Loading...
HomeMy WebLinkAbout2440RESOLUTION NO. 2440 1994-1999 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, THE CITY OF BREMERTON has reviewed the work accomplished under its Comprehensive Arterial Street Construction Program and determined current City Street needs, and WHEREAS, the City Council caused to be prepared a revised and extended Six-Year Transportation Improvement Program for the period January 1, 1994 to December 31, 1999~ and after public hearing thereon approved the same at such hearing August 18, 1993, now therefore, BE IT RESOLVED that the revised and extended Six Year Transportation.Improvement Program 1994 to 1999 attached.hereto as Exhibit A and schedule is hereby adopted as the revised and extended Six-Year Transportation Improvement Program for the period January 1, 1994 to December 31, 1999. PASSED by the City Council of the City of Bremerton this 18th day of August , 1993. EILEEN FITZ, President Bremerton City Council Approved this 20 day of August 1993. LOUIS MENTOR, Mayor ATTEST: KATHLEEN L. McCLUSKEY, Clerk Agency BRfJIERTON 'City 115 C~ty 18 Project Costs in Tt~Dur~ards of Dollars Phase Data Expenditure Schedule F~c Project I~ Total Util Start Federal Fmd (Local Agency) CI Pri Identificati~ Type L~th C~e Date Cost FL~'w~ C~e L~aI Sr'c Cost Total 1st 2~ ~ 4th-6th 10 O1 GORST TO BRFJ~RTON O1 LO0 T PE 0 DISCR 10,000 T 17,000 27,000 150 150 0 0 CONNECTOR ~ 0 0 O 0 0 0 0 0 ~RST TO FE~Y TER~4INAL CN 0 0 0 0 0 0 0 0 TOTAL 0 10,000 17,000 27,000 'NEW CONSTRUCTION, WIDe, C&G, PAVING, CHANNELI~TION, SIGNAL 10 02 KITSAP WAY 04 ~ON TO AUTO CENTER PAVING, C~, SIGNAL, CHANNELI~TION, DRAINAE, SIDEWALK 0.2~ G PE 46 STP 0 T 9 55 0 0 0 0 ~ 0 0 0 0 0 0 0 0 CN 410 0 85 495 0 0 0 0 TOTAL 456 0 94 550 10 03 SYLV~ WAY OLYPIPUS ~IVE TO WHEATON WAY 0.50 0 PE 0 0 10 10 0 0 0 0 ~ 0 0 0 0 0 0 0 0 ON 0 0 148 148 0 0 0 0 TOTALl. 0 0 ~58 158 1 04 C~TRAL BUSINESS DISTRICT 0 0.00 ONE WAY TRAFFIC SYSTFJ4' 1 05 CITY WIDE LEVEL OF 12 0.