Loading...
HomeMy WebLinkAbout4281tenter Search Criteria, Press Eec Key to Transmit Press Del Key to Terminate Delete Mode CHANGE Contract Transactions + Contract Number 4281 ~Vendor Name STAN PALMER CONSTRUCTION +Subject CALLOW AVE BASIN PRIORITY 5 STORM DRAIN SEPARATION  Department ENGINEERING Status Code CON i Amount $3120818.33 Begin Date 05/28/2002 Insurance End Date 02/28/2003 Type Amount Review Date 02/15/2005 ~ GL $2000000.00 AL $1000000o00 + ~ Insurance Total $3000000.00 ~ Insurance Review Date 08/01/2003 + Comments CHANGE ORDERS #1 9/02 #2 3/03 #3 10/03 VAULT 01/01/2005 + PUBLIC WORKS AND UTILITIES 3027 Olympus Drive * Breraerton, WA 98310-4799 * (360)478-5318 * FAX (360) 478-5018 TO: FROM: DATE: SUB J: MEMORANDUM ENGINEERING DIVISION Paula Johnston Lynn Price -~ January 8, 2004 Stan Palmer Construction Co., Callow Basin Priority 5 Storm Drainage Seperatiun I have received all the releases from the State of Washington and completed the necessary procedures for project closeout. The following original documentation is attached for your files: Project Release signed by Contractor Advertisement of "Notice of Final Completion" Certificate of Payment of State Excise Taxes by Public Works Contractor Department of Labor and Industries Release Certificate of Payment from Employment Security Department If release of retainage for this project is acceptable to you, please indicate by signing below then return this to me. I will see that the necessary accounting paperwork is processed to release the retainage. Please call me if you have any questions at 5272 ~P~'~la Johnst~nyp~ty'C'it~ (~lerk RELEASE Callow Basin Priority 5 Storm Drainage Separation City of Bremerton Project No. V9267306 The Contractor, by signing below, is in agreement with the final total Contract payment including tax and retainage of $3,120,818.33. This total shall represent full compensation for work performed under the Contract referenced above. Furthermore, the Contractor releases the City of Bremerton from any and all claims, liability, demands, damages, and actions, involving the above referenced project. By: /~ ~ -- ~ - Date: Tit .'~ /~/~ No. 100080761 AI~R)AVIT OF PUBLICATION County of Ki~.~p, Sta~e of Washington I, Valerie Zoller, being first duly sworn on oath, deposes and says: That she is now, and at all times embraced in the publication herein mentioned was rite PnnCipal clcrk of the prinlea's and publishers of THE SUN; that said newspaper has been approved as a legal n~wspaper by ordar of the Superior Coma of the Coumy of Kitsap, in which County i~ is published and is now and has bee~ for mor~ than six months prior to the date of the publlcati~n h~reinafter refen~d to, publishad in the ~lish lail~Ua~ continually as a daily newspaper in Bt~,~ton, Kitsap County, Washinglon, and is now and during all of said time, was prin~ed in ma office maintained ill the aforesaid plac~ of publication of said newspaper; that the following is a true mxt of a legal advetfi~emel~t as Jt was pubhshad in ~gular issues (and not in suppiemont form) of said n~wspaper on ~ following dam, lo wit: Nov~mher 4, 2003 and ~ such nowspat~r was r~gulatly dislributad to its subscribers during all of said period. That the full amount of the fae charged for.the f,~c~oing publication is the sum of $32.51 amount has nol been paid in full. ~ .~ ~.o ~.~, _ =~ (Signature of Principal Clerk) Subscri .~_= *~'sl~0~b .Cl~.