B. Presentation by Phil Williams, Director of Public Works & Utilities on 1) Proposed
resolution to waive public bidding requirements; and 2) a request to award a contract for
the replacement of storm and sanitary lines from Broad to Hanford Street
2. CALL TO ORDER: 5:30 P.M. in CHAMBERS LOCATED ON FIRST FLOOR
A. Pledge of Allegiance
B. Invocation
3. PUBLIC RECOGNITION & ANNOUNCEMENTS
4. CONSENT AGENDA
A. Claims & Check Register (#AB07-242)
5. GENERAL BUSINESS
A. Resolution No. 3037, waiving public bidding requirements for the installation of storm and
sanitary lines from Broad Street to Hanford Street (#AB07-243)
B. Contract Award between MWSH, Inc. LLC and the City of Bremerton for replacement of
storm and sanitary lines from Broad Street to Hanford Street (#AB07-244)
6. ADJOURNMENT OF CITY COUNCIL BUSINESS MEETING
CITY COUNCIL STUDY SESSION
Immediately following the City Council Meeting, the Council Members will reconvene in COUNCIL CONFERENCE ROOM
603. Please note that the Study Session is open to the public but there will be no opportunities for input or
participation; that no action will be taken, and the content of these items is subject to change. ..
A. NO DISCUSSION PLANNED - The following items are budgeted items or have been reviewed by the
appropriate Council Committee; and will be placed on the next Council Meeting Agenda for action...
1. Authorization to extend Insurance Broker Services Contract - Peggy Lesser, Risk
Manager, Financial Services; and Wendy Priest, Chair of the Finance Committee
B. FULL DISCUSSION ITEMS
2. Budget Amendment for Kitsap Economic Development Alliance (KEDA) Special
Assessment - Laura Lyon, Finance Director; and Will Maupin, Council President
3. Adoption of a Resolution for entry into a Change Order to Synergy Construction for
Harborside Fountain Park, Museum & Fountain Room, and Memorial Plaza for the
Harborside Plaza Contractor/Project Manager work - Gary Sexton, Economic
Development
\
I Americans with Disabilities Act (ADA) accommodations provided upon request. Those requiring special
accommodations should contact the City Clerk's Office at (360) 473-5323 by noon on the Monday preceding the Council
meeting.
DATE SUBMIDED:
BILL # AB07-242
AGENDA BILL
CITY OF BREMERTON
CITY COUNCn.
'IA
....................................................................................8.......
SUBJECT:
Committee Meeting Date:
COUNCIL MEETING Date: October 10, 2007
Department: Financial Services
Presenter: Cathy Johnson
Phone: 473-5296
Claims & Checks Register
SUMMARY:
Consent Agenda item. Approval of payroll, checks and electronic fund transfers.
ATTACHMENTS:
FISCAL IMPACTS (Include Budgeted Amount):
APPROVALS:
DEPARTMENT DIRECTOR:
CITY ATTORNEY:
FINANCE DIRECTOR:
MAYOR:
COMMITTEE CHAIR
COUNCIL PRESIDENT:
u)y~ p'
CONSENT AGENDA X
GENERAL BUSINESS D
PUBLIC HEARING D
RECOMMENDED MOTION:
1) Check #'s 320038 through 320193 and EFT's 7404 through 7418 in the amount of $1,796,292. 11.
2) Regular Payroll for the pay period ending September 30,2007 in the amount of 699,437. 87.
COUNCIL ACTION: ~ Approve 0 Deny 0 Table
o Continue 0 No Action
DATE SUBMITTED: October 9, 2007
BILL# 07 - 243
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SA
.......................................................................m................
