Loading...
HomeMy WebLinkAbout2467RESOLUTION NO. 2467 A RESOLUTION addressing City participation in Local Improvement Districts. WHEREAS, the City supports the use of Local Improvement Districts (LID) and Utility Local Improvement Districts (ULID) to fund improvements; and WHEREAS, a LID and ULID is a method of funding improvements wherein the property owners within the LID or ULID pay a fair share of the cost of the project based upon the benefit received; and WHEREAS, the City Council supports the formation of LIDs and ULIDs by funding costs associated with project administration and engineering design to the limit of available funding and as determined by a percentage of the project construction amount; now, therefore, BE IT RESOLVED by the City Council of the City of Bremerton: That Administrative Policy and Procedure regarding "City Participation in Local Improvement Districts" attached hereto and incorporated as Exhibit 'A" is hereby approved. PASSED by the City Council of the City of Bremerton on this 27th day of April, 1994. EILEEN FITZ Council: President EXHIBIT "A" CITY OF BREMERTON ADMINISTRATIVE POLICIES AND PROCEDURES SUBJECT: CITY PARTICIPATION IN LOCAL IMPROVEMENT DISTRICTS EFFECTIVE DATE: April 27, 1994 FILE UNDER SECTION: FINANCE APPROVED BY: Resolution #2467 1-17 1. PURPOSE: The City supports 'the use of Local Improvement Districts (LID) and Utility Local Improvement Districts (ULID) to fund improvements which the City cannot otherwise solely provide. Typical improvements may include: street or alley paving, street lighting, water, sewer or storm drainage extensions, sidewalk repairs, etc. 2. DEFINITION: A LID or ULID is a method of funding improvements, wherein property owners who benefit from improvements pay a fair share of the cost of the project. based upon the benefit received. All properties within an LID or ULID boundary are assessed their fair share. 3. CITY CONTRIBUTION: The City will support the formation of a LID or ULID by funding costs "'associated with the project administration and engineering design to the limit of available funding and the maximum percentages below: Project Construction Amount Maximum City Contribution as a Percentage of Project Construction Amount $ 0.00 - $ 50,000.00 $ 50,000.01 - $100,000.00 $100,000.01 - $500,000.00. Greater than $500,000.00 20% 18% 15% 12% The City may exceed the limits stated above where appropriate to address a City wide objective. The City will fund its fair share assessment for City property within any LID or ULID boundary. LID-ULID.PCY - Disk 9 - 4/1~/9~, i The City will maintain improvements financed through a LID or ULID. LID OR ULID CONTRIBUTION: The LID or ULID will finance all costs associated with the project not covered by the City, including, but not limited to: construction, right-of-way or land acquisition, construction inspection, environmental documentation, short term financing, bond sale, permit fees and City costs in excessof the maximum amounts specified in section 3. PETITION REVIEW: The petition, proposed district boundaries, estimated project costs and method of assessment must be reviewed and approved by the Mayor, City Engineer andCity Treasurer prior to circulation for signature. APPLICABILITY: The City support for a LID or a ULID is for existing development within the City limits. It is not intended for use in conjunction with any development project· LID-ULID.PCY - Disk 9 - 4/14/94 2