Loading...
HomeMy WebLinkAbout4320+Enter Search Criteria, Press Esc Key to Transmit Press Del Key to Terminate Delete Mode CHANGE Contract Transactions Contract Number 4320 + ~Vendor Name BAINBRIDGE ARCHITECTS/BREMERTON HOUSING AUTHORITY ~Subject ANDERSON COVE MASTER PLAN/URBAN DESIGN STUDY Department ECON DEVEL Status Code PRO Amount $35000.00 Begin Date 01/10/2003 Insurance End Date 08/31/2003 Type Amount Review Date 02/15/2006 + Insurance Total $0.00 Insurance Review Date + Comments & BREMERTON SCHOOL DISTRICT HOLD HARMLESS VAULT 01/01/2006 + ...... ~ ...... September 16, 2002 Proposal Date: September 16, 2002 To: Mayor Cary Bo~eman, City of Bremerton Washington Cc: Gary Sexton, Director of Economic Development, Breme~on WA. Merrill Wa,ace, Executive Director, Bremerton Housing Authority Betty Hyde, Superintendent, Bremerton School District 100-C From: Bill Isley FAIA, Architect, Bainbridge Architects Collaborative Seen Parker AIA, Architect, Bainbridge Architects Collaborative Reference: Preliminary Master Plan / Urban Design Study, Anderson Cove, Bremerton Washington Proposed Scope of work and estimated budget Based on our meeting and discussions with Gary Sexton and Merrill Wallace September 11, 2002 the Bainbridge Architects collaborative propose the following scope of work, approach, fees and schedule. Background ! UnderstandinR Historlcelly, Anderson Cove was a WWII government housing project built in the early 1~40s, which was subsequently individually sold to private properly owners. Over the years the housing and the general area has suffered extensive deter'iomtion due to deferred maintenance and neglect. Nearly all of the housing is rented with few owner occupied units. A gr~owing crime rate combined with the general condition of the area has negatively influenced the surrounding neighborhoods resulting in depressed and declining proper~y valuation. In response to this growing problem the City of Bremerton, the Bremerton Housing Authority and the Bramedon School District, is embarking upon a planning and redevelopment process, which will achieve each authority's mutual objectives toward neighborhood improvement with emphasis on the planning and financial viability of placement of a Bremerton Middle School in the greater Anderson Cove area. Anderson Cove Proposal Bainbridge Architects Collaborative Overall Objectives 1. Conceptualize an urban development "Action Plan" for the Anderson Cove area, which will lead to the redevelopment of key properties, and in turn will stimulate private improvements in surrounding properties. 2. Analyze location and financial viability of acquiring a minimum of 20 acres within the greater Anderson Cove area for the development of a new Bremerton Middle School. 3. Utilize federal, state and local programs to finance the acquisition, planning and associated public and private redevelopment projects. 4. Identify, plan and construct infrastructure improvement such as parks, open spaces, sidewalk and street improvement amenities necessary to entice new development. 5. Identify locations for the development of affordable housing of varying densities. 6. Identify and implement programs to assist surrounding properties in making physical improvements, including code variances, grants, tax reductions, subsidized loans and other financial incentives. Immediate Objectives 1. Prepare a "conceptual master plan / action plan "that the three agencies can embrace as a basis for discussion and to illuminate specific problems and opportunities. 2. Conclude this planning effort within 90 days. 3. Limit this initial planning effort to executive "in-house" discussions. Public outreach and stakeholders meetings will be initiated in subsequent phases once the agencies have concurred on a "concept direction". 4. Limit the budget for this phase of work to a: Conceptual Master Plan / Action Plan, vision graphics, and supporting data and documentation with a maximum professional fee of $30,000 plus $5,000 for direct expenses and graphic modeling. Study area Primary study area - 19th Street to the north including waterfront and properties north of and adjacent 19th Street, 13th street on the south, Naval Ave. on the east and Callow to the west. Secondary study area - Lafayette Avenue and North Wyckoff Avenue on the west, 24th Street on the north, 11th Street on the south and one property east of Naval Ave. on the east. See attached map exhibit A. Anderson Cove Proposal Bainbridge Architects Collaborative Project Scope of Work I. Meetings estimated hours 16 Briefings and progress meetings with COB, BHA and BSD; Four meetings including an initial briefing meeting and three progress meetings / presentations. II. Inventory, analysis and data collection estimated hours 60 1. Base map preparation including streets, tax parcels, topography, air photo and pertinent available GIS mapping from Kitsap County (by COB) 2. Summary of status of contaminated waterfront site at 19th Street and Naval Ave. (Including any documentation and correspondence from DOE. (COB)) 3. Incidents of police reports in primary study area (COB from PDR Group study) 4. Kitsap County tax assessment data by parcel including primary and secondary study areas (COB) 5. Mapping of existing property values from Kitsap County assessor database. 