HomeMy WebLinkAbout1110 TRANSFER RESOLUTION AND REQUEST FOR THE DIRECTOR OF HIGHWAYS
TO PERFORM CERTAIN WORK
Resolution No. lll0
Before the Cit.¥ Co~ission of Bre~zrt~n , Washington.
It is HEREBY RESOLVED, by the Co~isston that
the Director of Highways is authorized and directed to cdnduct ~ fransportation study
of the Puget Sound region, comprised of King, Kitsap, Pierce, and Snohomish
counties, according to the prospectus dated 3uly 29, 1960, which is attached and
made a part of this resolution. The Cit~_ of Br~rton~
~/~h~n.qton agrees to contrtbute 0.20 percent of the tOtal
cost oi the study, to the amount of two thousand one hundred
($ 2,~00,00 ) Dollars, and
Authorization is hereby granted for the withholding from the monthly fuel tax
allotments to the above specified sum, being an amount not in excess o£ the money
reasonably anticipated to accrue to the credit of the City of
Bremert~n in the Motor Vehicle Fund prior to ~une 30,
1963, and
Upon completion of the aforesaid work, and a statement of cost having been
furnished the City of Bre~ert0n of the cost of
all labor, equipment, material, supplies, and engineering, authorization is made
to effect reimbursement to the Department of Highways in the amount of such cost
from the funds withheld, however, not to exceed the above specified sum with any
unexpended balance to be released to the City of Hremerton
and to be included in the next succeeding warrant covering fuel tax alloiments.
The above funds will be withheld as follows:
$700.00 per year for three years.
ADOPTED by the Citer Commission of Bremer~on this 21st
day of September , 19 60 .
SEAL
Attest:
Clerk'
9.7.60
approved by
Technical Committee
?1 .916o
Prospectus
Puget Sound Regional Transportation Study
The four counties of King, Kitsap, Pierce, and Snohomish contain slightly
more than half of the population of the State of Washington. Urbanization in this
area is expected to continue with growth from a present population of approximately
1,500,000 to approximately ~-,500,000 by 1990. This increase in population, with
an accompanying increase in economic activity will require careful planning in
order to adequately provide the necessary facilities for increased transportation
needs.
In contrast to a single metropolitan area in which the predominant traffic
flow is between the central city and fringe areas, the Puget Sound Region is
composed of several centers, each having its own commuting pattern as well as
being a terminus for intermetropolitan or regional transportation. Growth of
the population of the region will result in changes in the pattern of distribution of
residential, comrnercial, and industrial uses of land and therefore in the patterns
of travel.
A comprehensive transportation study should include answers to the follow-
ing questions:
What are the solutions to transportation problems created by population
and economic growth? Will transportation facilities now under construction or
programmed meet these problems, including provision of the necessary terminal
facilities ? What combination of highway, transit and other facilities will comprise
an optimum transportation system to meet regional transportation needs ? Will
such a system encourage and serve desirable patterns of land-use and promote
desirable developrnent?
I, Objectives
The general objectuve of the study is to £ormulate a transportation plan as
part of a general development plan for the region. Since several transportation
systems are possible, depending on the character and form of development, the
purpose of analysis of transportation requirements is to determine which system
is best for a given regional land-use plan. Accomplishment of the land-use plan,
however, depends on an adequate transportation system. Generalized plans for
both land-use and transportation therefore are necessary for adoption of a final
regional development plan by legislative bodies of the counties and cities included
in the study area.
Specific objectives include the following:
1. Determination of a desirable pattern of regional land-use development.
Z. Formulation of a general plan relating mass transportation routes,
highways, and terminal facilities, in a system of major transportation corrido-~*s.
3. To provide information and a frame of reference for local planning
and construction programs within each of the political jurisdictions in the region.
4. Establishment of organization and procedures for a continuing program
of collection and analysis of data useful in land-use and transportation planning.
5. To formulate functional plans for interregiona! highways, mass
transportation routes, and other forms of transportation rather than design of
specific facilities. Standards should be recomrnended, howe~zer; in order to
attain uniformity between local areas.
6. Estimate total costs of a!ternat[ve transportation systems and a
schedule of costs for successive stages of development which will serve as a
basis for construction programs.
II. Scope of the Study
The study area will include King, Kitsap. Pierce, and. Snohornish counties:
Major emphasis of the study should be devoted to the regional network, especially
in the more urbanized areas where transportation problerns are n'xost critical.
Because of anticipated population and economic growth, other sections of these
counties may be expected to become urbanized and therefore should be included
in the study.
III. General Procedures
In order to meet the objectives of the study, the following general
procedures are considered essential:
1. Preparation of specifications for collection and analysis of data
and for land-use and transportation planning. These specifications should
be approved by local agencies, the Department of Highways, and the Bureau of
Public Roads.
2. Employment of a study director who will select and organize a staff
to include the requisite professional skills in transportation planning, engineering,
traffic engineering, city and regional planning, administration, and da'fa collection
and processing.
--~,--
Collection and analysis of data in conformance with the detailed
specifications.
4. Formulation of several alternative concepts of regional develop-
ment.
5. ]Evaluation by cities and counties of these concepts and selection of
one or more for further study, including transportation planning.
6. Formulation and testing of alternative transportation plans, including
highways, transit, rail, air, water and terminal facilities.
7. Selection of a final regional development plan and transportation plan
by the legislative bodies of counties and cities included in the study area.
8. Formulation of a long-range program of facilities which will be
required in order to maintain the highest degree of accommodation for traffic
anticipated during successive stages of regional development.
9. Recommendation of organization and procedures for a continuing
program of more detaited planning at the local level.
IV. Organization
The Washington State Department of Highways will be responsible for
administration of the study, including control of quality and quantity of work in
accordance with the specifications and with regulations of the Bureau of Public
Roads.
The Puget Sound Governmental Conference will be responsible for co-
ordinating efforts toward agreement on decisions required of county and city
legislative bodies and for keeping them informed on progress of the study. The
Puget Sound Regional Planning Council will be responsible for review of proposed
regional land-use plans and for recommendations to the Governmental' Conference
and to local planning commissions.
The Technical Committee, to be composed of city and county engineers,
city and county planning directors, and representatives of public transit agencies
will be responsible for review of specifications and all work on the study, including
land-use, origin-destination survey, and the testing of proposed transportation
systems. The Technical Committee will advise the Governmental Conference
on matters related to the study.
The study director will be responsible for administration of the staff in
accomplishing objectives of the study. The director will be responsible for
periodic reports to and consultation with the Governmental Conference and the
Technical Committee.
--3--
Local technical and citizen advisory committees will be the responsibility
of local governmental units.
V. Financing the Study
Total cost of the three-year study will be $700,000 of which $175,000
will be contributed by the four counties and metropolitan areas in the region.
The remainder of $5Z5,000 will be provided by the Washington State Highway
Commission from Federal Highway Planning and Research Funds. Local
contributions will be made through resolutions authori~.ing withholding of state
fuel tax allocations according to a schedule convenient to the counties and cities.
Withholding installments will be completed before ~une 30, 1963.
The following distribution of local contributions has been estimated by
the Puget Sound Governmental Conference subject to agreement by participating
agencies:
Share Total Study Cost .Av. er.~ge Yearly Cost
Seattle-King County 6Z% $108,500 $ 36,167
Tacoma-Pierce County Z3°~o 40,250 13,416
Everett=Snohomish County 9~/0 15,750 5,250
Bremerton-Kitsap County 6% 10,500 3,500
$175,ooo $~8,3z3
-4-