Non-Motorized Transportation Plan
The City of Bremerton ("City") and Parametrix ("Consultant"), referred to collectively as
the "Parties," enter into the following Agreement for professional services:
I. Scope: The Consultant agrees to perform the services more specifically described in the
Scope of Work, dated December, 2006, including any attachments thereto, attached hereto as
Exhibit A, which is incorporated by reference herein. The Scope of Work may be modified only
pursuant to Section VII.G. of this Agreement. If the Scope of Work provides for unspecified
additional services such services shall only be performed upon the express written request of the
City. Consultant further represents that the services furnished under this Agreement will be
performed in accordance with generally accepted professional practices in effect at the time such
services are performed.
II. Term: The City and the Consultant agree that work will begin on the tasks described in
Exhibit A immediately upon execution of this Agreement. The parties agree that the work
described in Exhibit A is to be completed as provided for in the work schedule attached hereto as
Exhibit B; provided however, that additional time shall be granted by the City for excusable
delays or extra work as provided for in section IX (A) of this agreement.
III. Compensation: In consideration of the services provided pursuant to this Agreement, the
City shall pay Consultant in an amount not to exceed $99,975.86. Consultant's charges and bills
shall conform to the fee schedule attached hereto as Exhibit C and incorporated herein by this
reference.
The Consultant shall submit regular billing statements detailing work performed and
amount charged on each task or portion thereof. The descriptions shall conform to and fall
within the categories set out in the Scope of Work and/or Fee Schedule. Upon receipt of a
conforming billing statement, the City shall promptly process payment. PROVIDED,
HOWEVER, the City reserves the right to prioritize scoped work and accelerate and/or delay
work tasks under the time frame set forth in Section II herein. The Consultant's labor rates and
billing fees shall be as delineated in Exhibit C.
Consultant shall not perform work beyond the Scope of Work, nor shall be compensated
for such work, unless the Scope of Work or amount of compensation is modified pursuant to this
Agreement. Consultant shall only be compensated for additional services if requested pursuant
to Section I and, if not otherwise provided, such compensation shall be in accordance with
Exhibit C.
If a billing statement does not conform to this Agreement, the City may withhold
payment until the statement is brought into compliance. Such withholding does not relieve
Consultant of its obligations under this Agreement.
BremertonlParametrix
Non-Motorized Transportation Plan
Page 1 of6
IV. Relationship of Parties: Consultant represents that it is skilled in the matters addressed
in the Scope of Work and is performing independent functions and responsibilities within its
field of expertise. Consultant and its personnel are independent Consultants and not employees
of the City. Consultant and its personnel have no authority to bind the City or to control the
City's employees and other Consultants. None of the benefits provided by the City to its
employees, including, but not limited to, compensation, insurance, and unemployment insurance
are available from the City to the employees, agents, representatives, or sub-Consultants of the
Consultant. Consultant will be solely and entirely responsible for its acts and for the acts of
Consultant's agents, employees, representatives and sub-Consultants during the performance of
this Agreement. The City may, during the term of this Agreement, engage other independent
Consultants to perform the same or similar work.
As an independent Consultant, Consultant is responsible for its own management. The
City's administration and enforcement of this Agreement shall not be deemed an exercise of
managerial control over Consultant or its personnel.
As an independent Consultant, Consultant is responsible for payment of all taxes and
licensing fees necessary to perform its obligations under this Agreement. These taxes and fees
include but are not limited to State industrial insurance, Business & Occupation, State
professional licensing, and City business licensing. If any taxes or fees due the City have been
declared delinquent, the City may withhold the delinquent amount, plus any additional charges
arising from the delinquency, from any payments due Consultant.
V. Indemnification: Consultant shall defend, indemnify and hold the City, its officers,
officials, employees, agents and volunteers harmless from any and all claims, injuries, damages,
losses or suits, including all legal costs and attorney fees, arising out of or in connection with the
performance of this Agreement, except for that portion of the injuries and damages caused by the
City's sole negligence.
The City's review or acceptance of any of the work when completed shall not be grounds
to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this Agreement is subject to
RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons
or damages to property caused by or resulting from the concurrent negligence of the Consultant
and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability
hereunder shall be only to the extent of the Consultant's negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE
INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S
WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY
FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER
ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER.
The provisions of this section shall survive the expiration or termination of this Agreement.
BremertonlParametrix
Non-Motorized Transportation Plan
Page 2 of6
VI. Insurance: The Consultant shall procure and maintain for the duration of the Agreement,
insurance against claims for injuries to persons or damage to property which may arise from or in
connection with the performance of the work hereunder by the Consultant, its agents,
representatives, employees, sub-consultants or sub-Consultants.
Before beginning work on the proj ect described in this Agreement, the Consultant shall
provide a Certificate of Insurance evidencing:
1. Automobile Liability insurance with limits no less than $1,000,000 combined single
limit per accident for bodily injury and property damage; and
2. Commercial General Liability insurance written on an occurrence basis with limits no
less than $1,000,000 combined single limit per occurrence and general aggregate for
personal injury, bodily injury and property damage. Coverage shall include but not be
limited to: blanket contractual; products/completed operations/broad form property
damage; explosion, collapse and underground (XCD) if applicable; and employer's
liability; and
3. Excess Liability insurance with limits not less than 1,000,000 limit per occurrence and
aggregate.
4. Professional Liability insurance with limits no less than $1,000,000 limit per
occurrence/claim.
Any payment of deductible or self insured retention shall be the sole responsibility of the
Consultant.
All required policies shall be provided on an "occurrence" basis except professional
liability insurance (if required), which may be provided on a "claims-made" basis.
