Loading...
HomeMy WebLinkAbout3046 RESOLUTION NO. 3v4Se A RESOLUTION of the City Council of the City of Bremerton, Washington, approvmg the Non-Motorized Transportation Plan subject to adoption as part ofthe pending 2007 Comprehensive Plan Amendment docket. WHEREAS, the State of Washington requires a periodic update of long range transportation plans to maintain eligibility for certain state and federal transportation improvement grants; and WHEREAS, the Bremerton Comprehensive Plan contains goals and policies related to transportation facilities that require periodic review and revision to adjust for changing needs and population growth; and WHEREAS, the City entered into a contract with Parametrix of Kirkland, Washington to assist the City in obtaining public input and drafting the plan update; and WHEREAS, the Public Works and Utilities Department widely advertised and sponsored two public workshops on the Plan on March 13,2007, and July 12,2007 and solicited citizen input by conducting interested group interviews including the Bremerton School District, Olympic College, and Harrison Hospital; and WHEREAS, the draft Plan was made available to the general public and interested parties for review and comment at City offices and on the City's web page; and WHEREAS, the draft Plan was sent to the State of Washington Office of Community Trade and Economic Development on October 25, 2007 and no adverse comments were received; and WHEREAS, the Planning Commission held a public workshop on October 23, 2007 to consider the Plan; and WHEREAS, the Non-Motorized Transportation Plan was brought to the Planning Commission for review at its November 20,2007 meeting and recommended approval of the Plan by the City Council; and WHEREAS, on December 19,2007, the City Council held a public hearing on the Plan update; NOW THEREFORE, 1 Non-Motorized Transportation Plan THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. The City Council accepts and adopts the recommendation of the Planning Commission as presented in the minutes of the November 20,2007 meeting. SECTION 2. The City Council approves the Non-Motorized Transportation Plan, attached hereto as Exhibit A and incorporated herein by reference, subject to adoption as part of the pending 2007 Comprehensive Plan Amendment docket. SECTION 3. Severability. If anyone or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect. SECTION 4. Effective Date. This Resolution shall take effect and be in force immediately upon its passage. 7) . PASSED by the City Council of the City of Bremerton, Washington this IqM dayof (ea~ ,2007. J At r f ent APPROVED AS TO FORM: ATTEST: , City Attorney 2 Non-Motorized Transportation Plan . . , . I , c:I I z i i z j r-- i 0 ! a. O. . N C!) N i Z I - ..- i << .... , UI Q) UI ..c i , z E : (; Q) , z > UI 0 Z i , ; ! i .' ~, ,,~ <':, ...:/- ,.\,~.-~, ti~~~~t;~~ Bremerton Non-Motorized Transportation Plan Second Review Draft November 12, 2007 Parametrix/Alta Planning & Design Second Review Draft - Bremerton Non-Motorized Transportation Plan I City of Bremerton Acknowledgments In appreciation of those who contributed time and ideas in the creation of this plan, we would like to acknowledge and thank: Citizens of the City of Bremerton who attended open houses and sent ideas and comments Kitsap Transit Kitsap County Kitsap County Health District Harrison Medical Center Mosquito Fleet Trail Advocates West Sound Cycling Club Puget Sound Naval Shipyard Washington State Ferries City of Bremerton Department of Community Development City of Bremerton Department of Parks and Recreation City of Bremerton School District Second Review Draft - Bremerton Non-Motorized Transportation Plan I 1 City of Bremerton Table of Contents ACKNOWLEDGMENTS ......... ................. ................. .........;... ... ... ..... ... ..... ...... ... ....... ........ ............ .... .1. 1. EXECUTIVE SUMMARY.. ......... .......... ................. ............ ..... .......... .................... ......... ......... .......1 1.1 ViSiON.......................................................................... ............................................................1 1 .2 PURPOSE OF PLAN.............................,..................................................................................... 2 1.3 EXISTING CONDITIONS.............................................................................................................. 2 1.4 STAKEHOLDER AND PUBLIC OUTREACH.......................................:.............................................. 3 1.5 RECOMMENDATIONS................................................................................................................. 4 2. F ACI LITIES EV ALUA TION .... ...................... ........... ................. ........ .............................. ......... ...19 2.1 EXISTING CONDITIONS........... .............................................. ....................................................19 2.1.1 Shared Facilities..................... ......:................................................................................ 19 2.1.2 Pedestrian Facilities...................................................................................................... 21 2.1.3 Bicycle Facilities........ .................................;. ................................................................. 23 2.2 POSITIVE SYSTEM ATTRIBUTES. ............................................................................................... 25 2.2.1 Pedestrian-Friendly Environment................................................................................. .25 2.2.2 W arni ng Signage........................................................................................................... 25 2.2.3 Traffic Calming.............................................................:................................................ 25 2.2.4 Intersection Treatments for Pedestrian Crossings................................. ........................26 2.3 SYSTEM DEFiCiENCiES..................... ....................................................................................... 27 2.3.1 Sight Distances.................... ......................................................................................... 27 2.3.2 Limited Street Connectivity............................................................................................ 27 2.3.3 Barriers...................................................................................................................... ...27 2.3.4 Uncomfortable Sidewalks................................................................................. .............27 2.3.5 Cyclist and Motorist Behaviors...................................................................................... 27 2.3.6 Fragmented Sidewalk Network............ .......................................................................... 28 2.3.7 Sidewalk Obstructions........ ..........................................................,................................ 28 2.3.8 Narrow Bridge Sidewalks....... ....................................................................................... 28 2.3.9 Incomplete Shared Use Path Network.......................................................................... .28 2.3.10 Difficult Crossings......................................................................................... .............. .28 2.4 BICYCLE/PEDESTRIAN CRASH HiSTORy................................................................................... 32 2.5 DESTINATIONS AND CONNECTIONS... .................:..................................... ,...............................33 2.5.1 Connections with Transit and Ferries ................................................................:...........33 2.5.2 Connections with Schools and .olympic College............................................................35 ..1 DRAFT - Bremerton Non-Motorized Transportation Plan 11 City of Bremerton Table of Contents (continued} 3. PEDESTRIAN AND BICYCLE FACILITY IMPROVEMENTS..................................................... 41 3.1 PEDESTRIAN FACiLITIES.......................................................................................................... 41 3.1.1 Sidewalks..................................................................................................................... 42 3.1.2 Intersection Improvements............................................................................................ 42 3.1.3 Signal Timing Evaluation and Modification .......................... ..........................................43 3.1.4 Pedestrian Signals........................................................................................................ 43 3.1.5 Curb Ramps.................................................... ............................................................. 43 3.1.6 Crosswalks....................................................................... ............................................43 3.1.7 Streetscape Improvements.................................................... .......................................44 3.1.8 Shared Use Paths ........................................................................................................ 44 3.1.9 Pedestrian/Bicycle Bridges........................................................................................... 45 3.1.10 Path Feasibility Studies........................................ ....................................................... 45 3.2 BICYCLE FACiLITIES................................................................................................................ 46 3.2.1 Bicycle Lanes............................................................................................................... 46 3.2.2 Shoulder Bikeways....................................................................................................... 48 3.2.3 Shared Roadways/Bicycle Boulevards....... ....................... ........ .................................... 48 3.2.4 The Mosquito Fleet Trail: Tying it all Together .............................................................. 49 4. PEDESTRIAN AND BICYCLE PROGRAM IMPROVEMENTS ..................................................51 4.1 SAFE ROUTES TO SCHOOL...................................................................................................... 51 4.1.1 Why Do We Need SR2S?............................... .............. ............................................... 51 4.1.2 What are the Benefits of a SR2S Program?................................................................. 52 4.1.3 Local Coordination and Involvement........................................................ .... .................52 4.1.4 Funding............................................................................. ........................................... 57 4.2 BICYCLE PARKING.................................................................................................................. 59 4.2.1 Parking Requirements........................................................ .......................................... 59 4.2.2 Facility Design Requirements.......................................... ............................................. 60 4.3 BICYCLE/PEDESTRIAN ACCESS TO TRANSIT ..................................................... ... .....................61 4.3 BICYCLE/PEDESTRIAN ACCESS TO TRANSiT.............. .................... ........................................... 61 4.3.1 Providing Good Sidewalks and Bikeways to Transit Stops............................................ 61 4.3.2 Addressing Bicycle and Pedestrian Needs at Transit Centers ...................................... 62 4.3.3 Providing Secure Bicycle Parking.................... ..................... ........................................ 63 4.3.4 Allow Bicycles on Transit .............................................................................................. 63 Second Review Draft - Bremerton Non-Motorized Transportation Plan I iii City of Bremerton Table of Contents (continued) 4.4 ALTERNATIVE TRANSPORTATION COORDINATOR/ADVISORY COMMITTEE....................................64 4.5 W A YFINDINGI SIGNING PROGRAM................................... .........................................................65 4.6 CAPITAL SPOT IMPROVEMENT PROGRAM... ................... .......... ........ ........................ .................65 4.7 BECOMING A BICYCLE FRIENDLY COMMUNITy........................................................................ ... 66 4.7.1 What does it take? ........................................................................................................ 66 4.7.2 Action Plan for Bicycle Friendly Communities ...............................................................66 4.7.3 Sidewalk Infill Program........... ....................................................................................... 68 4.8 ACCOMMODATING PEOPLE WITH DISABILITIES ...................................................................... ....69 4.8.1 Developing an ADA Transition Plan.............................................................................. 69 4.9 EDUCATION PROGRAMS...... ............. ....................................................................................... 72 4.9.1 School-based Education Programs............................................................................... 72 4.9.2 Bicycle Patrol Unit............... ................ .......................................................................... 73 4.10 ENCOURAGEMENT PROGRAMS................. ......:....................................................................... 73 4.10.1 Employer Incentive Programs...... .......................... ............................ ......................... 73 4.10.2 Community Bikeway! Walkway Adoption............ ..... ...... ..............................................73 4.10.3 Business Incentives for Bicycling and Walking........ ........................... .........................74 4.11 ENFOHCEMENT PROGRAMS................................................................................................... 76 4.12 THE PROGRAMMATIC ApPROACH: WHERE TO START........ .................................... ................. 76 5. PROJECT PRIORITIZA liON AND FUNDING .......... ................ ..................... .......... ........... ....... 81 5.1 CAPITAL IMPROVEMENT PROJECTS.. ........................................................................................ 81 5.2 FUNDING SOURCES........................................................................................ .,.......................82 5.2.1 Federal Funding Sources. ............... ........................ ............................................. ......... 82 5.2.2 State Funding Sources.........................................................~. ~...................................... 85 5.2.3 Regional funding Sources...... ....................................................................................... 87 5.2.4 Local Funding Sources........... ....................................................................................... 87 5.3 OTHER FUNDING SOURCES ............ .......................... ."................................................;............. 89 . I DRAFT - Bremerton Non-Motorized Transportation Plan IV City of Bremerton Table of Contents (continued) LIST OF MAPS Map 1 Bremerton Non-Motorized Transportation Plan Existing Sidewalk and Bicycle Lanes Inventory................................................................................................... 11 Map 2 Pedestrian Issues and Opportunities Diagram ................................................................. 13 Map 3 Bicycle Issues and Opportunities Diagram....... ................... ............................................. 14 Map4 Bremerton Non-Motorized Transportation Plan Proposed Pedestrian Network Improvements.................................................................................. 15 Map 5 Bremerton Non-Motorized Transportation Plan Proposed Bicycle Facility Network.......... 17 Map 6 2004-2006 Bicycle/Pedestrian Crash Locations............................................................... 39 Map 7 Armin Jahr Safe Routes to School Map ...................... ........ ............................... ..... .........78 Map 8 Kitsap Lake Safe Routes to School Map... ....................... ........................................... ..... 79 LIST OF TABLES Table 1 Recommended Pedestrian and Bicycle Projects.................. .............................. ................ 7 Table 2 Proposed Mosquito Fleet Trail Route in Bremerton................. ......................................... 50 LIST OF APPENDICES ApPENDIX A: TERMINOLOGY AND TECHNICAL DISCUSSIONS ApPENDIX B: DRAFT PROJECTS LIST WITH COSTS ApPENDIX C: PROPOSED PROJECT DESCRIPTIONS Second Review Draft - Bremerton Non-Motorized Transportation Plan I City of Bremerton 1 1. Executive Summary s.tre?ts through Charleston, ultimately hnkmg to a path along SR 304 to Gorst. 1.1 Vision Finally, imagine building a transportation Imagine stepping off a ferry in downtown system that reduces fu.e~ consumption, Bremerton and walking all the way to enables fr?edom ?f. mobIhty, en?ourages Evergreen Park on a Boardwalk more physIc~l actIvIty, allows chIldren to overlooking Port Washington N walk and bIke to school, reduces traffic arrows. t' d k' 'b Imagine taking in Evergreen Park's sites conges lOn, an. ma es It pOSSI Ie to a d. th k' create economIC growth at the same n VIews, en ma mg your way to. .. . . Olymp.ic College on a series of com leted tIme.:. thIS IS. the .vIsIOn for Bremerton's . d lk. . . p walkmg and bIcyclmg system. SI ewa s .and safe street crossmgs. The . . Biking Safety Lessons walk contmues across Port Washington The foundatIOn of a potentIally Narrows on a pedestrian/bicycle bridge tremendous bikeway/walkway network is directly to Lions Community Playfield already in place or in development. The and its abundant . recreation downtown core and several neighborhoods opportunities. Now imagine walking have well-connected streets with few through East Bremerton's vibrant sidewalk gaps, while some streets also act neighborhoods and to Harrison Medicai as good bicycling routes. Center. on saf~, comfortable, and Several high-profile pedestrian/bicycle convement pedestrIan routes. projects, including the Louis Mentor Now imagine bicycling your way through Boardwalk extension and Manette Bridge Bremerton on the Mosquito Fleet Trail. replacement, are also underway. Walking is fun From East Bremerton, imagine cruising Bremerton residents and leaders desire to down Trenton Avenue on a wide shoulder make their community even more away from car traffic. As. you enter attractive for walkers and bicyclists. In Enetai, Trenton Avenue becomes a some areas, especially around schools, bicycle-friendly street where autos and commercial centers, transit stops, and bikes travel at the same speed. As you business districts, bicycle/pedestrian near the bottom of the hill, the ride takes system upgrades are needed. These you on a new bicycle/pedestrian path include intersection improvements, along Upper Shore Drive through sidewalk completion, Americans with Manette, leading you to a n-ew Manette Disabilities Act (ADA) compliance, Bridge with dedicated space for bikes. completing bikeway network gaps, and Now imagine passing -through downtown establishing new connections. In addition, Bremerton on the newly extended Louis the Safe Routes to School and other Mentor Boardwalk. The ride continues innovative programs covered in this Plan west on lower-speed bicycle-friendly seek to address the needs of people of all ages and abilities. 21 Second Review Draft - Bremerton Non-Motorized Transportation Plan City of Bremerton This Non-Motorized Transportation Plan to identify their bicycle and pedestrian (NMTP) will take Bremerton to the next Issues. The Bremerton Planning level. This Plan presents the VISIOn Commission and City Council provided of a fully developed bicycle/pedestrian insights in a series of work sessions and system over the next 20 years, serving public meetings. residents, commuters, shoppers, and 1.3 Existing Conditions visitors alike. A complete bikeway and walkway network will Increase The existing system was evaluated to connections within the community, determine existing gaps, barriers, and increase the number of children walking bottlenecks that prevent facility users and bicycling to school, and promote the from traveling to destinations within a health of Bremerton residents by neighborhood, throughout the region, or making walking and bicycling safe, from connecting to points within the Trails for everyone comfortable, and attractive travel regIOn. Factors that determine or modes. influence the state of the existing 1.2 Purpose of Plan system include: . Accessibility from points of origin This NMTP provides an updated (coverage), inventory and assessment of existing . Comfort level of streets used in bicycle and pedestrian conditions. Based terms of vehicle traffic, crossing on the inventory and input from protection, lane width, driveways, stakeholders, this Plan recommends and other items, comprehensive strategies for systemwide . Topography and grades, improvements, and specifies exactly what needs to be done to achieve the . Support facilities such as benches City's goal of becoming a better walking and drinking fountains at major and bicycling community. These destinations, and recommendations will help Bremerton . Coherence of the system to the leverage the necessary funding and average user attempting to reach an other resources needed to achieve this unfamiliar destination. goal. Bremerton's existing bicycle and City staff, stakeholder groups, and most pedestrian network consists of of all, Bremerton residents, helped guide sidewalks, bicycle lanes, shoulder this Plan. Community workshops were bikeways, shared roadways, and shared held throughout the project's duration, use paths that range in quality. Map 1 enabling residents and other interested shows the locations of these elements. A individuals to express concerns and positive bicycling and walking ideas for im prove men ts. The Project environment is already established in a Team conducted stakeholder interviews number of places including: Second Review Draft - Bremerton Non-Motorized Transportation Plan 13 City of Bremerton . Pedestrian -friendly environment in . Lack of bicycle parking facilities in downtown, Harborside District, and several areas, and other areas, . Lack of wayfinding tools to orient . Warning signage advising motorists bicyclists and pedestrians. of pedestrian and bicycle traffic on These Issues and opportunities are city streets, diagrammed in Map 2 and Map 3. . Traffic calming devices on several 1.4 Stakeholder and Public streets, and . Intersection treatments to facilitate Outreach safe and convenient pedestrian The City held two meetings with crossIngs m some areas. stakeholders and the public to obtain Areas for improvement were located input and ideas on pedestrian and and described by stakeholders and bicycle system deficiencies, safety community members in outreach events concerns, and ideas for project Kitsap Way today and group interviews and include: improvements. Each workshop was . Impaired sight distances resulting organized similar to a design .charette, from steep topography, where the individual stakeholder. representatives provided input during a . Limited street connectivity in some pre-scheduled 1-hour meeting. The first areas, workshop was held on March 13, 2007 . Natural and man-made barriers with stakeholder meetings during the , (e.g., waterways, fencing, wide day followed by an evening open house- streets with high traffic volumes), workshop with other community . Excessive vehicle speeds on some members. The evening open house with streets where bicyclists and the community was an opportunity to motorists share the same lanes, share input from the stakeholder . Narrow sidewalks in some areas, workshop and seek broad public input. A second workshop presented the Draft including bridges, Plan and requested input from the Vision for Kitsap Way . Fragmented sidewalk network in stakeholders on specific improvements some areas, and priorities. Information about the . Sidewalk obstructions (e.g., light public workshops/open houses was poles, fire hydrants, etc.), disseminated through mailings, flyer . Difficult pedestrian crossings at posting, e-mail, and web sites. several intersections, . Fragmented shared use path network, I Second Review Draft - Bremerton Non-Motorized Transportation Plan 4 City of Bremerton . . comprise a variety of facilities including The stakeholder meetmgs were he~d wIth sidewalks, bicycle lanes, shoulder 4>> the following groups and. theIr key bikeways, an expanded shared concerns are briefly summar~zed below. roadway/Bicycle Boulevard netwo:k, All input became the basIs for the shared use paths, and intersectIOn projects list and recommendations. improvements. Table 1 summarizes the · City of Bremerton Department of proposed projects. Naval Avenue with bike lanes Community Development The basis -for the recommendations is . City of Bremerton Department of the in-depth existing conditions Parks and Recreation evaluation discussed in Section 2. These · City of Bremerton School District recommendations are. discussed i~ ... greater detail m SectIOns 3 and 4. · KItsap County TransIt Section 3 focuses on facility or capital · Kitsap Health District, Harrison improvements such as sidewalks and Medical Center bicycle lanes; and Section 4 focuses on · Mosquito Fleet Trail Advocates programs such as Safe. Routes . to W t S d C ling Club Schools and transit connectIOns. SectIOn · es oun yc . ... t' I . 5 presents the pnontIzatIOn ra IOna e · Puget Sound Naval ShIpyard and possible funding sources. Appendix · Washington State Ferries B contains the prioritized The public participation process was recommendations with cost opini?ns Traffic Circle concluded with final meetings at the that may be used for the CapItal City of Bremerton. Planning Improvement Projects list. Commission and City Council for the To get the momentum going, the City formal review and approval of the Non- should start today with a few key Motorized Transportation Plan. strategies (later chapters discuss these 1 5 R mmendations strategies in greater detail): . eco .. Implement bikeway and walkway This Plan lays out a compr~henslVe projects along the Mosquito Fleet system connecting key walkmg ~nd Trail: Developing Bremerton's bicycling destinations and surroundmg section of the regional Mosquito Fleet areas. The recommen.ded system ,,:as Trail provides a valuable opportunity developed based on mput from CIty for the City to implement and staff, stakeholder groups, and showcase each of the bicycle/ Bremerton residents, and ?uilds upon pedestrian facility types proposed in recommendations from prevIOUS and ?n- this Plan. Passing through going City, County, and State plannmg Bremerton, the trail would follow a efforts. The proposed systems, combination of streets, sidewalks, and diagrammed m Map 4 and Map 5, paths. Second Review Draft - Bremerton Non-Motorized Transportation Plan Is City of Bremerton This Plan recommends some minor Wayfinding Signage Plan to visibly alignment changes to take advantage demonstrate its commitment to of several proposed bikeway and creating an easy-to-use system. walkway projects. Efforts to develop . Implement Safe Routes to School pilot this trail are well underway, as projects: The City should build upon shown by the planned Boardwalk the School District's tremendous Safe extension and Manette Bridge Routes to School efforts by replacement. The City should keep implementing several pedestrian this momentum going. safety pilot projects. This Plan . Implement a Bicycle Boulevard identifies two schools where the City demonstration project: In many should concentrate its initial efforts of areas, Bremerton benefits from a completing sidewalk gaps and generally well-connected system of updating intersection crossings. lower-volume streets that-with the . Revisit and update Municipal Code addition of relatively small-scale bicycle parking requirements: t:reatments--could become spectacular Bremerton has an immediate low-cost bicycling routes for riders of all ages opportunity to ensure future and skills. Using a variety of developments provide adequate treatments, the City could develop a bicycle parking facilities. The City Bicycle Boulevard network to make should evaluate its current bicycle riding safer and more comfortable on parking requirements, and update streets where motorists and cyclIsts the Municipal Cod~ to include more share the same space. To get started, detail regarding space requirements the City should implement a Bicycle and facility design. The Code update Boulevard demonstration project to should address both short- and long- test these applications. Segments of term bicycle parking. This effort Group Ride the proposed Mosquito Fleet Trail would allow the City to take route are ideal locations for a advantage of new development and demonstration project. redevelopment projects. . Develop and implement a Wayfinding . Create a Bicycle/Pedestrian Signage Plan: Wayfinding signage is Technician position: A one of the most cost-effective and Bicycle/Pedestrian Technician visible ways to promote bikeway and dedicated exclusively to non- walkway system use. While motorized project implementation encouraging people to get out and use could physically oversee, assist, the system, wayfinding signage also and/or lead project construction. The orients walkers and bicyclists to tec):mician could expedite smaller- Bicycle Parking appropriate routes. Bremerton should scale project implementation such as develop and implement a citywide sign age and pavement markings, and I Second Review Draft - Bremerton Non-Motorized Transportation Plan 6 City of Bremerton monitor the condition of . Developing education programs bicycle/pedestrian infrastructure to (e.g., safety handbook) identify and address maintenance issues . Developing encouragement as needed. Other responsibilities could programs (e.g., employer incentives, include installing, repairing, and multi-modal access guides, replacing public bike racks, bike lockers, bicycle/pedestrian events) and other facilities as needed. The Enforcing traffic laws relating to technician could also oversee the update . and implementation of Municipal Code pedestrians and cyclists bicycle parking requirements. Equally important to the walkway and bikeway network are support programs. Additional strategies for . . Improvmg walking . and bicycling In Bremerton include: . Building on and continuing the Safe Routes to School program . Updating the Municipal Code's bicycle parking requirements . Improving pedestrian/bicycle access to Kitsap Transit and Washington State Ferries . Creating an alternative transportation coordinator or advisory committee . Creating a Bicycle/Pedestrian Technician P9sition . Developing a Wayfinding Signage Plan . Developing a capital spot improvement program . Continuing the City's Sidewalk Program for filling system gaps . Developing an ADA Transition Plan Second Review Draft - Bremerton Non-Motorized Transportation Plan 17 City of Bremerton . Table 1. Recommended Pedestrian and Bicycle Projects i ~. '.. .1 Jntet:Se.ctioiflm rov.~metits~; ':" ;:.~-' . ..$ide_~a.lks .. 11th Sl. at Callow Ave. N/A 1st Sl. Kitsap Way at Harlow Dr. N/A 1stSl. Kitsa Wa at North Lake Wa N/A 6th Sl. Loxie Ea ans Blvd. at National Ave. N/A 11th Sl. Loxie Ea ans Blvd. at SR 3 NB Ramps N/A 15th Sl. Loxie Ea ans Blvd. at SR 3 SB Ram s N/A 16th Sl. Marion Sl. at Renaissance Hi h School N/A 18th Sl. National Ave. at Preble Sl. N/A 25th Sl. Old Wheaton Way north of Lebo Blvd. N/A 26th Sl. Old Wheaton Wa at Harkins Sl. N/A Arsenal Wa Old Wheaton Way at Lebo Blvd.lCherry Ave. N/A Arsenal Way Per Ave. at Holman Sl. N/A Corbet Dr. Per Ave. at Stone Wa N/A Harlow Dr. Sheridan Rd. at Pine Rd. N/A Harlow Dr. SR 303/Warren Ave. at 4th Sl. N/A Hartford Sl. SR 303/Warren Ave. at 5th Sl. N/A Magnusson Wa /Stone Wa SR 303/Warren Ave. at 11th Sl. N/A Marine Dr. SR 303/Warren Ave. at 13th Sl. N/A Marion Ave.lAdele Ave. '" SR 303/Warren Ave. at 16th Sl. N/A Naval Ave. SR 303/Wheaton Way at Riddell Rd. N/A Old Wheaton Way SR 303/Wheaton Wa at Sheridan Rd. N/A Old Wheaton Wa SR 303/Wheaton Wa at S Ivan Wa N/A Oyster Bay Ave. SR 304/Burwell Sl. at Callow Ave. N/A Oster Ba Ave. Wa SR 304/Burwell Sl. at Mont omery Ave. N/A Petersville Rd. SR 304/Burwell Sl. at State Ave. N/A Phinne Ba. Dr. SR 310/Kitsap Wa between Forrest and Pershing N/A Preble Sl. SR 31 O/Kitsap Way at 11th Sl. N/A Price Rd. . SR 310/Kitsa Wa at SR 3 NB Ram s N/A Rock Point Rd. SR 310/Kitsap Wa at SR 3 SB Ramps N/A Roosevelt Blvd. SR 310/Kitsa Wa Schley Blvd. Shorewood Dr. Snyder Ave. Terrace Sl. Tracy ton Beach Rd. Trenton Ave. W coff Ave. I Second Review Draft - Bremerton Non-Motorized Transportation Plan 8 City of Bremerton Table 1. Recommended Pedestrian and Bicycle Projects (continued) Almira Dr. Austin Dr. Austin Dr./SR 3 overcrossing Auto Center Wa Wa Harlow Dr. Harlow Dr. Kitsa Wa Loxie Ea ans Blvd. Manette Br. Marine Dr. National Ave. 01 mpus Dr. Per Ave. ' BicYcle:.Lanes. ' " . " . '. " ,. "1" ' . Pine Rd. 1stSI. Montgomery Ave. to Naval Ave. Riddell Rd. 6th SI. Callow Ave. to Park Ave. SR 304/Navy Yard Hwy. 6th SI. Park Ave. to Washington Ave. 11th St./WashinQton Ave. Park Ave. to Manette Br. Austin Dr. SR 3 interchanqe to Erlands Point Rd. Auto Center Blvd./Bruenn Ave. Kean Blvd. to Auto Center Way (northern junction) Lebo Blvd. Bremerton city limits to Old Wheaton Way Sharef/Use Paths;' ',,~::. ' ,. ". :' .. . ';' .' ,. ;< '.>. .;.:/. :,". Loxie EaQans Blvd. Auto Center Way to National Ave. Dockside subdivision N/A .Naval Ave. 1st SI. to 15th SI. accessways NAD Park-Jackson Park Naval Shorewood Dr. northern terminus to existing path Old Wheaton Way Manette Br. to Sheridan Rd. Housing Area Shared Use Path in Jackson Park Naval Housing Area SR 3 Shared Use Path SR 16 to SR 304 SR 310/Kitsap Way 'SR 3 interchanQe to Callow Ave. SR 3/Searle SI. Baer Blvd. to overcrossing's east end Sheridan Rd. Lebo Blvd. to SR 303/Wheaton Way Bicycle/Pedestrian Overcrossing Shore Dr. Shared Use Path 10th SI. to Vandalia Ave. Sylvan Way SR 303/Wheaton Way to Olympus Dr. Port Washington Narrows West of SR 303/Warren Ave. Bridge Bicycle/Pedestrian Bridge SR 303/Warren Ave. SR 303/Warren Ave. at 15th SI. Pedestrian/Bicycle Overcrossinq West End Rail Corridor ?17? 