Loading...
HomeMy WebLinkAbout2508 RESOLUTION NO. 2508 A RESOLUTION of the Bremerton City Council Adopting the Revised Bremerton Comprehensive Plan WHEREAS, the City of Bremerton adopted a revised Comprehensive Plan in 1986, and followed in 1988 with a revised Zoning Ordinance; and WHEREAS, the Growth Management Act (GMA) of 1990 established statewide goals, guidelines, and procedural requirements to guide the development, coordination, implementation and financing of long-range comprehensive plans; and WHEREAS, the City completed a citywide land use inventory, a build-out analysis, Urban Growth Area recommendations to Kitsap County, population projections, and adoption of the Critical Lands Ordinance, guided by both the GMA and by the adopted Kitsap Countywide Planning Policies; and WHEREAS, a Citizens Advisory Committee (CAC), consisting of a cross-section of Bremerton residents, was established in the spring of 1993 and directly assisted in the review of the 1986 Comprehensive Plan and the drafting of revisions; and WHEREAS, all preliminary Plan drafts were openly discussed during a series of advertised public CAC meetings before being forwarded to the Planning Commission; and WHEREAS, in accordance with RCW 43.21C and WAC 197-11, a Draft Supplemental Environmental Impact Statement (SEIS) was prepared, based on the EIS that was done for the City's 1986 Comprehensive Plan, and filed on January 20, 1995; and WHEREAS, copies of the draft Plan and SEIS were made available to citizens and organizations, and were distributed to local jurisdictions, libraries, and state agencies for the mandatory sixty-day review period; and WHEREAS, following the required comment period, the Final Supplemental EIS was issued on February 21, 1995, and became final on February 28; and WHEREAS, the Bremerton Planning Commission conducted public study sessions and public hearings before fine-tuning the draft Plan and recommending it to the City Council Comprehensive Plan Adoption Resolution: Page 1 by Resolution No. 1995-1; and WHEREAS, the Bremerton City Council held public study sessions, a joint study session with the Planning Commission, and a series of public hearings prior to making final revisions to the Plan; now therefore BE IT RESOLVED BY THE BREMERTON CITY COUNCIL that the revised Bremerton Comprehensive Plan, a copy of which is attached hereto, is hereby adopted. PASSED by the City Council of the City of Bremerton this 5th day of April, 1995. ~~-~ E'~~ Bremerton City C~~ilE Comprehensive Plan Adoption Resolution: Page 2 City of Bremerton COMPREHENSIVE PLAN This Plan is the culmination of a three-year major revision process to bring the City's 1986 Comprehensive Plan into'compliance with the state Growth Management Act. Adopted: April 5, 1995 City of Bremerton DEPARTMENT OF COMMUNITY DEVELOPMENT 286 Fourth Street Bremerton WA 98337 Donald L. Pratt, Director Ron W. Hough, Planning Manager Kay W. Wilson, Senior Planner Phone: (360) 478-5275 Assistance in the preparation of this Comprehensive Plan was provided by the City's Engineering, Parks & Recreation, Police, Fire, and Public Works & Utilities Departments, and by the City Attorney and Treasurer. Other participants included Puget Power, Cascade Natural Gas, Kitsap County, State Dept. of Community Trade and Economic Development, and others. · The Citizen Advisory Committee (CAC) for the Comprehensive Plan provided a public forum for community involvement as well as direct assistance to City staff in developing all draft documents and recommendations to the Planning Commission. · This project was financed in part by Growth Management grants from the State of Washington and a Community Development Block Grant (CDBG) for preparation of the Housing Element. Additional technical assistance was provided by the consulting firms of Parametrix, Inc. (transportation), and Beckwith Consulting Group (parks & recreation). District #1: District #2: District #3: District #4: District #5: Position #1: Position #2: Position #3: Position #4: Position #5: City of Bremerton Comprehensive Plan ACKNOWLEDGEMENTS MAYOR Lynn S. Horton CITY COUNCIL AI Colvin Marice "Morrie" Dawkins John Law Lon Overson Richard Neville District #6: District #7: District #8: District #9: David Farr Sherril Huff-Menees, Pres. Carlos Montgomery- Bob Winters PLANNING COMMISSION Vacant Richard Goetze, Chair John Hancock Debra L. Jackson Vacant Position #6: Position #7: Position #8: Position #9: Barbara Gray Boyd Wayne Olsen, Vice-chair Laurence Stone Bill D. Robinson CITIZENS ADVISORY COMMITIEE (CAC) Douglas Berry Barbara Gray Boyd Richard Goetze Del Knauss Jack Lefcoski Carlos Montgomery- Russ Nickerson Wayne Olsen Sandi Perkins Roy Runyon Harry Wilson PRIMARY STAFF Donald L. Pratt, Director of Community Development Ron W. Hough, Planning Manager Kay W. Wilson, Senior Planner SUPPORT STAFF Randy Witt, City Engineer Pat Harris, Parks Director JoAnne Wroblewski, Asst. Parks Dir. Al Duke, Assistant Fire Chief Rich Hanna, City Treasurer Kathleen Cahall, Water Resources Manager Paul DuFresne, Police Chief Joe Hatfield, as Acting Police Chief Tim Richard, Senior Engineer Ian Sievers, City Attorney ... RESOLUTION NO. c250 g A RESOLUTION of the Bremerton City Council Adopting the Revised Bremerton Comprehensive Plan WHEREAS, the City of Bremerton adopted a revised Comprehensive Plan in 1986, and followed in 1988 with a revised Zoning Ordinance; and WHEREAS, the Growth Management Act (GMA) of 1990 established statewide goals, guidelines, and procedural requirements to guide the development, coordination, implementation and financing of long-range comprehensive plans; and WHEREAS, the City completed a citywide land use inventory, a build-out analysis, Urban Growth Area recommendations to Kitsap County, population projections, and adoption of the Critical Lands Ordinance, guided by both the GMA and by the adopted Kitsap Countywide Planning Policies; and WHEREAS, a Citizens Advisory Committee (CAG) , consisting of a cross-section of Bremerton residents, was established in the spring of 1993 and directly assisted in the review of the 1986 Comprehensive Plan and the drafting of revisions; and WHEREAS, all preliminary Plan drafts were openly discussed during a series of advertised public CAC meetings before being forwarded to the Planning Commission; and WHEREAS, in accordance with RCW 43.21C and WAC 197-11, a Draft Supplemental Environmental Impact Statement (SEIS) was prepared, based on the EIS that was done for the City's 1986 Comprehensive Plan, and filed on January 20, 1995; and WHEREAS, copies of the draft Plan and SEIS were made available to citizens and organizations, and were distributed to local jurisdictions, libraries, and state agencies for the mandatory sixty-day review period; and WHEREAS, following the required comment period, the Final Supplemental EIS was issued on February 21, 1995, and became Jinal on February 28; and WHEREAS, the Bremerton Planning Commission conducted public study sessions and public hearings before fine-tuning the draft Plan and recommending it to the City Council Comprehensive Plan Adoption Resolution: Page 1 by Resolution No. 1995-1; and WHEREAS, the Bremerton City Council hel~ public study sessions, a joint study session with the Planning Commission, and a series of public hearings prior to making final revisions to the Plan; now therefore BE IT IRESOLVED BY THE BREMERTON ~ITY COUNCIL that the revised Bremerton Comprehensive Plan, a copy of which is attached hereto, Is hereby adopted. PASSED by the City Council of the City of Bremerton this ~day of April, 1995. HERRIL HUFF- Bremerton City C Comprehensive Plan Adoption Resolution: Page 2 City of Bremerton Comprehensive Plan ELEMENTS of the Plan A. Introduction B. The Vision for Bremerton C. Planning Goals D. Citizen Involvement Program E. Land Use F. Transportation G. Housing H. Capital Facilities Part 1: Capital Facilities Plan Part 2: Capital Facilities Program I. Utilities J. Environmental Management K. Implementation, Consistency & Concurrency * Glossary.. ... Bremerton Comprehensive Plan INTRODUCTION TO THE PLAN Prepared by: BREMERTON PLANNING Adopted: April 5, 1995 A Bremerton Comprehensive Plan ELEMENT A INTRODUCTION TO THE PLAN How shall we grow? This question is being asked by cities and counties throughout the State as they prepare long-range "comprehensive plans" to lead them into the future. Growth takes many forms --- more people, more homes, more schools, new job opportunities, new flows of information, higher levels of aspiration, higher levels of learning, higher standards of living, changes in mobility, changes in community wealth and social characteristics, and so on. Growth occurs in many directions and many different scales. This twenty-year comprehensive plan for the City of Bremerton deals primarily with the accommodation of new physical growth; that is, the increased use of land for urban development and activities. The term "comprehensive" means that the plan is not limited to land use concerns, but also addresses a wide variety of growth issues, including those identified in statewide planning goals, Countywide Planning Policies, and in our own 'Vision for Bremerton". . .. " .. . . . . , . . .. . .. , ' ." , . . .. .. ... " . ",. . ... . 1..JHE<>NEEQFORPtANNIf\JG ~~A ~ittleAisto . .....<. ... . ...... ........ . ........ ................ . .... ry Prior to the Growth Management Act of 1990, local governments in Washington were working with one of the weakest mandates for comprehensive planning of any state. If cities and counties wished to do long-range planning, they needed to address only the issues of land use and transportation. With the exception of the Shoreline Management Act, there was no state requirement that anyone actually prepare a long- range plan. Nor was there much policy guidance from Olympia on issues of statewide significance. The result of weak planning was a growing list of problems at the local level. There was growing competition between city and county jurisdictions for growth, new development, and tax revenues. Annexations, the traditional method of city growth, ground to a halt in some areas as jurisdictions and neighbors took sides to struggle in support or opposition. Development standards often conflicted at political boundaries. There was no consensus on basic goals and visions. There was little or no coordination of regional essential facilities such as water supplies, sewage treatment facilities, jails, solid and hazardous waste disposal sites, etc. And, there was no effective conduit for ongoing communication between jurisdictions. Introduction - Page 1 Although Washington's planning Jaws allowed cities and counties to develop plans, it didn't require that zoning or capital improvement decisions be based on those plans. Thus, the plans were often very weak and ineffective. They were not good guides for zoning and community development decision-making. What Washington needed was a mandate from the State for the development of local comprehensive plans that were based on common goals and guidelines arid that were consistent with one another. And, those plans needed to have teeth so that they could be effective working documents and not end up on a dusty shelf. The Growth Management Act of 1990-91 was the most significant such legislation to occur in Washington since the State City jCounty Planning Act of 1939. ..2.~. .....~.R0Y\irH.......MANAq.E.MENII....ACT.....R~Q.Q.~.B.e.M.t;.fSirs................ With passage of the Growth Management Act, Washington found itself at the forefront of comprehensive planning. It had borrowed ingredients from successful growth management programs in such states as Oregon, Georgia and Florida, and created a new program uniquely suited to meeting the needs of Washington. The initial Act called for most comprehensive plans to be completed and adopted by July, 1993; a deadline that was later extended to July, 1994. Kitsap County and its four cities were among those required to plan under the guidelines of the Act. The following is a very brief summary of some of the major requirements and benefits of the Growth Management Act: A. Citizen Participation: The Act required "early and continuous" citizen participation throughout the planning process. Bremerton established the Citizens Advisory Committee (CAG) to work directly with staff and to provide ongoing opportunities for direct public involvement in drafting all Plan revisions before sending them on to the Planning Commission for public hearings and action. B. Protection of Natural Resources and Critical Areas: The Act required jurisdictions to identify and protect steep slopes, wetlands, aquifer recharge areas, fish and wildlife habitat, and other critical areas as well as forest, agriculture and mineral resource lands. C. Urban Growth Areas: Following suggestions from its cities, Kitsap iCOUrity was required to identify existing urban areas, determine 20-year urban growth needs, and establish Urban Growth Areas (UGAs). The UGAs would be designed to accept two-thirds of our new growth, as directed by our Countywide Planning Policies, thus relieving development pressures in rural areas. Introduction - Page 2 D. Goals and Development Standards: The state has established thirteen broad statewide planning goals to provide overall direction. Each jurisdiction is to build on those goals and also develop consistent standards for new development and especially public facilities infrastructure. E. Coordinated Policies: Cities and counties were to work together to establish Countywide Planning Policies that would guide the individual planning programs and help ensure consistency. Multi-county Planning Policies followed later to address and link major regional issues. F. Required Elements: New city plans must have at least these five elements: (1) Land Use (2) Transportation (3) Housing (4) Public Facilities Plan (5) Utilities. Counties must also prepare a "rural" element. G. Concurrency: Plans must be realistic and workable. If plans call for new development, the responsible jurisdiction must be able to provide the needed public services and utilities within a reasonable amount of time. H. Levels of Service: In order to deal with traffic and congestion resulting from new development, new requirements for transportation planning include the measure of existing Levels of Service (LOS) and a plan for continued development that will not exceed an adopted LOS standard that is acceptable to the community. I. Agency Compliance: Not only are local plans required to be consistent with each other, but State agencies are also required to comply with local plans and development regulations. J. Regulations: Immediately following adoption of the new or revised comprehensive plans, each jurisdiction must review and revise, as necessary, its development codes and regulations so that they will implement the plan. Introduction - Page 3 ... ... . ........ .... ..... ...... .. ..........,. ...3~....... .........~REMgB,..QN.~.S.......1..as6.......R.liAt4........................................... Bremerton has long history of land use planning. Early plans addressed the issues of their day, many of which are the issues of today. In addition to basic land use, they included economics, parking, parks and recreation, public schools, transportation, annexation, utilities, urban renewal, and development standards. In 1986, the City adopted a new Comprehensive Plan. It contained goals and policies for the following elements: A. Overview . Introduction . Assumptions . The Vision for Bremerton B. Land Use C. Natural Resources D. Transportation E. Public Services F. Housing G. Economic Development This Plan's Land Use Element contained specific policies related to environmental and shoreline protection, the Central Business District, a single-family conservation area in West Bremerton, the South Callow area, and the Brownsville Highway Corridor. Through the years, additional special area studies were necessary. Some were adopted as amendments to the Comprehensive Plan, including the Waterfront Access Plan, West Hills Area Plan, and the Campus/Evergreen Neighborhood Plan. Smaller Plan amendments were also approved and will be incorporated into the Plan revisions. The 1986 Comprehensive Plan was the product of a long and intense community involvement process. The goals and policies were very well refined and, although some amendments were necessary, most of the Plan remained intact. When the Growth Management Act was passed in 1990, the Bremerton Plan was only four years old. Rather than abandon it and embark on a new planning process, the City decided to build on the 1986 Plan, integrate the GMA requirements, and ensure consistency with other plans. The result would be a revised Plan for the next 20 years. The 1986 Comprehensive Plan included a generalized Land Use Plan Map. It was a .policy plan" map that helped to guide zoning and other land use decisions but was not intended to be site specific. Properties along the borders of districts had built-in flexibility (or vagueness) and a development or zoning action could fall in either direction, depending on the type of proposal, its compatibility with surrounding uses, or other factors. Introduction - Page 4 The Growth Management Act has elevated the Comprehensive Plan and its maps to a much higher status. The Plan now leads the way for zoning, public improvements, and other very specific decisions. Plans must now be consistent with other plans, internally consistent with their own elements, and zoning and other implementation "tools" must be consistent with the Plan. Therefore, our new Plan maps must be site specific rather than the "blob" style maps of yesterday. 4.....<\R............E.i.H~:TI~k~S><>OI~.....:+O.< ~D.....lJSE./)REG>tJ~tldNS>)...<........ . .. .....: '.<.;:':...;...... ~........~I~ ....,..n r>...~:~... ."';', .. . .,' .' ....;..... ,'...... ,..";-:. . . . ._....... ... ..':' ..<....;.. _._. ..... Land use regulations are the tools that implement the Comprehensive Plan and, therefore, must be consistent with the Plan. If the Plan shows high-density residential development in a particular location, the Zoning Map should show a similar zoning designation. If the Plan calls for certain street development standards within low- density neighborhoods, then we need to adopt those standards and apply them when new development occurs. During and following preparation of the revised Comprehensive Plan, development regulations will be prepared and revised as necessary. The primary regulations to be dealt with include: A. Critical Lands Ordinance: Prepared as a GMA requirement, this ordinance was adopted in 1993 for the protection of sensitive natural areas. B. Zoning Ordinance: The City's current Zoning Ordinance was adopted in 1988, following a four-year process. It has been fine-tuned over the past five years and is working very well. Any changes made necessary by the revised Comprehensive Plan will be initiated immediately following Plan adoption. C. Subdivision Ordinance: Although a "Short Plat" ordinance has been in effect for many years, Bremerton does not have a subdivision ordinance. Subdivisions are processed in direct accordance with State law. Following Plan adoption, the City will consider the development of a new Subdivision Ordinance. Another option being considered is the transition of the Zoning Ordinance to a "development code" document which would include a subdivision section. D. Shoreline Management Program: The City adopted a series of major changes to its Shoreline Management progam in 1992. Although it is very current, specific proposals in the revised Plan could trigger additional amendments. Introduction - Page 5 E. Urban Renewal: The City has a Downtown Waterfront Urban Renewal Plan which was adopted in 1989. The Comprehensive Plan will take another look at the CBD and waterfront and determine whether or not the Urban Renewal Plan should remain intact, be revised, or be replaced with a different program. In addition to these regulatory measure:s, the planning process will produce an "Urban Growth Management Agreement" (UGMA) between the City and County to guide land use and development decisions within the UGA. A "Concurrency Management System" will be developed to meet the "pay-as-you-go" requirements. And, a variety of other agreements and guidelines will likely be developed to assist in the planning and the implementation of this Plan. """,. . 5. PERIODIC REVIEW AN[) AMENDMENT Following adoption of the Revised Comprehensive Plan and related development regulations, the City shall continually monitor their effectiveness and document needed amendments. A major review IOf the Plan will be conducted at five-year intervals and annual amendments will be considered in accordance with the process established in Element "K" (Implementation, Consistency, and Concurrency Element). . ~~ . 6-A:INTRO.E-A Introduction - Page 6 Bremerton Comprehensive Plan THE VISION FOR BREMERTON Prepared by: BREMERTON PLANNING Adopted: April 5, 1995 B Bremerton Comprehensive Plan ELEMENT B THE VISION FOR BREMERTON .. .. ..,. . ..' . . . .. . . .' . . po .... 1. INTROOUCTION.. . Each element of the Bremerton Comprehensive Plan will be based on an overall "vision" of the community's future, as incorporated into the Plan document. That vision will then be translated into the long-range goals, policies, and specific recommendations of each Plan element in order to bring the vision to reality. One of the first tasks of the Bremerton Citizens Advisory Committee (CAC) was to review the Overview Element of the City's 1986 Comprehensive Plan, which included a section entitled "The Vision for Bremerton". This resulted in the revised vision statements that follow. The statements will later be scheduled for a Planning Commission public hearing to solicit additional public input. Following the Planning Commission's review and refinement, the vision statements will be forwarded to the City Council. Since the vision will guide the Plan's goals, policies and proposals, it is important to firmly establish the planning program's direction early in the process. Once approved, the vision will be incorporated into an early chapter (element) of the Comprehensive Plan, along with the introductory narrative, major goals, and assumptions. The Vision for Bremerton is presented in the following order: . Bremerton -- 20 Years From Now . Population Growth . Neighborhoods . Human Development/Education . Urban Governmental Services . Economic Diversification . Tourism . Transportation & Mobility The Vision - Page 1 <2~. .BRI:MERTQNi2~()YEARSFRQM~dw> . The comprehensive planning process involves an assessment of our community's strengths and weaknesses, problems, Clnd. opportunities for improvement. Through our visions, goals, and courses of action, we can greatly influence our future by directing change. The following vision statements will show us the direction we intend to go and where we will be twenty years from now. A. During the next twenty years, Bremerton will experience the greatest population and development increases since World War II. The new growth will be planned, properly serviced, and accepted with care to ensure that it will be beneficial and not disruptive to the community. B. Bremerton will be economically stronger that it is today, with a greater diversification of commercial and industrial activity, a wider range of job types and salary levels, and a higher level of economic independence. C. Harrison Hospital will continue t() playa major roll in the provision of medical services and its surrounding district will continue to grow and strengthen its roll as a regional health services center. D. The educational foundation of the community will expand to offer four-year college degrees as well as a var~ety of vocational training. E. New arts, entertainment and civic facilities will strengthen Bremerton's prominence as the center for social.and cultural activities in Kitsap County. F. Recreational opportunities will increase to serve new residents. Existing facilities will expand, joint-use facilities will become more common, and new parks and recreational facilities will be provided. G. Interjurisdictional cooperation will improve, and the provision of needed governmental services and facilities will be better coordinated and provided in a more economical and efficient manner. H. Neighborhoods will continue to E~volve, improve, and become more attractive, comfortable, and desirable. They will provide a greater variety of housing options, affordable to a larger share of the market, and will become stronger and more stable as the proportion of owner-occupants gradually increases. I. As growth and traffic increase, travel and work habits will change. New mobility options will become available, including expanded ferry and bus service, increased car- and van-pooling, and a greater emphasis on placing housing and jobs in close proximity to each other. Tele-commuting will become more commonplace as an effective way to reduce travel. J. Bremerton will allocate the resources necessary to achieve the objective of a drug-free and gang-free community. The Vision - Page 2 ............ .. .... ..... ...... ........ ......... ...... .......... .... ............. ... .......... . .......... ......... ......... . ........................ ...... ..... . ........... ................ .......... . ........... .. ........ .... ..... . ............ ........ ............ ............ . ....... . ........ ... ........ .. ....... .. .. .. .. .. ... ........ ........ ........... . ........... . ........... . ......... ............ ......... ......... ................. ......... . ........ ............. ... ........ ........ . ........ .3lPc>POI!.AT'IONGROWTHn................>i.. New Countywide Planning Policies favoring growth in urban areas are expected to result in significant growth during this period. Population allocations suggest that Bremerton's population could increase by as much as 20,000, or nearly fifty percent over current levels. This will be a significant change from Bremerton's fairly steady population trend over the past decades and will result in significant increases in residential density and commercial intensity. We will face new problems and increased service demands, as well as opportunities for improvement as we adjust to accommodate our share of the region's growth. A. New ways to increase mobility and relieve traffic congestion will be found to deal with the nearly 40,000 new residents that will move into Bremerton and the remainder of the Central Kitsap Urban Growth Area. B. The provision of urban governmental services, long-range service plans, and service areas will become better coordinated among the various providers as demands for and costs of services increase. C. Competition between jurisdictions for new growth and development will diminish as coordinated plans, growth management agreements, revenue/cost sharing programs, and other innovative techniques are implemented. D. New growth and development will bring many opportunities for community improvement. New projects will bring with them utility extensions, improved streets, attractive landscaping and open space, recreational facilities, and attractive efficient design that will improve the quality of our neighborhoods and enhance the image of Bremerton. n . .. .. 4. NEIGHBORHOODS The quality and stability of neighborhoods are indicators of a community's overall health. We generally associate "quality" with a number of factors that include the level of property maintenance, neighborhood pride, peace and quiet, and the nature and style of the architecture, landscaping, and overall design. Bremerton has a great variety of housing choices. Some neighborhoods are in need of protection while others need rehabilitation or, in some cases, redevelopment. A. Bremerton will continue to provide homes for Naval personnel and workers from all sectors of the local economy, retirees, Seattle commuters, and others. B. We will continue to strive for a variety and a good balance of housing opportunities for all economic and social segments of the community. C. We will see a greater emphasis on home ownership as a means of achieving a higher degree of neighborhood maintenance and pride, and to offer the D. In order to achieve a higher level of home ownership, a greater emphasis will be placed on the provision of small, private, affordable single-family homes, both in new subdivisions and as "in-fill" within existing neighborhoods. Condominiums and other forms of ownership will increase in popularity. E. Historic preservation will playa greater role in Bremerton's future as certain unique areas and structures are recognized for their historical value. F. Neighborhood quality, safety, stability, and affordability will be given increased consideration in all community improvement programs. G. Bremerton will support its neighborhoods through greater availability of community services and improved maintenance of streets and other public facilities. 5. HUMANDEVELOPMENT /EDUCATIO~ .. Bremerton has continued to serve as a s.ocia', cultural and educational center of Kitsap County and will strengthen its roleis in these areas through expanded programs, facilities and other opportunities. A. Bremerton will improve its position as a center for quality education as Olympic College expands its curriculum to offer four-year degrees. B. We will experience an increasing need for vocational training and re-training to accommodate economic diversific:::ation and military facility downsizing. C. Lifelong learning opportunities will continue to be provided through the public libraries, public access television, and other community educational programs offered by the City, County, and c>thers. D. New approaches will be used to better ensure the provision of needed services to seniors, children, youth, physically and mentally disadvantaged, and to meet other social service needs througlhout the community. Such services might involve recreation, hobbies, organizational activities, youth facilities/activities, nature study, etc., in addition to the more typical social services. '.. . .. '.. .. . .. ..... . .. . . .... ... .. . ... .. .., .... ..,.... . . ..... . n_.... n' . . . , " ..... .. .. , .. . .. "', . . ., .. .... ....... 6~URBAN~OVE;RNMEf.JTAtSER\lICES> The Growth Management Act gave Bremerton primary responsibility for the provision of urban services and utilities. Bremerton iswithin a larger Urban Growth Area, the unincorporated portions of which are in tlhe jurisdiction of Kitsap County which is also a major provider of urban services. A. Plans for the provision of urban services within the Bremerton Urban Growth Area will be coordinated with all servi'ce providers to ensure quality, dependability, and coordinated development standards. The Vision -- Page 4 B. Bremerton will continue to provide a full range of urban services at reasonable costs within its identified service areas. C. Public involvement in local government will continue to be encouraged. There will be expanded opportunities for participation at both the neighborhood and community levels. Public access television, computer bulletin boards, and other advances in electronic technology will play greater roles in linking the local citizenry with the business of their elected officials. ...., , , , " ......" . ..... ... , " . "'''' ..." . . , , ... .. "'" .. .....".. .,", ,',. " .... ........ . ,","".'.,' ........,.' 7 . ECONOM1CDIVERSIFICA TIOrsl.<>>> Throughout its history, Bremerton and much of Kitsap County have been closely linked to national defense. Bremerton grew up around the Puget Sound Naval Shipyard (PSNS) and local employment relied heavily on the health of the shipyard. The military is in the process of change. "Economic diversification" is no longer just a good idea, it's vital to our economic stability. . A. Bremerton will continue to playa major role in national defense, will continue to support PSNS as its major employer, and will retain many of the important elements of its naval industrial complex. B. Bremerton will continue to grow as a business and service center, but will also gradually diversify to provide a greater range of career-oriented commercial and industrial jobs and a stable economy. C. The economic base of Bremerton will become more interdependent with other metropolitan centers throughout the Puget Sound region. D. Bremerton will experience growth and diversity within the Central Business District. It will continue to transition from a retail commercial center to a new mix of residential, retail, office, and tourist facilities. E. The growth of new businesses and jobs will be accompanied by growth in small home occupations and telecommuting which will benefit the local economy without adversely affecting their surrounding neighborhoods. 8. TOURISM The Pacific Northwest is an increasingly popular tourist destination and the Puget Sound ferry system is a prime tourist attraction. Bremerton's strategic regional location offers major opportunities to capitalize on the great potential offered by the tourism industry. A. Tourism will playa greater role in the local economy and will capitalize on such advantages as convenient ferry access to Seattle, the "Gateway to the Olympics", and an increasing interest in the arts, museums and other cultural The Vision - Page 5 activities, especially within walking distance of the ferry terminal. B. Bremerton will strengthen its position as a cultural center while placing greater value on its historical and architectural heritage. C. Local tourist accommodations, such as restaurants, hotels, meeting and convention facilities will be expanded to meet the increasing needs. '';,' . ,',' . ,',',';",', ....>.. "':.,., '" 9...... TRANSPORTATION & MOBiliTY> Substantial population growth will challenge our ability to move around as freely as we have in the past. A limited mass transit system of buses and ferries currently serves Bremerton and Kitsap County. However, the private automobile remains the primary mode of transportation for most local travelers. A. As traffic and congestion increasl9 with new development, steps will be taken to discourage use of the family car in favor of other options. Among the options likely to be addressed within our twenty-year planning period are expanded bus and ferry services; greater emphasis on carpooling, bicycling, and walking; and innovative development designed to allow workers to live near their places of employment. B. We will see more frequent and dependable ferry service between Seattle and Bremerton, supplemented with short-range "mosquito fleet" ferry service. This combination will promote higher density residential and mixed use development near ferry terminals and help make multimodal terminals feasible. C. Light rail transit may be in our distant future. We will begin to prepare for such a system by orienting our land uses, residential areas, transportation and development corridors, and other physical features in ways that will facilitate a future rail-type mass transit system. ... 6-A:VISION.E-B The Vision .- Page 6 Bremerton Comprehensive Plan PLANNING GOALS Prepared by: BREMERTON PLANNING Adopted: April 5, 1995 c Bremerton Comprehensive Plan ELEMENT C PLANNING GOALS p' .. ...." . " .. ..,.. ,,, .... . .. ... . ." ..... . . ..... .. .... . .... uu' n" .. ..... .. ...INTROOOCTlON Comprehensive Plan goals help define the vision for Bremerton's future. These goals point the direction the City will head as it changes, redevelops, and grows. Goals sketch the future envisioned by the Plan. They may not ever be totally realized, but they represent the ideal community the City will strive to achieve. . Goals are broad value statements and recommendations. The Growth Management Act (GMA) includes "planning goals" to guide the development and adoption of comprehensive plans and development regulations. The Comprehensive Plan must be consistent with GMA planning goals. Local goals refine the City's vision of its ideal future, within the framework of the State goals. State and City planning goals are listed below. Goals #1 - 13 are State goals. Supplementary City goals are listed under related State goals. Additional supplementary City goals begin with Goal #14. GOAL #1 URBAN GROWTH Encourage development in urban areas where adequate public facilities and services exist or can be provided in an efficient manner. A. Accommodate new development with care that Bremerton will be a "most liveable city" made up of strong, healthy neighborhoods, workplaces and activity centers. B. Group higher intensity development convenient to community activities and busy streets to strengthen the identity of Bremerton's neighborhoods. C. Approve only those annexation requests that are for lands within the designated Urban Growth Area, that can be effectively served by all needed public facilities and services, and that will result in long-term benefits to the community. Planning Goals - Page 1 community. D. Maximize the City's existing in-fill development potential to ensure the most efficient use of existing utility infrastructure and facilities. GOAL #2 REDUCE SPRAWL Reduce the inappropriate conversion of undeveloped land into sprawling, low- density development. A. Cluster development on vacant sites so as to retain greater areas of open space in Bremerton. GOAL #3 TRANSPORTATION Encourage efficient multimodal transportation systems that are based on regional priorities and coordinated with county and city comprehensive plans. A. Provide for safe, efficient movement of people and goods within and through town. B. Provide a system of interconnected interchanges for different kinds of public transportation so people are not forced to use private cars at all. C. Cluster housing, shopping and workplaces together, particularly around transportation interchanges, to reinforce Bremerton's public transportation system. D. Keep major roads outside of Bremerton's neighborhoods. E. Reduce reliance on the private automobile in the central business District, where the focus will be on multimodal transportation options. GOAL #4 HOUSING Encourage the availability of affordable housing to all economic segments of the population of this state, promote a variety of residential densities and housing types, and encourage preservation of existing housing stock. A. Provide a range of housing opportunities in healthy living environments for all members of our Bremerton community. B. Establish liveable neighborhoods with a mix of household types in every Bremerton neighborhood. Planning Goals - Page 2 C. Help make the American dream of home ownership possible for a majority of Bremerton residents. GOAL #5 ECONOMIC DEVELOPMENT Encourage economic development throughout the state that is consistent with adopted comprehensive plans, promote economic opportunity for all citizens of this state, especially for unemployed and for disadvantaged persons, and encourage growth in areas experiencing insufficient economic growth, all within the capacities of the state's natural resources, public services, and public facilities. A. Develop a strong, healthy, diversified economy that supports and protects Bremerton's quality of life. B. Accent the roles of small businesses, tourism, health services, education, and social and cultural activities in diversifying Bremerton's economy. GOAL #6 PROPERlY RIGHTS Private property shall not be taken for public use without just compensation having been made. The property rights of landowners shall be protected from arbitrary and discriminatory actions. A. Respect private property rights while protecting the long term good of our Bremerton community. GOAL #7 PERMITS Applications for both state and local government permits should be processed in a timely and fair manner to ensure predictability. A. Maintain streamlined City permit systems while giving adequate notice of development applications to those who will be affected. B. Provide equitable, consistent and effective land use management programs. Planning Goals - Page 3 GOAL #8 NATURAL RESOURCE INDUSTRIES Maintain and enhance natural resource-based industries, including productive timber, agricultural, and fisheries industries. Encourage the conservation of productive forest lands and productive agricultural lands, and discourage incompatible uses. A. Balance protection of natural resource-based industries with stewardship of Bremerton's natural resource base. GOAL #9 OPEN SPACE AND RECREATION Encourage the retention of open space and development of recreational opportunities, conserve fish and wildlife habitat, increase access to natural resource lands and water, and develop parks. A. Provide a variety of recreational opportunities convenient to Bremerton homes and workplaces. B. Combine the requirements for Critical Areas protection with the need for passive open space, to provide areas that will enhance the visual and aesthetic beauty of the Bremerton area. C. Promote joint use of parks, schools, and other public facilities to maximize their benefits to the Bremerton community. GOAL #10 ENVIRONMENT Protect the environment and enhance the state's high quality of life, including air and water quality, and the availability of water. A. Protect the natural environment so as to preserve and enhance Bremerton's quality of life into the foreseeable future. B. Restore the natural environment where it has been damaged, and take care that new development does not undermine the sustainability of the environment. C. Assure an adequate supply of affordable energy for residents, business and industry in the Bremerton area. Planning Goals - Page 4 GOAL #11 CITIZEN PARTICIPATION AND COORDINATION Encourage the involvement of citizens in the planning process and ensure coordination between communities and jurisdictions to reconcile conflicts. A. Provide opportunities for Bremerton residents and business people to participate in City decisions that affect them. B. Encourage Bremerton residents and business people to form neighborhood groups to work for their common interest. GOAL #12 PUBLIC FACiliTIES AND SERVICES Ensure that those public facilities and services necessary to support development shall be adequate to serve the development at the time the development is available for occupancy and use without decreasing current service levels below locally established minimum standards. A. Provide a range of urban services at reasonable costs. B. Require new development to pay a fair share of the costs of public services and facilities. C. Coordinate the provision of public services and facilities with Kitsap County and special districts within the Bremerton Urban Growth Area to ensure quality, dependability, and coordinated development standards. GOAL #13 HISTORIC PRESERVATION Identify and encourage the preservation of lands, sites, and structures, that have historical or archaeological significance. A. Protect, preserve and restore areas identified as having historical, cultural, or educational value. B. Work with local historical preservation organizations and consider the development of a preservation plan and ordinance for Bremerton. Planning Goals - Page 5 GOAL #14 COMMUNITY IMAGE Enhance Bremerton's image as a pleasant, beautiful city in which to live, work and visit. A. Foster identifiable, liveable neighborhoods that provide a variety of residential opportunities complimented by recreational, shopping and social support services. B. Redevelop downtown Bremerton as a pedestrian-oriented "urban waterfront village" with housing, retail shops and services, and offices, supported by recreational, entertainment and intermodal transit facilities. ... 