HomeMy WebLinkAbout3007
RESOLUTION NO. 3007
A RESOLUTION of the City Council of the City of
Bremerton, Washington, adopting the 2007 - 2012 Six Year
Transportation Improvement Plan.
WHEREAS, after proper notice, the City Council of the City of Bremerton held a
public hearing at the regular meeting of the City Council at 5:30 p.m. on September 6, 2006, to
consider public testimony on the City's proposed 2007 - 2012 Six Year Transportation
Improvement Plan and, having considered public testimony regarding the Plan and in accordance
with the provisions of RCW 47.80; NOW THEREFORE,
THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON,
DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. The 2007 through 2012 Six Year Transportation Improvement
Plan, set forth in Exhibit "A" attached hereto and herewith filed with the City Clerk, is hereby
adopted.
SECTION 2. Severabilitv. If anyone or more sections, subsections, or
sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not
affect the validity of the remaining portion of this Resolution and the same shall remain in full
force and effect.
SECTION 3. Effective Date. This Resolution shall take effect and be in force
immediately upon its passage.
PASSED by the City Council of the City of Bremerton, Washington this ~
dayof~_ ~JJ. J ,2006.
~f~ent
APPROVED AS TO FORM:
1
Six Year Transportation Plan
~
~II
Agency:
Co. No.:
City No.:
Bremerton
Six Year Transportation Improvement Program
From 2007 to 2012
Washington State Department of Transportation
18
0115
Co. Name: Kitsap Co.
MPO/RTPO: PSRC
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. Federal Aid No. B. Bridge No. oW :5 en Fund Source Information Expenditure Schedule Projects Only
iU .a.:D c m Ql
C III lll_ Cl "0 (Local Agency)
.;:: L) C. Project Title E.!!!. III c: 0 UI
gg: ::I .3 (1l Federal Funding
.2 E llllll - 0 .c RIW
t:I- '-::J D. Street/Road Name or Number ~a. Jll ~ a.
50 o..z li~ rn ] U Phase Federal Federal State 4th Required
u. E. Beginning MP or Road - Ending MP or Road .5 ~ ;; Ql Start Fund Cost by Fund State Local Total Envir. Date
::J -[ Funds Funds Funds 1st 2nd 3rd Thru Type
F. Describe Work to be Done lJ. (mm/ddlyyyy) Code Phase Code 6th (MMlYV)
1 2 3 I 4 5 6 7 8 I 9 I 10 11 12 13 I 14 15 16 17 18 19 20 21
I I I I I I I I I
14 1 HP-1996(029) 01 S 0.45 P PE 511/2003 Discretionary 4658 I I 4858 I EA
Downtown Pedestrian/BTe Access Improvemenls 06 G RW 9/112005 Discretionary 4700 I I I 4700 I I Yes
SR304/Paclfic Ave. 07- T CN 1011/2006 Discretionary 20263 I I I 20263 110 I 851
W
from: Ferry Terminal to: Warren Avenue 04 C
Improve pedeslrian and vehIcle mobility In downtown Bramellon 911/06
0
Totals 29521 29821 110 85
14 2 03 S .9 C ALL! 61112004 I I I WSDOTI 110001 5221 115221 54001 I I ErS
SR 304 TIP - Stage 1D - Navy Yard Highway Phase 04 G Yes
SR 304 06 P
S
from: Charleston Beach Rd to: SR 3 07 T
HOV Improvemenls, overlay, wiclenlng, reconslnlcl/on 10101/06
W
Totals 11000 522 11522 5400
14 3 01 S .14 P PE I 1/1/2005 I I I AIPI 1351 101 14~1 301 I I
Warren Ave. Off-ramp 12 W CN 611/2006 AlP 1 7211 401 761 7611 I No
SR 303 T
from; Sheridan Ave to; Callahan Drive
Conslnlcl off ramp connecling saulhbound SR 303 wilh Callahan Olive
Totals 0 856 50 906 791
- 1-- I
17 4 06 S 0.18 P PE I 11112005 STP(U) I 130j I I 201 15~1 I I I CE
Auto Center Way Improvements 07 CN 8/112006 STP(U) 780 1 I 1201 900 9001 I No
Auto Center Way 12
from: 6th Street to; SR 30nramp 05
Exlend second multipurpose lane 10 Improve operal/on al SR 30nramp
Totals 910 140 1050 gOO
----
Report Date: July 13,2005
Page 1
v. 5.6 - Supersedes previous editions
~
ili
Agency: Bremerton
Co. No.: 18
City No.: 0115
Six Year Transportation Improvement Program
From 2007 to 2012
Washington State Department of Transportation
Co. Name: Kitsap Co.