~ SF. RVICE TRAFFIC STUO~ (GROWTH NG~T H,ad'IOATE) PE 0 50 0 50 0 0 0 0 RW 0 0 0 0 0 0 0 0 CN 0 0 0 0 0 0 0 0 TOTAL 0 5(:) 0 513 PE 0 30 Z,'I(3 60 Z,O 0 0 0 ~ 0 0 0 0 0 0 0 0 CN 0 0 0 0 0 0 0 0 TOTAL 0 30 30 643 10 ~ WARREN A~JE 1 OFFRA~IP CONSTRUCT OFF RAI4P 10 07 llTH STREET CHESTER TO W~R~ ~CONSTRUCT ANO ST~ILIZE ~ADWAY 0 08 ~ISC. TRAFFIC CONTROL 12 DEVICES UPGRADE AND INSTAL~TION Of MINOR TRAFFIC CONTROL DEVICES 0.21 T PE CN TOTAL 183 37 0 220 0 , 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1~ 37 0 220 0.~ 0 PE 0 60 0 0 60 10 10 10 10 RW 0 0 0 0 0 0 0 0 CN 0 120 0 1~ ~ ~ 20 20 TOTAL 0 180 0 180 0.19 0 PE 0 7 U 28 35 7 0 0 0 MId 0 0 0 0 0 0 0 0 CN 0 81 322 '403 81 0 0 0 TOT~ 0 ~ 350 4~ Agency 8RE~,RTON City 115 County 18 Six Year Transportation Program 1994 to 2000 oa12s193 Fa~e 2 Project Costs in Thousand~s of Dollars Phase Data Expenditure ScheduXe Func Project Imp Total Util Start Federal Fund (Local Agency) Cl Pri Identification Type Le~th C~e Date Cost F~n~ Code L~l Sr~ Cost Total 1st ~ ~ 4th-6th 0 09 HISC SIGNAL UPGRADES 14 O.O0 0 FIE 0 SO 0 30 5 5 5 5 RW 0 O 0 0 0 0 0 0 CN 0 90 0 90 15 15 15 15 UPGRADE EXISTING SIGNALS TOTAL 0 120 O 120 0 10 EIIERGENCY STREET REPAIRS IS 11 LOWER IrARIME DRIVE ~t~INE DRIVE TO IIARINE DRIVE REHABILITATION ANO RECONSTRUCTION 0.00 0 PE 0 0 0 0 0 0 0 0 0 · RW. 0 0 0 0 0 O 0 0 CN 0 lO0 0 100 17 17 17 17 TOTAL 0 1DO 0 100 4 0.09 PE 0 ~0 0 40 0 0 0 0 RW 0 O 0 0 O O 0 0 CN 0 0 0 O 0 0 0 0 TOTAL. 0 40 0 40 lS 12 llCCLAIN AVENUE CUL-DE-SAC TO E. 31ST .STREET ~Fd~)I~TATION ~SURFACING 0.11 S PE 0 7D 0 70 O 0 0 0 RW 0 0 0 0 0 0 0 0 CN 0 0 0 O 0 0 0 0 TOTAL 0 70 0 70 lS 13 PIEADE AVENUE BURWELL STREET TO KITSAP WAY REKABI~TATION ~C~TRUCTION 13 14 ~RA AVENUE 6TH STREET TO 9TH STREET RE)UU)ILATATION RECONSTRUCTION lS 15 HEAD( AVENUE KITSAP WAY TO 9TH STREET 13 16 REHABILATATION AND RECONSTRUCTION 9TH STREET KITSAP WAY TO BERTHA AVENUE REHABILATATION AND RECONSTRUCTION 0.05 0.10 0.05 PE 0 39 0 S9 0 0 0 0 ) 0 0 0 0 0 0 0 O. CN 0 0 0 0 0 0 0 0 TOTAL 0 S9 0 S9 PE 0 19 0 19 O 0 0 0 RW 0 0 0 0 0 0 0 0 ON 0 0 0 0 0 0 0 0 TOTAL 0 19 0 19 PE O 20 0 20 0 0 0 0 RW 0 0 0 0 0 0 0 O CN O 0 0 0 0 0 0 0 TOTAL 0 20 0 20 PE 0 30 0 SO 0 0 0 0 RW 0 0 0 0 0 0 0 0 CN 0 0 0 0 0 0 0 0 TOTAL 0 30 0 30 Agency BREMERTON City 115 County 18 Func Project Six Year Transportation Program 1994 to 2000 0a/26/93 Page Imp Project Costs in Thousands of