CHANGE Contract Transactions
Contract Number 4319
IVendor Name HART CROWSER
Subject ENVIRONMENTAL REVIEW & REMEDIATION EVALUATION
~Department ECON DEVEL
~Status Code PRO
+ Amount $15733.00
Begin Date 08/14/2002
Insurance End Date 12/31/2003
Type Amount Review Date 02/15/2006
~ Insurance Total $0.00 ~
Insurance Review Date
+
Comments VAULT 01/01/2006
CONTRACT ORDER
DATE: April 15, 2003
CLIENT: Gary Sexton ~s~on
City of Bremerton
239 - 4th Street
Bremerton, Washington 98337
PROJECT: Environmental Oversight of Soil Excavation ~_~,,~,
Bremerton Conference Center
Bremerton, Washington
7806-01
Description of Work ~n~o,,ds
We are pleased to present this scope of work for environmental oversight for construction of the Bremerton
Conference Center in Bremerton, Washington. Because of the potential for encountering contaminated soft at the
site, we will perform the following tasks to assist you in handling potentially contaminated materials encountered
during construction:
· Task 1 - Prepare a Construction Contingency Plan;
· Task 2 - Provide Excavation Oversight;
· Task 3 - Prepare a Construction Report; and
· Task 4 - Project Management and Agency Interaction.
Based on our February 6, 2003, meeting with you and Opus Northwest and on the current schedule for site
development, we understand that remediation at the site will be conducted as an Independent Cleanup Action
under the Washington State Department of Ecology (Ecology) Voluntary Cleanup Program (VCP). This scope of
work is based on completing the cleanup action as described in the Cleanup Action Plan (Hart Crowser 2003)
and preparing a VCP closure report after completing remedial actions at the site. It is our understanding that the con:~ t~act~
City of Bremerton intends to seek a No Further Action letter from Ecology.
Below we present our proposed scope of work, project schedule, and estimated cost.
City of Bremerton 7806-01
April 15, 2003 Page 2
Task t - Prepare a Construction Contingency Plan
We will prepare a construction contingency plan for handling and di~osing of potentially contaminated
material& 'lt~e plan will outline areaswhere we expect to encounter contaminated materials; procedures for
sampling, segregating, and stockpiling; and outlining criteria for disposal. We will coordinate with the contractom
and the waste disposal facility in advance as much as possible to minimize delays from environmental conditions
encountered during construction.
Tnis ta~ also includes preparation of a Halt Crowser site-specific health and safety plan. Note that the Excavation
Contractor is responsible for his own health and safety.
Task 2 - Provide Excavation Oversight
~, Hart Crowser field representative will be present on site during soil excavation activities. His responsibilities will
nclude:
· Pen~orm eJr monitoring for volatile organic compounds (VO Cs) using a photoionization detector (PID) and
benzene detector tubes, as appropriate;
· Screen soil es it is excavated for sheen, odor, or staining, and testing for the presence of VO Cs with a PID;
· Direct soil that is potentially contaminated to either be hauled to Olympic View Sanitary Landfill, if highly
contaminated, or to the City of Bremerton storage site if marginally contaminated;
· Collect, for chemical analysis, a minimum of one soil sample per 500 cubic yards of soil hauled directly to
Olympic View Sanitary Landfill;
· Collect verification samples from potentially contaminated soil le~ in place at the base and side walls of the
excavation, at a minimum of one soil sample per 1,000 square feet. Verification samples will be collected
from the gasoline-contaminated area near Washington Avenue, the hot spot excavation area in the
Waterfront Area, and any other potentially contaminated areas identified during construction;
· Arrange for analysis of verification samples for appropriate chemical constituents;
· Assess removal of contamination based on verification sample analytical results;
· Inspect stockpiles to ensure integrity of environmental control measures;
· Collect stockpile characterization samples for chemical analysis at a frequency in accordance with Ecology
guidance; and
· Oversee removal or in-place closure of the Wa,~ington Avenue US-T.
Verification and stockpile soil sampies will be analyzed at a minimum for the following constituent~
· Gasoline-range petroleum hydrocarbons;
· Diesel-range petroleum hydrocarbons; and
City of Bremerton 7806-01
April 15, 2003 Page 3
If oil-range petroleum hydrocarbons are detected in any sample and the stockpile will potentially be left at the
City property, the sample will be analyzed for polycyclic aromatic hydrocarbons (PAH s) to ensure that these
cornpounds are below MTCA Method A cleanup levels
If sandblast grit is encountered, it will be segregated and samples will also be analyzed for metals by toxicity
characteristics leeching procedure (TCLF') extraction to determine proper disposal. If TCLP analysis is necessary, it
will be performed as a change order to this scope of work.
