Loading...
HomeMy WebLinkAbout08-061 DA TE SUBMITTED: March 5, 2008 BILL # 08 - 0(-, I AGENDA BILL CITY OF BREMERTON CITY COUNCIL ........................................................................................ SUBJECT: Professional Services Agreement with RH2 Engineers for Design of Sheldon Boulevard Sewer. Committee Meeting Date: March 12,2008 COUNCIL MEETING Date: March 19,2008 Department: Engineering Presenter: Michael Mecham Phone: 473-5288 SUMMARY: The sewer in Sheldon Boulevard is deteriorated and needs to be replaced. In addition the pressure main from sewer pump station CE-3 needs to be replaced. The Engineering Division has obtained a PWTF loan for the design and construction of the gravity sewer in Sheldon Boulevard. There are also funds in the Wastewater Capital Budget for construction of the pressure main. The Engineering Division has chosen RH2 Engineers from a list of qualified engineering firms for this type of work. A scope of work, cost and schedule is included in the exhibits attached to the Professional Services Agreement. ATTACHMENTS: 1. Council Summary; 2. Professional Services Agreement. FISCAL IMPACTS (Include Budgeted Amount): $500,000 is budgeted in the 2008 Wastewater Capital budget. The PWTF loan identifies $30,000 for design. The cost of this contract is $67,678.00. APPROV ALS: DEPARTMENT DIRECTOR. , CITY ATTORNEY: FINANCE DIRECTOR: MA YOR: CONSENT AGENDA J8( GENERAL BUSINESS 0 PUBLIC HEARING 0 COMMITTEE CHAIR COUNCIL PRESIDENT: RECOMMENDED MOTION: Move to approve the Professional Services Agreement with RH2 Engineers, Inc. to provide engineering design services for the sewer in Sheldon Boulevard and authorize the Mayor to finalize and execute the necessary agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: ~pprove 0 Deny 0 Table o Continue 0 No Action