9 Second Review Draft - Bremerton Non-Motorized Transportation Plan 19 City of Bremerton Table 1. Recommended Pedestrian and Bicycle Projects (continued) 'StlaredRoadwa s1Bic cleBoulevard$., Auto Center Blvd./Bruenn Ave. to Auto Marine Dr. Rocky Point Rd. to northern terminus Center Wa 1stSl. Hartford Ave. to Naval Ave. Mont ome Ave. 4th and 5th Sts. Olympic Ave. to Washington Ave. aiding Rd./Shore Rd./Root Cl. 11th Sl. Ave. 13th Sl. 15th Sl. 16th St./Chester Ave. 17th Sl. Park Ave. 18th Sl.1T errace Sl. Perry Ave. Arsenal Wa /Hartford Ave. Pitt Ave. Baer Blvd./Russell Rd./Arsenal Wa Phinne Ba Dr. Cher Ave. Robin Ave./Solie Ave. Constitution Ave./Marion Ave./Adele Ave. Rock Point Rd. ElmS1. Searle Sl. Eastlake Dr./Lakehurst Dr. Harlow Dr. to Lakehurst Dr. southern Schley Blvd. terminus Sheridan Rd. to Almira Dr. Shore Dr. 10th S1. to 11th S1. 5th S1. to 15th S1. Shorewood Dr. SR 310/Kitsap Wa to NAD Park Per Ave. to Trenton Ave. Trenton Ave. Shore Dr. to Stone Wa Shore Dr. to Holman Sl. Wash in ton Ave. 1st Sl. to Manette Br. Schle Blvd. to Trenton Ave. I Second Review Draft - Bremerton Non-Motorized Transportation Plan 1 0 City of Bremerlon Table 1. Recommended Pedestrian and Bicycle Projects (continued) Other 'Pr .~tS' Cit ide bi cle wa Indin Kitsap Lake Trail Feasibili Stud Bremerton Transportation Center Bicycle/ Pedestrian Sub-Area Plan Munici al Code Bic c1e Parkin Re uirements U date N/A Armin Jahr Elem. School safe routes to school N/A 1m rovements Crown Hill Elem. School safe routes to school N/A Improvements Kitsap Lake Elem. School safe routes to school N/A Improvements Naval Avenue Elem. School safe routes to school N/A 1m rovements View Ridge Elem, School safe routes to school N/A Improvements West Hills Elem. School safe routes to school N/A Improvements Bremerton 8th Grade/Freshman Academy safe routes to N/A school 1m rovements Mountainview Middle School safe routes to school N/A 1m rovements Bremerton High School safe routes to school N/A 1m rovements Renaissance High School safe routes to school N/A Improvements 1 This project (or elements of the project) is included in the 2001 Kitsap County Bikeways Plan. 2 This project (or elements of the project) is included in the 1995 Kitsap County Greenways Master Plan. 3 This project (or elements of the project) is included in the 2001 Mosquito Fleet Trail Master Plan. 4 This project (or elements of the project) is included in the Bremerton 2006-2011 Transportation Improvement Plan. 5 This project (or elements of the project) is included in the 2004 Bremerton Comprehensive Plan (Transportation Element), - c c ",2 0:: a:; c ~ ,2 ~ 5;: 60 S} c ~ ;:;". ~'." " ~ ~ . o. 0'. o -. z .. 000 ! ~l . .- , "" . . . . .0 . ., . 0" ~ I-~~ o · . jl ~ !~ o '0 . o. o .. o ,. . g,l zGl " C'- 0(1) 1:'" _GlC Q.E~ l'G GJ.- "",->< ""rnw ~ o II! o ~ "6 U5 5 5 " 0 " 8 ~ ~ ..:.:: ~ ~ 1 ~ ~ ~ ~ ~ I. n 1, !.J .iij " ;::: c ill ~ ~ :) ~ ~ -6 U) u ~ .c g~s E' g> jij ~. ~ ~ j j I. I r ;; o " .~ 0 lL :: o i ~ ! t:: I/J ~ ! Lf 5 g g E i ~ t ~ ~ N co : M .....a,) I: fa ~ ... C'f") l~ ~ ~ ~ .~ E .~ C) ....... ,Ill '" 0 - III e "' Q. co \ ~ () _ ~ ~ .S ~ to' ~ c( .- l: C , .!e tl,;!1 'O.5"S!l! ~ ~ C ~ .g I 0 .;: Co x.l 0 .r:. <J ij; '" . II> ;:;-Q) l.g 1n t/1 L.. .c rJ E -0 co ~ ..... E I E .- 0 '" t) > .- .- l: .- Q) l:~ t Q:I: 11. III > C III :;l !II ;0 om I~ - ',po ',en *, ,/I-. s::: ~ .c ' . . . . .'~ · ...- - iiiI. ). IiiIlO, .... ,-:''' -- . ~ ~ o u , ' ~.....' ,~,r . · ~ ~. 0 ~ ~ ~ ~ ~ 0 ~ ~ ~ s::: o CO ... II> o Q) ~ ~ l: II> o II> Z - l: s::: 9 CO ~ .- ~ ~ ~ NW ~ ~~ , CO Q) ~ ~~ ~ o 3= ~ '> ~ 0:: '0 l: o V ~ VI ,- I'" I Second Review Draft - Bremerton Non-Motorized Transportation Plan 14 City of Bremerton - -~ ~----- - ..- --- --- .-,-,_. .__._-,~._.._-,--- Symbols Key * District Center II Hospital . Parks ii, Schools + Washington State Ferry . Difficult intersections ~ Safely Concerns . Bikeways . . . . . Bike-Pedestrian loops . . . t April 1, 2007 N Map3 Bicycle Issues and Opportunities Diagram ~ ~ c n:;.g 0: E e ~ . .g ~ .!!!II> ...- ~ > e to . ' e '" 0 .2E El- -'" ~ ll! > ~ o e I- c.c. " II> E .~ e- ra..., 6 ~o 0 "C~ :E l!l '" C: 0 ;:z z Be ~ ora g ~:s .11> " e .. E 0"c f! Z" '" e'" ~ 0" 1::'" ~ "'ltm~ a c.Ec. ~ ra l!! e " :!Em... .S; " '" " ~ 8 ~ '.. >= ~ ~ ~ ~ ~ ~ :g 0 ~ ~ ~ g ~ ~ a. C) a. I !II co c c 0 - 1l ~ ~ () " "'" E <J - o = ffi ::J - :2 ~ ~ 1 :E '0 en . ~+ ... Q; o .. Second Review Draft - Bremerton Non-Motorized Transportation Plan 117 Oly or Bremerlon Legand ::.\ - --~. Street ~~.... Proposed Bicycle Lane on Shoulder Map 5 Bremerton Non-Motorized Transportation Plan 0 N 2.500 - Existing Bicycle Lane - Proposed Bicycle Route or Sharrow Proposed Bicycle Facility Network , ' Feet - Proposed Off-Street Trail C::J City of Bremerton Second Review Draft - Bremerton Non-Motorized Transportation Plan \19 City of Bremerton 2. Facilities notable paths comprise the base of this system, including the Louis Mentor Evaluation Boardwalk, and popular shared use paths In Evergreen Park, Lions A moderate-sized city (about 35,000 Community Playfield, and along people), Bremerton is built around a Ostrich Bay in the Jackson Park Naval historic downtown and what is now the Housing Area. The Louis Mentor Puget Sound Naval Shipyard. Boardwalk connects the Bremerton Recognizing the economic potential of Transportation Center with Evergreen siting a community adjacent to a naval Park and nearby restaurants and hotels facility, William Bremer platted the in the downtown Harborside District. original town site in 1891, with the City The Boardwalk includes several incorpora ting In 1901. Today, pedestrian amenities, offers VIews Bremerton has a vibrant downtown, a across the Narrows toward Manette, revitalizing Harborside District, and will be extended northward In healthy neighborhoods, great par ks, 2007. This . . structure IS ImpressIve Louis Mentor Boardwalk and a beautiful natural environment. designed to highlight the waterfront, The ci ty' s proximity to other Puget attract new development, and celebrate Sound communities and the Olympic Bremerton's nautical history and Peninsula will only make the culture. community more desirable In the Shared use paths .exist within several fu ture. West Bremerton parks, including an 2.1 Existing Conditions S-foot-wide path along the Port Washington Narrows In Evergreen This section describes both deficiencies Park, as well as loop paths within Lions and positive attributes of the existing Community Playfield. Shared use paths system. West and East Bremerton are also follow the west side of Ostrich Bay described separately. Appendix A in the Jackson Park Naval Housing provides a glossary with definitions for Area and on a vacated segment of the technical terms used below and a Shorewood Drive in NAD Park. discussion of the technologies. A pedestrian/bicycle overpass crosses Shared use path in Evergreen Park 2.1.1 Shared Facilities SR 3 between the Loxie Eagans Boulevard and SR 310/Kitsap Way interchanges. Approximately 7.5 feet West Bremerton wide, the bridge connects commercial Shared Use Paths land uses along Auto Center Way with Today, Bremerton has the foundation of residential neighborhoods on the east side of SR 3. what could be a spectacular interconnected path system. Several 20 I Second Review Draft - Bremerton Non-Motorized Transportation Plan City of Bremerton Several proposed trail corridors would Accesswavs utilize existing and future shared use Several neighborhood accessways offer paths, as well as sidewalks and bicycle direct pedestrian and bicycle lanes on the city street system. Largely connections m areas where the following existing streets, the Port surrounding street system provides Washington Narrows Trail (also known limited connectivity. Some accessways as the Bridge-to- Bridge Trail) would are formalized paved paths, including a form a loop between East and West short path on Burwell Street between Bremerton along Lebo Boulevard, Old Lafayette and Summit Avenues near Wheaton Way, the Manette Bridge, Forest Ridge Park, and a path . Washington and Pacific Avenues, the connecting SR 310/Kitsap Way with shared use path in Evergreen Park, and nearby residences on Brentwood Drive. the Warren Avenue Bridge. Other accessways are less formal, f .... Unpaved accessway connecting Osprey Circle and The regional Mosquito Fleet Trail unpave~ ac~htIes, but stIll ~erve as key Price Road would pass through Bremerton and pedestnan/bIcycle. connectIOn~. Less ~ ' connect several historic .Mosquito Fleet ~ormal accessways on ?sprey CIrcle, .for I docks throughout KItsap County. Instance, co~~ect WIth .surroundmg i. Within Bremerton the trail corridor streets provIdmg a contmuous loop would follow Illahee Road Trenton around Kitsap Lake. , Avenue, 11th Street, the Manette Bridqes Bridge, 4th and 5th streets, Charleston T b'd 'd .. R d d SR 30 /N Y d H. h wo n ges prOVI e pedestnan/bIcycle oa an 4 avy ar Ig way. .. b ' connectIOns etween East and West Roadwav Shoulders Bremerton. Constructed in 1953, the In many parts of West Bremerton and ~arren Avenue Bridge .has 4-foot-wide surrounding areas, roadway shoulders sIdewalks on ~oth sIdes t~at. are accommodate bicycle and pedestrian separated from hIgh-speed traffIc WIth a . . I h 'd lk d . short concrete barrier Narrow Narrow sidewalk on the Manette Bndge trave were SI ewa s 0 not eXIst. .. '. . ________ Such streets include portions of SR staIrways (wIth~ut ramps) are dIffI.cult 310/Kitsap Way and Austin Drive. for some cyclIsts and pedestnans Although roadway shoulders are wishi~g t~ access Lebo Boulevard from appropriate in rural areas, Bremerton's the bndge s north end. predominantly urban and suburban The Manette Bridge, built m 1930, character generally attracts higher includes a sidewalk (approximately traffic volumes on area roads, 4 feet wide) on the south side only. This indicating a need to separate bridge is scheduled to be replaced in pedestrians and cyclists from motorists. 2012, although the pedestrian and This is especially true on corridors such bicycle facilities have not yet been as those listed above. determined. Narrow sidewalk on the Warren Avenue Bridge Second Review Draft - Bremerton Non-Motorized Transportation Plan 121 City of Bremerton East Bremerton Shared Use Paths Bridqes Shared use paths exist within several Please refer to the "Bridges" section in East Bremerton parks, including loop the West Bremerton subsection for a paths within Haddon Park. Northeast discussion of pedestrian issues on the of Bremerton, Illahee State Park Warren Avenue and Manette Bridges. provides a system of earthen hiking trails that lead to a boat dock on 2.1.2 Pedestrian Facilities Sinclair Inlet. Several proposed trail corridors would West Bremerton use existing and future shared use Sidewalks paths,as well as sidewalks and bicycle The presence and condition of sidewalks Wider sidewalks in Downtown Bremerton lanes on the city street system. These corridors are discussed in the preceding vary considerably throughout West section describing shared use paths in Bremerton. Most streets in the area West Bremerton. bounded by SR 304/Burwell Street, 13th Street, Callow Avenue, and Roadwav Shoulders Washington Avenue have sidewalks on In many parts of East Bremerton and both sides. The' downtown core's surrounding areas, roadway shoulders sidewalk environment includes a accommodate pedestrian travel where variety of complementary pedestrian sidewalks do not exist. Such streets facilities such as textured crosswalks, include portions of Perry Avenue, pedestrian signals, ADA~compliant curb Trenton Avenue, and Tracy ton Beach ramps, pedestrian -scale lighting, and Road. Although roadway shoulders are amenities like benches and trash appropriate in rural areas, Bremerton's receptacles. Curb-tight sidewalks on both sides of streets in newer subdivisions predominantly urban and suburban character generally attracts higher traffic volumes on area roads, indicating a need to separate pedestrians and cyclists from motorists. This is especially true on corridors such as those listed above. Accesswavs East Bremerton does not appear to have any accessways. . National A venue lacks sidewalks in most locations 221 Second Review Draft - Bremerton Non-Motorized Transportation Plan City of Bremerton Most streets in the outlying areas of Intersection Treatments West Bremerton either have sidewalks In West Bremerton, the quality of on one side only (e.g., Auto Center Way) in tersections from a pedestrian or no sidewalks altogether (e.g., Marine perspective varies by location. Marked Drive and portions of National Avenue). crosswalks and curb ramps exist at Sidewalks along some major and minor most signalized intersections on major streets (e.g., SR 310/Kitsap Way) streets and wi thin downtown abruptly end, forcing pedestrians to Bremerton. Most signalized inter- walk along roadway shoulders or sections also include pedestrian- landscaped areas that are often used for activated signals or have pre-timed vehicle parking. Some popular walking signal phasing allowing pedestrian routes. (e.g., roads traveling around crossmg movements concurrent with Kitsap Lake) also lack dedicated parallel vehicle movements. pedestrian facilities. ^- pedestrian "half signal" is used at SR It should be noted that several West 310/Kitsap Way between Forrest and Bremerton neighborhoods (e.g., Pershing Avenues. Half signals allow ADA-compliant curb ramps with detectable warning 0 near West Hills Elementary School, along pedestrians to cross major streets strips on Burwell Street at Pacific Avenue Rocky Point Road, and some areas west where full signalized intersections do of SR 3) that lack sidewalks are outside not exist. Half signals include Bremerton city limits and are within traditional signal heads for approaching Kitsap County's jurisdiction. Newer vehicles, and WALK/DON'T WALK residential developments In West signals on the perpendicular pedestrian Bremerton and throughout the city approaches. have sidewalks on both sides of the Intersection conditions along . lower- street per a City ordinance requiring order streets vary by location. Marked sidewalks and other street frontage crosswalks exist at intersections near improvements to be built in conjunction most schools and other pedestrian trip with new development and generators. Some in tersections have redevelopment projects. relatively new curb ramps with Sidewalk widths vary from 4 feet in detectable warnIng strips (e.g., SR older residential areas (e.g., along 13th 304/Burwell Street at Pacific Avenue), Street near Bremerton High SchooD to but most intersections either lack curb over 12 feet in commercial centers like ramps or have existing ramps that are Perry Avenue near Mountain View Middle School downtown Bremerton. Planter strips, in poor condition. with widths ranging between 2 and 8 feet, are used In some places to separate sidewalks and curbs. Second Review Draft - Bremerton Non-Motorized Transportation Plan 123 City of Bremerton crossmg movements concurrent with East Bremerton parallel vehicle movements. Marked Sidewalks crosswalks exist at intersections near most schools and other pedestrian trip The Manette and Harrison Medical generators. Some in tersections have Center neighborhoods have sidewalks relatively new curb ramps with on one or both sides of the street. Most detectable warnIng strips, but most north-south streets in Manette and the intersections either lack curb ramps or commercial corridor along 11th Street have existing ramps that are in poor have sidewalks. Most major streets condition. near Harrison Medical Center (e.g., SR 303/Wheaton Way, Lebo Boulevard, and 2.1.3 Bicycle Facilities portions of Sheridan Road) have Map 1, Existing Sidewalk and Bicycle sidewalks on both sides. However, several other streets (e.g., Perry Avenue Lane Inventory, depicts Bremerton's Mountain View Middle School) current designated bicycle routes. In near reality, bicyclists follow a variety of have sidewalks on one side only while 1 st Street b,etween Ferry Terminal and Puget Sound other streets (e.g., Tracy ton Beach street routes and often resort to Naval Shipyard Gate Road) lack sidewalks altogether. sidewalks. Part of the discrepancy may be that the entrances or bicycle As in West Bremerton, sidewalk widths gateways into Bremerton are not well vary by location, with widths ranging defined or signed. In addition, cyclists from 4 feet in older residential areas to will choose a more direct route between over 12 feet in commercial centers like destinations than a planned route. For Manette. Planter strips are used example, bicyclists ride on sidewalks occasionally to separate sidewalks and along 1st Street between Washington curbs, with widths rangmg between Avenue and Pacific Avenue because this 2 and 8 feet.! is the -most direct route between the Intersection Treatments Washington State Ferry Terminal and and curb Puget Sound Naval Shipyard Main Marked crosswalks ramps Gate. The route along 1st Street avoids exist at most signalized intersections on the circuitous rou te along Burwell major streets (e.g., along SR Street and Pacific Avenue. 303/Wheaton Way). Most signalized in tersections also include pedestrian- activated signals or have pre-timed signal phasing allowing pedestrian t Planter strips, with varying widths, are situated Outbound Bicycle Lane from Ferry Terminal adjacent to the curb, without obstructing the pedestrian "clear zone." I Second Review Draft - Bremerton Non-Motorized Transportation Plan 24 City of Bremerton Most minor collector and local streets in enough to ensure safe travel for the city can be categorized as shared cyclists. roadways due to their low traffic Bicycle Parkina volumes; however, the streets do not Covered bicycle parking exists at the have sIgns to indicate that vehicles Bremerton Transportation Center In must share lanes with cyclists. the parking garage adjacent to the West Bremerton Washington State Ferry Terminal. Bicycle Lanes and Shoulder Bikeways Bicycle racks are also found in several other downtown Bremerton locations. The only striped bicycle lanes in the East Bremerton city are on SR 304 between Burwell Street and the Missouri Gate of the Shoulder Bikeways Puget Sound Naval Shipyard, and on There are no designated shoulder the entrance and exit roadways to the bikeways In East Bremerton, but ferry terminal. shoulders and shared roadways are the SR 3 and Kitsap Way have nearly prImary bicycle pathways. A very Inbound Bicycle Lane to Ferry Terminal continuous shoulder bikeways and are popular scenic route is along Tracy ton the most convenient north-south and Beach Road and Lebo Boulevard; east-west bicycle routes, respectively. however, the shoulders along this road While riding on the SR 3 shoulders is are too narrow to safely accommodate legal, many bicyclists feel unsafe or cyclists and vehicles. uncomfortable riding next to high-speed Hazardous conditions exist on Warren freeway traffic. Hazardous conditions, Avenue in the vicinity of the Warren such as recessed or slotted grates and Avenue Bridge where there is usually cracked asphalt, exist in the shoulders debris on the road and glass on the along Kitsap Way near Cemetery Hill sidewalks. Along Wheaton Way and (west of SR 3) and between 11th and particularly near the hospital, the 6th Streets. stormwater grates are not flush with For the most part, shoulder bikeways in the road surface, which creates a Itl2:~T~~,... .~. West Bremerton are narrow, rough, or snagging hazard. non -existent. Places of particular Bicycle Lanes and Shoulder Bikeways concern are North Lake Road along the north edge of Kitsap, Lake, Warren East Bremerton does not have striped Avenue north of 11th Street, and the bicycle lanes. Warren Avenue Bridge. An alternate I~"~~~_~M'~~~'" _ ... ... . east-west route between SR 304 and Bicycle Parking at the Bremerton Transportation downtown Bremerton IS along 11th Center Street, but the travel lanes are not wide Second Review Draft - Bremerton Non-Motorized Transportation Plan 125 City of Bremerton in Manette and downtown 2.2 Positive System Bremerton create a sense of compact urban form and an inviting Attributes pedestrian atmosphere. Walking as a means for running errands is also Many characteristics contribute to a encouraged through the grouping of positive pedestrian environment In diverse land uses in downtown Bremerton. Bremerton and Manette. . A relatively well-connected street 2.2.1 Pedestrian-Friendly grid in downtown Bremerton, inner I ~~~"- Environment West Bremerton, and Manette r'-:- - . ,- Bremerton benefits from a pedestrian- facilitates convenient and direct l~~:~~~?;j~~~;:~ friendly environment in several parts of pedestrian travel. the community. Notable places include: . Wide planter strips between . The Louis Mentor Boardwalk is an sidewalks and curbs (e.g., on attractive pedestrian environment Gregory Way) provide a buffer Warning sign on Kelly Road advising motorists of with a large public plaza, waterfront between pedestrians and motor pedestrians in the roadway promenade, benches, ornamental vehicle traffic. lighting, and public art. . 4th Street offers an inviting 2.2.2 Warning Signage pedestrian environment between Although many streets throughout Pacific and Washington Avenues in Bremerton lack sidewalks or other downtown Bremerton with a narrow dedicated pedestrian facilities, the City cross-section, meandering flow, has placed warnIng SIgns In many street trees, and other pedestrian places to alert motorists that amenities. pedestrians are using the street. . Shared use paths invite pedestrian 2.2.3 Traffic Calming travel in several city parks, such as Evergreen Park and Lions Many local streets throughout Community Playfield. Bremerton have traffic calming . Newly constructed sidewalks within structures to slow vehicle speeds and subdivisions and other development encourage through-traffic to use higher contribute to a more complete order streets. For example, a small pedestrian network. traffic circle is located on Park Avenue at 14th Street near Evergreen Park. . Land use characteristics contribute Speed humps also exist on Park Avenue to a pedestrian-friendly and several other streets throughout environment. For instance, the city. buildings fronting the sidewalk edge 26[ Second Review Draft - Bremerton Non-Motorized Transportation Plan City of Bremerton 2~2.4lntersection Treatments for parking lane, these devices can calm Pedestrian Crossings traffic passing through or turning at an intersection. Curb extensions also Half Siqnals reduce pedestrian crossing distances Half signals allow pedestrians to cross and Increase the visibility of major streets where full signalized pedestrians waiting to cross the street. intersections do not exist, and include These features currently exist at traditional signal heads for approaching several in tersections along SR vehicles and WALK/DON'T WALK 304/Burwell Street between Naval and signals on the perpendicular pedestrian Pacific Avenues and along segments of approaches. These signals are typically 5th Street and Park Avenue. A mid- placed at locations where the demand block curb extension facilitates for convenient and direct crossings is pedestrian crossings on Callow Avenue high and they can reduce the potential between SR 304/Burwell Street and 6th for pedestrians crossing Gay"walking) Street. . at less"safe locations. A half signal Hiqh-Visibilitv Crosswalks and Siqnaqe currently exists on SR 31O/Kitsap Way High "visibili ty crosswalks exist Mini traffic circle on Park Avenue between Forrest and Pershing Avenues, at allowing pedestrians to several intersections throughout access commercial businesses and residential Bremerton. High .visibility crosswalks areas on opposite sides of the street. usually include multiple wide stripes oriented perpendicular to the Pedestrian Refuqe Islands pedestrian's direction of travel while Pedestrian refuge islands simplify crossing the street. Examples include pedestrian crossings at major streets by the intersections of SR 304/Burwell allowing pedestrians to break the Street at Chester and State Avenues. crossmg into multiple segments. In Bremerton also has several crosswalks Bremerton, a refuge island at the wit~ textured and/or colored pavement intersection of SR 304/Burwell Street to Increase motorists' awareness of and Callow Avenue enables pedestrians pedestrian crossings. Examples include crossing the intersection's southern leg the intersections of Washington Avenue to cross the wide street in two phases at 2nd Street, and SR 304/Burwell while encountering only one direction of Street at Pacific Avenue. Some traffic at a time. intersections also include warnmg Curb Extensions and Mid-block Crossinqs sIgn age to alert motorists of the presence of foot traffic. SR 304/Burwell Curb extensions slow vehicle traffic by Street at Chester and State Avenues creating a visual "pinch point" for for instance, provide warning signage. ' approaching motorists. Typically constructed within the on"street Second Review Draft - Bremerton Non-Motorized Transportation Plan [27 City of Bremerton 2.3 System Deficiencies Bay. Man-made barriers include SR 3 and fences and gates around the Puget This section identifies locations and Sound Naval Shipyard and the Jackson describes conditions where pedestrians Park Naval Housing Area. Major face obstacles. streets with minimal pedestrian 2.3.1 Sight Distances crossing treatments also act as barriers, such as SR 303/Warren Avenue, SR Bremerton's hilly terrain creates short 303/Wheaton Way, and SR 310/Kitsap sight distances, which means that Way. motorists have relatively short . distances during which to react to 2.3.4 Uncomfortable SIdewalks pedestrians or cyclists crossing a road. Pedestrians expenence an uncom~ Steep slopes on streets such as Perry fortable environment on streets with High-visibility crosswalk on Burwell Street at State Avenue and 15th Street can be a narrow sidewalks, and on high-volume Avenue challenge for seniors and pedestrians streets lacking buffers between with disabilities. This is especially sidewalks and vehicle traffic. Curb- problematic on streets (e.g., 13th Street tight sidewalks on SR 303/Warren near Lafayette Avenue) where a lack of Avenue force pedestrians to walk close sidewalks forces pedestrians to walk in to adjacent high-speed traffic. Other the road. streets with similar characteristics 2.3.2 Limited Street Connectivity include 6th and 11th Streets and Loxie Eagans Boulevard. Although well-connected street grids . . exist in downtown Bremerton, inner 2.3.5 CyclIst and MotOrIst West Bremerton, and Manette, in other Behaviors areas discontinuous streets imp~de Frequent conflicts occur between ~ght distan-E-~e!gplems on 13th Street direct travel between pedestnan motorists and cyclists regarding ~'i",~;""';"'. . '. < destinati~ns. . Circuitous . streets knowledge and respect of state laws ' charactenze neIgh-bor~lOods m outer that permit bicycles to share travel West Bremerton (especIall~ west of SR lanes. Signage such as "Bicyclist May 3) and the northern portlOns of East Take Lane" IS needed for these Bremerton. locations. In addition, traffic moves 2.3.3 Barriers faster than the posted 35-mph .speed . .. limit along Warren Avenue posmg a Natural and man-made barner~ lImIt threat to cyclists. the ability of cyclists and pedestnans to bike or walk directly between certain parts of Bremerton. Natural barriers Limited crossi~g opportuniti~s make Warren include the Port Washington Narrows, A venue a barrier to pedestnan travel Ostrich Bay, Oyster Bay, and Phinney 281 Second Review Draft - Bremerton Non-Motorized Transportation Plan City of Bremerton 2.3.6 Fragmented Sidewalk 2.3.9 Incomplete Shared Use Network Path Network Some parts of Bremerton benefit from a Although shared use paths exist in fairly complete sidewalk network while several parks and other areas other areas expenence a fragmented throughout Bremerton, the community network. Generally, a relatively lacks a comprehensive and connected com plete sidewalk network exists in system. For instance, two separate paths (in proximity to one another) -- Inner West Bremerton, but many exist along the west side of Ostrich Bay: streets in outer West Bremerton and portions of East Bremerton have no one segment on a vacated section of sidewalks. Several popular walking Shorewood Drive in NAD Park, and routes have discon-tinuous pedestrian another segment in the Jackson Park facilities, which is partially a result of . Naval Housing Area. However, the two some streets being located outside sections are separated by fencing and a Bremerton's city limits. gate at NAD Park's north end. 2.3.7 Sidewalk Obstructions 2.3.10 Difficult Crossings Although sidewalks exist on numerous Hiqh-Volume Streets streets, . their use IS occasionally Crossing SR 303/Warren Avenue IS hindered by obstructions like challenging for pedestrians because of vegetation, utility poles, fire hydrants, the relatively long distances between and other items. For example, there is a signalized intersections and marked 13-foot-wide sidewalk on the south side crossIngs. This affects pedestrians Sidewalk obstructions on Washington Avenue of 1st Street, but temporary fencing traveling between residential blocks at least 5 feet of usable space. neighborhoods east of the road and Overgrown vegetation obstructs paths Olympic College and Bremerton High and sidewalks in some areas (e.g., on School on the west side. The minimal portions of Trenton Avenue), forcing number of marked and signalized pedestrians to walk in the adjacent crossmgs also poses difficulties for planter strip or the road. pedestrians and cyclists trying to reach 2.3.8 Narrow Bridge Sidewalks transit stops on both sides of the street. The Manette Bridge has a narrow sidewalk on the south side, but lacks a sidewalk on the north side. Narrow sidewalks on both sides of the Warren Avenue Bridge are separated from high- speed traffic with short concrete barriers. Second Review Draft - Bremerton Non-Motorized Transportation Plan 129 City of Bremerton SR 303/Wheaton Way north of the Port 303/Wheaton Way, and SR 310/Kitsap Washington Narrows has similar Way. conditions. High vehicle speeds and Other difficult crossings due to lack of lengthy distances between signalized traffic control and crossing signals are: intersections discourage pedestrians . Old Wheaton Way and Sheridan from walking to serVIces along this Road corridor. In some cases, pedestrians Perry Avenue at Stone Way chose to cross the roadway between . designated crossIngs to reach their . Kitsap Way at the QFC driveway desired destinations. . Burwell Street at Naval Avenue The intersections of SR 304/Burwell . Kitsap Way at 11th Street Street at Chester and State Avenues . Burwell Street at Montgomery have mar ked crosswalks and Avenue supplemental warnmg sIgns for Burwell Street at Callow Avenue Faded crosswalk markings at the Manette approaching motorists. However, . Bridge's east end additional treatments appear to be . Burwell Street at State Street needed. Data from the Puget Sound . Burwell Street at Chester Street Naval Shipyard show that Some of the conflicts on Burwell Street approximately 1,000 to 1,500 between bicyclists, pedestrians, and pedestrians cross SR 304/Burwell motorists leaving ferries are because Street at these locations on a typical the travel ways are not clear ly weekday afternoon as employees depart indicated for each group. from nearby shipyard entrance gates. Puget Sound Naval Shipyard recently A difficult connection particular to requested that a signal be installed at cyclists is the transition to and from the one or both intersections to improve the Warren Bridge because of the stairs. pedestrian crOSSIng environment. Cyclists often divert to Manette Bridge V ehicle- bicycle conflicts also exist at to avoid the stairs. this location, especially between the Offset Intersections Missouri and Charleston Gates due to In the break between high speed right turn movements across some areas, Bremerton's multiple street grids the bicycle lane/shoulder. creates offset intersections (e.g., along The intersections of other major streets Naval Avenue and 6th Street), some of throughout Bremerton could benefit which include complex pedestrian from pedestrian crossing enhance- crossmgs. ments. Pedestrian and cyclist comfort and safety could be improved by adding crossmg treatments at intersections along SR 303/Warren Avenue, SR 30 I Second Review Draft - Bremerton Non-Motorized Transportation Plan City of Bremerton Crosswalk Issues at Loxie Eagans Boulevard, where At . . ( north-south pedestrian crossings are many mtersectIOns e.g., SR h'b't d t 1 ,----------. .--.,-..