Loading...
HomeMy WebLinkAbout4583 Contract Number: 4583 Vendor: TRANSPORTATION - DEPT (WA STATE) Subject: Tunnel Construction - Cooperative Department: Engineering File Class: LEG 12-1 Begin Date: 11/02/2006 End Date: Review Bate: 06/15/2010 Vault Date: Comments: CSO & Tunnel #GCA-4924 Supplement #1-5/07 Review date for tracking only Check w/Engineering 6/10 /'/ ~:r: Bremerton Tunnel Construction Cooperative Agreement GCA-4924 SUPPLEMENT NO.1 THIS SUPPLEMENTAL NO.1 to the original AGREEMENT is made and entered into this I (P I.!! day of f'J fI Y ,2007 between the STATE OF WASHINGTON, Department of Transportation, hereinafter the "STATE," and the City of Bremerton, hereinafter the "CITY." WHEREAS, the Parties hereto entered into the original AGREEMENT GCA-4924 on November 2, 2006 for the construction of improvements to SR 304 by the project entitled "SR 304 - Downtown Bremerton Pedestrian / Bremerton Transportation Center (BTC) Access Improvement Project," hereinafter the "PROJECT," located from M.P. 2.79 to M.P. 3.01, and WHEREAS, the CITY will furnish decorative streetlight standards for the illumination that is required for the PROJECT, as detailed in Exhibit F, and WHEREAS, electrical power services are necessary for the streetlights as well as signal systems on the PROJECT, as detailed in Exhibit F, and WHEREAS, the STATE is the responsible party for the cost of the electrical power services and decorative streetlight standards per legislative appropriation for the PROJECT, and WHEREAS, the original AGREEMENT also needs to be amended to provide for an updated estimate to the Combined Sewer Outfall "CSO" work to reflect current bid items nearing the advertisement of the PROJECT. NOW, THEREFORE, pursuant to RCW 47.28.140 and chapter 39.34 RCW and in consideration of the terms, conditions, covenants, and performances contained herein, or attached and incorporated and made a part hereof, IT IS MUTUALLY AGREED AS FOLLOWS: 1. Exhibit B of the original AGREEMENT is hereby deleted and replaced with Exhibit B-1, attached hereto and by this reference made a part hereof. 2. Section 6, CITY SERVICES FOR PROJECT AND CSO, of the original AGREEMENT GCA-4924 is supplemented to include the following: GCA--4924 Supplement No. I Page I of3 6.3 The CITY shall provide forty two (42) decorative streetlight standards for the PROJECT at locations identified in Exhibit F, attached hereto and by this reference made a part hereof. The streetlight standards shall include anchor bolts, mounting hardware, pole base, light pole, mast arms, luminaires, and fixtures. The CITY shall provide the STATE a Materials of Origin Certification, Bill of Lading, and a Paid Invoice for said streetlight standards. The STATE shall reimburse the CITY for the actual, direct, and related indirect costs for the procurement of the decorative streetlight standards. An itemized estimate of cost associated with the procurement of the streetlight standards is marked as Exhibit E, attached hereto and by this reference made part hereof. Upon completion of the installation of the decorative streetlight standards by the STATE, the CITY shall be responsible for ownership, operation, and maintenance. 6.4 The CITY shall provide electrical power services for the decorative streetlights and traffic signals systems constructed by the PROJECT at the locations detailed in Exhibit F. The STATE shall reimburse the CITY for the actual direct, and related indirect costs to provide the electrical services. An itemized estimate of cost associated with providing the electrical power services is marked as Exhibit D, attached hereto and by this reference made part hereof. Upon completion ofthe electrical power services the CITY shall be responsible for the ownership, operation, and maintenance of said electrical power services, including the future costs of electricity. 3. Section 7.9 ofthe original AGREEMENT GCA-4924 is hereby deleted and replaced with the following: 7.9 The CITY agrees to pay the STATE an advance payment amount of two hundred thousand five hundred three dollars ($200,503) within 20 days after the ST ATE submits its first partial payment request to the CITY. The advance payment represents approximately fifteen (15) percent of the estimate of cost and covers costs incurred by the ST ATE in the initial stages of the contract. The advance payment will be carried throughout the life of the contract with final adjustment made in the final payment. 4. Section 7 of the original AGREEMENT GCA-4924 is supplemented to include the following: 7.11 The STATE, in consideration of the faithful performance of work provided by the CITY, agrees to reimburse the CITY for the actual direct and related indirect cost of the work as described in sections 6.3 and 6.4. All other terms and conditions of the original AGREEMENT GCA-4924 shall remain in full force and effect as modified by this SUPPLEMENT NO.1. GCA--4924 Supplement No. 1 Page2of3 IN WITNESS WHEREOF, the Parties hereto have executed this SUPPLEMENT NO.1 as ofthe day and year first above written. STATE OF WASHINGTON :lyTY OF BREMERT~ . DEPART~. SPORTAT~N c::;~ By. 6-.~ C B M ~ K . J D R.~ Ad . . ary ozeman, ayor eVlll. ayton, eglOn mllllstrator Date: y.~-07 Date: ~~ /~~ ~ APPROVED AS TO FORM APPROVED AS TO FORM By: Y/;1 fa 12 ! I # By: CITY Attorney Assistant Attorney General Date: ~ ~ g '0--:;' Date: /y -/G, --07 GCA--4924 Supplement No_ 1 Page 3 of3 GCA-4924 Exhibit B-1 Downtown Bremerton PedestrianlBTC Access Improvements CSO - Combined Sewer Outfall Construction Estimate Note: (1) Per Overhead Agreement OH-00166 GCA-4924 Exhibit B-1 Page I of 4 PS&E JOB NO: 07C515 CONTRACT NO: 000000 WORK ORDER#: T A2 511 WASHINGTON STATE DEPARTMENT OF TRANSPORTATION ESTIMATES AND BIDS ANALYSIS SYSTEM ... PRELDaNARY ESTIMATE - BY GROUP ... GROUP NO : 3 PROGRAM ITEM .NUMBER CONSTR. TYPE CODE PROGRAM CODE STATE ROUTE (S) COUNTY CONTROL SECTION/SALES SAFETY CLASS CODE FUND NO: 2 330405A P9 304 KITSAP TAX : 188000 /8.60% PARTICIPANT: 'CITYBREM GCA- 4 924 ITEM STD. NO., NO. ITEM DESCRIPTION 1 0001 MOBILIZATION 2 0038 ARCHAEOLOGICAL AND HISTORICAL SALVAGE 24 3151 TESTING STORM SEWER PIPE 32 HDPE DR 32.5 STORM SEWER PIPE 48 IN. DIAM. 95 TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) PLAN 144 7006 STRUCTURE EXCAVATION CLASS B INCL. HAUL 146 7008 SHORING OR EXTRA EXCAVATION CLASS B 177 7728 MINOR CHANGE 217 7730 FUEL COST ADJUSTMENT WASHINGTON STATE SALES TAX 8.60% OF $ 56,861.44 GROUP 3 SUBTOTAL ENGINEERING 10.00% GROUP 3 TOTAL SR 304 DOWNTOWN BREMERTON PEDESTRIAN/ BTC ACCESS IMPROVEMENTS 06C514 DATE: 03/27/2007 TIME: 1 6 : 1 9 DOT RGG300 CSO-COMBINED SEWER OUTFALL. CITY OF BREMERTON WORK ON WSF PROPERTY PARTICIPATION PERCENT: 100.00% UNIT, MEAS UNIT PRICE L.S. EST. L.F. L.F. L.S. 3.0000 400.0000 C.Y. S.F. CALC CALC 30.0000 6.0000 QUANTITY 80.00 80.00 339.00 1,193.00 GROUP 3 BASE SUBTOTAL MAX AMOUNT: AMOUNT 5,900.00 250.00 ' 240.00 32,000.00 644.44 ' 10,170.00 7,158.00 -1.00 . 500.00 . 56,861.44 4,890.08 61,751. 