HomeMy WebLinkAbout4651 Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments: 4651 STAN PALMER CONSTRUCTION INC Sewage Pump Station CW-1 Upgrade Engineering LEG 12-1 09/06/2007 02/27/2009 02/15/2011 01/01/2011 Change Order #1-9/07 , _.__., .._~_~ __"'_ __m.. ._ ..m...'...>....'........:. . . : I .' 1! :_ :: > t? ~. ~.: " f . . . . . . . . , ,', '. . . '. -. , ) " "~ " " ..'\'t ."'~,!_,_." '" \ ?>~};~ '~~:~'--~/~~~ <~:~:-,~~: Public Works and Utilities Department - Administration 100 Oyster Bay Avenue N . Bremerton, WA 983.12 . (360) 473-2327 . FAX (360) 473-5018 February 27,2009 Travelers Casualty and Surety Company of America c/o Stan Palmer Construction, Inc. 5107 St Hwy 3 SW Port Orchard, W A 98367 R;E: Release of Retainage Bond # 104973123 Sewage Pump Station CW -1 Upgrade Dear Travelers Casualty and Surety Company of America, Stan Palmer Construction, Inc. has completed all work required under contract for the Sewage Pump Station CW -1 Upgrade. Please release the retainage bond at YOuT earliest convenience. Thank you for your prompt attention to this matter. Sincerely, A4H V~ Mildred H. Vellegas, CPA PW & U Financial Manager cc: Stan Palmer Construction, Inc. ;:Clty 'Clerk Contract file Bill Davis, Project Manager Bond No. 104973123 COPy RELEASE OF RET AINAGE BOND OF CONTRACTOR KNOW ALL MEN BY THESE PRESENTS: That we Stan Palmer Construction, Inc. (hereinafter called Principal), and Travelers Casualty and Surety Company of America a corporation organized and doing business under and by virtue of the laws of the state of Connecticut, and duly licensed for the purpose of making, guaranteeing or becoming sole surety upon bonds or undertakings required and authorized by the State of Washington, (hereinafter called Surety), as Surety, are held firmly bound unto City ofBremerton, (hereinafter called Obligee) in the just and full sum of SIXTY-TWO THOUSAND NINE HUNDRED EIGHTY- THREE AND 39/100THS ($62,983.39) plus 5% of any increases in the contract amount that have occurred or may occur, due to change orders, increases in the quantities of the addition of any new item of work THE CONDITIONS OF THIS OBIGATION ARE SUCH THAT, Whereas, the said Principal on the day of , , entered into a written contract with the said oblige for Sewage Pump Station CW-l Upgrade which said contract is hereby referred to and made a part hereof by reference. WHEREAS, Pursuant to Chapter 60.28 RCW, the above named Principal has requested release of retained percentage earned or which may be earned under said contract, and, WHEREAS, the oblige is willing to release retained percentage in advance of contract terms relating to payment provided the principal shall file bond to indemnify the oblige for all loss, cost or damages which the oblige may sustain by reason of payment of retainage to the principal, which bond shall be subject to all claims and liens in the same manner and same priority as apply to the retainage percentage released, or to be released, NOW, THEREFORE, the condition of this obligation is such that ifthe principal s.hall indemnify the obligee for all loss, cost or damages which the oblige may sustain by reason of payment of retained percentage to the principal then this obligation shall be null and void unless otherwise to remain in full force and effect. IN WITNESS WHEREOF, said principal and said Surety have caused these presents to be duly signed and sealed this 14th day of September, 2007. 'S" - '0~e. ~r ~>el ~ ......""