~ne"''' i O ~ this day of Novemhea' 10, 2003 ~.. ....,~ ~ ,,,,,,...,,,,," Notary Public in and for the Stare of Washington, Kitsap County. CITY OF BREMERTON' NOTICE OF FINAL COMPL~TION- Notice of Final Completion has been filed with the City of Bmmerton by Stan ?almar Construction on Contract #4281 for the Cal~)w Basin Priority 5 Storm Drahlage Sq)arafion Project. Any parties having a claim for material, labor or damagas with referonee to this corttract have thi~y (30) days f~n~na the date of publication of this notice to file a claim.' William Eley- Pmx:hasing Manager- 239 4~h Street" Bremerton, WA 98337- Novemher4, 2003. · #100080761- Washington State Department of Revenue PO Box 47474 Olympia, WA 98504-7474 600 336 626 Certificate of Payment of State Excise Taxes by Public Works Contractor STAN PALMER CONSTRUCTION INC 5107 STATE HWY 3 SW PORT ORCHARD WA 98367 7486 CITY OF BREMERTON DEPT OF PUBLIC WORKS 3027 OLYMPUS DR BREMERTON WA 98310 We hereby certify that taxes, increases and penalties due or to become due from the above-named contractor under Chapter 180, Laws of 1935, as amended, with respect to the following public works contract: CITY OF BREMERTON CALLOW BASIN PRIORITY STORM DRAIN SEPARATION PROJ together with all other taxes, increases and penalties due from such contractor, have been paid in full or that they are, in the Department's opinion, readily collectible without recourse to the state's lien on the retained percentage. This certificate is issued pursuant to the provision of Chapter 60.28 Revised Code of Washington for the sole purpose of informing the state, county, or municipal officer charged with the duty of disbursing or authorizing the payment of public funds to said contractor that the Department of Revenue hereby releases the state's lien on the retained percentage provided by this Chapter for excise taxes due from said contractor. This certificate does not release said contractor from liability for additional tax that may be later determined to be due with respect to the above-mentioned contract or other activities. Dated ,/t~-//~ "~/a:~t~-~/ at Olympia, Washington, State of Washington Department of Revenue To inquire about the availability of this document in an alternate format for the v sua y mpa red or n a anguage other than English, please call (360) 753-3217. TTY users may call 1-800-451-7985. REV 31 0028 (10-01-02)ROUTIN~sing~Of~cer,~,~ntractor, File, Special File Verify Premium Status - L&I - Washington Department of Labor and Industries Page 1 of 2 Verify Premium Status Of your contractor or other employer Employer Liability Certificate Check to see if this business is ree_istered as a contractor with LNI. Review Experience Factor History_ for this business. Department of Labor & Industries Employer Liability Certificate Date: ]./8/2004 UBI Number Legal Business Name Firm Account Number "Doing Business As" (DBA) Name quarterly Premium Reports Received Through Employer Industrial Insurance Status Team Number Account Iqanager 600 336 626 STAN PALMER CONSTRUCTION INC 383,931-00 STAN PALMER CONST INC Quarter 3 of Year 2003 Account is Current Firm has voluntarily reported and paid their premiums. T7 / CHUCK MYDLAR (360)902-5636 The information above shows the employer's industrial insurance (workers' compensation) premium status with the Department of Labor and lrndustries. Employers report and pay premiums each quarter based on hours of employee work already performed and are liable for premiums found later to be due. Industrial insurance accounts have no policy periods, cancellation dates or limitations of coverage. (See RCW51.12.050 and 51.16.190.) Note: Under Washington State law*, you may be liable for the unpaid industrial insurance (workers' compensation) premiums of anyone you contract with. (*See RCW 51.12.070.) LS~ Home I Claims & Insurance I How to Verify Premium Status Use of this Web site, its applications and connections subject to I.~ Web Usage Policy, including Access Aoreement, Privacy & Securit~ Statement, Intended Use/External Content Policy https://wws2.wa, gov/lni/crua/CRUA 1 .asp?Acctld=38393100 1/8/2004 STATE OF WASHINGTON EMPLOYMENT SECURITY DEPARTMENT PO Box 9046 · Olympia, WA 98507-9046 CONTRACTOR: Stan Palmer Construction Company Inc. 5107 StateHwy. 