52 6,175.15 67,926.67 PAGE: 14 VER: 1 . .. ... GCA-4924 Exhibit B-1 Page 2 of 4 PS&E JOB NO: 07C515 CONTRACT NO: 000000 WORI( ORDER#: T A2 511 PROGRAM ITEM NUMBER CONSTR. TYPE CODE PROGRAM CODE STATE ROUTE (S) COUNTY CONTROL SECTION/SALES SAFETY CLASS CODE FUND NO: 2 330405A P9 304 KITSAP TAX : 180301 /0.00% WASHINGTON STATE DEPARTMENT OF TMNSPORTATION ESTIMATES AND BIDS ANALYSIS SYSTEM *** PRELIMINARY ESTIMATE - BY GROUP ***. GROUP NO : 4 CSO--COMBINED SEWER OUTFALL. CITY OF BREMERTON WORK PARTICIPANT: CITYBREM GCA-4924 ITEM STD. NO. NO. ITEM DESCRIPTION 1 0001 MOBILIZATION 2 0038 ARCHAEOLOGICAL AND HISTORICAL SALVAGE 20 3091 CATCH BASIN TYPE 1 21 3105 CATCH BASIN TYPE 2 48 IN. DIAM. 24 3151 TESTING STORM SEWER PIPE 25 3541 SCHEDULE A STORM SEWER PIPE 12 IN. DIAM. 31 HOPE DR 32.5 STORM SEWER PIPE 36 IN. DIAM. 32 HOPE DR 32.5 STORM SEWER PIPE 48 IN. DIAM. 76 5334 ANTI-STRIPPING ADDITIVE 78 5711 PLANING BITUMINOUS PAVEMENT 79 5767 HMA CL. 1/2 IN. PG 64-22 80 5830 JOB MIX COMPLIANCE PRICE ADJUSTMENT 81 5835 COMPACTION PRICE ADJUSTMENT 82 5875 COMMERCIAL HMA 82 6516 CYCLIC DENSITY PRICE ADJUSTMENT 83 ASPHALT COST PRICE ADJUSTMENT 85 6403 ESC LEAD 88 6470 STREET CLEANING 91 6478 STRAW BALE 92 6490 EROSION/WATER POLLUTION CONTROL 95 TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) PLAN 109 6859 PLASTIC STOP LINE 131 6973 OTHER TEMPORARY TRAFFIC CONTROL SR 304 DOWNTOWN BREMERTON PEDESTRIAN/ STC ACCESS IMPROVEMENTS 06C514 PARTICIPATION PERCENT: 100.00% UNIT MEAS UNIT PRICE QUANTITY L.S. EST. EACH EACH L.F. L.F. 1,100.0000 2,800.0000 3.0000 35.0000 325.0000 400.0000 1. 00 1.00 ,1,579.00 77.00 1,163.00 339.00 L.E;. L.F. EST. S. Y. TON CALC CALC TON CALC CALC DAY HR EACH EST. L.S. 7.0000 70.0000 1,390.00 17 4.00 55.0000 200.0000 125.0000 25.0000 20.00 40.00 10.00 L.F. L.S. 8.0000 12.00 DATE: 03/27/2007 TIME: 16: 19 DOT RGG300 PAGE: 15 VER: 1 MAX AMOUNT: AMOUNT 114,500.00 250.00 . 1,100.00 2,800.00 4,737.00 2,695.00 377,975.00 135,600.00 180.00 9,730.00 12,180.00 370.00 240.00 30.00 148.00 4,000.00 5,000.00 250.00 80,000.00 644.44 96.00 7,900.00 GCA-4924 Exhibit B-1 Page 3 of 4 PS'E JOB NO: 07C515 CONTRACT NO: 000000 WORK ORDERH: TA2511 WASHINGTON STATE DEPARTMENT OF TRANSPORTATION ESTIMATES AND BIDS ANALYSIS SYSTEM ... PRELIMINARY ESTIMATE - BY GROUP ... GROUP NO : 4 DATE: 03/27/2007 TIME: 1 6 : 19 DOTRGG300 PAGE: 16 VER: 1 ITEM STD . NO. NO. ITEM DESCRIPTION UNIT MEAS UNIT PRICE QUANTITY AMOUNT HR 45.0000 120.00 5,400.00 L.S. 14,835.00 C.Y. 30.0000 6,357.00 190,710.00 S. F. 6.0000 16,861.00 101,166.00 EACH 5,000.0000 1. 00 5,000.00 EACH 6,000.0000 4.00 24,000.00 EACH 8,000.0000 1. 00 8,000.00 CALC -1.00 L.S. 750.00 CALC 500.00 GROUP 4 BASE SUBTOTAL 1,1l0,785.44 . 133 6992 OTHER TRAFFIC CONTROL LABOR 134 6974 TRAFFIC CONTROL SUPERVISOR 144 7006 STRUCTURE EXCAVATION CLASS B INCL. HAUL 146 7008 SHORING OR EXTRA EXCAVATION CLASS B 166 7364 MANHOLE 60 IN. DIAM. TYPE TYPE 3 167 7365 MANHOLE 72 IN. DIAM. TYPE TYPE 3 168 7366 MANHOLE 84IN. DIAM. TYPE TYPE 3 177 7728 MINOR CHANGE 178 7736 SPCC PLAN 217 7730 FUEL COST ADJUSTMENT ENGINEERING 10.00% 111,078.54 GROUP 4 TOTAL 1,221,863.98 ... SR 304 DOWNTOWN BREMERTON PEDESTRIAN/ BTC ACCESS IMPROVEMENTS 06C514 GCAA924 Exhibit B-1 Page 4 of 4 GCA-4924 Supplement No.1 Exhibit D City of Bremerton Electrical Services Description of Work The City of Bremerton is providing Puget Sound Energy (PSE) electrical services for streetlight and signal systems for the SR 304 ~ Downtown Bremerton PedestrianlBremerton Transportation Center (BTC) Access Improvement Project. The streetlight and signal systems will be owned and maintained by the CITY upon completion of the Project. Costs to provide electrical services for streetlight and signal systems will be paid by the CITY and reimbursed by the STATE. Estimate of Cost Three (3) Electrical Service Agreements: $5,157.85 Administrative Overhead (1) $0 TOT AL: $5,157.85 Note: (1) Per Overhead Agreement OH-00166 GCA-4924 Supplement No. I Exhibit D Page I of I GCA-4924 Supplement No.1 Exhibit E City of Bremerton Supplied Decorative Street Lights Description of Work The City of Bremerton will furnish 42 decorative streetlight standards for the Bremerton Tunnel Project meeting City requirements for the downtown district. The decorative streetlight standards are the Hudson River Park Lamp Post as manufactured by Spring City Electical Manufacturing Company. The City will furnish the standards, complete . with anchor bolts and mounting hardware, and decorative luminaires. The materials will be made available for pickup by the Bremerton Tunnel Project Contractor at the City of Bremerton's Oyster Bay Maintenance and Operations Facility located at 100 Oyster Bay Road, Bremerton. Estimate of Cost Hudson River Park Lamp Posts, including luminaires, 42 @ $6037 each: Anchor bolts and mounting hardware: Sales Tax @ 8.6 %: Administrative Overhead (1) Total: Note: (1) Per Overhead Agreement OH-00166 $253,554 $5,000 $22,236 $0 $280,790 GCA-4924 Supplement No. I Exhibit E Page 1 of 1 ~ N~,' ! !I I ~- e'~<1 I I ;<\ ,I ~CI..~ "; I A f ' L"~ Ii' =~~:".",:--- ,~ ~ :,~~ ~ ~~!' : ,{(ADM ~~)^ !~~I Ii\ ' {~/~'c~-7.<~rv'~' '~~.:-~~ ~~ I I fJ:> 0 6/3\ 3 '~/LJ :- o-~ 2Al M"'" ~ '31+00 /25\ /22\ jI2\:::-:: A_> ~ ,___JI--- \7i~I\~SERVICE 3 r\ r.;\ 3~~__ - ~~-7M 23 '\ _1-./i5> ~)-1 12 (2\ : ....i, ..J/ UY~ ~.~,~~4OV ,,2) j'-!; _-.-.{-"\ ,;4'115 lB6 / 8~.l\~~ 210Y,ij ,,.!,,- l EiLf T~ . '""'"\S~ \i--S ~ ~ ~ l' r7l Qf:it ~ ~ ~7ffi - - ~ =- - =- ~ ~ 185 6 / '1C\+U\l ~ c;~; , 211 - - - ..R~ I ci 1f LSi:, lB~\7^ lB2 ) '\ 1B3^ 29+0; ~ 184) 1 T-lINE 4 . (if 87 J1~+OO \'~ /~1\- ~~ . I 0 58+/i; ~ i!V~ /1 \ I J~_ - 1~O' ' ClTY'SERVlCU!O.; II I I ~, . ----:- I~+' I 0 I ~I B-L1NE 59+00 1201240V (8)--1 _ ~ I ~ 1;\ & A _ ~ ~ _ _ j;c, 6_ u ~u A i H " 'Ir:-, lAl (1A2 lA3 1M" r-;;: A. - - -=- & A - <,,:z: ..,.. l'll"J.112,=~l L4I ~" ~ '.l7114 lA5 0 lA6~~,:, lA7 /lAB ~r.-, 1Al0 / lAl1'~ I~ @/' ~ ~~~-~-J~~~-d~'~- Aq ~--~'~~A$- _~Al~~~~ SEC. 14 4N., R.1E., W.M. .. ~ '. ~ SEC. 13 T.24N., R.1 E., W.M. EXISTlNG NEWIRElOCA TED GENERAL NOTES LEGEND 1. ORIENT JUNCTION BOXES AS SHOWN ON THE PlANS AND DETAILS. 2--0---2 0-<>-0 COBRA HEAD LIGHT STANDARD DECORATIVE LIGHT STANOARIl o-----<J. 2. TREE waL JUNCTION BOXES SHAll BE INST ALLEO PER DETAILS 1,2,3,4,5,& 6 ON SHEET E04. ~ COBRA HEAD LUMlNAlRE ON SIGNAL POlE 3. SEE OWG. EDl FOR TREE waL LOCATION TABLE AND JUNCTlON BOX TABlE. o-~o C8i ~ EXISTING BTC LIGHTING POLE JUNCTION BOX, TYPE 1 JUNCTION BOX, TYPE 2 CONDUIT AND WIRING OoL.] 4. SEE OWG. E02 FOR SINGlE LINE DIAGRAM. 5. SEE OWG. E04 ANO E05 FOR SIDEWAlK, POLE. JUNC1lON BOX AND CABINET FOUNDATION DETAIlS. !,;; 6. SYSTEM GROUNDING WIRES NOT SHOWN IN CONDUIT I WIRE SCHEDULE. INSTAlL PER CODE. ~ ELECTRICAl SERVICE CABINET : I CONDUITIW1RE GENERAL NOTES 1. SYSTEM GROUNDING WIRES NOT SHOWN. INSTAlL PER CODE. 1 2 3 4 5 6 7 6 10 11 12 15 16 22 23 24 25 CONDUITIWIRE SCHEDULE (ILLUMINATION AND TREE LIGHTS) SERVICE NO.2 SERVICE NO. 3 IUUMINATION TREE LIGHT IUUMlNATlON TREE LIGHT CIRCUITS (24OV) CIRCUITS (12OV) CIRCUITS (24OV) CIRCUITS (12OV) 2-1 2-2 2-A I 2-B 2-<: 3-1 I 3-2 3-A i 3-B 3-C - ! - ! - -! I _ i _ i 3-#12 112 B 56+18.00 LUMINAIRE SCHEDULE REMOTE PHOTOCEll NDTES LUM. NO. 110 111 POlE STATION 857+45.00 B 56+05.00 POLE "'" 'NTlNG LUUlNAlRE OFFSET 'HEIGHT ARM' 32.0' LT. 35' 16' IT 4' 47.O'LT. IT 4' IT 4' 24.5'RT. IT 4' IT 4' 25.4' LT. IT 4' IT 4' 24.5' RT. IT 4' IT 4' 19.6' LT. IT 4' IT 4' 24.5' RT. IT 4' IT 4' 20.0' LT. IT 4' IT 4' 24.5' RT. IT 4' IT 4' 24.5' RT. IT 4' IT 4' 19.5' LT. IT 4' IT 4' 19.5' LT. IT 4' IT 4' 19.5' LT. IT 4' RUN NUMBER CONDUIT 6 SIZE SERVICE NO. 1 IUUMINATlON TREE LIGHT CIRCUITS (24OV) CIRCUITS (12llV) 1.1 1-2 loA l-B 2-118 - - 2-118 - 2-118 I - - 2-#8 - 2-#8 114 B 59+20.00 1.5" 1.5" 'Z' lS 'Z' 'Z' 'Z' 'Z' 4" 1.5" 'l' 'Z' . EX1S 3" IS 'l' 4" - I I I I ! - i - 113 BW 56+70.00 I - 244 I - 2411/0 ! - I ! I I , j ~ I I I I I I - 115 BW29+40.oo I I ! 