HomeMy WebLinkAbout1427 ~EAS, the City of Bremerton has rev~ewed the work accomplished
under its comprehensive street construction program and determined current
city street needs, and
~R~REAS, the City Council caused to be prepared, a revised and
extended six year comprehensive street construction program for the
period January l, 1970 to January l, 1975, and, after public hearing
thereon approved the same at such hearing August 27, 1969, now therefore,
be it
RESOLVED that the revised and extended six year comprehensive
street construction program and schedule therefore (a copy of which is
attached hereto and incorporated herein by reference) be and the same
hereby is adopted as the revised and extended six year comprehensive street
construction program for the period January l, 1970 to January l, 1975.
PASSED by the City Council of the City of Bremerton, signed by
the Mayor and attested by the City Clerk in authentication of such passage
ATTEST:
~L~- City Clerk
SA- 1
HEARING DATE
8/27/69
SIX yEAR CONSTRUCTION PROGRAM
ADOPTION DATE 9/3/69 RESOLUTION NO. 1427
1 of 3
( COUNTY )
(CITY) , Bremsrton; Wash.
ITEM OF STREET A B R
Burwell St/Washington Ave ~ Gr; Dr; Curb; Swk; Pave 0.33 667,800 667~800
Phase 4 (-)
Pacific Ave/lst St [ Dr; Curb; Swk; Pave 0.30 243,356 243,356
Connection to Freeway [ Feasibility & Location Study - 50,000 50,000
Perry Ave [ Dr; Curb; Pave 0.20 30,000 30,000
(Holman St to Stone Way]
' Pine Road ! [ Gr; Dr; Curb; Pave 0.80 210,775 210,775
(Sheridan Rd to N City
~ Trenton Ave [ Gr; Dr; Curb; Swk; Pave 0.70 100,387 100,387
(E. 16th to Stone Way)
High Ave/15th St Gr; Dr; Curb; Swk; Pave 1.10 329,300 329,300
( h.Ave: llth to 15thl (5O' R.O.W.)
(15th. High to Corbet
. Naval Avenue [ i Curb; Swk; Pave 0.30 104,600 104,6OO
(lst St to 6th St)
' E. 16th Gr; Dr; Curb; Swk; Pave 0.50 151,000 151, O00
(~neaton Way to i (50' R.O.W.)
Trenton Ave)
~ ~ Dr; Curb; Swk; Pave 0.20 49,000 49,000
1~ High Ave 17th) (50' R.O.W. )
(! tn to
Aug. 27, 1569
SA- 1
HEARING DATE 8/27/69
SIX yEAR CONSTRUCTION PROGRAM
'197o-1975
ADOPTION DATE RESOLUTION NO.
(COUNTY)
(CITY)
LOCAL NAME
OF
ROAD OR STREET
St
(Ohio Ave to High Ave)
Shorewood Drive
(Kitsap Way to Old
N.A'D. Gate)
Naval Ave
(~t~ st to 15th st)
Stewart Rd/Phillips Ave
(Stewart from Sheridan
to Dibb to Phillips
Phillips to Sylvan W~
Almira Drive
(Sylvan Way to
Winfield Ave/E 24th St
(Winfield from Wheaton
Way to Highlands to
E. 24th to Perry Ave)
4th Street
(Park to Washington)
5th Street
(Park to Washington)
OR
STREET
NO.
TYPE OF WORK
Curb; Swk; Pave
(~o, R.o.w.)
Gr; Dr; Curb; Swk: Pave
(5o' R.o.w.)
Curb; Swk; Pave
(50' R.o.w. )
Gr; Dr; Curb; Swk: Pave
Gr; Dr; Swk; Pave
Gr; Dr; Swk; Pave
Dr; Overlay
Dr; Overlay
LENGTH
IN
MILES
0.20
O. 70
0.30
0.20
O. 70
O. 80
0.30
0.30
14,50o
COST ESTIMATE
19'71
32,000
i73,322
1972-19~
95,000
68,200
109,040
225,000
TOTAL
32,000
173,322
68,200
109,040
225,000
SA- 1
SIX YEAR CONSTRUCTION PROGRAM
HEARING DATE ~ ADOPTION DATE RESOLUTION NO.
(COUNTY)
(CITY)
NO. ROAD OR STREET NO. C A TYPE OF WORK I MILES ~1970 197! 197~ .I 1972-19~' TOTAL
19 Marion Aven~e/Adele Ave Gr; Dr; Curb; Swk; Pave 0.80 101,250 101,250
(Kitsap Way to Arsenal
way)
20 Ohio Avenue Gr; Dr; Curb; 'Swk; Pave 0.;40 ' 63,100 63,100
(llth to 17th)
:1 Farragut Street Realign; R.OJ^T.; Or; Dr; Curb; O.!O 56,1OO 56,1OO
(Cambrian to Summit Ave ) ! Swk; Pave .-
'.2 Snyder Avenue R.O.W.; Gr; Curb; Swk; Pave 0.50
(15th to 24th) ' · (50' R,O.~.) I 102,3OO 102,3OO
i: 3 Rickey Road Gr; Dr; Curb; Pave 0,23 50,000 50,000
(Sheridan Rd to E 31st ;t)
~4 E.(3~lset RS~ Gr: Dr; Crub; Swk; Pave O.17 140,0OO 40,000
to McClain A R.O.W.