Dollars Phase Data Expenditure Schedule Total Util Start Federal Fund {Local Agency) Cl Pri identification Type Length Code Date Cost Fund Code Local Src Cost Total 1st 2hd 3rd 4th-6th 13 17 215T STREET FORD AVENUE TO WYCOFF AVENUE REHABILATATION AND RECONSTRUCTION 13 18 FORD AVENUE 215T STREET TO DEAD END REHABILATATION AND RECONSTPrm~T'~; ...,- f19 HONTGOMERY AVENUE 15TH STREET TO DEAD END REHABILATATION AND RFCONSTRUCTION 13 20 TERRELL AVENUE BURWELL STREET TO 6TH STREET REHABILATATION AND CONSTRUCTION 4 0.09 4 0.07 4 0.12 PE 0 35 0 35 0 0 0 0 RW 0 0 0 0 0 0 0 0 CN 0 0 0 0 0 0 0 0 TOTAL 0 35 O 35 PE 0 20 O 20 0 0 0 0 RW 0 0 O 0 0 0 0 0 CN 0 0 0 0 O O 0 0 TOTAL 0 20 0 20 PE 0 20 0 20 0 0 0 0 RW 0 0 0 0 0 0 0 0 CN 0 0 0 0 0 0 0 0 TOTAL 0 20 0 20 PE O 330 0 330 0 0 0 0 RW 0 0 0 0 0 0 0 0 CN 0 0 0 0 0 0 0 O TOTAL 0 330 0 330 13 21 TAFT AVENUE 20TH STREET TO DEAD END 13 22 VENETA AVENUE 4TH STREET TO 5TH STREET 13 23 LAFAYETTE AVENUE SOUTH CITY LIMITS TO PREBLE AVENUE REHABILATATION AND RECONSTRUCTION 13 24 ACORN STREET OAK STREET TO ELM STREET 13 25 SCHLEY WAY SCHLEY BLVD. TO DEAD END REHABILATATION AND RECONSTRUCTION O.Og 0,04 0.06 0.09 0.06 PE 0 42 0 42 0 0 0 0 RW 0 0 0 0 0 0 0 0 CN 0 0 0 0 0 0 O 0 TOTAL 0 42 0 42 PE 0 30 0 30 0 0 0 O RW 0 0 0 0 0 0 0 0 CN 0 O 0 0 0 0 0 O TOTAL 0 30 0 30 PE O 0 0 0 0 0 O 0 RW 0 0 0 0 0 0 0 0 CN 0 O 0 0 0 0 0 0 TOTAL 0 0 0 0 PE O 30 O 30 O 0 O 0 RW 0 0 0 0 0 0 0 0 CN 0 0 0 0 0 0 0 0 TOTAL 0 30 O 30 PE 0 18 0 0 18 0 0 0 0 RW 0 0 0 0 0 0 0 0 CN 0 0 0 0 0 D 0 0 TOTAL 0 18 0 18 Six Year Transportatio~ Program ~ 08125193 19g~ to 2000 Pm~e ~ Agency EE~ERTON City 115 County 18 P~oject Costs in Thousands' of Dollars hse Data Expendi~e Schedule Func Project Imp Total Util Start Federal Fund (Local Agency) Cl Pri Identification Type Length Code Date Cost Fund Code Local Src Cost Total 1st 2rid 3rd 4th-6th 13 26 WESTVIEW DRIVE 4 0.24 RE 0 80 0 80 0 0 0 0 PETERSVILLE ROAD TO RW 0 0 0 0 0 0 0 0 PETERSVILLE ROAD CN 0 0 0 0 0 0 0 0 TOTAL 0 80 0 80 'REHABILATATION AND RECONSTRUCTION 13 27 HOMi~ STREET 4 0.05 RE 0 20 0 20 0 0 0 0 WHEATON WAY TO WINFIELD RW 0 0 0 0 0 0 0 0 DRIVE CN 0 0 0 0 0 0 0 0 TOTAL 0 20 0 20 REHABILATATION