Contract Number 4367
STIRNCO STEEL STRUCTURES
Fire Storage. Building
Econ Devel
CON File Class LEG 12-1
$155529.00
06/10/2003
09/30/2003
02/15/2006
GL $
AL $
E&O $
Insurance Total $
Insurance Review Date
VAULT 01/01/2006
June 10, 2003
STIRNCO
Kathleen McCluskey
Steel Structures Administrative Services Director
GENERAL CONTRACTORS City of Bremerton
239 4th St.
Bremerton, Wa., 98337
Re: Fire Station Maint. Bldg.
Change Order #3
Dear Ms. McCluskey:
We offer the following change to our Contract:
Delete Overhangs around Building -$4,600.00
Add Rigid Insulation with Lamtec PVC Backing to Overhead Doom $220.00
TOTAL DEDUCT FOR THIS CHANGE -$4,380.00
Dale F. Stirn
Cc Mike Biggs
PO Box 2033 Tacoma WA 98401-2033 253 572 0360 FAX 253 572 0366 www.stirncosteel.com
June 9, 2003
STIRNCO
Kathleen McCluskey
Stee! Structures Administrative Services Director
GENERAL CONTRACTORS City of Bremerton
239 4th St.
Bremerton, Wa., 98337
Re: Fire Station Maint. Bldg.
Change Order #2
Dear Ms. McCluskey:
We offer the following change to our Contract:
Remove 6" Crushed Rock under Slab (to be placed by PWD)
(Approximately 85 Yards of Material) -$2,840.00.00
We will need to place the oil water separator, and, possibly, the rough
Plumbing for the center floor drain prior to installation of this material.
Dale F. Stirn
Cc Mike Biggs
PO Box 2033 Tacoma WA 98401-2033 253 572 0360 FAX 253 572 0366 www,stirncosteel,com
June 6, 2003
STIRNCO Kathleen McCluskey
Stee! Structures Administrative Services Director
GENERAL CONTRACTORS City of Bremerton
239 4th St.
Bremerton, Wa., 98337
Re: Fire Station Maint. Bldg.
Change Order #1
Dear Ms. McCluskey:
We offer the following changes to our base bid of $92,300.00
1. Change Wall Sheeting to 26 Gauge and remove future door openings -$378.00
2. Replace wind columns with x bracing -$944.00
3. Add Wash Pay Enclosure $16.944.00
4. Add Concrete/Floor Drains Per Mike Biggs Letter 5/6 (Maximum) $51,107.00
5. Modify Floor Drain/Catch Basin to Reduce Cost (If Approved by
City of Bremerton) -$3,500.00
TOTAL COST OF CHANGE #1 (Maximum) $63,229.00
TOTAL REVISED CONTRACT AMOUNT (Maximum) $155,529.00
Dale F. Stirn
PO Box 2033 Tacoma WA 98401~2033 253 572 0360 FAX 253 572 0366 www.stimcosteel.com
~.~,-]~-C. 07:Z'.an Froa-$ilvara~le Plumbinl& Heatini inc 3806~21867' T-047 POI/OS
silverdale plumbing & heating inc.
D&te-' Ma}, 15, ~003
To: Dale Stirn
Stirnco S~el Structures
From: Dennis Dlugosh
Silverdale Pltlmbing & Heating, Inc.
Fire Department Storage Building
I~LI/MBINQ ~OOI~E OF WORK Afl
Credit to change the type of trench drain and oil/water separator
{see attached submittalI.
