Loading...
HomeMy WebLinkAbout4688 Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments: 4688 BREMERTON, PORT OF Street Improvement PW Ops LEG 12-1 02/13/2008 03/31/2008 02/15/2010 01/01/2010 Completed work is fully reimbursable STREET IMPROVEMENT AGREEMENT THIS AGREEMENT, is entered into between the Port of Bremerton, a Washington Port Authority ("Port"),. and the City of Bremerton, a Washington Municipal Corporation ("Contractor"). The parties agree as follows: 1. CONTRACTOR SERVICES. The Contractor shall perform the following services for the Port: Contractor will supply labor and equipment to the Port to install switch vaults, j-vaults, transformer vaults and conduits on the City of Bremerton right of way on or near 2nd Street in Bremerton, Washington as directed by the Port and for the purpose of installing electric utilities for the Port expansion project. All vaults and conduits will be owned by Puget Sound Energy and provided by the Port. Installation of all vaults and conduits will be installed as per Puget Sound Energy standards and drawings supplied. Contractor will also provide labor, equipment and material to restore the right of way to conform with the City of Bremerton's standards and specifications. 2. TIME OF COMMENCEMENT OF WORK. Contractor shall commence work within one week of the parties' execution of this Agreement. Contractor will attempt in good faith to complete underground work within one month of commencement of work and restoration to follow weather permitting. 3. COMPENSATION. The Port shall pay the Contractor based on time and material at the City's cost. The Contractor shall send an invoice to the Port at the end of each month for services performed the previous month. 4. INDEPENDENT CONTRACTOR. Contractor is and shall be at all times acting as an independent contractor and not as an employee of the Port. 5. TERMINATION. The Contractor's obligations under this Agreement will terminate upon completion of the services described herein and inspection by Puget Sound Energy according to its standards. The Port's obligations under this Agreement will terminate upon its payment of the final invoice. 6. CHANGES. The Port or Contractor may issue a work change directive for any change in the Contract work during the performance of this Agreement. The work change directive must be in writing and submitted to the person designated for notice in this Agreement. The parties will attempt, in good faith, to reach agreement with each other on all equitable adjustments. However, if the parties are unable to agree, the Contractor will determine the equitable adjustment as it deems appropriate. If the Port disagrees with the equitable adjustment the Port must submit a written notice of protest within five days ofthe Contractor's notice to the Port of the equitable adjustment. The Port shall pay for all services related to a disputed equitable adjustments into an escrow account until the matter is resolved as set forth herein. The Street Improvement Agreement -1 of 2 Port's failure to follow the protest procedure set forth herein will constitute a waiver of any claim related to the equitable adjustment as determined by the Contractor. IN WITNESS WHEREOF, the parties below have executed this agreement. DATE DATE ziti loB I Notices to be sent to: Notices to be sent to: CONTRACTOR: Bob Tulp 100 Oyster Bay Avenue Bremerton, W A 98312 360-473-5753 PORT OF BREMERTON: Steve Slaton (director Marine Facilities) 8850 S.W. State Hwy. 3 Port Orchard, W A 98367 APPROVED AS TO FORM: ATTEST: ~d fipv Bremerton ty Clerk R:\Legal\Legal\Contracts\PUBLIC WORKS\Port ofBremerton Street Improvement Agreement.doc Street Improvement Agreement -2of2