.; e6;L;J` '•4„\ p..:,�•..;`i=t�.:,l.: � i;•,' :?�'?i1�• ),tti.yi F,.r} � CD t�y. ;:Y.,.I ;. c�• /y v1�i � �.0 ����''� ' �"d - � � - k� '1'�•� a ,�.�,,. �-*'��.•,^ , � t 1, y� �y�.� ,,.. : :, - . -1., , N��;1 , �,, �,,�: ��, �-. �: � 1 ' i i ry� ����, ,�. i t� ir i �;�t� �,�x!�i, . ^ l b, r.�:i,a�it;.�L i 4�` '� f0 (y . 1 ;a.�� \V� i L�i'if:U";�ll n �;�V��i+i1.:Y1�V 7�9i�+ti i">'1:1,:: ,•i?; �;;i`i�i�iiv+.l,i;.'.U �it �'f.��,L:1i:L=�t �^`.�:g'-...y.,lM'�?:,2:+�"+,C'`W . ,:, � � �..�1�.,, � y�,« :n•: ;;1.:�'atilClP "1 y �� 15;� .. �1� "�hR �u'�Lr�ri�U i�l:rd:i• i�:w: r:'' •c�re� „+ '•:?��-x� � - a . .! t�• 1 i-i.`:li ��;;�:;nhf��5 s", � . �; �' '.��.. .'fti4 f i'.:1�.t -.���a., i��` , �'��5.._ :�r� :'t;; •�.;Si:� fi3 ~;� i r . -:;.o - L � �a �R � i t��?�,�r.�. � E" . M1} i1�� �� �Y� : � � Q� � ',�.-� �:.is a � - i�' w c h ,5.��: �i'Ip`�Y•<u� �'�1'.Pi.j�� �Q{ �Xt..G , 1 �. 4,: .7 t'a -w- t ��,xyty �3 , � � .�a.�r} : Sci ..��� „4 - i;1`� `t - .i1;} 'Pw'; .1, � ���• . � ,.a� +�K a w.' tt,�,l`� ,�: �� ., ' :L .�y�� �,.. �:.� 1 k A1 1 i4 x:v. �,� x '!�' 1 � , ^t� , t� ; ,. - k. :N rO,M �t;, _�• :, °���p s,�`t� ��v �,�r1� �: �� i 7::,,, f�'4� �•A: � �'!7 ` },isr ���, r �. �.� 'r(;-}i•X�ie r �4�t�.7:�� i . il j � ��ti i� ] �4\ . L'7ti�.�:^ �.�,c134�;� � y .�ri::: l. L "N'I r.i`'�tl.yl,.rp� .�`,s• �,., � 4' [i�� 4 1-k`-;�, i. a� t4�� �F%l;e::nl.r .j�: ':��r �`ii; tn-,t.::aY�i. �i� i a �i e� �•. i r1" •.er, 3� �;ro� i,y..�.;.� li':t7`,C�"1; x lr. ,.�..>A",Sk ��•. tV x•sL��rl,a� ,is.:"L= � ��( , „GpS.� .,.oN ;i-.:ee1;•ti ` 'i�. + , �;:.:�� �� i .�t' Clr,i:�?'. �?�1:4:e. r +a�? { �i� t� � .y;.�.. `F� yi •�,fl F'l`r��t �.��.t PF�" ae=:•-.�f v1:',ti��ii7aitij� :.{• s�[ty,p,k•.:•;;t}i ,a;r:� �i., _ �•:�fl„1:-\tYltN:U;{�iFi6ln.�r,...� 1.A�.,Y. 4,. � F,. 4�:1:� ` �a � •h'3�k1 � i j TlL "�i:t(pti' .i. ,!i tE a5'��' � 5 �'H�aly�7 P�'� r{O,e,L.h�Y:h;• �..� "w_'4"„ �4 �5� � � u•��. S,c,�•V:' :.�, t�. �.'. �.; ';3G i rlj�i �'Z'� •,56� '�':.,;.,�Y1'' .ts. qr.1�:>.�'u�•+�`l� ,+�• � r.. i��v,�3 �n � _E`:;=•, '�7;�1 ' :�O)f.. � �'' Sl� 7. L'J.� �i��� Lr c;��. ..• 1'i r• .�t. �r. t•�' i O ��'@� r� .�• �.�, �r ..1�C71�0` �� 4� �'�: iat�.� ai,�c:`�' •�� �+: �r • a�c n.,�� a�•�i �a, 7 � iii4_-. ;.G.i'�.:','�.•�.{-?fi'l� :� 4 t.. .}�',., -�,� '�7.,7r�'�n..� ��o�.`c, N�r' ittae: F.: � rl � Q� �� ��I�i�.� � �i t�`S,.Si,i�i"l(A!{I}S,1'u4r'r'p;�:rt:�'' .;n' •.?3�'' t + i?n , , ��;..� �" � 1 r t�;�Y�tP•' A 1���n" ���r'�7 .. , . ..� 1 �� � 1� •�5v:�',`6�u .�b•'�� _.i.� �... .li��(^i:Ftat,` w...y. �tN�.;r.'t��; 1i1 , ;�, ,�. . (,7� y �iY 7 SI».y`, ,�;Q� 1.4i��?;diiry;ti;�f �S2f�'�F�C":'1%,°-t����lz�. ti' :,��1•L':°jm ��3� .�f :f �i: r :;? i., P, � �;H'ys,'itity.jti�!�t, ,l;�,.�,��tibryf:i,�C`�1��'e•�v,ie�;�'l.^rv��,'!S{ryL�NB� . .V.tt�qr �7 0 4gm n� � �u�:> �r td �.. � i$'�.� �"v,`,•'-��.'�'\Ol lKp�tit:<"�•'/ tiht��• }.'� :1'i'{�P;��,,; � �;�3};ii 5C'(�,I�rti�� t.:,u +:°.�i§rb �'9 - ai. i�•��w.'S• c�� t, Sh,:?.Y ,..o �tih�l,t u.y��l��id� �"�S .F. ;tY � :�" T1� O y:�-fr�N' �t S.ii�.d.� .5,i�� . u 7. i .eiy : :Y �:�fd-., L�• e N •a ;u."+!� �"''•S� '�, i:� f"' u 1' �' �y �:.1�f�C� y . . � :;�t ��.;h; 1.��s':r y.' :F�: Y4c t t J� -� �•�+"�l r ��iN �t'h� J!� �,` .�r;L"enl .'.\ L l i� r{'k'1%i;f i' � �. •is�'�V ; Iii h�;�, lii Y+'%���'i�r�� ' 11`.� ES i i f.l.���.,5r` ' 41`�� L `�;^l �,' � tK� ;}c y� ��`,i}.Gr;:eY�: ,Q,'�'!'.� '..�""." r 1 j;;�,'r, t� ' Z � ; ��Ca�1�i',t:.. : ��f: �a (�'��� i�Y+.,� t ��� t4.L:�Y.JFItx •II�F.^i..'.9 .11�WtiiD A�4�a �:�'C7 d A. 4��f b � � :t?,rit'� ���T���i� �wv�:��.�qljY�.;'1�:- 1 . +k,t ���, ,3 . � i c aY'l^.}� `E 61 o ap „�p� .�c �`, �-�,• r ic'�r.,°:�'�; t �'� `.Cy .� . , r c ��.��� ,,.� � ,,;,.,. ,� �r n �4•: � 5 .3`�r� � ��-` {F�';Y�ti:•lk�u���� r� : n{} .1...n`�i�l' } xTj' i.;,l',��•�t�.7�1-�bT����.i:,:���'1c�'r��iy!t.n�. , �\Li 2'� 7r, U�'.��k L�u'�;. �';h i.:� � s� ��7:�'�•�T:.i?k;�',i2�n° F.���7.,- ��e;sS�1-�'!'4i�i�19p3Y5we1m�STi+U7P'IaG:r�ofi.M���''�C O . •:1 ,�i� �1"1 C r �•�-af4�l'•',�`""•ti a •'"�•�'��E . -� *Y'� 'u7 ��y�`' ,��r,�r �..���.a O ��•. � � �F<d i� Q � 's.:1�G1,c t.��x �h C.�' � .,i:! '4 �.. `,`' r1i �';�y�� �°• ,ndt'L�'r, �:�.v� r.�; � r ' e.; +. , �, �' ` u 1� :� O'�' 1 tC� C+� ^� T+ ,kkk" .� ^ P�{�^ 4Q1• t' � t'' l,}. )k �,� �. 4'.••,•'� , t 1 �y'] L � 1 �:n � „ c{��1r• �`��i �... 1 � � �n7 6, r+�� Y1e_;�t'� � ."y'�"�e{4' �•�. .� � � ��.�,�O.a �kL, Pi���7 �` I � � N '.��� k? �}; @t��r ��ti�kC,r���ik��,,,J: - x y �yt ,: i,,,. � .rc ;:'X, y ;.,� ±,;: �., j .4i � ���' E � �J.� � y Y .W i "•yt7 1 'p1'�i �Yn�qK4�;.�;� �, rr�t;�. �:t�a:' , 'ki�,;•u1�, �`��.` r�,tr ,y� h•y,�'w�.C_ �' F� .�4. `� � ti � Ha,. vi scv.+ui.i� �F1Ca,' - n. y� r3,.� `i m� �qy,� I 4'!`�? y '� : t ;4 s,,. • - �'G ab �.i`'�� 1' �:� ti 4! � y �. 1, 1�. -a��+�,�F���'��{' t �' � (�. L[�'tL i.��G:V ��5 ,i:Y ( '"-J' L.iy�u..; M �. yG':1'e� �'L'. ��� L"t• �u .,,�.�bi{� r }�� .V �� + ;If�.G{a 1�",� e,�� t7.. �y 131" � >r 1� .4 �� onS. �•�,, S3 �t v ' t � dY n J �` � :�i 7;��{� � _ _y,.'1,5 t' � n �J� � :%F v: ':t, ,.�+,'' 1 'l' ��t tY t I � „`� � t ,�-- � �- � O� i,•a 1Q� �ar �, ' ,��..,*a 'I.M��1�_a ��::�,"C+ C l ,t,o�f'*�� ��y" J ��Q�, �`.:� ^'.:.,;i .G .=v k 1,Q�,�:�;. �' � � �'i � � i , . � .��,;- r�: T� t �� �., I'i' �, � ,;�. r ( i ni r 'u,acrrwc� ^nna� r � ���. ..a,'1f,''t�'�"a5`�;, ^�' n •�'Q�'�i�! a,:i ;k�; ` Y.{�;�:.'C1 � a'�L �4�.�i�n �tii � � $°'�}`7'�`•' ;d'�ii.�:�' 'iti.��r` '�otF `.T `. ry, t��A t `[�t iY.� L i I . y2 A 1;j�., +. [� S� �k �],�.^.%"* �!•?'� y 1 (;l0 � ..i.�}�ti '�f _t11� ��:f ti; p t � .:,r �fiy,p� ti {a �, � �z •.,�.,.�,�1lS'u�7'x . ��rr� �'. +rC �, �, r 1:. A n.�:�1i. � +' �� ." �4ir 1@x 1�' .�2+ qi. �-'�i , K=•.���,�s r ti 1ti_2X� } 1 7�.C'= Q G'` y �?� ^� �{,, a�� liGh�r �/1,G1' r:fJ^�:tia`i: � �a�:_tk a';t����01L=t�4S'r�'f�"¢i;. �t:4 .4� � i '1 v.: 4U:,�li�" lS�k q .17;, 4 t iY• Y�ir• ,,, f,I'�'Y `1;� h.�.i� lii"•T' 1, k�+�. %,' �y::v-tricktC...r1.v!.L'��r..�aT'X:�.s � C1 � G ���'i5y ;�y�' �xs.�+dt�+]+tc(d:� .�:.r,'.�1��l::,.�0` vG�+O' � i ��.�,f,y„ . (/� �' �, q ..�+ V'i !f4 tS �, • �.;h c �� a� •'(��''`�^ Y•t ' E x a w O O ,� '�' ;"}Y���, }a� 1„�_cd 1 l i4ti � 4 .a�,�. '�'�:?c•i"f':t �•Fi� :k'.w ,�•> `� 1''' -r�i'�i�,.t iR��, t� , R��i��`• »�in'i•;y'•Y.1ii;!. � � �.e � � r ]r� � '4 c.� �.c t'. 1' �^li -,k, S�_� �s�'�+��h'a;1�}�^c�_�� �4 �,'M��e. [ r e ' . 1: � o �; �'�;��� SEi � k �?a �.::.3 l. ;.. r x-t o•.. w. � a�<, �uxY n�: t n e p En"�@�"b ���., � CC'�Ll1�±;�''•i fG'e`'�,,:�� �,iy 4��':iu. y�t�•.'FiG�" �'t, �� � ' t 1 , 'tt t� i., � � �.�• � �� �+3`4. �h� : i�', � r.'v: L• � '�4. �i ,�O• f0'•s-ri iS ��"��1�,�.� . 3(j,�i�,.�r��: ; ;,�':� ��� �,�� ,�f � 4.,�:' s ��`� � }� � i � = . d ,:.�w��,.y ��l ti 4�,'- .,,.-.} -. 1.:7Y�5',z�t;f�,Z,i�Y�`r�.�„,j�'� f =.iFT. �� � G:��� �i��M1i^; T.c>= �k`t. ;.�, � c1�- ti;i3iFi�'.•'j'�•a�v"sa�r�"5�ti,1 v�h"-�i 7rz•�,�..�,}�,� �ta�uWakr�atuea.va,�e�w�r."•�t� �i�`•'G .1 4 ��sU:O'!N C .Q'.n k �.t'4'�, '�f �.•r•..i. f',^. d��i, ,r.,*''• *f .'x2.�� � � ����.. ¢ �-M !"{��01�-�'�(Gb�;` �F,''•�S �•�- 07 :� f�' ^ r�t{�,ka ,{„`'1L� y r .,., � 7,.,.� ti r�. n�(4 1: �d N�,r �) 1� \ t f ��;°t`' 1 - I `'•.y "hi' �It �., 1 � i .� ° ' ~ �'. Y �('�� (Q�l t;li'by�k.k�Y':�,'�I:'� t 4`,P�f��R�n v �i i °�' " x1!1�, 4E,�'.' �.`:r,�t. ° "fn�. - �mm .0 ac:.a " 1 'L`s� {4 � � ,S ���'�ier�� ��uR�� Q�tv`� ���t� 4""i�" k d•Ft, ��:ai,�'`l� ��� ��:�'rr7 5,�"H��i. , s �,i ryt.i� �•��. d � � � � � 7v� r t+r ��Ji � t rR:�'�/� � t L�1t�i � `�.k., i�+,� �i ;� ( 6; il {^� iy 1 �,r�se(, Y'. P ('� p '�� 1 �^.r��� J�ll',.;QY'.a` � j0.v�. f �\'..r ...�"'-'g� �l„�:\I�`tZ;; � �'� 7 i ,Q�.�',y� � p��"�'�;r� � s "'S�� y a:5�;d+�>�;i - �;'a��'�-L:':���i.>1tin�'#���C �n y . R7 " � ,� 7 i � � ` .�.i�� �1' Ir � r : y.' i.+e'.. "!� QI• :Yf� .L � z w '��t�• . r:'S� � �� r � RtLs' � c x,t'F'Sai,ti"i: �- £++;, '4 Rtl , .C•''�; i� � ' �;l:�'�?�:y:'d! ;��;3,,tt•�F r';•c'.n. �; �:. � �'� '��"�,rr' Va�'. �:m F-�l n,,, l; �' 1���• r �,,,,�[S1F J� 4 * , �.S � t� �.�•.. �����I���r1 Q`i ���?�1���• :��i.� N � V}� t s" �.�S ?'�� iJ,-.lt.''•��rfaYmt'i ♦ k: l�Y�a! S��i: r la - �•��F a�-`!1?�M�i'�ix(� z ti 5��,.li�; ��`'�< ` � � �< S • '� 'IM����'�,,''t• � � t• a!^ �ti� n�1"tg-i !'�.F � 7�����! ctf. E"�C j�t '-,:-, �`'�' e.+nsc_�rn�Yerr.aw �4"�� �- a�C 7 r �E�`', - '��,�Q' r ��� ', ki � 2 _�'.+, �6� "-�=.L� t_' �,�f,s c4� "�' �e'r ;� �1� �t;��.,y i 1�,^ r�t �ti �? . ti_�. � �e! + .n" �;"'" 1, Vl:� QP,�1-!c10: !. �;. ;; � rt.+r��� y. 3,,;r."��,'e�i;f;.:��ti;; �s�� i� f4 � '}y, . � Q Q�C'.Ivi�,'��1li<7��i�'/,��y'tt��'e '\: tF !b :+,� ��Y x,4i�, �.44.�?P�� !� N �� 'ai �� Cc YN.11�, ��,���Cri-�.=1�'i, y.xFa�.'.:�1�" `1Y' "'!%�til a - „4t':4t R Yxj- i:C . �r `�� ;,1:�` f�',aF^�,iS'v;1:F�'�. �o y; . , •. :;�., ��';F'i�,.:�7�1::? `�� � . � p �' , Y. }p w i 'S`� R � ! �• r �� ' X'� •-.,� t, � � �� . C] '!� '�a�l��'U'�` a 'G��,�J'il',SQ i'01�:•'''^:; .i �� �54. e` ; ytR^ �::.?;� i �,io,. , ti•�rsait�°� -�.,r�^cty � Y'=1:' a,. �+r, � ° � � � �5 ! �.�,G7 i ,k���.� N. t k w.,: }:� +`t { r � � P % q1 t .� , ` �: • a � a?c ° +� � � �° � .. '?h'' , :�' � � t� . a C 7lr��ri�'�� v �,.f!'�a "�':ii��'�.�1:�5`' .:�{r,.l L,'sQ;"'J,IE",�4"�.'�ri':j';'y�.r;n,'��7r ��>:��':� ���,;t= f:� M s���•�,Cjtii'�;m'���c;��x"��iSi�?,'��i -ti,,.� 1"• ,�,�',���0�'S � 5 � l 1 1 O�`i�' � � � i,ti.:. ti 2�r <� ,> �;, � �. 'A'F��r S�'.� f�� v..'l•�.: v �1 �5.� �� �N�S �'`�,� . ��1` 7 � t IR �r��'�r�;S�`�- � 8 �� ��Se,. Z' t �;,� t s.t: z 4 � J��. �u}.i' �.� 1� Cl,+n'JI� ,:�r�'.. �. ,��,C+, "�r.� �/i�-=S;}i:„ e .;c a�,;.�+,t 3� �i, �,�;Gl'�?'� � j' ��rn ��;�,F+r.�L ;��.,�, ;C7 3 a+t„ .�" 'f,��'4i'i,,���:�' rJ�7 �:��' r:� `q*54��^.•����i�:u<L a'�������'� � ;:�' y. O rt L�� �� , i�•�',}.nA; ''� H° '� n.;,t; b.;�ti{'� i �� i ��.!� 5.y ��,i,,�„+'pcht27q„t.,+•p q m rj r..V�i� :� -; �ty �^�^-tY N, t� i�,' 4i���� i%���,l5i,ir,� I.�:".L�'Myp�_. R�F 1. ",��,� � Ya`Ftiltffi5,'�i} 6GX'�t��;ku!y. � .�' � ���LN� t <y S�� `�1 :.iti� ,�tis�5,r.%, .ri � »<+�.. �n.F i:: �ft`�, � . li'. 'b�� Ke�''t'ir4:,�y�; iai e�'�:�` "3�, r '`p • t�.� �7�'•:C7A:}:,��?i.,��� , q��s,�a�'!1x�1 ;:�i.l :.;;i;�.h3� yu+.���75��'�,�. L;.�\,�1,F',�.,�.i?,I.:tY� t, �"J.,v �; �`;• �t� � Y�l iy�},, b , ', _� - - , • . � {c � �;'�i;� . r l: f t „� ::s n v .a. � n i`FSr"'';,�j''�w � Z { •y , o.Jl'� iii�°;4.' � '!};,; � l '�1 + � - � ' �:�+. ��:j:if�. ��li %ytf��.y� S�.�i.�:iz::t�'iqR.; }�.�iHx• h F '� .�l�;,tt�es .,,tf���iy�:t�:.r.,.;CF,1��,'�.�S.�ri"-•�aa.5" t� '-�i �,tii'� ., .1-i; . .,5�'� ��Li��. _ t y5 _ �t� j rh,.. :.Fl� � 1�^n r .;, tif;?: •'j' re 1� � y !. '�.� K t�•y�'{I ,. :6� :<Str,az.,,.,+�� . ,^4:, . . ,.:t. ,... . .'�a,��':Ctir�S.•IiV�;,�k't�..t,'si;3i. lr;n,;s�....... •:t��.�'`4;�;�s:�'y:��ai;'�fi':�`;1•ir?n.Xret�d.:51c�i�kSt.ti ��,.,' , CNG i0t lfi5v. o'LU/) CA"S�DE CITY OF BREMERTON Current eilling NA�C�LJIZA,L GAS 1_,600 W OYSTER BAY AVE Past Due After ,;� '�� � o�w P 8 A T � o� N° BREMERTON WA 98312-4735 10/09/2009 our un umber Service Period Service at: 170 0625-3 3 08/20/2009 TO 09/18/2009 1600 W OYSTER BAY AVE = Please refer to irNormation on reverse side. Previous bill amount 5774.62 Payments have been applied through 09/22/2009 .00 PAST DUE BALANCES DUE AS OF 09/09/2009 ARE DUE NOW ..62 Meter Type of Present Previous Energy Pressure Number Billing Rate Reading - Reading = CCF X Factor X Factor = Therms � 247020T REGULAR 504 19141 16999 2142 1.031000 1.673487 3696. Basic Se�vice Charge: 510.00 per month 510.00 Delivery Cha�ge: 3,696 X 50.23179 per therm 856.70 Average Cost of Gas: 3,696 X 50.80772 per therm 2 985.33 TOTAL the�ms cha"rge: 53;�3'� -.___� City tax 6.00 % TOTAL current billing due by 10/�9/2009 '54,083.1 Balance of y'our account +54�,�,5�'7"� " ` � ..--- ���� �- �� - Z� �� �2�v� � �c.o�- 24 H� - Business & Emergency: 1-888-522-1130 The current billing amount includes 3.852% state utility tax - 8157.28 Rate � Tariff information available a www.cng,c.com/reg_rates.asp 3500 3000 S �' � �`� 2580 ` �� 2 e 0 e Payments made by check may be processed electronically and may � 1500 be withdrawn from your account on the same day . You will not . 1000 ,receive Your check back from ,your financial institution. For in u�ires or opt-out options, ptease corttact CNGC@ 1-888- 5 e e 522-11�0. Payments made by check or electronically tfiet are e --- - dishonored by the bank will 6e assessed a retumed payment fee. - S 0 N D J F M A M J J A S . Month t y consumpt i on i n THERMS This bill does not extend the due.date.of past bills. � Nate: Current charges are due and payabie upon receiQt and �ast due as noted. . _ _ . . _ . . . . . . . .._ . I j��`;;,,.>>h� =�==�`�j�-,"`-�.= .-�-=:=,,�� �-.-__- _--_-_ _-_ , . �'. J r ,t -. � ,-. r''� . ?,' -_-...,_.� I I j �•� . ^. ,//�,«,�I, �. � FQi M �•_ :. . � E; i � ~ �e }"�����'—�.�:�-p",�' � �i�-��i).Yi �'3 ;�,ili�l j.� � v ;�, c i. p � �_ .r. , Ii � wr�.:.:':' ,?'�-✓f -a..�;i.,..,,,_�.,�\'.r...,,-,,.✓r�ill, '.. ; _�^ = ,�_71-; r„r f li ;:��-=_.-;,�:--';�f ' `l(; (c_.'�'�:..:.�_'�," �'. Y. '�I t_..___ � +. �_. ��,_;,,.�;;.� �-. ;r- .: �`—�.'�. r.��.:;'�::_ % � ..� •� ,_ ;.¢�;-�—""" '� : p'� _ i ',^ :a::�.:�:� . Y_ �'� . --� _ -- _ _�'� , �-- �::--- � ° �------- =� . �._�,_' - ti ; -.._...�...�.�;tis,� -_3 f ;_gi�:i: � T�s' PUBL/C WORKS & UT/L,/T/ES � =�7���sc=d'r�:saoo ? �� ` r�_ :� . .� ;;". �:= � ; _��'` ; , -•- Wastewater Traeatment P/an# �� ,� =�. r -. - � � ' �t600_Oyste,r Bay Aye: S.` '• � •-: 1 ,Breme�tnn,WA ; e89t2 ,•; •:`=� `�__.___"��..._�-.--__�.�;�._�. November 29, 2009 Pease & Sons Attn: Bryan Hiilemann BILl..IN6 INVOI�E Tota! Nntural Gns Usage 10/19/2QQ9 to 11/18/2009 $2 238.b0 (See afifiached billing from Castade Nafiura! 6as) I Less: City of Bremer#ort usage ($794.18} (Based on 20�8 usage for same cycle) Total Due from Pease & Sans � 444 42 ������ . ,,, ,. . - ' CITY OF BREMERTON '� Current�6illin�g�,;: ` ������ ��� 160 0 W QYSTER BAY AVE ;,� Past f3ue. � o R P o p A T � o K° BR�M�a70N WA 98312-4735 ;1_2�.0,9/2 Yaur Account Number Service Period Service at: `�� �� '� `" 170 062�-3.3 10/19/2009 TO lI/18/2009 16p0 W QYSTER BAY AVE �� Please refer to informatinn an reverse side. Previaus.bill amount . , _ $7,805.99 . PaYments have been applzed thraugh ,11/20/2009.,., , , �4,083:15CR,"� ; � �: . � � � "'PAST, ,DUE BALANCES DUE AS 0� .,I1/1�/20,09 �ARE � DUE NOW , , ' $ , 84 Meter � , Type of � Present . �� Previous � � � � � ' Energy Pressure ' ' Number ' Billing � Rate Read1ng - Reading = CCF ,X �. Factar X Factor . _� Therms ���� � , � 247020T •REGULAR 5D4 � .22263 � 2I,092 ' 1171, ;1.U3200U 1,.6T3487 , � 2022 . � Basic Service Charge:, ,�SIO.OD per �month ' � $10.Oa'`, . � Delivery Char.ge: � •2,022 X $0.23179 per.therm '� � 468.68 � �� Average Cost of .Gas: � 2, 022 .X .$0.8D772 per therm � �1 633:21 �� . � TOTAL therms, charge: � .. : � .� , � � � , � . . City tax . 6..00 :% . . .,. , . , , , � ��126.7.1. ; °� . .TOTA! current b3.7.ling by �].2/09/2009, � �� . � . � � ,� �2;�238.60 Balan�ce of your account . . . , . .. . . .. . , , , . . � . .,. :•��'.�'—�� ���4 � � � �� . , ���� � , . � . , � . , ' , . � '� . � , , � ; �Q� �,2 �� �20D9 � ; . , .. � . � . . � .. ,. . . ; , ; . ,. ,' .. . � . . � cm% oF a��ER�on� . � . � . �. . � . . � :. . . � , : . : � . . �24 Hr �- � •Business ��ir�e�b��E��A'F522-1130 � ,� � �, � �: � �: , : .`, The :cur.rent ��billing alnount ,•include.s 3..852% state utility tax -� ��86�:.23 �', ,',.�, ��, , . Rate & Tariff information availab].e � www.cngc.�om/reg_rates.asp � ' , ,. ' 3-506 ; ; '. � , . ; ; , '„ ,, . . , . . , .'. •: • • � � . . � 3 4 0 B ' � , . • ' . . `'�' � . ; -. 6 �, ,f ' �"" , r a ' ti r.�;�'r�•: °�, , � � r' ti , . : �f'� , h; �� ;�y:� ' • '�s� y�, • '��r i�;"�S�'a'v�+�: �� k '��`�'1� ' ��. y rr,�� 2506 � � �, r f y � �' a , ' ti ,,'r,r a � � ��. ;,� . :�fir . . . , ' , . :¢ 4r �,��`.«; , �� ti '+ .���.�`,F,r � r, �; � ai + a.' 'r � r '`�� �r7��S� 20ee, � ��Payments made by check may be,processed electrflnicailY and may � i5 �e � � �� � �,be withdrawn from your account on the same day:.You wilt not � s e e 0 � � . � � . receive your check back from,your financial [nsti�ntian. �. �,'- � � ' � � ; Far in u or opt-out options, p[ease contact,CNGC �.'1-88& �� a s :. 522-1 y�0. Payments made by check or electronicaily.t at are � . � 0 � dishonored 6y the, bank will6e assessed a re#umed,payment fee. ' N D .J F. M A,:M J J fa •S �;O..N .' •' ,. '. . , ,• „ . , , ;i ,. . , , Month ly consumpt i�on i n THERMS � .' ', This bill daes not extend the due date of past bllis. oie: Currant charges are dua and paya6te upon receipt end past due as noted. ' ' • lease return this stub with your check mada payable to CNG CorQ. in the envelope provided. Comments included on this stub wi! not be � �ad. Please write comments or changes on a separate paper, mcluding your name and account number. 1600 W OYSTER BAY AVE 14 . Your Current•Bilfng ' .'���:.F : �:, '...�;.. �: `..; 3usfrtess Address: Account Numher Past.•Due:After �� ' Th� � � :, �.., ., ,, , . ,... �,,.".. .,:;y'::• S�� : . .�:;,'�,., 222 FAIRVIEW AVE N SEATTLE WA 170 0625-3 3 �:1`2;�% _.-$ �''��:��=;��'"? 4621 C5 462I . , .. . .... ,�:,�:: �°rv, . . ... `'�v������ ., �ASCA�E — ����� �,� CITY UF BREMERTdN m 1600 W OYSTER BAY AVE —" `° R P °" A T '°" BREMERTON WA 98312-4735 --- P.O. Box 990465 (���,:l���n�llu��l�u��{�IE�II�«lu�t��l�l��in��l������l�l Boise, ID 83799-0065 170D62S33002238bDOQ596144 r� . .,�......� p.av.uaw/ . r .����� . CiTY aF BREMERTON '.' ""''":`" , ..'"` � � . .;�!�l:�"�:��; �`�; � � a 1600 1V OYSTER BAY AVE �P ��, e.r•?�;`. .C�LJ ihFY.FS' �C�.�;.�1!?`t • � . • BREMERTOi� WA 9833.2-�735 �����;Q� 2�1�f.4. C O A P O H A 7 I O M � our ount umber Service Periad Service at: - '`�'"''�""���'�;`'°'�'� 170 Q625-3 3 10/21/2008 TD 11/19/2008 ,16QQ W OYSTER BAY AVE . . . f'lease refer to inEormatlon on reverse side. . �reva.ous ,:�?Xl .. ��n�unt . � � � � . . , . .. .�.�.2� ..06 . _ � . ht .j fl:. ' ' �' _ ) - � i•c'' :i r : r, �1 � �'t' . . . a �e'r'be.e ;a .lied�,.:thr�u h '11l2Q/.2008 .;;:'�� - �;;: ;:�.23�.0.6GR, aym�.n�s�:'h. V., ,Cf. PP ,9 _ . .. .. :`i��°- .. , ._ , ::�: .`.� :�'. . ,,.., _ '( '! . :4'7.:.::i{:i.':::.'•; ' � alance�;°` f;.account�. �r�i�C•::fio.�;b�.11�ng�. .,,, - :{:.:._:. ,.,:,�• �:.:`� ::$.Ofl . ,S3 P ::r.' ,_,.,�:� ;,: ;� : :}: - ' :5.. .1i � x1;'.).:i: + 1' ':i.": ..�. • �:i '�.S•�• .L�•�. : • � . � ... � .... '. i': ::_ ; • �', e � ':1 • � I'::� t � _ � •• �•;�•� . . ii ' :i': _ �4� i��� , { '1 ; �•��:� ' :J..�: �4 ���, '�,• is : 4•• �.�,� :l J n1 �•t� .f � ':}. 'l ,.�. •�� ''1. ` �'`��' �� t ' i 1 • •l: .:t •" ` . �..�`� :v t`• :14.: "iL .i � '�.' :� i • •�4�� . +� T " r:,':t• :l '.i: •ic._..:'. + "i... �-�i •'i •i� ' n ] +�+ ' `R ' � �i� . .,�r . �1 ^ �.4 - •,t '• ';� �t. �.ti �� - .. � :` • ;'� '': ;•.'` _ � ':i :''r`:•.... •. i . _ � _ _ �'i' ' : �,. � ��;�) . . - h.`." . i ' :i :i . _ `y; ? � . � L • •:l . . �' ' ' , j f� •, � �: t��� _ il. '.L ;.Z�. .`,� `. 1 . l �,_ _ �� ` .:�, ~ �� 5 �'t •��. •� P essure �`r�• .�� �: ne � r . re' 'ous �" - : , � ':P � z;'P �� 's�bf. �r�' res nt �leter � �'F. e V� . . �: �� r9Y .:;:: Y :t :�.:..; _; . � ;:• �•; . . . :,'.' ;: _ ;� . :'s - }� ._ � . - :X �.The 's' ~ CF,•�X _ rm ��'C 'acfor : ;�,; �Fac r : °: F �`B �Ra#e' ''i�eadin � e�din � ��,�� t , to �lumh � r 1 in� ,�F�. a g 0. � !. 9 :'�, . r .'� �•. ..�.: - ': �: c' i � : •: e " ' �I• • �'�. •i rT.� :} .i. r`c: _�_ - - .� ��'_': .;i �1 : 1': =•!,• 1 i �' � � 03 DUD� '1:6 .3487.:.`•':•.�;� •623..' .G.7020T�•.RE6U .t,�•'•504. 1D207.. :�9846" �;�61. �i. .]�. '� 7 :'{:: -.R : , _ , ,,: .,, - . ,:7.i:��'it:. �•,. ;�•; :,.:, .`,.; ,._;'::;:��?: `�i'� :t:: .7.; 4.� :•:i'�.`:; t :ii'• - ":1.. ' :\ � .: - :'•c• . •.� . ��i ; � :.�, L�� i} : t � �•�r ti ''.' y.:�. - `: ` �; : � ' 7 •: i. t s ' - : 5: ,� 1 .:i;� " :'t' + �': ' -• . _ ~'� ,° . .:L� a\�i �S:' 'i,. :• 1;; it,,' :��� �,�.' �' 1. - .. i j ; .: J. , .' h' . ' • • S.''+i :�.: ?i`� �er��nio' •�. � . .,�. �i�o o�o 'c ����5er�vice��;�h'ar �e'c �'�10.�D0 - ��p n 3asi ..�. ,,� �er 'Char- e ��•• ':�f: '�623���X't`50.231�79 per ��'therm �'` �' �:�;�'''`:144.,'41 = �s . . J e 1 i v �/ .9. ��� °. - ::i,. ' :'� : ;�� _ •:� . �vera e �.Cost.°.pf.��.Ga$. �:� .,6.�� �'X����D:,95��7 �Per�:�ther.m ���;;��� :�;�' :b94:`82 `i� g _ ..;: : i : : �;�`: �'� �• � r� ''� 1`•. . _�r ;;" •.t: r`r•. _ '�';: .i� : i; erms .char: e. ••;�• :.,� ..� �: : TAL . `th •., , � :'� .�..�f .9�' 3-�. ��_':.:.'::; . ro � :�: �;� -:> lJ . .:i's.`. :'i ' ;�i' '. i • . i� . . y '� b' : i' . . .y": ' . . . . it� _ .�': ;�', r ,��' . . `{-. ;'t• ... . . - .:� :'•95 '�0 '�� - r'� . . r.ti•.. ..� . % {,{ ` " �aX- o i�t. - � 1 y •� .. ,•i _ �,'t ,:; �,, �<i}� � ., �� �.8 �794. . ;' .':a ���i2o o i s T OTAL'�:cu�r�n�t. , �lls�n .du.e ,by.�l2% 9. ��, :�„ .,: :p.'1'. .�.••., .;.�:,.,.:,�•_,...�. ��+:V?'r: ;:C,� �1';�°` ;Y•, 1•..'�::��}t� .. +tii. �t. �„'t.,�5:''i+.'.?t� ::i: � - •`y�' .. _ �.,�..;'::'.s . t:1.'•� . . .. . .. ':i: +i� •:r • t:.. . ....... - . „ , , : i: ..��•,ti:: . .. . � � � • ��� r.i i �:�{.,\•.�;�._ �.�.. ��;'' � ' a.; t; •. - `' $794. is Balan� �e.��of� �t5'u'r...:;�acco:unt: - ��,, ��,� .;.:_. . � ..�,'Y,. .�.�,. :.;• �� ,:�::•. t . ;}. ..;.-' �•�.:-. ;i: ,i; :,.: t , _ ; ;��; , .i' •:� .'i:� .. `•. :•",': ';� ' '•<<: :�ti : ��e �+�': i�i� �i �' t. i �i . •'�. :,' T �� , r �'� ' .:.� :: i'.': .: ' :•�? .�. .i��� » ��' • t{ �: i '' :�; t i;: ::,-`.. ��sc: �•1.�- ..� '• {'' � �i: - .} ° ' =+i' }�. ��i :�: :��" �.1 . ; .' �� f '•�'. .,� •. ..�': �'; '. ; { •'1'. .. 'ti 'v' .�i': ,�: i�,F- '.��. � f-� f �!'� :.i•' �.`'. ,;. 'i. - ' �'1.:.': ' :;y • ���:•' 7•. c � ':•..'` f � . :�i ' ��• �S � f y ' � �: .� i 4• _ ;. . . � j t : t,', 'L' ..�". ' '�'" i, .�� ':\ I • '•�': .�`, ��'• -:i:'% �i;t.: ���i i '1; ::i�. rr•':i;::::c � `i ,it,:,..; ,�. , �:7. t�:. ;::_; �.. '.;';.. }'. :';. . . .'•:,; "i'� .i'� t.,:• .'y .'•y�: ;y.' ;. '1: .•��� j] �� � �: �'i: 't = i'• : � ' - '•.f: _ 'i� :: "� :. ���:... •: 4Y�� - ' [� : �t'�' �' t t ' !:�'. 'ci'` :{'�. ' �{ t `': i 'i•'�I tY. (t ` .i �;: . z ;� '• �' �j � }� , � ,•7 i • 't ••,. . y � . :': ' ' ' 4 i� %�: t• � - :t .t :: � �1' ��.:. 1 � , � .• af�:. • . , .. � � :� F ~. .,'��� y��'� ��i.�: ..�I• ��^ �.5 .•i •. - .� � �'7� t�i�� ..i'•.. - i�•�;� •� . : r'.', - nti: i... n.��. - i'4. �5 1 . �_' , . , ... L � . ' .•. ' :�i.: . .., �•i� i:�?�• �.i: � �„ • i��. ♦�.�....• • . . .�• .... • , ...";:•.S • �::•:,...,..:�:�.; - :;. •' - ' rtc: :_1',. ..yv:;:;�, ,,.:. ,;`��: _'`'• 1. :,,�•.;•:, . . . � • .�.: : . . __ . ,.. . .,,-:;. �.,•.;., .. ....: � , . , .,. , .;•; : c : k .5n.... '.\ .:� f .'( "�:�;�'� .t � '. �i i :-� . l: �:.. ..f . - •J.': •': `� a�J. �!} ' , � � . � : :� �`.',' • �1 :'1 'i' � i ..j � _ ..'; ' , ; r . t .5' .f . "i: rf�' L - •.'�' :� _ ;'i' y�'`' •�:`: , �: S' � : i� `� .. ^t .i -.: • - . � i� _ .t..:';: :;�: _ . .�s'• :i�•: c, r .�+ .'�, �i `L � • .:i �'�'� ^ °..�; .`i� C;.• _ �.i. . � �; ,. r ;t: - •:i : • - ��� ' - . •, ;,;' �� ; Ff - � •� . ' i4:. :,:}'; �s j .�L:l! • �i� ,'; �' : .� :; . »� ' �O �4• z s: .J: - il' - - j. '�'L - ..I i i!:` ':�' :i: ..E : �•'�: r. . ' :o. , }. . 1'• 'l.: `i�' ' 1 �: . :,�' � �" :1� �'��. .1 � .'.ti �� ::� : � ���: �.4 : '• c. °1•' ;}' •��': .��i •'S ` i: �r i `' -:'C.�: - .,•`+ C �:f:c . �:s• 'i ' :'i .- . �i= �'.i ' .'��' ,* '�; • ' _ .l - '•Z � _ . " . �.t :.. • ;i. '.�• �5..: '�� ���� • �\ .� ; - :' � : : "1 � �.� � tx : • •. r : . �'. ` �s` - 3 0 . I�Y' �:8� ,. "�. 'E' .�, �s�i ��enc� �. :�. ��`888.;�522 ]. �.� RTrJN��-��:';;:•;:. � 24 .�I - �:B,u, ne.ss._&;';Em.e.r-,.�..._. y, ,,. .�. M- ,� _, the :,cu'�ir..e.n�t��:��'�l�l�,rig.>.�a�n,ount�.'�anc,}.udes,?.3:852% :�sta� ;ut��`� � �� '� �'�� ':;;:';; ' � � ` � ���± � r�°�:,.�r,::=: �ate .a :3fr�..`:.i ,f.ortn�t°ia:n�_,�a� ai�lalp�l,e�:=a.;;www:'cn,gc�:com ..!'e9 a: .Q.�:. ��,�::�,�: , '�;'��. �!. _, -,: ,,. .�., ,,-: ��`� _�. .�; ..�, �,� - •t. •� :,..:.� •,;' �'i�`=:'�� ::•. ,r�.� r.:: •�. cl:: ,,.: .:i:; ... .,�.:,;, ,.1:.-; •�i. .a:. .,'2:;57' `.`i'``^ .: t.:•' :i,.}i. •.!`� 'i1 ���:�:` �:i. � i' 4•i f: _ � 1a`� ..�. .k.{ 1:� '•�: : i :.�: ::` �.: ;: :;i.: ; 3 �. ': �' : „ . i� i:i: i :;v`:.•: t..':� • I. ..! � � �'• .•;�. . 'I . ' 45 t!�.:``i , 1. . ..' ; � �•• .i k .�. ,i .i : - .:i � •. t .:'L . t ' �'1" ' � �'� s _ 'i. _ ��i!« - � ).. •S �i � '�t: : ;:'.:•;''' , ..;, • �� � ~�. =. i. � �:�^ ':�+'•' :'� ..�'•?' �:�i� .'+: .,C�''- *1't `• �. '�f , •:�.:!' r =�1' I - i {'. . . :,'�: ,• ;��,,��.', ' {�' _ : �i� S i y i'�'i i- : 7 i .� < L • ` t � e: �t _ .' ' i - . '�t�t . . •.- .. . . _ . . ' • 1 � .� i : i 0 �..i" �: I � r . ee� . :,.; . a. ,�: . �,�; �;:; � 5 .:. � . . :.. . ....::. . . .. . .,: ..,;:..:.. ,( , ,,, . . ..,. � .....: .... . ...... .:. .::.� _ _ . .. , � . . ._ . �.;.: 5...•.���: . ..:.`i:�:.�,�. ;. �x•.��.:. .�r 1:�.. ��:, i4;�•i !i� .�ti�. t. :i• _ � �?� .:t. " ' ' 'S•'; '•' �i' ' :' r: : Yi =5� ��:'�:�•r': t:�� tti' ).?. r '��f , ':.: , 1i`:= i.�; � : •���t�.�.�.. .�. . . S - ''� '�C ::5. :..:� :..! ;'1:: :..�•. �: i. � Si: �`• - ':�:..,.�i:'. -:i••�:;:�.:': .., :::i. �•' <'ci' ..•� t •' - r: .�'i:..� � {� y • •'. _.i'.i�' • ; ,3; r . `��,, �°;':;�;. a.. .a �i' �s���;for... Q ifi �;;�►b es' se - ,�N tur 1:;;9,as.;:�:: ' ry ��b.�,;'.� ��`.�..;���: 9 :!R i�. - • "'" •'.�.. . .1{,�;•?.i � 1��^ t . s: r c �;,�::�.:`�;�� ;he;a,�in.9`��w�,��err;�:.��:��iag�'i:c.lot[�,Q.$�'��.rld_�:';:��:=�:;.:' 5 � ��` �.:� ..�: � ,, .. ��.:, .,,_ : . ;�; ..< :.. ...., . ;1 ��.::•. �:� ��.>• • �,ti �,:; �:;'; :�;::�:�' . :,t:;;,.�;`�; :��5:� ;,:;�;: .°;r;�.;�`'.�`�,.: •� ;, :•. a �!'� j � - '.*+' �';:' � �� - 'i. - '.U:' :.i:�?.;:;:'';;ti`•�j.t• ;t.; . s � �:xi'l: tii,:�c ii. ':�. 1{i3'".`'• ? �E t : ' �it. ; i:�'.:i:' i4• : t.a' .,�t:�[.�:ti'�, � .C,� �f7 . •i` S Y " ':t •?�. � .t�i:at.'}.:ji;.,.t,-i`�Etr.: 'i: �'1 �:5 .i!.�i��.: `- ..S•• ••i� - .?i:?c1', . . 'i:i3�i �t�}_ f. /� i:i ; t ; a ,:';3::.('.•i:::�?.};•' �.i :r. :�i•:i�`�`" i•. i'i."�e .�1M1:- n�' .t i �'!••.\^•' :o•.���� � :iJ . � f . . 7 . �.R .� t�l: :• l •'1. -.i•� :I ::1: , ` : t : j `i: t'.. • ;�'�'.L: ' i,; - .� .� : i � 1 .. :�.1` ,�i::' t' •': •' �'Z': i i :� ' •�1: 1.�.. . �l �i � 1�': ::�-'? � i`: ���h �I': � �'i: 7 + i ' : �'t.''� _ ;;}». _ _ ;M. :,•:•�..:�� •:�. �0:. . M `;A•:. �,�. . :�N; =';:. . . '� , t: �;�. .5:;= •F '��'�:. .�: - Yi . f Si:: I ! �. .} •. � ' .,q . ��:�Z . 1 . .� . � 1' !yi.•. .y. _ •t 1 .��.i t ;�'; �`.C;� t .. _�•• :}°.",:'' :.1:i :•: � . r.• � ;. p :.4' ��. '-1" .i � t - i� . .t �i`• � t �.. _�.. U. r,. ::r: ;� �.:,'- ..,> �:� �:2:� =��:;; .:;�:. .:;�; ;�;::.�. \. '.� 1 ..`� .�i � 1. �i' - . 1 •, ? : . y.• ::M �!' ::cd�� s"m :o.n :;f�' � ?F, . `�':��: p �h..y• .r.►� ,..P�'k�( .ri.,. �R - ��'�''�- .., . -•' `� '""� bElls. , ti � ,�? . ,;, .,, •�,. : . t � .. . �:;:�':�': ��Thls�bill cloes. i�pt e e thQ��lue.d�te of past ..� c....�,�. ,�::,:�. .�1: ., � � : Z-„�:.:•:...... .?�=r�.:.,. ...,.:;. ote: Current charges are due aqd ayable'upon.r�ael t and � �ast due as noteii. • ��'• �• •:! •:•`�'':- :; : : -,•:�� ; , :k: � � .; :;:.`°;�:; � �:':�":� :":•�:.�; . •'..• . . . . • . p p . :;�•��::� . �.. ;.�:.•:.:.�,.. •; :, leasa return this stub auith your check made payab{e to. CNG Carp. In the envelope included on this stub wtll not be .�� 3�d-Pts�ss�vei , m . � _ . � 1600 W OYSTER BAY AVE � . ' � x4 ' Yaur � �;u � Y B�Itir ; ���� ,,p�• �,�H .��-�;;, :�.., n } t i :�:; `� ,�� � , ,��'�� h:?��;;;��;:::��� Business Address: . Account Number � � { , � } $8�J; , `,J Y 1 (�'� !r �� �;�{1�:4.1�5 d.'�Ci,' AV' It i. ��� ?G:"v t � 1. li.i. �p h . • 45 � k . � � �./��u�, 1.4 U� S � ...1 i �;. 1•• � �: �p h�'}� � �� '� y lF `�I�� j 1• �}�};�� 1 ! t`'.`i�1 . ' ��i?Rhr �����-�V�`.."tt3.���'.L� Y�,{'M�`.:'�'a.(��Y�5.T1}A=}i+n4�11': :fYlsj�.l`'?5'�j1 4584 C5 4584 . . � �.���E �' CITY OF BR�MERTUN � NA►'�'�1�.c� �� � 1600 W UYSTER BAY AVE ` � o q P o a A T � a�,° BREMERTON WA.98312-4735 P.O. Box 34344� . II�1��I��I���iL»�1l��I�I�I��Ii���l��lb�lFlsll��slL��l��l�! Seattie, WA 98124-i344 170062533QOQ79418dOD79418 Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments: 4708 PEASE & SONS INC WWTP Wet Weather Facilities Upgrade Engineering LEG 12-1 04/08/2008 08/31/2009 08/01/2009 Change Order #1-2/09 #2-6/09 / CITY OF BREMERTON CHANGE ORDER CONTRACT CHANGE ORDER NO: Two PROJECT NAME: WWTP Wet Weather Facilities Upgrade PROJECT NO: 5020 CONTRACTOR: Pease and Sons ORIGINAL CONTRACT AMOUNT: $3,229,728.00 DAYS: 447 PREVIOUSL Y APPROVED CHANGES: $37,790.81 . DAYS: 16 THIS CHANGE: $292,915.46 DAYS: 56 REVISED CONTRACT AMOUNT: $3,560,434.27 ..DAYS: 519 (Excluding Sales Tax) This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment alld materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below does not include applicable sales taxes. DESCRIPTION OF CHANGES INCREASE IN CONTRACT AMOUNT ($) (DECREASE) IN CONTRACT AMOUNT ($) CONTRACT TIME EXTENSION (DAYS:) o ..... r-... r-... ..... ..... Q) Q) "3 "3 c::: c::: x .h Work Change Directive 3 - This work was deleted. The credit ($1,295.07) 0 reflects a restocking charge on two PVC knife gate valves. X Work Change Directive 14 - Provide 480/3 Phase power $6,113.93 0 conduit and conductors to the 3 cake pinch valves. X Work Change Directive 15 - Relocate flow meter FE46220 to $1,694.49 0 the discharge side of the air gap system. Provide power and signal conduit and wire. X Work Change Directive 16 - Provide 120 V power conduit and $2,579.24 0 wire for load cell power circuit. X Work Change Directive 17 - Provide communications and $3,011.31 0 control conduit and wiring between the existing TWAS Panel and the new RDT Panel. X Work Change Directive 18 - Modify panel LP-EPS in $615.88 0 accordance with Memo from CH2M Hill. X Work Change Directive 20 - Install city provided flow meter on $935.39 0 polymer line. X Work Change Directive 21 - Demo existing waste gas burner $8,015.68 0 piping and meter and boiler gas piping and meter. Replace meters. X Work Change Directive 22 ...: Remove and replace eight ductile $264,738.66 56 iron and aluminum control gates with plastic sluice gates with motor operators. CONTRACT CHANGE ORDER NO: PROJECT NAME: WWTP Wet Weather Facilities Upgrade Two X Work Change Directive 23- Provide additional control relay in $870.89 0 the centrifuge panel and wiring for the pneumatic No.2 water centrifuge flush valve. X Work Change Directive 25 - Modify 4" Drain piping to be routed 3,620.14 0 outside the building. Connect pressure relief piping to the new drain line: Modify air gap tank feed piping as necessary to meet cross connection control requirements. X Work Change Directive 27 - Demo concrete beam from DAFT $1,332.84 0 tank to accommodate concrete floor placement. X Work Change Directive 28 - Shop-paint floor drains in RDT $682.08 0 building to improve corrosion resistance. NET CHANGE IN CONTRACT AMOUNT $292,915.46 56 INCREASE OR (DECREASE) ESTIMATED SALES TAX (8.6%) $25,190.73 ESTIMATED TOTAL INCLUDING SALES TAX $318,106.19 Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for past performance. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. WWTP Wet Weather Facilities Upgrade Change Order No. 2 Page 2 of3 CONTRACT CHANGE ORDER NO: Two PROJECT NAME: WWTP Wet Weather Facilities Upgrade RECOMMENDED: RECOMMENDED: CITY ENGINEER / DIRECTOR OF PUBLIC WORKS ACCEPTED: APPROVED: ATTEST: -/ tJld~ WWTP Wet Weather Facilities Upgrade Change Order No. 2 ~/7 tJ Date 5 h /6 ! Date S-/ic Date Page 3 of3 CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Three Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: August 27,2008 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOllOWING CHANGE(S): Provide and install two 8" PVC knife gate valves on the centrate piping at the wall of each sump. A unistrut is shown on the detail to hold the valve in place without gluing the valve to the pipe. Alternatively the valve could be bolted to the wall if the valve selected will accommodate it. This work was deleted and there is a restocking fee on the 2 knife gates. A TT ACHMENT(S): See attached info. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: D Contractor's Records D Engineer's Records D Unit Price ~ Lump Sum D Time & Materials D Other: D Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ (1,295.07) Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMENDED: ~ AUTHORIZED: --- -1/ L--- CITY OI'REMERTON By: CONTRACTOR By: ab, FORMS, Work Change Directive, 3-00 BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 COST CODE OH 01030 OH 01031 01513 01512 01624 01073 01515 01516 01517 01950 DESCRIPTION: Deductive change to remove PVC knife gates from Centrifuge Drain line previously added by WCD 3. Cost is for restocking fee and shipping. Centrifuge WORK AREA: PEASE ISSUE #: Owner Chog # WCD3 RFI# PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager 0.0 $ 150.00 $ - Project Superintendent 0.0 $ 93.57 $ - Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 86.64 $ - Carpenter 0.0 $ 7'1.00 $ - Laborer -0.5 $ 59.60 $ (29.80) Millwright 0.0 $ 72.53 $ - $ - TOTAL - Pease & Sons Labor (29.80) PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift 0 $ 24.54 $ - Crane 0 $ 172. 72 $ - Boom Truck $ 73.08 $ - Uob Truck - Pickup 0.0 $ 9.00 $ - rash Truck $ 55.00 $ - Compressor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator / Light Plant $ 12.70 $ - aser $ 11.55 $ - TOTAL - Pease & Sons Equipment $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST Material (attached) $ (643.60) Restocking Fee (30%) & Shipping $ 350.00 $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ (293.60) SUBCONTRACTORS EST. COST Pease Piping, Inc. $ (739.87) $ - $ - $ - TOTAL - Subcontractors $ (739.87) Page 1 of 2 5/7/2009 6:54 AM BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 DESCRIPTION: Deductive change to remove PVC knife gates from Centrifuge Drain line previously added by WCD 3. Cost is for restocking fee and shipping. Centrifuge WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD3 RFI # CONTINUED FROM PAGE 1 of 2 SUBTOTAL - DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ (1,063.27) BOND & INSURANCE 1.5% $ (15.95) SUBTOTAL $ (1,079.22) OVERHEAD & PROFIT 20% $ (215.84) TOTAL - Direct Costs $ (1,295.07) IME EXTENSION AND RELATED COSTS I EST. COST "~ IME EXTENSION REQUESTED - WORKING DAYS: 0 IME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ - SUBTOTAL $ - PROFIT@ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ (1,295.07) This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements identified, unless specificallv neootiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time may result in cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. PEASE & SONS 07-May-09 DATE SUBMITTED 21-May-09 PROPOSAL VALID UNTIL BRYAN HILLEMANN Page 2 of 2 5/7/2009 6:54 AM CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Fourteen Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: January 30,2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOllOWING CHANGE(S): 480 30 For Pinch Valves ATTACHMENT(S): If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: D Contractor's Records D Engineer's Records D Unit Price D Lump Sum ~ Time & Materials D Other: D Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ $6,113.93 Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR By: ~~,~ CITY OF BREMERTON By: /~ -----... ab, FORMS, Work Change Directive. 3-00 BREMERTON WWTP 8510 Change Proposal - Lump Sum Basis Ref: Section 01250 DESCRIPTION: Provide 480V Power to Pinch Valves. WORK AREA: Centrifuge COST CODE PEASE ISSUE #: Owner Chng # OH 01030 OH 01031 01513 . 