3 S.W. Bremerton, WA 98367 ) CERTIFICATE OF ) PAYMENT OF CONTRIBUTIONS ) PENALTIES AND INTEREST ON ) PUBLIC WORKS CONTRACT TO: City of Bremerton Public Works & Utilities 3027 Olympus Drive Bremerton, WA 98310 ES Reference No. 461102-001 The Employment Security Department hereby certifies that contributions, penalties and interest due from the above named contractor under the Employment Security Act have been paid in full or provided for with respect to the following public works contract: Callow Basin Priority 5 Storm Drainage Separation Project The Employment Security Department hereby certifies that it has no claim pursuant to RCW 50.24.130 against the public body named above for tax attributable to service performed for said public body by the above named contractor on the above described contract. The Employment Security Department releases its lien on the retained percentage which is provided by RCW 60.28.040 for contributions, penalties and interest due from said contractor. This certificate does not release said contractor from liability for additional contributions, penalties and interest which may be later determined to be due with respect to the above mentioned contract. Dated at Olympia, Washington on November 25, 2003. COMMISSIONER EMPLOYMENT SECURITY DEPARTMENT (A~/thorized Representative) Original--Disbursing Officer Duplicate--Employer Triplicate~Central Office Files EMS 8449 760 R3-98 CITY OF BREMERTON CHANGE ORDER PROJECT NAME: PROJECT NO: CONTRACT CHANGE ORDER NO: 3 Callow Basin Priority 5 Storm Drainage Separation V9267306; 588 CONTRACTOR: Stan Palmer Construction, Inc. ORIGINAL CONTRACT AMOUNT: PREVIOUSLY APPROVED CHANGES: THIS CHANGE: REVISED CONTRACT AMOUNT: $3,066,885.50 DAYS: 240 $54,782.83 DAYS: 0 ($850.00) DAYS: 0 $3,120,818.33 DAYS: 240 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below includes any applicable taxes. DESCRIPTION OF CHANGES INCREASE IN (DECREASE) IN CONTRACT CONTRACT CONTRACT TIME AMOUNT AMOUNT EXTENSION ($) ($) (DAYS:) X 1. Assessed contractor responsibility for remark of monument 0 (850.00) 0 location on manhole frame located at 7th Street and Rainier Ave. NET CHANGE IN CONTRACT AMOUNT ($850.00) 0 INCREASE OR (DECREASE) Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for past performance. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous CONTRACT CHANGE ORDER NO: 3 PROJECT NAME: Callow Basin Priority 5 Storm Drainage Separation costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. RECOMMENDED: PI~ECT ENGINEER D~te RECOMMENDED: ACCEPTED: APPROVED: DIRECTOR OF PUBLIC WORKS Date MAYOR ¢' Date APPROVED AS TO FORM: ATTEST: C'~y Clerk- Page 2 of 2 CITY OF BREMERTO CHANGE ORDER PROJECT NAME: PROJECT NO: CONTRACT CHANGE ORDER NO: 2 Callow Basin Priority 5 Storm Drainage Separation V9267306; 588 CONTRACTOR: Stan Palmer Construction, Inc. ORIGINAL CONTRACT AMOUNT: PREVIOUSLY APPROVED CHANGES: THIS CHANGE: REVISED CONTRACT AMOUNT: $3,066,885.50 DAYS: 240 $0.00 DAYS: 0 $54,782.83 DAYS: 0 $3,121,668.33 DAYS: 240 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum price agreed upon between the Contractor and the City of Bremerton. DESCRIPTION OF CHANGES 1. Increase Bid Item No. 4 "Utility Excavation (Pot Holing)" quantity from 22 units to 37 units at $1,000.00 per unit. 2. Reduce Bid Item No. 5 "Force Account" from $111,017.66 to $0.00 3. Increase Bid Item No. 7 "Portland Cement Concrete Pavement Removal" quantity from 7,895 units to 8,037.5 units at $12.00 per unit. 4. Increase Bid Item No. 8 "Asphalt Concrete Pavement, Sidewalk, and Driveway Removal" quantity from 6,441 units to 9,833.48 units at $7.00 per unit. 5. Increase Bid Item No. 9 "Sawcutting" quantity from 13,200 units to 14,052.5 units