\ By: ( aSlilllty a.'1d Surety Company of America '~~ Lisa Kerstetter "- Attorney-in-Fact venry worKers' l...,omprremmrmstatuS - tmplOyer uaouny I...,emucare nrrps:IIIOnress. wa.gov/lillfCrpSII f\ccunrornnLaspXf f\CCOllllUQ=.j l5.1~j... Washington State Department of Labor and Industries Employer Liability Certificate Department ofLahor and Industries Employer Liability Certificate Date: 02/11/2009 UBI #: 600 336 626 Legal Business Name: STAN PALMER CONSTRUCTION INC Account #: 383.931-00 'Doing Business As' Name: STAN PALMER CONST INC Estimated Workers Reported: Quarter 4 of Year 2008 "51 to 75 Workers" (See Description Below) Workers' Comp Premium Status: Account is current. Firm has voluntarily reported and paid their premiums. Licensed Contractor? Yes License: STANPC*202NF Expire Date: 8/17/2010 Account Representative: T7 / ROBERT SCRIBNER (360)902-4679 - Email: SCRR235@lni.wa.gov What does "Estimated Workers Reported" mean? Estimated workers reported represents the number of full time position requiring at least 480 hours of work per calendar quarter. A single 480 hour position may be filled by one person, or several part time workers. Industrial Insurance Information Employers report and pay premiums each quarter based on hours of employee work already perfomled, and are liable for premiums found later to be due. Industrial insurance accounts have no policy periods, cancellation dates, limitations of coverage or waiver of subrogation (See RCW 5] .12.050 and 51.16.190). 10ft 2/11120094:08 PM '::-Employment Security Department """"'b- WASlilNGTON STATE P.O, 80< 90~16 · OlympiCl VV/>,98507.9046 CONTRACTOR: STAN PALMER CONST INC 5107 STATE HWY 3 SW PORT ORCHARD, W A 98367 CERTIFICATE OF ) PAYMENT OF CONTRIBUTIONS ) PENALTIES AND INTEREST ON ) PUBLIC WORKS CONTRACT ES Reference No. 4611 02-00 1 TO: CITY OF BREMERTON 3027 OLYMPUS DR BREMERTON, WA 98310 The Employment Security Department hereby certifies those contributions, penalties 'and interest due from the above named contractor under the Employment Security Act have been paid in full or provided for with respect to the following public works contract: 4651 The Employment Security Department hereby certifies that it has no claim pursuant to RCW 50.24.130 against the public body named above for tax attributable to service performed for said public body by the above named contractor on the above described contract. The Employment Security Department releases its lien on the reta.ined percentage, which is provided by RCW 60.28.040 for contributions, penalties and interest due from said contractor. This certificate does not release said contractor from liability for additional contributions, penalties and interest which may be later determined to be due with respect to the above mentioned contract. Dated at Olympia, Washington on December 11,2008. Original-Disbursing Officer Duplicate--Employer TripIicate--Central Office Files EMS 8449 760 R3-98 <' ..;.:})~I,.I" .r" AFFIDAVIT OF PUBLICATION Account # 15554 Ad # 241661 STATE OF WASHINGTON COUNTY OF IUTSAP I, Laura Wessels, being first duly swom on oath, deposes and says: That she is now, and at all times embraced in the publication herein mentioned was the principal clerk of the printers and publishers of KITSAP SUN; that said newspaper has been approved as a legal newspaper by order of the Superior Court of the County of Kitsap, in which County it is published and is now and has been for more than six months prior to the dale of the publication hereinafter referred to, published in the English language continually as a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kilsap County, Washington and is now and during all of said time, was printed in an office maintained in the aforesaid place of publication of said newspaper; that the following is a true text of a legal advertisement as it was published in regular issues (and not in supplement f0n11) of said newspaper on the loll owing date, to wit: November 20, 2008 and that such newspaper was regularly distributed to its subscribers during all of said period. That the full amount oftlle lee charged for the loregoing publication is the sum of $53.50. The amount has been paid in full. ~ A-, (UlJMi1lf:/ (Signature of