6-A:GOALS.E-C Planning Goals - Page 6 Bremerton Comprehensive Plan CITIZEN INVOLVEMENT PROGRAM Prepared by: BREMERTON PLANNING Adopted: September 1993 Re-adopted: April 5, 1995 D . Bremerton Comprehensive Plan ELEMENT D CITIZEN INVOLVEMENT PROGRAM . ,..' . .. "" . ...." ., " " ......, >INTRODUCfiON City of Bremerton and Washington State public meetings procedures mandate that all planning decisions be made publicly and with notice. Throughout the Comprehensive Plan revision process, it was the intent of the City of Bremerton to maximize citizen involvement opportunities. This was done through extensive public notice and information programs, and by assuring that the comprehensive planning process remained open and accessible and related materials were presented in a manner that was easily understood by the citizens of Bremerton. The bases of Bremerton's Comprehensive Planning Citizen Involvement Program are: . Adherence to City and State open meetings and public disclosure regulations; . Use of organized neighborhood groups to distribute, review and comment on planning proposals; . Appointment of a Citizens Advisory Committee (CAG) to work directly with staff in the preparation of drafts for Planning Commission consideration; . Preparation of clear and understandable materials to explain issues and options; and . Designation of a staff person to act as an advocate for citizen participation issues and actions. Since the Citizen Involvement Program is one of the most important components of our planning program, it was written and adopted by the City Council in September, 1992, to help guide the planning process. . . .. . '. . .. . . 2. ."REQUIREMENTSQFTHEACl\> '" The Growth Management Act requires that the City establish procedures providing for early and continuous public participation in the development and amendment of comprehensive land use plans and development regulations. Those procedures must achieve the following: Citizen Involvement - Page 1 A. Broad dissemination of proposals and alternatives; B. Opportunity for written comments; , C. Public meetings after effective notice; D. Provision for open discussion; , E. Communication and Information programs; and F. Consideration of and response to public comments. . . ..... .... . .... ... ... ," . " . ..;... ..... :.:....;...:..,':;.;...<:.. ............ :..' ...... ..;.:.:.....::,'.,'. .:.. .... ...... .,<:.,:-.::> ," :-:..;.;....;. ..,.';: <<:::: ',.';': (3)<<.' <PROGRAMeOt.ICIES'ANDPROCEPLJRES. " In order to ensure early and continuous public involvement, the following program shall be followed: A. Extent of Citizen Involvement: POLICY: Whenever possible, citizens shall be given the opportunity to be involved in all phases of the planning process, including: (1) Review of Data collection and staff analyses. (2) Plan preparation and refinement, including options. (3) Adoption. (4) Implementation. (5) Ongoing Evaluation. (6) Periodic Revision. B. Communication: (4) (5) POLICY: The City of Bremerton will: use the following methods to assure a high level of public awareness of the comprehensive planning program and to assure effective communication betv.:een all involved in the process: (1) Frequent releases of information to the press, including local newspapers, radio stations and public access television. (2) Frequent written staff and citizens groups' progress reports to the Planning Commission and CitY Council, and verbal reports during regularly televised Council meetings. (3) Printed summaries of information, activities and proposals, made available to schools, local organizations, and individual citizens. Public workshops and small group discussions in diverse neighborhoods. Public meeting agenda published in The Sun a minimum of ten days prior to the meeting and posted in key public locations (to be determined). Citizen Involvement - Page 2 (6) Utilization of public access television for announcements, panel discussions, and special planning programs, as appropriate or feasible. (7) Whenever possible, utilize existing publications or processes, such as regular utility bill. mailings and newspapers or newsletters produced by Bremerton High School, Olympic College, PSNS, Realtors, Homebuilders, Chamber of Commerce, etc. (8) Identification of a single staff person to be responsible for the citizen liaison activities for long-range planning issues. c. Technical Information: POLICY: The City will ensure that inventory data and other background information used in the preparation of the Comprehensive Plan is made available to other jurisdictions and to the general public during and after the planning process. This information will be available through the Department of Community Development's Citizen Liaison person. (1) Planning data will be available during the City's normal working hours at . the Planning Division office, 286 Fourth Street in Bremerton. (2) Special reports, tabulations of inventory information, and other organized information will be made available through City Hall and the public libraries. (3) Technical information and maps will be prbvided, when available, to the Bremerton Area Council of Neighborhoods (BACON), other citizens organizations, and other parties interested in active participation in the process. (4) Members of the Planning, Engineering, Utilities, or other involved Departments will provide technical assistance through personal requests and at neighborhood meetings, workshops, public hearings, and other opportunities. (5) The City will support and participate in public education/involvement programs offered by Kitsap County, Kitsap Regional Planning Council, special districts, or other area organizations. D. Input and Feedback Mechanisms: POLICY: The Citizen Liaison person will be responsible for maintaining two- way communication with the public through the following means: Citizen Involvement - Page 3 (4) (5) (6) (1) Planning data, drafts, and planning proposals will be publicized early in the process with adequate time for public review and comment. (2) The City will encourage written -and verbal comments that can be incorporated into the record ~nd directly considered and responded to. I (3) The process will include early public neighborhood and community- wide meetings and workshops during which ideas and concerns may be freely exchanged. The City will identify groups that are able to sponsor such meetings. Neighborhood organizations are encouraged to participate in the work tasks and to develop specific' neighborhood plans or proposals that might be considered for incorporation into the City's Comprehensive Plan. The Planning Commission will function as the primary advisory body to the City Council on matters involving the Comprehensive Plan. The City will ensure adequate representation on regional committees that may be created and operated by Kitsap County or the Kitsap Regional Planning Council (KRPC). Membership for such regional committees will be first drawn from the Planning Commission or City Council E. Financial SUDport: POLICY: Adequate human, financial and informational resources will be allocated to this Citizen Involvement Program and such resources will be contained in the budget of the Department of Community Development. (1) The City will utilize funds provided by the State to support the activities of the Citizens Liaison person. (2) The City will provide meeting places, as available, in City Hall, DCD, Utilities, Parks, Fire or other suitable facilities. (3) The City will provide printing, mailing, advertising, and other support services as may be necessary, within its financial means, to carry out this program. F. Periodic Review and Revision: POLICY: Further involvement opportunities will be made available following adoption of the Bremerton Comprehensive Plan:. Citizen Involvement.,... Page 4 6-A:CIT-INV.E-D (1) A formal process will be established for the annual consideration of Plan Amendments. (2) A joint City-County process will be established for the public review and involvement in future Urban Growth Area and City and County Plan Amendments. (3) An annual allocation of hours for a Citizen Uaison person will be made by the Department of Community Development. ... Citizen Involvement - Page 5 Bremerton Comprehensive Plan LAND USE ELEMENT Prepared by: BREMERTON PLANNING Adopted: April 5, 1995 E Bremerton Comprehensive Plan ELEMENT E lAND USE CONTENTS 1. INTRODUCTION............................................ 1 2. PRESENTATION FORMAT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ., 1 3. GOALS, POLICIES and THE VISION FOR BREMERTON . . . . . . . . . . . . .. 2 A. PLANNING GOALS and CITY POLICIES. . . . . . . . . . . . . . . . . . . ., 2 B. COUNTYWIDE PLANNING POLICIES. . .. . . . . . . . . . . . . . . . . . .. 6 C. CONSISTENCY WITH REGIONAL PLANS ................... 6 D. THE VISION FOR BREMERTON .......................... 7 E. POPULATION GROWTH. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 8 F. DEVELOPMENT CONSTRAINTS .......................... 11 'G. SOCIO-ECONOMIC CONSIDERATIONS .................... 13 4. ECONOMIC DEVELOPMENT CONSIDERATIONS. . . . . . . . . . . . . . . . . . .14 A. ECONOMY OF THE STATE AND REGION. . . . . . . . . . . . . . . . . . . 14 B. THE LOCAL ECONOMY ................................ 15 C. BREMERTON ECONOMIC OBJECTIVES. . . . . . . . . . . . . . . . . . . . 16 5. URBAN GROWTH AREA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 A. DEFINITIONS ........................................ 17 B. COUNTYWIDE PLANNING POLICIES. . . . . . . . . . . . . . . . . . . . . . . 18 C. BREMERTON'S UGA PROPOSAL . . . . . . . . . . . . . . . . . . . . . . . . . 18 D. URBAN GROWTH AREA MANAGEMENT. . . . . . . . . . . . . . . . . . . .19 6. LAND USE RATIOS & DENSITIES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 A. NATIONWIDE LAND USE SURVEY ........................ 21 1. Residential Uses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 2. Commercial Uses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 3. Industrial Uses ..................... . . . . . . . . . . . . . 23 4. Parks & Recreational Uses ......................... 23 5. Institutional Uses ................................ 24 6. Transportation & Utilities Uses . . . . . . . . . . . . . . . . . . . . . . . 24 7. OVERALL BREAKDOWNS . . . .. . . . . . . . . . . . . . . . . . . . . . . 25 8. CONCLUSIONS .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 7. EAST BREMERTON PLAN .................................... 27 A. EAST BREMERTON SECTOR DESCRIPTION ................ 27 B. LAND USE INVENTORY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 C. RESIDENTIAL LANDS ....;............................ 28 D. COMMERCIAL LANDS ................................. 30 E. INDUSTRIAL LANDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 F. PARKS & SCHOOLS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 G. OTHER LAND USE ISSUES ............................. 31 H. SPECIFIC AREA PLANS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 8. CENTRAL BREMERTON PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 A. CENTRAL BREMERTON SECTOR DESCRIPTION. . . . . . . . . . . . . . 33 B. LAND USE INVENTORY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 C. RESIDENTIAL LANDS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 D. COMMERCIAL LANDS ................................. 36 E. INDUSTRIAL LANDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37 F. PARKS & SCHOOLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 G. OTHER LAND USE ISSUES ............................. 38 H. SPECIFIC AREA PLANS ................................ 39 9. WEST BREMERTON PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40 A. WEST BREMERTON SECTOR DESCRIPTION ................ 40 B. LAND USE INVENTORY ................................ 41 C. RESIDENTIAL LANDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 D. COMMERCIAL LANDS ................................. 42 E. INDUSTRIAL LANDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43 F. PARKS & SCHOOLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43 G. OTHER LAND USE ISSUES ............................. 44 H. SPECIFIC AREA PLANS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 10. WATERSHED/UTILITIES LANDS ................. ./. . . . . . . . . . . . . 45 A. UTILITY LANDS MANAGEMENT ..........................45 B. THE LAND USE PLAN. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47 11. SPECIFIC AREA PLANS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49 A. INTRODUCTION...................................... 49 B. AREAS INCLUDED .................................... 49 E-1 MANETTE BUSINESS DISTRICT. . . . . . . . . . . . . . . . . . . 50 E-2 HARRISON HEALTH SERVICES DISTRICT . . . . . . . . . . . 52 E-3 WHEATON WAY CORRIDOR ..................... 54 C-1 CENTRAL BUSINESS DISTRICT. . . . . . . . . . . . . . . . . . . 56 C-2 CHARLESTON BUSINESS DISTRICT ............... 60 C-3 PARK AVENUE CORRIDOR ...................... 64 C-4 CAMPUS/EVERGREEN NEIGHBORHOOD. . . . . . . . . . . 66 C-5 SOUTH SMITH COVE REDEVELOPMENT. . . . . . . . . . . . 68 W-1 KITSAP LAKE BUSINESS DISTRICT ................ 71 W-2 WERNER ROAD INDUSTRIAL CORRIDOR. . . . . . . . . . . 72 W-3 WEST HILLS AREA PLAN ....................... 73 W-4 SO. AUTO CENTER ENHANCEMENT AREA . . . . . . . . . . 74 W-5 PENDERGAST SPORTS COMPLEX ................ 75 S-1 ANDERSON CREEK CORPORATE CAMPUS. . . . . . . . . . 76 MAPS & TABLES POPULATION TRENDS 1901-1993 (tabl\3) . . . . . . . . . . . . . . . . . . . . . . . . . .. 8 RECENT GROWTH HISTORY (graph) .............................. 9 HISTORICAL POPULATION GROWTH (table) . . . . . . . . . . . . . . . . . . . . . . . . . 10 Proposed URBAN GROWTH AREA (map) ........................... 20 COMPARISON OF MAJOR LAND USES (table) ....................... 25 EAST BREMERTON PLAN · SECTOR MAP ...................................................... 27 · LAND USE BREAKDOWN (table) ........................................ 28 · RESIDENTIAL DENSITIES (map) ........................................ 29 CENTRAL BREMERTON PLAN · SECTOR MAP ...................................................... 33 · LAND USE BREAKDOWN (table) ........................................ 34 · RESIDENTIAL DENSITIES (map) ........................................ 36 WEST BREMERTON PLAN o SECTOR MAP ...................................................... 40 · LAND USE BREAKDOWN (table) ........................................ 41 WATERSHED/UTILITIES LANDS · BIOSOLlD DISPOSAL AREAS (map) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . " 46 · UNION RIVER WATERSHED & UTILITY LANDS (map) ........................ 48 SPECIFIC AREA PLANS E-1 MANETTE BUSINESS DISTRICT ........................................ 50 E-2 HARRISON HEALTH SERVICES DISTRICT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 52 E-3 WHEATON WAY CORRIDOR ........................................... 54 C-1 CENTRAL BUSINESS DISTRICT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 56 C-2 CHARLESTON BUSINESS DISTRICT ,. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 60 C-3 PARK AVENUE CORRIDOR ............................................ 64 C-4 CAMPUS EVERGREEN NEIGHBORHOOD ................................. 66 C-5 SOUTH SMITH COVE REDEVELOPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . " 68 W-1 KITSAP LAKE BUSINESS DISTRICT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 71 W-2 WERNER ROAD INDUSTRIAL CORRIDOR ................................. 72 W-3 WEST HILLS AREA PLAN ............................................. 73 W-4 S. AUTO CENTER ENHANCEMENT AREA. .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . " 74 W-5 PENDERGAST SPORTS COMPLEX ...................................... 75 S-1 ANDERSON CREEK CORPORATE CAMPUS ............................... 76 LAND USE PLAN MAPS: · EAST BREMERTON ....... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 77 · CENTRAL BREMERTON . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . " 78 · WEST BREMERTON ................................................. 79 · WATERSHED & UTILITY lANDS ........................................ 80 Bremerton Comprehensive Plan ELEMENT E LAND USE ...... ... .. . ., . ....... ... ...., ... . ........ . . .."" ......, ........ . .. ..., .", ' . ........ . ...... ".."..... .. ., .... " tlr ....fNTROtJtJCTION ... The Land Use Element and its related maps are probably the most important and visible elements of the Comprehensive Plan. They depict the City's growth and development visions, goals, and policies for the next twenty years. Based on those goals and visions, this section of the Plan designates the future uses of all lands within the City. The Land Use Element describes Bremerton's position within its Urban Growth Area and within the region. It sets the stage for land use planning with discussions about population and growth projections, development constraints, social and economic considerations, and a summary of the citywide Land Use Inventory and Build-out Analysis. Based on those foundations, the Land Use Element provides a physical plan for commercial and industrial growth, residential densities that are most appropriate for various neighborhoods, special districts to be encouraged or enhanced, locations for redevelopment or urban renewal activities, and areas that should be preserved as sensitive or natural resource areas. Because all Plan elements are interrelated, there will be various degrees of over-lap. For example, the locations of parks and schools are discussed in this element while the Capital Facilities Element deals with the standards, levels of service and financing strategies for those and other public facilities. Specific projects outlined in the Transportation Element will also be addressed in the Capital Facilities Element and possibly other elements. One of the challenges of comprehensive planning is preventing conflicts and maintaining "internal consistency" among all elements. . . .. . . .. . . . - .. ... ' ., . ',' , . 2_PRESENTATIONH FORMAT The first sections of this element address regional and citywide issues, including overall goals, policies, visions, relationships to other plans, socio-economic considerations, etc. More specific land use policies and proposals are addressed within each of the major "sectors" of the community that were used in the Land Use Inventory and Build-out Analysis. This Element and the Plan Map combine all individual components into a 20-year land use plan for Bremerton that is supported by and consistent with all other elements of this Plan. Land Use - Page 1 . . ..... 'n ..... . .. n. .,..... . . ... ...... .... .n... ..... ...... . .., .....-... ....... >3.>~O~i..s~eO~IQIES~nd> .... . ....... / ....... ...... ....... ...>. ........ i..../H>)'tHeVISION> FdR...sRI2MEFlrON> ( ..... ..>... This element revises and expands upon the Land Use Element of the 1986 Comprehensive Plan. An extensive visioning process and policy review was followed by the Citizens Advisory Committee's tedious work and constructive input. This resulted in the recommendations that were offered for public review and later proposed for adoption. The provisions of the Land Use Element, more than any other, guide transportation planning, budgeting for capital facilities, the provision of needed housing, and other components of the City's Plan. It's essential that those provisions be internally supportive of and consistent with all other Plan elements, as well as with certain state, regional and county plans, goals, objectives and policies. A. PLANNING GOALS and CITY POLICIES Several of the Growth Management Act's statewide planning goals pertain primarily to land use planning. The following goals will be addressed most directly in this Element but may also be addressed in other elements. Each is followed by supporting City policies related to the Land Use Element. State Goal #1: URBAN GROWTH Encourage development in urban areas where adequate public facilities and services exist or can be provided in an efficient manner. Supporting Policies: (1) Collaborate with Kitsap County and other affected jurisdictions to ensure that the Urban Growth Area will be based on recognized urban development patterns, good access, efficient provision of utilities and public facilities, and projected growth needs. (2) Coordinate the timing of new development with the upgrading or extension of needed municipal services. (3) Accommodate new development with care so that Bremerton will continue to be a well-balanced "most liveable city". (4) Group higher intensity development convenient to community activities and busy streets to strengthen the identity of Bremerton's neighborhoods. (5) Continue to provide municipal governmental services within the Urban Growth Area, while ensuring that the plans of Bremerton, Kitsap County and other affected jurisdictions are coordinated and consistent. Land Use - Page 2 State Goal #2: REDUCE SPRAWL Reduce the inappropriate conversion of undeveloped land into sprawling, low- density development Supporting Policies: (1) Ensure that sufficient land areas are available and appropriate zoning is in place to allow the level of new development that is needed to accommodate Bremerton's twenty-year population allocation. (2) Adjust development guidelines and regulations to prevent development that is inappropriately low and that might waste valuable urban lands. (3) Assist Kitsap County in designing the Urban Growth Area large enough to accommodate our expected growth, but not so large that it will allow inefficient low-density urban sprawl development. (4) Work with Kitsap County to develop the Urban Growth Management Agreement (UGMA), as required by the Countywide Planning Policies, to better govern all lands within the Urban Growth Area. (5) Promote the concept of development clustering to conserve energy, save land, lower public costs, reduce sprawl, and provide open space. State Goal #3: TRANSPORTATION Encourage efficient multimodal transportation systems that are based on regional priorities and coordinated with county and city comprehensive plans. Supporting Policies: (1) Ensure that planned transportation facilities are designed to implement the City's Land Use Plan, rather than simply resond to development patterns and past trends. (2) Ensure that the City's Transportation Element and related Land Use proposals are consistent with the regional Vision 2020 Plan, with the Countywide Transportation Plan, with the plans of transportation service providers, and with regional and local priorities. See the Transportation Element for additional goals and policies. State Goal #4: HOUSING Encourage the availability of affordable housing to all economic segments of the population of this state, promote a variety of residential densities and housing types, and encourage preservation of existing housing stock. Land Use - Page 3 Supporting Policies: (1) Designate on the Land Use Plan sufficient, accessible, buildable land areas that can accommodate the housing needs of the community, and follow with consistent zoning and other appropriate regulatory controls. (2) Protect neighborhoods from incompatible development, noise, glare, odor, dust, bypass traffic, and other damaging intrusions that might adversely affect their comfort and livability. (3) Provide continuing opportunities for a range of housing types and densities that will accommodate the lifestyles and economic levels of present and future residents. (4) Promote preservation, rehabilitation, and redevelopment activities that ensure a variety of housing types and costs, and that also preserve the historic, social, and aesthetic qualities of Bremerton neighborhoods. See the Housing Element for additional goals and policies. State Goal #5: ECONOMIC DEVELOPMENT Encourage economic development throughout the state that is consistent with adopted comprehensive plans, promote economic opportunity for all citizens of this state, especially for unemployed and for disadvantaged persons, and encourage growth in areas experiencing insufficient economic growth, all within the capacities of the state's natural resources, public services, and public facilities. Supportina Policies: (1) Promote a strong, stable local economy that retains existing jobs, assists in economic expansion, promotes economic diversification, maintains environmental quality, and protects our quality of life. (2) Provide sufficient land use and development opportunities to ensure that Bremerton continues to provide a wide variety of job and business opportunities and continues to be a major economic center of Kitsap County. (3) Seek ways to attract and accommodate new kinds of businesses, home-based businesses, and industrial diversification opportunities to offset the anticipated decline in federal or military-related local jobs. (4) Ensure that proper zoning and expeditious development regulations are in place to accommodate new commercial, industrial, tourism, and other business-related development. (5) Review and streamline, as necessary, the City's governmental and permitting processes to ensure quick responses to potential investors, developers, homeowners, and others seeking to build, live or do business within the City. (6) Ensure the availability of adequate public services and utilities to all sites. Land Use - Page 4 (7) Protect quality well-located industrial lands from being lost to higher value commercial or other non-industrial competing uses. State Goal #8: NATURAL RESOURCE INDUSTRIES Maintain and enhance natural resource-based industries, including productive timber, agricultural, and fisheries industries. Encourage the conservation of productive forest lands and productive agricultural lands, and discourage incompatible uses. Supporting Policies: (1) Bremerton will continue to discourage costly and land intensive sprawl in rural areas by providing opportunities for new development concentrated at higher urban densities within the City. (2) Continue to manage the City watershed and related Utility owned lands in a manner that protects the forest and water resources in accordance with the. adopted Utility Land Management Plan. (3) Continue to improve sewage treatment facilities, the stormwater system, and other facilities, and enforce environmental regulations to help ensure clean and healthy water and shoreline environments for fish and other sea life. State Goal #9: OPEN SPACE AND RECREATION Encourage the retention of open space and development of recreational opportunities, conserve fish and wildlife habitat, increase access to natural resource lands and water, and develop parks. Supporting Policies: (1) Continue to acquire and develop new park, recreation and open space areas and facilities that will be needed to meet the needs of our growing population. (2) Work with the school district and other organizations to develop joint-use agreements for available facilities. (3) Incorporate into new development proposals the provisions of the adopted Waterfront Access Plan and other plans and regulations that call for shoreline access improvements, pathways, or other forms of access or facilities linkage. State Goal #10: ENVIRONMENT Protect the environment and enhance the state's high quality of life, including air and water quality, and the availability of water. Land Use - Page 5 Supporting Policies: (1) Through the process of siting, design, orientation and Site Plan Review, ensure that new development promotes the air quality goal and policies, the water quality and quantity goal and policies, and other applicable environmental quality provisions addressed in the Environmental Management Element of this Plan. (2) Continue to protect and manage the City's Union River Watershed and nearby Utility-owned forest resource lands. (3) Pursue environmental objectives through such indirect land use planning concepts as clustered housing, reduced vehicle travel, mixed use development, transportation corridors, and regulations to protect sensitive areas, resource lands, and other Ilocal valuables. State Goal #13: HISTORIC PRESERVATION Identify and encourage the preservation of lands, sites, and structures, that have historical or archaeological significance. Supporting Policies: (1) Identify historic sites and structures of architectural significance throughout the City and assist in their protection and preservation. (2) Promote the use of historic names, such as Manette or Charleston when those names have significance or provide a stronger local identity. B. COUNTYWIDE PLANNING POLICIES The Land Use Element is guided, in part, by Countywide Planning Policies. These were originally adopted by Kitsap County in August, 1992. The policies are too numerous to list here, but they pertain to all aspects of comprehensive planning, from establishment of the Urban Growth Area (U~A) to the details of fiscal impact analyses and policies for coordination between all jurisdictions. SupDorting Policy: Bremerton will continue to be guided by the adopted Countywide Planning Policies and will ensure that subsequent amendments to the Comprehensive Plan and its implementing regulations are consistent with the policies. C. CONSISTENCY WITH REGIONAL PLANS The primary regional guide to Bremerton's Comprehensive Plan is the Vision 2020 plan developed by the Puget Sound Regional Council. The Transportation Element discusses that plan and the City's role as a "metropolitan center". Land Use - Page 6 The "regional vision" is also embodied in the Multicounty Planning Policies, which Kitsap County shares with Pierce, King and Snohomish Counties. Most of the following summary policy statements will look familiar because they are very basic and are repeated, sometimes with greater emphasis, in other elements of the Plan. (1) Concentrate development in urban areas to conserve resources. (2) Promote urban growth in compact well-defined "centers" that are connected by an efficient multimodal high-capacity transportation system. (3) Create lively people-oriented areas with bicycle and pedestrian access. (4) Allocate population and employment in a manner consistent with the adopted regional vision. (5) Strive for City-County cooperation in the annexation process to ensure orderly growth of the City and coordination of utilities, roads and other services. (6) Support a countywide or regional siting process for essential public facilities, as well as local regulations that can accommodate them. (7) Phase public facilities and services to achieve the adopted vision. (8) Promote fair and equal access to housing for all persons. (9) Frame and separate central places and urban growth areas by creatign networks of permanent urban and rural open spaces that may include parks, recreation areas, critical areas and resource lands. Supporting Policy: Bremerton agrees with the overall intent and direction of the regional Vision 2020 Plan and with the Multicounty Planning Policies and will continue to support regional planning coordination and consistency of plans and programs. D. THE ViSION FOR BREMERTON Element "B" of this Plan provides the vision of Bremerton's future that guides the policies and recommendations of this Comprehensive Plan. The following are some basic visions that will affect the Land Use Element: 1. During the period 1994-2014, Bremerton expects to see its greatest population and development increase since World War II. 2. Bremerton will become economically stronger, more diversified, and will offer a greater range of career-oriented commercial and industrial jobs. Tourism will become increasingly important and related facilities will be needed. 3. The Harrison Hospital District will continue to grow in importance. 4. Olympic College will expand to offer four-year degrees. 5. Bremerton's role as the center for social and cultural activities will grow. 6. Parks and recreational opportunities will be expanded to meet new demands. Land Use - Page 7 7. Bremerton neighborhoods will improve, become more stable and provide opportunities for all economic segments of our community. 8. New and expanded mobility options,. involving buses, car-pools, ferries, bicycles, pedestrians, etc., will become increasingly available. 9. Higher densities and land use intensities will be planned around transportation corridors for maximum efficiency and mobility. E. POPULATION GROWTH 1. City growth history: Bremerton has grown through a series of about 90 annexations following the City's incorporation in 1901. These annexations have added more than 13,000 acres of land. Much of that area is n'ow the City's watershed and related Utility owned lands and not considered part of the "urbanized" community. The I City's area has nearly quadrupled during the past thirty years since 1964. 2. Population growth: Bremerton's population growth increased slowly until World War II when Naval activities, shipyard work, and population peaked. As shown in the following table, the City's population grew from 15,134 in 1940 to 27,678 in 1950. What doesn't appear in the decennial Census figures is the City's 1945 population of about 72,500. During a few short years during the peak of World War II, the City met its temporary housing need~, then settled back into a more conservative growth and population pattern following the war. POPULATION TRENDS 1901-1993 City 01 Bremerton. WashIngton Population (Thousands) 80.0 0.0 60.0 40.0 -~ 20.0 1901 1910 1920 1930 1940 1945, 1950 1960 1970 1980 1990 0.5 3.0 8.9 10.2 15.1 72.5 27.7 28.9 35.3 36.2 38.1 Land Use - Page 8 200.000 - 180.000 - 160,000 - 140,000 - 120.000 - 100,000 - z ~ so.ooo - j ::> ... 2 60.000 - 40,000 - 20.000 - NOTE: RECENT GROWTH HISTORY KJtup County Although the City has grown through annexations and continued to develop internally, much of that new growth has been non- residential or replacement residential and has not contributed significantly to population growth. Plans, zoning and development trends throughout the County have allowed and encouraged new growth in rural and unincorporated areas. During the past twenty years, the number of people living in unincorporated areas of Kitsap County has climbed from 54 percent (1975) to 69 percent (1993). Incorl'Orated 1975 1980 lSSS 1990 1993 The table to the left shows the continuing increase in unincorporated area population, compared to the relatively slow growth in cities. Bainbridge Island is shown as being incorporated for all years, even though the island was annexed by Winslow during this period. 