HomeMy WebLinkAbout2379 RESOLUTION NO. 2379
RESOLUTION ACCEPTING PRELIMINARY PLAT OF DAILY GREEN PLAT
SUBDIVISION, BREMERTON, KITSAP COUNTY, WASHINGTON.
WHEREAS, pursuant to RCW 58.17 Hansco Inc., proponent for the
proposed subdivision, comprising 1.2 acres and located at 1529
Pennsylvania Avenue (west side of Pennsylvania Avenue, 215 feet
north of 15th Street) within the City of Bremerton, has made
application for approval of a preliminary plat containing nine
lots; and
WHEREAS, the Planning Commission held a public hearing
concerning this matter on August 20, 1991; and
WHEREAS, the Planning Commission recommends to the Council
that the Daily Garden Subdivision Preliminary Plat be accepted
subject to certain restrictions; and
WHEREAS, an environmental checklist has been prepared and
considered by the Responsible Official and a Determination of
Environmental Non-significance issued; and
WHEREAS, the Bremerton City Council held a public hearing on
February 26, 1992 concerning the above preliminary plat, and hereby
adopts the finance of the Planning Commission; now therefore
BE IT RESOLVED BY THE BREMERTON CITY COUNCIL
That the Daily Garden Subdivision Preliminary Plat presented
for approval is hereby accepted and approved subject to the
restrictions listed in Exhibit "A" (Daily Garden Preliminary Plat
Conditions). Property in the city limits of Bremerton included in
this Plat is described as follows:
Lots 14, 15, 16 and 17 of the Plat of Daily Garden Tracts as
recorded in Volume 4, at Page 11, records of Kitsap County,
Washington.
PASSED by the City Council this 26 day of February,
1992.
LYNN HORTON
President, City Council
APPROVED this 6 day of March, 1992.
LOUIS MENTOR, Mayor
ATTEST:
KATHLEEN L. McCLUSKEY
EXPFF~I37 *"A""
D/~Tt.y Ga%RX)]~ I~RN~.TM'mq]%I~Y l=J_a~T ~I'fI(J~S
A. Infrastructure:
1. Riaht-of-way:
The applicant/developer shall improve Pennsylvania Avenue
by placing an additional three feet of pavement along the
west side adjacent to the site, constructing an asphalt
berm, and constructing an eight-foot-wide gravel
shoulder.
The applicant/developer shall submit plans for
improvements to Pennsylvania Avenu~ including a concrete
sidewalk, to the City Engineer for review and approval.
The Final Plat shall show a dedication of five feet of
right-of-way along the portion of the subdivision
fronting on Pennsylvania Avenue.
2. Utilities:
The applicant/developer shall design and construct
underground utilities for water, sanitary sewer, gas,
cable TV, etc., subject to the review and approval of the
Bremerton Utilities Director and City Engineer.
3. Stormwater:
The applicant/developer shall design and construct a
fenced stormwater detention facility for stormwater to be
collected from the site prior to discharge into the
City's stormwater system on Pennsylvania Avenue. The
design will be subject to approval by the City Engineer
with input from the neighborhood with Mr. Musial as the
contact person.
The stormwater system must comply with all Washington
State laws applicable to CSO's as of the date of this
Resolution or the date of the building permit whichever
comes later.
4. Subdivision Desian:
The Final Plat shall be prepared by a licensed surveyor
showing distances and bearings for lots and rights-of-
way.