-. . -. - 310/Kitsap W t M' D" pro I I e on mos egs to accommodate ay a anne nve, h' h 1 f . . W h. t A h S ) Ig vo urnes 0 turmng vehIcles. as mg on venue at 6t treet crosswalks are difficult to see fo; Pedestrian crossings are also prohibited approaching motorists. Crosswalk bars on some legs at the intersections of SR on many of the city's longitudinal 310/Kitsap Way at 11th Street, SR crosswalks (also known as "ladder 303/Warren Avenue at 16th Street, and style") .are fairly narrow. Furthermore at the Manette Bridge's east end. crosswalk bars have faded or have bee~ Although pedestrian crossing worn off by vehicle tires as in the case prohibitions can efficiently accommodate of Callow Avenue at 11th Street SR vehicle turning movements, they often 310/Kitsap Way at Harlow Drive' and require pedestrians to cross multiple legs . the Manette Bridge's east end.' of intersections to remain on their . . . . desired travel routes. Prohibited CroSSlnq Movements and Out- ... . Intersection without curb ramps on Nipsic of-Direction Travel Difficulties for Disabled Pedestrians Avenue In some areas, pedestrians must walk Curb ramps at some intersections are in long distances to reach marked and/or poor condition or disrepair, and some signalized street crossmgs. Although intersections lack curb ramps the street network surrounding altogether (e.g., Washington Avenue at Harrison Medical Center generally 6th Street). In some cases, marked includes lower volume, lower speed crosswalks lead to sidewalks with no streets, several street segments and curb ramps (e.g., on 13th Street near intersections lack marked crosswalks. Bremerton High School), or to a This can be a problem for seniors and roadway shoulder with no sidewalk mobility-impaired pedestrians (e:g., on Marion Avenue at Renaissance unwilling or unable to walk extra HIgh School; Harlow Drive at Carr distances to reach a marked crosswalk. Boulevard). This can make traveling by Most streets surrounding the Medical wheelchair or motorized mobility device Center also have relatively steep challenging, if not impossible. Visually- grades, furt~er indicati~g the need for and ~obilit~-i~paired p.ede~trians also Crosswalk without curb ramp on 13th Street at safe, .convement, and dIrect pedestrian ~xpenen~e dIff1~ulty navIgatmg through Bremerton High School crossmgs. IntersectIOns WIth curb ramps oriented Pedestrian crossings are prohibited on diagtonallYh towhard the intersection's some 1 g f . . t . cen er rat er t an toward a crosswalk e s 0 major m ersectIOns . throughout the city. Notable locations include ramp terminal intersections along SR 3 at SR 31O/Kitsap Way and Second Review Draft - Bremerton Non-Motorized Transportation Plan [31 City of Bremerton At some signalized intersections, as In the case of Loxie Eagans pedestrian activation buttons are Boulevard at the SR 3 southbound on- placed at a height exceeding guidelines ramp. prescribed in AASHTO's Guide for the Cyclists and pedestrians also Planning, Design, and Operation of experience difficulties crossing on- and Pedestrian Facilities. AASHTO off-ramps that allow free-flow vehicle recommends a 42-inch maXImum movements (e.g., SR 303/Wheaton Way activation bu tton height to at Callahan Drive). accommodate wheelchair users. Limited Transit Stop Facilities Activation buttons on Lebo Boulevard at Old Wheaton Way, for instance, are Kitsap. Transit operates several bus about 50 inches high. Signalized routes throughout Bremerton. However, in tersections throughout Bremerton many transit stops lack shelters, also lack audible pedestrian signals to benches, and posted schedules. facilitate safe crossings for the visually Walkways providing access to some impaired. stops are also in substandard condition, Gravel and debris on the sidewalk on Kitsap and, In some locations, formalized Way Interchanqe Areas walkways do not exist. This is described Pedestrians and cyclists face crossing in more detail in a later section. difficulties at highway interchange Poor Liqhtinq in Some Areas areas. They are likely to travel out-of- direction because of the crossing Some areas have minimal or no street prohibitions on some legs of the SR 3 lighting, which can potentially decrease ramp terminal intersections with Loxie comfort and safety. The Warren Avenue Eagans Boulevard and SR 310/Kitsap Bridge, portions of SR 310/Kitsap Way, Way. Channelized right turns at these and some areas In Manette lack in tersections induce higher vehicle sufficient street lighting. turning speeds, especially for motorists Lack of Wavfindinq Tools entering freeway on -ramps from the Bremerton would benefit from signage local street network. and other wayfinding tools to orient In addition to high vehicle speeds, cyclists and pedestrians to and through vegetation impedes motorists' sight of major destinations like downtown, the crossmg pedestrians at some ramp Bremerton Transportation Center, terminal intersections (e.g., westbound Manette, and Olympic College. motorists on Loxie Eagans Boulevard entering the SR 3 northbound on-ramp). Broad vehicle turning radii at some ramp terminals also create excessively long vehicle/pedestrian conflict zones, I Second Review Draft - Bremerton Non-Motorized Transportation Plan 32 City of Bremerton Maintenance Issues The majority of Bremerton's reported Existing sidewalks and shared crashes occurred at intersections and use involved motorists striking a bicyclist paths in several parts of Bremerton or pedestrian. Several intersections (e.g., portions of Harlow Drive, and the throughout the city experienced path accessing the SR 3 bicycle/pedestrian-related collisions in pedestrianlbicycle overpass) suffer from the 2004 to 2006 period; however, some cracking or heaving. The SR 3 locations experienced higher crash pedestrianlbicycle overpass, along with frequencies. Intersections experiencing other facilities, IS also littered with three or more reported crashes include graffiti and broken glass. Gravel and the following: other debris are also found on some sidewalks (e.g., portions of SR . SR 303/Wheaton Way at Hanford 310/Kitsap Way). Avenue . SR 303/Wheaton Way at Sheridan 2.4 Bicycle/Pedestrian Crash Road History - . SR 303/Wheaton Way at Sylvan The City of Bremerton provided Way bicycle/pedestrian crash data for 2004 . SR 310/Kitsap Way at 11th Street through 2006. A total of 95 reported . SR 31O/Kitsap Way at Marine Drive crashes involving non-motorized users . SR 310/Kitsap Way at Morgan Drive occurred during this period. Depicted on Map 6, the crash locations cover the . SR 310/Kitsap Way at Wilbert entire city and mostly occurred along Avenue/Corbet Drive major streets characterized by multiple Nearly all reported crashes at the travel lanes, numerous driveway intersections listed above involved accesses, and higher vehicle speeds and right-turning motorists failing to yield volumes. The data show that most the right-of-way to pedestrians in a bicycle/pedestrian crashes occurred on a crosswalk (or driveway) or bicyclists on few major street corridors, including: the adjacent shoulder. Driver . SR 303/Wheaton Way inattention represented the maIn . SR 304/Burwell Street contributing cause of these collisions. . SR 31O/Kitsap Way The intersection of SR 310/Kitsap Way 6th Street (West Bremerton) at 11th Street experienced the highest . number of reported bicycle/pedestrian . 11th Street (West Bremerton) crashes (four crashes) between 2004 . Sheridan Road and 2006. Second Review Draft - Bremerton Non-Motorized Transportation Plan 133 City of Bremerton This "T" intersection includes multiple . Manette through lanes on both streets, as well . Puget Sound Naval Shipyard as double left-turn lanes on SR . Bremerton Transportation Center 310/Kitsap Way and double right-turn . West Bremerton Transfer Center lanes on 11th Street. Pedestrian crossIngs are prohibited on the . Harrison Medical Center in tersection' s northern leg, while . Schools crosswalk markings on the remaining . Olympic College legs have faded. One crash involved a Parks and recreation areas motorist striking a pedestrian when the . motorist disobeyed the traffic signal, . Services along commercial corridors while two crashes involved right- (e.g., SR 303/WarrenAvenue, SR turning motorists striking pedestrians 303/Wheaton Way, and SR In the crosswalk. A similar crash 310/Kitsap Way) involved a right-turning motorist Transit stop with minimal passenger facilities on striking a bicyclist. 2.5.1 Connections with Transit Almira Drive Of the 95 reported crashes between and Ferries 2004 and 2006, 52 crashes resulted in Ensuring a strong pedestrian and bicyclist/pedestrian injuries, while one bicycle link to transit is an important crash resulted in a fatality. This crash, part of making non - motorized located on Kitsap Way near Crawford transportation a part of daily life in Drive, involved an inattentive motorist Bremerton. Several main components of striking a bicyclist riding on the bicycle and pedestrian-transit roadway shoulder. integration are: 2.5 Destinations and . Allowing bicycles on transit Connections . Providing benches, shelters, posted schedules, bicycle parking, and Major pedestrian and bicycle other features at transit stops destinations include educational . Improving connections between facilities, employment centers, shopping walkways, bikeways, and transit centers, neighborhood commercial areas, and parks. In addition, several . Encouraging use of bicycle and roads provide direct connections to transit programs other Kitsap County communities like Kitsap Transit operates several bus Gorst and Silverdale. routes throughout East and West Within Bremerton, popular pedestrian Bremerton, providing connections to and bicycle destinations include: intermodal transfer centers and other communities in Kitsap County. . Downtown 341 Second Review Draft - Bremerton Non-Motorized Transportation Plan City of Bremerfon The quantity and quality of pedestrian · The Bremerton-Seattle infrastructure along bus routes varies auto/passenger ferry (operated by ~_~__~___~_~_ by location. Streets along some routes Washington State Ferries) r~ ~ ~ -~ ~-~~- Wh -- ~ have sidewalks on both sides, such as The Transportation Center is a two- SR 304/Burwell Street, Washington level indoor and outdoor facility, with Avenue, and Lebo Boulevard. the upper level serving bus passengers Streets along other routes have and foot traffic entering and leaving the sidewalks on one side only, including Bremerton-Seattle Ferry. Passenger segments of Perry and Trenton boarding/alighting for the Bremerton- Avenues). In some cases, buses travel Port Orchard ferry occurs on the lower along streets without sidewalks, such level. as Almira Drive. A complete network of sidewalks and Conditions at transit stops also vary by the Louis Mentor Boardwalk provide location. While some stops only include pedestrian connections between the a bus route sIgn, others provide Transportation Center and downtown shelters, benches, and posted schedules. Bremerton. Sidewalks are in relatively Pedestrian crossing at 1st Street and Washington Kitsap Transit provides "ACCESS" good condition, with infrastr~cture a~so Avenue near the Bremerlon Transporlation Center demand-response shuttle serVIce for m bJ?ll.ace. to . serve pedestrIans WIth mo 1 Ity ImpaIrments. semors and passengers who are physically unable to use the fixed route There is a general lack of wayfinding bus system. Riders must meet eligibility signage to orient cyclists and requirements and make reservations at pedestrians approaching or leaving the least 1 day prior to their scheduled trip. ~ransportation Center. Improved sIgnage could help direct passengers to Bremerton Transportation Center their desired buses or ferries, and help Located adjacent to the Louis Mentor connect arriving passengers with key Boardwalk at 1st Street and destinations in the immediate area. The Washington Avenue, the Bremerton Transportation Center also lacks a Transportation Center provides direct designated, designed pickup/drop-off connections between varIOUS transit area. These activities currently take services: place informally along Washington . Fixed route buses (operated by Aven~e nort~ of 1st Street, occasionally Kitsap Transit) blockmg vehIcle travel lanes. . The Bremerton - Port Orchard passenger ferry (operated by Kitsap Transit) Second Review Draft - Bremerton Non-Motorized Transportation Plan 135 City of Bremerton Pedestrians and cyclists also experience of the school, while streets to the west conflicts with vehicle traffic near the are less connected and lack sidewalks Transportation Center. Most foot traffic on one or both sides. Several higher- accessing or leaving the Transportation volume streets are in the immediate Center passes through or near the vicinity, including Sheridan Road, intersection of 1st Street and Sylvan Way, and Pine Road. While the Washington Avenue. Although marked sidewalk network is more complete on crosswalks exist on the south leg, Sheridan Road, Sylvan Way and Pine pedestrians must cross multiple bus Road lack sidewalks In several lanes and passenger auto lanes. locations. West Bremerton Transfer Center Few marked crosswalks exist in the vicinity of the school, with most located The West Bremerton Transfer Center is on. higher-volume roads and at major Sidewalk on Robin Avenue near Armin Jahr located on 5th Street at Bruenn intersections. Elementary School Avenue, and serves several Kitsap Transit bus routes. The facility includes Crown Hill Elementary School a large shelter for transit users in Crown Hill Elementary School's addition to sIgnage with bus route designated walking catchment area is information. The sidewalk network is bounded by Phinney Bay Drive, Corbet fragmented In the vicinity of the Drive, SR 310/Kitsap Way, and Marine Transfer Center, with 5th Street and Drive. With the exception of SR Bruenn Avenue having sidewalks on 310/Kitsap Way and short segments some segments. Other nearby streets, along the east side of Marine Drive and including Auto Center Way, do not have Rocky Point Road, most streets near the sidewalks. school do not have sidewalks. Marked crosswalks exist on Marine Drive and 2.5.2 Connections with Schools Rocky Point Road immediately adjacent and Olympic College to the school, along with crosswalks at the intersection of Marine Drive and SR Elementary Schools 310/Kitsap Way. Crossing guards assist students at some crosswalks for 15- to Armin Jahr Elementarv School 20-111inute periods in the morning and Armin Jahr Elementary School's afternoon. designated walking catchment area is generally bounded by SR 303/Wheaton Way, Lebo Boulevard, Appaloosa Way, Sylvan Way, and Hanford Avenue. A relatively well-connected street grid with sidewalks on both sides exists east 361 Second Review Draft - Bremerton Non-Motorized Transportation Plan City of Bremerton Kitsao Lake Elementarv School 304/Burwell Street, 6th and 11th Kitsap Lake Elementary School's Streets, and Naval Avenue. designated walking catchment area is View Ridqe Elementarv School generally bounded by SR 810/Kitsap Way, Price Road, and Kitsap Lake. In View Ridge Elementary School's the vicinity of the school, streets with designated walking catchment area is sidewalks include Osprey Circle and generally bounded by Perry Avenue, surrounding streets In the Dockside Sherid.an Road, SR 803/Wheaton Way, subdivision. A narrow paved path also and RIddell Road. Streets in the area exists on the east side of Harlow Drive have limited connectivity, and north of Carr Boulevard. Most other sidewalks exist predominantly on streets lack sidewalks and have narrow streets within proximity of the school. or no shoulders for pedestrian travel. Higher-volume streets In the area ~._- Topographic variations include SR 308/Wheaton Way, Sheridan .. also create Road, Sylvan Way, and Riddell Road. sight-distance problems for motorists on several streets like Wilmont Street. West Hills Elementarv School Marked crosswalks exist on Harlow Drive at Carr Boulevard, and on Lyle The West Hills Elementary School Avenue at the school entrance. Crossing designated walking catchment area is guards are posted at these locations for bounded by Callow Avenue, SR 20 minutes In the morning and 10 304/Navy Yard Highway, SR 3, SR minutes in the afternoon. 310/Kitsap Way, and 9th Street. Many Naval Avenue Elementarv School streets in the immediate vicinity of the school have sidewalks on one side (e.g., Naval Avenue Elementary School's Naval Avenue) or lack sidewalks designated walking catchment area is altogether. In some cases, gravel paths bounded by SR 803/Warren Avenue, SR and shoulders substitute for sidewalks 304/Burwell Street, Callow Avenue, and (e.g., along the south side of Loxie 11th Street. The school IS located Eagans Boulevard near the school). It within a well-connected street network should be noted that West Hills with sidewalks In generally good Elementary IS located outside condition. Bremerton city limits, with most Most nearby streets have sidewalks on surrounding streets under Kitsap both sides, and marked crosswalks are County's jurisdiction. located at several nearby intersections. Within the walking catchment area, Several higher-volume streets surround streets with sidewalks include Baer the immediate area, including SR Boulevard, along with other streets east of Forest Ridge Park. Perry Avenue at Stone Way Second Review Draft - Bremerton Non-Motorized Transportation Plan 137 City of Bremerton Marked crosswalks exist at several Some streets immediately adjacent to intersections near the school, and the school lack sidewalks on one or both crossIng guards assist students on sides, including Stone Way, and Perry National Avenue at Loxie Eagans and Trenton Avenues. Marked Boulevard and Preble Street, and on crosswalks exist at several intersections Arsenal Way at Marion Avenue. in the vicinity of the school, yet some Middle Schools crosswalks lead students to gravel Bremerton 8th Grade/Freshman Academv shoulders (e.g., Perry Avenue at Holman Street and at Stone Way). Bremerton's 8th Grade/Freshman Academy's designated walking High Schools catchment area is roughly bounded by Bremerton Hiqh School Perry and Tren ton Avenues, Old Wheaton Way, Lebo Boulevard,. SR Bremerton High School's designated 303/Wheaton Way, and Riddell Road. walking catchment area is fairly large, Streets north of the school have limited and bounded by Port Washington Pedestrian mall at Olympic College connectivity and a fragmented sidewalk Narrows, Sinclair Inlet, Callow Avenue, system. Streets to the south, especially SR 310/Kitsap Way, and Marine Drive. those In. Manette, have better Streets south and east of the high school connectivity and a more complete are generally well-connected with sidewalk network. The walking sidewalks on both sides, while many catchment area also has several high- streets In the walking catchment's volume roads including SR 303/Wheaton western area lack sidewalks (some Way, Sheridan Road, Sylvan Way, and streets are within Kitsap . County's Riddell Road. Marked crosswalks exist jurisdiction). Relatively long distances at major intersections throughout the between protected pedestrian crossings area. on some higher-volume roads (e.g., SR 303/W arren Avenue) create a Mountain View Middle School challenging pedestrian crossIng Mountain View Middle School's environment. Crosswalks are present at designated walking catchment area is many intersections In the school's bounded by Sinclair Inlet, Port immediate vicinity, but some lack curb Washington Narrows, SR 303/Wheaton ramps to facilitate convenient Way, and Sylvan Way. wheelchair crossings. A well-connected street grid exists south of the school with a fairly complete sidewalk network, while a more- circuitous street system with fragmented sidewalks exists to the west. I Second Review Draft - Bremerton Non-Motorized Transportation Plan 38 City of Bremerfon Renaissance Hiqh School With the exception of Marion Avenue, Constitution Avenue, and 1st Street, near ly all streets In the vicinity of Renaissance High School lack sidewalks. Pedestrians must either walk on adjacent shoulders or in the road. Crosswalks are present at intersections near the school, but often lead to areas without sidewalks, curb ramps, and other basic pedestrian facilities. Olympic College The pedestrian network surrounding Olympic College is similar to that of Bremerton High School. Streets to the south and east are well connected and generally include sidewalks on both sides, while streets to the west are less connected and lack sidewalks in many locations. SR 303/Warren Avenue serves as a major barrier between the college and residential neighborhoods to the east. Within the campus, however, pedestrians benefit from attractive pedestrian malls linking vanous campus buildings and facilities. 0\ M CC ~ ~ .!!l .g ~ C ~~ ~ 0 C <lJ III .- O~ U - __ ~ CO 1ii~ 0)"0 () .... ._ .t:: J:; Ql 0 6u Ql ~ ~ "5 ...J c. - ..... I.,;, a. :~~,~ ~ <::{z ~ ~ ~ ti".' ~ ~ 'o~~~ E '0 'I',',}' Z; >.0 0 0 u CII' ,. ...' a. a. :::E if;}:;;;ff'p,,:) Ih:~jii2B ~::~J;, ..... I 2 ~ c . e: g. \\ ~ Qj \\ () E \ \ ~ ~ \ \ -- () III \ \.~/-.;/ CO I ,I .~.,!!,"/'" ~ ~ \~ ~'... ~ CD ~ ,i./ ~ 0 o \1 / . 0 3: ~ CD~ ~ ~. > ~ _0 CII ..., ,.. 0 ~ ~ ~N '0 \ C \ o ' u CII VI Second Review Draft - Bremerton Non-Motorized Transportation Plan 141 City of Bremerton 3. Pedestrian and bicycle and pedestrian friendly community. Bicycle Facility This chapter describes suggested Improvements improvements, with high priority projects defined as those that will Bremerton has the poten tial to provide significant bicycling and walking transform itself into one of Puget improvements within the first 5 years of Sound's most walkable and bikeable the Plan implementation. A section at communities. Although challenges lie the end of this chapter suggests specifically where the City should ahead, the foundation of a fantastic concentrate its infrastructure system already exists. This chapter lays improvement efforts first. out a 20-year plan for completing this system. The recommended network 3.1 Pedestrian Facilities builds upon previous and on-going local The recommended pedestrian network and regional planning efforts, and reflects .the extensive input offered by builds upon Bremerton's existing system Pedestrian Countdown Signal of sidewalks, shared use paths, and City staff, bicycle/pedestrian stakeholder other pedestrian infrastructure groups, and Bremerton residents. currently In place. Depicted on the The recommended network includes a Proposed Pedestrian Network comprehensive and diverse set of 1m provemen ts Map (Map 4), the walking and bicycling facilities recommended projects are intended to connecting key destinations throughout increase pedestrian safety and Bremerton. System improvements convenience while making walking an include filling on-street walkway and attractive and viable travel mode. bikeway gaps, upgrading intersections Recommendations include filling gaps in for safer bicycle/pedestrian crossIngs, the sidewalk system, developing an expanding the shared use path network, interconnected shared use path network, and implementing other infrastructure and targeting specific intersections for projects to encourage bicycling and pedestrian crossing enhancements. The walking. Suggested improvements sections below discuss specific include low-cost measures yielding pedestrian facilities in greater detail. immediate results, such as striping bicycle lanes where sufficient street width already exists. Other suggested im provements, such as bicycle/pedestrian overcrossIngs, represent longer-term strategies for transforming Bremerton into a truly I Second Review Draft - Bremerton Non-Motorized Transportation Plan 42 City of Bremerton 3.1.1 Sidewalks 3.1.2 Intersection Improvements Locations: please refer to Map 4 Locations: SR 303 and Wheaton Way, Bremerton benefits from a relatively near schools, SR 303 at Warren Avenue, complete sidewalk system In several SR 304 at Burwell Street, SR 3 areas (e.g., the inner portions of East in terchanges and West Bremerton), while streets in The intersections identified on the most outlying areas have fragmented Proposed Pedestrian Network sidewalks or no sidewalks at all. A City Improvements Map were recognized by ordinance requires sidewalks to be built City staff and residents as having a high along new roads and as properties level of importance. Most highlighted redevelop along existing streets. As a intersections are located on streets with result, the major challenge lies In wide cross. sections (e.g., with multiple retrofitting existing streets where travel lanes), higher vehicle speeds and sidewalks are fragmented or lacking volumes, and/or other conditions Dual curb ramps with detectable warning altogether, and where complicating pedestrian crossIng strips In areas significant redevelopment IS not movements. In East Bremerton, most of expected to occur. the recommended improvements are The Proposed Pedestrian Network located along SR 303/Wheaton Way and in areas with higher volumes of children Improvements Map illustrates the walking to school. In West Bremerton, proposed sidewalk system. While the intersections targeted for improvements map only depicts future sidewalks on are located along SR 303/Warren collector and arterial roadways, the City Avenue, SR 304/Burwell Street, and the should work to provide sidewalks on all interchange areas along SR 3. This plan streets to ensure maximum pedestrian also recommends intersection connectivity. Maintaining and improving improvements along several proposed the existing system holds equal bicycle boulevard corridors in East and importance. The City should also West Bremerton to facilitate easy and thoroughly inventory the existing safe crossIngs for bicyclists and sidewalk network to identify needed pedestrians at major streets. A later improvements (e.g., cracked or heaving section in this chapter discusses bicycle pavement, intersections lacking curb boulevards in greater detail. ramps, etc.) and dedicate resources on a continual basis to address these problem areas. Second Review Draft- Bremerton Non-Motorized Transportation Plan 143 City of Bremerfon 3.1.3 Signal Timing Evaluation Accessible pedestrian signals and Modification supplement pedestrian signal indications with audible and/or Locations: requires assessment vibrotactile information. Traffic signals in Bremerton are either 3.1.5 Curb Ramps pre-timed or actuated. Pre-timed signals accommodate pedestrian crossmgs Locations: All intersections ~_ J through automatic "phasing" concurrent Curb ramps are a fundamental element with parallel vehicle traffic. of an accessible public system. A Jurisdictional responsibility for signals sidewalk without a curb ramp IS depends on the intersection under focus; inaccessible to a wheelchair occupant, therefore, the City, Kitsap County, and forcing the occupant back to a driveway WSDOT should periodically evaluate and out into the street for access. signal timing plans to ensure adequate Likewise, street crossings . must be Longitudinal ("ladder'? crosswalk pedestrian crossing times are provided. aligned and properly designed to 3.1.4 Pedestrian Signals accommodate the needs of all people. Many of the single-access ramps built in Locations: Downtown, SR 310 at Kitsap previous decades direct users diagonally Way, SR 303 at Warren Avenue and into the street intersection (rather than Wheaton Way straight into the crosswalk area). This Three technologies are available for can be problematic for visually-impaired controlling pedestrian traffic In pedestrians because they could signalized in tersections. An advanced experience difficulty orienting themselves type of Pedestrian Countdown Signal toward the crosswalk. Where possible, all contains a countdown signal, in addition intersection corners should provide dual to the WALK/DON'T WALK symbol. The curb ramps oriented directly across the countdown signal displays the number of street. Curb ramps should also have Developing informal accessways into seconds remaining for the pedestrian to detectable warnmg strips to shared use paths could greatly-improve complete the crossing. accommodate the visually impaired. pedestrian and bicycle access in the Dockside subdivision Leading Pedestrian Interval signals give 3.1.6 Crosswalks pedestrians a 3- to 4-second head start Locations: Inventory is Required into the intersection before parallel A variety of crosswalk marking types traffic is released by the green light. This technology ensures that pedestrians currently exist in Bremerton, including are well into the intersection and visible transverse (also called parallel bar) to turning vehicles prIor to vehicles markings consisting of two bars crossing an intersection, and longitudinal (also entering the crosswalk. called ladder style) markings. Crosswalks with pavement texturing 441 Second Review Draft - Bremerton Non-Motorized Transportation Plan City of Bremerton and color also exist in the downtown core. pedestrian -oriented land use The City's crosswalk marking standards recommendations for properties that are reflect the longitudinal design, which developed or re-developed. The City of provide greater visibility compared with Bremerton should actively pursue transverse markings. The City also opportunities to implement the requires illumination at all crosswalks. recommendations of these sub-area Many existing marked crosswalks plans. throughout the community do not 3.1.8 Shared Use Paths currently meet the standards described Locations: Searle Street pedestrian above. The City should inventory the existing system and develop a schedule to overcrosslng (repairs); desire -pa ths In re-stripe and illuminate crosswalks as Dockside subdivision; Kitsap Lake trail; needed. NAD Park to Jackson Park Naval Housing Area; Shore Drive 3.1.7 Streetscape Improvements Relatively small-scale improvements Locations: implement design guidelines could substantially enhance the path The upper portion of Shore Drive in East throughout Breinerton system already In place. In West Bremerton could be developed into a Several recently completed and ongoing Bremerton, for instance, the Searle Street shared use path sub-area plans offer incredible pedestrian/bicycle overcrossing provides a opportunities for enhancing Bremerton's critical non -motorized link between Auto walking environment. The plans each Center Way and Westpark; yet, cracking include a variety of streetscape and heaving on the narrow eastern improvements based on design guidelines approach path complicates bicycle and developed specifically for each geographic pedestrian travel. The City could show its area under focus. Recent and ongoing commitment to system preservation by planning efforts include: reconstructing and widening this . The Downtown Sub-Area Plan relatively short link. . The Eastpark Sub-Area Plan Path corridors, such as the unpaved . The Westpark Sub-Area Plan accessways in the Doc~side subdivision, should be formalized. Children use. the . The Wheaton-Riddell Sub-Area Plan informal accessways to reach Kitsap Lake The recommended street design Elementary School and other pedestrians guidelines and associated streetscape and bicyclists use them as a recreational projects emphasize pedestrian comfort rou te along Kitsap Lake. Formalizing and safety. The streetscape these short links (which are located enhancements include wide sidewalks, within the public right-of-way) could planter strips, pedestrian refuge islands, greatly Improve recreational and street trees, and other treatments. utilitarian bicycling and walking Complementing these enhancements are opportunities. Second Review Draft - Bremerton Non-Motorized Transportation Plan I City of Bremerton 45 In East Bremerton, the upper portion of such as waterways or major streets. A Shore Drive could be converted into a pedestrian/bicycle overcrossing linking shared use path. Steep topography Olympic College with Lions Community currently separates bi-directional traffic Playfield would provide a safe, on this local street. The upper portion convenient, and comfortable alternative could serve foot and bicycle traffic while to the SR 303/Warren Avenue Bridge. the lower portion would remain open to Such a structure would be a critical non- vehicles. Because of the lack of motorized link between East and West driveways on the upper side, trail Bremerton and could serve as an development could occur with minimal opportunity for the community to display effects on private property access. its identity. This project would enable In West Bremerton, a short but critical pedestrians and bicyclists to freely travel bicycle/pedestrian could be filled between Olympic College, Evergreen gap Park, and surrounding neighborhoods between NAD Park and the Jackson Park Naval Housing Area. Currently, a without having to cross SR 303/Warren fence separates the northern end of Avenue at-grade. Pedestrian/bicycle overcrossings enable Shorewood Drive from the nearby shared 3.1.10 Path Feasibility Studies communities to express their identity while use path along Ostrich Bay. Completing Locations: Kitsap Lake Perimeter Study enhancing non-motorized connections this link would offer pedestrians and bicyclists a scenic and more direct route Path feasibility studies devote detailed linking the Naval Housing Area, NAD attention to specific trail projects. These Park, and other West Bremerton studies examine a particular trail corridor neighborhoods. in depth, and include opportunities and The City can maximize opportunities to constraints analyses, development of develop intercity paths by working with potential path alignment options, WSDOT and other agencies to implement selection of a preferred alignment, and the Mosquito Fleet Trail Master Plan. preliminary cost estimates. Feasibility The plan includes a proposed shared use studies are particularly useful for path along SR3 linking West Bremerton agencies exploring potential path and Gorst, with potential connections to corridors in areas faced with topographic, Port Orchard and other West Sound environmental, political, or other communities. challenges. Bremerton residents have 3.1.9 Pedestrian/Bicycle Bridges consistently expressed a desire for shared use paths In potentially challenging Locations: Link Olympic College with areas, most notably around Kitsap Lake. Lions Community Playfield The City should conduct a feasibility Pedestrian/bicycle bridges represent one study to explore the possibility of strategy for overcoming large barriers developing a Kitsap Lake Perimeter Trail. I Second Review Draft - Bremerton Non-Motorized Transportation Plan 46 City of Bremerton 3.2 Bicycle Facilities longer distances often gravitate to these routes. Second, the commercial character The recommended bicycle network of major streets makes these corridors depicted In Map 5 builds upon the destinations in and of themselves. existing system of bicycle lanes, shoulder To safely accommodate bicyclists on bikeways, and shared use paths and also corridors with current or anticipated takes advantage of many lower-volume high traffic volumes, bicycle lanes are bicycle-friendly streets. These proposed proposed on several maJor streets projects aIm to fill system gaps and throughout Bremerton. In developing the develop a more complete network. The proposed bicycle lane network, proposed system includes an expanded consideration was gIVen to several bicycle lane network on streets where factors, including: bicyclists could benefit from delineated . Gaps in the existing bicycle lane Existing wide shoulders on SR 310/Kitsap separation from motorists, and shoulder system bikeways (serving bicyclists and Way (with bike lane) pedestrians) provided several . Previous and ongoing planning are on efforts identifying the need for bicycle roadways at the