The City shall be named as an additional insured on the Commercial General Liability
insurance policy, as respects work performed by or on behalf of the Consultant and a copy of an
endorsement that is acceptable to the City, which names the City as an additional insured shall be
attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of
all the required insurance policies and endorsements. The City further reserves the right to reject
any unacceptable policies and/or endorsements.
The Consultant's Commercial General Liability insurance shall contain a clause stating
that coverage shall apply separately to each insured against whom claim is made or suit is
brought, except with respects to the limits of the insurer's liability.
The Consultant's insurance shall be primary insurance as respects the City and the City
shall be given thirty (30) days prior written notice by certified mail, return receipt requested, of
any cancellation, suspension or material change in coverage.
The City also reserves its unqualified right to require at any time and for any reason,
proof of coverage in the form of a duplicate of the insurance policy with all endorsements as
evidence of coverage.
BremertonlParametrix
Non-Motorized Transportation Plan
Page 3 of6
VII. General Conditions:
A. Reports and Information: When requested by the City, Consultant shall furnish
periodic reports and documents on matters covered by this Agreement. The reports and
documents shall be furnished in the time and form requested. Consultant shall maintain
accounting records in accordance with Generally Accepted Accounting Principles (GAAP) to
substantiate all billed amounts.
B. Ownership and Use of Records and Documents: Original documents, drawings,
designs and reports, including those in electronic format, developed under this Agreement are the
property of the City. All written information submitted by the City to the Consultant in
connection with the services performed by the Consultant under this Agreement will be
safeguarded by the Consultant to at least the same extent as the Consultant safeguards like
information relating to its own business. If such information is publicly available or is already in
Consultant's possession or known to it, or is rightfully obtained by the Consultant from third
parties, Consultant shall bear no responsibility for its disclosure, inadvertent or otherwise.
All data, documents and files created by Consultant under this Agreement may be stored
at Consultant's office in Bremerton, Washington. Consultant shall make such data, documents,
and files available to the City upon its request at all reasonable times for the purpose of editing,
modifying and updating as necessary until such time as the City is capable of storing such
information in the City's offices. Duplicate copies of this information shall be provided to the
City upon its request, and at reasonable cost.
All documents, including all reports, drawings, specifications, computer software or other
items prepared or furnished by Consultant pursuant to this Agreement, are instruments of service
with respect to the project and are the property of the City. Any reuse by the City for other than
the specific purpose intended will be at City's sole risk.
C. Work Performed at Consultant's Risk: Consultant shall take all precautions necessary
and shall be responsible for the safety of its employees, agents, and sub-consultants in the
performance of the work hereunder and shall utilize all protection necessary for that purpose.
All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss
of or damage to materials, tools, or other articles used or held for use in connection with the
work.
D. Place of Work: The Consultant shall perform the work authorized under this
Agreement at its offices in Bellevue, Washington. Meetings with the City staff as described in
Exhibit A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed
upon by the parties.
E. Entire Agreement: This Agreement and its Exhibits constitutes the entire agreement
between the Parties, and the Parties acknowledge that there are no other agreements, written or
oral, that have not been set forth in the text of this Agreement.
BremertonlParametrix
Non-Motorized Transportation Plan
Page 4 of6
F. Severability: Should any part of this Agreement be found void, the balance of the
Agreement shall remain in full force and effect.
G. Modification: This Agreement may only be modified by written instrument signed by
both Parties.
H. Written Notices: All communications regarding this Agreement shall be sent to the
parties at the addresses listed below by registered or 1 st class mail, or by personal service, and
shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement
or such other address as may be hereafter specified in writing.
City Address
Eduardo Aban
City of Bremerton
3027 Olympus Drive
Bremerton, WA 98310
Consultant Address
John Perlic
Parametrix
411 108th Avenue NE, Suite 1800
Bellevue, W A 98004-5571
I. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a
waiver of that provision. Waiver of any right or power arising out of this Agreement shall not be
deemed waiver of any other right or power.
J. Non-Waiver of Breach: The failure of the City to insist upon strict performance of any
of the covenants and agreements contained herein, or to exercise any option herein conferred in
one or more instances shall not be construed to be a waiver or relinquishment of said covenants,
agreements or options, and the same shall be and remain in full force and effect.
K. Compliance with Laws: Consultant shall comply with all applicable Federal, State,
and local laws in performing its obligations under this Agreement.
L. Choice of Law and Venue: This Agreement shall be interpreted according to the laws
of the State of Washington. Any judicial action to resolve disputes arising out of this Agreement
shall be brought in Kitsap County Superior Court.
M. Attorneys' Fees: In the event of litigation to enforce any of the terms or provisions
herein, each party shall pay all its own costs and attorney's fees.
N. Assignment: Any assignment of this agreement by the Contractor without the written
consent of the City shall be void.
VIII. Nondiscrimination: Consultant shall not discriminate in employment or services to the
public on the basis of race, color, national origin, sex, religion, age, marital status, or disability,
except for employment actions based on bona fide occupational qualification.
IX. Termination: This Agreement shall remain in force until completion and acceptance of
the services, terminated by written instrument upon mutual consent, or by the City of Bremerton
for convenience. This Agreement may be immediately terminated for cause by a Party if the
BremertonlP arametrix
Non-Motorized Transportation Plan
Page 5 of6
other Party substantially fails to perform through no fault of the terminating Party, and the non-
performing Party does not commence correction of the failure of performance within thirty (30)
days of the terminating Party's sending notice to the non-performing Party. Any Notice by
Consultant shall include a report showing the status of all items listed in the Scope of Work
current through the termination date.
