HomeMy WebLinkAbout4243+Browse: Next Previous First Last Update Delete Restart X - Exit
+Retrieve the Next record
Found: 1 Record(s) MAINTAIN Contract Transactions
Contract Number 4243
Vendor Name ACRES INTERNATIONAL CORP
tSubject CASAD DAM INTAKE TOWER SEISMIC UPGRADE
tDepartment ENGINEERING
~Status Code PRO
Amount $247401.00
Begin Date 01/29/2002
Insurance End Date 06/30/2004
iType Amount Review Date 02/15/2006
GL $1000000.00
E&O $1000000.00
Insurance Total $2000000.00
Insurance Review Date 07/01/2004
Comments E&O EXPIRATION 8/31/03 CONTRACT HAS 4 AMENDMENTS
INSURANCE EXPIRED LTR 6/14/04 VAULT 01/01/2006
+
AMENDMENT NO. 4
TO
PROFESSIONAL SERVICES AGREEMENT
w/ACRES INTERNATIONAL CORPORATION
FOR DESIGN AND CONSTRUCTION SUPPORT SERVICES
The City of Bremerton, Washington, (the "City"), and Acres International Corporation, ("Consultant") have
entered into a PROFESSIONAL SERVICES AGREEMENT, hereinafter referred to as AGREEMENT for
a project described as the Casad Dam Intake Tower Seismic Upgrade.
This AMENDMENT NO. 4 modifies the term of the contract set forth in the AGREEMENT dated January
16, 2002, as follows:
The term of the contract shall be extended to June 30, 2004.
Except as herein modified, the terms of the AGREEMENT shall remain in full force and effect.
In WITNESS WHEREOF, the parties hereto have executed the AMENDMENT NO. 4 to the Professional
Services Agreement on the date and year indicated.
For Acres International Corporation, dated this ] ~t day of~,2004, j j
By:
For the City of Bremerton, dated thisa~a-~.a day o~t~2004~
Cary Bozeman, Mayor
DEPAR E~~VAL:
w. eu;ene Sable'y, Ca fi;;blic Works and Utilities
F~aa o~t~n;t;n~/~u[y~City derk
+Enter Search Criteria, Press Esc Key to Transmit
Press Del Key to Terminate Delete Mode
CHANGE Contract Transactions
Contract Number 4243
IVendor Name ACRES INTERNATIONAL CORP
Subject CASAD DAM INTAKE TOWER SEISMIC UPGRADE
+Department ENGINEERING
~Status Code PRO
Amount $247401.00
Begin Date 01/29/2002
Insurance End Date 12/31/2003
iType Amount Review Date 11/01/2003
GL $1000000.00
E&O $1000000.00
Insurance Total $2000000.00
Insurance Review Date 05/01/2004
Comments E&O EXPIRATION 8/31/03
CONTRACT HAS 3 AMENDMENTS
+
PROFESSIONAL SERVICES AGREEMENT
BETWEEN THE CITY OF BREMERTON AND
ACRES INTERNATIONAL
AMENDMENT NO. 3
PROJECT Casad Dam Intake Tower Seismic Upgrade
CONSULTANT Acres International
THIS AGREEMENT SPECIFICALLY AMENDS THE AGREEMENT (the "Contract")
entered into between the City of Bremerton and Acres International~ on January Iv 2002
All provisions in thc Contract shall remain in full force and effect except as expressly modified by
this document.
Whereas additional professional services were requested by thc City of Brcmerton, Acres
International desires to modify the contract as further described in Attachment A.
For valuable consideration and by mutual consent of thc parties, the modifications to the Contract
are as follows:
Exhibit A (Scope of Work) is modified as follows: Additional tasks to be added for the Amended
Scope of Work are attached as Attachment A.
Exhibit B (Compensation) is modified per the budget in Attachment A.
The original contract amount was One Hundred Fifty-two Thousand Eight Hundred Fifty-eight
Dollalrs ($152,858.00~. Amendment 1 to the Contract was executed on February 12, 2003 which
added Thirt~ Five Thousand Two Hundred Seventy Five Dollars ($35~275.00). Amendment 2,
based on time and materials, added Twenty One Thousand Three Hundred Thirty Eight
~$21.338.00). The City shall pay the Consultant for the additional work described above for this
proposed Amendment 3, based on time and materials, an amount not to exceed Thirty Seven
Thouaand Nine Hundred Thirty ($37~930.00) for a total amended contract amount of Two
Hundred Forty Seven Thousand Four Hundred and One Dollars ($247,401.00)~ including this
Contract Modification.
II.
Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant
further agrees that this Contract Modification constitutes full and final settlement of all claims for
contract time and for all costs of any kind, including costs of delays, related to any work either
covered or affected by this Contract Modification.
The parties whose names appear below swear under penalty of perjury that they are authorized to
enter into a contract modification that is binding on the parties of this contract.
CONTRACT AMENDMENT 1 June 30, 2003
Project Number: 417
1N WITNESS WHEREOF, the parties have executed this Contract Modifications on the day and
year first written above.
Division Mgr - approved to process ~.~
Initials and Date
Dept. Director - approved to process
Initials and Date
CONSU~ T~
Its V'~ f-~- t~'dg~=,~tvt*~ Its Mayor
APPROVED AS TO FORM: ATTEST:
Bremerton City Attomey ~ -
NOTICES TO BE SENT TO: NOTICES TO BE SENT TO:
Mr. Robin G. Charlwood City Clerk
Vice President City of Bremerton
Acres International Bremerton, WA 98337
150 Nickerson Street Suite 310
Seattle, WA 98109
(206) 352-5730
CONTRACT AMENDMENT 2 June 30, 2003
Project Number: 417
Professional Services Agreement Amendment 3
Attachment A
PROFESSIONAL SERVICES AGREEMENT AMENDMENT
FOR ACRES INTERNATIONAL
SCOPE OF WORK AND BUDGET FOR
DAM AND WATER SYSTEM SECURITY ASSESSMENT
(The tasks below are only the additional tasks for the amended contract)
Background
The City of Bremerton Water Utility (Bremerton) is required by the US Environmental Protection
Agency (EPA) to perform a Vulnerability Assessment (VA) on its water system, including the dam,
to be submitted before December 31, 2003. Bremerton is performing the majority of the VA in-
house using the Sandia RAM-W method. Bremerton desires assistance in the VA in evaluating
security system effectiveness to determine the Protection System Effectiveness (P£) for its critical
water facility assets.
In the RAM-W methodology, the following formula is used to determine risk (R):
R = PA*(1-PE)*C
R = Risk
PA = Design Basis Threat
PE = Protection System Effectiveness
C = Consequences
Additionally, Bremerton has been requested by the Washington State Department of Ecology
(Ecology) to perform a security assessment of Casad Dam following the Federal Energy Regulatory
Commission (FERC) procedure.
The following scope describes the work to be accomplished.
Scope of Work
Task 1.5 Project Management
Robin Charlwood, Jim Rutherford, and/or Lane McNitt will perform the site visits and technical
work on this project. N. Reid and J. Mullins will input on the SCADA work. If these individuals
are not available, then Acres will obtain prior approval from the City for alternates.