urban/rural fringe. The recommended network also includes a lanes on specific streets comprehensive Shared Roadway/Bicycle . Planned street improvements that Boulevard system, taking advantage of would include bicycle lanes as part of Bremerton's extensive network of lower- construction volume streets. As discussed in Section . Whether an existing street could be 3.1 Pedestrian Facilities, the network retrofitted to include bicycle lanes also includes a system of shared use . Planned land development projects paths. with the potential to generate bicycle 3.2.1 Bicycle Lanes travel demand on major streets With the exception of SR 304/Navy Yard Highway, portions of Auto Center Way, and a few streets near Olympic College, Proposed bicycle lane striping and Bremerton's major streets lack dedicated pavement markings (no bike lane) bicycle lanes. Safely accommodating bicyclists on major roadways is important for several reasons. First, major streets generally offer the most direct routes between bicyclist destinations while providing better connectivity compared with lower-order streets. Consequently, commuter cyclists and those traveling Second Review Draft - Bremerton Non-Motorized Transportation Plan I City of Bremerton 47 Existing short-term and long-term motorized uses. 6th Street In West transportation plans do not propose any Bremerton currently provides four new major streets in Bremerton, nor do vehicle travel lanes, yet traffic volumes they include many maJor street are relatively low compared with nearby reconstruction projects. As a result, the parallel routes such as 11th Street and City will need to largely focus on SR 304/Burwell Street. retrofitting existing streets. Though The City could take advantage of this physical and other constraints preclude opportunity by re"striping 6th Street to bicycle lane development on some include bicycle lanes and a center left- corridors, the City of Bremerton could turn lane. Although this strategy would employ vanous approaches to work reduce the number of travel lanes, the around these challenges. These addition of a center turn lane could approaches are discussed below. improve traffic operations on this street. Old Wheaton Way near Parks ide Dr. Shoulder Striping and Pavement This stra tegy would transform 6th (existing conditions) Markings Street into a safer bicycle corridor. SR 310 and Kitsap Way In West The Sub-Area Plan has identified 6th Bremerton are wide enough to provide Street as a road diet candidate. The road bicycle lanes through enhanced striping diet could accommodate a landscaped and pavement mar kings on existing center median with center turn pockets shoulders. at key intersections. Uphill Bicycle Lanes Contra-Flow Bicycle Lanes This relatively low"cost, yet highly The City could add an eastbound- contra- effective treatment could be flow lane on 1st Street between' implemented immediately on Old Montgomery and Naval Avenues as part Wheaton Way in East Bremerton and. of a larger bicycle boulevard project. Old Wheaton Way with uphill 15th Street in West Bremerton. Uphill With low traffic volumes and no bicycle lane (with bike lane) bicycle lanes could also serve as an intersecting driveways on the contra- interim solution for streets that might flow lane side of the street, this corridor eventually be widened to include bicycle is an ideal candidate for this innovative lanes on both sides. treatment. The contra-flow lane would Road Diets also enable cyclists to avoid SR 304/Burwell Street, the nearest Road diets reallocate a portion of a alternative route. street for striping lllodifications. In Bremerton, several streets appear to have more width than IS currently needed for vehicles and this excess capacity could be striped for non- I Second Review Draft - Bremerton Non-Motorized Transportation Plan 48 City of Bremerton Street Widening 3.2.3 Shared Roadways/Bicycle The City of Bremerton could add bicycle Boulevards lanes to several streets with unused right-of-way. Although street widening Locations: SR 303 and Wheaton Way; incurs higher expenses compared with Perry Avenue; Downtown, Olympic re-striping projects, the City could College, Bremerton High School, develop short- and long-term strategies. Westpark, Jackson Park Naval Housing As a short-term measure, the City could Area focus on streets currently lacking curbs, Bremerton benefits from a generally gutters, and, sidewalks (e.g., Almira well-connected system of lower-volume Drive). The City could add bicycle lanes streets that could become spectacular to these streets without the high costs bicycling routes for riders of all ages of major infrastructure reconstruction. and skills with the addition of relatively In the long term, however, the City small-scale treatments. These streets should find opportunities to add bicycle (commonly referred to as shared lanes to other major streets where they roadways) accommodate bicyclists and are needed. Opportunities include motorists In the same travel lanes, adding bicycle lanes as streets and often with no specific vehicle or bicycle bridges are widened for additional auto lane delineation. Communities capacity, or as property development throughout the county are transforming necessitates street reconstruction. their shared roadways into even better 3.2.2 Shoulder Bikeways facilities, known as bicycle boulevards. Locations: Tracy ton Beach Road and Many streets throughout East and West Bremerton could benefit from a variety of Other Outlying Roads shared roadway/bicycle boulevard Shoulder bikeways are common in less- improvements. In East Bremerton, developed and rural areas, and typically several bicycle boulevards would provide consist of a paved shoulder for riders alternatives to major street pedestrian and bicycle travel. Although corridors such as SR 303 at Wheaton these facilities may suitably Way (characterized by high vehicle accommod~te bicyclists and pedestrians speeds and volumes) and the southern today, the City will need to consider portion of Perry Avenue (characterized additional treatments (e.g., bicycle by a steep grade and narrow cross- lanes, sidewalks, and shared use paths) section) . as new development occurs and as traffic volumes increase. Second Review Draft - Bremerton Non-Motorized Transportation Plan I City of Bremerton 49 In West Bremerton, bicycle boulevards changes that would offer trail users a would enhance non - motorized safer, more comfortable, and pleasant connections between down town and experience as they pass through the Olympic College, Bremerton High School, community. The trail alignment Westpark, and the Jackson Park Naval changes also take advantage of several Housing Area. exciting projects proposed in this Plan. 3.2.4 The Mosquito Fleet Trail: Efforts to develop specific trail alignments are already underway. The Tying it all Together City is in the process of extending the As a first step toward implementing the Louis Mentor Boardwalk, while Non-Motorized Transportation Plan, the WSDOT will soon replace the Manette City could develop a series of projects Bridge with improved demonstrating its commitment to pedestrian/bicycle facilities. These two improving bicycling and walking, both highly visible projects could serve as locally and regionally. The Mosquito the catalyst for a systemwide trail Fleet Tr ail provides. a tremendous development effort. opportunity to achieve this objective. Table 2 outlines the recommended Kitsap County completed a master plan Mosquito Fleet Tr ail rou te through for the regional Mosquito Fleet Trail in Bremerton. Beginning In East 2001. Utilizing a combination of shared Bremerton, the table identifies specific use paths, roadways and sidewalks, this alignments and bicycle/pedestrian trail would connect several communities facilities. Please refer to Section 6 for a (including Bremerton) and historic discussion of other projects and project Mosquito Fleet docks throughout the prioritizations. County. The Bremerton Non-Motorized Transportation Plan recognizes this trail as a key local and regional asset. Developing Bremerton's secti~n of the Mosquito Fleet Trail provides a valuable opportunity for the Ci ty to implement and showcase each bicycle/pedestrian facility type described In this chapter. Passing through Bremerton, the proposed trail alignment (as outlined in the Master Plan) would follow a combination of streets, sidewalks, and paths. The Non- Motorized Transportation. Plan recommends some mInor alignment 50 I Second Review Draft - Bremerton Non-Motorized Transportation Plan City of Bremerton Table 2. Proposed Mosquito Fleet Trail Route in Bremerton ,. ':~, ,c ... .:.:-'7.. ;"":.Se'grTu!~t; " ,." ~ . ,; , 1 . ~, ~ : .' :: ,;~ '/ltrom~to;, :. ~ " ..,'., ,.., .~ h .. :. "jFacilityType ., . " .~ ,. ., ,. i . .' ..C.", .. . '. ,~ , Trenton Ave. Sylvan Way to Stone Way Shoulder bikeway Trenton Ave. Stone Way to Shore Dr. Bicycle boulevard and sidewalks Shore Dr. Trenton Ave. to Vandalia Ave. Bicycle boulevard and sidewalks Shore Dr. Vandalia Ave. to 10th St. Shared use path 10th St./Pitt Ave.lHarkins St. Shore Dr. to Manette Br. Bicycle boulevard and sidewalks Manette Br. Old Wheaton Way to Bremerton Boardwalk Shared use path or bicycle lanes and sidewalks Bremerton Boardwalk Manette Br. to 2nd St. Shared use path 2nd St./Washington Ave. Bremerton Boardwalk to 4th/5th Sts. Bicycle boulevard and sidewalks 4th and 5th Sts. Washington Ave. to Naval Ave. Bicycle boulevard and sidewalks Naval Ave. 4th/5th Sts. to 1 st St. Bicycle lanes and sidewalks 1 st St. Naval Ave. to SR 304/Navy Yard Hwy. Bicycle boulevard and sidewalks (including eastbound contra-flow bicycle lane) 80utes from West Biemerlon to Gorst . ' .": "', Primary Route SR 304/Navy Yard Hwy. 1st St. to Charleston Blvd. (west junction) Bicycle lanes and sidewalks SR 304/Navy Yard Hwy. Charleston Blvd. (west junction) to SR 3 Shoulder bikeway SR 3 SR 304/Navy Yard Hwy. to SR 16 Shared use path Secondary Route 1 st St. SR 304/Navy Yard Hwy. to Hartford Ave. Bicycle boulevard and sidewalks Hartford Ave.lArsenal Way 1st St. to Loxie Eagans Blvd. Bicycle boulevard and sidewalks Loxie Eagans Blvd. Arsenal Way to Auto Center Way Bicycle lanes and sidewalks Union Ave.l3rd Ave.lKent Ave.lSherman Heights Rd. Loxie Eagans Blvd. to SR 3 Shoulder bikeway SR3 Sherman Heights Rd. to SR 16 Shared use path Routes from West Bremerlon to Chico Bay 1 st St. SR 304/Navy Yard Hwy. to Hartford Ave. Bicycle boulevard and sidewalks Hartford Ave.lArsenal Way _ 1st St. to Loxie Eagans Blvd. Bicycle boulevard and sidewalks Arsenal Way/Russell Rd.lBaer Blvd. Loxie Eagans Blvd. to SR 310/Kitsap Way Bicycle boulevard and sidewalks Shorewood Dr. SR 31 O/Kitsap Way to northern terminus Bicycle boulevard and sidewalks North of Shorewood Dr. terminus Area between NAD Park and existing shared use path Shared use path along Ostrich Bay in Jackson Park Naval Housing Area Root Ct./Shore Rd.lOlding Rd. Existing shared use path along Ostrich Bay to Austin Dr. Bicycle boulevard and sidewalks Austin Dr. Olding Rd. to Erlands Pt. Rd. Bicycle lanes and sidewalks Erlands pt. Rd. Austin Dr. to Chico Way Shoulder bikeway Chico Way Erlands Pt. Rd. to SR 3 Shoulder bikeway Second Review Draft - Bremerton Non-Motorized Transportation Plan IS1 City of Bremerton 4. Pedestrian and concentrate its programmatic efforts first. Bicycle Program 4.1 Safe Routes to School Improvements Safe Routes to . School (SR2S) refers to truly pedestrian - and multi -disciplinary programs aimed at To become a promoting walking and bicycling to bicycle-friendly community requires a school, and improving tr affic safety multi -faceted approach, including around school areas through education, strategies beyond traditional incentives, increased law enforcement, infrastructure projects. Utilizing and engineering measures. SR2S several . innovative approaches, programs typically involve partnerships Bremerton has the potential to become among municipalities, school districts, Crossing a model bicycling and walking community and parent volunteers, and community. law enforcement agencies. Bremerton's This chapter builds on the SR2S efforts are a vital component of comprehensive pedestrian and bicycle the Non - Motorized Transportation network outlined in Chapter 3. The Plan, because they will facilitate the sections below largely focus on non- implementation and funding for specific infrastructure strategies for improving improvements that will help increase walking and bicycling (although some bicyclist and pedestrian safety and physical infrastructure needs are encourage fewer auto trips. discussed). These strategies include Bremerton has vested interest providing children safe and convenient a In encouragmg school children to lead walking routes to school, along with active lifestyles. SR2S programs offer educational and enforcement measures ancillary benefits to neighborhoods by to get the message out about safe helping to slow traffic and provide walking, bicycling, and driving. This reasonable facilities for walking .by all chapter also proposes that the. City promote its bikeway and walkway age groups. network. Building the system is a major 4.1.1 Why Do We Need SR2S? investment; encouraging people to use The purpose of a SR2S program is to the system makes the investment identify and improve school commute worthwhile. routes, to Increase the number of The following sections discuss the students who walk and/or bicycle to recommended pedestrian and bicycle . school in Bremerton, to lessen traffic programs in greater detail. A section at congestion, and to improve health. the end of this chapter suggests specifically where the City should 521 Second Review Draft - Bremerton Non-Motorized Transportation Plan City of Bremerton . Although most children walked or biked physical activity into the everyday to school before and during the 1980s, routine of school children. Health the number of children walking or concerns related to sedentary lifestyles bicycling to school has sharply declined have become the focus of efforts both since, due to urban growth patterns and statewide and nationally. Identifying design that have made it less safe to do and improving routes for children to so, In addition to general lifestyle safely walk and bicycle to school is also changes emphasizing more driving. one of the most cost-effective means of Walking and bicycling to school are reducing weekday morning traffic healthy alternatives to being driven and congestion and can help reduce auto- can provide a sense of independence for related pollution. children who may otherwise be 4.1.3 Local Coordination and restricted by school bus or parents' Involvement schedules. 4.1.2 What are the Benefits of a The continued success of Bremerton's SR2S programs hinges on buy-in from SR2S Program? individuals and organizations Arcata, CA Jacoby Creek crossing guard The primary benefit of implementing a throughout the community. While each ~R2S program is the resulting increase school will have unique concerns and In safety for children walking and goals for improving the SR2S program, riding bicycles to school. A an organizational strategy promoting com prehensive strategy based on a idea-sharing between schools can be cooperative effort among school more effective than several isolated officials, parents, residents, and city school groups. The key components of planning staff will ensure that specific an effective SR2S program include school-related traffic calming projects champions (individuals at each school and pedestrian and bicycle who spearhead their school's organizing improvements will become priority effort), stakeholders (a team of people projects eligible for state, federal, or from an individual schooD, and a task other grant funding. Involvement of force made up of all stakeholder teams varIOUS stakeholders throughout the in the community. SR2S process increases the likelihood The basic components of a SR2S for implementation of needed safety program include the following: improvements. While the primary focus of a SR2S program is improving safety for children . walking and biking to school, these safety benefits often extend to all age and activity groups. A SR2S program also helps to integrate --"-- Second Review Draft - Bremerton Non-Motorized Transportation Plan 153 City of Bremerton Education may be implemented include a "Walking School Bus Program," which Curriculum programs implemented in involves parents taking turns walking schools can teach children the basics (or bicycling) with groups of children to regarding pedestrian and bicycle safety. school. A good opportunity to promote a Classroom educational materials should SR2S program is during International be presented in a variety of formats Walk to School Day, held annually in (safety videos, printed materials, and early October. Organized Bike and classroom activities), and should Walk to Scho'ol Days should be held continually be updated to make use of monthly or weekly to keep the the most recent educational tools momentum going and encourage more available. Classroom education children and their parents to walk or programs should also be expanded to bike to school. Prizes or drawings for promote the health and environmental prizes offered to participants have been Classroom benefits of bicycling and walking. used in some schools as an incentive. Outside schools, educational materials Events related to bicycling and walking should be developed for different should be incorporated into existing audiences, including elected officials curricula when practical. Involving local (describing the benefits of and need for celebrities or publishing the names of a SR2S program), and' parents (proper student participants in events can be an school drop-off procedures and safety effective means of encouraging student for their children). involvement. Another key to successful Educational programs should be linked events IS promotion. Ensuring that with events and incentive programs, parents are aware of events (whether when appropriate, and students should classroom-specific or district-wide) is be included in task force activities, such crucial to gaining maximum student as mapping locations for improvements. participation. Involving students can serve as an Other contests and event ideas to educational tool and can also provide encourage bicycling and walking to Group Ride the task force with meaningful data school include competitions in which that IS useful for prioritizing classrooms compete for the highest im provemen ts. Educational programs, proportion of students walking or and especially on-bike training, should biking to school; themed or seasonal be expanded to more schools and for events; and keeping classroom logs of more hours per year. the number of miles biked and walked Encouragement by children and plotting these distances on a map of Washington or the United School commute events and frequent States. commuter contests are used to encourage participation. Programs that I Second Review Draft - Bremerton Non-Motorized Transportation Plan 54 City of Bremerton Enforcement curve with regard to improving Various techniques employed to pedestrian safety among school children. are Route to School Maps and ensure traffic laws are obeyed. The SR2S task force and stakeholder teams should Recommended Improvements develop priority areas In need of Most Bremerton schools provide maps enforcement by the Bremerton Police illustrating suggested walking routes to Department. One option to avoid the cost school, with accompanying flyers noting of providing physical police presence is to problem areas such as difficult use innovative sIgn age, such as In- intersections or streets lacking sidewalks. roadway crosswalk signs or in-roadway The recommended improvements outlined warning lights, to alert motorists that in this Plan would enhance pedestrian children may be crossIng, or speed safety and comfort by completing system feedback signs that indicate to motorists gaps, enhancing system connectivity, and their current speed. Neighborhood speed addressing other elements like street watch programs-m which community crossmgs. members borrow a radar device and use This Plan provides detailed Route-to- it to record the license plate numbers of School maps for two schools: Armin Jahr speeding vehicles-can also be effective. Elementary School in East Bremerton Engineering (Map 7), and Kitsap Lake Elementary To provide safe access for children, school School (Map 8) in West Bremerton. The sites should have designated pedestrian maps are based on the process outlined in . - access points that do not require students the 2003 MUTeD, Chapter 7. Section to cross in front of drop-off and pick-up 7A.01 notes: "A school route plan for each traffic. Locations identified through the school serving elementary to high school SR2S process should be considered for students should be prepared in order to SR2S grant funding. develop uniformity in the use of school Streetscape improvements should ensure area traffic controls, and to serve as the basis for a school traffic control plan for adequate sight distance on all access each school. The school route plan, routes, crossIngs, and intersections. developed in a systematic manner by the School zone designations for speed limits school, law enforcement, and traffic should be an element of a comprehensive officials responsible for school pedestrian circulation plan that also includes school- safety, should consist of a map showing based student as well as Police streets, the school, existing traffic Department crossing guard programs and controls, established school walk routes, identification of safe routes for bicycling and established school crossings." and walking to school. With crossing guards posted at various locations near most schools, Bremerton is ahead of the Second Review Draft - Bremerton Non-Motorized Transportation Plan 155 City of Bremerton Encompassing the designated walking school. Additional review and practice catchment area for each school the runs by parents are a key component to maps depict suggested walking r'outes successful use of the maps. along with recommended pedestrian The following sections discuss infrastructure improvements. recommended improvements for Armin For each school, staff conducted field Jahr a~d Kitsap L~ke Elementa~y visits to inventory the pedestrian Schools In greater detaIl. Although thIs infrastructure' intersection traffic Plan focuses on these two schools, the .' lk d h City and school district should develop controls, sIgnage, crosswa s, an ot er lk' "' II h' 1 . physical conditions on streets safe wa mg routes lor ~ sc 00 s m surrounding the school. Staff. also Breme:-ton and update theIr SR2S maps reviewed existing suggested walking accordmgly. routes to school, and considered factors Armin Jahr Elementarv School including presence of traffic control, A' Jahr Elementary School's lk . d. k rmm . cross,wa s, or crOSSIng guar ~ at ey designated walking catchment area is 10catlOns,and presence of sIdewalks generally bounded by SR 303/Wheaton along street segments. In some cases, W Lebo Boulevard Appaloosa Way 'd h k ff ay, , , roadsI e pat s or nown 0 -s~reet cut- Sylvan Way, and Hanford Avenue. A throughs (such as a path leadmg to the relatively well-connected street grid back of a schooD are noted as suggested with sidewalks on both sides exists east routes. of the school, while streets to the west The Route-to-School maps are intended are less connected and lack sidewalks to reflect a partnership between City on one or both sides. Several higher- and school officials. Each map should be volume streets are in the immediate reviewed and signed by both the School vicinity, including Sheridan Road, Principa1 and a City Engineer to ensure Sylvan Way, and Pine Road. Sheridan that they accurately reflect both the Road has a relatively complete sidewalk physical roadway conditions around the network, while. Sylvan Way and Pine school and the walking patterns of Road lack sidewalks m several students. It is recommended that the locations. Few marked crosswalks exist maps be reviewed and updated in the vicinity of the school, with most regularly to reflect changes In the located on higher volume roads and at roadway network, such as new major intersections. Traffic calming sidewalks, crosswalks, or traffic control devices (e.g., speed humps) exist on changes. School officials should also some residential streets immediately review the maps at the beginning of east of the school. each school year to confirm that the suggested routes still reflect the best ways for children to walk and bicycle to I Second Review Draft - Bremerton Non-Motorized Transportation Plan 56 City of Bremerton . Motorists access the school In two The suggested walking routes noted on locations: the inter section of Map 7 largely reflect the suggested near routes developed by school officials. The Stewart Avenue and Dibb Street, and near E 31st Street and Mcelain Avenue. recommended infrastructure projects Students walking or bicycling to school will strengthen these routes by use these access points, while students providing safe and convenient walking traveling on foot also use an informal facilities for students and other path near the Manette Villa Apartments pedestrians alike. Combined with the west of the campus. other programmatic elements described above, these strategies could bolster Map 7 depicts recommended walking as an attractive mode for the improvements within the Armin Jahr Armin Jahr Elementary School Elementary School walking catchment community. area. The recommended improvements largely focus on completing the sidewalk Kitsap Lake Elementarv School network. This includes filling sidewalk Kitsap Lake Elementary School's gaps on local streets near the school and designated walking catchment area is constructing sidewalks along maJor generally bounded by Kitsap Way, Price streets connecting outlying Road, and Kitsap Lake. In the vicinity of neighborhoods. The recommended the school, streets with sidewalks improvements also include pedestrian include Osprey Circle and surrounding crOSSIng upgrades, such as high- streets in the Dockside subdivision. A visibility crosswalks on Lebo Boulevard, narrow paved path also exists on the Pine Avenue, Rickey Road, and Sheridan east side of Harlow Drive north of earr Road. Further engineering studies may Boulevard. Most other streets lack be necessary to ensure future crosswalks sidewalks and have narrow or no are sited' at locations with sufficient shoulders for pedestrian travel. Steep visibility and stopping sight distances . topography also creates sight-distance for approaching motorists. Intersection problems for motorists on several streets traffic control changes could also like Wilmont Street. Marked crosswalks improve pedestrian crossings. Relatively exist on Harlow Drive at earr long distances between stop signs and a Boulevard, on Lyle Avenue at the lack of traffic calming devices encourage northern school entrance, and on Carr higher vehicle speeds on some streets, Boulevard east of the school's east side. including Pine Road and Sheridan Road. eras sing guards are posted at these Traffic calming devices and/or all-way locations for 20 minutes in the morning stop control at some intersections along and 10 minutes in the afternoon. Traffic these corridors could reduce vehicle calming devices, including speed humps, speeds thereby . . pedestrian exist Carr Boulevard and Lyle ImprOVIng on safety and comfort. Avenue near the school. Second Review Draft - Bremerton Non-Motorized Transportation Plan 1 City of Bremerton 57 Motorists access the school m two stopping sight distances for approaching locations: immediately east of Harlow motorists. Intersection traffic control Drive at the earr Boulevard changes could also Improve the intersection, and north of Harlow Drive pedestrian crossing environment. at the Lyle Avenue intersection. Relatively long distances between stop Students walking or bicycling to school signs and alack of traffic calming use these access points in addition to a devices encourage higher vehicle speeds paved path connecting earr Boulevard on some streets such as Harlow Drive. with the campus's northeast corner. Traffic calming devices and/or all-way Map 8 d. t d d stop control at some intersections along epIC s recommen e . improvements within the Kitsap Lake these corndors ~ould :educe veh~cle Elementary School walking catchment speeds, thereby Improvmg pedestrIan Th . safety and comfort. area. e recommended Improvements largely focus on completing the sidewalk The limited street connectivity near network. Where topographic or other Kitsap Lake Elementary School offers physical constraints preclude sidewalk few walk-to-schoolroutechoices. construction, the eity should develop eonsequently, the' suggested walking other strategies to safely accommodate routes noted on Map 8 remam pedestrians such as colored shoulders unchanged. The recommended pavement texturing, etc. The eity could infrastructure projects will strengthen also enhance pedestrian system these routes by completing the sidewalk connectivity by improving two informal and path system, offering students neighborhood accessways m the dedicated walking facilities. eombined Dockside subdivision. Currently with the other programmatic elements unpaved, the accessways connect Osprey described above, these improvements eircle with neighborhoods and parks could bolster walking as an attractive immediately north and south. Upgrading ,mode for the Kitsap Lake Elementary these facilities to paved shared use paths School community. ,",:ould. facilitate eaSIer travel for 4.1.4 Funding bIcyclIsts and pedestrians with disabilities. While much of the initial work involved Th d d . 1 m starting a SR2S program can be e recommen e Improvements a so d t d b k h ld . 1 d d" con uc e y sta e 0 er team mc u e pe estnan crOSSIng upgrades.. ' . These d. l'd h' h . 'b'l' volunteers, eventually fundmg wIll be upgra es me u e Ig -VISI IIty d d . crosswalks along commonly-traveled ~ee e to plan and Implement physical walking routes to school. Further Impro.vements, hold ever:ts, and develop . '.. and Implement educatlOnal programs engmeermg studIes may be necessary to d t' 1 . an ma ena s. ensure future crosswalks are sIted at locations with sufficient visibility and I Second Revi~w Draft - Bremerton Non-Motorized Transportation Plan 58 City of Bremerton Capital Funding health and safety of children and the Capital funding for infrastructure entire community. In order to maintain and expand the program, new sources of improvements is available from a variety funding need to be obtained. Other of sources, many of which are noted in possible funding sources include: Chapter 5 of this Plan. The SR2S task force should work with eity staff to . eorporations and Businesses: Local identify all potential funding sources and corporations and businesses could to provide support on funding requests. provide cash, prizes, and/or Bremerton may be able to pursue federal donations, such as printing services, funds recently made available with the through community giving or other new SR2S Program established in the programs. Parents or other members Safe, Accountable, Flexible, Efficien t of stakeholder teams may be a good Transportation Equity Act-A Legacy for source for contacting companies. Users (SAFE TEA-LU). This section of . Foundations: There are institutions the bill provides $612 million in funding throughout the country that provide with no sta te receIvIng less than $1 funding to non-profit organizations. million per fiscal year. Other portions of The Foundation Center is a national SAFE TEA-LU, such as the organization dedicated to collecting Transportation Enhancements and the and communicating information Congestion Mitigation and Air Quality about philanthropy in the United (CMAQ) funds, may also provide funding States, and is an excellent source for opportunities for bicycle and pedestrian researching potential foundation projects. funding sources. Potential Program Funding foundation funding sources can be searched by geographic region and As Bremerton's SR2S program develops, by category. Some categories that funding will be needed to support the may be applicable include overall program, including coordination transportation, health, environment, assistance, purchasing incentives, and community building. printing newsletters, staffing events, and . Individuals: Statistically, developing educational materials. Both individuals give more money than school-based and program-based funding corporations and foundations will be essential for success. When combined. A local fund drive can program funding is pursued, it should be quickly reach a large number of emphasized that a SR2S program people if outreach is conducted by Improves the en tire community by stakeholder team members. relieving traffic congestion, contributing to cleaner aIr, creating alternative transportation routes, and improving the Second Review Draft - Bremerton Non-Motorized Transportation Plan 159 City of Bremerton . Events: Many SR2S programs have most effective when located close to trip raised funds by holding special destinations, is easy to access, and is events, often using a related themed easy to find. Where quality bicycle event such as a walkathon or a parking facilities are not provided, bicycling event. More traditional determined bicyclists lock their bicycles fundraising efforts, such as bake to street signs, utility poles, or trees: sales, concerts, talent shows, etc., These alternatives are undesirable can also help raise funds. because they are usually not secure, . Parent Teacher Associations (PTAs) may interfere with pedestrian and School Districts: Many PTAs movement, and can create liability or have funds to distribute to school damage street furniture or trees. Bicycle programs, and often schools have parking facilities that are conveniently their own safety funding sources. located and adequate in both quantity Stakeholder teams should work with and quality can help reduce bicycle theft local PTAs and school districts to see and eliminate inappropriate parking, if there is a method for applying for a benefiting everyone. Bicycle parking is grant. highly cost-effective compared with automobile parking. . City and County Funds: Some cities and counties allocate funds to 4.2.1 Parking Requirements support SR2S programs, Some also Field visits and discussions with allocate a portion of their local Bremerton residents indicate that more Transportation Enhancement funds bicycle parking is needed in some areas, to SR2S educational programs. including downtown and at several . State Funds: Each state receives schools. Chapter 20.48.180 of Federal Highway Safety Funds, .also Bremerton's Municipal eo de specifies called 402 Funds. Although each minimum bicycle parking requirements, state handles this program which pertain to all non-residential land differently, most funding is available uses as well as residential developments on a competitive basis for projects with six o'r more dwelling units. The that increase road safety. Municipal Code requIres one bicycle 4.2 Bicycle Parking parking space for every ten required vehicle spaces. The following exceptions Lack of secure, convenient bicycle apply: parking is a deterrent to bicycle travel. . Schools (except higher-education Bicyclists need parking options that institutions) must provide one provide security against theft, bicycle parking space per 20 vandalism, and weather. Like students. automobile parking, bicycle parking is 60 I Second Review Draft - Bremerton Non-Motorized Transportation Plan City of Bremerton . Video game and amusement centers lockers, attended facilities, and/or other commonly frequented by children secure provisions, while end-of-trip must provide one bicycle parking facilities refer to showers and changing space for every three required areas. vehicle spaces, Municipal eode enforcement holds equal . The City may waive bicycle parking importance. The eity should undertake requirements for non-residential a bicycle parking analysis to determine land uses "that would not normally whether' all of the bicycle parking have bicycle-riding clientele (such as required by the eode is provided, and if self-service businesses, automobile so, that it is sited in locations that are services, gas stations)." visible and free of obstacles, It should Although the Code's "blanket" also be noted that the eode only requirements ensure a minimum establishes parking minimums, and new number of bicycle parking spaces for commercial establishments should be most developments, the requirements encouraged to exceed these standards. may not fully addressparkir:g demand 4.2.2 Facility Design for. s.ome land uses. The elty should Requirements reVIsIt the current bicycle parking requirements and revise them to reflect Chapter 20.48.180 of the Municipal the needs of individual land uses Code briefly specifies bicycle parking especially those with traditionall; design re~uirements: "Bicycle facilities higher demand such as commercial shall be fIrmly attached to the ground, centers. The City should also eliminate located near the building entrance, and the parking requirement WaIver designed to allow both the frame and described above. Although some land wheels to be securely locked to the uses may generate relatively low structure." ~he City should establish parking demand, a minimum number of mor~ detaIled parking design spaces should be provided to meet the reqUIrements to address rack height and bicycle parking needs of employees and dimension.s, as well as bicyclist patrons. maneuvermg space between racks and Br t Id 1 b f't f 1 other obstacles. The City should also emer on cou a so ene 1 rom ong- d . t b. 1 k' d h d eve lop safety- and secunty-related erm lCyC e par mg an ot er en -of-' . . t' f "l't' Th C't h Id " reqUIrements to address lIghtmg as well np aCI lIes. e 1 y S au consIder . , t bl" h' 1 ,as covermg to protect bIcycles from es a IS mg ong-term parkmg . 