at $2.00 per unit. 6. Reduce Bid Item No. 10 "Gravel Borrow for Backfill" quantity from 2,500 units to 776.08 units at $12.00 per unit. 7. Reduce Bid Item No. 11 "Foundation Gravel" quantity from 3,500 units to 0 units at $17.00 per unit. 8. Increase Bid Item No. 13 "Crushed Surfacing Top Course or Base Course" quantity from 1,000 units to 1,339.7 units at $30.00 per unit. 9. Increase Bid Item No. 14 "Asphalt Concrete Class B" quantity from 4,808 units to 10,493.1 units at $22.00 per unit. INCREASE IN {DECREASE} IN CONTRACT CONTRACT CONTRACT TIME AMOUNT AMOUNT EXTENSION ($) ($) (DAYS:) $15,000.00 0 $1,710.00 $23,747.36 $1,705.00 $10,191.00 $125,072.20 $111,017.66 $20,687.04 $59,500.00 0 CONTRACT CHANGE ORDER NO: 2 PROJECT NAME: Callow Basin Priority 5 Storm Drainage Separation 10. Reduce Bid Item No. 15 "Asphalt Concrete, Class B for Overlay/Driveway" quantity from 3,920 units to 3,706 units at $8.00 per unit. 11. Reduce Bid Item No. 16 "Planing Bituminous Pavement" quantity from 3,266 units to 233 units at $7.00 per unit. 12. Reduce Bid Item No. 17 "Cement Concrete Pavement" quantity from 7,895 units to 6,168 units at $36.00 per unit. 13. Increase Bid Item No. 18 "PVC Storm Drain Pipe, 6 or 8 In. Diam." quantity from 1,679 units to 2,434.5 units at $60.00 per unit. 14. Reduce Bid Item No. 19 "PVC Storm Drain Pipe, 12 In. Diam." quantity from 4,827 units to 4,626 units at $73.00 per unit. 15. Increase Bid Item No. 20 "PVC Storm Drain Pipe, 15 In. Diam." quantity from 771 units to 774 units at $76.00 per unit. 16. Increase Bid Item No. 21 "PVC Storm Drain Pipe, 18 In. Diam." quantity from 1,732 units to 1,762 units at $86.00 per unit. 17. Increase Bid Item No. 26 "Reinforced Concrete Storm Drain Pipe, 54 In. Diam." quantity from 596 units to 599 units at $300.00 per unit. 18. Reduce Bid Item No. 29 "Manhole, 72 In. Diameter" quantity from 1 unit to 0 units at $7,500.00 per unit. 19. Increase Bid Item No. 30 "Manhole, 96 In. Diameter" quantity from 2 units to 3 units at $10,000.00 per unit. 20. Reduce Bid Item No. 32 "Catch Basin, Type 1" quantity from 40 units to 37 units at $870.00 per unit. 21. Increase Bid Item No. 33 "Catch Basin, Type 2" quantity from 3 units to 4 units at $2,500.00 per unit. 22. Increase Bid Item No. 34 "Remove Existing Structure and Replace with Catch Basin Type 1" quantity from 54 units to 63 units at $1,100.00 per unit. 23. Reduce Bid Item No. 35 "Remove Existing Structure and Replace with Catch Basin Type 2" quantity from 4 units to 3 units at $3,000.00 per unit. 24. Reduce Bid Item No. 37 "Adjust Existing Manhole/Catch Basin Frame and Cover to Finish Grade" quantity from 40 units to 32 units at $200.00 per unit. $45,330.00 $228.00 $2,580.00 $900.00 $10,000.00 $2,500.00 $9,9OO.OO $1,712.00 $21,231.00 $62,172.00 $14,673.00 $7,500.00 $2,610.00 $3,000.00 $1,600.00 0 0 0 0 0 0 Page 2 of 6 CONTRACT CHANGE ORDER NO: 2 PROJECT NAME: Callow Basin Priority 5 Storm Drainage Separation 25. Reduce Bid Item No. 38 "Adjust Existing Valve $1,200.00 0 Box/Clean Out Frame and Cover to Finish Grade" quantity from 30 units to 18 units at $100.00 per unit. 26. Reduce Bid Item No. 39 "Remove Existing Structure $1,600.00 0 and Plug Connection" quantity from 9 units to 7 units at $800.00 per unit. 27. Reduce Bid Item No. 40 "CCTV Pipe Inspection" $1,283.50 0 quantity from 44,083 units to 41,516 units at $0.50 per unit. 28. Reduce Bid Item No. 42 "Water Meter Boxes" quantity $400.00 0 from 26 units to 18 units at $50.00 per unit. 29. Increase Bid Item No. 43 "PVC Sanitary Sewer Pipe, 8 $19,180.00 0 In. Diam." quantity from 259 units to 396 units at $140.00 per unit. 30. Reduce Bid Item No. 44 "PVC Sanitary Sewer Pipe, 15 $2,400.00 0 In. Diam." quantity from 137 units to 122 units at $160.00 per unit. 31. Increase Bid Item No. 45 "Restore