SUBJECT: Resolution No. 303'7
waiving the purchasing procedures to replace
certain stormwater and sewer mains
Committee Meeting Date:
COUNCIL MEETING Date:
Department:
Presenter:
Phone:
October 10, 2007
Public Works &
Utilities
Phil Williams
473-5315
SUMMARY: The City has just determined that approximately 360 feet of stormwater main located west o(
Wheaton Way between Hanford and Broad Streets is experiencing severe corrosion putting the utility at risk of
total pipe failure. Total failure of this stormwater main will atIect public health and safety. Immediate action
is necessary to repair or replace the main and related utilities. There is 360 feet of aging sewer line
immediately adjacent to the stormwater main that needs to be replaced at the same time the stormwater main is
replaced. RCW 39.04.280(1 )( c) and BMC 2.76.600(a)(3) authorize a City to waive competitive bidding "^ \III S +1
requirements in the event of an emergency affecting public health and safety. M&WH has been issued a permit
to develop property on Broad Street. The proposed resolution authorizes the City to waive normal purchasing
procedures to have the contractor doing the work for MSWII replace 360 feet of stormwater and sewer mains.
MW~\-\
ATTACHMENTS: Council Summary, Proposed Resolution
FISCAL IMPACTS (Include Budgeted Amount): Funds are budgeted and available in the storm
water and wastewater capital fund for this construction
APPROVALS: ~
DEPARTMENT DIRECTOR: '-.:;;;;~
CITY ATTORNEY:
FINANCE DIRECTOR:
MAYOR:
COMMITTEE CHAIR
COUNCIL PRESIDENT:
CONSENT AGENDA 0
GENERAL BUSINESS ~
PUBLIC HEARING 0
RECOMMENDED MOTION: Move to approve Resolution No. 30:3>'7 waiving purchasing
procedures to replace certain stonnwater and sewer mains.
/ta~~
COlJNCIL ACTION: 0 Approve 0 Deny 0 Table
o Continue 0 No Action
RESOLUTION NO. 3031
A RESOLUTION of the City Council of the City of
Bremerton, Washington waiving the public bidding requirements
and authorizing the Mayor to take the necessary steps to replace
approximately 360 feet of stormwater main located west of
Wheaton Way between Hanford and Broad Streets ("Wheaton
Way Stormwater Main") and approximately 360 feet of the sewer
main located adjacent to the Wheaton Way Stormwater Main as
provided in RCW 39.04.280(1)(c) and BMC 2.76.600(a)(3).
WHEREAS, the Wheaton Way Stormwater Main is a critical and necessary
element of the City's stormwater conveyance system; and
WHER?AS, the City has a utility easement contammg the Wheaton Way
Stormwater Main that runs through property currently under development; and
WHEREAS, the City has just determined that approximately 360 feet of the
Wheaton Way Stormwater Main is experiencing severe corrosion putting the utility at risk of
total pipe failure; and
WHEREAS, the development occurring over the easement will add an additional
seven (7) feet of material over the Wheaton Way Stormwater Main further stressing the system;
and
WHEREAS, total failure of the Wheaton Way Stormwater Main is likely to and
will affect public health and safety unless immediate action to cause the permanent repair or
replacement of the main and related utilities is taken; and
WHEREAS, there is 360 feet of aging sewer line immediately adjacent to the
stormwater main that needs to be replaced at the same time the stormwater main is replaced; and
WHEREAS, RCW 39.04.280(1)(c) specifically authorizes a municipality to
waive competitive bidding requirements for purchases in the event of an emergency; and
WHEREAS, BMC 2.76.600(a)(3) provides the City is not required to seek
competItIve bids when the City contracts for materials, goods and equipment in order to
effectively respond to emergencies affecting public health and safety; NOW THEREFORE
THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES
HEREBY RESOLVE AS FOLLOWS:
SECTION 1. That an emergency condition exists due to unforeseen
circumstances beyond the control of the City that presents a real, immediate threat to the proper
1
Wheaton Way Storm water Main
performance of the essential function of the City's sewer system and related utilities and will
likely result in material loss or damage to property and the environment.
SECTION 2. That the Mayor is hereby authorized to cause the immediate,
permanent repair or replacement of approximately 360 feet of the Wheaton Way Stormwater
Main and approximately 360 feet of the sewer main immediately adjacent to the Wheaton Way
Stormwater Main and related utilities in accordance with the provisions ofRCW 39.04.280(1)(c)
and BMC 2.76.600(a)(3).