1 t th . me emen wea er. reqUIrements for large employment centers such as business parks and government buildings. Long-term bicycle parking facilities include bicycle Second Review Draft - Bremerton Non-Motorized Transportation Plan 161 City of Bremerton 4.3 Bicycle/Pedestrian . Ensure that bicycles are always allowed on buses and other transit Access to Transit vehicles Tremendous opportunities exist for 4.3.1 Providing Good Sidewalks increasing pedestrian!bicycle -tr ansi t and Bikeways to Transit Stops partnerships In Bremerton and The presence. and quality of sidewalks throughout Kitsap Transit's serVICe along Kitsap Transit routes Pedestrian infrastructure In area. Bremerton depends on the street under improvements around transit stops and focus, with some streets having transit centers enhance pedestrian sidewalks on both sides, on one side safety, comfort, and may generate more only, or no side'Yalks altogether. Kitsap ridership because most passengers start Transit's 2005-2011 Transit and end their trips as pedestrians. Development Plan includes a planned Integrating bicycles with transit allows Bus Rapid Transit (BRT) project on the the bicyclist to overcome barriers such SR 303/Wheaton Way corridor in 2008. as hills, inclement weather, night . This project. provides excellent riding, and breakdowns. an opportunity to integrate the pedestrian To Improve the pedestrian! bicycle- and bicycle facilities infrastructure transit link, Bremerton and Kitsap improvements with the planned BRT Transit need to: stations. Potential improvements . eomplete the sidewalk network on include intersection upgrades and filling both sides of streets along Kitsap sidewalk gaps on and near this corridor; Transit bus routes to ensure Potential bicycle improvements include connectivity and accessibility for all adding bicycle lanes and developing users when new development or bicycle boulevards connecting SR redevelopment occurs, or as part of 303/Wheatoh Way with surrounding the City's Sidewalk Program neighborhoods. This project also . Provide benches, shelters, lighting, presents an opportunity to implement and posted maps and schedules at the recommended streetscape transit stops improvements outlined in the Wheaton- Riddell Sub-Area Plan" . Provide secure bicycle parking at or near transit stops . Address the needs of bicycle and pedestrian circulation in the design of future transit centers 621 Second Review Draft - Bremerton Non-Motorized Transportation Plan City of Bremerton 4.3.2 Addressing Bicycle and bicycle access to and from the Puget Pedestrian Needs at Transit Sound Naval Shipyard remains an issue Centers due to the presence of one-way streets, and the new ferry auto ingress (under Pedestrian/bicycle access, internal construction) limits opportunities for circulation, and passenger facilities bicycle facilities on Pacific Avenue and should be a high priority in the design of 1st Street. Way finding represents transit centers. Adjacent access points another challenge facing bicyclists and should include sidewalks and high- pedestrians alike. The Bremerton visibility crosswalks, and widths should Transportation Center lacks sIgnage be adequate to accommodate peak highlighting bicycle/pedestrian routes to pedestrian flows. Internal circulation nearby destinations. To address these should be direct, well-signed, and meet challenges, the City should develop a ADA standards. Transit centers should sub-area plan specifically addressing also provide appropriate facilities such bicycle/pedestrian circulation near the as shelters, benches, restrooms, and Bremerton Transportation eenter, with secure and convenient bicycle parking. specific infrastructure and wayfinding The Bremerton Transportation eenter signage recommendations. serves as the city's main intermodal Located at 5th Street and Bruenn transfer center, connecting Kitsap Avenue, the West Bremerton Transfer Transit buses with ferries serving Port Center serves several Kitsap Transit Orchard and Seattle. The center bus routes. Fragmented sidewalks and provides indoor and outdoor passenger bicycle lane s characterize the non- waiting areas, with good motorized environment in this area, but pedestrian/bicycle access to the Louis the eity is currently filling sidewalk Mentor Boardwalk. A planned WSDOT gaps on some "nearby streets (e.g., Auto project will reroute ferry egress auto Center Way). Kitsap eounty's Transit traffic directly to SR 304/Burwell Street Development Plan contains a project to via a new tunnel. This will reduce traffic upgrade the Transfer Center in 2009, congestion on Washington Avenue, though the Plan does not identify where bicyclists and pedestrians project specifics. This project provides currently conflict with motorists leaving an excellent opportunity for improving the ferry terminal. The planned project pede strianlbicycle- transit connections. will also include a formalized "kiss and The City should closely monitor this ride" area. project and work with Kitsap Transit to The pending WSDOT project will take advantage of non-motorized facility improve multi-modal circulation at and improvements. near the Transportation Center; however, challenges remain. eonvenient Second Review Draft - Bremerton Non-Motorized Transportation Plan 163 City of Bremerton 4.3.3 Providing Secure Bicycle rate of theft. Now In their third generation, many PUBs utilize Parking "smartcard" technology to check out Long-term bicycle parking facilities bicycles and ensure they are returned. (e.g., lockers) may be the most 4.3.4 Allow Bicycles on Transit appropriate parking provision at transit centers and along bus routes. Neither Dozens of American cities currently the Bremerton Transportation Center allow bicycles on trains and buses in nor the West Bremerton Transfer some form. All fixed -rou te Kitsap Center have long-term bicycle parking Transit buses have bicycle racks facilities. "Bike Stations" may be available to passengers for no additional appropriate at these transit centers and charge. The agency also allows bicycles In higher-activity areas like Olympic on the Bremerton- Port Orchard College and downtown Bremerton. Bike passenger ferry for free. Washington San Jose, CA Bike Station Stations are public/private community State Ferries allows bicycles on the support facilities designed to encourage Bremerton-Seattle auto/passenger ferry bicycling and transit use by providing: with variable fares. Bicycle. . Secure, valet bicycle parking accommodations on ferries and buses Transit amenities and services facilitate easy bicycle connections for . passengers. The City should encourage . Close connections to transit Kitsap Transit and Washington f;)tate Bike Stations may also provide other Ferries to continue providing these services such as: accommodations. . Bicycle accessory retail sales . Bicycle repairs . Bicycle rentals . Restrooms/changing facilities . Electric bicycles Passenger loading a bicycle on Kitsap Transit . Safety/education information A more umque feature that a Bike Station may provide is access to Public Use Bicycles (PUBs). PUBs have been around since 1968, when the first "free bike" program" was established in The Netherlands. Since that time, PUB providers have worked to improve the bicycling experience while re"ducing the 1 Second Review Draft - Bremerton Non-Motorized Transportation Plan 64 City of Bremerton 4.4 Alternative responsibilities could include installing and main taining smaller-scale Transportation bicycle/pedestrian system components Coordi nator/ Advisory such as wayfinding and warnIng signage, bicycle boulevard and bicycle Committee lane pavement markings, crosswalks, The City of Bremerton should consider and detectable warning strips on curb ramps. Other responsibilities could creating an Alternative Transportation include installing, repaInng, and Coordina tor position. This position replacing public bike racks, bike lockers, would oversee implementation of and other facilities needed. The related plans, including the as vanous technician could also oversee the update Non - Motorized Transportation Plan. and implementation of Municipal Code The position would also coordinate with bicycle parking requirements (discussed other City departments (e.g., Public earlier). Works and Planning) and other organizations (e.g., Kitsap Transit and Depending on responsibilities assigned Washington State Ferries) to ensure to the Bicycle/Pedestrian Technician, that the needs of bicyclists and the City could create this position pedestrians are being considered in all within the Community Development or new projects and relevant programs. Public Works & Utilities Department (or Along with coordinator, the City designate the technician as a shared a position among multiple departments). should encourage the formation of a full- This position would require training in time Bicycle and Pedestrian Advisory facility installation and maintenance Committee that meets regularly to (including proper materials and identify and discuss the needs of procedures), as well as familiarity with bicyclists and pedestrians within the City, county, state, and federal City of Bremerton. standards and guidelines for The recommended Tier 1 bicycle/ bicycle/pedestrian project pedestrian projects laid out in ehapter 5 implementation. elose coordination with largely emphasize infrastructure other eity departments will be improvements that could be necessary for bicycle/pedestrian projects implemented at relatively low cost with overlapping with concurrent street minimal physical construction. To improvement projects. expedite project implementation, the City of Bremerton could create a Bicycle/Pedestrian Technician position to physically oversee, assist, and/or lead project construction. Technician Second Review Draft - Bremerton Non-Motorized Transportation Plan 165 City of Bremerton 4.5 Wayfinding/ 4.6 Capital Spot Signing Program Improvement Program The ability to navigate through a town Having the ability to respond quickly to or city IS informed by landmarks, the requests of bicyclists and natural features, and other visual cues. pedestrians will enhance Bremerton's A sIgnage system IS a low-cost yet standing as a bicycle- and pedestrian- highly visible component of a navigable friendly community. The City could fund environment. Wayfinding signs would a Capitat Spot Improvement Program inform pedestrians, bicyclists, and once a year, with all funds dedicated to motorists, while also enhancing smaller spot improvements identified by Bremerton's identity. An effective City staff and residents. Such wayfinding system communicates improvements might include: information clearly and concisely. . Striping and signing of a particular Placing sIgns throughou t the city path to increase safety and path user indicating to bicyclists and pedestrians compliance their direction of travel, lac a tion of Adding bicycle parking to locations destinations, and the time/distance to . those destinations will increase users' that currently lack appropriate" comfort and accessibility to the bicycle facilities and pedestrian system.. . Providing sidewalk infill to safely "Bike Route" sIgns currently exist connect vital pedestrian routes, throughout Bremerton, but their especially in school areas sporadic placement and lack of useful . Adding directional and informational information diminish their effectiveness. signage along paths, sidewalks, and Developing and im plemen ting a bicycle routes Wayfinding Signage Plan represents an . Re-striping bicycle lanes or immediate yet low-cost opportunity to crosswalks where the striping has Wayfinding signage concept Improve Bremerton's non-motorized worn away system. Wayfinding signs would provide . Providing ADA improvements in a highly visible means for parks demonstrating the City's commitment to improving bicycling and walking. 1 Second Review Draft - Bremerton Non-Motorized Transportation Plan 66 City of Bremerton 4.7 Becoming a Bicycle application process requires information that only Bremerton City staff would Friendly Community possess, and requires the enthusiastic The Bicycle Friendly Community (BFe) support of City leaders. Campaign is a national awards program Strategies recognizing municipalities that actively Bremerton could take a number of su pport bicycling, A bicycle-friendly short- and long-term steps to become a community provides safe BFC. The City should first commit to accommodations for cycling and becoming a BFC, The League of encourages its residents to bike for American Bicyclists provides an "Action transportation and recreation. The BFe Plan for Bicycle Friendly eommunities," eampaign IS administered by the which identifies ten specific steps that League of American Bicyclists, an the community should take to improve education and advocacy organization bicycling conditions. The City should working to bring better cycling to then adopt the Action Plan publicly with communities around the country. The the full backing of the Mayor and City BFe designation is awarded at one of eouncil. four levels (from lowest to highest): 4.7.2 Action Plan for Bicycle bronze, silver, gold, and platinum. In Washington, three communities have Friendly Communities been designated BFCs: Bellingham The Action Plan comprises the following (Silver), Redmond (Bronze), and 10 steps: Vancouver (Bronze). 1. Adopt a target level of bicycle use 4.7.1 What does it take? (e.g., percent of trips) and safety to Determining whether a community is be achieved wi thin a specific bicycle friendly involves considering timeframe, and improve data many factors and conditions. The collection necessary to monitor application is an audit of a community's progress, efforts to provide a more bicycle-friendly 2, Provide safe and convenient environment. The audit reVIews bicycle access to all parts of the engineering, education, encouragement, community through a signed enforcement, and evaluation and network of on- and off-street planning efforts for bicycling. The entire facilities, and secure parking. application and feedback from cyclists in Local cyclists should be involved in the community is sought to determine identifying maintenance needs and whether the League will award the BFC ongoing improvements. designation. Anyone can initiate the BFe campmgn effort; however, the Second Review Draft - Bremerton Non-Motorized Transportation Plan 167 City of Bremerton 3. Establish information programs to 8. Develop special programs to promote bicycling for all purposes, encourage bicycle use In areas and to communicate the many where significant segments of the benefits of bicycling to residents population do not drive and where and businesses (e.g., with bicycle short trips are most common, such maps" public relations campaigns, as the SR2S 'program discussed neighborhood rides, a ride with the earlier in this chapter. Mayor). 9. Promote intermodal travel 4. Make the City a model employer between Kitsap , Transit and by encouraging bicycle use among bicycles (e.g., by . " Improvmg its employees (e.g., by providing parking at transit stops, and parking, showers and lockers, and improving bicycle access to transit establishing a city bicycle fleet). stops) . 5. Ensure all city policies, plans, 10, Establish a citywide, multi- codes, and programs are updated disciplinary committee for non- and implemented to take motorized mobility to submit to advantage of every opportunity to the Mayor and City Council a create a more bicycle-friendly regular evaluation and action plan community. Staff In all for completing the items in this departments should be offered Action Plan. training to better enable them to The City of Bremerton should educate complete this task. community members and City staff on 6. Educate all road users to .share the how to become more bicycle-friendly., road and interact safely. Road This could entail holding a workshop or design and education programs other public forum to introduce should combine to Increase the community leaders to the basic elements confidence of bicyclists. of a BFC. The eity should also work 7. Enforce traffic laws to Improve with local advocacy organizations (e.g., West Sound eycling Club) and SR2S safety and comfort for all road programs to further the education effort. users, with a focus on behaviors and attitudes that cause Finally, the City should implement the vehicle/bicycle crashes. Bicyclists Action Plan. Once the Action Plan has should be educated to always ride been adopted; the City needs to ensure in the direction of vehicle traffic. that the Plan IS im plemen ted, and prep'are and submit its BFe application. 681 Second Review Draft - Bremerton Non-Motorized Transportation Plan City of Bremerton 4.7.3 Sidewalk Infill Program schools, and along streets with high vehicle volumes. This Plan strongly recommends that the Potential Implementation Process eity continue its efforts of expanding the sidewalk system. The same qualities To inform adjacent property owners of that make Bremerton umque and planned sidewalk construction in the livable are inextricably linked to its public right-of-way, the Public Works pedestrian friendliness. The City also Department could conduct extensive recognizes the intrinsic health, safety, public outreach. The outreach could economic, and environmental benefits of include the following steps. " . pedestrian facilities and Improvmg At the beginning of design, City staff promoting walking. would send a notification letter to all Completing some sidewalk links can be residents on the block face (owner and challenging, especially In older resident) where sidewalk infill residential areas where residents have construction IS planned. The letter developed fencing and landscaping would indicate that their location has within the public right-of-way and may been chosen for the Sidewalk Program, consider those areas to be part of their that design has started, and to contact personal space. In addition, some the Public Works Department with any residents may not want traditional questions. sidewalks due to the rural look of their City staff would send a notification neighborhoods, and potential impacts to postcard to the residents at 50 percent mature landscaping and trees. design completion. This would allow Regardless, the public right-of way that design to be far enough along to answer is generally located on either side of the location - specific questions, but still paved driving and parking area IS allow changes to the design as intended for walking, whether or not a appropriate. City staff would meet with sidewalk currently exists. any residents who contact the City Bremerton should actively continue to regarding design/construction details, implement its Sidewalk Program, where and they would refer any questions City staff periodically inventory the about the general Sidewalk Program to street networ k to identify sidewalk the Public Works Department. gaps, and develop strategies, project When design is complete and the project prioritization criteria, and funding for goes out to bid, eity staff would send a completing these gaps. Potential project third notification postcard to the prioritization criteria include filling residents indicating that the project is gaps along key pedestrian routes, near out to bid. The eity Council would major pedestrian trip generators such as award the construction contract and Second Review Draft - Bremerton Non-Motorized Transportation Plan 169 City of Bremerton receive a map of all locations where movement of goods. Accessible sidewalks are to be constructed, When in tersection crossmgs can Increase construction contracts are approved by safety for people regardless of ability. In the Council, eity staff would send a recognition of this, the City's fourth notification postcard to the philosophical approach IS to create residents informing them that the pedestrian environments that are eouncil has approved the construction attractive, functional, and accessible to contract and construction schedule, and all people. that residents would reCeIve a door 4.8.1 Developing an ADA hanger notice at least 72 hours before Transition Plan construction begins at their particular As a part of ADA implementation, the location. 4.8 Accommodating People Justice Department requires that all municipal jurisdictions have an ADA with Disabilities Transition Plan intended to spell out the eity's intentional retrofitting of its built With the advent of the ADA in 1990, the environment to an accessible state. nation recognized the need to provide While the Non - Motorized equal access to all residents. Since its Transporta tion Plan IS purposely inception, ADA has significantly written to accommodate people with changed design requirements for the disabilities, a separate document with construction of public space. However, greater specificity is required. much of the pedestrian environment The ADA Transition Plan should use all built prior to the ADA's inception does the relevant strategies of this document not adequately accommodate people as well as other current practices that with disabilities. The City of have merit. Monies set aside to Bremerton's approach is to gradually implement the ADA Transition Plan change this situation through land should be focused to accomplish the development project requirements, priorities of the Plan, rather than unrelated capital street improvement diverting them to ADA compliance in an projects, and capital projects that unrelated project. specifically retrofit antiquated, public pedestrian facilities. To adequately plan the pedestrian It is important to note that a pedestrian environment for people with disabilities, the ADA Transition Plan must take into ' environment strategically built to be account each of the disabilities and the accessible for people with disabilities is limitations they present. It IS also also more accessible for all. eurb ramps, important to be aware of how planning for instance, can accommodate strollers, for people with one disability affects shopping carts, and dollies for the people with another. 1 Second Review Draft - Bremerton Non-Motorized Transportation Plan 70 City of Bremerton For example, gradual ramps and smooth . Steep downhill slopes that can cause transitions to the street help people in a loss of control or are difficult to wheelchairs, but present challenges for negotiate the sight-impaired if they cannot easily . Cross slopes that cause instability or find the end of the sidewalk and loss of balance beginning of the street. The ADA . N arrow sidewalks that impede users' Transition Plan should also consider the ability to turn or to cross paths with needs of children and older adults. others The sections below describe populations . Devices that are hard to reach, such whose needs must be taken into account as push buttons for walk signals and In creating an accessible pedestrian doors environment. . Long distances People with Mobility Impairments . Situations that require fast reaction People with mobility impairments range time from those who use wheelchairs, . Signalized walk phases that are crutches, canes, orthotics, and shorter than the time it takes for prosthetic devices, to those who do not them to cross the street use such devices but face constraints for People with Sensory Impairments many reasons when walking long distances, on non -level surfaces, or on People with sensory impairments steep grades. Curb ramps are include those who are partially or fully particularly important to people with blind or deaf. They also include people mobility impairments. Prosthesis users whose perception of touch or balance is often move slowly and often have not good, as well as those who are difficul ty with steep grades or cross colorblind. slopes. Visually-impaired people have the People with mobility impairments are following characteristics: affected by: . Limited or no perception of the path . Uneven surfaces that hinder ahead movement or cause loss of balance . Limited or no information about . Rough surfaces that make rolling their surroundings, especially in a difficult, cause a loss of balance, or new place cause pain (especially for people with . Changing environments in which back injuries) they rely on memory . Steep uphill slopes that can make . Lack of non -visual information movement slow or impossible . Inability to react quickly Second Review Draft - Bremerton Non-Motorized Transportation Plan 171 City of Bremerton . Unpredictable situations, such as Children and Other Adults complex intersections where streets Children and many older adults do not do not intersect at a 90-degree angle fall under specific categories for . Inability to distinguish the edge of disabilities, but must be taken into the sidewalk from the street account In pedestrian planning. Compromised ability to detect the Children are less mentally and . physically developed than adults. They proper time to cross a street have the following characteristics: . Compromised ability to cross a street Less peripheral vision along the correct path (especially . when a curb ramp is oriented . Less ability to judge speed and diagonally toward an intersection's distance center point) . Difficulty locating sounds . Need for more time to cross the . Read less than adults or not at all, street and may not understand text signs Hearing-impaired people rely on visual . Sometimes act impulsively or information, which is often inadequate. unpredictably' They face most of their mobility . Lack familiarity with- traffic difficulties in not being able to hear . Face difficulty carrying packages approaching vehicles and not being able to detect the time of their arrival. This Other adults often exhibit degrading is especially an ,issue in locations with sensory or physical capabilities. This limited sight distances, such as where can cause them to: streets curve or landscaping blocks the . Gradually lose vision, especially at VIew. night People with Cognitive Impairments . Have decreased ability to hear People with cognitive impairments sounds and detect where they.come from encounter difficulties In thinking, learning, responding, and performing . Have less endurance; have less coordinated motor skills. Cognitive strength to walk up hills disabilities can cause some people to . Have less balance, especially on become lost, or to have difficulty finding uneven or sloped sidewalks their way. They may also not . React slowly to dangerous situations understand standard street signage or . Walk slowly not be able to read "benefit from" signs with symbols and colors. I Second Review Draft - Bremerton Non-Motorized Transportation Plan 72 City of Bremerton 4.9 Education Programs guards and signalized intersections, instructions for bicycle maintenance and 4.9.1 School-based Education use, instructions for fitting and wearing a Programs helmet, instructions for crossIng the street, and lists of emergency and school A school-based bicycle and pedestrian numbers. A general handbook can be education program educates students published by the City and used by each about the rules of the road, proper bicycle school in' conjunction with the school- equipment use, bicycling skills, street specific map. crossmg skills, and the benefits of Educate Motorists, City Staff, and bicycling and walking. These types of education programs are usually Maintenance and Construction Crews sponsored by a joint eity/school district Motorist education on the rights of committee consisting of appointed bicyclists and pedestrians IS limited, parents, teachers, student Many motorists mistakenly believe, for representatives, administrators, police, example, that bicyclists do not have a active bicyclists, and engmeermg right to ride in travel lanes and that they department staff. These programs can should be riding on sidewalks. Education also be rolled into a SR2S Program. about the rights and responsibilities of Education need not be limited to younger pedestrians and cyclists can include: school children. Adult bicycle education . Incorporating bicycle and pedestrian and safety programs can be developed safety into traffic school curriculum from existing courses, such as League of . Producing a brochure on bicycle and American Bicyclists courses" pedestrian safety and laws for public Additionally, the Bremerton Police distribution Department may want to use adult Enforcing traffic laws for cyclists . bicycle education programs as a "bicycle traffic school" in lieu of fines for bicycle- . Providing bicycle and pedestrian related traffic violations. planning training for all City Safety Handbook planners and engineers' . Working with contractors, Safety handbooks are generally subcontractors, and City maintenance developed as part of a school-based and utility crews to ensure they, bicycle and pedestrian safety program. understand the needs of bicyclists Handbooks may include a circulation and pedestrians, and follow standard map of a district or neighborhood procedures when working on or showing preferred circulation and adjacent to roadways and walkways parking patterns, suggested routes to school, locations of crosswalks, crossing Second Review Draft - Bremerton Non-Motorized Transportation Plan 173 City of Bremerton 4.9.2 Bicycle Patrol Unit 4.10.1 Employer Incentive Programs The City of Bremerton may want to work " with the Police Department, local Employe~ mcentIVe progra~s businesses, and neighborhood groups to encoura~mg employees .to ~alk and. b~ke establish local bicycle patrol units. A t~ work mclude strategIes lIke pro:~d~ng bicycle patrol unit may be an official law blcyc"le lockers a~d sho~er facIlItIes, enforcement unit, a private security guard o!fermg mo~e fle~Ible arrIval/departure patrol, ,or a volunteer network. Bicycles tImes, and mcentIves su.ch as monthly are an excellent community policing tool, :affle. contests. The Clt,Y ~ay offer because officers on bicycles are often mcentIves to employers to mS~Itute th~se viewed as more approachable, thus programs th~ough aI: qualIty credIts, improving trust and relations between lowe:ed .p~rk~ng reqUIrements, reduced citizens and police. Bicycle patrol units traffIc mItIgatIOn fees, or other means. can work closely with citizens to address 4.10.2 Community Bikewayl concerns before they become problems. Walkway Adoption Bike pedestrian detour sign These units can have a direct effect on bicycle safety by enforcing bicycle traffic Community Bikeway/Walkway Adoption laws (e.g., wrong-way riding, sidewalk programs are similar to the widely riding, obeying traffic controls, children instituted Adopt-a-Highway programs wearing helmets), and providing bicycle throughout the country. These programs safety education. ' identify local individuals, organizations, or