Loading...
HomeMy WebLinkAbout2379 RESOLUTION NO. 2379 RESOLUTION ACCEPTING PRELIMINARY PLAT OF DAILY GREEN PLAT SUBDIVISION, BREMERTON, KITSAP COUNTY, WASHINGTON. WHEREAS, pursuant to RCW 58.17 Hansco Inc., proponent for the proposed subdivision, comprising 1.2 acres and located at 1529 Pennsylvania Avenue (west side of Pennsylvania Avenue, 215 feet north of 15th Street) within the City of Bremerton, has made application for approval of a preliminary plat containing nine lots; and WHEREAS, the Planning Commission held a public hearing concerning this matter on August 20, 1991; and WHEREAS, the Planning Commission recommends to the Council that the Daily Garden Subdivision Preliminary Plat be accepted subject to certain restrictions; and WHEREAS, an environmental checklist has been prepared and considered by the Responsible Official and a Determination of Environmental Non-significance issued; and WHEREAS, the Bremerton City Council held a public hearing on February 26, 1992 concerning the above preliminary plat, and hereby adopts the finance of the Planning Commission; now therefore BE IT RESOLVED BY THE BREMERTON CITY COUNCIL That the Daily Garden Subdivision Preliminary Plat presented for approval is hereby accepted and approved subject to the restrictions listed in Exhibit "A" (Daily Garden Preliminary Plat Conditions). Property in the city limits of Bremerton included in this Plat is described as follows: Lots 14, 15, 16 and 17 of the Plat of Daily Garden Tracts as recorded in Volume 4, at Page 11, records of Kitsap County, Washington. PASSED by the City Council this 26 day of February, 1992. LYNN HORTON President, City Council APPROVED this 6 day of March, 1992. LOUIS MENTOR, Mayor ATTEST: KATHLEEN L. McCLUSKEY EXPFF~I37 *"A"" D/~Tt.y Ga%RX)]~ I~RN~.TM'mq]%I~Y l=J_a~T ~I'fI(J~S A. Infrastructure: 1. Riaht-of-way: The applicant/developer shall improve Pennsylvania Avenue by placing an additional three feet of pavement along the west side adjacent to the site, constructing an asphalt berm, and constructing an eight-foot-wide gravel shoulder. The applicant/developer shall submit plans for improvements to Pennsylvania Avenu~ including a concrete sidewalk, to the City Engineer for review and approval. The Final Plat shall show a dedication of five feet of right-of-way along the portion of the subdivision fronting on Pennsylvania Avenue. 2. Utilities: The applicant/developer shall design and construct underground utilities for water, sanitary sewer, gas, cable TV, etc., subject to the review and approval of the Bremerton Utilities Director and City Engineer. 3. Stormwater: The applicant/developer shall design and construct a fenced stormwater detention facility for stormwater to be collected from the site prior to discharge into the City's stormwater system on Pennsylvania Avenue. The design will be subject to approval by the City Engineer with input from the neighborhood with Mr. Musial as the contact person. The stormwater system must comply with all Washington State laws applicable to CSO's as of the date of this Resolution or the date of the building permit whichever comes later. 4. Subdivision Desian: The Final Plat shall be prepared by a licensed surveyor showing distances and bearings for lots and rights-of- way.