Principal Clerk) Subscribed and swom to belore me this day of February 18,2009. .. ~/ /~. . -6~~ Notary Public in and for the State of Washington, Kitsap'County. NOTICE OF COMPLETION Notice of Completion has been issued by the City of Bremerton to Stan Palmer Construction, Inc. for the contract Sewage Pump Station CW -1 Upgrade. Any parties having a claim for material, labor or damages related to this Contract have forty-f1ve (45) days from the date of first publication of this notice to file a claim. Carol Etgen City Clerk 345 6th Street Bremerton, Washington 98337 November 20, 2008..................AD #20079894 ACCEPTANCE OF COMPESSA nON & RELEASE OF ALL CLAIMS Sewage Pump Station CW-I Upgrade Project Number 591 - Contract Number 4651 Stan Palmer Construction hereby indicates agreement with. and acceptance 01: the final Contract Payment of $91,067.79, the total Contract Price ofSt,210,018.27, which includes Washington State sales and/or use taxes, and the final Contract Time of 275 days, as full.and final compensation for all Work performed in connection with Contract Number 4651, and does hereby release the City of Bremerton from all claims, liability, demands, damages and actions of any kind whatsoever, arising from performance of that Contract. St..l'~." By: 7 Title: -f?.o /u..+ nL ~ y Date: '1/6 ~/o~ I I Certificate of Notarv Subscribed and sworn to before me this L\+h day of $e.pkrn}er, 20..Q&. :\\\\'UlfIll1lt Q _ _ I\....f\ 0 ~ ~,'\ S.~.?-~~ '",~ y.QJJ...~'r\ . I J J - 1-QJL. ~ ,'~ow.wes:''!i Jt\~ () ;:: .':-1.'" IO'.-y~ S*.....~ NO]: ~~.-P~ .:: : -.. 4/} "O:tn:: =~: ~o ~:o: = - -.. .,,0 6.. m. - :::~l. 7........ ~ CtJ. = _-.' v,'!.. .... ~ ((\..t'7, ... Ie . ..oJ..::: ~ (')_.....?~ .. -r~ ~"'^" '.,/"<':110 ..- ~ ~ ~0/~SHiNG\~\\"~ 1//111111\\\\\\ Vendor Subject Department Status Code Amount Begin Date End Date Review Date Insurance Comments Contract Number 4651 STAN PALMER CONSTRUCTION INC Sewage Pump Station CW-1 Upgrade Engineering CON File Class LEG 12-1 $1269534.00 09/06/2007 05/31/2008 05/01/2008 GL AL E&O $2000000.00 $1000000.00 $ Insurance Total Insurance Review Date $3000000.00 07/01/2008 Change Order #1-9/07 CITY OF BREMERTON CHANGE ORDER CONTRACT CHANGE ORDER NO: 1 -----~.._. PROJECT NAME: Sewage Pump Station CW.1 Upgrade PROJECT NO: 591 CONTRACTOR: Stan Palmer Construction ORIGINAL CONTRACT AMOUNT: PREVIOUSLY APPROVED CHANGES: $1.269,534.00 DAYS: $0 DAYS: 240 o THIS CHANGE: ( $QL_g~:r~-.:_. $1.269,534.00 DAYS: o REVISED CONTRACT AMOUNT: 24D This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below includes any applicable taxes. DESCRIPTION OF CHANGES INCREASE IN CONTRACT AMOUNT (S) (DECREASE) IN CONTRACT AMOUNT ($) CONTRACT TIME EXTENSION (DAYS:) R ~ ..- ..- (ll Ql ::5 '5 0:: 0:: iC---j-:sectionO'1320 is deleied and repiaced wilh the following new Section 01320. \ \ 1 1 I I I I I I I ~_.J.___.___ NET.CfiANGE IN CONTRACT AMOUNT INCREASE OR (DECREASE) $0 (SO) o 1 i _~~-.=l ~-~~- $0 Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office overhead. or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for past performance. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and aU supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed. if any. for completion of the entire work due to said Change Order. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. CONTRACT CHANGE ORDER NO: 1. PROJECT NAME: SEWAGE PUMP STATION CW~1 UPGRADE The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. . i;[/ I!f:;Zi., PROJECT ENGINEE~ \... RECOMMENDED: ~ c: ~ CITY ENGINEER I DIRECTOR OF PUBLIC WORKS RECOMMENDED: (J'~. ] If'. _ VJC~/{t/) ACCEPTED: APPROVED: ATTEST: ~f!f?'7 Date <"1/1' j /C. -/.-7' /, L.'