01512 01624 01073 01515 01516 01517 01950 RFI# PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager 1.0 $ 150.00 $ 150.00 Project Superintendent 1.0 $ 93.57 $ 93.57 Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 86.64 $ - Carpenter 0.0 $ 71.00 $ - laborer 0.0 $ 59.60 $ - Millwright 0.0 $ 72.53 $ - $ - TOTAL - Pease & Sons labor 243.57 PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift o $ 24.54 $ - Crane 0 $ 172.72 $ r - Boom Truck $ 73.08 $ - Job Truck - Pickup 0.0 $ 9.00 $ - Trash Truck $ 55.00 $ - Compressor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator / Light Plant $ 12.70 $ - laser $ 11.55 $ - TOTAL - Pease & Sons Equipment $ MA TERrAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST $ - $ - $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ SUBCONTRACTORS EST. COST PSW Electric $ 5,134.62 $ - $ - $ - TOTAL - Subcontractors $ 5,134.62 Page 1 of 2 5/1/2009 7:54 AM BREMERTON WWTP 8570 . Change Proposal - Lump Sum Basis Ref: Section 01250 DESCRIPTION: Provide 480V Power to Pinch Valves. WORK AREA: Centrifuge COST CODE PEASE ISSUE #: Owner Chng # RFI# CONTINUED FROM PAGE 1 of2 SUBTOTAL - DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 5,378.19 BOND & INSURANCE 1.5% $ 80.67 SUBTOTAL $ 5,458.86 OVERHEAD & PROFIT 12% $ 655.06 TOTAL - Direct Costs $ 6,113.93 TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: - TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $' 6,113.93 This cost proposal is based on the cost elements identified. Pease & Sons res elVes all rights to additional compensation and time extension for work elements identified, unless specificallv neootiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accqrdance with this proposal. Failure to accept this proposal within the proposal time may result in cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reselVes any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. PEASE & SONS 01-May-09 DATE SUBMITTED 15-May-09 PROPOSAL VALID UNTIL . LARRY BOYD Page 2 of 2 5/1/2009 7:54 AM Bremerton WWTP Wet Weather FadHties Up~ade I~ PSW Electric Breakdown Summary lfI!rI!Io. weD PR No. Pmjact Nll.IImbelf: 155 IDmllsl $Illbmlltted: 3123/2009 Gellerrlll Conlrllu:tor: Pease Ai'IId Sons, Dll'lc~ Seopa: RI8'!ilsllillrDS ilIll PlilIeh V~lve POWlOlIr zm~ C;Oll1fttrlOlllz 1. !ElECTRICIAN LABOR COSTS 19.03 HR a. journeymlln electrician DaBJor @ b. Journeyman burden @l 1!!l.03 HR c. foreman electrlclail @ d. foreman burden @ 0.00 HR e. superintendent electrician @ f. auparlntendent burden @ $3!).84 62.00",(, $43.82 49.00",(, $47.81 46.00"10 DIRECTIl.ABOiI SUBTOTAL 758.16 394.24 833.89 408.61 0.00 0.00 2394.90 / Supervision g. direct supervision (NTE" 15% of 1 auf) h. safely 4NTE 3% of IIn8s1a.b,c.d,e & 1) i. Dellveiy iruck and driver 1$50 per hour) 359.23 71.65 0.00 1. CRAFT LABOR COSTS 2625.98 2. MATERIALS COSTS a. material cOlIte b: quote : 1:. quote: 1405.77 0.0C) 0.0C) :I. MjiI,'UlERIAL COSTS 1405.77 :J. EClUlftPiYlElMlI' coafS a. owned equipment (per epee approved Iilcuree) lb. rental equipmsnt 1\11811" finvoiclIl81 sttllci1leo:!) 0.1l0 0_00 3. EQUIPPIIE;iIlTC09TS 0.00 4. SMAll TOOLS a. IIf1'11l1l1 tools INTE 0% of 1&, c: & e) 0.00 4. SMALL TOOLS 0_00 5_ OVERHEAD 4231.75 423.18 423.18 6. OVERHEAD a. NTE 10% portion of 1.2,3&4 SUBTOTAL 1,2,3,&4 6. ALLOWANCE FOR PROFIT (NTE 10% OF 1,2,3&4 I 5. PROFIT 7. SUBCONTRACTORS 8. b. e. d. 7. SI;IBCONTRACTORS 0.00 Il. OVERHEAD ON SUBCONTRACTORS (NTE 10% OF 7) 8. OVERHEAD ON SUBCONTRIlCTORS 0.00 9. PROFIT ON SUBCONTRACTORS (NTE 10% OF 7 ) 9. PROFITONSU8CONTRIlCTORS 0.00 10. INSURANCE a. payi"C1I driven liability Insur1IlIIce (2% of 11 b. volume driven liability insurance 10% of 1 thru 7) 1D. INSURANCE 56.52 11. BOND a. bond (0% of 1 thru 10) 11. BOND 0.00 TOTAL COST 1 THRU111 $5.134.62/ 3!2:lr.2009 1f165.Ravtalons to Pinch Valya PCMGr SInd Contro.. 04/27/09 MON 15:59 [TX/RX NO 9963] 3/23f2.1!C9 4:!}[iU1 PM ~;a9fS '1 WWTP Pi91lch V'Oilva Job Number: 2<<l2 Extensloll By BreakdlOw!1I ''''m "# /Destription QllIantity. I?ric.e U lElJ1t il"11'100 ILabol1' HIll' iU Eld IL.;ab &-In- -- Revisions Pinch Valve P 8, C --- 1583 1" lLoclmut 12.00 40,24 C 4.33 0.14 E 1.63 1600 1" Plastic Bushing 12.00 31.113 C 3.74 0.14 E 1.68 1942 1" IL T Flex Con n wllfl$ Throat 6.00 335,09 C 20.11 0.15 E 0.90 2062 1" pve Mala Adaptor 12.00 33,96 C 4,05 0.1a E 2.16 2116 1" lPVe Coupilng 24.00 22.33 C 5.36 0.08 E 1.92 212a 1" IP\fC .Elbaw 12.00 0.76 E 9.12 0.40 E 4.80 2789 #14l1-1HN CU Stranded Wire 600.00 83.66 M 50.20 5.00 M 3.00 6906 1 ")(314" RE Washer 3.00 23.54 C 0.71 0.01 E 0.03 8081 1" Liquidtight Non-Metallic 9.00 n.70 C 6.99 8.00 C 0.72 8172 1" PVC (Schedule-BO) 90.00 64.43 C 57.99 4.25 C 3.63 13265 12X12X6 PVC Junction Box 1.00 52.04 E 52.04 1.60 E 1.60 TOOO1 ALLEN BRADL Y-NF25P-3PBJA 3.00 160.00 E 480.00 1.00 E 3.00 TOOO2 Re-Work Existing Control Panel 1.00 450.00 E 450.00 2.00 E 2.00 TOO03 Fiberglass Unistrut 20.00 4.18 E 83.60 0.10 E 2.00 TOOO4 1" O-Ring 12.00 0.84 E 10.08 0.01 E 0.12 TOOOS Stainless Steel All Thread 3/8" 16.00 2.43 E 38.88 0.06 E 0.96 TOa06 3/8" Stainless Steel Wedge Anchors 20.00 1.49 E 29.80 0.15 E 3.00 TOa07 1/4" Stl!linless Steel Wedge Anchors 16.00 0.63 E 10.08 0.10 E 1.60 TOaDS 3/g" Stainless Steel Nuts 16.00 0.14 E 2.24 0.02 E 0.32 Toa09 3/6" Stainless Steel Fender Washers 16.00 0.12 E 1.92 . 0.02 E 0.32 TOO10 3/8" Stainless Steel Lock Washers 16.00 0.12 E 1.92 0.02 E 0.32 TOO11 Control Terminations & labels 36.00 0.65 E 23.40 0.05 E 1.80 TOa12 Power Terminations & Labels 27.00 0.65 E 17.55 0.05 E 1.35 T0018 Coordination & Design 1.00 0.00 E 0.00 4.00 E 4.00 19 1" Fiberglass Strut straps 30.00 4.10 E 123.00 0.06 E 1.80 ..t.....d20 Phenolic labels 200 4.00 E 8.00 0.15 E 0.30 -~ Revisions Pinch Valve P & C Tolal - 1 ,495.64 45.21 -- Pinch Valve Credit -- 2061 3/4" PVC Male Adaptor -300 26.92 C -0.81 0.16 E -0.48 2109 3I4."'LIT Flexible PVC Connector -6.00 245.11 C -14.71 0.12 E -0.72 2115 3/4." PVC Coupling -10.00 14.50 C -1.45 0.06 E -060 2789 #14 THHN CU Stranded Wire -120.00 83.66 M -10.04 5.00 M -0.60 2790 #12 THHN CU Stranded Wire -240.00 124.84 M -29.96 6.00 M -1.44 8171 314." PVC (Schedule-BO) -60.00 43.19 C -25.91 5.00 C -3.00 T0021 314." Liquidtight Non-Metallic -9.00 77 .70 C -6.99 3.50 C -0.31 - Pinch Valve Credit Total --- -89.S7 -7.15 Job Tolal 1,405.77 36.Q6 '.~ 04/27/09 MON 15:59 [TX/RX NO 9963] CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Fifteen Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: January 30, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Move FE46220 to Air Gap ATTACHMENT(S): If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: o Contractor's Records o Engineer's Records D Unit Price ~ Lump Sum D Time & Materials D Other: o Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 1,694.49 Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase. the estimated times are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR BY:~~ ---- CITY OF BREMERTON By: '1 /C / - ab, FORMS, Work Change Directive, 3-00 BREMERTON \JVWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 COST CODE OH 01030 OH 01031 01513 01512 . 01624 01073 01515 01516 01517 01950 DESCRIPTION: WORK AREA: Relocate FE 46220 from CS line to #3 Water discharge at Air Gap. Centrifuge PEASE ISSUE #: Owner Chng # RFI# PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager 'LO $ 150.00 $ 150.00 Project Superintendent 1.0 $ 93.57 $ 93.57 Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 86.64 $ - Carpenter 0.0 $ 71.00 $ - La bo rer 0.0 $ 59.60 $ - Millwright 0.0 $ 72.53 $ - $ - TOTAL - Pease & Sons Labor 243.57 PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST F orkl ift 0 $ 24.'54 $ - Crane o $ 172. 72 $ - Boom Truck $ 73.08 $ - Job Truck C Pickup 0.0 $ 9.00 $ - Trash Truck $ 55.00 $ - Compressor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator / Light ~Iant $ 12.70 $ - Laser $ 11.55 $ - TOTAL - Pease & Sons Equipment $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST $ - $ - $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ SUBCONTRACTORS EST. COST PSW Electric $ 1,247.01 $ - $ - $ - TOTAL - Subcontractors $ 1,247.01 Page 1 of2 5/1/2009 7:52 AM BREMERTON V1JWTP 8570 Change Proposal ~ Lump Sum Basis Ref: Section 01250 DESCRIPTiON: WORK AREA: Relocate FE 46220 from CS line to #3 Water discharge at Air Gap. Centrifuge COST CODe PEASE ISSUE #: Owner Chng #. RFI# CONTINUED FROM PAGE 1 of 2 SUBTOTAL - DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 1,490.58 BOND & INSURANCE 1.5% $ 22.36 SUBTOTAL $ 1,512.94 OVERHEAD & PROFIT 12% $ 181.55 TOTAL - Direct Costs $ 1,694.49 TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFfiCE OVERHEAD, BONDS AND INSURANCE @ 16..5% $ - SUBTOTAL $ - PROFIT@ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER ~EQUEST: $ 1,694.49 This cost proposal is based dn the cost elements identified. Pease & Sons reseives all rights to additional compensation and time extension for work elements identified, unless specificallv neootiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provide,s written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time may result in cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been speCifically included and negotiated. PEASE & SONS 01-May-09 DATE SUBMITTED 15-May-09 PROPOSAL VAllO UNTIL LARRY BOYD Page 2 of 2 5/1/2009 7:52 AM Bremedo PSW lectric Breakdown$umma FINo. weD Project INMmbe!\": 155 PR No. ! Glsnsral CDntractor. PHSf) And S@ns, gl1c~: Seope: Relocate fEI!S220 ;: ~ , 1. ELECTRICIAN lABOR COSTS I 11.00 HR II. journeyman elactrlii::ian Biber @ b. journeyman burden. Ii 11UI\ Hit c. fOretnBn eilllCtrician @ 1 d. fDl'Mman burden @ I 1.00 HR 'II. superintendent electriclliin @ f. superintendent burden ~ . Suplll'Vision ~ I g. directsuparvlslan (NTEj11i% of 1a-f) h. safety (NTE 3% or lines ~ 8,b,c,d,e & 1) i. Delivery truck and drlv8~ ($50 per hour) " u ~ 2. MATERIALS COSTS .. material ccsi5 b: quote: '[ c. quote: i ( ,I .:B. IEQWIP'MaiT COSTS. I a. . owned equilllmeiiS (p8lrfC G1Jjl1provQd 1I0tlllN;lJ) b. rental equlpmMlt (per I 9iC418 attached) . . 4. SMALL TOOI.S . . e. small tools (NTE 0% of la, c & e) i ! i a. NTIE 10% pOrllon of 1.2,3&4 S. AILLOWANCE FOR PROFIT (hlTE 10% JF 1.2,3&4) ~ I ': , ~ . S. OVERHEAD 7. SUBCONTRACTORS a. b. $39.84- 52.00% 543.82 49.DO% $47.81 46.00% DIRECT LABOR SUBTOTAL c. d. 8. OVERHEAD ON SUBCONTRACTORS (~E 10% OF 7) , i 9. PROFIT ON SUBCONTRACTORS (NTS 10"'{' OF 7 ) j ; 1~ INSURANCE l B. payroll dl1ven lIability 1~i1 urBnce (2% elf 1 >> b. volume driven liability i~8urancB (0% of 1 thnl 7) , 11. BOND aI. bend (0% of 1 thnl 10) 4125/2009 0.00 0.00 452.74 226.74 47.81 21.99 759.28 113.69 22.78 0.00 128.29 0.00 0.00 0.00 0.00 0.00 Da1lit SlIbmifuld: 4/28/2009 / 1. CRAFT LASOR COSTS 895.96 2. I\IlA TElliA!!.. COSTS 128.29 !. EQUiPMENT COSTS 0.00 4. SMALL TOOLS O.DO SUBTOTAL 1,2.3,&4 1024.25 102.42 102.42 G. OVERHEAD iI. PROFIT 7. SUBCONTRACTORS 0.00 0.00 0.00 e. OlfERHEAD ON SUBCONTRACTORS 9. PRom ON SUBCONTRACTORS 10. INSURANCE 17.92 11. BOND 0.00 TOTAL COST 1 THRU 111 $1,247.01 I :~~t:(-;... ",e5-MDVB FE46220 04/27/09 MON 15:59 [TX/RX NO 9963] '''i-' " 412!5l2{Jil~' U~:2ili:'11 AM "-'fIl fiI. 1063 1587 1599 2279 2790 2971 3960 6644 6650 5871 6872 1 j i I I! . 3/4" GRC (Difficutt) ~ i 3/4" Locknut ~ :3/4" POntic BlJlsl1ing ~ 3/"''' 1-&-1ole Strap i -- 01 RflIceway, F!l.IlU'1gs ~ IBQl:Y~iS Total -- I ~ I [ ~ I ; ~ 20A 1 P 120f240V BlJlt-On Circuit LreakBr . - 03 Distribution Total ~- ~ I ~ l j Unistrul (Deep) j Cut 12. Gauge 1-518x1-5/6 ct1!i!lnn~i (labor) 1f4" Concrete Anchor ! 3/B" Concrete Anchor ~ - 07 Mise TotaO -- i i I ! I i , f. Dest:ripUon WWTP - ~~k FE~C Job Number: 237 1El('l.ellll$ioli1 Blf PhaslllI QUliIntlty iF'1I'ila::e U lEd Piiice 1LIiIIllO&'" IHr !Jl Eltt i..aIb Hr --- 01 Raceway, Fittings 8. Boxes :-'- 20.00 137.98 8.00 27.33- 4.001 30.70 4.00 32.15 #12 THHN CU Stranded Wira 2-Cond Thermostat Wire -- 02 Wire & Cabie Totai --- Job Tote I I ~ ~ ~-! t f. -- 02 Wire 8. Calble --- 240.00 80.00 -- 03 Distribution --- 1.00 --- 07 Misc -- 4.00 5.00 4.00 4.00 C 37.60 13.50 C C 2.19 0.12 E C 1.23 0.12 E C 1.29 4.00 C 42.31 124.84 M 317.74 M 29.96 25.42 55.3a 6.00 M 7.00 M JFlil!i91Gl 11 2.7!:l 0.96 0.48 0.16 4.30 1.44 0.56 2.00 0.40 0.40 0.80 1.30 0.64 1.12 3.86 'HI.56 . Target, Labor column 3 17.23 E 17.23 17.23 0.40 E 210.77 C 0.00 E 62.93 C 60.52 C 8.43 20.00 C 0.00 0.26 E 2.52 16.00 C 2.42 2B.00 C 13.37 128.2B 04/27/09 MON 15:59 [TX/RX NO 9963] CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Sixteen Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 Date: January 30, 2009 CONTRACTOR: Pease and Sons YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): 120 V power for the Load Cells for Cake Pump A TT ACHMENT(S): If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: D Contractor's Records D Engineer's Records 0 Unit Price 0 Lump Sum rgj Time & Materials 0 Other: o Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 2,579.24 Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR By: <:::~ ~ CITY OF BREMERTON ------ -- -- By: ~/( I ab, FORMS, Work Change Directive, 3-00 BREMERTON W\NTP 8570 Change Proposal p Lump Sum Basis Ref: Section 01250 COST CODE OH 0'1030 OH 01031 0'1513 01512 01624 01073 01515 01516 01517 01950 DESCRIPTION: WORK AREA: Provide 120V Power to Load Ceils at Cake Pump. Centrifuge PEASE ISSUE #: Owner Chng # RF1# PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager 1.0 $ 150.00 $ 150.00 Project Superintendent 1.0 $ 93.57 $ 93.57 Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 86.64 $ - Carpenter 0.0 $ 71.00 $ - Laborer 0.0 $ 59.60 $ - Millwright 0.0 $ 72.53 $ - $ - TOTAL - Pease & Sons Labor 243.57 PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift o $ 24.54 $. - Crane 0 $ 172.72 $ - . Boom Truck $ 73.08 $ - Job Truck - Pickup 0.0 $ 9.00 $ - Trash Truck $ 55.00 $ - Compressor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator / Light Plant $ 12.70 $ - Laser $ 11.55 $ - TOTAL - Pease & Sons Equipment $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST $ - $ - $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ SUBCONTRACTORS EST. COST PSW Electric $ 2,025.29 $ - $ - $ - TOTAL - Subcontractors $ 2,025.29 Page 1 of2 5/1/2009 7:53 AM BREMERTON VVWTP 8570 Change Proposal ~ Lump Sum Basis ReF: Section 01250 DESCRIPTION: WORK AREA: Provide 120V Power to Load Cells at Cake Pump. Centrifuge COST CODE PEASE ISSUE #: Owner Chng #: RFI# CONTINUED FROM PAGE 1 of 2 SUBTOTAL - DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 2,268.86 BOND & INSURANCE 1.5% $ 34.03 SUBTOTAL $ 2,302.89 OVERHEAD & PROFIT 12% $ 276.35 TOTAL - Direct Costs $ 2,579.24 TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 2,579.24 This cost proposal is based on the cost elements identified. Pease & Sons reselVes all rights to additional compensation and time extension for work elements identified, unless specificallv neootiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to .accept this proposal within the proposal time may result in cost escalation and possible additional delays. This Change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reselVes any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. PEASE & SONS o 1-May-09 DATE SUBMITTED 15-May-09 PROPOSAL VALID UNTIL LARRY BOYD Page 2 of 2 5/1/2009 7:53 AM Blremrerton WWTP Wet Weather lFmdRities UPKi'iilde 1- PSW Electric Breakdown Summary ~roHliSId NMmIbGrr: "ili!!'li GilIflIGll"ID Contractor.: Pease Alld $01113, Inc. Scope: Revisions Load Cell 1. ELfECTRBCIAINl LABOR COSTS 1ll.51 HR a. Journeyman IIlIIeCtrlClilll1l iiillbor@ b. Joumeyman burdien @ 1lI.5'! H1R c. foreman electrician @ d. forvmiln burden @ 11.00 HR e. S1uperintendent electrician @ f. superintendent burden @ Supervision g. direct supervision (NTE 15% of 1a-f) h. _fety (NTE 3% of IIn85 1a,b,C:,d,B & f) I. Delivery tnlck and driver ($50 per hour) 2. MA TERlAl.S COSTS a. mllterlal costs b: quote: c. quota: 3. iEQi.JjI~MIENll' COSTS iI. owned llqulpment (per spec alPl>>i"O\/'l8d l!lclJlrce~ iI. rentall eqiJipm@i'iIt (per inv.:iierelll a~till!::helllll 41. SMAl.l TOOLS a. small toohllNTE 0% of 18. e & QJ) 5. OVERHEAD a. NTE 10% portion of 1,2.3&4 6. ALLOWANCE FOR PROFIT (NTIE 10'% OF 1,2,3&4 1 7. SUBCONTRACTORS a. b. c:. d. $:!l9.i14 52.000,{, $43.112 49.00% $-47.81 48.00% IllRECT LAllIoR SUBTOTAL 8. OVERHEAD ON SUBCONTRACTORS (NTE 10% OF 7) 9. PROFIT ON SUBCONTRACTORS (NTE 10% OF 7 1 10. INSURANCE a. payroll driven liability insurance (2% of 1) Ib. volume driven liability InsurancD (0% of 1 thru 71 11. BOND a. bond (D",(, of 1 thru 101 31231200ll 339.04 176.30 372.91 182.73 0.00 0.00 1070.97 160.65 32.13 0.00 402.93 0.00 0.00 0.00 0.00 D.OO ~o. WeD PR No.. l!}illIRs Suiblmittllle!: / 1. CRAFY lABOR COSTS 2. MAYEIIIAL COSTS - 3123/200g 1263.75 402.93 3. EQUII'MENT COSTS. 0.00 SUBTOTAL 1,2.3,&4 ;.s. SIIIlALL TOOLS 0.00 8. ClIVERHI5A 0 iii. PROFIT 7. SUBCONT'RACTORS 1666.68 166.67 166.67 0.00 iii. OVERHEAD 0 N SUBCONTRACTORS 0.00 8. PROFIT ON SUBCONTRACTORS 0.00 10. INSURANCE 25.27 11. BOND 0.00 TOTAL COST 1 THRU 111 $2,025.29 I "1/i5.Loed Cell 04/27/09 MON 15:59 [TX/RX NO 9963] 31'23f;i!!Jl)9 ,UI~::MJ IfllM Pa!1@ '! WW1rP lead! !Cell Job Number: 226 lE~m'liol1 By Phi1lsa'J J....m'<# ~HCr!lp~i@rn Quanttty Plric~ U edlPlri~ lalOOr Hi' l! IE/.!:t !Lalli IHr -- 01 RllIceweoy, Fittings & Boxes-- 15197 3/4" loeknui 2.00 27.33 C 0.55 0.12 E 0.24 a2SS 3/4" Schedule 80 900 Condl.li'llElbow 6.00 2.48 E 14.88 0.00 E 0.00 -- 01 Raeaway, Fittings 8. Saxe!> Tof!<:ll ""- 15.43 0.24 -- 02 Wi,s ,& Calollll -- 2790 #'12 TD-lHN CU Stlflllnded Wire 300.00 124.8<1 M 37.45 6.00 M 1.80 - 02 Wire & Cabill! Totsl m 37.45 1.80 -- 06 Underground/Site -- 2061 3/4" PVC Male Adaptor 1.00 26.92 C 0.27 0.16 E 0.16 2115 3/4" PVC Coupling 12.00 14,50 C 1.74 0.06 E 0.72 8171 3/4" PVC (Schedule-BO) 60.00 43,19 C 25.91 3.75 C 2.25 - 06 Underground/Site Total -- 27.92 3.13 -- 07 Mise .-- TOO01 Fiberglass Unistrut 2.00 4.1S E 8.36 1.00 E 2.00 TOO02 3/4" Fiberglass Strut Straps 20.00 3.71 E 74.20 0.06 E 1.20 TOO03 J/8" Stainless Wedge Anchors 10.00 1.49 E 14.90 0.15 E 1.50 TOOO4 Wire Termina1;ons and Labels 14.00 0.63 E 8.82 0.06 E 0.84 TOCOS Coordination & Design 1,00 0.00 E 0.00 4.00 E 4_00 TOO06 18-4 Shielded Cable 25,00 1.23 E 30.75 0.02 E 0.50 TOCO? 1/4" Stainless Wedge Anchors 6,00 0.63 E 3.78 0.10 E 0.60 TOOOB Drill and Tap 1/2" Stainless 1.00 0.00 E 0.00 0.40 E 0.40 TOOO9 3 Hele Stainless 90" l Bracket ~.OO 45_33 E 1 B 1.32 0.20 E 0.80 --- 07 Mise Total - 322.1J 11.84 Job Tolal 402.93 17.01 04/27/09 MON 15:59 [TX/RX NO 9963] CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Seventeen Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: January 30, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOllOWING CHANGE(S): Tieing FIT 46111 from existing TWAS cabinet to RDT panel. ATTACHMENT(S): If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: D ~ D o Unit Price D D Contractor's Records Lump Sum Engineer's Records Time & Materials Other: D Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 3,011.31 Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR By: 1i) --- CITY OF BREMERTON By: /C~__~__ ab, FORMS, Work Change Directive, 3-00 BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 COST CODE OH 01030 OH 01031 01513 01512 01624 01073 01515 01516 01517 01950 DESCRIPTIQI\I: WORK AREA: Tie FiT 46111 control into ROT Panel. Centrifuge PEASE ISSUE #: Owner Chng # RF!# PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager 1.0 $ 150.00 $ '150.00 Project Superintendent 1.0 $ 93.57 $ 93.57 Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 86.64 $ - Carpenter 0.0 $ 71.00 $ - Laborer 0.0 $ 59.60 $ - Millwright 0.0 $ . 72.53 $ - $ - TOTAL - Pease & Sons Labor 243.57 PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift 0 $ 24.54 $ - Crane o $ 172.7? $ - Boom Truck $ 73.08 $ - Job Truck - Pickup .0.0 $ 9.00 $ - Trash Truck $ 55.00 $ - Compressor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator / Light Plant $ 12.70 $ - Laser $ 11.55 $ - TOTAL - Pease & Sons Equipfl)ent $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST $ - $ - $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ SUBCONTRACTORS EST. COST PSW Electric $ 2,405.37 $ - $ - $ - TOTAL - Subcontractors $ 2,405.37 Page 1 of2 5/1/2009 7:56 AM BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 DESCRIPTION: Tie FIT 46111 control into ROT Panel. WORK AREA: Centrifuge COST CODE PEASE ISSUE #: Owner Chng # RF1# CONTINUED FROM PAGE 1 of 2 SUBTOTAL - DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 2,648.94 BOND & INSURANCE 1.5% $ 39.73 SUBTOTAL $ 2,688.67 OVERHEAD & PROFIT 12% $ 322.64 TOTAL - Direct Costs $ 3,011.31 TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVI1Y NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ - SUBTOTAL $ - PROFIT@ 10% $ - . TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 3,011.31 This cost proposal is based on the cost elements identified. Pease & Sons reselVes all rights to additional compensation and time extension for work elements identified, unless soecificallv neootiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change prqposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time may result in cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reselVes any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. PEASE & SONS 01-May-09 DATE SUBMITTED 15-May-09 PROPOSAL VALID UNTIL LARRY BOYD Page 2 of 2 5/1/2009 7:56 AM B;r~merlon W'WTP WeiI: Weatheir Facilities Up[l;1I.'ade III PSW,:Electric Breakdown Summary. Project Mumber: 165 ""0. WeD PR No. Date SllIbmlli.teiJI: 4/2812009 GanernD Comnll:;\!or: PlDlillSG Ai'ld SOliS, Unc. SClIlpil;"I1l1 fiT 46111 to RYID PaU1leO ~ '1l. ELECTRICIAN LAIBOR COSTS D.DO HR a. Journeymlln eledrlclan Ulrlbow @l b. joumeyman burden @ : 16.33 HR c. foreman electrician @ . d. foreman burden e 1.00 HR e. superintendent electrlcl~n @l f. superintendent burden @ $39.84 52.00% $43.82 49.1.10% $47.81 46.00% . DIRECT LABOR SUBTOTAL 0.00 0.04) 1671 .716 ~29.16 47.81 21.99 1 (J70. 73 SUlMlrviaion '. g. direct supeNlsl on (NTE~ 15% of 13-f) . h. satety (NTE 3% of lines :1a,b,c,d,. & f) I. Dellvary truck and drl~.r ($50 per hour) 160.61 32.12 1.1.00 1. CRAIFT LABOR CO!lTS 1263.46 Z. MATERIALS COSTS a. material cOlris b: quobit : e. quote: 719.96 0.00 1.1.00 d. MA'i'ERiAl COSY5 719.96 3. IEQUIIPMIEIi'IIY COSTS. . B. owned IDqlllpment (par tiPIIIC lIPJllIOVHI5O>IllI'lClB) h. rental ~qlllllJlmeM {per l'/vClla:al5 attachedl 0.00 0.00 3. EQUIPMENT COSTS 0.00 4.. SIllIIAL I. TOOLS II. IImall too8/J (NTE 0% of 11il1, C & ol 0.00 4.SNALl TOOLS 0.00 5. OVERHEAD a. NTE 10% pDrtlon of 1,2,3&4 5. ALLOWANCE FOR PROFiT INTE 10% OF 1,2,3&4) 7. SUBCONTRACTORS a. b. c. d. S. PROFIT 1983.42 198.34 198.34 SUBTOTAL 1.2,3,&4 5. OVERHEAD 7. SUBCONTRACTORS 0.00 8. OVERHEAD ON SUBCONTRACTORS (NTE 10% OF 7) 8. OVERHEAD ON SUBCONTRACTORS 0.00 !to PROFIT ON SUBCONTRACTORS (NTE 10% OF 7 ) 9. PROfiT ON SUBCONTRACTORS 0.00 10. INSURANCE .. paYl'G1I di1ven liability Insurance (2% of 1) b. volume driven liability Insurance (0% of 1 Ithru 7) 10.INStIRANCE 25.27 11. BOND a. bond (0% of 1lhru 10) 11. BOND 0.00 TOTAL COST 1 THRU 111 $2,405.37 I <lI2512C1ll9 #1BS.TIe FIT 4611110 RTD Panel 04/27/09 MON 15:59 [TX/RX NO 9963] 41~!21l0~ 'ibll~:;j\m AIM! ~J-c"m# 1, dl 2033 4367 13360 TOOO1 TOOO2 T0003 T0004 T0005 WWiP. Tile lFiT .4 5"1 11 to IRTIJ PallilQI Job Number: 238 ElrteUTll5loi'1l By Phase Quantity iPr!~ lJ DIOISrcU1ipitJl<<l>flI IE~ !Lab !-Ill' 314" IPVC Coated Rigid Steel 3/4" IPVC Coated GUAT -- 01 Raoewiay, Fittil1'lge. &. Boms Tol'aii .~ --- 01 Racewa)I, !Fittings & Boxes-- BO.OO 288.50 C 2.00 81.1:3 IE . #1.H2-1l0 Wire Termination Laber .~ 02 Wire & Cable Totsl -- , --- 02 Wii's 8. Cabls -- 6.00 0.00 IE 150.00 IE 17.06 E 4.41 E 117.90 C 0.38 E 2.65 E ~t I?rrlc:& Llfl:lor IHIi U 230.88 152.26 393.14 0.00 0.00 B.ca c 1.08 E 0.18 E 15LUlO 0.56 E 34.12, 0.14 E 88.20 0.10 E 5.90 0.25 E 38.00 0.01 E 10.60 0.15 E 326.82 719.96 P.fJI!ll9 '! 6.40 2.16 8.56 HIB 1.08 0.56 0.28 2.aO 1.25 1.00 0.60 5.69 15.33 Com EJdsting Floo!' 1" Conduit 3/4" PVC Coat Union 3/4" Fiberglass Unlstrut Strap 5" xl 5ffr' Stainless Steel Unlsirut Type 3 Cable 100' Labels - 07 Mise Total -- -- 01 Mise --- 1.00 2.00 20.00 5.00 100.00 4.00 Job Total ".. "'let. Laber column 3 04/27/09 MON 15:59 [TX/RX NO 9963] CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Eighteen Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: April 1 0, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Modify panel LP-EPS in accordance with CH2MHiII memo and one line diagram. ATTACHMENT(S): Pease and sons change proposal, memo from CH2MHiII, one line diagram. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: o rg] o o Unit Price o o Contractor's Records Lump Sum Engineer's Records Time & Materia!s Other: o Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 615.88 Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. R~ CONTRACTOR AUTHORIZED: CITY OF BREMERTON By: By: 7// -- ab, FORMS, Work Change Directive, 3-00 BREMERTON WWTP 8570 Change Proposal - Lump Sum Ref: Section 01250 DESCRIPTION: Modifications to Panel LP-EPS perWCD 18. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng' # WCD 22 RFI# OH 01030 OH 01031 PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager c 0.0 $ 150.00 $ - Project Superintendent 0.0 $ 88.21 $ - Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 85.58 $ - Carpenter 0.0 $ 79.64 $ - Laborer 0.0 $ 66.86 $ - Millwright 0.0 $ 81.36 $ - $ - TOTAL - Pease & Sons Labor ~EASE & SONS EQUIPMENT HOURS HOURLY RA IE EST. COST Forklift 0 $ 10.10 $ - Boom Truck 0 $ 22.00 $ - ~-Gas Monitor 0 $ 5.63 $ - ~ob Truck 0 $ 9.00 $ - Compressor 0 $ 11.25 $ - Man Retriever 0 $ 7.13 $ - Core Drill Machine 0 $ 7.33 $ - Iventilation Blower 0 $ 2.50 $ - Duct 0 $ 2.75 $ - , Hose (50') Section 0 $ 0.88 $ - Rivet Buster 0 $ 6.25 $ - TOTAL - Pease & Sons Equipment $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ SUBCONTRACTORS EST. COST PSW Electric $ 505.65 $ - $ -( TOTAL - Subcontractors $ 505.65 Page 1 of2 5/7/2009 10:06 AM BREMERTON WWTP 8570 Change Proposal - Lump Sum Ref: Section 01250 DESCRIPTION: Modifications to Panel LP-EPS per WCD 18. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD 22 RFI # CONTINUED FROM PAGE 1 of 2 SUBTOTAL - DIRECT COSTS (less labor) EST. COST SUBTOTAL - DIRECT COSTS $ 505.65 BOND & INSURANCE 1.5% $ 7.58 !sUBTOTAL $ 513.23 OVERHEAD & PROFIT 20% $ 102.65 TOTAL - Direct Costs $ 615.88 TIME EXTENSION AND RELATED COSTS EST. COST IME EXTENSION REQUESTED - WORKING DAYS: . 56 day extension required based on attached CPM. Additional extension will be required for IME EXTENSION REQUESTED - CALENDAR DAYS: extended submittal review time or submittal rejection and resubmittal. No cost will be added for additional extension. Proposal is based on acceptance of attached CPM Schedule. ~PM ACTIVITY NUMBERS AFFECTED: Per Attached CPM Update EXTENDED FIELD OVERHEAD' (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ - SUBTOTAL $ - PROFIT@ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 615.88 This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements identified, unless soecificallv neQotiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time may result in cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct. indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost andlor time have been specifically included and negotiated. PEASE & SONS 07 -May-09 DATE SUBMITTED 21-May-09 PROPOSAL VALID UNTIL Bryan Hillemann Project Mgr. Page 2 of2 5/7/2009 10:06 AM CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Twenty Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: May 7, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Installation of meter on polymer piping. PSW will install wiring. PPI will install meter. Centrisys will modify the panel view ATTACHMENT(S): Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: o ~ o o Unit Price o o Contractor's Records Lump Sum Engineer's Records Time & Materials o Other: Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 935.39 Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMENDED: r CONTRACTOR AUTHORIZED: ---- ~ CITY OF BREMERTON By: By: -//~ / -- ab, FORMS, Work Change Directive, 3-00 BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 COST CODE OH 01030 OH 01031 01513 01512 01073 01515 01516 01517 01950 DESCRIPTION: Install city provided flow meter on polymer line. WORK AREA: Centrifuge PEASE ISSUE #: Owner Chng # WCD 20 RFI# PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager 0.0 $ 150.00 $ - Project Superintendent 0.0 $ 93.57 $ - Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 86.64 $ - Carpenter 0.0 $ 71.00 $ - Laborer 0.0 $ 59.60 $ - Millwright 0.0 $ 72.53 $ - $ - TOTAL - Pease & Sons Labor PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift 0 $ 24.54 $ - Crane 0 $ 172.72 $ - Boom Truck $ 73.08 $ - rash Truck $ 55.00 $ - Compressor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator / Light Plant $ 12.70 $ - Laser $ 11.55 $ - TOTAL - Pease & Sons Equipment $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST Material (attached) $ - $ - $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ IsUBCONTRACTORS EST. COST Pease Piping, Inc. $ 222.10 PSW Electric $ 545.87 $ - $ - TOTAL - Subcontractors $ 767.97 Page 1 of 2 5/7/2009 7:06 AM BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 DESCRIPTION: Install city provided flow meter on polymer line. WORK AREA: Centrifuge COST CODE PEASE ISSUE #: Owner Chng # WCD 20 RFI# CONTINUED FROM PAGE 1 of 2 SUBTOTAL - DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 767.97 BOND & INSURANCE 1.5% $ 11.52 SUBTOTAL $ 779.49 OVERHEAD & PROFIT 20% $ 155.90 TOTAL - Direct Costs $ 935.39 (ME EXTENSION AND RELATED COSTS EST. COST IME EXTENSION REQUESTED - WORKING DAYS: 0 TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): IvALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 935.39 This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements identified, unless specificallv neqotiated as part of this Change' Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time may result in cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. PEASE & SONS 07-May-09 DATE SUBMITTED 21-May-09 PROPOSAL VALID UNTIL BRYAN HILLEMANN Page 2 of 2 5/7/2009 7:06 AM Apr 27 2009 4:10PM PSW ELECTRIC INC. 13603771832 Bremerton WWfP Wet Weather Facilities Upgade PSW Electric Breakdown Summary . A.-V> ~~ Project Number: 165 GeM'" CcmtraI:tor. '""" And Sans, Ine. Scope: Er.ctricaI for Addld PoJymer FlOW Miler 1. EU!CTRIaIAN LABOR costS 0.00 MR e.JoUlO4lJm8n ~n 1Ror. It. journeYmIIn ~n" 4.02 HR Co fo........ .lectrIcllln CD II. fonllWn burden. '.00 HR .. eu,.......nd.J1l.JIIcttlcfan . f. supel'lnt8ndent burd.n. supenrMlon g. dlnlcl8up1t,,,1tI101I (Nfe ,.% of 1.4) It. ..rely (lITE S'" or DIlIIS 1a.b.c,d.. & II L DtIllft1y truck and drlVtlr ($10 per bou.) 2. MATERIALS COIITS L mIltlIrI.ll:O." b= qu_ : Co cpIOt1r. s. EQUIPMENT COSts . .. owned equipment fper ~ approvtRIlIOVrce) b. nmtaI equlpJMJ1llper Involca altltcbed) .. SMAU. TOOLS .. ..... tour. (NTE "" of 1.. c: . .) iii\. OVERHEAD L lIfE 10% portion of 1,z,:s&f G. ALI.OWANCE FOR PJIOFfT (tile 1ft OF 1.2.3&4 ) 7. SUBCONTRACTORS ,L b. e.. cL $3t.84 12.00% $4:1.82 ....GO'" "'7.8t 48.00% DlRECfUlllOll SUBlOTAL 0.00 O.DO 178.18 88.32 47.&1 21.99 33Z.m 49.84 0.97 0.00 5B.27 0.00 0.00 0.00 0.00 0.00 8. CWERHI!AD ON BUBCONTRAC:rrORS (NTE 10% OF 7) I. PRORT ON 8UBCDN1RACTOM8 (NTE 10% OP 7 J 'fO. INSUILQCE a. payroll drIVen UUIlItJ InaUI'lIRce I~% of t) b. volume IIrInn DabJIIty Imnamnca (0% of 1 tbru 7) 11. BOND .. 1MInclI10% d 1 U1ru 10) p.18 ""0. WCD PR No. Dm Sub11dtI&d: 4/2812009 t. CMFT UIIDIl COfla 392.09 Z. MTIJDALcoPS 56.27 J..II!QVJPllEiIfT cous 0.00 .....IL TOOU 0.00 SU6TOTAL,I,2.3.&4 448.36 .. CWERHI!'AIl 44.84 .. PJKlPJT 44.84 ".8U8CON'IRACTOllS 0.00 LGYElfttUDONIUIlCOIITIIAc:nJfllI 0.00 1.1'1l0mON8taCOlfJRADRlRl 0.00 'D.1N1lURAllC1f 7.84 1'.JIOND 0.00 TOTALC08T1THRUt11 $545.87 I 4I2lIIZIlIlI ,"65-MlIed ~...~ 04/27/09 MON 15:59 [TX/RX NO 99631 Apr 27 2009 4:11PM PSW ELECTRIC INC. 13603771832 4/261200910:21:54 AM ,. ,f '..-~.....' 1931 1952 2108 8Cl8O 8081 2190 2971 2073 2115 2289 69DO De$Crlptlon 31~ SHI-tiIB Com (Str) 314" Seal-Obt Conn (90 Degree) II? UT FIPbIo PVC Connec;IOr 112" LlquidUght Non-Metslfrc 3l4D lfqiddllght Non-Melallic - 01 Raceway, Fillings & Boxes Tot" -- ,-12 THHN CU SInu1ded Wre ~ Thermoalat WIltiI - D2 Wire & C8bIe Total- 314'" PVC Female Adaptor 314" PVC Coupling 314- P\fC.T ConcfufBt - 06 UncIergroundlSlte Totat - 3\4" x 1 \2'" RE Bullhlng - OT MJscTotal- Job Total WWTP Polymer FloW Meter Job Number. 241 . ~nslon By Pltase Quanllly Pdt>> U - 01 Raceway, FJ1tings & Boxes- 1.00 297.19 C 1.00 543.70 C 2.00 16'.98 C 5.00 51.81 C 5.00 77.70 C ExtPrica 2.m 5,44 3.2.4 2.SP 3.89 18.43 Labor Hr U 0.18 E 0.5) E 0.12 E 7.20 C 9.60 C 7.2D M 8.40 M 0.19 E O.or e 0.86 E 0.02 E p. 19 Page 1 En Lab H, 0.18 0.53 0.24 0.38 OAB U9 0.79 0.50 1.29 0.1& 0.07 o.ee 0.92 0.02 0.02 4.02 .. Target, Labor GOIumn 3 - D2 Wins & Cable- 110.00 124.84 M 60.00 317.74 M 13.73 19.06 32..19 - 06 Underground/Slte- 1.00 24.69 C 1.DD 14.50 C 1.00 363.98 C 0.25 0.f5 3.64 4.04 - 07 MIIe-- 1.00 1.01 E 1.01 1.01 56~7 04/27/09 MON 15:59 [TX/RX NO 9963) CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Twenty One Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: February 20, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): . Remove the waste gas burner meter. Remove 3 plug valves and piping. Install stainless steel spool with necessary taps for meter and additional tap for existing equipment. ATTACHMENT(S): Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: D ~ D D Unit Price D D Contractor's Records Lump Sum Time & Materials Engineer's Records Other: D Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 8,015.68 Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an. increase, the estimated times are not to be exceeded without further authorization. RECOMMEND~ ~_~ ~ ~ --=-~ CO CTOR . AUTHORIZED: CITY OF BREMERTON By: By: -? /( I ab, FORMS, Work Change Directive, 3-00 BREMERTON WWTP 8570 Change Proposal - Lump Sum Ref: Section 01250 DESCRIPTION: Remove and replace existing DGA spool between existing flanges at boiler room. Also includes cost for replacing DGA flow meter sized per spec to match existing 8" pipe. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD 21 RFI# OH 01030 OH 01031 PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager 0.0 $ 150.00 $ - Project Superintendent 1.0 $ 88.21 $ 88.21 Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 85.58 $ - Carpenter 0.0 $ 79.64 $ - Laborer 0.0 $ 66.86 $ - Millwright 0.0 $ 81.36 $ - $ - TOTAL - Pease & Sons Labor 88.21 PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift 0 $ 10.10 $ - Boom Truck 0 $ 22.00 $ - !<I-Gas Monitor 0 $ 5.63 $ - Job Truck 0 $ 9.00 $ - Compressor 0 $ 11.25 $ - Man Retriever 0 $ 7.13 $ - Core Drill Machine 0 $ 7.33 $ - Ventilation Blower 0 $ 2.50 $ - Duct 0 $ 2.75 $ - Hose (50') Section 0 $ 0.88 $ - Rivet Buster 0 $ 6.25 $ - TOTAL - Pease & Sons Equipment $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST Materials (Attached) $ 1,125.08 $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ 1,125.08 SUBCONTRACTORS EST. COST Pease Piping $ 2,786.56 PSW Electric $ 2,596.96 $ - TOTAL - Subcontractors $ 5,383.52 Page 1 of2 5/7/2009 12:45 PM BREMERTON WWTP 8570 Change Proposal. Lump Sum Ref: Section 01250 DESCRIPTION: Remove and rep.lace existing DGA spool between existing flanges at boiler room. Also includes cost for replacing DGA flow meter. sized per spec to match existing 8" pipe. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD 21 RFI# CONTINUED FROM PAGE 1 of 2 SUBTOTAL. DIRECT COSTS (less labor) EST. COST SUBTOTAL. DIRECT COSTS $ 6,508.60 BOND & INSURANCE 1.5% $ 97.63 SUBTOTAL $ 6,606.23 OVERHEAD & PROFIT 20% $ 1,321.25 TOTAL - Direct Costs $ 7,927.47 IME EXTENSION AND RELATED COSTS EST. COST IME EXTENSION REQUESTED - WORKING DAYS: IME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 8,015.68 This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements identified, unless soecificallv neaotiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time may result in cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. PEASE & SONS 07 -May-09 DATE SUBMITTED 21-May-09 PROPOSAL VALID UNTIL Bryan Hillemann Project Mgr. Page 2 of2 5/7/2009 12:45 PM BREMERTON WWTP 8570 Change Proposal - Lump Sum DESCRIPTION: PEASE ISSUE #: 00 #VALUEI Owner Chnc WCD 21 RFI # BILL OF MATERIALS (Pease & Sons) ITEM DESCRIPTION QTY. UNIT OF LABOR MATERIAL MEASURE UNITS TOTAL UNIT TOTAL 8" Sched. 10,316 SS 10 If 0.2 2.0 34.57 345.70 8" SK Flange 2 ea 1.3 2.6 20.00 40.00 Sched. 10 Type A Stub 2 ea 1.4 2.8 112.00 224.00 3/4" X 3 1/2" SS Bolts 32 ea - 7.36 235.52 3/4" SS Nut 32 ea - 1.98 63.36 1/8" NONASS RING 2 ea - 8.25 16.50 Demo Existing FM/Spool 1 lot 16.0 16.0 - Disposal 1 Is - 200.00 200.00 Shop Weld 2 ea 1.5 3.0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - I - - - - - - - - - - - - TOTALS MANHOURS: 26.4 COST: $ 1,125.08 Page 2 . BREMERTON WWTP 8570 Change Proposal - Lump Sum Pease Piping DESCRIPTION: PEASE ISSUE #: 00 #VALUEI TCF/PC CL # WCD 21 RFI: PEASE PIPING LABOR HOURS HOURLY RATE EST. COST Pipe Fitter Foreman 10.0 $ 86.21 $ 862.15 Pipe Fitter 16.5 $ 80.42 $ 1,326.94 Plumber $ 80.42 $ - $ - $ - TOTAL - Pease Piping Labor 2,189.09 PEASE PIPING EQUIPMENT HOURS HOURLY RATE EST. COST Forklift $ 24.54 $ - ~ob Truck 26 $ 9.00 $ 234.00 Boom Truck $ 73.08 $ - Compressor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator I Light Plant $ 12.70 $ - Laser $ 11.55 $ - TOTAL - Pease Piping Equipment $ 234.00 MA TERJAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST $ - $ - $ - $ - TOTAl- Material and Major Equipment Suppliers $ rroN_=~ TOTAL - Subcontractors Ii $ EST. COST GENERAL RELATED COSTS HOURS HOURLY RATE EST. COST Change Order Processing Fee Lump Sum $ 75.00 Estimating $ 75.00 $ - As-Built Drawings 1 $ 55.00 TOTAL - General Related Costs $ SUBTOTAL - DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 2,423.09 OVERHEAD & PROFIT @ 15% $ 363.46 TOTAl- Direct Costs $ 2,786.56 TIME EXTENSION AND RELATED COSTS I EST. COST rrlME EXTENSION REQUESTED - WORKING DAYS: TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - EXTENDED FIELD OVERHEAD @ 15% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 2,786.56 This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements identified. unless specifically negoiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time will result in cost escalation and,possible additional delays. ' PEASE & SONS GORDON PEASE - PROJECT MANAGER DATE SUBMITTED PROPOSAL VALID TIL Page 1 Apr 27 2009 4:08PM PSW ELECTRIC IHC. 13603771832 p.12 ...