Cred/t of: $3,800.00
Exclusions: · Trenching and backfill
· Washington State Sales Tax
Submitted by ' De' '~"'"'-}~oshnnis DI~
· 11875 Sztverdale Way NW, Suite 104 - SztverdaZe, WA 98383 · (360) 692-8840 - Fax (360) 692-1867
~:,-15-05 0,~:22~ Frcm-$ilYerda. le P;~.mbinli Heatini Inc 3~06~ E67 T-047 P 0Z/03 F-IG9
Z 86 6" TRENCH
SYSTEM
;,~, : -~r . ~"
~eall De~h Max. F~ ENGINEERING 8PECIFICATIO~; ~m Z~8~ ~w~e Pre~ op~
C~n~l In.es ~ Wt. TrenCh Dml~age ~ys~m. H~gn d~ns~ ~lyemytene structu
Numar C D ~
M~ Ma~ (G~ ,~Gra~6] com~ drain chan~l w~tn 75% bo~m slo~ Alt secbons 80
~nch modular lengths w~ ~n~ml ~p f~me, ~rlock~ng enas and
~1 3 5 4 i 93 14 maiuse~m Comb~n~e~ll~ehngdewcesat20-~nch
~2 4.1 47 122 15 ~n~als Furnished w~ hea~u~ ~.~-~a~ ~shron 9ta~e
~3 4 7 5 3 152 ~6 unless othe~i~
PREFIX
~3N 5.3 5 3 17
~ Z- Struc~ml Com~s~te Cnannel w~
~ 5.3 5.9 183
~u~-C~ Cast I~
~5 5.9 65 214 ~ ~TE: ~tuai channel ~eng~ ~s 81-1/4" ~o atlow for ove~ap
~ 6.5 7 1 245 21 -GD
~N 7.1 7 1 ~ ~G Flbergla~Gram
~7 7 1 7.7 278 ~ ~ Ex~ Heaw Du~ Frame Assy. W/Anchor
~8 7 7 8.3 3~ ~ Stuas a~ G~ L~kaown Har~te
~ 8 3 8,9 339 ~ ~ ~ Galv. E~m H~W Du~ Frame ~sy.
Ancot Studs and Gra[e k~k~ Hard.re
~10 8.9 9S 371 27 - ~DS S S ~ Heaw Da~ Frame Assy. W/Anc~ar
~11 95 10 1 4~3 ~ Stoas an~ Gmmk~aown Ha~ware
~12 19 1 1~ 7 435 ~ -~G HeavyDu~
' ' ~PD m~kPr~f Du~de Gram
. ~612N 1~7 10.~ ~ ~ ~PP HeekPt~fP~l~emyleneGmte
~13 10 7 11 3 ~7 31 ~ ~ Join~Co~ne~ar
~ -ED DuPle I~n Long~[~oinal SIo~ed Gra~
~14 11.3 11 9 498 ~ -, -PG PeE0ra~dGalv.~lG~
~15 11.9 1Z5 530 ~ -PS Pe~orat~ Sa. S{
SUFF~S ~ Rein~rc~lv. $teelSIO~Gram
-BG G~vamz~Du~delronCastBarG~t~ ~ ~
-~ D~a~tlve Broke G~te ~ Re~ S~, ~ Pedom~
~G Cas[ Iro~ Stoma Gra[e - ~ S~mless Stol Cast Bar
~ Ba~m Dome S~ner ~VF Ty~ 304 S~. St Ta~ Ven~
~D~etranCas[BarGra~ ~. ~2 2"No-Hu~BO~mOutle~
~ 3" No-Hua ~
~I C~En~Cap ~ ~ 6"NO-HuD~mOutlet
~ 2" NO-~uD En¢ Outer -~ Van~ Preteen:er
~ ~ No~ub Ena Ou~e~ -WC W~ Ac~d Res~s~nt C~a
~ 4" ~H~ Ena Oa~ , -WD W~ ~-R~s~nt Coa~a Duffle
~ 6"No-HubEnaOu~t R~..,,~
~ G~v.S~tSm~Grate ~/01 C.N. NO. 88046
~ Fa~a S~I ~ S~ed
- ~ G~an~dCastlronGm~ ~.~. 50358 ~. Z~86
DATE: June 9, 2003
OWNER: City of Bremerton
239 Fourth Street
Bremerton, Wa. 98337
CONTRACTOR: Stirnco Steel Structures
PO Box 2033
Tacoma, Wa. 98401-2033
CONTRACT AMENDMENT:
The following Section 12 Miscellaneous (L) shall be added to the contract between the
City of Bremerton and Stirnco Steel Structures dated June ~ , 2003.