Side Sewer with $6,500.00 0 Clean Out" quantity from 27 units to 32 units at $1,300.00 per unit. 32. Increase Bid Item No. 47 "Cement Concrete $21,925.00 0 Driveway/Sidewalk" quantity from 1,839 units to 2,716 units at $25.00 per unit. 33. Increase Bid Item No. 48 "Cement Concrete $2,500.00 0 Driveway/Sidewalk" quantity from 5 units to 10 units at $500.00 per unit. 34. Per Work Change Directive #2 change manhole cover $0.00 0 and frame materials type ductile iron as specified to cast iron covers and frames. Measurement and quantity shall remain unchanged from that specified. 35. Per Work Change Directive//3 catch basin at Station $0.00 0 D3+82.19 shall be shifted two feet south of it's planned location to avoid conflict with adjunct power pole. This change shall be at no additional cost to the City of Bremerton. 36. Per Work Change Directive #4A revise drilled dowel $11,732.00 0 and tiebar requirements at concrete pavement panels as follows: · The #5 tiebars to be drilled into existing concrete along the longitudinal construction joint will be deleted. ·The #5 tiebars along the longitudinal contraction joint will be deleted. · The 1-1/2" diameter dowel bars along the transverse construction joint will be changed to %- inch diameter (#6 bar). Dowels are required for all transverse construction ioints. Page 3 of 6 CONTRACT CHANGE ORDER NO: 2 PROJECT NAME: Callow Basin Priority 5 Storm Drainage Separation Create Bid Item No. 53 "Extra Work No. 4" Measurement will be per lump sum. 37. Per Work Change Directive #7A change sidewalk finish $1,778.40 0 to "Broomed" surface in lieu of the required "Patterned" surface along the west side of Callow Avenue from Burwell Street to 9th Street. Create Bid Item No. 54 "Extra Work No. 5" Measurement will be per lump sum. 38. Per Work Change Directive #9A install 95-feet of 12- $15,000.00 0 inch PVC storm sewer, two Type 1 catch basins, and an 8- inch PVC lateral with cleanout on Callow Avenue south of 13th Street adjunct to the St. Vincent DePaul Assistance Office. Create Bid Item No. 55 "Extra Work No. 6" Measurement will be per lump sum. 39. Per Work Change Directive #1 lA remove and replace $900.00 0 68 linear feet of curb and gutter on Callow Avenue as directed by the Engineer. Create Bid Item No. 56 "Extra Work No. 7" Measurement will be per lump sum. 40. Per Work Change Directive #15A full compensation for $39,078.39 0 all work associated with Stan Palmer Construction, Inc. Extra Work Costing Accounts X-2, X-3, X-6, X-7, X-9, X-14 through X-21, X-24 through X-29, X-31, X-33 through X-36, X-38, X-42, X--47, X-48, and X-48 through X-53 and performed by Force Account in accordance with the Contract Documents for a negotiated amount as noted. Create Bid Item No. 57 "Extra Work No. 8" Measurement will be per lump sum. 41. Per Work Change Directive #16A respond to 4" water $2,328.70 0 main failure at Station A23+00 to assist City crews in shutting off=water flow and repaidrevise water main so as to place main back into service. Create Bid Item No. 58 "Extra Work No. 9" Measurement will be per lump sum. 42. Per Work Change Directive #18A raise the grade of the $1,800.00 0 12-inch PVC pipe as required between Manhole F6+45.68 and existing 12" HDPE Manhole. Create Bid Item No. 59 "Extra Work No. 10" Measurement will be per lump sum. 43. PerWork Change Directive #19A extend 12-inch PVC $2,911.58 0 pipe from Manhole F13+90.55 to an existing manhole in the number two lane of eastbound 11th Street. Create Bid Item No. 60 "Extra Work No. 11" Measurement wild be per lump sum. 44. Per Work Change Directive #20 add a new 48- $16,156.00 0 manhole and 12-inch PVC pipe at Station D17+20. Create Bid Item No. 61 "Extra Work No. 12" Measurement will be per lump sum. 45. Per Work Change Directive #21 delay removal and $966.00 