Loading...
HomeMy WebLinkAbout4662 Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments: 4662 RH2 ENGINEERING INC 2008 Water Main Improvements Engineering LEG 12-1 10/03/2007 02/29/2008 02/15/2010 01/01/2010 Amendment #1-5/08 'J OR1GINALlpAGENO~OF _~PAGES' AMENDMENT NO.1, TO PROFESSIONAL SERVICES AGREEMENT FOR 2008 Water Main Improvements . . '. - The City of Bremerton, Washington, (the ':City"), and RH2 Engineering, Inc. ("Consultant") have entered into a PROFESSIONAL SERVICES AGREEMENT for the project identified as the 2008 Water Main Improvements, This AMENDMENT NO. 1 modifies the Scope of Work and Budget setforth in the AGREEMENT ,dated October 3,2007, as follows: ' " , , , ' - , . , ',' . > ,', " TheScope of Work and Estimateof Time and Expense shall be modified to add additional scope items as outlined in the attached Exhibit A. ' The Compe~sationJor services shall be increased by Twenty Eight Thousand Five Hundred Sixty Seven Dollars ($28,567) and the total fees under this Agreementshall not exceed Three Hundred , Thirty Thousand Nine Hundred Fifty-Six Dollars ($330,956.00). ' ' . '. u ". .' . . , , ' Except as herein modified, the terms of the AGREEMENT shall remain in full force and effect. .'nWITNESS WHEREOF, the parties hereto have executed the AMENDMENT NO.1 to the Professional Services Agreement the date and year indicated. For RH2 Engineering, Inc. dated this , , , .z4d day of .' ~4L , 2008. By rf;M6I~ " ! ,," " " . , " BY~ ' Cary Bozeman, Mayor For the City of Bremerton, dated this /~ day of . ~}U20VA~ ~/? / Of Phil Williams, Director o,fPublic Works and Utilities ~RM CD N r--: o (") :;;: 0::: aJ 0::: w aJ :;;: ::J Z f- a w ..., ,0 0::: CL CL N :r: 0::: Task 1 A B C Task 2 A B C D E F G H Task 3 A B C D EXHIBIT A City of Bremerton Amendment No.1 2008 Water Main Improvements - Airport Extension Estimate of Time and Expense ,..................................................................~~~.~.r.i~~.i~~....................................................................,......................................;;;~~~:'..........l......J;;t.;;;.r........:L.~~~.:..~~~i."..~:...l....~;~;;~~;.....l..::.r.~..:r.:.~::~.:.... , Classification 'Prinei 81. IX r''ProfessionaI.IV j :Professional III ,', Professional I j lTechnician IV "Administrative'III' BASE MAP PREPARATION Utility Records Site Survey Base Map Drawinas . . .... .... . :....... .....t.................( ........ ' :::::1::::::::::::::....4................ ..................:...............t..................j""................ .:::::::::::::~:::::::.:::::r::::::::::::::.:I:::::.::.:::.....r-..............-}.............+...........6 ...................;...............::r::::::::::::::::::r::::::::::::::::: 5 2 14 2 3 Subtotal PREPARE CONSTRUCTION DRAWINGS & SPECIFICATIONS Preliminary Alignment Plan and Profile Connection Details Water Main Improvement Details and Notes 50% In-house Review 50% City Review Cost Estimate Construction Contract & Specifications 7 $ 808, $ $- 134;: $ 942' '".'.20 $ . 2,318, $ -' $ .233, $ '" 2,551) 9 : :$:' . 1,032 $ -. $ 102; .$ 1",134'; 7 ' $ 798. $ - L 17'{$ , " 87:5' .:6 , $ 772: $ :$ 120' ,$ 892' '5 $ 580 $ '$ 131' $. 711 4 $ 468 $ $ 49" $ 517. 2.2. $ 2;574. ' $ ,$ 147, :$,. 2,721 80' $ "9,350 $.' $ 994 '$ 10,3<14 11 $ 1,424 $ ,$ '158 : $ 1,582' 6 $ ',757. .$ $ 113. $ 870' 12 $ 1;456) $ $ 583 $ 2,039 :4 $ 904 $ $ 49. $ 553: 33'. $. 4,141,,$ $ 903 ,$ 5,0<14 ' 19 139 I $ 16,476 I $ 9,775 I $ 2,316 r $ .28,5671 Subtotal FINALIZE PLANS, SPECIFICATIONS & BID DOCUMENTS In-house Review City Review Finalize Documents Cost Estimate Subtotal Ii:" ~I . . --~ ----: ~. P~O"J;:C'!:J'0;r AL 9 29 8 48 26 J:\Dsla\BRM\307-126\02\Alrport Extension - Fee Estimate xis ',; ,", 'U. , ',:," ". ., " 663 $ .. $ ,95 $' 758 .~ .-- 935 $.. .. 9,775: ,$ " 114 '$ , ,10,824, .. 1',:)8(' '.$ '- $ '2jl.., $ ,1';5913.: -2;985 $ '.. :,9,775. $ . ~-- 419 ':$.,' ,...13,179, 6 : 8 , .12": . <26 ,$ $, $ $ o ::0 G) :z ):> I=- ""U ):> G) m :z o IJ0 11 IG I ""U ):> G) m (J) 4/24/20081131 AM Vendor Subject Department Status Code Amount Begin Date End Date Review Date Insurance Comments Contract Number 4662 RH2 ENGINEERING INC 2008 Water Main Improvements Engineering PRO File Class LEG 12-1 $302389.00 10/03/2007 02/29/2008 02/01/2008 GL AL E&O $4000000.00 $2000000.00 $2000000.00 Insurance Total Insurance Review Date $8000000.00 08/01/2008 ORIGINAL_L PAGE NO ~_Ods:.PAGES PROFESSIONAL SERVICES AGREEMENT [2008 Water Main Improvements] The City of Bremerton ("City") and RH2 Engineering Inc. ("Consultant"), referred to collectively as the "Parties," enter into the following Agreement for professional services: I. Scope: The Consultant agrees to perform the services more specifically described in the Scope of Work, dated I f~:I--~--' j \.1 , 20(fl, including any attachments thereto, attached hereto as Exhibit A, which is Incorporated by reference herein. The Scope of Work may be modified only pursuant to Section VII.G. of this Agreement. If the Scope of Work provides for unspecified additional services such services shall only be performed upon the express written request of the City. Consultant further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices in effect at the time such services are performed. II. Term: The City and the Consultant agree that work will begin on the tasks described in Exhibit A immediately upon execution of this Agreement. The parties agree that the work described in Exhibit A is to be completed as provided for in the work schedule attached hereto as Exhibit B; provided however, that additional time shall be granted by the City for excusable delays or extra work as provided for in section IX (A) of this agreement. III. Compensation: In consideration of the services provided pursuant to this Agreement, the City shall pay Consultant in an amount not to exceed $302,389. Consultant's charges and bills shall conform to the fee schedule attached hereto as Exhibit C and incorporated herein by this reference. The Consultant shall submit regular billing statements detailing work performed and amount charged on each task or portion thereof. The descriptions shall conform to and fall within the categories set out in the Scope of Work and/or Fee Schedule. Upon receipt of a conforming billing statement, the City shall promptly process payment. PROVIDED, HOWEVER, the City reserves the right to prioritize scoped work and accelerate and/or delay work tasks under the time frame set forth in Section II herein. The Consultant's labor rates and billing fees shall be as delineated in Exhibit C. Consultant shall not perform work beyond the Scope of Work, nor shall be compensated for such work, unless the Scope of Work or amount of compensation is modified pursuant to this Agreement. Consultant shall only be compensated for additional services if requested pursuant to Section I and, if not otherwise provided, such compensation shall be in accordance with Exhibit C. If a billing statement does not conform to this Agreement, the City may withhold payment until the statement is brought into compliance. Such withholding does not relieve Consultant of its obligations under this Agreement. BremertonlRH2 Engineering, Inc. 2008 Water Main Improvements Page 1 of 6 ORIGINAL-L PAGE NO~OF 15PAGES IV. Relationship of Parties: Consultant represents that it is skilled in the matters addressed in the Scope of Work and is performing independent functions and responsibilities within its field of expertise. Consultant and its personnel are independent Consultants and not employees of the City. Consultant and its personnel have no authority to bind the City or to control the City's employees and other Consultants. None of the benefits provided by the City to its employees, including, but not limited to, compensation, insurance, and unemployment insurance are available from the City to the employees, agents, representatives, or sub-Consultants of the Consultant. Consultant will be solely and entirely responsible for its acts and for the acts of Consultant's agents, employees, representatives and sub-Consultants during the performance of this Agreement. The City may, during the term of this Agreement, engage other independent Consultants to perform the same or similar work. As an independent Consultant, Consultant is responsible for its own management. The City's administration and enforcement of this Agreement shall not be deemed an exercise of managerial control over Consultant or its personnel. As an independent Consultant, Consultant is responsible for payment of all taxes and licensing fees necessary to perform its obligations under this Agreement. These taxes and fees include but are not limited to State industrial insurance, Business & Occupation, State professional licensing, and City business licensing. If any taxes or fees due the City have been declared delinquent, the City may withhold the delinquent amount, plus any additional charges arising from the delinquency, from any payments due Consultant. V. Indemnification: Consultant shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the performance of this Agreement, except for that portion of the injuries and damages caused by the City's sole negligence. The City's review or acceptance of any of the work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WANER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HA VE MUTUALLY NEGOTIATED THIS WANER. The provisions of this section shall survive the expiration or termination of this Agreement. Bremerton/RH2 Engineering, Inc. 2008 Water Main Improvements Page 2 of 6 ORIGINAL-L PAGE NO 3 _OF IS PAGES VI. Insurance: *********CONTACT PEGGY LESSER FOR APPROPRIATE INSURANCE LANGUAGE******The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, employees, sub-consultants or sub-Consultants. Before beginning work on the project described in this Agreement, the Consultant shall provide a Certificate of Insurance evidencing: 1. Automobile Liability insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and 2. Commercial General Liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and general aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCV) if applicable; and employer's liability; and 3. Excess Liability insurance with limits not less than 1,000,000 limit per occurrence and aggregate. 