Section 12. Miscellaneous.
L. ~ed Dam~. CITY and CONTRACTOR recognize that time is of the
essence of this Agreement and that the CITY will suffer financial loss if the work
is not completed within the times and phases specified in Section 2 herein, plus
any extensions thereof allowed in accordance with Section 7 of this agreement or
the General Conditions & Supplementary Conditions. The CITY and
CONTRACTOR also recognize the delays, expense, and difficulties involved in
proving in a legal proceeding the actual loss suffered by the CITY if the work is
not completed on time. Accordingly, instead of requiring any such proof~ the
CONTRACTOR shall pay the CITY $100.00 as liquidated damages for each day
that expires a~er the dates or times specified in Section 2 herein for Substantial
Completion and Final Completion of the work in accordance with the General
Conditions and Supplementary Conditions. This provision has been specifically
· negotiated.
Dated this day of June, 2003.
STIRNCO STEEL STRUCTURES CITY OF BREMERTON
D~I¢ Stim, President Cary Bozemart, Mayor
'C 'Clerk (
PUBLIC WORKS AGREEMENT
THIS AGREEMENT, is entered into between the City of Bremerton, a Washington
Municipal Corporation ("City"), and Stimco Steel Structures ("Contractor") whose mailing address
is 227 Tacoma Avenue South, Tacoma, WA 98401.
The parties agree as follows:
1. CONTRACTOR SERVICES. The Contractor shall perform the following services
for the City: Provide and erect a 50-foot wide by 91 foot long by 17 foot high (at eave line) pre-
engineered metal building in accordance with the contract drawings and specifications. This
includes the approximately 25 foot wash bay in Additive Bid Item #1. Provide column reactions to
Owner. Erect building on a foundaf~on and floor slab constructed by contractor. Provide
mechanical, electrical, pavement and utility connec(ions as specified in the drawings and
specifications. The above referenced contract drawings and specifications are attached as Exhibit
2. TIME OF COMPLETION. Contractor shall complete the work within 120 (one
hundred twenty) calendar days from the date of issuance of the City's Notice to Proceed.
3. COMPENSATION. The City shall pay the Contractor the total amount of
$107,922.00 plus any applicable Washington State Sales Tax, for the pre-engineered metal building
and Wash Bay. The City shall pay an amount not to exceed $47,607.00 for the concrete foundation
and drain system. The Contractor shall invoice the City monthly. The City will pay for the portion
of the work described in the invoice that has been completed by the Contractor and approved by the
City. The City payment shall not constitute a waiver of the City's right to final inspection and
acceptance of the project.
A. Performance Bond. Pursuant to Chapter 39.08 RCW, the Contractor, shall
provide the City a performance bond for the full contract amount to be in
effect until sixty (60) days after the date of final acceptance, or until receipt
of all necessary releases from the State Department of Revenue and the State
Department of Labor and Industries and until settlement of any liens filed
under Chapter 60.28 RCW, whichever is later.
B. Retainage. The City shall hold back a retainage in the amount of five percent
(5%) of any and all payments made to contractor for a period of sixty (60)
days after the date of final acceptance, or until receipt of all necessary
releases from the State Department of Revenue and the State Department of
Labor & Industries and until settlement of any liens filed under Chapter 60.28
RCW, whichever is later.
C. Defective or Unauthorized Work. The City reserves its right to withhold
payment from Contractor for any defective or unauthorized work. Defective
or unauthorized work includes, without limitation: work and materials that
do not conform to the requirements of this agreement; and extra work and
materials furnished without the City's written approval. If Contractor is
Stirnco Steel Page 1 of 8
unable, for any reason, to satisfactorily complete any portion of the work, the
City may complete the work by contract or otherwise, and Contractor shall be
liable to the City for any additional costs incurred by the City. "Additional
costs" shall mean all reasonable costs, including legal costs and attorney fees,
incurred by the City beyond the maximum Contract price specified above.
The City further reserves its right to deduct the cost to complete the Contract
work, including any Additional Costs, from any and all amounts due or to
become due the Contractor.