--..... Bremerto~ WWTP Wet Weather Facilities Upgade PSW Electric Breakdown Summary P_Numbor:165 uJUP ~~( l1li0. weD PR No. Dabt 8ulsmftted; 412812009 GtlJI8ra1 CDnII'Ile:Ior. Pee8. And 80118, Ine.: Scope; Dlplller 0_ Flaw Metar << PIpe srm Change) t. ELECTRICIAN lABOR COltT8 . l).OO HIt ..~ eJlN:!rlch.. labor. It. JOUrraeymaD burd_.' : 2:.GO HR e.1Greman elecllfclan a d. forMnan InmI8a CD . 2JHI HR .. .1I)ltId~ _ctrfcllm . f. nparinlenchnt burden .. .' $38.84 12.00% $U.82 ....00% t47.81 4&.00% ClIRliCrLAIJOR~ 0.00 0.00 B7.64 42.94 95.62 43.99 210.19 8upervIsJon t. dIJIICt aupervfston (N1E 11% of 1a.f) b. ..... fNI'E 3% of In. 1I1AO..... .. ., I. DelMny Irwk and drfvet fSIO piN' hour. 2. MATfERJALa COSTS .. IDIlferIeJ coa1a II; quote : c. quote: 40.53 8,11 0.00 1.CM1J' &AIlOR cotTI 318.82 0.00 HUD.OO 0.00 ~..., CanIRIIa 3. EQUIPMENT COSTS .. owned equfpJlJOnt Cpa; 8Pee .pprond Huree) It. renIIII equlpmgnt (pIN' InvalO8a attached) 0.00 0.00 z. MtllRlALc:on5 1840.00 ~ ea_MINT c:otTS 0.00 I 4..SJMLI.. TOOLS 0.00 .! SUBTOTAL 1.2.J.... 2158.82 .. ovPtIl!AO 215.88 So PROFIT 215.88 4. SMALl. TOOLS .. _II tooIa (NlE 0% of t.. c".) 0.00 t. OVERHEAD e. N1'E 10% portion of"t,2,3&4 S. ALLOWANCE FOR PROFIT (lITE fKOF 1.2.3M >> T. SUBCONTRACTORS .. b. c. d. 7.llIUBc:oHTRAClDRS 0.00 a. OVERHEAD ON SUBCONTRACTORS (NTE 10% OF 7) '0 P"OI'IT ON SueCONTRACrORS (NTI! 10% OF '1 ) LCM!lUfIAD D1UUIICON1'RACTClRS O.DO to PROm ON .Ul1COI'I1'IIAefOlU O.DO 10. INSURANCE .. ..-yrDIJ drlwn .lAbllUy ln8urallCtl (2% of'lJ It. val..... driven lJabIIily lnau..nc:e (0% of t thru 7) 11.JNaUIWICII 6.3B 11. BOND .. bond (0% of.. UUu 10) 1t.IJCND 0.00 TOTAL COST" THRU 11~ $2.598.96 I CI2fJ2lIOIl ~.-~-y;:.: ,,;: .~. . ~~ '" i.~ ~~~ .~GDnAIIl\flI1lIr ~'. 7" .4r ~ ~ ';,z.; ! . ~ ~~~(~~~~::.., 04/27/09 MON 15:59 [TX/RX NO 9963l Apr 27 2009 4:0BPM 4/2512009 9:~t:43 AM t._~ II Description ,---. TOOO1 PSW ELECTRIC INC. 19603771892 WWTP Dlduter Ga. Flow Mate,. Job NUIIlber: 236 Ex&en,1on By Phase Quantlly - 07 Mise-- 1.00 1.840.00 E Prrce U En Price Labor H,. U Qualily Co.nuoJs..Sierra Thermal Me.. FloW Meter -aT MfGToIat- Job Talal . -....... '--~ 1,840.00 2.00 E 1.840.00 p.19 Page 1 Ex( lIIb HI' 2.00 2.00 Z.OO . Tervet, Labor c:oJumn 2 1.840.00 I , 04/27/09 MON 15:59 [TX/RX NO 9963] CITY OF BREMERTON / WORK CHANGE DIRECTIVE WCD#: Twenty Two Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 Date: April 10, 2009 CONTRACTOR: Pease and Sons YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Replace 8 slide gates as follows: Gates G-C-3, G-C-4, G-C-7, and G-C-8 at the aeration basin. Gates G-E1-1 and G-E1- 2 at the chlorine contact chamber, and gates G-X-11, and G-X-12 in the headworks building. The gates in the headworks should be provided by the same manufacturer as the other headworks gates and additional electrical work associated with these two gates will be completed by PSW. The City will complete the electrical work for the other 6 gates. Contractor shall supply and install gates in accordance with the attached revised specification 35-20-16.25 and details. Contractor shall provide submittals for all materials, prepare a schedule, and a provide a work plan for each area of work. ATTACHMENT(S): Pease and Sons change proposal, Original Gate Shop Drawings, Revised Specification 35-20-16.25 If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: ~ Contractor's Records D Engineer's Records D Unit Price D Lump Sum ~ Time & Materials D Other: D Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 264,738.66 Substantial Completion: 56 days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOM~EN~ __ -___________ ~CTOR - AUTHORIZED: CITY OF BREMERTON By: By: 1/1 --- ab, FORMS, Work Change Directive, 3-00 BREMERTON WWTP 8570 Change Proposal - T&M Basis Ref: Section 01250 DESCRIPTION: Replace (8) existing slide gates with copolymer slide gates per description in WCD 22. Proposal is based on materialslwarranty as provided by Ashbrook Simon-Hartley. Aeration Basin Influent gates to be surface wall mounted opposite of existing gate. Aeration basin influent gate demo will include removal of existing gate/actuator only, frame to be cut flush with surface. Chlorine Contact gates to be surface wall mounted opposite of existing gates. Electrical and startup included in Headworks gates only. Headworks gate installation includes cost for roof patch, installation is based on supporting gates from existing structure. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD 22 RFI# OH 01030 OH 01031 PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager 0.0 $ 150.00 $ - Project Superintendent 180.0 $ 88.21 $ 15,877.43 Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman 266.0 $ 85.58 $ 22,763.84 Carpenter 266.0 $ 79.64 $ 21,185.52 Laborer 0.0 $ 66.86 $ - Millwright 0.0 $ 81.36 $ - $ - TOTAL - Pease & Sons Labor 59,826.80 PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift 160 $ 10.10 $ 1,616.00 Boom Truck 120 $ 22.00 $ 2,640.00 ~-Gas Monitor 160 $ 5.63 $ 900.80 ~ob Truck 446 $ 9.00 $ 4,014.00 Compressor 64 $ 11.25 $ 720.00 Man Retriever 160 $ 7.13 $ 1,140.80 Core Drill Machine 64 $ 7.33 $ 469.12 rventilation Blower 320 $ 2.50 $ 800.00 Duct 320 $ 2.75 $ 880.00 Hose (50') Section 128 $ 0.88 $ 112.64 Rivet Buster 64 $ 6.25 $ 400.00 TOTAL - Pease & Sons Equipment $ 13,693.36 MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST Materials Attached $ 2,688.16 Sunbelt 42" Pipe Plug $ 400.00 Coast Crane 30T Boom Truck $ 7,200.00 $ - TOTAL - Material and Major Equipment Suppliers $ 10,288.16 SUBCONTRACTORS EST. COST PSW Electric $ 3,594.44 I\shbrook-Simon Hartley $ 139,270.00 $ - TOTAL - Subcontractors $ 142,864.44 Page 1 of2 5f112009 12:05 PM BREMERTON WWTP 8570 Change Proposal- T&M Basis Ref: Section 01250 DESCRIPTION: Replace (8) existing slide gates with copolymer slide gates per description in WCD 22. Proposal is based on materialslwarranty as provided by Ashbrook Simon-Hartley. Aeration Basin Influent gates to be surface wall mounted opposite of existing gate. Aeration basin influent gate demo will include removal of existing gate/actuator only, frame to be cut flush with surface. Chlorine Contact gates to be surface wall mounted opposite of existing gates. Electrical and startup included in Headworks gates only. Headworks gate installation includes cost for roof patch, installation is based on supporting gates from existing structu re. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD 22 RFI# CONTINUED FROM PAGE 1 of 2 SUBTOTAL - DIRECT COSTS (less labor) EST. COST SUBTOTAL - DIRECT COSTS $ 166.845.96 BOND & INSURANCE 1.5% $ 2,502.69 SUBTOTAL $ 169,348.65 OVERHEAD & PROFIT 21 % $ 35,563.22 TOTAL - Direct Costs $ 204,911.87 IME EXTENSION AND RELATED COSTS EST. COST IME EXTENSION REQUESTED - WORKING DAYS: . 56 day extension required based on attached CPM. Additional extension will be required for IME EXTENSION REQUESTED - CALENDAR DAYS: extended submitial review time or submillal rejection and resubmittal. No cost will be added for additional extension. Proposal is based on acceptance of attached CPM Schedule. CPM ACTIVITY NUMBERS AFFECTED: Per Attached CPM Update EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ . - HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 264,738.66 This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements identified. unless soecificallv neaotiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time may result in cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change oroer. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. PEASE & SONS 07 -May-09 DATE SUBMITTED 21-May-09 PROPOSAL VALID UNTIL Bryan Hillemann Project Mgr. Page 2 of 2 5/7/2009 12:05 PM May 7, 2009 11. ""roo I" ,.."""."",-"",tYi?"ii,ik';j,' ".....Ul . .._"~^'-".., . "&" SimDIl-Hartlev" To: Pease & Sons Attn: Bryan Hillemann 11600 East Hardy Houston, Texas 77093 (800) 362 - 9041 Re: Bremerton WWTP, WA Specification: Section 35 20 16.25 Ashbrook Quotation Number: 2003-9810 rev. 1 Dear Gentlemen, We are pleased to offer our bid, for the supply of the specified Coplastix Sluice Gate(s) to meet the intent and fulfill the requirements as detailed in the specification, based upon our Coplastix Design. We also include our Ten-Year Warranty, which is and has proven to be a great attribute to the longevity and quality of our equipment. The Coplastix equipment offered comes complete, ready for installation by the contractor unless noted otherwise. If you disagree with the take-off contained herein, you must advise us. 1. FRAME. 304SS. (except as shown as option for 316 SS) Frames are wall mounted against a 1" nominal grout base, no thimbles or flanges are needed or included. 2. SEALS Sluice gates frames shall be fitted with fixed sealing faces that are mounted in the frame sides. Seals shall be molecularly incompatible with the Disc face and shall have a co-efficient of friction of 0.1 0 or less. 3. DISCS Shall be manufactured from suitably reinforced composite plastic materials. The outer skin material shall have a minimum thickness of 1/8" and is non-toxic, ultra-violet light stabilized. The internal steel reinforcing members shall be designed to adequately withstand the hydraulic forces and/or the mechanical operating loads that will be imposed upon the Disc. The Disc shall be designed for a deflection of less than 1/1000 of the span (Width of Opening/1 000). 4. LEAKAGE RATES Per Specification (A WW AC50 1), no factory water testing will be performed as site testing will need to be done and passed, normal factory inspection and certification report issued. Item #1 G-X-ll. G-X-12 May 7, 2009 Bremerton WWTP, W A Ashbrook Quote No.: 2003-9810 Page 2 Qty.: Size: Gate: Operator: Stem: Two (2) 54" x 66" Wall mounted Coplastix Sluice Gate, suitable for 5' on & off Head pressure. Invert to floor 77" approx. Electric Actuator assembly mounted on a base plate on frame top. Rising 304 stainless steel. Price: $28,119.00 Net Total (both Gates) Item #2 Qty.: Size: Gate: Operator: Stem: G-C-3. G-C-4 Two (2) 30" x 70" Wall mounted Coplastix Weir Gate with a 30x30 opening on the door and suitable for 5' on & off Head pressure. Invert to floor 63" approx. Electric Actuator assembly mounted on a base plate on frame top. Rising 304 stainless steel. Price: $33,461.00 Net Total (both Gates with 316 SS frame option) Item #3 G-C-7. G-C-8 Two (2) 42" x 42" Wall mounted Coplastix Sluice Gate, suitable for 10.8' on & off Head pressure. Invert to floor 198" approx. Electric Actuator assembly mounted on a floor mounted pedestal. Rising 304 stainless steel. Qty.: Size: Gate: Operator: Stem: Price: $36,480.00 Net Total (both Gates) Item #4 G-El-l. G-El-2 May 7,2009 Bremerton WWTP, WA Ashbrook Quote No.: 2003-9810 Page 3 Operator: Stem: Two (2) 48" xA8" Wall mounted Coplastix Sluice Gate, suitable for 13.9' on & off Head pressure. Invert to floor 237" approx. Electric Actuator assembly mounted on a wall mounted pedestal at floor level. Rising 304 stainless steel. Qty.: Size: Gate: Price: $41,210.00 Net Total (both Gates) NOTES AND EXCEPTIONS: A. Equipment offered is Coplastix Standard Design. B. Ashbrook excludes grout, packers, etc. C. Anchor Bolts: 316 stainless steel, Included. (if required) D. No Service Included. Ifneeded, see service terms. DO NOT assume any item not listed above is included in our proposal. F.O.R Houston, Texas, FFA to job site. NO TAXES INCLUDED. Unless otherwise specified in this proposal, all installation of equipment supplied by Ashbrook shall be installed by others. Taxes: The quoted price does not include any local, state or federal taxes, permits or other fees. Any taxes or fees that may apply must be added to the quoted price and paid by the buyer. Note: Ashbrook is only registered to collect and remit sales tax in the following states, Texas, Louisiana, Florida, California, Massachusetts, Ohio, New Jersey and North Carolina. Taxable projects located in states outside of these will need to accrue and remit these taxes directly to the respective state. Proposal Acceptance: This proposal is offered for acceptance within thirty (30) days from date of this quotation or date of bid opening, whichever is the later date. Prices are subject to review thereafter. Prices are firm, based upon receipt of a Letter of Intent or Purchase Order and notice to proceed within this thirty (30) day period and the review and return of submittal drawings to Ashbrook within thirty (30) days. Delays caused by slow return of submittals and/or other manufacturing delays caused by the contractor, owner, owner's agent or engineer may result in additional charges of I % per month for such delays or part thereof. May 7, 2009 Bremerton WWTP, WA Ashbrook Quote No.: 2003-9810 Page 4 Submittal Drawings (2 to 3 weeks from receipt of written Purchase Order) Mechanical submittal and drawings on the preceding equipment will be submitted in accordance with the required delivery date of the equipment and after receipt of a firm purchase order. Note: A purchase order signed by both Ashbrook and the purchase order originator must be executed prior to any submittal being forwarded. Shipment: Upon LOI from contractor, we can begin drawings prior to formal PO. Submittals should take no more than two weeks. I will have to say delivery will be 12 weeks from drawing approval. It may be shorter depending on when approved and released. We may can do 8-10 weeks but cannot commit to that date as we have some large jobs going. When we get approval, I will see where we can slip this in and let you know then. I will have to say delivery will be 12 weeks from drawing approval. It may be shorter depending on when approved and released. Shipment on the preceding equipment can be made within ten (10) to twelve (12) weeks from receipt of approved submittals. Payment Terms: 100% net 30 days and as such no provision for retainage will be allowed under the terms of this project. These payment terms are not contingent upon payment from owner to Purchaser. Shipments such as embedded metal or partial items will be invoiced as shipped on a prorated price to be determined by Ashbrook Simon-Hartley. If Purchaser delays shipment, Ashbrook Simon-Hartley may invoice and pass title to the Purchaser; Purchaser agrees to remit the amount due at the times stated, as if the equipment had shipped. All costs of storage shall be at the Purchaser's expense. Escalation Charges: In the event that delivery of equipment cannot be made on the scheduled delivery date agreed upon between Ashbrook and buyer and as evidenced by the terms of the contract, due to buyer delay, Ashbrook reserves the right to assess reasonable escalation charges to the project at the rate of 1 % per month of the contract value for each month that the project is delayed. Terms: May 7, 2009 Bremerton WWTP, W A Ashbrook Quote No.: 2003-9810 Page 5 Ashbrook's Standard Terms and Conditions are enclosed and apply in their entirety. All applicable sales, use or other taxes are to be paid by buyer. If any taxes are to be paid by seller, the quotation price shall automatically be increased by the same amount. Failure to pay invoices promptly when due nullifies Ashbrook Simon-Hartley's obligation to perform work under warranty, installation and start-up in a timely manner. The contractor explicitly agrees that subject to acceptance by the consulting engineer and/or the owner, Ashbrook Simon-Hartley may substitute a stand-by letter of credit in lieu of cash retainages required in the plans and specifications and contract documents, and 100% of the cash released by such acceptance will flow through immediately to Ashbrook Simon-Hartley. All orders are subject to credit approval prior to acceptance of contract and/or purchase order. General Notes: There is no provision included in the quoted price, unless noted, for field erection supervision, tests, inspections or adjustment of equipment. If factory representative is required for any of these services, please refer to "Service Terms" enclosed. The equipment offered by Ashbrook Simon-Hartley is our standard design, materials and manufacture. In the event that these items of equipment are subject to any alteration in design or materials or manufacture by the contractor, owner, owner's agent or engineer, such alterations shall be subject to change in the contract price and/or delivery schedule. We wish to thank you for the opportunity of offering this proposal. Should you have any questions, please feel free to contact our representative or us noted below. Sincerely, at ~~., Al Ramirez Fluid Control Project Manager cc. Granich Engineered Products (Ken Hogan), Ashbrook Local Representative Apr 27 2009 4:07PM PS~ ELECTRIC INC. B_~WetWeather Pacllitie PSW lectric Breakdown '-' Pro eel Number: 165 611118..1 COntractor. ~ ADd Sons. I 8llOP*= EIKtIIaI far AddId Gala OperalO 1. ELECTRICIAN LA8ORCOSTS D.GI HR .. J.......,..... etKIricIMI .... JoIInwymall burden .. Z3.OI HR Co 10......" .1itOtriC1Im .. , II. fonmaII baldeD .. UD HR .. auperirdllRdent f. auparlftllNldent burden' lhapervhllon g. dlrRt ...".."r.1on (NTE 5% of 1.4) h. ..ret,v (NTE 3% of... ...b.c..... & f) l. DtIIlvery truck and 41'" ($SO per hour) 2. MATERIALS COSTS .. .........1 c:ost8 b:qUObf: Co lPIoIII: :s. eQUlPIIENT COSTS II. awned equlpni.nt (per It.. nmtlIl..uI~(per appnwed source) ...cbttd) .----~ .... INAU. TOOLS II. SlIIlIIIlooIa (NTE'" cd It" ~ . e) 5. OVERHEAD .. NTE 111% pOItIDn of I~ &4 I. AI.LOWANCE FOR PROFIT fNlE In. F 1.2.3M} 'T. SUBCONTRACTORS .. b. Co II. 10% OP 7) e. PROfIT ON SUBCONTRACTORS ( to. INSURANCE .. paJntII drluft '''blDIy .. volutM dJIwtn IIIIbIIHr i I I .. band (0% of 11h....10) 11. BOND ----' $38M' 52.110% $43.82 41.00% $Q.8' ..GD'Wo aum:rLABOR_OTIIL 13603771832 p.4 0.00 D.oo 1010.05 494.92 9M2 43.99 1844.58 248.69 49.34- 0.00 1022..42 0.00 0.00 0.00 0.00 0.00 o. wet) PR No. Data SUbmItI8d: .tIIl812OD9 I. CIUIfT LA80R co.... 1940.81 I. UATllUALCOSYS 1022.42 ;l.EQUIPMEItTCOImI 0.00 ... &lMlJ,.lODLB 0.00 SUBTOTAL 1.2.3.&4 2963.03 If.OW/IIII!IID 296.30 .. PIIGf'It 298.30 7.1il/IK:0NI"RACTClR8 0.00 ..00000000000NlUllCOfRRACTotU 0.00 to PflorrTOrf 5lJIICIJJfJJWml 0.00 11.lNSUIWICI! 38.81 fl. BOND 0.00 TOTAL COST., '1HfW 111 $3.594.44 t 4IaI2Ill>> .1~1MdI GIIlll 0pInIII1S 1lI_11Wt11U 04/27/09 YON 15:59 [TX/RX NO 9963] Apr 27 2009 4:07PM PSlJ ELECTRIC INC. 13603771832 p.5 f 412612009.10;50:25 AM Page 1 WWTP- Added Gate Operators at Hea Job Number: 242 Extsnelon By Phue v .,. DescrIplloD QulUlllty U E.t Pri<;. Labor Hr U EJlt Lab Hr - 01 RBCeWiIy. F"dtings & Boxua 1176 314- PVC Coated RIgid Steel 1.00 2.89 10.00 C 0.10 1587 314- Locknut 1.00 ClZ7 0.15 E 0.15 1643 3/If' Gmundlog Bushing 1_00 3.05 0.68 e 0.56 1744 314- Sealing LOclcnut 1.00 0.79 0.15 E 0.15 - 01 Raceway, Flttlnga & II Tot.l- 7.DO 0.96 - 02 WIre & Cabls-. 2790 ',2 THHN CU StraDded W... SOD.GO 124.84 M 112.36 7.50 M 6.75 4387 .'4-12-10wnTennln~1on Labo 3O.DO '0.00 E 0.00 0.22 E 6.80 - OZ WIre & Cable Total- 112.36 13.65 ~ ~ - 03 Dlatrlbutlon - 3981 2M 3P 120J2.tOV BoI-On CIrcuit a!fer 4.DO 8lJ.27 E 353.08 1.00 E 4.DO '- D3 Dlstr1butIan Total- 363.08 4.00 -07M1tc- 13351 Care Exfalfna wan 1-1l2" Conduit 1.DD 150.00 E 15,0.00 0.95 E 0.96 T0001 1213 Tray Cab. 100.DO 480.00 M 46.50 1.26 C 1.26 T0002 Tray Cable Termitatola 4.DD 66.27 E 285.oa D.31 E 1.2.4 TDD03 StainIHs Steel KsIIemB Cable 2.00 ~3.oo E 6&.00 0.25 E O.~ TDOO4 1n." StUtJeu Sleel ~ CtIlJr1P 2.00 . 0.15 E 0.30 0.19 E 0.38 100C5 1/4" It r SlllnlBn Steel u Boll 2.00 Q.05 E 0.10 0.06 E 0.12 - rn MJacTDf8I- 549.98 4A4 Job Talal 1,022.42 23.05 ~_....., r t f . f I k i ! r ~ j , 04/27/09 MDN 15:59 [TX/RX NO 9963) ! i l [ I I I I i I I I i . TargBt.l.abarcolurm3 WET WEA THER FACILITIES UPGRADE 329775A SECTION 35 20 16.25 COPOLYMER SLIDE GATES PART 1 GENERAL 1.01 REFERENCES A. The following is a list of standards which may be referenced in this section: 1. ASTM International (ASTM): a. A167, Standard Specification for Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip. b. A193, Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service. c. A240, Standard Specification for Heat-Resisting Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels. d. A276, Standard Specification for Stainless and Heat-Resisting Steel Bars and Shapes. e. B209, Standard Specification for Aluminum and Aluminum Alloy Sheet and Plate. f. B308, Standard Specification for Aluminum-Alloy 6061-T6 g. Standard Structural Shapes. 2. National Electrical Manufacturers Association (NEMA): a. 250, Enclosures for Electrical Equipment (1,000 Volts Maximum). b. MG 1, Motors and Generators. 1.02 DEFINITIONS A. Self-Contained: The arrangement of the gate operator, supported by the gate frame, such that operating thrust loads are not applied external to the assembly. B. Slenderness Ratio: The ratio of the maximum unsupported stem length to the stem cross-section radius of gyration. 1.03 SUBMITTALS A. Shop Drawings: 1. Make, model, weight, and horsepower of each equipment assembly. 2. Manufacturer's catalog information, descriptive literature, specifications, and identification of materials of construction. 3. Detailed structural, mechanical, and electrical drawings showing the equipment fabrications and interface with other items. Include SEN329775.FP .04.02.0 I.SP MAY 7, 2009 COPOLYMER SLIDE GATES 3520 16.25 - 1 329775A WET WEATHER FACILITIES UPGRADE 4. 5. dimensions, size, and locations of connections to other work, and weights of associated equipment associated therewith. Gate operator and stem calculations for each gate and service condition. Gate opening and dosing thrust forces that will be transmitted to the support structure with operator at extreme positions and load. External utility requirements such as air, water, power, drain, etc., for each component. Functional description of internal and external instrumentation and controls to be supplied induding list of parameters monitored, controlled, or alarmed. Power and control wiring diagrams, induding terminals and numbers. Performance Test Procedures. 6. 7. 8. 9. B. Quality Control Submittals: 1. Special shipping, storage and protection, and handling instructions. 2. Manufacturer's written/printed installation instructions. 3. Routine maintenance requirements prior to plant startup. 4. Manufacturer's Certificate of Proper Installation in accordance with Section '014333, Manufacturers' Field Services. 5. Operation and mainte~~nce manual. C. Contract Closeout Submittals: Service records for maintenance performed during construction. 1.'04 SYSTEM DESCRIPTION A. Coordinate such that electric motor operators are fully assembled and tested, induding motor, at the factory. 1.'05 EXTRA MATERIALS A. Furnish, tag, and box for shipment and storage the following spare parts and special tools: Item Special tools required to maintain or dismantle Quantity One complete set PART 2 PRODUCTS 2.'01 SUPPLEMENTS A. See Copolymer Gate Schedule at the end of this section for additional product information. COPOLYMER SLIDE GATES 352'0 16.25 - 2 SEA/329775:FP.'04.02.'OLSP ,- MAY 7, 2'0'09 WET WEATHER FACILITIES UPGRADE 329775A 2.02 MATERIALS A. Copolymer: Polyester or aramid fiber sheets treated with suitable resin to produce rigid, impermeable coating. B. Stainless Steel: 1. Plate, Sheet, and Strip: ASTM A240, Type 304L. 2. Bars and Shapes: ASTM A276, Type 304L. 3. Bolting, Mounting Hardware: ASTM A193, Type 316L. C. Carbon Steel: ASTM A36. D. Aluminum: Aluminum members are not acceptable. 2.03 PERFORMANCE REQUIREMENTS A. Leakage shall not exceed 0.1 gallon per minute per foot of gate periphery under either seating or unseating head conditions. 2.04 SLIDE GATES A. Rising stern type, with assembly styles designated as follows: 1. Style A: Upward acting type for wall surface mounting on the concrete structures. 2. Style B: Not used. 3. Style B2: Upward acting, self-contained type for mounting in existing channels frame and invert mounted tight to existing concrete wall and channel floor. B. Guide Frames: 1. Stainless steel. 2. Vertical Guides: Design for maximum rigidity, and extend in one continuous piece from the gate invert to form posts for support of gate operators of self-contained gates. When guides extended above the operating floor, they shall be sufficiently strong so that no further reinforcements are required. a. Weight: Not less than 9 pounds per linear foot for stainless steel. b. Incorporate a replaceable UHMW polyethylene bearing strip in a retainer slot on the downstream side (unseating head side) of the gate. 3. Frame Invert: For flush bottom gate, furnish a neoprene insert to function as a seating surface for the gate disc. a. Weight: Not less than 9 pounds per linear foot for stainless steel. 4. Join vertical guide frames and invert with factory welded comers. SEA/329775.FP .04:02.01.SP.. MAY 7, 2009 COPOLYMER SLIDEGATES 352016.25 - 3 329775A WET WEATHER FACILITIES UPGRADE C. Disc: 1. Disc Plate (Sliding Member): Fabricated copolymer member. Disc shall be constructed of carbon steel frame that is sandblasted to SSPC 10 then immediately coated with an Owner epoxy primer per Section 09 90 04, Painting, System No.5. Voids shall be filled with a closed cell foam and machined to provide smooth surface. Fiber sheets shall then be applied and treated with resin to produce impermeable copolymer surface. All seams shall be sealed with a double thickness of material. Reinforce as required so that the disc will not deflect more than 1/360 of the gate span, when the upstream liquid depth (seating head side) is as shown on . the schedule and the downstream liquid depth is less than 1/2 inch. 2. Seals: Manufacturer's standard seals for all sides of gate disc. D. Operator Support Pedestal: Floor-mounted pedestal or wall-mounted pedestal on a wall bracket. 1. Material: Stainless steel, painted carbon steel or cast iron. E. Stems: 1. 1-1/2-inch minimum diameter, ASTM A276, Type 304 stainless steel. 2. Threads: Modified Acme type with RMS surface roughness of 63 micro-inches or less on the flanks for manually operated gates and 32 micro-inches or less on the flanks for electrically operated gates. Extend threaded portion of stem 2 inches above operator when gate is in CLOSED position. 3. Ratio of the unsupported stem length to the radius of gyration, both in inches, shall not exceed 200. 4. Stems to withstand in compression, without damage, the thrust equal to at least 2-1/2 times the rated output of the hoisting mechanism, with a 40-pound effort applied to the handwheel or crank. 5. Design electric motor-driven floor stands and self-contained frames to withstand at least 1.25 times the output thrust of the motor in the stalled condition. 6. Equip operating stems with cast iron, bushed stem guides, mounted on cast iron brackets; adjustable in two directions and spaced so that the Llr ratio does not exceed 200. 7. Adjustable stop collar for the CLOSED position. 8. Connect the stems to the disc plate with a yoke, bolted to the stem and welded to the disc. F. Stem Covers: 1. Transparent plastic, vented pipe stem cover and cap. COPOLYMER SLIDE GATES, 3520 16.25 - 4 SEA/329775~FP.04.02.01:SP . MAY 7, 2009 WET WEATHER FACILITIES UPGRADE 329775A 2. Provide with OPEN/CLOSED designators with I-inch graduations on clear mylar pressure sensitive, adhesive tape, suitable for outdoor application. G. Manufacturers: 1. Copolymer Slide Gates: a. PlastiFab, Tualatin, OR. b. Ashbrook, Houston, TX. c. Ham Baker, Houston, TX. 2.05 GATE OPERATORS A. Type 4, Electric Motor Operators: 1. Mount to self contained gate frame, totally enclosed weatherproof electric drive unit, and a totally enclosed gear box that operates two-piece, bronze stem nut, which lifts the gate stem. 2. For non-self-contained gates, mount electric motor operator to high- strength cast-iron pedestal or base and provide stem guides as specified in this Section. 3. Gears: Heat treated alloy steel, supported throughout by antifriction ball or roller bearings and grease or oil lubricated. 4. Automatic double-acting geared limit switches and double-acting torque switches. a. Gear directly to the operating gear train and shall be "in step" at all times, whether in motor or manual operation. b. Wire geared limit switches internally to stop the motor at the fully OPEN and fully CLOSED positions. c. Wire torque switches internally so that, in the event of a mechanical overload in either direction, the motor will be stopped. 5. Equip with side mounted handwheel for manual operation. a. Include an automatic clutch to positively disengage the handwheel at any time the drive motor control is energized. b. Design handwheel operator so that failure of the motorized gearing will not prevent hand operation of the gate. , """.." Ii" SEA/329775.FP .04.02;OI.SP ,MAY 7, 2009 COPOL YMERSLIDE GATES 3520 16.25 - 5 329775A WET WEA THER FACILITIES UPGRADE 6. Drive Unit: a. Electric motor with integral OPEN/STOP/CLOSE weatherproof pushbuttons, reversing controller, 480V ac - 24V dc control power transformer and rectifier, space heaters in the limit switches and in the control compartments, mechanical dial type position indicator, and transparent plastic pipe stem cover and cap unless otherwise specifically noted on the Drawings. b. Self-locking, with approximately 12 inches per minute gate travel speed, and a rated running torque equal to 20 percent of the motor starting torque at a rated running time of 15 minutes, without exceeding the allowable NEMA temperature rise for the insulation class used. Operation: Drive the gate to its fully OPEN or CLOSED position when the OPEN or CLOSED pushbutton is depressed momentarily. Motor shall stop in mid-travel when the STOP button is depressed. Electrical Rating: a. NEMA 7 (explosion-proof) for Class 1 Division I or Class I Division 2 environments. b. NEMA 4X for all other environments. Controls: Furnish the following in accordance with the operator control styles listed below and specified in the Slide Gate Schedule: 7. 8. 9. Feature Description. Local OPEN/STOP/CLOSE pushbutton station. End position limit switches; OPEN and CLOSED position switches shall be normally open contacts that close at the end position; contacts shall be dry and rated for 5 amps, 120V ac. A B a. Operator Control Styles: I) Style 1: Includes control feature A only. 2) Style 2: Includes control features A and B. 10. Manufacturers and Products: a. Auma; SA. b. Rotork; IQ. c. ElM Valve Controls; 2000 Series. d. Limitorque; L120 Series. B. Identification Tagging Requirements: 1. For each gate operator, 1-1!2-inch minimum diameter heavy brass tag, bearing the gate tag number shown in the schedule. 2. Attach the tags to the operator by soldered split key rings to that ring and tag cannot be removed. Use block type numbers and letters with COPOLYMER SLIDE GATES 3520 16.25 - 6 SEN329775'.FP.04~02:01.-SP' .- ""J MAY 7, 2009 WET WEATHER FACILITIES UPGRADE 329775A 1/4-inch minimum high numbers and letters stamped on and filled with black enamel. 2.06 APPURTENANCES A. Lifting Lugs: Furnish suitably attached for equipment assemblies and components weighing over 100 pounds. B. Anchor Bolts: ASTM A193, Type 316 stainless steel sized by equipment manufacturer at least 1/2 inch in diameter, or as shown, and as specified in Section 05 50 00, Metal Fabrications. 2.07 SHOP/FACTORY FINISHING A. Coat all exposed carbon steel surfaces in accordance with Section 09 90 04, Painting, System No.5. B. Coat all submerged carbon steel surfaces in accordance with Section 09 90 04, Painting, System No.2. PART 3 EXECUTION 3.01 DEMOLITION OF EXISTING GATES A. Existing gates are installed with channel frames embedded in cementitious grout or concrete, or mounted to face of concrete structures. For in-channel gates, cut existing gate frames and bolts flush with concrete surfaces and install new gate frames over existing frames in accordance with Drawings. For wall-mounted gates coordinate removal with Owner. In some cases gates shall be mounted on opposite side of concrete wall from existing gate. Disassembly of existing gates may be required. Existing gates shall be salvaged and provided to Owner. B. Use of Bulkheads: Owner shall be responsible for bulkheading to isolate channels where work is to be performed. Owner shall clean existing structures that are taken off-line and provide all dewatering of existing channels, including leakage of sewage by installed bulkheads. 3.02 INSTALLATION A. Sequencing constraints apply. See Section 01 31 13, Project Coordination. B. In accordance with the manufacturer's written instructions. C. Field mount operators after installing gates. D. Install gates per manufacturer's instructions using field-drilled adhesive anchors as specified in Section 05 50 00, Metal Fabrications. SEA/329775.FP.04.02.01 :SP' MAY 7, 2009 COPOL Y!vfERSLIDE"GATES" ' 352016.25 -7 329775A WET WEATHER FACILITIES UPGRADE E. Lubricate stems before operating. 3.03 FIELD QUALITY CONTROL A. Functional Tests: Conduct on each slide gate. 1. Verify proper operation including limit switch function. B. Performance Test: 1. Conduct on each slide gate. 2. Perform under actual or approved simulated operating conditions. 3. Test for a continuous I-hour period (or 2 full gate open-close cycles, whichever comes first) without malfunction. 4. Adjust, realign, or modify units and retest if necessary. 3.04 MANUFACTURER'S SERVICES A. Manufacturer's Representative: Present at site or classroom designated by Owner, for minimum person-days listed below, travel time excluded: 1. 0.5 person-day for installation assistance and inspection. 2. 0.5 person-day for functional and performance testing and completion of Manufacturer's Certificate of Proper Installation. 3. 0.25 person-day for facility startup. 4. 0.25 person-day for post-startup training. Training shall not commence until an accepted detailed lesson plan for each training activity has been reviewed by Owner. B. See Section 01 43 33, Manufacturers' Field Services, and Section 01 91 14, Equipment Testing and Facility Startup. C. Provide manufacturer's representative at site in accordance with Section 01 43 33, Mariufacturers' Field Services, for installation assistance, inspection and certification of proper installation, equipment testing, startup assistance, and training of Owner's personnel for specified component, subsystem, equipment, or system. 3.05 SUPPLEMENTS A. The supplement listed below, following "End of Section," is a part of this Specification. 1. Copolymer Gate Schedule. END OF SECTION . . COPOLYMER SLIDE'GA TES ... . 3520 16.25 - 8 " -~, : " ... SEA/329775.FP;04.02.01.SP..... MAY 7,2009 WET WEA THER FACILITIES UPGRADE 329775A Copoh mer Gate Schedule Operating Channel Conditions or Gate Top of Cone. Design Head Opening Opening Gate Invert Slab to Support (Seating, Gate Assembly Width Height Elevation Pedestal Seating Unseating) Operator Type/ Number Style (in) (in) (ft) Actuator Condition (ft) Control Style Notes G- X-II B2 54 66 161 167.42 Unseating (5,5) Type 4/Style B2 See Note 1 G-X-12 B2 54 66 161 167.42 Unseating (5,5) Type 4/Style B2 See Note 1 G-C-3 C 30 30 184.25 189.5 Unseating (5,5) Type 4/Style A Self contained G-C-4 C 30 30 184.25 189.5 Unseating (5,5) Type 4/Style A Self contained G-C-7 A 42 42 170 186.5 Unseating (10.8, 10.8) Type 4/Style A G-C-8 A 42 42 170 186.5 Unseating (10.8, 10.8) Type 4/Style A G-El-l A 48 48 132.5 152.25 Unseating (13.9, 13.9) Type 4/Stvle A G-EI-2 A 48 48 132.5 152.25 Unseating (13.9, 13.9) Type 4/Style A Note 1: Class 1. Division Ilocation. Provide NEMA 7 explosion-proof electrical components. SEN329775.FP .04.02.0 1.SP MAY 7, 2009 COPOLYMER SLIDE GATES 35 20 16.25 SUPPLEMENT - 1 , j'" . '.: ., "-. ;~J#{;{.