HomeMy WebLinkAbout4620
Vendor
Subject
Department
Status Cod~
Amount
Begin Date
End Date
Review Date
Insurance
Comments
Contract Number 4620
OPUS NORTHWEST
Remodel Oyster
Econ Devel
CON
LLC
Bay Room in Kitsap Conference Center
File Class
LEG 12-1
$32938.00
03/19/2007
05/31/2007
02/15/2009
GL
AL
E&O
$2000000.00
$1000000.00
$
Vault 01/01/2009
Insurance Total
Insurance Review Date
$3000000.00
09/01/2007
.1
'. "
G OPUS
Opus Northwest, L.L.C.
915 - 118th Avenue S.E.
Suite 300
Bellevue, WA 98005
Option A proposal
Bremerton Harborside
Date:
1/10/2007
Job No.:
To:
Job Name:
Bremerton Harborside Remodel
Oyster Bay Room
ATTN: Gary Sexton
Phone: Fax:
Descrintion: Bremerton Harborside Remodel
Inclusions:
Option A: Option A pricing includes the following: The demolition of the existing North wall of the Oyster Bay room. The relocation of the existing Hollow metal door to
new location shown on the attached LMNdrawing dated 1/8/07. Option A includes building a small soffit wall (approx 6" below ceiling grid) where the existing wall was
located to tie the two ceilings together. Electrical relocation of the fire alarm strobe, exit sign and security for the double door. Reloation of the existing T-stat and re-
balancing the Oyster Bay room. The carpet in the Oyster Bay Room has been discontinued. We have allowed $5,813 for the removal and installation of new carpet in
this area. Painting clean up and supervision is included.
. /ncludes attachment A dated 2/1/07.
Code Description Subcontractor: Quantity Unit Unit Rate Subtotal
1 General Demolition, Framing, Rough Carpentry & Doors Sessler 1 Is $8,378.00 $8,378
2 Demo ceiling grid/re-install grid & metal tile ADI 400 sf $11.00 $4,400
3 Electrical: Move fire alarm and security on existing door to new location Valley 1 Is $2,500.00 $2,500
4 HVAC: Move T-stat and balance system for new space MacDonald Miller 21 hrs $55.00 $1,155
5 Demo existing carpet and install new. Division 9 132 SY $44.00 $5,813
6 Painting and touch up VS Painting 32 hrs $65.00 $2,080
7 Opus General Overhead and accounting Opus 25 hrs $95.00 $2,375
8 Misc. Expenses Opus 1 Is $500 $500
Clarifications:
* Work will be done during normal working hours SUBTOTAL $27,201
FEES 0% $0
SUBTOTAL $27,201
Contingency $2,720
B&O Tax and Insurance @ 1.5% $408
-"-- SALES TAX 8.6% $2,608
pay the above amount for the additional work.
THE ADDITIONAL CHARGE FOR THE ABOVE WORK IS:
--(3,,, y 3t:,,[ulI C,a rt j --:bo 7..e rYl Ct.". Hct.\..IO i("
Print Name & Tille
,~- c;- DI
Date
~- lCf-Of..
Date
.,
Attachment A
BREMERTON HARBORSIDE
OYSTER BAY ROOM REMODEL
2/1/07
CLARIFICATIONS AND ASSUMPTIONS OPTION A
I. CLARIFICATIONS AND ASSUMPTIONS:
General Design assumptions are as follows:
1. DIVISION 01 - GENERAL CONDITIONS.
. Duration of the project is to be no less than 4 weeks from mutual acceptance.
. Weather is variable and we have not included any time or budget money to deal with weather
delays.
. We assume we can work normal working hours and construction work days.
2. DIVISION 08 - DOORS AND WINDOWS.
. Includes re-using the existing double door located in the Oyster Bay room. No additional
doors, frames or hardware has been included.
3. DIVISION 09 - FINISHES.
. Finishes are limited topainted drywall, new carpet at an allowance of $5,813 only. No other
finishes have been included in this estimate included matching of existing materials (i.e.
fabric panels, etc.)
4. DIVISION 12 - FURNISHINGS.
. Owner to provide all room furnishings.
5. DIVISION 15 - MECHANICAL.
. HVAC is limited to the relocation of the T-stat and balancing the existing room only. This is
assuming that we can install the new wall and door location to avoid existing YAY's.
6. DIVISION 16 - ELECTRICAL
. Electrical is limited to the removal and relocation of all electrical device (i.e. fire strobe,
security) on the gwb wall to be demolished. All outlets, high and low voltage devices to
remain.
7. SOFT COSTS - EXCLUDED FROM THIS ESTIMATE
. No consultant fees have been included.
. No permit fees have been included.
. Any additional sound requirements to this space have not been included.
. Retention
. Off hours work. Working around conference center functions. We assume that this
work can be partitioned off and performed during business hours of 7 to 4pm.
",'
GENERAL CONDITION TERMS:
PROGRESS PAYMENTS
1.0 Based upon Applications for Payment submitted to the Owner by the Design-Builder, the
Owner shall make timely progress payments on account of the Design-Build Agreement Sum to
the Design-Builder as provided in this Design-Build Agreement and such amounts as are
consistent with Design-Builder's Applications for Payment and Design-Builder's actual percentage
of completion of the Work. The period covered by each Application for Payment shall be one
calendar month ending on the last day of the month. Payment shall be made on the tenth day
following the previous month's Application for Payment.