SECTION 3. Competitive bidding requirements are hereby waived and are not
required for securing contracts for materials, goods, equipment and services necessary to respond
to the emergency referenced in this resolution.
SECTION 4. The Mayor is hereby authorized to award all necessary contracts
on behalf of the City in order to effectively respond to this declared emergency.
SECTION 5. Severability. If anyone or more sections, subsections, or
sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not
affect the validity of the remaining portion of this Resolution and the same shall remain in full
force and effect.
SECTION 6. Effective Date. This Resolution shall take effect and be in force
immediately upon its passage.
PASSED by the City Council of the City of Bremerton, Washington this _ day of October,
2007.
WILL MAUPIN, Council President
APPROVED AS TO FORM:
ATTEST:
ROGER A. LUBOVICH, City Attorney
CAROL ETGEN, City Clerk
R:\Legal\Legal\Resolutions\Public Works\Wheaton Way Sewer Main Emergency Resolution.doc
2
Wheaton Way Storm water Main
DA TE SUBMITTED: October 9,2007
BILL # 0-7 - :~ Lft-f
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
56
........................................................................................
SUBJECT: Agreement with ~fSWti M W 5 \-\
Bremerton, LLC for construction of a
sanitary sewer and storm sewer.
Committee Meeting Date: October 9, 2007
COUNCIL MEETING Date: October 10, 2007
Department: PW&U
Presenter: Phil Williams
Phone: 473-5315
SUMMARY: This agreement is for the replacement of a 12" diameter sanitary sewer and a 42"
diameter storm sewer. These pipes extend from Broad Street to Hanford Street, west of Wheaton
Way.
ATTACHMENTS: 1. Council Summary; 2. Scope of Work; 3. Agreement; and 4. Exhibit.
FISCAL IMP ACTS (Include Budgeted Amount): The cost for the sanitary sewer is $39,250.00.
Funds are budgeted at $39,500.00 and available in the Wastewater capital project 2007 Substandard
Sewer Main Replacement (BARS #594.3535-56310-5052). The cost for storm water is $72,817.00.
The developer will pay the initial cost of the storm water system construction. The City will be
crediting the developer for $32,817.00 when they pay their general facility charge for storm water.
The developer will be directly obligated for the additional $40,000.00.
APPROVALS:
DEPARTMENT DIRECTO
CITY ATTORNEY:
FINANCE DIRECTOR:
MA YOR:
COMMITTEE CHAIR
COUNCIL PRESIDENT:
.... // ;>- ~~
~, L- ~_../-._____
../t~2-/ .
L7t ,Ii
_ CONSENT AGENDA D
GENERAL BUSINESS [gJ
PUBLIC HEARING D
M.WS 14
RECOMMENDED MOTION: Move to approve the agreement with ~4S.WB Bremerton, LLC and
authorize the Mayor to finalize and execute the necessary contract documents for the agreement in
substantially the same terms and conditions as presented.
COUNCIL ACTION: D Approve D Deny D Table
D Continue D No Action
AGREEMENT WITH MWSH BREMERTON, LLC
COUNCIL SUMMARY
SUMMARY
MWSH Bremerton, LLC is constructing assisted living facilities on Broad Street west of
Wheaton Way. There is an existing storm sewer and sanitary sewer pipe running north
and south through the development from Broad Street to Hanford Street. These two
pipes are quite old and have experienced significant deterioration. The 42" Corrugated
Metal Pipe has corroded completely through and this creates a risk of complete
structural failure of the pipe under load. The project will be further stressing this
damaged pipe by adding an additional 7 feet of cover material over the top off the pipe.
This creates an immediate need to replace the storm water pipe. The sewer line also
has a defect in its profile which requires us to perform frequent maintenance on the line
to keep it functional. This sewer line is located in close proximity to the storm line (< 5'
at several points). It would be nearly impossible to replace the sewer line later without
risking damage to a new storm line or to replace the storm line now without risking
damage to the adjacent sewer line. Prudence dictates both be replaced at the same
time during this emergent situation.