--;'-;YO~;Z::.~/~ROiiffi~!I:'~-::"-'~ --,,- -~,,-"'-~'-' / V'L'",W litiU',? ,.,6n;" . .. '. OilltcmoRAl, ""flOW 4HD \l(OJlD ':Q/l'tel.Il4!rr. 'IN . . t.1I''r.'lOlJ$iNO :' . NOTE'.lOIlArltlG {Br 0' 'IiiRSJHOT SHOWN ~O/lTRACrOf{ TO PROVIOI: AEOUIIl! 0 OI'PiiN~ }C~r I/s' . ",._ .@(/i'CFJ $TE!pI ~f:Ii.rH f2'J"( rO'~:5# ) THRD rtl" frt/1Iwet:J $EctKlN @ //~~.---'\. mt'~T ../NlIT tJliltf fl\JT '. 4HQIOA ii<K. T . .MttHOA .sotT HDt'lIo.MMM. 8OI.T .'. .leX MtiWACH, 80l.T 'fIX '..vr . '~NVT . 'j" . . . 5, (oE~I!.Q!?ttrA1N ~ ~.,. 4"" !Ilt.-n--.,.I' , ,., ,;.!iiC-Tlcm;.;:-@....-. . " " . ,. ~, . '~" ""~".'. ~;.' . . Wt\~tewater .1"rearment l'larit. JtYX75d.,,>WAT~~~J\4~El .~f~~~fl;~~~~!~~~~on ~o. ar~nllktol1.W<is\lilllit-onA,(nR*5f-.;t.;itlt.,-y.,.. . ~e$tth,: \lb 9R109 ~ ; Conttl1n',tT ~Sehcdllle A FAB'A)(:~l!~ '~~~~INUM ,n ~: '"L_ G~M Hill, f,ns.\ineeTS ~1JI SpItE ~AtE' 1',0, NO~ iOFW .4t 1~. "). a; L__ ..,__..__._..~:.o~~:_. ~l'W~___~~TEAM~~~~'m~OA~ l~IESJ_~~.~~~=~'~'-===..,,_..L.:_.._,~.,~.u~.~~!!!!....,. '2 I I lit' .tJ1' .8 I 88 $8 911. 8a. 9.8 "3 IIt~=: flJ",t:;':/;;.,<' e tIt"tIC. 2"1,j; .. . , ' 2 .J/~'tlC'& lWLI. 21r""MQ 2 . 'iN.",. .. (1/ .<t: ~: g-tPA.UUS . ", :.t, ':'1 '. r1J -.,',' NOllE 711.1 /I/-j-$! . fH#I#'~~e .. _..........h_..... .._....,_...._...L:..__ -11 n"Jl~;j~;l;F ;'[/1/4: ,,~-...l::::-L----, NPl!.S ~~--,j1iJ ) -'It O-..L , I"" 11' .". . : : _' 3" J" (E)......;,.,..... .--+-..."..- - ,t ,~ r l (NrIr SUIlWH1~' ,~ 4 PLCS 2:f .,../'.' . 8 PLCS ~ ,c_ tOOt OF WAl.L .' " I E:W A-A '" PLCSl~ - i'-~:;;l '\0.f.::.RAILH1Y OlHt.R5JNOl SHOWN CONTRACTOR TO ENSURE PROPER CLEARANCE BE TWF.EN ItAHDIlAfL MW HANOCAANK 1 "lrj: ----~ '$ F NOTE' 7"'h tJlAECTlONAL ARI\OW AHO f Rt:F1 WOAD OptN CAST IN LIF't HOU!SINQ ----r-'1 Nfl JfJll 'A<WPlt>I:~ f '!#!m~;t~f){'. . -:J~ . Non- GRAtiNG (ey OTHEIlS)Nor SHOWN CONT/utTOR TO "'!tWIOE REOtJlllED OPEHfIIG H" 215" ( (71. 'I" ) 'j}:IdJ"fllif.,.{JJlj . it V~:!(1fi:'lf"j . .: :;mf. '. FUI.I.. Of>E N . 1f/" . v' f ti! 10&" & P,f(Id.: "r -12 Pits 4- P!!~ ., PUg '''PACT IN TO IXNElAtL GAClOVE MACHIIlE FLAl l&i~ JlR~fr~ll~ 'V - .' . .--~--<t El.ll4', 1;(.7' , .rgl<if *~'NDIII, OP.ENINa . IN GATE. ,fg"X 1.8'11011I. OPENING . JtI TH~'=--.._INV~ EL. ;,;'/ ,'itJ/ -$- ..... -l-/.;>' ._- /l/tH<'167J'Jt.;/ Ht'lLl' -TAP THIMll\.E (@) 5/1fNC,(ib JI'I.CS TO MATCH 04TE -~ l' 11},.Js fa . M:~. 0> l(,!:wit Constr'uction Co. 1)00 'Aloha Suut Seattle. WA 98109 Wu:tewate.r Treatment l'bnt Bremenoo, Washinp,t"" Cont ract CT .. Sd,,,du!,, ^ -t-=:' '"""~~-;;;- irx iF" WATERMAN MODEL 2-55 - 20-F eRST 1.wY SLUICE GATE ~,"!__~_:~~:ERM~~~.~~a\!!~I:~IN::-_._~...___~=~=~~ 1'.,(1. NO, l010K .. -.':'~ ;/, ,.::.. ...._-~-"--,,....._._,.- "-~"''''''''~r.~__-..,.... MiI'.;"-."". T,r:' FiNISH KItY 1:CiJi'iROirA~'fM"A:i2\1B--! iO..STEifC:.AfSiJoao-----~- I, CAST 2. Mii.~MAt.HjljED- CASY OUCTU;-4STM A'5~ II. SHEl PIPE> An", A-lac <lGAl.VAlJtZl:- ASnI.-12lI 3. eOMP.IlllZ.-A$TM 6-5&4 AL 12. COMMERCIAL MOllIE !\~G4LVANtll!:' ASTN lIr-l'3 . MAllQ.!JRZ.-MN Il-~AL~ '~.R\.ItlI'VI-A.mI c-~ 11630 8,"'IN1"~A)(flM(l D IIlIlSl . WlVA1.R-NlTM Il-Zl 14~ Cl.UR ~U\3TIC MYIlATE PlI'E rf,fM["" .'j p....,,; S"(I T .lI'TfIUC~ STL.rASTM w~ 'ilS.l:dTIIIN~ljM(1J ~lJB81J1 .....'"'. 1\1I1ItA.' Ie 't.e.', &'l'\.,."~H~ GtIl:l.M Ill. ( .D"~'THr/llf.D 3(Rlts ,10. 8..STI..If~E-ASTW A<<n 11. tlN)SU MATS TO ec F'lEW ,le~Ji'lt;$tfil.-AS1..u.m ~PrLl(O (BY OTIlt.RSt I~ Df:$CRIP1'IOll I Sl.Ulct GATE ASSEMBLY 1 c). F!lAME' FLA T BACX I 611 -,-- ~) c9Vlm - u. I &/I I .) lltATS (N.\VAL SIlONZE ) 5 3 i?iJ. d l $IJ)~ WEOGE ASSY II. &.L SYSTEM "2- WEDGtri .. 1,:1 w-S 131 A. /I- (.. . '11'-500.. ASSY H.(IIIOWAI1 E 98 2 ::0 .) GUIDE RAIL I $A CAST O!I IINTEGl'IAL WITH FRAME). - , 11 iOP WEDGE ASSY z.1 WEDGE a eAACKE'r .. '.3 VI-5006 II &D01 ABS'f HAADWAIlE 98 2 0180TlOt,i .\YlDQE ASSY - 1. WEO'GE a IlRACKET .. 1,3 w-6D06 Ii 500S M1SY HARIlWARE llEl 2 '" (IINNT' IN SlOE ONLY). ~"D 5TUO IltiE Ellb' 3TUO AHCliOR sou ANCHOR IIDL 1 AI'IC~OO BOLl H!ll ItUl WA$I:IPI HItX NuT WASHeR 1{)f,7tftl't ell rleW file, 1,4 S I I H 9~ I.; I , ,1,6' tA ~8 L 15 Z I IA a$ a sf) 3 9B a~3 98 2.S as 2.a ~~ ~ es 2 9B 2 $ R 4- I:; 1.. 6/B N.c. 5/11 OIA. 3/4 N.c. 5/4 014. REF f(R-fiJJ'''~ 20 jij' ./4 6 o (., '_ lIWt. S!ATINO 1Ill.' 55 n i liWt. UHaU1lIIG tIP.. 1.0 tl. (G4TE C4PACITY) a. un. ~ WI "10 L8S.1'QIJ.~ 11/1tl~S. . ~ATlllO:HE40 FllOIol t.:',~.13.Ht..Ut<<AYIH!l.J3.;/I. .. t~. tWtOCflAKK. c,c.w. to' 0PiI( ( MI.SE ) GllTE III lltM!~Ot;i ttlCLUD~$ ," FOI'! 0Il0UT 1'40, ~ ~rtJIf I'll //CRt!''' dR .fIJ/I/JLV D> eli !..(M,:f/"'E.~ ,- ;ti~';"i}('J- ~o. .""~~~:4JjJ/f!J:.' ,1"?3J /Yd. t,J.E./^!.i.+ Z. .~ C" / 2.-1 /,'J .../- (99''- ~ I ~ /IIQ$3- /I. 042 ;& 4-1.. ' M -~ f". A.-S. hlEtfI/[lj/ --- .. ill li,-~-83 L.E.S ",ONi .---.--...--- -----.....-- elCCOtEo .. Till IiJ. 4" 5 j I1Em ?'.:~._.__~~I~;:~.. : R 8 ._,,'} . ///'2 No-f'E DlRl!:CTtONAL ARfWW ANO WOAO OPEN CAST IN LIFT HOUSING 4i 4t stlinON A-A '1 !" GI'!OUT I'AO (BY O'tHtR$) t,j~ /77" (IlUPl SUM. ~~NCHH 2r1') ( 17'. T'. ) THREAD/lCl .57/1 &tM"{ 12.'.- ~#'ll,. . '.' . fB fj{)".Cr;;-s"{"i . '. .. G"ii f'uUl"OI>Q. .. ':'16/' "'< . "r ;,/1M." $ j, 7;;' /"X" 'il} I /5 ;,; PLCS ',");/ .' " 'I:"j'c ,_.~.>;J;;f/If _____ tQ,W. iL f.f{~ 5{!' f'n' IU/IOF ~ t-:ft;.,'~; '7"~ "._~/., . ',.."<' .,~_'~ I..,<'.t _' _~J'" (4 4 h..ts' 'iJ7 J /'//!~~ -IM~ACT ~NTC DOVETAlc .GROove. MACHINE FGA T TI) .002 tl ~ WITH A 6(/ FiNISH Oil ~ETTER --..-- _:........-.... '''--oj:, EL. 7'/1. ;/Jj" 49"1. ";,,," NOM. OP(NING ~ . I. iN GATE, 4,7"/);11. NOM. QPENIN() IN 'ltIIM8LE _...._ INY. El. -r1'i )(7" r;cAi;r-'ii~~':Asri/~~:: ~~~L'IO'~T~~~A7~" ;f)i~-':":==:_:=:' T cl~~NJ;I~~~i~~~;;{~~~~ ".C;AST WCrU-Mlll4 A-e36 II.Sn:... PIPE> AS"'" .1-120 4.llALVMiZ. E- AS1loIA"la3 ;5, COMIlIllU.,"ASTM 9-$94 AI.. Iia COMMERCIAl. 8ROl:IlE ~,GAt.V"'NliE' AS,.',HHM 4 ~~~l~~': ~ ~:\r.l.l. . ~: ~ ;tl;::'~~~A~~:l PIPE (S, I'J\III1 '.ftJ(()~r (t,a (flits ) ,STAVeTul'lA1. lITl....AS:1\t A-l!&. I!l, t:1.IJrlt 1t5'3't!X'rtf'(J P.VJl$EA r 46.:;/jPkJ(Jf!R. (,SHOe! ;' c,~, $lL.~~A-lOIII G<M IG. ( ).rH(rnro,1f~I€.~ M. , $lUIAlONAAE- A$1'fil A"aar 11. . (1I~ tJTq. ~ FI!LD !i. Ill-a $'llI. ~.W14...;t1e . ,lI"",tJ -A-' . . i\ , ) 191' lI'EO(ll; ASlIY WillGS: I!l IlttMKET P,SSY HAIlGWAIlE. Q) SO.TrOM .WEllllE AB$Y WEbGE 8 .I!.llACKET ASSY HAlle-WARE (!) LIfT ASS[J,lIlL.'1 Q)LIf;T . b).J'f;~ESiAL . " lPf t,/J'I(rr . Tl'lllilBI,E (PAlN1' INSICE ONLY) DQUIlLl! I\ND STUll OOlJIll.li END' STUD ANcitoll /lOI,. T . ANCHOR BOLT ANC"lOFl eo'l.T , " 'HI!); NUT , WASfltl'! . lit)( NUT WASI'IIlR. i t'liY17/'lt/l r ni' /lit: '" I I ~ 611 en 3 SYSTEM ~8" <I I,! W" 5 (:11 It ~l., , W.~004 9S Z I 611 :z CAST ON, IINTEGRAl yi.iTK FRAME l 4 1,3 W-wo!> 8 6007 'iB 2 ....;" '4 . 1,3 W~II006 8 500$ 98 Z L. 7:' 1,4 IS l'lf,9 9.8 ~ 95 S '8 2;3 9/1'. 2.~' 9B 2,3 41'.N11l11ti~X:>Hr.'Jll tJllIJlIJEX ~rT'tl' w- 'I. ,f.. ''T'fPE"PffJ<Jy'J)( /~-I. .YBN..(:. . J7,\.n '2 .5/11 H. C. 1l :r 1,.0. 0' 5/11 II.C. . 10 LG. .'f... 3/4 ltC, x 12 LO. ... $1;+ N.C. . Ir LG. i' ~t 2 "8 tlii, If!. ~ 1.1/& 1$ . !JB 2: :'1-/4 II.\:. 11. '8 2 Wit lilll. ... VEl" #,17. ?5G'?.5 ! NorEs' , MAx. SEA'TlllG HO.' 5.5 1\; MAX. IlNUATINO He.. 7. (J II. (GATE OAl'ACITYl t L1" C4!'AtI'l'Y. wi 40: LM. PULL' 7.f.Mt:ft. ' . '," OPERATItiQ ilEAl> 1'ROlit. t. '..~. IO.MI.; UNSUTlNO- (0;311. . TlMff HAHlll:RANK, t~w. TO <if'l!It I .R"'ISE t GAtt I!J DIMfNSiON INCl.VOEl! I" FOR OROU1'. I'J\ O. Wi l'(i,vmj~ rtJl( u; I/!!'l'lfr !I,f .fIlPIY. v. 1[',fIi."it;W l~'#.i'/A; !'f.J)'[If./iT. )7/,; #l1. !:{/U H ,:'5 {;'-/?,U' jcl9rh ~I ~t~"t . POftl "Z"X .dqr< t^,"'':T"ERMAN MODEL tj"-- Kiew;t CO""t,'m'.tj,,,., C". W3$tewa~ei Treatment Plant 'f'..' 'f'L . vvI4J.. ':.. ~ IV" 1 ~()O Aloha Str",'t ..... . I\rel11erton. Washington sr-5S--2f)'-F CIIsr I~{ S""ttl", W,\ 98iOl) , /'r'QfJ3-/1-P43 Contract CT .. $(\hedill" A' r _.. . "tot/> t~"" ":: '"""=-----_ ~U~CE GATE ~~_-__~____ "."& -7;.4,..r. f:~". AU::,Ll" /(u,,~rm L.__. REO TOP ..*_WATE~!,,~~A,~~~V~'~IES~ '~~_..______.____._,______._.-.=~, RB-";" ~lI9_____.._.__,_____!~~~.~_~~5 -::-. 00 I"'" r '-::"j - ;~~ --::~,; n_________L :::::; ... (,.. ~ ,c-.,..: ;-~ ..,,- ------1 -. ---"---'--r --..............-_.,-,..~.?t~-~~.~._~..;<-=t :t1! t: ---T i:i, . l'~ . .:tj [: ) ;q l" I ...: - ~ ~~1 3e. 150- :1 _i 00 [:\_._.L i! Sf 'f=~~~':::+_"""':-~ . .." , F_I:;_:-.t'_"-"~~~~--.-:-i_,--~_:,'i,r,!~' ,,," H , ' 'r'~; ,:~:~~~I M' :U j,---.J0<-~--~-::- ~::l'f ' - ; ':: E-'--------~.J."I, 1 -f'~' ""J:"c~-",~.,~ --=-~F-o-q -~, ,~, 5:\(';" er...ou:O{rf - ~fU-tT rU.L :..,. n-r QTHERS t<.--~~~~~_rrr :-1,2~'f r nnn____L: I :::::J.:2:!_~~ nnnl i. ---- ;) --- 'i it" .. """1 :~l"i' - H --.1' ~~~;~-:~~~t- ./ .~...ti J ___n___---' J __nn 6" _n.._ " steno;\, ',\"-'..li" S'ECTIOI' -lr-'s '\ 6:fS rr. -, j ~~~i ;-;~U~~-M.\&---;-~-~ n. ~ ~ l'.r>:ID.~-~ '';--(tfl: ~-- '~~~A6l>>","~"'IT. !l$f;..~Eg:f'f.;l:U!'-:1Tl."it.Ef:1 Li:~i~7 :."c::~~:~~1~~i:~:: :l;!!:..;oo;~~;;'E<:'_-~~~~~::__ P.~(1Fl-f \1ft'1{.\>....K,t!'.. emF_ ~._~------_.._--. .._--- \[-,~",:_.'L='~"--._:.. :---r--rr ....u-.----:=,.~;e.-.- . .._~... r:; ....=::- --.,. __m_____~_9t)-OOt~_._.l ~-t~t ....L _~i_<!~.Y~_~L;:'_.. ~~~~::~~;:~~;!!~~~~~.~~. ~~-~~~;; -~._--_._---_...__.-_.._._---- ..._----_._---~--- ---------. ..-..--------------.- CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Twenty Three PROJECT: WWTP Upgrade Page 1 Of 1 Project #: 5020 CONTRACTOR: Pease and Sons Date: May 5, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOllOWING CHANGE(S): Provide additional control relay in the centrifuge panel and wiring for the pneumatic NO.2 water centrifuge flush valve. A TT ACHMENT(S): Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: D ~ [J D Unit Price D D Contractor's Records Lump Sum Time & Materials Engineer's Records Other: D Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 870.89 Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMENDED: ~~.- CONTRACTOR AUTHORIZED: -- -------- CITY OF BREMERTON By: -?-( By: / ab, FORMS, Work Change Directive, 3-00 BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 COST CODE OH 01030 OH 01031 01513 01512 01624 01073 01515 01516 01517 01950 DESCRIPTION: Install relay in Centrifuge Control Panel to control operation of pneumatic actuated ball valve. WORK AREA: Centrifuge PEASE ISSUE #: Owner Chng # WCD 23 RFI# PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager 0.0 $ 150.00 $ - Project Superintendent 1.0 $ 93.57 $ 93.57 Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 86.64 $ - Carpenter 0.0 $ 71.00 $ - Laborer 0.0 $ 59.60 $ - Millwright 0.0 $ 72.53 $ - $ - TOTAL - Pease & Sons Labor 93.57 PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift 0 $ 24.54 $ - Crane 0 $ 172.72 $ - Boom Truck $ 73.08 $ - Job Truck - Pickup 0.0 $ 9.00 $ - Trash Truck $ 55.00 $ - Compressor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator / Light Plant $ 12.70 $ - Laser $ 11.55 $ - TOTAL - Pease & Sons Equipment $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST $ - $ - $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ SUBCONTRACTORS EST. COST PSW Electric $ 621.45 $ - $ - $ - TOTAL - Subcontractors $ 621.45 Page 1 of 2 5/7/2009 6:32 AM BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 DESCRIPTION: Instat! relay in Centrifuge Control Panel to control operation of pneumatic actuated ball valve, WORK AREA: Centrifuge COST CODE PEASE ISSUE #; Owner Chng # WCD 23 RFI# CONTINUED FROM PAGE 1 of 2 SUBTOTAL. DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 715.02 BOND & INSURANCE 1.5% $ 10.73 SUBTOTAL $ 725.75 OVERHEAD & PROFIT 20% $ 145.15 TOTAL - Direct Costs $ 870.89 IME EXTENSION AND RELATED COSTS I .. EST. COST IME EXTENSION REQUESTED - WORKING DAYS: IME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 870.89 This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements identified, unless specificallv neaotiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time may result in cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. PEASE & SONS 07 -May-09 DATE SUBMITTED 21-May-09 PROPOSAL VALID UNTIL LARRY BOYD Page 2 of 2 5/7/2009 6:32 AM CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Twenty Five Page 1 Of 1 PROJECT: WWTP Upgrade \ Project #: 5020 CONTRACTOR: Pease and Sons Date: May 5, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOllOWING CHANGE(S): Modify 4" Drain piping to be routed outside the building. Connect pressure relief piping to the new drain line. Modify air gap tank feed piping as necessary to meet cross connection control requirements. A TT ACHMENT(S): Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. . Method of determining change in Contract Price: Method of determining change in Contract Times: D [gJ D D Unit Price D D Contractor's Records Lump Sum Time & Materials Engineer's Records D Other: 'Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 3,620.14 Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOML:--=---_____.. D ____ - AUTHORIZED: CONTRACTOR CITY OF BREMERTON By: By: l/L ab, FORMS. Work Change Directive, 3-00 BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 COST CODE OH 01031 01513 01512 01624 01073 01515 01516 01517 01950 DESCRIPTION: Plumb 4" overflow drain from Air Gap tank to exterior of generator room. Air Gap connection to be rerouted to existing air gap tank vent as directed by the City of Bremerton. WORK AREA: Generator Room PEASE ISSUE #: Owner Chng # WCD 25 RFI# PEASE & SONS lABOR HOURS HOURLY RATE EST. COST Project Superintendent 1.0 $ 88.21 $ 88.21 Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 85.58 $ - Carpenter 0.0 $ 79.64 $ - laborer 0.0 $ 66.86 $ - Millwright 0.0 $ 81.36 $ - $ - TOTAL - Pease & Sons labor 88.21 PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift 0 $ 24.54 $ - Crane 0 $ 172.72 $ - Boom Truck $ 73.08 $ - ~ob Truck - Pickup 0.0 $ 9.00 $ - tr rash Truck $ 55.00 $ - Compressor $ 14.36 $ - !welding Machine $ 10.34 $ - Generator / Light Plant $ 12.70 $ - laser $ 11.55 $ - TOTAL - Pease & Sons Equipment $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST Materials Attached $ 917.02 $ - $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ 917.02 SUBCONTRACTORS EST. COST Pease Piping, Inc. $ 1,982.76 \ - $ - $ - $ - TOTAL - Subcontractors $ 1,982.76 Page 1 of 2 5/7/2009 11:04 AM BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 DESCRIPTION: Plumb 4" overflow drain from Air Gap tank to exterior of generator room. Air Gap connection to be rerouted to existing air gap tank vent as directed by the City of Bremerton. WORK AREA: Generator Room COST CODE PEASE ISSUE #: Owner Chng # WCD 25 RFI # CONTINUED FROM PAGE 1 of 2 [sUBTOTAL - DIRECT COSTS (less labor) EST. COST SUBTOTAL - DIRECT COSTS $ 2,899.78 iBOND & INSURANCE 1.5% $ 43.50 SUBTOTAL $ 2,943.28 IoVERHEAD & PROFIT 20% $ 588.66 TOTAL - Direct Costs $ 3,531.93 TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 3,620.14 This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements identified, unless specificallv neaotiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance, with this proposal. Failure to accept this proposal within the proposal time may result in cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and-impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. PEASE & SONS 07 -May-09 DATE SUBMITTED 21-May-09 PROPOSAL VALID UNTIL LARRY BOYD Page 2 of 2 5/7/2009 11:04AM BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis DESCRIPTION: PEASE ISSUE #: 00 #VALUEI Owner Chnc WCD 25 RFI # BILL OF MATERIALS (Pease & Sons) ITEM DESCRIPTION QTY. UNIT OF LABOR MATERIAL MEASURE UNITS TOTAL UNIT TOTAL 4"90's 3 ea 0.3 0.9 16.45 49.35 4" MADPT 1 ea 0.2 0.2 29.36 29.36 4"X2" TEE 2 ea 0.6 1.2 33.96 67.92 2" MADPT 2 ea 0.2 0.4 13.09 26.18 4" Sched. 80 PVC 20 If 0.1 2.0 4.35 87.00 2" 90's 2 ea 0.3 0.6 4.76 9.52 Glue 1 ea - 18.39 18.39 Primer 1 ea - 15.84 15.84 Core Drill 1 ea - 300.00 300.00 Link Seal 1 ea 1.5 1.5 40.95 40.95 Caulk 2 ea 0.1 0.2 3.25 6.50 Hangers 6 ea 0.8 4.5 14.38 86.28 - - Reconfiqure Air Gap Supply per COB request - - 4" 90's 3 ea 0.6 1.8 16.45 49.35 4" MADPT 1 ea 0.2 0.2 29.36 29.36 4" Sched. 80 PVC 10 If 0.2 2.0 4.35 43.50 Hangers 4 ea 0.8 3.2 14.38 57.52 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - TOTALS MANHOURS: 18.7 COST: $ 917.02 Page 2 BREMERTON WWTP 8570 Change Proposal- Lump Sum Basis Pease Piping DESCRIPTION: PEASE ISSUE #: 00 #VALUEI TCF/PC CL # WCD 25 RFI: PEASE PIPING LABOR HOURS HOURLY RATE EST. COST Pipe Fitter Foreman 9.0 $ 86.21 $ 775.93 Pipe Fitter $ 80.42 $ - Plumber 10.0 $ 80.42 $ 804.21 $ - $ - TOTAL - Pease Piping Labor 1,580.14 PEASE PIPING EQUIPMENT HOURS HOURLY RATE EST. COST Forklift $ 24.54 $ - Job Truck 16 $ 9.00 $ 144.00 Boom Truck $ 73.08 $ - Compressor $ 14.36 $ - ~Iding Machine $ 10.34 $ - Generator / Light Plant $ 12.70 $ - Laser $ 11.55 $ - TOTAL - Pease Piping Equipment $ 144.00 MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ ru.~-=~ TOTAL - Subcontractors Ii $ EST. COST GENERAL RELATED COSTS HOURS. HOURLY RATE EST. COST Change Order Processing Fee Lump Sum $ 75.00 Estimating $ 75.00 $ - As-Built Drawings 1 $ 55.00 TOTAL - General Related Costs $ SUBTOTAL - DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 1,724.14 OVERHEAD & PROFIT @ 15% $ 258.62 TOTAL - Direct Costs $ 1,982.76 TIME EXTENSION AND RELATED COSTS 1 EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: 0 TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): !VALUE OF EXTENDED FIELD OVERHEAD $ - EXTENDED FIELD OVERHEAD @ 15% $ - SUBTOTAL $ - PROFIT@ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 1,982.76 This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements identified, unless specifically negoiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time will result in cost escalation and possible additional delays. PEASE & SONS GORDON PEASE - PROJECT MANAGER DATE SUBMITTED PROPOSAL VALID TIL Page 1 CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Twenty Seven PROJECT: WWTP Upgrade Page 1 Of 1 Project #: 5020 CONTRACTOR: Pease and Sons Date: May 5, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOllOWING CHANGE(S): Demo concrete beam from DAFT tank to accommodate concrete floor placement. ATTACHMENT(S): Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: D Contractor's Records D Engineer's Records D Unit Price ~ Lump Sum D Time & Materials D Other: D Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 1,332.84 Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECO~--- "'l2- "------_ -~~___ ----L.l.L. ~ "-. --~---. - --==== CONTRACTOR AUTHORIZED: CITY OF BREMERTON By: By: -?/( / --- ab, FORMS. Work Change Directive, 3-00 BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 COST CODE OH 01030 OH 01031 01513 01512 01073 01515 01516 01517 01950 DESCRIPTION: Cost to demo concrete beam in DAFT tank per RFI 043. Cost is based on sawcutting both ends of beam, city to coat exposed surface if desired. , Centrifuge WORK AREA: PEASE ISSUE #: Owner Chng # RFI # WCD 27 PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager 0.0 $ 150.00 $ - Project Superintendent 0.0 $ 93.57 $ - Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman 2.0 $ 86.64 $ 173.28 Carpenter 1.0 $ 71.00 $ 71.00 Laborer 0.0 $ 59.60 $ - Millwright 0.0 $ 72.53 $ - $ - TOTAL - Pease & Sons Labor 244.28 . PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift 0 $ 24.54 $ - Boom Truck 2 $ 25.00 $ 50.00 Trash Truck $ 55.00 $ - Compressor $ 14.36 $ - ~elding Machine $ 10.34 $ - Generator / Light Plant $ 12.70 $ - Laser $ 11.55 $ - TOTAL - Pease & Sons Equipment $ 50.00 MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST Disposal Cost $ . 400.00 $ - $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ 400.00 SUBCONTRACTORS EST. COST Evergreen Concrete Cutting $ 400.00 $ - $ - $ - TOTAL - Subcontractors $ 400.00 Page 1 of2 5/7/2009 7:18 AM BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 DESCRIPTION: Cost to demo concrete beam in DAFT tank per RFI 043. Cost is based on sawcutting both ends of beam, city to coat exposed surface if desired. Centrifuge WORK AREA: COST CODE , PEASE ISSUE #: Owner Chng # WCD 27 RF! # CONTINUED FROM PAGE 1 of 2 IsUBTOTAL - DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 1,094.28 BOND & INSURANCE 1.5% $ 16.41 !sUBTOTAL $ 1,110.70 OVERHEAD & PROFIT 20% $ 222.14 TOTAL - Direct Costs $ 1,332.84 TIME EXTENSION AND RELATED COSTS I EST. COST IME EXTENSION REQUESTED - WORKING DAYS: 0 IME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND iNSURANCE @ 16.5% $ - SUBTOTAL $ - PROFIT@ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 1,332.84 This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements identified, unless soecificallv neaotiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time may result in cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. PEASE & SONS 07 -May-09 DATE SUBMITTED 21-May-09 PROPOSAL VALID UNTIL BRYAN HILLEMANN Page 2 of 2 517/2009 7:18 AM CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Twenty Eight Page 1 Of 1 PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: May 5, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOllOWING CHANGE(S): Shop paint floor drains in RDT building to improve corrosion resistance. ATTACHMENT(S): Pease and Sons change proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change( s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications. or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: D Contractor's Records D Engineer's Records 0 Unit Price ~ Lump Sum 0 Time & Materials 0 Other: o Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 682.08 Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMEND~ 8~ CONTRACTOR AUTHORIZED: CITY OF BREMERTON By: By: -)/( / ab, FORMS, Work Change Directive, 3-00 BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 DESCRIPTION: Coat floor drains at Thickener Building as requested in floor drain submittal review comments. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # WCD 27 RFI# OH 01030 OH 01031 PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager 0.0 $ 150.00 $ - Project Superintendent 0.0 $ 66.96 $ - Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 66.64 $ - Carpenter 0.0 $ 71.00 $ - Laborer 0.0 $ 59.60 $ - Millwright 0.0 $ 72.53 $ - $ - TOTAL - Pease & Sons Labor PEASE & SONS EQUIPMENT - HOURS HOURLY RATE EST. COST Forklift 0 $ 10.10 $ - Boom Truck 0 $ 22.00 $ - 4-Gas Monitor 0 $ 5.63 $ - Compressor 0 $ 11.25 $ - Man Retriever 0 $ 7.13 $ - Core Drill Machine 0 $ 7.33 $ - rventilation Blower 0 $ 2.50 $ - Duct 0 $ 2.75 $ - Hose (50') Section 0 $ 0.66 $ - Rivet Buster 0 $ 6.25 $ - TOTAL - Pease & Sons Equipment $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST Materials Attached $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ SUBCONTRACTORS EST. COST Duncan & Bush $ 560.00 $ - $ - TOTAL - Subcontractors $ 560.00 Page 1012 5/7/2009 6:46 AM BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 DESCRIPTION: Coat floor drains at Thickener Building as requested in floor drain submittal review comments. WORK AREA: COST CODE PEASE ISSUE #; Owner Chng # WCD 27 RFI# CONTINUED FROM PAGE 1 of 2 SUBTOTAL - DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 560.00 BOND & INSURANCE 1.5% $ 8.40 SUBTOTAL $ 568.40 DVERHEAD & PROFIT 20% $ 113.68 TOTAL - Direct Costs $ 682.08 (ME EXTENSION AND RELATED COSTS I EST. COST IME EXTENSION REQUESTED - WORKING DAYS: IME EXTENSION REQUESTED - CALENDAR DAYS: u 0 CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): ALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE@ 16.5% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 682.08 This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements identified, unless specificallv neaotiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time may result in cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. PEASE & SONS 07 -May-09 DATE SUBMITTED 21-May-09 PROPOSAL VALID UNTIL Bryan Hillemann Page 2 of2 5/7/2009 6:46 AM Page 1 of 1 Bryan Hillemann From: Kirk Parnham Sent: Tuesday, February 17, 20091:15 PM To: Bryan Hillemann Subject: FW: 8570 Bremerton Floor drains See below. Is grey OK? Kirk W. Parnham Pease Piping, Inc Mechanical Superintendent Ph (253) 572-5126 Fax (253)383-3519 Cell (253) 377-1121 kirk@peaseandsons.com From: Randy Buzzard [mailto:randyb@dunkinandbush.com] Sent: Tuesday, February 17, 2009 1:12 PM To: Kirk Parnham Cc: Pete Weese Subject: RE: 8570 Bremerton Floor drains Kirk, If you can drop these off at my house I will have them delivered back in about 1 week. I have a lot of gray's in urethane in our shop, will this work for you? If so we can do these for $80.00 each = $560.00 total. Let me know when you get a chance. Regards, Randy Buzzard Project Manager Dunkin & Bush, Inc. 12005 N. Burgard Rd . Portland. OR 97203 Phone ;:'03.235.0100 . Fax 503.285.1925 [~~??aIQ~d~Q~iDgDQ~~~O.~Qm YtYLI/f .dlJ!]kin<;!.i]Qbush.com From: Kirk Parnham [mailto:Kirk@Peaseandsons.com] Sent: Tuesday, February 17, 2009 12:23 PM To: Randy Buzzard Cc: Bryan Hillemann Subject: 8570 Bremerton Floor drains Hi Randy, Here is a cut sheet for the floor drains along with the paint specification. Please give me a price that I can send to the engineer. Thanks, Kirk W. Parnham Pease Piping, Inc Mechanical Superintendent Ph (253) 572-5126 Fax (253)383-3519 Cell (253) 377-1121 kirk@peaseandsons.com 51712009 Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments: 4708 PEASE & SONS INC WWTP Wet Weather Facilities Upgrade Engineering LEG 12-1 04/08/2008 07/31/2009 07/01/2009 Change Order #1-2/09 CITY OF BREMERTON CHANGE ORDER CONTRACT CHANGE ORDER NO: One PROJECT NAME: WWTP Wet Weather Facilities Upgrade J PROJECT NO: 5020 CONTRACTOR: Pease and Sons ORIGINAL CONTRACT AMOUNT: 3,229,728.00 DAYS: 447 PREVIOUSLY APPROVED CHANGES: . 0.00 DAYS: o THIS CHANGE: 37,790.81 DAYS: 16 REVISED CONTRACT AMOUNT: 3,267,518.81 DAYS: 463 This Change Order covers changes to the subjeCt contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below does not include applicable sales taxes. DESCRIPTION OF CHANGES INCREASE IN CONTRACT AMOUNT ($) (DECREASE) IN CONTRACT AMOUNT ($) CONTRACT TIME EXTENSION (DAYS:) o ..... I'- I'- ..... ..... ell ell "3 "3 0::: 0::: X Work Change Directive 1 - Provide additional spare high $3,272.06 0 voltage conductors for primary plant power supply. X Work Change Directive 3 - Install'2 8" PVC knife gates on $1,721.37 3 centrate line. X Work Change Directive 4 - Provide, place, and channel $3,007.02 0 additional concrete in the existing centrate sump. X Work Change Directive 5 - Provide, and install 125 feet of 2" No $7,500.00 2 water line form.the generator room to the centrifuge room. Work includes all hangers, piping, valves, fittings, and core 0 drilling. X Work Change Directive 6 - Provide, and install additional $8,389.16 conduit and conductors necessary to provide 120V and 208 0 3PH power to switch gear. X Work Change Directive 7 - Repaint entire generator enclosure $1,300.00 in accordance with.Sabelhaus West proposal. Contractor primarily responsible for repainting due to damage caused 0 X during crane work. Work Change Directive 8 - Relocate centrifuge equipment $1,573.58 0 panels and provide concrete pedestals. X Work Change Directive 9 - Provide Mechanical seals and Atra- $3,482.18 0 Flex couplings for WAS pumps. CONTRACT CHANGE ORDER NO: One PROJECT NAME: WWTP Wet Weather Facilities Upgrade X Work Change Directive 10 - Extend SS abrasion plates for the $926.06 0 cake dumpster. X Work Change Directive 11- Provide FRP cable trays in the $3,319.38 0 headworks building in lieu of aluminum cable trays. X Work Change Directive 12 - Move FV 46224 to centrifuge inlet. $1,500.00 5 X Work Change Directive 13 - Install relief valve at polymer pump. $1,800.00 5 Weather Days - January 7,2009 through January 9,2009 3 NET CHANGE IN CONTRACT AMOUNT $37,790.81 16 INCREASE OR (DECREASE) Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for past performance. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. ---J ./ ('/ P~JECT ENGINEER /2. RECOMMENDED: 2ft /07 Date RECOMMENDED: _ORKS Dat~ ACCEPTED: APPROVED: () - ate ATTEST: ~d1 City Cle Page 2 of2 . .. - . . - - - -. .. .."'w w ... ~... P' . P' .. ~"''''''''''''''^''''''~~~-'''_'''~''.~~~'~'''~'''''''''''''''.~6'""_"/'.6'>:~~",:",:",>:.:":~::"P'..~~.' CITY OF BREMERTON .CD#: One WORK CHANGE DIRECTIVE Page 1 Of 1 PROJECT: WWTP Upgrade CONTRACTOR: Pease and Sons Project #: 5020 Date: August 1, 2008 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Provide conductors to be pulled into conduit E113 matching those identified for conduit MV101. Conductors shall be pulled in, terminated, and parked by Potelco at the pole top and in the J~box vault. ATTACHMENT(S): Valve Vault Sketch If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change( s). The Change Order will be executed in accordance with Section 1..Q4.4 of the WSDOT Standard SpecifJCations, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: o ~ o Unit Price Lump Sum Time & Materials Other: o o Contractor's Records Engineer'S Records o Other. Negotiated Estimated increase (decrease) in Contract Price: $ 3,272.06 ;If> Estimated increase (decrease) in Contract Times: Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR oa4:J CITY OF BREMERTON j/Jb3he I' , By: '''l//L- I /1/7/00 I / . ab. FORMS. Work Change Oi(ectiYe, 3-00 . . . Bremerton WWTP Wet Weather Facilities Up~ade WeD #1 PS~ Electric Breakdown~~umma\""D' weD PRNo. -. Project Number: 165 Genenil Contractor: Pease And Sons, Inc. Scope: Added MY (;able To Conduit E113 1. ELEClRICIAN LABOR COSTS 3.00 HR L journeyman electric:iln labor. b. jourMylT1lln burden @ 1.50 HR Co foreman eJecttlcl8n@l II. foreman burden @ 0.00 HR .. :luperlnter'lclent electrician @ f. 8uperlJltendanl burden S Supervision g. direct supervision (NTE 15% of 1.-f) h. Hfttty (NTE 3% of linea 1a,b,e,d,e & 11 I. Delivery truck and driver (SSO per hDur) 2. MATERIALS COSTS eo malBrt81 COIlS b: quote : c. quote: 3. EQUIPMENT COSTS .. owned equlpl'Mnt (PH spec approved source) b. rental equipment (per Invoices abelled) 4.. SMALL TOOLS a. omall tools (NTE 0% of 1., C $. et 5. OVERHEAO .. NTE 10% portion err 1,2,3&4 6. ALLOWANCE FOR PROFIT (NTE 10% OF 1,2,3&4 ) 7. SUBCONTRACTORS e. b. c:. d. 139.84 62.00% $43.82 49.00''' $47.81 62.00% DIRECT LABOR SUBT01AL 8. OVERHEAD ON SUBCONTRACTORS (NTE 10% OF 7) e. PROFIT ON SUBCONTRACTORS (mE 10% OF 7 ) 10. INSURANCE a. payroll drlvtHllillbllity Insurance (2% of 1) b. volume drlvlitn liability Insurance (.79% 011 thru 7) 11. BOND B. bOfld (0% of 1 thru 10) 119.52 B2.15 65.73 32.21 0.00 0.00 279:61 41.94 8.39 0.00 2051.40 (J.OO 0.00 0.00 0.00 0.00 913012OO~ 3020), !! 'Vi:> F'tk. '\3-0IVt:} S -;:. with ~:4 /)1. up {I \. D 2.. (~'2 10 7/10):" '52 72 . 6 to ~- ~ v'd 2881 U..80981 Oats Submittad: 9J29/2008 1. CMI'T LABOR COSTS 329.94 Z. lIA TERlAL COSTS 2051.40 J. EQUIPMENl COSTS 0.00 4. SMALL TOOLS 0.00 SUBTOTAL 1.2,3,&4 2381.34 238.13 238.13 5. QllERHEAD &. PROFIT 7. SUBCONTRACTORS 0.00 e.OVERHEI'.DONSUBCOIIITRACTORS 0.00 g. PROFIT ON SUBCONTRACTORS 0.00 10.JN$UMNCE 6.60 1'.~OND 0.00 TOTAL COST 1 THRU 111 $2,864.20 I #165-WCD#1 Added M'o{Cabl. '~~I ~I~1~313 MSd W~OS:L 8002 02 ~~O 9/29/20088:10:33 AMI Page 1 II if Descriptlof1 #165 Bremerton WWTP weD 1 Job Number: 33 Bid Summary: Oef.ult Extension By Phase Quantity Price U --- 02 Wire & Cable --- 390 5.26 E Ext Price labor Hr U . Ext Lab Hr . 2885 ;lI!1I0 15KV Grd EP/PVC Wire -- 02 Wire & Cable Total -- 2,051.40 0.00 M 2,051.40 0.00 0.00 Job Total 2,051.40 0.00 . . S'd 2E81LLE09El 'J~I JI~lJ3l3 MSd W~OS:L 8002 02 ~~O CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Three .JROJECT: WWTP Upgrade Page 1 Of 1 CONTRACTOR: Pease and Sons Project #: 5020 Date: August 27, 2008 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Provide and install two 8" PVC knife gate valves on the centrate piping at the wall of each sump. A unistrut is shown on the detail to hold the valve in place without gluing the valve to the pipe. Alternatively the valve could be bolted to the wall if the valve selected will accommodate it. A TT ACHMENT(S): See attached info. If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: o . o o Unit Price o o Contractor's Records Lump Sum Time & Materials Engineer's Records Other: o Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 1,721.37 Substantial Completion: 3 days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 3 days; If the change invoives an increase, the estimated times are not to be exceeded without further authorization. RECOMMENDED: ---- AUTHORIZED: -;;7/ ( r OF BREMERTON By: /VElJ i.cl./Er2 D' <' ~ -~._.~ CONTRACTOR BY:~, ~li(e,aUllI1 . ab, FORMS, Work Change Directive. 3-00 k:N t r=E. Gt A:\a loCA\\oN. ~ET~\L- N.T.S. 2 .,., -'---. -------- -----Fb=-=:-Fl Il---j I I i===11 I i= = =11 1[==11 Ir--II II II 1.,<<: NOTE 21 II ~ ~ t !~~1.1 \ . I J . ~y.:LC ~ : a . N C) ---- HW~Yi jd"'P,__,."UP Gr.RA-D~----- ~ II------~- u~______ c I \ -:;:;: 11" J 1 U. _ _ ~ m 1"11 " ~ r~ I ___ NOTE 10 I ~ i= ' NOTE1~.~ '-:PI ~ LE =1== 6" TWAS""\ \ I L. 46131-1 NOTE 1 - . \ lJ;;;J.".n 1-. -v "'-" TWAS PUMP 1 4" V 30 If .~. . . TWAS PUMP 2 IWW0460TWAS461! . ~ == '.;c -, ~ IWW04601WAS4621 \<\' r t F"'E- q~rE.. ~ I '- ~ ~ V /PIPE PENETRATION, . " \~ --........ . i __ ( 15607 ) ..... - .J"-""-- --........ V '- n '~O' N 1012....... .:t: ~ 'I"";' · 2" NO.2 --..... _ NO~ II I \ II 1./ J. 18~ ~ D~ "'- II IJiIt ...-NOTE3 ~u: '1:~~ .\0 2"V300 1112"PO ~ ~~, \,. BALlVALVE EXIST CENTRIFUGE " L . f 2" AS EXIST _ ~[- L- ",,~PUMP_... NOTE 227 ,~~~:'~~IFUGE) -~~ 'WW~'~_~ ." {O NOTE257 T -T ,. -1112"N02 ~ .., ....t., I I . tr,~ NOTE 13 ~ I 1 '.I--- 'I 7 (f..... C ABRASION - N-l .0.' PLATE.1YP ~4 3.CS-......" 6"V150 r 1 ..~ ~ ..--1"JIl62- T "--"1 L..;.. 3. V608 IN VERTICAL 1 r. 1 /1 I I "' ~ I /r::..2 4'..()" 4'.8. : : '. "n NOn 1\ '\ fI ~~- r~CS . l1iiiiI\' 00"'" It _~t EXIST. ~' J..:. 1'1 ;-1+1-I- -r ."'. rJl , TRANS ~CEN - I, " ~V"'" , '=' ~5 I I - I 6"CS,NOTE8--V t;\. 6 '" . I I I I 7 F:' ~ J:j r-S"CEN \} !'l.2..n:.2.!;!\] yl,!. r r~- --- ~~ ~ L __...J ,-1._ f- " 'j 017'_6" ....--... c::::: . . . ~--i~ ~i r '--~pC~GE~NOTE~~ ~~~~~\l ~ rr/ ~~~~ B" CEN I -,-;::I" I_,~~ ~ ~ r.= SEE c-002 FOR I I .. .. c.!,,-......23 I ~ ~ CONTINUATION '1 I 18'..{)" /. I IE=153.26 f- k \'. ~"'. IE=153.1D tn - /.:.- T I ~ ........._ ~~ T-:;=- ~ 4" OS TO EXISTCEN~FUGE . ~n~"!;~o~.j::;T I FE . l' , - 4"V130 0 5 1 ~G22~ ./ 3" N'I .:::7. i- "" V608 KW I FE" Gf p,.a t:: SHIPS LADDER . --- 3"\l'tOO_ .~~ __~ r ~ 4"DSTONEW iDlE 6.-'77;; lI'. . -: - 2" V300, 2. V630 "" " I CENTRIFUGE ~ M .L-.;,"........ , \/ ,IF,V\J/L ':J t b ' , T A NOTE 22 46224 , \ \L '--'/(!! -v.;.~ . '-EXIST 2" PO (ROUTE 3. vtib . . INTO NEW POLYMER ACCESS TO BOILER ROUTE 3/8' a. V130 INJECTION RING} ROOM, SEE SHEET . ILCp.WW04 POLYMER fA\' EXIST 1" PO (NOT SHOWN) M-ll07 ~~. ILCP-WW04 INJECTION M-003 (DISCONNECT AND CAP) see NOTE RING & MIX ____ ~~~_"I..--o"'~ _NC5!E.; $oEE: KNIFE.:. Cij) \ N..S.TA.LL~. \ LON '>E..\A l L.. ... .-. ..' (A~ED) . ~ ........ -- I 8/2 7/08 ~ J:/r c -~",r_ ~lf:~ -- ;! c= . FV 42535 FI 42634 '---" . PLAN 1/4"" 1'0()" . -0 cu il. c ~ ro ...., ::; 0. r- ,- W (5 ......0 CO ~Jj r--- 03 - C'J iJ) (j) C . "6:. o c zw ~ i!).J d !r= C w f! ~n ~ . . I WWTP - I~N e:tf-- U?~R~t:>~ 8/2 7/08 1I . .t=>c I t=N D 8' P'vC r\ 'PE.. \ t-.\TO S\J ~/\ P ~\\(}/-:) , C:>l"... '\', ...."....t: (' , . 1'1 '1 i '~i ~I c: S \j}.A-p/ ' II !- I I -.- ,1-----,---------- --. . ... $' :- I I L _~C ____ :- I .a ~ . - F'RP \jw.~ s.T~\j\ S.0'F''i?o~\ vJ / S> S A ~.J.<"-\~-c::iR! ~ ST'R.A...P 'I. . . ,9. _ [... '" :4. :') PLAN N :T- $_ 'NO~: 1>0 -,-.toT GtL0E- 81\ K\-J.{:re- cqA""lclD F'\~ (SI-IP "FIT O\-..tLY) sr-CI..J~ \JJj Fi~? \JJJ.\~\"R0T~ r i r;F 4' '-' P' c:. ~ II I - A-,") - e SVNt'P? 'I H-ALLOW ROOM To ! - ~ I 'RcN\DVE VALVE. ~~-t=- t -T- -"i--'- ... ~ t;'t....A.~s: ~ ~ 'I' . ~ L '\ ~ C"C>F;? ,', c_ - , ..... "" ~....: ........ ' ..' ~"".... ,~'\ a - -.... (' ~ '" fl.::', ............. .... ......... .. "'. ... .. '..... ... KN iFf 4A lE IN STALLAT10N. DE..TA\L ----riI llz~. ...... - '- '= ~Or-\ LE: {lve Gate Valves - Knife Valves - Slice Valves Page 1 of2 . . rt:":~~~=~:::::-~.:m::.~;=<~~:';:';"' ';'~;-;'..;:-_~ HSPECIAL DEALS f: if~:~~;':!~;~~Ci~: ~~::;~~:~~ :::::.::::::.. ":::';;:;~;::f l'!wat.er:pumps. I!-. r jA~"P~~mps:i.aiQ-;;\;;;r~.. ...;'r ~_._.~-..,..,._".....;.,.,..,." ..,.'''.........-. ....... .... ...._,-! itFilterq an,d..M~dja ~.! !,.-.".,.."........--...-.-.---.-..--.-.... ... .......~ El.f~r, $.t~~Dj~er$. ~, ~ v..