HomeMy WebLinkAbout2562 RESOLUTION NO. 2562
1997-2002 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
WHEREAS, THE CITY OF BREMERTON has reviewed the work accomplished under
its Comprehensive Arterial Street Construction Program and determined current City Street
Needs, and
WHEREAS, the City Council caused to be prepared a revised and extended Six-Year
Transportation Improvement Program for the period January 1, 1997 to December 31, 2002, and
after public hearing thereon approved the same at such hearing September 18, 1996 now
therefore,
BE IT RESOLVED that the revised and extended Six-Year Transportation Improvement
Program 1997 to 2002 attached hereto as Exhibit A and Schedule is hereby adopted as the
revised and extended Six-Year Transportation Improvement Program for the period January 1,
1997 to December 31, 2002·
PASSED by the City Council of the City of Bremerton this 18th day of September, 1996
JOHN LAW, Council President
APPROVED this 20 day of Spt, 1996.
LYNN S. HORTON, Mayor
ATTEST:
KATHLEEN L. McCLUSKEY, City Clerk
Approved as fto Form:
IAN SIEVERS, City Attorney
96614
1997-2002 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
s~Y
CHANGES TO THE PLAN INCLUDE:
Kitsap Way reconstruction, Weslon Place to Auto Center Way - delayed fi.om 1996 to
1997 due to securing additional funding with the Transportation Improvement Board.
l l th Street reconstruction, Chester Avenue to Warren Avenue - is finishing up and the
final paperwork may continue into early next year.
Rodgers Road construction, Kean to Auto Center Way - this is part of the Economic
Development Grant and is scheduled to start construction in 1997.
Overlay and Maintenance - This project has been added to address city-wide arterial
streets and will be prioritized by the City's Pavement Management System.
MSS\bak
96633
Six Year Transportation Improvement Program
In Order by County, Agency, City, TIP Year Priority, Funding Status
Projects seperated by County, Agency
Printed 09/10/1996
MPO : ALL
Agency : Bremerton
County : Kitsap County
Six Year Transportation Improvement Program
1997 to 2002
(Project Costs in Thousands of Dollars)
Hearing Date
Adoption Date
Resolution Number
Phase Data
Func Project Imp Total Util Start Federal RAP,etc. Local/
¢l Pri identification Type Length Codes Date Fund Code Cost Code Cost State Total
City Bremerton 01 4.000 I T o l Funding Secured Revision: 0
14 1 SR3/SR304GORSTTO BREMERTON T.I.P.
BREMERTON FERRY TERMINAL
cay
14 2
City
14 3
GORST
HOV IMPROVEMENTS/RECONSTRUCTION OF THE CORRIDOR
Expenditure Schedule
(Local Agency Use)
let 2nd
3rd 4th-6th
PE 880 500 150 0
RW 3,000 3,243 2,982 2,386
CN 1,700 2,5(X) 1,573 0
PE 111997 STP 675 0 0 675
RW 111997 STP(C) 657 0 0 657
CN 111997 STP(C) 4,370 0 0 4,370
ALL 1/1997 0 UATA 8,640 0 8,640
ALL 1/1997 0 1,164 0 1,164
ALL 111997 0 COUN 500 0 500
ALL 1/1997 0TRANS 250 0 250
ALL 1/1997 0 0 490 490
PROJECT TOTAL 5,702 10,554 490 16,746
Bremerton 06 0.190 I I Funding Secured
11TH STREET RECONSTRUCTION
CHESTER AVENUE TO WARREN AVE
RECONSTRUCT AND STABILIZE ROADWAY
01 0 0
PROJECT TOTAL 0
Total 5,580 6,2~ 4,706 2,386
Revision: 0
0 0 0
0 0 0
Bremerton 06 0.240 ~G P T ] Funding Secured
KITSAP WAY RECONSTRUCTION
WESLON PLACE TO AUTO CENTER WAY
PAVING, C&G, SIGNAL, CHAN., DRAIN, SIDEWALK
PE 1/1997 STP 46 TIA 9
CN 111997 STP 410 TIA 62
CN 1/1997 0 UATA 385
CN 111997 0 0
PROJECT TOTAL 456 456
Revision: 0
0 55
0 472
0 385
53 53
53 965
PE 0 0 0 0
RW 0 0 0 0
CN 10 0 0 0
Total 10 0 0 0
PE 55 0 0 0
RW 0 0 0 0
CN 910 0 0 0
Total 965 0 0 0
Utilities Legend I
G Gas P Power T Telephone O Other
C Cable TV S Sewer W Water
6YRTIP.FRX SAN Rev: 2.19a 7/18/96 Form Rev Date: 06/03/96
MPO : ALL
Agency : Bremerton
County : Kitsap County
Six Year Transportation Improvement Program
1997 to 2002
(Project Costs in Thousands of Dollars)
Hearing Date
Adoption Date
Resolution Number
Func
CI
City
14 4
c~y
19 5
c~y
14 6
City
14 7
Project Imp Total Util Start Federal
Identification Type Length Codes Date Fund Code
Bremerton 07 0.500 I
SYLVAN WAY RESURFAClNG
OLYMPUS DRIVE TO WHEATON WAY
RESURFACE
CN 111997 0
PROJECT TOTAL 0
Phase Data
RAP,etc. Local/
Cost Code Cost State Total
Revision: 0
Funding Secured
1~ 12 ~2
1~ 12 ~2
Expenditure Schedule
(Local Agency Use)
let 2nd
3rd
~h-6~h
Brernerton 01 0.210 ~G P T I Funding Secured
0 RODGERS ST
KEAN ST TO AUTO CENTER WAY
CONSTRUCTION OF A PAVED ROAD WITH ADEQUATE STORM DRAINAGE
PE 111997 0
PROJECT TOTAL 0
Revision:
0 2O
0 2O
Brernerton 01 0.210 I T I Planning Purposes Revision:
WARREN AVENUE OFFRAMP
SHERIDAN ROAD TO CALLAHAN DRIVE
CONSTRUCT NEW OFF RAMP
PE 111997 FAUS 123 0 0
PROJECT TOTAL 123 0 0
Bremerton 06 0.475 I C P T I Subject to Selection Revision:
WERNER RD/LOXlE EAGANS BLVD. IMPROV.
