Loading...
HomeMy WebLinkAbout2562 RESOLUTION NO. 2562 1997-2002 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, THE CITY OF BREMERTON has reviewed the work accomplished under its Comprehensive Arterial Street Construction Program and determined current City Street Needs, and WHEREAS, the City Council caused to be prepared a revised and extended Six-Year Transportation Improvement Program for the period January 1, 1997 to December 31, 2002, and after public hearing thereon approved the same at such hearing September 18, 1996 now therefore, BE IT RESOLVED that the revised and extended Six-Year Transportation Improvement Program 1997 to 2002 attached hereto as Exhibit A and Schedule is hereby adopted as the revised and extended Six-Year Transportation Improvement Program for the period January 1, 1997 to December 31, 2002· PASSED by the City Council of the City of Bremerton this 18th day of September, 1996 JOHN LAW, Council President APPROVED this 20 day of Spt, 1996. LYNN S. HORTON, Mayor ATTEST: KATHLEEN L. McCLUSKEY, City Clerk Approved as fto Form: IAN SIEVERS, City Attorney 96614 1997-2002 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM s~Y CHANGES TO THE PLAN INCLUDE: Kitsap Way reconstruction, Weslon Place to Auto Center Way - delayed fi.om 1996 to 1997 due to securing additional funding with the Transportation Improvement Board. l l th Street reconstruction, Chester Avenue to Warren Avenue - is finishing up and the final paperwork may continue into early next year. Rodgers Road construction, Kean to Auto Center Way - this is part of the Economic Development Grant and is scheduled to start construction in 1997. Overlay and Maintenance - This project has been added to address city-wide arterial streets and will be prioritized by the City's Pavement Management System. MSS\bak 96633 Six Year Transportation Improvement Program In Order by County, Agency, City, TIP Year Priority, Funding Status Projects seperated by County, Agency Printed 09/10/1996 MPO : ALL Agency : Bremerton County : Kitsap County Six Year Transportation Improvement Program 1997 to 2002 (Project Costs in Thousands of Dollars) Hearing Date Adoption Date Resolution Number Phase Data Func Project Imp Total Util Start Federal RAP,etc. Local/ ¢l Pri identification Type Length Codes Date Fund Code Cost Code Cost State Total City Bremerton 01 4.000 I T o l Funding Secured Revision: 0 14 1 SR3/SR304GORSTTO BREMERTON T.I.P. BREMERTON FERRY TERMINAL cay 14 2 City 14 3 GORST HOV IMPROVEMENTS/RECONSTRUCTION OF THE CORRIDOR Expenditure Schedule (Local Agency Use) let 2nd 3rd 4th-6th PE 880 500 150 0 RW 3,000 3,243 2,982 2,386 CN 1,700 2,5(X) 1,573 0 PE 111997 STP 675 0 0 675 RW 111997 STP(C) 657 0 0 657 CN 111997 STP(C) 4,370 0 0 4,370 ALL 1/1997 0 UATA 8,640 0 8,640 ALL 1/1997 0 1,164 0 1,164 ALL 111997 0 COUN 500 0 500 ALL 1/1997 0TRANS 250 0 250 ALL 1/1997 0 0 490 490 PROJECT TOTAL 5,702 10,554 490 16,746 Bremerton 06 0.190 I I Funding Secured 11TH STREET RECONSTRUCTION CHESTER AVENUE TO WARREN AVE RECONSTRUCT AND STABILIZE ROADWAY 01 0 0 PROJECT TOTAL 0 Total 5,580 6,2~ 4,706 2,386 Revision: 0 0 0 0 0 0 0 Bremerton 06 0.240 ~G P T ] Funding Secured KITSAP WAY RECONSTRUCTION WESLON PLACE TO AUTO CENTER WAY PAVING, C&G, SIGNAL, CHAN., DRAIN, SIDEWALK PE 1/1997 STP 46 TIA 9 CN 111997 STP 410 TIA 62 CN 1/1997 0 UATA 385 CN 111997 0 0 PROJECT TOTAL 456 456 Revision: 0 0 55 0 472 0 385 53 53 53 965 PE 0 0 0 0 RW 0 0 0 0 CN 10 