3. Population Allocation: A twenty-year population growth projection for Kitsap County was determined early in the planning process and adopted within the Countywide Planning Policies in August 1992. The adopted 2010 projection was for 91,254 new residents in Kitsap County. That growth was allocated to the three county subareas, the island city of Bainbridge Island, and 20,000 to Bremerton. The allocations were consistent with an early policy to direct 75 percent of new growth into designated urban areas. Later in the process, Kitsap County determined that the 20,000 allocation to Bremerton may be excessive and may cause utilities, facilities and service needs to be under-estimated in other areas. A proposal to revise the Countywide Planning Policies was submitted to the Kitsap Regional Planning Council in the spring of 1994, received a favorable recommendation, and was later approved by the County. The amendment recognized the fact that no city or county plans had yet been adopted to trigger the intended changes in growth patterns. Since Bremerton had virtually no population growth from 1990 to 1994, its growth curve was Land Use - Page 9 shifted four years ahead but remclined at 20,000 for the period 1994-2014. The policy amendment added four years of additional growth to the county total and shifted a higher proportion 01' the population into rural areas, based on an allocation policy of two-thirds urban and one-third rural. HISTORICAL POPULATION GROWTH PERCENT OF YEAR POPULATION COUNTY 1940 15,134 34.1% 1950 27,678 36.6% 1960 26,681 31.7% 1970 35,307 34.7% 1980 36,208 24.6% 1990 38,142 20.1% 1994 35,920 1995 40,801 (2/2B/95 Adjusted) 4. Ability to Accept New Growth: Bremerton completed an extensive Land Use Inventory that included a residential build-out analysis based on existing lands, development patterns, and existing plans and zoning. The inventory discovered a considerable amount of vacant and underutilized residential land throughout the City. The Build-out Analysis determined that the current scenario can accommodate another 13,000 residential dwellings, capable of housing at least 30,000 new residents. Most of the urbanized portions of Bremerton are already served by the necessary utilities, roads and other municipal services. Bremerton has the ability to accommodate the 20,000 new residents that were allocated by the Countywide Planning Policies. Whether or not that level of growth ever occurs in the City is largely dependent upon Kitsap County's ability to implement the intent of the GMA and Countywide Planning Policies regarding the curtailment of urban spr;awl so that most new growth will effectively be directed into designated urban growth areas. The new Kitsap County Comprehensive Plan was adopted by the Board of Commissioners in December 1994. It appears that the Plan contains no significant changes in the designations of rural areas that might trigger the desired shift in growth toward cities arid urban growth areas. Without the benefit of stronger rural development controls, Bremerton will continue to plan for growth, but will anticipate a slower, rate of growth. Land Use - Page 10 F. DEVELOPMENT CONSTRAINTS (1) Environmentally Sensitive Areas: Bremerton has adopted a Critical Lands Ordinance that defines, addresses and regulates aquifer recharge areas, fish and wildlife habitat conservation areas, flood hazard areas, geologically hazardous areas, wetlands, and stream corridors. This ordinance is intended to ensure that the City's remaining critical areas are preserved and protected and that new development in and adjacent to these areas will be carefully managed to avoid further degradation. While viewed as development constraints, these regululations will ultimately enhance new development and reduce long-term problems. Their influence will be felt least in the already developed portions of Bremerton. The greatest opportunities for impact will be on larger sites in less-urbanized West Bremerton locations. Even there, development can be planned and adjusted to shift densities away from sensitive areas without losing development potential. (2) Watershed Lands: Bremerton's primary source of water is a carefully managed surface system along the Union River Watershed. Over time the City has acquired approximately 3,500 acres of land to protect that water resource and will continue to strengthen it. These lands are currently planned and zoned for watershed use and not available for other types of development. (3) . Utility owned lands: Adjacent to the City watershed in southwest Bremerton are approximately 5,000 acres of mostly forested lands owned by the City's Utility. With the exception of lands in the vicinity of Anderson Creek that have been "surplussed" and designated for industrial use, these lands are not available for urban development at this time and are currently managed as forest resource land. Some of the non-watershed lands are used for recreation (Gold Mountain Golf Course) and some are needed for the composting and disposal of sludge from the City's sewage treatment plant. This practice serves the dual purpose of disposing of the waste product while enhancing tree growth and wood production. (4) Shorelines: Bremerton has miles of lake and marine shoreline, including Kitsap Lake, Dyes and Sinclair Inlets, and the Port Washington Narrows. These are important natural, scenic, aesthetic and recreational resources. Although most shoreline parcels have already been developed, the overall impact of this program on development will be minimal. We do expect additional infill and redevelopment along our shorelines. The provisions of the Shoreline Master Program will help ensure that those activities will enhance, rather than damage, our shoreline environment. (5) Steep Slopes and Hillsides: Bremerton has very little flat land. It was built on hilly terrain surrounded by waterways and, in some locations, steep marine bluffs and hillsides. Again, since most of the urban area has already been developed, these constraints are not expected to seriously affect new or infill development. Most areas have street access and utilities and, since the hills and slopes provide excellent and highly desirable view sites, they tend to be considered valuable resources rather than development obstacles. Land Use - Page 11 (6) Existing Development Patterns: Existing structures and development patterns may be the greatest development constraint. Bremerton's housing stock consists of many small older homes. Many of the lots are large enough for an additional house, large enough to further divide, or suitable for redevelopment. However, the presence of existing structures on the potential redevelopment site, or deteriorating structures nearby tends to raise the cost of development, affect financing, and/or reduce the desirability of the site to potential buyers or tenants. Bremerton will continue to offer a variety of housing programs that will gradually'improve the overall condition of structures and properties throughout the City. (7) Market and Competitive Factor~: Although Bremerton has sufficient properly zoned land area to accommodate more than 30,000 additional residents, a number of market factors stand in our path. Among the obvious are regional or national economic conditions, availability of financing for new construction and home-ownership, weak "curb appeal" of available sites, availability of business-related financing, strength of the job market, etc. Some constraints are more directly related to the Land Use Element, including: (a) Willingness to convert: Many of Bremerton's oversized lots and other vacant infill sites are being enjoyed by their owners for yard areas, additional off-street parking or RV storage, to protect views, etc. These yards are valuable and not readily given up by many resident home-owners. However, investors may be more financially-inclined and willing to maximize the development potential of these properties. So, while the City encourages home-ownership, . it also encourages property investment, new ideas, infill, redevelopment and neighborhood improvement. The conversion process is slow and favors vacant lots over underutilized lots. Bremerton has many mdre of the latter. (b) Competition and Development Pressures: Bremerton has an extensivl~ public infrastructure, zoning, an efficient permitting process, development incentives, all the conveniences and services of a central city, and a land use inventory that shows where the development opportunities are:. We are in position and ready to grow. There are reasons why Brelllerton is not yet growing as intended. The city is surrounded by rapidly growing urban development in unincorporated areas that also have urban services. Kitsap County is one of the fastest growing counties in Washington and development pressures are great. However, development is often easier and less expensive when done on the urban fringe or in rural areas where public sewer and water systems aren't required and road and other standards are considerably lower than in ~rban areas. Those areas are also more likely to have larger vacant parcels available, less expensive land, and occasionally urban services to further stimulate growth. Land Use - Page 12 The Growth Management Act was intended, in part, to deal with urban sprawl, to more clearly define jurisdictional roles, and to better manage growth in a less competitive manner. Until plans that comply with GMA objectives are in place and starting to take effect, we don't expect to see much change in the past growth trends, nor in the competitive nature of local jurisdictions in dealing with new development. G. SOCIO-ECONOMIC CONSIDERATIONS The "profile" presented in the Housing Element of this Comprehensive Plan explains the social and economic diversity that is characteristic of the Bremerton community. The City's character was shaped largely by its military population, its historic ties to the Navy and the Puget Sound Naval Shipyard, its role as a social and cultural center, its educational and recreational opportunities, and as a home for many who commute by ferry to work in Seattle or elsewhere along the 1-5 Corridor. An understanding of our history, current characteristics, and trends are important in planning for our future. The cultural fabric of Bremerton is gradually changing. . The proportion of racial/ethnic group members increased by 5 percent from 1980 to 1990 and now accounts for about 16 percent of the City's population. . Families are getting smaller the numbers of single parent and female headed households are increasing. . Bremerton's average household size is expected to continue to drop from an already low figure of 2.31 pph in 1980 to about 2.2 pph in 2010, according to Puget Sound Regional Council forecasts. This contrasts with Kitsap County's average household size in 1990 of 2.65 persons per household. . Bremerton's older housing stock is meeting much of the regional need as well as giving the community its style and character. There is a strong need to conserve and rehabilitate the affordable housing stock that is currently being used by those who need it most. . The Housing Element projects a need for about 11,700 new housing units by 2014 to house our 20,000 population target. The Land Use Element will show where those units can be constructed and will be followed by zoning adjustments, as necessary, to allow them to be built. . Nearly half (49%) of Bremerton's families and households had incomes below 80 percent of the County Median and were considered "low-income" in 1990. . About 19 percent of Bremerton's owner households were paying more than 30% of their gross incomes for housing, while 35.3% of renters were overpaying. Most of our households are renter-households. Land Use - Page 13 The economic characteristics of Bremerton residents and households suggest a need for more stable career-oriented jobs to complement recent growth in the lower-paying service sectors. At the same time, Bremerton's housing stock needs to be upgraded to provide a better balance of housing for all income groups. The Land Use Element and Plan Map will designate the most appropriate locations for housing, business, industry, and public/quasi-public land uses that will be needed to meet changing needs and gradually improve our socio-economic conditions. ,. . . .. ... d.... . '" "... . . "...., d... . . . _n_ . .. __.. . .. ...... ... . _. un .. .. _ . . . ... . 4~ . ECONOMIC DEVELQPMENTCONSIOEAAIIONS> A. ECONOMY OF THE STATE AND REGION Idaho, Oregon and Washington were among the ten fastest growing states in 1990 and a recent (1994) U.S. Census Bureau report predicted that Washington would continue to be the fourth fastest growing state, behind Florida, Texas and California. While the U.S. economy was in a recession in the early 1990s, Washington's economy remained relatively healthy. In fact, the hardest hit areas were New England and the Middle Atlantic states. High employment growth in the Pacific Northwest made 1990 one of the best years ever. Total employment has continued to grow. The most troubled sector of the regional economy has been the wood products industry. Timber harvests have been reduced to protect endangered species and to adjust to long-term sustainable harvest programs on public forest lands. Some local communities have been hit hard by unemployment and have taken steps to adjust through economic diversification or other means. Aerospace is Washington's largest manufacturing sector and dominated by The Boeing Company. Many smaller manufacturing subcontracting firms rely heavily on Boeing. About 20 percent of Boeing's business is defense and space related and about 24,000 Boeing employees are currently working on defense contracts in Washington. Obviously, there is concern over military and space program cutbacks and how they might affect the economy of the state. Total non-agricultural employment in Washington was 2,155,000 in 1990. Declines in lumber and wood products were offset by small gains in nearly all other manufacturing sectors. Employment growth is expected to be fairly slow over the next few years as Boeing continues to make adjustments, as state and local governments trim budgets, and as troubled industries and military-reliant communities diversify. Newer high-technology sectors such as computer software and hardware, biotechnology, and environmental management technology continue to flourish throughout the Northwest. This region is also working hard to project a new and strong international image, particularly toward Canada and around the Pacific Rim. International trade through Northwest ports is expected to grow significantly. Land Use - Page 14 . ,.... Lower business costs, comfortable lifestyle, and natural beauty have made Washington a very desirable place in which to live and establish a business. Continuing population and economic growth will be accompanied by growing environmental issues. Protection of old growth forests, air quality, water quality and quantity, natural resources management, waste disposal, salmon runs, and preservation of other threatened wildlife species and sensitive areas are sure to grow in importance as they are placed in the path of growth and new development. These obstacles will, in many cases, increase the costs of business and are likely to affect our overall economy. Thus, it is critical that the Comprehensive Plan, and particularly the Land Use Element, provide the most suitable sites for economic growth in locations that have the least potential for environmental conflict. . B. THE LOCAL ECONOMY The Kitsap County economy has been largely dependent upon its five military bases and continued strong support for federal military spending. These bases provide about 40 percent of all jobs in Kitsap County. As cut-backs occur in military spending and bases around the country are closing, our state and local economies are feeling the pinch. Rather than succumbing to the threats of higher unemployment and economic decline, we are accepting the challenges of new opportunities and economic diversification. Three of the County's five major military employers are located within the City of Bremerton --- the Puget Sound Naval Shipyard, the Naval Hospital adjacent to the Jackson Park community, and the Naval Supply Center. These facilities provide approximately 20,000 military and civilian jobs. However, the nature of those jobs has changed recently with the military "down-sizing". Today, more than half of the skilled shipbuilders are being paid to take old ships apart, a task that may not last more than a few more years. The diversification efforts are aimed at how we might keep those skills here at home, but in jobs that have a brighter future. This County's economic imbalance is reflected in the lack of major industrial or manufacturing businesses, very few industrial parks, and less than 3 percent of our jobs in the manufacturing sector. Most of our new jobs have been in the lower- paying retail and service sectors, which have grown by about 25,000 jobs since 1980. Most of those jobs are located in the retail complexes of Silverdale and scattered throughout the County in smaller commercial locations such as along the Kitsap Way and Wheaton Way corridors of Bremerton. The strong growth in retail and service sector employment is attributable, in part, to the fact that Kitsap County continues to be a very desirable and affordable place to live and is a relatively easy commute to the larger 1-5 Corridor job markets of Seattle, Tacoma and other east Sound areas. If Kitsap County continues to grow in popularity as a retirement community and recreational/tourist destination, retail and service growth will continue to grow to serve those needs. land Use - Page 15 Recent studies by the Economic Development Council of Kitsap County and the County's Department of Community Develbpment have determined that there is a considerable deficiency of land that is of stlitable size, properly served, and planned and zoned for new industrial development throughout the County. An EDC committee determined that the County should designate more than 2,000 acres of land for new commercial and industrial development to :meet growth and diversification needs. I As part of Bremerton's Land Use Inventory process, an Industrial Lands Inventory was completed in March 1993. It reviewed the 'Character and degree of existing and potential development for all industrially-zoned areas in the City. Of the 474 acres of industrial zoning, 217 acres (46%) are currently developed and used for industrial or commercial purposes. The remaining 54 percent (257 acres) will provide opportunities for new development. The s,hipyard's industrial lands were not included in the "Industrial Inventory" but were included in the citywide Land Use Inventory which found that our industrial lands account for about nine percent of our total land area --- very close to the national average. I It's much more difficult to determine the degree to which PSNS land is used and how much expansion potential exists. C. BREMERTON ECONOMIC OBJECTIVES The supporting policies that follow State planning goal #5 (Economic Development) in Section 3 of this element outline the City's economic objectives, as they pertain to the Comprehensive Plan. These policies a~e generally supportive of state, regional and county economic objectives and with the adopted Countywide Planning Policies. Economics are also addressed in the policies of other elements of this Plan. The City , may expand its Plan to include a separate element to deal more directly with economic issues. Such an element could be added during a subsequent update. The Economic Development Council of Kitsap County (EDCKC) is working to retain existing employment, expand existing employers' operations, and promote selected new employment opportunities. Policy: Bremerton supports the efforts of the EDCKC and will assist, through land use planning and other means available, in promoting a strong, countywide economy and balanced economic growth that will: . Improve support for existing industry and business. . Stabilize local area economic fluctuations. . Diversify employment opportunities. : . Strengthen the tax base. . Create new jobs. , . Improve the general countywide business climate. . Manage the character of economic growth. . Research and distribute demographic data. . Diversify and strengthen the EDCKC's membership and funding base to ensure the continued delivery of economic development services in Kitsap County. Land Use - Page 16 ...r..).lR. .....B\kt.:fiSR.~1~JffiXbEA)>>......u>> ...... >>0.. ,,'>:.:;.::.:\.1 n~,~:\q,:, ,V.:Y.V:':I'n..<t\n ...:.,...:.:.:::.... . . In accordance with the Growth Management Act, each city must submit a proposed Urban Growth Area to Kitsap County. The County must review the proposals, locate other areas having urban characteristics, and formally establish Urban Growth Areas countywide. October 1, 1993 was the deadline to establish "interim" UGAs. A. DEFINITIONS Throughout this planning process there has been controversy over terminology. The key terms .urban. and "rural" are not specifically defined, nor are the preferred .or acceptable density ranges or types of development within each category. Thus, we have relied heavily on the following definitions provided in the Growth Management Act (ESHB 2929) for guidance: (1) Urban Growth refers to growth that makes intensive use of land for the location of buildings, structures, and impermeable surfaces to such a degree as to be incompatible with the primary use of such land for the production of food, other agricultural products, or fiber, or the extraction of mineral resources. When allowed to spread over wide areas, urban growth typically requires urban governmental servics. "Characterized by urban growth" refers to land having urban growth located on it, or to land located in relationship to an area with urban growth on it as to be appropriate for urban growth. (2) Urban Growth Areas means those areas designated by a county pursuant to Section 11 of the Growth Management Act, which includes the following basic guidelines and principles: (a) Urban growth shall be encouraged within the designated UGA and growth outside a UGA can occur only if it is not urban in nature. (There is a need here for a clear interpretation of what is "urban" and what is "rural", along with their respective densities and uses.) (b) The UGA must include areas and densities sufficient to permit the urban growth that is projected to occur in the county for the succeeding twenty-year period. (Our Countywide Planning Policies directed two- thirds of new growth into urban areas and one-third into rural.) (c) Each city must proposed a UGA and the county must attempt to reach agreement with the city, or justify in writing why it could not. (d) Urban growth should be located first in areas already characterized by urban growth that have the public facility and service capacities to serve such development, and second in areas already characterized by urban growth that will be served later. Land Use - Page 17 (e) It is appropriate that urban governmental services be provided by cities, and urban governmental services should not be provided in rural areas. (ij Interim UGAs must be adopted by October 1, 1993 and final UGAs adopted at the time of cornprehensive plan adoption. (g) All urban growth areas must be reflected in county and respective city comprehensive plans. (Each city needs to know the limits of its UGA well before adoption of the County's Plan. This suggests that the "interim" UGA, adopted by Oct. 1, 1993, should be as close as possible to the final UGA.) (3) Urban Governmental Services include those governmental services historically and typically delivered by cities, and include storm and sanitary sewer systems, domestic water systems, street cleaning services, fire and police protection services, public transit services, and other public utilities associated with urban areas and normally not associated with nonurban areas. In addition to the terminology addressed in the Growth Management Act, Bremerton developed an extensive Glossary of planning terms to assist the CAC, Planning Commission, City Council, and general public, and which was distributed to other jurisdictions for their use as well. B. COUNTYWIDE PLANNING POLICIES The "Urban Growth Areas" chapter of the Countywide Planning Policies for Kitsap County addresses a number of growth issues, but did not establish UGAs. However, policies were adopted to guide the establishment of UGAs, based on a process outlined in Element 2 of the Region Wide Growth Management Strategy which was adopted by the Kitsap Regional Planning Council on November 13, 1991. That policy was generally consistent with guideline documents published by the State Department of Community Development and recommended a land use inventory and build-out analysis of available lands to provide the foundation for the UGAs. Bremerton based its UGA proposal primarily on existing development patterns, access, urban utilities and services, and the approximate additional area that may be needed to accommodate the County's urban growth needs. Bremerton's proposal was based, in part, on a detailed Land Use Inventory and Build-out Analysis of all lands within the City and some additional adjacent unincorporated areas. C. BREMERTON'S URBAN GROWTH AREA PROPOSAL (1) First Submittal: Bremerton submitted a proposed UGA to Kitsap County on May 26, 1992 for incorporation into the Countywide Planning Policies that were being developed at that time. (UGAs were not included) Land Use - Page 18 (2) Second Submittal: Bremerton's UGA proposal was refined and resubmitted in the fall of 1992. The UGA included the unincorporated communities of Silverdale and Gorst, Bremerton National Airport and the adjacent industrial park, and other areas as illustrated on the following map. It was specifically noted that the UGA was not a proposed annexation map and that interjurisdictional cooperation and coordination would be essential to ensure that urbanization would be efficiently implemented. (3) Interim UGA Adoption: In October 1993, Kitsap County adopted the "Urban" and "Semi-Urban" designations of its current Comprehensive Plan as its "Imterim UGAs". The adopted UGA was not based on the cities' proposals and was not consistent with the County's draft Land Use Plan. (4) Third Submittal: At the County's request, Bremerton again reviewed the proposed UGA, the Planning Commission held a public hearing to accept public comments, no amendments were made, and the City again submitted the same proposal on February 24, 1994. Kitsap County adopted its Comprehensive Plan and Final UGAs on December 29, 1994. Until appeals of the County Plan and UGA process are resolved, Bremerton's UGA will be depicted as shown on the map on page 20, with the understanding that the UGA will be adjusted later through the normal Plan Amendment process. D. URBAN GROWTH AREA MANAGEMENT Much of the area around Bremerton is "urbanized" (characterized by urban development). Residential densities and development patterns are urban in nature and design, and many areas enjoy public water and sewer utilities, paved streets, and other typically urban services. Commercial districts extend beyond the City limits and the county's primary airport and industrial park are expected to expand and will need services. All such areas should be contained within Urban Growth Areas. Bremerton provides urban services to some unincorporated areas but lacks zoning or other land use control. Thus, coordinated land management procedures would help ensure the coordinated provision of those services. The City and County must work together toward agreements and mutually-adopted plans for future land uses and densities so that we can more accurately plan for our future service needs. The UGA will accept most of Central Kitsap's new growth and will demand a high degree of interjurisdictional cooperation. Bremerton will include all of its service areas in its Comprehensive Plan along with provisions to ensure that future land use amendments within those areas are done mutually to avoid premature and unnecessary demands. The Countywide Planning Policies include provisions for an "Urban Growth Management Agreement (UGMA)", to be entered into by Bremerton and Kitsap County and which would provide the guidance needed for a smooth growth and development transition throughout our shared UGA. It is the intent of the City to pursue the development of this agreement immediately following Plan adoption. Land Use - Page 19 -11\ --J:::;I i I), ...J l=fYffll ,_ ^ ~q~~ diH1lL, ~4 ftl~ 'iI'~] l ~!' ~,~~ ~ ~ rJJf~f tJ) r~' - =l r _ ~ 'J~. I f- .111 - II'M l' '~m: I ~ ,: tIo ilfc Jl Jtlll, 1P.\.\ " ' tl: I.' I _ P};1 _ ' \. 1_ '-t-l= 1-/ ~~ I l!JJ: u.-., 0.' I =I=~ I~ --J IJI - , I " g--E]i~ 'I'll. . - ~'g ~ 'V~iIi, ~ -rr ~ 7~!I '[If ~r-f"\ . I;~~ -'l...~1-- c-: ~ "Ii -I' - 'r~,J~iiIT 'I!!tm-; ~l ]' ~(,i~~ _ .- r'~ ::1111; _ -LJ--IPr Silverdale -:,.j I--~- - - IT JI U' 1 unineor rate? 1 IY -h -~ Proposed URBAN GROWTH AREA J ~ i'jlfll 'T= L' -'- ~~m~,J It ~ ~~i II~ 11 ~ May 26, 1992 I...L li. November 1992 ~I-- liflI,~ '~ February 24, 1994J!~lm1 __ ,~' ,(,oj I', /J. ' ~ 1It1-1-l-JOl " _, ~JI-IH 1J111't'I'h~ 1~1frl1i I- ,- T'~II I ~ I U U . ----- Bremerton City limits Urban Growth Area ~ Prepared by: Bremerton Planning Submitted: Revised: Reviewed: tm r DYl!s Inlet 'JI j - I I -" ~":; .~' ~!:l.incorporated la. 10 ~ II~ 'F 1--- 0:: ----I ~ ~ I _- " ~ " ..., I I I "" I dJs> \;> -:=J L ___' _ -.-J -_ J-E:_ . .Ii -I--I~-I -lr{ r~ -- . L. ~'l. 'j, r,r i/ J'nLi~i IlJ~~-- , : ~Tl -.. ..r~~p : ... C;ly of .,emerton rhj: 1 ,fJl -'~H=t~-; I--~.~;~ "-':.:,J~ "il" ~ ~f' tij;t:~ ~ ~,~ ~ M-~l:II / ;r)"P III,,! ~ ~ ;r~=--' r ~ ;=" 97 ____ ~- ~ ~1f S1~ :/") ;:r_ ~ ~f1~"~:C:~'I"'!~ ~~~i~~:~= ',( ~~:~~I ~ 0 ~l--F:~~ __ ~.' ! I · Ii Land Use '- Page 20 ::- ~~l 1~-c-fM31'9~~wr ~ ?:Lj~ L"j ~Tv-J'll l'aiC1 __ ~ .~.. ityof remerton ~-~j~ liI!li!!~"V ~1 ~ Sinclair Inlet Port fA Orchard 1i; 1 ~ - ...,. ~ ~~ ~111~t_,,11 rltl \J.: ~f ,",,0' s.; c ;J I~~ it ~ !1 - j- -IF" ; \=r ~I R;!l . 71 ~,. ~- I ; -H+-:"jJt: I~: ".=17,' According to Kitsap County's adopted Countywide Planning Policies, the Urban Growth Management Agreement is to include at least the following: (1) The UGMA must address Mure annexation proposals and the annexation process. (2) Annexation policies guiding the County and individual cities shall be adopted in a timely fashion and subsequent annexations processed according to the terms of those policies and related agreements. (3) The UGMA will include provisions that will guide the provision of public services. (4) A method for determining appropriate compensation, if any, for major capital construction projects within annexation areas. The UGMA must also include a method for sharing revenues and expenses resulting from annexation actions. (5) Pre-annexation agreement issues related to the provision of urban governmental services must be considered in the UGMA. (6) The UGMA must include levels of service (LOS) standards, following a countywide process to establish a common methodology. (7) The UGMA will provide the process by which jurisdictions may review and comment on each other's Plan amendments, zone changes, and development applications. (8) The UGMA must identify common and consistent development and construction standards to be applied throughout the UGA. These may include streets and roads, utilities, and other infrastructure. (9) The UGMA must identify services to be provided within its UGA, the service purveyors, and the terms under which the services will be provided. 6. LAND USE RATIOS & DENSITIES It's helpful to have a good understanding of the balance and patterns of land uses within our City, and a comparison of how our land use ratios are similar to or different from those in other communities. This exercise can also help us find land use deficiencies and determine whether or not a major trend adjustment is justified. Land use ratios refer to the breakdown of various categories of land as a percentage of the total amount of land in a community. Ratios have been used as land use planning "rules of thumb", but are more commonly used to identify strengths and imbalances. Our Land Use Inventory provided the acreages of each type of use, which were then tallied and mapped so their relationships could be better viewed and discussed. A. NATIONWiDE LAND USE SURVEY An extensive study of land use ratios was undertaken by the American Planning Association in 1992. The APA surveyed 66 municipalities to update an older 1983 survey. In order to accommodate the wide range of data sources, the survey used only the categories of residential, commercial, industrial, and public. Since the intent was to review "uses" of urban land, vacant, agricultural, and forest areas were not included. However, resource extraction (gravel pits) was included as an industrial use. Transportation facilities, rights-of-way, communications, and utilities were included in the "public" category. Mixed uses were Land Use - Page 21 tabulated according to the dominant use of the property which, in most cases, was the ground floor use. The process and categories use(j in this survey were very compatible with Bremerton's Land Use Inventory and the results were somewhat predictable. The following are some highlights and findings from the 66-city survey that are of value in Bremerton's Land Use Element. Acreage figures piertain only to the "urbanized" areas of Bremerton and do not include the City's watershed and other forested Utility lands. Disclaimer: Cities have different land use requirements and different factors affecting their land use distribution. These figures should be used only to better understand how we compare with other cities in terms of general land use breakdowns. (1) Residential Uses -.. National Survey In 1955, 40 to 42 percent of city land was in residential use. A 1973 follow-up found about the same percentage. However, suburban development (sprawl) began to show up in the statistics in 1983 when the residential percentage rose to 48%. Densities tended to be lower in newer sprawling western cities. By 1992, the percentage had exceeded 50% in the average city. A number of factors are now working hard to reverse the urban sprawl trend, including basic economics, home prices, availability of financing, zoning trends, incentives to cluster, encouragement of mixed use developments, preservation of resource and rural lands, and others. This is especially true in growth management states that are required to do responsible planning that will result in higher urban densities and more efficient use of urban infrastructure. ' Single family dwellings comprise 73 percent of the housing stock of a typical city. Bremerton has a higher overall density than the typical city and our figure is a much lower 49 percent, or 60 percent when combined with duplexes. Forty percent of Bremerton's housing stock is comprised of multi-family units (more than one dwelling unit within the same structure), compared to only 14% in the typical community. Although manufactured homes are growing in rural popularity, they comprised only 3% in the surveyed cities and less than one percent in Bremerton. (2) Commercial Uses --- National Survey This category includes offices and retail business. The commercial ratio rose from 3.3 percent of all land uses in 1955 to about 10 percent in 1992. Much of this change is attributed again to a sharp increase in suburban sprawl, in the form of strip commercial, primarily one-story retail, garden office complexes, and other development that caters to the automobile and that includes great expanses of parking lots, which are also included in this category. Newer suburban communities tend to have higher proportions of commercial land use. Land Use - Page 22 The average square footage of commercial space per worker increased from 110 sq.ft. in 1942 to 342 sq.ft. in 1988. Thus, three times as much land is now used for the same number of employees, which has helped raise the commercial ratio. Approximately 7 percent of Bremerton's urban area is devoted to commercial and office uses, which is less than typical, but which would be expected in a higher-density community. (3) Industrial Uses m National Survey In 1955, the average industrial land use ratio was 6.4 percent. Industrial land use peaked in the late 1970s or early 1980s at around 12 percent. By 1992, the average had slipped to 10.5 percent. In small cities and suburban areas, the figure has remained constant at about 7.5 percent. Coldwell Banker determined that we experienced the highest ever national vacancy rate in 1990 of 6.9 percent for industrial buildings larger than 100,000 square feet. This was attributed to an economic shift from manufacturing to service industries that is continuing. We are also experiencing a trend toward mixed commercial and industrial businesses. The result is often "heavy commercial" rather than what used to be considered "light industry". Mixed use concepts are increasing in popularity and provisions are being added to zoning ordinances. Bremerton allows several forms of mixed use development and it's getting more difficult to find a clear separation when applying development standards to many industrial and commercial uses. (4) Parks and Recreational Uses --- National Survey We often apply the National Recreation and Parks Association's (NRPA) standards of acres per thousand people when planning for park and recreational facilities. Ten acres per 1000 residents has been the traditional rule of thumb for calculating the number of acres of park land needed in a community. Unfortunately, many cities have fallen well short of that goal and have looked at other ways of measuring their park and recreational facilities. One way is to view them as a percentage of the community's overall land use inventory. In 1955, the amount of developed park/recreational land was 4.4 to 7 percent. Newer suburban communities with large single-family lots tended to have fewer parks but also had large open fields at the local schools. Private open space in inner city areas simply wasn't available, and inner city schools were also crowded onto small parcels, often with asphalt playgrounds. Thus, public parks were considered much more important in those areas, and the only real opportunities for outdoor recreation. Land Use - Page 23 The survey results showed that the percentage of park lands varied from 1 percent in several communities to more than 20 percent in Peoria IL, Reno NV, Galveston TX, and some smaller cities. However, there were too many measurement inconsistencies and other variables to establish a useable average. Even in Bremerton, there are different ways to measure parks and recreational lands. Should they include private facilities? Should they include joint-use facilities? Should open space incluqe cemeteries or open water areas? Should the City's thousands of acres of watershed and forested Utility lands be included in the category of open space, even if they are not available for public access or use? Our Land Use Inventory found that 9.5 percent of urban lands are devoted to these uses, not counting our utility lands or school sites, but including significant public-asseslsible "open space" areas such as cemeteries. (5) Institutional Uses --- National Survey This category has grown gradually from about 10 percent in the 1940s to 13 percent in 1983. Larger cities typically have larger percentages because they tend to provide more public services of a regional nature, along with their related facilities. Surveys found that uses such as hospitals, churches, schools, and government buildings are all directly ,related to the population. As population grows, so do these uses. Other uses, such as museums, civic centers, and colleges, are not affected by population growth in the same ways. These types of uses are normally allowed throughout the community, within I the commercial, industrial and residential zones. General demand is predictable but it's not necessary for;the Comprehensive Plan to designate specific sites in advance of need 'for most facilities. In fact, pre-designation could damage the process of site acquisition by inviting speculation or causing an artificial value adjustment. (6) Transportation & Utilities Uses --- National Survey These facilities account for the second highest percentage of land uses. Generally, the amount of public right-of-way increases in proportion to the percentage of single-family dwellings. ISTEA and "neotraditional town planning" are tools that may affect the ways we plan for transportation. We will improve the management of land use and transportation systems rather than simply adding capacity to existing streets and highways. Successful implementation of high-occupancy vehicle lanes, bus lanes, ridesharing, encouraging the use of alternate modes of travel, and coordinated land use and transportation policies could help to hold ROWand transportation use ratios steady as population continues to rise. Land Use - Page 24 Bremerton's Land Use Inventory found that 18 percent of the City's urban area consists of public rights-of-way. The percentage increases in the older central areas that are characterized by a typical grid-pattern of streets and alleys and relatively short blocks. Newer suburban subdivisions with larger lots, no alleys and reduced-width streets tend to have a much lower proportion of ROW. (7) OVERALL BREAKDOWNS For comparison purposes, the following figures for Bremerton include only developed lands within the "urbanized" portion of the City. These figures do not include the thousands of acres of watershed and other Utility-owned lands. 1< '., . .. ...11992APA SURVEY L I . .. ... . .. .... .1993 BREMERTON INVENTORY LAND USES RESIDENTIAL 48% 35% 41.7 Ac.j1,000 pop. COMMERCIAL 10% 9% 10.6 Ac.j1 ,000 pop. INDUSTRIAL 10% 9% 10.0 Ac.j1,000 pop. PUBliC 32% 47% 55.9 Ac.j1 ,000 pop. (8) CONCLUSIONS (a) Bremerton's land use ratios for commercial and industrial lands are not significantly different from the average of the 66 cities surveyed in 1992. (b) Bremerton's fairly high-density residential core and a compact residential development pattern result in a smaller proportion of land area devoted to residential uses. This figure also reflects the fact that Bremerton is a mature community and its housing stock does not include many large-lot suburban (sprawl) subdivisions. (c) The larger than normal amount of "Public" lands might be attributed to the presence of a community college, a freeway, two cemeteries, and a higher than average percentage of public street rights-of-way. (d) Bremerton's growth focus is within its current City boundaries. We don't expect to see a significant growth in total land area, but we can expect changes in land uses within the City. As population increases, additional land must be provided for the services, jobs, retail centers and other uses that accompany growth. Land Use - Page 25 (e) If we use the current acres of land use per 1,000 population as a guide, it's clear that we will need vast amounts of new commercial and industrial land area to accommodate 20,000 more people. In fact, at a rate of 10 acres per 1,000, we would need 400 acres of new commercial and industrial development -- in addition to the 200 or more acres of new parkland. (f) Not all of those related land uses will occur within the City. Many may locate outside the City but within the surrounding Urban Growth Area, in accordance with the County's Land Use Plan for the UGA. Others may be accommodated through rezones, redevelopment activities, mixed use development, or higher-intensity development within existing zones. Some trade-ofts may occur as the City continues to evaluate its needs to accommodate residential growth, or perhaps to focus greater attention on its role as a center of commerce and industry with more land, resources, and development opportunities in that direction. The Comprehensive Plan will continue to evolve and change through the process of periodic review and amendment, and as the result of new ideas and changing community needs and desires. Land Use -. Page 26 ...,.'