Loading...
HomeMy WebLinkAbout4637 Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments: 4637 HDR ENGINEERING INC Design - Sewage Pump Station CW-1 Upgrade Engineering LEG 12-1 06/11/2007 06/01/2008 02/15/2010 01/01/2010 Modification #1-1/08 .~ ~"J ...; CONTRACT MODIFICATION AGREEMENT NO.1 BETWEEN THE CITY OF BREMERTON AND HDR ENGINEERING PROJECT Sewage Pump Station CW-l Upgrade CONSULTANT HDR Engineering. DATE December 19. 2007 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE Professional Services A2reement with HDR En2ineerin2 for Desi2n Services for CW-l Um!rade (the "Contract") entered into between the City of Bremerton and HDR En2ineerin2 on June 28, 200] ',< All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I. Section I. Scope , is modified as follows: Exhibit A, Task 206: Biddin2 and Construction Assistance allowance is increased bv $7,500. from $7,400 to $14,900. Section II. Term , is modified as follows: No chan2e Section III. Compensation 0 , is modified as follows: The original contract amount was $25,000.00 Dollars. The City shall pay the Consultant for the additional work described above, based on time and materials, an amount not to exceed $7,500.00 Dollars for a total amended contract amount of $32,500.00 Dollars. including this Contract Modification. II. Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant's claims for contract time and for all costs of any kind, including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City's right to bring a claim for past performance. CONTRACT MODIFICATION Project Number: 573/591 ..# The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. City Engineer / Public Works Director approved to process~ t! ;:2:/ Initials and Date I /1/0? t ( ~a ULTA. NT. ~" ~1:! =-- -' l~., Its >1"'. Uu-e ~.s(di;:/C .-DATE: t/z.-! 0 g DATE: ATTEST: tJddtlrjuJ City Clerk NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: HDR Engineering City of Bremerton Engineering Dept. City Clerk's Office Mr. Bill Davis Civil Engineer II City of Bremerton Engineering Department 3027 Olyrnpus Drive Bremerton, W A 98310 (360) 473-2312 R:\LEGAL\Contracts\FORMS\Contract Modification (2003).doc CONTRACT MODIFICATION Project Number: 573/591 2 Vendor Subject Department Status Code Amount Begin Date End Date Review Date Insurance Comments Contract Number 4637 HDR ENGINEERING INC Design Services - Sewage Pump Station CW-l Upgrade Engineering PRO File Class LEG 12-1 $25000.00 06/11/2007 06/01/2008 05/01/2008 GL $ AL $ E&O $ Insurance Total $ Insurance Review Date PROFESSIONAL SERVICES AGREEMENT DESIGN SERVICES FOR SEWAGE PUMP STATION CW-l UPGRADE This Agreement is between the City of Bremerton, a municipal corporation (hereinafter referred to as "City") and HDR Engineering, Inc. ("Consultant"), referred to collectively as the "Parties," enter into the following Agreement for professional services: I. Scope: The Consultant agrees to provide the services set out in the Scope of Work attached hereto and incorporated herein by this reference as Exhibit A. The Scope of Work may be modified only pursuant to Section VII D. of this Agreement. If the Scope of Work provides for unspecified additional services the City may request, such services shall only be performed upon the express, written request of the City. II. Term: This Agreement commences upon issuance of a written Notice to Proceed by the City and terminates on June 1,2008, unless another date is substituted pursuant to Sections IX. The Parties agree that time is of the essence for completing this work and agree that work under this agreement will be completed by the termination date of this agreement. III. Compensation: In consideration ofthe services provided pursuant to this Agreement, the City shall pay Consultant in an amount not to exceed Twenty Five Thousand Dollars ($25,000). Consultant's charges and bills shall conform to the fee schedule attached as Exhibit B and incorporated herein by reference. The amounts for individual tasks set forth in Table B-1 may vary provided the total is within the not-to-exceed amount, less the amount set aside for additional services, of this Agreement. The Consultant shall submit regular billing statements describing services rendered and the amount charged for each service consistent with the level of detail provided in Exhibit B. The descriptions shall conform to and fall within the categories set out in the Scope ofvVork. Upon receipt of a conforming billing statement, the City shall promptly process payment. Consultant shall not perform work beyond the Scope of Work, nor shall be compensated for such work, unless the Scope of Work or amount of compensation is modified pursuant to this Agreement. Additional services shall be compensated for only if requested pursuant to Section I and shall be compensated as set out in the request or, if the request does not so provide, as set out in Exhibit B. BremertonIHDR