In addition, doing this project now will allow the private developer to remain on-schedule
with their project and reduce the City's cost to accomplish this work after the surface
area is developed.
FINANCIAL SUMMARY
Each year in the capital budget there are monies for replacement of substandard mains.
The cost for the sanitary sewer is $39,250.00. Funds are budgeted at $39,500.00 and
available in the 2007 Substandard Sewer Main Replacement (BARS #594.3535-56310-
5052). The cost for storm water is $72,817.00. The developer will pay the initial cost of
the storm water system construction. The City will be crediting the developer for
$32,817.00 when they pay their general facility charges for storm water. The developer
will be directly obligated for the additional $40,000.
City of Bremerton
Agreement with MSWH Bremerton, LLC
October 2007
PUBLIC UTILITIES CONSTRUCTION AGREEMENT
TIllS IS A CONTRACT between the City of Bremerton, a first class municipal
corporation of the State of Washington ("City") and M8WH Bremerton LLC ("Owner"), and
RV Associates, Inc. Owner's contractor ("Contractor"). It is effective on the date executed by
all the parties. M W 5 H
Back2xound
A. Owner is the owner of approximately twelve (12) acres of property located west of
Wheaton Way, between Hanford and Broad Streets. Owner is making improvements to that real
property. Incidental to those improvements, Owner has agreed to make utility improvements
pursuant to the Scope of Work, attached as Exhibit A.
B. Owner has selected Contractor to construct the Project.
C. Owner shall remain responsible and liable to the City for all aspects of the performance of
this agreement including the concurrent responsibility and liability for the Conti'actor's performance
under this agreement.
Terms
1. DESCRIPTION OF THE PROJECT: The Owner, at its own expense, has retained a
licensed Professional Engineer registered in the State of Washington ("Design Engineer") who has
designed the Project as outlined in the approved plans and specifications attached ("Plans").
The Contractor will physically construct the project providing all performance of work,
including all labor, materials, transportation, equipment, supplies, and services necessary for and
reasonably incidental to the completion of all work as set out in the Plans.
2. FEES AND COMPENSATION:
A. The Owner agrees to pay in advance the following expenses associated with the
project:
. Seventy Two Thousand Eight Hundred Seventeen Dollars ($72,817.00) to
replace the storm-water conveyance system pursuant to the attached plans.
. Thirty Nine Thousand Two Hundred Fifty Dollars ($39,250.00) to replace
the on-site sanitary sewer conveyance system pursuant to the attached plans.
B. Upon approved completion and final acceptance of the project in accordance with
the terms of this agreement, the City shall reimburse the Owner Thirty Nine
Thousand Two Hundred Fifty Dollars ($39,250.00) plus any additional costs as
agreed to pursuant to Section 10(D) of this agreement for costs related to the
sanitary sewer replacement. Such payment shall be made in full within Thirty (30)
days of final acceptance.
C. Upon approved completion and final acceptance of the project in accordance with
the terms of this agreement, the City agrees to credit to the Owner's future Storm-
Bremerton/Contractor
Public Utilities Construction Agreement
Page 1 of7
water General Facility Charges an amount not to exceed Thirty Two Thousand
Eight Hundred Seventeen Dollars ($32,817.00) for costs related to the storm-water
replacement.
D. The Contractor shall be responsible for obtaining and paying for necessary permits
from other governmental agencies and shall be responsible for any additional costs
for inspection billed to the City by any government agency, including but not limited
to the City ofBremerton, Kitsap County, or the State of Washington.
E. The Owner shall pay all costs associated with easement acquisition, if any, and
insuring title to the properties.
F. The Contractor shall post with the City Treasurer a Performance Bond prior to
construction and a Warranty Bond upon completion of the work. The bonds shall be
posted in the amounts as follows:
Performance Bond
(1) One hundred percent (100%) of the Design Engineer's estimated cost of
construction, as approved by the City, for all work.
Warranty Bond
(1) Twenty percent (20%) of the actual cost of construction.
