Loading...
HomeMy WebLinkAbout3648tEnter Search Criteria, Press Esc Key to Transmit Press Del Key to Terminate Delete Mode CHANGE Contract Transactions Contract Number 3648 Vendor Name PAPE & SONS +Subject CALLOW AVENUE BASIN Depar tment ENGINEERING Status Code CON Amount $2123159.25 Begin Date 05/24/1995 Insurance End Date 12/31/1996 Type Amount Review Date 02/15/2006 + Press F1 for AL $1000000.00 ~ valid insuranceGL $2000000.00 + type codes E&O $4000000.00 Insurance Total $7000000.00 Insurance Review Date 09/23/1997 + Comments LITIGATION RECEIVED SUMMONS 4/97 VAULT 01/01/2006 + CHANGE ORDER No. 4 WARREN AVENUE BASIN C.S,O. Page 1 of 2 DESCRIPTION OF WORK: This Change Order includes: 1. Adjust the unit for Bid Item 40 (Asphalt Concrete Paving Class B) from $12.50 per square yard to $72.00 per ton and increase the total quantity to 2,513.04 tons. 2. Charges for additional work invoiced to date, as detailed in Attachment A. 3. Increase the quantity of work to be performed under Bid Item 86 (Reconnect Existing Side Sewer) fi.om 40 Ea. to 108 Ea. The unit price for this item ($425.00 Ea.) shall remain unchanged. IMPACTS TO CONTRACT Cost: The total cost of Item 1 is: $173,125.00 The total cost of Item~2 is: 84,194.69 The total cost of Item~,Z is: 28,900.00 The total cost impact to the Contract is: $286,219.69 Time: There shall be no change in the Time for Completion of the Contract. CHANGE ORDER No. 4 WARREN AVENUE BASIN C.S.O. Page 2 of 2 This document shall become an amendment to the Contract and all provisions shall apply hereto. rape & Sons Co~truction,~c. SIGNED WITH COMMENTS IN LETTER DATED OCTBOER 18, 1996 City of Bremerton ..4 /r Proj~¢i IV~r By: Date: City Engiheer Authorized for City of Bremerton this~,.~(.day of ~ ,1996. Mayor ~'Ci~y~lerk ~.~ - ~ ~ Date: 12/29/95 Page 1 of 2 ATTACHMENT A CHANGE ORDER No. 4 - ADDITIONAL WORK SUMMARY WARREN AVENUE BASIN C.S.O. - V4213106 CONTRACTOR: PAPE & SONS CONSTRUCTION, INC. ITEM WORK t TOTAL NO DESCRIPTION DATE COST 1 Highland Avenue - Standby & removal of contaminated soil 1/19/95 $2,028.35 2 9th/VVarren - Remove excess concrete for connection to manhole 1/24/95 817.92 3 Excavate water main for service line repair by City 1/27/95 114.13 4 Grade Park Ave. - Gas Main/Water Main 1/31/95 222.21 5 Grade Parl( Ave. 2/22/95 172.67 6 10th & Chester - Fill void under concrete, repair 8-inch sanitary sewer 2/23/95 1,569.84 7 Grade Park Avenue 3/22/95 79.31 8 Install Temporary Outfall 3/13/95 4,899.82 9 Re-plumb Pump Station CE-5 3/14/95 999.7~ 10 Repair force main 3/14/95 2,438.48 11 Gracle Park Avenue 3/16/95 151 12 Replace hooded casting with stanclard frame and grate 3/23/95 53.60 13 Replace frame & grate on existing manhole (existing slab into concrete roadway) 3/25/95 1,189.88 14 13th & Park - Standby to resolve gra(~e conflict 3/27/95 259.52 15 Grade Park Avenue 3/28/95 75.69 16 17th - Change storm drain material from HDPE to ductile iron 4/10/95 2,007.85 17 Reconnect 8" sanitary sewer in conflict with 42" storm drain 4/3/95 1,448.52 18 11th & Park - Install 8" drop connection in manhole 4/4/95 2,433.87 19 Load & haul contaminated matedal to Kitsap County Sanitary Landfill 4/10/95 3,820.15 20 Gracle Park Avenue 4/10/95 164.02 21 Grade Park Avenue 4/11/95 79.05 22 Standby while existing side sewer cleaned out 4/18/95 99.21 23 13th & Warren - expose, backfill exist, telephone duct bank 4/18/95 1,441.89 24 Grade Park Avenue 4/20/95 84.86 25 8th - St. Connect 6" sanitary sewer through 42" storm drain (grade conflict) 4/27/95 906.36 26 Bth & Warren - Standby for 16" water main shutdown 5/2/95 818.89 27 Bth & Warren - m-excavate 16" water main 5/2/95 925.79 28 8th Street - Connect 6" side sewer through 42" storm drain (gracle conflict) 4/24/95 1,123.78 29 8th & Warren - install repair bands on 16" water main 5/3/95 7,383.08 30 8th & Warren - stanclby for 16" watermain shutdown 5/3/95 586.56 31 8th & Warren - Complete temp. bypass on 27" storm drain 5/10/95 264.50 32 Standby for broken water service 5/15/95 287.89 33 8th & Warren - Re-mobilize to Lay 42" storm drain (After 16" W.M. Conflict) 5/23/95 394.68 34 13th & Broadway - remove curb/sidewalk on 13th 5/25/95 293.91 35 12th & McKenzie - Raise invert of 15" storm drain to clear san. sewer at MH 12D-3 5/31/95 50.01 ~- ~- Date ; 2/29/95 Page 2 of 2 ATTACHMENT A CHANGE ORDER No. 4 - ADDITIONAL WORK SUMMARY WARREN