244 2-114 - I - 2-#6 i 2-#6 - I - I - ! 2-#6 ! 3-#12 116 B 59+97.00 2-#1/0 2-#8 2-#8 2-#6 i 2-118 I I ! I 117 BW 30+00.00 I ! ! - I I I 2-118 ! 2-#6 ! #1/0 ! ~ I i I 2-118 i 2-#2 I '11ll (5) 118 B 60+93.00 I _ CONDUITNVIRE SCHEDULE NOTES (1) INSTAlL P\JU ROPE (2) EMPTY (3) CAP CONDUIT AT UIlIT OF CONSTR\JCT10N (4) SCHEDUlE 60 PVC (5) REMO\IE EXISTlNG CONDUCTORS i I 3-#12 3-#12 3412 210 T 1ll+68.00 120 B 61+ll8.oo 248 2.f8 2-18 ; I I _ 211 Tl1+35.oo 212 T 11+97.00 ,.". ngr.: .. \cM.s/ ~ ~~~lir{~~ . J:-Y "'c>~ 't li~ ,~)-/V . ,,/ exeltech ~.,~~,}6:.J':f.3_~<;:l/~ A1 OlympIa, We Seattle. We Portland, OR C'J>~c,:tw tONAL ~~..:: .... iZi Washington State Department of Transportation ~l~~"IJ ST:'i[ F~!). AID PROJ. NC. ',Htt-, ~lr, _:~~c}~ W1UitEJ.M SIU. OCTOBER 2llO6 OCTOBER 2llO6 OCTOBER 2llO6 ;0 '/JA'3h GazuN ,j~a ~J~~S",ER II ...J6C:J,.... LOCHNER Er;qr.: -~- DI'Tf RE'./!$~ON 2V APp.D Ell:PIA:ES 1.ro(JIO! LUMlNAlRE TYPE 'lJIJ-W SIGNAl. l00-W DECORATIVE IllO-W DECORATIVE IllO-WDECORATIVE IllO-W DECORATIVE l00-W DECORATIVE lllO-W DECORATIVE IllO-W DECORATIVE l00-W DECORATIVE IllO-W DECORATIVE l00-W DECORATIVE l00-W DECORATIVE IllO-W DECORATIVE l00-W DECORATIVE l00-W DECORATIVE l00-W DECORATIVE 100-W DECORATIVE l00-W DECORATIVE l00-W DECORATIVE lllO-W DECORATIVE lllO-W DECORATIVE IllO-W DECORATIVE IllO-W DECORATIVE IllO-W DECORATIVE IllO-W DECORATIVE CIRCUIT NO. 1-' 1-' 1-2 1-1 1-2 1-1 1-2 1-1 1.2 1-2 2-1 2-1 2-1 CONSTRUCTION NOTES CD INSTAlL 'lJIJ-W LUMINAlRE AT 35-fOOT MOUNTING HEIGHT. SEE SIGNAL PlAN. OWG. TSl (0 CONSlRUCT FOUNDATION AT STAl10N AND CENTERl.JNE OFFSET SHOWN. SEE CITY OF BREMERTON STANDARD OWG. 7014, EXCEPT USE 4 ANCHOR BOLTS PER POlE MANUFAClIJRER'S RECOMMENOATlONS. FURNISH AND INSTAlL DECORATIVE STEEL LIGHT STANDARD AND LUMINAIRES. FURNISH AND INSTAlL TYPE 1 JUNCTION BOX ADJACENT TO ST ANDARO PER OWG. E04. DETAlLS 1. 2, 3. 4 & 5 APPROPRIATE TO ADJACENT SIDEWAlK CONDITIONS o FURNISH AND INSTAlL TYPE 1 JUNCTION BOX AIlJACENT TO TREE waL PER OWG. E04, DETAIL 6. FURNISH AND INSTAlL MAINLINE CONDUIT AND WIRE INTO JUNCTlON BOX PER WIRING SCHEDULE. COIL 3 FEET Of WIRE IN EACH JUNCTION BOX INSTAlL PHOTOCEll. ON STREET LIGHT POLE CONS1RUCT FOUNDATION FOR SERVICE CABINET AT ST A.. B 58+17.00,32.0' LT. SEE SIGNAL PlANS AND INSTAlL FOUNDATION PER OWG. E05, DETAIl. 6 AND DETAlL10. FURNISH AND INSTAlL SERVICE CABINET AND COMPONENTS FOR SERVICE NO. I, SEE OWG. ED1 FOR SERVICE REQUIREMENTS AND BREAKER SCHEDULE APPROXIMATE LOCATION FOR PSE HANDHOlE FOR SERVICE CONNECTION o o <}) <}) CONSTRUCT FOUNDATION FOR SERVICE CABINET AT STA. BW 31+00.00,12.0' RT. SEE SIGNAL PlANS AND INSTALL FOUNDATION PER OWG. ED5, DETAIl. 6 AND DETAIL 10. FURNISH AND IN...QAlL SERVice CABINET AND COUPONENTS FOR SERVICE NO. 2, SEE OWG. EDl FOR SERVICE REQUIREMENTS AND BREAKER SCHEDULE SEE DWG. TS2 FOR LOCATION OF PSE HANOHOLE FOR SERVICE CONNECTlON @ REMARKS -- -- -- GCA-4924 Supplement No. 1 Exhibit F Sheet 1 of 4 SR 304 DOWNTOWN BREMERTON PEDESTRIANI BTC ACCESS IMPROVEMENTS 1L2 ILLUMINATION PLAN SHEET 131 or 25.' SHEE~ LUMINAIRE SCHEDULE LUMINAIRE SCHEDULE (CONTINUED) I. POLE ~ LUMINAJPE LUMiNAlRE CiRCUIT RE",nvo LUI.l, POlE POLE IlCUtmNG LUMINAlRE LUMINAlRE. CIRCUIT .--.! :nON OFFSET HBGHT ARI.l TYPE NO. """"'" NO. STATION OFFSET fi:IGHT ARM TYPE NO. RaoIA!OCS - . 24.SRT. lT 4' 1llO-WDECORATlVE 2-2 211 B64+38.00 24.5' LT. 1T 4' lllO-WDECORATlVE >85.00 1T 4' lllO-W DECORATlVE __ l1TT 44: 1llO-W DECORATIVE 2.1 ii 1T 4' ~WDECoRATIVE 2~2- .'--- lllO-WDECORATIVE''--- 00 24.5' RT. I . 308 P 65+52.90 23.3 RT. 1 3-1 . 1T 4' ~~ORATlVE -----l---- 7 4' l~WDECORATlVE ~--- -~ I 24.5'RT. 1T 4' 1llO-WDECORATlVE 2-2 _ 309 B65+53.00 24.5' LT. 1T 4' 1llO-WDECORATlVE -- ' <91).00 1T 4' 1llO-W DECORATIVE 1T 4' lllO-W DECORATIVE 3-1 0 1T 4' lllO-W DECORATIVE -- 1T 4' 1llO-W DECORATlVE ------ ~ - .....7000 195'RT 2-1 310 B65+55.oo 4O.O'RT. 3-2 ~ ll') ... . ., 1T 4' 1llO-W DECORATIVE, 1T 4' 1llO-W DECORATIVE ~ il -i <0 33+44.00 19.5'LT.:~ :. :=:=~ 2-1 311 P66+32.00 17.O'LT.:~ :: ::~=~ 3-1 ~ ~ =-::::::..:-_ 3 AS SEC. 13, T.24N., R.1E., W.M. 312 P66+9l.00 36.5'RT.:; :: :=:=~ 3-2 ~ ~ -.:---c::: ' o ~ \ (2\ k-\ 313 P67+35.OO 17.0' LT. 1T 4' lllO-WDECORATlVE 3-1 ! _ _ _ ~ \ ~ 17 4' lllO-W DECORATlVE \ ~ ,," 0 ~~ "^ /.\ f,\ ~ ~ I. ~11\ -~-=-~ ~~ / lS jJ) / 12~f2\ ~ 2 ~. ? J ~ 20 ~"-i'::'Ii::: LL /'-!-I -------I \~ /28\ '" 7 ~_ ,.. ~ " /"-1. 'fI'K.~"/ i-- ~..;X'J V ~ _ / _ \_~___________ 309\\.:)ili ILH 17 / ~Oo SW,. 2B2 ( ;\'215 1" '\. -~21i r 0 I -,- ~ m--lf - m - ~ ,i '*' I' ~'LINf ~ AI 2B3 A / L ^, 284 ;2B~ A 0 '21'# 0 ~7 i~O I :f~.'Lc./ ~19\ A: 64+00 11 /17,\ /17\ y ^ ~ " /L J>\ '" a.UN: as;oo ~ II ~ 0 ,,_0 r. / ':14 ~ ~.~ ~ ,"'~>::J *' ;"\A - -{.\~ - ~32 -~8 /2B\ )'1' i8- f- <1 o~'- lLJ ,. J l~ : II 2C4,,,,, 2C5 ~ 2C7 2C8 218 m f- <-\ . +- ~14 '-'-/ \ &0 3 /31\:.::-" 27~ )~" ./ ONDUIT/W~",,~CHEDULE (~~,INATION AND ~~,L1GHTS) ~ . ;;'(-~:',< ~jBl ~V!~ ~IT ~~~::~ I Q~~~ d~~~t~~ CI~~?l~ ~~~~~~~ CI~~?~ P~~ Nom ~ ! 33 :'::",.:'.':..J/~ ~ ^ 1-1 1-2 l-A I 1-8 2-1! 2-2 2-A, 2-8 i 2-C l-1 I l-2 M! 3-8 i l-C 3 "- , ~ r-- V ~ ': ~: ~ i :: i . i : [. . i : i : I : : ~: 31r~~;\'r;q&:i-';C;;::0' 1.5' _ ill 2-#8 _ ! I ! _ ; q ,8 - - . ~\ " ~ ~!\ ... ~ ~! I 2-#8! ~: - I ~ : I - _: -: _ _ K" -CI~ 0 . L_ ~ ~ M ~. ~ :r _ _ i . I I 2-14 I _ _ I _ i _ !' ~ /~ c.o 384 ~ ~ ~ ~ _ i_I _ : l~~ - . i ~ ! . - 4" '" BI ~L ~' -~ .. :s. I .;~: : ~~ : ~ ~: 3-412 - 3 ,'../ I (~~ 26 ,~ . 'i., '" i '" i" ,.. I : i. 8~ '" ;C '~1~fl :~ _: -:.': - _! i ~:: 2-#8 -: ~; ~2 ~ ~"-li 0 ~ 3651 2' _ _ I _ ! I I I 2-#8 I - ! 29 :..../' ~ I~II ~ ' .1'::\ :r I ! I I 2-#8 12-#8 I ' I L- ~nl "0 3" i-I - - i ! 2-#8 12-#8 - .. ~ ,_ _ _ _ 386 i-l:___ 3" I _ ! I i I! (2) MATCHLlNE P 67+80.00, DWG.IL4 :r i _I _ 'I - 2-14! . :r I - i ! - I ,2-#1/0 , 3" I _, _ ! ! I . - ; I 2-#2 12-13/0 3" : _:, ! - 2-#1/0 i 2-#2 12-#310 :r . I I I 2-48 i l-#12 4' _!. ' I 2,'/8! 2-48 #1/0 j 2-#2 ! 2-#310 3-412 ,. w z :::i 0.. ~ I u ~ " ~ ~ /iLJ j .I ii ;j '\ 20 t T-UNE ~ ~-I ..... .,. A N ! I o 20 m . SCALE IN FEET 1. J 1. GCA-4924 Supplement No.1 Exhibit F Sheet 2 of 4 OONDurr~RESCHEOUlENOTES (1) INSTALl pULL ROPE (2) EMPTY (3) CN' CONDUIT AT LIMIT OF CONSTRUCTIoN (4) SCHEDULE 80 PIIC gr.: _ . ~tM-:Sf'-.. .r<:V~ASi;;-:! (...... 1 ~'\>- ~ "1-'0' ~ . ~:. a ~,f,Jf <I ~'... 26~': <> };,t ^' ...:.t>~5'",,~1 S'T'E?-~..:..e",.... ~--1t; ~~\'" l E)('PI~ES M:c.:i}g; ~ exeltech Olympia, Wa S(l8ltlll, Wa Portland. OR ...... == Washington State 'VII Department of Transportation --.' I~_____----~--- --- OCTOBER 2006 QCTOBER2006 OCTOBER 2006 :~;:?i I ST,\T~ rED. AlD ;)~O..... W),!"~,~[i <;;:;:.~ I'I1t.l.IiElM SU -.. ." !I ....c.' .', I ''''o,C. I i LOCHNER GOzuN Engr.: ,j(i:; !,;l)~J12[.=: 06~5j~ 1.: . ;;;- A.??"D - I ''';,;E P.i:',j!:.llfJi': GENERAL NOTES 40 j 1. ORIENT JUNCTION BOXES AS SHOWN ON iliE PLANS AND DETAILS. 