Loading...
HomeMy WebLinkAbout1427 ~EAS, the City of Bremerton has rev~ewed the work accomplished under its comprehensive street construction program and determined current city street needs, and ~R~REAS, the City Council caused to be prepared, a revised and extended six year comprehensive street construction program for the period January l, 1970 to January l, 1975, and, after public hearing thereon approved the same at such hearing August 27, 1969, now therefore, be it RESOLVED that the revised and extended six year comprehensive street construction program and schedule therefore (a copy of which is attached hereto and incorporated herein by reference) be and the same hereby is adopted as the revised and extended six year comprehensive street construction program for the period January l, 1970 to January l, 1975. PASSED by the City Council of the City of Bremerton, signed by the Mayor and attested by the City Clerk in authentication of such passage ATTEST: ~L~- City Clerk SA- 1 HEARING DATE 8/27/69 SIX yEAR CONSTRUCTION PROGRAM ADOPTION DATE 9/3/69 RESOLUTION NO. 1427 1 of 3 ( COUNTY ) (CITY) , Bremsrton; Wash. ITEM OF STREET A B R Burwell St/Washington Ave ~ Gr; Dr; Curb; Swk; Pave 0.33 667,800 667~800 Phase 4 (-) Pacific Ave/lst St [ Dr; Curb; Swk; Pave 0.30 243,356 243,356 Connection to Freeway [ Feasibility & Location Study - 50,000 50,000 Perry Ave [ Dr; Curb; Pave 0.20 30,000 30,000 (Holman St to Stone Way] ' Pine Road ! [ Gr; Dr; Curb; Pave 0.80 210,775 210,775 (Sheridan Rd to N City ~ Trenton Ave [ Gr; Dr; Curb; Swk; Pave 0.70 100,387 100,387 (E. 16th to Stone Way) High Ave/15th St Gr; Dr; Curb; Swk; Pave 1.10 329,300 329,300 ( h.Ave: llth to 15thl (5O' R.O.W.) (15th. High to Corbet . Naval Avenue [ i Curb; Swk; Pave 0.30 104,600 104,6OO (lst St to 6th St) ' E. 16th Gr; Dr; Curb; Swk; Pave 0.50 151,000 151, O00 (~neaton Way to i (50' R.O.W.) Trenton Ave) ~ ~ Dr; Curb; Swk; Pave 0.20 49,000 49,000 1~ High Ave 17th) (50' R.O.W. ) (! tn to Aug. 27, 1569 SA- 1 HEARING DATE 8/27/69 SIX yEAR CONSTRUCTION PROGRAM '197o-1975 ADOPTION DATE RESOLUTION NO. (COUNTY) (CITY) LOCAL NAME OF ROAD OR STREET St (Ohio Ave to High Ave) Shorewood Drive (Kitsap Way to Old N.A'D. Gate) Naval Ave (~t~ st to 15th st) Stewart Rd/Phillips Ave (Stewart from Sheridan to Dibb to Phillips Phillips to Sylvan W~ Almira Drive (Sylvan Way to Winfield Ave/E 24th St (Winfield from Wheaton Way to Highlands to E. 24th to Perry Ave) 4th Street (Park to Washington) 5th Street (Park to Washington) OR STREET NO. TYPE OF WORK Curb; Swk; Pave (~o, R.o.w.) Gr; Dr; Curb; Swk: Pave (5o' R.o.w.) Curb; Swk; Pave (50' R.o.w. ) Gr; Dr; Curb; Swk: Pave Gr; Dr; Swk; Pave Gr; Dr; Swk; Pave Dr; Overlay Dr; Overlay LENGTH IN MILES 0.20 O. 70 0.30 0.20 O. 70 O. 80 0.30 0.30 14,50o COST ESTIMATE 19'71 32,000 i73,322 1972-19~ 95,000 68,200 109,040 225,000 TOTAL 32,000 173,322 68,200 109,040 225,000 SA- 1 SIX YEAR CONSTRUCTION PROGRAM HEARING DATE ~ ADOPTION DATE RESOLUTION NO. (COUNTY) (CITY) NO. ROAD OR STREET NO. C A TYPE OF WORK I MILES ~1970 197! 197~ .I 1972-19~' TOTAL 19 Marion Aven~e/Adele Ave Gr; Dr; Curb; Swk; Pave 0.80 101,250 101,250 (Kitsap Way to Arsenal way) 20 Ohio Avenue Gr; Dr; Curb; 'Swk; Pave 0.;40 ' 63,100 63,100 (llth to 17th) :1 Farragut Street Realign; R.OJ^T.; Or; Dr; Curb; O.!O 56,1OO 56,1OO (Cambrian to Summit Ave ) ! Swk; Pave .- '.2 Snyder Avenue R.O.W.; Gr; Curb; Swk; Pave 0.50 (15th to 24th) ' · (50' R,O.~.) I 102,3OO 102,3OO i: 3 Rickey Road Gr; Dr; Curb; Pave 0,23 50,000 50,000 (Sheridan Rd to E 31st ;t) ~4 E.(3~lset RS~ Gr: Dr; Crub; Swk; Pave O.17 140,0OO 40,000 to McClain A R.O.W.