HomeMy WebLinkAbout2479RESOLUTION 2479
1995-2000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
WHEREAS, THE CITY OF BREMERTON has reviewed the work
accomplished under its Comprehensive Arterial Street Construction
Program and determined current City Street needs, and
WHEREAS, the City Council caused to be prepared a revised
and extended Six-Year Transportation Improvement Program for the
period January 1, 1995 to December 31, 2000, and after public
hearing thereon approved the same at such hearing September 7, 1994
now therefore,
BE IT RESOLVED that the revised and extended Six Year
Transportation Improvement Program 1995 to 2000 attached hereto
as Exhibit A and schedule is hereby adopted as the revised and
extended Six-Year Transportation Improvement Program for the period
January 1, 1995 to December 31, 2000.
PASSED by the City Council of the City of Bremerton this
7th day of September, 1994.
SHERRIL HUFF-MENEES, President
Bremerton City Council
APPROVED this 12 day of Spt 1994.
Lynn S. Horton, Mayor
ATTEST:
Kathleen L. McCluskey, City Clerk
1995-2000 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
SUMMARY
CHANGES TO THE PLAN INCLUDE:
1. DELETION OF 11 COMPLETED PROJECTS.
2. KITSAP WAY RECONSTRUCTION, WESLON PLACE TO AUTO CENTER WAY
DELAYED FROM 1994 TO 1995 DUE TO COORDINATING WITH STATE
CONCERNING SR3 SOUTHBOUND OFFRAMP.
3. llTH STREET RECONSTRUCTION, CHESTER AVENUE TO WARREN AVENUE
DELAYED FROM 1994 TO 1995 DUE TO STATE TIB FUNDS BEING
UNAVAILABLE.
NO NEW PROJECTS HAVE BEEN ADDED TO THE PLAN FOR THE FOLLOWING
REASONS:
THE CITY WIDE LEVEL OF SERVICE TRAFFIC STUDY CURRENTLY BEING
CONDUCTED BY PARAMETRIX WILL RECOMMEND FUTURE PROJECTS AND
PRIORITIES.
THE ENGINEERING DIVISION IS INVESTIGATING A PAVEMENT
MANAGEMENT SYSTEM. THIS WILL INCLUDE A RESURVEY OF THE
EXISTING ROAD CONDITIONS WHICH WILL DRIVE THE PRIORITIZATION
OF .THE LOCAL PROJECTS. THERE ARE ENOUGH LOCAL PROJECTS ON
THE CURRENT LIST THAT SCHEDULING THESE PROJECTS WILL NOT BE
AFFECTED.
94549
Year Transportation improvement Program
Projects selected by County, Agency &/or MPO
in Order by TIP YEAR & Priority
Printed 09/01/i994
Ti~RPTi.FRX
0115
Six h.. transportation im rovemerit Program 09/01/1994
199~ to
Page
Hearing Date
AdoptZon Dare
Resolution I{umber
MPO : AlL
C:ty: Bremerton
Counzy: Kitsap
ProDerr Costs in Thousands of Dollars
Func PrcDecr imp Total Ut~L Phase Data
21 Pri idenIiflca:non Type Length Codes Exnenditure Scheduie
Passe Federal RAP,ere. Local/ (Local AGeE~t use)
start Date Fund Code Cost Code Cost State Total is: 2nd 4th-dth
AGenc}' BREMERTON 01 4.000 T 0 PE i50 150
i4 GORST TO BREI{ERTOI{ COI{NECTOR RW