2. TREE WELL JUNCTION BOXES SHAlL BE INST AU.ED PER DETAILS 1.2,3,4,5.& 6 ON SHEET ED4. 3. SEE DWG. EDl FOR TREE waL LOCATION TABLE AND JUNCTION BOX TABLE. 4. SEE DWG. ED2 FOR $INGlE lINE DIAGRAM. 5. SEE DWG. ED4 AND ED5 FOR SIDEWALK. POLE, JUNC'i\ON BOX AND CABINET FOUNDATION DETAILS. 6. SYSTEM GROUNDING WIRES NOT SHOWN IN CONDUIT I WIRE SCHEDULE. INSTALl PER CODE. 7. INSTALL 1 _ 'r DIAMETER PMPlY CONDUIT IN ALL ILLUMINATION RUNS EXCEPT RUN NO.1, 2, 11, 13,26,29,33 AND 39. CONSTRUCTION NOTES (]) CONSTRUCT FOUNDATION AT STATION AND CENTERUtlE OFFSET SHOWN. SEE CITY Of BREMERTON STANDARD DWG. 7014, EXCEPT USE 4 ANCHOR BOLTS PER POLE MANUFACTURER'S RECOMMENDATIONS. FURNISH AND INSTALL DECORATIVE STEEL UGHT STANDARD AND LUMINAIRES. FURNISH AND INSTALl TYPE 1 JUNCTION BOXAOJACENTTO STANDARD PER DWG. ED4, DETAILS 1, 2. 3,4 & 5 APPROPRIATE TO ADJACENT SIDEWAlK CONDITlONS FURNISH AND INSTALl TYPE 1 JUNCTION BOX,ADJACENT TO TREE WELL PER DWG. ED4, DETAIL 6. FURNISH AND INSTALL I.IAINLINE CONDUIT AND WIRE INTO JUNCTION BOX PER WIRING SCHEDULE. COIL 3 FEET OF WIRE IN EACH JUNCTION BOX INSTALL PHOTOCELL ON STREET UGHT POLE APPROXIMATE LOCATION FOR PSE HANDHOLE FOR SERVICE CONNECTION CONSTRUCT FOUNDATION FOR SERVICE CABINET AT ST A. P 66+83.00, 29.0' LT. SEE SIGNAl. PlANS AND INSTALl FOUNDATION PER DWG. ED5, DETAIL 7 AND DETAIL 9. FURNISH AND INSTALl SERVICE CABINET AND COMPONENTS FOR SERVICE NO.3, SEE DWG. EDl FOR SERVICE REOUIREMEIlTS AND BREAKER SCHEDULE CD (0 o o LEGEND EXISTING ~ NEWIRELOCATED COBRA HEAD LIGHT STANDARD 0-0-0 DECORATIVE LJGHT STANDARD ~ COBRA HEAD LUMINAlRE ON SIGNAL POLE o-~O EXISTING BTe UGHTING POLE JUNCTION BOX, TYPE 1 JUNCTION BOX, TYPE 2 ___ CONDUIT AND WIRING !2E aecTRlCAl SERVICE CABINET rol TREE WEU @J \JT1lITYHANDHOlE L=:J 5'xTx 5' VAULT ~::' O"'=:i (ij 10: ~ IlRAWlNe NUUBER SR 304 DOWNTOWN BREMERTON PEDESTRIANI BTC ACCESS IMPROVEMENTS IL3 ILLUMINATION PLAN SI-lE[j I 3> z.. 0' Z8~ SHEETS -OCTOBER 2006 OCTOBER 2006 OCTOBER 2006 SEC. 13, T.24N., R.1E., W.M. OATE R::'jISi(";N 2f /.pp-o S-L1NE _ ""J~-: Nf ST:'_IE FCC. ArD PReJ. "40. SHE:. '{no W/.S:-'. JOB NUitlEER 06C5: L RUN NUMBER CONDUIT 6 SIZE 26 1.5" 28 2" 29 1.5" 30 2" 34 2" 35 3' 37 3' 41 3' CONDUIT/WIRE SCHEDULE (ILLUMINATION AND TREE LIGHTS) SERVICE NO. 1 ILLUMINATION TREE LIGHT CIRCUITS (24OV) CIRCUITS (120V) 1-1 I 1-2 1.A I 1-8 SERVICE NO. 2 ILLUMINA nON TREE LIGHT CIRCUITS (240V) CIRCUITS (120V) 2-1 ! 2-2 2-A 2-B! 20G SERVICE NO.3 ILLUMINATION CIRCUITS (240V) 3-1 3-2 2-#8 2-#8 2418 2-#8 TREE LIGHT CIRCUITS (12OV) MI3-B 3-C I i ! REIJOTE PHOTOCELL NOTES I 24M) 2-#310 24M) CONDUITIWIRE GENERAL NOTES 1. SYSTEM GROUNDING WlRES NOT SHOWN IN CONDUIT I WIRE SCHEDULE. INSTALL PER CODE. CONDUITIWIRE SCHEDULE NOTES (1) INSTALL PULL ROPE (2) EMPTY (3) eN' CONDUIT AT UMfT OF CONSTRUCTION (4) SCHEDULE 80 PVC ! I N I I 20 0 20 40 I , I SCALE IN FEET GENERAL NOTES 1. ORIENT JUNCTION BOXES AS SHOWN ON THE PLANS AND DETAILS. 2. TREE WELL. JUNCTION BOXES SHALL BE INSTALLED PER DETAILS 1.2.3.4.5,& 6 ON SHEET E04. 3. SEE DWG. EDl FOR TREE WELL LOCATION TABLE AND JUNCTION BOXTABLE. 4. SEE DWG. ED2 FOR SINGLE LINE DIAGRAM. 5. SEE DWG, E04 AND ED5 FOR SIDEWALK. POLE, JUNCTION BOX ANO CABINET FOUNDATION DETAILS. 6. SYSTEM GROUNDING WIRES NOT SHOWN IN CONDUIT I WIRE SCHEDULE. INSTALL PER CODE. 1. INSTALL 1- 2" DIAMETER PIAPTY CONDUIT IN ALL ILLUMINATION RUNS EXCEPT RUN NO. 1.2, 11. 13. 26. 29, 33 AND 39. CONSTRUCTION NOTES ill CONSTRUCT FOUNDATION AT STATION AND CENTERUNE OFFSET SHClVYll. SEE CITY OF 8REMERTON STANDARD OWG. 7014, EXCEPT USE 4 ANCHOR BOLTS PER POLE MANUFACTURER'S RECOMMENDATIONS. FURNISH AND INSTALL DECORATIVE STEEL UGHT STANDARD AND LUMINAIRES. FURNISH AND INSTALL TYPE 1 JUNCTION BDXADJACENT TO STANDARD PER OWG. ED3, DEl AILS 1, 2, 3, 4 & 5 APPROPRJA TE TO ADJACENT SIDEWALK CONDmONS CD FURNISH AND INSTALL TYPE 1 JUNCTION BOX ADJACENT TO TREE WELL.PER DWG. ED3, DETAIL 6, FURNISH AND INSTALL MAINLINE CONDUIT ANO WIRE INTO JUNCTION BOX PER WIRING SCHEDULE. COIL 3 FEET OF WIRE IN EACH JUNCTION BOX LEGEND EXISTING NEWIRELOCATED :r---p: COBRA HEAD LIGHT STANDARD >2--0--.2 0-<>-0 DECORATIVE UGHT STANOARD ~ COBRA HEAD LUMINAJRE ON SIGNAl. POLE CP::J D-<>-O EXISTING arc LIGHTING POLE " 0 JUNCTION BOX. TYPE 1 !,,; 5J JUNCTION BOX. TYPE 2 -..---- CONDUIT AND WIRING ~ ELECTRICAl. SERVICE CABINET G TREE WELL [QJ UTILITY HANOHOlE LUMtNAIRE SCHEDULE LULl, POLE POLE POlE LUMINAJRE LUMlNAlRE CIRCUIT REMARKS NO. STATION OFFSET HEIGHT ARM TYPE NO. 314 IT 4' llJO.W DECORATIVE ),2 P 67<83.00 36.5'RT. IT 4' 100.W DECORATIVE 315 lT 4' IlJO.W DECORATIVE 3-1 P 68+29.00 17.0' LT. IT 4' 100.W DECORATIVE 316 lT 4' IlJO.W DECORATIVE 3-2 P 68+30.00 36.5'RT. lT 4' llJO.W DECORATIVE 317 IT 4' lQO.W DECORATIVE 3-1 P 69+18.00 17.0' LT. IT 4' 1QO.W DECORATIVE 318 P 69+23.00 11.0' LT. lT 4' 1lJO.W DECORATIVE 3-2 GCA-4924 IT (' lQO.W DECORATIVE 319 P 69+65.00 IT 4' lQO.W DECORATIVE 3-2 Supplement No. I 36.5'RT, lT 4' lQO.W DECORATIVE Exhibit F 1T 4' 1QO.W DECORATIVE 320 P70+11.oo 17.O'LT. IT 4' l00.w DECORATIVE 3-1 Sheet 3 of 4 ,I); '... <::H ..T.... LOCHNER ~ exeltech .... W Washington State Department of Transportation OlympIa. Wa Seattle, Wa Portland. OR SR 304 DOWNTOWN BREMERTON PEDESTRIANI BTC ACCESS IMPROVEMENTS DRAWING NU""ER IL4 IllUMINATION PLAN SHEET I 3~ Of '2-%(.. SHEETS .. . . '. SEC. 13, T.24N., R.1E., W.M. GENERAL NOTES LEGEND 1. ORIENT JUNCTION BOXES AS SHOWN ON THE PlANS AND DETAILS. EXISTING NEWIRELOCA TED oVJG. \l4 ~R~ 3+'31.50}. r 1 ell' \ '~E p 101-40.~ - :1 :: w..1 rl.... - - 'u.! ' \\ ~ I ~ 3C1\--.\ ^ ~II ,J ^ i~, '\~~ /~ '4< ,f'{i) /33 \ '\ \ ^~I ' \ /j) ~~~ ~ \, 3C2 o/~~. / /~~ 3A15 ...J "" 28 7. INSTAll 1-2' DIAIolETER PMP1YCONOUIT IN All ILLUMINATION RUNS ^ 3 i: ~ ~ s' / ~b".L ~~\ /\ EXCEPT RUN NO. 1,2, 11,13,26,29,33AN039, ~ I 0 , '/ 28 \ 8. COORDINATE WMINAJRE STANDARD RELOCATION X212, X213 Willi WSf. \ I' ,/ ~ , 29 I ~ 0 2 r, / \ (3C3 '~-c.. ".. 1\ (\, P, ..->-+ . ~ ~ :;;'~, ,~: ? ~,\ A~: 324 \:J 'p 28 A3C4 -~ ! " , , + :I 2 .{ ~~~ ~ Ii 1 -45<}J)- ~__ ~~_ ,: /~~/,~_ ~~->.... .......~ ". ~'" ~ ~,:~~::~~~-n:~ - I .-- '.' 10325 ;;eL Y _L - ~~ ,-.- ..;J~ X X ~ i~:)~ r., I ~ ~ .~ ~ ~ .,.. ~ .. 0,( E/;"JY~rs- - - ~- - -J~r~~r~/I 32626~' Q ~~~ '" -...... '" ~ 78~. \3J 28' } '-- II ,............. .. .... -...... .. -8\>>::];:; ! , I, br .. ---------- '!.. -'( So.:;;;; , i( ADMINISTRATION f(.i g--i\ '/ '^29-~-- I f'.~" '--.. ~,;~:~. L:II<<S /}/ <<~ ~ /29\ '" 900;':' ~ . 0 I ~ ~ 'fl X212 2. lREE WELL JUNCTION BOXES SHALl BE INSTAllEO PER DETAILS 1.2,3,4,5,& 6 ON SHEET E04. <>---$.:: ..:--~2' \r."'-{) /~ 3. SEE DWG. EDl FOR TREE WELL LOCATION TABLE AND JUNCTION BOX TABLE, ~ 4. SEE DWG. ED2 FOR SINGlE UNE DIAGRAM. OvCJ Q-o---G @ ~ :3) 5. SEE DWG. EIl4 AND ED5 FOR SIDEWALK. POlE, JUNCTION BOX AND CABINET FOUNDATION DETAIlS. ~ 6. SYSTEM GROUNOING WIRES NOT SHOWN IN CONDUIT I WIRE SCHEDULE. INSTAlL - . PER CODE. LUMINAIRE SCHEDULE ~ 1( --o~" '\.~-r 1-1~' ~~ \ ::'\ \ < ~13 \ .. ~ .. 