AVENUE BASIN C.S,O, -V4213106 CONTRACTOR: PAPE & SONS CONSTRUCTION, INC, TOTAL DESCRIPTION DATE COST Manhole HD-2 Stand by for repair of unmarked water service 6/5/95 143.4 Manhole HD-2 Connect to new 8" SD 6/5/95 124.57 Excavate unmarked water service for repair by City 6/6/95 443.06 Haul asbestos-contaminated soil to Kitsap County Sanitary Landfill 6/12/95 1,233.50 Remove temporary Outfall Structure 6/21/95 1,432.88 Make temporary connection to 27" storm drain (for 16" water main conflict) 5/9/95 1,237.87 Excavate & backfill for 15" storm drain 5/25/95 2,019.61 Haul asbestos contaminated soil to Kitsap County Sanitary Landfill 6/12/95 1,523.08 Stand by for repair of unmarked water service (8D-5 to 8D-6) 6/14/95 287.54 Park Ave & 17th Re-set 48" storm drain manhole 4/18/95 757.63 Additional work to complete permanent strorm drain outfall (Pape) 8/11/95 5,693.06 A.H. Powers' additional cost for outfall construction Jun.-95 9,856.90 Repair unlocated water service (1610 Park Ave.) 7/1/95 303.83 Install 54-inch manhole in lieu of 48-inch (mat'l cost increase) 5/20/95 610.70 install 4-inch force main connection at Manhole P-4 7/27/95 469.53 1216 Park Ave. - Additional excavation for side sewer 9/8/95 1,679.18 12th St. Park to Mckenzie - Replace 8-inch water main Sept. - 95 8,933.38 Park Ave. 12th to 13th: Additional Excavation for side sewers 9/19/95 325.61 Demolish/Remove City Quonset Hut 12/10/95 7,431.88 FORCE ACCOUNT TOTAL: $84,194.69 CHANGE ORDER #2 CALLOW AVENUE CSO DESCRIPTION OF WORK This change order includes the following: l) Add or increase existing bid items as shown on attachment "A" for construction of 450 feet of 24" diameter water main. INCREASE COST TO CONTRACT $111,275.55 IMPACTS TO CONTRACT: 1) The total cost of this Change Order is: $111,275.55 2) 15 working days additional time will be allowed for construction of the watermain and associated surface restoration. This document shall become an amendment to the Contract and all provisions shall apply hereto. Pape & Sons Construction, ~ By: ,~~--_~ ~.~.-~-- ~, Title: ~o~7~ ~'.~v~;4; City of Bremerton Recommended By:~~ ~~ Project l~l~er Reconunended By~a~\. ~ City Engineer Authorized for the City ofBremerton this~f~day of December, 1995. Mayor Attested: ~x ~ City Clerk ~ Sheet1 CHANGE ORDER PROPOSAL FIRST STREET 24" WATER MAIN ITEM UNITS QUANTITY , UNIT PRICE AMOUNT ~save.i Curb & Gutter, & Sidewalk Removal |S.Y~ 732~ $8.00 $5,856.00 Structure Exc. CI B Incl. Haul Fi -- ~3~ $4.00 $1,740.00 24" Diam. C150 D.I. Restrained Joint ~5~ $125.00 $31,500.00 L~F. ~ _ 24" Diam. C150 D.I. L.F. $122.00 $24,156.00 L S. $2,600.00 $2,600.00 3" C.I. Watermain Relocation CDF i .Y. 2.3 $45.00 $103.50 ~ackfi~(Bank Run) ~.Y. $13.60 $3,168.80 Connec~i~,~~ 24" Butterfly Valve L.S. I 1 ', $12,670.00 $~ ~e~n~ntlConc. Barrier Curb & G~i ~ ~ IL:F: ~ 1~0~ $~:'/~ - $!.,_8_5_2.50 CSTC :Ton ~ 72! $13.40 $964.80 Cement c~nc~r-et~Pavement 'C?~'i ~ 70~ ~ ~,-40~00 Pa~avement, Asph~;l~-c~~ ~-r0n ' 10~ - ~6.00~ $7,676.00 ~m~c~:o~rol ]L..S. 7 ' i~ $1,800.00 ~ T re~ch-§af~ System tL.F. ~ 4~0i.' ~O0 ~ - SUBSOIL $102,937.60 ~-ES TAX $ 8,337.95 ~ T~ I $111,275.55 Page 1 CHANGE ORDER # 1 CALLOW AVENUE BASIN C.S.O. Page 1 of 2 DESCRIPTION OF WORK: This Change Order includes the following: 1) Increase Item 76 of Schedule A of the Contract (Force Account) by $50,000 to cover the cost of changed foundation conditions at manhole SD-4. 2) Add the following Item to Schedule B of the Contract: Quantity_ Unit Description Unit Price Total Price 1,336.39 Cubic Yard Trench Backfill (Bank Run) $13.60 $18,182.25 IMPACTS TO CONTRACT Cost: A) The total cost of Item 1 is: $50,000.00 B) The total cost of Item 2 is: $18,182.25 The total cost impact to the Contract is: $68,182.25 Time: A) For Item 1, 26 working days additional Time For Completion will be allowed for construction of modified foundation for manhole SD-4. B) For Item 2, there shall be no increase or decrease in the Time For Completion of the Contract. CHANGE ORDER # 1 CALLOW AVENUE BASIN C.S.O. Page 2 of 2 This document shall become an amendment to the Contract and all provisions shall apply hereto. Pape& Sons ~Co{/n~ctioj By: ~"~~ ~ Date:/~,-/,.~, ' ?,j Title: City of Bremerton By: ~.~~/~./~ Date: Project-~ger By: '"--~w.,.~,l ~~ Date: City Engin&~r Authorized for City ofBremerton this.__~day of ~c~ ,1995. Mayor Attest: ~ City Clerk