The work products for Tasks 12 - 18 are directly related to the City's VA and exempt from public
disclosure under RCW 42.17.310(1)(ww). All work products are to be clearly labeled
CONFIDENTIAL and NOT FOR PUBLIC DISCLOSURE. Appropriate precautions will be taken
to ensure confidentiality. No work products shall be kept by Acres after this project is finalized.
Deliverables for Tasks 12 - 18 shall be hand delivered, prepared in MS Word, and in electronic
format only.
There will be a project initiation meeting on the first day of the site visits. There will also be a
meeting with the City's VA team to discuss findings and recommendations.
CONTRACT AMENDMENT 3 June 30, 2003
Project Number: 417
DELIVERABLES: · 1-hour project initiation meeting
· 2-hour project completion meeting
· 1 electronic copy water system security assessment report in Word
· 1 electronic copy of Casad Dam security assessment in Word
Task 9.11 Chainfall Design
Inspect the valve house floor to verify site conditions. Select a chain fall hoist that will support the
Howell Bunger valve weight and allow it to be moved 3' from the connection flange. Provide
structural calculations that verify the capacity of the valve house floor and design the anchorage
needed. Provide a single detail drawing of the installation.
DELIVERABLES: · Select a chain fall hoist
· One detail drawing of the installation
TASK 12 Review Water System Data Sheets for Physical Protection Features
Bremerton will supply facility information and data sheets listing the current status of the physical
protection features currently in place for Casad Dam and other critical assets. Attached is FORM 1
as an example. Bremerton will also supply the design basis threat (DBT) as determined through the
RAM-W process. (Includes potential threats from Vandals/Criminals and/or Insiders)
Acres will carry out a brief review of the DBT and consider potential threats from National groups
and International Groups by briefly interviewing selected local, state and federal law enforcement
agencies. These are normally considered in FERC Dam Security Assessments.
TASK 13 Review Water Utility Security Policies and Procedures
Bremerton will supply any policies and procedures relating to security and dam safety, including the
dam emergency action plan (EAP).
DELIVERABLE:
· Acres will review and provide any comments in a brief memo to Bremerton.
TASK 14 Review Facilities in the Field
Acres will perform site visits to review existing security measures in place. Acres will be
accompanied by Water Utility staff who will assist in answering questions. Bremerton's security
system supplier (Fire One) may also be present at these site visits. The visit will be to
approximately 12 facilities that Bremerton and Acres will identify prior to the site visit and will
include Casad Dam and its components, all cr~tical facilities, and representative examples of typical
pump stations and reservoirs. These facilities are all within several miles of each other. Acres has
been presented with a preliminary list of facilities.
DELIVERABLE:
· 2-3 days for site visits.
CONTRACT AMENDMENT 4 June 30, 2003
Project Number: 417
TASK 15 Review Performance of Existing Security Systems
Acres will develop a worst-case scenario for each critical facility. Both insider and outsider DBTs
will be considered. Estimate the PE relative to the design basis threat by determining the following:
Ability of the existing system to DETECT the design basis threat (DBT = P^).
Ability of the existing system to DELAY the DBT.
Ability of the existing system to RESPOND to the DBT.
Acres will rate the above abilities as high, medium, or low and document this information on Form
2 attached
DELIVERABLE:
· Form 2 filled out, and PE determined.
TASK 16 Review Cyber Threat Vulnerability
Bremerton will perform an initial review of the Water Utility SCADA. The City will provide this to
the consultant for review. Recommend SCADA upgrades.
DELIVERABLE:
· Report on recommended SCADA upgrades.
TASK 17 Recommend Security Improvements
Based on the evaluation above, make recommendations for security system improvements -
considering both procedures and equipment - for each critical facility and provide budget-level cost
estimates.
DELIVERABLE:
· A list of security system improvements with budget-level cost estimates where appropriate.
Task 18 Casad Dam Security Assessment and Security Plan
Acres will perform a security assessment for Casad Dam using FERC procedures. Bremerton has
already determined the DBT. Evaluate and, where necessary, recommend changes to security
procedures and other measures to meet requirements similar to those of FERC's security program as
specified for Group 2 dams in their letter to licensees dated June 7, 2002. Since no power is
generated at Casad Dam, its operation is regulated by Ecology and not FERC; however, Ecology
has stated that this level of assessment would be appropriate for Casad Dam.
Acres will perform a VA Analysis for Casad Dam using the automated FERC "RAM-C"
methodology.
Acres will review the Casad Dam EAP and prepare a brief memo with any recommendations
regarding the integration of security procedures with the EAP (as recommended by FERC for
Group 2 dams).
DELIVERABLES: Acres will produce two reports:
· Security Assessment (includes threat assessment, consequences and assessment and
completion of the APPA Dam Security Checklist) in a separate technical report on Cased
Dam appropriate for submission to the Deputhnent of Ecology.
· Security Plan (which includes reactions to various alert levels etc.)
Task 19 Additional Work
CONTRACT AMENDMENT 5 June 30, 2003
Project Number: 417
Additional work may be requested of Acres during the course of this project. Expenditure of the
funds designated for this task in the budget must have prior written authorization from the City.
CONTRACT AMENDMENT 6 June 30, 2003
Project Number: 417
FORM 1
WATER SYSTEM DATA COLLECTION WORKSHEET
PHYSICAL PROTECTION FEATURES
Facility: Assets:
Date: Recorded by:
Physical Protection Features Description Notes
(1) Fa~llty Bcmnda~j +++++++++++++++++++++++++++
(la) Fence height and construction
(lb) Vehicle barders - number and type
(lc) Natural barders
(2) Pm~ty Entrance (describe type of entrance) +++++++++++++++++++++++++++
(2a) Personnel - number, type, and construction
(2b) Veh~e - number, type, and construction
(2c) Entrance locks - list lock series
(2~ Addr~s clearly identiftsd [] Yes [] No
(3) Dt~tallce be~,~en boundar~ &facility
(4) Faollity construction
(5) Fa~lity entrances (doors, windows, vents,
skylights) - list number and constr~ction
(6) Dtsteace between facility entrance and crlticat
aseet
(7) S~nsom I Monltom (fence, intrusion, door/gate
peNtion, penc~ration, motion)
(8) IDchecks I'~ Yes [] No
(9) D¥~ntfon by personnel (inspection frequency) +++++++++++++++++++++++++++
(Sa) Operators
(81=) Police inspection route
(8c) Caretakers
(Sd) Other personnel
(Be) Neighbors
(10) De, eaton As~ssment: [] Camera [] SiteVisit
(11) Tamper Indicating measures +++++++++++++++++++++++++++
(11a) Intrusion Alarms (type)
(11al) local [] Yes [] No
(11a2) ramctetoSCADA r-t yea [] No
(11 a3) remote to Alarm Carl Center [] Yes [] No
(11 b) Other stalm$ (type)
(1161) local E] Yes [] No
(1162) remote to SCADA [] Yes [] No
(1163) remctetoAlam~ Call Center [] Yes [] No
(11c) Customer calls (Iow preasure, nowater, etc) [] Yes [] No
(12) C~mmunica~on Unes-VolceTelephoce [] Yes E] No
(t3) Communlcafdon Mites-SCADA r-I Phone [] Radio [] None
(14) O~-LIne Anatyzem (such as CI2, tud:,idity or pH
me~ers) - list
(t5) Ama Lighting - (switch, phcto cell or motion etc)
(t6) om.r-
0~) Oa~r-
Additional Information Attached or Available: [] Additional notes [] Site map [] Photo
[] Piping diagram [3 Other
CONTRACT AMENDMENT 7 June 30, 2003
Project Number: 417
FORM 2
Form 2
Potentinlly Effective Physicnl Protection Systems (PPS) Fentures
Facility:
PPS Features Outsider DBT Insider DBT
Detection
Delay
Re~n~
Note: PE is the lowest of detection, delay, and response.