If the City receives reimbursement by any federal, state, or other source for work described in
Section I herein, and that funding is withdrawn, reduced or limited in any way, or the project is
cancelled or substantially reduced after the execution date of this Agreement and prior to the
completion of the work, the City may summarily terminate this Agreement.
A. Excusable Delavs: The right of Consultant to proceed shall not be terminated nor shall
Consultant be charged with liquidated damages for any delays in the completion of the work due
to: 1) any acts of the federal government in controlling, restricting, or requisitioning materials,
equipment, tools, or labor by reason of war, national defense, or other national emergency; 2)
any acts of the City, its consultants, or other public agencies causing such delay; and 3) causes
not reasonably foreseeable by the parties at the time of the execution of the Agreement that are
beyond the control and without the fault or negligence of the Consultant, including, but not
restricted to, acts of God, fires, floods, strikes, or weather of unusual severity. PROVIDED,
HOWEVER, that the Consultant must promptly notify the City within ten (10) calendar days in
writing of the cause of the delay. If, on the basis of the facts and the terms of this Agreement,
the delay is properly excusable, the City shall, in writing, extend the time for completing the
work for a period of time commensurate with the period of excusable delay.
B. Rights Upon Termination: In the event of termination, the City shall pay for all
services performed by the Consultant to the effective date of termination, as described on a final
invoice submitted to the City. After termination, the City may take possession of all records and
data within the Consultant's possession pertaining to this project which may be used by the City
without restriction. Any such use not related to the project which Consultant was contracted to
perform shall be without liability or legal exposure to the Consultant.
P ARAMETRIX
~.L
By: ~n M Ue
its: Rr/~}?c.--(
Date: / I zz., Or
BremertonlParametrix
Non-Motorized Transportation Plan
Page 6 of6
EXHIBIT A
; < ,0'$ .". "^',,," . . SO'OPE OF WORK . < . · ..' ':. .
'n'......,.,~i:h::~~ ~:",,;!-": ~_'. ~.~ ".",,,... ~ _ . ." ~". '~~"~,J;! .....l';, ~..,..,:,~'l.~'fI.~'
City of Bremerton
Non-Motorized Transportation Plan
Task 01 - Project Management
Task Objective
To monitor the project scope of work completion, schedule, and budget, and communicate status with the
City of Bremerton project manager
Approach
The Parametrix Team will prepare a brief project management plan (PMP) at the beginning ofthe project
to document the scope of work, schedule, budget, contact list, and general roles and responsibilities of the
project team. The PMP will be distributed to all team members including Alta and City of Bremerton
staff. Monthly invoices will be prepared, including a progress report summarizing work accomplished,
changes, and upcoming work.
Assumptions
. Up to two updates to the project management plan will be prepared to document project changes
Deliverables
. Draft Project Management Plan
. Final Project Management Plan
. Monthly Invoices
Task 02 - Community Outreach and Participation
Task Objective
To obtain community input and ideas on pedestrian and bicycle facility improvements
Approach
The Parametrix Team will arrange stakeholder meetings with the following groups through two all-day
workshops with:
. Bremerton School District
. City of Bremerton Public Works, Planning, and Parks staff
. City of Bremerton Neighborhood Group representatives
. West Sound Cycling Club
City of Bremerton
Non-Motorized Transportation Plan
Scope of Work
December 2006
~~~I~:';;;:~Jf.:t..o.~~,.,,>:. ";, 'f. . '.. S'COPE OF. WORK (CONTINUED) . " ',=. :~',':' . "~~':':i<\','i"
,<c'",,,_{. , "M...j{"'" " _ ""i'"'" ~ j -" ' ." .. ^ .'" J ~b",,<e.:;. ,.
· Olympic College students, faculty, and staff
· Harrison Hospital staff
. Kitsap Transit
· Washington State Ferries
The first workshop would be held early in the plan development process to obtain input and ideas on
pedestrian and bicycle system deficiencies, safety concerns, and ideas for project improvements. Later in
the process, a second workshop would present the Draft Plan and request input from the stakeholders on
specific improvements and priorities.
Each workshop would be organized similar to a design charette, where the individual stakeholder
representatives would be invited to provide input at a specific time. Parametrix team members would
facilitate the discussion around a series of questions designed to elicit creative thinking. At the end of the
day, the Parametrix team and City of Bremerton staff would invite other community members to an open
house to provide an opportunity to share input from the stakeholder workshop and seek broad public input
into the process.
The Parametrix Team would organize the meeting logistics, set the agenda, facilitate the meeting, prepare
a meeting summary and follow up with ongoing tasks for each of the public meetings. Information about
the public workshops/open houses will be disseminated through mailings, flyer posting, e-mail, and
websites. The information may be in the form of a fact sheet, press release, flyer or letter, depending on
which is most appropriate.
The Parametrix Team will also complete the public participation process at final meetings at the City of
Bremerton Planning Commission and City Council. These meetings would provide for the formal review
and approval of the Non-Motorized Transportation Plan.
Assumptions
· The Parametrix Team would have lead responsibility for preparation of meeting materials
including boards, displays and handouts at the two public workshops/open houses.
· City of Bremerton staff would be responsible for sending invitations to stakeholder groups, and
advertising the open house meetings.
· The Parametrix Team would lead the Bremerton Planning Commission and City Council
presentations with support from City of Bremerton staff.