(:' () 'Date rdfo7 ~1tr:r~~' ~~ r Pngc 2 01'2 TEMPORARY BYPASS PUMPING REQUIREMENTS (Revised via Change Order #1) SECTION 01320 PART 1 . GENERAL 1.1 SCOPE A. The City's responsibilities and scope of work for the temporary bypass pumping operation include: a. Equipment rental, installation, operation, maintenance, layout, and demobilization of the bypass pumping system. b. Responsibility for any CSO events that occur at the site due to a rain event that exceeds the capacity of the pumping system. c. Coordinating directly with the pump vendor for all matters pertaining to the installation, operation and maintenance of the system. d. Ensuring the diesel pump is supplied with fuel. e. Make any connections between the pump telemetry system and the main control panel to ensure alarm communication between the pump station and the WWTP. f. Coordinate with the Contractor as needed to setup the bypass pumps. g. Apply for and coordinate installation of the temporary power (480V) to operate the system. B. The Contractor's responsibilities for the temporary bypass pumping include: a. Notify the City of any problems observed with the system immediately upon discovery of any problems. b. Allow the City unhindered access to the system as needed for operation and maintenance. c. Meet with the City and pump supplier to coordinate installation. d. Maintain power to the main control panel at all times except when working inside the panel to make connections. Panel outages shall be coordinated with the City. e. Schedule outside work appropriately that may be affected by the location of the bypass pumps and discharge piping. 1.2 SCHEDULE OF IMPLEMENTATION A. The bypass pumping system shall be installed no earlier than January 7, 2008. The Contractor shall schedule work to minimize the amount of time the pumping system is mobilized on the site. B. The Contractor shall notify the City at least 21 days in advance of when the system needs to be on-line so the City and pump supplier can install the system without delaying the Contractor's work. C. Upon completion of startup activities by the Contractor, the City shall demobilize the system so the Contractor can complete remaining outside activities, including fencing and landscaping. SEWAGE PUMP STATION eW-1 UPGRADE SEPTEMBER 2007 - REVISED VIA e.o. #1 TEMPORARY BYPASS PUMPING REQUIREMENTS 01320-1 1.2 SYSTEM LAYOUT AND CONFIGURATION A. The pumps shall be located on skids approximately where located on Sheet C1 to minimize interference with the Contractor's outside work. The location shall be coordinated between the City and Contractor at a scheduled meeting. B. The pump discharge piping shall be routed around the back of the building and along the east side of the building. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) END OF SECTION SEWAGE PUMP STATION CW-1 UPGRADE SEPTEMBER 2007 - REVISED VIA C.O. #1 TEMPORARY BYPASS PUMPING REQUIREMENTS 01320-2 I I I I I I I I I I I I I I I I I I I AGREEMENT SECTION 00500 THIS AGREEMENT is dated the 6 t h day of SEPTEHBER by and between City of Bremerton (hereinafter called OWNER) and STAN PALHER CONSTRUCTION, INC. (hereinafter called CONTRACTOR). in the year 2007 OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK. CONTRACTOR shall complete the WORK as specified or indicated in the OWNER's Contract Documents entitled Sewage Pump Station CW-1 Upgrade. ARTICLE 2. CONTRACT TIMES. Substantial Completion for the WORK must be achieved not later than 240 calendar days from the date of Notice to Proceed. Final Completion and Acceptance of the Work must be achieved not later than 30 calendar days after Substantial Completion. ARTICLE 3. LIQUIDATED DAMAGES. OWNER and the CONTRACTOR recognize that time is of the essence of this Agreement and that the OWNER will suffer financial loss if the WORK is not completed within the time specified in Article 2 herein, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions and Supplementary Conditions. They also recognize the delays, expense, and difficulties involved in