6. Bremerton School District footprint and site program requirements for the envisioned Middle School (BSD) 7. Middle School projected student population distribution (by BSD) 8. Select on-site photography 9. On-site visual inventory of primary and secondary study areas Summary of site area analysis drawings including: topography and land forms, site opportunities for school locations, views, existing parks and related amenities, generalized pattern of building condition and assessed value, specific problems and opportunities. III. Alternative Urban Design concepts estimated hours 40 Based on the above, prepare three concept site plans depicting the integration of: · Acquisition and redevelopment areas for both commercial and residential uses including housing types and densities. · Infrastructure improvements. · Open space and park improvements. ,, Potential school locations. · Joint public / private opportunities. · Areas needing financial assistance for private renewal and renovation. IV. Alternatives Evaluation estimated hours 32 Prepare a summary comparative analysis of the above alternatives related to generalized cost and benefit. V. Select and refine a preferred plan and / or approach estimated hours 60 VI. Draft "Action Plan" report text, graphics and illustrations estimated hours 120 3 Anderson Cove Proposal Bainbridge Architects Collaborative Fees The total professional services fee is estimated @ 328 hours @ average hourly rate of $91/hour = $30,000 Direct expenses including travel, printing, photography, and graphic illustrations, renderings, and vendor services - allowance = $5000 Total lump sum fee -- $35,000 Schedule The project will be completed in final draft form within 90 days of the sigmng of this letter agreement. Contract Parties Contract parties shall be the City of Bremerton, the Bremerton School District, the Bremerton Housing Authority and Bainbridge Architects Collaborative. Attachments Short form contract for professional services. Exhibit B Accepted Bain.bridge. ,Srch itect~s..Colla bo rative CiJ~~.__ V~llia.m A Jsle. y.~.~.,l~, ~a{e / Cary Bo~man, Mayor Date /' // // ! City of Bremerton (-.8'ea"n P~'.,r~, AI'A Dat~ Betty-Hyj~ / Date " Bremerton School District 100 C Merrill Wallace Date Bremerton Housing Authority 1'!673~ Anderson Cove Proposal Bainbridge Architects Collaborative EXHIBIT B CONSULTANT AGREEMENT THIS AGREEMENT is between City of Bremerton, the Bremerton School District, the Bremerton Housing Authority and Bainbridge Architects Collaborative (Consultant). The parties agree as follows: 1. SCOPE OF SERVICES: The purpose of this agreement is to acknowledge the parties' mutual interest in Consultant providing the services as set forth in The Scope of Work letter dated, September 16, 2002. 2. TERMS AND CONDITIONS: All dghts and obligations of the parties to this Agreement shall be subject to and governed by the Terms and Conditions contained in the text of this Agreement, and as maybe attached and incorporated herein. 3. PERIOD OF PERFORMANCE: Subject to its other provisions, the period of performance of this Agreement shall commence as of September 11,2002 and terminate December 11, 2002 or until terminated by either party in writing. The term of this agreement may be extended by mutual consent of the parties. 4. REIMBURSEMENT AND PAYMENT: City of Bremerton, the Bremerton School District 100C, and Bremerton Housing Authority shall pay Bainbridge Architects Collaborative an amount not to exceed $35,000.00 including $5,000.00 for estimated reimbursable expense. 5. BILLING PROCEDURE: Bainbridge Architects Collaborative shall submit monthly invoices for reimbursement showing actual hours worked plus any applicable direct expenses. 6. COMPLIANCE WITH LEGAL REQUlREMENTR: Each party accepts responsibility for compliance with federal, state or local laws and regulations. Anderson Cove Proposal Bainbridge Architects Collaborative 7. NOTICES: All notices and other communications to be given by either party may be given in writing, depositing the same in the United States mail, postage prepaid and addressed to the appropriate party as follows: City of Bremerton: Gary Sexton City of Bremerton 239 4~ Avenue Bremerton, WA 98337 Consultant: William Isley, FAIA Sean Parker, AIA Bainbridge Architects Collaborative 435 Edcksen Avenue, #250 Bainbridge Island, WA 98110 8. REPORTS: Consultant may be required to submit periodic reports of progress as outlined in the letter agreement dated, September 16, 2002. 9. NON-DELEGATION/NON-ASSIGNMENT: Neither party may delegate the performance of any contractual obligation, to a third party, unless mutually agreed in writing. Neither party may assign this Agreement without the written consent of the other party. 10. HOLD HARMLESS: Each party shall be liable and responsible for the consequences of any negligent or wrongful act or failure to act on the part of itself and its employees. Neither consequences of any act or admission of any person, firm or corporation not a party to this Agreement. 11. SEVERABILITY: Any provision of this Agreement, which is prohibited or unenforceable, shall be ineffective to the extent of such prohibition or unenforceability, without invalidating the remaining provision or affecting the validity or enforcement of such provision. 2 Anderson Cove Proposal Bainbridge Architects Collaborative 12. ENTIRE AGREEMENT: This Agreement is the entire agreement of the parties and supersedes all prior negotiations and agreements whether written or oral. This Agreement may be amended only by written agreement and no purported oral amendment to the Agreement shall be valid. IN WITNESS WHEREOF, this Agreement is signed by the parties this ~ day of~, 200~.  CONSU.L~rANT ~ . _ Mayor Carey Bo~eman William Isl~y, FATATM ! City of Bremerton, WA Bain,~idge Archi~/~llaborative Betty~e /~ ¢ ////~ /~/~ S~an Park~, ~IA Bremerton School District 100C Bainbridge Architects Collaborative Merrill'~/allace Bremerton Housing Authority Anderson Cove Proposal Bainbridge Architects Collaborative ATTACHMENT B Hourly Rates The services identified in the letter agreement dated September 16, 2002 will be provided by Consultant to the City of Bremerton on an actual hours basis as listed below. City of Bremerton shall reimburse Consultant at the following rates, not to exceed $ 30,000.00 plus an allowance of up to $5,000.00 for reimbursable expenses total for the term of this Agreement. Hourly Rates Senior Principal ArchitecFPlanner $150.00 Principal Architect $120.00 Project Planner $ 75.00 Project Architect $ 75.00 Draftsman $ 45.00 Administrative $ 45.00 4