Loading...
HomeMy WebLinkAbout253 Resolution No. 253 %~EREAS, in connection with the Water Works Project, known as Wash. bock. No. 45-165, it has been necessary to make a change in the contract for the construction of the pump house at Anderson Creek, which is due to the nature of the chlorine gas used in the chlorinator room, and it is necessary to exhaust the air from the said room at the ground level, and it is necessary to change the contract in this regard by eliminating the duct work and the location of the fan, and WHERI~AS, B. N. Branch, architect for said project, has requested a proposal for such change from A. P. Hendrix, the contractor performing such work, and the said A. P. Hendrix has proposed to furnish all labor and materiels and other costs in connec- tion w:th said change for the sum of $75.00, and WHERF~S, said proposal is a reasonable one and has been approved by the Federal Works Agency, NOW THEREFORE, BE IT RESOLVED, that said change is hereby confirmed and ratlf~ed, and the Mayor and C~ty Clerk are hereby authorized and directed to notify the said A. P. Hendr!x of the acceptance of his proposal and order the said A. P. Hendrix to proceed forthwith in accordance with the plans, specifications and his acceptance thereof. PASSED by the City Commission of the City of Bremerton, signed by the Mayor, and attested by the City Clerk in authentication Of such passage, this 4th 'day of September, 194~. ATTEST Ci