ANO RECONSTRUCTIONN 13 28 CRESTVIEW DRIVE 4 · 0.05 PE' BURCHFIELD STREET TO DEAD RW ENO CN TOTAL 13 29 ANDERSON STREET 4 0.14 PE 0 5~ 0 54 0 0 0 0 OLY~IC AVENUE TO ~ 0 0 0 0 0 0 0 0 BLOOMINgTON AVEN4JE CN 0 0 0 0 0 0 0 0 TOTAL 0 54 0 5~ RFJiASILATATION ANO RECONSTRUCTION 13 30 ANDERSON STREET 4 0.03 PE 0 10 0 10 0 0 0 0 ~INIER AVENUE TO HOUSTON RW 0 0 0 0 0 0 0 0 AVEIfJE CN 0 0 0 0 0 0 0 0 TOTAL 0 118 0 118 REHABILATATION AND RECONSTRUCTION 13 31 ROOC, ERS STREET 4 0.02 RE 0 5 0 5 0 0 0 0 WEST CITY LIMITS TO RW 0 0 0 0 0 0 0 0 CONSTITUTION AVENUE CN 0 0 0 0 0 0 0 0 TOTAL 0 5 0 5 REHABILATATION AND RECONSTRUCTION 13 32 RAINIER AVENUE 4 0.16 PE 0 60 0 bO 0 0 0 0 ~INIER AVE~E TO HOUSTON RtJ 0 0 0 0 0 O' 0 0 AVENt. E CN 0 0 0 0 0 0 0 0 TOTAL 0 60 0 60 REHABILATATION ANO RECONSTRUCTION 13 33 PENNSYLVANIA AVENUE ~ 0.25 RE 0 69 0 69 0 0 0 0 15TH STREET TO WATER RW 0 0 0 0 0 0 0 0 CN 0 0 0 0 0 0 0 0 REHABILATATION AND TOTAL 0 6g 0 69 RECONSTRUCTION ' Agency E~RE~ERTON City 115 County 18 Year Trar~portaUon Program ) 08/23/93 1994 to 2000 Page 5 Project Costs in Thousandsof Dollars fYnaseData Expenditure Schedule Fu~nc Project Imp Total UUI Start. Federal Fund {l~al Age~y) C1 Pri Identification Type Ler~ath Code Oate Cost Fmd Cxx)e Local ~ Cost TotaX 1st 2rid 3rd 4th-6th 13 34 LOWER OYSTER BAY AVEJfdE 4 0.09 PE 0 35 0 35 O O O 0 KITSAP WAY TO OEAO END RW O, O O 0 0 O O 0 CN 0 0 0 0 0 0 0 0 REHABILATATION AND TOTAL 0 35 0 35 RECONSTRUCTION 13 35 FARRAGUT STREET 4 0.07 PE O 26 0 26 0 0 0 0 StarlIT AVENDE TO CAIIBRIAN ) 0 0 0 0 0 0 0 0 AVENUE CN O O 0 0 O 0 O O TOTAL 0 26 O 26 REHABILATATION RECONSTRUCTION 15 56 BURNELL STREET 4 - 0.13 PE' 0 50 0 50 0 0 0 0 8RtrcJiN AVEI~JE TO AUTO ~ 0 0 0 0 0 0 0 0 CENTER WAY CN 0 0 0 O O 0 O O TOTAL 0 50 0 5O 15 37 13 38 BURNELL STR~J'ZT 4 0.07 PE 0 29 0 29 0 0 0 0 NATIOHAL AVENDE TO BF. RTHA ~ 0 0 0 0 0 0 0 0 AVENUE ~ O O O 0 0 O D 0 TOTAL O 129 0 129 REHABILATATION AJ~D RECONSTRUCTION 6TH STREET 4 0.15 PE 0 98 0 98 0 8 O 0 WASHINGTON AVE]~d TO ~ 0 0 0 0 O 0 0 0 PACIFIC AVEkRJE CN O 0 O 0 0 O 0 0 TOTAL 0 · 98 0 ' 98 REXASILATATION AND RECONSTRUCTION 15 39 12TH STREET 4 0.12 PE 0 55 0 55 0 0 O 0 WASHINGTON AVEIfJE TO ~ 0 0 0 