1. \. I I PIlE POlE POLE LUMINAlRE LlJMlNAIRE STAllON OFFSET HEIGHT ARM TYPE P 11' 4' 1~W OECORATNE 3-2 'J0+50.00 44.0' RT. 11' 4' I~W OECORATNE P7lI+87.00 70.0' RT. 11' 4' 1OG-W DECORATNE 3-2 IT 4' 1~W OECORATNE P71~.00 15.0' RT. 11' 4' 1OG-W OECORATNE 3-1 11' 4' 1OG-W DECORATNE P71t13.00 113.O'RT. 11' 4' 1~WDECORATNE 3-2 IT 4' 1OG-WOECORATNE - P 71+50.00 79.B RT. 17 4' 1QO..W DECORATIVE 3-2 _ 11' 4' 1OG-W DECORATNE P71~.oo 25.m.:~ :: :::=~ ~~ ~________._____ -lr' 4' l00-WDECORATNE 3-1 _ 8.0' RT. 1 l' 4' 1OG-W OECORA l1VE - 1"----- IT 4' 1OG-WOECORATNE ;P73+Q7,OO 25.5' LT. 3-1 11' 4'. ~OECORATNE 25.5'LT. IT 4' 11JO..W OECORATNE 3-1 11' 4' lCO-WOECORATNE P74+4 11' 4' llJO..W OECORATNE X 21 2.00 19.0' L T. 1 l' 4' 11JO..W OECORATNE - -- ---, -----.----.+--- ,-----....-..--.....-,--..-- 721 4' lOG-WDECORATNE WSF . '-18.00 59.0' RT. 17' 4' l~W DECORATIVE ''l-- ----WOO:W BTC LUM 2' 1000..WBTCLUM WSF RELOCATEFROMT22+10, to'RT. 'l 1000..W BTC LUM WSf RELOCATE FROM 38~, 74.rr LT. 2' 1000-WBTCLUM CIRCUIT NO. REMARKS 'l I I I I i I -- I I I -- 11 \\ RUN NUMBER CONDUIT D SIZE COBRA HEAD LIGHT ST ANllARO DECORA T1VE LIGHT ST ANDARO 10 1/ ;/ . ill/! ~"o A'~v / / . /:A '~~ /,/.f j ,/ ' /' ~0 /'/ II /~;/ /~ ! N I I COBRA HEAD LUMINAlRE ON SiGNAl POlE EXISTING BTC L1GHllNG POLE JUNCTION BOX, TYPE 1 JUNCTION BOX, TYPE 2 CONDUIT AND WIRING ~ ELECTRICAl SERVICE CABINET I / I / / / / ir~ I, I," ! i I i I I , ~I ~ c.----- '-'-_ X211 .......,....... I ^,. !~ L 1/1 t-/ A o -r;. ~ o 20 [ o 40 ! GJ TREE WELL 20 , SCAlE IN FEET @} UTILITY HANOHOlE CONSTRUCTION NOTES @ CONSTRUCT FOUNDATION AT STAllON AND CENTERLINE OFFSET SHOWN. SEE CITY OF BREMERTON STANDARD DWG. 7014, EXCEPT USE 4 ANCHOR BOLTS PER POlE MANUFAClUP.ER'S RECOMMENDATIONS. FURNISH AND INSTAll DECORATNE STEa UGHT STANDARD AND LUMINAIRES. FURNISH AND INSTAlllYPE 1 JUNCTION BOX ADJACENT TO STANDARD PER DWG. EIl4, DETAILS 1,2,3,4 & 5 APPROPRIATE TO ADJACENT S!OEWAlJ< CONOlTlONS CD FURNISH AND INSTAll TYPE 1 JUNCTION BOX ADJACENT TO TREE WELL PER DWG. EIl4 DETAIL 6, FURNISH AND INSTAll MAINLINE CONDUIT AND WIRE INTO JUNCTION BOX PER WIRING SCHEDUlE. COIL 3 FEET OF WIRE IN EACH JUNCTION BOX / , X210 ' (.' / IL ~-< 1. ,.'. . , ~ 7 +00 I \lY . ~ 1:. t4-~ I I 10 . \ .,\ " \ . @ RElOCATE EXJSTING BREMERTON lRANSPORTATlON CENTER (BTC) LUMINAJRE POLE, LUMINAlRE CAMERA AND SPEAKER TO NEW FOUNDATION. EXTEND CONDUIT, SPEAKER, CAMERA, AND illUMINATION CABLES TO EXISTING BTC CONlROl PANas AND SERVICE @ RELOCATE EXISTING BREMERTON lRANSPORTATION CENTER (BTC) LUMINAlRE POlE AND LUMINAlRE TO GATE ISlAND GCA-4924 Supplement No. 1 Exhibit F Sheet 4 of 4 o P 72'43,00 1t> CONDUITIWIRE SCHEDULE (ILLUMINATION AND TREE LIGHTS) -------~------- " P 74+77.00 ifJ 28 27 28 29 30 ,33 36 ~ '\ .A ~ ~ ~ \ \ + \ 7 22~.00 lS.5'RT. 35' \ . 1ft 38+e0.00 8.0' LT. 35' Er,gr.: . ~C.M'SI:o. ~~i~"'" ,. r1~'>i'.," t( f." J.-l o\-Y, ~' "' ~i<' ~~.\ if .h..-" "- '..0 2~"~, ~ ~, ~;"~ClS1f.\\~ .~." .. '~./~~c""C' ,'-? _~~ If'V. , EXPIRES~ ~ exeltech WILlHElM . ERIc SILL - OCT6eER2ilO6 . GERRY WlLLHEu.t OCTOBER 2OIl6 Ell GoZUN OCTOBER 2006 cts Engr.: . 'ay: _ '<iG;~~~ 5T/- ~:~ --~1-:::::----- ~~:.- .~~:=--~~=r--~ "': '!I:S~. . t----.---. ;C~ ''':''8':R o~c~l=-=~=--=:;='G:; ===:=::=----- B{;:;~ C6CS'4 F~D. j..JQ PRO.;. NO -'~;6t! c~{j::;'5 Olympia. Wa Soattle, Wa Portland, OR LOCHNER ciOlist; . SERVICE NO.1 n.LUMINA TION lREE UGHT CIRCUITS (24OV) CIRCUITS (12OV) 1:1'T-i-2 l-A I 1-8 1.5' 1.S- 2' IS 'l: 'l: 2' ...... 'li SERVICE NO. 2 ILLUMINATION CIRCUITS (24OV) 2-1 I 2-2 I [ TREE LIGHT CIRCUITS (120V) 2-A I 2-8 I 2-G -' I - I ! - i ! I I - I ! SERVICE NO.3 IU.UMINAllON CIRCUITS (240V) ~1 I 3-2 2-1/8 I 24/8 I 24/8 ' -TREEUGHT- REMOTE CIRCUITS (120V) PHOTOCElL 3-A I ~ I c~ I i - I 1_ NOTES 3-#12 - ! ! 2-#8 I 2-#8 - j 2-#4 : 2-#4 _WING NUWSER SR 304 DOWNTOWN BREMERTON PEDESTRIAN/ BTC ACCESS IMPROVEMENTS Washington State Department of Transportation IL5 ILLUMINA rlON PLAN 13T) OF' 2.8(, SHE"" Vendor Subject Department Status Code Amount Begin Date End Date Review Date Insurance Comments Contract Number 4583 TRANSPORTATION, DEPT OF (WA STATE) Tunnel Construction - Cooperative Engineering GOV File Class LEG 12-1 $1129756.00 11/02/2006 06/01/2008 GL $ AL $ E&O $ Insurance Total $ Insurance Review Date CSO & Tunnel Bremerton Tunnel Construction Cooperative Agreement GCA - 4924 THIS AGREEMENT is made and entered into this .~ ~ day of Ne:""z;/"h3~ ~DO&; between the STATE OF WASHINGTON, Department of Transportation, hereinafter the "STATE," and the City of Bremerton, hereinafter the "CITY." WHEREAS, the CITY has designed a project for improvements to SR 304 entitled "SR 304 - Downtown Bremerton Pedestrian / Bremerton Transportation Center (BTC) Access Improvement Project," hereinafter the "PROJECT," located from M.P. 2.79 to M.P. 3.01, and WHEREAS, it has been determined that the STATE will be the lead agency for the construction of the PROJECT, but the CITY will participate in the construction process as further provided herein, and WHEREAS, the CITY also has plans to construct a project entitled, "Combined Sewer Outfall," hereinafter the "CSO," as shown in Exhibit A, attached hereto and by this reference made a part of this AGREEMENT, within the same footprint as the PROJECT and scheduled for construction at the same time as the PROJECT, and WHEREAS, the CITY will direct the PROJECT design consultant to incorporate the CSO work into the construction design of the PROJEC:r under a separate group and at no cost to the STATE, and WHEREAS, since a mutual benefit in cost savings, through economy of scale and other efficiencies, will be derived by both the STATE and CITY by incorporating the CSO work into the PROJECT, the ST ATE agrees to construct the CSO at the same time as the highway PROJECT, and WHEREAS, the CITY is obligated for the cost of CSO work described in Exhibit A, NOW, THEREFORE, pursuant to RCW 47.28.140 and chapter 39.34 RCW and in consideration of the terms, conditions, covenants, and performances contained herein, or attached and incorporated and made a part hereof, IT IS MUTUALLY AGREED AS FOLLOWS: 1. GENERAL 1.1 The STATE agrees to construct the CSO work at the same time as the highway PROJECT. 1.2 Plans, specifications and cost estimates shall be prepared by the CITY for the CSO work in accordance with the current State of Washington Standard Specifications for Road, Bridge, and Municipal Construction, and amendments thereto, ("Standard Specifications") and adopted design standards, unless otherwise noted. The CITY's consultant will incorporate the CSO plans and specifications into the STATE's PROJECT. The STATE will thereafter advertise the resulting PROJECT for bid and, assuming bids are received and a contract is awarded, administer the contract. GCA - 4924 Page 1 of8 1.3 Warranty: The STATE's contract will include a bid item titled "CSO Warranty" specifying that the STATE's contractor will provide to the CITY, an agreed upon warranty for all associated CSO work performed under the contract. The ST ATE shall not be a party to this warranty. The CITY agrees that all actual direct and related indirect costs associated with the bid item "CSO Warranty" shall be the sole responsibility of the CITY. 1.4 The CITY hereby approves the CSO work shown in Exhibit A. 1.5 The CITY may, if it desires, furnish an inspector on the contract or CSO work. Any costs for such inspector will be borne solely by the CITY. All contact between the CITY and the STATE's contractor shall be through the STATE's representative. The STATE's representative shall have final authority for any and all decisions affecting the STATE's contract, including the CSO work shown in Exhibit A. 2. AWARD OF PROJECTffiELETION OF WORK 2.1 Following bid opening, the STATE shall provide the CITY with one (1) copy of the apparent low bidder's bid. The CITY shall have fifteen (15) calendar days from the date of receipt, or two (2) calendar days from notification by the STATE or United States Environmental Protection Agency, hereinafter USEP A, that the apparent low bidder has met USEP A' s Women and Minority Business Enterprise requirements, whichever is longer, to review and provide the STATE with the CITY's written concurrence of award or rejection of said bid. In the event the CITY rejects the bid the STATE shall delete the CSO work covered by this AGREEMENT from the STATE's contract. Should the CITY fail to respond as provided herein, the STATE shall delete the CSO work from the contract. 