." ..... ..".... : ", " .... 7..EAsTBREMERTON PI..AN. A. EAST BREMERTON SECTOR DESCRIPTION For ease of analysis and planning, Bremerton was divided into three "sectors", The East Bremerton sector includes all areas north and east of the Port Washington Narrows. Within this area are the community of Manette, Harrison Hospital, lIIahee State Park (outside City), the Wheaton Way commercial corridor, Perry Avenue Mall, and points of interest. All lands were inventoried, including unincorporated areas, and existing uses and residential densities were determined. For purposes of this section, only lands within the City limits will be addressed with the understanding that Kitsap County will produce a consistent and coordinated land use plan for all unincorporated areas. B. LAND USE INVENTORY The City's land use inventory went beyond the City limits because it was necessary to understand the nature of existing development, land use patterns and trends, and to possibly assist Kitsap County in determining whether or not these areas should be included in the Urban Growth Area. Also, Bremerton's Comprehensive Plan has traditionally included these unincorporated surrounding areas and, at the time of the inventory, they were included in the "Bremerton Planning Area". The detailed results of the City's land use and build-out capacity studies are contained in the April 1994 (revised) document entitled land Use Inventory and Build-out Analysis and won't be repeated here. The following table provides a summary of land uses within the City limits of East Bremerton. This sector contains no watershed or utility lands and its total area is about 11 percent of the total City area. This is the smallest sector. land Use - Page 27 E. BREMERTON LAND USES RESIDENTIAL COMMERCIAL INDUSTRIAL PARKS & O.S. SCHOOLS PUBLIC WATERSHED UTI L1TY LAN DS RIGHT-OF-WAY VACANT I TOTALS: 607.7 148.5 , 1.6 94.8 96.2 61.2 0.0 0.0 ~69.6 347.7 PERCENT OF TOTAL 37.3 9.1 0.1 5.8 5.9 3.8 0.0 0.0 16.6 21.4 100.0 TOTAL ACREAGE I ' 1,627.3 % of City = 11.1 c. RESIDENTIAL LANDS (1) Overall Character: Most East Bremerton neighborhoods have been around long enough to be considered mature, but not old. When we compare this area to older Central Bremerton, we see that East Bremerton is lower in overall density, structures are newer, average property values are higher, and most neighborhoods have not been seriously impacted by non~residential intrusions. East Bremerton neighborhoods are often on hilly ter~ain with exceptional views of the Olympics, Cascades, Mt. Rainier, Seattle, and surrounding waterways. Multi-family dwellings dominate in East Bremerton. Their portion would approach 60 percent if duplexes were included in the total. The overall appearance, when passing through, is a mostly single-family community. Most condominiums and apartment complexes are clustered in high-density districts and along shorelines, and tend to be well-sited and buffered from surrounding uses and views. The Manette area is probably the most diverse in terms of residential mix, which may be contributing to its unique character and strong sense of community. (2) Breakdown of Residential Types by Numbers of Dwelling Units: Single-family dwellings 2,573 Duplex dwellings 806 Multi-family Dwellings 2,948 Mobile Homes 19 40.5% 12.7% 46.5% 0.3% (3) Residential Density: A key principle of this Plan is to build higher levels of Land Use -. Page 28 residential density along major transportation corridors and around terminals. In such areas, we will strive for a minimum density of7 units per acre. East Bremerton already has a good density base and an overall average density of 6.9 DU / Acre. The Build-out Analysis showed that a maximum residential density of 11.8 DU / Acre could be reached at full development. To be most effective, higher densities should be within easy walking distance of transit routes and in close proximity to commercial and office districts. DENSITIES Residential only. Does not include lands that are zoned or used for non-residential purposes. - - .. [2].... . '. .' . <> . ~ ' ..; . "," - ,;.~ . .'. -.-. D GREATER THAN 10 DU/Acre 8.1 to 10 DU/Acre 6.1 to 8 DU/Acre 4.1 to 6 DU/Acre 4 DU/Acre or less Land Use - Page 29 D. COMMERCIAL LANDS Approximately 9 percent of East Bremerton lands are in commercial use. This is typical of the 66 cities in the APA survey and reflects the citywide average. In addition to these lands, the Land Use Inventory found another 51.9 acres that are not in commercial use but are commercially zoned and could be developed to me'et growing commercial needs. (1) The Perry Avenue Mall and surrounding businesses serves the east side in the vicinity of Perry Avenue and Sheridan Road, an area that has considerable growth potential both within and outside the present City limits. (2) The Sheridan Village Shopping Center shares a mixed commercial/medical district along Old Wheaton Way at Lebo. This district is centrally located, has good access, and is growing toward 'the north and southeast. The City will develop a more specific plan for the Harrison Health Services District in 1995. (3) The Manette Business District, located at the east end of the Manette Bridge is an older neighborhood center that ,has considerable improvement potential. A business survey was conducted in the spring of 1994 to get comments about the district's current health and suggestions for improvements. A more specific land use plan will be recommended if the business community supports the idea and participates in the program. (4) The Wheaton Way Corridor is a long strip of intense auto-oriented commercial activity. This is a very su'ccessful and valuable commercial strip. However, commercial signs, lights, noise, and heavy traffic dominate and the result is an environment that is oft,en hostile to the pedestrian or bicyclist and generally unattractive to the passer-by. (5) The Brownsville Corridor is the northerly extension of Wheaton Way beyond the City limits. Kitsap County has planned and zoned this corridor in a manner that will continue the "strip commeircial" pattern even further. I E. INDUSTRIAL LANDS East Bremerton has virtually no industrial base. Among the few exceptions are a clothing manufacturing business and a moving and storage warehouse. Retail and service businesses dominate the non-residential sectors and there is very little land remaining that is clearly suitable for industrial use. Truck access, proximity to markets, utilities, and other factors tend to discourage the establishment of new industries or an industrial park in the East Bremerton area. However, the City will encourage small businesses that assemble products or conduct on-premise sales of manufactured goods in a mixed-use environment, as well as small home-based operations. Land Use - Pag,e 30 F. PARKS & SCHOOLS Parks and open space areas in East Bremerton include Lions Field, Stephenson Canyon Park, the East Park Greenbelt and YMCA area park, Sheridan Community Center, Bremerton Theater, the Blueberry Patch on Sylvan Way, Bataan Park, the Senior Center in Manette, and several small street end waterfront parks. These are addressed in greater detail in the Parks and Open Space Element and in the Capital Facilities Plan Element. The Land Use Plan includes designations for the protection of recreational and/or open space areas along all shorelines. The purpose will be a combination of public access, recreation, natural bank protection, and wildlife habitat preservation, as well as a first step in integrating the City's various environmental regulations. An optional "Environmental Management Element" is included in this Plan to assist in the integration of various environmental plans and codes. And the "Capital Facilities Plan Element" addresses park needs specifically, with emphasis on the financial aspects of providing for the City's future growth. The Parks Department recently updated its 5-year Comprehensive Parks & Recreation Plan, to be adopted in early 1995. That process provided much of the parks and open space data that are now contained in the Capital Facilities Element. Schools are also addressed specifically in the Capital Facilities Plan Element and all existing schools and known sites for proposed new facilities are shown on the Comprehensive Plan Map. The City will work with the Bremerton School District on joint~use facilities and other programs of mutual interest, but will not speculate on the locations of future school sites prior to completion of the school district's plans. Major concerns of this Element, as it pertains to schools, are safe and convenient access to and from schools, prevention of conflicting or distracting adjacent land uses, and protection of surrounding neighborhoods from school- related activities. G. OTHER LAND USE ISSUES (1) Transportation: A large portion of East Bremerton traffic has its origins and/or destinations outside the City and travels through the community primarily on Wheaton Way. East Bremerton has a build-out capacity for an additional 3,700 dwellings. Lands beyond the City limits are even less densely developed and have much greater development potential. The peninsula extending from Manette to Silverdale can expect to more than double in population. The possible results of that growth on the transportation and road systems is addressed in the Transportation Element. It's possible that the City and/or County Land Use Plan will have to be adjusted if the financial means cannot be found to provide the needed transportation facilities "concurrent" with new development. Land Use - Page 31 (2) Public/Quasi-public Uses: The public category includes a variety of public and quasi-public uses. These include utilities, governmental services, public schools, Harrison Hospital, the library and Post Office complex on Sylvan Way, and the City utilities/services center on Olympus Drive. Many of these will follow growth and will be absorbed i~to the community under present zoning. Other "essential" facilities will be addressed in the Capital Facilities Plan Element and through regulatory adju!?tments, as necessary. Churches, private clubs, and similar Qrganizations are also examples of quasi- public facilities, but are usually small and not planned in advance. The Zoning Ordinance provides for these facilities within other zones. H. SPECIFIC AREA PLANS At the end of this element are brief but more specific land use and improvement plans for key areas of East Bremerton, including: (1) Manette Business District (2) Harrison Health Services District (3) Wheaton Way Corridor Land Use - Pag~ 32 ... ... ........... ... . . ......8: ...............C12mFfA12......BREMERfQf\J.......plAN............................ A. CENTRAL BREMERTON SECTOR DESCRIPTION The Central Bremerton sector includes areas south and west of the Port Washington Narrows, the Central Business District, puget Sound Naval Shipyard, and all other areas west to the vicinity of National Avenue and Oyster Bay. Also within this area are Brem~rton High School, Olympic College, Evergreen Park, Forest Ridge Park, the Charleston Business District, and other points of interest. All lands were inventoried and existing uses and residential densities were determined. For purposes of this section, only lands within the City limits will be addressed with the understanding that Kitsap County will produce a consistent and coordinated land use plan for all unincorporated areas. B. LAND USE INVENTORY \\- \.- '.:=" \ ..= ~ . , . ~..-.-- ..".- .". ;; , ;; ;; ~;. ~f --...- ..... ~L~ ;; 1 ......~ ;; 11\ I ...;,J.c"'~ '''''_ c." ,; ... '" /' ~.,..;..: ,..- The City's land use inventory included Rocky Point because it was necessary to determine the nature of existing development, land use patterns and trends, and the potential build-out based on County zoning. This was particularly important because Rocky Point Road is essentially a very long cul-de-sac street that empties directly onto Kitsap Way and has a high potential for additional congestion and access problems. Bremerton's Comprehensive Plan has traditionally included Rocky Point, Navy Yard City, and other unincorporated adjacent areas and, at the time of the inventory, they were included in the "Bremerton Planning Area". The following table provides a short summary of land uses within the City limits of Central Bremerton. This sector contains no watershed or utility lands and its total area is about 13 percent of the total City area. Land Use - Page 33 C. BREMERTON PERCENT LAND USES TOTAL ACREAGE OF TOTAL RESIDENTIAL 576.6 30.0 COMMERCIAL 190.2 9.9 INDUSTRIAL 235.9 12.2 PARKS & O.S. 113.8 5.9 SCHOOLS 67.6 3.5 PUBLIC 4,1.9 2.2 WATERSHED 0.0 0.0 UTILITY LANDS 0.0 0.0 RIGHT-OF-WAY 396.7 20.6 VACANT 302.1 15.7 I TOTALS: I 1,924.8 I 100.0 I % of City == 13.1 c. RESIDENTIAL LANDS (1) Overall Character: Bremerton's oldest neighborhoods and structures are located in the Central sector. These neighborhoods are as diverse in their architecture as they are in their socio-economic characteristics. Neighborhood appearance also varies considerably from the high-traffic arterials to quiet tree-lined residential streets, and from rows of attractive bungalows to waterfront condominiums. This sector of Bremerton includes the full range of residential possibilities. It also includes the most intense, but not always well-conceived, mixtures of residential and commercial in the CBD, Charleston and elsewhere. The character of Central Bremerton cannot be described without noting the presence of structural age, poor maintenance, deterioration and dilapidation. This is the inner city of Kitsap County and, although the problems don't measure up to those of large cities, they are serious problems that need attention. All cities age -- some mme gracefully than others. Much of Central Bremerton is now at a turning point. More than half of the homes are more than 50 years old. We can't afford to allow the deterioration to grow into more serious blight. The City intends to take actions that will force a transition in a positive direction. Some specific options have already been developed and others will follow. (2) Infill Capacity: Fifteen percent of the Central Area is considered vacant, which includes partially-developed lots. Seventy-five pecent of the 6,809 dwellings are single- family homes or duplexes, which is a radical contrast to East Bremerton where multi-family units are the majority. Land Use - Page 34 The Residential Build-out Analysis found that the current zoning would allow an additional 1 ,858 single-family and duplex residences and an additional 1,026 multiple-family units in Central Bremerton. These would accommodate about 6,750 new residents. These figures are pure calculations of allowed development to give us a better feel for the current potential for new development, without consideration of the wide variety of market, economic and environmental factors that tend to shape the local market. Remaining vacant lots will accommodate some new growth. However, the Central Area has relatively few vacant lots, so most new dwellings will more likely be built as infill on underutilized or partially used lots as they become available, or would be provided through redevelopment activities. (3) Breakdown of Residential Types: Single-family dwellings 4,324 Duplex dwellings 756 Multi-family dwellings 1,729 63.5% 11.1% 25.4% It should also be noted that the Central sector also contains Puget Sound Naval Shipyard and a constantly changing number of Navy ships. It also includes West Park and Jackson Park housing complexes, and a number of rooming houses and group quarters facilities. These are listed in the Land Use Inventory and most are updated annually as part of the City's Census update reporting. (4) Residential Density: As noted in the East Bremerton Plan discussion, a key objective is to build higher levels of residential density along major transportation corridors and around terminals so that public transit is economically feasible and becomes a legitimate alternative to the family car. A minimum density level of 7 units per acre has been proposed for those corridors. The residential areas of the Central Bremerton sector have an average density of 8.1 units per acre, the highest in the City. Maximum build-out figures based on today's zoning would raise the overall density to 11.6 DU / Acre. Nineteen of the Central Bremerton subareas already have densities exceeding ten units per acre (see following map) and are already being served by Kitsap Transit. These high density neighborhoods are located around Evergreen Park and extend from the CBD to Charleston. They follow Burwell, Sixth, and Eleventh Streets, each of which is currently a transit route. Land Use -- Page 35 D. COMMERCIAL LANDS DENSITIES Residential only. Does not indude lands that are zoned or used for non-residential purposes. - - III D.... : .' ". '0 . , ~ :~ : ~ :' " ':.-' :;. :.':. D GREATER THAN 10 DU/Acre 8.1 to 10 DU/Acre 6.1 to 8 DU/Acre 4.1 to 6 DU/Acre 4 DU/Acre or less The developed lands within this category (not incll:Jding vacant), comprise about 11 percent of all developed lands within the Central Area. This is very close to the 10 percent average in the APA study of 66 cities. Our Land Use Inventory found an additional 15 acres of vacant commercially-zoned land within this sector for future expansion. (1) The Central Business District is the focus of business activity and often the focus of attention. The CBO has been struggling through a ten-year transition, brought on primarily by the commercial development of Silverdale in the mid- 1980s. The retail importance hais shifted from the CBO to Silverdale and also to auto-oriented strip commercial areas. Oowntown Bremerton is now working to establish a new identity and land use mix that will work effectively to bring the area back to prosperity and vitality. Recent studies have introduced new downtown and waterfront development concepts, have stressed the importance of improved ferry service and an intermodal transportation facility, and have recommended the promotion of Land Use - Page 36 major new housing to create a more balanced round-the-clock CBD "neighborhood". These concepts will be summarized in the CBD Area Plan at th~ end of this Element. (2) The Charleston Business District along Callow Avenue is one of Bremerton's older commercial districts and remains at an important transportation cross- roads. The district is showing its age and in need of physical improvements and district management -- possibly through a local business association. The Plan will promote higher-density housing in and around this district and will recommend assisting local property owners in the development of a specific Area Plan for their district. (3) New mixed use applications were introduced with adoption of the City's new Zoning Ordinance in 1988. This was a slight change from past practices of concentrating major commercial and office uses in commercial districts to keep them out of residential neighborhoods. A "Neighborhood Business (NB)" zone was adopted in 1988 to allow small personal and neighborhood service uses within or adjacent to neighborhoods. These areas exist in the South Smith Cove area (Eleventh Street Place), at Callow and 15th Street, along Sixth Street, and other locations. (4) In-home businesses are allowed in some residential zones. These may include home occupations, some types of personal services, and office uses. The idea is to allow compatible businesses and services closer to their users, thereby reducing their need to travel. It also allows for maximum use of the home and reduced demand for commercial office space. (5) Parking lots are a significant land use in the Central area, totaling 41 acres. In most cases, these are commercial lots in which people pay to park. Lots that were clearly accessory to another business or land use were mapped as part of the "parent" use. Some exceptions were made for excessively large parking lots on separate parcels, such as those used by Olympic College and Bremerton High School. With a greater emphasis (Transportation Element) on mobility alternatives, we won't expect to see the creation of more large parking lots. In fact, it's possible that the provision of automobile parking facilities will be discouraged, or at least limited, in favor of other options. E. INDUSTRIAL LANDS Central Area commercial lands total 236 acres, about 14.5 percent of all development. A large portion (204 acres) lies within the puget Sound Naval Shipyard. There are two identifiable industrial "districts" outside the shipyard in the Central Area. One is in the Smith Cove area along Sheldon Boulevard. The other is along Thompson Drive, north of Fifteenth Street. Many of the uses mapped in this category tended to be small scattered uses, often in commercial zones and occasionally in residential areas. Land Use - Page 37 Other than PSNS expansion into the Charleston area, there are no plans to increase the industrial presence in the Central Area. In fact, the City has taken steps to reduce industrial opportunities by reducing some industrial zoning to' "Business Park" zoning, and to encourage the relocation of the remaining industrial! uses from the Smith Cove and Thompson Drive areas so that those lands might be recovered for more compatible uses. F. PARKS & SCHOOLS Parks and open space uses were mapped as th,sy exist and included extensive areas within PSNS. The Parks and Open Space category accounted for 114 acres, including the major parks (Evergreen and Forest Ridge), Ivy Green Cemetery, and smaller scattered playfields and other areas. The 68 acres of school acreage within the Central Area included Olympic College, Bremerton High School, Naval Avenue School, and other institutional facilities. The need for land acquisition for new schools and/or public parks, recreational facilities, or open space will be addressed by the affected school districts, in the City's Comprehensive Parks Plan, and in other elements of the ComprE~hensive Plan, most specifically the "Capital Facilities Plan Element". As more data becomes available on land needs or specific sites for schools, parks, open space, etc., the Land Use IElement will be adjusted to accommodate it. G. OTHER LAND USE ISSUES (1) Transportation: Central Bremerton's arterial streets handle great volumes of traffic. The Warren/Eleventh Street intersection is one of the busiest in the state. Adding 20,000 to the City's population, and a similar amount immediately outside the City will bring about some serious traffic concerns. Improved ferry service is a primary need that will, in turn, affect traffic to and through the CBD and other areas of the community. The new Highway 304 entrance into the City and the question of whether or not one-way streets are needed will also be continuing issues. These will be addressed in greater detail in the Transportation Element. (2) Public/Quasi-public: The "Other Public" category of the Land Use Inventory includes a variety of public and quasi-public facilities, including churches, frateral lodges, community centers, and governmental services and offices. These uses accounted for 42 acres and are the types of uses that will grow in proportion to population growth. The City's Plan and zoning will accommodate these uses as they are needed. (3) PSNS Expansion: The puget Soundi Naval Shipyard is expanding westward to Callow Avenue. Indirectly related to that expansion is a new arterial entrance design from Charleston Beach Road into Callow Avenue. Care will have to be taken to ensure that these changes will satisfy the shipyard's needs, but not adversely affect surrounding land uses, traffic patterns, and the health of the Charleston Business District. Land Use - Page 38 H. SPECIFIC AREA PLANS At the end of this Element are brief but more specific land use and improvement plans for key areas of Central Bremerton, including: (1) Central Business District (2) Charleston Business District (3) Park Avenue Corridor (4) Campus/Evergreen Neighborhood Plan (5) So. Smith Cove Redevelopment Area Land Use - Page 39 a~uWESTBREMERT6N>PLAt.J ..... ... A. WEST BREMERTON SECTOR DESCRIPTION The West Bremerton sector is, by far, the largest of the three with 11,122 acres, or about 76 percent of the City's total area. The urbanized por1ion accounts for about one-fifth of the sector and includes all areas west of National Avenue and Oyster Bay, the West Park and Jackson Park communities, the Naval Hospital, NAp Park, the developing Pendergast Sports Complex, Kitsap Lake, the City's sewage treatment plant, SR-3, and other points of interest. On the urban fringe are operating gravel extraction operations and undeveloped hills. The non-urbanized 4/5 of the West Sector consists mostly of City Utility-owned forest lands, the City's Union River Watershed, Gold Mountain ~olf Course, and some smaller facilities. Also included in this sector, but physically separated, is the Anderson Creek utility lands east of Gorst and south of Sinclair Inlet. In December 1994, a portion of the Anderson Creek area (approximately 340 acres) was declared to be surpius utility land and has been designated for industrial use on the Comprehensive Plan. ( I Jr ~ All lands were inventoried and existing uses and residential densities were determined. Only lands within the City limits or in City ownership will be addressed, with the understanding that Kitsap County will produce a consistent and coordinated land use plan for all unincorporated areas. B. LAND USE INVENTORY The City's land use inventory included only areas within the City limits. The following table provides a short summary of land uses within the City limits of West Bremerton. W. BREMERTON PERCENT LAND USES TOTAL ACREAGE Of TOTAL RESIDENTIAL 382.4 3.5 COMMERCIAL 81.4 0.7 INDUSTRIAL 142.9 1.3 PARKS & O.S. 345.8 3.1 SCHOOLS 22.0 0.2 PUBLIC 226.5 2.0 WATERSHED 3,529.2 31.7 UTILITY LANDS 4,963.4 44.6 RIGHT-Of-WAY 387.6 3.5 VACANT 1,040.8 9.4 I TOTALS: I 11,122.0 I 100.0 I % of City = 75.8 c. RESIDENTIAL LANDS (1) Overall Character: . Residential lands account for only 3.5 percent of the total land area and the overall residential density is a very low 2.3 dwellings per acre. Much of West Bremerton and adjacent unincorporated areas might be considered Bremerton's "urban fringe". These areas were originally rural and still retain much of their rural character and lifestyle. The neighborhoods surrounding Kitsap Lake have a character of their own and residents often express a sort of protective "pride of ownership" regarding the lake and its environs. West Bremerton is a very desirable place in which to live, as demonstrated by the success of the Dockside on Kitsap Lake community and other new investment and development. (2) Infill Capacity: The City's watershed and utility lands are important to the City's water source and forest resources and are not being considered for residential development. However, with the urbanized portions of the West Bremerton sector, the Land Use Inventory found 784 acres of vacant or under- utilized residential lands that are presently zoned for residential use. This Land Use - Page 41 availability of land, along with proper zoning and a very low current density, provides for the greatest residential development opportunities in Bremerton. Since West Bremerton is generally newer than other parts of Bremerton, there will be very few opportunities for redevelopment. Most new development wi!! be in the form of new subdivisions or infill on remaining vacant lots. (3) Breakdown of Residential Types: Single-family dwellings 844 Duplex dwellings 110 Multi-family dwellings 1,582 Manufactured Homes 113 31.9% 4.1% 59.7% 4.3% The housing type breakdown is somewhat misleading. With nearly 60 percent of the housing stock being multi-~amily units, one would expect to find an overall density considerably higher than 2.3 DUjAcre. The answer is in the density of the multi-family developments. Most of these are located within Jackson Park and West Park. Both of these multi-family communities have considerable amounts of internal open space, mostly single-story structures, and very low overall densities. Although Jackson Park and West Park tend to dominate the housing statistics for West Bremerton, multi-family development is not characteristic of most of the West Bremerton area. (4) Residential Density: It was stated earlier that the existing ,residential density of the West Bremerton sector is a low 2.3 units per are. At maximum build-out under current zoning, the density could rise to 6.7 DUjAcre. This is still relatively low because very little of the zoning allows multiple-family development. Higher density within and along maj<;>r transportation corridors remains a priority. The City will look for opportunities for higher density development along Kitsap Way; in the vicinity of cpmmercial service centers, and along transit routes. A large Planned Unit Development has been partially approved adjacent to the Pendergast Sports Complex site. Twenty percent of the land area within that PUD may be developed for multi-family units to a density of approximately 20 DU j Acre. D. COMMERCIAL LANDS The land use table shows that commercial development amounts to only 0.7 percent of West Bremerton's total area. If only the urbanized areas are considered (without the watershed and other utility lands), the amount of existing commercial increases to 3.6 percent. Land Use -- Page 42 Most of the commercial development is concentrated within the Auto Center District or the small neighborhood service center at the north end of Kitsap Lake. Restaurants, motels and other tourist-related uses are located along Kitsap Way on each side of SR-3. Only 12.6 acres of vacant commercial land remains in West Bremerton and the City will be looking for opportunities to increase commercial development opportunities, especially in areas that have good freeway visibility and easy access to SR-3. E. INDUSTRIAL LANDS Most of the area's 143 acres of industry are located within the Auto Center District, which is zoned for "General Industry", the City's "heavy industrial" zone. Mineral resource extraction operations are "industrial" land uses for planning and zoning purposes. Gravel extraction takes place at the west end of Werner Road and in other locations throughout the area. These sites have limited life expectancies and the next use of those lands is not yet clear. Some hilly sites offer excellent views and may be more desirable as residential sites. The Plan reflects the current industrial use and, at the owners' requests, will support the "Industrial Park" zoning that has been on these properties since 1988. It's apparent that all lands presently zoned for industrial use are not necessarily most suitable for for non-resource type industrial uses. Some have physical, locational, or other limitations. Some owners will request Plan amendments to allow more appropriate uses --- primarily residential. Lands that really are uniquely-suited to future industrial uses will be strongly protected by the City from competing non-industrial development pressures. The old Kitsap Lake Drive-in Theater, north of the lake was zoned for industrial development and will soon become a new puget Power facility. Some adjacent (currently residential) lands to the east have been added to this industrial park district for future expansion. F. PARKS & SCHOOLS The West Bremerton sector is fortunate in having a great deal of undeveloped land and many opportunities for parks and recreational areas. The area already has Kitsap Lake Park, NAD Park, the new Pendergast Sports Park, Jarstad Park near Gorst, Gold Mountain Golf Course, and smaller parks and recreation facilities in Jackson Park, West Park and other areas. With the vast amount of total area, its surprising that there is very little public shoreline access. Jackson Park offers a shoreline park and beaches for its residents. Kitap Lake has the public park and two other small public access points. And, those fortunate enough to live in waterfront homes or condominiums have access to their shorelines. The Parks and Open Space Element of this Comprehensive Plan will explore ways in which NAD Park and other areas might be further developed to provide new access opportunities. Three public schools serve West Bremerton; Jackson Park and West Hills Elementaries, and a new elementary school just east of Kitsap Lake. Since West Bremerton has the greatest growth potential, it will also generate additional demands on the school system to provide more facilities. This matter is discussed in greater detail in the Capital Facilities Plan Element. Land Use - Page 43 G. OTHER LAND USE ISSUES (1) Transportation: A Gorst to Brernerton bypass route has been discussed and may become more important as growth occurs and State Highway 3 becomes more congested. Such a route, depending on its location, could open up new areas for development and provide better access for commercial and industrial businesses as well. (See Transportation Element) (2) Werner Road Industrial Corridor: As Auto Center nears full capacity, there is a growing need for new industrial sites. Although the district has been zoning for heavy industrial development, that zoning allows a number of non-industrial commercial uses as well. The result has been higher property values (costs) and a greater proportion of commercial uses than intended. The commercial development of this "industrial" zone has reduced the City's inventory of available industrial sites. We am now looking for other suitable sites for industrial expansion. The most obvious and easily-accessible area is the corridor that extends along Werner Road from SR-3 to the gravel pits at its west end. Much of this corridor is currently within an unincorporated island which should be annexed to the City eventually. H. SPECIFIC AREA PLANS (W-1) Kitsap Lake Business District (W-2) Werner Road Industrial Corridor (W-3) West Hills Area Plan (W-4) South Auto Center Enhancement Area (W-5) Pendergast Sports Complex Land Use -- Page 44 "" ...... ....... ....... ... . .... ... .. ".. ... ..... ............... Ipi~~I~B~H~QY9XI~II0~~.......~Ng~............................ The City's Union River Watershed and other Utility-owned forest lands were included in the West Bremerton sector. This section provides some additional information about the unique nature of these non-urbanized lands that are within the City limits but not available for urban development. A. UTILITY LANDS MANAGEMENT The City's Utility-owned lands are managed by the Utility Lands Management Plan and also by the City's wastewater and other adopted plans, which include the following provisions: (1). Water Resources: Bremerton has a plan for the management of thousands of acres owned by the Bremerton Water Utility. These lands include the Union River, Anderson Creek, Gorst Creek, and Heins Creek watersheds as well as other Utility owned lands. The overall objective of the management plan is to provide an adequate supply of high quality drinking water at a reasonable cost. Strict water quality control measures are needed to accomplish this. In addition to the surface reservoirs, groundwater sources are also important to the utility. Programs are in place to protect those sources from contamination and overdraft. (2) Forest Resources: Kitsap County has a colorful history as a producer of timber products and much of the County remains in timber company ownership. The City's utility lands are mostly forested, soils and climate favor tree growth, and the long- range plan is to continue to manage these valuable forest resources. The Utility Lands Management Plan (ULMP) recommends that the City implement a program of sustained yield harvest on utility lands. The Union River drainage would be harvested at a rate of about 40 acres per year and other lands at about 60 acres per year. It would take about 60 years (about year 2046) to bring all the lands into a sustained yield rotation. At that time, the annual cut would stabilize at about 2.8 million board feet. There is no reason to believe that surrounding development pressures will erode the forest productivity of these lands. Forest management on Utility lands is not a new concept. A forest inventory and management report was prepared in 1952 and several follow-up analyses have been carried out by the Utility or its consultants since that time. The Utility employs its own professional forester to supervise forest management activities in accordance with the long-range management plan. Land Use - Page 45 (3) Biosolid Disposal: Bremerton's wastewater treatment plant generates a solid residue, referred to as biosolids. These were dispOSEid of at the Olympic View Landfill until increasing volumes and tighter disposal regulations resulted in a switch to a land application (silviculture) method: of disposal. Of the various options available, this was found to have the lowest cost, as well as low environmental and health risks. Today, all of BrE~merton's biosolids are used in silviculture application on hundreds of acres of Utility-owned lands near Gold Mountain Golf Course. This practice is enhancing tree growth in these areas as well as providing an environmentally friendly means of biosolid disposal. BIOSOLlD DISPOSAL AREAS (Silviculture) ~o::t:!'::!..'S...!::~_~.!::/O",g~_ TOWN6t.uC:>> 1') ~OUTH (4) Fish: The City Utility has worked with the Department of Fisheries and the Suquamish Tribe to enhance the salmon fishery at Gorst. Protection of streams within the watershed and utility lands will continue to be a primary objective of the management pro~~ram. (5) Management Objectives: The City's management objectives for these lands are resource-related and structured to protect the watersheds and timberlands. Within the strict protective structure of the Plan an:! objectives that could allow some use of these lands for research activities or other uses that are clearly in support of overall utility operations objectives. Land Use -. Page 46 (6) Recreation: The Utility lands are divided into use "zones". One of those is "Recreation" to accommodate Gold Mountain Golf Course. The golf course will probably be expanded within the next few years, but not into lands that are critical for the protection of watersheds or forest resources. (7) Commercial Uses: A "commercial" designation can be applied to specific sites to accommodate various types of commercial agreements, such as antenna site leases. Any further commercial use of Utility lands will be evaluated for compatibility with overall management objectives. (8) Surplus Lands: When the Utility Lands Management Plan was prepared there were several "blocks" of surplus utility land that were not needed for water supply protection. The Plan suggested that these lands may be suitable for other "higher and better uses". The land surrounding Reservoir #3 was an example, based on its close proximity to an urban area, etc. Those lands have since been transferred to private ownership for urban development. Portions of the Anderson Creek drainage and lands around Lake Tahuya were other areas of surplus property and were suggested for development. The City will continue to build its protective land use base around the watershed and, when opportunities arise, will consider a sale or trade of properties that might achieve a higher level of resource protection. B. THE LAND USE PLAN The map entitled "Watershed & Utility Lands LAND USE PLAN" shows the 20-year plan for these lands and includes: (1) The Union River Watershed --- totally protected from development. (2) Gold Mountain Golf Course and its expansion area. (3) Jarstad Park west of Gerst on Old Belfair Highway. (4) The Anderson Creek "Industrial Park" district souteast of Gorst was found to be more suitable for industrial uses than for continued forestry and watershed uses. The City will retain its wells on the property but allow it to be sold and converted to much-needed industrial development sites. (5) Other City Utility-owned lands (designated "UL") will continue to be managed for forest production. However, a study is being conducted to determine if any of those lands can be declared surplus and converted to other uses. (6) Develop a specific area plan for the "Anderson Creek Corporate Campus". Land Use - Page 47 City of Bremerton UNION RIVER WATERSHED and UTILiTY LANDS II Prepared by: Bremerton Plennlng .