G. The bonds shall provide the following:
(1) The Contractor shall complete the project in accordance with good and
accepted engineering and construction practice.
(2) The Contractor shall comply with all the terms of this agreement.
(3) The Contractor shall fully comply with all requirements of law in carrying
out the project, and shall comply with all lawful requirements imposed by
any agency with jurisdiction relating to the project.
(4) The Warranty Bond shall be effective for two years after completion of
construction unless affirmatively released sooner by the City, and shall
guarantee the completed projects against defects in workmanship and
materials.
(5) The bond must be approved by the City's Risk Manager and may include
one or more surety bonds issued by any surety company that is licensed to do
business in the State of Washington and meets the City's Risk Managers
rating criteria. The Surety bond may be substituted by a cash deposit in the
full-required amount deposited with the City Treasurer or an irrevocable and
unrestricted assignment of funds on deposit in a licensed bank or credit
union, in the full-required amount.
H. Contractor shall possess a current Bremerton Business License and regulatory licenses
required to fulfill Contractor's obligations under this contract. As an independent
contractor, Contractor is responsible for payment of all taxes and licensing fees
necessary to perform its obligations under this Agreement. These taxes and fees
include but are not limited to State industrial insurance, B&O, and City business
Bremerton/Contractor
Public Utilities Construction Agreement
Page 2 of7
licensing. If any taxes or fees due the City have been declared delinquent, Contractor,
by this agreement, assigns any payments due under this contract to the City Clerk for
payment of such taxes The City may also withhold the delinquent amount, plus any
additional charges arising from the delinquency, from any payments due Contractor.
3. REPRESENTATIVES: The Owner and Contractor hereby name the following
persons as the representative of the Owner and Contractor for all purposes required by this
agreement:
Owner
Name:
Phone:
Address:
Email:
fax:
Contractor
Name:
Phone:
Address:
Email:
fax:
The Owner and Contractor warrant that their representatives have full authority to bind the
them in all respects required by this agreement, and all applicable government requirements
imposed by any agency with jurisdiction. The City hereby designates Paul Wandling of its
Department of Public Works and Utilities as its Project Manager and warrants that the Project
Manager has full authority to exercise such discretion as does the Director of Public Works and
Utilities under the ordinance of the City for purpose of carrying out the terms ofthis agreement.
Notices shall be in writing and delivered by personal service or first class mail to the
above addresses for the Contractor and Owner, and for the City they shall be delivered to:
City Address
City of Bremerton
ATTN: Paul Wandling
3027 Olympus Dr.
Bremerton W A. 98310
Tel: 360-473-2351
4. PROJECT DESIGN: The Owner, at its own expense, will retain a Design Engineer
who shall design the project, prepare the necessary plans, and provide construction engineering to
the extent reasonably necessary.
The Owner shall use the following up to date standards for drafting, design and construction
ofthe project. Deviation from City standards will not be accepted.
. Standard plans and specification provided by the City.
. Bremerton Utilities Development and Construction Standards.
. Washington State Department of Ecology's Stormwater Management Manual for
the Puget Sound Basin.
. American Waterworks Association Standards.
. Washington State Department of Transportation's Standard Specifications for Road,
Bridge, and Municipal Construction.
Bremerton/Contractor
Public Utilities Construction Agreement
Page 3 of7
5. PUBLIC WORKS PROJECT PERMIT: The City's Project Manager will review the
project design, plans, and specifications, and when satisfied the work is in accordance with City
standards, shall approve the plans by stamping and signing four (4) copies of the plan sheets. The
City reserves the right to require modification ofthe plans at the Contractor's expense in the event
of errors or mistakes in the drawings, or if new information becomes available which requires a
change in the plans to properly accomplish the project. Plan changes initiated by the Contractor
must be approved in writing by the City's Project Manager prior to commencement or alteration of
the work. Proposed plan changes shall be accompanied by an estimate of value.
The City will issue a Public Works Project Permit upon completion of the following:
. Construction Plans and Specifications have been approved by the City's Project
Manager.
. Deposit of advance cash deposits as stated in this agreement with the City Treasurer.