GORST TO BREERTO~ FERRY TER!iNAL ?oral 150 i50
CONSTRUCTION OF A CO~ECTGR ROAR
PE 0i/:995
C~ 01/1995
TOTAL
STP<C) 1.700 1,000
i,700 l,O00 2,700
0.240 G
WESLO~ TC AUTO CENTER WAY
FATliNG, C&G, SIGNAL, CHAIN., ~RAiN, SW
PE 0i/i995 STP 46
R~ 01/2~95
C~ 01/1995 STP 410
TOTAL 456
9
PE
RW
CR
Total
E5 495
94 550
AteneE BRERERTO~ 07 0.500
14 j STLVA~ WAY
OLTRPUS DRIVE TO WHEATOI{ WAY
RESURFACE
?E 0i/1995
RW 01/1995
CN 0i/i995
TOTAL
?E
RW
C~
Total
10
148 148
i58
CENTRAL BUSii{ESS DiSTRiCT RW
DOWNTOg BUSII{ESS AREA Total
OI{E WAY TRAFFIC SYSTEM
PE 50 50
RW
CM
TC. TAL 50
.=age i
Ti'PRPTi.FR[
S~x h
!ransportat~ou iaprovement Pro~ru ! 09/01/!994
IY~5 to ZOO0 Page 2
MPO : ALl
City: Bremerton 0115
County: Kitsap
Func Proiect imp Total Utzi
:i Pr: !de~tifZcation Type ,en!~)seCode, Federal
Start Date Fund Code Cost
Bearing Date
Adoption Date
Resolution Mumbet
Project Costs in Thousands of Dollars
Phase Data
Expendnure Schedule
RAP,etc. Local/ (.ocal kUency Use}
Code Cost State Total 1st 2rid 3rd 4th-Eth
Aceucy BREMENTON 12 O.OOO PE 30
OO : CiTY WiDE LEVEL OF SERVICE TRAFFIC STUDY RW
CiTY WiDE STUDY Total 3C
?E 01/1995 60 60
RW 01/1995
CN 0i/1995
TOTAL 60
WARRE~ AVENUE OFFRAMP-
CN
SBERiDA~ R~ TO CALLAHAN Total
CONSTRUCT ~EW OFF RAMP
PE 01/1995 STP(C) 18~ 37 220
RW 0i/1995
TOTAL 183 37 220
Agency BREMERTO~ 06 0.190 PE
~t ~ iiTR STREET
CM
CHESTER AVE TO WARREN AVE Total 88
RECONSTRUCT AND STABILIZE ROADWAY
PE 01/1995 STF 28 7
RW' 0!/i995
CN 01/i995 STP 322 81 403
TOTAL 350 88 438
A~ency BREMERTOM 12 0.000 PE lO I0 !0 I0
Ou ~ NISC. TRAFFIC CONTROL DEVICES
CM 20 20 20 20
CITYWiDE · tal 30 )0 30 30
UPGR & iNST'N OF MINOR TRAF CONTROL DEVICES
PE 0i/i995 60 60
RW 01/1995
CN 0i/i995 120 ~20
TOTAL 180
Pa~e 2
TiPRPTi.FRX ,
Six ~,_. !ransportaUon ~a rovemerit ProGra~
MPO : All
CountF: Eitsa~
Adoption Date
Resolution Mumbet
Projeu imp Total Uni
idennf:cat~on Type Length Codes
Phase Federal
Start Date Fund Code Cost
09/01/i994
PaGe
Project Costs in Thousands cf Dollars
Func Phase Data
C] Pri Expenditure Schedule
RAP,etc. Local/ (Local AGency Use
Code Cost State Total !st 2rid 3ro 4th-dth
MiSC SIGNAL UPGRADES
UPGRADE EXiSTiNG REPAIRS
PE 01/1995
RW 01/1995
C! 0i/1995 90 90
TOTAL i20 120
CN i5 15 15 15
To:al 20 2[ 2C. 20
BRENERTON ]i 0.000 PE
EMERGENCY STREET REPAIRS
CN 17 17
CiTYWiDE Total
PE 0./1995
RW 01/1995
CN 01/1995 i00
TOTAL iOC i00
MCCLAiN AVENUE RW
CN
CUL-DE-SAC TO E. 31ST Total
REHABILATATiON & RECONSTRUCTION
PE 01/1995 70 70
PE 01/!995
CN 01/1995
TOTAL 70 70
!enf{ RHNHRToN0.100 PE
DORA AVENUE
CN
6TH STREET TO 9TH STREET Total
REHABiLATATiON AND RECONSTRUCTION
PE 0i/1995 ~9 29
RW 0!/1995
CM 01/1995
TOTAL 19 19
Page
T.~PRPT~.FRT.