UNION AVE TO NATIONAL AVE
IMPROVEMENTS TO STREET INCL. WIDENING, ACCESS CONTROL, TRAFFIC SIGNALIZATION, AND
CHANNELIZATION; PEND. STUDY RESULTS
PE 1/1997 0 0 36
CN 111998 0 0 355
PROJECT TOTAL 0 0 391
PE 40 0 0 0
RW 0 0 0 0
CN 232 0 0 0
Total 272 0 0 0
27 0 0 0
169 0 0 0
149 80 0 0
345 80 0 0
2O 0 0 0
0 0 0 0
0 400 0 0
20 400 0 0
15
0
0
15
21
0
138
159
0
0
217
217
PE
RW
CN
Total
2O
PE
RW
CN
Total
123
123
PE
RW
CN
Total
36
355
391
0
0
0
0
Utilities Legend
Gas P Power T Telephone
Cable TV S Sewer W Water
O Other
6YRTIP.FRX SAN Rev: 2.19a 7/18/96 Form Rev Date: 06/03/96
MPO : ALL
Agency .. Bremerton
County : Kltsap County
Six Year Transportation Improvement Program
1997 to 2002
(Project Costs in Thousands of Dollars)
Resolution Number
o~/~o/~
Pa§e
Func
Cl Pri
c~y
c~y
16 9
c~
14 10
Phase Data
RAP,etc.
Cost Code Cost
Project Imp Total Util Start Federal Local/
Identification Type Length Codes Date Fund Code State Total
Bremerton 12 0.000I I Planning Purposas Revision: 0
MAINTENANCE PROJECTS
CITY WIDE (EAST AND WEST)
SAFETY, NON-MOTORIZED, TDM, EMERGENCY, & LOCAL PROGRAM SUPPORT (PER PMS)
PE 111997 0 0 300
CN 111997 0 0 600
PROJECT TOTAL 0 0 900
Expenditure Schedule
(Local Agency Use)
1st 2~d
3rd
4th-6th
Bremerton 06 0.500 I t Funding Secured
OVERLAY & MAINTENANCE
ARTERIAL STREETS CITY WIDE
OVERLAY, CURB, GUTTER, AND SIDEWALK. SELECTION WILL BE MADE UTILIZING CITY PMS.
PE 1/1997 0 0 10
CN 111997 0 0 65
PROJECT TOTAL 0 0 75
Revision: 0
PE
RW
CN
Total
10
65
75
PE 50 5O 50 150
RW 0 0 0 0
CN 100 100 100 300
Total 150 150 150 450
Bremerton 31 0.000 I C P T t Planning Purposes Revision:
SR303 CORRIDOR
SR303 WARREN AV BRIDGE TO BROWNSVILLE HVVY
MAJOR INVESTMENT STUDY
ALL 1 / 1997 0 0
CN 1/1997 0 0
PE 111997 0 0
PROJECT TOTAL 0 0
10 10
10 10
10 10
30 3O
10 10 10 30
0 0 0 0
65 65 65 195
75 75 75 225
PE 0 0 0 0
RW 0 31 14 0
CN 0 0 0 0
Total 0 31 14 0
TOTAL for the Agency of Bremerton 6,281 11,160 2,081 19,522
TOTAL for the County of Kitsap County 6,281 11,160 2,081 19,522
GRAND TOTAL 6,281 11,160 2,081 19,522 7,432 7,138 5,161 3,061
Utilities Legend
G Gas P Power T Telephone O Other
C Cable TV S Se~er W Water
6YRTIP.FRX s/w Rev: 2.19a 7/18/96 Form Rev Date: 06/03196