Loading...
HomeMy WebLinkAbout2479RESOLUTION 2479 1995-2000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, THE CITY OF BREMERTON has reviewed the work accomplished under its Comprehensive Arterial Street Construction Program and determined current City Street needs, and WHEREAS, the City Council caused to be prepared a revised and extended Six-Year Transportation Improvement Program for the period January 1, 1995 to December 31, 2000, and after public hearing thereon approved the same at such hearing September 7, 1994 now therefore, BE IT RESOLVED that the revised and extended Six Year Transportation Improvement Program 1995 to 2000 attached hereto as Exhibit A and schedule is hereby adopted as the revised and extended Six-Year Transportation Improvement Program for the period January 1, 1995 to December 31, 2000. PASSED by the City Council of the City of Bremerton this 7th day of September, 1994. SHERRIL HUFF-MENEES, President Bremerton City Council APPROVED this 12 day of Spt 1994. Lynn S. Horton, Mayor ATTEST: Kathleen L. McCluskey, City Clerk 1995-2000 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM SUMMARY CHANGES TO THE PLAN INCLUDE: 1. DELETION OF 11 COMPLETED PROJECTS. 2. KITSAP WAY RECONSTRUCTION, WESLON PLACE TO AUTO CENTER WAY DELAYED FROM 1994 TO 1995 DUE TO COORDINATING WITH STATE CONCERNING SR3 SOUTHBOUND OFFRAMP. 3. llTH STREET RECONSTRUCTION, CHESTER AVENUE TO WARREN AVENUE DELAYED FROM 1994 TO 1995 DUE TO STATE TIB FUNDS BEING UNAVAILABLE. NO NEW PROJECTS HAVE BEEN ADDED TO THE PLAN FOR THE FOLLOWING REASONS: THE CITY WIDE LEVEL OF SERVICE TRAFFIC STUDY CURRENTLY BEING CONDUCTED BY PARAMETRIX WILL RECOMMEND FUTURE PROJECTS AND PRIORITIES. THE ENGINEERING DIVISION IS INVESTIGATING A PAVEMENT MANAGEMENT SYSTEM. THIS WILL INCLUDE A RESURVEY OF THE EXISTING ROAD CONDITIONS WHICH WILL DRIVE THE PRIORITIZATION OF .THE LOCAL PROJECTS. THERE ARE ENOUGH LOCAL PROJECTS ON THE CURRENT LIST THAT SCHEDULING THESE PROJECTS WILL NOT BE AFFECTED. 94549 Year Transportation improvement Program Projects selected by County, Agency &/or MPO in Order by TIP YEAR & Priority Printed 09/01/i994 Ti~RPTi.FRX 0115 Six h.. transportation im rovemerit Program 09/01/1994 199~ to Page Hearing Date AdoptZon Dare Resolution I{umber MPO : AlL C:ty: Bremerton Counzy: Kitsap ProDerr Costs in Thousands of Dollars Func PrcDecr imp Total Ut~L Phase Data 21 Pri idenIiflca:non Type Length Codes Exnenditure Scheduie Passe Federal RAP,ere. Local/ (Local AGeE~t use) start Date Fund Code Cost Code Cost State Total is: 2nd 4th-dth AGenc}' BREMERTON 01 4.000 T 0 PE i50 150 i4 GORST TO BREI{ERTOI{ COI{NECTOR RW GORST TO BREERTO~ FERRY TER!iNAL ?oral 150 i50 CONSTRUCTION OF A CO~ECTGR ROAR PE 0i/:995 C~ 01/1995 TOTAL STP<C) 1.700 1,000 i,700 l,O00 2,700 0.240 G WESLO~ TC AUTO CENTER WAY FATliNG, C&G, SIGNAL, CHAIN., ~RAiN, SW PE 0i/i995 STP 46 R~ 01/2~95 C~ 01/1995 STP 410 TOTAL 456 9 PE RW CR Total E5 495 94 550 AteneE BRERERTO~ 07 0.500 14 j STLVA~ WAY OLTRPUS DRIVE TO WHEATOI{ WAY RESURFACE ?E 0i/1995 RW 01/1995 CN 0i/i995 TOTAL ?E RW C~ Total 10 148 148 i58 CENTRAL BUSii{ESS DiSTRiCT RW DOWNTOg BUSII{ESS AREA Total OI{E WAY TRAFFIC SYSTEM PE 50 50 RW CM TC. TAL 50 .=age i Ti'PRPTi.FR[ S~x h !ransportat~ou iaprovement Pro~ru ! 09/01/!994 IY~5 to ZOO0 Page 2 MPO : ALl City: Bremerton 0115 County: Kitsap Func Proiect imp Total Utzi :i Pr: !de~tifZcation Type ,en!~)seCode, Federal Start Date Fund Code Cost Bearing Date Adoption Date Resolution Mumbet Project Costs in Thousands of Dollars Phase Data Expendnure Schedule RAP,etc. Local/ (.ocal kUency Use} Code Cost State Total 1st 2rid 3rd 4th-Eth Aceucy BREMENTON 12 O.OOO PE 30 OO : CiTY WiDE LEVEL OF SERVICE TRAFFIC STUDY RW CiTY WiDE STUDY Total 3C ?E 01/1995 60 60 RW 01/1995 CN 0i/1995 TOTAL 60 WARRE~ AVENUE OFFRAMP- CN SBERiDA~ R~ TO CALLAHAN Total CONSTRUCT ~EW OFF RAMP PE 01/1995 STP(C) 18~ 37 220 RW 0i/1995 TOTAL 183 37 220 Agency BREMERTO~ 06 0.190 PE ~t ~ iiTR STREET CM CHESTER AVE TO WARREN AVE Total 88 RECONSTRUCT AND STABILIZE ROADWAY PE 01/1995 STF 28 7 RW' 0!/i995 CN 01/i995 STP 322 81 403 TOTAL 350 88 438 A~ency BREMERTOM 12 0.000 PE lO I0 !0 I0 Ou ~ NISC. TRAFFIC CONTROL DEVICES CM 20 20 20 20 CITYWiDE · tal 30 )0 30 30 UPGR & iNST'N OF MINOR TRAF CONTROL DEVICES PE 0i/i995 60 60 RW 01/1995 CN 0i/i995 120 ~20 TOTAL 180 Pa~e 2 TiPRPTi.FRX , Six ~,_. !ransportaUon ~a rovemerit ProGra~ MPO : All CountF: Eitsa~ Adoption Date Resolution Mumbet Projeu imp Total Uni idennf:cat~on Type Length Codes Phase Federal Start Date Fund Code Cost 09/01/i994 PaGe Project Costs in Thousands cf Dollars Func Phase Data C] Pri Expenditure Schedule RAP,etc. Local/ (Local AGency Use Code Cost State Total !st 2rid 3ro 4th-dth MiSC SIGNAL UPGRADES UPGRADE EXiSTiNG REPAIRS PE 01/1995 RW 01/1995 C! 0i/1995 90 90 TOTAL i20 120 CN i5 15 15 15 To:al 20 2[ 2C. 20 BRENERTON ]i 0.000 PE EMERGENCY STREET REPAIRS CN 17 17 CiTYWiDE Total PE 0./1995 RW 01/1995 CN 01/1995 i00 TOTAL iOC i00 MCCLAiN AVENUE RW CN CUL-DE-SAC TO E. 31ST Total REHABILATATiON & RECONSTRUCTION PE 01/1995 70 70 PE 01/!995 CN 01/1995 TOTAL 70 70 !enf{ RHNHRToN0.100 PE DORA AVENUE CN 6TH STREET TO 9TH STREET Total REHABiLATATiON AND RECONSTRUCTION PE 0i/1995 ~9 29 RW 0!