D. Final Payment: Waiver of Claims. THE MAKING OF FINAL PAYMENT
(EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A
WAIVER OF CLAIMS, EXCEPT THOSE PREVIOUSLY AND
PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS
UNSETTLED AT THE TIME REQUEST FOR FINAL PAYMENT IS
MADE.
4. INDEPENDENT CONTRACTOR. Contractor is and shall be at all times acting as
an independent contractor and not as an employee of the City. The Contractor shall secure at its
expense, and shall be responsible for all payments of income tax, social security, state disability
insurance compensation, unemployment compensation, and all other payroll deductions for the
Contractor, officer, agents, employees and sub-contractors. The Contractor shall also secure all
applicable business licenses, if required, in connection with the contract services, including all
required licenses for Contractor's officers, agents, employees and sub-contractors.
5. TERMINATION. The City may terminate this agreement for good cause. "Good
cause" shall include, without limitation, any one or more of the following events:
A. The Contractor's refusal or failure to supply a sufficient number of properly
skilled workers or proper materials for completion of the Contract work.
B. The Contractor's failure to complete the work within the time specified in
this agreement.
C. The Contractor's failure to make full and prompt payment to subcontractors
or for material or labor.
D. The Contractor's persistent disregard of federal, state or local laws, rules or
regulations.
E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt.
If the City terminates this agreement for good cause, the Contractor shall not receive any
further monies due under this agreement until the Contract work is completed.
6. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay
Prevailing Wages," with the State of Washington Department of Labor & Industries prior to
commencing the Contract work. Contractor shall pay prevailing wages and comply with Chapter
39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate
provisions. The latest prevailing wage rate revision issued by the Department of Labor and
Industries is attached.
Stirnco Steel Page 2 of 8
7. CHANGES. The City may issue a written change order for any change in the
Contract work during the performance of this agreement. If the Contractor determines, for any
reason, that a change order is necessary, Contractor must submit a written change order request to
an authorized agent of the City within fourteen (14) calendar days of the date Contractor knew or
should have known of the facts and events giving rise to the requested change. If the City
determines that the change increases or decreases the Contractor's costs or time for performance,
the City will make an equitable adjustment. The City will attempt, in good faith, to reach
agreement with the Contractor on all equitable adjustments. However, if the parties are unable to
agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor
shall proceed with the change order work upon receiving either a written change order from the City
or an oral order from the City before actually receiving the written change order. If the Contractor
fails to require a change order within the time allowed, the Contractor waives its right to make any
claim or submit subsequent change order requests for that portion of the contract work. If the
Contractor disagrees with the equitable adjustment the Contractor must complete the change order
work; however, the Contractor may elect to protest the adjustment as provided below:
A. Procedure and Protest by the Contractor. If the Contractor disagrees with
anything required by a change order, another written order, or an oral order
from the City, including any direction, instruction, interpretation, or
determination by the City, the Contractor shall:
1. Immediately give a signed written notice of protest to the City;
2. Supplement the written protest within fourteen (14) calendar days
with a written statement that provides the following information:
a. The date of the Contract's protest.
b. The nature and circumstances that caused the protest.
c. The provisions in this agreement that support the protest.
d. The estimated dollar cost, if any, of the protested work and
how that estimate was determined.
e. An analysis of the progress schedule showing the schedule
change or disruption if the Contractor is asserting a schedule
change or disruption.
The Contractor shall keep complete records of extra costs and time
incurred as a result of the protested work. The City shall have access
to any of the Contractor's records needed for evaluating the protest.
3. The City will evaluate all protests, provided the procedures in this
section are followed. If the City determines that a protest is valid, the
City will adjust payment for work or time by an equitable adjustment.
No adjustment will be made for an invalid protest.
B. Contractor's Duty to Complete Protested Work. In spite of any protest, the
Contractor shall proceed promptly with the work as the City has ordered.