Task 3 - Prepare a Construction Report
After excavation and soil disposal activities are completed, we wi~ prepare a construction report documenting the
occurrence and disposal of contaminated materials Verification sample locations and analytical results will be
included. The report will aisc include copies of weigh tickets for sell disposed of at Olympic View Sanitary
Landfill.
Task 4 - Project Management and Agency Interaction
This task includes invoicing, meetings, and communications with Ecology. The estimated coal is based on four
meetings in Bremerton with the City of Brernerton, Opus, and/or Ecology. Thistask includes preparing VCP
application forms for requesting a No Further Action determination. However, it does not inciude fees for
Ecology's review of the reports or application form.
Schedule
We will perform construction oversight during your construction schedule, This scope of work assumes soil
removal activities will take 10 weeks The construction report will be prepared within 3 weeks of receiving final
chemical results from the laboratory and disposal documentation from you.
The estimated cost of the above scope of work is $137,616. Because this work depends on the project
construction schedule and the amount of potentially contaminated soil encountered, the work will be billed on a
time and materials basi& This cost estimate does not include analysis of any samples via TCLP extraction. The
estimated cost breakdown as follows, with details provided in Table 1:
Task 1 - Prepare Construction Contingency Plan $3,961
Task 2 - Provide Excavation Oversight $78,313
Task 3 - Prepare Closure Report $9,232
Task 4 - Proiect M anaoemant and Aoancv Interaction $10,432
~ubtotal $106,187
Contingency for Scope Overruns $35,678
City of Bremerton 7806-01
April 15, 2003 Page 4
Total Estimated Costs $137,6t6
The tasks above a'e equivalent to Tasks 1 D, 4A, 4D, 4E end 4G, listed in Table 1 of our Revised Remediation
Cost F~timate Letter dated November 1,2002. The total estimated cost of these tasks in the November 1, 2002,
letter was $113,508 without contingency and $153,236 with contingency. The lower estimated cost is due to a
lesser amount of reporting and Ecology interaction based on performing the cleenup action as an independent
Remedial Action rather than under an Agreed Order.
We have included a contingency for several potential conditions that may occur during construction.
Contingencies include en extended construction schedule; extra sample enalysis on rush turnaround time, or for a
greater volume of contaminated soil; and per[orming this work under en Agreed Order with Ecology rather then
as an Independent Remedial Action. We have included these contingencies in this scope of work to minimize
potential delays in the construction schedule but we will not use it without prior authorization from you.
The scope of work outlined above will be billed in accordance with the Terms and
Conditions of our existing contract dated December 17, 2002, and the attached rate
schedule. Our services will be performed in accordance with the standard of care of our
profession. Please acknowledge your acceptance of this work by having this contract
propedy signed and returning a signed copy to us. Any changes to this contract must be in
writing and mutually agreed to. We intend to use the Contract Change form (provided in
earlier pr°p°sals) t° effectively implem~'.n_~ a.~. ument any changes'~
AF~VB3 FORClTY // ) ~ /-*"~~ Date:
Printed Name: ~'~:~' /~'~
HARTCROWSI~,INC.~ Date: .~'/,'~/~'-~/_
Printed Name: ~"~J L- I e'- ~c. I,~J. c-.JV~ ~- C
E\ D ocs~ ,bbs~ 780601\ BCC(contract o rder).doc
· C7 c-
HART CROWSER RATE SCHEDULE
Sr. Principal $158
Principal $144
Sr. Associate $130
Associate $116
Sr. Project $102
Project $ 88
Sr. Staff $ 74
Staff $ 60
Technician $ 51
Sr. Drafter $ 65
Drafter $ 51
Project Assistant/Technical Word Processor $ 51
DIRECT CHARGES
Auto Mileage Current Federal Standard
Truck/Van Rental {Half-day minimum) $70.00/day
Subcontractors and Outside Vendors Cost + 10%
Communication Charge 5% of Billed tabor
Safer7 Program for Potentially Dangerous/Hazardous Material $5.00/field labor hour
The current Schedule of Laborator~ and Field Charges for in~house laboratory services and field
equipment rental and supplies is available upon request. All rates are subject to change without notice.