MPOJRTPO: PSRC
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. Federal Aid No. B. Bridge No. - .c: UI Fund Source Information Expenditure Schedule Projects Only
1i'i z-lii c
CIl_ m QI ell
c: III 1:1 (Local Agency)
'C .a C. Project Title EUI 11/ C 0 IJl
,2 IJl .Q E 111- ::J ~ 0 CD Federal Funding R!W
U.!!! >111 - .s::.
'-::::J D. Street/Road Name or Number oc. ClI ~ n..
50 - :m Required
o..z a~ 0 '0 Phase Federal Federal State 4th
LL E. Beginning MP or Road. Ending MP or Road .5 {!. ;; II> Start Fund Cost by Fund State Local Total Envir. Date
::l -e' 1st 2nd 3rd Thru
F. Describe Work to be Done (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (MMIYY)
D.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 I 18 19 20 21
I I I I I I 61 501 I I
17 5 32 S P PE I 1/1/2006 STP(U} I 441 I 50 1 I CE
Harlow DrivelKitsap Lake Elementary Pedestrian Improvements e eN 11112007 STP(E) 206 I I 341 240 2401 1 No
Harlow Drive T
rrom: Lakehurst Drive to: Osprey Circle
Construct a pedestrian pathway along the west side of Harlow Drive
Totals 250 40 290 290
. PE 3/1/2007 STP(U) 150 I I 1701 I
14 6 05 P 0.06 e 201 170 CE
SR 303 at 11th Street Intersection Improvement G RW 12/1/2007 I I 1520 1520 1 7601 760 Yes
5R 303 P CN 2/1/2009 I I 7301 730 I I 730
rrom: 111h 51. to; 13th St. S
lengthen ellisllng righttum lane from southbound SR 303 to westbound T 02109
11th Street. W
Totals
19 7 07 S ALL I 1/1/2007 I I I I I 12001 12001 2001 2001 2001 600
Miscellaneous (Local Program Supporl) 06
City Wide 32
from: N/A 10: N/A 12
Miscellaneous projects 10 Improve safety and operallons; non-molorized N/A
transportation; roadway preseJValion
Totals 1200 1200 200 200 200 600
17 8 05 P .0,5 P ALL I 1/1/2008 I I I I I 50001 50001 I 25001 25001
Arsenal Way/Patlon Ave. Safety Improvements 06 S
Arsenal Way/Palton Avenue 07 T
W
wom; Loxie Eagans Bllld to: LareyeUe 12 G
SaFely Improvements Including curb and guller. sldwalks,lighting, roadway e
widening, and intersection Improvements
0 Totals 5000 5000 2500 2500
Report Date: July 13. 2005
Page 2
v. 5.6 - Supersedes previous editions
~
Yli
Agency:
Co. No.:
City No.:
Bremerton
Six Year Transportation Improvement Program
From 2007 to 2012
Washington State Department of Transportation
18
0115
Co. Name: Kitsap Co.
MPO/RTPO: PSRC
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. Federal Aid No. B. Bridge No. .... = UI Fund Source Information Expenditure Schedule Projects Only
1li 2"lii c III Q)
C:tI) 1lI.-. en l:II "tI III (Local Agency)
'C .0 C. Project Title ES c 0
.9 In .E III m Federal Funding
....m .Q E llIm ..J 0 .c R/W
u- >a. J!l n.
50 .....~ D. Street/Road Name or Number [~ S ~ Required
o.z en i:S Phase Federal Federal State 4th
LL E. Beginning MP or Road. Ending MP or Road .E ~ S III Start Fund Cost by Fund State Local Total Envir. Date
:I "6' 1st 2nd 3rd Thru
F. Describe Work to be Done ~ (mmlddlyyyy) Code Phase Code Funds Funds Funds 6th Type (MMIYY)
D..