Low effectiveness = 0.1 = little evidence of system effectiveness
Medium effectiveness = 0.5 = evidence of general but not specific capabilities
High effectiveness = 0.9 = evidenea of specific security system capabilities to address specific concerns
CONTRACT AMENDMENT 8 June 30, 2003
Project Number: 417
+Enter Search Criteria, Press Eec Key to Transmit
Press Del Key to Terminate Delete Mode
CHANGE Contract Transactions
Contract Number 4243
~Vendor Name ACRES INTERNATIONAL CORP
+Subject CASAD DAM INTAKE TOWER SEISMIC UPGRADE
Department ENGINEERING
Status Code PRO
Amount $212971.00
Begin Date 01/29/2002
Insurance End Date 12/31/2003
Type Amount Review Date 11/01/2003
GL $1000000.00
E&O $1000000.00
+
~ Insurance Total $2000000.00
Insurance Review Date 05/01/2003
+
~ Comments E&O EXPIRATION 8/31/03
+
PROFESSIONAL SERVICES AGREEMENT
BETWEEN THE CITY OF BREMERTON AND
ACRES INTERNATIONAL
AMENDMENT NO. 2
PROJECT Casad Dam Intake Tower Seismic Upgrade
CONSULTANT Acres International
THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE
Professional Services Agreement
AGREEMENT (the "Contract") entered into between the City of Bremerton and .4cres
International, on January It 2002
All provisions in thc Contract shall remain in full force and effect except as expressly modified by
this document.
Whereas additional design services were requested by the City of Bremerton, Acres International
desires to modify thc contract as further described in Attachment A.
For valuable consideration and by mutual consent of the parties, the modifications to the Contract
are as follows:
Exhibit A (Scope of Work) is modified as follows:
See Amended Scope of Work attached as Attachment 1.
Exhibit B (Compensation) is modified per Attachment 1.
The original contract amount was One Hundred Fifty-two Thousand Eight Hundred Fifty-eight
Dollars {$152,858.00). Amendment 1 to the Contract was executed on February 12, 2003 which
added Thirty Five Thousand Two Itundred Seventy Five Dollars ($35,275.00). The City shall
pay the Consultant for the additional work described above for this proposed Amendment 2, based
on time and materials, an amount not to exceed Twenty Four Thousand Eight Hundred Thirty
Eight ($24~838.00) for a total amended contract amount of Two Hundred Twelve Thousand Nine
Hundred Seventy One Dollars ($212,971.00), including this Contract Modification.
II.
Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant
further agrees that this Contract Modification constitutes full and final settlement of all claims for
contract time and for all costs of any kind, including costs of delays, related to any work either
covered or affected by this Contract Modification.
CONTRACT MODIFICATION I March 26~ 2003
Project Number: 417
The parties whose names appear below swear under penalty of perjury that they are authorized to
enter into a contract modification that is binding on the parties of this contract.
1N WITNESS WHEREOF, the parties have executed this Contract Modifications on the day and
year first written above.
Division Mgr- approved tO process ~ ¢
I 'rial Date
Dept. Director - approved to process ~ g~J~
Initi~fls and Date
Its ~/~t-,,~-~ Its Mayor
DATE: q'/~"~,~ - DATE: d'-,g- O,.,a
APPROVED AS TO FORM: ATTEST:
Bremerton City Attorney r"~it~ ~le[k/f
NOTICES TO BE SENT TO: NOTICES TO BE SENT TO:
Mr. Robin G. Charlwood City Clerk
Vice President City of Bremerton
Acres International 239 Fourth Street
150 Nickerson Street Suite 310 Bremerton, WA 98337
Seattle, WA 98109
(206) 352-5730
CONTRACT MODIFICATION 2 March 26, 2003
Project Number: 417
Attachment 1
March 10, 2003
Casad Dam Intake Tower Seismic Upgrade
Scope of Work for Tasks Covered by Amendment No. 2
Task 1 - Project Management
· Subtask 1.4 - Project Management Extension: It is proposed that project
management be extended an additional year, September 2002 through
September 2003. The extension has become necessary since construction was
delayed one year in order to wait for technical information and cost
information from Nippon Steel Corporation concerning their un-bonded brace
struts. PM activities covered under this subtask would be related to providing
technical direction, coordination and management during the final design
phase. Also included under this subtask would be coordination meetings with
the City. A total of 2 additional meeting are assumed. The original contract
covers PM during construction. Starting in January 2003 Acres shall
prepare monthly invoices with progress reports that will include an
estimate of earned value as the basis for requested payment. If the
earned value estimate is less than the accrued labor and expenses charges
the difference will be withheld. Earned value will be estimated based on
the percent complete for each subtask multiplied by the budgeted
amounts. Each monthly invoice will show the total accrued billings and
report the cumulative amount withheld, if any.~
Task 8 -. Design Review
· Subtask 8.4 - Star Seismic Brace Review & Cost Comparison: After initial
contact and receiving proposal from Starr Seismic informed City of potential
seismic brace supplier with a product similar to Nippon Steel's product.
Performed background check on owners of Start Seismic and their partnership
with PKM Steel Services. (This extra work item was covered by the $1,500
contingency provided under Amendment No. 1 .)
· Subtask 8.5 - Design Review with Department of Ecology: Included
preparation for meeting with the Department of Ecology Dam Safety Office
(DSO), participation in a meeting in Olympia with DSO and providing
reference materials related to the design before and after the meeting.
Reference materials submitted included a progress printing of the design
drawings, basis of design, seismicity report and calculations related to dam
safety under seismic brace loads.
Bold is used to show additional scope added to existing Subtask 1.4 scope.
Task 9 - NinetF Percent Design/Final Bid Documents
Subtask 9.8 - Nippon Steel Brace Procurement Documents: Prepared a
performance specifications that was used by Nippon as a basis for preparation
ora proposal for fabrication and supply of seismic braces. Reviewed in detail
Nippon's proposal and negotiated requirements for low cycle fatigue
appropriate to the unique requirement of this project.
· Subtask 9.9 - Seismic Brace Bid Documents: Prepared bid documents for
procurement of seismic braces. Assisted during bidding answering bidder's
questions. Prepared several addendums to the bid documents.
· Subtask 9.10 - Design Modifications to Incorporate Star Seismic Braces:
Revise design to incorporate Star Seismic brace end connection details that
includes double connection plates instead ora single connection plates. Also
review any modifications Star may propose to the connection pin design.
