Loading...
HomeMy WebLinkAbout868 RESOLUTION NO. ___~ ..... WHEREAS, heretofore and on the 27th day of November, 1953, the City of Bremerton entered into a certain contract with Ted Hyde, d/b/a Hyde Construction Company, for the erection and con- struction of the Forest Ridge Reservoir in the City of Bremerton, Washington, and under which contract said work was to have been completed within one hundred fifty (150) days from the date there- of, and WHEREAS, heretofore and on the 26th day of May, 195~, an extension was given to said Ted Hyde to the 27th day of July, 195~, on the basis of unavoidable delay and weather conditions and WHEREAS, by reason of the use of increased qualities of material being from an estimated one thousand four hundred fifty yards of concrete to an estimated two thousand one hundred yards flor final completion, and for steel, one hundred sixty-eight thousand oounds increased to two hundred and forty thousand pounds ~at it will not be possible to comolete said reservoir by the 27th day of July, 195~, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Bremerton that the time of completion for the work contem- plated under said described Contract be, and hereby is extended to October 30th, 195~. BE IT FURTHER RESOLVED that no liquidated damages or dam- s%es of any kind or nature shall be asserted by the City of Brem- erton against said contractor for failure to complete by the contract date, or any extension thereof, and BE IT FURTHER RESOLVED that copies of this resolution be forwarded by the City Clerk to Ted Hyde, d/b/a Hyde Construction Comoany, the contractor, and the surety on his performance bond ffiled with the City. PASSED by the City Council of the City of Bremerton, signed by the Mayor and attested by the City Clerk in authentication of such passage this 28th day of July, 195~. ~. H~ T'. ~lC GOWAN, City Clerk.