/1995 CM 01/1995 TOTAL 19 19 Page T.~PRPT~.FRT. Siz t,_ ~ransportation h rovemerit Progral MP6 : All City: Bremenon 0i15 County: Kitsap Func Project lip Total CA Pn identificatio~ TDe Len!~seCo{es Federal Start Date Fund Code Cost Heanng Bate Adoption Date Resolution MumDot 09/01/1994 Page 4 Project Costs in Thousands of Dollars Phase Data Expenditure Schedule ~lP,etc. Local/ (uocal Agency Use) Code Cost S~ate Total Ist 2rid 3rd 4th-6th ~cen~ BREMERT0I~ 06 0.040 4TM STREET TO 5TE STREET REBABiLATATiOM PE RW Total ?E 0i/199! !5 30 Rf 02/199~ CE 01/1995 TOTAL 30 30 ACOR~ STREET OAK STREET TO ELI STREET Total REHABILHATiOK AND RECOMSTRUCTiON ?E 01/1995 30 Ri 0./1995 CM 0t/!995 TOTAL 30 3C BREIERTOM 06 6.240 PE WESTVIEW DRIVE C! PETERSViLE RD TO PETERSV!LLE RD Total REBABiLATATiO! A~D RECOMSTRUCTIOM PE 0i/1995 RW 0i/1995 CM 0i/1995 TOTAL 80 80 CRESTTIEW DIIVE BURCHFIELD STREET TO DEAD E~D Total REHABILATATIO! AMD RECOMSTRUCTiO! PE 0i/it95 RW 0i/i195 CN 01/i195 TOTAL 14 TfPRPTi.FRI Six ~,__ ~ransportatiou Im rovelent ProUram 09/0i/t994 Page 5 MPO : All City: Eremorton 0ii5 County: Kitsap iE Bearing Date · Adoption Date Resohtlon Number Proiec: Costs in Thousands of Dollars Func Project imp Total Ut~i Phase Data Ci Pri i'enUf:cation T e ~ yp Length Codes Expenditure Schedule Phase Federal RAP,etc. Local/ (Local AGency Use) Start DaTe Fund Code Cost Code Cost State Total Ist 2rid 3to 4th-6th l~enc[ BREKERTOM 06 0.140 PE i9 !~ A~DERSO~ STREET CB' OLYMPIC AVENUE TO BLOOEi~GTO~ AVEr'US REEAFiLATATiO~ A~D RZCONSTRUCTIO~ ?E 01/1995 54 54 R[ 0i/i995 C~ 0i/!995 TOTAL 54 54 Aeencv 3REMERTOM 06 0.030 PE 29 i[ ANDERSOM STREET RW CM RAiMiER AVEMUE TO HOUSTOM AVEMUE REHABiLATATIOM AMD RECO]STRUCTiOH P[ 0i/i995 RW 0111995 CM 0i/1995 TOTAL .... RODGEMS STREET W. CITY LIMITS TO CONSTITUTION AVENUE Total REHABiLATATIOM AND RECONSTRUCT!ON PE 02/1995 5 5 RW 01/1995 CN 0i/i995 TOTAL 5 5 RAttlER AVE~E CN RAiM!ER AVENUE TO HOUSTON Total REHABILATATIOM AND RECONSTRUCTION PE 01/t995 60 60 R{ 0!/1995 C~ 01/i995 TOTAL PaGe 5 TihPT~.FRX ~ Six Y~,, fransportation in roveaent Progran 09/01/1994 Page MPO : All City: Bremerton 01!5 County: K:tsap 18 Fuuc Pro~ct imp Total Utli :i Pr: idehtifica:ion Type Len!E~seCodes Federal Start ~ate Fund Code Cost Hearln~ Date Adoption Date Resoiutlon Number Pro]ec~ Costs :n Thouands o! Dollars Phase Data Expenditure Schedule RAP,etc. Local/ (bocai Agency Use} Code Cost State Total 1st 2rid ]rd 4th-dth lqency BRHERTO~ 06 0.250 ?E J 2~ PENKSYLVINiA AVENUE !STH STREE? TO VATER REHABiLITATiON ANE RECONSTRUCTION RW 01/1195 C~ 01/ii95 TOTAL 69 69 ieu ! SRZMERTON0.0 0 ,, LO~ER OYSTER BAY