Siz t,_ ~ransportation h rovemerit Progral
MP6 : All
City: Bremenon 0i15
County: Kitsap
Func Project lip Total
CA Pn identificatio~ TDe Len!~seCo{es Federal
Start Date Fund Code Cost
Heanng Bate
Adoption Date
Resolution MumDot
09/01/1994
Page 4
Project Costs in Thousands of Dollars
Phase Data
Expenditure Schedule
~lP,etc. Local/ (uocal Agency Use)
Code Cost S~ate Total Ist 2rid 3rd 4th-6th
~cen~ BREMERT0I~ 06 0.040
4TM STREET TO 5TE STREET
REBABiLATATiOM
PE
RW
Total
?E 0i/199! !5 30
Rf 02/199~
CE 01/1995
TOTAL 30 30
ACOR~ STREET
OAK STREET TO ELI STREET Total
REHABILHATiOK AND RECOMSTRUCTiON
?E 01/1995 30
Ri 0./1995
CM 0t/!995
TOTAL 30 3C
BREIERTOM 06 6.240 PE
WESTVIEW DRIVE
C!
PETERSViLE RD TO PETERSV!LLE RD Total
REBABiLATATiO! A~D RECOMSTRUCTIOM
PE 0i/1995
RW 0i/1995
CM 0i/1995
TOTAL 80 80
CRESTTIEW DIIVE
BURCHFIELD STREET TO DEAD E~D Total
REHABILATATIO! AMD RECOMSTRUCTiO!
PE 0i/it95
RW 0i/i195
CN 01/i195
TOTAL 14
TfPRPTi.FRI
Six ~,__ ~ransportatiou Im rovelent ProUram 09/0i/t994
Page 5
MPO : All
City: Eremorton 0ii5
County: Kitsap iE
Bearing Date ·
Adoption Date
Resohtlon Number
Proiec: Costs in Thousands of Dollars
Func Project imp Total Ut~i Phase Data
Ci Pri i'enUf:cation T e
~ yp Length Codes Expenditure Schedule
Phase Federal RAP,etc. Local/ (Local AGency Use)
Start DaTe Fund Code Cost Code Cost State Total Ist 2rid 3to 4th-6th
l~enc[ BREKERTOM 06 0.140 PE
i9 !~ A~DERSO~ STREET
CB'
OLYMPIC AVENUE TO BLOOEi~GTO~ AVEr'US
REEAFiLATATiO~ A~D RZCONSTRUCTIO~
?E 01/1995 54 54
R[ 0i/i995
C~ 0i/!995
TOTAL 54 54
Aeencv 3REMERTOM 06 0.030 PE
29 i[ ANDERSOM STREET RW
CM
RAiMiER AVEMUE TO HOUSTOM AVEMUE
REHABiLATATIOM AMD RECO]STRUCTiOH
P[ 0i/i995
RW 0111995
CM 0i/1995
TOTAL
.... RODGEMS STREET
W. CITY LIMITS TO CONSTITUTION AVENUE Total
REHABiLATATIOM AND RECONSTRUCT!ON
PE 02/1995 5 5
RW 01/1995
CN 0i/i995
TOTAL 5 5
RAttlER AVE~E
CN
RAiM!ER AVENUE TO HOUSTON Total
REHABILATATIOM AND RECONSTRUCTION
PE 01/t995 60 60
R{ 0!/1995
C~ 01/i995
TOTAL
PaGe 5
TihPT~.FRX ~
Six Y~,, fransportation in roveaent Progran 09/01/1994
Page
MPO : All
City: Bremerton 01!5
County: K:tsap 18
Fuuc Pro~ct imp Total Utli
:i Pr: idehtifica:ion Type Len!E~seCodes Federal
Start ~ate Fund Code Cost
Hearln~ Date
Adoption Date
Resoiutlon Number
Pro]ec~ Costs :n Thouands o! Dollars
Phase Data
Expenditure Schedule
RAP,etc. Local/ (bocai Agency Use}
Code Cost State Total 1st 2rid ]rd 4th-dth
lqency BRHERTO~ 06 0.250 ?E