. Approved bonds posted with the City Clerk.
. Proof of insurance approved by the Risk Manager.
. A copy of the City or County right-of-way permit submitted to the Utility.
6. INSURANCE AND INDEMNITY: The Contractor shall provide liability and property
damage insurance covering all work under this agreement for construction within the public right-
of-way, including all work provided by Sub-Contractors. Said insurance shall name the City of
Bremerton as additional insured and provide the following limits:
- Bodily injury, $2,000,000.00 each person;
- $2,000,000.00 each accident;
- Property damage, $500,000.00
Evidence of such insurance shall be provided to the City's Risk Manager prior to issuance
of the Public Works Project Permit. Insurer shall provide the City's Risk Manager with 30 days'
written notice of any cancellation or change of coverage of the policy.
Contractor agrees to defend, indemnify, and hold harmless the City and its officials and
employees from and against all liability, loss, damages, and expenses, including costs and
attorneys' fees, resulting in whole or in part from actions, claims, and lawsuits arising or alleged
to have arisen, in whole or in part, out of or in consequence of the acts or failures to act of
Contractor, its employees, its subcontractors, its agents, or its assigns in the performance of this
Agreement. The City and Contractor have specifically negotiated Contractor's waiver of its
immunity under Title 51 RCW, which is hereby waived for purposes of Contractor's
indemnification and hold harmless of the City, including the duty to defend. This provision shall
be inapplicable to the extent such action, claim, or lawsuit is judicially found to arise solely from
the acts or failures to act of the City. The provisions of this section shall survive the
termination or expiration of this agreement.
7. PROSECUTION OF WORK:
A. Construction of the project shall be initiated by the Contractor within one (1) year of
execution of this agreement or within 30 days of issuance of the Project Permit,
Bremerton/Contractor
Public Utilities Construction Agreement
Page 4 on
whichever shall sooner occur. Failure to begin work within the one-year limit shall
result in forfeiture of all rights under the agreement regardless of any other
provisions ofthis agreement.
B. The Contractor agrees to continuously pursue work and complete the project within
six (6) months of permit issuance.
8. ADDITIONAL CONSTRUCTION WORK REQUIREMENTS: The Contractor in
addition to other duties included in this agreement shall comply with the following:
A. Schedule system connections with the Project Manager and meet all requirements
for the connection and testing of their improvements in the presence of the City's
authorized representative. Major system connections to the City's system shall not
be authorized on Fridays. Subsequent operation of system valves must be performed
by City personnel.
B. No work shall be performed by the Contractor other than Monday through Friday
between 7:30 a.m. and 6:00 p.m., exclusive of City holidays, except with written
prior consent of the City' Project Manager. If consent is given by the City's Project
Manager for work on Saturday, Sunday or holidays or before or after the normal
working hours above, the Contractor shall pay to the City the reasonable cost of
furnishing the required inspection and supervision during said periods.
C. Remove and correct at the expense of the Contractor any improvements not
authorized or constructed in compliance with the Utilities Development and
Construction Standards.
D. Restore all public and private property disrupted by the installation of the project to
its original condition upon completion. The entire job site will be maintained in a
neat and workman like appearance. The Contractor will provide landscape
restoration including sodding, seeding or barking as may be required by the City's
Project Manager, if applicable. Landscape restoration shall follow installation of the
various segments ofthe project as closely as is practicable. When, in the opinion of
the City's Project Manager, landscape restoration has fallen behind installation of the
segments of the project, the Project Manager may halt all construction work until
restoration catches up.
E. Notify the City when the project is ready for final inspection and approval by the
Utility.
9. INSPECTIONS AND FINAL ACCEPTANCE:
A. The City will provide periodic inspection during construction to ensure that the
work complies with plans and City Utilities and Construction Standards. Inspections
by the City shall not relieve the Contractor of its responsibility to construct the
Bremerton/Contractor
Public Utilities Construction Agreement
Page 5 of7
project in full accord with the standards ofthe City. Nor shall inspection be deemed
to be supervision of the project, methods or means of performance, compliance with
construction site safety requirements, or the Contractor's employees.