4. Professional Liability insurance with limits no less than $1,000,000 limit per occurrence/claim. Any payment of deductible or self insured retention shall be the sole responsibility of the Consultant. All required policies shall be provided on an "occurrence" basis except professional liability insurance (if required), which may be provided on a "claims-made" basis. The City shall be named as an additional insured on the Commercial General Liability insurance policy, as respects work performed by or on behalf of the Consultant and a copy of an endorsement that is acceptable to the City, which names the City as an additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all the required insurance policies and endorsements. The City further reserves the right to reject any unacceptable policies and/or endorsements. The Consultant's Commercial General Liability insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. The Consultant's insurance shall be primary insurance as respects the City and the City shall be given thirty (30) days prior written notice by certified mail, return receipt requested, of any cancellation, suspension or material change in coverage. The City also reserves its unqualified right to require at any time and for any reason, proof of coverage in the form of a duplicate of the insurance policy with all endorsements as evidence of coverage. BremertonIRH2 Engineering, Inc. 2008 Water Main Improvements Page 3 of 6 ORfGINAL~PAGE NO c..{ OFI~ PAGES VII. General Conditions: A. Reports and Information: When requested by the City, Consultant shall furnish periodic reports and documents on matters covered by this Agreement. The reports and documents shall be furnished in the time and form requested. Consultant shall maintain accounting records in accordance with Generally Accepted Accounting Principles (GAAP) to substantiate all billed amounts. B. Ownership and Use of Records and Documents: Original documents, drawings, designs and reports, including those in electronic format, developed under this Agreement are the property of the City. All written information submitted by the City to the Consultant in connection with the services performed by the Consultant under this Agreement will be safeguarded by the Consultant to at least the same extent as the Consultant safeguards like information relating to its own business. If such information is publicly available or is already in Consultant's possession or known to it, or is rightfully obtained by the Consultant from third parties, Consultant shall bear no responsibility for its disclosure, inadvertent or otherwise. All data, documents and files created by Consultant under this Agreement may be stored at Consultant's office in Port Orchard, Washington. Consultant shall make such data, documents, and files available to the City upon its request at all reasonable times for the purpose of editing, modifying and updating as necessary until such time as the City is capable of storing such information in the City's offices. Duplicate copies of this information shall be provided to the City upon its request, and at reasonable cost. All documents, including all reports, drawings, specifications, computer software or other items prepared or furnished by Consultant pursuant to this Agreement, are instruments of service with respect to the project and are the property of the City. Any reuse by the City for other than the specific purpose intended will be at City's sole risk. c. Work Performed at Consultant's Risk: Consultant shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and sub-consultants in the performance of the work hereunder and shall utilize all protection necessary for that purpose. All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. D. Place of Work: The Consultant shall perform the work authorized under this Agreement at its offices in Port Orchard, Washington. Meetings with the City staff as described in Exhibit A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed upon by the parties. E. Entire Agreement: This Agreement and its Exhibits constitutes the entire agreement between the Parties, and the Parties acknowledge that there are no other agreements, written or oral, that have not been set forth in the text of this Agreement. BremertonIRH2 Engineering, Inc. 2008 Water Main Improvements Page 4 of 6 ORIGINALL PAGE NO S- OF~_PAGES F. Severability: Should any part of this Agreement be found void, the balance of the Agreement shall remain in full force and effect. G. Modification: This Agreement may only be modified by written instrument signed by both Parties. H. Written Notices: All communications regarding this Agreement shall be sent to the parties at the addresses listed below by registered or 1st class mail, or by personal service, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. City Address Michael Mecham 3027 Olympus Drive Bremerton, Washington 98310 Consultant Address Mike Pleasants_ RH2 Engineers 600 Kitsap St, Suite 101 Port Orchard, Washington 98366 I. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a waiver of that provision. Waiver of any right or power arising out of this Agreement shall not be deemed waiver of any other right or power. J. Non-Waiver of Breach: The failure of the City to insist upon strict performance of any of the covenants and agreements contained herein, or to exercise any option herein conferred in one or more instances shall not be construed to be a waiver or relinquishment of said covenants, agreements or options, and the same shall be and remain in full force and effect. K. Compliance with Laws: Consultant shall comply with all applicable Federal, State, and local laws in performing its obligations under this Agreement. L. Choice of Law and Venue: This Agreement shall be interpreted according to the laws of the State of Washington. Any judicial action to resolve disputes arising out of this Agreement shall be brought in Kitsap County Superior Court. M. Attornevs' Fees: In the event of litigation to enforce any of the terms or provisions herein, each party shall pay all its own costs and attorney's fees. N. Assignment: Any assignment of this agreement by the Contractor without the written consent of the City shall be void. VIII. Nondiscrimination: Consultant shall not discriminate in employment or services to the public on the basis of race, color, national origin, sex, religion, age, marital status, disability, or sexual orientation except for employment actions based on bona fide occupational qualification. IX. Termination: This Agreement shall remain in force until completion and acceptance of the services, terminated by written instrument upon mutual consent, or by the City of Bremerton for convenience. This Agreement may be immediately terminated for cause by a Party if the BremertonfRH2 Engineering, Inc. 2008 Water Main Improvements Page 5 of 6 ORIGINAL_lpAGENO~OFr) F other Party substantially fails to perform through no fault of the terminating Party, and the non- performing Party does not commence correction of the failure of performance within thirty (30) days of the terminating Party's sending notice to the non-performing Party. Any Notice by Consultant shall include a report showing the status of all items listed in the Scope of Work current through the termination date. If the City receives reimbursement by any federal, state, or other source for work described in Section I herein, and that funding is withdrawn, reduced or limited in any way, or the project is cancelled or substantially reduced after the execution date of this Agreement and prior to the completion of the work, the City may summarily terminate this Agreement. A. Excusable Delays: The right of Consultant to proceed shall not be terminated nor shall Consultant be charged with liquidated damages for any delays in the completion of the work due to: 1) any acts of the federal government in controlling, restricting, or requisitioning materials, equipment, tools, or labor by reason of war, national defense, or other national emergency; 2) any acts of the City, its consultants, or other public agencies causing such delay; and 3) causes not reasonably foreseeable by the parties at the time of the execution of the Agreement that are beyond the control and without the fault or negligence of the Consultant, including, but not restricted to, acts of God, fires, floods, strikes, or weather of unusual severity. PROVIDED, HOWEVER, that the Consultant must promptly notify the City within ten (10) calendar days in writing of the cause of the delay. If, on the basis of the facts and the terms of this Agreement, the delay is properly excusable, the City shall, in writing, extend the time for completing the work for a period of time commensurate with the period of excusable delay. B. Rights Upon Termination: In the event of termination, the City shall pay for all services performed by the Consultant to the effective date of termination, as described on a final invoice submitted to the City. After termination, the City may take possession of all records and data within the Consultant's possession pertaining to this project which may be used by the City without restriction. Any such use not related to the project which Consultant was contracted to perform shall be without liability or legal exposure to the Consultant. C~E~ ~y: (1 L7 ry 80 Z P.}Inn I? ItS: ~ tff fA Date: '() ~ '07 I Approved as to form: &~omey CONSULTANT By: its: Date: ~ Attest: c~d+J R:\LEGAL\Contracts\FORMS\Professional Services Agreement Form (2003).doc Bremerton/RH2 Engineering, Inc. 2008 Water Main Improvements Page 6 of 6 ORIGINALl PAGE NO ~OF l~ PAGES EXHIBIT A City of Bremerton 2008 Water Main Improvements SCOPE OF WORK BACKGROUND The proposed project includes improvements to the City of Bremerton's (City's) water system. The improvements include 27 separate projects, totaling over 23,000 feet of water mains. Most of the improvements are pipeline replacements. Some new mains are also included. The understanding of the project list is attached as Exhibit A-1. The Public Works and Utility Department at the City will construct all projects estimated to cost under $50,000. For these projects, RH2 will provide stamped and signed construction drawings, but no specifications. The remaining projects will be combined to create one bid package. This contract does not include services during bidding or construction as the schedule of the construction of these. improvements