2.2 Should the CITY exercise its option to delete the CSO work or should the CITY fail to accept or reject the bid within the time provided under Section 2.1, the CITY agrees, upon receipt of a STATE invoice therefore, to reimburse the STATE for any and all engineering and administrative costs incurred by the STATE in deleting, from the STATE's contract, the CSO work covered by this AGREEMENT. 2.3 The STATE shall make the final determination as to appropriateness of any bid with regards to the Standard Specifications for Road, Bridge, and Municipal Construction and regarding the practices, policies and procedures of the Washington State Department of Transportation and reserves the right, should the STATE deemit necessary, to reject any and all bids for the PROJECT and/or the CSO. 3. CHANGES TO WORK 3.1 Changes to the contract will be documented by change order as defined in the current edition of the Standard Specifications. 3.2 Required change orders involve such changes in quantities or alterations in the CSO work or CITY -owned facilities as are necessary to satisfactorily complete the work as determined by the STATE. All other change orders shall be considered elective. The STATE shall process all required GCA - 4924 Page 2 of8 .' change orders in the manner as set forth Iii subsection 1,-iAC(3), Approval of Changes, STATE Construction Manual, current edition. 3.3 The CITY herein authorizes the STATE to initiate, negotiate, document and execute all required change orders. 3.4 The STATE will advise the CITY of any proposed required change order affecting the CSO or other CITY-owned facility and provide it with an opportunity, if time permits, to review the change order before execution. The STATE will determine the length of the review time based upon the need to expedite the change order to avoid delay to the PROJECT work. 3.5 Any elective change order affecting the CSO or other CITY -owned facility shall require the written approval of the CITY before execution. 3.6 The CITY may request additions to the CSO work through the STATE. The STATE will comply with the requested change, provided that the change complies with the Standard Specifications, contract permits, state and/or federal law and applicable rules and/or regulations and/or design policies. 3.7 The STATE will make available to the CITY all change order documentation pertaining to CSO work and other CITY-owned facilities impacted by the contract. 4. ACCEPTANCE OF CSO WORK 4.1 The CITY agrees, upon satisfactory completion of the CSO work, as part of the STATE's PROJECT contract, to deliver a letter of acceptance to the STATE which shall include a release and waiver of all future claims or demands of any nature resulting from the performance of the CSO work under this AGREEMENT. 4.2 If a letter of acceptance is not received by the STATE from the CITY within twenty (20) business days following STATE's completion notice to the CITY ofthe physical completion of the CSO work, said CSO work shall be considered accepted by the CITY and shall release the STATE from all future claims and demands of any nature resulting from the performance of the CSO work under this AGREEMENT. 4.3 The CITY may withhold this acceptance of the CSO work by submitting written notification to the STATE within the twenty (20) business day period. This notification shall include the reasons for withholding the acceptance. If these reasons cannot be resolved within forty (40) business days of the receipt of the CITY's notification, the outstanding issues will go to dispute resolution per Section).6 of this AGREEMENT. i'f~ 5. REPRESENTATIVES 5.1 The STATE's PROJECT manager for the STATE's contract is: GCA - 4924 Page 3 of8 Howard Diep, P .E. Port Orchard Project Engineer 8293 Spring Creek RD SE Port Orchard, WA 98367-8192 360-874-3000 Fax - 360-874-3003 5.2 The CITY representative, acting as the CITY project coordinator, for the CSO work shall be: Ned Lever, P.E. CITY CSO Coordinator 3027 Olympus Drive Bremerton, W A 98310 (360) 473-2398 Additionally, the CITY's representative providing technical expertise to the STATE for all other CITY facilities affected by the STATE's PROJECT shall be: Lynn Price, P.E. CITY Tunnel Project Coordinator 3027 Olympus Drive Bremerton, WA 98310 (360) 473-5272 6. CITY SERVICES FOR PROJECT AND CSO 6.1 The ST ATE may request, and the CITY may provide, CITY construction support services for the PROJECT, such as, providing ongoing project review, coordination with CITY services, and expert advice regarding design and/or construction details of the STATE's contract as it may impact CITY facilities. Such requests may be either written or verbal and the ST ATE agrees to reimburse the CITY for 100% of its actual direct and related indirect costs for said construction support services not related to the CITY's CSO work. Verbal requests will be followed up in writing. Any services provided by the CITY without-written or verbal request of the ST A TE- shan -be at the CITY~s expense. Billing for services provided under this section 3.1 shall be in accordance with section 6.6 and 6.7 of this AGREEMENT. 6.2 The STATE may request, and the CITY agrees to provide, construction support services related to the CITY's CSO work. All CSO related services requested by the STATE and provided by the CITY shall be at 100% CITY expense. GCA - 4924 Page 4 of 8 7. PAYMENT 7.1 The CITY, in consideration of the faithful performance of the CSO work to be done by the ST ATE, agrees to reimburse the STATE for the actual direct and related indirect cost of the CSO work as shown in Exhibit A. The CITY will also reimburse the STATE for a percentage of the STATE's construction administration and engineering costs based on the ratio of the value of CITY work to all contract work at award. 7.2 The CITY agrees to make partial payments within thirty (30) days of receipt of a detailed STATE invoice to cover costs incurred. Payments are not to be more frequent than one (1) per month. It is agreed that any partial payment will not constitute agreement as to the appropriateness of any item and that at the time of the final payment, all required adjustments will be made and reflected in the final payment. 7.3 An itemized estimate of cost for the CSO work to be performed by the STATE at the CITY's expense is marked as Exhibit B, attached hereto and by this reference made a part of this AGREEMENT. 