businesses interested in "adopting" a 4.10 Encouragement bikeway or walkway. Adopting a facility Programs means that a person or group would be , responsible for the facility's maintenance Strategies for community involvement in either through direct action or as the bicycle/pedestrian improvements are source of funding for the City's important to ensure broad-based maintenance of that facility. For support, which translates into ~oliti~al example, members of a local recreation support" to help secure fmanclal group might volunteer every other resources. Private sector involvement in weekend to sweep a bikeway and identify raIsmg awareness of the benefits of and address larger maintenance needs. bicycling can range from small Or a local bike shop might adopt a incremental activities by non-profit bikeway by providing funding for its groups to efforts by the largest employers maintenance costs. The managers of an m the City. Specific, programs are adopted bikeway would be allowed to described below. post their name on bikeway signs along the route to display their commitment to bicycling in Bremerton. I Second Review Draft - Bremerton Non-Motorized Transportation Plan 74 City of Bremerton Multi-Modal Access Guide distributing the access guide, and those with disabilities. A multi-modal access guide provides 4.10.3 Business Incentives for concise customized information on how to reach specific destinations with an Bicycling and Walking emphasis on bicycling, walking, and Incentive programs encouragmg transit. Access guides can be as simple bicycling and walking to local as a map printed on the back as a businesses can be developed In business card or as complex as a multi- coordination with individual businesses, page packet distributed to employees. the Chamber of Commerce, and bicycle Access guides commonly include: advocacy groups. Such efforts may . An area map depicting bus stops, include: recommended walking and bicycling . ereating promotional events such as routes, landmarks, facilities such as "Bicycle to the Grocery Store" days, restrooms and drinking fountains, when cyclists get vouchers for items, locations of bicycle and vehicle or discounts on items in the store, or parking, and major roads "Bicycle to the Video Store" days, . Information on transit service, when cyclists receive free popcorn or including frequency, fares, accepted a movie rental discount payment methods, first and last . Holding an annual community event runs, schedules, telephone numbers to encourage residents to replace one and websites of transit service car trip a week with a bicycle trip, providers and taxis and integrating this type of event . "Walking times" or ''riding times" with current special events like the between destinations Bremerton Blackberry Festival . Accessibility information for people . Developing, promoting and with disabilities publicizing bicycle commuter Best practices include using graphics, services, such as bike shops selling providing specific step-by-step travel commute gear, bikes-on-transit directions, providing parking location policies, and regular escorted and pricing information, and providing commute rides information about the benefits of . ereating an annual commuter walking and bicycling. challenge for area businesses High-quality access guides are concise and accurate, and should incorporate input from key stakeholders such as public transportation operators, public officials, employees, staff who will be Second Review Draft - Bremerton Non-Motorized Transportation Plan 175 City of Bremerton Walk- and Bike-to-School Days TravelSmart provides customized . . . information and training to help people The CIty an? School DI~t:ICt s~ould take transit, bike, walk, or carpool. encourage. reslden~s to partICIpate m the TravelSmart projects provide many annual mternatIOnal Walk-t~-School benefits including individual health and Day hel~ e~ch October. The elty ~nd financial improvements, and SchooLDlstnct could also create ~ Blke- community-wide benefits such as to-S?hool d~y. :rhese events. raIse the reduced mr pollution and enhanced profIle of blcyclmg and walkmg among community safety" children. Local Bike- and Walk-to-Work . days can be held annually in conjunction :rravelS~art gives participants just the with school-related events. mformatlOn they ask for to help them B'k F. 0 . d ROd d get started, or to keep on walking, I e airs rgamze I es an b' l' k' . l' R ' . , ICYC mg, ta mg transIt, or carpoo mg. aces Those who do not want information are Hosting bike fairs, organized rides, and left alone. Materials are delivered by a races in Bremerton (such as Tour de "Travel Ambassador" m the most Kitsap) can raise the profile of bicycling efficient and cost-effective way-by in the area and provide entertainment bicycle. Travel Ambassadors are cross- for all ages at the same time. Bike fairs trained to answer participants' and races provide opportunities to questions concernIng all alternative educate and encourage current and travel modes. Depending on the potential' bicyciists. These events can information requested by an individual also bring visitors to Bremerton that participant, marketing materials could may also contribute to the local include maps identifying safe, economy. These events could be convenient, and direct walking and sponsored and implemented through bicycling routes in Bremerton, public collaboration between the eity and local bicycle parking locations, Kitsap Transit employers. maps and schedules, and free bus or TravelSmart Programs ferry passes; Travel Ambassador,s .would . .' contact program partIcIpants TravelSmart IS .an mnovatIve ,",:ay to periodically to answer questions about encourage envlroIlmentally fnend~y alternative transportation. The City ways to travel. The c~~cept, used m could also periodically survey more t~an 3?? co~m"u~lltIeS around the participants about their travel habits to world, IdentIfIes mdlvlduals who want evaluate the program's success. to change the way they travel and uses personal, individualized contact to motivate them to think about their travel options. I Second Review Draft - Bremerton Non-Motorized Transportation Plan 76 City of Bremerton 4.11 Enforcement and other tools to help them accomplish Programs their mission. Finally, it is recommended that the The best protection for pedestrians and Police Department vigorously pursue bicyclists traveling along and across legal action against motorists who cause streets are motorists who are aware of a bicycle/pedestrian injury or fatality. and follow, laws regarding 4.12 The Programmatic bicycle/pedestrian right-of-way. Many people, however, are unaware of these Approach: Where to Start laws. The sections above describe numerous Targeted enforcement action should be programmatic strategies for enhancing focused in areas with high bicycle and Bremerton's walking, and bicycling pedestrian volumes or where non- environment, each fulfilling educational, motorized travelers are especially encouragement, and/or enforcement vulnerable. Law enforcement efforts objectives. Although some proposed should be targeted during periods and at strategies would yield results over the locations where motorists and the long term, the City could set into motion general public will become aware of several programs today that would yield bicycle/pedestrian laws and their cost-effective, immediate, and highly penalties. These efforts should occur at visible results: least four times per year and last Develop and Implement a Wavfinding 1 week. Focused enforcement should . also take place at the start of the school Signage Plan: While serving the year. An effective form of targeted purpose of orienting bicyclists and enforcl;Jment is the use of a Police Officer walkers, wayfinding signage would posmg as a pedestrian crossing the encourage residents and visitors to street. Motorists who do not yield to the get out and use the system. Lack of awareness of convenient and safe officer are ticketed by other Police non-motorized routes represents a Officers further down the street. . Ticketing cars parked across the major barrier to walking and sidewalk or within striped bicycle lanes bicycling in Bremerton today. represents another effective Encouraging more people to use the enforcement tool. system, a wayfinding signage plan would maximize use of the City's All targeted enforcement actions should bicycling and walking network. be coordinated with the Public Works Department. The Bremerton Police Department should also be surveyed for input on appropriate educational material, advisory and warning signs, Second Review Draft - Bremerton Non-Motorized Transportation Plan 177 City of Bremerton . Implement Safe Routes to School Pilot . ereate a Bicvcle/Pedestrian Proiects: Although the eity should Technician Position: A implement SR2S improvements for all Bicycle/Pedestrian Technician elementary, middle, and high schools, dedicated exclusively to non- this Plan identifies two schools that motorized project implementation could be targeted for initial, could physically oversee, assist, , improvements. The City should work and/or lead project construction. The with the Bremerton School District to technician could expedite smaller- initiate infrastructure improvements scale project implementation such as near Armin Jahr Elementary School signage and pavement markings, and in East Bremerton, and Kitsap Lake monitor the condition of Elementary School in West bicycle/pedestrian infrastructure to Bremerton. The City could identify and address maintenance supplement the tremendous issues as needed. Other programmatic work already responsibilities could include underway at these schools by installing, repairing, and replacing enhancing pedestrian and bicycle public bike racks, bike lockers, and facilities in surrounding areas. other facilities as needed. The . Revisit and Update Municipal eode technician could also oversee the Bicvcle Parking Requirements: update and implementation of Bremerton has an immediate low-cost Municipal Code bicycle parking opportunity to ensure future requirements. developments include adequate bicycle parking facilities. The City should evaluate its current bicycle parking requirements, and update the Municipal Code to include more detail regarding space requirements and facility design. The Code update should address both short- and long- term bicycle parking. This effort would allow the City to take advantage of new development and redevelopment projects. <1l <1l C <.Il ::.r. </) 0) 0). </) 0) ..><: (ij C/) ..><: c 0 c_ c ~ m 0 ~g 0) 05 m -'" ~Ill N (fj </) ~ <1l (ij ~ ..: ~~ a. m <1l <1l ~ Q,) ~~ Q. 0 0 '0 m a. c: <1l ..... ea 0 U5 0 0 (fj <Il 'C(/) 0) ..... '0 '0..... ::2: U5 Ci5 0 u; V c ~Z 0 ,gJj2 '0 '0 '0 ....Q,) 0 <1l <l1 0) V 0) C> Q,) Cl Q,) ~ E ({) c: <1l C c: <l1 C f/) 0 Q,) v .~ 0 ~ ~ 0 0 0l,C 0 0).... a. 0.. 1/j 0.. "- U O)::J e 0 e W.... ..t: ::J 0 'x "X 'X ..... '5( V III 0 (/)0:: ill a.. ill W a.. UJ a.. 00 0 t I I II tJ) . 0 0 I I I 0 - - I ..-1 - l/) Q) - ::::s 0 0:: J!! ea tJ) &.. ..t: ea , I"'-C Q.E ea &.. ::2:<( C lti is: C 0 :w lti ... .. 0 0- III C ~ '1J CII N .;: 0 ... 0 ~ C 0 z C 0 t::: CII E CII .. ll:l , ~ ~ .!! C il ~ CII E .- c :! ijjg ~ <D '1J ~ COs 0- u 0 CIIE VlU 00 r-- 0\ t'- l: C 1\l.8 c: " l: ~ ad; +:'0 .l!lE ~u ~ ~ o 0 "0" " 0. .- - 0 rn "~ !' . ,,0 rn'- ~ - · ~ ~2 w ~ " m ~ ~ ~ rn ~ ~ ---1 s a; 0. 0 m ~ " " ..s 0 " -,_.\Z Olo ill u; 5. ~ 11 · ~ ~~ 11 o " - ~.- ~ u · " ;: ~ " · ~ 0" rn 0 . U ~ W co!' c. , rnO 0 . rn ~. " ". ern;; " 0 .S go ~ rn ol .. ,,0 ~ .. o ,0 .- 0." ~ 0 C " .0 ~ " :;; " 0 "H" on e." .0 0. ~ 0 cE rn 0 , t c.. w >< 0 ,tJl 0.. ,~ ~ C tJl 0 c w ' - 0 .0 ~ 0 o . 0. on Ii. .. .0 0. 0 ZOO I ClO)( e J: c I c- wo. U o - · I I . ,ft t - · I I : .. o .-' . . 0 E - ~ w ~ w . - ~ ~ ~ 0 o ~ ~ J!! - ..~ ~ ~ w " ~ c .. e ~ QJ ~ ",,0. c.CO co~ ::!:i: Second Review Draft - Bremerton Non-Motorized Transportation Plan 181 City of Bremerton 5. Project governments. A table identifying available funding sources and Prioritization and applicability to specific priority projects Funding is provided in Appendix B. The criteria used to develop the 5.1 Capital 1m provement recommendations include: Connectivity-provide connectivity Projects between existing sidewalks, routes, The recommendations presehted here lanes, or paths. Major gaps and are ranked according to the degree to barriers, including narrow roadway which each one meets the above segments, should be targeted as high criteria. Cost opinions were developed priority items. for the pnmary (Tier 1) Multi-Modal eoordination-take recommendations. A phasing plan was advantage of multi-modal outlined based on the ranking outcome connections including ferry and bus combined with the following transfer stations, transit terminals, considerations: (a) funding availability and shuttles to major destinations. and requiremen ts, (b) other programmed transportation Accessibility--be accessible from improvements, (c) eliminating an residential neighborhoods and immediate bottleneck or safety hazard, connect to major destinations within and (d) ensuring that the system grows Bremerton, including parks, rationally rather than as a series of community centers, employment disconnected pIeces over time. The centers, schools, and commercial phasing plan recommends short-term, centers. , intermediate-term, and long~term tiers Convenience-provide reasonably to complete a system over the next 10 to direct routes from residential areas 20 years. to major destinations. Major federal, state, regional, and local Aesthetics-ensure, where possible, funding sources for the proposed bicycle, pedestrian, and SR2S project recreational and commuting users are listed. Cost estimates of the phased prefer to ride along streets and improvements are compared with through areas that are shaded, have funding needs, so that long-term visual relief, or offer other visual programming for local matching funds amenities. can be accomplished. This will include estimates of operating and maintenance costs that are usually borne by local 821 Second Review Draft - Bremerton Non-Motorized Transportation Plan City of Bremerton Usage-serve the greatest number of In Washington, federal funding IS commuters and recreational users administered through state (WSDOT) possible, focusing on maJor and regional planning agencies. Most, destinations. but not all, of these funding programs are oriented toward transportation Safety-provide the highest level of versus recreation, with an emphasis on safety possible while mitigating reducing auto trips' and providing inter- major safety concerns such as narrow modal connections. Federal funding is roadway segments. intended for capital improvements and Planned Roadway Improvement safety and education programs, and Projects-take advantage of planned projects must relate to the surface roadway improvements that may transportation system. accommodate bicycle facilities with SAFETEA-LU relatively little additional cost, Described below, several SAFETEA-LU Coordination with Existing Plans- programs provide funding for bicycle identify and ensure consistency with and pedestrian projects. other local, county, and regional Surface Transportation Program plans. The Surface Transportation Program 5.2 Funding Sources (STP) provides . states with flexible funds, which may be used for a wide Federal, state, regional, and local variety of projects on any federal-aid funding sources are described below. highway, including the National 5.2.1 Federal Funding Sources Highway System, bridges on any public road, and transit facilities. Bicycle and Federal funding is primarily distributed pedestrian improvements are eligible through several programs established activities under the STP. This covers a by the Federal Transportation Act. The wide variety of projects including on- latest act, The Safe, Accountable, street facilities, off- street trails, Flexible, Efficient Transportation sidewalks, crosswalks, bicycle and Equity Act - a Legacy for Users pedestrian signals, parking, and other (SAFETEA-LU) was enacted in 2005 as ancillary facilities. SAFETEA- LV also Public Law 109-59, SAFETEA-LU specifically clarifies that the authorizes the federal surface modification of sidewalks to comply transportation programs for highways, with ADA requirements qualifies as an highway safety, and transit for the eligible activity. 2005-2009 period. Second Review Draft - Bremerton Non-Motorized Transportation Plan 183 City of Bremerton As an exception to the general rule Transportation Enhancement Grants described above, STP-funded "bicycle WSDOT provides federal funding to and pedestrian facilities may be located transporta tion orela ted activities on local ,and collector roads, which are designed to strengthen the cultural, not part of the Federal-aid Highway aesthetic, and environmental aspects of System. the intermodal transportation system, In addition, bicycle-related non- The program provides for the construction projects (e.g., maps, implementation of vanous non- coordinator positions, encouragement traditional projects, including historic programs) are eligible for STP funds. highway facility restoration, bicycle and Highway Safety Improvement pedestrian' facilities, landscaping, and scenIC beautification. Projects must Program relate to surface transportation. This program funds projects designed to Congestion Mitigation/Air Quality achieve significant reductions in traffic Improvement Program fatalities and serious injuries on all public roads, bikeways, and walkways. The Congestion Mitigation!Air Quality This program includes the Railway- Improvement Program ( CMAQ) Highway Crossings Program and the provides funding for projects and High Risk Rural Roads Program, This programs in air quality non-attainment program replaces the Hazard and maintenance areas for ozone, Elimination Program from the carbon monoxide, and particulate Transportation Equity Act for the 21st matter, which reduce transportation- Century (TEA-21). related emissions. In Washington, five Railway-Highway Crossing Program Metropolitan Planning Organization areas (including the Puget Sound Administered by WSDOT, this program region) qualify as non-attainment or is funded by a set-aside of STP funds maintenance areas. These federal funds and is designated for improvements to can be used to build bicycle and highway-rail at-grade crossmgs to pedestrian facilities that reduce eliminate safety hazards. Eligible automobile reliance. Recreational projects include installation of new facilities generally are not funded. crossIng protection devices, paSSIVe The state will receive at least one-half crossing protection devices, upgrades of of 1 percent of all federal CMAQ funds, existing signal devices, railroad and this minimum will be distributed to crossIng closures, and pedestrian the five non - attainment/main tenance crossIng improvements. Funding for areas based on their population shar.e. this program comes out of Highway Safety Improvement Program funds. 1 Second Review Draft - Bremerton Non-Motorized Transportation Plan 84 City of Bremerton Recreational Trails Program Safe Routes to School The purpose of the Safe Routes to Schools The Recreational Trails Program of the (SR2S) program is to provide children a Federal Transportation Bill provides safe, healthy alternative to riding the bus funding to states to develop and or being driven to school. The SR2S maintain recreational trails and trail- program is supported by both the federal related facilities for both non-motorized government (through SAFETEA-LU) and and motorized recreational trail uses. Washington State through recent An example of trail uses include hiking, legislation. The Engrossed Substitute bicycling, in-line skating, and equestrian Senate Bill 6091 also includes a state use. These funds are available for both funding commitment to support paved and unpaved trails, but may not be pedestrian and bicycle safety projects used to improve roads for general such as safe routes to school, transit, and passenger vehicle use or to provide pedestrian and bicycle paths. shoulders or sidewalks along the roads. WSDOT administers federal and state Recreational Trails Program funds may funds for the SR2S program. Eligible be used for: projects include engineering . Maintenance and restoration of improvements, education projects, and existing trails enforcement efforts wi thin 2 miles of . Purchase and lease of trail primary and middle schools (K:8). cOl1structioll and maintenance New Freedom Initiative equipment SAFETEA-LU creates a new formula . Construction of new trails, including grant program providing capital and unpaved trails operating costs to provide transportation . Trailhead construction services and facility improvements . Acquisition or easements of property exceeding those required by the ADA. for trails Land and Water Conservation Fund . State administrative costs related to The Land and Water eonservation Fund this program (limited to seven provides funding to assist in preserving, percent of a state's funds) developing, and assuring accessibility to . Operation of educational programs outdoor recreation resources, including to promote safety and trails. Funds can be used for right-of-way environmental protection related to acquisition and construction. These funds trails (limited to 5 percent of a are administered by the Washington state's funds) State Recreation and Conservation Office. Second Review Draft - Bremerton Non-Motorized Transportation Plan 185 City of Bremerton Community Development Block program funds planning efforts only (there are no implementation monies Grants available) . Projects are prioritized The eomniunity Development Block based on criteria that include Grants program provides money for conserving significant community streetscape revitalization, which may resources, fostering cooperation largely consist of pedestrian between agencies, servmg a large improvements. number of users, encouraging public Federal Community Development involvement in planning and Block Grant grantees " implementation, and focusing on may use lasting accomplishments. Community Development Block: Grants funds for activities that include (but Transportation, Community and, are not limited to): acqUIrmg real System Preservation Program property; reconstructing or rehabilitating housing and other The Transportation, Community and property; building public facilities and System Preservation Program provides improvements, such as streets, federal funding for transit-oriented sidewalks, community and senlOr development, traffic calming, and other citizen centers and recreational projects that improve transportation facilities; paying for planning and system efficiency, reduce administrative expenses, such as costs transportation's environmental related to developing a consolidated impacts, and provide efficient access to plan and managing Community jobs, services, and trade centers. The Development Block Grants funds; program IS intended to provide provide public services for youths, communities with resources to seniors, or the disabled; and initiatives integrate their transportation systems such as neighborhood watch with community preservation and programs." environmental activities. These funds require a 20 percent local match. Rivers, Trails and Conservation 5.2.2 State Funding Sources Assistance Program The Rivers" Trails and eonservation Statewide Transportation Assistance (RTCA) program IS a Improvement Program National Par ks Service program The Statewide Transportation offering technical assistance (via direct staff involvement) to establish and Improvement Program (STIP) restore rivers, trails, represents the 4-year, fiscally green ways, constrained and prioritized program of watersheds, and open space. The RTeA transportation projects, compiled from 861 Second Review Draft - Bremerton Non-Motorized Transportation Plan City of Bremerton local and regional plans, along with the the Washington Wildlife and Recreation Washington Transportation Plan. The Program (WWRP) In 1990. STIP contains federally funded projects Administered by the Recreation and plus sta te and local regionally eonservation Board, the program's goal significant projects programmed for is "to acquire as soon as possible the calendar years 2007 through 2010. most significan t lands for wildlife These projects have been identified conservation and outdoor recreation through a planning process as the purposes before they are converted to highest priority for the available other uses, and to develop existing funding to the state's transportation public recreational land and facilities to program. meet the needs of present and future generations," Grants maybe used to Urban Sidewalk Program fund vanous park-related projects The Washington State legislature including trails (Bremerton received a established the Urban Sidewalk $2.2 million WWRP grant in 2007 to Program In 1995. The Washington extend the Louis Mentor Boardwalk). Transportation Improvement Board Applicants must submit a plan, distributes $1 million to $2 million including project goals and objectives, annually to three designated regions an existing conditions inventory, and an based on lane miles and population" To overview of public involvement efforts. be eligible for the program, projects Traffic Safety Grants must be located on a federally classified route, serve a transportation -related The Washington State Traffic Safety purpose, and meet ADA requirements. Commission provides funding for The Transportation Improvement Board programs, projects, serVIces, and evaluates project proposals based on strategies to reduce the number of several criteria including safety, deaths and serious injuries that result proximity to pedestrian trip generators, from traffic crashes. Funds may be used and degree of local support. Applicants for pedestrian and bicycle must provide a minimum 20 percent improvements, including "School Zone" funding match. flashing lights, and school zone police equipment costing more than $10,000. Washington Wildlife and Recreation Program In response to increased demand for outdoor recreation land and growing concerns about wildlife habitat loss, the Washington State legislature created Second Review Draft - Bremerton Non-Motorized Transportation Plan 187 City of Bremerton Hazard Elimination Safety Grants - under focus. Funding from bond measures can be used for right-of-way Intersection and Corridor Safety acquisition, engIneerIng, design, and Program construction of pedestrian and bicycle In 2005, WSDOT developed the ' facilities, Intersection and eorridor Safety Tax Increment Financing/Urban Program to fund projects that eliminate Renewal Funds or reduce fatal or injury accidents at designated high accident, intersections Tax Increment Financing is a tool that and within designated high accident uses future gains in taxes to finance corridors. Eligible projects include current improvements that will create activities for resolving intersection- those gains. When a public project (e,g" specific safety problems, and roadway sidewalk improvements) is constructed, elements that constitute a danger to surrounding property values generally motorists, pedestrians, and/or bicyclists. Increase and encourage surrounding 5.2.3 Regional funding Sources development or redevelopment. The increased tax revenues' are then Surface Transportation Program - dedicated to finance the debt created by Regional Funds the original public improvement project, Metropolitan Planning Organiza tions Tax Increment Financing typically provide federal funding for projects on occurs within designated Urban any federal-aid highway, bridge projects Renewal Areas (URAs) that meet on any public road, transit capital certain economIC criteria and are projects, and intracity and intercity bus approved by a local governing body. To terminals and facilities. A portion of ' be eligible for this financing, a project funds reserved for rural areas may be (or a portion of it) must' be located spent on rural minor collectors. Eligible within the URA. projects include modifications of System Development existing public sidewalks to comply Charges/Developer Impact Fees with ADA requirements. System Development Charges (SDes), 5.2.4 Local Funding Sources also known as Developer Impact Fees, Local Bond Measures represent another potential local funding source. SDCs are typically tied Local bond measures, or levies, are to trip generation rates and traffic usually initiated by voter- approved impacts produced by a proposed project. general obligation bonds for specific A developer may reduce the number of projects. Bond measures are typically trips (and hence impacts and cost) by limited by time based on the debt load paying for on- or off-site pedestrian of the local government or the project I Second Review Draft - Bremerton Non-Motorized Transportation Plan 88 City of Bremerton ' improvements encouraging residents to Business Improvement Districts walk, bicycle, or use transit rather than Pedestrian improvements can often be drive. In -lieu parking fees may be used included as part of larger efforts aimed at to help construct new or improved business improvement and retail district pedestrian facilities. Establishing a beautification. Business Improvement clear nexus or connection between the Districts collect levies on businesses in impact fee and the project's impacts is order to fund area .wide improvements critical to avoiding a potential lawsuit. that benefit businesses and Improve Street User Fees access for customers. These districts may include prOVlSlOns for pedestrian and The City of Bremerton could administer bicycle improvements, such as wider street user fees through residents' sidewalks, landscaping, and ADA monthly water or other utility bills. The compliance. revenue generated by the fee could be Other Local Sources used for operation and maintenance of the street system, with priorities Residents and other community members established by the Public Works are excellent resources for garnering Department. Revenue from this fund support and enthusiasm for a bicycle and could be used to maintain on-street pedestrian facility, and the eity should bicycle and pedestrian facilities, work with volunteers to substantially including routine sweepmg of bicycle reduce implementation and maintenance lanes and other designated bicycle routes. costs. Local schools, community groups, Local Improvement Districts or a group of dedicated neighbors may use the project as a project for the year, Local Improvement Districts (LIDs) are possibly working with a local designer or most often used by cities to construct engineer. Work parties can be formed to localized projects such as streets, help clear the right-of-way for a new trail sidewalks, or bikeways. Through the LID or main tain existing facilities where process, the costs of ,local improvements needed. A local construction company are generally spread out among a group could donate or discount services. Other of property owners within a specified opportunities for implementation will area (with the City providing a appear over time, such as grants and predetermined match). The cost can be private funds. The City should look to its allocated based on property frontage or residents for additional funding ideas to other methods such as traffic trip expedite completion of the bicycle and generation" pedestrian system. Second Review Draft - Bremerton Non-Motorized Transportation Plan 189 City of Bremerton 5.3 Other Funding Sources American Greenways Program Administered by The eonservation Fund, the American Greenways Program provides funding for the planning and design of greenways. Grant applications can be submitted by local, regional, or statewide non -profit organizations and public agencies, The maximum award is $2,500, but most awards range from $500 to $1,500. American Greenways Program monies may be used to fund unpaved trail development. Appendix A: Terminology and Technical Discussions Second Review Draft - Bremerton Non-Motorized Transportation Plan 1 A-I City of Bremerton Appendix A: Daily Traffic [ADT] volumes), roadway Shoulder Bikeways shoulders are often adequate for Shoulder bikeways are shoulders along a Terminology pedestrian and bicycle travel. Similar to paved roadway and are indicated by "shoulder bikeways", these roadways striping. Ideally, they are wide enough Pedestrian and bicycle travel are should have shoulders wide enough to for bicycle travel and have signs that accommodated and enhanced by accommodate both pedestrians and alert motorists to expect bicyclists on the sidewalks, shared use paths, bicyclists. shoulder. neighborhood accessways, crosswalks, curb ramps, and other infrastructure. A. 2 Pedestrian Facilities Shared Roadways Bremerton has several different types of Shared roadways accommodate vehicles pedestria~ facilities, the most basic of Sidewalks and bicycles in the same travel lane. The which are described below. The most common type of walkway, most suitable roadways for shared A.1 Shared Facilities sidewalks generally parallel roadways, vehicle/bicycle use are those with low Sidewalks have a hard, smooth surface posted speeds (25 miles per hour or less) (e.g., concrete), with separation from the or low traffic volumes (3,000 ADT or Shared Use Paths roadway typically consisting of a curb less). A common practice is to add signs Shared use paths (also referred to as and/or planter strip. along the road with way-finding "trails" and "multi use paths") are used information for cyclists and to indicate to by various non-motorized, users, A.3 Bicycle Facilities motorists that the cyclists are permitted including pedestrians, bicyclists, In- According to AASHTO's Guide for the in the lane. skaters, and runners. Shared use paths Development of Bicycle Facilities there are typically paved (asphalt or concrete) are several types of bikeways. Bikeways but' may also consist. of an unpaved are pathways that preferentially smooth surface as long as it meets' accommodate bicycle'travel in the form Americans with Disabilities Act (ADA) of bicycle route designation or bicycle standards. lane striping. Accessways Bicycle Lanes Accessways provide direct pedestrian Bicycle lanes are striped lanes between and bicycle connections to destinations the outer vehicle travel lane and the that would otherwise require out-of- roadway shoulder. They are designated direction travel on the surrounding as bicycle lanes by symbols in the lane street system. and signage. Roadway shoulders Roadway shoulders often serve as pedestrian and bicycle routes in rural areas. On roadways with low traffic volumes (e.g., less than 3,000 Average I Second Review Draft - Bremerton Non-Motorized Transportation Plan A - 2 City of Bremerton Technical Discussion: WALKING PERSON (symbolizing audible or transmitted speech messages WALK) and an UPRAISED HAND can identify the location of the Pedestrian Facilities (symbolizing DON'T WALK)." An intersection and the specific crosswalk advanced type of pedestrian signal head controlled by that push bu tton, A Traffic Signal Timing contains a countdown signal, in addition vibrating arrow at the push button can Pre-timed signals accommodate to the WALK/DON'T WALK symbol. The also supplement the audible signals. To be pedestrian crossings through automatic countdown signal displays the number of considered for audible signals, an "phasing" concurrent with parallel seconds remaining for the individual to intersection must first meet the following vehicle traffic. At actuated signals, complete their crossing. basic criteria: pedestrians usually push an activation . The intersection must already be button to trigger the walk signal. Leading Pedestrian Interval (LPI) signalized. Providing adequate pedestrian crossing Including LPIs at signalized crossings . The location must be suitable for time is a critical element of the walking provides pedestrians with a 3- to audible signals in terms of safety, environment at signalized intersections. 