is not known at this time. The target completion date of all tasks included in this contract is the end of the 2007 calendar year. TASK 1- PERMITTING/EASEMENTS Objective Submit applications for or negotiate the necessary approvals/permits or easements, respectively, that are required for the construction of the water mains. Approach A) Permit Information Collection - Compile basic information on known streams, wetlands, regulated shorelines and ESA-listed species in the project area, to be used in preparing the SEP A and other permitting documents. Conduct limited field documentation of critical areas along the alignment, topographic map review, County GIS review, Federal Species lists requests and related information review. B) Prepare SEP A Checklist - Prepare a Draft SEP A checklist for final review, signature and processing by the City. C) Shoreline Pennit and Critical Area Review Application - Prepare Draft JARP A application for final review, signature and processing by the City. Note: The workftr Task 1, while an estimate is provided, will be peiformed on a time and expense basis due to the uncertain!J of the effort required Product Information and photo documentation to be used for SEP A and JARP A preparation; one paper copy and one electronic file of a Draft SEP A checklist; and one paper copy and one electronic fue of a Draft JARP A application. 10/3/2007 Page 1 Z.\NewI3usmcss\Proposal\Cl'ty of Brerncnon\2008 Water Mam Improvements\BRJ\.1 - 2008 Water Mam Improvements SO\X1.doc ORIGINAL_LpAGE NO g- _Od~__PAGES City of Bremerton 2008 Water Main Improvements EXHIBIT A SCOPE OF WORK TASK 2 - BASE MAP PREPARATION AND SUBSURFACE INVESTIGATION Objective Collect the information needed to determine the water mall alignment and constructability of the proposed water mains. Approach A) Utility Records - Prepare maps to show the extents of the improvements. Provide these maps to City and franchises with a request for record drawings. Collect utility drawing records from the City and franchise utility providers. Collected utility records will be used to verify accuracy of site survey. B) Site Survey - Retain two licensed surveyors who will perform surveys of the surface features, the located underground utilities and topographical features with two-foot contours. The surveyors will coordinate the locating of underground utilities by an underground utility locator. Prepare maps and meet with the surveyors in the field to confirm the extents of the survey information needed. C) Base Map Drawings - Create base sheets and format survey drawing data. Perform site visits to review completeness of survey and utility data. Establish stationing for water main design with reference to permanent monuments. D) Subsurface Investigation - It is assumed the City has and will provide soil data from projects constructed throughout the City in the vicinity of the proposed projects. Conduct a limited geological and hydrogeological exploration using test pits to characterize stratigraphy and ground water conditions. The City will provide the operator, flaggers, equipment and any other staff required to dig and backfill the tests pits. Depth of test pits will be as deep as possible with the equipment available. With a rubber tired backhoe we should be able to excavate to 10 feet below ground surface dependant on groundwater conditions and adjacent structures/roads. RH2 will prepare test pit logs and interpret information. RH2 will develop geotechnical and engineering geology recommendations for trenching, handling of subsurface water, placement of improvements, temporary cut and fill slopes, backfill and compaction recommendations. and include recommendations for import vs. use of native earth as backfill. If a directional drill or boring is required to complete portions of these projects, such recommendations can only be provided if previous reports of adjacent borings are available for review including investigation and construction records. If no reports exist such information can be provided via an amendment to this scope of work. We assume the water mains constructed down any steep slopes can be accomplished with standard cut and fill trench. If directional drilling or other methods are required they shall be reviewed via amendment to the contract. Product AutoCAD base map drawings at a scale of 1" = .30' using the site topography survey with 2-foot contours detailing located underground and surface utilities. 