0 0 0 0 0 PACIFIC AVENUE CN 0 0 0 0 O 0 0 O TOTAL O 55 0 55 REHABILATATION ARO RECONSTRUCTION 15 13 41 7TH STREET 4 O.Og PE 0 35 0 35 0 0 O 0 ROOSEVELT AVENUE TO RW 0 0 0 0 0 0 0 0 HEWITT AVE)MJE CN O O O O O O 0 O TOTAL 0 35 0 35 REHASI~TATION ARD, RECONSTRUCTION HAYWARD AVENUE 4 0.06 PE 0 25 0 25 0 0 0 0 FAST 19TH SllEET TO EAST ~ 0 0 0 0 0 0 O. 0 iOTH STREET CN 0 0 O 0 O 0 0 O TOTAL 0 25 0 25 REHABILATATION ARO RECONSTRUCTION Six Yet Tr~tation Pr~}Pm t []8/23/93 1994 to 2000 PeQe 6 Agency BREMF. RTON City 115 County 18 Project Costs in Thousands'of Dollars Ptmse Data Ex~wmdittre Schedule Fmc Project I~ Total Util Strt Fe<k~rai F~s~U (Lc~al Ager~y) Cl Pri Identification Type Longth C~ Date Cost Ftm~d C~de L~al ~*c C~st Total 1st ~ ~ &th-6th 13 ~2 ~RINE DRIVE PtACE ~ 0.06 PE 0 25 0 25 0 0 0 0 LAUREL AVENUE TO MARINE RW 0 0 0 0 0 0 0 0 DRIVE CN 0 0 0 0 0 0 0 0 TOTAL 0 25 0 25 REJgABI~TATION Am RECONSTRUCTION ALDER STREET i 0.11 P~ 0 ~1 0 ~1 0 0 0 0 TRENTON AVENUE TO GROVE R~ ~ 0 0 0 0 0 0 0 AVEtIJE CN 0 0 0 0 0 0 0 0 TOTAL 0 ~l 0 ~1 REHABILITATION ANO RECONSTRUCTION RODGERS STREET ~ 0.12 PE 0 54 0 5~ 0 0 0 0 HARTFORO AVEME TO RW 0 0 0 , 0 0 0 0 0 CAMBRIAN AVENUE CN 0 0 0 0 0 0 0 0 TOTAL 0 5a 0 54 REI~a~I~TATION AJ4O RECONST~JCTION 13 ~5 WHITNEY AVE~J~ i 0.12 PE 13TH STREET TO 15TH RW STREET CN TOTAL RED~ABILATATION RECONSTRUCTION 13 ~.6 W~ST MARIN~ DRIV~ 4 0.11 ~ 0 42 0 42 0 0 0 0 MARINE DRIVE TO MARINE ~ 0 0 O 0 0 0 0 0 DRIVE CN 0 0 0 0 0 0 0 0 TOTAL 0 42 0 42 REHABILATATION N~O RECONSTRUCTION 13 ~7 3ENNER AVEME ~ 0.07 P~ 0 32 0 32 0 0 0 0 EAST 26TH STREET TO FIR RW 0 0 0 0 0 0 0 0 AVEME CN 0 0 0 0 0 0 0 0 TOTAL 0 32 0 32 RE}tABILATATION Aj40 RECONSTRUCTION 13 ~8 SOUTH MARIN~ DRIVE ~ 0.21 P~ 0 78 0 78 0 0 0 0 MARINE DRIVE TO SOUTH ENO RW 0 0 0 0 0 0 0 0 CN 0 0 0 0 0 0 0 0 RE~ASI~TATION AJ40 TOTAL 0 78 0 78 RECONSTRUCTION Six Year Transportation Program > 08/23/93 ~994 to 2000 Page 7 Agency 8EIf, RTON City 115 County 18 Project Costs in Thousands' of Dollars Phase Data Expenditure Schedule Fu~ Project Imp Total Util Start Fmderal Fund [L~al AQe~y) CI Pri I~tifi~t~on Type Lef~gth Ccx~e Date C~st Fu~ C~x~e L~al ~*c Cost Total 1st ~ ~*d 4th-6th