------.,.---- I -- I I I I I o I .. I I I I I I +------------_....-- ~I:z : ~l~ I ~I. I j:i I I I I :"\ I --- I I I ---- Land Use -- Page 48 .' ... . . . ..... .... .' . . . .................. ............... ............................ .......... . ........ .... . .... ..... ii. .......SPEGIFICAREA13IlANS) A. INTRODUCTION Earlier sections of the Land Use Element discussed the East, Central and West sectors of Bremerton and the watershed/utility lands. Policies and land use proposals for those "general" areas were discussed, as they are reflected on the Land Use Plan map. In addition to the three sector descriptions, a number of smaller more specific areas and/or issues also need to be addressed. This section of the Land Use Element allows a greater degree of detail for each of these important areas. Although this section is entitled .Specific Area Plans", not all of the following areas have been developed to "plan" status. Some of these areas have been identified as problem or opportunity areas and are presented in an introductory manner, sometimes with proposed guiding policies or recommendations for further studies or actions. Some describe plans that have already been completed and are used or referenced within the Comprehensive . Plan. All were determined to be important enough to the community to warrant attention within this Plan and beyond. B. AREAS INCLUDED This section of the Land Use Element is intended to be ever-changing. The areas identified as needing further study or action today will be replaced with other areas in subsequent Plan revisions. This edition of the Land Use Element includes the following specific area plans: E-1 Manette Business District E-2 Harrison Health Services District E-3 Wheaton Way Corridor C-1 Central Business District C-2 Charleston Business District C-3 Park Avenue Corridor C-4 Campus/Evergreen Neighborhood Plan C-5 South Smith Cove Redevelopment Area W-1 Kitsap Lake Business District W-2 Werner Road Industrial Corridor W-3 West Hills Area Plan W-4 South Auto Center Enhancement Area W-5 Pendergast Sports Complex Land Use - Page 49 ........EZ~:> ...Ml\NEUE. BOSINESS[JIISTF{I€T<.i ........ . ...... . A. LOCATION: The Manette Business District lies at the east end of the Manette Bridge in East Bremerton. For purposes of this Plan, the "study area" includes all commercial businesses along Eleventh Street, as well as those on Harkins, Pitt, Shore Drive and Wheaton Way. Residential properties are also considered part of the district. B. AREA DESCRIPTION: This small neighborhood business district contains a well-defined core of businesses along Eleventh Street and Harkins that includes a grocery store, restaurants, night club, appliance store, and other personal services. The location of the bridge and the confusing combina- tion of Harkins, Pitt, Wheaton and Eleventh result in an awkward flow of traffic through the area. III I :> < I ~ ~ < . > < J: > a: II: III 11. The district consists of both new and very old structures, constructed without an architectural theme or master plan. The result is a mix of building sizes, styles and conditions. Local businesses claim the area is deficient in parking. It also lacks amenities, such as landscaping, street trees, attractive signing and lighting, pedestrian facilities, and other visual features that could greatly improve the overall appearance of the district. C. BUSINESS DISTRICT SURVEY: In the spring of 1994, as part of Bremerton's Comprehensive Planning program, a questionnaire survey was conducted of property owners and businesses within this study area. Seventeen responses were received. On a scale of 1 to 5 (1 being best), the overall status of the district was given a rating of 3.3 and "customer/employee parking availability" was rated lowest (3.8). Categories rated slightly higher than average were "appropriate mix of businesses" and "pedestrian convenience and comfort". Most respondents felt that there is not too much commuter traffic and traffic is fine at present levels. Of least importance were better bus service and bicycle usage, although those categories were rated above average in importance. Of various activities that might bring benefits to the district, "voluntary clean-up or fix-up campaign" ranked highest, followed by "low-interest rehab./improvement loans" and "street tree or landscaping program". Activities having lowest priorities were "more restrictive regulations" and "targetedl code enforcement program". Narrative comments included a mix of ideas and feelings about this district. Some were very critical of its appearance and degree of maintenance while others felt it was "perfect". Many were very concerned about the impacts on business of the possible closing and rebuilding of the Manette Bridge. The present location was preferred to new alignments. About 71 percent felt the business district would become stronger jf more people lived in and around it. The concept of living quarters above businesses was specifically supported by at least one. And, although several discouraged government intervention, many felt that the government, businesses, and neighborhood groups should work together on activities to benefit the district. Land Use - Page 50 D. RECOMMENDATIONS: The Manette Business District is vital to the community. It is in a strategic location to capitalize on traffic flow, visibility, and neighborhood convenience, but is also vulnerable to continued deterioration, congestion, and other adverse effects of its confusing circulation pattern. Consistent with the City's visions related to the maintenance of healthy and attractive neighborhoods and business districts, The following actions are recommended: 1. The City should undertake a traffic study of the business district and Manette neighborhood and create a master plan for future streets- and street improvements that will handle projected traffic volumes most efficiently. 2. The City should work with the local neighborhood, businesses, State Dept. of Transportation, and others in formulating comments and recommendations regarding the future of the Manette Bridge, including alternative locations and alignments. 3. The City should encourage the establishment of a Manette Business District association that can meet regularly, discuss problems and opportunities, coordinate promotional activities, and initiate and follow through with identified district improvements. 4. The City should offer to assist the Business District association and/or neighborhood association in the development of a Manette Business District improvement plan to include some or all of the following: a. A master plan for future land uses in and around the district. b. Zoning adjustments to more directly reflect the district's growth ambitions. c. A strategy to improve the image and visual appearance of the district, possibly including landscaping, street trees, signing, design guidelines, and building maintenance programs. d. A plan to improve mobility through pedestrian-related improvements, bikeways/routes, bus scheduling and bus stop design. Land Use - Page 51 ..............12;.. .........IiIJxRalstTJN......H.~tTA......S.E.IRVIG.ES..... DlstRioT........... A. LOCATION: An area of East Bremerton generally bounded by... . Sheridan Road on the north . Warren Avenue on the west . Port Washington Narrows on the south . East Park Residential Area on the east B. AREA DESCRIPTION: Harrison Hospital and associated medical offices and support services have evolved into a regional health care complex that accounts for most of Bremerton's 2,600 health services jobs. As the complex grew, it gradually encroached into the surrounding neighbor- hood, converting vacant lots and residences into new medical facilities and parking lots. jWW~ I ~ The district also consists of the sheridan Village Shop- ~~I I Lr.=~G. ping Center, which provides a good range of neighbor- ~Ir ]c=J ~ B~ ~ ho~d shopping opportunitie~. Several restaurants, con- DB ~ ~= 1\ venlence markets, auto services, churches and other I~ 00 8~ I \ uses fill the local non-medical service needs and round ro,-, r-, [QO"!J 9'0 =q out the range of available services. Residential uses surround the district. Some older properties have been converted to non-residential uses, but adjacent stable neighborhoods remain. Along the western edge of the district are higher-density residential uses, including a convalescent center, apartments, and a new senior apartment complex. As the few remaining vacant lots are developed or committed, Harrison Hospital and other medical facilities are facing not only new land acquisition costs but also the hurdles of Comprehensive Plan amendments and rezones, especially if their plans involve further encroachment into adjacent residential neighborhoods. C. SPECIFIC PLAN PROPOSAL: Half a dozen zoning districts control land use and development within this district. To date, only market forces and the very general Comprehensive Plan have guided growth and zoning. There is a need for a more specific area plan developed separate from but consistent with the Comprehensive Plan, and which is based on the City's vision for its regional medical complex, as well as on basic planning objectives: Vision: Harrison Hospital will continue to playa major role in the provision of medical services, and its surrounding district will continue to grow and strengthen its role as a regional health services center. land Use - Page 52 Objectives: (The minimum framework for the area plan) 1. To build on past health services and commercial investments. 2. To improve access to the service providers, as well as circulation within the district. 3. To maintain and strengthen the professional relationships between Harrison Hospital and surrounding physicians' offices and related medical services. 4. To anticipate Mure growth needs and incorporate them into a land use plan for the district that will minimize the need for Mure Plan amendments and rezones. 5. To minimize increased traffic, bypass traffic, physical encroachment, and other disruptions to surrounding stable residential neighborhoods. 6. To maximize the efficient utilization of existing lands through creative design and site planning, improved public transit service, mixed use development, and other features. 7. To establish a balance of land uses that will complement each other and maintain long term stability. D. SUGGESTED OUTLINE fOR THE AREA PLAN: 1. ANALYSIS OF EXISTING CHARACTERISTICS a. Land Use Inventory. b. Population and Residential Area Analysis. c. Physical Condition Survey. d. Economic Conditions and Opportunities. e. Utilities. f. Transportation/Mobility. g. Appearance/Aesthetics. 2. ESSENTIAL CHARACTERISTICS OF THE NEIGHBORHOOD a. Regional Significance. b. Business Activity and Economic Growth. c. Preservation of Residential Quality and Desirability. d. Problems and Opportunities. 3. PROGRAMS AND PROJECTS ADDRESSING MAJOR ISSUES a. Further Studies Needed. b. Capital Expenditures Needed. c. Private Investment Needed. d. Implementation Strategies. Land Use - Page 53 .1::::3: ..... ......W8EAfONWAYCORRltJOR{..?<..} A. LOCATION: The Wheaton Way Corridor is one of Bremerton's most active transportation corridors and business areas. It extends from the Warren Avenue Bridge northward to Riddell Road and beyond into unincorporated areas. Beyond Riddell the corridor is more commonly referred to as Brownsville Highway. B. AREA DESCRIPTION: Major stores along the corridor include Safeway, Eagle Hardware, K-Mart, Bag-N-Save, and a wide array of auto services, restaurants and fast food outlets. The corridor also passes through an established low- density residential neighborhood, and past schools. For the most part, land use patterns are well defined and not expected to change significantly. The only exception may be the school district property northeast of the Wheaton/Sheridan intersection which may be better located and of greater value for non-school pur- poses. A mixed use designation has been placed on the Land Use Plan for that reason. The fact that Wheaton Way carries a large volume of through traffic sometimes conflicts with its commercial and local circulation functions. As growth in the East Bremerton and nearby unincorporated areas continues, the demands on Wheaton Way will also increase. The Transportation Element deals more directly with this issue and provides alternatives. C. RECOMMENDATIONS: 1. For purposes of the City's Comprehensive Plan, the Wheaton Way Corridor must continue to provide the following primary functions: a. Carry regional through traffic efficiently and within its adopted Level of Service. b. Carry local traffic to and from businesses, public facilities, and residential neighborhoods. c. Provide visible and easily accessible sites for businesses and services. Land Use - Page 54 2. In addition to the basic functions, and absent specific design guidelines, the City should ensure that the following policies are considered during the permitting process for all future expansion and new development along the corridor: a. Developments shall provide interconnecting pedestrian walkways, to the greatest extent possible, to encourage walking. b. The provision of safe and frequent pedestrian crossings of Wheaton Way shall be a priority and shall not be precluded by the need to move large volumes of traffic. c. A street tree program shall be established by the City and applied to all new and expanding development through their landscape plans. d. New curb cuts and driveways shall be discouraged. Frontage roads or common access points serving several adjacent properties are preferred. e. The City shall consider amending its Zoning Ordinance to add incentives or a bonus system for mixed-use development, possibly based on a point system, th~t will encourage increased densities and commercial/office intensities along the Corridor and maximize land use efficiency. f. For transportation planning purposes, priority shall be given to Plan Amendments and Rezones that would increase residential density within one- fourth mile of the Wheaton Way Corridor. g. Nonconforming signs, parking, structures and other improvements shall be phased out at the earliest opportunity. h. In considering design alternatives, preferential treatment shall be given to designs that favor mass transit, car-pooling, bicycling, or walking over the single-occupant vehicle. 3. The City shall proceed to initiate the preparation of a cooperative City jCounty jState Wheaton Way jBrownsville Highway Corridor Study, extending from Burwell Street to Waaga Way. NOTE: Also see Transportation Element for similar transportation-related study. Land Use - Page 55 ., . .... ...... . .. . ..... -,. . ... .. .... , . . ...... ...... .... . .... ,........ .... ............... ........... ........',. ..-....... . .c~ 1:}~EN)fRAla{JSI~ES$dDIStRICTi/ A. LOCATION: The Central Business District is described in the Bremerton Zoning Ordinance as the geographical area bounded on the south by PSNS, on the east by the Port Washington narrows outer harbor line, and on the north and west by the rear property lines of properties that front on Sixth Street and Warren Avenue. B. AREA DESCRIPTION: Bremerton's CBD has historically been the business and commercial center of Kitsap county. A general decline set in during the mid-1980s for a variety of reasons, including the construction of the new Kitsap Mall in Silverdale. While private business was declining, a number of public projects were being implemented along the waterfront. These included the removal of the old ferry terminal and YMCA building and construction of a new .temporary" ferry terminal. A floating recreational pier was con- structed from the end of the First Street dock. The shoreline north of First Street was enhanced with a concrete "overwater park", the placement of the histori- cal ship USS Turner Joy, and a recreational marina. Other dilapidated structures were removed and more are scheduled to go. During the past year, the City and local property owners combined resources to rebuild a one-block section of Fourth Street, between Washington and Pacific. It is now a velY attractive meandering street with street trees, wider sidewalks, decorative street furniture and lighting, a fountain, and other amenities. It's clear that the CBD is in transition from its former retail-commercial focus to a new mix of business, government and residential that will be more diversified and that will result in a more economical and comfortable "neighborhood" balance. Residential development in and around the CBD is an important key to the success of this transition and will be emphasized in this Plan and in the zonin~l to follow. C. STUDIES: A number of downtown economic, design, redevelopment, and revitalization studies have been commissioned over the years. Each has produced innovative concepts and new ideas, but most were costly and few have actually been implemented. The most recent study was completed by the LElland Consulting Group in 1993, in cooperation with a large Downtown Task Force which continues to strive toward implementation. The study is commonly referred to as "The Leland Study". It looked at the economics and revitalization prospects for the downtown area and the feasibility of a waterfront hotel/convention facility. It provided a range of possibilities, along with steps that would lead gradually toward revitalization. This study also pointed out that Bremerton is in a good geographical position to accept growth, but needs to properly position itself in the marketplace so that positive economic change will occur. The City will need to be ready to take the initiative and seize the opportunities when the time is right. Land Use - Pa~ 56 D. DOWNTOWN VISIONS AND POLICIES: The following visions and policy statements were derived from Plan Element "B" (The Vision for Bremerton), recent studies, and the City's 1986 Comprehensive Plan: VISION: The Central Business District will continue to be the heart of Bremerton, providing a diversity of economic, residential, recreational and cultural activities that will attract new growth and visitors to the area. The CBD will become more of a Hpeople placeH as new residential development joins with other activities to create an active downtown neighborhood. A high-density low rise ''waterfront village" will link the CBD with the waterfront, marina and overwater park, and will provide quality housing for Seattle commuters who rely on fast reliable ferry service. The revitalized CBD will offer culture and entertainment, new retail shops and services, a hotel with convention facilities, offices, art galleries, quality restaurants, and other specialty businesses. POLICIES: 1. The City of Bremerton will: (a) Promote the development of a regional intermodal transit "plaza" to replace the temporary ferry terminal. (b) Continue to work toward improved ferry service to Seattle. (c) Undertake positive activities and projects in the downtown area that are designed, in part, to build public support for the community and CBO revitalization. (d) Continue to work with downtown merchants and property owners to refine goals and objectives, to develop implementation strategies for revitalization and new development, and to develop a list of public and private .opportunity sites. and funding sources for new development and CBO enhancement. (e) Work with downtown interests to develop guidelines for the various sub-districts of the CBO. (f) Continue the marketing efforts that are already underway and convince developers and lenders that the City's improvement program is critical to the success of downtown renovation. Land Use - Page 57 (g) Revise plans, regulations, and the permitting process, as necessary, to allow and encourage the intended types of uses and get them approved as expeditiously as possible. (h) Promote land uses and development patterns consistent with the following Urban Diagram and continue to study and refine the diagram to reflect the best interests of the community. Central Business District URBAN DIAGRAM Neighborhood Preservation Transit high-de mixed- ~. Redevelopment to ~t::1 - -, ~ 1---,---., ~- ~d High-density Resid. l'H "-0-- '- ~ ~~ ~~ ~~gl f-- I-'- 1-_ 1--: '- HI . . 1-_ s~\\JGt. I < f--- '--- 'li == =1=: = ';:= : Ii i I = i:: rr[lffi ~ i- .==1-- - f-- \'I,IIt. ' lcrn..ST. _ - f--V NIP- - ~Y::J. ~ I 11I1 i i II - - ',--<-- , - ~ 1:8 .r=- - rf .---i - -- ~ - '-- 1--= -- ---;'---' ~ I I 11I1 : , , , <, I-- _ ~ ~ /-----'~ ~~~ ~ !II l-- _ -- I ----id mt ST. i- f--- l-- '-l-~ ~I~ l-- -- --"-- ~ ! ITO i, I 11]1 i == - ' -+-- ~ r=--- ~ i f--- , .~~~ '-- c; . lId--- = 1= == - f---:""'- ~ Sixth Street ion to ST -- i I I c~W f-- - '-- ~ '---- /' Office & Resid. nsity ~ i f-r-H I--L- use \ c Ilj'lii:1 qj' f-- -"'1 l--l-- C:t=: ~ '-- >j , I ill ~ f---i-- 5./ <(I I l--f--,_ ~IL Sixth Street ,'ft ~ (;:: , I II IT L- AutO-oriented \ ..... ST . . I l \. I I I I! I I I ~ : III III Ifr71.IT II I IL -,/ -, '1111 ~r\11 II' , ~ i ,- '~' -' if-- 'Cd '\ "'" .-- ..;: :w1i '{II I : l! r I I !1"-k. ! I ~ ~I 1 w ~-~ I " ! I ~- ~ nlrr I r I ~ High-density "" N1lr~R .lJ1TT ; iT! III~ 1 jj::. J Residential , I I Tf II II l l .... Y I! I 'I 7/:;::j 1 ' I f!! --.. IIIL I / .o.......~ / g I T~ ..n ..-..- _u -. ~ _ /L r J ~ ......-_,-- I='c-. ~ (] ~ i 1[i! ... ~ -commercial ~ king ~ f-;;Ifj 7, I ~ .~ ~ /. II .... Service Commercial I'f" sr...... ", I I? f I " I ~~ I, 'J). I, Compact, intense '. ~ pedestrian-oriented . Waterfront retail district ~ Mixed Use Hotel/Historic I District Intermodal Terminal Highway and Par land Use - Page 58 E. FERRY TERMINAL AREA: VISION: An intermodal transportation terminal that provides an effective, functional and attractive regional transportation facility that is integrated with Bremerton's waterfront and Central Business District. POLICIES: 1. The City will coordinate its downtown land use patterns and transportation facilities with its ferry service and terminal development expectations. 2. The City will support and participate in feasibility and design studies regarding replacement of the present "interim" terminal. Such studies may also involve such jurisdictions as Washington State Ferries, State Department of Transportation, Kitsap County, Kitsap Transit, and others. 3. The design for a new terminal facility shall include consideration of at least the following issues: (a) Adequate vehicle holding area and measures to prevent overflow onto downtown streets. (b) Easy and comfortable pedestrian access and circulation to and from other downtown locations. (c) Reconfiguration of the Washington/First Street intersection to separate pedestrian from vehicle traffic, ensure a smooth flow of off-loading vehicles, and increase safety. (d) Integration - of commuter services on ground level of terminal that might include a cafe or coffee shop, gift shop, tourist information services, etc. (e) Possible inclusion of offices or facilities that might accommodate small group meetings. (f) Covered walkways and outdoor waiting areas. (g) Adequate access, circulation, and waiting areas for transit buses and taxis, as well as convenient rider access to those services. (h) Bicycle racks and lockers. (i) Limited on-site commuter parking, with priority for short-term and handicapped parking. U) Look for public/private partnership opportunities that might lead to a facility that includes expanded commercial, office, or other areas that might benefit from the terminal location. (k) Include the possibility of a future heliport in design concepts. (This may be the only suitable downtown location for such a facility.) Land Use - Page 59 , '. . . .... .... '. ... . . ............G~2.:.... .............~.H~~~sTo.~.......BIJSI.NE$s...o.l.sIRlct................... .... A. LOCATION: The Charleston Business District is centered around Callow Avenue, and to a lesser extent Montgomery Avenue, and concentrated pri- marily between Eleventh Street on the north and First Street on the South. The district is irregular in shape and includes some adjacent commercial, office and light industrial busi- nesses as well. Street access to the district is excellent. Kitsap Way flows into Eleventh and Sixth Streets, while Charleston Beach Highway (S.R. 304) provides access from the south to Burwell Street and Callow Avenue. B. THE NAME: The Charleston Business District is the downtown portion of the former community of Charleston, which was con- solidated with the City of Bremerton in 1927. Callow Avenue is the central street and in recent years the area has been known as the Callow Business District. A recent (spring 1993) property owner and business questionnaire found the name Charleston to have important historic significance and to be clearly preferable to Callow. On that basis, the area will be referred to as the Charleston Business District throughout this Plan. C. AREA DESCRIPTION: 1./-1-/-/-1-1- 1_1.1_~I_I_I_:o ,e\_lel_lele/o,. 1.1-1.leI.I.I. This business district is central to at least five residential neighborhoods which, in turn, are separated from each other by arterial streets. The arterials function as barriers to effectively prevent ease of movement or interaction between these neighborhoods. Even so, neighborhood residents do have good access to this business district. The business district provides a full range of retail shopping and personal services. The 7/11 convenience store at the south end of the district, the Bremerton Food Outlet at Sixth and Montgomery, and the new Safeway at Eleventh and Callow satisfy most grocery needs. Several restaurants, a bakery, and a tavern or two add variety. Retail stores include a sporting goods store, bicycle shop, furniture stores, used and antique goods, sports card shop, appliances, and others. Services include automotive repair, gas, animal care, pawnbrokers, banks, beauty school, hair care salons and others. L.aJ1d Use - Page 60 This district has a lot to offer. Unfortunately, it is also quite old and showing its age. On a scale of 1 to 5, those responding to the business district survey gave the district an overall quality rating of 3.5. The feature that was rated lowest was customer/employee parking (3.9), followed closely by lack of overall visual/aesthetic appeal (3.7), lack of attractive and effective signing (3.7), and poor physical condition of buildings (3.6). Eighty-one percent of the respondents felt the district could become stronger if more people were living in or around it. Traffic considerations were rated higher than physical conditions. Most agreed that current traffic volumes are okay and that improved bus service would benefit the district. But most were cool to the idea of one-way streets. When asked what kinds of activities would bring the greatest benefits, the highest rated response by far was "low-interest rehabilitation/improvement loans". The action bringing the least benefit was "loosening up development regulations.. Between the extremes, respondents felt relatively positive about a targeted code enforcement program, a voluntary clean-up or fix-up campaign, a street tree or landscaping program, and design standards for new buildings and signs. Some expressed frustration at the lack of organization of the business community and the difficulty in getting individual property and business owners to commit to district improvements. They expressed a need for coordination and leadership from within the district itself, but with support and assistance from the City. At least five distinct neighborhoods surround the Charleston Business District. They are separated from each other by arterial streets which act as barriers to mobility and inter- action. Land Use - Page 61 D. RECOMMENDATIONS: Consistent with the City's visions related to the maint~nance of healthy and attractive neighborhoods and business districts, the following actions are recommended: 1. The City shall carefully consider the impacts of the Highway 304 improvements on the Charleston Business District and on circulation in and around the district and new PSNS gates and expansion area. 2. The City shall encourage the establishment of a Charleston Business District Association that can meet regularly, discuss problems and opportunities, coordinate promotional activities, and initiate and follow through with identified district improvements. 3. The City shall offer to work with local property owners, businesses, and surrounding residents in the development of a Charleston District Neighborhood Plan to include some or all of the following: a. A master plan for future land uses in and around the district. b. Zoning adjustments to more directly reflect the district's growth ambitions. c. A strategy to improve the image and visual appearance of the district, possibly including landscaping, street trees, signing, design guidelines for new construction and rehabilitation, and building maintenance program. d. A plan to improve mobility through pedestrian-related improvements, bikeways/routes, bus scheduling, bus stop design, and other means. E. DEVELOPMENT AND DESIGN REVIEW: The Charleston Business District has retained much of its original character. The central portion along Callow is very pedestrian-oriented with small stores, window displays, interesting storefronts and signs, and a human scale. , New development and building rehabilitation projects can be encouraged to take into consideration these features and design their projects accordingly. The City can assist by advising clients of design options and by applying adbpted criteria in the site plan and design review stages of the permitting process. For a project to be in compliance with the Comprehensive Plan, it should be found to be consistent with the following criteria: 1. Efforts to repair and rehabilitate older existing structures are. encouraged. 2. Natural exterior building materials such as wood and brick are preferred over concrete, plastics, or metal. land Use - Page 62 3. Exceptionally large stores should be located at the extreme north or south of the district, or along Montgomery Street to avoid disruptions to the small business character of central Callow Avenue. 4. Providing a higher density residential base is an important objective. One or two stories of residential development are encouraged over street level businesses whenever possible to bring more people into the district as residents. The City will look for ways to assist through incentives or other means. 5. In keeping with regional and citywide transportation objectives, local district policies will give preference to travel modes that provide alternatives to the single-occupant vehicle. Some additional parking should be provided, but so should bicycle facilities, improved bus service, and pedestrian amenities. 6. New parking lots should not front on Callow Avenue, but should be provided behind the buildings, off alleys, or along Montgomery Street. The possibility of consolidating properties to create a single large parking lot along the west side of Montgomery between Burwell and Sixth should be investigated. 7. The present Bremerton School District administration building property at the northeast corner of Burwell and Montgomery should be master planned for business uses or a mixed use development that can take advantage of the high-traffic location' while also becoming a part of the business district. 8. In addition to being consistent with the Zoning Ordinance, signs are encouraged to be simple, in scale with the buildings and surroundings, and consistent with the "Old Charleston" character (or other locally adopted theme) of this district. (The district association may wish to establish design standards.) 9. All new development shall be pedestrian oriented. a. The primary entrances to buildings and businesses shall be from the street frontage sidewalk, particularly buildings fronting on Callow and Montgomery. b. Street front facades shall showcase their businesses and encourage window displays. The City will consider a Zoning Ordinance Amendment to allow no more than 40 percent (suggested) of a building's first floor width to consist of solid walls to the street. 10. The Zoning Ordinance shall be adjusted to encourage the continuation of established development patterns that provide the district's character and to adjust setbacks, parking, or other requirements that may be overly restrictive. At the same time, the City will emphasize the importance of landscaping requirements and encourage street trees, private landscaping, and other amenities that might enhance the visual appearance and image of the Charleston District. land Use - Page 63 ..'.......... ...... ...:.........:....:...:.;.:...;.'."'.' ".'';" ""', .....;;..,.. '.' ..., ......::: :::.:.': ::::.:;. ..>>>>>>>>>..;.;.;,>,.... "'::... >...,.,.. ......'.'.'.', . C~3:/ ......P~I<AVENLJlEeQRRI[j0Fl).. A. LOCATION Park Avenue provides a connection between the west side of the Central Business District and residential areas north of Eleventh Street. It extends northward from Burwell to the Port Washington Narrows, a distance of about 0.8 miles. The concept of this corridor is to connect the downtown with the Ever- green Park neighborhood to the north and provide an urban greenway that will offer multiple modes of transportation and that will become the focus of future redevelopment. B. CORRIDOR DESCRIPTION The southern half of the Park Avenue Corridor is currently in a state of transition. There is no central theme or cohesiveness. It is com- prised of a mixture of shipyard-oriented park- ing lots, offices, small service businesses, auto-related services, and even some small industrial businesses. The newest and best maintained properties are at the Sixth/Park intersection and include a bank, a 7/11 con- venience market, and insurance offices. SMITH COVE Business structures south of Sixth are in need of repair, maintenance, or redevelopment. North of Sixth, many old houses have been removed and a considerable amount of vacant land now lies between Sixth and Eleventh. This area was given "Mixed Use" zoning six years ago, but has little to show for it. The MX zone continues to offer a wide range of commercial, office, and high-density residential development potential. ~ ~ ~ FERRY . "-- TERM I NAL The general character changes north of Eleventh Str~et as the corridor enters the Evergreen neighborhood. Even with the commercial and public facilities near the corner of Eleventh and Park, this is clearly a residential area. A strategically placed neighborhood entrance sign might further reinforce the character of this place. Land Use - Page 64 C. DEVELOPMENT CONCEPT 1. Overall Objective: To assist the redevelopment and improvement of the Park Avenue Corridor into an attractive, people-oriented, heavily-landscaped urban greenbelt linking the Central Business District with Evergreen Park, with linkages to shorelines, Olympic College, Bremerton High School, and other points of interest. 2. Development Concept Policies: (a) A mixed-use concentration of development shall occur along both sides of Park Avenue between Burwell and Eleventh, consisting of high- density residential uses, offices, and limited service commercial. (b) A pedestrian-friendly boulevard shall be created with wide sidewalks, coordinated design and signing, pedestrian amenities, bikeways, professionally-designed landscaping, and continuous street trees. (c) Off-street parking requirements may be reduced when the reduction is counterbalanced by an emphasis on alternative modes of travel, frequent bus service, or other management techniques or programs. (d) A collaborative effort of the City and local property owners shall develop a master redevelopment plan for the corridor. The planning area may include areas west of Park Avenue to Warren, between Burwell and Eleventh, and other related areas as appropriate. D. IMPLEMENTATION 1. The development concept will be implemented through Comprehensive Plan policies, mixed-use zoning, development guidelines or incentives to encourage creative design, and with the possible use of pUblic/private partnerships. 2. The City shall develop plans for needed utility improvements, based on the levels of density/intensity proposed in the Comprehensive Plan and allowed by zoning, and to ensure .concurrency" (public improvements in place when new development needs them). 3. The City shall initiate installation of major landscaping and street trees to establish the overall theme and appearance and to provide incentives for private investment to follow. Land Use - Page 65 .. .....CI4: .................CA~J3.U$fl.~~.B<3.Fl~~.~.......~.E.IB~.FJQ.~~Q~.~................ ".. .......... . , . ..... Campus/Evergreen is actually the combination of two neighborhoods. The "Evergreen Park" neighborhood lies to the north of Eleventh Street and east of Warren. The "Campus" neighborhood is directly west, extend- ing to Naval Avenue. For purposes of a grant-funded neighborhood plan project in 1992, these two neighbor- A. LOCATION B. AREA DESCRIPTION and THE PLAN The Campus/Evergreen Neighborhood covers 271 acres and is very diverse. It includes more than 1,200 dwellings, some heavy industrial uses in the vicinity of Smith Cove, and limited commercial uses. It is also the home of OlymPric College, Bremerton High School, a number of churches and other public and quasi-public: facilities, and Evergreen and Rota Vista Parks. The area consists of mostly small lots and has a relatively high density of 8.5 dwellings per gross acre (includes abutting streets). It also has a considerable capacity for additional residential infill development. A Build-out Analysis showed that another 700 dwellings could theoretically be added to the area, based on today's z6ning and land availability. The Campus/Evergreen Neighborhood Plan was adopted as a Comprehensive Plan Amendment in December 1992. It will continue to be ~n extended part of the Plan but will also function independently an area-specific neighborhpod plan that is consistent with the citywide Comprehensive Plan. The goals of the Neighborhood Plan were based on the 13 goals of the Growth Management Act to help ensure planning consistency. The Plan defines the neighborhood and its physical characteristics; provides a socio-economic and housing profile; and identifies problems and needs in all major areas including land use, housing, transportation, parks and open space, and utilities. It also includes specific recommendations in the areas of residential land use and density, commercial and industrial, schools, parks and recreation, mixed use redevelopment, and traffic and circulation. Land Use - Page 66 C. SUMMARY OF RECOMMENDATIONS The PURPOSE of this plan was to help guide City decisions pertaining to land use and zoning, public improvements, parks and recreation programs, shoreline improvements, and other matters of concern to this particular neighborhood. Since the Campus/Evergreen Neighborhood Plan is designed to function independently of the citywide Comprehensive Plan, the following is provided to familiarize the reader with an overview of the policies and development proposals for this area. The Plan document itself should be referred to for more specific information and wording. 