10/3/2007 Page 2 Z:\NewBusmess\Proposal\C'ty of Brcrnerton\2008 \'(Tater ~lam Improvements\BRM - 2008 \X'atcr MalO Improvements SOW.doc ORIGINALJ_PAGE NO.!LOF I)PAGES City of Bremerton 2008 Water Main Improvements EXHIBIT A SCOPE OF WORK An engineering geology and geotechnical engineering report that will include test pit logs and construction recommendations that can be incorporated into the construction documents. TASK 3 - PREPARE CONSTRUCTION DRAWINGS AND SPECIFICATIONS Objective Prepare construction plans and specifications for the installation of the water mains. Approach A) Preliminary Alignment - Meet with City to develop design criteria. Prepare schematic layout of preliminary alignment. Meet with City to discuss before continuing design efforts. Preliminary plans will be plan view sheets at a scale of 1" = 30.' B) Plan and Prof1le - Prepare plans of the water main alignment for review and approval by the City. Plans will include TESC features and pavement restoration extents. Scale will be 1" = 30' horizontal and 1" = 5' vertical. C) Connection Details - Prepare details of temporary testing connections and permanent final connections to the existing water system. Develop a plan for the abandonment of the existing water main for each of the improvements. D) Water Main Improvement Details and Notes - Prepare special details not included in the City Standards as needed to convey scope and construction standards for water main improvements. Provide General Notes in conformance with City Standards for construction drawings. E) Pavement Restoration Details and Notes - Prepare special details not included in the City Standards as needed to convey scope and construction standards for pavement restoration improvements. Provide General Notes in conformance with the City Standards for construction drawings. F) In House Review - Conduct a Quality Control review of the plans and specifications at 50 percent completion of construction documents. G) City Review - Submit plans to City at 50 percent completion. Attend 50 percent design review meeting for clarification on City comments. H) Cost Estimate - Prepare preliminary cost estimate at 50 percent completion of construction documents. I) Construction Contract and Specifications - City to provide RH2 Engineering with a master copy of the 'boiler plate' Contract Document section in a Microsoft Word electronic f1le. Prepare advertisement to bidders for the City to advertise. Prepare bid schedule, and measurement and payment descriptions. Prepare the Technical Specifications through reference to and modification of the current WSDOT / APW A Standard Specifications so as to be compatible with construction scope and City Standards. 10/3/2007 Page 3 Z \Nev.'Busmcss\Proposal\Ctty of 13remcrton\2008 \'(Iater Mam Improvcmcnt~ \BRM - 2008 \'(iater MalO Improvements SOW.doc City of Bremerton 2008 Water Main Improvements OR1GINAL-LPAGE NO--1QOF I~PAGES EXHIBIT A SCOPE OF WORK Product One set of preliminary alignment plans. One set of 50 percent construction plans, specification and bid documents. TASK 4 - FINALIZE PLANS, SPECIFICATIONS AND BID DOCUMENTS Objective Finalize plans, specifications and contract documents. Approach A) In House Review - Conduct a Quality Control review of the Plans and Specifications prior to submitting 90 percent plans and specifications for City review and prior to preparation of fmal bid documents. Perform edits to plans and specifications based upon in-house review prior to 90 percent design review meeting with the City. B) City Review - Submit plans and specifications to City at 90 percent completion. Attend 90 percent design review meeting for clarification on City comments. C) Finalize Documents - Perform fmal edits to plans and specifications based upon in-house review and City comments. D) Cost estimate - Prepare cost estimate at 90 percent completion of construction documents. Finalize with completion of construction documents. Product Two sets of construction documents, including plans, specifications and contract documents. 10/3/2007 Page 4 Z.\NewBusmess\Proposal\Clty of Brcmcrton\200B Water ;\lam Improvcmcllrs\BRM - 2008 Water ."'-1;un Improvements SO\V.doc EXHIBIT A-l City of Bremerton 2008 Water Main Improvements Project List Prj}ject# Ploposed [\in. Existing Oiil... Le~lgth From IAlong} 'At 'To \ P-3o 8 4 239 . Easement : Marlow Ave : Easement P.31 12 6 914 Winfield Ave 'E 16th St ~Winfieid Ave . . P-32 8 .1,?94. Orange Dr NW ~ N\N T~ylor Bd Orang~ Dr NW . .. P-36 8 4 758 Seabeck H.ighway. 'N.grtllla~e\ll/ay_ NW Seab.eck High""ay P-37 8 4 248 . Robin Ave 'Dibb St Robin Ave P-38 12 8 295 'Winfield Ave E 15th St Winfield Ave P.40 8 6 2,900 . Marine Dr : Cedar Dr Marine Dr P.41 12 6 2,605 .Jacobson Boul. 'Trenton Ave 'Jacobson Boul. P-42 8 6 1,203 . Kitsap Way 'Oyster Bay Ave . Kitsap Way P-43 8 6 696 'KitsapWay Burchfield Dr 'Kltsap Way P.45 12 6 1,419 Northlake Way NW .. . m. .... 'I . - 1419' south of Lebel's Lane NVV Northlake Way NW P.46 8 6 352 . ;Jul}if:Jer .' . Morrison Ct Juniper P.47 8 . .... 3 789 E 18th St Perry Ave iE 18th St .-. -_.~-- .... ,-. P-1 DO 8 6 445 Halverson Ave E 30th St Halverson Ave P.101 B 6 309 Sheridan Rd Halverson Ave Sheridan Rd P-102 8 6 545 .Sanders Ave . Sheridan Rd Sanders Ave _n ._........__..__ _.... P.103 8 6 351 E 30th St .Sanders Ave . Sanders Ave P.104 TSheridanRd(vv intersectionf' -" ------~ .... 8 6 403 . Lewi sAve Lewi sAve P-105 8 6 341 Sheridan Rd Lewis Ave (Eintersection) ,Sheridan Rd P-106 8 6 484 Bender Circle NE ,Intersection Stem & Logp Bender Circle NE P.107 12 8 379 : Stal~ Ijighway 3. .Turnquist Rd .. . ~!ate. Highway 3 .. .. .. ....... P-106 12 6 645 Anderson Hill Rd SW Dead end Anderson Hill Rd SW P-109 12 6 722 W Frontage Rd State Highway .16.. W FrontageRd 'P-11O 12 8 91 ..W.Frontage ~d... 3D' W of F eigley Rd W W Frontage Rd Hilltop. 