7.4 In recognition of the cost savings to the CITY by the STATE's incorporation of the CITY's CSO work in the STATE PROJECT, the CITY agrees to pay for the actual direct and related indirect PROJECT costs identified as ineligible by the Federal Highway Administration. These costs are estimated at less than five thousand dollars ($5,000). The CITY shall not be responsible for ineligible costs resulting from the sole negligence of the STATE. 7.5 The STATE, in consideration ofthe faithful performance of services provided by the CITY, agrees to reimburse the CITY for the actual direct and related indirect cost of the work as described in Section 3.1. 7.6 The STATE agrees to reimburse the CITY for ST ATE-requested services as provided under Section 3.1. The STATE agrees to make partial payments within thirty (30) days receipt of a detailed CITY invoice. These payments are not to be more frequent than one (1) per month. It is agreed that any such payment will not constitute agreement as to the appropriateness of any item and that at the time of the final payment, all required adjustments will be made and reflected in the final payment. 7.8 An itemiz~d estimate of Qo_st (or services to be performedbytl1e (::ITY _at the STATE's expense is marked as Exhibit C, attached hereto and by this reference made a part of this AGREEMENT. 7.9 The CITY agrees to pay the STATE an advance payment amount of one hundred sixty-nine thousand four hundred sixty-three dollars ($169,463) within 20 days after the STATE submits its first partial payment request to the CITY. The advance payment represents approximately fifteen (15) percent of the estimate of cost and covers costs incurred by the STATE in the initial stages of the contract. The advance payment will be carried throughout the life of the contract with final adjustment made in the final payment. 7.10 In the event unforeseen conditions require an increase in the cost of 25 percent or more from that agreed to on either Exhibits B or C or section 6.4, the parties agree to amend this AGREEMENT to include such increase. . GCA - 4924 Page 5 of8 8. CLAIMS 8.1 Claims for Additional Payment 8.1.1 In the event the contractor makes a claim for additional payment for CSO work, the ST ATE will immediately notify the CITY of such ciaims. Such claims shall be made in the manner and form as provided for in the Standard Specifications. 18.1.2The CITY shall have the right to review and discuss the settlement of all claims. The ultimate decision to pay a claim will be by mutual agreement of the CITY and the STATE. In the event such claims are not resolved, the CITY shall defend such claims at its own cost and shall pay any court judgment or arbitration award resulting from such claims, provided that the CITY shall not be obligated to pay such claims or the cost of defense to the extent that the claims are caused by the negligent acts or omissions of the STATE in administrating the CSO work. The STATE will cooperate with the CITY in the CITY's defense of the claim(s). The CITY shall reimburse any ST ATE costs incurred in providing such assistance. 8.2 Claims for Damages 8.2.1 After CSO work acceptance, in the event of claims related to the CSO work for damages or loss attributable to bodily injury, sickness, death, or injury to or destruction of property, the CITY shall defend such claims and hold harmless the ST ATE, and the ST ATE shall not be obligated to pay any such claim or the cost of defense. Nothing in this section, however, shall remove from the STATE any responsibilities defined by the current laws ofthe State of Washington or from any liabilities for damages .caused by the STATE's own negligent acts or omissions independent of the CSO work performed under this AGREEMENT. 9. RIGHT OF ENTRY 9.1 The CITY hereby grants to the STATE, including its contractors and subcontractors, the right of entry upon illllan<r wliieli tlie CITYhas interest, within or adjacent to the righr of way of the highway, for the purpose of constructing and if necessary, maintaining said improvements. Upon completion of the work outlined herein, all future ownership, operation and maintenance of the CITY's facilities shall be at'the sole cost ofthe CITY and without expense to the STATE. 10. MODIFICATION 10.1 No modification of this AGREEMENT is valid unless evidenced in writing by amendment to this AGREEMENT and signed by both Parties. No verbal agreement may supersede, replace or amend this AGREEMENT. GCA - 4924 Page 6 of8 ii. ASSIGNMENT 11.1 Neither Party to this AGREEMENT shall transfer or assign any right or obligation hereunder without the prior written consent of the other Party. 12. SEVERABILITY 12.1 Should any section, term or provision of this AGREEMENT be determined to be invalid, the remainder of this AGREEMENT shall not be affected and the same shall continue in full force and effect. 13. HOLD HARMLESS/INDEMNIFICA TION 13.1 Each Party to this AGREEMENT shall protect, defend, indemnify, and save harmless the other Party, its officers, officials, employees, and agents, while acting within the scope of their employment as such, from any and all costs, claims, judgments, and/or awards of damages (both to persons and/or property), arising out of, or in any way resulting from, each Party's negligent acts or omissions in connection with the terms of this AGREEMENT. No Party will be required to indemnify, defend, or save harmless the other Party if the claims, suits, or actions for injuries, death, or damages (both to persons and/or property) is caused by the sole negligence of the Party. Where such claims, suits, or actions result from concurrent negligence of the Parties, or is covered by RCW 4.24.115, the indemnity provisions provided herein shall be valid and enforceable only to the extent of the Party's own negligence. 13.2 This indemnification shall survive the termination of this AGREEMENT. 14. DISPUTES. 14.1 In the event that a dispute arises under this AGREEMENT that cannot be resolved to the satisfaction of both Parties, with regards to the CSO work and other CITY -owned facilities, it shall be resolved as follows: The CITY and ST ATE shall each appoint a member to a disputes board, these two members shall select a third member not affiliated with either Agency. Costs related to the third member will be equally shared between the CITY and STATE. The decision made by this board shall be final and binding on the Parties to this AGREEMENT. GCA - 4924 Page 7 of8 15. VENUE 15.1 In the event that either Party deems it necessary to institute legal action or proceedings to enforce any right or obligation under this AGREEMENT, the Parties hereto agree that any such action or proceedings shall be brought in the superior court situated in Thurston County, Washington. IN WITNESS WHEREOF, the Parties hereto have executed this AGREEMENT as of the day and year first above written. CITYO~TON ~ By: _ ~~y: Cary Bozeman, Mayor Date: /0 --;<&-~~ APPROVED AS TO FORM By: ~ Date:~ - ~ -/o4~ IQ " / GCA - 4924 Page 8 of8 Date: STATE OF WASHINGTON DEPARTMENT OF TRANSPORTATION /~ t1.