Revise contract drawings. (Single connection plates were assumed in the
original design.)
Task 11 Construction Engineering Services
· Subtask 11.6 - Review Star Seismic Brace Test Submittal: Review Star
Seismic submittal showing that they have sufficient test information to justify
fabrication of the Casad seismic braces without further testing.
Casad Dam Intake Tower Seismic Upgrade 10-Mar-03
Amendment No. 2
Table lA - Summary of Estimated Costs
Item Amount
Direct Labor. $7,108._7Z -
Indi~rect Labor (1) $11,942.73
Total Labor Cost $'19.0~5~
Profit (2) _ _ $2,286.18 ~$.2,28 t
Direct Expenses (3)
Co_n~i_n~Lency $3.50(
Total: $24,838
Table fB - Summary by Category of Additional Work
Estimate
Direct Labor Labor at Billing
Category of Additional Work Subtask(s) Cost Rate (4) Expenses
Task 8 - Design Review
8.4 Star Seismic Brace Review & Cost Compahsion 8.4
18.5 Design Review with Depa~rtment of~celocJy i 8.5 ~11~.37 ~,447
Task 9 - Ninety Percent Design / Final Bid Documents
I 9~ Nip, on Steel Brace Procurement Documents 9.8 $625.26 $1,877
I 9.9 Seismic Brace Bid Documents 9.9 $2,192.46 $9,581
~9.10 Desitin Modifications to Incorporate Star Seismic Braces 9.10 $2.783.34 ~,3.54 ..
Subtotai~ $5,601.06 $16,81~2
Task '11 - Construction Engineering Services
! 11.6 Review Star Sesimic Brace Test Submittal 11.5 $359.34
~ Subtotal: $359.34 $1,079
Amendment Estimate: $7,108.77 $21,338
Notes: 1. Based on 168% of Acres Direct Labor. 2. Based on additional 12% of Acres Total Labor CosL
3. Expenses based on actual cost for disbursemenls.
4. Billing Rate = (1.68 +1.00) * ~. 12 = 3.0016 x Labor Cost
+Browse: Next Previous First Last Update Delete Restart X - Exit
+Retrieve the Next record
+Found: 10 Record(s) MAINTAIN Contract Transactions
+ Contract Number 4243
+
+Vendor Name ACRES INTERNATIONAL CORP
+Subject CASAD DAM INTAKE TOWER SEISMIC UPGRADE
+Department ENGINEERING
+Status Code PRO
+ Amount $152718.00
+ Begin Date 01/29/2002
+ Insurance End Date 12/31/2003
+ Type Amount Review Date 11/01/2003
+ GL $1000000.00
+ E&O $1000000.00
+
+ Insurance Total $2000000.00
+ Insurance Review Date 05/01/2003
+
+ Comments E&O EXPIRATION 8/31/03
+
+
AMENDMENT NO. 1
TO
PROFESSIONAL SERVICES AGREEMENT
w/ACRES INTERNATIONAL CORPORATION
FOR DESIGN AND CONSTRUCTION SUPPORT SERVICES
The City of Bremerton, Washington, (the "City"), and Acres International Corporation, ("Consultant") have
entered into a PROFESSIONAL SERVICES AGREEMENT, hereinafter referred to as AGREEMENT for
a project described as the Casad Dam Intake Tower Seismic Upgrade.
This AMENDMENT NO. 1 modifies the Scope of Work and Budget set forth in the AGREEMENT dated
January 16, 2002, as follows:
The Scope of Work shall be modified to add additional scope items as outlined in the attached Amendment
No. 1, Exhibits E and F.
The term of the contract shall be extended to December 31, 2003.
The Compensation for services shall be increased by $35,275.00, and the total fees under this Agreement
shall not exceed One Hundred Eighty Eight Thousand One Hundred Thirty three dollars ($188,133.00).
Except as herein modified, the terms of the AGREEMENT shall remain in full force and effect.
In WITNESS WHEREOF, the parties hereto have executed the AMENDMENT NO..1 to the Professional
Services Agreement on the date and year indicated.
For Acres International Corporation, dated this ~ ~day of
By:
For the City of Bremerton, dated this ~ day o~~~
Cary B4zeman, Mayor
DEPA~VAL:
W. Eugene Sampley, I]~,gl:So~of Public Works and Utilities
Exhibit E
Casad Dam Intake Tower Seismic Upgrade
Scope of Work for Tasks Covered by Amendment No. 1
L Proiect Management Extension
· Subtask 1.4 - Project Management Extension: It is proposed that project
management be extended an additional year, September 2002 through
September 2003. The extension has become necessary since construction was
delayed one year in order to wait for technical information and cost
information from Nippon Steel Corporation concerning their un-bonded brace
struts. PM activities covered under this subtask would be related to providing
technical direction, coordination and management during the final design
phase. Also included under this subtask would be coordination meetings with
the City. A total of 2 additional meeting are assumed. The original contract
covers PM during construction.
2. Nippon Steel Unbonded Braces
· Subtask 5. 6 - SAP 2000 Analysis for Un-bonded Braces: SAP2000 runs were
made for Nippon Steel's un-bonded brace as a friction damper for both MDE
and MCE level seismic events.
· Subtask 8.3 - Design Review of Un-bonded Braces: This subtask covers the
additional work involved in assessing the applicability and economics of using
Nippon Steel's un-bonded braces relative to other alternatives. Supply and
installation costs, and life cycle costs were compared for over four different
design alternatives. Acres met on four occasions with Nippon Steel
representatives to discuss cost and technical performance of their brace
system. One site visit was made with Nippon representatives to familiarize
them with the existing conditions.
2. Tower Intake and Sluice Gate Upgrades
· Subtask 9.4a & 9.4b - Ninety Percent Gate Upgrades Design Submittal:
Prepare 90% level design drawings and specifications for imake and sluice
gate upgrades according to the City's requirements. Subtask design activities
are outlined below. (Note: "a" = intake gate scope, "b" = sluice gate scope.)
9.4.1a & 9.4.1b - Stem Design: Design stem with A316 stainless steel.
Confirm 2 lA inch stem diameter is sufficient. Design improved stem
connection to intake and sluice gate.
9.4.2a & 9.4.2b - Stem Bushing Design: Design bronze bushing with steel
housing to fit existing stem brackets. Stem bracket as-built dimensions
assumed provided by the City.
9.4.3a & 9.4.3b - Stem Bracket: Analyze existing stem brackets and stem
bracket anchors. Based on analysis, recommend use or replacement of
stem bracket. Design new stem brackets either as replacements or spares.
9.4.4a & 9.4.4b - Stem Operator: Review Rodney Hunt stem operator
information and select model appropriate for replacing the existing
operators. Confirm that new stem operator will fit intake dimensions and
hoisting requirements.
9.4.5a & 9.4.5b - 90%0 Drawings: Assume two additional drawings
required.
9.4. 6a & 9. 4. 6b - 90% Specifications: Assume additional sections required
to cover underwater construction, stem operator procurement, steel
fabrication for stems, stem brackets, and bushings.