-----.--....--.-....'n.~' ",......... .... -w...-r, Ijs.~(r:nJf!t:!;;..$.;. Or;<i!~fl$. ~. [, ll~i~~;~:":-~~--~II :Koi: 8 owl. 8.; Liner l> ~ ..~ ..... . . . ;: i=.'O--=""'''~".,'',::',,::,,:'''','''''''''"=''';''''~'"":,' IjM.e~ic:atIQIJ~ ~. f! r--'--:"""'~"""" ..........,............,.....--....... .,~,~...~, -,': .. !\IIlatenr:~qtmenl.s ~.. . l.,...-...."...:.......,.,..:.._...,,-,._.._..__.v.-~..: .:,:, ',. i~~~~~.:~.~:~~~!~".;,,~::,;::;;:;.,.:;:.:;.::~..1 HKp.i; ~ Qod.~ ~ i l~,.....___~___'_.~_'_'__"'", ..........':: !"'Pond)\uto: Va~.der~. .. l> I [!~;~B.~!;:~:;;~~~~~:::,:::::cEI !~:~~~;~,~~'~,~.~:~~~!~::~...........~:.i; .I~:==:~=!n=11 llPolJd Llghtjn!i!r~ ~. ! [1io;;.d'va'~~u.m~-...'-_..,,-_._..-t':1 L......_.. ....,... ..................__._......... ..... ..' j;:PetD"eterrents .. .. "~:i r::~~::::'"C~~'1 r'-"..""...'.'.'''' ,. ,.,..,.........-. ..-.... .... ....'.! I . Re!li~"'n:es ..\ ~ € Ordering, Inf~ ViIll.IM ~hQPp in~: Cl!!rt E nil HPr.;: ! r ! i i . I...-:-,...~ .,...,......_.._ ............_ .....~.....:_.":"...:_~:.:.: ".,. .......; . h ltp://www.fancykoioutlet.com/supply/gatevalve.htm KNIFE GATE VALVES 11/2" Unibody Knife Gate Valve Slip x Slip '.._'..'."', $7.50 [~~.~,,!,~E~.~) 2" Unibody Knife Gate Valve Slip x Slip $12.50 l~~.~=i?~SJ._;~ 3" Knife Gate Valve. PVClWhite wI Stainless Steel Paddle (Slip x Slip) $24 95 (Add ToCali:'~ . .~_...-._-- 4" Knife Gate Valve w PVCIWhite wI Stainless Steel Paddle ( Slip _~_.~~~.p.,>.._._ rf.~dd Tn Cali:. $59.95 '-."~,",....,,..-... ......-.-.-. 6" Knife Gate Valve Assemblies wI Stainless Steel Paddle ( Slip ~~!!.pL___.._. ! J~.lcl"..fJ l' :':1'r-.~ $229.00 \.:-.=-...-.:._._-:..~:.....:-.: 8" Knife Gate Valve Assemblies wI Stainless Steel Paddle ( Slip '.':.~I,i'p'). ..._.__..._ $324.00 ~.'~?d.T{~.Li~.:~:.:. 28" Aluminum Extension Rod 8/1512008 . . Aquamasters USA - Knife Gate Valves 3" to 8", and 10" to 18" - Prices ,. Aquamasters USA For Questions. please email tocustserv@AAy.ami!Ji.1~rs.com The Source of Your Aquatic Equipment, Needs, & Supplies Knife Gate Valves up to 2" to 8" (Different Gate Valves 10" to 18" - Scroll Below) . : -" I' ,_.,..:.:,7J:~1'n :'.."HH!. ~.' _1' . . Uft'ir\: (':":)::.', '.' ~ Left Side: 6" or 8" Valve Pictured. Valve Pictured. Page 1 of3 Right: 4" Inexpensive valve for industrial. agricultural. and commercial markets. Ideal for quick shut off in low pressure or vacuum lines. Also well suited as a drain valve to tanks. Attaches to Schedule 40 or 80 pve pipe. . Attaches to Schedule 40 pve Pipe . Quick opening . Trouble free simplicity . 100% water tested at factory . Unrestricted flow . Low cost . Quick Shut-Off for Low Pressure Applications These Knife Gate Valves work great in low-pressure applications and have really caught on in the aquaculture industry. Valves are available from 1-1/2" to 8". · Actuated knife gate valves are also available up to 2" sizes. Part # Description Max PSI Price Order KGV3 3" Knife Gate Valve 30 PSI 39.00 KGV4 4" Knife Gate Valve 20 PSI 79.00 KGV6 6" Knife Gate Valve 10 PSI 295.00 :. KGV8 8" Knife Gate Valve 10 PSI 399.00 http://\vww.aquamusters.com/K.Ilifegates. hIm 8/25/2008 Aquamasters USA - Knife Gate Valves 3" to 8", and 10" to 18" - Prices . DIMENSIONS of the Above Slip x Slip Valve I- I . :.' j . :j' I. ., Size A B C 0 E F 1%"PVC 6%" 8 5/8" 2 7/8" 2 3/8" 3 15/16" 3 3/8" 1%"ABS 6%" 8 5/8" 2 7/8" 2 3/8" 3 15/16" 27/8" . 2" ABS 7%" 10%" 3%" 211/16" 4%" 31/8" 2"PVC 7W' 10%". 3%" 20/.." 4%" 3%" 3" ABS/PVC 9%" 13" 43/8" 315/16" 5 3/16" 4%" 4"PVC 13%" 18" 6 5/8" 5" 7 7/16" 5 3/16" 6"PVC 22 3/8" 31 1/8" 11" 7%" 13~" 11 1/8" 8" PVC 22 3/8" 31 1/8" 11" 9 5/16" 123/16" 130/.." Page 2 of3 G.at~._Valves 10" to 18" .(not the same (DiffeJ:enl.than .'_iste.rJ._~J~QYJ!) . http://www.aquamasters.com/Knifegatcs.htm 8/2512008 Aquatic Eco-Systems: Knife Gate Valves, 1 1/2" to 8" . Page 1 of2 ECO-SYSTEMS,lNC. t4y Account I Quick B~y View Cart if P Items I Questions? 5inl:eJ978 t[JJ ~I (~] [Ii ISearch Keyword or Part # m '= 1-311.31J1.4.788 Home AQuaculrum lake & Pond Water Garden Aquarium Class r------.--.--.--.. ...-------- -....---------.----..--...-.--..-..-...-.---.... ~ AES Home >> Aquarium Supplies>> Plumbing>> Knife Gate Valves, 11/2" to 8" I .._.-~ I Knife Gate Valves, 1 1/2" to 8n Knife gate valves are economical, quick-acting valves for clean and dirty water low pressure applications. They have become very popular far several reasons. They can be easily taken apart and the seals can be changed, even the valve body can be changed, without upsetting the ends that may be glued to your pipes. So they can be used in place of unions! If you have a valve glued in place, but want to take it out, you can simply unbolt it and purchase new side pieces. They offer unrestricted flow and are quick- opening, 100% water tested at the factory and quite low in cost. These 1 1/2/1 to 8/1 valves are all pve with stainless steel shafts, polypropylene knife gates (except far 4", 6" and 8", which are stainless steel), and have Santoprene@ seals. The valves listed are all slip by slip, but please note that you can order sides in various other styles. Like most valves, they are not for use in freezing weather. One-year warranty. t 1..... {) .~-' ~"-..I :;:::. .r.:::. .~' .{.:! Click Image to view large . Products Reviews ....... .... ....... .. ............... ....... ....................... ..... .~. .... ", .................-...... ..................... . .... n. ...... .'~" ," .. ..... . ........ : Part No. Name Shipping In Stock Price Quant . GVll 1 1/2" Gate Valve In Stock $11.55 ($10.50/6+ ) . GV12 12" Gate Valve In Stock $586.62 ($527.04/6+) : GV15 15" Gate Valve Out of Stock $719.09 Still available for ordering ($646.20/6+) . GV18 18" Gate Valve Out of Stock $818.86 Still available for ordering ($736.8S/6+ ) GV2 2" Gate Valve In Stock $20.14 ($18.02/6+) GV3 3" Gate Valve In Stock $25.34 ($22.04/6+ ) GV4 4" Gate Valve In Stock $72.87 ($66.44/6+ ) GV6 6" Gate Valve In Stock $290.11 ($268.62/6+) GV8 8" Gate Valve In Stock $459.72 . ($427.65/6+) .... ............ ~.. ..... ............ . .. ....-. .......-.... ..... '~""'...-'... .........._.....H__.._.... .. ......-........ ..-'.. hllp:/ /www.aqulIticeco.com/subcategories/804/3-Gate- Valve 8/2512008 . . . Pvc Knife Valve - W. Lim Corporation... 2007 Page 1 ofl ~~~~~i~1;bt~, WI1~,~~!!i N:~Wi QI):If eIjQ,l;J;~Lqt;,s, ~, T:~'Qbi: ~q:I,U},QiJTt: ~.~IJst;a.,c.tJ;!;~~ WIJ;Q1E!; fia..IJ~' : PVC KNIFE GATE VALVE (VALTERRA) Gravity Pressure Design . :;::-:;f.~;T~~l~~~~'!:,:,:, . ........ ...... .';G;~:::;: :,,~~;~:;;:~':A ~TYf~Tn"~I . .... .~. -,. ':":.:'::~ ,I: ,~ .~j ITEM # I DESCRIPTION I LIST PRICE PLASTIC PADDLE 1504 Knife Gate Valve ..1 1/2" Slip $ .J 1.25 1505 Knife Gate Valve.. 2" ....Slip $.. 17.60 1506 Knife Gate Valve ..3" ....Slip $ ..21.65 STAIN LESS STEEL PADDLE 1505-S Knife Gate Valve ..2" ....Slip $ ..27.90 1506-S Knife Gate Valve ..311 ....Slip $ ..31.93 1507-S Knife Gate Valve ..4" ....slip $ ..87.25. 1508-S Knife Gate Valve ..6" ....SliD ..$ 365.00. 1509-S Knife Gate Valve ..8" ....Slip ..$ 519.00. . ""-'--'-'~'-"--'-"'-""-'''''''-'''''~--'-''''-''__''''_'''_'...-_._.__._.-.....-.,.._,~ .........u........ ." '.... ............u.._........ ......._...._.~_.....h.........._.............,._.._.._..._......____._...__.................MM ........ "M'" .. ..~." ....' ...... ...M.......... ~.'.. .........._.".__. P'IC I<nife Valve Illiip- Pv~SinClle Union Entrv Ball Valv12! Slip_Pvc Ulilltv Ball Valve I Pvc Ball Valve (Flo Control) 1 Ball Valve EI,ldm Seal E ....-_.~~--..' -. _.._....M...~. .._.._ ..____ .__._._____M. _._.._.M~_.._ _~______._._..._..._____...M... '.M M'. n._ __.__. .__._._..._._.....M......._~._. ._ ._....._... n..__...._._~... _._.~.M_.. _.._. M _'_....M...M.M... M.......... ..__...._.... . ...... .'M _._.._._.._....._._ _...... .. flulktle"ds & Flanqes I <;heck Valves la-Wav Valves I Gale & Knife & Ball Valves l8.uto Fill V<llves I Eitlin.9!! I E'jQ.~.f!....t!9~J! I Y~ntu!i~& Mjxing.E41,1~ Basket Fittinqs I DiQital Flow Meiers I Sealants & "["ges W<ill!LP.!Lrr!P.!i! I p.J~ro.mf1.91 C.QIT.!l1l~I~.Ejlleration Syslems I Individual Filters I Waterfalls & Waterfall Fillers I Filtration Media I Tanks I Ultraviolet St~r! ~oUorn.Qll!.i.!!~ I s.~immgf!! 11.1]~.!,I~!r.f!!.LG~DgrnIQr~ 11':91 & .RPn~&.Hq!:>\!YPf.pg!,J!;t!i I A.ql!!Iri!l(l) .C.h(l!e~ I Hea.l~ri? ...-.--....-....-.....-........ - ...... ..... - ..~......- '..-. ...-..." ....... ...__.._..........__....._..._.__M......._.. ......M.. . .'_'_" ....._......M....._......_._.n....,.....~_..M._....._........._._.M....._. ..,. ..... .~._...._ ...._.. __ ..................._~..M.___.._~~..__.__.___._._._._.__. ..... . HPllJe I Wl:lat~s. JIIeW I QUtf'r.pgul::!s I TechSIlPPO[\ I C.on.!<1ct.Us I Whol.e..SC!le. Info I $.6.afc.n About U!j I 9J!~..M~p. I E!~.f.KJQ.l91'hQ.LP'gg? W.Lirn Corporation all rights reserved htlp:/ /www.wlimproducls.com/prod lIcts/5023/i ndex .php 8/15/2008 BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 . COST CODE OH 01030 OH 01031 01513 01512 01624 .73 01515 01516 01517 01950 . DESCRIPTION: WORK AREA: Install (2) 8" PVC Knife Gates, (1) at Centrifuge Sump and (1) existing Centrifuge Drain. Centrifuge PEASE ISSUE #: Owner Chng # RFI# PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager 0.0 $ 150.00 $ - Project Superintendent 0.0 $ 93.57 $ - Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 86.64 $ - Carpenter 0.0 $ 71.00 $ - Laborer 0.5 $ 59.60 $ 29.80 Millwright 0.0 $ 72.53 $ - $ - TOTAL - Pease & Sons Labor 29.80 PEAS~ & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift 0 $ 24.54 $ - Crane 0 $ 172.72 $ - Boom Truck $ 73.08 $ - Job Truck - Pickup 0.0 $ 9.00 $ - Trash Truck $ 55.00 $ - Compressor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator I Light Plant .$ 12.70 $ - Laser $ 11.55 $ - TOTAL - Pease & Sons Equipment . $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST , Material (attached) $ 643.60 $ - $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ 643.60 SUBCONTRACTORS EST. COST Pease Piping, Inc. $ 739.87 $ - $ - $ - TOTAL - Subcontractors $ 739.87 Page 1 of 2 2/3/2009 7:58 AM BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 . DESCRIPTION: WORK AREA: Install (2) 8" PVC Knife Gates, (1) at Centrifuge Sump and (1) existing Centrifuge Drain. Centrifuge COST CODE PEASE ISSUE #: Owner Chng # RFI# CONTINUED FROM PAGE 1 of 2 SUBTOTAl- DIRECT COSTS EST. COST SUBTOTAl- DIRECT COSTS $ 1,41327 BOND & INSURANCE 1.5% $ 21.20 SUBTOTAL $ 1,434.47 OVERHEAD & PROFIT 2.0%. $ 286.89 TOTAL - Direct Costs $ 1,721.37 . TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: 3 TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANC.E @ 16.5% . $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 1,721.37 This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements identified, unless specificallv neaotiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time may result in cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. PEASE & SONS 03-Feb-09 DATE SUBMIITED 17-Feb-09 PROPOSAL VALID UNTIL LARRY BOYD . Page 2 of2 2/3/2009 7:58 AM BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Pease Piping DESCRIPTION: ~ASE ISSUE #: 00 #VALUE! TCF/PC CL # 00 RFI: EASE PIPING LABOR Pipe Fitter Foreman Pipe Fitter Plumber HOURS $ $ 8.0 $ HOURLY RATE 96.56 $ 80.42 $ 80.42 $ $ $ EST. COST 643.37 TOTAL - Pease Piping Labor 643.37 PEASE PIPING EQUIPMENT HOURS HOURLY RATE EST. COST Forklift $ 24.54 $ - $ - Boom Truck $ 73.08 $ - Compressor $ 14.36 $ - Welding Machifle $ 10.34 $ - Generator I Light Plant $ 12.70 $ - Laser $ 11.55 $ - TOTAL - Pease Piping Equipment $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ SUBCONTRACTORS EST. COST OTAL - Subcontractors $ $ $ $ $ GENERAL RELATED COSTS HOURS HOURLY RATE EST. COST Change Order Processing Fee Lump Sum $ 75.00 Estimating $ 75.00 $ - As-Built Drawings 1 $ 55.00 TOTAL - General Related Costs $ SUBTOTAL - DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 643.37 OVERHEAD & PROFIT@ 15% $ 96.51 TOTAL - Direct Costs $ 739.87 TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: 3 TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: . EXTENDED FIELD OVERHEAD {rate per work day}: VALUE OF EXTENDED FIELD OVERHEAD $ - EXTENDED.FIELD OVERHEAD @ 15% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 739.87 This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements identified, unless specifically negoiated as part of this Change Proposal. Work will proceed in accordance _the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed . cordance with this proposal. Failure to accept this proposal within the prP8.osal time will result in cost escalation and possible dltlonal delays. . PEASE & SONS GORDON PEASE - PROJECT MANAGER DATE SUBMITTED PROPOSAL VALID TIL Page 1 BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis _SCRIPTION: ASE ISSUE #: 00 Owner Chnc 0 - #VALUEI RFI# BILL OF MATERIALS (Pease & Sons) ITEM DESCRIPTION QTY. UNIT OF LABOR MATERIAL MEASURE UNITS TOTAL UNIT TOTAL Valterra 6801 8" PVC Knife Gate 2 ea 3.9 7.7 321.80 643.60 SELECT Demo 4 sf 0.1 0.3 - - - - - - - - - - - - - - - - - - - - - - - . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - TOTALS MANHOURS: 8.0 COST: $ 643.60 .' Page 2 . . . Jdll. L I. LVV'J I V: LjAIYI No. 7841 P. 1 20 INTERNATIONAL WAY lONGVlEVV, WA Y 986~:2 FERGUSON ENTERPRISES7INC~' . PHONE 1-.360--425-5330 FAX 1-360-425-..8457 IF T~AN.sMlSSION IS INCOMPLE;TE, Plt::ASE, PAX OR CALl. THE NUMBeRS fJR.OVIOED. DATE: I... ;) 7 -09 COMPANY I'. NAME: -?.Q~ ~,1:. ~'3 ATTENTION: <t:,-\-eA}L .A ~ FAX NUMBE~ :)la(') - 2.1L ~3% FROM: ~~ c; , .- ~ ~ TOTAL NUMBER OF PAGES (INCLUDING) THE COVER LETTER: ~X) \} CA \ teX\fQ :# Co<eOI ~ C~(At~ '8 IIg1JC KV\I~~ ~ C:j~.. ~ - ~l~ ,'/\& 42,JI. 'get j- ~ '\?:,-\ ~. Vn ~ ,Q Q~ ' VJE APPRECiATE OUR BUSINESS. '.+~'8::~~~~i~>', . . . ,. . .' .,. ::i-. ":':::="~:-~-:~i::j::;':::~'~'-~~'Si~.'~ .... ..... __' , L ~~ ~,~:L~f.~ ~7~~:~~riSi;:,,:i:;:~:t :\B:/: '~':,::'.'~:~~:i;;,:'i~:::i:~:~:~.i~:~j*~,::~.. ,.,~. .,' '" .. ,";e&:' :i. ""'i.'~~ ,:" ':',"""~~i:"'> "::"'.:~'~::<<<:"'<"~',:':,~ CdWr White; 'wh~i.llladc White 'Slack white" " . White .t~~ f'VtIA, tfqAfJ,S," :1tV(, .":'~',,",'. ,<M,:;~".':::' ' , = . ~AB ~~!:{t;~,_ABS.. e:;::=: = ,.~,">::t0 "" s....ls Samop ,Santop~ne Scmtoprene ,~~~~e. P$(;.S MJ '~" ".' , '"'$''' '.. . : : . ,~" ::<;'.'".:,::,;\,>'.':':,: ";:' SQ,cket be; till /lIIClln I.SJ1fi:lt 't;lMltt 3ll'k:l! AE ~7 ~~ L6 ~ 1.~ .1.6 La ,~~,I H/A I 1~1. 5~ NjA +.37!i , ,~l~lh N/~ , :t~J", . ':,- ~ . . Oimeris 00$' 1 ' '" ~I;,t1tIJ ~ ( ~ " . ~ ' . ,. 1...5 we (L5 8.625 2.875 3.9375 3.$75 1<..5 ADS 6.5 '~ns 2.87.!$ '~..9$'1S ~~~, ": '. Z ABS 7.5 10.25 3.25 4.5 ' 3.125 ~ M 1.$ 1~~ ~.25 , 4.J'" 3;~" :] ABS/PVC 9.25 13 4.375 5.1875 4.5 4 ~t 13.J J8', ,1).625 ' 7~a1$ ",&4-<<,-.16 fi rJC 22..3 S 31.125 11 1..25 '13.25 11.125 rslpvc 22.:3 $ :U.t~, 11 ~u, ~~t"S.. ,U.;l'$ l-1r Dfmensft)l1 t$ ~i91rt of valve in fully i1peri p.(I Won. . "'.:' "i , , ApPlicationS '~ ':' , " ": . " ...~~.~-' "::1I~t. ~ricutturat arnt: fOOrcial. ma~ " , .;w~~: " ': :j~'~:m,~t~~~~,~ " .' '... ,', t. ,weu~~ ~rti~.., ~ij, . I, " '. . . I , ! ' r" j . B , , A 'Ilt""':''''': Alo.'O'-' . : . ," 'rrh- ", ' '; ~ '1"'YLt: nJ;J : ':, ,:, ~rl~ , ., Ofi ial{ 1"..............dA~~ ~.u.....;..,....~...... lhe... .w.,otn~~ '" ""'"".I.........~J;S, ~;;.;s J,,~~., ~ ''1''"'" ";,", in ~hoos1'ng:~Prit ,:' ~\iel)t ~Mtl\!ty~r' l~' ~ n\>t H1 ; , AaS PYC U e IPS 1t193 or equivab!nt i ; At$:.. ',~;,~ t:1:71'~ ~~;tt 1 , PVIE ASS U Ws 1793 or equiva~t \ ' PVif P\IC 'U :,:lP$:'~;Oitq~(eni I ; , ; ,\ I ; 't . . . . r -f,J.at,t-..:t'~u.tm'i' ': I-'~ ,""~~' " ~r~p~., .~,:", . Omeri,rig Inro ;: alioh '. . I : Noriuat 1:efliis an<! , .:. . . ,fi.$ ~lmi.y" j' : $~OO JlJll1itnu(ll : .. F.O.Bl.llal~tm F;K:tol)' ,~ , ,j : ': I ' . ~ " j " 1}1Y#! .jUr; I : ,..'---..-...., e: T . d r-nl""f'""\ TI""t,..... ..Xr~?>;"X"Z;':--':.~";:.:.;.:"Z~;";y:":-;";"~;"~;~~;":--;";V"h.;~":"?;+~~,:";?;r~;;;~;>>~~;";:;%~~~:;X:--'>/J;);;;:;";>>:;~'::::;~~5x;:;;;';:;x::;;~:;';:;Z;;~::~;~:;:{.::?$;:::::';:;;X*~2;~::.::.;:F/;:;:W::~~<<:::{..-;Z~m~;:~~Z;Xm:;&~2{~~:~~~.i~:s1:r~~~~?i;t;~~~~ CITY OF BREMERTON 'CD#: Four WORK CHANGE DIRECTIVE PROJECT: WWTP Upgrade CONTRACTOR: P~andSons Page 1 Of 1 Project #: 5020 Date: August 27, 2008 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOlLOWING CHANGE(S): Provide additional concrete in the sump for the centrale pump chamber and provide CDF backfill below the transformer top slab. ATTACHMENT(S): If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard SpecifICations, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: o ~ o Unit Price Lump Sum Time & Materials Other: o o Contractor's Records Engineer's Records o Other: Estimated increase (decrease) in Contract Price: $ 3,007.02 ~e Estimated increase (decrease) in Contract Times: Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR BYc4; ~f I~.vns CITY OF BREMERTON By: ~'l/L I' I II/? /0 <3 I . ab. FORMS, Worlc Change Directive. ~ . . . TRANSMITTAL PEASE & SONS, INC. P.O. BOX 44100 · Tacoma, Washington 98444-0100 10601 Waller Road East. (253) 531-7700 · Fax (253) 537-8113 Contractor Registration No. CCOI-PE-AS-ES*302PO E-mail address:mail@Deaseandsons.com . To: Bremerton WWTP Date: September 12, 2008 Contract #: Job Number: 8570 Job Name: BREMERTON WWTP Location: Bremerton, W A Attn: Ned Lever o We are sending you 0 herewith 0 under separate cover, the following items: 0 Plans D Shop Drawings D Copy of Letter D. Specifications D Samples D RFI 0 Proposal Ftequest D Field Authorization [J Other: CD ROM D Substitution Request D Prevailing Wage D SUBMITTAL # 1 9/12/08 CHANGE PROPOSAL: Added Concrete and cnF P&S Issue #006 These are transmitted as checked below: [8J For Approval D For Your Use D Resubmit D Approved as Submitted D Approved as Noted _Copies for Approval D As Ftequested D For Correction D For Review and Comment Copy To: Signed: FILE, FIELD Ata'l/ffll:E.N .JtC9l9lIYW, Project Expeditor BREMERTON WWTP 8570 Change Proposal.. Lump Sum Basis Ref: Seelio" 01250 DESCRIPTION: added concrete and CDF WORK AREA: e COST CODe PEASE ISSUE #:006 OH 01030 OH 01031 01513 . 01512 01624 01073 01515 01516 01517 01950 . Owner Chng 11004 RFI# PEASE & SONS LABOR HOURS HOURLY RATE I;$T. COST Project Manager 1.0 $ 150.00 $ ,~~ ft~ Project Superintendent 3.0 $ 66.62 $ 199.86 - Project Engineer 0.0 $ 95.00, $ . Carpenter Foreman 0.0 $ 61.68 $ . Carpenler 5.0 $ 1t\ :t +..58.3i-' $ 291.76 o~ Laborer 0.0 $ 48.25 $ - - MIllwright 0.0 $ 58.70 $ - $ - -Z 4'>. 0 ~ t1 G" . '2- b (g4-L'l1 TOTAL - Pease & Sonll Labor 641.62 PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift o $ 24.54 $ - Crane o $ 172.72 $ . Boom Truck $ 73.08 $ . Job Truck - Pickup 3.0 $ 9.00 $ 27.00 Trash Truck $ 65.00 $; - Compressor $ 14.36 S . Welding Machine :? 10.34 S - Generator I Ught Plant $ 12.70 S . Laser $ 11.55 $ . TOTAL - Pease & Sons Equipment -J. I. '2.1 27.00 ~ 1.. . &"1 $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST concrete pump $ 517.48 added COIlCl'ete 6 yaros at $97.00 per yard $ 562.00 added CDF 10 yards at $76.00 per yard . $ 780.00 $ - ill - $ - TOTAL - Material and Major Equ1pment Suppliers '/- \.'1. I 10879.48 "'Z'l '1 ct.. . n $ SUBCONTRACTORS EST. COST $ - $ . $ - $ - TOTAL - Subconlractol1 $ Page 1 of2 9/11/2008 2:39 PM BREMERTON WWTP 8570 Change Proposal.. Lump Sum Basis . Ref: Section 01250 DESCRIPTiON: added concrete and COF WORK AREA: COST CODE PEASE ISSUE #:008 Owner Chng #004 RFII CONTINUED FROM PAGE 1 of 2 SUBTOTAL. OIRECl COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 2.548.10 HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 15% $ 382.22 SUBTOTAL $ 2,930.32 PROFIT @ 10% $ 293.03 'Z.. ~ 4-g. oS" X' (. 02.. ~~1 TOTAL - Direct Costs $ 3,223.36 '--~-~.......",. c~~~ . TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: TIME EXTE~ION REQUESTED - CALENDAR DAYS: CPM ACTMTY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD S - HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ - SUBTOTAL $ - PROFIT@10% $ - TOTAL. Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 3,223.35 This cost proposal Is based on the cost elements Identified. Pease & Sons reserves all rights to additional oompensatlon and lime extension rorwork elements Identified. unless specifically nec:lotlated as part of this Change Proposal. Work will proceed in eccordance with the contract documenbl untn the Owner either providea written acceptance of thh~ change proposal or a written directIve to proceed In accordance with this proposal. Failure to accept this proposal within the proposalllme may result In cost escalation and pOSSible additional delays. ThIs change proposal must be Included as an attachment to OWner change order. NOTICE Is hereby provided that the Contractor reserves any and all rights to recover dlrect, Indlrecl, and consequentlal costs, includIng bui not Rmlted to the cost of detay and Impaot related to any work cover by this change or othacwlse affected by this change unless the cost and/or time have been epeclflcally Included and negotiated. rb~[) 11-Sep-Oa DAlE SUBMITTED 25-Sep-08 PROPOSAL VALID UNTIL LARRY BOYD . Page 2 of2 9/11/2008 2:39 PM . . . TRANSMITTAL PEASE & SONS, INC. P.o. BOX 44100 · Tacoma, Washington 98444-0100 10601 Waller Road East. (253) 531-7700 · Fax (253) 537-8113 Contractor Registration No. CC01-PE-AS-ES*302PO E-mail address;mail@oeaseandsons.com To: Bremerton WWTP Date: September 12,2008 Contract #: Job Number: 8570 Job Name: BREMERTON WWTP Location: Bremerton, W A Attn: Ned Lever o We are sending you D herewith D under separate cover, the following items: 0 Plans 0 Shop Drawings D Copy of Letter 0 Specifications D Samples D RFI 0 Proposal Request 0 Field Authorization 0 Other: CD ROM 0 Substitution Request 0 Prevailing Wage 0 SUBMITTAL # 1 9/12/08 CHANGE PROPOSAL: Added Concrete and CDF P&S Issue #006 These are transmitted as checked below: I25J For ~pproval D For Your Use D Resubmit o Approved as Submitted o Approved as Noted _Copies for Approval o As Requested o For Correction o For Review and Comment Copy To: Signed: FILE, FJELD .J<<lU/Jll:{;.;f! .Jt&/ll!Jl&W" Proj ect Expeditor BREMERTON WWTP 8570 Change Proposal.. Lump Sum Basis .. Ref: Section 01250 _ DESCRIPTION: added COllcrete and CDF WORK AREA: Owner Chng 11004 RFI# COST CODE PEASE ISSUE #:006 OH 01030 OH 01031 01513 01512 01624 . 01073 01515 01516 01517 01950 . PEASE & SONS LABOR HOURS HOURLY RATE EST, COST Project Manager 1.0 $ 150.00 $ 150.00 Project Superintendent 3.0 $ 66.62 $ 199.86 Protect Engineer 0.0 $ 95.00 $ ~ Carpenter Foreman 0.0 $ 61.68 $ . Carpenter 5.0 $ 58.35 $ 291.76 Laborer 0.0 $ 48.25 $ - Millwright 0.0 $ 58.70 $ - $ - TOTAL - Pease & Sons Labor 641.62 PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift 0 $ 24.54 $ - Crane 0 $ 172.72 $ - Boom Truck $ 73.08 $ - Job Truck - Pickup 3.0 $ 9.00 :> 27.00 Trash Truck $ 65.00 $ - Compressor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator / Light Plant $ 12.70 $ - Laser $ 11.55 $ . TOTAL. Pease & Sons Equipment $ 27.00 MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST concrete pump $ 517.48 adde<f concrete 6 yards at $97.00 per yard $ 582.00 added CDF 10 yards at $7a.OO per yard s 780.00 $ - $ - $ - TOTAL - Material and Major EquIpment Suppliers $ 1,879.48 SUBCONTRACTORS EST. COST $ - $ . $ - $ - TOTAL - Subcontractors $ Page 1 of2 9/11/2006 2:39 PM BREMERTON WWTP 8570 Change Proposal M Lump Sum Basis ..Ref: SecUon 01250 .. DESCRIPTiON: added concrete and CDF WORK AREA: COST CODe PEASE ISSUE #:006 Owner Chng #004 RAtJ CONTINUED FROM PAGE 1 of 2 SUBTOTAL. OIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 2.548.10 HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 15% $ 382.22 SUBTOTAL $ 2,930.32 PROFIT@ 10% $ 293.03 TOTAL - DIrect Costs $ 3,223.35 . TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: TIME EXTENSiON REQUESTED -CALENDAR DAYS: CPM ACTIViTY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD. BONDS AND INSURANCE @ 18.5% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Rela\ed Costs $ TOTAL CHANGE ORDER REQUEST: $ 3,223.35 This cost proposal Is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and lime extension for work elements identified, unless specifically neQotiated as part of this Change Proposal. Work will flroceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed In accordance wIth this proposal. Failure to accept this proposal within the proposal time may result In cost escalation and possible additional delays. This change proposal must be Included as an attachment to Owner change order. NOTICE Is hereby provided that the Contractor reserves any and all rights to recover direct, Indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work COVer by this change or othelWise affected by this change unless the cost and/or time have been specifically Induded and negotiated. r;ia. ~[) E SONS 11-Sep-08 DArE SUBMITTED 25-Sep-08 PROPOSAL VALID UNTIL LARRY BOYD . . Page2of2 9/11J20Q8. 2:39 PM PROJECT: WWTP Upgrade Project #: 5020 CONTRACTOR: Pease and Sons Date: August 27, 2008 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Provide and install approximately 125 feet of 3" Schedule 80 PVC NO.2 water line form the existing Generator room to the Centrifuge room. See the attach8 email from CH2M Hill and the attached sketch. ATTACHMENT(S): CH2M Hill emait and sketch. If a claim is made that the above change( s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: o ~ o Unit Price Lump Sum Time & Materials o o Contractor's Records Engineer's Records o Other: Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 7,500.00 ~6 Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR CITY OF BREMERTON By: -'J /L-~ / 11/7/CfG , I . ab. FORMS. Work Change Directive. 3-00 ..{..~..v~~..:~.:.:...:~.:.-:..:+~:..;..;~~.~.or.~:..>>;..:.;..:..:..~;-..:..;..~.~.:..;..;...;";~;":"J:';+;"':';":'-;~;"~";';vx""...:--;.y';.~'~;':"X";";'-:";-:':.;"~..;..;,..~j<;Y~';";";'~-{"~:"';"N>>;'l;~~;";";~;"';':"~~~;~?'~;~;~;(.:-;:";~;>;r@;y./~~~:;::::X;:;::;;;t;:,.~~~~~:;:;*:~;:;';:;"k;:;:~;;'~~:;:;:':x.;:~~.<;X;:':;;:;;:;;;Z~~3~).~~:E;~:f.*:i:::r)/;-/~; . . . Page 1 of2 Ned Lever -- ......_.._.~-_.._. -.....-...- .~~ .----. _.'._--~--..~...--..~.--~---_.~ ...-. ----................................ From: Brady.Fuller@CH2M.com Sent: Wednesday, August 27. 2008 1 O~44 AM To: Ned Lever Cc: Melissa.Wu@CH2M.com Subject: FW: Bremerton - No.2 water line sketch Attachments: Oocumenlpdf Ned Please see.attached sketch of the proposed new 3- No.2 water pipeline. We are not aware of any pipe material limitations in the gas handling or boner room so SCH 80 PVC is acceptable. They need to provide pipe supports of course. This needs to tie into the new OS pipeline through the 3- V300, FV46224, 3"V608, and 3"V130. The V300 is just an isolation valve which could go anywhere on the new 3" No.2 water line since the location near the tie-in appears congested. I also suggest that we add an isolation valve back near the new 3"X31f tee. The V300 is a bronze valve which has threaded endsnnot suitable for use with PVC pipe. We could usa a 3. PVC ball valve in lieu of the V300. Here is a spec for that 3" PVC ball valve, although we would normally use a diaphragm valve or butterfly valve on PVC piping larger :than 2". V331 PVC Ball Valve 3 Inches and 4 Inches: a. Rated-150 psi at 73 degrees F I with ASTM D1784 Type I, Grade 1 PVC full port body, Teflon seat, Viton O-ring stem. face and carrier seals, end entry design with dual union, solvent-weld socket ends, or single union ball valve with flanged ends drilled to ASME 816.1. b. Manufacturers and Products: 1) Nibco; Chemtrol Tru-Bloc. 2) ASAHUAmerlca; Type 21. 812712008 . . . .~ "rCtll~t.. l~;:~ N~ M(H A~~)u;~,. t~";:\.S i ~ i ...,.....~QVdiJfo Ii Z: 'i (,.",. ~ ;' $'1 V r::WJ' . ....~~J7I~~.~f.':~" I......n:. . . ,:y,,",," <,.,;0.;. ! . '!<Y".;~..:J..:'~M. 5t'~" ;,..' ~.l;;.~%~';";;'".:u., . ~".:..:::"''''''''"" ':".':~'''' .:' _..,,::'....'.' ".~,,' ":.~$',, " ", .' ..' ~.,.~"N., . ,"'''' VI>N ..""" -.-...... .- ,~, f . .. .. . ." .., ., ..... ..... .. .....,.'" ~... ~.!: r ....... __...,"" .,',. ..., <~ v'.~ .....-' . :;.:.".."....,,:.....;.;. .._....::...;..-....E:.Y-~ -""::h'J.. " ,---'...,.......''....'' ..- ~r...~ c;lVT 4' -~. . 1,,,;,: 1 t :Mf':. ~Tr. 1'\. ~ . 1 1t~ t~ " .. - ~- " {;._ ...nc...'~ . "". ~t" . \' . .. . "'1'40 ~ I. - r-' -." ""."'.0,,,:;.,,-, . __. .:~..., """ 0 .~' "", ." "".. ,<, ,..... .. "p" <:: .' . -- .,....:..~"':,. > ,?,,.. ';'::;l-{~~~'! <,......" : r:", .~ :/,,>,8.>"/" 'f;'~ \.Q"(I'W......,'''~....." '..":.: .J t' . '~..." ,'. ,.' )0 ....,. .~--- "\(J "'t.",,~. I ..2/.....,,"" ~f.'>,..1 ..... . St'" ..."I....,,-a.>U'.A$>.'.<I.! ....,.:...~-r.;;;--------<4-::+- .= ;;.,r;,.",w I"..... ::l""",,, { i:t~~ ..", "'~'!t'.<: ........ ~ . It" I : ~~~ ,.. ," \ 'J.. t ~'w ;".0( 'i"y' Jl'JdtJp I (1: I"" (~2) .-; / ,.':: <!" ~ ,.>"'" ~. veN\,: '\ -::.~;::.,~ :-~\. "1') 'I' :., / .~.-O, l! .... '~-l"t~" rt;) ,. ,,\ ~ It""x::;. . \. ''''.. I; .. ,/" nr;:;w"" Y;'lo'.ll,. H.. .'",... "<"'W' J ""~"', -~ J- ::;""'~"'""'''''''''''''''''''''''''''''i...t,..ftbl.,~ ,,' (7...,."'....,-." \.S.::::;:.::.:.,.. ".f I:;'.'::;':..'::'::':'::+:::"':;'~':;;""'=~Y .,;.... ...=-:/_"~,.v",,,,' '" \ ~_.----, 1 r '-7'," 'N; C" : ~ '~,(~~~'i I . .;. :' .~ '. . ":'h...!"""ll'~ .~-'..., . '. .. _".." . , "......_~ I ....~~,.i .'!\.. _"0\ . ., ~."f'iI...,. ~r'1,,"'l .~. "Ho; .".. tJll!',~ ;' 'I'" ... ff.:.~'"rrf; "":,1 . G?N'1'\~\~'V~~ \ ~ ~,I,of :!l'~~~'~~~ .,~~' - .~.....~. :-................- .",.,~ ...... / , / / .f .' )/./' ! .' / ... .f' ./ Ii f :; I '1 ! i \ ~! \ " \ '\ '\ \ :' \ '\, \ '. \ \\ '" "':'\" '\~~ . .>",....~ /' ~ ,I"" ." '" / ..," .. ..:7"'..~:z.~~-::~" --. .-. -- -=:;;:;;>. ..'. . '''i'".,~ ~"""....-. ,.._"""-,,, . I ('fYP\~'~) . ...~"'...."..~..... {, ~ /,~.. "-;;:r ~~\ .. .:~:."7;'!(t;.:......./j( "(~~ ~., I. PJ..~ ~1'v6' At-""NP)<:I~6r. ..(J(:J\TO.Y OP c::.::.~Lfo!'C"IOf"",.lr '1t) ~N" - "l!!f.,.... /'" ~Ko . ~. o'~"~.r~~ . ~;!. J;!'9!f,.='_^i9:d. ,. I ,.:7-:' ";'~-:':. ' e' ,', ..' f / / ./ / ,'~~ (~f't!. I ~" tp~rt:r ,...)tt~~ ,/~F'L' ! ... ,I <>/~. ~\ '\ ,"\ , \\...... " , , . \" "'\, .,<",- ... .... / "":;""-"rl>." ~~e~i~.. C. b-I'-l L.CE'..ol"H <>- ~. II..( ...~'~ t"..,..'" '$."e-t:....e; .e'l~1 _c,...."'-l ~N'1P$ INCJ(:;l'o..,~' ~ ~.~c:. fI'I~ .....'i7'J~ 0.' :...'>0 N 'TfoI"~ nlCl!. d ~"I.""'~."/n""'''~ ..1lSoUe."j ~.c'W ~,.do~... .,. ~M~"n::I"'~~tj "'K~ ~Yof""o'lltO"'~ i$7Vf:t ~:""l1' "", ,1r'~VC ""A.:....~O~ GfiOUND LEVeL PL UM13ING I"'LAI::L J.....,.C) [..............-n.~~.~1 : "..,..-n';.n'~ hi ;'Io"t~(:, ,......, ..\ , Iii ".,'r..".l.... '.:~" <~.;.~~,'..~'t.. .', .... .....,,-...:.. ":: ~:l:~~~ l,~.~ ~~;~,,:;. ~~'~~~~i: ; ~'1 ::c,'''''l~r<.~"l'~ .: : :.t,'.",I'I." 't.\' ... ~~I(tefi.'~'" '.~J""hl,:<o !ltC:Wl~tt:AL a"Ql,INOl,.IVI!L PlU,.SIHG P....AN ~:f~ '. ~:.+~:\~It_. ~:~~.~~L~~r:.;~;;.;.. ..~.....: ~: ,. * ,~ ~, ~ ~ " i: i ~ ~ ~ ~ ~ ~ -: ~ ~ , ~ ~ ~ ~ ~ l- ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 1 ! ~ , ~ ; i I ! ~ . , ! , , i I ; ~ l , , ~ p II .. . . .. " :, ~. t. ~.. ~~ ,~-, \~:::;:f >r,,--::~. :;_ o;;r ;(l';~"l::--.. to:" -- . ~:~:::;;~3 , ,,,.. ...~. ~._.............._..................--_........_~_. ~......, . . . .. . . . . "I . . . . . . .. . , 0> , .. .' . . __~~ ,._-L._,.. -~_..- 1---. , . '~"--""""-~------"'''''----- " ('''1. '... ) (1~ \~r I NQ.I>)"1. ~~~':~ (fe.\ \ ~. ., :: :-~ ~~~~:':I1.\\.. --, '~'.'-; . ..d :~. .'." ',' . I .\. .'...... _'~".~~...~-."'';f' :',,' ::,::'~~~hJL~~~i;:iL~:;.:.~::. .-i@ ; :. ,- .~' "ttmt 10 U"T()YI'A~M'^Tfl't 1 I l ':',., ,,' WTv.'\"\ ~ ." . ~ ''''''''''fl ...... /. . 'I' .. .... .:L-....: tI' r~ \ '\ ~ .\:.~! ~~~.:M)TE'" ,'.. I:~'~~I"'''" .: ,.),,'" "'!:J;:tTI"~~:(""": :" ;-;;';;..IW. (::~~)'\ / ....'J' .,.J...:~?,j . ".' ft3 l ll~j:~.i~..:t.~.. W~f{f;-cliiYfA1w:~ l'~~\ ~\ll ,.' Ilt"~(\ ~ '., .,.~! n ~ ~ ,,' " ~j"!i,!'.."t"""""" 1'11' .,,~,~.' .... " .. ,,' S ", .m,., ~- ':':'E1~",,:"il. ~t~": : :.,/ '..''''11) / "'"'n ~:~.-;\.,~ ~~.... I. .i~~1i ~"?;'.. r~~'''''''''';''it;;;;'.;;,1:::'''''''<'\':'''''''' :..:....:7:-:..f,':..:~:.:::.. ::c~':.< ." .... -'. : i ''';' . ..l j.}.....,. '^"..... ~., 1 \' . '". ...... " . , .' , ..~... t-tGff.1 "<,'~~' , l'\l'3.!J >~ ! H "'" 1/;rW> ..... fol.('.....re;::I/f'NPO "'~~'''''C..'"~V~" ''0", I' '0 0 h \';;.;'::;'..w. 1!l;tj"&.O!I\l!i<~~ .' ;w~..."".."..."'_."". ~ t--"" ~~.f......:" 'I' ~..... II L'" ~...~. .,~ I / ir'^,," m:tiNOT{lOl) ~ ". 1 P1\qvtt:.c~EvV"'WqGPOOfofl",,~R;P.'anrOll-C'irAl'l~W1flTff'. ':'~:.:':'i I I"~"""-~"-'; I :. ;~; ",.Ot'r.1'l.~t:: ..... ;"~:J::~"" "I',ij'~~~;""'''. Hj .. :.,~. ,). C~.~T$Qc")ImINGJ,.~.:tr\f'l.rHf,OUlf"f~')I~W.d~e"'l.IPlf\!AM'}III'!TtNG.t4ItI;.Ot,) . ~ ....,~.I, t (~ii' : ~ . (' ~~~~.~~"lMl'Uc:-t:) / ffOTPOl"(W:..t~ '" : i" I r l "- """ "/ ,': " ",,""'" ." I, ~cm ( 1~~~1l " "'''''^,ll'Ql."""",'''''e''''''''''"'''.H''''Y''''~ 1..I.0""",'.C<lt<'F.I:IUHO..''''''''''''''''-. ,1 J t \. .." ........ ~~.." ..- ,..... ../....--......'" I , I" ,. tQo'<NP.r..."""C"S<JCIIO......~O"l""""'!_""""""..IO"O"''''''_'.''''''''t.''''''''''n''''''....'' ~~~. !"1-J. I:"',:.:.;" ..... .1 ....;.~\~:.;.;.::~."<....,,,.S;J. i..lNO'~\3 i .L-:.:~~,~,.t. ~"M.,.""."DL'....._.........,.."""" --"1":''''-'' r. r IV, 21 C'i....~ ~"'w :, . ,I .!'~ '..... ,,' .. . .' T. "'x.neTOtiXt$1'lttnftl)P"'Ot....~'illJ.~~fI'UU)oll:l. t, j',. I! 4ftl~) \"q ~'l:'l ~.. !i'viiQJ /N\/1J1:flCAl.' ....._l;~.\oiit ~L '.... ,*IiO.t . '... r .. '. .' ~Tf, :sm:.M1SL . ....~i" l t \of.......... 1~~lO-i;tr \ '.r. '9 r$"\~ j'&"CS /; ,d. F I: I I '. \1 ~ji...~"1Q) · ~=~:~:OM$L04"fI(\t~"TflR...It.(....1!mO.C".iN cut1r.tr$l.or~Tn,.Cf'I'IJ>F.W1't.&.'41(:lNf..flt.Oi\ .s CQt{.. .. '\..""'.1 I ~ ... ....~(. "';j;- ,~~J......,. ., t ,,__-.- J..... \ On' ' ?\. stif'4QTt:e ~~. T. [...., .. ,I\l1o'" ,- l,,~,J .,.)........ 1.Jl.l', . ',._..,or""'-'~Il .', · "~K...W..'''..,.,.~.._." I I -:';" .r ~ . '. . ~ -- ,.J _ FV130-M.....\'I'. "'1:1'" I ' ,.'~. T!'''~!,,;.,.'''''''.' .....1!ll;l$n:<<lffOl'PQl..~A . '''''''''''T ~" '-- .,....... ...-.....-1--1..- __'. / ,.'~tl~.~:Ati...,_... l~~ \{~ ___.O_':=:N.~l~ '........~T 1'/: r' .~~:' , ~.[~tlt.uiJj; ~1 , IU.ROV'f.lU7'I-'OTat-'OL.'t'MEXIli.II;.C(K.l'i~,,~ct>~P.ft'WIIS.("(,-iQYlot."LlyA(.~GNJLJrvrJItlGTOt'"MCI1 r.. . _I- I- I' l..,........... .". ..-..... .1,10'"\''' 1~4" . t '.. .....-........... !jvVjC~ ",."'.llQlW.,,"""~""'''''''\ ._-/ - - fl - -'! .. ":,- -;.;;..;;.,.;;,,-~ ,>. (rv"'i-'~~" :', ... l ,-il:!;-'.-'--"1 11 ...CVl'."AOOl"'A.......v,..'...n..' "''''''....'''''''0'''''......''''''''''', ~,~J>I>,.~,rou I .~.. ...:.\ ....!~'!2... ----~ f~ \ ',>-. ~', :i'" ,;' OI'"'"""""""'J"''' CON;;;;"~ 1"-' ")~ _.~.1 ,-, . _'M.'." -. ...\li,.... III:\\ll~.1l1.;1. ry >> .. ~ I ~ 1-'/I,I",.,."J~ ~ l~"tf(Ntl)f,l"Moc;ll!!1"f\Jr"..-v:wn,M.,.S$"tNlt'Pt..u...WOtfme'lICNNiO~5Q1IIrHQl..~31"OOL$otf'I<rCIITWM ., ,,_ 0 It -~: 1 #._.'. I ~.. "#_ /' . ;m, 1'~Wk~l7t"40'i' ..._l!;tJ9'fP\XVLtEA 'f'ViHf"(.."01At.P~E$WA.EtAA..,.t ~^ _, "..j" .... --/""f'/:" t ," .!.t! ,',.~-_."",,,,, ""',,'''''','. (roLk... ~,: I "-":U"'-":=L";;;;;;-';';;-;.:;:;'''''''' .....a..r<<l.... '7 .: . i'T ,,, ...:,'-Ii?,...-' ,/ "; : l~~~?"r~l] '~.l'O\I" t \(1""" ."'""'"'''''"''"''''''''.''''.."'''''''''....''0'.........,'''''''''''.--..... ~~ ...~:. '1th"'; i:"'~ . ."V"'O COM'''''''''''".:. I.. '............."r~".."~ '" i .,;>'". ..._...O.2l'Q1.:<1o'l!".......'''''''''^>1.H'O><O'..''I;.....''l<UIl\lUl'''''..,."....HO"'''f<ll''"'"'".O..-. ., )"'ym....~"f ,n ,./....r".. L "i6-)6 FORCE.~uoe:. " ft: ~, - $tWlJl.AIXlbR '>-< 'i\I.!!;'.!:;:::'~ .,tl. _ -1""'.'''''''.'''' '. ..,' .........ll$tQHI.NI f ~I \ ,........."""""""Oc.,.,.....""",...""....Y...._".~"',...J....Owu""""'''''''''''''."LOW''''''''''''.. (t.", :. ~".'. '," "."..~~~""~..~.. ... ,. C'N""''''''' .- ..,...wcO>,CQ!lC!ll!1ll.00;.....,PLOO'''''.....CQtICl<l!'If.....O.....,...,....'''....... ~T"~ ~~ :G\.:~.:~~;;.~f~::\~~:~=:........ J \'7-':~-~' ',.~"a~~~~~=~jF~~~.=~~~ri,~~ \ . rH.lt'Cl1ONtt~) '.~ ,. ROlW S'i(~~~'1' \L ~'.PlWVIJ&m.....fift~ONPlE~r~C'~4'~10$UCT~r..e~"'1A"'. P'OI..y~ 6...')\ \..."m1 1.f"O{N01~iQIMi)~~' M<<H' ::cc~ 't.I~l" (ClI$OONIiE.e,~r;/oPl il to,il '9,~~6:0~~'"QWA'~nro\:K1SIllHGTflO PRl;W'ttl~GI.~~vu.~"M4L.ll.l'iI.lWJ w.L.VF-IoIlP y",-~.~Te" j;J ro. fAI.e POIltU# DUI'lItiG1<QN:J.t1iOCrlOH~.il\~ Bl=t::"'~ i, "\' E!.eI~ ""''IIt'.1r 2'1.ROU. W'(f1'\lnHQ~. 2;l:,ROUlE 1'J;"~"!Q ..&.i'll . ;0:1. ~OI=tpQSJoIAU. ~"("OWFOft)l)ot .W~PPWGj:'~MCll~l 1'''' pt,l~:sl:Atw.....Ft~\),"'.t'''Io((l~D R~l"hA$IoIUUP.ANUii::1Ot 16 f''''O,",'1:4. r4F.