De/iverables
The community outreach and participation process will include a total of 4 (four) meetings:
· Two all-day workshops/open house meetings,
. One meeting with the City of Bremerton Planning Commission to reVIew the Draft Non-
Motorized Transportation Plan
. One meeting with the Bremerton City Council to approve the Non-Motorized Transportation Plan
City of Bremerton
Non-Motorized Transportation Plan
Scope of Work
2
December 2006
"'?..'~ ;")'.~ :' ,:".\ ;;. : '. . . SCOPE OF WORK (CONTINUED) . ,. j " ",:--, ',',' : .,:..:.
4;,- J.\,,,~~'~~"'" ~ ~~.;;'~~'fi~.t..p ~".l;.".~ <I~ '" .< 0 " .. . '" ,{t.= "" ~""'1" ~ \4 !.'
Task 03 - Existing Conditions Inventory
Task Objective
To collect and summarize existing non-motorized transportation system information
Approach
The Parametrix team will determine the adequacy of existing conditions for bicyclists and pedestrians
through data contained in the City's Transportation Plan, roadway inventory, and accident records and
from field observations. The Parametrix Team will conduct supplemental fieldwork to review the
condition of crosswalks, transit stops, and high-volume pedestrianlbicycle use areas such as the
Bremerton Transportation Center, Manette neighborhood, Olympic College, and schools, We will
summarize the attributes of existing facilities in the City based on our observations. Given the varied
needs of bicyclists and pedestrians, we will conduct separate reviews for bicycle and pedestrian
circulation.
The Parametrix Team will also conduct street-level field review and analyze the condition and adequacy
of existing bicycle routes. We will examine the location, design, and functionality of those facilities.
Throughout the course of this analysis, we will keep in mind the needs of a variety of users. We can
divide bicyclists according to their use of a bicycle for commuting, also called utilitarian use, or for
recreation. Utilitarian cyclists need to be able to bicycle all the way to their destinations, whether that is a
commercial center, a store, school, or to a doctor's office. On the other hand, many recreational cyclists
would prefer to stay away from such destinations.
The needs of pedestrians vary as well. Able-bodied adults frequently maintain walking speeds that are
greater than children, senior citizens, and people with disabilities. They are also more skilled at navigating
through intersections. As we examine existing pedestrian conditions, we will keep in mind the needs of
those who do not walk fast, those with less peripheral vision and awareness, and people who are
otherwise disabled.
The Parametrix Team will also review bicycle and pedestrian collision data compiled by the City of
Bremerton and WSDOT. We will review and summarize the overall number of collisions, their locations,
as well as other information kept in records.
The Parametrix Team will collect existing traffic count data (our team has much of this already) and
review the level of service on existing bicycle routes from information in the Bremerton Transportation
Plan. Traffic data will also be compiled for other key facilities as well. This data will be utilized in
subsequent tasks as they relate to the identification of opportunities and constraints for new bike and
pedestrian facilities. We will also collect information regarding enforcement policies of the Bremerton
Police Departments and provide an assessment of the adequacy and effectiveness of these programs.
City of Bremerton
Non-Motorized Transportation Plan
Scope of Work
3
December 2006
"~',~'~;j"'X'\-l,.. "" ~. ~- .
i\if~,r;)f:;:..:;:'~t'",:",'. ~.::".~~.~'. .. SCOPE OF WORK (CONTINUEDL '. '.', '.'::;:,,,!:;\:!~~/ ;;::.;.
Assumptions
· City of Bremerton staff will provide traffic accident, recent traffic counts and roadway inventory
information
· City of Bremerton staff will provide available information on the presence of ADA accessible
curb returns
· City of Bremerton staff will assist with coordination with the Bremerton Police Department on
enforcement policies
Deliverable
· Existing condition section of the draft and final report.
Task 04 - Identify Non-Motorized Transportation System Deficiencies
Task Objective
To identify bicycle and pedestrian system deficiencies in the City of Bremerton
Approach
The Parametrix Team will use a combination of information gathered from the Existing Conditions
Inventory and a questionnaire to determine what the needs of bicyclists and pedestrians in Bremerton are,
as well as to prioritize these needs. We will develop, circulate and tabulate data from a bicycle and
pedestrian needs focused survey. The intent of the survey questionnaire is to identify and prioritize some
of the needs of the community. The questionnaire may solicit information about demographics, route
preferences, facilities, safety issues, and other behaviors related to bicycling and walking. Questionnaires
will be distributed at the public workshops and through other informational outlets such as the Olympic
College and the Bremerton Transportation Center. These surveys will be tabulated and analyzed. The
survey analysis will be used to determine:
· identification of general facility and program needs for bicycle and pedestrian development
within Bremerton
· location of most needed bicycle facility improvements and type
· location of most needed pedestrian facility improvements and type
· planning and implementation priorities of the general public
· potential safety conflict locations
Next, The Parametrix Team will determine the adequacy ofthe existing bicycle facilities for the following
criteria:
. safety
. connectivity
· network completeness
City of Bremerlon
Non-Motorized Transportation Plan
Scope of Work
4
December 2006
:!\~;;:;:;':':.,~,l,':;"'~":::;"_2 ~..'. ',scOPEOFWORK(CONTINlJED) ,: ',,;;::/;;"...",::~:'.;:,
;;:"''''-J:'''i::;JJf",''!t't-'.'''n _ ~ "'~';:' ~ A~~ 1<'J A~~ .. . '" ,,~ ',~ _ '_{:~:I-~.'t 'ISh ..-o,M :}"'"
· ability to serve work centers, shopping, residential areas, parks, schools, the CIVIC center,
community centers, transit links, and other important destinations
· accessibility
. convemence
· ability to serve different bicyclist user groups
We will identify gaps in the bicycle route network and areas of the City that are not well served. We will
also identify the needs of the various users that are not well served.