2.0 Design-Builder may withhold retainage from its Subcontractors in the amount of five (5)
percent. Owner shall not withhold retainage from Design-Builder in an amount greater than or
less than the amount of retainage Design-Builder has withheld from its Subcontractors. To the
extent Design-Builder withholds retainage from its Subcontractors, Owner agrees to pay Design-
Builder and Design-Builder agrees to pay Subcontractor the retainage within thirty (30) days of
when Subcontractor has completed its work and fulfilled each of its obligations under its
Subcontract with Design-Builder.
3.0 Payments due and unpaid under the Design-Build Agreement shall bear interest from the
date payment is due at the rate of twelve percent (12%) per annum.
FINAL PAYMENT
4.0 Final payment, constituting the entire unpaid balance of the Design-Build Agreement Sum,
shall be paid by the Owner to the Design-Builder when the Design-Build Agreement has been
fully performed by the Design-Builder but no later than thirty (30) calendar days after
Substantial Completion. Assumes punch list is 100% complete prior to final payment.
CHANGES IN THE WORK
5.0 The Owner, without invalidating the Design-Build Agreement, may order changes in the
Work consisting of additions, deletions or modifications, with the Price, and the Contract Time
being adjusted accordingly. Such changes in the Work shall be authorized by written Change
Order signed by the Owner and Design-Builder.
6.0 The Design-Build Agreement Sum and Design-Build Agreement Time shall be changed
only by Change Order.
7.0 The cost or credit to the Owner from a change in the Work shall be determined by mutual
written agreement between Owner and Design-Builder.
8.0 In the event that any Change Order results in a reduction of the Cost Of The Work, such
reduction in the Cost Of The Work shall not result in a reduction of the Fees. The Fees shall be
earned and owing to the Design-Builder from the Owner regardless of any reduction in the Cost
Of The Work pursuant to said Change Order.
,/
,/
,// !~
!~w
! WAU/ __
!~
I
,
") J
1"-. //
!~"-. V
:---~ ~, --- ) ---- - -- ---
, "- "-.....' . --.j
! '''-,~~ .-.,( -- - ~
! "'""I~ '-....<__ _---..
" ~;:
! ai':!.I^,IAV~ ~ ' , '" ........... :
! I ~'1UJ a:::-- "-- ~~_~ ......... .... .1QlJ::
I -t:x.\$il rJ~ ~H1 ' .."" '"
i t'l~ ~~:~'~,
I fl~~ll---~ ~, '..........
, ' -
! W;.Hi ~--...._~:"'-"'--....
! f3(..A-N~~ ~ ~V~ ! --~~~ ----r--___
! ~~'\I tJb Sfe1l.,l.E. I I --- - ~~ -- - ~
I ,I ~~- ~ -
, I L ----~-~ =-r--.
! ~~etA~ ~~eo~c;lW' I -------- -~- - ~
I, olo'1'~i3A'f~" ~ I --------]j~
I l ---- ~
2.. 'l+'~7
'(5" -:::: t.....o"
- .
i '
I
,
I
,
I
,
I
,
I
,
I
,
I
,
I
lr.;;;;::--......-----
L~_
j ',-----;/
I ' ,/
~ ' ./
I ,/ '\,
~ ,/./ ......--
1./ "-
./ '
I~ ________
I ./
,./
/0'
I
li[t2tMji ' 'j 1 iil!
--L- ----"-- f--- @ --- -om ~--
i ! 0
tx X I
,
I
,
I
,
,
rJ&
- -'lil'l~ --
1'1 I.
I I.
'. Iii '-:
Iii ,I
Iii
~..:. Iii.. 0 X
... . 11'1'
..... .-
I'j
'I
Iii "0' ,.
.Iil
- ---- - - -
o U
~ ,
11
!I
!I
!I
!I
r -
,I
~
,
I
,
I
,
I
@
---- -- -- -- -- -- -
@
.
Lx @ X
......
~
_ _1
,
I
,
I
,
I
I
I
I
I
,/
j
: i
o
o
o
_ _ X _
j.
.i
i
';
"
c .:..j
I
I
',I
.,
o
o
_ .S?\ c _
o
o
o
o
o
. 0
o
IXo
,[
. J
. !
. I
. .' ". j
~-""!"'-.j
o
rrr R
_ 0 _ II 1fiUj]'~
:I"~
=
~~ lIG
G'l.-(),^~
/,
\ ~ , r
\ (
'.
," (. r \
, " ...
~ , (
.
,
" I \
I \
I \
\. ' , I \
\ I \ /1/
c=O e-
, /
, /
, / 4-
,
" /
f -
1lC~~"0~ ~,pe.,
'\o\c,..~ ~\ '\<.~'\ ~~
\. <6. (J7 'l...l4"1 AI<O\ l-reors
f1r.lI::::.\~o'\ ~ ~A\lcN
or-noN \A'
~
vJN..-l-
a.\si1~b
C.13U ..., &
~1J3?
vecl<. ~\9
~l !{trt..\~
~
,.f ..
i .
-\:X~o/n lJC;;
0G-\ L \ l.9"
~t.stl ~~
COL-UN\. N
JJt;W 1JJA.l.L.i\
" l'"
'r "- ,
r .. .
I
I,.. ..
'" '"
~
. ,.. , r
r t' r'
'- r .. ~ ... r 'r-
~ r
/ f (f
hUG. 'N' }l ~
<?'\2l~t-t\ MtJLUO~
=:~
~ Al,U'M\'NVW\
<?to~tsr
?"\~~.
r;
(
J.
11
It,
~
~~N \-IA~ti!.ti.,te
\b'fc,,~ \3A1 ~ ,I 'roIV1OPEL-
!'~,Ol L.V1N ~~
Ytll~ I'--v\\ asn<.~NCG ~A-l1bN
l::9f'11tlN 'l3'