· Subtask 9.5a & 9.5b - Ninety Percent Design Review of Gate Upgrades:
Facilitate City's review of 90% level design of the intake and sluice gate
upgrades. Document design changes required by the City. Coordinate an
internal Acres review of 90% design documents.
· Subtask 9.6a & 9. 6b - Final Design for Gate Upgrades: Compete final
contract documents incorporating results from the City's and Acres internal
review.
· Subtask 9. 7a & 9. 7b - Construction Cost Estimate for Gate Upgrades: Prepare
a construction cost estimate for supply and installation of intake upgrades.
· Subtask ll. Sa & ll. Sb - Construction Engineering Support for Gate
Upgrades: Review shop drawings and construction plans.
Exhibit F - Casad Dam Intake Tower Seismic Upgrade
Table lA - Summary of Estimated Costs for Additional Work
Item Amount
Direct Labor ~i~ $11,086
Indirect Labor (1) $18,624
Total Labor Cost $29,71(
Profit (2) $3,565 $3,56{
Direct Expenses (3) $50(
Contingency $1,50(
Total: .$35,275
Table lB - Amendment Summary by Category of Additional Work
Total Labor
Category of Additional Work Subtaak(a) Labor Coat Coat Expenses
1. prOject Management Extension '1~4 $21~97 $6,156 $200
2. Nippon Steel Unbonded Braces
- ~AP ?000~nal~/sis ' i 5.6 $862 $~,30~
- Design Review of Unbonded Braces 8.3 ~ .~
Subtotal: $4,168 $1t,t70
3. Tower Intake Gate Upgrades
- Des~n 9.48 L ~.78 $2,865 $~,678 $150
- Construction En9. Support~Shop D[~wi~gs) 11.5a $328 $87~9. $50
Subtotal: $3,193 S8,557 $200
4. Tower Sluic® Gate Upgrades
~ De~i~n 9.4b - 9.~b $1,319 $3,534 ~ $60
- Construction Eng. Support'Shop D~win~s.) 11 .Sb i ~ $293 $40
Subtotal: $1,428 $3,827 $100
Amendmant Totals: $11,086 $29,710 $500
Notes: 1. Based on 168% of Acres Direct Labor. 2. Based on additional 12% of Acres Total Labor Cost.
3. Expenses based on actual cost for disbursements.
4. Based on 268% of Acres Direct Labor.
PROFESSIONAL SERVICES AGREEMENT
CITY OF BREMERTON - CASAD DAM INTAKE TOWER SIESMIC UPGRADE
PREDESIGN, DESIGN, AND BID SUPPORT SERVICES
ACRES INTERNATIONAL CORPORATION
THIS AGREEMENT is between thc City ofBremerton, a municipal corporation (hereina~er
referred to as "City" and "Owner") and Acres International Corporation (hereinafter referred to as
"Consultant").
WITNESSETH:
1. SCOPE: Consultant agrees to provide engineering services for the predesign, design, and
bid support services of the Casad Dam Intake Tower Seismic Upgrade, as further described in the
Scope of Work, attached hereto and incorporated herein by this reference as Exhibit "A' (Scope of
Work).
2. TERM: Contract shall commence on the date of this agreement and will terminate on
December 31, 2002, unless othenvise extended by the City.
3. COMPENSATION: City shall pay Consultant compensation as follows:
Total compensation (Cost and Fixed Fee) under this Agreement shall not exceed
$152,178.00. Charges for services shall conform to the fee schedule attached hereto and
incorporated herein as Exhibit "B".
Consultant shall submit regular statements describing the services rendered with a breakdown
for work completed as authorized under this Agreement. The City, upon receipt of the completed
statement, shall promptly process said invoice for paymem. The undisputed amount of said invoice
shall be paid within 30 days of receipt.
Additional services which may be requested by the City will be paid for by the City at the
rates set forth in Exhihit B, which sum may exceed the "not to exceed" amount set forth above.
However, said services will only be performed, and compensated by the City at~er the City has
directed such performance in writing.
4. RELATIONSHIP OF PARTIES: The parties understand and agree that Consultant is
a firm skilled in matters pertaining to Civil Engineering and will perform independent functions and
responsibilities in the area of its particular field of expertise. Consultant and its personnel shall act
as independent contractors and not employees of the City. As such they have no authority to bind
neither the City or control employees of the City, contractors, or other entities. Within the
PROFESSIONAL SERVICES AGREEMENT -1-
Acres International Corporation- January 16, 2002
performance of these duties, Consultant shall work under the direction of the Director of Public
Works & Utilities.
5. INDUSTRIAL INSURANCE: Consultant agrees to provide for State industrial
insurance coverage for its personnel as required by State law.
6. LICENSE AND TAXES: Consultant shall possess a current City of Bremerton Business
License and any regulatory license required to fiflfill Consultant's obligations under this Agreement.
B & O taxes shall be paid when due.
7. INSURANCE AND HOLD HARMLESS: Consultam shall provide professional liab~ty
or errors and omissions insurance of $1,000,000 per claim and in aggregate and commercial general
liability insurance, including bodily injury and property damage, of at least $1,000,000 per occurrence.
The City shall be named an additional insured on the commercial general liability insurance policy.
If such policy is written on a claims made form, the retroactive date shall be prior to or
coincidem with the date of this Contract. The policy shall state that coverage is claims made, and
state the retroactive date. If; at any time, claims from work performed by the Consultant outside of
this contract, reduces the amount of insurance available for claims under this contract to an amount
less than the minimum required coverage, the Consultant shall immediately purchase additional
coverage to ensure the minimum required coverage is available for this contract. Claims made form
coverage shall be maintained by the Consultant for a minimum of three years following the
termination of this Contract, provided that such coverage is generally available at reasonable cost,
and the Consultant shall annually provide the City with proof of renewal. If renewal of the claims
made form of coverage becomes generally unavailable, or economically prohibitive, the Consultant
shall purchase an extended reporting period ("tail") or execute another form of guarantee acceptable
to the City to assure financial responsibility for liability for services performed.
Consultant shall, at all times, be responsible for the negligent or wrongful acts or failures to
act of its personnel which occur or arise in any way out of the performance of this agreement.
Consultant agrees to indemnify and hold harmless the City, its appointed and elected officers and
employees, from and against any and all liability, loss, costs, damage, and expense, including costs
and reasonable attorney fees in defense thereof, because of actions, claims or lawsuits for damages
resulting from personal or bodily injury, including death at any time resulting therefrom, sustained by
any person or persons, and on account of damage to property, to the extent arising out of the
negligent performance oft}tis Agreement, if such injuries to persons or damage to property is due to
the negligence of the Consultant, or its subcontractors, agents or assigns. This provision shall be
inapplicable to the extent such damage or injury is caused by the negligence of the City.
In no event shall Consultant have any liability whatsoever to the City for the City's indirect
or consequential damages, including, but not limited to, loss of water supply or profit.
PROFESSIONAL SERVICES AGREEMENT -2-
Acres International Corporation- January 16, 2002
The parties have specifically negotiated to provide that Consultant hold harmless, and
indemnify the City for all claims, damages, and losses, including reasonable attorneys fees, arising
from any claims of Consultant's employees for injuries covered by Title 51 RCW, and for which
Consultant could not be held directly liable.