We will also conduct a general review and analysis of those pedestrian facilities which experience the
highest activity levels including:
· Employment Centers
· Harborside District
· Downtown Bremerton and Other Commercial Centers
· Local Public Schools
· Olympic College
· Multi-modal Transportation Connections
· Local and Regional Parks
· Community Centers and Libraries
The existing pedestrian facilities in Bremerton will be evaluated for continuity, convenience barriers for
disabled persons, and access. System continuity is defined as providing the user the opportunity to travel
in a reasonably direct line from an origin (a residential neighborhood typically) to a destination. The
existing system will be reviewed to determine existing gaps, barriers, and bottlenecks that prevent facility
users from traveling to destinations within a neighborhood, throughout the region, and to connecting
points within the region. The existing system will be reviewed for general user convenience in terms of:
· accessibility from points of origin (coverage),
· comfort level of streets used in terms of vehicle traffic, crossing protection, lane width,
driveways, and other items,
· topography and grades,
· support facilities such as benches, and drinking fountains at major destinations, and
· coherence of the system to the average user attempting to reach an unfamiliar destination
Assumptions
· The Parametrix Team will develop the questionnaire/survey form and summarize survey
results
· City of Bremerton staff will assist with survey distribution and collection
City of Bremerton
Non-Motorized Transportation Plan
Scope of Work
5
December 2006
~ tl ~ t....~ .. I ~ """ '
~~l\:;'.\,;'""(;,~.~.~'~,,,~~~.:.;' ',;;',,', ~. ~ SCOPE OF WORK (CONTINUi::P) ,.:.' h .':,,~!'~'";:? :~;: ~.: ,!
Deliverable
· Section of the final report and maps depicting non-motorized transportation system deficiencies
in the City of Bremerton
Task 05 - Identify Bicycle and Pedestrian Facility Improvements
Task Objective
To identify non-motorized facility projects and programs for future implementation
Approach
The needs analysis will lead to a set of recommendations for bicycle and pedestrian network
improvements. The key objective of this effort will be to evaluate the proposed network consisting of
bicycle and pedestrian facilities. The Parametrix Team will focus on primary (or regional) and secondary
routes, design and operating standards for the installation of bicycle and pedestrian improvements, new
safety and marketing programs, and a detailed implementation strategy focusing on developing feasible
and competitive projects for available State and Federal funding.
The evaluation framework generally consists of criteria such as need, safety, available right of way,
connectivity and directness, grades, barriers, multi-modal linkages, safety and conflicts, and security.
Typical criteria used to develop recommended bicycle and pedestrian routes and facilities include:
.
Connectivity - provide connectivity between existing sidewalks, routes, lanes, or paths. Major
gaps and barriers, including narrow roadway segments, should be targeted as high priority items.
.
Multi-Modal Coordination - take advantage of multi-modal connections, including ferry and
bus transfer stations, transit terminals and shuttles to major destinations.
.
Accessibility - be accessible from residential neighborhoods and connect to major destinations
within Bremerton, including parks, community centers, employment centers, schools, and
commercial centers. Existing and future activity center maps will be used to identify any
changes in the location of major destinations in the region, including transit centers, employment
centers, entertainment venues, and other destinations.
.
Convenience - provide reasonably direct routes from residential areas to major destinations.
.
Aesthetics - both recreational and commuting users prefer to ride along streets and through areas
that are shaded, have visual relief, or offer other visual amenities.
.
Usage - serve the greatest number of commuters and recreational users possible, focusing on
major destinations. Potential usage will be determined through field observation, surveys, and
feedback from staff and project stakeholders.
City of Bremerton
Non-Motorized Transportation Plan
Scope of Work
6
December 2006
;~;"':,[-'g'::~'/"#:"",':,,, . r., '. SCOPE OF WORK CONTINLJED) " ...." .'~',' .1''',~'
~~"-'",,,L,;~.:.!d:.;.,'i~!F'~'''''';~;_"''':''7.\;;'' l\:"" . ....'"" '..<", ,\", _"'~'l~"'~."- ~~~.-V
· Safety - provide the highest level of safety possible while mitigating major safety concerns such
as narrow roadway segments. This will be determined through discussions with staff, field
observations, and the accident analysis. We will also identify high vehicular traffic locations and
present the opportunities and constraints associated with the proposed bike and pedestrian vis-a-
vis general circulation.
· Planned Roadway Improvement Projects - take advantage of planned roadway improvements
that may accommodate bicycle facilities with relatively little additional cost.
· Coordination With Existing Plans - identification of consistency with other local, County, and
regional plans
Bicycle Facilities
The Parametrix Team will recommend a network of bicycle facilities including bicycle lanes, shared use
paths, and neighborhood bicycle routes (called bicycle boulevards or routes) and supporting amenities.
All proposed bikeway facilities will be described by the classification system developed by AASHTO in
"A Policy on Geometric Design," and by the latest research conducted by FHW A on bikeway planning
and design. The classification system consists of the following categories:
· Shared Use Paths: bicycle or multi-use paths separate from roadways, with at-grade or grade-
separated crossings
· Bike Lanes: striped bicycle lanes, typically on the right-hand side of roadways
· Bike Routes: shared roadways, often in neighborhoods, on which traffic calming, intersection
treatments, signage, and other improvements ensure safe and convenient shared use. Also refers to
major roadways that provide adequate shoulder or curb lane width and signing, but no striping.