J 2~ PENKSYLVINiA AVENUE
!STH STREE? TO VATER
REHABiLITATiON ANE RECONSTRUCTION
RW 01/1195
C~ 01/ii95
TOTAL 69 69
ieu ! SRZMERTON0.0 0
,, LO~ER OYSTER BAY AVENUE
CN
KiTSAP WAY TO DEAD END Total
iEEABILATIT20~ AND RECONSTRUCTION
?E 0i/1995 35
RW 01/i995
CN 0i/1995
TOTAL 35 35
Acency BRENERTON 06 0.070 PE
l~ 2~ FAIllOUT STREET
SUMMIT AVENUE TO CAMBRIAN AVENUE Total
REHABiLITATiON AND RECONSTRUCTION
PE 01/1996 26 26
R{ 0i/t996
CN 0i/1996
TOTAL 26 26
IenE{BRE,EtToN0.: 0
BUHELL STREET RN
BRGENN AVENUE TO AUTO CENTER WAY Total
REHABILITATION AND RECONSTRUCTION
PE 01/i996 50 50
RW 01/1996
CN 01/1996
TOTAL 50 50
PaGe 6
irauspcrtation Improvement Program
09/01/1994
Pa,~e
City: Eremet:on 0i15
Project Costs in Thousands el Dollars
Passe Federal RAP,etc. Local/'
Start Date Fund Code Cos~ Code Cost S~ate Tots]
Adoption Date
Resolution MurDer
{Local A~enc
2rid '
.. 2 BURWELL STREET
~ATiOKAL AVENUE TC 5ERTEA AVENUE
REHAELATATiON ANL EECO~STRUCTiO~
CN 0i/1996
TOTAL 29 29
Agensy BREMERTO~ 06 0.i50 PE
WASEiMGTO~ AVENUE TO PACiFiC AVENUE To~al
?E 01/199~ 9~ 98
C~
TOTAL
Acenov BEEERTO~ 06 0.120 PE
19 2~ 12TH STREET
WASHiMGTO~ AVEM~E TO PACIFIC AVEN~E Total
RERABiLATATIO! AND RECONSTRUCTiO~
Pl 0i/1996 55 55
~i 01/!99[
CM 0i/1996
TOTAL 55 55
BREMERTO~ 06 0.090 PE
7T~ STREET
ROOSEVELT AVENUE TO 5EWiTT AVENUE Total
RE~ABiLATATiOM AE ~ECONSTRUCTiON
PE 0i/1996 35 35
TOTAL 55 35
TIPRPTi.FRX
six ~, ,'ransp}~atZon zm rovemerit Prqra,i 09/01/D94
5 to 20~0
Page
5earlno Date
Adoptiofi Date
Resolution Number
NPO : All
City: Bremerton 01i5
County: Kitsap 18
Pro3ect Costs in Thousands of Dcilars
Func Proiec: imp Total UtiL Phase Data
Ci Pri Identification Type~ ". * ' Ezpend~ture Schedule
~en!~Le~°nes Federal RXF,etc. Local/ (boca! AGency Use)
Start Date Fund Code Cost Code Cost State Total ist 2rid 3re 4th-6th
HATNARD AVENUE R;
C~
EAST !gTH STREET TO E. iOTR STREET Total
REHABiLATATiON AND RECONSTRUCTION
PE 01/i996 25 25
R{ 01/1996
CN 01/i996
TOTAL 25 25
!!e I,RENERToNo6 0.060
~ MARINE DRIVE PLACE RW
CN
LAUREL AVENUE TO MARINE DRIVE Total
EEHAB!LATATiO~ AND RECONSTRUCTION
PE 01/1996 25 25
R~ 0~/~99E
CN 01/1996
TOTAL 25 25
. ALDER STREET RW
CN
TRENTON AVENUE TO GROVE AVENUE Total
REHABiLATATiON AND RECO{STRUCTIO~
PE 0!/1996 4i 4i
RW 0i/1996
CN 01/i996
TOTAL 4i 41
AMency BRENERTON 06 0.!20 PE
i~ 3z RODGEMS STREET RW
CN
HARTFORD AVENUE TO CHBRiA! AVENUE Total
REHABiLATATiON AND RECONSTRUCTIO!