PREBLE STREET 4 0.05 PE 0 20 0 20 0 0 0 0 LAFAYETTE AVENUE TO RW 0 0 0 0 0 0 0 0 CANSRIAN AVEMJE ~ 0 '0 0 0 0 0 0 0 TOTAL 0 20 0 20 'RE~BI~TATION ANO RECONST~JCTION 13 50 TERRELL AVENUE 4 0.12 6TH STREET TO 9TH STREET REHABI~TATION AN4) REC[~6TF~JCTION PE 0 45 0 0 45 0 0 0 0 RW 0 0 0 0 0 0 0 0 CN 0 0 0 0 0 0 0 0 TOTAL 0 45 0 45 '12 51 PORTER STREET 4 0.02 SU/fIT AVENUE TO LAFAYETTE AVEI~UE REHABI~TATION ANO RECONST~JCTION 12 52 24TH STREET 4 0.04 WYCOFF AVENUE TO CALLON AVENUE RI=-J~BI~TATION ANO REO)NSTRUCTIDN ~ 0 8 0 8 0 0 0 0 ~ 0 0 0 0 0 0 0 0 C'N 0 0 0 0 0 0 0 0 TOTAl. 0 8 0 8 ~ 0 15 0 15 0 0 0 0 ~ 0 0 0 0 0 0 0 0 CN 0 0 0 0 0 0 0 0 TOTAL 0 15 0 15 13 53 r~NTGOr~RY'AVENUE 6TH STREET TO 9TH STREET REHABI~TATION ANO REC(~ST~JCTION 0.12 PE R~ CN TOTAL 0 65 0 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 65 0 65 13 54 ROOGERS AVENUE KEAN STREET TO AUTO CENTER MY ~'=~ABI~TATION ANO RECONSTRlJCTION PE 0 320 0 320 0 0 0 0 I~ 0 0 0 0 0 0 0 0 CN 0 0 0 0 0 0 0 0 TOTAL ' 0 320 0 320 13 55 ANIRA DRIVE 4 0.76 PE SYLVAN WAY TO RIDOELL R~' ROAD CN TOTAL REHABI~TATION AND RECONSTRUCTION 0 ~27 0 ~27 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 427 0 427 Year Transportation ~am ~ ~/23/9~ 0 to 6 Page 8 Agency BREMERTON CIty 115 County 18 Pro,bct Costs j.n Thousands of Dollars Phase Oata Ex~iture Schedule Func Project I~ Total, ~il Start F~ral f~ [local Agency) Cl Pri Identification Ty~ l~th Ccw~e Date Cost F~ C~K~e Local ~ Cost Total 1st 2rw~ ~ 4th-6th 0 ~ PEltRY AVEMJE 0.~ ~ ~. ilTH ST, TO STONE ~Y R~ CN TOTAL 0 57 KITSAP WAY 1,40 SR~ TO CITY LIMITS PE 0 0 0 0 0 0 0 5 ~ 0 0 0 0 0 0 0 0 ~ 0 0 0 0 0 0 0 0 TOTAL 0 0 0 0 0 ~ 6TH ST~ET AT C~L~ A~FcJ~U~ 0.~ ~ CN TOTAL' 0 0 0 0 0 0 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 59 OLD 8ELFAIR VALLEY ROAO RESURFACING PE 0 0 0 0 0 0 0 '5 RW 0 0 0 0 0 0 0 0 CN 0 0 0 0 0 0 0 0 TOTAL 0 0 0 0 LE~ BOUjV&RO k~F, AT~ WAY TO CI~ LIMITS 1,20 .PE RW CN TOTAL 0 0 0 0 0 0 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 61 LEBO BOULEVARD {dr, ATOM WAY TO CITY LIMITS SIDEWALKS IN SCHOOC AREAS 0.00 PE 0 0 0 0 0 0 0 5 RId 0 0 0 0 0 0 0 0 CN 0 0 0 0 0 0 0 0 TOTAl, 0 0 0 0 GRANO TOTAL 639 13,229 17,632 31,5(X]