~;r VU<<l. ritl,'M"'""'; I'o'-0Il* 3~!tlr:s.a.a . ~ :; ~ .' :~ ~ " :- " .' S " , .' ,> ~ 1 ~ j 1 :J X g I i % U ~ '" g I!. I.: ... '" ~ t!l ~ a: 1IJ ~ ~ .~_~.._......................."'~......"'~....."'........~.w..~. ~~'\"'.~"I.''''.'~.''''''.''''''''''''''';' ~~"=~.~"~ . . . Page 1 of2 Ned Lever From: Brady.Fuller@CH2M.com Sent: Wednesday, August 27, 2008 10:44 AM To: Ned Lever Cc: Melissa.Wu@CH2M.com Subject: FW: Bremerton - NO.2 water line sketch Attachments: Document.pdf Ned Please see attached sketch of the proposed new 3" No.2 water pipeline. We are not aware of any pipe material limitations in the gas handling or boiler room so SCH 80 PVC is acceptable. They need to provide pipe supports of course. This needs to tie into the new OS pipeline through the 3" V300, FV46224, 3"V608, and 3"V130. The V300 is just an isolation valve which could go anywhere on the new 3" No.2 water line since the location near the tie-in appears congested. I also suggest that we add an isolation valve back near the new 31X3" tee. The V300 is a bronze valve which has threaded ends..not suitable for use with PVC pipe. We could use a 3" PVC ball valve in lieu of the V300. Here is a spec for that 3" PVC ball valve, although we would normally use a diaphragm valve or butterfly valve on PVC piping larger tt:lan 2". V331 PVC Ball Valve 3 Inches and 4 Inches: a. Rated 150 psi at 73 degrees F, with ASTM D1784 Type I, Grade 1 PVC full port body,'Teflon seat, Viton O-ring stem, face and carrier seals, end entry design with dual union, solvent-weld socket ends, or single union ball valve with flanged ends drilled to ASME 816.1. b. Manufacturers and Products: 1) Nibco; Chemtrol Tru-Bloc. 2) ASAHIIAmerica; Type 21. 8/27/2008 . . . --""'2"' 1( !Jf'> 4- ! z' , '>N_.. /"' "'0 "'" '.. J~" ON 70 3"V t7N~",' / '/L;,AV=tWH-e~o~ c..tJT:, .--~,. ""4.~1:.POt''''''.4-;,oDf~ i I '-; ('/~~~.s ~t 5 rt T: ;l:: r O!!'JCf..J,A~~ fO t-J!::J . ,. i<~:::::::~~~~~>,~:~ ~:~~-:~:;~i\ !/~;;, =-::;;i";.C ~c,~~~~:~:~~~< ///" - ,< -,;./ ,,/ c~ .A60~€~ '''-... .-->.:,., ~~ '-Hflt.-/'l <:l r;", €I: )~. -DN ;If, '/;>}./ro 1 .' ",",," /' /,-- "'/IV''!3H....O {.""..D ..~- "\', "'tx.:2- ~ 1 - ,"" , .!$. H!;> 1 E.c'r /;:.l v"- - 2 .,., S ~'~."."" ?'o,/~/,./~ '..... .,,~kr~, , . :1': ,~..~'- - /'~~..j ">... '" o.j ... . , , 'fr....o... --- -. - -- '" I:- ('0 <::0--+--1 ~ :s < /',r' ' - 2'I(O~";"'" -!.t.."'." 'r"./' co ~o'tF--J.O\'" 1{'1."~tj'\~?~t" 0...., ,/ //~/ e" v'~;), ~ 4~ = ~" . ..~~H~8~' ,( ~%" ;; (~6^e'tS ~ //-~~ :,~: l! '. \ 1 '0' CON' . ,-. ,,'c"TO \. J. !.Owe;<- CF.W," ,./ / ,,' r;;rii;fC:~~\\~~~:~'::::: c' '1:) ;~.o _~~~"-_. --:.-':_".. _:'\ P- _ --r^' vi l$~-__: _~,-i~4:~" v ~:' .or') f / \ ~ ?"'v nN 1. . .~I !I / '. \ {GE" . 1,1 i \ ': 'NCI'~'Z1 , / 1 ~ I f -(1- ;\ \ , 1 \ \ / : 1[' \\\.. il! '\ \ / ! ." "D: ".....,3.;VDN fI"f"ON TO \ '\ \ / t:"~, (~1)' .~. I ~.OIV ;0 LO'w'\oe!. t..eVEL- \ \. \ / i.:-,~/^.!L"X,,,, p .:.:.:::.=::::::..:L-I-<=;:------~;--::~.~::';::~~~. -- ", ..~ i=\ -.~ \ / /: I J "4"V~ TO ~_J\ '. \ "\\ /,' \~: 4"VT~ ~~- ", \\ \\\, /~>/' L.-- ,'- A' V~'/FT "'J~~b.~MA'f:O!!. :; ~ !Jr' -. __ """ --< \'\,"" ___ '\... '- ,,~ I' ,: r:; ,.I..H'" m ~"RO ~e \. '\.. ~--~ejt:.. \. """ :x ! ! l , "'c:MJ70 / "" .../ / ,.- /' ".; ~~ ON! SAI(!;iloJe / r UP 1'0 " '... " AJ6evorHeJt!:"5 ~~+~..... .~~ /' ~/ " >'''''''', , I (TY-"'OF.')'" " ,"/avro~r:.,,^-"6r-e) I z-,..c> ">(,! see'5I-JA-ZS/ "- ~.. "\" ''-, ./ ,.,.('/ INVTEL f~ H~:c_..'-'1'~.-4-'-4' U>-J~,~"'\.' / t M~UP co Z"?'o"c(rYp) f- ...;... ~~4urOFPl--;....!"'vel\ '''-~ ~ /'<.,::J 1"".4"---' --- ..'o-ll~-o-L~~l:"L--i.;',;. ..!.!'...!-o-II =-"r--+.1'b-;o-#'~ co ,>/~' ,~~ ~.%'J;.g;;,t.:,~~) '''-k ~ .-/' -:7 I . '_D-Y--Z.il<.... -:t ',~ ~~: Z HO . "'':>0 ......."-_ /' /; "".;. , ______ / '" OOF , /' . .....----.--~~---- ---- --.........'.101 '., '''''''~ .___ , I ,'f .......~, _ ~..""~... r-l.../...J50.ea' ~ ......iNY7S_ \, ._l..~rr ,-:' "._ '. _ "~::::._ ..__..;~.~/ '/ .'-"""- ------ ~ I"O'-CCWT . z'" u-", I I ISI,n' t_"-~~''"~-~t' --,%I, ~(f'--'''-'/ "" '-'''<0',__ ..' / ';'I""'~ ~- rc==-~' ""-"SHA-Z"I "'''''',,/, l ~ ".' ""--, "Yo ' . ~"vvpro ~'"",~",.......,,: /~.c..rrp/;<Z)2' '--'~-,~''''-,-------- .' :: t ~~ " ,/ ,~:;~~~':;-." ~~i~ ': , ..< / f :~_;:~;:"I NO.t~~-----~ ,..'-"_.~~ Ii l /-0,/ '. I ..' :'" ",~,,",,',,~, ,:..., ~ X J::r---s,,,,,, \ ...".......:::~.~ I,' ,~~ : l ~-(::;;c:.------<- :.t=--;;.o,,! (, \ : i ~ ''!.>~'ro~?(~ NOTES \ ......,.....:-......, , I I - . _ \ \ ,~ '5IMILA--;iitTi5 I, ~'W~;:;;:Ni"":'"::;''z;,,'r'~~ .~;;iJ or CONNECnON"~ .' LJ::::,,4~_-i,\ ~ ___~..~-t..", ,_",.,.-:!:: ". ---';~l-" .'~. .bd ~j j P.;,;! ",,,~eem= NO' "~"/,/#.~~'bg:7:;E 'N ,.v~ 1"1,-" s.e"v" ""TWeeN ~l'/.g,;;,"{,T "", ; 't---.\,,\'~~_:=.-~1-,'~,;~L:~:::':,';,~:, '~: 11" :i '''-1 J;;' GRDU' 'D L E' 'CL F(,'ISfleo aNO --'''- ._~_.. -.------....',::., "",J,. ".,,, ""... - CONNg:;:; 6,"/~ actx:J/tOIN/'fTE:. P;ptN3 W!TH G~ CO TN T...lIG ..........eA. IV, Vi- T., '4"$0 ~"'~'\'''''''''''''' ,,' ..,,~._,~.\;S-:;,r.4.N.G. ...... 4 M::>uvr wlJ.e("",."", """"re.e; eE<,ow ,-",,,,-,r.;-.,' PLUMBING PLAN t Nvn"''''':> ,---. ", \,,'(\-n~-"'3 x3 '~~~b,IT~=.,..,..-rs eo YWQ7eeM5T~tjs:O kl4(.ve J:!JY'Crn-feIeS ~'../.o '$"ee'SHA-e3 .:..( "'., --rE; t;.AJ01'eS "" ToiAL Le.N6In+ AP~, 1:;a,SI ~~ .:':':A~'Y' "N'tDN ~-I\'CtI ~"ooN,,; 2, '\%1l!L.D ~cj\ft"E- 1"0 : /---~\.~r:~~~~~~4 !:r , -:,,::~q~..! P:~~~Tff:f-.__~P~L ~ "- II . OiGeSTE~ NO, Z' -: * i t ,,~.-", ._;_,_~____ j ~o' ~-~~iTO ).11(,-...... t....-' rf,.fO __ : 4" : . f I \ ~_'..., ..i 2'-t~\I' . CH2:"j ::1,111 ;~iur.o ?-6p'''!Ijorii';;(~ -- -~.^ -- ..~. '--~r.v;:;t"7' "--n",,, C~~~'~g~~~~~~~~~l~~~~l:~.~;~~~"~J ;;1,',1 (':<. a;~E'.'E:RT{.'N W;,f,..,lt ,;:; G'. P:=I'...~f>.'( TAE:;.';ll-iYtr f>~A~~ COt,Hv.c,r C' SC,,'C::t)Ul.f' A DI::iEtn:p COMP!..i::'<: MECHANICAL GROUND lEVEL PLUMBING PLAN ~" 1>28 ~<l ~ ~1! ~:~",,"1 r,' . .. .. II ... <- 'II I . . . I I . . I I I I c I I I I " 11 ',"" I . . (1'\ \.....J i:~ (~,> . " v'. ; v~,' ~ I ,;- N..?-!1:2""\ ( ro\. \ A . -" ,~~~~ .j.ll .. ),r. ~ _.. ",.".. . ./-.\ ,_. j ,~t t;: .~;..It:=-~l:.~;t' .~i~: j':~- :L=~:: - ~t@' .. ~< --i~;:~'~:OlE 1 NOIE 11 b . / ~61J') I . T'NAS " '\ . " ~ _ ~P2 " ." ::-\"" .U' W!A.~E!L_._.S'"" .....~. PUM?l -".< - - --:1;lo..:~]t~'I, '[./ ~:;:~E~;;;~N rYP "W:~",~,. " !'! ~ '"' ., / O~~ Fr~' , '. ... '--"';:>)1 ~/t~f\~,,,~ ,~&~""" '""02 -ce.__.. '1" ,,, !~; " .. ""1"; "II \. ~OTE2' .- ....- . "', :, ,.. ", -. "'00 " ... -" ,'---''" j ':"'~.. r~_'__"1 ,",,' -~c ":" --,-&.. ,-- "", L_,___~-, _,:~:::::::, "<" , ",..~, 'y '- .)" '-~.._" I "".-'~ I ' - 1 _:~,?" (I) ""'::::, '''/S~= / '~~~:-:: ~" ': I I ~NOTE20" 1 ' "1";'" h __~< . '- "'__"~~ : ;"':;1 '-, . \~f -_.~"!:: =~'=':'~~:: I,'; , / '''" ". \ '\ l=~;",_ ,.,,, , ',- -----., n ~- Ill", ".._ ..'--~~, " " ___f_ - - r~ ,. "_ _= , ., ... , Y-' ::;"''''''- . _. "'..., NlRAS'ON ., l"f..~ - -. u~ , r,'rv\ 1 ~.,I'/"'JM8 rO"CS I ~~:,iL ~OTE sIi ["." I /', !iiwo',"ocr'FP.:!'!1J, . t""Q4J)"Q!l....__ -,- ,~ : """'.J""~"~ (' --'u~'-'n- '"" ~I 1'<;' '"'~~_;,. . " ... , ;'i' I" -- "".'-'" " " ...... ! I r...-,:: T'i'l" ',- -i=1jI---l--;;s ~;'TEO. ", 11, I' Q ~ r . .,~~. -",'::::'.0'_ n -1: · :: ~I ,", 1 - ~'" 1 '--;,." 'l: ,U> I . . __'" ".rn.",,~.," .=~'rn' ,~~" 1-"",", ,,="Ii' " -l,.,".e.,...., \, J 'I' 'It~, . y. :[m"I}.'~~= l:..r/ FEED Pu"P 1,;;;-;, a A1~5 T: h I 'V',H'-, "-"!'".::=-_:..:.-\.,~\ \',', ..l@]",.._." . /Y"o";;;'?~Jl.', lWWO<6oonPillJ - ~, - C'_" '~;'";::,;;,-~\,~.:v'E' \ ',',' '. .1'" '";;;.-"'/_" ""', r----:~;:r:.::t.;-l 1I '" :..-.,- --=ffi.,= ~1. ," ~'. "",,_",--, ., ' .- "'t---Je -'=-",-, -"~~ .'..." t:,::, ! ----~"'....'....14:5' .=/ ", -'"---,,., ------1.n~../" ~___ \ >-< SEE9;~~~~~ i--- ~"--:::--_.:-;-,;.;.,~._~ __00" __ . C"..._ \, f " CON, , L ' , ,,'" , ._ _ ~'.. '''''', . Y l"'" '-,'., ~ ~ ~,:'Eb)t /",::."", ':~;::;"~:'\'r'cc . )'. I~ .." ..Ln .. .... "-r '. _.n.... - I \L ~~j;~:-,".v ~-,~cI\- ""'-';;;" \':"'''':':'r , NOTE22~><!j_ ..-. 'C7'\- \ \'(XIST"i':;~~MER tS~E ROOM.SEES <8J!l\ SEE NOTE" ~' / I '-, \ \ '~CT1ON RING) slti. M.()!l7 m ~ J r_ \ N ~_'" "' " Vl30- ,r-;", \ '-EX!ST'" P~dTA"O CAP) ,J,. POlYMER ~- {DISCONN ~~~C~I~X f~~3 VALVE. NOTE ~~--- .~~ _,r>:':\' : ' ~ t,: t :,(,,-. AND PLAN 1'W-;""i::cr-_'_"_H- . I ., ________1 .I !~Qn:_~. 1, ReTAIN E"X::)TINGB~lenlr:R.. 2, PROV;D~ NEVJ S-WAS SPOOI.S AS RFQ'O TO INSfAU. NEW 6"TI~E J. CONNECT TO EXISTING.;- NO 7.. FlE'.l,n ROUTE AND PP,OVlOE At I PIf>!;; AND FITTI~JO AS H~O'D. .t, INSTAll. POL YMr.n INJCCl ION HINO ANt) MIX VALVE. FIU.CRoun: CON~f,:CnON TO EXISTl~G Z' POL b. CONNECT POL YMI:.R S(JC1ION AND OlSCt1ARGE PIPING FSY FIELD ROUftNG AND cm:Nr.cnNG PER DWG P..QOl. 6. ROUfF 3" NO.2 TO f:XISTINC 'I- os pr':'OVIOE fEE 7, ROUTE TO EXISIINGROl POLYMlll-t1 LLOPUMI-'S. a. ROUlE 6. CS FROM SLOP DIVFRTFR VALVE TO fJ" CFN CUl1Z :.:6" Sl or Uf rOPOFI)tPFV\/1nissrCOVERf'OR VIF.WING SLOP. 9 ROUTE 6- WAS TO EXISTING ,,- W/IS, 10. ROUTf' 1 112" PO TO POLYMER INJECnON HINGS ON m 6" WIIS, PnO\lIOE AlL VN.. VfS A~JO TUBING TO tJlAKE fUNCTIONAl. SEE SECTION ~ -46 25 11 PHOVIDt;. SAUOlC TAP, 3/4- v307, AND SST t~IPf'LeS & CAP TO ACT AS PRI""t~jG PORT, II PHOVIOE SAOOlE TAP, 3/1\- V301, ANO ssr NIPPLES & CAP ON SUCllON Arm DISCI lARGE SPOOLS OF FAClI 1WAS PUMP (4 'TO'rAL PRESSURE TAPS) 13. ROUTE 1 11T NO, 2 TO HYDRAULIC BACKDRIVl:, PROVIDE ALL FlrnNG$. AND MAKE UP PIPING PER p..003. 1,1. ROUTE NO.2 POLYMER DILUTION WA'TEf{ TO HOTM1ETER AND SOLENOID [,ND THEN ON TO POLYMER rEED PIPING FOR CENTRIFUGE. 15. MANUFACTURER TO CONfiRM CENTER OF GRAVITY FOR CENTRlrUGE BOWL, lOCATE DIRECTI.V BE::LOW MOt~ORAll t6. ~AWCU1 CONCRETE. REPLACE flOOR SLAB CONCRETE AND INSTALL NEW Rf:'8AR 17. SEaUENCING CONSTRAINTS APPLY TO DEMO WORK. SEE SECnOtl 0' 31 13. CCOROltlATION WITH OVERSI7.f;D EQUIPMENT, TANKS AND TEMPORARY FACrLl nES SHALL BE COORDINATED BY CON TRACTOR '.filTH THE BUILDING 'ENCLOSURES (eon~ EXISTING AND NE'N) TO AVOID CONFLICTS. 18 PROVIDE TRANSITlON PIECF CONNECTING 4" PIPE TO SUcnONIDlSClfARGE Of PUMP. 19 ROUTE ,~ NO.2 FLUSHING WATER TO EXISTING 2- PO PROViDE GLOBE VAlVE, ROl MlE TER. Bf,l ( VALVE AND SOLI;NOID PER P..Q04. 20. rr.::'e FOR USE DURING CONSTRUC1l0N NtASE. SEe M.oo5. 21, ROI.t WYE', FITTING ItS REQ'D. 22.ROIJTE 1/2" AS fQ~). '-.--' :i':\ BASIS m. i.lIO SHALL A.1I ow FOR 311 Of 318" AS PlPlNG rOR EACH PANel 2~, PROVIDe&Al WATER ASSI-'MUl Y '>I::.H ~ FOR lWA5 PUMf:' I ANU ~ EACH. ~ ____._.-11$ '" ~ .. ~ ~ ~ ffi ~ II '0 ~;; I~ ~I !~ ~! iil~1 i! h Q 1J: I~~ W!f; ~~ .15 I~l ~; 0, ~: > I~i o ci C) !;l; zlzl8 Ii " :a ~: ~ ~ ~i ~ ~ ~~ ~ ~ ~! ~" ~. .... 0. l'2. !U:,) ~ '" UP TO WASH'J'JATER - -- r r Ht=ABER ---"-7~-...~~ I : (PRV\_ / '1 : J (;v" 4~,'Z~2' \;1 //.-...tl-. 4,Gl~2 0' L '" . (PI \ ..om., .", \ .......-,--..1 """ .....'--"'" ..... .1 .-~! ' ' ./ __~~f2=J__ ._ -1-,-,.--[-"1 Sf0 . WIW ~!;( L10 ..J ..J :c ~ N :c U z 5 n. w Cl ::> LL ii:: I- Z w Ll Cl z ii:: w !;: ?!: w o ~ ~ ~ " VERl~"Y SCALf ,A/i':iO'IIC.flCIol.,1f ...'l(JG\........Ool(l','N'......, 0_1- OA~-'---:iAN 7003 PROi"-----mn; DwO M..OO. siiEi~T---'_..---V l'1ot r.;<m. CI:f ,J;ln.2008 Pl,,\'fjm(': lO,54al1l 1'3 PROVIDe NEW 3" V130. filen;trr<< U OC1 32'!J715,/MoQ e . . TRANSMITTAL PEASE & SONS, INC. P.O. BOX 44100 · Tacoma, Washington 98444-0100 10601 Waller Road East · (253) 531-7700 · Fax (253) 537-8113 Contractor Registration No. CC01-PE-AS-ES*302PO E-mail address:mail(a).oeaseandsons.com To: Bremerton WWTP Date: September 12, 2008 Contract #: Job Number: 8570 Job Name: BREMERTON WWTP Location: Bremerton, W A Attn: Ned Lever Q We are sending you D herewith D under separate cover, the following items: o Plans D Specifications D Proposal Request D Substitution Request D Shop Drawings D Samples D Field Authorization D Prevailing Wage D Copy of Letter DRFI o Other: CD ROM D SUBMITTAL # l >t:~,~ ."~ :'1 '.. ~ . . '.:. 1 9/12/08 CHANGE PROPOSAL: Added Water 3" Waterline P&S Issue #007 These are transmitted as checked below: I:2J For Approval D For Your Use D Resubmit D Approved as Submitted D Approved as Noted _Copies for Approval . D As Requested D For Correction D For Review and Comment Copy To: Signed: FILE, FIELD .J<<lU9la.Af .;J(,(p9l/ll(p'W., Project Expeditor ............--,- '.'_m. n. .........._..._..._....~_..-~...f ,. ....... ..............'.. BREMERTON wwtp 8570 Change Proposal - Lump Sum Basis Pease Piping - oeSCRIPTION: ADD ~.. WATER UNE!- weD #& PEASE ISSUE': 00 TCF/Pc CL 1# DO RFI: PCASE PIPING LABOR HOURS HOURLY RATE EST. cosr Plpa Filler Fo~man 8.0 $ 72.1f $ 576.84 Plp~ FItter 51.9 $ 68.28 $ 3,641.91 Plumber - $ 88.28 $ - $ . S . TOTAL - Pease PIping Labor 4,118.75 PEASE PIPING EQUIPMeNT HOURS HOURLY RATE! EST. COST Forklift $ :!A.54 $ - $ - Boom Truck $ 73.08 $ - Comprassor $ 14.36 $ . Weldll1Q Machine $ 10.34 $ - GenQrator I Light Plant $ 12.70 $ - Laser $ 11.65 $ . TOTAl. Pesse Piping ECJ.llpment $ MATERIAL AND MAJOR EQUIPMENT SUPPLieRS EST. cosr $ . $ - ,. $ - $ - e TOTAL. Malllrfal and Major Equipment Suppliers r~oo~o~ TOT At.. - Subcontractors $ Ii $ EST. COST GENERAL RELATED COSTS HOURS HOURLY RATE EST. COST Change Order processIng Fee lump Sum $ 75.00 $ - EsIimaUng $ 75.00 $ . As-Built Drawings 1 $ 55.00 $ - TOTAL - General Related Costs $ EST. COST $ 4,118.76 $ 617.81 $ 4,736.57 TIME EXTENSION AND RELATED COSTS I EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: TIME: E:XTENSlON REQUeSTE:D - CALENDAR DAYS: CPM ACTIVllY NUMBERS AFFECTED: EXTENOED FIELD OVERHEAD (rata perwoil< clay); VAlUE OF EXTENDED FJELD OVERHEAD $ . EXTENDED FIELD OVERHEAD@ 16% $ - 8UBl'OTAL S . PROFIT @ 10% $ . TOTAl.. . Time Exlenalon and Related Costs $ . TOTAL CHANGE ORDER REQUEST: $ 4,736.57 This coal proposal Is based on the cost elements Identified. Pease & Sons resB/Ves aD rights to addiUonal compensaUon and Ome extelIslon for worn elements ldenUlled, IJnless specifically negolated as part of this Change P(oposaI. Work will proceed In accordance willi the contract documents untJllhe OWner either provides writtan acceptance of !his change proposal or iii written dlrectlve to proem In a~ with this proposal Failure tJ accept !hIs proposal within the propos8111~ wUI rS$ullln co$t es~llltlon and possible addlliOllal delays. ' . PEASE & SONS GORDON PEASE - PROJECT MANAGER DATE SUBMITTED PROPOSAL VALIDTIL Page 1 ,.. ..~. r I . e BREMERTON wwtp 8570 Change Proposal - Lump Sum Basis DESCRIPTION: ADDED WATER 3" WATERLINE WORK AREA: COSTCOOE PEASEISSUEtl: 007 OwnerChng#OD5 OH 01030 OH 01031 01613 01624 01512 . 01515 01516 01617 01950 . 03310 02200 03310 15000 01060 RFI# PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager 2.0 $ 160.00 $ 300.00 Project Superintendent 4.0 $ 66.62 $ 266.49 Project Engineer 3.0 $ 95.00 $ 285.00 Carpenter Foreman 0.0 $ 81.68 $ " Carpenter 0.0 $ 68.35 $ - Laborer 0.0 $ 48.26 $ - Millwright 0.0 $ 58.70 $ - Piping Superintendent 0.0 $ 74.98 $ " Pipefttter 0.0 $ 68.28 $ - $ - TOTAL - Pease & Sons Labor 851.49 PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Fortlift o $ 24.54 $ - Crane o $ 172.72 $ - Boom Truck $ 73.08 $ - Job Truck - Pickup 4.0 $ 9.00 $ 36.00 Trash Truck $ 55.00 $ - Compressor $ 14.36 $ - Welding Machlne $ 10.34 $ " Generator I Ught Plant $ 12.70 $ - laser $ 11.55 $ - TOTAl- Pease & Sons E(julpment $ 36.00 MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST Concrete & Fonnlng $ - $ . $ - $ - $ " TOTAL. Malerlal and Major Equipment Suppliers $ SUBCONTRACTORS EST. COST PPI $ 4,736.57 $ - $ - ElecJr1cal Contractors $ A TOTAL -Subcontractors $ 4,736.57 Page 1 of 2 ..,/ 91111200B 10:37/W1 . . . BREMERTON wwtp 8570 Change Proposal - Lump Sum Basis DESCRIPTION: ADDED WATER 3" WATERLINE WORK AREA: COST CODE PEASE ISSUE #: RFI# Owner Chng #605 CONTINUED FROM PAGE 1 of 2 SUBTOTAL - DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 5,624.06 HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 15% $ 843.61 SUBTOTAL $ 6,467.66 PROAT @ 10% $ 646.77 SUBTOTAL. Direct Cosls $ 1,114.43 FINANCING COSTS EST. qOST Financing Of Change Order (3 months @ 1.5% compounded) $ - TOTAL - Direct Costs $ 7,114.43 " TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTNlTY NUMBERS AFFECTED: EXTENDED RELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ . HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.6% $ . SUBTOTAL $ - PROFIT @ 10% $ . TOTAL. Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 7,114.43 This cosl proposal Is based on the cost elements Iden6f1ad. Pease &. SOIlS reserves all rights 10 addiUonal compensallon and 6me extension for WOrl< elemenls Identlfled, unless sceclflC811v necollated as part or this Change Proposal Work will proceed in accordance with lI1e contracl documents until the OwJ1er ellher provides written acceptance of this change proposal or a wrillen directive to proceed In accordance with this proposal. Fafture 10 accept Ihls proposal witI:lln the proposal time may result In cost escalallon and possible additional delays. This change proposal must be Included all an attachment to Owner change order. NOTICE Is hereby provided that the Contractor reserves any and all rights to recover direct, Indirect, and consequenllal costs, including but nolllm/led to Ihe cost of delay and Impact related 10 any work cover by this change or olheEWise affected by this change unless the cost and/or lime have been speciflcally Included and negotlaled. 11-Sep.o8 DATE SUBMITTED 25-Sep-08 PROPOSAL VAliD UNTIL PEASE & SONS LARRY BOYD Page 2 of 2 9111/2008 10:37 I'M 9/11/2008 8:04 AM FILE: BREMERTOM WWTP UPGRADE ,......,..-. Pa01 Est bv JB Job Name WATERLINE CHANGES aid Date Labor Location Mab Total UnIt x MeA Count Item DescrlDtion Net -. -= . --= -- - ~- ~= ~~ 12.60 0.090 1.00 0.09 140 ft 3" SCH 80 PVC pipe 3.98 0.43 0.430 1.00 0.43 1 ea 3" X 3" SCH 80 PVC TEE 23.54 3.50 0.350 1.00 0.35 10 ea 3" SCH 80 PVC 90 14.03 2.04 0.340 1.00 0.34 6 ee 3" SCH 80 PVC COUPLING 18.75 33.30 1.110 1.00 1.11 30 ea 3" CLEVIS HANGERS W 2' OF ROD 14.85 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 tOo 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1,00 0.00 0.000 1.00 0.00 '0.000 1.00 ,. 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1,00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 I.GO 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.000 1.00 0;00 0.000 1.00 0.00 0.000 1.00 I 51.87 --- - -- - ._'T'O.. Totals This Sheet (;~7. 2 0 2'3 . ~.:r 14-0 .~o LI"l.~o f~.~.~ ~=~ l'27Q.o+ )(: 10/21/20082:14 PM FILE: BREMERTOM WWTP UPGRADE Est bv JB Pg 01 Job Name WATERLINE CHANGES Bid Date Labor Location Material Total Unit x MeA Count Item DescriDtion Net Total --- -- I=--;.. Jl -" - . .60 0.090 1.00 0.09 140 ft 3" SCH 80 PVC pipe 3.98 557.20 0.43 0.430 1.00 0.43 1 ea 3" X 3" SCH 80 PVC TEE 23.54. 23.54 3.50 0.350 1.00 0.35 10 ea 3" SCH 80 PVC 90 14.03 140.30 2.04 0.340 1.00 0.34 6 ea 3" SCH 80 PVC COUPLING 18.75 112.50 33.30 1.110 1.00 1.11 30 ea 3" CLEVIS HANGERS W 2' OF ROD 14.85 445.50 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 - .00 0.000 1.00 0.00 - 0.00 0.00 0.000 1.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 .00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 0.00 0.00 0.000 1.00 . 0.00 51.87 .. 1-0-. Totals This Sheet =::: ;:- 1,279.04 -. - CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Six .OJECT: WWTP Upgrade CONTRACTOR: Pease and Sons Page 1 Of 1 Project #: 5020 Date: September 8, 2008 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOllOWING CHANGE(S): Provide and install additional conduits and conductors in accordance with the response to RFI18 to provide 120V single phase and 208 V three phase power to the switchgear. ATTACHMENT(S): RFI No 18 Response If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: D ~ , Unit Price D D Contractor's Records Lump Sum Time & Materials Engineer's Records IOther: D Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 8,389.16 Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization: Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMENDED: fS~~ -- CONTRACTOR BY:~ U,I~AlWI By: ;./ 87 ~VtTL . ., , " ab, FORMS, Work Change Directive, 3-00 i-SREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 . COST CODE OH 01030 OH 01031 01513 01512 .24 ~073 01515 01516 01517 01950 . DESCRIPTION: Add 120V single phase and 208V 3 phase power to MV switch per RFI 018. WORK AREA: PEASE ISSUE #: 008 Owner Chng # WCD 006 RFI# 18 PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager 0.0 $ 150.00 $ . Project Superintendent 0.0 $ 66.62 $ - Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 61.68 $ - Carpenter 0.0 $ 58.35 $ - Laborer 0.0 $ 48.25 $ - Millwright 0.0 $ 58.70 $ $ - TOTAL - Pease & Sons Labor . PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift 0 $ 24.54 $ - Crane 0 $ 172.72 $ - Boom Truck $ 73.08 $. - Job Truck. Pickup 0.0 $ 9.00 $ - Trash Truck $ 55.00 $ - Compressor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator / Light Plant $ 12.70 $ - Laser $ 11.55 $ - TOTAL - Pease & Sons Equipment $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST $ - $ - $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ SUBCONTRACTORS EST. COST PSW Electric $ 7,379.63 $ - $ - $ - TOTAL - Subcontractors $ 7,379.63 Page 1 of 2 2/3/2009 12:44 PM "'-em:MERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 . DESCRIPTION: Add 120V single phase and 208V 3 phase power to MVswitch per RFI 018. WORK AREA: COST CODE PEASE ISSUE #: 008 Owner Chng # WCD 006 RFI# 18 CONTINUED FROM PAGE 1 of 2 SUBTOTAL - DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 7,379.63 BOND & INSURANCE 1.5% $ 110.69 SUBTOTAL $ 7,490.32 OVERHEAD & PROFIT 12% $ 898.84 TOTAL - Direct Costs $ 8,389.16 . TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 8,389.16 This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements identified, unless specificallv neaotiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time may result in cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. PEASE & SONS 03-Feb-09 DATE SUBMITTED 17-Feb-09 PROPOSAL VALID UNTIL Bryan Hillemann Project Mgr. . Page 2 of 2 2/3/2009 12:44 PM . REQUEST FOR INFORMATION Pease & Sons R.F.I. No.: 018 Project Name: Engineer: BREMERTON WWTP WET WEATHER FACILITIES UPGRADE Job No: 8570 CH2M HILL, INC. Contract No: Date: 09/03/08 Potential Cost I tern: ~ YES D NO Response Needed By: 09/04/08 Draw ing Sheet #: C-003,E-009 Spec #: 26.32 13.1- 2.13.P.l Issue: URGENT Grid Ref: Subject: Generator Power Conflicts Per the onsite schematics for the medium voltage switch gear, it is requiring (1) 208V / 3 phase circuit and (1) 120V circuit for control functions of the switch. There is a conflict with the power available from the generator enclosure. The existing system is 120 / 240- 480V single phase. There is not a conduit out to the switchgear from the generator enclosure panel listed for this power either. Please advise. . PSW ELECTRIC, INC. CONTRACTOR 9/8/2008 DATE MAUREEN MORROW PEASE & SONS, INC. ATTACHED SHEETS DYES REPLY: [g] NO LIST: Date: . Owner shall provide test power per spec 01 91 14 3.01.E.1. Rather than providing tem porary power, provide perm anent 208/120, 3-phase power for testing switchgear as follows: 1. Reference drawings C-003, E-009, and conduit [P10S]. 2. Revise [P10S] conductors from 3# 1,1# 1N,l#4G to 3#4,l#6G. Feed from 60A 3-pole 480V CB in Panel LAE in Adm inistration Bldg per NOTE 14 on DWG C-003. Note, additional conductors will be included in the new conduit part of this circuit, see below. 3. Provide NEMA 3R J-Box (6"x6"x4" min) on outside of genset enclosure adjacent to disconnect required by NOTE 9 on DWG C-003. 4. Revise NOTE 9, DWG C-003, to require 60A, 3-pole disconnect instead of 100A disconnect. Terminate the #4 conductors on the LINE side of the disconnect but use only two legs to feed the lSkVA single phase transformer inside genset enclosure. 5. Under Owner's electrician's direction, source 208/120V, 3-phase power from a 30A CB in Administration Building panel. Route 4#8,1#10G using existing . em pty conduit to H H. Continue the 208/120V conductors with the 480V [P10S] conductors to the ]-Box on the genset enclosure. 6. Provide a new 30A, NEMA 3R with isolated neutral, disconnect on the other side of the ]-Box from the 60A disconnect. Extend 208/120V conductors unsplice from ]-Box. 7. Provide a new 1" conduit from the genset enclosure to the switchgear for power. Include the 30A, 208/120V circuit from the new disconnect and a 20A, 120V circuit from the genset enclosure circuit breaker panel. Use # 10 conductors for both circuits. 8. The 120V circuit is needed for switchgear battery and control power. It should serve for 120V testing power also. Bill Badgeley 9-04-08 ARCHITECT I ENGINEER I OWNER DATE NOTE: This is not an authorization to proceed with work involving additional costs andl or time. Notification must be given in accordance with the Contract Documents if any response causes changes to the Contracted scope of work. . . . . . Bremerton WWTP Wet Weather Facilities Up~ade ;" weD #6 PSW Electric Breakdown Summary RFI ~o. weD Project Number: 165 PR No. General Contractor: PeBliIl And Sons, Inc. Scope: Added 208'120V Power to MV Switch 1. ELECTRICIAN LABOR COSTS 0.00 H a. journeyman electrician labor @ b Journeyman burden @ 64.46 . R--{ foreman electrician @ d. foreman burden @ 0.00 HR e. superintendent electrician @ f. superintendent burden @ SupervisIon g. direct supervision {HTE 15% of 1a-f} h. safety (HTE 3% of lines 1 a,D,c,d,e & f) I. Delivery truck and driver (SSO per hour) 2. MATERIALS COSTS a. material costs b: quote: c. quote: 3. EQUIPMENT COSTS a. owned equipment (per spec approved sourcel b. rental equipment (~r invoices attached) .. SMALL TOOLS a. smaUtools (HTE 0% of 1 a, c & e) 5. OVERHEAD a. NTE 10% portion of 1,2,3&4 6. ALLOWANCE FOR PROFIT (HTE 10% OF 1,2,3&4 ) 7. SUBCONTRACTORS a. Wllka Group, Inc. b. c. d. $39.84 52.00% $-43.82 49.00% $47.81 52. DO.'" DIRECT LAlIOR SUBTOTAL 8. OVERHEAD ON SUBCONTRACTORS (NTE 10% OF 7) 9. PROFIT ON SUBCONTRACTORS (NTE 10% OF 7 ) 10. INSURANCE a. payroll driven liability Insurance {2% of l' b. volume drlvan liability Insurance (0% of 1 thru 7) 11. BOND a. bond (0% of 1 thru 10) 913ll12lKJB Sod 2EB 1 U.EOSE 1 0.00 0.00 2824.64 1384.07 0.00 0.00 4208.71 631.31 . 126.26 0.00 1448.88 0.00 0.00 0.00 0.00 0.00 .J~I JI~lJ3l3 MSd 6 Date Submitted: 912912008 1. CRAFT LABOR COSTS 4966.28 2. MATERIAL COSTS 1448.88 3. EQUIPMENT COSTS 0.00 4. SMALL TOOLS 0.00 SUBTOTAL 1,2,3,&4 6415.16 S. OVERHEAD 641.52 6. PROfiT 641.52 1.5U8CONTRACTORS 341.88 34.19 a. OVERHEIID ON SUBCONTRACTORS 9. PROFIT ON SUBCONTRACTORS 34.19 10. INSURANCE 99.33 11.80NO 0.00 TOTAL COST 1 THRU 111 $B,207.77 I #l65.WCD ru; Added Power to MY Switch W~OS:L B002 02 +00 9/3012008 7:06:21 AM Page 1 #165 Bremerton WWTP . WeD 6 (Added 208v 3 Phase) . Job Number: 32 Bid Summary: Default Extension By Phase ,mlt. DescrIption Quantity Price U Elrt Price Labor Hr U Ext Lab Hr --- 01 Raceway, Fittings & Boxes --- 1123 1" Steel Flex 6 96.94 C 5.82 7.50 C 0.45 1177 1" PVC Coatea Rigid Sleel 15 410.99 C 61.65 10.00 C 1.50 1896 1" Steel SqueeUl FleJo: Conn 1 744.71 C 7.45 0.17 E 0.17 6426 6">:6"x3' Gutter-Nema 3R 1 67.84 E 67.84 0.57 E 0.57 8231 1" Field Knockout (labor only) 6 0.00 E 0.00 0.56 E 3.36 8234 2" field Knockout (labor only) 2 0.00 E 0.00 0.70 E 1.40 9209 1" 900 Die-Cast Squeeze Flex Con nector 1 976.84 C 9.77 20.00 C 0.20 TOO01 1" Oca! Myers Hub 2 44.00 E 88.00 0.20 E 0.40 TOO02 2" Oeal Myers Hub 1 82.50 E 82.50 0.40 E 0.40 --- 01 Raceway, Fittings & Boxes Total --- 323.03 8.45 -- 02 Wire & Cable --- 2815 #10 XHHW CU Stranded Wire 795 322.06 M 256.04 16.00 M 12.72 2816 #8 XHHW CU Stranded Wire 1.600 493.96 M 790.34 18.00 M 28.80 2817 #6 XHHW CU Stranded Wire 325 735.01 M 23888 20.00 M 6.50 2818 #4 XHHW CU Stranded Wire 975 1,133.46 M 1,105.12 18.00 M 17.55 - 02 Wire & Cab Ie Total -- 2,390.38 65.57 -- 03 Dislribution -- 3179 30A/2P 3WSN 24QV HD Safety Sw-Nema3R 1 118.70 E 118.70 2,00 E 2.00 3185 30Af3P 4WSN 240V HD Safety Sw-Nema3R 1 133.98 E 133.98 2.20 E 2,20 3983 30A 3P 1201240V GE THQB Bolt-On CircLlit Breaker 1 85.80 E 85.BO 0.80 E 0.80 .7 40A 2P 480V GE TED Bolt-On Circuit Breaker 1 291.50 E 291.50 0.80 E 0.80 --. 03 Distribution Total -- 629.98 5.80 -- 06 UndergroundrSite-- 1189 1" PVC Conduit 20 29.05 C 5.61 4.00 C 0.80 2074 1" PVC Female Adaptor 2 40.27 C 0.61 0.18 E 0.36 - 06 Underground/Site Total .- 6.62 1.16 --- 07 Mlsc -- 6902 1-114" x 1" RE Bushing 1 342.89 C 3.43 0.02 E 0.02 6903 2" x 1-1/4" RE Bushing 1 859.07 C 8.59 0.02 E 0.02 TOOO3 Mounting Hardware 1 22.00 L 22.00 0.50 E 0.50 -- 07 Mise Total - 34.02 0.54 --- 15 Credit -- TOO04 #1 XHHW Cu Stranded - Credit -1,300 1,314.50 M -1,708.85 11.00 M -14.30 TOO05 #4 XHHW Cu Stranded - Credit -325 696.30 M -226.30 8.50 M -2.76 --- 15 Credit Total --- -1,935.15 -1706 Job Total 1,448.88 8 . L..d 2E81L.L.E09El .J~I JI~lJ3l3 MSd W~OS:L. 8002 02 +00 . . . lUOD ~. b DlSL...uS'S' TRANSMITTAL PEASE & SONS, INC. P.O. BOX 44100 · Tacoma.. Washington 98444-0100 10601 Waller Road East. (253) 531-7700 · Fax (253) q37-8113 Contractor Registration No. CC01~PE-AS-FS*302PO E-mail address:mailuuDeaseandsons.com To: Bremerton WWTP Date: December 16, 2008 Contract #: Job Number: 8570 Job Name: BREMERTON WWTP Location: Bremerton, W A Attn: Ned Lever IJ We are sending you 0 herewith 0 under separate cover, the foUowing items: D Plans D Specifications D Proposal Request o Substitution Request o Shop Drawings o Samples o Field Authorization o Prevailing Wage o Copy of Letter o RFI lJ Other: CD ROM ~D SUBMITTAL# CHANGE PROPOSAL :Additional Conduits RE: RFI #018 P&S Issue #008 WCD #006 These are transmitted as checked below: 181 For Approval D For Your Use o Resubmit D Approved as Submitted D Approved as Noted ~ Copies for Approval D As Requested D For Correction o For Review and Comment Copy To: Signed: FILE, FIELD .. .JtO'I19/a.AI.Jt(JJ9l.'Jlf!JW, Project Expeditor .. . .. ...'.. .....~ ..... ... .......... ... .....'-. .... ... ..... . ...... . . ...~ H ... ..... .~nm"H'''' ",. ..........,....., ~"_..,,..._ 'H_"'_" .. ._ BREMERTON WWTP 8510 Change Proposal ~ Lump Sum Basis Ref: Seollon 01250 e DESCRIPTION: Add 120V single phase and 208V 3 phase pow&!' to MY switch per RFI 018. WORK AREA: COST CODE PEASE Issue ,,: OH 01030 OH 01031 01613 . 01612 01&24 01073 01515 01111& 01517 01960 . 008 Owner Chng , weD 006 RFI# 18 PEASE & SONS !,ABOR HOURS' HOURLY RATE .. EST. COST Project Manager . 0.0 $ 150.DO $ . Project Superintendent 0.0 $ 66.62 $ . PrOject Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 61.68 $. 0 Carpenter 0.0 $ 58.35 $ - Laborer 0.0 $ 48.25 $ - Millwright 0.0 $ 58.70 $ - $ - TOTAL - Pease & Sons labor " PEASE & SONS EQUIPMENT HOURS HOURLY RATE . EST. COST Forklift o $ 24.54 $ - Crane o $ 172.72 $ - Boom Truck . $ .73.08 $ - Job Truck - PIc:IWp 0.0 $ 9.00 $ - Trash Truck $ 55.00 $ - Compreseor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator I Ught P1ll1'lt $ 12.70 $ . Laser $ 11.55 $ - TOTAL 0 Pease & Sons Equipment $ MATERIAL AND MAJOR EQUIPMENT SUPPUERS EST. COST $ . $ . $ - $ - $ . $ - TOTAL 0 Material and Major Equipment Suppllere $ SUBCONTRACTORS EST. COST PSW Electric $ 7,379.63 $ - $ - $ - TOTAL - Subcontractore ~ $ 7,379.83 Page 1 of 2 12116n008 12:36 PM BREMERTON WWTP 8570 Change Proposal ~ Lump Sum Basis . Ref.: Sedlon 01250" DESCRIPTION: Add 120V slnlJie phase and 208V 3 phase power to MV switch per RFI 018~ WORK AREA: COST CODe PEASE ISSUE #: OOB Owner Chng fi weD 006 RFI# 18 CONTINUED FROM PAGE 1 012 SUBTOTAL. DIRECT COSTS " EST. COST SUBTOTAL - DIRECT COSTS $ 7.379.63 BOND & INSURANCE'f.S% $ 110.69 SUBTOTAl $ 7,490.32 OVERHEAD & PROFIT 20% $ 1,498.08 TOTAL - Direct Costa $ 5'1~. S+ 8,988.39 f>'7~4. I"'" V . TIME EXTENSION AND RELATED COSTS EST. COST T'!-1E EXTENSION REQUESTED- WO~K1NG DAYS: ," TIME EXTENSJONREQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIEI.DOVERHEAD (rate perwork~ay): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE@ 18.5% $ - SUBTOTAL $ - PROFIT @ 10% $ . TOTAL - Time 8clension and Related Cosls $ TOTAL CHANGE ORDER REQUEST: $ 8,988.39 This cost proposal Ia baaed on the cost elemen/a Identifted. Pease & Sons reserves aU rights to addiUonal compensation and lime extension fer work elements identified, unless SDeciticallv neaatlaled as part of this Change Proposal. Wolk willllroceed In accordance with the contract documents unlll the Owner either provides wlltten acceptllllce of this Change proposal or a written directive to proceed in accordance Vvith this propOllel. FaBuro to accept this p!'Ofl0681 within the proposal time may rssult In CXlst escalallon and possible addlUonal delays. This change proposal must be included as an attachment to Owner changs order. NOTICE Is hereby prolllded that tlie Contractor reserves any and all r1ghls to recover direCl, Indirect, and consequential c:p8l8, itlduding but not limited to the CXlst of delay and Impact related to any work CXlver by thIs change or otheJWIse affected by thIs change unless the cost and/or lime have been specificaOy included and negoUated. PEASE & SONS 16-080-08 DATE SUBMITTED 30-0eo-08 PROPOSAL VALID UNTIL Btyan Hlllemann Project Mgr. . Page 2 of2 12/16/2008 12:38 PM . . . Bremerton WWTP Wet Weather Facilities Upgrade WeD #6 PSW Electric Breakdown Summary mlJo. weD Project Number: 165 PR No. General Contlaetor: Peas8 And Sons, Inc. Scope: Added 208l12OV Power to MV Switch 1. ELECTRICIAN LABOR COSTS 0.00 HR a. joumeyman electrician labor 8 b. JOt/mayman burden @ 63.02 HR c. foreman electricIan 8 d. foreman burden @ 0,00 HR .. superintendent electrician @ f. superintendent burden @ Supervision g. direct supervision (NTE 16% of 18-1) h. safety (NTE 3% of linea 1a,b,c,d,1l & f) I. Delivery truck and drIver ($60 per hour) 2. MATERI~L:S COSTS '. a. material celts . b: quote : c. quote: .~ 3. EQUIPMENT COSTS 'a. l!wned equipment (per spec approved 8.ouree) b. rental equipment (per InvOices attached) 4. SMALL TOOLS a. small tools (NTE 0% of 1a, C & e. 6. OVERHEAD a. NTE 10% portIon of 1,2,8&4 8. ALLOWANCE FOR PROFIT (NT! 10% Of 1,2.3&4 J . 7. SUBCONTRACTORS a. Waka Group, Ine. b. e. d. $3~..84 62.00% $43.82 49.00% $47.81 62.00% DIRECT I.ABOR SUBTOTAl. 8. OVERHEAD ON SUBCONTRACTORS (NTE 10""" OF 7) 9. PROFIT ON SUBCONTRACTORS (NTE 10% OF 7) 10. INSURANCE a. payroll drIven liability Insurance (2% of 1) b. volume driven lIablJlty Insurance (0% of 1 thru 7) 11. BOND a. bond (0% or 1 thru 10) 12116l2OO8 6-REV 2 Data Submitted: 121312006 " 0.00 0.00 2323.34 1138.43 0.00 0.00 3461.77 519.27 103.85 0.00 1. CAAFT I.A8PR COITI 4084.89 1484.77 0.00 0.00 2. MATEIUAL COSTS 1484.77 0.00 0.00 ,. EQUIPMENTCO$T8 0.00 0.00 4. SMALL TOOLS 0.00 SUBTQTAL 1,2,3,&4 5569.66 6. OVERHiAD 556.97 a. PROfiT 656.97 7. SUSCONTAACTQRlt 611.95 51.20 51.20 8. OVERHEAD ON SUBCOIfTRACTORS 9. PROFIT ON SUBCONTRACTORS 10. INSURANCE 81.70 i'.S0ND 0.00 TOTAL COST 1THRU 11l $7,379.63 I #l85-WCOH Adcled Power 60 IN SwIdl_ 2 (3) Dee 15 2008 1:51PM PSW ELECTRIC INC. 13803771832 p.Z 121812008 1 :U:e1 PM . ...... 7163 7218 7497 Too08 TOODT TOaDI TOOO2 TOCOS ---- . '- .11 *1a8 Bntmolton WWTP . Fiber CablB Tray 'Job NLimberl411 Bid Bumm,ry: DefBult . Exten,lon BV S.ctlon Quantlt, Price U -- A~argla81 Cable Tray:~. 70' 27.20 E 2 1311.00 E 2 19.22 E 14 5.00 E 14 . "'.50 E Pagll 1 Ext Prtc... :Labor Hr U Ext LIIb Hr 1.904.00 ..lB.oO C 12.60 2511.oo 3.8& E 7.70 38.44 0.85 E 1.30 70.00 10.00 C 1.4D 83.00 .O.lfi E 2.10 I.. 2.333.44 26.1D -688.00 .13.50 C .9.45 I -115.40 2.21> E -4.40 -2D.OQ 0.37 E -0.74 -723.40 -14.59 1.610.04- 1D.Il~ I, Description Fibe"CabIaTra~Run"l 6" Apartl.."Dll6"W IiIllDeg Fiber Cable Tray EIbOW..6"RungIlJ"0lC15'W FIber Cabls Tray End Plates-6" Wide Fiberglas8 sb'ut Fiberglas. Hold Down Kit , ,-.- Fiberglass Csble Trey TOla' -- 6''lfI4- Alwnlnuin Cable tray 9oo8g Aluminum Cable tray Elbow , A1umlt\1Jm Cable Tray End Plate , ~~ CrodltAlumlnum Cablll Tray TOllll - -- Credit Aluminum Cable Tray-- -70 8.40 E -2 57.70 E -~ 1~.OD 'E Job Total . Targel, Labor column 3 . 12/15/08 MON 13:47 [TX/RX NO 6390] ".. ' . ..._-~~. .. ~~ v~.)V-,.,?..".t"~-.......~~........'...h......S".~~"..:.:..:"..:"..~~,,:....~";"~:"~:..;..>~:"':"Y-';":.~";'=-;"X~..;-:..;..;..~,.;..;.{..;,.;..;~;.:...~;*;~;:-;;;>>::X~>::CZj:;~:::;:*:::;;:':$*~;;;;;:;::;;:;:%*;(;;;:~~Z.:;~m::2;:;~E~j>>::::}~~::*;;~~~:;~~;~2.:;i::~~j::~~tl~?r:f~~5~~a:;~~*;~;~~q*~~;~~?