AVENUE CN KiTSAP WAY TO DEAD END Total iEEABILATIT20~ AND RECONSTRUCTION ?E 0i/1995 35 RW 01/i995 CN 0i/1995 TOTAL 35 35 Acency BRENERTON 06 0.070 PE l~ 2~ FAIllOUT STREET SUMMIT AVENUE TO CAMBRIAN AVENUE Total REHABiLITATiON AND RECONSTRUCTION PE 01/1996 26 26 R{ 0i/t996 CN 0i/1996 TOTAL 26 26 IenE{BRE,EtToN0.: 0 BUHELL STREET RN BRGENN AVENUE TO AUTO CENTER WAY Total REHABILITATION AND RECONSTRUCTION PE 01/i996 50 50 RW 01/1996 CN 01/1996 TOTAL 50 50 PaGe 6 irauspcrtation Improvement Program 09/01/1994 Pa,~e City: Eremet:on 0i15 Project Costs in Thousands el Dollars Passe Federal RAP,etc. Local/' Start Date Fund Code Cos~ Code Cost S~ate Tots] Adoption Date Resolution MurDer {Local A~enc 2rid ' .. 2 BURWELL STREET ~ATiOKAL AVENUE TC 5ERTEA AVENUE REHAELATATiON ANL EECO~STRUCTiO~ CN 0i/1996 TOTAL 29 29 Agensy BREMERTO~ 06 0.i50 PE WASEiMGTO~ AVENUE TO PACiFiC AVENUE To~al ?E 01/199~ 9~ 98 C~ TOTAL Acenov BEEERTO~ 06 0.120 PE 19 2~ 12TH STREET WASHiMGTO~ AVEM~E TO PACIFIC AVEN~E Total RERABiLATATIO! AND RECONSTRUCTiO~ Pl 0i/1996 55 55 ~i 01/!99[ CM 0i/1996 TOTAL 55 55 BREMERTO~ 06 0.090 PE 7T~ STREET ROOSEVELT AVENUE TO 5EWiTT AVENUE Total RE~ABiLATATiOM AE ~ECONSTRUCTiON PE 0i/1996 35 35 TOTAL 55 35 TIPRPTi.FRX six ~, ,'ransp}~atZon zm rovemerit Prqra,i 09/01/D94 5 to 20~0 Page 5earlno Date Adoptiofi Date Resolution Number NPO : All City: Bremerton 01i5 County: Kitsap 18 Pro3ect Costs in Thousands of Dcilars Func Proiec: imp Total UtiL Phase Data Ci Pri Identification Type~ ". * ' Ezpend~ture Schedule ~en!~Le~°nes Federal RXF,etc. Local/ (boca! AGency Use) Start Date Fund Code Cost Code Cost State Total ist 2rid 3re 4th-6th HATNARD AVENUE R; C~ EAST !gTH STREET TO E. iOTR STREET Total REHABiLATATiON AND RECONSTRUCTION PE 01/i996 25 25 R{ 01/1996 CN 01/i996 TOTAL 25 25 !!e I,RENERToNo6 0.060 ~ MARINE DRIVE PLACE RW CN LAUREL AVENUE TO MARINE DRIVE Total EEHAB!LATATiO~ AND RECONSTRUCTION PE 01/1996 25 25 R~ 0~/~99E CN 01/1996 TOTAL 25 25 . ALDER STREET RW CN TRENTON AVENUE TO GROVE AVENUE Total REHABiLATATiON AND RECO{STRUCTIO~ PE 0!/1996 4i 4i RW 0i/1996 CN 01/i996 TOTAL 4i 41 AMency BRENERTON 06 0.!20 PE i~ 3z RODGEMS STREET RW CN HARTFORD AVENUE TO CHBRiA! AVENUE Total REHABiLATATiON AND RECONSTRUCTIO! PE 01/i997 54 54 R{ 01/1997 J 01/1997 TOTAL 54 54 Page 8 Ti~RPTL.FRX MPO : All Czty: Bremeuon 0i15 CountF Kitsap Six ~,. *rauportatio: la rovemerit Program Project Imp Total Ut!l identification Type Length Codes Phase Federal Start Date Fund Code Cost Reanng Date Adoption Date Resoiut~on ~umbe: 09/0!