C. Contractor's Acceptance of Changes. The Contractor accepts all
requirements of a change order by: (1) endorsing it, (2) writing a separate
acceptance, or (3) not protesting in the way this section provides. A change
order that is accepted by Contractor as provided in this section shall
Stirnco Steel Page 3 of 8
constitute full payment and final settlement of all claims for contract time and
for direct, indirect and consequential costs, including costs of delays related
to any work, either covered or affected by the change.
D. Failure to Protest Constitutes Waiver. By not protesting as this section
provides, the Contractor also waives any additional entitlement and accepts
from the City any written or oral order (including directions, instructions,
interpretations, and determination).
E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the
procedures of this section, the Contractor completely waives any claims for
protested work and accepts form the City any written or oral order (including
directions, instructions, interpretations, and determination).
8. CLAIMS. The Contractor shall give written notice to the City of all claims other
than change orders within fourteen (14) calendar days of the occurrence of the events giving rise to
the claims. Any claim for damages, additional payment for any reason, or extension of time,
whether under this agreement or otherwise, shall be conclusively deemed to have been waived by
the Contractor unless a timely written claim is made in strict accordance with the applicable
provisions of this agreement; or, if (and only if) no such provision is applicable, unless that claim is
set forth in detail in writing and received by the City within seven (7) calendar days from the date
Contractor knew, or should have known, of the facts giving rise to the claim. At a minimum, a
Contractor's written claim must include the information set forth regarding protests in Section
7.A.2.a.-e.
FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM
WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS
ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM
OR CAUSED BY THAT DELAY.
Contractor must, in any event, file any claim or bring any suit arising from or connected
with this agreement within 120 calendar days from the date the contract work is complete.
9. WARRANTY. The Contractor shall correct all defects in workmanship and
materials within one year from the date of the City's acceptance of the Contract work. When
defects are corrected, the warranty for that portion of the work shall extend for one year form the
date such correction is completed and accepted by the City. The Contractor shall begin to correct
any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the
Contractor does not accomplish the corrections within a reasonable time, the City may complete the
corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the
correction.
10. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its
officer, officials, employees, agents and volunteers harmless from any and all claims, injuries,
damages, losses or suits including all legal costs and attorney fees, arising out of or in connection
with the performance of this agreement, except for injuries and damages caused by the City's
negligence.
The City's inspection or acceptance of any of Contractor's work when completed shall not
be grounds to avoid any of these covenants of indemnification.
Stirnco Steel Page 4 of 8
Should a court of competent jurisdiction determine that this agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Contractor and
the City, its officials, employees, agents and volunteers, the Contractor's liability hereunder shall be
only to the extent of the Contractor's negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS
INDEMNIFICATION CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY
UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF THIS
INDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE MUTUALLY
NEGOTIATED THIS WAIVER.
The provisions of this section shall survive the expiration or termination of this agreement.
11. INSURANCE. The Contractor shall procure and maintain for the duration of this
agreement insurance of the types and in the amounts described below against claims for injuries to
persons or damage to property which may arise from or in connection with the performance of the
work by the Contractor, its agents, representative, employees, subconsultants or subcontractors.
Before beginning work on the project described in this agreement, the Contractor shall
provide a Certificate of Insurance evidencing:
1. Automobile Liability insurance with limits no less than $1,000,000 combined
single limit per accident for bodily injury and property damage; and
2. Commercial General Liability insurance written on an occurrence basis with
limits no less than $1,000,000 combined single limit per occurrence and
general aggregate for personal injury, bodily injury and property damage.
Coverage shall include but not be limited to: blanket contractual;
products/completed operations/broad form property damage; explosion,
collapse and underground (XCU); and employer's liability.
3. Excess Liability insurance with limits not less than $1,000,000 per
occurrence and aggregate.
Any payment of deductible or self insured retention shall be the sole responsibility of the
Contractor.
The City, its officials, employees, agents and volunteers shall be named as an additional
insured on the insurance policy, as respects work performed by or on behalf of the Contractor and a
copy of the endorsement naming the City as additional insured shall be attached to the Certificate of
Insurance.
The Contractor's insurance shall contain a clause stating that coverage shall apply
separately to each insured against whom claim is made or suit is brought, except with respects to the
limits of the insurer's liability.