Building off of the existing network, The Parametrix Team will propose a network of bikeways. Prior to
recommending specific routes, we will confer with the stakeholder group and the larger public to learn of
the preferences for vehicle lane widths, the type of streets on which the City is willing to put bikeways,
and other pertinent details. We will select candidate routes to consider for bikeways before going into the
field. Each of these candidate routes will be measured from curb to curb, explored by The Parametrix
Team staff via bicycle, and assessed for its potential as a bikeway.
We will develop recommendations as to what can be done to improve selected streets or corridors as
bikeways. We. will describe the classification of each of the recommended routes, their starting and
ending points, as well as the destinations and neighborhoods they will serve. We will propose typical
cross-sections of each of the recommended streets with added bike lanes including typical lane widths and
restriping that would be needed. We will describe any paving, striping, signage, and other improvements
needed to create each of the bikeways. We will also prepare a cost estimate for each bikeway.
Bicycle Parking and Support Facilities
The Parametrix Team will recommend a public bicycle-parking program focused on employment centers,
major shopping centers, public buildings with high rates of visitors, and schools. Bicycle parking
improvements recommendations for these locations will include:
City of Bremerton
Non-Motorized Transportation Plan
Scope of Work
7
December 2006
\t"., , ,~"'C'~' .'. > ,~ SC EO K CO U . '. ,~
r">~~~i:,:.'~:-';',,""'..i(~' ,'0.> ;; ,;,', .., OP F WOR ( NTIN ED) , ,:' ~~',~~;,~~J: ,.';,"l,~" ,,-
· the appropriate type of bicycle parking for each location (racks or lockers)
· design standards for bicycle racks that are easy to lock to, support bicycles well, and are suitable to be
placed in public spaces
· the availability of physical infrastructure to accommodate bike racks in parking lots and on sidewalks
· general design standards for appropriate bicycle parking locations
· an approximate number of bicycle parking devices needed region-wide; and,
· a cost estimate for the program,
The bicycle parking program will focus on use public right-of-way and lands, such as sidewalks and
parking lots. Additionally, we will recommend means of retrofitting existing commercial and retail
buildings to include bicycle parking.
The Parametrix Team will recommend guidelines for employment site amemtIes that accommodate
bicycle commuters. These amenities will include bicycle parking, showers, and clothing lockers. The
guidelines will include:
.
the appropriate type of bicycle parking needed
the number of bicycle parking spaces needed according to land use type and size
appropriate locations for bicycle parking along with spacing recommendations
an adequate number of showers and clothing lockers according to land use type and size
.
.
.
These guidelines will be suitable for developer requirements or as a regulating ordinance.
Pedestrian Facilities
Based on our findings from the existing conditions analysis and needs analysis, The Parametrix Team will
develop specific recommendations to improve the pedestrian environment in Bremerton. The primary
focus will be locations having the highest numbers of recorded pedestrian accidents. The secondary focus
will be areas documented as having the highest level of pedestrian activity.
We will propose specific improvements and at ten to fifteen of the highest priority locations.
Recommendations may include such intersection enhancements as:
· new crosswalks
· enhanced crosswalks
· refuge islands
· new pedestrian signals
· improved signage or pavement markings
· curb extensions
· in-pavement flashing markers
· countdown signals
· wider sidewalks
· ADA ramps or improvements to existing ramps.
City of Bremer/on
Non-Motorized Transportation Plan
Scope of Work
8
December 2006
~,},~,:~&"::~.,;","'~L'~~'1i,.:., ,'SCOPE-OF WORK CONTINUEP) - '. _' "0': ~.~_[:.~.-"':::.;t.",
We will prepare general recommendations for improving the walking environment along Bremerton's
residential streets. These recommendations may include such improvements as:
· decorative street lighting
· street furniture
· improved landscaping
· improved ADA ramps; and,
· sIgnage
Safe Walk Routes to School Improvements
Safe Routes to School programs help encourage more children to bicycle and walk to school through
engineering, education, encouragement, and enforcement. The Parametrix Team will work with the
stakeholder group to develop programmatic and site-specific safe routes to school recommendations for
the community. Ultimately, safe routes to school plans are co-operative ventures, and their success
depends on informing, consulting, and involving everyone with an interest in the project. The Parametrix
Team will establish a framework for the City of Bremerton and the local school district to carry out this
process.
The Parametrix Team will identify eXIstmg general barriers to walking to school, including school
policies, and propose feasible projects for eliminating those barriers. We will recommend programs to
increase the number of children walking to school, and suggest methods to integrate pedestrian systems
linking schools with other community trip generators. The plan will also provide tested strategies that can
be adopted by the School District.
Depending on map resources available to the consultant, The Parametrix Team will create a "Route to
School Map" for up to two selected neighborhood schools. The Parametrix Team will prepare a route and
targeted improvement map for each of the target schools. Each school plan will include a description,
cost estimate, and photograph ofthe location for each high priority project, up to three projects per school
(as available information permits). Additional projects will be provided in tabular form with a project
location, planning level cost estimate, and photograph.