8. GENERAL CONDITIONS:
a. Reports and Information - Consultant, at such times and in such forms as the City may
require, shall furnish the City such reasonable periodic reports and documents as it may request
pertaining to the work or services undertaken pursuant to this Agreement, the costs and obligations
incurred or to be incurred in connection therewith, and any other matters covered by this Agreement.
Consultant will maintain accounting records in accordance with generally accepted accounting
principles and practices to substantiate all invoiced amounts.
b. Entire Agreement - This Agreement constitutes the entire agreement between the parties
and both parties acknowledge that there are no other agreements, written or oral, that have not been
fully set forth in the text of this Agreement. There are attached hereto and incorporated by reference
as part of this Agreement Exhibits "A, B, C, and D".
c. Amendments - The parties hereby further agree that this Agreement cannot be amended
or modified without the written concurrence of both parties.
d. Notices - Any notices required to be given by the City to Comultant or by Consultant to
the City shall be in writing and delivered to the parties at the following addresses:
City of Bremerton Acres International Corporation
City Clerk 150 Nickerson Street, Suite 310
239 Fourth St. Seattle, WA 908109
Bremerton, WA 98337 Attention: Mr. Robin G Charlwood
e. Waiver - Failure to insist upon strict compliance with any terms, covenants or conditions
of this A4greement shall not be deemed a waiver of such, nor shall any waiver or relinquishment of
such right or power at any time be taken to be a waiver of any other breach.
f. Compliance with State, Local and Federal Laws - Consultant agrees to exercise care and
skill to comply with all applicable local, state and federal laws in performance of all services under
this Agreement.
g. Applicable Law; Venue - This Agreement shall be construed and interpreted in accordance
with the hws of the State of Washington and, in the event of dispute, the venue of any action brought
PROFIgSSIONJkl. SERVICES JkGRIglgIqENT -3-
/Xcres In'cerna~_J_ona3_ Corporat±on- ,January 16, 2002
hereunder shall be in Kitsap County Superior Court.
h. Attorney Fees - The substantially prevailing party in any litigation arising hereunder shall
be entitled to its reasonable attorney's fees and court costs, including appeals, if any.
9. NONI)ISCRIMINATION: Consultant shall not discriminate in employment or services
to the public on the basis of race, color, national origin, sex, religion, age, marital status or disability,
except employment actions based on a bona fide occupational qualification.
10. TERMINATION: This Agreement may be terminated by the City for convenience upon
thirty (30) days' written notice to the other party, or for cause by either if the other party fails
substantially to perform through no fault of the other and does not commence correction within five
(5) days of written notice and diligently completes the correction thereafter. Upon such termination,
City will be entitled to reports showing the status of all matters upon which Consultant is advising
the City as of the effective date of termination.
11. STANI)ARD OF PERFORMANCE: The standard of care for all professional
engineering and related services performed or furnished by Consultant under this Agreemem will be
the care and skill ordinarily used by members of Consultant's profession practicing under the same
or similar circumstances at the same time and in the same locality.
12. CONSTRUCTION PROCEDURES: Not Applicable (No construction procedures
are directly associated with this project).
13. RE-USE OF I)OCUMENTS: All documents, including all reports, drawings,
specifications, computer sottware or other items prepared or furnished by Consultant pursuant to this
Agreement, are instruments of service with respect to the project and are property of the City. The
format for documents and work products shall be as specified in the exhibits.
//
//
PROFESSIONAL SERVICES AGREEMENT -4-
Acres International Corporation- January 16, 2002
IN WITNESS WHEREOF the parties hereto have executed this Agreement the date and year
indicated.
Date: [ ]'7/~/~)~/ ~7~7~ION
ROBIN G. CHARLWOOD, Vice President
CITY ~/~ ~ ~RTO~::~._.._._~
DEP~ APPROVAL:
W. Eug~n¢S~r of Public Works & Utilities
APPRO~~
Loren D.C~nbs, h~t~nm City Attorney
RECEIVED FOR FILING:
Kathleen L. McCluskey, City ~lerk
!
PROFESSIONAL SERVICES AGREEMENT - 5-
Acres Inte~nati~al Corporation - January 16, 2002
EXHIBIT A
Casad Dam Intake Tower Seismic Upgrade
Scope of Work
Introduction
This document represents the proposed Scope of Work for the Casad Dam Intake Tower Seismic
Upgrade. The main task groups proposed under this contract are as follows:
1. Project Management
2. Review of Background Materials
3. Site Seismicity Assessment
4. Tower Concrete Testing and Underwater Inspections
5. Dynamic Analysis
6. Preparation of Predesign Report and Basis of Design
7. Preparation of Fifty Percent Design Subnfittal
8. Design Review
9. Preparation of Contract Documents
10. Assistance dunng Bidding
11. Construction Engineering Services
Exhibit C is the project schedule that gives target dates for key deliverables and milestones.
Exhibit B gives the estimated cost for this work. The scope of work includes input fi.om: 1) Eric
Kollgaard on review of design and construction concepts, 2) Anil Chopra on review of dynamic
analyses, and 3) Bill Perkins, Shannon and Wilson on seismicity.
Task Descriptions
1. Project Management
Purpose and Objectives:
· Management of the project, planning, coordination and reporting.
Tasks: 1.1 Project technical direction; coordination and management for design phase
1.2 Coordination during bidcYmg and construction phase
1.3 Coordinate meetings with the City of Bremerton. Assume 4 meetings
Deliverables / Milestones:
· Progress Reports: On a monthly basis these reports will include total labor hours, sub-
consultant costs, expenses, and an estimated percent completion.
· Meetings: A total of 4 meetings are planned with the City. Attendance and meeting
minutes will be prepared and submitted to the City.
2. Review of Background Materials
Purpose and Objectives: · Review original design basis and construction records from previous investigations and
studies as background to develop repair alternatives.
· Investigate perrfftt requirements.
Tasks:
2.1 Review work previous consultants and parametric study completed as part of the Acres
proposal.
2.2 Assess value of seismic dampers and their potential installation underwater.
2.3 Review constructability of proposed concepts
2.4 Identify all permits which must be obtained prior to construction.
Deliverables / Milestones:
· Telephone logs, meeting minutes and prodUCt information sheets.
3. Site Seismicity Assessment
Purpose and Objectives:
· Assess regional seismicity and recommend Maximum Design Earthquake (MDE).
Operating Basis Earthquake (OBE), and Maximum Credible Earthquake (MCE) to be
used in the intake seismic upgrades
Tasks:
3.1 Review recommendations made by previous consultants.
3.2 Assess regional seismicity and recommend OBE and MDE for design.
3.3 Select recommended time histories and response spectra. One time histo~ set will be
selected for the OBE and two time history sets will be selected for the MDE. Reference
Attachment 1 to Exhibit A for a detailed description of Shannon & Wilson's sc~pe for
performing this work.
Deliverables / Milestones: · Meet with City to discuss options for basis of design.
· Letter report summarizing recommended seismic design basis.
4. Tower Concrete Testing and Underwater Inspections
Purpose and Objectives:
· Contract with concrete testing organization and coordinate removal of representative core
samples and have compression strengths taken.