~ f Randall A. Hain, Region Administrator /1- z. . t.:l f, APPROVED~FORM By: ~~. Assistant Attorney Genera Date: - . fa - ~ - (;) 0-- GCA-4924 Exhibit A Page 1 of 5 Description of Work The Combined Sewer Outfall line will install 1,163 feet of 36 inch pipe and 418 feet of 48 inch pipe from the intersection of 4th Street and Park Avenue to 1 st Street and Pacific A venue in the City of Bremerton. It includes associated manholes, shoring, excavation, backfill and erosion control work. The work will also include the installation of a 12 inch storm lin~ at the intersection of 4th Street and Park Avenue and pavement restoration on Park A venue from Burwell Street through to 4th Street. ! N I LE:C,;END C:;,T'.>.p';"..;;;n.. T)'; E" ,.j..l";l:'-,<\> C.::'(j f.~H '~-{~-T ii T)'?f. ii. !.-\[) UST f Xi~) WiG rJP,NH(A,f I r- w w :t: Ul /~8A\U{A"~ tXISTfN<..S- 1'A,~NH(':LE GCA-4924 EXHIBIT A Sheet 2 of 5 .,\:>~~)~-:-i 1:).;lSnr*(~ (;;~1CH 8i"SlM CZJ REi.,j("\:E DR':'.l!.,;tGE: '5'rRlJ(;pj:~;~ o Z 8rid~~..[nll" ~ Supem_ ., 0..'9"'" ceHlf'! I Ch.<:Wl ~ R IJOORE ~ ~:Mj :i~;'oc::.~: PUWfl. PIon Ily Ncl'titect c:laht STAT[ fED. AID PROJ. NO. ,:4..~'/~"2'- :.\~ .p e x e I tee h ~.W" ~,w" &.loo'n,QR 01 WASI<. .... Y7~ Washington Btate 'ffi_ Department of Transportation SR 304 DOWNTOWN BREMERTON PEDESTRIANI BTC ACCESS IMPROVEMENTS >;:;' JOB NUIolBER DRAINAGE PLANS OATE """""" B'r ,.,pp'D "'"", ;,,,," 4~::~'Z~, """ '" ~ ',\", I""" i ...~ '\ 'It, \ % \ I 0- W w I <Il ..;c~l ,0 ;" ~~,.. cj Z BfIdlp o.t>4l"l ["9r, ~ SupeMtQI' ..... o._v.*' 9y C.OIIN J C"eco"-d 8)' R NOORf Oetoiled By L BOROS ClJa~.PtI)-cllE"9" p,.lOm. f'Icp., By Art"'i1llCt/~ioli$t STIlo.1! Irt:O. NO PRO.I. NO. ",""" ~ .... V Wuhlngton State Department of Transportation exeltec:h I.K>8y,WA ~w" ~OR "'''''''''' 6r1 Ai'f"O "'''' ! N I L,EGENIJ C:i. TG., nA-:W''; i''rTE: ~ STQf{bl Sf: 'NEi~ tY>./U} CSU 15i, -:~(p(;:! ','h, II "'t t.., .)~~ EJlSLNG- kiN'HOd:: i2j ;) ~;-';\;~'-TU:H; GCA-4924 EXHIBIT A Sheet 3 of 5 SR 304 DOWNTOWN BREMERTON PEDESTRIAN! BTC ACCESS IMPROVEMENTS ~ ~ D2 DRAINAGE PlANS I >- LU LU J: '" I ci Za.iI:Slj.~E""lr ~s.vp.<Viw< , ()cs~d&JCCHIN I Che:clled It)' R MOORE Detailed l BOROS ffi S'id<I- PtQi-ct& E:~9f. Prel;.... f'~" 8)' .....~"'j\-..;t S ld;$l 290 "''' ,rn",," % \ % \ % \ %i r,~ (,41)1% '1 \ :,;~>cl~~ __J ;;;-M";';~~:.~--"'-; SlATE F(I), NO PROJ_ NO. exeltech iAOOy,WA s.o.ttlD,W!\. s-,OA ~ J06 NIJ,llJ[A BY APP'O - -=J__ t>UNE SECOi'iD STREET .. ....-.....-. ! N I LEGEND ,J,-T ;~H gi,~;~H 1 YPi:: 1 r.Ad. 'YPi.: {1 iL~j Rr:J..;C)'f5 f:;,tN.''.',:;t :.~1 PUr>,:., f~C ~~-rGF<f\~ SE~vEn --- --- ..:::. ~ W Waahlngton Stat. Yk, Departrnent of Transportation GCA-4924 EXHIBIT A Sheet 4 of 5 SR 304 DOWNTOWN BREMERTON PEDESTRIANI BTC ACCESS IMPROVEMENTS _0 ~ 03 DRAINAGE PlANS I tu w I <n o z arld9'DesI9"~. ~ Suponw ..... C.CHlN I o-:~.,; &t R-~ o.tOl~<I By 1. OOROS ffi Btidq.P,"i-<:tIIE:ng. 1",.1""" Plal! 9) ....cNl.ctS ioIi;s.t LEGEf\jC) CAf(~H SA,S;;,,'iY;;'c ~ c;c f./i"!. i"~'Fr I .~ ,\.\!~_ ":'YPE H, ':'.DJL:~n F \iS1 1>H.:; t',.L.V)H(.U, AbANDrfi U;:S rlN(; M,t:.N1KLE ,'\fJJUS~' E:<.i$"1iNG CA fGH gASI;<; [2".\ HE\~CVF Di~Ai,~F,!~iE S'HtUCr'~.~{E hUG E),;$ !"ii'~G PiPE // STAT[ rt:D. AID PROJ. NO. 10 W.-.sH exeltec:h \,.acey,WA S-,WA s..nOR i N I ,,' ~\F'\l GCA -4924 EXHIBIT A Sheet 5 of 5 ~ .... fli SR 304 DOWNTOWN BREMERTON PEDESTRIANI Waahlngton State BTC ACCESS IMPROVEMENTS Department of Transportatloft D4 J08 HUlolBUI "'" BY N'f"O R('-.1SI{)H _c . DRAiNAGE PLANS GCA - 4924 Exhibit B Downtown Bremerton Pedestrian/BTe Access Improvements Construction Estimate GROUP 3 GROUP 4 TOTAL STD ITEM DESCRIPTION I UNIT I UNIT PRICE QTY AMOUNT QTY AMOUNT QTY AMOUNT ITEM PREPARATION 0001 MOBILIZATION (7%) L.S. $ 3,434.03 $ 57,916.64 $ 61,350.66 0049 REMOVING DRAINAGE STRUCTURE EACH $ 1,000.00 1 $ 1,000.00 1 $ 1,000.00 STORM SEWER 3091 CATCH BASIN TYPE 1 EACH $ 2,500.00 1 $ 2,500.00 1 $ 2,500.00 3151 TESTING STORM SEWER PIPE L.F. $ 2.00 80 $ 160.00 1,579 $ 3,158.00 1659 $ 3,318.00 3577 SCHEDULE A STORM SEWER PIPE 12 IN. DIAM. L.F. $ 50.00 77 $ 3,850.00 77 $ 3,850.00 HOPE DR 32.5 STORM SEWER PIPE 36 IN. DIAM. (See CSO) L.F. $ 325.00 1,163 $ 377,975.00 1163 $ 377,975.00 HDPE DR 32.5 STORM SEWER PIPE 48 IN. DIAM. (See CSO) L.F. $ 400.00 80 $ 32,000.00 338 $ 135,200.00 418 $ 167,200.00 STRUCTURE DEWATERING L.S. $ 250,000.00 0 $ 0.00 $ LIQUID ASPHALT 5334 ANTI-STRIPPING ADDITIVE EST. $ 1.00 190 $ 190.00 190 $ 190.00 HOT MIX ASPHALT 5711 PLANING BITUMINOUS PAVEMENT S.Y. $ 10.00 1700 $ 17,000.00 1700 $ 17,000.00 5767 HMA CL. 1/2 IN. PG 64-22 TON $ 65.00 187 $ 12,155.00 187 $ 12,155.00 5830 JOB MIX COMPLIANCE PRICE ADJUSTMENT CALC $ 1.00 370 $ 370.00 370 $ 370.00 5835 COMPACTION PRICE ADJUSTMENT CALC $ 1.00 230 $ 230.00 230 $ 230.00 EROSION CONTROL AND PLANTING 6403 ESC LEAD DAY $ 150.00 10 $ 1,500.00 10 $ 1,500.00 6470 STREET CLEANING HR $ 125.00 25 $ 3,125.00 25 $ 3,125.00 6373 SILT FENCE L.F. $ 4.00 250 $ 1,000.00 250 $ 1,000.00 6478 STRAW BALE EACH $ 5.00 5 $ 25.00 5 $ 25.00 6490 EROSION/WATER POLLUTION CONTROL . EST. $ 100,000.00 0.1 $ 10,000.00 0.10 $ 10,000.00 TRAFFIC 6857 PLASTIC CROSSWALK LINE SF $ 12.00 166 $ 1,992.00 166 $ 1,992.00 6882 RAISED PAVEMENT MARKER TYPE 1 HUND $ 250.00 0.9 $ 225.00 1 $ 225.00 3884 RAISED PAVEMENT MARKER TYPE 2 HUND $ 600.00 0.3 $ 180.00 0.30 $ 180.00 INTERCONNECT L.S. $ 32,000.00 0.00 $ 0.00 $ 6971 PROJECT TEMPORARY TRAFFIC CONTROL L.S. $ 430,000.00 0.04 $ 17,200.00 0.04 $ 17,200.00 6992 OTHER TRAFFIC CONTROL LABOR HR $ 50.00 100.00 $ 5,000.00 100 $ 5,000.00 6974 TRAFFIC CONTROL SUPERVISOR L.S. $ 125,000.00 0.04 $ 5,000.00 0.04 $ 5,000.00 OTHER ITEMS 7006 STRUCTURE EXCAVATION CLASS B INCLUDING HAUL . C.Y. $ 16.00 340 $ 5,440.00 3668 $ 58,688.00 4008 $ 64,128.00 7008 SHORING OR EXTRA EXCAVATION CLASS B S.F. $ 2.50 1193 $ 2,982.50 15467 $ 38,667.50 16660 $ 41,650.00 7013 GRAVEL BACKFILL FOR PIPE BEDDING C.Y. $ 25.00 111 $ 2,775.00 1,500 $ 37,500.00 1611 $ 40,275.00 7014 GRAVEL BACKFILL FOR DRAIN C.Y. $ 25.00 228 $ 5,700.00 2,490 $ 62,250.00 2718 $ 67,950.00 7360 MANHOLE 48 IN. DIAM. TYPE 1 EACH $ 4,000.00 1 $ 4,000.00 1 $ 4,000.00 7364 MANHOLE 60 IN. DIAM. TYPE 3 EACH $ 4,000.00 4 $ 16,000.00 4 $ 16,000.00 7365 MANHOLE 72 IN. DIAM. TYPE 3 EACH $ 4,200.00 1 $ 4,200.00 1 $ 4,200.00 7366 MANHOLE 84 IN. DIAM. TYPE 3 EACH $ 4,500.00 1 $ 4,500.00 1 $ 4,500.00 CONSTRUCTION FENCING L.F. $ 10.00 250 $ 2,500.00 250 $ 2,500.00 7736 SPCC PLAN L.S. $ 5,000.00 0.04 $ 200.00 0.04 $ 200.00 Sub-Total Construction $ 52,491.53 $ 885,297.14 $ 937,788.66 Sales Tax $ 4,409.29 $ 4,409.29 Construction Ennineerina Costs 10%) $ 5,249.15 $ 88,529.71 $ 93,778.87 Construction Continoencv 110% \ $ 5,249.15 $ 88,529.71 $ 93,778.87 Administrative Overhead 11) $0.00 Total Construction $ 67,399.12 $ 1,062,356.56 $ 1,129,755.68 eso (in State Ri9hl of Way) eso NOTE: (1) per Overhead A9reement OH-00166 City Items Estimate 9-7-06 - Revised GCA-4924 Page 1 of 1 GCA-4924 EXHIBIT C Combined Sewer Outfall City Inspection Service and Coordination City coordination and technical expertise provided by the City of Bremerton at WSDOT request 0.75 Full Time Equivalent X 12 months X $7,000 I mo. 0.25 Full Time Equivalent X an additional 8 months X $7,000 I mo. $77,000,00 Administrative Overhead (1) $0.00 Total City Services $77,000.00 Note: (1) Per Overhead Agreement OH-00166 GCA-4924 Page 1 of 1