8 4f2 ...1,690 Hilltop Ln NW ..Chico Way Hilltop Ln NW.. Shore 12 8 1,600 ... . ..... . . E 10th St Shore Or .Shore Dr ~ . Union 12 6 800 . Union Ave :Werner Rd ,Union Ave 27 23.139 10/3/2007 At .W.>N turn 50' south of E 16th St Seabeck Highway ..,-.-- , 'Dead end E 32nd St E 16th St Fitz Dr NE Alder St National Ave 900' SE of Burchfield Dr :Lebers Ln NW 'Dead end Winfield Ave . Sheridan Rd .Sanders Ave E 30th St Halverson Ave Sayles Rd ' _.. Lewis Ave ryv intersection) NE Faster Rd NW->8end .SW Cook Rd W E of Feigley Rd W Bend in W Frontage Rd _.Chico Way. :'Ire.n.ton Ave PoindeKter Ave .. 'System MOl!). 2016 2016 1013 1113 1813 2017 1413-15 2116-17 1517 1316 1115 1814 2016 1913 1913 1913 1913 1814 1614 . 1703 1214 1426-27 1226 1226 1114 2016f2118 1420 Z:\NewBusiness\Proposal\City of Bremerton\2008 Water Main Improvements\2008 Water Main Exhibit A-I.doc r. :.1 ~ .r~ ,-. I i \J ):-. GO rn z C' I::: '0 I~ lV) I \J :t>- O r;-; If. EXHIBIT B City of Bremerton 2008 Water Main Improvements Estimate of Time and Expense Description Principal Project Manager Princi al VIII Professional I Engineering ! Engr. Geologistj Staff Scientist i Word Processor Technician "'T~'ch~jcian' iv "f .....pri~ci...~.i'\IiT...~ . P~~'fesslon'al'lij 'l"Ad'min'i'st~ati~~"i'li" Project i Staff Engineer; Engineer ':"P~ofes's'i'onai"i'i(.t mp;of~s~;o~la'i"li ..t . ............... ".......... Classification Task 1 A B C PERMITTING Permit Information Collection PreQare SEPA Checklist Shoreline Permit and Critical Areas Review A $ 8,455 ~,3s1 ~T~566 $ 22 382 .4.9.:"::.:.:,'::...::r::. 24~ 24 88 ""e ~.. 8 """il ~.. 24 .~.~.. 2 2 ....... '2 Subtotal 6 ."....~ .. 8 8 24 66 $ ----so $ ----sa $ 174 $ 7,894 $ 5,894 $ 7,206 $ 20 994 $ 561 467 360 1 388 Iication Task 2 BASE MAP PREPARATION & SUBSURFACE INVESTIGATION .." "........ . ~~~ .. ........, ,,,. -~---._--_._- A UtJllt)" Records ~ ~ ~ .....R.. .......".. . 32 ., .....~... ..~"32 , ........1...... 8 104 $ 12,032 $ - $ 683 $ 12,715 B Site Survey 4.... .... ... 16 ...... "... ;2 "16 . ... o. 8 44 -~,956 ~,825- T----ms $-92,989 C Base Ma~ Drawings J~.... 1.6. ..~?... , 8 104 -~,872 $----- 1- 1,156 -'$--13,028 ......... ....".. ....... . ,. .. ~-- $---16,848- D Subsurface Investl atian 28 80 24 $ 16,224 $ $ 624 Subtotal 4 48 32 64 80 28 80 48 384 $ 45 084 $ 87825 $ 2671 $ 135,580 Task 3 A B C D E F G H I 180 8 4 40 92 PREPARE CONSTRUCTION DRAWINGS & SPECIFICATIONS Preliminaey-A!!gnment Plan and Profile Connection Details Water Main Imf2rovement Details and Notes Pavement Restoration Details and Notes 50% In-House ReVIew 50% City ReView Cost Estimate ConstructIOn Contract & S eClfications ~ci .' 60 "20" ?O ""il 16. 8 4 4 ... ~ $ 15,824 -$ $ 1,264 $~ 17,088 " ~ ~lQ,096 $ $ 2,861) 32,957 108 $ 12,504 $ $ 1,007 $ 13,511 . .. 52 $ 5,792 $ - $ 461 $ 6,253 .... 32~,632$~T~$--4,093 " .."... ----sa $ 6,820 $ $ 328 $ 7,148 .. ... ~ $ 4,560 $ $ 759 $ -5,31g 26 $ 2,954 $ $ 303 $ 3,257- ~ $ 10,924 $ $ 911 $ 11,835 818 $ 93106 $ $ 8,355 $ 101461 ......... .~.. """".. 16 ...,,}2.. .....~4.".. . .. ..4." . ..""....1......... .. . .?9." ".?9. 6 . '20" 126 4 Subtotal 12 Task 4 FINALIZE PLANS, SPECIFICATIONS & BID DOCUMENTS . . ""....... .. .... .........., ....""..... .. ............... A In-house ReView ..."."..16 ...2.1..... .... ". 24 .............. ..... 21 ""'''24'' . .......... ........... ...".".~. .. ............ ~ $ 14,896 $ $ 1,044 ~_~,940 .............. $ 4,164 B City Review 4 .""..8 ". ;4" 1~ .......... ......... ..".,,~........ ---.lL $ $ 759 $ 4,923 C Finalize Documents 16 24 48 ..... 24 ...... ~ ~,176 $ $ 1,98? "f 18,163 D Cost Estimate ""4 4 .... 6 12" oj 30 $ 3,638 $ $ 303 $ 3,941 Subtotal 40 60 54 100 24 44 322 $ 38874 $ $ 4,092 $ 42,966 PROJECT TOTAL 1698 I $ 198,058 I $ 87,825 I $ 16,506 I $ 302,389 I 62 252 212 476 284 36 168 208 o :.0 Gi Z ):> r- I- I ;; G) m z o fp o I~ "'1J ):> G) m (J) Z \NewBu5Inass\Proposll\C!ty of Bremerlon\2008 Water Main ImlJrovlllmenl~\aRM. 2008 WIIIlI MaHllmprovlmlntl. F.. E~llmate ~I, 10/"'12007832 AM ',\/H;'~' !><' , ,< ' ... \i);,;ii2007HOURLV RATES' " ,~~~I;r:('" ' ,( ~;;~t::L :,/2If!:' " ,:C{1~~~,}t~~t! /, {\ '~;,> y RATE IX $17100 -----------------------------------------------------------------------------~ VIII $17100 ------------------------------------------------------------------------------ VII $]6400 ------------------------------------------------------------------------------ VI $152.00 .----------------------------------------------------------------------------- V $144.00 .----------------------------------------------------------------------------- IV $135.00 ------------------------------------------------------------------------------ III $125.00 ------------------------------------------------------------------------------ _!!m_mmmm__mm_____mmm_____________________m_EL~,9_~__ $106.00 ------------------------------------------------------------------------------ In-house copies (each) In-house copies (each) In-house copies (each) In-house copIes (color) (each) . . In-house copIes (color) (each) : In-house copies (color) (each) , ~~;4t~~' ' , 0", ~~ . .' 'INcHOUSE SER\GCES,%y. :;%%\. .:.ifR::~,i%ti:::(i; 81/2"X II" $007 --------------------------------------------------------------------._-------- _?_!!?::2'.._!:'.