/1994 Pa~e 9 Project Costs in Thousands of Dollars Fuuc Phase Data .2i Pr: Expenditure Schedule RAP,etc. Local/ (Local AGency Use} Code Cost State Total 1st 2rid 3re 4th-[:h Acencv BREMHETO! O~ 0.120 PE !! 2! WHitnEY AVENUE R~ C~ iDTH STREET TO iSTE STREET Total REHBiLATATiON AN[ RECOnSTRUCTiON PE 01/1997 44 44 01/1997 CN 0i/1997 TOTAL 44 44 Aiencv BREEERTO~ 06 0.i10 1., 31 {EST MARiNE DRIVE EARDE DRIVE TO MARiNE DRIVE Total HHABiLATAT!OM AND RECONSTRUCTiU PE 0i/1997 42 42 RW 0!19q7 C~ 0i/1997 TOTAL 42 42 A~ency BREtERTO! 06 0.070 PE i~ 2: JESTER AVENUE lg CN E. 24TH STREET TO FIR AVENUE Total REHABiLATATIO! AND RECONSTRUCTION PE 0i/1997 32 32 01/i997 CM 01/1997 TOTAL 32 32 !e I ,EMERToHo.Z o PE SOUTH ~ARI~E DRIVE lg CH DRIVE TO S. E~D Total REHABiLATATiO~ AND RECO{STRUCT!O{ PE 01/i997 78 78 RW 01/~9~ CN 01/!997 TOTAL 78 78 ?aGe 9 TfPRPTi.FRX Six ~., IF95 to .~0~ 10 Transportation ts rovesent Progras 09/01/1994 MPO : All City: Breserton 0115 County: Kitsap Func Project imp Total C2 Prl identification Type ~en!~sjo~es Federal Start Date Fund Code Cost Bearing Date Adoption Date Resolution ~umber Project Costs zn Thousands of Dcilars Phase Data Expenditure Schedule RAP,etc. Local/' (.ocal Agency Ose] Code Cost State Total ist 2rid 3rd 4th-6th ~en~Z BREMERTOM 06 0.050 .. , ?EEDLE STREET LAFAYETTE AVERUE TO CAMBRiA~ AVENUE Total ?E 01/1997 CM 8i/1997 TOTAL 20 20 TEREELL AVErUE {T[ STREET TO 9TB STREET Total 2EEABILATATiOr ArD RECOrSTRUCTiOr ?E 01/i997 45 45 RW 01/1997 CN 0 ~9~ TOTAL 45 45 RE, RTo.oe o.ozo ,. PORTER STREET SU~iT AVENUE TO LAFAYETTE AVErUE Total REHABILATATIO! A~D RECONSTRUCTiO! PE 01/199~ RW 0]/1998 Cr 01/i998 TOTAL 8 8 !en E,RE,ERTO,0.0 0 24TH STREET RW WYCOFF AYEM~E TO CALLOW AVEMUE Total REHABILATAT!OM AM~ RECO]STRUCTIOr PE 0i/199~ RW 01/!99[ TOTAL 15 15 Page T~hPT;.rn MPG : City: Bremerton 0115 County: Kitsap Six ~, - Transportat:on im ro~enent Program 1! 5 o qt Hearln~ Date Adoption Date Resolution hmber 09/01/1994 Page Ii Proiect Costs in Thousands of Dolhrs Func Project imp Total U::L Phase Data Ci Pr: ident~f:cation Type Length Codes Ezpend!ture Schedule Phase Federal RAP,etc. Local/ (Local Agency Use) Start Date Fund Code Cost Code Cost State Total 1st 2rid 3rd 4th-6th NONTGOERT ATE~¢E C~ ~T~ STREET TO 9TE STREET Total RE~ABiLATAT!OM A~[. ~ECO~STRU:TiON PE 01/!~9~ E5 CM 01/189E TOTAL E5 65 ., 4 RODGERS AVENUE RW C~ KEA~ STREET TO AUTO CENTER WAY Total REHABILATXTiON AN~ RECONSTRUCTION PE 01/199E 320 RW 01/199E C~ 01/199E TOTAL 320 520 A{enc~ BREMERTOM 06 0.760 PE !9 4] ALMiRA DRIVE RW CM STLVAM WAT TO RIDDELL ROAD Total REHAB!LATATIOM A{D RECONSTRUCTION PE 01/i999 427 427 R{ 01/1999 CM 0i/i999 TOTAL 427 427 GRAMD TOTAL 2,689 3,897 6,586