· Obtain representative concrete compressive strengths based on compressive testing of
core samples.
· Contract with diving subcontractor and complete a one day underwater inspection of the
intake tower and document results.
Tasks:
4.1 Retain a qualified materials testing organization and coordinate coring and testing of a
minimum of three concrete samples. Samples will be taken by coring vertically from the
top of the tower. Prior to taking core samples take Schmidt hammer readings at each
coting location.
4.2 Retain a qualified diving contactor and coordinate performance of a one day underwater
inspection o£the intake tower. Arrange for video and audio take documentation of the
underwater inspection. Tie all observations to elevation and plan position. Provide
written inspection report.
Deliverables / Milestones
· Tower Concrete Test and Underwater Inspection Report
5. Dynamic Analysis
Purpose and Objectives: · Check extent of damage to tower under OBE and MDE.
· Investigate design of bracing concepts including dampers
· Develop design loads for bracing and dampers
· Check local impact of bracing on arch dam crest
Tasks:
5.1 Dynamic analysis of intake tower and coupling to arch dam as is to check capacity and
establish seismic ground motion time histories at tower and brace attachment points
5.2 Analyses of vatious bracing concepts including structural frames, frames with viscous or
friction dampers
5.3 Stress check on arch dam at bracing contact points
Deliverables / Milestones
· Dynamic Analysis Results
6. Pre-design Report and Basis of Design
Purpose and Objectives:
Based on regional seismicity, site conditions, dynamic analysis and consultation with. the City and
Acres team members and external consultants select tower stabilization approach and basis of
design.
Tasks:
6.1 Review alternatives in light ofrcvicw of background matctials and site scismicity.
6.2 Compare upgrade alternatives and their effectives expanding on the parametric studies
presented in Acres proposal. Evaluate alternatives based on effectiveness of repair, long term
maintenance requirements, ease of construction and life cycle cost. Choose favored alternative
and document rationale for selection.
6.3 Prepare preliminary construction and cost estimate for selected alternative.
6.4 Provide basis for review and acceptance by City and external review consultants Eric
Kollgaard, and Anil Chopra as basis to proceed to detailed design. Eric will be available for
overall review of the results of the analyses and design, and eonstmctability of proposed remedial
measures. Professor Chopra will assist with methods of seismic analysis and review of the
results. Don Anderson, an Earthquake Engineering Specialist, will assist in dynamic analyses of
the tower and assessments of its seismic capacity.
Deliverables / Milestones.
· Pre-design Report: Document tower stabilization alternatives and rational for selected
alternative. Include preliminary construction cost estimate and construction schedule for
the selected alternative.
· Basis of Design: Prepare basis of design giving design criteria necessary for completing
fift:y percent !evel design documents.
· Review Meeting Notes: Prepare review meeting notes with recommendations and
conclusions.
7. Fifty Percent Design
Purpose and Objectives:
· Develop 50% level design and construction plan for selected concept in accordance with
Exhibit D
Tasks:
7.1 Prepare 50% percent level design drawings.
7.2 Prepare outline specifications with notes on specific material to be presented.
7.3 Prepare construction plan and preliminary cost estimate, Include prelimir~ary
construction schedule.
7.4 Prepare Project Report for Department of Health.
Deliverables / Milestones: · Fifty percent level design drawings and outline specification.
· Preliminary construction plan and cost estimate.
8. Design Review
Purpose and Objectives:
· Review by City of 50% design.
Tasks:
8.1 Update basis of design to incorporate review comments by the City and Acres team.
8.2 Incorporate V2 size drawings from fifty percent design submittal showing the selected
upgrade concept.
9. Ninety Percent Design / Final Bid Documents
Purpose and Objectives:
· Prepare 90% and final design and contract documents for supply and installation of
seismic upgrades in accordance with the Basis of Design and 50% design review
comments in accordance with Exhibit D.
Tasks:
9.1 Prepare 90% level design drawings and specifications. Specifications to include all
sections including in Section 0 and Section 1 according to the City's requirements.
9.2 Coordinate review of 90% level design documents.
9.3 Prepare bid documents, final design drawings and specifications.
9.4 Prepare engineer's construction cost estimate and schedule.
Deliverables / Milestones: · Ninety percent level design drawings and specifications.
· Documentation of review comments and recommended design changes.
· Finalized contact documents.
· Engineer's Estimate and Schedule
10. Assistance during Bidding
Purpose and Objectives:
· Provide engineering support during bidding.
Tasks:
10.1 Respond to bidder questions in coordination with the City.
10.2 Document all requests for information (RFI) and responses provided by Acres.
10.3 Assist the City in preparation of addendums to the bid documents.
10.4 Assist City with review of bids.
Deliverables / Milestones:
· Documentation of all RFI and responses provided by Acres.
11. Construction Engineering Services
Purpose and Objectives: · Provide engineering support during construction of seismic upgrades.
· Provide as built drawings
Tasks:
11.1 Review shop drawings and construction plans.
11.2 In coordination w/th the City conduct up to eight site inspections.
11.3 Document results of site inspections.
11.4 Prepare as built drawings.
Deliverables / Milestones: · Site inspection reports and recommendations.
· As built drawings.
EXHIBIT A
ATTACHMENT 1
_ 111
SHANNON &WILSON. INC.
GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS
PROJECT UNDERSTANDING AND BACKGROUND
Task 3 - Site Seismicity Assessment
We understand that the intake tower seismic upgrade design will be based on the following two
ground motion levels:
OBE - Operating Basis Earthquake, defined as ground motions with a 10 percent chance of
exceedance in 50 years (probabilistic ground motion).
MDE - Maximum Design Earthquake, defined as the maximum credible earthquake that could
affect the site (deterministic ground motion).
We understand that the performance criteria for the tower for these events have not yet been
determined.
Previous seismic analyses of the dam and intake tower considered similar risk levels. In the 1994
study, time history analyses were conducted with ground motions scaled to peak ground
accelerations or 0.35g and 0.5g, corresponding to OBE and MDE ground motions, respectively.
The MDE ground motion was from rupture on the Seattle Fault. There is no indication that time
histories were modified (other than scaling to the peak ground acceleration) to match a design
rock spectrum. In the 1996 study, peak ground accelerations of 0.3g and 0.5g were used to
characterize the OBE and MDE, respectively. Rock spectra were also developed with t'oese peak
ground accelerations and were used in dynamic, three-dimensional, finite element, response
spectrum analyses. It does not appear that a time-history analysis was conducted.
Since 1996, the results of regional probabilistic ground motion studies have been published and
significant findings have been made regarding the activity and location of various potentially
seismogenic structures in the Puget Sound reg/on, including the Seattle Fault. The spectra for
both the ODE and MDE should be revised to be cons/stent with these newer studies and findings.
The U.S. Geological Survey (USGS) published in 1996 the results of a regional probabilistic
ground motion study that incorporated the USGS!s understanding of the seismogenic potential of
the area at that time. The results of that study were apparently not available to Dames & Moore
for their 1996 report on the intake tower. Since publication of the USGS study, Shannon &
Wilson has incorporated the results of additional research into our geologic/seismological models
for more recent ground motion studies for other projects in the area. The peak ground
acceleration for the OBE used in the 1996 dam intake tower study is similar to the results of the
more recent, probabilistic ground motion studies. However, in our opinion, a more current OBE
spectrum can be obtained directly from the spectral ordinates from the USGS study.