proving in a legal proceeding the actual loss suffered by the OWNER if the WORK is not completed on time. Accordingly, instead of requiring any such proof, the OWNER and the CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) the CONTRACTOR shall pay the OWNER $500 for each day that expires after the time specified in Article 2 herein for Substantial Completion of the WORK and all fines levied against the City. ARTICLE 4. CONTRACT PRICE. OWNER shall pay CONTRACTOR for completion of the WORK in accordance with the Contract Documents in current funds the amount set forth in the Bid Schedule( s). ARTICLE 5. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. ~contractor Initials) SEWAGE PUMP STATION CW-1 UPGRADE JUL Y 2007 AGREEMENT 00500-1 . Drawings as listed in the List of Drawings. Addenda numbers '~ 1 to 4, inclusive. I I I I I I I I I I I I I I I I ,I ,I ARTICLE 6. CONTRACT DOCUMENTS. The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR concerning the WORK consist of this Agreement (Section 00500) and the following attachments to this Agreement: . Notice Inviting Bids (Section 00030). . Instructions to Bidders (Section 00100). . Bid Forms including the Bid, Bid Schedule(s), Information Required of Bidder, Bid Bond, and all required certificates and affidavits (Section 00300). . Performance Bond (Section 00610). . Payment Bond (Section 00620). . General Conditions (Section 00700). . Supplementary General Conditions (Section 00800). . Technical Specifications as listed in the Table of Contents. . . Change Orders which may be delivered or issued after Effective Date of the Agreement and are not attached hereto. There are no Contract Documents other than those listed in this Article 6. The Contract Documents may only be amended by Change Order as provided in Paragraph 3.04 of the General Conditions. ARTICLE 7. INDEMNIFICATION. The CONTRACTOR and OWNER acknowledge and agree that they have negotiated the following in accordance with the requirements of RCW 4.24.115 and the CONTRACTOR specifically waives his immunity under industrial insurance under Title 51 RCW. The CONTRACTOR and OWNER acknowledge and agree to the requirements for indemnification in Section 00800 SC-6.20. The provisions of this article shall survive the termination or expiration of this agreement. ARTICLE 8. SUSPENSION OF WORK AND TERMINATION The Contractor agrees to the right of the OWNER to suspend work or terminate this agreement as indicated in Article 15 of Section 00700 (Standard General Conditions) and Section 00800 (Supplementary Conditions). . ,,_I' ~~t7 (Contractor Initials) SEWAGE PUMP STATION CW-1 UPGRADE JUL Y 2007 AGREEMENT 00500-2 (I , , , , , , , ~ , 11 ,~ ,., . I .J) I:: LJ ,:-: A ; . t., .:.;';: I~" L1\ ARTICLE 9. ASSIGNMENT No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. The OWNER, in its sole discretion, may refuse to allow the CONTRACTOR to assign any or all of its duties, rights and/or responsibilities under the Agreement, except with regards to an assignment of funds for security purposes. In the case of an assignment for security purposes the OWNER may condition its approval to the extent it deems necessary to assure that there will be adequate funds to complete the WORK and to pay a subcontractors and suppliers. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect of all covenants, agreements and obligations contained in the Contract Documents. IN WITNESS WHEREOF, OWNER and CONTRACTOR have caused this Agreement to be executed the day and year first above written. Attest (}At;" ,,'.I.Jcd/Vl.). ~ /--- Address for giving notices t5::!::::}(jl1;li;7~tJ Address for giving notices Po r t 5107 State Hwy 3 SW Orchard, WA 98367 . ST-AN-PC-*202NF LIcense No. to FOrm:r 4 (~ignatuAtr. ~. C:,b O~~ (Ti e) Agent for service of process: SEWAGE PUMP STATION CW-1 UPGRADE JULY 2007 AGREEMENT 00500-3