~_m_m_m_______m___________________________mJ_~,9_L 11"X IT' $0.14 ----------------------------------._------------------------------------------ 81/2"Xll" $0.85 ----------------------------------------------------------.------------------- _?J!?~~2'.._~~m__mmm_m_m_________________________mm_~_~'?_~__ _1L~_1.?:.________m_mm_m___mm_____________________m__~_~'?_~__ $100 ------------------------------------------------------------------------------ Per Hour $25.00 ------------------------------------------------------------------------------ PURCHASED SERVICES L~ <:: ' All purchased printmg, copymg, miscellaneous and subconsultant servIces are billed at cost plus 15% '::~' CHANGES IN RATES GRIGINALL PAGE NO 13 OF 15 PAGES <it0-;q:, , , ;,"\,;~~<YC{~,: ':::"'"CLASSIFI€A:fION TechnicIan Technician Technician Technician .!.Y_m__m_________m__E9_~,9_~_ .1!1____m________________E9_~,9_~_ .1!______________mm_____E~,9_~_ .!__________________________~?_?,9_~_ Administrative Administrative AdministratIve Administrative Administrative ..Y__________m____________~~2_9_~_ .!.Y_________________________~?_~,9_~_ .!!!m___________mm_____~?_~,9_~_ .!1__________mm_____m__~?_~,9_~_ .!.____________m___________~~_~_9_~_ CAD Plots .!:~!_~~____m_m_________~1_~,9_~_ CAD Plots .!::~1L?.~~~________m___m_~_~,9_~_ CAD Plots .!:!_~~_~i~~_________________~_~,9_~_ GIS System .~~!.!:!5!!lL___________mE~,9_~_ GIS Plots .~~!_~!?!__________mm___~2_9_~_ In-house Computer .~~!_!:!_'!!l!.:__________m____~2,9g_ MIleage .~~!.0-~!:_m_m______m~9,:'.?_~_ . Digital Camera .~~!_!?!~L_______________~1_~,9_~_ Digital Camera .~~!_!'{~_~~__________m__~~_~_9_~_ Digital Camera .~~!_0-?_11!~_mm________~~_~,9_~_ "Note At project completion all digital photos can be supplied to the client on CD, upon request {; cty;" ., Rates listed here are adjusted annually. The current, most recent schedule of hourly rates are used for billing purposes. Payment for work 1:-*&;';' ": accomplished shall be on the basis of hourly rates in effect at the time ofbillmg plus direct expenses and outside services as stated in this Exhibit i :<,'!v&t~' 2007-171RATES.I$ Duration Completion 2007 2008 Weeks Date Se t Oct Nov Dec an Feb March 12341234 14 2/1/2008 10 11/26/2007 12 1/25/2008 14 2/1/2008 10 3/1/2008 Exhibit 0 City of Bremerton 2008 Water Main Improvements Preliminary Project Schedule Descri twn Subsurface Investigation Prepare Construction Drawings and S ecifications Finalize Pfans, S ecifications and Bid Documents Z:INewBusinesslProposallCity of Bremerton\2008 Water Main ImprovementslBRM - 2008 Water Main Improvements - Fee Estimate.xls 10/4/2007 o :0 G) 2: ):> 1~ ""0 )> G) m z o tc '0 I~ ""0 )> G) m OJ \ PAGE NO' t;; OF)<) PAGES ORlGINAL_I_ - - ACORD~ CERTIFICATE OF LIABILITY INSURANCE I DATE (MMIDDNYVY) 9/26/2007 PRODUCER (425)898-8780 FAX: (425)836-2865 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Sammamish Insurance, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR 704 228th Ave NE, PMB 373 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Sammamish WA 98074 INSURERS AFFORDING COVERAGE NAIC# INSURED INSURER A Hartford Casualty Ins. 29424 RH2 ENGINEERING, INC. INSURER B: Con tinen tal Casual ty 12100 NE 195TH ST., STE 100 INSURER c. INSURER D BOTHELL WA 98011 INSURER E COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. I~~ ~o,,~~ TYPE OF INSURANCE POLICY NUMBER Pa'k~~~~~6gMF Pg~f:(~~gg",MN LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 2,000,000 - ~~~~~~JOE~~~J~~nce; ~ 5MMERCIAL GENERAL LIABILITY $ 300,000 A X CLAIMS MADE GJ OCCUR 52SBANM5475 8/16/2007 8/16/2008 MED EXP (Anyone person; $ 10,000 - PERSONAL & ADV INJURY $ 2,000,000 GENERAL AGGREGATE $ 4,000,000 ~'L AGGREnE LIMIT AFlES PER PRODUCTS - COM PlOP AGG $ 4,000,000 X POLICY j~c?T LOC AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT 2,000,000 - $ ANY AUTO (Ea accident) - A ALL O'ANED AUTOS 52SBANM5475 8/16/2007 8/16/2008 BODILY INJURY - $ SCHEDULED AUTOS (Per person) - ~ HIRED AUTOS BODILY INJURY $ ~ NON-O'ANED AUTOS (Per aCCident) I- PROPERTY DAMAGE $ (Per aCCident) GARAGE LIABILITY AUTO ONLY- EA ACCIDENT $ R ANY AUTO OTHER THAN EA ACC $ AUTO ONLY' AGG $ EXCESS/UMBRELLA LIABILITY EACH OCCURRENCE $ 2,000,000 ~ OCCUR D CLAIMS MADE AGGREGATE $ 2,000,000 $ A 8 DEDUCTIBLE 52SBANM5475 8/16/2007 8/16/2008 $ X RETENTION $ 10,000 $ A ~~~}(rX>~)k)6)(~ I V\CSTATU-:I 10TH- TORY LIMITS X ER EMPLOYERS' LIABILITY 1,000,000 ANY PROPRIETORIPARTNER/EXECUTIVE E.L EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? 52SBANM5475 8/16/2007 8/16/2008 E.L DISEASE - EA EMPLOYEE $ 1,000,000 If yes, descnbe under 1,000,000 SPECIAL PROVISIONS below E L DISEASE - POLICY LIMIT $ B OTHER Professional Liab AEH004312321 5/29/2007 5/29/2008 Per Claim $2,000,000 Aggregate $2,000,000 Deductible $25,000 DESCRIPTION OF OPERATIONS/LOCATIONSNEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS City of Bremerton 2008 Water Main Improvements CERTIFICATE HOLDER CANCELLATION City of Bremerton 345 6th Ave, Suite 600 Bremerton, WA 98337 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 45 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE -~--<:. ~~ --~ A Fugitt CPCU/JONA ACORD 25 (2001/08) @ACORD CORPORATION 1988 1"'I~n?J;, """/"\0\ /"\O~