1. GOALS AND POLICIES: The goals and policies address the following: (a) Toprovide a long-term plan (20-years) that will guide future change and decision-making, and that will encourage the type of public improvements and private development that are most needed and desired. (b) To promote public transit and other laternatives to the single-occupant vehicle. (c) To give greater emphasis to the pedestrian environment. (d) To provide a coordinated and efficient circulation system while reducing bypass traffic. and de-emphasizing the dominance of the motor vehicle. (e) To provide a mixture of housing sizes, types and costs for all economic segments of the population and to encourage infill development. (ij To prevent the encroachment of large-scale businesses into the neighborhood while allowing small "mom & pop. scale convenience stores and services. (g) To encourage mixed use development, particularly residential over commercial. (h) To enhance and expand existing parks and recreational opportunities and access to nearby shorelines. (i) To recognize the open space and recreational opportunities offered by the high school and college and better integrate them into the neighborhood. 0) To provide for the future expansion needs of the two schools. (k) To ensure the adequacy of all public facilities and services to meet the growing needs of this neighborhood. (I) To establish a strong neighborhood organization that will provide on-going leadership and cooperation throughout the implementation of this plan. Land Use - Page 67 ........ ..G1s.:... .............~Qy!e.......sM.jfrH.....GQVE.....BeG>Evs.LQP.MEN];........... A. LOCATION Smith Cove is considered part of the Campus/Evergreen Neighborhood and was addressed in that Neighborhood Plan. The cove is relatively small and shallow and is located immediately south of Evergreen Park and at the north end of Pacific Avenue. B. AREA DESCRIPTION The cove has been severely impacted by past development. It has a history of oil tanks, fuel piers, and possibly even a landfill. It is currently home to Brem-Air, the local trash hauling company which parks and maintains its trucks within feet of Smith Cove waters. Other industries and small businesses also operate along the area's Sheldon Boulevard. Smith Cove has a great deal of potential as a community recreational and aesthetic asset. However, there are some obstacles to overcome. The existing industries tend to adversely impact the area's potential. Puget Power has a major transmission line crossing in the area. The residential neighborhood is deteriorating. Local streets are narrow and in need of repair. And pedestrian walkways and visual amenities are lacking. This area has a number of small and large vacant properties, most of which are currently zoned "Business Park". There is considerable opportunity for new development. However, the development potential cannot be realized until some of the key problems are corrected. C. THE PLAN FOR SMITH COVE The Campus/Evergreen Neighborhood Plan, adopted in December 1992, included analyses of and specific recommendations for the Smith Cove area. Since this neighborhood plan was adopted as an extended part of the City's Comprehensive Plan, it will continue to function independently, consistent with the citywide Plan. The goals, policies and recommendations that pertain to the Smith Cove area are oriented toward redevelopment and address the following matters: Land Use - Page 68 1. To redevelop residential areas that have fallen into a severe state of deterioration. 2. To work toward the relocation of all industrial uses from the Smith Cove area, including the City maintenance yard at 14th and Park Avenue. 3. To provide visual and physical public access to shorelines, including the southward expansion of Evergreen Park and eventual public greenway along the south shore of Smith Cove. 4. To recognize the environmental importance and sensitivity of the shorelines and waters of Puget Sound and protect them from over-use, pollution, and poor development practices. 5. To establish a "mixed use redevelopment" plan designation for the neighborhood around South Smith Cove and follow-up with similar zoning with the additional requirement that any significant new development be based on a Planned Unit Development for the entire area to help ensure harmony and land use compatibility. 6. To consider improvements to Sheldon Boulevard to create a pedestrian-oriented central street onto which the new mixed-use neighborhood would front. Refer to the Campus/Evergreen Neighborhood Plan for additional information. SOUTH SMITH COVE AREA Development Concept Land Use - Page 69 Land Use - Page 70 .......Wi.:~...;..... ..........~t$Ap.......lAI<E.......BUSIN.ESS.......~'~JRI&1\.................................................................... A. LOCATION This neighborhood business district is located north of Kitsap Lake and along both sides of Kitsap Way. B. AREA DESCRIPTION This business district serves the Kitsap Lake community and surrounding areas. It includes a market, drug store, and other smaller businesses. The area also includes a small . rural fire station (F.D. #12), auto repair and other services, and a carpet sales outlet. \ LaJ,(,e. . -' ,- . ~ . , : Although the district has a good overall mix of businesses, they are separated by a wide expanse of asphalt that poses a major obstacle to pedestrians. Thus, the businesses on each side of the highway can't relate to each other very well and customers tend to drive across the street rather than challenge the traffic. The area lacks curbs, landscaping and street trees that could better define the edges of the roadway and separate it from parking lots. Driveway locations and parking area entrances are confusing, there is no coordination of design or signing, and there may be a need to paint, repair, or better maintain some of the commercial structures. C. RECOMMENDATION A specific business district "improvement plan" is hereby recommended, but only with the support and participation of area property owners, businesses and residents of the surrounding neighborhood. Such a plan might include at least the following: 1. Property/structural condition assessment. 2. Utility infrastructure capacity analysis to ensure it ability to serve new growth and business expansion, as allowed by zoning. 3. Parking design and management program to coordinate and make most efficient use of existing parking areas. 4. Landscape improvement plan that includes frontage landscaping along Kitsap Way, as well as street trees for appearance and hard surface relief. 5. Pedestrian improvements to increase comfort and safety, including one or more very visible pedestrian crossings of Kitsap Way. Land Use - Page 71 ....V!!}~t. ...............,ER~.ER.....F{OAm.......I.~QgS1fFt'At.....EOFlIH.I.Jlli)~R.. ... A. LOCATION Werner Road extends westward from SR-3. It provides the southern entrance to the Auto Center Way industrial/commercial district, as well as to area neighborhoods and to the future Pendergast Sports Complex. (: , 2J~. ":=J ~ ~, Beyond the industrial area, Werner Road ==:3 c:::::::J . climbs a short but relatively steep hill, then =:J c:::::::J flattens out for a distance before entering the gravel extraction areas at its west end. B. AREA DESCRIPTION Werner Road passes through an unincorporated County "island" that is completely surrounded by the City of Bremerton. For much of the distance, the area consists of scattered homes on large lots, vacant lots, a church, ~nd other uses. Because of its direct access to the freeway (SR-3), and because of the development opportunities and good future availability of urban utilities and services, this corridor appears to have considerable potential for industrial growth. The Economic Diversification Committee has recommended that the corridor be included on the County's Comprehensive Plan and that request is currently being considered. Bremerton also believes this is an excellent location for industrial expansion and is showing it on its Comprehensive Plan, with the understanding thqt most of the area is outside the City's jurisdiction. C. RECOMMENDED POLICIES 1. The City shall work with Kitsap County to ensure that both City and County Plans designate this corridor for future irildustrial development. 2. The City shall ensure that its utility capaCity can adequately serve this area and plan for any needed service extensions and infrastructure improvements. 3. The City shall work with local property oymers to coordinate an annexation of this unincorporated "island" as soon as pOSSible so that the Werner Corridor is within one jurisdiction. 4. The City shall consider preparation of a corridor development master plan that would establish minimum standards and expedite the permitting process. Land Use - Page 72 ................... ....... . . ............. .... .... . ...-..... .. . ... ............. .....-. . .. . ..... ..... ... :::-:-:-:......:;.:.;.:-;:::;.:.;::.;.:-:.;.:.;..... .:::.:.;:::::;:::;:::::::::::::::::;:::::...:.....::::::;:::::;:::-:<;:::;:::::;:;;,>::":' .':::::,:,::,::,,::':'. .....:.::::..:.>...:...:::::.........:...:..:.::.::::.:....::..;:::::;:::::::::"';'<-: :..':':;::::::;:::::;.:.: ......::;...:.:..::.:::::::;:...;.....:.:... Vil+S:_S810~li~$~R~Pt1(f\J.>) ........... A. lOCATION When this area plan was written in 1989, the 130 acre area was totally unincorporated. The area extends south of Werner Road to the Sunn Fjord residential development. It is bounded on the east by SR-3 and on the west by Union Avenue and the City limits. B. AREA DESCRIPTION This area includes about 300 individual lots, about 180 dwellings, a church, a small park, a restaurant, a major auto dealership, and a soft drink bottling company. The terrain is very hilly with good views of Sinclair Inlet, Bremerton, and Port Orchard from the higher elevations. C. CURRENT STATUS .. fiIJJffi " ~ ~ \ 8Iffi5 fttID,= ~.~ [ll!tI!gO, ffi[[ QI1tIYQ .1iEW ~1~li Vk I. ffirnJ .~ ~ This area plan was adopted as a Comprehensive Plan Amendment on February 7, 1990. Since that time, two annexations have brought approximately 80 percent of the area into the City. Most of the Comprehensive Plan designations and zoning districts that were incorporated within this Plan have already been implemented. Street and utility plans will follow. This Plan remains on track. The City will continue to look for opportunities to complete the annexafion of the entire area and eliminate remaining unincorporated pockets so that streets, utilities and other improvements can be planned and installed smoothly. The newly revised Comprehensive Plan will incorporate the recommendations of this area plan to ensure plan consistency. Land Use - Page 73 ....WSl.:......... .......$Q.UTtj......AOIQ... .cB.N1-~R......E~.~~NceMIEN-r....ARIEA.......... A. LOCATION The South Auto Center Enhancement Area lies immediately north of Werner Road and generally between Auto Center Way on the east and Kean Street on the west. B. DESCRIPTION In the spring of 1993, City staff prepared the South Auto Center Industrial District Enhance- ment Program as an urban renewal plan. The primary objectives were to initiate the removal of dilapidated structures, debris, and other blighting influences so that the southern portion of this important business district so that new private investment would occur and the area would complete its development, as intended by the City's Comprehensive Plan. ~< r;- J.~ -<~ J]tf;~o~ .j-+ ~ t:) .d ~ ftdn ffiD ~~n Part of the program was to improve traffic flow and utility services, particularly storm drainage. The extension and improvement of Rodgers Street between Auto Center Way and Kean Street was also an objective. C. CURRENT STATUS The Urban Renewal Plan has been prepared, property acquisition and clean-up costs have been determined, and some enforcement activities have taken place. This document will continue to guide clean-up actions and its recommendations have been incorporated into other elements of this Comprehensive Plan to ensure consistency. Land Use - Pal~e 74 .HtAj5<>~\ dt8N........jS~t6~Ad*S.dhR.. ......~S..\~O\.jdl..r::1(,....)><. ":'>.,.y.~ .;:::::::.;... ~::-= .....~~.gQr\~~:;~:.. ..... rr:)J '.(~:': ../ty, , ...'YIC.~: "::";... C. CONCERNS AND RECOMMENDATIONS A. LOCATION The site of this future sports complex is approximately 50 acres in size and located generally south of Werner Road and west of Union, but fronts on neither. Access is gained through the National Guard property to the east. B. CURRENT STATUS The City's parks department is currently implementing the development plans. The complex should be partly available for play by the summer of 1995. To the north of the sport complex site is the proposed industrial corridor along Werner Road. Industrial uses are generally considered to be compatible with sports complexes. The National Guard Armory property lies to the east and it too is being considered for industrial development because of its relatively flat terrain and good access to SR-3. The City has approved a "planned unit development" for lands to the west and south. The PUD will consist primarily of residential development, but will also include some industrial park development. The potentially close proximity of the residences to the sports complex is a concern that should be reviewed during the next design stages of the PUD and during the "Phased SEPA" review which is currently being processed along with the PUD. The development of an area plan for lands in the vicinity of the sports complex is not recommended at this time. Design work being administered by the City's Parks Department and nearby development being reviewed and permitted by the Department of Community Development should provide adequate site plan review to ensure that the sports complex and adjacent industrial develoment, traffic, noise, etc., will be compatible with nearby future residential development. ... land Use - Page 75 ...........$;1...:.. ...........ANPERSON....CRE.EK...C.ORPOMTE.....GAM.PUS............................... S. R. 16 A. LOCATION An undeveloped area of approximately 400 acres, located east of Gorst, mostly south of SR-16, and west of Anderson Hill Road. d Ii B. AREA DESCRIPTION .~~~..~~~~'T..t:!_ .rOw.....i;..' '" 1) ~OU"i... The subject area currently hosts City of Bremerton ground water supply sources. The terrain slopes upward from Sinclair Inlet and Highway 16 to an elevation of nearly 400 feet at the southwest corner. The area includes a system of streams and ravines. ;\ I' I' 1\ I \ u .. C. SPECIFIC PLAN PROPOSAL The owner of the site proposes a comprehensive development that would include a planned office, hotel, and warehouse distribution development. The mix of proposed uses on this single site represents un unfamiliar combination that is not readily processed through existing development regulations and zoning. The uniqueness of this proposal justifies further analysis to ensure a quality development as well as slensitivity to its neighbors and environmental characteristics. Included in this study should be an analysis of infrastructure availability and timing. The cities of Port Orchard and Bremerton have agreed to provide both sewer and water to support a large-scale corporate campus at this location. The detail,s need to be completed. ... B:LAND-USE.E-E Land Use - Page 76 ....,.............;.;..... :.;.:.:.:.:.:.:..:.'.: ..-... ....::::.....:-::.:.:.:.:.:....:::-:.:::: :...:.:.;...:.:..;.:.:.;.:-:.:.:-....:_;.:-..;.:.:. .. .................. l.'.~~~;;;'~:;:;~ RESIDENTIAL: LOR LOW-DENSITY RESIDENTIAL 3 TO 8 DU/Acre MDR MEDIUM-DENSITY RESIDENTIAL 8 TO 18 DU/Acre HDR HIGH-DENSITY RESIDENTIAL More than 18 DU/Acre COMMERCIAL: C-G GENERAL & HIGHWAY COMMERCIAL C-P GENERAL & PROFESSIONAL OFFICES CBD CENTRAL BUSINESS DISTRICT NC NEIGHBORHOOD CONVENIENCE . MU MIXED USE/PUD INDUSTRIAL: HI HEAVY INDUSTRIAL IP INDUSTRIAL PARK BP BUSINESS PARK RE RESOURCE EXTRACTION T TRANSPORTATION FACILITIES PUBLIC & QUASI-PUBLIC FACILITIES: P or OS Parks & Open Space. S Schools H Hospital C Cemetery PW Public Works U Utilities ~ MILITARY FACILITIES FTC C 1 r----- n ,;;f mE!l~LB~fj3mMlCl~UI.l rDLfl~ ~r,T I R;dd.I~~: J : //~ J IIrrT L I~~ umCQ rill HDR ~ r I '00, /-~ --ij ~ ~ L- -Ir-l.- om! ]-'.: ~' II lr 1 1M +- 11 II I IH:/ 7)?fjj I :n~~ -u. ~LDR~ cr;~ ~ MDR ~~ ~~~ ~ _ I ~f/-y ~I/' , f/ DJJ l- '111, L?, ffffiLOR~ lit- l - ~ ~ ~ I r [j fmiffi3~" I ,~) w. r\l~ 0 LOR ">~~ MDR II ~ L~ Rim "- ,'~, JlTJ~~ :~~I ~ I ,\ ~ ~ MDR' ~I EJEfI7: mrro '-J' II ~ \\ 1:?~ H ttt'i(5fiIIIP I IT LDR l\TT I IiL 553r::r: IiIfE I ' ~ ~VJg ""'ea.,L ~ ~ 1ft " rTH, L-.; y, (,J/-o 0 r: Tl "".J -r ;,J:: B 00 n. r:: ffi C-G 0 MOR :1 IT :J;;L0 , ~~c 00 =-:-n.r; ~ MOR MDI1.J IT-... \~Y::>'f)L Sylvan WayJffi I q, .... .. -~- ~ ~~ n- ~L; It! LI-'p [;- -GI ~ LJ&. ~I~t p Iii .-J~BiI1~ SIEI I I~ E"I .-.- HDR' LOR J1: -Lf '" L LOR LOR ~ I 51 ~5 r!!jfj 'r\~ ~~r- LOR HDR 11 S I;ffi~ JJ S ....~ffiA:; ~~~IRTITlI'111I ill!I~' 11 Ip.-~~ --eWJr4:4l;j ~ I -/ ~ -,-, ~ III ~ fI, ~~,.~ ~ ~fjfJJJ, f-!_~lIl1lllllllllmrnrralo::u:RIQ ~~ic,'T=~EF'" ) ] ~~ .- ~,IIIlWII Ie:, II II ~B' ,~ --J;J = ~ ,~----c - I ~ U I I 1!l1Tt:J -1:""- I I . - -,!...--j-1 :& LDR l:S! a:: ~ ~ ' =t:: M U ' .- =J , I I , ffiDH=1 rrITtjilTl- ,---' ,I r--, Cc.-D h ,- - Ib '~ == ~II I ""C-G ~-G (t.LOR,S -i n ; 1/' I N I ~ Ii ~ Ifm J;:J r=iP1 ' r;:::r 1-1111 J II ~ C-G II"' I ~ . 8m . 11-11 j IrTTTTTl ...: I I I ~ '1 I ~ ~ ~~R ':;c-G' HDR~~R III III Gm;1 I ~MDD.J' ~~LOR~ 1-<~ D~ -r- ~~ i 0TmnJ, II ~I n'-'~ ~~,~ }.... ~ c-p~'--' I c..<:: ',' 'I ~ ~ LOR" - - :;;oJ :::.J ~ !Il;.; , = ti:B II ~ >!. \"dj ~ LOR MP,R ~ C p /i / rn t- ~";: p ~ ~~\-~~ I'~)"- ~- '() OS'" Iin= I 1-,,1 , I :r' 11i ~~pR I ~~ H' r ~~ s - :1\1=11 ~~F.~~~ ~ MDR ~~ S ~ ,I ~ ~~~.tc-P /I 4;:i \! ~1~aQIi-~ H I ~ ~ C"J) ;"/ l1.illlWillJ ~I EllIIIT[o~ ~ {~ ~ . ~ P DIIIIIlE s ~J:tj "tcl3 ~ 14 ~ I . ITIIIIIJ:lj l::l E8 mB I- jjill ~ 7 Ci~ . ~n~ ~diL~~~ ~~~~D MOR~~ I"\-l~ma~ Ht=d "~ oG 1~lmlil " MDR~p ~~i(\ ~HD.!' ommnMDR ~R ~~1' ~ ~~mir~' fl . "'~~" ~ "'~~,) ~. !:j;Jm~. ~~ ~~..lO-OOmwlrlj ~ HD~"~~~P1! p ;s:J "p LOR..... ~ ''lj~~ ,~, 1 ~ ~~ , 1~~~FHwno.m I I 1-1 L .u.< Adopted by: Bremerton City Council Resolution No. 2508 April 5, 1995 Ilr'lflllll: RESIDENTIAL: LOR MOR HDR LOW-DENSITY RESIDENTIAL 3 TO 8 DU/Acre MEDIUM-DENSITY RESIDENTIAL 8 TO 18 DU/Acre HIGH-DENSITY RESIDENTIAL More than 18 DU / Acre COMMERCIAL: C-G C-p CBO. NC MU INDUSTRIAL: HI IP BP RE T GENERAL &HIGHWAY COMMERCIAL GENERAL & PROFESSIONAL OFFICES CENTRAL BUSINESS DISTRICT . . NEIGHBORHOOD CONVENIENCE MIXED USE/PUD HEAVY INDUSTRIAL INDUSTRIAL PARK BUSINESS PARK RESOURCE EXTRACTION TRANSPORTATION FACILITIES ':~::.;::::: ::" .;.. ....... . .......::...;.;.:::::::::.:.:.:-.:;..;.;.;...... . :..:.:::.:.:...;.:.:.;.......:........... ........ ......... ....... . :: :::.:::;::. ':;':: ::: :;:. ::: :~:::::;::: .;.; .:;:;: ;::-;::;:\:<-:.;::::::;:>:.::::.;:..-::.; PUBLIC & QUA SI-PUBLlC FACILITIES- P or OS P . arks & Open Space S H C PW U ~ Schools Hospital Cemetery Public Works Utilities MILITARY FACILITIES Adopted by: Bremerton City Council Re~olution No. 2508 Aprll5,1995 _ ~lll ~ I ---' ---, j~' P7 1t=~~ JJ i~- ~ =TI1 ~ III ;-; 9S I 1 -=l -1.J:: [ , -I--;:=~\ . ~ ~ ~ ~ :.lr:::. ~I m}, 1P::::r::::: .D\\:.J . '>- ~ : ~~~I~. (m~ ~ -;;: P _ :, '~ :'l... Kitsao Wa'L Cop ==. ". ~ ~-"-G.r-t2.-G ~ ~t~ld. , ~@ : '::':"\ ~~ ~~... 1" LOR . r\ I~. ~ ,LOR ID _.~ .. K~a: c ~ ~ ~~.Rj'~\~\ ~~~ Oyster Bay ~ I ~ I, \ Vl ~ HOR :::j - . "\ lliW --'! \.l 'P'- ~ ~ ~~ tr~ /1 7~\ ~f~ == ~I::j. of "l C-G;'I"l :0< LOR1.... C-P_ ~ ~~ 1= · C~ U~~ORn - --= -1:=.1 t.' ~~~h3 .f- fl. ~ -- .JP- ~ ~7 I~ ~~~JR ~~~ C-~~ ,...... y~ W~ ~~~~~ ~ark U q OS ff~~JF:. HI' ~' ~ I~ LOR 1-1t7 m- tE h---l ..\.Y" Ii=: U //~ , LOR 1=:: 1 7W... ~~~IP' IJ Ul;; ,pi _" ~ :;,= c.P ~~~ ) ..,::R /7/1 I fl ='1 I H- -- ~HI ~ 1J1 ~~.JJ!I~IP I ,!1.... ~ I J ~ ) / Ir r= Werner Rd. nrr r-r m:n:m IP -IP I I ~ I\E:t \ ~ I ~- IP P;rr TtJ I U IrC-.G\ fI';;E , , -L! I I ,~?' sa:mt , I fi5ID (0) ~ -=-- EBD IfttllIE! IP 11!R ~C .Jull~ ~ ~ II J~ q: I~ ~L~ I-::Im j : d/krcf ~~ -I}) ~[I = . J~i~ LL :.est;.:..~[~rij~~(jJ8::'::':.':";:::<:::':':":'. .;: '.' '.': ::'::>:.;>' ....... . i:::::i::::wi:k::lrX ":li::,es:I!i':' :':'I!lI?:?1\lkif ". . :"elSl~MEz "Q~ES "IJHlZt\li'M~ . ;::":::-::::;:::;:::::::::;::::::;::::::i; ::::::::..::.::;:::::::.)/:'. ......... .:-:::.:::::::;::i:i;;.::::" ..;:.{. . RESIDENTIAL: LDR LOW-DENSITY RESIDENTIAL 3 TO 8 DU/Acre MDR MEDIUM-DENSITY RESIDENTIAL 8 TO 18 DU/Acre HDR HIGH-DENSITY RESIDENTIAL More than 18 DU / Acre COMMERCIAL: C-G GENERAL & HIGHWAY COMMERCIAL C-P GENERAL & PROFESSIONAL OFFICES CBD CENTRAL BUSINESS DISTRICT NC NEIGHBORHOOD CONVENIENCE MU MIXED USE/PUD INDUSTRIAL: HI HEAVY INDUSTRIAL IP INDUSTRIAL PARK BP BUSINESS PARK RE RESOURCE EXTRACTION ; T TRANSPORTATION FACIUTIES PUBLIC & QUASI-PUBLIC FACILITIES: P or OS Parks & Open Space S Schools H Hospital C Cemetery PW Public Works U Utilities ~ MIUTARY FACIUTIES -LOR ~~ ~~ ~c=J :E7p H I I Adopted by: Bremerton City Council Resolution No. 2508 April 5, 1995 ~~ f-J~ ~ ~J i LO~ e I ~ II ~i~ ft/ ~ \ HOR ';r~ : I '(ff/;(~~~ S II'I'~~/~ 1 -- % ~: , r'~ MDR ~ ~) - ~~ ,.-'-11 I "~ L=LDR: 'E:i3 i Jackson Park \ /1 liS ~- ~ /'j %;~~ I"'//h. S "U',n//- .11.3 NA Park ...,....,-- MDR f I~' =::::: ~I~ 'I-- \-- T Ostrich Bay o 3 ~ P I - P - ~ I LOR LOR g ~ '''- -T-- \ \ I I 1 1 \ c::J 1 1 I I +----- - ~1'2 t-I< uJ1- :l 9 Sl~ -11-< ~I":: 1 I I i'\ t I I I I I --~-- I I I I I 111.'~111Ij,\ ""'-- I I : COMMERCIAL: I I C-G I -~ I I GENERAL & HIGHWAY COMMERCIAL INDUSTRIAL: IP INDUSTRIAL PARK HI HEAW INDUSTRIAL PUBLIC /QUASI-PUBLlC. , P or OS PARKS, RECREATION, & OPEN SPACE WATERSHED (general area) CITY UTILITY-OWNED LANDS WS UL ~D. I I I I I I --. ---- ~~ ~ l~ ~ L , I I I I I I I I I I I ----t--- I I , -rO-.}-.l'Slo-lIO ~ """021'1--1. TOW':-SHIP-':'l> ~OU\H- Unincorporated Unincorporated I I I '- I , Unincorporated I I I I I I I I I I J I I I I I I o (fI ~ w o :z 4: Adopted by: Bremerton City Council Resolution No. 2508 April 5, 1995 --- --- --- ~ Bremerton Comprehensive Plan TRANSPORTATION ELEMENT Prepared by: BREMERTON PLANNING BREMERTON ENGINEERING PARAMETRIX, INC. Consultants Adopted: April 5, 1995 F Bremerton Comprehensive Plan Element F TRANSPORTATION CONTENTS Page 1. INTRODUCTION A. PURPOSE OF THIS ELEMENT ................................. 1 B. STUDY AREA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1 C. SCOPE AND CONTENT ...................................... 3 D. GOALS, POLICIES and THE VISION FOR BREMERTON . . . . . . . . . . . . . .. 4 2. EXISTING CONDITIONS AND DEFICIENCIES . . . . . . . . . . . . . . . . . . . . . . . . . 8 A. ROADWAY CHARACTERISTICS AND FUNCTIONAL CLASSIFICATION. . .. 8 B. TRAFFIC VOLUMES ........................................ 10 C. LEVEL OF SERVICE ........................................ 13 D. ACCIDENT INFORMATION ................................... 18 E. TRANSIT AND FERRY SERVICE ..................:............ 20 F. PEDESTRIAN AND BICYCLE FACILITIES . . . . . . . . . . . . . . . . . . . . . . . .. 20 G. EXISTING DEFICIENCIES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 23 3. FUTURE CONDITIONS AND DEFICIENCIES ........................ 24 A. TRAVEL DEMAND FORECASTING MODEL DEVELOPMENT. . . . . . . . . .. 24 B. TRANSPORTATION AND LAND USE SCENARIOS TESTED ........... 28 C. LEVEL OF SERVICE STANDARDS. . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 32 D. FUTURE TRAFFIC VOLUMES AND LEVEL OF SERVICE. . . . . . . . . . . . .. 33 4. PROPOSED TRANSPORTATION IMPROVEMENTS AND COSTS. . . . . . . .. 40 A. ROADWAY IMPROVEMENT OPTIONS.... . . . . . . . . . . . . . . . . . . . . . .. 40 B. TRANSIT SERVICE AND FACILITY IMPROVEMENTS. . . . . . . . . . . . . . " 42 C. FERRY SERVICE AND FACILITY IMPROVEMENTS. . . . . . . . . . . . . . . . .. 43 D. PEDESTRIAN AND BICYCLE IMPROVEMENTS .................... 45 E. TRANSPORTATION DEMAND MANAGEMENT STRATEGIES. . . . . . .. . .. 46 F. TRANSPORTATION SYSTEMS MANAGEMENT STRATEGIES. . . . . . . . .. 48 G. COST ESTIMATES ........................;................ 49 5. FINANCING AND IMPLEMENTATION PLAN ......................... 51 A. EXISTING AND PROJECTED REVENUE. . . . . . . . . . . . . . . . . . . . . . . . .. 51 B. IMPROVEMENT COSTS/REVENUE COMPARISON ................. 52 C. CONCURRENCY MANAGEMENT AND IMPLEMENTATION. . . . . . . . . . .. 53 LIST OF TABLES Table ~ 1 Existing Corridor Level of Service ............................... 17 2 Existing Intersections that Exceed the Annual Accident Thresholds . . . . . .. 19 3 Population and Employment by T AZ - Bremerton Planning Area . . . . . . . .. 26 4 2014 Corridor Level of Service for All Scenarios .. . . . . . . . . . . . . . . . . . .. 29 5 Transportation Network Assumptions for the Various Scenarios ......... 31 6 Future Potential Travel Demand Reductions in Congested Corridors . . . . .. 39 7 Kitsap Transit - Short-, Medium-, and Long-Range Goals .............. 44 8 Planning-level Cost Estimates for Scenarios 3 and 6 . . . . . . . . . . . . . . . . .. 50 9 Cost/Revenue Comparison for Scenarios 3 and 6 ................... 52 10 Six-Year Funding and Projects (in thousands of dollars) - Transportation. . . . 55 Figure 1 2 3 4 5 6 7 8 9 10 11 12 13 LIST OF FIGURES Page Study Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Functional Classifications ....................................... 9 Roadway Characteristics and Traffic Control . . . . . . . . . . . . . . . . . . . . . . . . . 11 Existing Traffic Volumes - Average Weekday ........................ 12 Existing Traffic Volumes - PM Peak Hour . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Existing Level of Service ....................................... 16 Existing Transit Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Bicycle and Pedestrian Facilities ................................. 22 Transportation Analysis Zones . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 Year 2014 Scenario 3 - Level of Service. . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 Year 2014 Scenario 6 - Level of Service. : . . . . . . . . . . . . . . . . . . . . . . . . . . 35 Year 2014 Scenario 3 - Total Daily Traffic Volumes. . . . . . . . . . . . . . . . . . . . 36 Year 2014 Scenario 6 - Total Daily Traffic Volumes. . . . . . . . . . . . . . . . . . . . 37 APPENDICES Available separately with other Plan background materials: . APPENDIX A - TRAFFIC ACCIDENT SUMMARY . APPENDIX B - VOLUME AND CAPACITY INFORMATION FOR SCENARIOS 1 - 6 Bremerton Comprehensive Plan ELEMENT F TRANSPORTATION 1. INTRODUCTION A. PURPOSE OF THIS ELEMENT As an important element of the Comprehensive Plan, the Transportation Element must be consistent with all other elements and will assist Bremerton in moving toward its vision and goals. This element will not simply promote more parking lots and wider streets. It will encourage efficient multimodal and intermodal transportation systems that will give our citizens an array of mobility options. It will address bicycle and pedestrian facilities, mass transit, ferry service and other components of transportation. This element also recognizes that there are more than three million registered automobiles in this state. We are traveling 50 billion miles per year and consuming roughly three billion gallons of fuel. While we work on mobility alternatives, we can't ignore the importance of the family car, motorcycles, service vehicles, 18-wheelers, and the many other types of motor vehicles that presently serve our needs. . The systems and strategies proposed in this element are based on regional priorities but also coordinated with the comprehensive plans of our neighboring cities and Kitsap County. The proposals within this Element will be consistent with those plans and will contribute in a positive way to the regional transportation "system" that we all share. A well-coordinated regional transportation system will enhance the efficient movement of people, goods and services at optimum levels of safety, economy and energy efficiency while also helping to reduce urban sprawl and other undesirable development patterns. B. STUDY AREA The Transportation Element covers all areas within the City limits of Bremerton. If the City's Comprehensive Plan is expanded to include areas beyond the City limits, such as a smaller Urban Growth Area or Area of Mutual Concern, the Transportation Element will be expanded to ensure adequate services to those areas as well. Some aspects of this element will deal with transportation services that connect us with other areas, but are not fully within the City, such as ferry and transit services. Figure 1 shows the study area for the Transportation Element. Transportation - Page 1 I ,'''c-. ......~ "':<P", .' cw ,...,.", .-- '<;~;:,--- ,~... _. w 'U ~_ c_ <:~." ~~ " \ , J_ Parametr'J{, 'nc. _PI!!- CWlQIWI) I'fDESTRINI FiiiiY ~: NN ~j , j I Q1Y OF RMER10N CCUlREHENSIVE ~A1IQN PlAN _1 ,. .. (B I1.SI o 1750 3500 SCALE IN FEET Figure 1 Study Are. Transportation - Page 2 C. SCOPE AND CONTENT Section 365-195 WAC contains .procedural criteria" for adopting comprehensive plans and their development regulations. It also contains the specific requirements and recommendations for the Transportation Element. The guidelines that were set forth in the Growth Management Act require, at a minimum, the following: (1) Outline of assumptions to be used in estimating travel and travel needs for comprehensive planning. (2) Inventory existing capital facilities and transportation services, including: (a) Air: Airport access, heliport facilities, etc. (b) Water: Ferry, industrial, and pleasure craft facilities. (c) Land: Streets, highways, pedestrians, and bicycles. (d) Public Transit: Levels of service, etc. (3) Establish Levels of Service (LOS) standards for all arterial streets and transit routes. (4) Establish a Master Plan of Streets that designates development standards for primary and secondary arterials, collectors, local access, industrial and private streets. (May also consider scenic route standards.) (5) Outline systems improvements that will be necessary to bring substandard facilities up to the desired level of service. (6) Forecast traffic levels for the next ten years, based on the land use plans of the City and surrounding unincorporated areas that are expected to affect local traffic demands. (a) Locational and capacity improvement recommendations. (b)' Recommendations for new facilities or routes. (c) Outline appropriate phasing of those improvements. (7) Analysis of funding capability and funding sources. (8) Multi-year financing plan to serve as a basis for the required six-year program. (9) Reconsideration for funding shortfalls. (10) Provide for ongoing intergovernmental coordination. (11) Establish Demand Management Strategies to deal with demands. Other important aspects of this element are: Transportation - Page 3 (1) Adequate public participation during the preparation and adoption of the Transportation Element. NOTE: This element followed the same path as all other elements, in accordance with the City's adopted Citizen Involvement Program. This path includes open meetings and involvement opportunities at the Citizens Advisory Committee, the Planning Commission, and the City Council. (2) Internal Consistency with all other Plan elements. NOTE: The Transportation Element was designed primarily to implement the Land Use Element. All Plan elements were coordinated throughout the process to ensure internal consistency, as well as consistency with the plans of other affected jurisdictions. (3) A "Concurrency Management Program". NOTE: After the City has adopted Levels of Service (LOS) standards, it will not be able to permit new development that causes the LOS of a particular transportation facility to decline below the adopted standard, unless improvements or strategies to accommodate the development's impacts are made "concurrent with the development', In other words, those improvements or strategies must be in place at the time of development, or a financial commitment is in place to complete them within six years. D. GOALS. POLICIES AND THE VISION FOR BREMERTON This Transportation Element revises and expands the Transportation Element of the 1986 Comprehensive Plan. Although the basic goals and objectives have not changed significantly, the City has gone through an extensive visioning process and policy review in order to determine the most desirable direction and actions. This Plan must be supportive of and consistent with certain state, regional and county transportation plans, including their goals, objectives, and policies. It must also provide a strategy that will implement our own vision of Bremerton's future. (1) Statewide Transportation Goal: The Transportation Goal of the State of Washington, as stated in the Growth Management Act, is: Encourage efficient multimodal transportation systems that are based on regional priorities and coordinated with county and city comprehensive plans. (2) Regional Transportation Plans: In strengthening our role as a "metropolitan center", as envisioned in the Puget Sound Regional Council's Vision 2020 Plan, our Transportation Element is consistent with and helps promote the following goal and its policies: Transportation - Page 4 GOAL: Strategically invest in transportation facilities to support the regional system of central places. SUPPORTING POLICIES: . Provide a transit-oriented transportation system linking central places. . Connect regio~al, metropolitan, and subregional centers with rapid transit. . Connect residential areas with centers through expanded transit and passenger ferry service. . Promote an interconnected system of diamond lanes serving the urban areas. . Promote a moderate expansion of key roadways that support centers and access to jobs. . Promote programs encouraging transit and ridesharing options, modifying travel behavior. . Develop a regionally coordinated network of facilities for pedestrians and bicycles. . Invest in transit early so options are available. . Develop transit options before expanding highway capacity. . Support investing a greater percentage of the dollar in transit than in highways. . Maintain the existing transportation system in a safe state. . Promote transportation projects that get the most efficiency our of existing roads. . Promote programs that shift travel demand to less congested times or reduce demand. (3) CountYWide Planning Policies: Countywide Planning Policies were adopted in August, 1992, to guide the efforts of all jurisdictions that would be doing comprehensive planning within the county. Section "0" of Kitsap County's CPP document is entitled "Policies for County-wide Strategies for Transportation Facilities and Services" and includes numerous transportation policies under the following general headings: (a) Relationships with the Puget Sound Regional Council (PSRC) and Peninsula Regional Transportation Planning Organization (PRTPO). (b) Identification of needed transportation related facilities and services within Kitsap County . Transportation - Page 5 (c) Coordination of intra-county transportation planning efforts. (d) The process for establishing coordinated and consistent level of service standards. (e) Strategies for transportation demand management. (4) The Vision For Bremerton: Element "B" of this Plan provides the vision of Bremerton's future that guides the policies and recommendations of this Comprehensive Plan. The following visions were included under the heading "Transportation and Mobility": (a) Population growth will challenge our ability to move around freely. (b) Use of the family car will be discouraged in favor of other options. (c) The Plan will address bus, ferry, carpooling, bicycling, walking, etc. (d) New development patterns will allow people to live closer to work. (e) More frequent and dependable ferry service will be available to Seattle. (1) Possible "mosquito fleet" type services will supplement the ferry service. (g) We'll see higher density development around multi-modal terminals. (h) We will orient new development and densities to better accommodate mass transit. (5) Bremerton's Transportation Goals: The statewide planning goal is supplemented by the following supporting goals of the City of Bremerton: (a) Provide for safe, economical and energy-efficient movement of people and goods while protecting the quality of life. (b) Provide transportation facilities that will meet present and future needs, conserve energy, and minimize environmental harm. (c) Provide safe, efficient circulation patterns and roadway design to achieve economy of energy and time with a minimum of advers,e environmental impacts. (d) Provide safe, convenient bicycle and pedestrian facilities that can serve as viable alternatives to automobile travel. (e) Provide regionally coordinated mass transportation systems that relieve traffic congestion, promote energy conservation, and serve the majority of the people. (1) Provide an efficient circulation system for the shoreline areas which is adequate for marine and land traffic without detracting from shoreline amenities. Transportation - Page 6 (g) Utilize railroads and bridges on the shoreline to a minimum and, where they are necessary, place them in a manner which will preserve and enhance the visual and physical access to and physical characteristics of the shoreline. (6) Relationships To Existing Plans & Policies: In addition to the vision statements and goals, the City has also reviewed the goals and policies of its 1986 (existing) Comprehensive Plan, as well as the provisions of the following plans to ensure consistency: (a) Waterfront Access Plan (Bremerton) -- Adopted: 1989 (b) Campus/Evergreen Neighborhood Plan (Bremerton) -- Adopted: 1992 (c) West Hills Area Plan (Bremerton)-- Adopted: 1990 (d) County Transportation Element (Kitsap Co.) -- Draft: 1994 (e) Kitsap Transit long Range Plan (Kitsap Transit) -- Adopted: 1993 (f) Implementation Plan: Passenger-only Ferry Program -- Adopted: 1993 (g) Washington Statewide Multimodal Transportation Plan (WSDOT) -- Draft: 1993 (h) Vision 2020 Regional Growth/Transp. Strategy (PSRC) -- 1991 (i) Draft Metropolitan Transportation Plan (PSRC) -- 1994 0) Other plans and documents. Transportation - Page 7 2. EXISTING CONDITIONS AND. DEFICIENCIES This section of the transportation plan describes the existing transportation system conditions in the study area. This includes a description of the roadway characteristics, functional classification, traffic volumes, level of service, accidents, transit and ferry service, and pedestrian and bicycle facilities. A. ROADWAY CHARACTERISTICS AND FUNCTIONAL CLASSIFICATION Figure 2 depicts the functional classification of the arterial roadway system serving the study area and shows the ferry routes serving the City of Bremerton. Identification of the roadway functions is the basis for planning roadway improvements and the appropriate standards (right-of-way width, roadway width, design speed) that would apply to each roadway facility. The following definitions serve as a general guide in determining street classifications: · Principal Arterials - Intercommunity roadways connecting primary community centers with major facilities. Principal arterials are gene~ally intended to serve through traffic. It is desirable to limit direct access to abutting properties. · Minor Arterials - Intracommunity roadways connecting community centers with principal arterials. In general, minor arterials ser:ve trips of moderate length. Access is partially controlled with infrequent access to abutting properties. · Collector Arterials - Streets connecting residential neighborhoods with smaller community centers and facilities as well as access to the minor and principal arterial system. Property access is generally a higher priority for collector arterials; through- traffic movements are served as a lower priority. · Local Access Streets - Streets providing direct access to individual residential or commercial properties. The transportation plan addresses only the arterial street system within the City of Bremerton since local access streets typically do not have capacity deficiencies. A brief description of the arterial streets and highways in the City of Bremerton follows: SR 3 is the sole north-south freeway in Central Kitsap County. Located on the west side of Bremerton, this four-lane facility accommodates both regional and more localized travel between surrounding communities in Kitsap COUlnty. Interchange connections within the City of Bremerton exist at Austin Drive, Kitsap Way, Loxie Eagans Boulevard/Werner Road, and SR 304. SR 304 is a designated State Route with a partial interchange connection to SR 3. SR 304 extends northeast into the City of Bremerton, where it functions as a four-lane undivided arterial facility. The existing SR 304 alignment follows Farragut Street east to Callow Avenue, Callow Avenue north to Burwell Street, Burwell Street east to Washington Avenue, and south to the Ferry Terminal. Transportation - Page 8 o '" ::l -~ I~ 19 .:..