Loading...
HomeMy WebLinkAbout2903 RESOLUTION NO. ~ 07 A RESOLUTION of the City Council of thc City of Bremerton, Washington, adopting the 2004 - 2009 Six Year Transportation Improvement Plan. WHEREAS, after proper notice, the City Council of the City Of Bremerton held a public hearing at the regular meeting of the City Council at 5:30 p.m. on July 16, 2003, to consider public testimony on the City's proposed 2004 - 2009 Six Year Transportation Improvement Plan and, having considered public testimony to the Plan and in accordance with the provisions of RCW 47.80; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. The 2004 through 2009 Six Year Transportation Improvement Plan, set forth in Exhibit "A" attached hereto and herewith filed with the City Clerk, is horeby adopted. SECTION2. Severability. If any one or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect. SECTION3. Effective Date. This Resolution shall take effect and be in force immediately upon its passage. PASSED by the City Council of the City of Bremerton, Washington this~tl:~ day of ~d~.,~, 2003 CAROL AP, ENDS, Council President APPROVED AS TO FORM: ATTEST: ~/R~ GE R~ L~'~O VICH,-~Ci~n~ KA~I-~LEEN MCCLUSKEY, CiW/~lerk 1 Six Year Transportation Plan ATTACHMENT B - Supplemental Information July 22, 2003 AGENDA BILL - 2004-2009 SIX YEAR TRANSPORTATION IMPROVEMENT PLAN The following provides additional clarifying information regarding several of the projects contained in the City of Bremerton 2004-2009 Six-Year Transportation Improvement Plan (TIP): 1. Downtown Pedestrian/BTC Access Improvements This project's inclusion in the 6-year TIP is a necessary step in qualifying and securing funding for the project to allow studies and design to proceed. The source of the City's match for all phases of the project has been identified as the Ferry Toll Match funds administered by WSDOT. With this commitment, no City funds will be required to satisfy the project match requirements. As a contingency, various other funding sources are being examined including Transportation Improvement Board (TIB) funds. Additional discussion with the City Council on this issue is continuing. 2. Warren Ave. Off-Ramp The project is included as a key transportation element in the "Harrison District Plan", which was adopted by Ordinance #4572, effective 10/30/96, and incorporated into the Bremerton Comprehensive Plan. The primary project objective, as identified in the plan, is to improve access to the Harrison District, with a focus on improving emergency access to Harrison Hospital. The Plan was adopted with significant input from the public and key stakeholders including Bremerton Fire and Rescue. In response to a City Council inquiry, the Department of Public Works is estimating anticipated traffic volumes on the proposed ramp, and is assessing the effects of this traffic on existing driveway access to Callahan Drive. The results of this analysis will be provided to the City Council by August 31, 2003. The Department is available to present this information at Council District meetings. 3. State/Burweil Pedestrian Issues The Department of Public Works and Utilities will commission a study in 2004 by an independent consultant to examine pedestrian and safety issues at the intersection of State Street and Burwell Street. The study will include an analysis of existing signage, traffic and pedestrian operations, and will include recommendations on what, if any, engineering improvements can be made to the intersection. The study is expected to cost $5,000- $10,000. Although not specifically identified in the TIP, this study will be included in the "Miscellaneous" planning and budget line item.