1 2 I 3 4 5 6 I 7 a 9 I 10 11 12 13 14 15 16 17 18 19 20 21
I I I I I I I I I
14 9 12 P .12 W PE 1/1/2010 I 1821 182 182
Lower Wheaton Way Realignment 02 P RW 1/1/2010 I I 2181 218 I 218
Wheaton Way CN 1/1/2010 1 I 10051 1005 I I 1005
rom: Callahan Dr to: Sheridan Rd
Realign Wheaton Way 10 north south configuration
Totals 1405 1405 1405
16 10 P 0.15 C ALL I 1/1/2009 I I I I I 15001 15001 I I 15001
Pacific Avenue Improvements G
Pacific Avenue 0
from: 6th Street to: Burwell Street p
Construct slreelscape. pedestrian and safety improvemenls S
T
W Totals
17 11 06 P 0.3 C ALL! 1/1/2011 I I I I I 50001 50001 I I I 5000
Wemer Road Improvements 05 G
Werner Road 0
from: Union Avenue to: SR3 p
Conslrucllntersectlon Improvenls and slgnallzallon allhe lnlersecllons of S
Werner Road at Union Avenue and Werner Road allhe southbound SR 3 T
olf ramp W Totals
14 12 P 0.1 C ALL! 1/1/2009 I I I I I 5001 5001 I I 5001
Wheaton Way at Magnuson Way Intersec/ion Improvement G
Wheaton Way 0
from: Magnuson Way to: Magnuson Way P
S
Conslrucllum pockets and signalizallon T
w Totals
Report Dale: July 13,2005
Page 3
v. 5.6 - Supersedes previous editions
......
il.i
Agency:
Co. No.:
City No.:
Bremerton
Six Year Transportation Improvement Program
From 2007 to 2012
Washington State Department of Transportation
18
0115
Co. Name: Kitsap Co.
MPO/RTPO: PSRC
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. Federal Aid No. B. Bridge No. .. J: III Fund Source Information Expenditure Schedule Projects Only
1ii ~Qj c m II) OJ
c:: II) CII""; "C II) (Local Agency)
'C .0 C. Project Title E"e III c 0
.9 UJ :l j 0 III Federal Funding
-Ill .2 E IIlm :m .I:: R/W
u- ....:::1 D. Street/Road Name or Number ~11 ~ a..
SO a.z ii.~ UJ ]j 0' Phase Federal Federal State 4th Required
u.. E. Beginning MP or Road - Ending MP or Road .5 {? s OJ Start Fund Cost by Fund State Local Total Envir. Date
:::J .~ 1st ~ 3rd Thru
F. Describe Work to be Done e (mmlddlyyyy) Code Phase Code Funds Funds Funds 6th Type (MMIYY)
D.
1 2 3 4 5 I 6 7 8 9 10 I 11 12 13 14 I 15 16 17 18 19 20 21
I I I I I f I I I I
19 13 P .15 C ALL! 1/112007 I I 5251 525 251 2001 3001
Park Avenue Signal Improvements G
Park Avenue 0
rrom: 6th Street to: Burwell Street p
S
Install new signals on Park Avenue between 6th Street and Burwell Street T
as needed to Improve traffic clrculalJon W
Totals
14 14 04 P 2.6 C ALL I 1/1/2010 I I I I I 100/ 100/ I I I 100
SR 303 Bremerton to Silverda/e Transportation Comdor 06 G
SR 303 12 P
from: Burwell 5t to: Riddell T
Implement recommendations of SR 303 Corridor Study w
Totals
PE I 1/1/2011 I I I I I 1251 1251 I I I -
00 15 01 P 125
Port Blakely Alternative Route Analysis 03
Various 04
from: N/A to: N/A 05
Condu[;t analysis of polenlialtranporlallon roules 10 selVe the Port Blakely 06
Planning area
12 Totals 125 125 125
Grand Totals for Bremerton 30981 11856 8482 51319 7691 2785 2700 2130
Report Dale: July 13, 2005
Page 4
v. 5.6 . Supersedes previous editions