4-second head start into the intersection noise level, and neighborhood The Manual on Uniform Traffic Control before parallel traffic is released by the acceptance. Devices (MUTCD) recommends traffic green light. LPIs ensure that There must be a demonstrated need for signal timing to assume a pedestrian pedestrians are well into the intersection an audible signal device (typically walking speed of 4-feet-per-second, and visible to turning vehicles prior to through a user request). meaning that the length of a signal vehicles entering the crosswalk. phase with parallel pedestrian movements should provide sufficient Accessible Pedestrian Signals time for a pedestrian to safely cross the Accessible pedestrian signals supplement adjacent street. It should be noted pedestrian signal indications with audible however that the 4 -feet-per- second and/or vibrotactile information. These walking speed does not reflect the treatments include directly audible or walking rates of many users. At transmitted tones, speech where older pedestrians messages, crossIngs or Talking Signs, and vibrating surfaces. pedestrians with disabilities are They intended to make real-time expected, speeds low are crossIng as as pedestrian signal information accessible 3-feet-per-second may be assumed. to visually-impaired pedestrians, Innovative Pedestrian Signals Audible signals can also provide Pedestrian Signal Heads directional guidance, which is particularly useful at non-perpendicular intersections According to the MUTCD, "Pedestrian and at wide multi-lane crossings, Many Signal Heads provide special types of different technologies exist. Newer signal traffic signal indications exclusively types have a quiet, slow ly repeating intended for controlling pedestrian locator tone indicating to approaching traffic. These signal indications consist pedestrians that they must push a button of the illuminated symbols of a to trigger a WALK signal. Directly Second Review Draft - Bremerton Non-Motorized Transportation Plan 1 A-3 City of Bremerton Technical Discussion: informs motorists that bicyclists are riding legally In a dedicated lane. Bicycle Facilities Contra-flow lanes work best In the following circumstances: Uphill Bicycle Lanes . When alternate routes require excessive out-of-direction travel; An uphill bike lane is used where the . When alternate routes include unsafe right-of-way or curb-to-curb width on a or uncomfortable streets with high street is such that there is only room to traffic volumes and/or no bicycle stripe a bicycle lane on one side facilities; (assuming travel lanes and on-street . When the contra-flow lane provides parking are not removed). Under these direct access to bicyclist destinations conditions, bicycle lane striping should on the street under focus; be added to the uphill side of the street. When few intersecting streets, alleys, Bicyclists ascending hills tend to lose . momentum, especially on longer street or driveways exist on the side of the segments with continuous uphill grades. contra-flow lane; and This speed reduction creates greater . When bicyclists can safely and speed diff eren tials between bicyclists conveniently re-enter the traffic and motorists, creating uncomfortable stream where the contra-flow lane and potentially unsafe riding conditions. ends. Separating vehicle and bicycle t~affic, To ensure bicyclist safety on streets with uphill bicycle lanes enable motorists to contra -flow lanes: safely pass slower-speed bicyclists, . Signs should be posted at intersecting thereby improving conditions for both streets, alleys, and driveways travel modes. This measure often includes delineating on-street parking (if informing motorists to expect two- provided), slightly narrowing travel way bicycle traffic. lanes, and/or shifting the centerline if . Intersection traffic controls along the necessary. street (e.g., stop signs and traffic signals) should also be installed and Contra-Flow Bicycle Lanes oriented toward bicyclists in the contra-flow lane. Contra-flow bicycle lanes enable On-street parking should be prohibited bicyclists to safely ride in the opposite between the contra -flow lane and the direction of vehicle traffic on one-way curb to prevent motorists from crossing streets. The facility is placed on the the bicycle travelway. right-hand side of the road (to the motorists' left) , and separated from traffic with a double yellow line. This A 41 Second Review Draft - Bremerton Non-Motorized Transportation Plan - City of Bremerton corridors often lack bicycle lanes or other Bicycle Boulevards dedicated facilities thereby creating an uncomfortable, unattractive, and Bicycle boulevards generally follow potentially unsafe riding environment. lower-order streets with lower traffic Bicycle boulevards serve as alternate volumes and vehicle speeds, such as parallel facilities allowing cyclists to minor collector or local streets passing avoid maJor streets for longer trip through residential ne~ghborhoods. segments. Traffic controls along a boulevard assign priority to through cyclists while Parallel maior streets with bicvcle facilities encouraging through vehicle traffic to that are uncomfortable for some users use al terna te parallel routes. Traffic Some users may not feel comfortable calming and other treatments along the using bicycle lanes on major streets for corridor reduce vehicle speeds so that various reasons including high traffic motorists and bicyclists generally travel volumes and vehicle speeds, conflicts at the same speed, creating a safer and with motorists entering and leaving more comfortable environment for all driveways, and/or conflicts with buses users. Boulevards also incorporate occupying the bicycle lane while loading treatments to facilitate safe and and unloading passengers. ehildren and convenient crossIngs where bicyclists less experienced riders might find these cross other local access and arterial environments especially challenging. steets. Utilizing lower-order streets, bicycle Bicycle boulevards are often established boulevards provide alternate route on street grids, where riders can follow choices for bicyclists who are reasonably direct and logical routes with uncomfortable usmg the maJor street few twists and turns. Boulevards work network. For experienced cyclists, best when higher-order parallel streets bicycle lanes on major streets provide exist to serve through vehicle traffic" important access to key land uses, and Why are bicycle boulevards used? the major street network often provides the most direct routes between major Communities develop bicycle boulevards destinations. For these reasons, bicycle for various reasons, as discussed below. boulevards should complement a bicycle Parallel maior streets lack dedicated lane network and not serve as a bicvcle facilities substitute. Higher-order streets such as arterials and maJor collectors typically include maJor bicyclist destinations such as commercial, employment, and other activity centers. However, these Second Review Draft - Bremerton Non-Motorized Transportation Plan I A-5 City of Bremerton Most local streets can be converted to corridors provides a starting point for bicvcle boulevards fairlv easilv selecting appropriate site-specific im prove ments. The five bicycle Bicycle boulevards incorporate cost- boulevard application levels are: effective and less physically intrusive treatments. Most streets could be Levell: Signage provided with relatively inexpensive Level 2: Pavement markings treatments like new signage, pavement Level 3: Intersection treatments markings, striping and signal improvements to facilitate bicyclists' Level 4: Traffic calming mobility and safety. Other potential Level 5: Traffic diversion treatments include curb extensions, medians, and other features that can be It should be noted that corridors implemented at reasonable cost and are targeted for higher-level applications compatible with emergency vehicle would also receive relevant lower-level accessibility. treatments. For instance, a street Providina benefits beyond an improved targeted for Level 3 applications should also include Level 1 and 2 applications bicvclina environment as necessary. It should also be noted Residents living on bicycle boulevards that it may not be appropriate or benefit from reduced vehicle speeds and necessary to implement all Level 2 through traffic, creating a safer applications on a Level 2 street. and more-attractive environment. Furthermore, several treatments could Pedestrians and other users can also fall within multiple categories as they benefit from boulevard treatments (e.g., achieve multiple goals. To identify and by improving the crossing environment develop specific treatments for each where boulevards meet major streets). bicycle boulevard, the City. should Bicycle Boulevard Applications involve the bicycling community, neighborhood groups, and the Public This section describes vanous Works Department. Further analysis treatments commonly used for and engmeermg work may also be developing bicycle boulevards, The necessary to determine the feasibility of treatments have been divided into five some applications. Figure A-I depicts an main "applicatiop levels" based on their example of bicycle boulevard level of physical intensity, with Level 1 applications on a hypothetical street and representing the least physically Figure A-2 shows a sample bicycle intensive treatments that could be boulevard treatment in plan view. implemented at relatively low cost. The following sections discuss the five Identifying appropriate application bicycle boulevard application levels in levels for indivIdual bicycle boulevard greater detail. I Second Review Draft - Bremerton Non-Motorized Transportation Plan A-6 City of Bremerton C.hok~'r Entt::u!Ccs Traffk'Dlwrv?'\!- I ' "'1 ,;'IL1 .. .,:. If', ..,." 'Ii ~". "..' ~ (hIGlI~:rs Mini i1.fFk':Clrcie, Chk:,l~!" Mini Trilfflc Clrr;{(:s .. .. . " , . ,. NlF.dian\fl~lrm'~ Hdtt5iqn..,ls MOOI~tl~/JsIBfKh Helf, Slqn~l; Medii1Fl'i-/l::.tifllth. Hatf>s.i~ilrlli' 'f'i'i'. ru'r. llr. _J ~ :~~.l~; ~ ~.>.~~ .! . ' ~::~~t~~H '. ' ~ ; ;.;;~ ~ '~):~ 1_, . . "il.:[~, c. r ,.JyI1".1 . I ~ "1-. ~. ", \ ~ .': -' . ,', . SI'I~r~1 L..fl(; 01req.lonl;ll. 51llJred l.ane ~lr~tlo.l"lal Shan..'tl Lwn.... O'tc..'t:liorli::1t $hrlf{'o.Lflnc Djf(':\~Uon,ll .. ~~... . :'Mrt<I"IlS' "",Jrklhg, '-Mar"'1~5 MarRIn~s - ~II mlN ~II ~..' ,,,--,. ,- " \....1 ~:'.J , ,,' \':":'ft~} . '. '--' ,') 'I '- '.- > ' ;<.t'}l:~. ..~~;"~-~ W'PJ'fJ fnd ing Warninq w.y;l,ldlr,g , W"mn~ W"Yflnolng '-'{llmln~ , W,,yf Inolng ~.lrn1ng Wf\'ftjnd1n~ WJ1m1ng ~::~ ~ ()Tnl~!L SHARE THE ,Y!Htjl~I''''I~", ROAD LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 LEVEL 5 Signage Pavement Markings Intersection Treatments Traffic Calming Traffic Diversion I ~ Intensity of Treatments Figure A-1 Bicycle boulevard application levels Second Review Draft - Bremerton Non-Motorized Transportation Plan I A-7 City of Bremerton . I I " l ,~edl~n Ope~ing allo~~ Choker entrance prohibits rnotor vchldcs from I ! ! bl(.ytll~l!l- to <.:ro~~ <uLI:Hlal entering the bICycle boulevard 1 I: II ! ! 1 " I' ! t, I t i ' ,; i j I I . ; 1! , , ! ' t I I " ! ' i ! I I : I R.:.I~erJ me-dld!l pr~veng. rllotl.lrlst-!. I I l ,! ! j I \ from cutting through JI!: I : I 'I L~_~ I II. L~ -.---,;:' --€ .....'.. '._ -' ---'----.--'-----'.'"I----.~---,-.,--, ..e 1_- I .." ,I l d -I / : 1 Bk"l{le bouleVdfd Sigr15 0 ' \ ) I . OQ~ ete-cto: enav es. // : j 'if ..._ _ and j'.)awrnent markings I / bl(ycll<;t$ to ~)(UViJtf! .slgn,)' / ; I Ii ~rY{> uS wilyfindlng df>vicpc;. .. It / / ! and reinforce thdt bftyr.lish 'I MinI truffle circles ;Jl1d ~peoP.d humps / 1 riff! on rJ pr~rprrl-ld routfl " ,.e-rw",., traIT1c<.almlog devl(e~ / t 1 1 II Tr.affk slgn.:!1 pn~bl,:,.... hkYI:lj'J.to; I 1 . . to (r05S arteriJI street t : I ~t(lfl c:,lg,ns on crn55-o;.trf.'op.ts 1 ' : ; j rrlvor IhrnlllJh.bkydt! rnOV~[11pnl 1 ! . j 'Figure A-2 Sample bicycle boulevard treatments A sl Second Review Draft - Bremerton Non-Motorized Transportation Plan - City of Bremerton Level 1 - Signage would be especially effective near major bicycle trip generators such as Bikeway signage is a cost-effective yet schools, parks, and other activity highly visible treatment that can centers. Warning signs should also be improve the riding environment on placed on major streets approaching Bremerton's bicycle boulevard bicycle boulevards to alert motorists network. Described below, signage of bicyclist crossings. can serve both wayfinding and safety Level 2 - Pavement Markings purposes. Wavfindinq Siqns A variety of pavement marking techniques can effectively Improve Bicycle wayfinding signage could be bicycling conditions along a boulevard installed along Bremerton's bicycle network. boulevards and other cycling routes, On-Street Parkinq Delineation Signs are typically placed at key locations leading to and along bicycle Delineating on-street parking spaces boulevards, including where multiple with paint or other materials clearly routes intersect and at key bicyclist indicates where a vehicle should be "decision points." Wayfinding signs parked, and can discourage motorists displaying destinations, distances and from parking their vehicles too far ~ NAD PARK "riding time" can dispel common into the adjacent travel lane. This ....... misperceptions about time and could help cyclists by maintaining a distance while . . , wide enough space to safely share a Increasmg users comfort and accessibility to the travel lane with movmg vehicles Wayfinding signage concept boulevard network. Wayfinding signs while minimizing the need to swerve also visually cue motorists that they farther into the travel lane to are driving along a bicycle route and maneuver around parked cars. In should correspondingly use caution. addition to benefiting cyclists, Note that too many road signs tend to delineated parking spaces also clutter the right-of-way, and it is promote the efficient use of on-street recommended that these sIgns be parking by maximizing the number of posted at a level most visible to spaces in high-demand areas. bicyclists and pedestrians, rather Bicvcle Boulevard/Directional than per vehicle signage standards. Pavement Markinqs Warninq Siqns Directional pavement markings (also Warning signs advising motorists to known as "Bicycle Boulevard "share the road" could also improve markings") lead cyclists along a bicycling conditions on Bremerton's boulevard and reinforce that they are boulevard network. These sIgns on a designated route. The markings Second Review Draft - Bremerton Non-Motorized Transportation Plan 1 City of Bremerton A-9 can take a variety of forms, such as adopted standard, they are small bicycle symbols placed every successfully used In many 600 to 800 feet along a linear communities throughout the United corridor. When a bicycle boulevard States. In Bremerton, shared lane travels along several streets (with markings could be used, on bicycle multiple turns at intersections), boulevard segments with higher additional markings accompanied by vehicle volumes, such as Arsenal Way directional arrows are provided to and Washington A venue. guide cyclists through turns and Level 3 - Intersection Treatments other complex rou ting areas. Directional pavement markings also Intersection treatments represent a visually cue motorists that they are critical component of bicycle traveling along a bicycle route and boulevards. Intersection traffic should exercise caution. controls favoring through bicycle Shared Lane Markinqs movement on the boulevard facilitate continuous and' convenient bicycle Some communities use high-visibility travel. Intersection treatments also pavement markings to delineate provide convenient and safe crossings specifically where bicyclists should where boulevards intersect major operate wi thin a shared roads. The following sections discuss Bicycle boulevard marking vehicle/bicycle travel lane. These varlOUS intersection improvement markings, known as shared lane tools. marki~gs (or "sharrows"), are often Stop Siqn Placement used on streets where dedicated bicycle lanes are desirable but are not Placing stop signs on cross- streets possible due to physical or other approaching a bicycle boulevard can const:aints. The photos in the right facilitate convenient through bicycle margm show markings placed travel. A reduced number of stop signs strategically In the travel lane to on a designated bicycle route' enables alert motorists of bicycle traffic, while riders to maintain their momentum also encouraging cyclists to ride at an while exerting less energy with fewer appropriate distance from the "door "stops and starts." This' treatment zone" of adjacent parked cars. Placed should be used judiciously to minimize in a linear pattern along a corridor the potential for increasing vehicle (typically every 100-200 feet), shared speeds on the bicycle boulevard. lane markings also encourage cyclists Shared lane marking to ride ina straight line so their movements are predictable to motorists. Although these pavement markings are not yet a nationally I Second Review Draft - Bremerton Non-Motorized Transportation Plan A-I0 City of Bremerton Bicvcle Left Turn Lanes Curb Extensions Boulevards crossing major streets at Curb extensions slow vehicle traffic by offset intersections can incorporate creating a visual "pinch point:' for "bicycle left turn lanes" to facilitate approaching motorists. TYPIcally easier bicyclist crossings. Similar to constructed within the on-street medians/refuge islands, bicycle left parking lane, these devices can calm turn lanes allow the crossing to be vehicle traffic ~assing ~hrough or completed in two phases. A bicyclist turning at an mtersectlOn. Where on the boulevard could execute a bicycle boulevards. intersect maJor right-hand turn onto the cross-street, streets, curb extenSIOns placed on the then wait in a delineated left turn major streets reduce the lane (if necessary to wait for a gap in bicycle/pedes~rian crossing dist,anced. oncoming traffic). Intersection with curb extensions Curb extenslOns should be deslgne " , ' 'I' '. ~'i'I"" I with sufficient radii to accommodate , Bicvcle ~etectlon at SIQnallzed I:. .. " : .1 ': the turning movements of emergency Intersections : '.0 ,! vehicles. Several treatments can be us~d to ..~ . " . "':~ " streamline bicycle travel where bIcycle n'''' "::':, ~,i!~ 0 Medlans/RefuQe Islands , 'th ,. "", ' " . . boulevards approach intersectIOns. WI .7'11: -r.; '71 _; ,_ ~edlans are elevated or ~elme~ted actuated signals. In-pavemen~ blc!c~e _ t . T-... .~ ~ Islands that b:-eak u~ non moton.zed loop detectors can sense a b~cychst s :. L'/\u!;:;,J..' IIt.o street crossmgs mto multIple presence (in the way that vehICle loop " '., " segments, Where shared roadways detectors sense automobiles) and Crossing with a median/refuge Island intersect major streets at unsignalized trigger the signal to provide a "green" I L intersections, medians can be use~ to phase for the cyclist. Bicycle loop I simplify bicyclist and pedestnan detectors should be placed within the crossings of the maJor street, bicyclist's expected travel path, Appropriate signage should be (including left turn lanes and installed on the major street approach shoulders) and should be accompanied to warn motorists. of with a p~vement marking indicating bicyclist/pedestrian crossmgs. the optimal location for detection. Bicycle left turn lanes Additionally, vegetation withi~ t~e Vehicle loop detectors can also be used median should be low to mamtam for bicycle detection provided they are adequate sight distances for both located within the bicycle travel path motorists and bicyclists/pedestrians. and their sensitivity levels are Medians can also be used alon~ the adjusted for bicycles. bicycle boulevard to create a vIsual pinch point for motorists, as well as to accommodate mid-block bicycle and " d t. . s Bicycle loop detector and markingkpe es nan crossIng . Second Review Draft - Bremerton Non-Motorized Transportation Plan I A-II City of Bremerton Similar to pedestrian activation not have to wait more than one buttons, bicyclist activation buttons signal cycle for a green light; can be used at signalized interseCtions . Cyclists at the head of the line can as long as they do not require cyclists avoid breathing exhaust fumes from to dismount or make unsafe leaning vehicles idling at the intersection; movements. These devices should be and placed as close to the street as possible . Bicyclists making left turns can in a location that is unobstructed by safely position themselves in the bike parked vehicles or motorists making box in front of motor vehicle traffic, right- hand turns. as opposed to merging with vehicle Bi ke Boxes traffic as they approach the As bicyclists and motorists intersection. on a boulevard approach a signalized Half Siqnals intersection, bike boxes assign priority Lower-order streets often provide to bicyclists. Bike boxes incorporate minimal treatments to accommodate Bike box. treatments, including: bicycle/pedestrian crossIngs when . A striped bicycle lane: Allows they approach maJor streets. In bicyclists to safely maneuver to the situations where there are few "head of the line" of stopped crossable gaps and where vehicles on vehicles; the maJor street do not stop for . An advanced vehicle stop bar pedestrians and cyclists waiting to located several feet upstream from cross, ''half signals" could be installed the intersection: Provides a space to improve the crossing environment. for bicyclists to move directly in Half signals include pedestrian and front of the vehicle at the head of bicycle activation buttons and may the line; also include bicycle loop detectors on Bicycle pavement markings in the the bicycle boulevard approach. Many . of these models have been used bike box: Advises motorists to stay successfully for years overseas, and out of the bike box; and their use in the United States has . Signage: Advises motorists to stay increased dramatically over the last out ofthe bike box. decade. Discussed below, a variety of Bike boxes offer several advantages: half signal applications could be used Enabling cyclists to move to the on Bremerton's bicycle boulevard . network. head of the line, bike boxes reduce bicyclist waiting time and increase the likelihood that a cyclist would I Second Review Draft - Bremerton Non-Motorized Transportation Plan A -12 City of Bremerton Pelican Sianals Puffin Sianals A Pelican (Pedestrian. Light eontrol A Puffin (Pedestrian User Friendly Activated erossing) signal Intelligent) crossIng signal IS an ,,--_.,- ---- r:.>~ .' , incorporates a standard red-yellow- updated version of a Pelican crossing. " J"" green signal on the maJor street The signal consists of a traditional i ' I approach that rests on green for signal for motorists, as well as i r vehicular traffic until a pedestrian or activation buttons and infrared or i bicyclist wishes to cross and presses pressure mat detectors. Mter a I the button. The signal then changes bicyclist or pedestrian pushes the to yellow, then red, while WALK is button, a detector verifies the shown to the pedestrian!bicyclist on presence of the user at the curbside. the bicycle boulevard approach. The This helps eliminate false signal calls signal can be installed as either a associated with people who push the one-stage or two' stage signal, button and then decide not to cross. depending on the street's When the bicyclist/pedestrian is given Puffin signal characteristics. In a two-stage the WALK signal, a separate motion crossing, the bicyclist/pedestrian detector extends the WALK interval crosses first to a median island and is (if needed) to ensure that slower then channelized along the median to pedestrians have time to cross safely. a second signalized crossing point. At Conversely, the signal can also detect that point, the user then activates a when the intersection IS clear of second crossing button and another pedestrians/bicyclists and return the crOSSIng signal changes to red for green signal to vehicles, reducing motorists while the vehicle delay at the light. Puffin pedestrian/bicyclist is given a WALK signals are designed to be crossed in a signal. The two crossings only delay single movement by the bicyclist or the bicyclist/pedestrian minimally pedestrian, unlike the Pelican signal and allow the signal operation to fit which can be designed to cross in into the arterial synchronization, either one or two stages. thus reducing the potential for stops, Hawk Sianals Hawk signal delays, crashes, and aIr quality issues. A Pelican crossing is quite A Hawk (High-In tensity Activated effective In providing a Crosswalk) signal is a combination of bicycle/pedestrian crossmg at mid- a beacon flasher and traffic control block locations when the technique signaling technique for marked can be integrated into the roadway crossings. The beacon signal consists design. of a traffic signal head with a red- yellow-red lens. The unit is normally off until activated by a pedestrian or Second Review Draft - Bremerton Non-Motorized Transportation Plan I A -13 City of Bremerton bicyclist. When bicyclists/pedestrians effective on streets with narrower wish to cross the street, they press a cross. sections. button and the signal begins with a Mini Traffic Circles flashing yellow indication to warn Mini traffic circles are raised or approaching motorists. delineated islands placed at A solid yellow, advising motorists to intersections, reducing vehicle speeds prepare to stop, then follows the through tighter turning . radii and flashing yellow. The signal is then narrowed vehicle travel lanes. These changed to a solid red, at which time devices can effectively slow vehicle the user is shown a WALK indicator. traffic while accommodating all The beacon signal then converts to an turning movements at an intersection. alternating flashing red, allowing Mini traffic circles can also include a drivers to proceed after stopping at paved apron to accommodate the the crosswalk while the turning radii of larger vehicles like fire Chicanes bicyclist/pedestrian IS shown the trucks or school buses. flashing DON'T WALK signal. Speed Humps/Speed Cushions Level 4 - Traffic Calming Speed humps are rounded raised Traffic calming treatments on bicycle areas . of the pavement reqUIrmg boulevards Improve the bicycling approaching motor vehicles to reduce environment by reducing vehicle speed. These devices also discourage speeds to the point where they through vehicle travel on a street generally match cyclists' operating when a parallel through route exists. speeds, enabling all users to safely co. Speed cushions are similar to speed exist on the same facility. Specific humps, but include narrow inlets traffic calming treatments are enabling bicycles to pass through described below. without riding over the hump. Mini traffic circle Chicanes Spacing between inlets could be matched with the spacing of wheels Chicanes are a series of raised or on a fire truck to allow these vehicles delineated curb extensions on to pass through without slowing. alternating sides of a street forming Level 5 - Traffic Diversion an S-shaped curb, which reduce vehicle speeds through narrowed Traffic diversion treatments maintain travel lanes, Chicanes can also be through bicycle travel on a street achieved by establishing on-street while physically restricting through par king on alternate sides of the auto traffic. These treatments direct street. These treatments are most vehicle traffic onto parallel higher- Speed cushion order streets while accommodating I Second Review Draft - Bremerton Non-Motorized Transportation Plan A-14 City of Bremerton bicyclists and local vehicle traffic on the bicycle boulevard. Traffic diversion IS most effective when higher-order streets can sufficiently accommodate the diverted traffic associated with these treatments. Choker Entrances ehoker entrances are intersection curb extensions or raised islands allowing full bicycle passage while restricting vehicle access to and from a bicycle boulevard. When they approach a choker entrance at a cross-street, motorists on the bicycle boulevard must turn onto the cross-street while cyclists may continue forward. These devices can be designed to permit some II vehicle turning movements from a cross-street onto the bicycle boulevard while restricting other movements. Traffic Diverters Choker ef}trance at entrance of two-way Similar to choker entrances, traffic local street diverters are raised features directing vehicle traffic qff the bicycle boulevard while permitting through bicycle travel. Traffic diverter Appendix B: Draft Projects List with Costs Second Review Draft - Bremerton Non-Motorized Transportation Plan I B-1 City of Bremerton Table B-1. Recommended Pedestrian and Bicycle Projects ~Rt:"e · , . ",' ~ ., ';' .. ,% '{Ij,1::-:e.~,.. .. · 'JE~ ~ 1'~ltol,' , {~ Dei f' · d }~~ .," <:, ;{"'~}e ~;/ , ~;;:~ w, {&jtlft2;~~ ~ ~\C~\ti1tl'Viii~ ,!<j' AL "',, , '. '~*'~''''"* .~,{tIIDl~~_,.. ~., '. _JtJ_.11! UU ,.f~~,,~~~,. ,~g,JY~ > 1;~'l1imj.~."""~"'''''4''''''''''_'''''~'''b; 11th St. at Callow Ave. N/A Intersection improvements, Bremerton Kitsap Way at Harlow Dr. N/A Intersection improvements Bremerton $125,000 Kitsap Way at North Lake Way N/A Intersection improvements Bremerton LoxieEaQans Blvd. at National Ave. N/A Intersection improvements Kitsap County Loxie Eagans Blvd. at SR 3 NB Ramps N/A Intersection improvements WSDOT Loxie EaQans Blvd" at SR 3 SB Ramps N/A Intersection improvements WSDOT Marion St. at Renaissance HiQh School N/A Mid-block crossing improvements Bremerton National Ave. at Preble St. N/A Intersection improvements Kitsap County Old Wheaton Way north of Lebo Blvd. N/A Mid-block crossing improvements Bremerton Old Wheaton Way at Harkins St. N/A Intersection improvements Bremerton Old Wheaton Way at Lebo Blvd.! N/A Intersection improvements Bremerton Cherry Ave" Perry Ave. at Holman St. N/A Intersection improvements Bremerton Perry Ave. at Stone Way N/A Intersection improvements Bremerton Sheridan Rd" at Pine Rd" N/A Intersection improvements Bremerton SR 303/Warren Ave. at 4th St. N/A 'Intersection improvements WSDOT SR 303/Warren Ave" at 5th St. N/A Intersection improvements WSDOT SR 303/Warren Ave. at 11 th St. N/A Intersection improvements WSDOT SR 303/Warren Ave. at 13th St. N/A Intersection improvements WSDOT SR 303/Warren Ave. at 16th St. N/A Intersection improvements WSDOT SR 303/Wheaton Way at Riddell Rd. N/A Intersection improvements WSDOT SR 303/Wheaton Way at Sheridan Rd. N/A Intersection improvements WSDOT SR 303/Wheaton Way at Sylvan Way N/A Intersection improvements WSDOT SR 304/Burwell St. at Callow Ave. N/A Intersection improvements WSDOT SR 304/Burwell St. at Montgomery Ave. N/A Intersection improvements WSDOT SR 304/BUlwell St. at State Ave. N/A Intersection improvements WSDOT $487,000 SR 310/Kitsap Way between N/A Mid-block crossing improvements WSDOT Forrest and PershinQ SR 310/Kitsap Way at 11th St. N/A Intersection improvements WSDOT SR 31 O/Kitsap Way at SR 3 NB Ramps N/A Intersection improvements WSDOT SR 310/Kitsap Way at SR 3 SB Ramps N/A Intersection improvements WSDOT I Second Review Draft - Bremerton Non-Motorized Transportation Plan B-2 City of Bremerton Table B-1. Recommended Pedestrian and Bicycle Projects (continued) ~_~fA~~~It~~I~'f~~ ~Jal:pj~-~t~)-L, '/tMl., \iv,,' ,,'. %~i~ . ,,~~i;,,"t~~rgm? .ltQ~~~ !i~~bh, ,,~,I;)'~~J t!~";:%j,4r .;, ,,;{: f i2~tr-;<<g:~"GY~1~i..iMi.l1t@.r[~it~~3.