CW-l Design Professional Services Agreement Pagelof5 If a billing statement does not conform to this Agreement, the City may withhold payment until the statement is brought into compliance. Such withholding does not relieve Consultant of its obligations under this Agreement. IV. Opinions Of Probable Cost (Cost Estimates) Any opinions of probable project cost or probable construction cost provided by Consultant are made on the basis of information available to Consultant and on the basis of Consultant's experience and qualifications, and represents its judgment as an experienced and qualified professional engineer. However, since Consultant has no control over the cost of labor, materials, equipment or services furnished by others, or over the contractor(s') methods of determining prices, or over competitive bidding or market conditions, Consultant does not guarantee that proposals, bids or actual project or construction cost will not vary from opinions of probable cost Consultant prepares. v. Relationship of Parties: Consultant is skilled in the matters addressed in the Scope of Work and will perform independent functions and responsibilities in the area of its particular field of professional services. Consultant and its personnel are independent Consultants and not employees of the City. Consultant and its personnel have no authority to bind the City or to control the City's employees and other consultants or contractors. As an independent consultant, Consultant is responsible for its own management. The City's administration and enforcement of this Agreement shall not be deemed an exercise of managerial control over Consultant or its personnel. As an independent consultant, Consultant is responsible for payment of all taxes and licensing fees necessary to perform its obligations under this Agreement. These taxes and fees include but are not limited to State industrial insurance, B&O, State professional licensing, and City business licensing. If any taxes or fees due the City have been declared delinquent, the City may withhold the delinquent amount, plus any additional charges arising from the delinquency, from any payments due Consultant. VI. Insurance and Hold Harmless: Consultant shall provide Certificates of Insurance to the City's Risk Manager verifying the following coverage: 1) a professional liability policy ("E&O") providing coverage of $1 ,000,000 for negligent errors and omissions committed by Consultant while performing its obligations under this Agreement, and 2) a comprehensive general liability ("CGL") policy providing coverage of at least $1,000,000 per occurrence and including bodily injury and property damage. The CGL shall name the City as an additional insured. Both policies shall remain in full force and effect, and provide coverage for the full term of this Agreement. Insurer shall provide the Risk Manager with 30 days' written notice of any cancellation or change of coverage of either policy. Consultant shall, at all times, be solely responsible for the negligent or wrongful acts or failures to act of its personnel, subconsultants and agents which arise in any way out of the performance of this Agreement. Consultant agrees to defend, indemnify, and hold harmless the BremertonIHDR CW-l Design Professional Services Agreement Page 2 of5 City and its appointed and elected officials and employees from and against any and all liability, loss, costs, damage, and expense, including costs and attomey fees in defense thereof, because of actions, claims, or lawsuits for damages resulting from personal or bodily injury, including death any time resulting therefrom, sustained by any person or persons, and on account of damage to property, to the extent arising out of the willful misconduct or negligent performance of the Agreement, if such injuries to persons or damage to property is due to the willful or negligent act or omission of the Consultant, its subconsultants, its agents, or assigns. The City and Consultant have specifically negotiated Consultant's waiver of its immunity under Title 51 RCW, which is hereby waived for purposes of Consultant's indemnification and hold harmless of the City, including the duty to defend. This provision shall be inapplicable to the extent such action, claim, or lawsuit is judicially found to arise from the acts or failures to act of the City. VII. General Conditions: A. Reports and Information: When requested by the City, Consultant shall furnish periodic reports and documents on matters covered by this Agreement. The reports and documents shall be furnished in the time and form requested. Consultant shall maintain accounting records in accordance with Generally Accepted Accounting Principles (GAAP) to substantiate all billed amounts. B. Entire Agreement: This Agreement and its Exhibits constitutes the entire agreement between the Parties, and the Parties acknowledge that there are no other agreements, written or oral, that have not been set forth in the text of this Agreement. C. Severability: Should any part ofthis Agreement be found void, the balance of the Agreement shall remain in full force and effect. D. Modification: This Agreement may only be modified by written instrument signed by both Parties. E. Notices: Notices shall be in writing and delivered to the following addresses: City Address Consultant Address City of Bremerton 239 4th Street Bremerton, W A 98337 HDR Engineering, Inc. 500 10Sth Avenue NE Ste 1200 Bellevue, W A 9S004-5549 F. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a waiver of that provision. Waiver of any right or power arising out of this Agreement shall not be deemed waiver of any other right or power. Bremerton/HDR CW -] Design Professional Services Agreement Page 3 of5 G. Compliance with Laws: Consultant shall comply with all applicable Federal, State, and local laws in performing its obligations under this Agreement. H. Choice of Law and Venue: This Agreement shall be interpreted according to the laws of the State of Washington. Any judicial action to resolve disputes arising out of this Agreement shall be brought in Kitsap County Superior Court. 1. Attorneys' Fees: To the extent not inconsistent with RCW 39.04.240, in any claim or lawsuit for damages arising from the parties' perfonnance of this agreement, each party shall be responsible for payment of its own legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit; however, nothing in this subsection shall limit the City's right to indemnification under Section VI of this agreement VIII. Nondiscrimination: Consultant shall not discriminate in employment or services to the public on the basis of race, color, national origin, sex, religion, age, marital status, or disability, except for employment actions based on bona fide occupational qualification. IX. Termination: This Agreement may be terminated, at will, by the City upon 30 days' notice to the Consultant. This Agreement may be immediately terminated for cause by either Party if the other Party substantially fails to perform through no fault of the terminating Party, and the non-performing Party does not commence correction of the failure of performance within five days of the terminating Party's sending notice to the non-performing Party. Upon termination the City will be entitled to reports showing the status and/or all work products, independent of their stage of completion or preparation format, of all items listed in the Scope of Work current through the termination date. x. Standard Of Performance: The standard of care for all professional engineering and related services performed or furnished by Consultant under this Agreement will be the care and skill ordinarily used by members of Consultant's profession practicing under the same or similar circumstances at the same time and in the same locality. XI. Construction Procedures: Consultant's observation or monitoring portions of the work performed under construction contracts shall not relieve the contractor from its responsibility for performing work in accordance with applicable contract documents. Consultant shall not control or have charge of, and shall not be responsible for, construction means, methods, techniques, sequences, procedures of construction, health or safety programs or precautions connected with the work and shall not manage, supervise, control or have charge of construction. XII. Re-Use Of Documents: All documents, including all reports, drawings, specifications, computer software or other items prepared or furnished by Consultant pursuant to this Agreement, are instruments of service with respect to the project and are the property of the City. Any reuse by the City for other than the specific purpose intended will be at City's sole risk and without liability or legal exposure to Consultant, and City will defend, indemnify and hold harmless Consultant from all claims, damages, losses and expenses, including attorney's fees Bremerton/HDR CW-l Design Professional Services Agreement Page 4 of5 arising or resulting therefrom. The format for documents and work products shall be as specified in the exhibits. IN WITNESS WHEREOF the parties hereto have executed this Agreement the date and year indicated. flIP- , IN C. ~tal Approval . -~ Phil Wi Iiams, Director PW&U as to form: Bremerton/HDR CW-l Design Professional Services Agreement Page 5 of5 EXHIBIT A CITY OF BREMERTON PUMP STATION CW-l ENGINEERING DESIGN SERVICES (2007) SCOPE OF WORK INTRODUCTION The purpose of this contract is for HDR to provide engineering services to assist the City in the design of the upgrade of Pump Station CW -1. The scope of HDR services for this project include the following tasks. A detailed description of each task is provided herein. Table 1. Scope of Services Task Description 101 Project Management, Coordination and Meetings 202 Electrical and Instrumentation Design 206 Bidding and Construction Assistance 300 Additional Services General Project Assumptions 1. The pump station upgrade will require temporary bypass pumping to facilitate the construction of the new improvements within the pump station. Design of a temporary bypass pumping system is not included in this scope. 