0 replacement of existing 5-foot wide sidewalk in front of various businesses for access along the west side of Page 4 of 6 CONTRACT CHANGE ORDER NO: 2 PROJECT NAME: Callow Basin Priority 5 Storm Drainage Separation Callow Avenue between Burwell Street and 6TM Street. Create Bid Item No. 62 "Extra Work No. 13" Measurement will be per lump sum. 46. Per Work Change Directive #22 replace two additional $4,500.00 0 traffic control loops. One loop is located in the southbound lane of Wycoff Avenue at Kitsap Way, and the second is in the eastbound lane of Kitsap Way at Wycoff Avenue. Create Bid Item No. 63 "Extra Work No. 14" Measurement will be per lump sum. 47. Per Work Change Directive #23 full compensation for $8,270.20 0 all work associated with Stan Palmer Construction, Inc. Extra Work Costing Accounts X-l, X-I 1, X-30, X-32 and X- 45, and performed by Force Account in accordance with the Contract Documents for a negotiated amount as noted. Create Bid Item No. 64 "Extra Work No. 15" Measurement will be per lump sum. 48. Assessed penalty bythe State of Washington $10,000.00 0 Department of Ecology against the City of Bremerton as a result of the storm sewer overflow into Sinclair Inlet on July 23, 2002. See attached Notice of Penalty Incurred and Due No. DE 02WQNR-4983 and URS letter to Stan Palmer Construction dated February 5, 2003. Create Bid Item No. 65 "Extra Work No. 16" Measurement will be per lump sum. SUBTOTAL INCREASES (+) $390,879.43 SUBTOTAL DECREASES (-) $336,096.60 SUBTOTAL $54,782.83 SALES TAX 8.5% $0.00 TOTAL $54,782.83 NET CHANGE IN CONTRACT AMOUNT Increase $54,782.83 Page 5 of 6 CONTRACT CHANGE ORDER NO: 2 PROJECT NAME: Callow Basin Priority 5 Storm Drainage Separation Contractor acknowledges and accepts that this contract modification constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this contract modification, including, without limitation, claims related to contract time, on-site or home office overhead, or lost profits. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all previsions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. P~EC']' ENGINEER / Da~e CITY ENGINEER × Da~e ACCEPTED: .¢(,~T~ bate APPROVED: MAYOR / f ' Date Page 6 of 6 CITY OF BREME, ,'ON CHANGE ORDER Contract Change Order No. 1 Project Name Callow Basin Priority 5 Storm Original Contract Amt $ 3,066,885.50 Days 240 Drainage Separation Project No. V9267306; 588 Prev. Appvd. Changes $ 0 Days 0 Contractor Start Palmer Construction, Inc. This Change $ 0 Days 0 Revised Contract Amt $ 3,066,885.50 Days 240 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items for a lump sum pdce agreed upon between the Contractor and the Cit}, of Bremerton. Description of Changes Increase in (Decrease) Contract Contract in Contract Time Amount Amount(S) Extension ($) (days) 1. Per Work Change Directive//6 change the $20,791.84 0 cement concrete pavement section on Callow Avenue between Burwell St. and 9th St. from 6 inch thickness to 8 inch thickness. Create Bid Item No. 50 "Extra Work No. 1". Measurement will be per square yard. The quantity is 2936.7 square yards. $7.08 is the agreed unit price per square yard. 2. Per Work Change Directive #13 install 14 inch ductile iron pipe and 18 inch PVC pipe at Station $11,575.50 0 A23+00 as identified in the contract drawings. Create Bid Item No. 51 "Extra Work No. 2". Measurement will be per lump sum. 3. Per Work Change Directive # 14 remove and $6,615.00 0 replace concrete panels at 6th and Callow Ave and restore traffic signal loops. Create Bid Item No. 52 "Extra Work No. 3". Measurement will be per lump sum. 4. Reduce Bid Item No. 5 "Force Account" from $38,982.34 0 $150,000.00 to $111,017.66 Totals $38,982.34 $38,982.34 Net change in c0rjtract amount increase or [oecrease) $0.00 