~~~; . CITY OF BREMERTON WORK CHANGE DIRECTIVE WCDiI: Seven PROJECT: WWTP Upgrade CONTRACTOR: Pease and Sons Page 1 Of 1 Project #: 5020 Date: October 2, 2008 YOU ARE DiReCTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Repaint enUre generator enclosure in accordance the Sabelhaus West proposal. The generator must be properly preppe(l for aln and a. warm shall be provided that runs concurrent with the Cummins warra ATTACHMENT(S): Sabelhaus West Proposal and Cummins Wanantv Info If a claim Is made that the above change(s) have affected Contract Price or Contract nnes any claIm for a Change Order Is based thereon will Involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed In accordance with Section 1.04.4 of the WSDOT standard Specifications, or Article 10 of the General Conditions. Method of determining change In Contract Price: Method of detenninlng change in Contract TImes: o Contractors Records o engineer's Records o , l8J .0 o Unit Price Lump Sum Time & Materials Other: o Other: Estimated increase (decrease) in Contract Price: Estimatecllncrease (decrease) in Contract Times: $ 1300.00 if!J.- days; Substantial Completion: o If the change im,Dlves an increase, the esDmated amount Is not to be exceeded without further authorization. Ready for final payment 0 days; If the change Involves an increase, the estimated times are not to be exceeded without further authorizatton. RECOMMENDED: AUTHORIZED~ CONTRACTOR Br- ri; ~ CITY OF BREMERTON 10 IJ~J08 , I /1/7/08 I ! ~/l/( I By: ~ . ab. ~ Wart CtlIltg8 DlI8Cllve. 3-00 ...~;..:~:.g';';';.Xk:'':'J;~&;~~;'r'::~;~;'';';'';.;'';'~'';''/.;';:;;(mx;::;;;~::-;;;xQ;>>:;::'::X::;$:;~:;::;:*~q;;;;:~:;;:}>;:~;;;;:~~;~:~:~~~:;:;:7z.~~>.:c~:~~~;;%3~:::::%;;~::~~;t"~~~=::;:::::Z::;::<<;~x:3::;$*:;::f{~:*~~~~:~$~;:$:;;:%t~:=::?x:;:}1:':5?;~*~;~~~~~~:;*~~:z~~ COMMERCIAL / INDUSTRJAL / RESIDENTIAL PAINTING SPECIALISTS . September 19th, 2008 To: MBlJcan Crane Attn: Brett or Andy Project: Bremerton WWTP generator container Scope of work: Exterior repainting SpedfJcatlons: Hempel Hempaxane or Sherwin WlIDams We propose to furnish labor and IllllterJaI for the following scope of work: Option #1 RepBint damage panels on the East and West sides, 1 door, and 1 jam exterior only to match existing. Color may not match to the exfstfng. $ 2,586.00 OptIon #2 RepaInt the entire container new color including exterior walls, roof, and 2 exterior sides of doors and jams. 1. Prep surface to be repaired Wfth a DA sander. 2. Mix and apply Rage Gold filler to fill area of repair. 3. Sand in Stages working down from lower grit sand papet to finer grit sand paper to achieve a smooth palntable finIsh. 4. Prime area for paInt. S. Apply finish coat for unlfonn finish. $ 3,680.00 ClarifJcatIon$ 1. We will use the exact product that came with the container but due to weathering, and the lack d controJ In a 2 component product touch up color may no~ be exact, 2. Repainting d the entire container Wi" be done using a Sherwin Williams product or a Wasser product that can be purchased locally. Plus sales tax if applieable. Assumptions: Work wiD need to be completed weather permitting in October 2008 Terms; Payments to be made on a 3o-day cyde, billing on the 1ft payment due by tile 10*. 10880 OlD FI\ONTlER RD. SILVERDALE, WA ~~3 ,- O~flC.E (~) 66~.9860 _ FA)( (360) 662-9866 * ...... . 1 I -'~~.................._ :........h..'_....~~-............M.._.......'..~hV..'......-.............~........:.:'.:'.....X&~;.........!.~..~.&:,..;.!i:.......~~;..~:.-:,..;..:...:..:~;..;.;.;~~.;~:--;<<..:~X->>;..:.~;..;.~;.;.:.;..~.;.;-;,;~;..;:~;;.':Z::.,;(..-;.~;::i';~X:~;:;y)'myx.o::;;.~~===:<.::;}:;::~::~:;:;:::::;:;:;.:=:=:;:~i;~;~:zt;~~m~::.;x;;3:~~:3:x~*5;:x::::;:t~~~~t~~~~~~:~~:~~~~~* COMMERCIAL I (NDUSTRIAlI RESIDENTIAL PAINTING SPECIALISTS SIgnature of acceptance: Date: f&timate Is valid for 30 days. . 10880 OlD FRONTIER RD. SllVERDAlE. WA 9~83 - ~;FIC~ ~360) ,66~:986{) - FAX (360) 662-9866 * 4L ,~__ :"~~.~'M!"~~"~'~~":'~~:":~}:";";"~~~:-':~.2:':':-:~;":";.{":"';";",:-;";'~:V.r;.=";'-;";";"~~-;'X'~';"X..:..;.~;..:..;,,;.;..;.;..;..;,,;..^"~';'''.(=:-;:-~~;7~~~~Y-<';-~'Yh:;:;:;:;;;:;::~~~~:>%~j:;:;:;~:::~-{:?6:::;:::;:::;X*::;:;;;::5:;:~;:;;;:~;:;:;:;;#;;:;:~~;:(;~:f'~;;;~:;~:'=;i-z.;.:f=*:<<:::;~;~:i;~:::~:f;:;*::'~X:**:;~~:;;~:;~;~ff~~;:::~B.: . . . Commercial Worldwide Warranty Commercial Generator Set Transfer Switch Switchgear C. ~:~:~ation limited Warranty ('~r~ri@hl.'.~II<)':. (:lIRlIuill. I'\nKr ''''1lL'I:tf~1I1 u.:a /~~l'L,,,t:RI,,,.,,,,~ "I (.".......... III~. .\lllIiJhb K..",,,'(1:,,,L -\8:;11:"': Jjjfl5 I V~'_'",' ~'-"',' .'~", ".',.,' ~.~.~" " ,!. ','~- :,','~ '.~. ...' p' p -,.. ...... -.' ..- .",',. _:...' " ,:+:.:...:..:..:..:.:. ~~~..:.:_:..::-. ~:.;-=.. ;'!.o:'-~'/;,;,:. ).:~~;~ ;~:.:~:.;.;.:.?;. :.;.:-;,.;..;~;, ;.x..:,.;. ;,~';..;" ;:-::-:~~;:k.c;.;;;;:~~:.:;;;~:.::.;~<<;;:;.:;:;~:<<:.:;~:&:;:;=;.:;:;;;::~::;;;=~:~ :;: ;;:~::;:;::.:.:;:: ;!;:~;~~~:~;~:~:.::.?~~~;~;::.:.:::~;::;:;:;:;;::~:~:;;~:;:::;:; :::~;; ::: :=::::~:;:; :;;: ::;~;:::~:'::~:;~ . Coverage Period Commercial Generator Set and Transfer Switch This is a limited warranty that applies to all Cummins Power Generatlon@ brand Commercial Generator Sets and associated Accessories (hereinafter referred to as "Product"). Product will be free from defects in material and workmanship for a period of one (1) year from the date of 'n service" or 18 months from shipment (24 months for pennanenUy instafled equipment) to the first end user. whichever comes first (Pennanently Installed Is defined as Product installed and intended to remain in place for its lifetime, for example, where a generator set must be installed in a lluildlng during the early stages of construction. This does not include applications such as a generator set mounted on a concrete slab and hooked up to a building.) Base Coverage Commercial Switchgear This is a limited warranty, which applies to all Cummins Power Generation~ brands Switchgear and .associated Accessories (hereinafter referred to as "Product"). Product will- be free from defects in material and workmanship for a period of one year from the date of "in seMes- or 18 months from shipment to the first end user, whichever comes first. All Commercial Product Repair or replacement parts are warranted for ninety (90) days from the date of purchase. excluding labor and travel expenses except in those cases where the end user has paid these expenses for a previous repair. Non..cummins Power Generation accessories are not covered . under this warranty. In the case of Product used for rental or demonstration purposes, the base coverage period begins on the date the Product is first used for such. rental or demonstration purposes. This warranty is extended to all subsequent owners of the Product during the coverage period. Said coverage shall Inducte parts. labor, travel expenses and labor to remove/reinstall said Product. See your Distributor for detaUs. Cummins Power Generation Responsibilities Cummins Power Generation's llabllity and owners sole remedy are limited to the repair or replacement. at Cummins Power Generation's option, of the Product or parts that do not confonn to this warranty. In accordance with Cummins Power Generation's Warranty Administration policies, Cummins Power Generation will pay for the parts and labor required to repair the Product and, when necessary, reasonabfe labor expenses associated with the removal and reinstallation of the Product if such work Is done by an authorized Cummins Power Generation IOnan Distributor or designated service representative. In accordance with Cummins Power Generation's Warranty Administration policies, Cummins Power Generation will pay limited travel expenses (excludes mobile applicatIons) for generator sets 20 kW and above. transfer switches and switchgear total round trip Is limited to 500 miles (800km) and 11 hours travel time and for generator sets below 20 kW total round trip Is limited to 100 miles (160 km) and 2.5 hours travel time when necessary to make on-site repairs. The cost of maintenance items such as 011, filter elements, belts, hoses, starting batteries and light bulbs will be paid for by Cummins Power Generation when such Items are not reusable because of the warrantable failure. . ('op,ripl!CI~. Cmullinsl'mwlt~i"RPIcn:tI\RIknlIlkorCDl1llllill&l",," AnRi!ll*a~ '\b~ JJ"..oq, 1 ~."~'."',,"..'r'r'_~'''''r.~~..~~.~.:.,:...r~'~':_;':,;,,:J.:_:')~;..;.;.::.;':r':.':"':':"';'%~.;";";'^';.:";.:_;"~~;r;.;r~;.~:.)-;';~;:r.;:;~~;~;.,.;:~.'):;.:;:~,.:;:;:;:;::.::;;~~:~:;:;:~;:;:;.:~;;:;::;;;::~:~:~;:;::':;;::;;>:;;~~}.:~;f:~;t;~~~:~~:~*~::::::;~~::~~~~::~~:~[.;::~~::::;i;~:~;~:~;:::::;:;=;:i~~;~;;;;~t*~~~~:~~:2~::;:~::~:~~:;;::;~:~:~;:;:;::~*:~~*~ . . . Owner's Responsibilities The owner is obligated to install, operate and maintain the Product in accordance with the recommendations published by Cummins Power Generation, inctuding, without Umltation, operating within power rating designation set out in Power Rating section for generator sets, below. The owner Is responsible for the costs associated with such maintenance. The owner Is responsible for any adjustments which may be required beyond 90 days from the in service date. Prior to expiration of the applicable warranty and within 30 days after discovery of the warrantable failure, the owner must notify an authorized Cummins Power Generation/Onao Distributor or designated repair facility of any warrantable failure and have the repair or replacement made by such facility. Installation inspection and initial start-up of Commercial Product must be conducted by an authorized Cummins Power Generation/Onan distributor or designated representative. The owner is responsible for payment of any of the following expenses that might be incurred as a result of a failure under the terms of this warranty: 1. Rental equipment used to replace the Product being repaired, other downtime expenses, and all business costs and losses. 2. Telephone, communication, living and travel expenses incurred by the owner. 3. The premium costs for overtime labor requested by the owner. . 4. The cost of airfreight or other extraordInary expenses for shipment of parts over and above premium surface transportation. 5. Any other consequential or incidental amounts. Under Comprehensive Extended Coverage, owner responsibilities are identical to those noted under the Base Warranty. Under Basic Extended Coverage, the owner Is responsible for all expenses beyond the Base Warranty period except the cost of the failed warrantable part and the labor to remove/replace such failed part through the second year. as specified in the Base Warranty. Under Major Components Extended Coverage. the owner responsibilities are Identical to those listed under Basic Extended Coverage up to year 5 or 1500 hours, whichever occurs first. In years 6 through 10 or hours exceeding 1500, up to 3000, the owner Is responsible for all expenses except the cost of the failed warrantable major component as specified under Cummins Power Generation's ResponslbUities. Under Prime Power Extended Coverage, the owner is responsible for all expenses beyond the Base Warranty period except the cost of the failed warrantable part and the labor to remove/replace such failed part as speclfled in the Base Warranty. For all Extended Coverage programs, the owner is responsible for providing written documentation showing that the product has been maintained in accordance with Cummins Power Generation's published recommendations. C"llmllblO~.2. ClIfwainl......~r aClla.nldn ill. ~ Imdan:trI: u( CNIl1II1iDlIn~. An lUglJl5 Ra..-rn.'lf.. AB:!lIl9 3:2005 3 ...........:..............~~..'~:~..."..;..>:,,:.:.~.>:.:.x..:.:~~.:.;.:.:~:.:.~-;..:./.....:.~.;.,;.;..;..;~;.....;.;-;.~.;.;.:.;.;.;.;:;.;~;:';~j:;~;:..~;~;~:;::j:~;;:~;~;:.t::;~;~;~:;:;::.:~:~:;:~:;:;~::~:~:::;:~;,;:::~:::.:;;;::5:;~:::::::~;~;;~;;;;;~~:=;~;~;::;::;:;*~::;:;:::::~:;;:::;~::~;~~::~~:?;:;:::;:~::~:::~~:~;:~~~~;;~;;~;~~::3.z~;~~:;:::::;:::::~~~::?;:::::;:~::::::~:~:::;::~~~~::$ . . . Power Ratings Cummins Power GeneratJon generator sets must be applied within the following rating designations: Standby Power Rating The standby power rating Is applicable for supplying emergency power for the duration of normal power Interruption. No sustained overload capability is available for this rating. This rating Is applicable to installations served by a reliable normal utility source. This rating is only applicable to variable loads with an average load factor of 80% of the standby rating for a maximum of 200 hours of operation per year. In installations served by unreliable utility sources (where outages last longer or occur more frequently), where operation Is likely to exceed 200 hours per year, the prime power rating should be applied. The standby rating is only applicable for emergency and standby applications where the generator set serves as the back-up to the normat utility source. No sustained utility parallel operation is permitted with this rating. For applications requiring sustained- utility paraDe! operation, the prime power or base load rating must be utilized. Prime Power Rating The prime power rating Is applicable for supplying electric power In lieu of commercially purchased power as set out below. The number of allowable operating hours per year Is unllmJted for variable load applications but Is limited for constant load applications as described below: Unlimited RunnIng Time Power Prime power is available for an unlimited number of annual operating hours in variable load applications. Appfications requiring any utility parallel operation at constant load are subject to running time limitations. In variable load applications, the average load factor should not exceed 70% of the prime power rating. A 10% overload capability Is available for a period of one hour within a twelve hour period of operation, but not to exceed 25 hours per year. The operating time at or above the Prime Power Rating must not exceed 500 hours per year. Umited Running Time Prime Power Prime power is available for a limited number of annual operating hours in constant load applications such as Interruptible, toad curtailment, peak shaving and other apprtcations that normally Involve utility parallel operation. Generator sets may operate in parallel with the utility source up to 750 hours per year at power levels not to exceed the Prime Power Rating. Any application reqUiring more than 750 hours of operation per year at the Prime Power Rating should use the Base Load Power Rating. Base Load Power Rating The base load power rating is applicabJe for supplying power continuously to a load up to 100% of the base rating for unlimited hours. No sustained overload capability is available at this rating. This rating is applicable for utility base load operation. In these applications, generator sets are operated in parallel with a utility source and run under constant loads for extended periods of time. Note: In determining average load factor, loads of less than 30% are considered as 30% and time at standstBJ is not counted. C"P~ri~l. ClSIUIIiu 1'0""" u-Iian l&. "'liNmd IndcAwk ufClnumiot: ln~. All RitlII5 R~. AIJ:!IJ19 1/:!llII$ 4 ...........";...."..~.~~.._~........~.......~..'...........,,:......J~~~:-~..::.:.:q:";..X'r:'v:':";"Z":"::-':<<V>:~:";'.:";":.:.~;":,,;.:";";.;r;.:--;';.;..~..;..~..:,.;..;..;./;~;~~~~~=*:y;%~;;y..:z;=;.:<<;:Y;:<<::*;;.:;:;:;~:::;Y;X:::':':~:e;*:a::~;;~~Z~::;:~~::;t:::-:::::~:~~::='1;'~~?~~'::{:;~?:~~~;$;W~~;;;J;:*::::z:~:?{~~:::~~:~~}x~; . . . Limitations Cummins Power Generation is not responsible for the repair or replacement of Product required because of normal wear, accident. misuse. abuse, improper installation (such as installing a generator set designed for stationery use In a mobUe apptication), lack of maintenance, unauthorized modifications. improper storage, neglIgence, improper or contaminated fuel, or use of parts that do not meet Cummins Power Generation specifications. Generator set warranty wi" not cover any failures associate with Battle Short Mode applications. Extended Coverage options for Standby Applications apply only to Cummins Power Generation brand Generator Sets, Transfer Switches, Switchgear and associated Accessories used exclusively in emergency standby power apptlcations. 10 year Extended Coverage applies only to Cummins Power Generation brand diesel gensets rated 200 kWfao Hz and above. Extended Coverage options for Utility Load Management Applications apply only to Cummins Power Generation brand diesel Generator Sets, Transfer Switches, Switchgear and associated Accessories rated at 200 kWI60 Hz and above used exclusively In Utility Load Management Apprications. 2 year Prime Power Extended Coverage applies only 10 Cummins Power Generation brand diesel Generator Sets, Transfer Switches, Switchgear and associated Accessories, Including set mounted controls. All Commercial Product must be registered within the Base Warranty period. If this requirement Is not followed, a penalty charge will apply. See your Cummins Power Generation Distributor for details. tf you have any questions regarding your warranty rights and responsibilities, you should contact your Cummins Power GeneratiOn/Onan distributor by calling 1..aoo.SB8-6626. NORMAL WEAR: This warranty will not cover repair where normal use has exhausted the life of a part or Product. All mechanical devices need periodic parts replacement and service to perform well. It should be remembered that the service life of any product Is dependent on the care it receives and the conditions under which it has to operate. Coolant heaters will be covered for a period of one year from date of start~up. This warranty shaD not apply to starting batteries. Steel enclosures are warranted for one year only and are not covered by any extended warranty option. The use of aluminum generator set enclosures and skirts, whenever offered by CPGF is the proper Installation practice for generator sets in outdoor applIcations in coastal regions. defined as locations 60 miles and closer to bodies of saltwater. THERE fS NO OTHER EXPRESS WARRANTY, AND NO PERSON IS AUTHORIZED TO GIVE ANY OTHER WARRANTIES OR TO ASSUME ANY OTHER LIABILITIES ON CUMMINS POWER GENERATION'S BEHALF UNLESS MADE OR ASSUMED IN WRITING BY AN OFFICER OF CUMMINS POWER GENERATION. Cllp~:ztJ02.. CIIIllIlIins PoW;!fGl!Mr.ltbl ic. ...ftld ......I<ttoxk grClIlltlnla.1..~. ^" Rl:IusllOllVCd. ^1I!1I19].'2005 S - ..............~.........~....:.:.:..~..:..:.~~~,.;..;.;..:..:.:...j;~,..~.x.:..;..:..~?;.~;~..~.:<<.;-:-:...;"l;.~..;-;..;-:.;-~;~:;~;~:~;:;~;:;.;;y~>>.:;;;:~~=;::i:;::)X:.::;;::;;;;;:~;:.:;;?1;~~:f&;:~:f;:.Z~:~~~:5:;~:t~:::~*~*:<:>:":;:E~:=*;Z:*::~:};;:~;;~~~~;;:~]~=::~;~J:?~*:~:::::$~$:~:*:~:;:::#;~~i~:~:~;~?;;~~;~:~:;;~:~~;*;~~ . . . IMPLIED WARRANnES. INCLUDING MERCHANTABILITY AND FITNESS FOR A PARTICUlAR PURPose ARE LIMITED TO THe PERIODS OF COVERAGE SET FORTH ABOVE. TO THE EXTENT PERMrrrEO BY LAW, ANY AND AlllMPUED WARRANTIES ARE exCLUDED. IN NO EVENT IS CUMMINS POWER GENERATION LIABLE FOR INCIDENTAl OR CONSEQUENTIAl DAMAGES. This warranty gives the owner specific legal rights. The owner may also have other rights which vary depending on local laws. In some areas, local taws do not allow limitations on how long an Implied warranty lasts or do not aUow the exclusion of Ihcldental or consequential damages, so the above limitations may not apply to you. Extended Coverage Features Several levels of Extended Coverage are available on Commercial Products. Basic. Comprehensive. Major Components. Prime Power and UtiNly Load Management. Extended Coverage programs are available only in the United States and Canada. Extended coverage must be registered within the base warranty of the product Cummins Power Generation provides total system coverage for alt Commercial Product and associated Accessories. There 81'& NO deductibles applied to these programs. CIlll1ri~. CunlIllI"" '-':tG:-.1km lu"'Bi*md U'IIdermrlt ....CllftIrIlia.o hII:. All ~ ftacryOll. MJ>>ZJ lfZllllS 6 ..~....~.......*,.......~~.~....~~....:..:..:~:.~:..~:..:...~~~,,:~~~z..~-;.:':.~:~~:"':";";":":";"':">>~";~';"~~;";{";";~:.;:,::lli~~7:~~~>>Y~%>::.:::~:::<~:~;:;:~;:;:.::;:~:~;;;*<;;:;::;::;;~:?;.:.~~:~~;~~*;.:::..'S.::;;::::~3~$:;:~:~~~::*:::;z*~~~::;;~~~;;;;:;::::~X~~~:::5::~:::;~~~;~~.$;~~;:~::~;~~:~;~{~~f:~~~;:~~~~;s; . . . CPGF COMMERCIAL \V ARRANTY PROGRAM COVERAG.E SUM.MARY Major Comprebeu5 Comprehfll.$iYe Prime Pon'!!r Components Warrnot)' ;\'"t BllSic E1t~nded E.\tended Extended Program B:.lllt! Extended E~tendl!d Coverage COVlmtge C~verage*""'" WUrrUnll Co~'(!.....ze Coverll..e Gellerulor Set llj:::~ lO!i) lO30 lOll L040 L041 Sales Feature Generator Set I 16 Ii I'; 20 19 WarrllDty LD. Number TrnDSrer 0001.7 G004-1 (;006-7 GOO;-7 NfA 0008- i Switch Sales fellture Swikbgear RFQ RFQ RFQ RFQ RFQ RFQ Sales Future Warranty Application Cod~ All 5T 51 51 PR 5T Year.; froRt I ! ;; 5 1 10 .'Dllte In ~rvke" FlOlWi Covered Unlimited 1500 Hours 1500 Hool'S 1500 Hour.; fil)lJO Hours 3000 Hours TIlrouyh :!"" Thmul:h 1'''' Y car only Labor Stand;mJ StllOu:trd y~r only Srandard Sumdanl , Months from Illi~4 30;36 60i66 60/66 M\lnlhj;.... 30/36 121111:!b Months""''' Shipntcnt to MOnlh5*** Month;;,..... !\..Iomhs".. Monlh;;*"" Elld User M;ixJmum 300 Mill:S 500 MiI~ 3M Miles Rpuld Trip tSOOkm) and ISUOkm) and First Yl:llr, (800km) llnd II First year only'" Fir.;l year onl ~ 'l< TrnellMileage II hours" II hours" only" hours. Meals/Ludging Reasonable". RCllSonllbk"* Fl.,;! year Reasonable" Fir.\l YaJt only firsl y~r only ooh' Maintenance loss duc to W5S duc to loss duc Iu Lm.'ll dw 10 loss Jue 10 Los." duc Iv fitilUN Ill:ms litilun: failure failure failure failure Unit RemoveJ I First yeur only Reinstall CUh:rcu Covered First year Covered First yc.'lr only ol1lv Regfnn3 WorM Wide US;CallilLllI US/Canada USiCal1l1Wt US/ClInada US!Cmllldu Covered DedltctiblL"S None None None None Non.: None Proouct Gcn~llJr Genscl ~lr Gcnsctllr Gensel or Gcn.'icr llr DiCllcl. ncnscI ,)r Tro.lns';:r S' Conrcd Tmnsl~r Transfer Transfer Transfer SwilCh Transfcr Switch Switchgear Switch or $wilch or Switch I)f or Swit~hgellr lIr Swilclll:ear S\\'ilchgcar Swilchgco.lr Switl;hgcur [''I'}1i~b!{::!I)1':!. (.........in. po""" ;"""T~l~lll ift a l\.'11i",To:.I1r3drllldrl. ..fr...""",... I.". .-\11 Ri\lhl. R,,-...,...,~1. ,\8:'1~~ ;..:tlll;; 7 :....~......-..~.....~.'\.~&......'..'.:-+...............'.....-,.........~.....'..................'........-_................'.._-.........:'...;'..~...........~....~....!"......'........'..........~.......~........'............~,_.r....~.~.~..........'/_..'................~........J'.......r.'...............:'..oy,?...........-..."...~....r..,?'.'.......-....."........J'............J......~......I"J....~.....'\;'..........-^......."a.of............................r................~......""....................._........',......,...'..............""...".... . $ CPGF COMMERCIAL \V ARRANTY PROGRAM COVERAGE SUM~lARY Cont.. . UtUlty Load Utility Load Muagement Batie M....SftDCDt WARRANTY Extended Coverage Comprebaslve PROGRAM Extacled CoVer8Re Cellel'llt8r Set Sales LOS4 LOSS FeatUre Generator Set 22 23 WlltnlOty t.D. Na"" Trusfer Switch Sale. N/A N/A Feature Swltdlgear Sales RFQ kFQ Feature Warraoly ADDleatioll Code UT UT Vears from "Date In S Years SYdU'S Sentk<< Houn COllered 400() HoutS 4000 Hour.;. Vears/Hours Thnmgh 2"" year only Labor Standard Mentlls frem 60166 Monlhs... 60166 Monw... Shlpmellt to Eod User Muimam Round First year only 500 Miles (800km) and 11 Trip TravefIMnutte bows MntsILodl!lnf! Firsr vea.r onlv*. Reasonable.. MlI1ilteunee lteau Loss d~ to failure losS due to failure V.it First year only Covered Remo~elReiDStall Deduttibles None: None 200+ kW Diesel 200+ kW Diesel Gensel Pt-odoet Oeoset or TtBllliIcr or Transfer Switch or Cevered Switch or Switchgear Switchgear Rtidon CoveTed U.s. and Canada only U.S. andCaIIlIdaonly . CPGF COMMERCIAL \V ARRANTY PROGRAM COVERAGE SUMMARY KEY · Below 20kw 100 miles (160km) and 2.5 hour maximum .. Combill8tion of 10 hours of rravdllabor during one trip for meals and lodging to be aUowed ... Warranty coverage is extended an additional 6 monlbs for all permanently installed generator set or rransfer switch. Pconaocntly installed is defined 115 Product installed and inlended.to remain in place for its lifetime. for example. where a generator set must be installed in a huildina during the early stages of construclion. This does not include applications such as a generalor set mounted on a concrete slab and booked up to a building. This does not apply 10 5witchgcar. .... Major Componenu Extended Coverage provides only replacement partS for the foUowins major components: Engines- Cylinder block, camshaft, crankshaft. connecting rods. and flywheel: Altemator-main rotor. main stator and drive disc; Transfer Switch-actuator motor and main confactS; Switcbgear-buswork and main circuit breaker. c"",tlf/IIO;!OOJ. CldllIIliaI JIowcr Ol:nmcIoIII Q rqWm:d ImdcauIrt DrC'ummillll~ All RJsltllllWtMd. A8:!llJ1} JIID05 g ........~_._..'........-...-_....._._._...'>'.....'_..t.........................~..............'.....-..................J'J....._'J..J_'.................J................_.........J'...............,J>~.........I<J'.I'..__......-'"-._....,..+............-"J<.........................................."......~...,.....~....................~................,....................................................................._...........~......................._...y......_..~......._....>.........._....'...,................: e . . Diesel Generator Set QSK50 Series Engine EPA Emissions 1100-1500kW 60Hz Description This Cummins Power Genetation commercial generator set Is a fully Intsgrated power genemlion system. providing optimum performance, reliability and versatility tor stationary standby, prime power and continuous duty appIfcaUoI16. ^ ~ TbII genaralor set Is dealgnad In faclUlIll& cer1IlIitd to 1S09001. TI1ls gell8fatOt Hils marv.rfacILW'ed In tadllies cerIItIed to 1S09OO1 or 1509002. . The Prototype Test Support (PTS) program verlll8$1h8 performance imegllly of the genel'8lllr sel d8&1gn. CummIns Power GemIraIIon pRldUCII beerlng Ibe PTS ~ meet Ihe pnlIolype tesI reqUIrements of NFPA 110 for t.evel1 syslems. @.., All low volIsge 11Illdeb.. CSA cettified 10 product class 4215-01. @ The genemtor 5el1$ avallabl8 Listed 10 UI.22OO. Slallonaty Engine a..mlor Assemblies. The ~1JII1IIIIlIl alIllral ill USIed to UL508 - CIIlagaIy NITW7 for U.s. and Cin&dIan U&agIJ. Cin:IlIt breakar 8SI8II1bIles 8J8 UL489 UsI8d far 100'lIo tOtIlinuOUll operalIr:ln and IIIso UI.88iA u.sed SeMele EqulpmanL Model D G QGAB Stan Rat 60Hz kW VA 125 1500 8 Power Generation Optional Feeture& ShoWn Features . LOW' Exhaust emissions - EngIne C8f1ified to U.S. EPA Nonroad Sourca Emissions Standards. 40 CFR 89, TIer 2- . Cummine- ....avy-Duty engine. Rugged 4-cyc/e Industrial diesel dellv8lS reliable power,low emlsalons. and fast response to load Change&. . Perma....nt Magnet Generator (PMG) - Offers eMal".ced motor staJt\ng end 'ault clearing ShOrt Circuit capebHIty. . Allam.tor - Several a1tematllr sizes offer s&lectabl. moIer starting capability With low reactance 213 pitch w1ndlng&; low waveform dl$lorlion With non-linear loads, faufI: cIeartng short-circuit capability, and class For H lnsulaUon. · Control 8yatam - The PowerCommand1" electronic conlrOlls standard equipment and provides tolal gensei system integration, including automalie remote starting/stopping, precise frequency and voltage regulation, alarm and status message display, AmpSentryN protection, output metering, aUlo-shutdown at taull detection. and NFPA 110 compliance. . Cooling System-. Standard Integral set-mounted radiator system. designed and tested fot rated ambient temperatures, simplifies faclllt.y design requlnm1ents for rejected heat · Structural Steel Skid Sase - Robust skid base supports the engine, alternator. and radiator. · Warranty and Service - Backed by a comprehensive walT8f1ty and wor1dw1de distributor network. 5 Data Sheats 60Hz D-3331 D03334 0200+2006 CUmmInt Power GeneraIlon 5-15128 (1/06) SpeclJicBl10ns Subjer;t to Change WRhDUf Nollc6 CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Eight .OJECT: WWTP Upgrade Page 1 Of 1 Project #: 5020 CONTRACTOR: Pease and Sons Date: January 13, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOllOWING CHANGE(S): Relocate centrifuge control panel, cake pump control panel, polymer pump panel, and hydraulic pump. Additional costs are for concrete bases required. There will be no additional costs for electrical work based on this change. A TT ACHMENT(S): Pease and Sons Change Proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: D r8l ~ Unit Price D D Contractor's Records .Lump Sum Time & Materials Engineer's Records ,Other: D Other: Estimated increase (decrease) in Contract Price: $ 1,573.58 Estimated increase (decrease) in c~nt Times: , -1 L.-- Substantial Completion: jays; , If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMENDED: ~P'C~ ~~~ f7>>-L- CONTRACTOR AUTHORIZED: ~:: By: . _ -- CITY OF BREMERTON -- By: l/~ . ab, FORMS, Work Change Directive, 3-00 BREMERTON WWTP 8570 Change Proposal- Lump Sum BasIs Ref: Section 01250 . COST CODE OH 01030 OH 01031 01513 01512 01624 .01073 01515 01516 01511 01950 . DESCRIPTION: WORK AREA: Relocate Centrifuge Control Panel, VFD Panels, and Hydraulic Pump per attached drawing, and as discussed on 1/6/09 meeting. Centrifuge PEASE ISSUE #: 015 Owner Chngll RFI/f PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager 0.0 $ 150.00 $ . Project Superintendent 0.0 $ 66.62 $ - Project Engbteer 0.0 $ 95.00 $ . Carpenter Foreman 9.0 $ 81.68 $ 555.14 Carpenter 2.0 $ 58.35 $ 116.70 Laborer 0.0 $ 48.25 $ . MlIlwrfght 0.0 $ 58.70 $ - $ - TOTAL . ,Pease & Sons Labor 671.85 PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift o $ 24.54 $ . Crane o $ 172.72 $ - Boom Truck $ 73.08 $ . Job Truck - Pickup 0.0 $ 9.00 $ - Tra&h Truck $ 55.00 $ - Compressor $ 14.36 $ - Welding Machine $ 10.34 $ . Generator I Ught Plant $ 12.70 $ - Laser $ 11.55 $ - TOTAL - Pease & Sons Equipment $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST Materials (attached) $ 620.09 $ - $ . $ - $ . $ - TOTAL - Material and Major Equipment Suppliers $ 620.09 SUBCONTRACTORS EST. COST $ - $ - $ - $ - TOTAL - Subcontractors s Page 1 of2 1/8/2009 10:14 AM . BREMERTON WWTP 8570 Change Proposal- Lump Sum Basis Ref: Secllon 01250 DESCRIPTION: Relocate Centrifuge Control Panel, VFD Panels, and Hydraulic Pump per attached drawing, and 8S dIscussed on 1/6/09 meeting. WORK AREA: Centrifuge COST CODE PEASE ISSUE II: 016 Owner Chng It RFlIt CONTINUED FROM PAGE 1 0'2 SUBTOTAL. DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 1,291.94 BOND & INSURANCE 1.5% $ 19.38 SUBTOTAL $ 1.311.32 OVERHEAD & PROFIT 20% $ 262.26 TOTAL - Direct Costs $ 1,573.68 . TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REOUESTED - WORKING DAYS: 1 TIME EXTENSION REOUESTED - CALENDAR DAYS: 1 CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FiElD OVERHEAD (rate pet work day): VAWE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 1,573.58 ThIS cost proposal Is based on the cost elements IdenUfied. Pease & Sons reserves aD rights to additional compensation and time eJdenslon for work elements lden1lfled. unless sDoolficaIJv neaotlated as part of this Change Proposal. Work wiD proceed In accordance wllh the contract documents until the Owner ellhet provides written acceptance of this change proposal or a written directive to proceed In accordance with this proposal. Failure to accept this proposal within the proposal time may result In cost escalation and possible additional delays. This change proposal must be Included as an attachment to OWner change order. NOTICE Is hereby provided that the ContrllCtor reselVes any and all rights to recover direct, Indirect, and consequential com. including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specilicaHy Included and negotiated. 08.Jan-Q9 DATE SUBMITTED 22.Jan-09 PROPOSAL VALID UNTIL PEASE & SONS Bryan HOlemann . Page2of2 1/812009 10:14 AM BREMERTON WWTP 8570 Change Proposal- Lump Sum Basis . DESCRIPTION: PEASE ISSUE fJ: - ..".. - ~.. ~ - Relocate Centrifuge Control Panel, VFD Panels, and Hydraulic Pump per attached drawing, and as discussed on 1/6/09 meeting. 015 Owner Chng II RFII . BILL"OF MATERIALS {Pease & Sons} ITEM DESCRIPTION QTY. UNIT OF LA! roR MATERIAL MEASURE UNITS TOTAL UNIT TOTAL FORM IN PlACE Ea. FDN./03 11 13.40.0020 .22 SFCA 0.3 6.6 3.60 79.20 CONC. CURB4-XS-/32 16 13.13.0300 44 LF 0.1 4.2 4.84 212.96 CIP CONCRETE 1 eN - 97.00 97.00 SHORT LOAD 1 EA - 60.00 60.00 PLACING EO. FDNJ 03 31 05.70.4300 1 CY 0.7 0.7 - EQ. FDN. BRM FNSH./03 35 29.30.0150 25 SF 0.0 0.3 - DRILL RESTEELJ 03 82 16.10.0200 32 EA 0.1 4.1 0.05 1.60 EPOXY DOWEl/03 63 05.10.1530 32 EA 0.2 7.1 3.54 113.28 RESTEEl../03 21 10.6<1.0600 0 TON 13.9 0.5 1,475.00 56.05 - - - . - - - - - - - - - - - - - - - - - - - - - - . - - - - - . - - - - - - - - - - - - - . - - - - - . - TOTALS MANHOURS: 23.6 COST: $ 620.09 . Page 2 . .. . REQUEST FOR INFORMATION (RFI) PSW EL~CTRIC RFl #j(D Owner: CI of Bremerton Pro ct Bremerton WWTPWet Weather Facilllles U rade Preeet#: 5020 En lneer. CH2M HID Contractor: Pease and Sons Reference Draw Reference S lIcallon section: Desafption of request We recommend relocating the centrifuge conto/ler. Cake pump VFD. Polymer pump controUer, the pOlymer pump #2 and the bydraullc pwnp to revised /ocaUons as shown. We beleve that this configuraUon will allow the best access for operation with the new centrifuge. The Centrifuge controller and the hydraulic pump wDl be mounted on 128 concrete pads. the cake pump VFD and the POlymer pump VFD will be Installed on sa unistrut mOtlnf$. Please confirm approval of Ihese modifications to layout of electrical control equipment and the hydraulic pump. Submission Date: Review Priorit Dale for R onsa: 1/512008 inl2008 M004, Moo5, E003 -.------...--...--- ~-~\ d ~,-- n ~ / ~ / ( @g\ '-. .J:==I - .. 'l::; L~ I p~~merPum0 ~ ""SHIPS lADDER ':r p r-ll POLYMER vro/ ...,. , i ! j - ~ CENTRI~ .:: k-------.-.--.__.-'--_~_~__:x:__:......_.l____ Cosllmpact No Increased eleclrlcal cosllmpact Schedule knpact: NONE Comments: Submitted By: Tille Company Don Wolfrom Project Manager PSW E10clric CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Nine .OJECT: WWTP Upgrade Page 1 Of 1 Project #: 5020 CONTRACTOR: Pease and Sons Date: January 13, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Provide unspecified mechanical seals and Atra Flex couplings for centrifugal WAS pumps. A TT ACHMENT(S): Fairbanks Morse Change Proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: D D ~ Unit Price D D Contractor's Records Lump Sum Time & Materials Engineer's Records D Other: Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 3,482.18 Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. ~DED: \, ~t11 CONTRACTOR BY:~~ -:- AUTHORIZED: J-tlk.. CITY OF BREMERTON ~ By: 1/( . ab. FORMS, Work Change Directive, 3-00 e (' . . #059.2-Non-Clog Dry-Pit Cent Pumps-WAS 1 & 2 The following information is noted for each outstanding item listed in the submittal comments. item 1- See attached revised spare parts list item 5- We will provide the pump suction/discharge orientation per the drawings ( clockwise rotation, position 5 on our drawing). item 7- We can provide the Atra Flex coupling for an addition charge of $300.00 for both pumps. item 8- Fairbanks Morse will have the slenderness ratio for me today or tomorrow and I will forward once received. item 9- We can provide the requested cartridge AES mechanical seals for an additional charge of $2768.00 for both pumps and spare seal item 10- See attached performance curve showing reduced speeds with efficiency. item 11- See attached Klixon data sheets (legible) . . Ref. No. Fairbanks Morse Pump f'lJrnished Spar~ parts Description 1 4 14 16 17 102 156 203 272 291 456 Impeller Pump Shaft Shaft Sleeve Wear Ring, Fronthead Wear Ring, Impeller Key, Impeller Volute Gasket Cleanout Gasket Coupling Key Handhole Gasket Mechanical Seal 091904SRO Quantity 1 1 1 1 1 1 1 1 1 1 1 SP-5440 CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Ten .OJECT: WWTP Upgrade CONTRACTOR: Pease and Sons Page 1 Of 1 Project #: 5020 Date: January 13, 2009 vdu ARE DIRECTED TO PROCEED PROMPTl V WITH THE FOllOWING CHANGE(S): Extend two stainless steel abrasion plates from 18' to 22' ATTACHMENT(S): Pease and Sons Change Proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: D ~ D - Unit Price D D COl1tractor's Records Engineer's Records Lump Sum . Time & Materials Other: D Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: Substantial Completion: .