2. The construction ofthe improvements included in this scope of work is based on the existing pump station being completely taken out of service. 3. No staging of improvements will be incorporated into the design of the improvements in this scope. 4. Demolition drawings will be developed by the City. 5. The documents will use the Standard General Conditions of the Construction Contract as prepared by the Engineers Joint Contract Documents Committee (EJCDC). 6. The City will prepare specifications for Divisions 0 through 11, and Division 15 except for the sections noted in this scope to be prepared by HDR. No specifications in Divisions 12 or 14 will be developed in this scope of work. 7. The Consultant has completed design improvements for the CW-l previously. The intent of this scope of work is to incorporate revisions to the design previously City of Bremerton Pump Station CW-l Engineering Design Services (2007) Page 1 of7 provided by HDR based on changes in the design objective since the work was completed previously. SERIES 100 TASKS - PROJECT MANAGEMENT Task 101 - Project Management, Coordination, and Meetings Consultant Responsibilities: 1. Contracting and internal project controlling and accounting 2. Staff administration and scheduling 3. Monthly reports and invoices 4. Attend coordination and review meetings Assumptions: 1. Standard invoices and reports will be prepared on a monthly basis 2. HDR standard monthly invoice format will be utilized. This format contains an itemized list ofproject staff who charged to the project, hourly rates, number of hours charged, and Other Direct Charges (ODCs). 3. Invoice hours will be classified by tasks. 4. No backup information (i.e. timesheets, logs, receipts, etc.) will be submitted with the invoices unless specifically requested by the City. Backup information will be available in HDR files for inspection by City project auditing staff, if requested by the City. 5. The City will maintain the role of overall project coordination with other governmental agencies. Work Products: 1. Monthly reports with descriptions of the work performed and cost of associated work. 2. Monthly standard invoice. SERIES 200 TASKS - DESIGN SERVICES Task 202 - Electrical and Instrumentation Design The existing pump station electrical equipment is inadequate to provide service for the upgraded pumping facility. The electrical upgrade will require new variable frequency drives (VFDs), new motor control center, line reactors, and new standby generator. It is also anticipated that a new 600 amp service from Puget Sound Energy (PSE) will be required. Consultant Responsibilities: 1. Modifications to plans and specifications to bring to 100% completion and ready to be issued for bid 2. Answer questions from prospective bidders regarding the contract documents. 3. Prepare responses to questions from prospective bidders so that they may be included in addenda issued by the City City Responsibilities: 1. City to provide existing instrumentation drawings for 2004 control panel modifications. City of Bremerton Pump Station CW-l Engineering Design Services (2007) Page 2 of7 2. City will design new in line flow monitoring equipment. Assumptions: 1. The existing lighting within the pump station will remain. 2. The existing pump station control panel, control equipment, and SCADA system will remain in place. Existing control equipment includes wet well level sensing check valve limit switches. 3. Written responses to client review comments will not be required. 4. The City has changed their standard for VFDs and the final electrical revisions to the specifications and drawings will incorporate changes to reflect the new standard. 5. The existing specifications that will be reviewed and updated include: 16010 ELECTRICAL: BASIC REQUIREMENTS 16060 GROUNDING 16120 WIRE AND CABLE - 600 VOLT AND BELOW 16130 RACEWAYS AND BOXES 16132 CABLE TRAY 16140 WIRING DEVICES 16265 VARIABLE FREQUENCY DRIVES - LOW VOLTAGE 16320 STANDBY ENGINE GENERATOR 16411 TRANSFER SWITCHES 16412 SEPARATELY MOUNTED CIRCUIT BREAKERS 16440 SWITCHBOARDS 16441 PANELBOARDS 16442 MOTOR CONTROL EQUIPMENT 16490 OVERCURRENT AND SHORT CIRCUIT PROTECTIVE DEVICES 16491 LOW VOLTAGE SURGE PROTECTION DEVICES (SPD) 16492 ELECTRICAL METERING DEVICES 16493 CONTROL EQUIPMENT ACCESSORIES 16682 ACTIVE HARMONIC CONDITIONERS 6. A new specification for ARC FLASH REPORTS will be included in the documents. This will tentatively be numbered 16432. Work Products: 1. One set of final design drawings and specifications stamped by the engineer. 