B. All easements necessary for the project have been obtained in the name ofthe City,
accepted by the Project Manager, and recorded with the County Auditor.
C. Within thirty (30) days of final inspection, furnish a complete set of Mylar "Asbuilt"
drawings of the project improvements that have been prepared and stamped by the
Design Engineer and a complete set of electronic Asbuilt drawings, in Autocad@
2000i.
10. GENERAL CONDITIONS:
A. Reports and Information: When requested by the City, Contractor shall furnish
periodic reports and documents on matters covered by this Agreement. The
reports and documents shall be furnished in the time and form requested.
Contractor shall maintain accounting records in accordance with Generally
Accepted Accounting Principles (GAAP) to substantiate all billed amounts.
B. Entire Agreement: This Agreement and its Exhibits constitute the entire agreement
between the Parties, and the Parties acknowledge that there are no other agreements,
written or oral, that have not been set forth in the text of this Agreement. The section
headings and article titles of this Agreement shall have no effect upon the construction or
interpretation of any part hereof.
C. Severability: Should any part of this Agreement be found void, the balance of the
Agreement shall remain in full force and effect.
D. Modification: This Agreement may only be modified by written instrument signed
by both Parties.
E. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a
waiver of that provision. Waiver of any right or power arising out of this
Agreement shall not be deemed waiver of any other right or power.
F. Compliance with Laws: Contractor shall comply with all applicable Federal,
State, and local laws in performing its obligations under this Agreement.
G. Choice of Law and Venue: This Agreement shall be interpreted according to the
laws of the State of Washington. Any judicial action to resolve disputes arising
out of this Agreement shall be brought in Kitsap County Superior Court.
11. NON-COMPLIANCE/TERMINATION: Failure to comply with the terms ofthis
agreement within 60 days following written notice by the Project Manager shall automatically result
Bremerton/Contractor
Public Utilities Construction Agreement
Page 6 of7
in the termination of service and forfeiture of bonds and shall not relieve the Owner or Contractor
of the duty to comply with all the terms of this agreement, paying all sums due.
12. SUCCESSORS AND ASSIGNS: The City, Owner and Contractor each agree to be
bound to the other party in respect to all covenants, agreements, and obligations contained in this
contract. Neither party shall assign the contract in part or as a whole, without the written consent
of the other.
IN WITNESS WHEREOF the parties hereto have executed this Contract the date and
year indicated.
Owner
Date
Contractor
Date
CITY OF BREMERTON
Cary Bozeman, Mayor
Date
Departmental Approval
Phil Williams
Director of Public Works and Utilities
Approved as to form:
Roger Lubovich, Attorney
Received for Filing:
Carol Etgen, City Clerk
R:\Legal\Legal\Contracts\PUBLIC WORKS\Wheaton Way Stormwater Main.doc
Bremerton/Contractor
Public Utilities Construction Agreement
Page 7 of7
SCOPE OF WORK
. Remove and dispose of 360 lineal feet of 42-inch CMP.
. Install 360 lineal feet of 42-inch N-12 storm drainage pipe.
. Remove existing structure at the north end.
. Install two (2) 72-inch storm drainage manholes at the northerly and southerly limits of
the new 42-inch N-12.
. Remove and dispose of 360 lineal feet of 12-inch sewer pipe.
. Install 360 lineal feet of 12-inch SDR 18 class 150 C-900 sewer pipe.
. Perform and provide all labor, materials, and equipment necessary for pump and by-pass
operations.
. Perform all work in accordance with City of Bremerton standards and requirements of the
most current "STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND
MUNICIPAL CONSTRUCTION" prepared by the Washington State Chapter of
American Public Works Association (APW A), and Washington State Department of
Transportation, including all revisions and supplements.
. Perform all work associated with and necessary for the replacement of the existing storm
drainage pipe and sanitary sewer pipe as referenced above, including all labor, materials,
transportation, equipment, and services necessary for and reasonably incidental to the
completion of the work.