Assumptions
· The Parametrix Team will lead the identification of project improvements in this task with
support and input from City of Bremerton and Bremerton School District staff
Deliverables
. Section of the final report and maps depicting non-motorized transportation system improvements
in the City of Bremerton
. "Route to School Map" for up to two selected neighborhood schools
City of Bremerton
Non-Motorized Transportation Plan
Scope of Work
9
December 2006
~"'.;;i~i;,;:'''';~ ~'.,i'~,,, ~: '.' ,,', . SC"PE "F W"RK (C"NTINUED)' '. ".,' . 1.j' < 0'. ,:,~, '
~ M,,,p,.,,4...;~"_<"~~~:*.,,tt,,,,,,;,_.~';",":'"1,,,.... ,~~ U. v v v ,,, .~,' ,,,:, : "~_:';:'~"::"_'" J:.-:'''''''1<?.~''' ;s,.1~
Task 06 - Plan Implementation and Funding Strategy
Task Objective
To develop a strategy to implement the plan and seek funding for individual projects
Approach
Recommended bicycle, pedestrian, and safe routes to school programs and improvements will be ranked
according to long range comprehensive plan criteria and submitted to city staff and the stakeholder group
for review and comments. These criteria will include those listed below and others developed with the
stakeholder group,
.
Closure of a critical gap or correction of an existing system bottleneck
Improvement or program that serves an immediate safety need
Segment which will attract high usage
Current availability and/or suitability of right of way
Service to a previously neglected part of Bremerton
Cost effectiveness
Projected reduction in vehicle trips and vehicle miles traveled
Integration into the existing regional bikeway system
Interface with other modes
Local political and community support
.
.
.
.
.
.
.
.
.
The recommended programs and improvements will next be evaluated according to specific criteria listed
in funding sources such as SAFETEA-LU Each source requires a different type of project and
documentation of impacts and benefits. Because of this, the selected routes or improvements will be
developed in sufficient detail to qualify for the most stringent program requirements. Other criteria to be
applied from SAFETEA-LU include an emphasis on commuter routes, coordination with adjoining
community bikeways, coordination with other modes (transit), a completed and adopted bikeway plan,
and compatibility with regional transportation plans.
Our Team will work closely with the stakeholder group and staff throughout the selection and ranking
process, lending expertise on funding, planning, and design guidelines when required. We will also
conduct another field review to crosscheck the feasibility of certain sections, which may present
implementation challenges,
A phasing plan will be developed based on the ranking outcome combined with (a) funding availability
and requirements, (b) other programmed transportation improvements, (c) eliminating an immediate
bottleneck or safety hazard, and (d) ensuring that the system grows rationally rather than as a series of
disconnected pieces over time. The Phasing Plan will recommend a ranking (short-term, intermediate-
term, and long-term) to complete a system over the next 10 to 20 years.
City of Bremerton
Non-Motorized Transportation Plan
Scope of Work
10
December 2006
!ir?:!>~>:,,\:~~i::'{~ "" :2. " .- 0 , ~eOPE OF WQRK (CONTINUED) . '.. . ,., :.';i.:_'Y,:~:;';,;~'~
Each segment will be evaluated according to an estimated cost-per-mile and estimated on-going
maintenance and operation costs by implementation phase based on comparable experiences.
Departmental responsibility will also be identified, as will the relationship to possible funding and other
specific requirements.
The Parametrix Team will identify major federal, State, Regional and local funding sources for the
proposed bicycle, pedestrian and safe routes to school project. Cost estimates of the phased
improvements will be compared with funding needs, so that long term programming for local matching
funds can be accomplished. This will include estimates of operating and maintenance costs that are
usually borne by local governments. A table identifying available funding sources and applicability to
specific priority projects will be provided in the final report.
Assumptions
. The Parametrix Team will lead the preparation of preliminary project cost estimates, with
assistance from City of Bremerton staff regarding recent unit price information
· The Parametrix Team will lead preparation of funding source identification supplemented by City
of Bremerton Staff experience and knowledge of existing funding sources
Deliverable
· Section of the final report summarizing preliminary cost estimates and funding sources for non-
motorized transportation system improvements in the City of Bremerton
Task 07 - Draft and Final Report
Task Objective
To prepare draft and final non-motorized transportation plan documents
Approach
The Parametrix Team will prepare draft and final reports. The reports will include:
· title page
· table of contents
· executive summary
· discussion of existing conditions
· needs analysis and survey results
· conclusions
· bicycle facility improvement recommendations (short-, intermediate-, and long-term)
City of Bremerton
Non-Motorized Transportation Plan
Scope of Work
II
December 2006
~\;k.',!'." ,', :;;',,;,. -t ~ ,,', .~,., SCOPE OF WORK (CONTINUED) . . , '.. . ,',', q,.:t: 'I.
tf!~'::f,~l:;-'!&~~tt",","'t"';'.1'cl..,"A#' 1"" ,,:, . ,'. .,'"" ~ "" "'"{T"'" ,t';k;"l ., \:'~.~;:~
.
pedestrian facility improvement recommendations (short-, intermediate-, and long-term)
school access recommendations (short-, intermediate-, and long-term)
appropriate tables, figures, and appendices
references and bibliography
technical appendices (as required)
.
.
.
.
The pedestrian section of the report will include a prioritized list of recommended projects, project sheets
with detailed descriptions of the top 10 to 15 priority projects, and cost estimates as well as an
implementation plan.
The plan report will also include maps and graphics that depict facility improvements ranging from
bikeways and bicycle parking to intersection improvements and signage.
Assumptions
. The Parametrix Team will lead preparation ofthe Draft and Final reports
. City of Bremerton staff will be responsible for providing one consolidated set of comments from
the internal review team on the Draft report
Deliverable
. Five hard copies and an electronic version of the Draft Non-Motorized Transportation Plan
. Twenty hard copies and an electronic version of the Final Non-Motorized Transportation Plan
City of Bremerton
Non-Motorized Transportation Plan
Scope of Work
12
December 2006
10
Task Name
1 Project Management
: f~mE~~5~:~~f~::'uo.-
,
5 j ..~I~~ningcomrnissionand.Ciiycoundl Meetin~:m
6 I Existing Conditions Inventory
:l:::::~;:::::~;:~~:~'..........