In our opinion, the MDE spectrum should be revised based on the results of recently published
research on the Seattle Fault. Specifically, research by the USGS in 1999 has re-characterized the
Seattle Fault as an approximately 2 V~- to 4-mile-wide (north-south) zone of multiple faults or
splays (see Figure I). As shown on Figure 1, the nearest mapped splay from this study is located
about 5 miles north of the site. As a result, the fault is significantly closer to the site than
reflected in the MDE spectra provided in 1996. Furthermore, as shown on Figure 1, the splay
farthest to the south ~s not mapped as continuing west to directly north of the site. This map is
based on marine seiSmic work (i.e., detection of faults beneath navigable water), and the fault
splays could continue to the west and closer to the site (e.g., to within about 2 V2 miles of the site).
SCOPE OF WORK
Task 3 - Site Seismicity Assessment
ODE and MI)E Spectra
Shannon & Wilson will develop free-field ground motion spectra for rock conditions for both the
ODE and the MDE. The ODE horizontal ground motion spectrum will be derived largely from
the published USGS regional probabilistic ground motion study. The MDE spectrum will be
developed for movement on the Seattle Fault. In developing the IVlDE spectra, the possibility of
the southernmost splay extending an additional 6 m/les west to a distance of approximately 2 V2
miles north of the site w/ll evaluated. We will discuss the results of this evaluation with Acres
and also, if required, the City of Bremerton. After that discussion and their review, we w/ll
prepare the f'mal MDE spectra. We will also be develop vertical spectra for both the MDE and
ODE.
Earthquake Time Histories
Shannon & Wtlson will develop free-field earthquake ground motion time histories for both the
ODE and MDE. In our previous proposal of September 7, 2001, we had proposed to develop six
time history sets; three sets for each design level. At your request, we have revised the number of
time histories. Our revised scope of work will include development of three time-history sets;
one set for the ODE and two sets for the MDE. Each time history set will include two,
orthogonal horizontal motions and one vertical motion. Recorded earthquake time histories will
be selected to be as consistent as practical with earthquake magnitude, fault type and distance
characteristic of the ODE and MDE and site conditions (i.e. rock conditions). These recorded
earthquake time histories will be modified to closely match the ODE and MDE spectra and will
be scaled to be consistent with earthquake time-history requirements provided in the 1997
Uniform Building Code (UBC). That is, the average of the square root of the sum of the squares
of the spectra of the two horizontal components will be equal to or greater than 1.4 times
appropriate ODE or MDE spectra over the period range of interest for the intake tower.
Report
A letter report will be prepared that will include the spectra and a description of the methods and
assumptions in their development. Digital versions of the time history sets will be included with
the report, along with a description of the methods and assumptions in selection and development
of the time histories.
EXHIBIT B
CITY OF BREMERTON
CASAD DAM INTAKE TOWER SEISMIC UPGRADE
COMPENSATION
Compensation for Consultant's services under this Contract shall be on a Cost Plus Fixed
Fee basis but not to exceed the Total Price. The Total Price is the stun of Cost and Fixed
Fee plus Contingency and shall be the compensation for the Scope of Services as shown
in Table 1. The estimated staff hours budget for this project is as shown in Table 2.
Cost shall include Direct Labor Cost, Indirect Costs, and Reimbursable Expenses. Cost
shall be an amount equal to Direct Labor Cost times a factor of 2.68 plus Reimbursable
Expenses.
Direct Labor Cost shall mean salaries and wages, (basic and overtime) paid to all
personnel for time worked directly on the project.
Indirect Costs shall include overhead, taxes and other indirect project administrative
costs.
Contingency is an allowance to cover unforeseen costs.
Fixed Fee shall mean a fixed amount of fee that is added to the Cost. The Fixed Fee for
all tasks included in the Scope of Services shall be at a rate of twelve percent (12%) on
the Cost excluding Reimbursable Expenses; The Cost may vary, but the Fixed Fee shall
remain the same provided the Scope of Services does not change. The fixed fee will be
prorated and paid monthly in proportion to the project work satisfactorily completed. A
payment for an individual month shall include that portion of the fixed fee allocable to
the project work satisfactorily completed during the month and not previously paid (e.g.
pro-rated in accordance with the amount spent-to-date). Any portion of the fixed fee not
previously paid in the monthly payments shall be included in the final payment.
Compensation Schedule
Reimbursable Expenses shall mean the actual expenses incurred directly or indirectly in
connection with the project for transportation travel, subconsultants, subcontractors,
computer usage, telephone, fax, shipping and express, and other incurred expense.
Charges for reimbursable expenses incurred by the Consultant are estimated in Table 3
and will be at the following rates as shown in Table 4. The amount of any sales tax,
Acres International Corporation 1 26 September 2001
excise tax, or gross receipts tax that may be imposed on this Agreement shall be added to
the Consultant's compensation as Reimbursable Expenses.
Table 4. Reimbursable Expense Charge Rates
Item Billing Rate
Travel Mileage at 34.5_cents per mile or the current Intemal Revenue Service (n~.s)
allowable rate for business use of an automobile
Other travel expenses at cost
Associated included
Project Costs
(M,C)~
Computer included
1. Associated project costs include telecommunications, FAX mmsmittals, in-honse reproduction and
plotting, postage, and computer (PC).
Monthly invoices shall be submitted to the City for work performed subsequent to work
covered by all previously submitted invoices and shall be computed pursuant to the rates
and limitations set forth above.
The labor rates listed in Table 2 are representative of the actual rates that might
apply during the term of this Agreement. Billings will be based on the individual labor
rates current at the time the services being billed for were performed. Labor rates are
subject to change without notice. Acres International will notify the City of labor rate
changes 30 days before submitting an affected invoice. Labor rate changes shall not alter
the stipulated "not to exceed" amount or fixed fee.
The multiplier on Direct Cost to arrive at Cost shall be fixed for the term of this
Agreement.
,4cres International Corporation 2 26 September 2001
Exhibit B
TABLE 1 - SUMMARY OF ESTIMATED COSTS
City of Bremerton
Casad Dam - Engineering Services
Item Amount
Direct Labor $39,698
Indirect Labor (1) $66,693
Total Labor Cost $106,391
Profit(2) $12,766.97 $12,767
Direct Expenses (3) $23,700
Contingency $10,000
Total: $152,858
1 Based on 168% of Acres Direct Labor
2 Base on 12% of Total Labor Cost
3 Based on actual cost for disbursments and sub-consultants to Acres
Casad Exh B Cost Est(jhr)_09'1301
EXHIBIT B
City of Breme~on TABLE 3 - DISBURSEMENTS ESTIMATE
Casad Dam-EngineeHngService$
ACRES INTERNATIONAL:
Prdlect Management $4C $120 $~80
$340
2 Revew of Background Ma~ermls $1C $30 $30
$7d
3 Site Seismicity Assessment
7 F~/Percent Design $100
$10C
SHANNON ~, F~IL~ON