---.. IN( I CITY OF BREMER TON COMPREHENSIVE TRANSPORTATION PLAN ~ ,~ ~ o~Ch~_ ~@s, .~ ~~ ~J- "'\~ "'r "- \ \ I I P.r.metrlx, Inc. RD PORT ORCHARO ~ ~ - - - iiiieSrRiAH FERRY '\. \ \ "" /~\ ,I \ ,/ -----.. r I FlI.E: 18ll62SB1/ll11162S17 LEGEND ~ ILJI o 1750 3500 SCALE IN FEET Figure 2 Functional Classifications FREEWA Y PRINCIPAL. AR7F:RIALS - - - - - - - MINOR ARTf:RIALS - - -- COLLECTORS Transportation - Page 9 The other major east-west arterials in downtown Bremerton are 6th and 11 th Streets. Both are four-lane undivided facilities from Washington Avenue westward. These two arterials ultimately come together at Kitsap Way (SR 310), continuing as a single, major arterial to the interchange connection with SR 3 and northwest to Chico Way. In east Bremerton, Riddell Road, Sylvan Way, and Sheridan Road are east-west arterials connecting to Wheaton Way (SR 303). The major connector from downtown Bremerton to east Bremerton and the Silverdale retail area to the north is Warren Avenue/Wheaton Way (SR 303), a four/five-lane arterial that extends from Burwell Street north across the four-lane Port Washington Narrows Bridge. The two-lane Manette Bridge also connects Washington Avenue in downtown Bremerton to Wheaton Way in east Bremerton. Other north-south arterials that provide traffic circulation in Bremerton include Washington Avenue and Pacific Avenue in downtown Bremerton, Naval Avenue to the west of the downtown area, Perry Avenue and Pine Road in east Bremerton, and National Avenue in west Bremerton near SR 3. Access to SR 3, and to newly developed areas west of Bremerton, is provided by Loxie Eagans Road/Werner Road, which is located midway between SR 304 and Kitsap Way. Loxie Eagans Road is a four-lane urban arterial/collector from SR 3 to Arsenal Way. To the west, Werner Road is an undivided two-lane, rural collector route. The characteristics of these arterial roadways in the study area are shown in Figure 3. The majority of other roadways within the city limits are two lanes with a speed limit of 25 mph. Existing intersection traffic control devices are also indicated on Figure 3. The major arterial street intersections are signalized as shown. Most other intersections are two-way stop sign controlled on the minor streets, with four-way stops at the Sylvan Way/Perry Avenue, 13th Street/High Avenue, 15th Street/High Avenue, and Price Road/Harlow Drive intersections. B. TRAFFIC VOLUMES Existing traffic volumes are shown in Figures 4 (daily) and 5 (PM peak hour) from traffic counts recorded between 1987 and 1994 by the City of Bremerton, Washington State Department of Transportation (WSDOT), and Parametrix, Inc. The volumes shown were not adjusted to a common 1994 base since traffic volumes have remained relatively constant during the last five to seven years. In several locations where traffic counts were available for more than one year, traffic volumes have actually decreased during the last five years. Figure 4 shows average daily weekday traffic volumes on the arterial street system. Average daily weekday traffic on city streets range from 1,200 vehicles per day on 1 st Street west of SR 3, to 45,000 on Wheaton Way. The higher-volume arterials are Kitsap Way between 11th Street and SR 3, SR 304 between Callow Avenue and SR 3, and Wheaton Way/Warren Avenue between 11 th Street and Riddell Road. Transportation - Page 10 Parametrlx, Inc. l ~ "'~~:,:;: "~ r-~ ~~:::=::::::~l "'e=~~-= , t~!:~1 '~,; 't;. '~,i =.-,-~--, u-;-~~..:':~.l I I I r l..J i c_...._____ i 'L~~, C::.:::::, ~~':':""""J:!' j ~ :;;--=~~ I ! f.;:.;::"~~=~ ~ ( --. ......,.." (..~-" \ CHICO ...v aTY OF BREMERTON CCMlREtDSIVE lRANSPORTAnON PLAN PLI: 1_'11_'. (B IlSI o 1750 3500 SCALE IN FEET LEGEND . SlGNAUZED IHTERSECTION o 4-WAY S10P NOm S1RalS ARE JM) /.AHES AND HAK A 25 ".., SPEEI) I.AIIT CXCEPT IIHERE SHOrIM 0lHER1I5E S1RalS ARE JM) WAY CXCEPT Co 11tH AT THE tINETT[ Mf)G[ AND CALLAHAN IJIC)ER IMRRI:H A \E Transportation - Page 11 .. S'RJ' SIGN ~ SPEEI) lilT - FOIJR I.AHE ARlERlALS Figure 3 Roadway Characterlatlca and Traffic Control Parametrlx, Inc. ;~~~,jo'~--r_ <.''''~4 . ~t..t~' ') ) @ ..4, .....~~--.~-._..-'. ~-]-~y "<..."" j ~ f .'.OI~.......",-"",=- , J ~ I QTY OF BREMERTON COMPROENSIVE lRANSPORTA liON PLAN I'JU: ._.,,_.. ,--.I (B ~ o 1750 3500 SCALE IN FEET LEGEND (ill) AIERACE IlEEJaMY TRAFFIC NOm 'TRAFFIC IoO!.l.M'S ARE UNNMJS1ED FROItI AC1WIL. 'TRAFFIC COlJNl'S ~ 8[JIEEN fNT AND fIN Figure 4 Exl.tlng Traffic Volume. Average VV.ekday TransportIItion - Page 12 Afternoon peak-hour directional traffic volumes shown in Figure 5 range from 100 to 2,300 vehicles per hour on the arterial street system. SR 3, between Bremerton and Gorst, has the highest peak-hour directional volume at approximately 3,700 vehicles per hour in the southbound direction. C. LEVEL OF SERVICE The following section provides a summary of the of roadway Level of Service (LOS) standards and methodology used for the Transportation Element of the City of Bremerton Transportation Plan. The purpose of this information is to provide an overview of LOS and to identify its relationship to the transportation goals and policies of the City. (1) Level of Service Definition: Level of Service is an estimate of the quality and performance of transportation facility operations in a community. One commonly used method is the Transportation Research Board's Highway Capacity Manual LOS system. The degree of traffic congestion and delay is rated using the letter "A" for the least amount of congestion to the letter "F" for the highest amount of congestion. The following Level of Service categories provide general descriptions of the different levels of service defined in the Highway Capacity Manual. The community decides what level of traffic congestion is tolerable (Le., decides whether their standard is "C," "D," or some other level). The choice of a particular LOS threshold can vary by planning subarea, roadway classification, or specific corridor or street. Establishing LOS standards is also a requirement of the State's Growth Management Act. (2) Level of Service Categories: . Level of Service A: A free flow condition. Speeds are at or near the speed limit and little to no delay exists. Freedom to select desired speeds and to make turns and maneuver within the traffic stream is extremely high. . Level of Service B: Zone of stable flow. Drivers still have reasonable freedom to select their speed. Only minor delays of 5 to 15 seconds per vehicle at signalized intersections are experienced. . Level of Service C: Still in the zone of stable flow, but speeds and maneuverability are more closely controlled by the higher volumes. The selection of speed is not affected by the presence of others, and maneuvering within the traffic stream requires vigilance on the part of the driver. Longer delays of 15 to 25 seconds per vehicle are experienced at signalized intersections. . Level of Service D: Approaches unstable flow. Speed and freedom to maneuver are somewhat restricted with average delays of 25 to 40 seconds per vehicle. Small increases in traffic flow can cause operational difficulties at this level. Transportation - Page 13 ~-- -'~q?1r. ~,,- Q4'~7-1Ctf"b Parametr'J(, 'nc. ), II) 1100 '>>0 '<8 ~ ? , [ --=0;.;:=_,_. -~~=-~'?<':V-EY .~~-O -'~-"=]-- --~~--~ i I ,..,~ --~....., .--,--~-,-,-~- J;'JTSAF LAll2' QlY OF IIEMERTON CDFREtDSIVE lRANSPORTAlION PlAN I --J fIUl '_'\'_ ~ ILJI o 1750 3500 SCALE IN FEET LEGEND ~ DIRECTIONAL,."" PEAK HOUR Figure 6 Existing Traffic Volume. PM Peak Hour NOm lRNJ'JC ~ ARE UNAIMIS1ED FR06f AC7UAL lRNJ'JC COCM7S RE'CIOIlDiED IE71IEEN '987 AND 'fH Transportation - Page 14 ';.1 . Level of Service E: Represents operating conditions at or near the capacity of the roadway. Low speeds (approaching 50 percent of normal) and average intersection delays of 40 to 60 seconds per vehicle exist. Freedom to maneuver within the traffic stream is extremely difficult. Any incident can be expected to produce a breakdown in traffic flow with extensive queuing. . Level of Service F: Describes forced flow operation at very low speeds. Operations are characterized by stop-and-go traffic. Vehicles may progress at reasonable speeds for several hundred feet or more, then be required to stop in a cyclic fashion. Long delays of over 60 seconds per vehicle occur at signalized intersections. A more technical method has been developed in the Highway Capacity Manual to measure LOS, involving the calculation of the volume to capacity ratio (V /C) of the roadway or intersection. The following Volume/Capacity (V /e) ratio ranges have been developed for determining planning level mid-block LOS on urban and rural roadways. ws A B C D E F less than or equal to less than or equal to less than or equal to less than or equal to less than or equal to greater than Volume/Capacity 01 /e) Ratio .3 .5 .75 .90 1.0 1.0 More detailed methodologies to calculate LOS at specific locations such as unsignalized or signalized intersections are outlined in the Highway Capacity Manual. These are typically utilized during the development review process to assess potential traffic impacts on roadway facilities in the project vicinity. (3) Existina Level of Service: Based on current traffic volumes, the volume to capacity ratio and Level of Service was calculated for mid-block arterial roadway sections throughout the City. The results are shown in Table 1 and graphically in Figure 6. Level of Service D was selected as the initial LOS threshold to identify system deficiencies. This is the LOS standard used in most urban areas in the Puget Sound region, including the urban portion of Kitsap County. This is a reasonable initial threshold to begin to identify deficiencies in the network. The following existing roadway sections exceed or are close to exceeding this Level of Service D threshold during the PM peak hour: . SR 304 - Preble to Farragut . Warren Avenue/Wheaton Way (SR 303) - Bridge to Sheridan Road . Kitsap Way (SR 310) - Callow Avenue to SR 3 (high LOS D approaching LOS E) . Manette Bridge (high LOS D approaching LOS E). Transportation - Page 15 ,,<;~~~ <-' ,.,#(~'O:"-~;~ 4~r r~l Parametrbt, 'nc. ~-=-~:'EO<II""l L~.~,,~._ r-~ , ,,;:~~~~ -~--'''''~ k.~~;:;::.~~_"':::.-~ r- jY~1--= i, II , l ~ < -""""'-="'''-'''''~ 1. ! aTY OF BREMERTON CCl.tPRaBlSIVE lRANSPORTA11ON PLAN fa&: \_.,.._. LEGEND ~ LOS I vjt:; LOS LE\El. OF SEJMC(' vIe ~ 10 CN'AaTY RAlJO Figure 8 Exletlng Level of Service (B ILJI o 1750 3500 SCALE IN FEET TraIlIpOI1a&ion - PIlge 16 . Table 1 Existing Corridor Level of Service Two-Way Peak Hour VIC Level of Street Section Volume. Capacity Ratio Service WEST BREMERTON 6th Street Washington to Warren 760 3,650 0.21 A 6th Street Warren to Callow 1,880 3,425 0.55 C 11th Street Washington to Warren 1,060 3,425 0.31 B 11th Street Warren to Kitsap Way 2,300 4,100 0.56 C 15th Street High to Callow 690 1,440 0.48 B Auto Center Way S/O Kitsap Way 1,030 1,625 0.63 C Burwell Washington to Warren 880 1,440 0.61 C Burwell Warren to Naval 1,510 1,950 0.77 0 Burwell Naval to Callow 1,400 2,800 0.50 B Callow Farragut to 6th 1,990 3,050 0.65 C Callow 6th to 11th B40 1,950 0.43 B Cambrian (304) Preble to Farragut 2,360 2,600 0.91 E Farragut (304) Callow to PSNS 920 2,600 0.35 B Harlow 1 st to Price 140 1,025 0.14 A High 6th to 15th 370 1,025 0.36 B Kean Werner to 1 st 360 1,440 0.25 A Kitsap Way Callow to SR-3 3,240 3,725 0.87 0 Manette Bridge 1,430 1,600 0.89 0 National Kitsap to City Limits 640 1,440 0.44 B Naval Burwell to 11 th 1,200 3,050 0.39 B Pacific Burwell to 11th 400 1,200 0.33 B SR 304 SR 3 to Preble 2,930 4,000 0.73 C Warren Burwell to 11 th 1,350 4,100 0.33 B Warren 11th to Bridge 3,300 4,100 0.80 0 Warren (Wheaton) Bridge to Callahan 4,050 4,100 0.99 E Washington 6th to Burwell 940 3,650 0.26 A Werner National to SR-3 1,370 3,650 0.38 B Transportation - Page 17 Table 1 - Continued Two-Way VIC Level of Street Section Peak Volume Capacity Ratio Service EAST BREMERTON Perry E. 11th to Riddell 560 1,310 0.43 B* Pine Sheridan to Riddell 610 1,310 0.47 B Riddell Pine to Petersville 990 1,200 0.83 D Sheridan Pine to Halverson 1,020 1,310 0.78 D Sylvan Pine to Petersville 1,060 1,440 0.74 C Trenton E. 11th to Stone Way 470 1,310 0.36 B* Wheaton Callahan to Sheridan 3,190 3,725 0.86 D Wheaton Sheridan to Riddell 2,960 3,725 0.79 D · No traffic counts available; volumes from traffic model. D. ACCIDENT INFORMATION Accident data records compiled by the Washington State Patrol for the City of Bremerton were reviewed for the years 1989 through 1993. Major intersections were reviewed for the number of accidents and accidents severity (personal injury, fatalities, and property damage only). The results of the analysis are contained in Transportation Appendix A. The criteria used to determine if an intersection should be considered for further examination from a safety perspective were: . Five or more average accidents per year for unsignalized intersections · Ten or more average accidents per year for signalized intersections. This is similar to criteria used by the City of Seattle to identify intersections that should be examined from a safety perspective. After many years of using these thresholds, Seattle has found them to be a simple way of identifying possible safety issues and prioritizing intersection improvements. This list does not imply that Bremerton is responsible for improvements at all of these intersections. At some of these intersections there are no consistent accident patterns or no reasonable improvements that could be identified to decrease accidents. Table 2 identifies the intersections that exceed these accident thresholds based on the average number of accident during the last five years. There are 10 signalized and 6 unsignalized intersections that have exceeded the annual accident thresholds during the last 5 years. Most are on the major arterial corridors in the City including: Warren Avenue/Wheaton Way, Kitsap Way and 11th Avenue. A review of the accidents involving a fatality revealed that over the last five years approximately two people were killed each year in accidents involving automobiles. A total of 12 fatalities occurred over the five-year period. All fatalities occurred at different locations. A list of the fatal accidents are also included in Transportation Appendix A. . Transportation - Page 18 Table 2 existing Intersections that Exceed the Annual Accident Thresholds Total Number of Accidents Intersection '89 '90 '91 '92 '93 Tota 5-Year I Average SIGNALIZED INTERSECTIONS Burwell/Callow 13 14 14 13 9 63 12.6 Burwell/Montgomery 14 11 11 14 9 59 11.8 11th/Kitsap Way 11 11 21 12 12 67 13.4 11 th/Callow 6 16 5 12 18 57 11.4 11th/Warren 11 22 11 19 12 75 15.0 Kitsap 7 12 10 19 29 77 15.4 Way /Shorewood Kitsap Way/National 10 5 9 11 15 50 10.0 Kitsap Way /Mar.ine 12 12 14 10 12 60 12.01 Wheaton/Sheridan 23 15 16 14 21 89 17.8 Warren/16th 12 12 11 10 8 53 10.6 UNSIGNALlZED INTERSECTIONS . 11th/Montgomery 5 6 7 4 6 28 5.62 11th/Hewitt 3 6 2 14 3 28 5.63 11th/Veneta 3 4 9 11 2 29 5.83 Warren/13th 5 6 8 22 9 50 10.0 Kitsap Way jpershing 4 13 14 14 11 56 11.24 Pine/Sylvan 3 7 6 5 5 26 5.25 1 Improvements made at this intersection in 1994 should reduce the number of accidents at this intersection. 2 The closing of the south leg of this intersection in 1994 should reduce the number of accidents 3 Providing a protected left turn phase at the 11th Street/High Avenue intersection would likely reduce the number of left turn accidents at these unsignalized intersections. This improvement is planned for 1995. 4 Accidents at this intersection are primarily caused by vehicle queues back from National Avenue. S Acc.idents at this intersection have been closely monitored by City of Bremerton staff. Even though the intersection has averaged more than five accidents during the last five years, only 3 to 4 accidents per year would be susceptible to correction by installing a four-way stop sign at this intersection. Therefore, the intersection is below the threshold identified in the Manual of Uniform Traffic Control Devices (MUTCD) for installing a four-way stop sign. Transportation - Page 19 E. TRANSIT AND FERRY SERVICE Transit service .in Bremerton is provided by Kitsap Transit. Current fixed route service is illustrated on Figure 7. Many of the transit routes serve the Puget Sound Naval Shipyard, downtown Bremerton, and Washington State Ferry Terminal. Transfers between the various transit routes can be made at the following locations: . Washington Avenue at the Washington State Ferry Terminal. . Wheaton Avenue/Sylvan Way intersection. . Auto Center Way south of the SR 3/Kitsap Way intersection. These transfer station locations are also shown on Figure 7. Regular transit routes generally operate on one hour headways with one or two additional runs during peak periods. Other special routes, such as #15 - McWilliams provide peak hour service only. Downtown Bremerton is currently served by auto and passenger-only ferries' operated by Washington State Ferries (WSF) and a privately-operated passenger ferry to Port Orchard. Both the auto and passenger ferries operated by WSF connect downtown Bremerton with Colman Dock in downtown Seattle, providing a convenient link between the two downtown areas. There are typically two auto ferries operating on the Bremerton-Seattle route; during peak summer months, one Issaquah class (100 vehicle capacity) and one expanded Issaquah class (130 vehicle capacity) vessel serves the route, while two Issaquah class vessels serve the route during the off-peak season. Both :of the vessels also have a capacity for 1,200 passengers. There are currently 14 dail~, runs in each direction on the route, with operating headways that range from 60 to 105 minutes. The Bremerton terminal area currently has a holding area for approximately 100 vehicles, two transfer spans, three toll booths, and overhead passenger loading. The route length is approximately 13.5 nautical miles and the scheduled crossing time is 60 minutes. The Seattle-Bremerton passenger-only ferry has a capacity for 250 passengers. There are 5 scheduled runs per day from Seattle to Bremerton and 6 scheduled runs from Bremerton to Seattle. The scheduled crossing time for the passenger-only ferry is 50 minutes. F. PEDESTRIAN AND BICYCLE FACILITIES Pedestrian and bicycle facilities are an integral part of the transportation network, and the provision for these facilities will be incorporated in the transportation improvement program. Currently, sidewalks are provided throughout the downtown and central Bremerton areas and in other areas with commercial land uses such as the Kitsap Way and Wheaton Way corridors. Paved or gravel shoulders are predominant throughout the other residential areas. Shoulder treatments (paved or gravel); sidewalks, and designated bicycle routes for the study area roadways are shown in Figure 8. Transportation - Page 20 .Po,/",. ~ .D..fC. ~~~~~~ Jo.5r~b l--"""'-"~ .i(lIr --U .._,..,,"~~.",._._ iJ'1., ~ \ I Parametrlx, 'nc. ""- ",-- \,,,\-,.> \~~::J ~~~~ ,- ....-t::=:;::::::=~::~1 '':.:.~~'~.::.:::::.=::::.~~ , "" "it. ~~ 'C~' {~~ j '\, ~;:-=-;." ~:::::::;::~_:''1 ~_.,'''':~::;ltIjl' ~ ;-:~~:=~-::.:J- ~;, :...51~tr--=<~l"''' f",","'crl<>l''''' -',:~,~~~:=~;~i:1;;:~.,~ !:~'l,.,,;~ .. .-'/ ,. 1ICCkV" Pi:iiHr iiR-''''' -, " ~\ ~ '\.. - .,,,,,.... ,.~~ ".... ~^ "'-. "-~~"'-~'-'-_, (~~~:[' -....."...i ,:;; .1'~~~-~~-~H : t ,.I ; ..,.,.$""""_~~'S ~] .i,.....l.--"..... " . " . ,~ 1"","<,...,:.__"", I ! I ,,,I j ....'} - ,-.,.."..."" JI'''. ,-:./ 'L._}. > .. ,,~rt5~A,F~ r'o-~,}G~-' ~-'--""="'",,:ILJJ_'r_ '~~~'<_~. ~ i - il I ~J!~.~~::~.~.- .. .."'.............CHiCij.-.' - aTY OF BREMERTON ca.tPRaENSIVE lRANSPORTA liON PLAN tor>>ft.,;::c>....- ~"<1UlI\E .y --... \~~~ \_ ~~~r_~~-..J ~.~~~ ).u".-- " """'::-'.' ./ -==........,.......,..""'-,..,.......", ~ 1--'/1_"" ~ ~ o 1750 3500 SCALE IN FEET LEGEND -@--sus ROUT[S ANO ROUTE HUttfBERS In. TRANSFER STATICW Figure 7 Exl8tlng Tran81t Service Transportation - Page 21 I _01 ~~?;)f F~},.c:-.-,> ~>'(f;:::(~iO' -----...,..,___ ':t. -'. ~r r--'" ~'" ,j . - i 1 f "".~ I '--.1 '_.~~_, Parametrlx, Inc. . ~ E ... \, I i .; PErErlMIE RO <8 t. t. ! r~~ f ~ II LJ ~j ~.......~~~ DlY OF BREMERTON CClitPREtBlSIVE lRANSPORTA11ON PLAN ram l_.\l_ (B ILJI o 1750 3500 SCALE IN FEET LEGEND SDf:WAL.K (2 SIDES) - - - SDf:WAL.K (f S6JE) _.. - PA\ED Off CiWA\IEL SHOU.DER NO SHOU.DER Figure 8 Bicycle and Pede.trlan Facllltle. ,,""""""" " SJGINED JICltI.[ ....,. Transportation .- Page 22 G. EXISTING DEFICIENCIES Existing transportation system deficiencies were identified from the Level of Service information described in the preceding sections. These deficiencies include: (1) SR 304 (Cambrian Avenue) south of Farragut Street: This roadway segment currently operates at LOS E in the PM peak hour. A significant portion of the relatively high traffic volumes on this street segment are a result of employees leaving the puget Sound Naval Shipyard. (2) Warren Avenue Bridge: While the existing LOS on this bridge is calculated to be LOS E, the capacity constraint occurs at the intersections on either end of the bridge. Therefore, the actual Level of Service on the bridge may operate somewhat better than the calculated LOS E. (3) Kltsap Way (Callow Avenue to SR 3): This roadway segment currently operates at a high LOS 0 approaching LOS E. There are nine signalized intersections in this segment (including the signals at Callow Avenue and the SR 3 southbound ramps) that tend to control Level of Service in the corridor. Other existing transportation system deficiencies have been identified as a result of discussions with City staff and the Bremerton Citizen's Advisory Committee (CAG). These deficiencies include: (4) Kitsap Way intersections with the SR 3 ramps and Shorewood Drive: This section of Kitsap Way has existing operating deficiencies due to the close spacing of intersections and large left turn volumes to and from SR 3. The signalized Kitsap Way /SR 3 southbound ramps intersection currently operates at LOS E and the unsignalized Kitsap Way /SR 3 northbound ramps intersection currently operates at LOS F during the PM peak hour. (puget Power Kitsap Service Center Traffic Impact Analysis, Transportation Solutions, Inc., September 1994). (5) Werner Road/Loxle Eagans Blvd. between Union Ave./Kean St. and National Avenue: There are five major intersections in this sections of Werner Road/Loxie Eagans Blvd., including two intersections with SR 3 ramps. The relatively close spacing of intersections and large turning movements affect traffic operations in this area. Improvements to address the operational deficiencies in these areas will also be developed as part of the transportation improvement plan. Transportation - Page 23 3. FUTURE CONDITIONS AND DEFICIENCIES This section of the transportation plan describes future conditions in the year 2014,20 years into the future. A number of land use/transportation network scenarios were tested using a travel demand forecasting model to estimate traffic volumes in 2014. Level of service standards and future transportation system deficiencies are also discussed in this section. A. TRAVEL DEMAND FORECASTING MODEL DEVELOPMENT A city-wide transportation planning model was developed utilizing the TMODEL2 computer software package. An important function of a model is its ability to analyze future development scenarios in terms of traffic impacts. This requires a model structure that incorporates trip generation based on land use characteristics, allowing the impact of different land use types and intensities to be evaluated. Model output includes peak hour roadway traffic volumes given specific land use or transportation network scenarios. The model developed for the City of Bremerton provides peak hour link volumes on all arterial streets. Intersection turning movement volumes are generally less accurate with this type of link based model; however, intersection deficiencies typically exist where link deficiencies are identified. The land use data is based on the division of the Bremerton planning area into Transportation Analysis Zones (T AZs) as shown on Figure 9. The creation of the Bremerton T AZs was based on several factors: · The existing boundaries of Kitsap County T AZs . Existing and future land use scenarios . Travel demand patterns and volumes · Existing roadway network structure and density . Geographic features The land uses contained in the T AZs are segregated into three main categories: · Residential dwelling units - this category includes single and multi-family dwelling units · Retail employees - this category includes ail types of retail employees · Other non-retail employees - this category includes all types of non-retail uses including office, light industrial, school, hospital, and service employees. Table 3 summarizes the amount and category of land use in each TAZ for existing conditions and the future 2014 development scenario (Land Use Scenario 1) provided by City of Bremerton planning staff. The future recommended 2014 land use assumes an overall increase of 8,917 households (56% increase over existing) and 18,181 employees (49% increase over existing). This would result in a total of 24,724 households and 55,361 employees within the Bremerton Planning Area by the year 2014. Transportation - Page 24 QlY OF BRatERTON co.PR&ENSIVE lRANSPORTAnON PLAN "~ :t'"" o"c' .,~. ~j> Parametrlx, 'nc. 10f PErERMJ::[ RO ~~. t ';ll .\ -- I I I I I I I I ,J I fa.i: 1__ (B ILJI o 1750 3500 SCALE IN FEET Figure 8 Transportation Analysis Zones Transportation - Page 25 Table 3 Population and Employment by TAZ - Bremerton Planning Area Estimated 1994 Year 2014 Land Use Year 2014 Land Use Employment (Scenario 1) (Scenario 2) County City 1990 Non- Total Non- Total Non- Total TAZ TAZ DU Retail Retail Emp. DU Retail Retail Emp. DU Retail Retail Emp. 79 79 83 195 795 990 1,272 238 874 1,112 781 238 1,674 1,912 80 80 565 300 816 1,116 1,217 400 838 1,238 1,117 500 838 1,338 81 81-A 29 36 62 98 38 176 77 253 38 176 77 253 81-8 21 24 42 66 26 118 51 169 26 18 51 69 82 82 608 180 486 666 654 600 233 833 704 300 233 533 83 83 723 469 300 769 1,570 581 291 872 970 581 291 872 84 84 682 59 134 193 740 81 152 233 740 81 152 233 85 85-A 628 207 851 1,058 1,002 267 772 1,039 603 267 772 1,039 85-8 314 103 426 529 503 133 386 519 1,002 133 386 519 86- - 86 498 80 83 163 669 0 52 52 569 0 52 52 87 87 1,655 17 710 727 1,976 140 957 1,097 1,776 140 947 1,097 88 88-A 636 69 123 192 697 138 93 231 697 138 93 231 88-8 636 69 124 193 697 137 93 230 697 137 93 230 89 89 0 0 5,600 5,600 0 193 7,381 7,574 0 0 6,300 6,300 90 90 0 0 5,600 5,600 0 193 8,073 8,266 0 0 6,300 6,300 91 91-A 22 0 5,600 5,600 22 193 8,073 8,266 22 0 6,300 6,300 91-8 22 0 5,719 5,719 22 193 8,073 8,266 22 772 6,300 7,027 I 92 92 465 10 389 399 791 60 521 581 691 60 521 581 93 93 686 61 692 753 1,044 112 845 957 1,044 212 1,045 1,257 94 94 214 76 561 637 350 648 573 1,221 250 648 1,073 1,721 Transportation -- Page 26 Table 3 Population and Employment by TAZ - Bremerton Planning Area Estimated 1994 Year 2014 Land Use Year 2014 Land Use Employment (Scenario 1) (Scenario 2) County City 1990 Non- Total Non- Total Non- Total TAZ TAZ DU Retail Retail Emp. DU Retail Retail Emp. DU Retail Retail Emp. 95 95 125 700 1,088 1,788 1,215 1,200 1,471 2,671 3,215 1,200 1,471 2,671 96 96 846 0 261 261 1,329 23 574 597 1,087 23 574 597 97 97 213 14 46 60 435 199 130 329 285 0 0 0 98 98-A 1,314 140 207 347 1,711 140 234 374 1,108 140 234 374 98-8 603 60 90 150 701 60 100 160 994 80 180 260 99* 99 43 379 82 461 146 300 187 487 96 400 187 587 100 100 940 800 825 1,625 1,302 1,346 1,265 2,611 1,302 1,346 1,265 2,611 101* 101 5 203 163 366 3 400 379 779 3 250 179 429 102 102 2,186 265 500 765 3,111 97 3,454 3,551. 3,411 97 1,454 1,551 103 103 490 83 130 213 743 273 381 654 843 173 181 354 104 104 554 14 62 76 738 56 83 139 638 36 83 119 Totals 15,806 4,613 32,567 37,180 24,724 8,695 46,666 55,361 * Does not include land use outside city limits. Transportation - Page 27 The model was calibrated to match existing volumes on the transportation network within acceptable levels of error as specified by the National Cooperative Highway Research Program (NCHRP) #255. This calibration process verifies that the model is replicating existing volumes on the transportation network prior to estimating future traffic volumes based on the 2014 land use assumptions. An initial traffic assignment using the 2014 future land use forecasts (Land Use Scenario 1) was prepared on the existing transportation network. The results of this scenario, in terms of link level of service during the PM peak: hour, is summarized in Table 4. (Appendix B contains a more detailed spreadsheet showing the volume, capacity, v/c ratio, and LOS on the arterial street segments within the City of Bremerton). Since this alternative resulted in many links reaching LOS F conditions with high volume/capacity ratios indicating extreme traffic congestion, additional land use and transportation network scenarios were tested and evaluated. These scenarios are identified in the following section of the plan. The primary deficiencies in the network for this scenario included: · the Manette and Warren Bridges · Cambrian (SR 304) Corridor . Kitsap Way Corridor · Warren/Wheaton Corridor Improvements to these deficient corridors were tested; however, the corridors could not be improved to LOS 0 or even LOS E conditions with conventional widening and intersection improvements. This initial Land Use Scenario that was tested on the existing transportation is referred to as Scenario 1 in subsequent sections of the transportation plan. B. TRANSPORTATION AND LAND USE SCENARIOS TESTED A second land use scenario and four different transportation network scenarios were tested and evaluated. The second land use scenario (Scenario 2) involved relocating some of the future population and employment growth from East Bremerton into downtown Bremerton and other land use reallocations. The purpose of testing Scenario 2 was to reduce the overall travel demand crossing the Manette and Warren bridges and in other congested corridors. The total growth in population and employment within the Bremerton Planning Area for Scenario 2 was the same as for Scenario 1. Table 3 also shows the future population and employment for Scenario 2 by T AZ. The four network scenarios were all evaluated using the future land use allocations in Scenario 2, since the volume/capacity ratios in most corridors were 5 to 10% less than in Scenario 1. The land use reallocated in Scenario 2 did provide some benefit as anticipated. Table 5 summarizes the transportation network improvements assumed for all scenarios as well as the different improvements tested for each scenario. Transportation - Page 28 Table 4 2014 Corridor Level of Service for All Scenarios Existing Scenario 1 Scenario 2 Scenario 3 Scenario 4 Scenario 5 Scenario 6 Street Section vie Level of vie Level of vie Level of vie Level of vie Level of vie Level of vie Level of Ratio Service Ratio Service Ratio Service Ratio Service Ratio Service Ratio Service Ratio Service WEST BREMERTON Manette Bridge 0.89 D 1.81 F 1.73 F 1.40 F 1.18 F - - 1.08 F Kitsap Way Callow to SR-3 0.87 D 1.59 F 1.47 F 0.98 E 0.99 E 1.00 E 1.00 E Burwell Warren to Naval 0.77 D 1.46 F 1.45 F 0.89 D 0.88 D 0.88 D 0.88 D Cambrian (304) Preble to Farragut 0.91 E 1.33 F 1.21 F 0.89 D 0.89 D 0.89 D 0.89 D Warren 11th to Bridge 0.80 D 1.16 F 1.10 F 1.09 F 0.93 E 1.28 F 0.94 E Burwell Washington to 0.61 C 1.03 F 1.14 F 0.56 C 0.56 C 0.60 C 0.56 C Warren SR-304 SR-3 to Preble 0.73 C 1.02 F 0.95 E 0.90 D 0.90 D' 0.90 D 0.90 D Werner (Loxie National to SR-3 0.38 B 0.90 D 0.79 D 0.63 C 0.64 C 0.65 C 0.65 C Eagans) 6th Street Warren to Callow 0.55 C 0.90 D 0.85 D 0.81 D 0.85 D 0.81 D 0.89 D 11 th Street Warren to Kitsap 0.56 C 0.90 D 0.83 D 0.92 E 0.78 D 0.84 D 0.84 D Way Burwell Naval to Callow 0.50 B 0.78 D 0.64 C 0.64 C 0.58 C 0.63 C 0.58 C Callow F arragut to 6th 0.65 C 0.91 E 0.82 D 0.88 D .0.94 E 0.94 E 0.86 D Pacific Burwell to 11th 0.33 B 0.75 C 0.91 E 1.24 F 0.72 C 0.74 C 0.52 C 15th Street High to Callow 0.48 B 0.69 C 0.65 C 0.56 C 0.47 B 0.41 B 0.47 B Auto Center Way SIO Kitsap Way 0.63 C 0.68 C 0.65 C 0.66 C 0.65 C 0.65 C 0.65 C Farragut (304) Callow to PSNS 0.35 B 0.67 C 0.39 B 0.24 A 0.24 A 0.24 A 0.24 A Warren Burwell to 11th 0.33 B 0.54 C 0.62 C 0.61 C 0.59 C 0.65 C 0.59 C Washington 6th to Burwell 0.26 A 0.53 C 0.54 C 0.68 C 0.69 C 0.69 C 0.68 C High 6th to 15th 0.36 B 0.52 C 0.46 B 0.47. B 0.50 B 0.63 C 0.52 C Naval Burwell to 11th 0.39 B 0.50 C 0.52 C 0.50 C 0.63 C 0.67 C 0.67 C Callow 6th to 11th 0.43 B 0.50 C 0.53 C 0.55 C 0.52 C 0.75 D 0.66 C Transportation - Page 29 Table 4 2014 Corridor Level of Service for All Scenarios Existing Scenario 1 Scenario 2 Scenario 3 Scenario 4 Scenario 5 Scenario 6 Street Section vie Level of vie Level of vie Level of vie Level of vie Level of vie Level of vie Level of Ratio Service Ratio Service Ratio Service Ratio Service Ratio Service Ratio Service Ratio Service 11 th Street Washington to 0.31 B 0.48 B 0.52 C 0.53 C 0.61 C 0.67 C 0.63 C Warren 6th Street Washington to 0.21 A 0.43 B 0.44 B 0.43 B 0.43 B 0.45 B 0.44 B Warren Kean Werner to 1 st 0.25 A 0.29 A 0.30 A 0.29 A 0.29 A 0.29 A 0.29 A Harlow 1 st to Price 0.14 A 0.20 A 0.20 A 0.24 A 0.24 A 0.24 A 0.23 A New Bridge Naval to Pine - - - - - - - - 0.94 E 0.57 C 0.55 C EAST BREMERTON Riddell Pine to Petersville 0.83 0 1.44 F 1.19 F 0.43 B 0.39 B 0.49 B 0.39 B Sheridan Pine to Halverson 0.78 0 1.37 F 1.38 F 0.41 B 0.47 B 0.61 C 0.48 B Sylvan Pine to Petersville 0.74 C 1.36 F 1.13 F 0.42 B 0.44 B 0.55 C 0.44 B Wheaton Callahan to 0.86 0 1.12 F 1.11 F 1.06 F 0.92 E 1.09 F 0.92 E Sheridan Wheaton Sheridan to Riddell 0.79 0 1.06 F 1.04 F 1.03 F 0.97 E 1.02 F 0.95 E Pine. Sheridan to Riddell 0.47 B 0.79 0 0.76 0 0.74 C 0.78 0 0.63 C 0.54 C Perry E. 11th to Riddell 0.43 B 0.89 0 0.79 0 0.80 0 0.64 C 0.67 C 0.67 C Trenton E. 11th to Riddell 0.36 B 0.60 C 0.56 C 0.54 C 0.52 C 0.41 B 0.52 C Notes: See Table 3 for documentation on the different land use assumptions in Scenarios 1 and 2. See Table 5 for documentation on the different transportation network assumptions for ~cenarios 3 through 6. All of these scenarios use the land use assumptions from Scenario 2. Transportation - Page 30 Table 5 Transportation Network Assumptions for the Various Scenarios Scenario Improvement All scenarios . Bremerton-Gorst Improvements (see Section 5.1 for description). . Widen Kitsap Way to 6/7 lanes - 11th to SR 3. . Riddell, Sheridan, and Sylvan widened to 5 lanes at the intersections with Wheaton Way. . Triple the amount of ferry service during the peak hours.1 Scenario 3 . Replace Manette Bridge in the same location.2 . No new bridge crossing. Scenario 4 . Replace Manette Bridge in the same location.2 . Construct new two-lane bridge west of Warren.3 Scenario 5 . Remove Manette Bridge. . Construct new four-lane bridge west of Warren.3 Scenario 6 . Replace Manette Bridge in the same location. . Construct new four-lane bridge west of Warren.3 2 3 This would result in doubling the auto ferry service and increasing passenger ferry service to 2 runs in the peak hour. This project would increase lane widths, resulting in a small capacity improvement. For modeling purposes, the new bridge was assumed to extend between Naval Ave. to the south and Pine Road to the north. This is only one of many possible future locations for a new bridge alignment that will be subjected to further study. Transportation -- Page 31 C. LEVEL OF SERVICE STANDARDS The Growth Management Act (GMA) requires the adoption of level of service standards for arterial streets. Consistent with the methodology used to calculate existing level of service, the level of service standards for streets in the City of Bremerton will be based on the peak hour link level of service. This methodology and level of service thresholds are described in the existing conditions section of the plan. Level of service standards required by the GMA are closely related to the issue of concurrency. The GMA requires transportation improvements to be made concurrent with development. Once a street exceeds its level of service standard, the street must be planned for improvement within six years to a level that does not violate the standard. If plans to improve the street would exceed the six-year timeframe, new development that would add traffic to the street could not be approved. For these reasons, level of service standards need to be carefully chosen for each different city and for different arterials within a city. Level of Service should desirably be the same on both sides of a city/county boundary; however, different goals on either side of a boundary can be legitimate reasons for two juriSdictions to establish different standards. Establishing appropriate level of service standards for the City of Bremerton was discussed with the Planning Commission Citizen Advisory Committee (CAG) at several meetings. The CAC has suggested the following related to level of service standards: · Maintain a LOS F with a volume/capacity (v / c) ratio threshold of 1.06 in the Wheaton Way/Warren Avenue Corridor. (A vlc ratio of 1.08 was later adopted.) · Maintain LOS E or better (v /c less than or equal to 1.00) in the Kitsap Way corridor and on the Manette Bridge. · Maintain LOS D or better (v/c less than or equal to 0.9) on all other arterial streets in the City. In addition to the suggested level of service standards, additional suggestions were made at the November 8, 1994 CAC meeting to clarify the City's position on initiating planning studies in the deficient corridors. These studies would begin to develop long-term solutions for improving LOS in the WarrenfWheaton and Kitsap Way corridors. The CAC did not want to cause any delay in initiating these necessary studies to evaluate improvements in these corridors. These additional suggestions were: · The City shall proceed to initiate the preparation of a cooperative city/county/state Wheaton Way/Brownsville Highway Corridor Study from Burwell to Waaga Way. · The City shall proceed to initiate the preparation of a cooperative city/county/state Kitsap Way Corridor Study, from 11th Street to SR 3. These suggestions were intended to provide clear direction to City staff to initiate these corridor studies, in cooperation with WSDOT, Kitsap County and Kitsap Transit, prior to reaching the level of service standard established in each corridor. Transportation - Page 32 D. FUTURE TRAFRC VOLUMES AND LEVEL OF SERVICE PM peak hour traffic volume forecasts were prepared for the six scenarios using the transportation forecasting model. These volumes were used to calculate v j c ratios and to determine the LOS of arterial streets in the City. The LOS and vjc ratios for the six scenarios were previously summarized in Table 4. The LOS information presented in Table 4 includes the improvements identified in Table 5 for each scenario. (Appendix B contains a more detailed spreadsheet showing the volume, capacity, vjc ratio, and LOS on the arterial street segments within the City of Bremerton). Based on this information, the following streets would exceed the established level of service standards described previously. Scenario 3: Manette Bridge Warren Ave.jWheaton Way form 11th to Callahan Pacific from Burwell to 11 th Scenario 4: Manette Bridge Wheaton Way from the bridge to Callahan Scenario 5: Warren Ave.jWheaton Way from 11th to Sheridan Scenario 6: Manette Bridge In addition to the above facilities, Kitsap Way is also just below the LOS E or better standard for all scenarios, assuming that the corridor is widened to seven lanes in the future. Therefore, the LOS on Kitsap Way would need to be monitored closely to determine when the widening would be needed. Based on a review of the future traffic volume and LOS information and discussions with City staff, scenarios 3 and 6 were selected for further review and analysis. Scenario 4 was eliminated from further consideration since a new two-lane bridge would cost nearly as much as a new four-lane bridge and cause similar environmental impacts, without improving level of service to LOS E or better. Scenario 5 was also eliminated from further consideration because maintaining a crossing of the Port Washington Narrows at the Manette Bridge location is important from a travel demand perspective. Therefore, subsequent sections of the transportation plan refer to only Scenarios 3 and 6. Figures 10 and 11 graphically depict the future level of service information for Scenarios 3 and 6, respectively. Daily traffic volume forecasts for Scenarios 3 and 6 are shown on Figures 12 and 13, respectively. The year 2014 traffic volume forecasts for each scenario assume that the improvements identified previously in Table 5 would be in place. The year 2014 traffic volume forecasts were prepared assuming that future travel characteristics would continue to be the same as they are today. The transportation forecasting model used for this analysis is limited in its ability to predict travel characteristic changes in the future as a result of: Transportation - Page 33 --"~'1 ~ PH: lID ;""- j ,..,.