+Browse: Next Previous First Last Update Delete Restart X - Exit +
+Retrieve the Next record +
+Found: 10 Record(s) MAINTAIN Contract Transactions +
+ Contract Number 4319 +
+ +
+Vendor Name HART CROWSER +
+Subject ENVIRONMENTAL REVIEW & REMEDIATION EVALUATION +
+Department ECON DEVEL +
+Status Code PRO +
+ Amount $15733.00 +
+ Begin Date 08/14/2002 +
+ Insurance End Date +
+ Type Amount Review Date 06/15/2003 +
+ +
+ +
+ +
+ Insurance Total $0.00 +
+ Insurance Review Date +
+ +
+ Comments REVIEW DATE FOR TRACKING PURPOSES ONLY +
+ +
+ +
www. harrcrowser, corn
Deii~ering smarter solutions
CONTRACT ORDER NO. I
Anchorage
DATE: August 14, 2002
CLIENT: Gary Sexton ~ ~ tl~
City of Bremerton
239 4th Street
Bremerton, Washington 98337
PROJECT: Environmental Review and Remediation Evaluation
Bremerton Convention Center
Bremerton, Washington
03-5-1100-020
Edmonds
Description of Work Cost
Based on our telephone conversations and a meeting on August 7, Data Review
2002, this contract order describes our scope of services and cost to Data Review: $1,550
conduct an environmental review and remediation evaluation for the Interviews: $ 500 Eureka
subject property. Direct Expenses: $ 60
Numerous environmental investigations have been conducted on and
Subtotal: $2,110
around the subject property. We reviewed the recent Phase I
Environmental Assessment and Technical Memorandum conducted Remediation Analysis
and prepared by Parametrix and a preliminary geotechnical report Cost Estimating: $1,500 Jersey City
prepared by Terra Associates. Senior Review: $ 600
We understand that project is in the design stage and you are seeking Subtotal: $2,100
an evaluation of remedial options for the known environmental issues
in conjunction with the development plans for the new convention Technical Memorandum
center. Preparation: $1,000 Juneau
Our data review will include a review of the recent Parametrix reports QA/QC: $ 350
and Terra report and a review of the available reports (submitted to us
Direct: $ 200
from Parametrix or Opus) on nearby properties with chlorinated
solvent data. We will also contact the City of Bremerton regarding Subtotal: $1,550
discharge requirements to the sanitary sewer and/or storm sewer Long Beach
systems. Total: $5,760
We will also evaluate remedial options for the site including but not
limited to soil disposal, soil treatment, capping, groundwater treatment,
groundwater discharge to sanitary or storm sewer, and barrier walls. Portland
These options will be evaluated for cost, risk, and feasibility. A
technical memorandum will be prepared with a discussion of our
analysis and presentation of a table with these comparisons.
City of Bremerton 03-5-1100-020
August 14, 2002 Page 2
We also have included one site visit to the subject property and a
meeting in Bellevue with you and Opus Northwest to discuss our
findings.
We have previously discussed the need for sampling and analysis of the
existing groundwater monitoring wells on the subject property for
chlorinated solvents. We also discussed the possibility of conducting
additional Phase II sampling and analysis on the subject property to
supplement the existing available data. It is our understanding that you
will be discussing this additional work with Parametrix. If requested,
we can provide you and/or Opus with a scope of work and cost
estimate to conduct additional Phase II sampling and analysis. This
current scope of work and cost estimate does not include any sampling
or chemical analysis.
We will perform the scope of work outlined above on a time and
materials basis with a not to exceed (without prior approval) budget of
$5,760.
The scope of work outlined above will be billed in accordance with the attached Rate Schedule and
Terms and Conditions (HCH 1/99), and any exhibits or attachments referenced herein are
incorporated into our agreement with you and by your authorization to proceed, you are agreeing to
these terms and conditions. Please acknowledge your authorization for this work by having this
contract order signed and returned to Hart Crowser.
CITY OF BREMERT~,
Printed Name: ~/
HART CROWSER, INC.
By:~ Date:
Printed Name: ]ulie K. W. Wukelic
Attachments:Terms and Conditions (HCH 1/99) with Exhibit A
Rate Schedule (HCFY02)
F:\Docs\Proposals\035 ~ 100020\contractorderbremcc.doc