The Contractor's insurance shall be primary insurance as respects the City, and the City
shall be given thirty (30) calendar days prior written notice by certified mail, return receipt
requested, of any cancellation, suspension or material change in coverage.
Stirnco Steel Page 5 of 8
12. MISCELLANEOUS.
A. Nondiscrimination. In the hiring of employees for the performance of work
under this Agreement or any sub-contract hereunder, the Contractor, its sub-contractors, or any
person acting on behalf of such Contractor or sub-contractor shall not, by reason of race, religion,
color, sex, national origin, or the presence of any sensory, mental, or physical disability,
discriminate against any person who is qualified and available to perform the work to which the
employment relates.
B. Compliance with Laws. Contractor shall comply with all federal, state and
local laws, rules and regulations throughout every aspect in the performance of this agreement.
C. Work Performed at Contractor's Risk. Contractor shall take all precautions
necessary and shall be responsible for the safety of its employees, agents, and subcontractors in the
performance of this agreement. All work shall be done at Contractor's own risk, and Contractor
shall be responsible for any loss of or damage to materials, tools, or other articles used or held for
use in connection with the work.
D. Nonwaiver of Breach. The failure of the City to insist upon strict
performance of any of the terms and rights contained herein, or to exercise any option herein
conferred in one or more instances, shall not be constructed to be a waiver or relinquishment of
those terms and rights and they shall remain in full force and effect
E. Governing Law. This agreement shall be governed and construed in
accordance with the laws of the State of Washington. If any dispute arises between the City and
Contractor under any of the provisions of this agreement, resolution of that dispute shall be
available only through the jurisdiction, venue and roles of the Kitsap County Superior Court, Kitsap
County, Washington.
F. Attorney's Fees. To the extent not inconsistent with RCW 39.04.240, in any
claim or lawsuit for damages arising from the parties' performance of this agreement, each party
shall be responsible for payment of its own legal costs and attorney's fees incurred in defending or
bringing such claim or lawsuit; however, nothing in this subsection shall limit the City's right to
indemnification under Section 10 of this agreement.
G. Written Notice. All communications regarding this agreement shall be sent
to the parties at the addresses listed on the signature page of this agreement, unless otherwise
notified. Any written notice shall become effective upon delivery, but in any event three (3)
calendar days after the date of mailing by registered or certified mail, and shall be deemed
sufficiently given if sent to the addressee at the address stated on this agreement.
H. Assignment. Any assignment of this agreement by the Contractor without
the written consent of the City shall be void.
I. Modification. No waiver, alteration, or modification of any of the provisions
of this agreement shall be binding unless in writing and signed by a duly authorized representative
of the City and Contractor.
J. Severabilit¥. If any one or more sections, sub-sections, or sentences of this
agreement are held to be unconstitutional or invalid, that decision shall not affect the validity of the
remaining portion of this agreement and the remainder shall remain in full force and effect.
Stirnco Steel Page 6 of 8
K. Entire Agreement. The written provisions and terms of this agreement,
together with any attached Exhibits, supersede all prior verbal statements by any representative of
the City, and those statements shall not be construed as forming a part of or altering in any manner
this agreement. This agreement and any attached Exhibits contain the entire agreement between the
parties. Should any language in any Exhibit to this agreement conflict with any language contained
in this agreement, the terms of this agreement shall prevail.
IN WITNESS WHEREOF, the parties below have executed this agreement.
Dale Stim Cary Bozeman
Title: President Title:Mayor
Notices to be sent to: Notices to be sent to:
CONTRACTOR: CITY OF BREMERTON:
Dale Stirn Project Administrator
Stirnco Steel Structures 239 Fourth Street
227 Tacoma, Ave. South Bremerton, WA. 98337
Tacoma, WA 98401
APPROVED AS TO FORM:
ATTEST:
Br~rt~ City Clerk
Stirnco Steel Page 7 of 8
EXHIBIT "A"
DRAWINGS & SPECIFICATIONS
Stirnco Steel Paee 8 of 8