}: ~g~s~~~~t!l1J!!t~;);~; SiClewalks:' .. "":,":," ',-"' ',.' ."".", ,,' "", ' , ,~,",.":' '",.,:,.',"<''-,/,..' '".., .".. ',./, ;:~" .,..;, .." ..... '", ; ,,' 1st SI. Auto Center Blvd.lBruenn Sidewalks Bremerton Ave" to Auto Center Wav 1st SI. Marion Ave. to Callow Ave. Complete sidewalk gaps Bremerton 6th SI. Price Rd" to Auto Center Complete sidewalk gaps Bremerton Wav 11th SI. SR 310/Kitsap Way to Complete sidewalk gaps Bremerton Callow Ave. 15th SI. Corbet Dr. to Lafayette Ave" Complete sidewalk aaos Bremerton 16th SI. Old Wheaton Way to Sidewalks Bremerton Trenton Ave" 18th St Old Wheaton Way to Perry Sidewalks Bremerton Ave. 25th St Wycoff Ave. to Snyder Ave" Comolete sidewalk aaos Bremerton 26th St Phinney Bay Dr. to Wycoff Sidewalks Bremerton Ave" Arsenal Way Loxie Eagans Blvd. to Yantic Complete sidewalk gaps1, 2 Bremerton Tier 1 Ave" Arsenal Way Oyster Bay Ave" to Loxie Sidewalks Kitsap County Eagans Blvd" Corbet Dr. SR 310/Kitsap Way to Sidewalks Bremerton/ Kitsap County Phinnev Bav Dr" Harlow Dr. Kitsap Way to Price Rd" Sidewalks Bremerton Harlow Dr. Price Rd. to Bruenn Ave" Sidewalks Bremerton/ Kitsap County Hartford St Arsenal Way/Yantic Ave" to Sidewalks Bremerton Tier 1 1st SI. MaQnusson Way/Stone Way Schley Blvd. Sidewalks Bremerton/ Kitsap County Marine Dr. Rocky Point Rd" to northern . Sidewalks Bremerton terminus Marion Ave./Adele Ave. Arsenal Way to SR Complete sidewalk gaps Bremerton 310/Kitsap wav Naval Ave. 13th SI. to 15th SI. Comolete sidewalk aaos Bremerton Old Wheaton Way Callahan Dr. to Sheridan Rd. Sidewalks Bremerton Old Wheaton Way Harkins SI. to Callahan Dr. Complete sidewalk aaps Bremerton Oyster Bay Ave. "C" St to Loxie Eagans Complete sidewalk gaps Bremerton Blvd" Oyster Bay Ave. Arsenal Way to SR Complete sidewalk gaps Bremerton 310/Kitsap Way Petersville Rd. Sheridan Rd. to Sylvan Way Sidewalks Bremerton/ Kitsap County Phinney Bay Dr. Rocky Point Rd. to Corbet Sidewalks Kitsap County Dr" , .' National Ave. to Lafayette Ave. Price Rd. Harlow Dr. to 6th Sl. Sidewalks Rocky Point Rd. Marine Dr. to northern Sidewalks terminus Roosevelt Blvd. 3rd Ave" to Oyster Bay Ave" Sidewalks Brernerton SR 310/Kitsap Way SR 3 interchan'ge to Callow Complete sidewalk gaps WSDOT Ave" Schley Blvd" Old Wheaton Way to Sidewalks Bremerton Sheridan Rd. Shorewood Dr. SR 310/Kitsap Way to NAD Sidewalks Bremerton Park Snyder Ave" 15th Sl. to 25th Sl. Bremerton Terrace St. Perry Ave. to Trenton Ave" Bremerton Tracy ton Beach Rd. Bremerton city limits to east Bremerton of Sheridan Rd. Trenton Ave" Shore Dr. to Stone Way Bremerton Tier 1 Wycoff Ave. 25th Sl. to 26th Sl. Bremerton . Sidewalk$'andBic cl,elanes. " " ,~~, , ,',,~ -. ': ,,-,," .. ,,' " . ~/",. ,'" . ,."' . > Almira Dr. Sylvan Way to Riddell Rd. Sidewalks and bic cle lanes Bremerton Austin Dr. Kitsap Way to SR 3 Sidewalks and bicycle lanes Bremerton interchan e Austin Dr.lSR3 overcrossing N/A Widen existing overcrossing to provide WSDOT sidewalks and bicycle lanes Auto Center Way Loxie Eagans Blvd" to SR Complete bicycle lane and sidewalk Bremerton 310/Kitsap Way gaps Harlow Dr. Kitsap Way to. Price Rd" Sidewalks and bic c1e lanes Bremerton Harlow Dr. Price Rd. to Auto Center Sidewalks and bicycle lanes Kitsap County Blvd" Kitsap Way North Lake Way to SR 3 Sidewalks and bicycle lanes Bremerton interchan e Loxie Eagans Blvd. National Ave" to Arsenal Sidewalks and bicycle lanes Kitsap County Way Manette Br" Washington Ave. to Old Replace bridge to include bicycle lanes WSDOT/ Tier 1 Wheaton Way and sidewalks and/or a shared use path Bremerton Marine Dr. SR 310/Kitsap Way to Sidewalks and bicycle lanes Bremerton Rock Point Rd. National Ave. Charleston Beach Rd. to SR Sidewalks and bicycle lanes Bremerton/ Kitsap County 310/Kitsap Wa 01 m us Dr. Sheridan Rd. to Sylvan Way Sidewalks and bic cle lanes I Second Review Draft - Bremerton Non-Motorized Transportation Plan B -4 City of Bremerton Table B-1. Recommended Pedestrian and Bicycle Projects (continued) Sidewalks and bicycle lanes Kitsap County Pine Rd" Sidewalks and bicycle lanes3 Riddell Rd" Sidewalks and bic cle lanes SR 304/Navy Yard Hwy" Sidewalks and bicycle lanes3 Tier 1 Sheridan Rd. Sidewalks and bicycle lanes Bremerton/ Kitsap County Sylvan Way Sidewalks and bicycle lanes Bremerton/ Kitsap County ':..Y;/~:.~<' ";'~ .,." .' ,";'. ; . ,. ,:\. ' ", r, , ' .. Montgomery Ave" to Naval Stripe eastbound contraflow bicycle Bremerton Tier 1 Ave. lane; westbound bicycle travel accommodated in shared vehicle/bicycle lane 6th Sl. Callow Ave" to Pari< Ave. BicyCle lanes Bremerton Tier 1 $81,000 6th Sl. Park Ave. to Washington Bicycle lanes Bremerton Ave. 11th Sl./Washin ton Ave. Park Ave. to Manette Br. Bicycle lanes Bremerton Austin Dr. SR 3 interchange to Erlands Bicycle lanes Bremerton Point Rd. Auto Center Blvd.lBruenn Ave" Kean Blvd. to Auto Center Bicycle lanes Bremerton Wa northern 'unction Lebo Blvd. Bremerton city limits to Old Bicycle lanes Bremerton Wheaton Wa Loxie Eagans Blvd. Auto Center Way to National Bicycle lanes3. 4 Bremerton/ Kitsap County/ Ave. WSDOT Naval Ave. 1st St. to 15th St. Bic c1e lanes4 Bremerton Tier 1 $74,500 Old Wheaton Way Manette Br. to Sheridan Rd. Bicycle lanes Bremerton Tier 1 $215,000 SR 310/Kitsap Way SR 3 interchange to Callow Bicycle lanes WSDOT Tier 1 $34,000 Ave" Sheridan Rd. Lebo Blvd. to SR Bicycle lanes Bremerton 303/Wheaton Wa Sylvan Way SR 303/Wheaton Way to Bicycle lanes Bremerton 01 m us Dr" Y.{'<" . .. ,? ,",'. '.' <I. SR 3 to North Lake Way Chico Way to Austin Dr" North Lake Way to Price Rd. North Lake Way Kitsap Way to Kitsap Lake Shoulder bikeway Rd. Per Ave. Sylvan Way to Riddell Rd. Shoulder bikewa Price Rd. Kitsap Lake Rd. to Harlow Shoulder bikeway Dr. Riddell Rd. Tracyton Beach Rd" to Pine Shoulder bikeway Kitsap County Rd. SR 304/Navy Yard Hwy" SR 3 to Charleston Beach Shoulder bikeway WSDOT Tier 1 Rd. west 'unction Tracy ton Beach Rd" Bremerton city limits to Shoulder bikeway Riddell Rd. Trenton Ave" Stone Way to Sylvan Way Shoulder bikewa 3,4 Tier 1 Union Ave.l3rd Ave.lKent Ave.lSherman Loxie Eagans Blvd" to SR 3 Shoulder bikeway4 Hei hts Rd" ,',Shared ~oadwayslBicycleBoulevards ',~, ^'. ." ", ':.! >'/'. ,", .. ' " 1st St. Auto Center Blvd.lBruenn Level 1 bicycle boulevard applications Bremerton $1 ,500 Ave. to Auto Center Way (signage) 1stSt. Hartford Ave" to Naval Ave. Level 1 , 2 and 3 bicycle boulevard Bremerton Tier 1 $314,300 applications (signage, pavement markin s, intersection treatments) 4th and 5th Sts. Olympic Ave" to Washington Level 1 , 2, 3 and 4 bicycle boulevard Bremerton Tier 1 $360,000 Ave" applications (signage, pavement markings, intersection treatments, traffic calming) 11th St. Winfield Ave" to Trenton Level 1 and 2 bicycle boulevard Bremerton $5,900 Ave. applications (signage, pavement markin s 13th St. Naval Ave" to Park Ave" Level 1 , 2, 3 and 4 bicycle boulevard Bremerton $354,000 applications (signage, pavement markings, intersection treatments, traffic calmin 15th St. Lafayette Ave" to High Ave. Level 1 , 2, 3 and 4 bicycle boulevard Bremerton $133,400 applications (signage, pavement markings, intersection treatments, traffic calming) ,< Level 1 and 2 bicycle boulevard Bremerton $2,000 applications (signage, pavement markings) 17th Sl. Level 1 , 2 and 3 bicycle boulevard Bremerton $1,100 applications (signage, pavement markings, intersection treatments) 18th St./T errace Sl. Old Wheaton Way to Level 1 , 2 and 3 bicycle boulevard Bremerton $33,000 Trenton Ave" applications (signage, pavement markings, intersection treatments) Arsenal Way/Hartford Ave. National Ave. to Level 1 , 2, 3 and 4 bicycle boulevard Bremerton/ Kitsap County Tier 1 $88,200 1stSt. applications (signage, pavement markings. intersection treatments, traffic calming) Baer Blvd./Russetl Rd./Arsenal Way SR 310/Kitsap Way to Level 1 , 2, 3 and 4 bicycle boulevard Bremerton/ Kitsap County Tier 1 $67,400 National Ave. applications (signage, pavement markings, intersection treatments, traffic calmin Cherry Ave" Old Wheaton Way to Level 1 and 2 bicycle boulevard Bremerton $72,000 Sheridan Rd. applications (signage, pavement markings) Constitution Ave./Marion Ave./Adele Ave. Preble Sl. to SR 310/Kitsap Level 1 , 2, 3 and 4 bicycle boulevard Bremerton/ Kitsap County $197,000 Way applications (signage, pavement markings, intersection treatments, traffic calmin ElmSl. Lebo Blvd. to Sheridan Rd. Level 1 and 2 bicycle boulevard Bremerton $1,100 applications (signage, pavement markings Eastlake Dr./Lakehurst Dr. Harlow Dr" to Lakehurst Dr. Level 1 and 2 bicycle boulevard Bremerton $1,500 southern terminus applications (signage, pavement markin s Halverson Ave./Spruce Ave. Sheridan Rd" to Almira Dr. Level 1 , 2 and 3 bicycle boulevard Bremerton $70,500 applications (signage, pavement markings, intersection treatments) High Ave. 5th Sl. to 15th Sl. Level 1 , 2, 3 and 4 bicycle boulevard Bremerton $92,700 applications (signage, pavement markings, intersection treatments, traffic calmin Second Review Draft - Bremerton Non-Motorized Transportation Plan 1 B-7 City of Bremerton Table B-1. Recommended Pedestrian and Bicycle Projects (continued) , Shared RoadwayslBicyCle.Bou}evards'( continued) <~", \ ~ ;~O\' _.' f >~ " "~"Ji~:' :...~~ >~.~4: ~ ,'.,;., ','. 'e'" '. .',. ' " " . -' , " " " , . Holman St. Perry Ave" to Level 1 and 2 bicycle boulevard Bremerton $1,200 . Trenton Ave, applications (signage, pavement markings) lronsides Ave.lNipsic Ave. Shore Dr. to Level 1 , 2, 3 and 4 bicycle boulevard Bremerton Tier 1 $35,700 Holman Sl. applications (signage, pavement markings, intersection treatments, traffic calming) Magnusson Way/Stone Way Schley Blvd" to Trenton Ave, Level 1 and 2 bicycle boulevard Bremerton/ Kitsap County $2,400 applications (signage, pavement markinQs) Marine Dr. Rocky Point Rd, to northern Level 1 , 2, 3 and 4 bicycle boulevard Bremerton $15,000 terminus applications (signage, pavement markings, intersection treatments, traffic calming) Montgomery Ave, 1st Sl. to 15th Sl. Level 1 , 2, 3 and 4 bicycle boulevard Bremerton $101,300 applications (signage, pavement markings, intersection treatments, traffic calming) Olding Rd.lShore Rd.lRoot Cl. Austin Dr. to existing shared Level 1 and 2 bicycle boulevard Bremerton $2,400 ' use path along Ostrich Bay applications (signage, pavement markinQs) Olympic Ave,/Whitney Ave. 4th Sl. to 15th Sl. Level 1 , 2, 3 and 4 bicycle boulevard Bremerton $216,200 applications (signage, pavement markings, intersection treatments, traffic calming) . Osprey Cir. Segment along Kitsap Lake Level 1 and 2 bicycle boulevard Bremerton Tier 1 $2,100 applications (signage, pavement markings) Oyster Bay Dr. Arsenal Way to SR Level 1 bicycle boulevard applications Bremerton $1,700 310/Kitsap Way (siQnaQe) Pacific Ave" 1st Sl. to 13th Sl. Level 1 , 2 and 3 bicycle boulevard Bremerton $51,200 applications (signage, pavement markinQs, intersection treatments) Park Ave, 4th Sl. to 17th Sl. Level 1 , 2, 3 and 4 bicycle boulevard Bremerton $66,800 applications (signage, pavement markings, intersection treatments, traffic calming) s[ Second Review Draft - Bremerton Non-Motorized Transportation Plan B- City of Bremerton Table B-1. Recommended Pedestrian and Bicycle Projects (continued) Sha~d, RoadwayslBicyq/~Boulevaids (continued) , ", .. "" " ,;..:~' ;"":,c ....:. '.. ..' ,', .. ..'..,i,' , ", ..' ... ":'," ... ' .. . ... " . . .. ',.. :.. Perry Ave. Holman SI. to Magnusson Level 1 , 2, 3 and 4 bicycle boulevard Bremerton $25,500 Way! Stone Way applications (signage, pavement markings, intersection treatments, traffic calming) Pitt Ave" 10th SI. to 11th SI. Level 1 bicycle boulevard applications Bremerton Tier 1 $800 (signage) Phinney Bay Dr. Rocky Point Rd. to Lafayette Level 1 , 2, 3 and 4 bicycle boulevard Bremerton! Kitsap County $34,100 Ave" applications (signage, pavement markings, intersection treatments, traffic calming) Robin Ave.iSolie Ave. Sheridan Rd. to Sylvan Way Level 1 , 2, 3 and 4 bicycle boulevard Bremerton $3,200 applications (signage, pavement markings, intersection treatments, traffic calming) Rocky Point Rd. Marine Dr" to northern Level 1 , 2, 3 and 4 bicycle boulevard Brernertonl Kitsap County $100,200 terminus applications (signage, pavement markings, intersection treatments, traffic calming) Searle SI. Auto Center Way to SR 3 Level 1 bicycle boulevard applications Bremerton $800 bicycle! pedestrian (signage) overcrossing Schley Blvd. Old Wheaton Way to Level 1 , 2 and 3 bicycle boulevard Bremerton $34,100 Sheridan Rd. applications (signage, pavement markings, intersection treatments) Shore Dr. 10th SI. to 11th SI. Level 1 bicycle boulevard applications Bremerton Tier 1 $800 (signage) Shorewood Dr. SR 310!Kitsap Way to Level 1 and 2 bicycle boulevard Bremerton $3,900 northern terminus applications (signage, pavement markings) Trenton Ave. Shore Dr. to Stone Way Level 1 , 2, 3 and 4 bicycle boulevard Bremerton! Kitsap County Tier 1 $89,900 applications (signage, pavement markings, intersection treatments, traffic calming) Washington Ave. 1 st SI. to Manette Sr. Level 1 and 2 bicycle boulevard Bremerton $6,300 applications (signage, pavement markings) Second Review Draft - Bremerton Non-Motorized Transportation Plan I B-9 City of Bremerton Table B-1. Recommended Pedestrian and Bicycle Projects (continued) Share,d UseF?aths: , - . <~ *..-' ~ ",,' < ,: ::;, '::,,' ' ',,' .. .. "' .. .." , . ' " " .. ",,:' " Dockside subdivision accessways N/A Convert informal accessways to paved Bremerton Tier 1 $60,100 shared use paths linking Osprey Circle to Price Rd. and Lakehurst Dr. NAD Park-Jackson Park Naval Housing Shorewood Dr. northern Shared use path Bremerton Area Shared Use Path terminus to existing path in Jackson Park Naval Housing Area SR 3 Shared Use Path SR 16 to SR 304 Shared use path3.4 WSDOT Tier 1 SR 3/Searle SI. Bicycle/Pedestrian Baer Blvd. to overcrossing's Reconstruct and widen existing shared Bremerton Overcrossing east end use path . Shore Dr. Shared Use Path 10th SI. to Vandalia Ave, Convert upper portion of Shore Dr. to Bremerton Tier 1 $154,500 shared use path Port Washington Narrows West of SR 303/Warren New bicycle/pedestrian bridge Bremerton Tier 3 Bicycle/Pedestrian Bridge Ave" Bridge connecting Olympic College with Lions Communitv Plavfield SR 303/Warren Ave. Pedestrian/Bicycle SR 303/Warren Ave. at 15th Construct pedestrian/bicycle Bremerton/ WSDOT Tier 3 Overcrossing SI. overcrossing over SR 303/Warren Ave. at 15th SI. West End Rail Corridor Shared use path on former railroad corridorS Other Projects " ..' .. , '. .' .,:.....;-i" ': '\...,'<'. .. ':.. '.' , '. , " ,. ' " " Citywide bicycle wayfinding signage plan N/A Develop a citywide bicycle wayfinding Bremerton Tier 1 $20,000-$40,000 signage plan identifying: appropriate locations for signs, destinations to be highlighted on each sign, and approximate distance and riding time to each destination Kitsap Lake Trail Feasibility Study N/A Conduct study to determine feasibility of Bremerton/ Kitsap County $20,000-$100,000 developing a shared use path around Kitsap Lake Bremerton Transportation Center N/A Develop a sub-area plan addressing Bremerton/ WSDOT Tier 1 $20,000-$30,000 Bicycle/Pedestrian Sub-Area Plan bicycle/pedestrian circulation needs in and around the Bremerton Transportation Center Municipal Code Bicycle Parking N/A Update Bremerton Municipal Code to Bremerton Tier 1 $10,000 Requirements Update establish bicycle parking requirements for individual land uses, and establish bicycle parkino facilitv desion requirements B 1 0 I Second Review Draft - Bremerton Non-Motorized Transportation Plan - City of Bremerton Table B-1. Recommended Pedestrian and Bicycle Projects (continued) CitherProjects (co[JtinuedJ:' '.., > ":','::,^ : " . ' " . , ' Armin Jahr Elem. School safe routes to N/A Inventory bicycle/pedestrian facilities in Bremerton Tier 1 $1,383,000 school Improvements the Armin Jahr Elem. School walking catchment area, and identify specific deficiencies that complicate bicyclist and pedestrian travel. Design and construct infrastructure improvements, including shared use paths, neighborhood accessways, bicycle lanes, sidewalks, curb ramps, crosswalks, and other intersection improvements where necessary. Assign higher prioritization to projects along major bike- and walk-to- school routes. Crown Hill Elem. School safe routes to N/A Inventory bicycle/pedestrian facilities in Bremertonl Kitsap County $1,000,000- school Improvements the Crown Hill Elem. School walking $2,000,000 catchment area, and identify specific deficiencies that complicate bicyclist and pedestrian travel. Design and construct infrastructure improvements, including shared use paths, neighborhood accessways, bicycle lanes, sidewalks, curb ramps, crosswalks, and other intersection improvements where necessary. Assign higher prioritization to projects along major bike- and walk-to- school routes. Kitsap Lake Elem. School safe routes to N/A Inventory bicycle/pedestrian facilities in Bremerton Tier 1 $1,607,000 school Improvements the Kitsap Lake Elem" School walking catchment area, and identify specific deficiencies that complicate bicyclist and pedestrian travel. Design and construct infrastructure improvements, including shared use paths, neighborhood accessways, bicycle lanes, sidewalks, curb ramps, crosswalks, and other intersection improvements where necessary" Assign higher prioritization to projects along major bike- and walk-to- school routes. Second Review Draft - Bremerton Non-Motorized Transportation Plan I B-ll City of Bremerton Table B-1. Recommended Pedestrian and Bicycle Projects (continued) " ' , .. N/A Inventory bicycle/pedestrian facilities in Bremerton $1,000,000- the Naval Avenue Elem. School walking $2,000,000 catchment area, and identify specific deficiencies that complicate bicyclist and pedestrian travel. Design and construct infrastructure improvements, including, shared use paths, neighborhood accessways, bicycle lanes, sidewalks, curb ramps, crosswalks, and other intersection improvements where necessary" Assign higher prioritization to projects along major bike- and walk-to- school routes. View Ridge Elem. School safe routes to N/A Inventory bicycle/pedestrian facilities in Bremerton/ Kitsap County $1,000,000- school Improvements the View Ridge Elem. School walking $2,000,000 catchment area, and identify specific deficiencies that complicate bicyclist and pedestrian travel. Design and construct infrastructure improvements, including, shared use paths, neighborhood accessways, bicycle lanes, sidewalks, curb ramps, crosswalks, and other intersection improvements where necessary. Assign higher prioritization to projects along major bike- and walk-to- school routes. West Hills Elem. School safe routes to N/A Inventory bicycle/pedestrian facilities in Bremerton/ Kitsap County $1,000,000- school Improvements the West Hills Elem" School walking $2,000,000 catchment area, and identify specific deficiencies that complicate bicyclist and pedestrian travel. Design and construct infrastructure improvements, including shared use paths, neighborhood accessways, bicycle lanes, sidewalks, curb ramps, crosswalks, and other intersection improvements where necessary. Assign higher prioritization to projects along major bike- and walk-to- school routes" 1 Second Review Draft - Bremerton Non-Motorized Transportation Plan B-12 City of Bremerton Table B-1. Recommended Pedestrian and Bicycle Projects (continued) N/A Inventory bicycle/pedestrian facilities in Bremerton/ Kitsap County $1,000,000- the Bremerton 8th Grade/Freshman $2,000,000 Academy walking catchment area, and identify specific deficiencies that complicate bicyclist and pedestrian travel. Design and construct infrastructure improvements, including shared use paths, neighborhood accessways, bicycle lanes, sidewalks, curb ramps, crosswalks, and other intersection improvements where necessary" Assign higher prioritization to projects along major bike- and walk- to-school routes. Mountainview Middle School safe routes to N/A Inventory bicycle/pedestrian facilities in Bremerton/ Kitsap County $1,000,000- school Improvements the Mountainview Middle School walking $2,000,000 catchment area, and identify specific deficiencies that complicate bicyclist and pedestrian travel. Design and construct infrastructure improvements, including shared use paths, neighborhood accessways, bicycle lanes, sidewalks, curb ramps, crosswalks, and other intersection improvements where necessary" Assign higher prioritization to projects along major bike- and walk- to-school routes. Bremerton High School safe routes to N/A Inventory bicycle/pedestrian facilities in Bremerton/ Kitsap County $1,000,000- school Improvements the Bremerton High School walking $2,000,000 catchment area, and identify specific deficiencies that complicate bicyclist and pedestrian travel. Design and construct infrastructure improvements, including shared use paths, neighborhood accessways, bicycle lanes, sidewalks, curb ramps, crosswalks, and other intersection improvements where necessary" Assign higher prioritization to projects along major bike- and walk- to-school routes. Second Review Draft - Bremerton Non-Motorized Transportation Plan 1 B-13 City of Bremerton Table B-1. Recommended Pedestrian and Bicycle Projects (continued) ^" 'h '. ,"" "." , N/A Inventory bicycle/pedestrian facilities in Bremertonl Kitsap County $1,000,000- the Renaissance High School walking $2,000,000 catchment area, and identify specific deficiencies that complicate bicyclist and pedestrian travel. Design and construct infrastructure improvements, including shared use paths, neighborhood accessways, bicycle lanes,sidewalks, curb ramps, crosswalks, and other intersection improvements where necessary" Assign higher prioritization to projects along major bike- and walk- to-school routes. . This project (or elements of the project) is excluding property acquisitions and easements 1 This project (or elements of the project) is included in the Bremerton 2006-2011 Transportation Improvement Plan" 2 This project (or elements of the project) is included in the 2004 Bremerton Comprehensive Plan (Transportation Element), 3 This project (or elements ofthe project) is included in the 2001 Kitsap County Bikeways Plan, 4 This project (or elements of the project) is included in the 2001 Mosquito Fleet Trail Master Plan, 5 This project (or elements of the project) is included in the 1995 Kitsap County Greenways Master Plan, Notes: . Cost estimates for several intersection improvements illustrated on the bicycle and pedestrian network maps are included within the cost estimates for shared roadway/bicycle boulevard projects and/or Safe Routes to Schools projects. . All cost estimates include a 25% contingency beyond the original project cost. The estimates were also increased by an additional 20% for engineering and design. Appendix C: Proposed Project Descriptions Second Review Draft - Bremerton Non-Motorized Transportation Plan 1 C-l City of Bremerton Description j.j This project would develop bicycle boulevards on 4th and 5th streets in "...:...... ~~l West Bremerton. With relatively low traffic volumes, these streets provide ~::z!t~~)"",,~~~~ ~ _,'itt~~;:..,....;~, ~.;-i';;~ - -.-. ''''- 8 ! I" ...... ". excellent opportunities to create bicycle-friendly corridors for riders of all ..., ....., ! .,.... .. " a .. '. ages and skills. Potential treatments include intersection improvements to . .....1.. .. .,- create safe and convenient crossings at major streets, traffic calming, ,:. "- '~i:l"-'-'-"--'~-' streets cape enhancements, bicyclist wayfinding tools, and .' ,.; Median opening allows signage/pavement markings to increase bicyclists' visibility. The 4th-5th ' bicycliSts to cross anerlal Street bicycle boulevards are part of the proposed Mosquito Fleet Trail route , through Bremerton. Ii: 1I Raised median prevent~ motorists ~ from (uttlng through , Project Elements Issues · Bicycle boulevard treatments on . One-way streets at east and west 4th and 5th Streets between ends of corridor could complicate Olympic and Washington Avenues bicyclist connections to , ,,,,",, . Improvements include signage, surrounding streets ~_.~ -- . .,'., " 'j . _... - - - - . pavement markings, intersection, · Crossing improvements at SR j ~"":~'l_+?"'~"~~~" "ii,} "':.:.5;; ; ~, .~ 'm< treatments, and traffic calming 303/Warren Ave. subject to I -.. - . or -- . /: (further analysis needed to WSDOT approval : Stop signs on cross,streets .~ determine specific treatments i favor through bicycle movement Bicycle boulevard sign> and locations) ! and pavement markings I serve as wayflndlng devlces and reinforce that blcycllm j / - ~ ' are on a preferred route , / I Lead Agency Planning Level Cost Estimate Minl trafflc circles and speed humps ~., I I serve as traffic (aiming del/Ices City of Bremerton $360,000 , \ . i ! "" . ''''li'' I . .~~., '" . - ._~. ,-, . +- ., ,1 i . ,~> ...,-~. . I . ,~ t' ! I ori <, alts ~ ~ Sample Bicycle Boulevard Treatments ~ 1 Second Review Draft - Bremerton Non-Motorized Transportation Plan C-2 City of Bremerton Description This project would re-stripe 6th Street to provide bicycle lanes and center left turn pockets between Callow Avenue and Park Avenue. Center landscaped medians would also be constructed in some locations. Compared with parallel higher-order streets (e.g., Burwell, 4th, and 11th Streets), this street handles lower traffic volumes that could be accommodated with fewer travel lanes. Striped bicycle lanes would provide a convenient east- '~1 west through-route for bicyclists traveling between West Bremerton, downtown, and the Manette Bridge. Landscaped medians would also provide opportunities to enhance the corridor's visual character. Project Elements Issues . Street re-striping to provide two . Center landscaped medians could 6th Street - Existing cross-section travel lanes, center left turn constrain driveway access in some pockets, and bicycle lanes locations . Center landscaped medians at some locations . Motorist advisory signs and bicyclist wayfinding signs . Lead Agency Planning Level Cost Estimate City of Bremerton $81,100 6th Street - Proposed cross-section sits - Second Review Draft - Bremerton Non-Motorized Transportation Plan 1 C-3 City of Bremerton Description This project would improve the pedestrian crossing environment at the SR 304/Burwell Street at State Avenue intersection. This intersection handles high volumes of pedestrians entering and leaving the Puget Sound Naval Shipyard. A pedestrian- activated signal would replace the existing overhead "crosswalk" sign to provide a safe and comfortable means for crossing SR 304/Burwell Street. Other proposed treatments include additional curb extensions, curb ramps, and supplemental signage. Project Elements . Pedestrian-activated "half signal" . Curb extension at intersection's northwest corner . Supplemental warning signage for approaching motorists . Curb ramps with detectable warning strips on all corners Issues . Sign,al subject to WSDOT approval . Curb extensions complicate bicycle travel by forcing bicyclists into the ,~_:c~t.~' vehicle travel lane Lead Agency SR 304/Burwell Street at State Ave'nue WSDOT /City of Bremerton (proposed improvements) Planning Level Cost Estimate $487,400 C 41 Second Review Draft - Bremerton Non-Motorized Transportation Plan - City of Bremerton Description This project would improve two accessways in West Bremerton's Dockside subdivision. The currently informal paths link Osprey Circle with Price Road to the south and Lakehurst Drive to the north. The accessways provide direct bicycle/pedestrian connections between adjacent neighborhoods as an alternative to surrounding circuitous streets. Students use these routes to reach Kitsap Lake Elementary School, while other bicyclists/pedestrians use the paths as a recreational route around Kitsap Lake. Developing the accessways into formal shared use paths would increase accessibility for bicyclists, mobility-impaired pedestrians, and improve convenience and connectivity for all users. Project Elements Issues . Paved shared use paths linking · Encroaching vegetation on the Osprey Circle with Price Road southern accessway and Lakehurst Drive e Potential drainage issues on the Existing unimproved accessway . Curb ramps to facilitate smooth northern accessway due to transitions between the paths surrounding topography and streets . Bicycle/pedestrian wayfinding signage Lead Agency Planning Level Cost Estimate City of Bremerton $60,100 (combined cost estimate for both accessways) Proposed paved accessway sits - Second Review Draft - Bremerton Non-Motorized Transportation Plan I C-5 City of Bremerton Description This project would improve the pedestrian crossing environment at the Kitsap Way at Harlow Drive intersection. Kitsap Way's wide cross- section and the lack of formalized pedestrian facilities create an uncomfortable pedestrian environment in this area. Improvements include pedestrian- activated overhead warning lights, a pedestrian refuge island, formalizing driveway access points, and supplemental signage. Project Elements . Formalize nearby driveway access points . Relocate existing crosswalk on Kitsap Way . Pedestrian refuge island . Pedestrian-activated overhead warning lights . Crosswalk on Harlow Dr. approach . Warning signs Issues . Access management would require further study and design . Private property encroachment could complicate sidewalk Kitsap Way at Harlow Drive construction Lead Agency (proposed improvements) City of Bremerton slta Planning Level Cost Estimate 11II $125,000 C 61 Second Review Draft - Bremerton Non-Motorized Transportation Plan - City of Bremerton Description This project would add bicycle lanes to SR 310/Kitsap Way between SR 3 and Callow Avenue. In most locations, the roadway's existing wide shoulders could be converted to bicycle lanes without major road widening or reconstruction. The wide shoulders currently make SR 310/Kitsap Way a popular bicycle route, and formalizing the bicycle lanes through enhanced striping and pavement markings would increase motorists' awareness of non- motorized users. Project Elements Issues . Striped bicycle lanes and . WSDOT may convert existing pavement markings shoulders to vehicle travel lanes . Minor shoulder widening as part of a future capacity between 11 th and Wycoff expansion project . Motorist advisory signs and . Potential physical constraints bicyclist wayfinding signs between 11 th and Wycoff SR 310/Kitsap Way near Wilbert Ave. (existing conditions) Lead Agency Planning Level Cost Estimate WSDOT /City of Bremerton $33,900 SR 310/Kitsap Way near Wilbert Ave. afts (with bicycle lanes) H Second Review Draft - Bremerton Non-Motorized Transportation Plan 1 C- 7 City of Bremerton Description This project would re-stripe Naval Avenue to provide bicycle lanes between . 1 st and 15th Streets. The street could be retrofitted through various options (see concepts at right) to also include landscaped medians/pedestrian refuge islands and/or on-street parking. Striped bicycle lanes would provide a convenient north-south bicycle route connecting the Puget Sound Naval Shipyard with other West Bremerton destinations. Landscaped medians would also provide opportunities to enhance the corridor's visual character. A portion of this project serves as the proposed Mosquito Fleet Trail route through Bremerton. ,-~_ Tli:~~ Project Elements Issues · Street re-striping to provide . Center landscaped medians could bicycle lanes constrain driveway access in some . Center landscaped locations medians/pedestrian refuge . Potential traffic impacts islands and/or on-street parking associated with reduced number . (depending on the concept of travel lanes .-__ ultimately selected) · Motorist advisory signs and bicyclist wayfinding signs Lead Agency Planning Level Cost Estimate City of Bremerton $74,500 . (I ~ . ~ .t~, c-::-~, 1-:-' t;, .c::::::::>, A '. " ~ "",''''''-I. ,,-:_1, if 'C.~~'. . _...~~~",<,~:;,'f",_M"{"~'Jt.~ II" "'"~M~j1awr'I~"~'}I"""" ~~il~T~~~-~.'''':' ' , i ~ Jir!.~~!, ',. ;~:hf,!;.:;t;l;.,'I'f'aJ~(.':~ ~~rl(e~~~1.1:k'~~. ;, ..I(j,~; ,'I ne' !raW e~~,!i'M-i&Sli'e.Cli!. flra~l~~_ iiil , " ' , ~~~,~~ l:J"J>>,:'J1f...,' ',' , Naval Avenue - option with 2 travel lanes, center turn lane, on-street parking, and bike lanesa1ta - 1 Second Review Draft - Bremerton Non-Motorized Transportation Plan C-s City of Bremerton , Description This project would add bicycle lanes to Old Wheaton Way between Sheridan Road and the Manette Bridge. The street is characterized by steep grades in several locations, forcing slower-speed uphill bicyclists to share travel lanes with higher-speed motorists. Striped bicycle lanes would provide a dedicated space for bicyclists to safely operate at comfortable speeds. This project would also serve as an on-street segment of the proposed Port Washington Narrows Trail (also known as the Bridge-to-Bridge Trail). This project could be combined with a planned project to re-align Old Wheaton Way between Callahan Drive and Sheridan Road. Project Elements Issues . Striped bicycle lanes and . Existing on-street parking and/or pavement markings center turn lanes may need to be . Motorist advisory signs and modified to accommodate bicycle bicyclist wayfinding signs lanes in some locations. Old Wheaton Way near Parkside Dr. . Narrow curb-to-curb widths may (existing conditions) preclude bicycle lanes on both sides of the street in some locations. In these locations, bicycle lanes should be provided in the uphill direction and shared lane markings should be provided in the downhill direction. Lead Agency Planning Level Cost Estimate City of Bremerton $214,600 Old Wheaton Way near Parkside Dr. alta (with uphill bicycle lane) - Second Review Draft - Bremerton Non-Motorized Transportation Plan 1 C-9 City of Bremerton Description This project would enhance pedestrian and bicyclist crossings at the SR 304/1 st Street intersection. This project could be developed as part of a larger bicycle boulevard corridor on 1 st Street, which is part of the proposed Mosquito Fleet Trail route through Bremerton. Project Elements . Bike/pedestrian activated "half- signal" . Median inlets on SR 304 to allow east-west bicycle travel through intersection . Reconstruct curb extension on 1 st Street to allow bicyclist passage . Bicycle/pedestrian wayfinding signage . Regulatory and warning signs for approaching motorists Issues . Intersection modifications and signal subject to WSDOT approval EXCEPT Lead Agency BICYCLES WSDOT /City of Bremerton SR 304 at 1 st Street Planning Level Cost Estimate (proposed improvements) $314,300 (part of a larger bicycle sits boulevard project on 1 st Street between Hartford and Naval Avenues) <.. 1 Second Review Draft - Bremerton Non-Motorized Transportation Plan C-I0 City of Bremerton - Description This project would convert the upper portion of Shore Drive into a shared use path exclusively for bicyclists and / " pedestrians. The lack of direct ,/ ,r driveway accesses on this street ,- creates low demand for vehicle use. A path would maximize the street's potential to serve recreational and utilitarian bicycle/pedestrian trips. This project also serves as part of the proposed Mosquito Fleet Trail route through Bremerton. Project Elements . Conversion of upper Shore Drive into a shared use path between 10th Street and Vandalia Avenue; lower Shore Drive remains open to vehicle traffic . Intersection treatments to accommodate safe bicyclist/pedestrian crossings Issues . Potential out-of-direction travel to reach some residences in the immediate area In East Bremerton, upper Shore Drive (above right) could be developed into a shared use path Lead Agency City of Bremerton Planning Level Cost Estimate sits $154,500 -