0 0 0 Total 10 0 0 0 PE 55 0 0 0 RW 0 0 0 0 CN 910 0 0 0 Total 965 0 0 0 Utilities Legend I G Gas P Power T Telephone O Other C Cable TV S Sewer W Water 6YRTIP.FRX SAN Rev: 2.19a 7/18/96 Form Rev Date: 06/03/96 MPO : ALL Agency : Bremerton County : Kitsap County Six Year Transportation Improvement Program 1997 to 2002 (Project Costs in Thousands of Dollars) Hearing Date Adoption Date Resolution Number Func CI City 14 4 c~y 19 5 c~y 14 6 City 14 7 Project Imp Total Util Start Federal Identification Type Length Codes Date Fund Code Bremerton 07 0.500 I SYLVAN WAY RESURFAClNG OLYMPUS DRIVE TO WHEATON WAY RESURFACE CN 111997 0 PROJECT TOTAL 0 Phase Data RAP,etc. Local/ Cost Code Cost State Total Revision: 0 Funding Secured 1~ 12 ~2 1~ 12 ~2 Expenditure Schedule (Local Agency Use) let 2nd 3rd ~h-6~h Brernerton 01 0.210 ~G P T I Funding Secured 0 RODGERS ST KEAN ST TO AUTO CENTER WAY CONSTRUCTION OF A PAVED ROAD WITH ADEQUATE STORM DRAINAGE PE 111997 0 PROJECT TOTAL 0 Revision: 0 2O 0 2O Brernerton 01 0.210 I T I Planning Purposes Revision: WARREN AVENUE OFFRAMP SHERIDAN ROAD TO CALLAHAN DRIVE CONSTRUCT NEW OFF RAMP PE 111997 FAUS 123 0 0 PROJECT TOTAL 123 0 0 Bremerton 06 0.475 I C P T I Subject to Selection Revision: WERNER RD/LOXlE EAGANS BLVD. IMPROV. UNION AVE TO NATIONAL AVE IMPROVEMENTS TO STREET INCL. WIDENING, ACCESS CONTROL, TRAFFIC SIGNALIZATION, AND CHANNELIZATION; PEND. STUDY RESULTS PE 1/1997 0 0 36 CN 111998 0 0 355 PROJECT TOTAL 0 0 391 PE 40 0 0 0 RW 0 0 0 0 CN 232 0 0 0 Total 272 0 0 0 27 0 0 0 169 0 0 0 149 80 0 0 345 80 0 0 2O 0 0 0 0 0 0 0 0 400 0 0 20 400 0 0 15 0 0 15 21 0 138 159 0 0 217 217 PE RW CN Total 2O PE RW CN Total 123 123 PE RW CN Total 36 355 391 0 0 0 0 Utilities Legend Gas P Power T Telephone Cable TV S Sewer W Water O Other 6YRTIP.FRX SAN Rev: 2.19a 7/18/96 Form Rev Date: 06/03/96 MPO : ALL Agency .. Bremerton County : Kltsap County Six Year Transportation Improvement Program 1997 to 2002 (Project Costs in Thousands of Dollars) Resolution Number o~/~o/~ Pa§e Func Cl Pri c~y c~y 16 9 c~ 14 10 Phase Data RAP,etc. Cost Code Cost Project Imp Total Util Start Federal Local/ Identification Type Length Codes Date Fund Code State Total Bremerton 12 0.000I I Planning Purposas Revision: 0 MAINTENANCE PROJECTS CITY WIDE (EAST AND WEST) SAFETY, NON-MOTORIZED, TDM, EMERGENCY, & LOCAL PROGRAM SUPPORT (PER PMS) PE 111997 0 0 300 CN 111997 0 0 600 PROJECT TOTAL 0 0 900 Expenditure Schedule (Local Agency Use) 1st 2~d 3rd 4th-6th Bremerton 06 0.500 I t Funding Secured OVERLAY & MAINTENANCE ARTERIAL STREETS CITY WIDE OVERLAY, CURB, GUTTER, AND SIDEWALK. SELECTION WILL BE MADE UTILIZING CITY PMS. PE 1/1997 0 0 10 CN 111997 0 0 65 PROJECT TOTAL 0 0 75 Revision: 0 PE RW CN Total 10 65 75 PE 50 5O 50 150 RW 0 0 0 0 CN 100 100 100 300 Total 150 150 150 450 Bremerton 31 0.000 I C P T t Planning Purposes Revision: SR303 CORRIDOR SR303 WARREN AV BRIDGE TO BROWNSVILLE HVVY MAJOR INVESTMENT STUDY ALL 1 / 1997 0 0 CN 1/1997 0 0 PE 111997 0 0 PROJECT TOTAL 0 0 10 10 10 10 10 10 30 3O 10 10 10 30 0 0 0 0 65 65 65 195 75 75 75 225 PE 0 0 0 0 RW 0 31 14 0 CN 0 0 0 0 Total 0 31 14 0 TOTAL for the Agency of Bremerton 6,281 11,160 2,081 19,522 TOTAL for the County of Kitsap County 6,281 11,160 2,081 19,522 GRAND TOTAL 6,281 11,160 2,081 19,522 7,432 7,138 5,161 3,061 Utilities Legend G Gas P Power T Telephone O Other C Cable TV S Se~er W Water 6YRTIP.FRX s/w Rev: 2.19a 7/18/96 Form Rev Date: 06/03196