~ days; $ 926.06 If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMENDED: _~~6e-- ~St r~ CONTRACTOR AUTHORIZED: CITY OF BREMERTON BY:~ ....... ~ .- - By: ./7/{ I . ab, FORMS, Work Change Directive, 3-00 BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis . Ref: Section 01250 COST CODE OH 01030 OH 01031 01513 01512 01624 . 01073 01515 01516 01511 01950 . DESCRIPTION: WORK AREA: Extend abrasion plate length from 18' to 22'In length. Plates to be Installed with 12' and 10' sections abutted together. PEASE ISSUE N: 016 Owner Chng fJ RFI # PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager 0.0 $ . 150.00 $ . Project Superintendent 0.0 '$ 66.62 $ . Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 61.68 $ . Carpenter 0.0 $ 58.35 $ - Laborer 0.0 $ 48.25 $ - Millwright 4.0 $ 58.70 $ 234.82 $ - TOTAL - Pease & Sons Labor 234.82 PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST ForkUft o $ 24.54 $ . Crane o $ 172.72 $ - Boom Truck $ 73.08 $ - Job Truck. Pickup 0.0 $ 9.00 $ - Trash Truck $ 55.00 $ - Compressor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator / Light Plant $ 12.70 $ . Laser $ 11.55 $ - TOTAL - Pease & Sons Equipment $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST Materials (attached) $ 37.50 Strieoh Bros. $ 488.00 $ - $ - $ . $ - TOTAL. Material and Major Equipment suppliers $ 525.50 SUBCONTRACTORS EST. COST $ - $ - $ - $ . TOTAL - Subcontractors $ Page 1 of2 12/31/2008 11:55AM BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis . Ref: Section 01250 DESCRIPTION: WORK AREA: Extend abrasion plate length from 18' to 22' In length. Plates to be Installed with 12' and 10' sections abutted together. COST CODE Owner Chng II RFIIJ PEASE ISSUE II: 016 CONTINUED FROM PAGE 1 012 SUBTOTAL. DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 760.32 BOND & INSURANCE 1.5% $ 11.40 SUBTOTAL $. 771.72 OVERHEAD & PROFIT 20% $ 154.34 TOTAL - Direct Costs $ 926.06 . TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED. WORKING DAYS: 1 TIME EXTENSION REQUESTED - CALENDAR DAYS: 1 CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ . HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ . SUBTOTAL $ - PROFIT @ 10% $ . TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 926.06 This cost proposal Is based on the cost elaments Identified. Pease & Sons reserves all rights to additional compensation and time extension for wor!< elements Identified, unless SDeclficallv negotiated as part of this Change Proposal. Work will proceed In accordance wllh the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed In accordance with this proposal. Failure to accept this proposal within the proposal time may result in cost escalation and possible additional delays. This change proposal must be Included as an attachment to Owner change order. NOTICE Is heraby provided that the Contractor reserves any and all rights to recover direct, Indirect, and consequential costs, Including but not limited to the cost of delay and Impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically Included and negotiated. ~- PEASE & SONS 31-0eo-08 DATE SUBMITTED .14-Jan-09 PROPOSAL VALID UNTIL Bryan Hlllemann . Page 2 01 2 12J31/2008 11:55 AM '\ BREMERTON WWTP 8570 Change Proposal.. Lump Sum Basis e DESCRIPTION: Extend abrasion plata length from 18' to 22' in length. Plates to be installed with 12' and 10' sections abutted together. PEASE ISSUE #: 016 Owner Chng # 0 RFI # BILL OF MATERIALS (Pease & Sons) ITEM DESCRIPTION QTY. UNIT OF LABOR MATERIAL MEASURE UNITS TOTAL UNIT TOTAL 3/8"X4" SS Kwlk Bolt 10 ea - 3.75 37.50 - - - - - - - . - - - . . - - . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - . - - - - - - - - - - - - - - . - - - - TOTALS MANHOURS: . COST: $ 37.50 . Page 2 CITY OF BREMERTON WORK CHANGE DIRECTIVE 'WCD#: Eleven .OJECT: WWTP Upgrade CONTRACTOR: Pease and Sons Page 1 Of 1 Project #: 5020 Date: January 16, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOllOWING CHANGE(S): Supply and install fiberglass cable. trays in headworks in lieu of specified aluminum cable trays. ATTACHMENT(S): Pease and Sons Change Proposal If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: o rg] -i Unit Price o o Contractor's Records Lump Sum Time & Materials Engineer's Records 'Other: o Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: $ 3,319.38 Substantial Completion: o days; If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 0 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. R~ AUTHORIZED: CONTRACTOR .~ '~7/L C~ OF BREMERTON By: AIe--1) ~VE)L By: ~ ilrll~~ . ab, FORMS, Work Change Directive, 3-00 '~.J.:~ , BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 e COST CODE OH 01030 OH 01031 01513 01512 .24 ~1073 01515 01516 01517 01950 . DESCRIPTION: Supply and install fiberglass cable trays in headworks in lieu of specified aluminum trays. WORK AREA: PEASE ISSUE #: Owner Chng # RFI # PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager / 0.0 $ 150.00 $ - Project Superintendent 0.0 $ 66.62 $ - Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 61.68 $ - Carpenter 0.0 $ 58.35 $ - Laborer 0.0 $ 48.25 $ - Millwright 0.0 $ 58.70 $ - $ - TOTAL - Pease & Sons Labor PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift 0 $ 24.54 $ - Crane 0 $ 172.72 $ - Boom Truck $ 73.08 $ - Job Truck - Pickup 0.0 $ 9.00 $ - Trash Truck $ 55.00 $ - Compressor $ 14.36 $ - Welding Ma,chine $ 10.34 $ - Generator / Light Plant $ 12.70 $ Laser $ 11.55 $ - TOTAL - Pease & Sons Equipment $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST $ - $ - $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ SUBCONTRACTORS EST. COST PSW Electric $ 2,919.93 $ - $ - $ - TOTAL - Subcontractors $ 2,919.93 Page 1 of 2 2/3/2009 12:47 PM , . v . i~ '" BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis tif: Section 01250 DESCRIPTION: Supply and install fiberglass cable trays in headworks in lieu of specified aluminum trays. WORK AREA: COST CODE PEASE ISSUE #: Owner Chng # RFI# CONTINUED FROM PAGE 1 of 2 SUBTOTAL- DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 2,919.93 BOND & INSURANCE 1.5% $ 43.80 SUBTOTAL $ 2,963.73 OVERHEAD & PROFIT 12% $ 355.65 TOTAL - Direct Costs $ 3,319.38 . TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 3,319.38 This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements identified, unless specificallv neaotiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time may result in cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. PEASE & SONS, 03-Feb-09 DATE SUBMITTED 17-Feb-09 PROPOSAL VALID UNTIL Bryan Hillemann . Page 2 of 2 2/3/2009 12:47 PM '. . . TRANSMITTAL PEASE & SONS, INC. P.O. BOX 44100 · Tacoma; Washington 98444-0100 10601 Waller Road East · (253) 531-7700 · Fax (253) 537-8113 Contractor Registration No. CC01-PE-AS-ES*302PO E-mail address:mai1@Deaseandsons.com To: Bremerton WWTP Date: December 16, 2008 Contract #: . Job Number: 8570 Job Name: BREMERTON WWTP Location: Bremerton,WA Attn: Ned Lever . . a We are sending you 0 herewith 0 under separate cover, the following items: o Plans o Specifications o Proposal Request o Substitution Request o Shop Drawings o Samples o Field Authorization o Prevailing Wage o Copy of Letter o RFI 1:1 Other: CD ROM 0" SUBMITTAL # P&S Issue #014 These are transmitted as checked below: 12] For Approval o For Your Use o Resubmit D Approved as Submitted D Approved as Noted _Copies for Approval o As Requested D For Correction o For Review and Comment Copy To: Signed: FlLE, FIELD .Jttl'lt.911:E./V v1W~ Project Ex-peditor . . . BREMERTON WWTP 8570 Chanrle Proposal ~ Lump Sum Basis, Ref: Seelion 01250 DESCRIPTION: Supply and Install fiberglass cabl& trays In head~orks In lieu of specified aluminum tra}'s. WORK AREA: COST CODE PEASE ISSUE #: 0/1 OH 0.1030 OH 01031 01513 01512 01624 01073 01515 ;01616 01517 01950 Owner Chng ., RFt# PEASE & SONS LABOR HOURS. ... HOURLY RATE EST. COST Project Manager 0.0 $ .150.00 $ - Project Superlntendent 0.0 $ 66.62 $ - Project Engineer 0.0 $ 95.00 .$ - Carpenter Foreman 0.0 $ 61.66 $ - Carpenter 0.0 $ 58.35 $ - Laborer 0.0 $ 48.25 $ - Millwright 0.0 $ 58.70 $ - $ . TOTAL - Pease & Sons Labor :,;, PEASE: & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift o $ 24.54 $ . Crane o $ . 172.72 $ - Boom Truck. $ . 73.08 $ - Job Truck. - Pickup 0.0 $ 9.00 $ . Trash Truck $ 55.00 $ - COmpressor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator I Light Plant $ 12.70 $ - Laser $ 11.55 $ - TOTAL- Pease & So~ Equipment $ MATERlALAND MAJOR EQUIPMENT SUPPUERS EST. COST $ - $ - $ - $ - $ - $ - TOTAL - Malerial and Major Equipment Supplers $ SUBCONTRACTORS EST. COST PSW Electric $ 2,919.93 $ - $ ~ $ . TOTAL - Subcontractors $ 2,919.93 Page 1 of2 . .', .........--......._......._ '''''_''__.__..un 12116/2008 12:33 PM . . ~ .... ......-..--........... --- ..-- . . . BREMERTON WWTP 8570 Change 'Proposal.. Lump Sum Basis Ref: Section 01250 DESCRIPTION: Supply and install fiberglass cable trays in headworks in lieu of specIfied ~Iuminum trays. WORK AREA: COST CODe PEASE ISSUE #: Owner Chng # RFI# CONTINUEI> FROM PAGE 1 of2 , SUBTOTAL - DIRECT COSTS . EST. COST SUBTOTAL - DIRECT COSTS $ 2,919.93 BOND & INSURANCE 1.5% $ 43.80 SUBTOTAl. . $ 2.963.73 OVERHEAD & PROAT 20% $ 592.75 755.(",\ TOTAL. Direct Costs $ 3,558.41 TIME .EXreNSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED- WORKING DAYS: .. TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTMTY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rale per work day): VALUE OF EXTENDED FiElD OVERHEAD $ . HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ . . SUBTQTAL $ . PROFIT @ 10% $ . TOTAL - lime Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ 3,556.47 This cost proposal is based on the cost elements identified. Pease & Sons r88tWes aR m,hts to additional compensation and time extension forwolk elements identified, unless specificallY neCloliated 8S part of this Change Proposal. Work wilt proceed In' accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance wlth this proposal. Failure to accept this proposal within the proposallimEl may result in cost escalaUon and possible additional delays. This change proposal must be Included a8 an attachment to Owner change order. NOTICE Is hereby provided that Ihe Contractor reS8/VElII any and all rfghts to recov~r direct, indirect, and consequential costs, including but. not limited to \he cost of delay and impact related to any work cover by this change or olhelwise affected by this change unless the cost and/or time have been specifically Included and negotiated. 16-Dec-08 DATE SUBMITTED 3O.0e0-08 PROPOSAL VAUD UNTIL PEASE Be SONS Bryan HiDemam Page 2 of2 12/1612006 12:33 PM . .,', . . '. ..' . . . .....__'-.. ..~.~..~..,,_~.~...--_~__..._.._.._..____.__...._.._ .. n______ ........ . . . Bremerton WWTP Wet Weather Facilities Up~ade weD #_ PSW Ele.ctric Breakdown Summary ~NO. weD Project Number: 165 PR No. General Contractor. Pease And Sons,. Ine. Scope: Change Alllmlnum Cab{e tray to Flberglil$$ In Headwolks 1. ELECTRICIAN LABOR COSTS '. 0.00 HR a. Journeyman electrIcian Iabor@ b. Journeyman burden @ 10.61 HR c. foreman electrIcian @ d. foreman burden @ 0.00 HR e. superintendent electrician @ f. superintendent burden @ Supervision 9- direct supervIsion (HTE 16% of 1a.1) h. safety (NTE 3% of JInes 1a,lt.c,d,e 8. 1) I. Delivery truck and driver ($60 per' hour) 2. MATERIALS COSTS Ii. material costs b: quote: c. quote: 3. EQUIPMENT COSTS a. owned equipment (per.spec approved source) b. rental equipment (pllr InllOlce$ attached) 4. SMALL TOOLS a. small tools (NTS 0% of ie, C 8. e) 6. OVERHEAD a. HTE 10% portion of 1,2,3&4 6. ALLOWANCE FOR PROAT (NTE 10% OF 1,2,3&4 ) 1. SUBCONTRACTORS a. b. c. d. $39.84. 62.00% $43.82. 49.00% $47.81 62.00% DIRECT LABORSUBTOTAl. 8. OVERHEAD ON SUBCONTRACTORS (IIITE 10% OF 7) 9. PROFIT ON SUBCONTRACTORS (NTE 10% OF 7 ) 10. INSURANCE a. payroll driven liability lfIsurance (2% of 1) b. volume driven liability Insurancs (O% of 1 thru 7) 11. BOND a. bond (0% of 1 thru i0) 12I1812lKl8 . ~'. .'-. . ......._..-......_.__...~..- 0.00 0.00 460.55 225.67 0.00. 0.00 686.22 102.93 20.59 0.00 1610.04 0.00 0.00 0.00 0.00 0.00 Date Submitted: 1218J2008 1. CIW'T lABOR COSTS 809.74 ,. 2. MATERIAL COSTa 1610.04 3. EQUIPMI!NTCOm 0.00 4. SMALl. TOOLS 0.00 SUBTOTAL 1,2,3,&4 2419.78 ,. OVI!RHeAD 241.98 S. PROFIT 241.98 7.8UBCOHTRACTOItS 0.00 t. OVERHEAD ON SUSCONTRAC'TORS 0.00 t. PROI'ITONSUSCONTRACTORS . 0.00 10. INSURANCe 16.19 11. BOND '0.00 TOTAI.COSTHHRU111 $2,919.931 .1~...CQbI. nay In H8ICfv.ooff<s (3) e . . Dee 15 2008 1:51PM PS~ ELECTRIC INC_ 13603771832 " .' TO; B1jan flilJ,';"""o FaDM, Don Wolfrom. COMPANY. DA'1'l!: Pease and Sons FAX NUMllB:II. (253) 537--8113 PHONE NUt.mBR! 12/15/08 TOTAL NO. Ot" PAGliS CNC1.UD1JoJG COVl!.lt, 2. ,l;BNDER'S lIBPBIl.BNCe NUMIllOR, p.l 'PEASE & SONS, \Me. . Ute , '2. 'lOOB ~C'O V\A fA){ REo COP back up as requested YOUR RSPEftBNCR NUMBE:R: ~ " URGENT o PLBASE COMMENT Ii! PLEASe. IillPLY [J I'LB.ASE RECYCLE FOll REVIEW Nores/Coft'\i'nPnm: Bzyan, Here is the back up as youuquested. IE you ba.ve ~y c:oncetiLs 0% qucstio:ns. please cOntact m.e. Sincerely, Don Wol.6:otti / PSW Office--(360) 377-4660 CeU---(360) 340-8159 E-Mall--don@paweJect:ti.c.com ..... 3375 NORTHLAKE WAY NW 98312 BREMERTON, WA 12/15(08 MON 13:47 [TX/RX NO 6390) . . . . . " . .......~_..~~u....,~...~.... .. .... .,., ..._.....~_____.... .. .." ....____... _____............. ,... ... .. ...._....._u.__... ,.... ...._.;.;.:.:..':..~..._...._..____._.~_~_..._ " .' . . '---'-'~-'~_._-.._~..__. '.. , . i i i I I I I I I !. Dee 15 2008 1:51PM PSW ELECTRIC INC. UI812008 1 :23:01 PM . ,-.... 7163 7218 7497 lOCOS rOOO1 TOOOI T0002 rOODS '---' . ".....,. '18& Bremerton WWTP . Fiber Cable Tray 'Job Numb.,r: 48 ' BId EI UIIImJry: Defllult, extension By Section Quantity Prlca U -- A~erglaB8 Cable Tray:~, , 70' 27.20 E 2 139,00 E 2 19.22 E 14 5.00 E 14 , 4.50 E ,14 Description Fiber't:abla Tray/Rungs 6" Apartl4"Dl6'W 9DD8g Fiber Cable Tray EIboWs-6"Runga/3"Dx6'W Fiber Cable Tray EIId Plates-6" Wide Fiberglasa sltut Fibergla15 Hold Down Kit , ,-,- Fiberglass Ceble Tray TOlaf -- 13803?71832 p.2 6''x4'' Alwnlnum Cable Iray 9ooB9 Aluminum Cable tray Elbow , A1urnl\11lm CAble Tray end Plato , . , ..:~ Credit Aluminum Cabls Tlay TOlal - Job Total .- Credit Aluminum Cable Tray-- -70 8.40 E -2 51.70 E -~ 10.00' e Page 1 .' Elrt PtlC& ,Labor Hr U Ext Lab Hr .. . ... ~ ... ...... 1.904.00 ,': :..18.00 C 12.60 259.00 3.85 E 7.70 38.44 0.65 E 1.30 70.00 10.00 C 1.40 83.00 ,0.15 E 2.10 I.- 2,3~.44 , 25.10 -688.00 ,13.50 C -9.45 ,I -115.40 2.20 e -4.40 -20.OQ 0.37 E .0.74 -723.40 -14.59 1,610.04- lQ.ll~ " I, I I I I I . Target, l...abOt column 3 . 12/15/08 MON 13;47 [TX/RX NO 63BO} ... . " \ .. ...... .-..-.._-- ...._._.~~.......~..~.~......-.._.._....- CITY OFBREMERTON WORK CHANGE DIRECTIVE WCD#: Twelve Page 1 Of 1 RO~ECT: WWTP Upgrade CONTRACTOR: Pease and Sons Project #: 5020 Date: February 6, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOllOWING CHANGE(S): Relocate valve 46224 to centrifuge. A TT ACHMENT(S}: Pease Change Proposal If a claim is made that the above change(s} have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s}. The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 100f the General Conditions. 0 Unit Price [gJ lump Sum 0 Time & Materials -. -.J Other: Method of determining change in Contract Times: o Contractor's Records o Engineer's Records Method of determining change in Contract Price: o Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: Substantial Completion: 5 days; $ 1,500.00 If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 5 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. RECOMMENDED: '~ J:z:~- AUTHORIZED: -----, ~'i/( CIT~F BREMERTON By: ~ED ~V82 By: ~ ~, M((~(p{f11 ab, FORMS, Work Change Directive, 3-00 BREMERTON WWTP 8570 Change Proposal- Lump Sum Basis ~( COST CODE OH 01030 OH 01031 01513 01512 01624 073 01515 01516 01517 01950 DESCRIPTION: WORK AREA: Relocate Valve #FV46224 and reroute #2 water at Centrifuge to provide wash down. Centrifuge PEASE ISSUE #: Owner Chng # RFI# PEASE & SONS LABOR HOURS HOURLY RATE EST. COST Project Manager 0.0 $ 150.00 $ - Project Superintendent 0.0 $ 93.57 $ - Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman: 0.0 $ 86.64 $ - Carpenter - 0.0 $ 71.00 $ - Laborer 0.0 $ 59.60 $ - Millwright 0.0 $ 72.53 $ - $ - TOTAL - Pease & Sons Labor PEASE & SONS EQUIPMENT HOURS .HOURLY RATE EST. COST Forklift 0 $ 24.54 $ - Crane 0 $ 172.72 $ - Boom Truck $ 73.08 $ - Job Truck - Pickup 0.0 $ 9.00 $ - Trash Truck $ 55.00 $ - Compressor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator / Light Plant $ 12.70 $ - Laser $ 11.55 $ - TOTAL - Pease & Sons Equipment $ MATERltLAND MAJOR EQUIPMENT SUPPLIERS EST. COST Materials (attached) $ 254.77 $ - $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ 254.77 SUBCONTRACTORS EST. COST Pease Piping, Inc. $ ~ ,'LV. $ - $ - $ - TOTAL - Subcontractors $ ..1,.U.O..4+r Page 1 of 2 c{':&e ~0l-- ~n9- ~'O-"''- 2/3/2009 7:56 AM BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis DESCRIPTION: WORK AREA: Relocate Valve#FV46224 and reroute #2 water at Centrifuge to provide wash down. . . Centrifuge COST CODE PEASE ISSUE #: RFI# Owner Chng # CONTINUED FROM PAGE 1 of 2 SUBTOTAL - DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ 1 ,ST,). 18" \ BOND & INSURANCE 1.5% $ I SUBTOTAL $ .., ^, ^ - OVERHEAD & PROFIT 20% $ i- .....,."..,."u TOTAL - Direct Costs $ ..2, 1 QIi.71 TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: 3 TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFIcE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Related Costs $ TOTAL CHANGE ORDER REQUEST: $ ~ -r ,-zJ( ~~~3~~ 1'Z_5~.. ~ L-S-~;J '5b --- l{;UI i> A ~ ,~ I GctL 0g This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements identified, unless specificallv neaotiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time may result in cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change' unless the cost and/or time have been specifically included and negotiated. 03-Feb-09 DATE SUBMITTED PEASE & SONS Bryan Hillemann Project Manager Page 2 of 2 17 -Feb-09 PROPOSAL VALID UNTIL 2/3/2009 7:56 AM BREMERTON WWTP 8570 Chang~ Proposa/~Lump Sum Basis Pease Piping DESCRIPTION: oEASE ISSUE #: 00 #VALUEI TCFlPC CL # 00 RFI: ...~ PEASE PIPING LABOR HOURS HOURLY RATE EST. COST Plumber! Fitter Foreman 3.0 $ 96.56 $ 269.69 Pipe Fitter $ 60.42 $ - Plumber 15.0 $ 60.42 $ , $ - $ - TOTAL - Pease Piping Labor -.J !neB 1, 502,0/1 ~&Z-'- ~.3 PEASE PIPING EQUIPMENT HOURS HOURLY RATE EST. COST Forklift $ 24.54 $ - Boom Truck $ 73.06 $ - Compressor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator! Light Plant $ 12.70 $ - Laser $ 11.55 $ - TOTAL - Pease Piping Equipment $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ I ~ I SUBCONTRACTORS EST. COST . OTAL - Subcontractors $ GENERAL RELATED COSTS. HOURS HOURLY RATE EST. COST Change Order Processing Fee Lump Sum $ 75.00 Estimating $ 75.00 $ - As-Built Drawings 1. .$ 55.00 TOTAL - General Related Costs $ TOTAL - Direct Costs $ w7zjp '3 f-~~ SUBTOTAL - DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ OVERHEAD & PROFIT@ 15% $ ~ IJTI6.41 TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: 3 TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED. FIELD OVERHEAD $ - EXTENDED FIELD OVERHEAD @ 15% $ - SUBTOTAL $ - PROFIT@ 10% $ - TOTAL CHANGE ORDER REQUEST: $ ~1 qttP- 02- TOTAL - Time Extension and Rel<:ited Costs $ This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements identified, unless specifically negoiated as part of this Change Proposal. Work will proceed in 'lccordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written -ective to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time will result in cost _~calation and possible additional delays. PEASE & SONS GORDON PEASE - PROJECT MANAGER DATE SUBMITTED PROPOSAL VALID TIL Page 1 BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis ~SCRIPTION: cASE MOD NO: 00 #VALUEl rCF/PC CL 100 ,,'.' RFI: BILL OF MATERIALS (Pease Piping) ITEM DESCRIPTION QTY. UNIT OF LABOR MATERIAL MEASURE UNITS TOTAL UNIT TOTAL 1" SS 150# Thrd Tee 1 ea 1.5 1.5 - - 2" SS 150# Thrd Union 1 ea 2.0 2.0 - 2X3 SS Sched. 40 3 ea 0.1 0.2 - 3" SS Std. Clevis HGR 3 ea 0.9 2.8 15.35 46.05 2" SS Std. Clevis HGR 3 ea 0.9 2.6 9.41 28.23 3" Sched. 80 PVC 20 If 0.1 1.6 1.92 38.40 2" Sched. 80 PVC 20 If 0.1 1.4 0.94 18.80 3" Tee Sched. 80 PVC 1 ea 0.6 0.6 8.62 8.62 3" ADPTR MPTXS Sched. 80 2 ea 0.2 0.4 6.18 12.36 2" ADPTR MPTXS Sched. 80 1 ea 0.2 0.2 4.90 4.90 2" 90 EL Sched. 80 PVC 2 ea 0.3 0.5 1.78 3.56 3X2 BUSHING SPIGXS Sched. 80 PVC 1 ea 0.2 0.2 7.00 7.00 SLVNT PVC QT GRY LOW VOC 3 ea - 18.39 55.17 PRIMER QT CLR PVC CPVC 2 ea - 15.84 31.68 Roll 90/Adjust 4" DS to accomdate TEE 1 Is 4.0 4.0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - , - - - - - - - - - - - - - - TOTALS MANHOURS: 17.9 COST: $ 254.77 Page 2 Harrington Industrial Plastics 4322 South 104th Place Seattle WA 98178 206--,725-9100 206-723-4252 Fax Quotation# Written: Quote Date Expire Date Page 00727532 JJJ 01/29/09 02/28/09 1 OF 1. Quotation 040305 PEASE & SONS INC Ship To: PEASE & SONS 10601 WALLER ROAD EAST POBOX 44100 TACOMA, WA 98448-0100 TACOMA, WA 98446 1. )(07 Job: RFQ# ============================================~================================== Contact: MARK Phone#: 253-531-7700 Fax: 253-537-8113 Ship Via: BEST WAY POSSIBLE FOB / Delivery ARO: SHIPPING POINT Frt-Tenns: CHRG INBOUND & OUTBOUND It/'f ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- product/Description Quantity Price U/M Extension --------------------------------------------~---------------------------------- 800-020 21f PIPE PiE PVC SCH80 20 1.92 FT 38.40 V 20 0.94 FT 18. 80 ~--- 1 8.62 EA 8.62 1// 2 6.18 EA 12.36 -,/ 1 4.90 EA 4.90 ./ 2 1.78 EA 3.56OV' 1 7.00 EA 7.00,-", 800-030 311 PIPE PiE PVC SCH80 801-030 311 TEE S PVC SCH80 b ,-030 31f ADAPTER MPTxS PVC SCH80 836-020 21f ADAPTER MPTxS PVC SCH80 806-020 211 90 ELBOW S PVC SCH80 837-338 3lfx21f BUSHING SPIGxS PVC SCH80 SCH80 2711QG SOLVENT CEMENT PVC QT GRY LOW VOC HEAVY BODIED MED SET MC,AC 3 18.39 EA 55.17 /' P70QC PRIMER QT CLR FOR PVC CPVC LOW VOC MC,AC 2 15.84 EA 31.68 '- =============================================================================== Merchandise Tax Est.Freight / Handling Net Quote Total =============================================================================== 180.49 0.00 0.00 180.49 Ttlanks For Thinking Harrington. Respectfully Jeff J. Johnson All Quotations are subject to review upon placement of order. Freight/Handling and applicable taxes if not listed above will be added. Harrington standard tenns and conditions apply to this quote. Attention: Company: To: From: Subject: Memo: Harrington Industrial Plastics LLC Harrington Industrial Plastics 4322 South 104th Place Seattle W A 98178 Phone: 206-725-9100 MARK PEASE & SONS INe mark@peaseandsons.com Jeff 1. Johnson QUOTE 00727532 j;" Fax: 206-723-4252 n ~!51l ....~. a^ .l..1L..CJ/~VVCJ ~....;'-' .t"""l""\.UJ....:.. VV-L/VV.L ~. a.^ IJG.L v G.L ~FERGUSON ENTERPRISES, INC: FEI- TACOMA #3006 3517 PACIFIC HIGHWAY, EAST TACOMA, WA 98424 Deliver To: MARK From: Ronald Butz Comments: 14:4LI:02 JAN 29 2009 . FERGUSON ENTERPRISES, INC. FEI - SEA TILE #3206 Price Quotation Phone: 253-922-9060 Fax: 253-922-2813 Page # 1 Bid No.......: B243776 Bid Date....: 01/29/09 Quoted By.: RLB Cust Phone: 253-531-7700 Terms........: NET 10TH PROX Customer: PEASE & SONS INC PO BOX44100 TACOMA. WA98446 Ship To: PEASE & SONS INC PO BOX 441 00 TACOMA. WA 98446 Cust PO#...: Job Name: Item Description Quantity 1 1 3 3 3 Net Price UM Total IS6CTTG IS6CTU K DS46NKM N1SSM N1SSK 1 SS 316 150# THRD TEE 2SS316 150#THRD UNION 2X3 SS SCH40 316 NIP 3 SS 304 sm CLEVIS HGR 2 SS 304 sm CLEVIS HGR 4.800 EA 23.200 EA 9,890 EA 15.350 EA 9,410 EA -'.4,80 .. --2J,2g- --29:6"'--- 46.05 .---- 28.23 L,../ Net Total: Tax: Total: 131.95 0,00 131.95 Quoted prices are based upon receiRt of the total quanti1y for immediate shipment (48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT. Quotations are offered contingent upon the Buyer's acceptance of Seller's terms and conditions. Seller objects to all other terms and conditions. Seller not responsible for delays or lack of Rroduct due to causes beyond our control. Purchaser's sole warranties. If any:. are those provided by the manufacturer. SELLER DISCLAIMS ALL EXPRESSED OR IMPLIED WARRANTIES, INCLUDING ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS OR FITNESS FOR A PARTICULAR PURPOSE. IN NO EVENT WILL SELLER BE LIABLE FOR ANY INCIDENTAL, PUNITIVE. SPECIAL OR CONSEQUENTIAL DAMAGES ARISING DIRECTLY OR INDIRECTLY FROM THE OPERATION OR USE OF THE PRODUCT. SELLER'S L1ABLlTY, IF ANY, SHALL BE LIMITED TO THE NET SALES PRICE RECEIVED BY SELLER. Complete Terms and Conditions are available upon request or can be viewed on the web at www.ferguson.com/sales-terms.html. (~(~ j}~1!J S ------- CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Thirteen Page 1 Of 1 ROJECT: WWTP Upgrade Project #: 5020 Date: February 6, 2009 CONTRACTOR: Pease and Sons YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Relief Valve at Polymer Pump A TT ACHMENT(S): If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. D Unit Price ~ Lump Sum D Time & Materials .J Other: Method of determining change in Contract Times: D Contractor's Records D Engineer's Records Method of determining change in Contract Price: D Other: Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: Substantial Completion: 5 days; $ 1,800.00 If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Ready for final payment: 5 days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. AUTHORIZED: ~/(> CI~ OF BREMERTON By: /"/EV 6wEIC RECO~ ~ CONTRACTOR By: ~&'. .ttlt~ ---. ab, FORMS, Work Change Directive, 3-00 CITY OF BREMERTON WORK CHANGE DIRECTIVE WCD#: Thirteen Page 1 Of 1 ~OJECT: WWTP Upgrade CONTRACTOR: Pease and Sons Project #: 5020 Date: January 30, 2009 YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S): Relief Valve at Polymer Pump ATTACHMENT(S): If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order is based thereon will involve one or more of the following methods of determining the effect of the change(s). The Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of the General Conditions. Method of determining change in Contract Price: Method of determining change in Contract Times: D Contractor's Records D Engineer's Records D Unit Price cgJ Lump Sum 0 Time & Materials ~ Other: D Other: Estimated increase (decrease) in Contract Price: $ Estimated increase (decrease) in Contract Times: ~ o\-- Substantial Completion: % days; Ready for final payment: P" ~ days; If the change involves an increase, the estimated times are not to be exceeded without further authorization. If the change involves an increase, the estimated amount is not to be exceeded without further authorization. RECOMMENDED: AUTHORIZED: CONTRACTOR CITY OF BREMERTON By: By: ab, FORMS, Work Change Directive, 3-00 BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 COST CODE OH 01030 OH 01031 01513 01512 M624 '073 01515 01516 01517 01950 DESCRIPTION: WORK AREA: Install Relief Valve at Polymer Pump Centrifuge PEASE ISSUE #: Owner Chng # RFI# PEASE & SONS LABOR ,HOURS HOURLY RATE EST. COST Project Manager 0.0 $ 150.00 $ - Project Superintendent 0.0 $ 93.57 $ - Project Engineer 0.0 $ 95.00 $ - Carpenter Foreman 0.0 $ 86.64 $ - Carpenter 0.0 $ 71.00 $ - Laborer 0.0 $ 59.60 $ - Millwright 0.0 $ 72.53 $ - $ - TOTAL - Pease & Sons Labor PEASE & SONS EQUIPMENT HOURS HOURLY RATE EST. COST Forklift 0 $ 24.54 $ - Crane 0 $ 172.72 $ - Boom Truck $ 73.08 $ - Job Truck - Pickup 0.0 $ 9.00 $ - Trash Truck $ 55.00 $ - Compressor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator I. Light Plant $ 12.70 $ - Laser $ 11.55 $ - ) TOTAL - Pease & Sons Equipment $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST Material (attached) $ 871.82 $ - $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ 871.82 SUBCONTRACTORS EST. COST Pease Piping, Inc. $ - $ - $ - $ - " hq~.OJ TOTAL - Subcontractors $ Page 1 of2 2/3/2009 7:53 AM BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Ref: Section 01250 DESCRIPTION: WORK AREA: Install Relief Valve at Polymer Pump Centrifuge COST CODE PEASE ISSUE #: Owner Chng # RFI# CONTINUED FROM PAGE 1 0(2 SUBTOTAL - DIRECT COSTS EST. COST rL\~ SUBTOTAL - DIRECT COSTS $ -0..,. 0'"' BOND & INSURANCE 1.5% $ ~ -z...' '- ~ SUBTOTAL $ ~ \ '-~2> ' OVERHEAD & PROFIT 20% $ ~ 7- C. TOTAL - Direct Costs $ ~,~ ~-4? ~ \ (J'-' cb ..."""')-( ~ z:~ 1 t/; TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: 3 TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - HOME OFFICE OVERHEAD, BONDS AND INSURANCE @ 16.5% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL CHANGE ORDER REQUEST: $ ~ TOTAL - Time Extension and Related Costs $ This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation extension for work elements identified, unless specificallv neqotiated as part of this Change Proposal. Work will proceed in accordance with the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed in accordance with this proposal. Failure to accept this proposal within the proposal time may result in cost escalation and possible additional delays. This change proposal must be included as an attachment to Owner change order. NOTICE is hereby provided that the Contractor reserves any and all rights to recover direct, indirect, and consequential costs, including but not limited to the cost of delay and impact related to any work cover by this change or otherwise affected by this change unless the cost and/or time have been specifically included and negotiated. PEASE & SONS 03-Feb-09 DATE SUBMITTED 17-Feb-09 PROPOSAL VALID UNTIL LARRY BOYD Page 2 of 2 2/3/2009 7:53 AM BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis Pease Piping DESCRIPTION: "EASE ISSUE #: 00 #VALUE! TCF/PC CL # 00 RFI: - HOURS HOURLY RATE EST. COST 96.56 $ 193.13 ~-(# 80.42 $ 80.42 $ ~ $ d~~ $ PEASE PIPING LABOR Pipe Fitter Foreman Pipe Fitter Plumber TOTAL - Pease Piping Labor PEASE PIPING EQUIPMENT HOURS HOURLY RATE EST. COST Forklift $ 24.54 $ - $ - Boom Truck $ 73.08 $ - Compressor $ 14.36 $ - Welding Machine $ 10.34 $ - Generator I Light Plant $ 12.70 $ - Laser $ 11.55 $ - TOTAL - Pease Piping Equipment $ MATERIAL AND MAJOR EQUIPMENT SUPPLIERS EST. COST $ - $ - $ - $ - TOTAL - Material and Major Equipment Suppliers $ . rBCONTRACTORS TOTAL - Subcontractors Ii $ EST. COST GENERAL RELATED COSTS HOURS HOURLY RATE EST. COST Change Order Processing Fee Lump Sum $ 75.00 Estimating $ 75.00 $ - As-Built Drawings 1 $ 55.00 TOTAL - General Related Costs $ - ~\ Gt~-~ /]1;;--'1/ ,~ ~11 ~1--,r c; vrz,,, ~ SUBTOTAL - DIRECT COSTS EST. COST SUBTOTAL - DIRECT COSTS $ ~8 OVERHEAD & PROFIT@ 15% $ 173J:3., TOTAL. Direct Costs $ TIME EXTENSION AND RELATED COSTS EST. COST TIME EXTENSION REQUESTED - WORKING DAYS: 3 TIME EXTENSION REQUESTED - CALENDAR DAYS: CPM ACTIVITY NUMBERS AFFECTED: EXTENDED FIELD OVERHEAD (rate per work day): VALUE OF EXTENDED FIELD OVERHEAD $ - EXTENDED FIELD OVERHEAD @ 15% $ - SUBTOTAL $ - PROFIT @ 10% $ - TOTAL - Time Extension and Related Costs $ on 07 ~ l L..-.- TOTAL CHANGE ORDER REQUEST: $ _1.~':t1.~ This cost proposal is based on the cost elements identified. Pease & Sons reserves all rights to additional compensation and time extension for work elements identified, unless specifically negoiated as part of this Change Proposal. Work will proceed in accordance 'Ih the contract documents until the Owner either provides written acceptance of this change proposal or a written directive to proceed lccordance with this proposal. Failure to accept this proposal within the proposal time will result in cost escalation and possible additional delays. PEASE & SONS GORDON PEASE - PROJECT MANAGER DATE SUBMITTED PROPOSAL VALID TIL Page 1 BREMERTON WWTP 8570 Change Proposal - Lump Sum Basis I)ESCRIPTION: EASE ISSUE #: 00 Owner Chnc 0 - #VALUEl RFI# BILL OF MATERIALS (Pease & Sons) ITEM DESCRIPTION OTY. UNIT OF LABOR MATERIAL MEASURE UNITS TOTAL UNIT TOTAL 1 1/2" Sched. 80 PVC Ball Valve 1 ea 1.0 1.0 46.35 46.35 Hayward RV1002E Relief Valve EPDM 1 1/2 FT l' ea 1.5 1.5 419.85 419.85 Gauge 0-100 1 ea 0.5 0.5 74.00 74.00 Gauge Cock 1 ea 0.6 0.6 7.10 7.10 Sched. 80 PVC 1 1/2" 20 If 0.1 2.0 0.68 13.60 2"TEE 1 ea 0.6 ~ 0.6 6.34 6.34 2X1 1/2 Bushing 2 ea 0.2 0.4 2.54 5.08 1 1/2 TEE 1 ea 0.6 0.6 5.07 5.07 1 1/2 45 2 ea 0.3 0.6 3.24 6.48 1 1/2 90 3 ea 0.3 0.9 1.47 4.41 1 1/2 ADPTR MPT 2 ea 0.2 0.4 3.39 6.78 1 1/2 Y STRAINER 1 ea 1.5 1.5 103.20 103.20 2 Y STRAINER 1 ea 2.0 2.0 120.94 120.94 SLVNT PVC OT GRAY 2 ea . 18.39 36.78 - PRIMER OT PVC LOW VOC 1 ea - ' 15.84 15.84 - - - - ,- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - TOTALS MANHOURS: ~ COST: $ 871.82 Page 2 Harrington Industrial Plastics 4322 South 104th Place Seattle WA 98178 206-725-9100 206-723-4252 Fax Quotation# Written: Quote Date Expire Date Page 00727558 JJJ 01/30/09 03/01/09 1 OF 2 Quotation 040305 PEASE & SONS INC Ship To: PEASE & SONS 10601 WALLER ROAD EAST POBOX 44100 TACOMA, WA 98448-0100 TACOMA, WA 98446 Job: RFQ# ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Contact: MARK Phone#: 253-531-7700 Fax: 253-537-8113 Ship Via: UPS GROUND FOB / Delivery ARO: SHIPPING POINT Frt-Terms: CHRG INBOUND & OUTBOUND ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Product/Description Quantity Price U/M Extension 800-015 1-1/2" PIPE PiE PVC SCH80 20 0.68 FT 13.60 1601015 1-1/2" VALVE BALL TUBV SiT PVC EPDM PTFE TYPE 21 230PSI 1 46.35 EA 46.35 801-015 1 ~/211 TEE S PVC SCH80 1 5.07 EA 5.07 801-020 2" TEE S PVC SCH80 1 6.34 EA 6.34 817-015 1-1/211 45 ELBOW S PVC SCH80 2 3.24 EA 6.48 806-015 1-1/211 90 ELBOW S PVC SCH80 3 1.47 EA 4.41 \ 836-015 1-1/211 ADAPTER MPTxS PVC SCH80 2 3.39 EA 6.78 837-251 2I1X1-1/211 BUSHING SPIGxS PVC SCH80 2 2 . 54 EA 5.08 RVl150TE 1-1/211 VALVE PRES RELIEF T PVC EPDM S-75PSI 1 419.85 EA 419.85 YS10150S .1-1/211 Y-STRAINER 8 PVC FPM 1/3211 PERF PLA8T 8CRN 1 103.20 EA 103.20 Y 12008 2>' Y-STRAINER S PVC FPM 1/32" PERF PLAST SCRN 1 120.94 EA 120.94 Continued . Harrington Industrial Plastics 4322 South 104th Place Seattle WA 98178 206-725-9100 206-723-4252 Fax Quotation# Written: Quote Date Expire Date Page 00727558 JJJ 01/30/09 03/01/09 2 OF 2 =~~============================================================================ 1 juct/Description Quantity Price U/M Extension ------------------------------------------------------------------------------- =============================================================================== Merchandise Tax Est.Freight / Handling Net Quote Total ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- 738.10 0.00 0.00 738.10 Ttldnks For Thinking Harrington. Respectfully Jeff J. Johnson All Quotations are subject to review upon placement of order. Freight/Handling and applicable taxes if not listed above will be added. Harrington standard tenus and conditions apply to this quote. Attention: Company: To: From: Subject: Memo: Harrington Industrial Plastics LLC Harrington Industrial Plastics 4322 South 104th Place Seattle W A 98178 Phone: 206-725-9100 Fax: 206:" 723-4252 MARK PEASE & SONS INe MARK@PEASEANDSONS.COM Jeff J. Johnson QUOTE 00727558 Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments: 4708 PEASE & SONS INC WWTP Wet Weather Facilities Upgrade Engineering LEG 12-1 04/08/2008 07/31/2009 06/01/2009 AGREEMENT , SECTION 00500 THIS AGREEMENT is dated the p -+=.' day of A9 {' i \ tJY and between City of Bremerton (hereinafter called OWNER) and " ?e.Q~'~ SCMSI ~C-. (1lGreinafter called CONTRACTOR). in the year 2008 ()WNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK. CONTRACTOR shall complete the WORK as specified or indicated in the Owner's Contract Documents " ~ntitled Bremerton WWTP Wet Weather Facilities Upgrade. ARTICLE 2. CONTRACT TIMES. Substantial Completion for the WORK for the entire Project must be achieved not later than 447 calendar ~ from the date of Notice to Proceed (NTP). Final Completion and Acceptance of the Work must be lwhieved not later than 30 calendar days after Substantial Completion. Constraints to periods of work t'ctivlties and the critical milestone dates for the various Project components are as follows: . . -. .- -- - - - - - - - ,- - - -. - - - -. " -. - - - - ~ . . , ) ,~;(:~;j~{~,.~mfTt1::(~~:r~l,\,;,C}(:"l.'I.l~:,QUi~~':]~~';', ..:l ,: ''Xi1.ti.~lnU;f~;, [)~~\';'t, -r(~ ~! :'_,f~} 1 lO..~ (WA 9&14c() License No. PEASt..~~ ~~fO Agent for service of process: ~\ {\ AGREEMENT 00500-3