2. Electronic drawing files in AutoCAD format and Adobe PDF format. 3. Specifications in Microsoft Word. Task 206 - Bidding and Construction Assistance Consultant Responsibilities: 1. Upon request by the City, answer specific technical questions from prospective bidders regarding the contract documents. 2. Assist the City in preparation of addenda items during the bid process. City of Bremerton Pump Station CW-I Engineering Design Services (2007) Page 3 of7 3. Provide engineering support during construction within the allotted hours in the budget. 4. Review Division 16 shop drawing submittals and the submittals directly related to specifications and design provided by HDR. 5. Provide engineer's cost estimate for construction. Consultant's charge for estimate shall not exceed $1500. City Responsibilities: 1. The City will advertise, evaluate, and award the contract. 2. The City will administer all aspects of the construction contract including coordination with owners of other utilities that must be relocated prior to construction. 3. Prepare and distribute addenda to plan holders Assumptions: 1. No field visits will be required during bidding or construction. 2. A total of36 hours ofHDR staff time have been included in the budget for assistance during bidding and construction. Work Products: 1. Telephone records or other documentation of bidding questions answered during the bidding phase. 2. Shop drawing review comments. 3. Engineer's estimate for construction SERIES 300 TASKS - ADDITIONAL SERVICES Consultant Responsibilities: 1. Prepare cost proposals for additional services requested by the City. 2. Provide assistance as requested by the City. City Responsibilities: 1. Request assistance and document request in writing. E-mail is considered suitable for authorization. Assumptions: 1. An allowance has been included in the project budget for additional services as requested by the City. Funds will not be expended from this task budget without prior written authorization from the City. Work Products: 1. Work products will be determined at the time services are requested by the City. City of Bremerton Pump Station CW-l Engineering Design Services (2007) Page 4 of7 EXHIBIT B - COMPENSATION Compensation for ENGINEER'S services under this Agreement shall be on the basis of an hourly rate equal to Direct Labor Cost times a multiplier of3.2 to be paid as total compensation for each hour an employee works on the project, plus Reimbursable Expense with a maximum not to exceed the total amount in Table B-1. This table provides an estimate of the cost per task as described in Attachment A. The Engineer may adjust the distribution of compensation between individual tasks of the work noted herein to be consistent with services actually rendered, but shall not exceed the total estimated compensation amount unless approved in writing by the Owner. The amount of any sales tax, excise tax, value added tax (V AT), or gross receipts tax that may be imposed on this Agreement shall be added to the ENGINEER'S compensation as Reimbursable Expenses. Compensation terms are defined as follows: Direct Labor Cost shall mean salaries and wages, (basic and overtime) paid to all personnel engaged directly on the Project. Reimbursable Expense shall mean the actual expenses incurred directly or indirectly in connection with the Project for transportation travel, subconsultants, subcontractors, computer usage, telephone, telex, shipping and express, and other incurred expense. ENGINEER will add ten percent (10%) to invoices received by ENGINEER from sub-consultants and subcontractors. Charges for typical reimbursable expenses incurred by the consultant will be at the following rates. Miscellaneous: Travel: Postage at cost Current IRS rate for business use of an automobile Other travel expenses at cost Standard at 10 cents per page $4.10 per labor hour At cost 75 cents per page for outgoing faxes No charge for incoming faxes Copying: Computer/Software Charge: Phone: Fax: City of Bremerton Pump Station CW-l Engineering Design Services (2007) Page 5 of7 The approximate distribution of costs with respect the tasks are as follows. Table B-1. Task Breakdown of Project Budget Task Description Estimated Cost 101 Project Management, Coordination and Meetings $3,500 202 Electrical and Instrumentation Design $5,800 206 Bidding and Construction Assistance $7,400 300 Additional Services (See Note) $8,300 TOTAL CONTRACT AMOUNT $25,000 Note: No charges will be made to task 300 without prior written approval. Email will suffice as written authorization. City of Bremerton Pump Station CW-I Engineering Design Services (2007) Page 60f7 EXHIBIT C - SCHEDULE Notice to Proceed Engineer's Construction Cost Estimate Final Design Drawings and Specifications March 12, 2007 March 13, 2007 March 23,2007 City of Bremerton Pump Station CW-I Engineering Design Services (2007) Page 70f7