The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of the directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all Page 1 of 2 CITY OF BREME, ,'ON CHANGE ORDER Contract Change Order No. 1 Project NameCallow Basin Priority 5 Storm Original Contract Amt $ 3,066,885.50Days 240 Drainage Separation Project No. V9267306; 588 Prev. Appvd. Changes $ 0 Days 0 Contractor Stan Palmer Construction, Inc. This Change $ 0 Days 0 Revised Contract Amt $ 3,066,885.50Days 240 provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the City of Bremerton. Recom mended: ~,,~../~ ~ Prj;)je~t Engineer Date Recommended: .'~/ ,,'~'~ CityE~g(~ ~'~ ~ ~ Date Accepted: ~~ ~ ~~ ~ Date ~ Approved: ~ ~ Date Page 2 of 2 +Browse: Next Previous First Last Update Delete Restart X - Exit + +Retrieve the Next record + +Found: 10 Record(s) MAINTAIN Contract Transactions + + Contract Number 4281 + + + +Vendor Name STAN PALMER CONSTRUCTION + +Subject CALLOW AVE BASIN PRIORITY 5 STORM DRAIN SEPARATION + +Department ENGINEERING + +Status Code CON + + Amount $3066885,50 + + Begin Date 05/28/2002 + + Insurance End Date 02/28/2003 + + ~ype Amount Review Date 02/15/2005 + + GL $2000000.00 + + AL $1000000.00 + + + + Insurance Total $3000000.00 + + Insurance Review Date 08/01/2003 + + + + Comments VAULT 01/01/2005 + + + + + Contract Documents For CALLOW AVENUE BASIN PRIORITY 5 STORM DRAINAGE SEPARATION City of Bremerton Project No. V9267306 Pre-Bid Conference: April 11,2002 1:00 PM Department of Public Works and Utilities 3027 Olympus Drive Bremerton, WA 98310 Bid Opening: April 19, 2002 2:00 PM City Clerk's Office, City Hall 239 Fourth Street Bremerton, WA 98337 Contact Person: Tom Knuckey, Managing Engineer Public Works & Utilities Engineering Dixdsion 3027 Olympus Drive Bremerton, WA 98310 Tel: (360) 478-7976 FAX: (360) 478-5018 Engineering, Inc. Mailing Charge: $8.00 CONTRACT THIS AGREEMENT is dated the 28th dayof ~qay in the year 2002 by between City of Bremerton (hereinafter called CITY) and and Start Palmer Construction, Inc. (hereinalSer called CONTRACTOR). CITY and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK. complete the WORK as specified or indicated in the CITY's Contract CONTRACTOR shall Documents entitled Callow Avenue Basin Priority 5 Storm Drainage Separation. ARTICLE 2. CONTRACT TIMES. The WORK shall be completed within 240 calendar days from the commencement, date stated in the Notice to Proceed. The WORK has been divided into two phases and the contract has additional time of completion requirements for Phase I as defined in Section 1-08.5 of the Special Provisions. Time is of the essence as to each and every deadline set forth in this agreement. This provision has been specifically negotiated. ARTICLE 3. LIQUIDATED DAMAGES. CITY and the CONTRACTOR recognize that time is of the essence of this Agreement and that the CITY will suffer financial loss if the WORK is not completed within the time specified in Article 2 herein and Special Provision 1-08.5, plus any extensions thereof allowed in accordance with Section 1-08.8 of the Standard Specificatons which may be modified by the Special Provisions. They also recognize the delays, expense, and difficulties involved in proving in a legal proceeding the actual loss suffered by the CITY if the WORK is not completed on time. Accordingly, instead of requiring such proof, the the CONTRACTOR shall the CITY liquidated damages for any pay each day that expires after the time specified in Article 2 herein and Special Provision 1-08.5 for Substantial Completion and Final Completion of the WORK in accordance with Section 1-08.9 of the Standard Specifications as may be modified by the Special Provisions. ARTICLE 4. CONTRACT PRICE. CITY shall pay CONTRACTOR for completion of the WORK in accordance with the Contract Documents in the amount set forth in the Bid Proposal, which shall include sales tax as provided in Section 1-07.2(1) of the Special Provisions. ARTICLE 5. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Section 1-09.9 of the Standard Specifications which may be modified by the Special Provisions.. Applications for Payment will be processed by ENGiNEER as provided in the Special Provisions Contractor Initials Callow A venue Basin Priority 5 CONTRA CT-I Ci(y of Bremerton Storm Drainage Separation Department of Public Works and Utilities ARTICLE 6. CONTRACT DOCUMENTS. The Contract Documents which comprise the entire agreement between CITY and CONTRACTOR concerning the WORK consist of this Contract (pages Contract~l to Contract-3, inclusive) and the following attachments to this Contract: o Notice Inviting Bids, o Bidders Checklist, o Bid Proposal including the Proposal Forms, Information Required of Bidder, Bid Bond, and all required certificates and affidavits, o Performance Bond, o Payment Bond, o Standard Specifications, o EPA Specifications and Inserts, o Special Provisions, o Contract Plans, o Addendanurnbers 1 to 2 ,inclusive. o Change Orders which may be delivered or issued after Effective Date of the Agreement and are not attached hereto. There are no Contract Documents other than those listed in this Article 6. The Contract Documents may only be amended by Change Order as provided in Section 1-04.4 of the Standard Specifications wh/ch may be modified by the Special Provisions. ARTICLE 7. INDEMNIFICATION. The CONTRACTOR and CITY acknowledge and agree that they have negotiated the following in accordance with the requirements of RCW 4.24.115 and the CONTRACTOR specifically waives his immunity under industrial insurance under Title 51 RCW. To the fullest extent permitted by Laws and Regulations, the CONTRACTOR shall indemnify, defend, and hold harmless the CITY, ENGINEER, and DESIGN ENGINEER, their consultants, subconsultants, and the officers, directors, employees, and agents of each and any of them, against and from any and all claims, injuries, damages, losses or suits, including all legal costs and attomey fees, all claims and liability arising under, by reason of, related, or incidental to the Contract Documents or any performance of the WORK, but not from the sole negligence or willful misconduct of the CITY and/or the ENGINEER as ~rther defined in the Contract Documents. The provisions of this section shall survive the termination of the contract. Contractor Initials Callow Avenue Basin Priorizy 5 CONTRACT-2 City of Bremerton Storm Drainage Separation Deparmlent of Public WorPm an4 Utilities ARTICLE 8. ASSIGNMENT No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. The CITY, in its sole discretion, may refuse to allow the CONTRACTOR to assign any or all of its duties, rights and/or responsibilities under the Agreement, except with regards to an assignment of funds for security purposes. In the case of an assignment for security purposes the CITY may condition its approval to the extent it deems necessary to assure that there will be adequate funds to complete the WORK and to pay a subconh'actors and suppliers. CITY and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect of all covenants, agreements and obligations contained in the Contract Documents. IN WITNESS WHEREOF, CITY and CONTRACTOR have caused this Agreement to be executed the day and year first above written. CITY: CiW of Bremerton CONTRACTOR By -~ [ :'; SLan Palmer Ccm~-rnc*~-~t~'~ Tn~. Attest Address for giving notices Address for giving notices 5107 $~ca'co H,ry. 3 St/ Port-. Dr,.hard, License No. App~ Agent for service of process: (Si .gnature) /~Title) '/ Callow A venue Basin Priority $ CONTRACT-3 City of Bremerton Slorrn Drainage Separation . Department of Public Work~ and Utilities