PE 01/i997 54 54
R{ 01/1997
J 01/1997
TOTAL 54 54
Page 8
Ti~RPTL.FRX
MPO : All
Czty: Bremeuon 0i15
CountF Kitsap
Six ~,. *rauportatio: la rovemerit Program
Project Imp Total Ut!l
identification Type Length Codes
Phase Federal
Start Date Fund Code Cost
Reanng Date
Adoption Date
Resoiut~on ~umbe:
09/0!/1994
Pa~e 9
Project Costs in Thousands of Dollars
Fuuc Phase Data
.2i Pr: Expenditure Schedule
RAP,etc. Local/ (Local AGency Use}
Code Cost State Total 1st 2rid 3re 4th-[:h
Acencv BREMHETO! O~ 0.120 PE
!! 2! WHitnEY AVENUE R~
C~
iDTH STREET TO iSTE STREET Total
REHBiLATATiON AN[ RECOnSTRUCTiON
PE 01/1997 44 44
01/1997
CN 0i/1997
TOTAL 44 44
Aiencv BREEERTO~ 06 0.i10
1., 31 {EST MARiNE DRIVE
EARDE DRIVE TO MARiNE DRIVE Total
HHABiLATAT!OM AND RECONSTRUCTiU
PE 0i/1997 42 42
RW 0!19q7
C~ 0i/1997
TOTAL 42 42
A~ency BREtERTO! 06 0.070 PE
i~ 2: JESTER AVENUE lg
CN
E. 24TH STREET TO FIR AVENUE Total
REHABiLATATIO! AND RECONSTRUCTION
PE 0i/1997 32 32
01/i997
CM 01/1997
TOTAL 32 32
!e I ,EMERToHo.Z o PE
SOUTH ~ARI~E DRIVE lg
CH
DRIVE TO S. E~D Total
REHABiLATATiO~ AND RECO{STRUCT!O{
PE 01/i997 78 78
RW 01/~9~
CN 01/!997
TOTAL 78 78
?aGe 9
TfPRPTi.FRX
Six ~., IF95 to .~0~ 10
Transportation ts rovesent Progras 09/01/1994
MPO : All
City: Breserton 0115
County: Kitsap
Func Project imp Total
C2 Prl identification Type ~en!~sjo~es Federal
Start Date Fund Code Cost
Bearing Date
Adoption Date
Resolution ~umber
Project Costs zn Thousands of Dcilars
Phase Data
Expenditure Schedule
RAP,etc. Local/' (.ocal Agency Ose]
Code Cost State Total ist 2rid 3rd 4th-6th
~en~Z BREMERTOM 06 0.050
.. , ?EEDLE STREET
LAFAYETTE AVERUE TO CAMBRiA~ AVENUE Total
?E 01/1997
CM 8i/1997
TOTAL 20 20
TEREELL AVErUE
{T[ STREET TO 9TB STREET Total
2EEABILATATiOr ArD RECOrSTRUCTiOr
?E 01/i997 45 45
RW 01/1997
CN 0 ~9~
TOTAL 45 45
RE, RTo.oe o.ozo
,. PORTER STREET
SU~iT AVENUE TO LAFAYETTE AVErUE Total
REHABILATATIO! A~D RECONSTRUCTiO!
PE 01/199~
RW 0]/1998
Cr 01/i998
TOTAL 8 8
!en E,RE,ERTO,0.0 0
24TH STREET RW
WYCOFF AYEM~E TO CALLOW AVEMUE Total
REHABILATAT!OM AM~ RECO]STRUCTIOr
PE 0i/199~
RW 01/!99[
TOTAL 15 15
Page
T~hPT;.rn
MPG :
City: Bremerton 0115
County: Kitsap
Six ~, - Transportat:on im ro~enent Program
1! 5 o qt
Hearln~ Date
Adoption Date
Resolution hmber
09/01/1994
Page Ii
Proiect Costs in Thousands of Dolhrs
Func Project imp Total U::L Phase Data
Ci Pr: ident~f:cation Type Length Codes Ezpend!ture Schedule
Phase Federal RAP,etc. Local/ (Local Agency Use)
Start Date Fund Code Cost Code Cost State Total 1st 2rid 3rd 4th-6th
NONTGOERT ATE~¢E
C~
~T~ STREET TO 9TE STREET Total
RE~ABiLATAT!OM A~[. ~ECO~STRU:TiON
PE 01/!~9~ E5
CM 01/189E
TOTAL E5 65
., 4 RODGERS AVENUE RW
C~
KEA~ STREET TO AUTO CENTER WAY Total
REHABILATXTiON AN~ RECONSTRUCTION
PE 01/199E 320
RW 01/199E
C~ 01/199E
TOTAL 320 520
A{enc~ BREMERTOM 06 0.760 PE
!9 4] ALMiRA DRIVE RW
CM
STLVAM WAT TO RIDDELL ROAD Total
REHAB!LATATIOM A{D RECONSTRUCTION
PE 01/i999 427 427
R{ 01/1999
CM 0i/i999
TOTAL 427 427
GRAMD TOTAL 2,689 3,897 6,586