9 , Plan Implementation and Funding
mmm1omtOraii Report
I
11mm FinafRepor!
Bremerton
Non-Motorized Transportation Plan
Duration
192 days.
145 days
5 days,
..~.....
5 days'
5 days!
27 days ,
35 days ,
40 days
35 days
Mon 6/25/07
Mon 9/10/07
. Thu2/1ibj
Thu 2/8/07
Thu 3/29/07
Thusi24ibj
Fri 9/14/07
Fri 3/2/07
Fri 6/29/07
Fri 9/14/07
Fri 3/9/07
\\BELL-FS 1 IPROJECTS\Clients\ t896-City of BremertonlBremerton Non-Moterized Plan\Schedule\Non-Motorized Plan_12t916.mpp
o::l
t--<
........
S
~
~
PARAMETRIX
BUDGET ESTIMATE
Form 01-PD-41/Rev. 01/06
PROJECT: Non-Motorized Transportation Plan
CLIENT: City of Bremerton
PMX# BILLING Project Transp. GIS Tech Aide Design Graphics Word Principal
MULTIPLIER: STAFF Manager Planner (Chen) (Wainhouse) (Martin) Engineer (Burton) Processing (Webb)
(Perlic) (MacDonald) TOTAL TOTAL
PHASE TASK ORG CODE 3.10 BILL RATES $185.00 $85.00 $86.00 $65.00 $133.00 $91.00 $5800 $146.00 HOURS COST
- I
1 Project Management 4 I 8 12 $1,260.00
- -
2 Community Outreach and Participation 32 16 16 8 4 76 $9,96800
- -
3 Existing Conditions Inventory 8 40 48 $4,880.00
- c----
4 Identify System Deficiencies 16 32 4 52 $6,024.00
- -
5 Identify System Improvements 20 40 60 $7,10000
-
6 Plan Implementation and Funding 8 24 32 $4,672.00
- -
7 Draft and Final Report 20 48 18 20 16 16 2 140 $13,304.00
- -
- -
- -
- 1-
- -
- -
- -
- -
- -
-
- -
-
- -
- -
- -
-
Labor Subtotal at Current Salary Rates 108 176 38 28 24 24 16 6 420 $47,208.00
Estimated % of project completed before next salary increase Additional Labor Cost
Salary Escalation
Estimated % of next salary increase from salary escalation
In-House Expense Item Quantity I Unit Cost Unit I Direct Cost I
$0.445 mile
$0.10 sheet
$1.00 sheet
....
$2.00 sheet
$15.00 each
Outside Expenses Description Direct Cost % Markup
Other Expenses Direct Expenses @ 6% of Labor $47,208.00 6% $2,832.48
15%
Alta $47,557.50 5% $49,93538
Sub consultants 10%
10%
PROJECT TOTAL $99,975.86
Prepared By:
Reviewed By:
Approved By:
(Project Manager)
(Division Manager)
(Principal)
~f~}~l~1:;;; :5,L~~l t;~.';..;k~:,~:\Y.:~~'i,:,i 1~}
. 'HIBI1\'C,( i...)L,
'" ;1:{;I;,P;.~i: ,1;1 ( \A~iUl~I;:/i':
Project Delivery System
Page 1 of 1
File Name: Bremerton Non-Motorized Plan Budget
Date Printed: 12/21/2006
PARAMETRIX
BUDGET ESTIMATE
Form 01-PD-41/Rev. 01/06
PROJECT: Non-Motorized Transportation Plan
CLIENT: City of Bremerton
PMX# BILLING Project Planner Designer Clerical I
MULTIPLIER STAFF Manager (Birk) (Renlro& (VItkay) (Morgan)
Tressider) TOTAL TOTAL
PHASE TASK ORG CODE 3.10 Bill RATES $1\5.00 $70.00 $7500 $55.00 HOURS COS7
- -
1 Project Management
- -
2 Community Outreach and Participation 40 24 14 78 $8,530.00
-
3 Existing Conditions Inventory 16 40 56 $5,120.00
-
4 Identify System Deficiencies 16 60 76 $6,520.00
- -
5 Identify System Improvements 20 120 16 8 164 $12,940.00
-
6 Plan Implementation and Funding 8 48 8 64 $4,960.00
- -
7 Draft and Final Report 16 50 20 86 $6,920.00
-
-
-
- -
-
-
- -
- -
- -
- -
-
- -
- -
- -
- -
- -
- -
labor Subtotal at Current Salary Rates 116 342 30 36 524 $44,990,00
Estimated % of project completed before next salary increase Additional labor Cost
Salary Escalation
Estimated % of next salary increase from salary escalation
In-House Expense Item Quantity Unit Cost I Unit Direct Cost I 11..\....'1' .111..11......
Mileage 1500 $0.445 mile $667.50 $667.50
Photocopies (6& W 500 $0.10 sheet $50.00 $50.00
Photocopies (Color 250 $1.00 sheet $250.00 $25000
Plots (Color) 20 $3000 sheet $600.00 $600.00
lodging and Meal 5 $20000 each $1,000.00 $1,000.00
Outside Expenses Description Direct Cost % -=
Other Expenses 6%
15%
10%
Subconsultants 10%
10%
PROJECT TOTAL $47,557.50
Prepared By:
Reviewed By.
Approved By.
(Project Manager)
(Division Manager)
(Principal)
Project Delivery System
Page 1 of 1
File Name: Bremerton Non-Motorized Plan Budget (Alta)
Date Printed. 12/21/2006