~~ - ,~_.- QTY OF BREMERTON CCl.FAEtENSIVE lRANSPORTA liON PLAN ..t1Q.q~ . 4~~(~~ -~t'Q r'--"-"l"""'}.".,~~i)' '-Ib._-' '~_, Parametrlx, Inc. :::;;;::'"."~='='>'" L:::~~ l"" ~~~:'_-~m,<'.;.~;,,~, i ,r"'-"""""', ,,........-. /-.' SA~" " /( \, ~"-----',",,-, -'"", - ...,..-".- ctICO *Y flLEll_.'l_ (9 IL...JI o 1750 3500 SCALE IN FEET LEGEND ~ LOS/V/C LOS LE\El. OF SEJMCE v/C Io<lLUIllE ro CAPAaTY RAllO Figure 10 Year 2014 Scenario 3 Level of Service Transportation - Page 34 Oi ~II) <tZB>@ '~"o W;~J_ -- ~ -----'~ -b1r Parametrlx, 'nc. , "- ~<\~ 'II~ 1 c-'C;:::~ t=o::-~;'" ~ '{~~, 1:;, ,,:p -.;;i;, -~, ~~ PIN[ "'1 '~";. ~~~" t.. ~ l~~'~ll - k,,,,,,.,,,. I f";';::::'," l~'.' r..--,.J J c !\ .-- '.. e',". ~ DR " I - ,- .- """ o,,:~~~.(~rttc8' E4 Y ~I~""".." O.S'T}UC'H ii'"~ t" ,..c- Ii! I 1....--. I I - ................--....,. -..- alY OF' BREMERTON ca.tPRDENSM: lRANSPORTAnON PLAN I'1Ul \_'\'_ LEGEND €B n..s-l o 1750 3500 SCALE IN FEET ~ LOS V/C NOTE: LOS I V/C LEYa. OF SER\fCE \G..tAlIC,1O CAPltaTY RAllO LOCA 1ION OF HE'll BRID6E WAS USED FOR IItXJEJ.MG PURPC15ES CH. y Figure 11 Year 2014 Scenario 8 Level of Service Transportation - Page 35 '~\~':i"~T~ . > O--?-~_& ~-"-. -.... - .\(itt:> 4.- !""'""''''''''''-1-~'''~''1'' :," I J '''', ~ f~ "..--">o-n.,.".. Parametrlx, Inc. . \) /J ~ RO ~,:>" "\~;;;;;;L:" , "r:;;':::'::1 ";:,,"~--..I '..,..."""",.".- [...~'~ r , ! ""'-"-~~"""l . "J"'''''-'' '-'3..,....,.....,.,~ ". T-~ '+.......... .....~-_"-'---------_. "-",i D..9J~'?fCS' l~~~}>' I ,i/\ t j/ \..~~_._~~." t I ! O,s'T'l":JCE BAY QTY OF BREMER1'ON CClttPRDENSIVE lRANSPORTAlION PLAN J fll&l1_.\1_, (B ILJI o 1750 3500 SCALE IN FEET LEGEND (l!l) A~ IImCDAY TRAFRC Figure 12 Year 2014 Scenario 3 Total Dally Traffic Volume. Transportation - Page 36 )].'4'," . q~ ---~. ~"''' "-- """<" ~r Parametrlx, Inc. ~ @ 1'J'~ ':'t.,. ~.j ,"~" "d~ '--= I . i~ 'it:. ~" ~- .,,~ .-.w't Ii~~~. I t::~~o= i r ,....,~- I ..-' , ~Ill:i=m_ ~-=- \, '\., \, i~'<" I rc , alY OF BREMERTON CDtPRaENSIVE lRANSPORTA 110N PLAN B&ll_,\l_ (B IlSI o 1750 3500 SCALE IN FEET LEGEND (jj[) A\OAGE MEEKDAY TRAme NOTE: LOCA 1ION OF HEW BRIDGE IMS USED FOR tlODfJ.IH(; PfJRPOSES OM. Y Figure 13 Year 2014 Scenario 8 Total Dally Traffic Volume. Transportation - Page 37 . increased transit use, . implementation of additional intra-county passenger ferries, . spreading of the peak hour - as a facility becomes increasingly congested, some of the demand tends to shift to other times of the day, resulting in a spread of the peak hour, . increased bicycle use, and . other demand management strategies such as telecommuting. Therefore, adjustments to the future volumes for Scenarios 3 and 6 were quantified to reflect the potential of these "non-traditional- transportation strategies. The results of these adjustments in the three major travel corridors, Manette Bridge, Kitsap Way, and Warren Bridge are summarized in Table 6. For Scenario 3, the non-traditional travel demand adjustments could reduce the total peak hour volumes by approximately 10 percent. The largest reductions would occur from increased transit use and peak hour spreading. The level of service standards would still be exceeded on the Manette and Warren Bridges; however, the LOS on Kitsap Way would improve to LOS D. For Scenario 6 with a new four-lane crossing of the Port Washington Narrows, the non- traditional adjustments would improve the futUlre PM peak hour LOS to LOS E on the Manette and Warren Bridges, and to LOS Don Kitsap Way. Therefore, assuming that these non-traditional travel demand adjustments would occur in the future with Scenario 6, all streets in the City of Bremerton would operate at LOS E conditions or better. Transportation - Page 38 Table 6 Future Potential Travel Demand Reductions in Congested Corridors Scenario 3 Scenario 6 Manette Kitsap Warren Bridge Manette Bridge Kitsap Way Kitsap Way Warren Bridge Bridge Way (No HOV Lanes) (With HOV Lanes)5 Unadjusted 2014 Peak Hour Volume 2,795 4,717 5,443 2,162 4,807 3,873 4,338 2014 LOS (vie) F (1.40) E (0.98) F (1.33) F (1.08) F (1.00) E (0.94) GP Lanes F (1.08) B (0.46) HOV Lanes Peak Hour Volume Reductions . Transit1 -100 -150 -75 -100 -150 -75 -75 . Peak Hour Spreading2 -145 -240 -280 -120 -245 -160 -235 . Passenger Ferry-{lntra-County)3 -65 -65 -135 -65 -65 -135 -135 Bicycle Use4 ',' -15 -25 -10 -25 -25 -25 . -30 Total Reduction -325 -480 -520 -295 -485 -395 -470 Adjusted 2014 Volume 2,470 4,237 4,923 1,867 4,322 3,478 3,868 Adjusted LOS (vie) F (1.24) D (0.88) F (1.20) E (0.93) D (0.90) D (0.82) GP Lanes E (0.94) B (0.46) HOV Lanes Assumptions: 1 2 3 Doubling of service frequency in all corridors (most of this service increase is planned by Kitsap Transit in the next 2-3 years). Decrease in the K-factor (ratio of peak hour to total daily volume) from 10.00,-b to 9.5%. Implement two routes with 160 passenger boats A Silverdale/Chico/Tracyton/Downtown Bremerton B Brownsville/lllahee/Pt. White (South Bainbridge)/Downtown Bremerton Assumes one peak hour run per boat. Bicycle Use Assumes mode shift of 0.5% from auto to bicycle. Assumes that the two additional lanes on Kitsap Way would be signed and striped for HOV use and that a mode shift would occur such that the number of people moved in an HOV lane would equal the number of people moved in an adjacent general purpose lane. This would involve a significant mode shift from single occupant vehicles (SOVs) to carpools and transit. 4 5 Transportation - Page 39 4. PROPOSED TRANSPORTATION IMPROVEMENTS AND COSTS This section of the report describes the transportation facility improvements and costs needed to accommodate the future travel demand resulting from increased growth in the City of Bremerton. In addition to the roadway facility improvements, transit, ferry, pedestrian, bicycle and transportation demand management strategies are also identified in this section of the plan. A. ROADWAY IMPROVEMENT OPTIONS: The results of the future travel demand forecasts have highlighted the importance of the Warren Ave./Wheaton Way, Kitsap Way, and Cambrian/Burwell corridors to the City of Bremerton. The improvement options for each of these major travel corridors are discussed below. In addition to these major travel corridors, other improvements in the City are mentioned under the Operational and Safety improvements category. (1) Warren Ave./Wheaton Corridor: The major issue related to the future of this corridor is whether a third crossing of the Port Washington Narrows would need to be constructed in the future. The results of the future traffic volume forecasts and level of service analysis for Scenarios 3 and 6 highlight the operations in this corridor with and without this new crossing. If the future growth in population and employment occurs as assumed in these traffic forecasts, the third bridge crossing would be needed for the Warren Ave./Wheaton Way to operate below the level of service standard of LOS F (v/c = 1.08). Since the identification of a specific location for this third bridge crossing location is beyond the scope of this transportation plan (given the GMA deadline to have comprehensive plans completed by the end of 1994 and the regional nature of the project), any specific decision on the appropriate solution for this corridor will be deferred until a cooperative city/county/state Wheaton Way /Brownsville Highway Corridor Study from Burwell to Waaga Way is completed. This study would need to be conducted under federal requirements for a Major Investment Study (MIS). The MIS process would involve the identification of all potential options, including transportation systems management (TSM) or transportation demand management (TDM) strategies, to decrease the future travel demand in the Warren Ave./Wheaton Way Corridor. The land use plans in the City and County that affect travel demand in this corridor would also need to be evaluated as part of the MIS. This MIS and associated environmental analysis would require approximately two years to complete. Therefore, the CAC has recently suggested that City staff proceed with this MIS process as soon as possible. Refer to the Financing and Implementation Plan section for further discussion on the relationship between this MIS process and the GMA's concurrency requirements. Referring back to the previous discussion on level of service standards and concurrency, once the level of service standard for a particular roadway is exceeded, Transportation - Page 40 the City of Bremerton would have six years to improve the facility to be in compliance with the level of service standard. Since the process for identifying, evaluating, selecting and ultimately constructing improvements in this corridor would likely require more than six years to complete, the MIS study process needs to begin well before the level of service standard is exceeded in the Warren Ave.jWheaton Way Corridor. Otherwise, a development moratorium could occur in this area. (2) Kitsap Way: The situation on Kitsap Way is analogous to the Warren Ave.jWheaton Way Corridor, except the improvement options may be more limited on Kitsap Way. The improvements options for ensuring that the LOS E standard (vjc = 1.00) is not exceeded in this corridor are: · Widening Kitsap Way with the added lanes open to all the traffic. (The LOS analysis indicates that 7 lanes on Kitsap Way in the year 2014 would result in LOS E or better conditions on Kitsap Way. This would be in compliance with the LOS standard established for this corridor). · Widening Kitsap Way with the added lanes reserved for HOV or transit use only. · Improving a parallel route to the east into downtown Bremerton. An improved connection between SR 3 and downtown Bremerton could shift some of the future volume growth on Kitsap Way to other corridors. Similar to the Warren Ave.jWheaton Way corridor, a comprehensive evaluation of this corridor should be conducted prior to recommending a preferred improvement strategy. (3) Cambrian/Burwell Corridor: The Bremerton-Gorst project is a series of improvements to SR 3, SR 304 and certain City of Bremerton streets to facilitate increased mobility and safety, and improve access between the regional highway system and downtown Bremerton. Within the City, improvements include a realigned arterial route adjacent to the western expansion of the Puget Sound Naval Shipyard and an expanded Kitsap Transit Base Facility connecting to Callow Avenue south of Burwell Street. Improvements into the downtown and connection to the proposed Bremerton Transportation Plaza at the ferry terminal will be provided from an improved four lane Burwell Street (with removal of existing on-street parking) or alternatively, by a proposed Burwellj6th one-way couplet system. Alternatives that were reviewed as part of this study included potential new corridor routes between Gorst and Bremerton via the Loxie EagansjSR 3 interchange to the north. However, operational problems, environmental impacts and community opposition resulted in these alternatives being dropped from further consideration. Required environmental review for the project at the state and federal level is anticipated to be complete in 1995, with construction of the various sections to follow between 1996 and the year 2000. (4) Operational. Safety. and Other Improvements: In addition to the major corridor improvements discussed above, there are a number of smaller-scale improvements that would be needed to improve traffic operations and safety. Replacement of the Manette Bridge is also included in this category. These improvements include: Transportation - Page 41 . Widening of Sheridan Road, Sylvan Way, and Riddell Road on their approaches to Wheaton Way. These improvements are needed to provide additional capacity at the Wheaton Way intersection and for access to adjacent property. (This would involve widening these street approaches for a distance of 1000-3000 feet to accommodate turning movements for access to adjacent property). . Widening of Kitsap Way to 7 lanes in the SR 3 interchange vicinity. This project, which is currently in design, would improve traffic operations in this area. . Installation of a new traffic signal at the Kitsap Way /SR 3 northbound ramps intersection and interconnect this new signal with existing signals at the SR 3 southbound ramps and Shorewood Drive intersections to provide coordinated signal timing. (This is a WSDOT project scheduled for the 1995-1997 biennium.) . Widening of Werner Road/Loxie Eagans Blvd. to 4/5 lanes between National Ave. and Union Ave./Kean St., including traffic signals at the SR 3 ramps, Auto Center Way/Oyster Bay Ave., and Kean St./Union Ave. intersections. A modification of the access control in this area needs to be evaluated as part of this project. . Improving the Warren Ave. southbound off-ramp to Callahan Drive. This project will improve signalized intersection operations on Sheridan Road and improve access to Harrison Hospital. The proposed funding for the project is from federal "pre-ISTEA" funds dedicated to the City. . Reconstruction of 11 th Street from Chester to Warren to provide an improved roadway surface. This project is currently funded. . Other miscellaneous channelization or traffic control improvements to reduce accidents as warranted. As mentioned previously, intersections listed in Table 2 do not imply that the City of Bremerton has a responsibility for improving each of these intersections. The intersections were identified to assist the City with prioritizing improvements based on safety issues. . Replacement of the Manette Bridge in its present location using State of Washington bridge replacement funds. B. TRANSIT SERVICE AND FACILITY IMPROVEMENTS: Future transit service and facility improvements in Bremerton are documented in the Kitsap Transit Long-Range Plan, March 1994. This plan addresses short (1994-1999), medium (2000-2008), and long-range (2009-2020) improvements. The plan addresses transit service and routes, park-and-ride lots, HOV facilities, transfer centers, passenger ferry services, paratransit, and ridesharing. The goals of the plan are summarized in Table 7. Transit service is and will continue to be important for the City of Bremerton to achieve its transportation and land use vision identified in the. Comprehensive Plan. Transit connections to the Bremerton Ferry Terminal and Puget Sound Naval Shipyard are two of the obvious examples that emphasize the importance of transit service in the City of Transportation - Page 42 Brerrierton. In both of these examples, a limited supply of long-term parking has created the demand for alternatives to the single-occupant vehicle (SOV). Key elements of the Kitsap Transit Plan that relate to the City of Bremerton's transportation plan are summarized below. . Doubling of transit service of existing regular service routes in the City of Bremerton. This would decrease headways from 60 to 30 minutes on these routes. This service increase will be implemented within the next 2-3 years. . Establishing a ring of primary park-and-ride lots that will serve as remote transit terminals. Two of these lots in the City of Bremerton are identified in the plan: an expansion of the existing McWilliams park-and-ride lot and a new lot located in the vicinity of the SR 3jKitsap Way interchange. . Expansion and restructuring of paratransit service for elderly patrons and people with disabilities. . Implementing HOV priority facilities initially in the Gorst-Bremerton Corridor and then outward from the Bremerton ferry terminal. . Encouraging additional non-motorized vehicle travel by integrating special facilities and features into transit such as: bicycle racks on buses and secure bicycle parking facilities at transit terminals. While transit service within Bremerton is the responsibility of Kitsap Transit, the City needs to work closely with Kitsap Transit since most of their future service and facility improvements will affect the City's transportation system. This spirit of cooperation has already been well established through the implementation of the parking management program in the Puget Sound Naval Shipyard vicinity and the transit signal priority system on Kitsap Way. C. FERRY SERVICE AND FACILITY IMPROVEMENTS: Future improvements to ferry service and facilities are anticipated in three areas: . Terminal and service improvements on the Washington State Ferry (WSF) system. . Improvements to the privately-operated Horluck passenger ferry . New passenger-ferry service between downtown Bremerton and other Kitsap County locations such as Silverdale, Brownsville and South Bainbridge Island. Each of these improvements is described in more detail below. Transportation - Page 43 Table 7 Kitsap Transit - Short-, Medium-, and Long-Range Goals SHORT -RANGE GOALS (1994-199) . Double ridership by the year 2000. . Relieve rush hour congestion and parking needs, particularly at terminals and employment centers. Improve commuter mode split by 20% at these sites. . Provide a basic system of accessible transportation service for the transportation disadvantaged, especially for those of limited mobility. . Reinforce plans for land use development within the Kitsap community. . Help improve environmental quality, especially air and water quality. . Help maximize investment in existing transportation facilities and minimize long-term investments in new facilities. . Implement the state-mandated TOM program for Kitsap County in such a way as to (1) insure that local major employers reach the SOV commute-trip reduction goals, and (2) to effectively assist the region in meeting overall TOM goals. MEDIUM-RANGE GOALS (2000-2008) . Reduce the rate of increase in vehicle miles traveled within Kitsap County to below the level of the rate of population increase. LONG-RANGE GOALS (2009-2020) . Utilize transit facilities and service, particularly the high capacity and high occupancy vehicle segments, to assist in local government planning and management of the physical development of Kitsap County . WSF recently participated in a long-range plan for the Bremerton ferry terminal in cooperation with the City of Bremerton, Kitsap Transit, and Kitsap County. Key features of the plan included: a multi-level bus and commuter parking structure, tenant space for mixed-use development, new vehicle access and egress locations, and an expanded terminal waiting area to accommodate up to 800 people. In addition, WSF plans to increase passenger-ferry service in the future to provide minimum crossing times of 35 minutes and peak hour headways that are less than 45 minutes. This planned passenger-ferry service increase would include the Bremerton- Seattle route. This service increase was assumed to be in place in the transportation model. Transportation - Page 44 The privately-operated passenger-ferry operating between downtown Bremerton and Port Orchard is the last of the historic mosquito fleet operating in Kitsap County. This service is identified in the Kitsap County Transportation Plan as a vital link between the south and central portions of the County. In order to maintain the viability of this service, Kitsap Transit has focused on two strategies: . Indirect operating assistance. through the integration of fares into the overall fare .structure of the Kitsap Transit system. . Capital assistance to improve landside terminal facilities and vessels to modern standards and to make them fully accessible under Americans With Disabilities Act (ADA) requirements. The third category of ferry system improvements would be to implement new passenger- ferry service, similar to the Horluck passenger ferry, between downtown Bremerton and other Kitsap County destinations. Two possible new routes would include: . Dyes Inlet route serving Silverdale, Chico, Tracyton, and downtown Bremerton. . Bainbridge Island/East Bremerton route serving Brownsville, lIIahee, Point White, and Downtown Bremerton The potential traffic volume reduction associated with these new passenger-ferry routes were previously summarized in Table 6. A 160-passenger vessel with one scheduled run during the peak hour was assumed for this analysis. D. PEDESTRIAN AND BICYCLE IMPROVEMENTS: Pedestrian and bicycle facilities are becoming increasingly important to compliment other elements of the transportation system. For Bremerton, the trips that have the greatest potential for shifting to a non-motorized travel mode include: trips to and from transit and ferry terminals and short trips for shopping, errands, and other purposes. Improving safety for pedestrians and bicyclists is also critical to advance this form of transportation. Bremerton currently has a reasonably complete network of pedestrian and bicycle . facilities, especially in the downtown area where sidewalks exist on all major streets. With the density increase assumed for downtown, these pedestrians and bicycle facilities will be important to accommodate trips to and from the ferry terminal and short trips to yarious downtown destinations including PSNS. The existing bicycle routes shown on Figure 8 provide a complete network of bicycle facilities for traveling between major destinations within Bremerton. The first category of pedestrian and bicycle facilities that provide access to transit and ferry terminals can improve the viability and increase the usage of both transit and non- motorized travel modes. The two transit transfer stations located at the Wheaton Way /Sylvan Way intersection and on Auto Center Way south of Kitsap Way and the combined transit transfer station/ferry terminal in downtown Bremerton need to be made fully accessible to bicyclists and pedestrians. Improvements that can enhance pedestrian and bicycle access to these terminals include: secure and weather-protected bicycle Transportation - Page 45 storage and waiting areas, crosswalks and signal timing that give pedestrians equal advantage at intersections, and exclusive bicycle access lanes and wide sidewalks that connect to major residential and retail areas in the surrounding community. The goal of the second category of pedestr:ian and bicycle facilities would be to provide a safe and convenient environment for bicycling and walking. Providing safe and convenient local facilities offer great potential for substituting bicycling and walking for short, intra-community vehicle trips. Facility improvements in this category would include safety improvements at crosswalks in central areas, access to and across principal arterials, and removal of barriers to pedestrian and bicycle travel. Implementation of non-motorized connections to transit and ferry terminals and enhancement of the local pedestrian and bicycle facility network can be achieved without new and expensive exclusive facilities. Bremerton will take an "opportunistic" approach to enhance the bicycling and walking environment by considering non-motorized improvements as part of regular maintenance or capital improvement projects. For example, the City should encourage and promote the inclusion of pedestrian and bicycle facilities as part of the ferry terminal redevelopment project. Other low-cost opportunities to provide enhanced pedestrian and bicycle facilities may occur through other private development projects. The City should also support public information and education campaigns to encourage more pedestrian and bicycle and improve the awareness of safety issues and concerns. E. TRANSPORTATION DEMAND MANAGEMENT STRATEGIES: All communities in the Puget Sound region, including the City of Bremerton, have inadequate funds to continue to expand roadways for single-occupant vehicles. Since the region can no longer rely exclusively on "building our way out" of congestion problems, transportation demand management (TOM) strategies have received increasing attention during the last 10 to 15 years. The goal of any TOM strategy is to reduce the amount of vehicle travel on roadways and ferries. This. can be accomplished by: · Shifting single-occupant vehicle trips to carpools, transit, or non-motorized travel modes. · Eliminating trips entirely-telecommuting and home-shopping are common examples of trip elimination. · Shortening trip lengths and "trip-chaining"-combining a series of multi-purpose trips into a longer chain of trips can improve efficiency and reduce vehicle miles traveled. Most TOM programs need to be initiated at the state or regional level since most trips cross many jurisdictional boundaries. There are, however, programs that can be initiated at the local level that can enhance and support these larger statewide and regional programs. The full-range of TOM strategies have been grouped into five categories: transportation pricing, employer-based strategies, land use strategies, telecommunications, and capital Transportation - Page 46 facilities that support TOM. Historically, TOM strategies have focused solely on the work trip; more recently, however, TOM has been broadened to cover all trip types since work trips account for only 20 to 30% of all trips made in the region. Specific TOM activities in each of the five categories are described in more detail below. (1) Transportation Pricing: . As part of the puget Sound Regional Council's (PSRC) Metropolitan Transportation Plan (MTP) Update, a variety of transportation pricing strategies are being evaluated and considered for inclusion in the regional plan. These strategies are intended to provide a market-oriented user-based pricing system that eliminates the current pricing structure that favors the single-occupant vehicle at the expense of other travel modes. These include: . Automated Tolling - Use of anonymous "smart cards" to charge drivers for road use on all limited access freeways and major arterials. This system uses an electronic transponder attached to each vehicle and detectors to charge vehicles for road use. Similar to telephone service pricing, higher fees could be charged for traveling during peak times of the day. . Parking Charges - A property tax on parking stalls or region-wide regulation of all parking rates. . Restructuring of Annual Vehicle Registration Fees - These fees would be based on vehicle miles traveled instead of the current system based on vehicle value. . Additional Fuel Taxes - A significant increase in the fuel tax that would affect all motor vehicles. All of these strategies would need to be implemented on a statewide or regional basis. At the local level, the City of Bremerton could support those strategies in statewide or regional legislative forums. TOM strategies in this category can influence all trip types including work trips. (2) Employer-Based Strategies: This is the category of TOM strategies that comes to mind most often because of the Statewide Commute Trip Reduction (CTR) requirements that affect employers with more than 100 employees. Work trips are the only trip type affected by employer-based strategies and programs. (3) Land-Use Strategies: Concentrating population and employment growth in centers, as well as providing a mix of land use types, can be effective TOM strategy. In Bremerton, the increased population and employment density in the downtown area assumed in Scenarios 2 through 6 could be considered a TOM strategy. (4) Telecommunications: This category encompasses the broad range of telecommunications strategies that can reduce or eliminate certain types of trips. This goes beyond telecommuting which focuses solely on the work trip. While the trip reduction potential of these strategies are currently difficult to quantify, their potential for reducing or eliminating certain trip types is nearly unlimited. Transportation - Page 47 (5) Capital Facilities that Support TOM: Transportation facilities that support the other TOM strategies by providing alternative travel options are included in this category. These include transit, pedestrian, bicycle, and HOV facilities. While these facilities are also identified in other sections of the transportation plan, they are repeated in the TOM element because of their importance in helping to reduce overall travel demand in the City of Bremerton. Since much of the direct work on TOM strategies needs to occur at the state and regional level, the most effective way for the City of Bremerton to be involved in TOM activities are: · Support of statewide and regional TOM initiatives and programs. · Implement a local public awareness and education program designed to promote the TOM strategies outlined above. · Support and implement capital facility improvements that support TOM such as transit, HOV, bicycle and pedestrian facility improvements. · Cooperate with Kitsap Transit on implementation of the State's CTR program. F. TRANSPORTATION SYSTEMS MANAGEMENT STRATEGIES: Transportation systems management or TSM refer to strategies that improve facility operations, traffic flow, or safety without adding lanes to increase capacity. TSM strategies are generally low-cost improvements since they do not involve major construction of new or expanded capital facilities. The following lists some of the more common TSM strategies that have been used in Bremerton and other jurisdictions in the Puget Sound region. · One-way couplets - Changing the operation of two parallel two-way streets to one- way operation can improve capacity and traffic flow within the same street width. · Parking prohibitions/restrictions - Prohibiting on-street parking or restricting on- street parking during peak traffic flow hours can improve capacity without widening streets. This strategy can be controversial, "however, particularly in business districts where no parking alternatives exist. · Access control - Left turn restrictions or consolidating driveways to individual businesses can improve facility operations and safety. Closing or restricting access driveways improves through traffic movement; however, this strategy can be controversial due to potential side street traffic increases. · Traffic signal timing coordination - Interconnecting a series of traffic signals can improve traffic flow progression through an arterial corridor. This strategy is particularly useful in areas with closely spaced signalized intersections such as freeway interchanges. These and other TSM strategies will be evaluated as part of all planned transportation improvement projects in Bremerton. Transportation - Page 48 G. COST ESTIMATES: Planning-level cost estimates were prepared for the major facility improvements identified previously for Scenarios 3 and 6. The cost estimates for Scenario 6 are identical to Scenario 3, except for the addition of the new bridge crossing the Port Washington Narrows and associated improvements. Costs for funding the transit, ferry, and TDM elements, of the plan are not included since these improvements would be funded by WSDOT, WSF, or Kitsap Transit. The cost of completing the Wheaton Way MIS is included for both Scenarios 3 and 6. Table 8 summarizes the planning-level cost estimates. In addition to the total cost of each project, an estimated breakdown of the City of Bremerton's share for each project is provided. The "other" portion of the costs for these improvements would come from federal, state, county, transit agency, and private sources. All cost estimates were prepared in 1994 dollars. Transportation - Page 49 Table 8 Planning-level Cost Estimates for Scenarios 3 and 6 Project City Other Total - $210,000 $840,000 $1,050,000 1. Kitsap Way - 7 lanes (11th to SR 3) 2. Replace Manette Bridge 0 13,000,000 13,000,000 3. Bremerton-Gorst Improvements 800,000 7,800,000 8,600,000 4. Kitsap Way - 5 lanes at SR 3 Interchange 20,000 480,000 500,000 5. Werner Road - 5 lanes (Union Ave. to National 80,000 720,000 800,000 Ave.) - 6. Riddell Road . 375,000 375,000 750,000 7. Sylvan Way 375,000 375,000 750,000 8. Sheridan Road 335,000 335,000 670,000 9. Wheaton Way MIS 200,000 400,000 600,000 10. Miscellaneous (Safety, Operations, Non-motorized, 3,000,000 0 3,000,000 TOM) TOTAL COST (Scenario 3) $5,395,000 $24,325,000 $29,720,000 11. Construct New Bridge 4,550,000 40,950,000 45,500,000 TOTAL COST (Scenario 6) $9,945,000 $65,275,000 $75,220,000 ASSUMPTIONS: (1 ) Since some of this section currently has 7 lanes, widening would be needed for approximately half of the entire section. A 20% City /80% Other funding split was assumed. (2) The entire cost of this project would be funded with state bridge replacement funds. (3) The City share for this project has been established as part of ongoing planning efforts. (4) This project will be funded almost entirely by federallSTEA and State Transportation Improvement Board funds. (5) The cost estimate assumes the addition of three new traffic signals in addition to widening Werner Road. The City share was assumed to be 1()oA, of the total cost since the improvements are mostly in Kitsap County. (6),(7), Assumes that property developers in these corridors would fund approximately half of these and (8) projects. (9) This is the estimated cost for the Wheaton Way MIS. (10) This category was developed to provide the City with $150,00 per year of discretionary funds for miscellaneous operations, safety, non-motorized and TOM improvements. (11 ) Planning-level cost estimates include costs to mitigate and improve the arterial corridors on either side of the bridge and to provide a new arterial connection between Pine Road and Central Valley Road as identified in the Kitsap County Transportation Plan, April 1991. Transportation - Page 50 5. FINANCING AND IMPLEMENTATION PLAN The GMA requires a financial element to be included as part of the transportation element of the comprehensive plan. The financial plan needs to include a comparison of estimated transportation improvement costs against the potential revenue generated from existing and future sources. Future revenues may include new local sources such as parking taxes or development impact fees, revenues from state and federal fuel taxes, and grants from federal, state, or county agencies. A key requirement of the GMA is that the estimated transportation improvement revenues must be sufficient to fund the improvements identified in the plan. If revenues fall short of anticipated costs, the City must identify additional funding sources. If additional funding sources cannot be identified, or are not desired, the level of service standard or land use assumptions contained in the plan must be adjusted to maintain a balance between costs and revenues. A. EXISTING AND PROJECTED REVENUE: The City of Bremerton currently relies on a combination of local and other sources to fund transportation improvements. During the 5-year period from 1989 to 1993, the City of Bremerton expended $5.4 million on transportation improvements or an annual average of $1.08 million. Of this annual average amount, approximately one-third, or $357,000, was from City sources. The remaining $723,000 per year was obtained from a variety of federal and state sources. These historical funding patterns were used to estimate future revenues from both City and other sources over the life of the plan. For the City of Bremerton, an annual revenue amount of $300,000 was assumed to fund transportation improvements. This would amount to $6,000,000 over the 20-year life of the plan in 1994 dollars. This estimate of $300,000 per year is conservatively low since the average annual revenues during the last five years have been approximately 20% higher. For other funding sources, the $723,000 annual amount was assumed to continue into the future at the same rate. This would generate an additional $14.5 million over the 20- year life of the plan. Funding sources in this "other" category include: (1) Federal Funds: For local agencies, most of the potential for federal transportation funding is from the Surface Transportation Program (STP) of the Intermodal Surface Transportation Efficiency Act (ISTEA). For local agencies, STP funding is available for eligible projects in the following categories: regional competition, statewide competition, transportation enhancements and safety (hazard elimination and railroad grade crossings). (2) Urban Arterial Trust Account: These are statewide competitive grants allocated through the Transportation Improvement Board (TIB) for projects on city streets and arterials within urban areas. Transportation - Page 51 (3) Transportation Improvement Account: These grants are also administered through the TIB with minimum percentages to certain areas. Emphasis is placed on projects that are multimodal, multijurisdictional, and provide congestion relief caused by economic development or growth. B. IMPROVEMENT COSTS/REVENUE COMPAIRISON: The transportation improvement costs summarized previously were compared to the potential revenues over the 20-year timeframe for implementing the transportation. Table 9 summarizes the surplus or deficit in revenues for Scenarios 3 and 6. Table 9 Cost/Revenue Comparison for Scenarios 3 and 6 Scenario 31 Scenario 6 City Other Total City Other Total Total Improvement $5,395,000 $24,325,000 $29,720,000 $9,945,000 $65,275,000 $75,220,000 Costs Estimated Revenue $6,000,000 $27,5oo,~ $33,500,000 $6,000,000 $27,5oo,~ $33,500,000 Surplus or (Deficit) $605,000 $3,175,000 $3,780,000 ($3,945,000) ($37,775,000) ($41,720,000) Improvement costs for Scenario 3 include the cost of the Wheaton Way MIS. 2 The estimated .other" revenue includes $14,500,000 based on historical trends plus an additional $13,000,000 in state bridge replacement funds for the Manette Bridge. As shown above, there is an overall revenue surplus for Scenario 3 and a revenue deficit for Scenario 6. For Scenario 3, the City's estimated revenue over the next 20 years exceeds the estimated costs by $605,000. This would result in an additional $30,000 per year for miscellaneous operations, safety, non-motorized, or TDM projects. There is also a $3,175,000 revenue surplus identified in the other category, assuming that the $13,000,000 Manette Bridge replacement project would be funded entirely from state bridge replacement funds. This is different source of funding that would not affect the City's ability to obtain ISTEA or TIB funding for other projects. Therefore, there is reasonable certainty that the City of Bremerton would be able to obtain the $24,325,000 needed from other sources to fund all of the improvements identified in Scenario 3. The $3,175,000 surplus of other revenue is based on historical trends. This amount would not be available, unless a project is approved through regional, state, or federal competitive process. For Scenario 6, the deficit between costs and revenues increases substantially to a total of $41,720,000, primarily because of the $45,500,000 cost to construct a new bridge crossing the Port Washington Narrows and associated arterial street improvements. This project will be evaluated in more detail as part of the MIS for the Wheaton Way (SR-303) corridor before it is included in the Transportation Element of the City's Comprehensive Plan. Therefore, the new bridge crossing project is not included in the transportation element at this time. Transportation - Page 52 As recommended by the CAC, the feasibility of the Warren Ave. project will be examined in more detail as part of the MIS described earlier in the plan. If the preferred alternative from this MIS process contains a third bridge, a reasonably certain source of funding will also need to be identified. The project and identified funding sources would need to be added to the transportation plan in the future if the MIS process results in a recommendation to proceed with a third bridge crossing. C. CONCURRENCY MANAGEMENT AND IMPLEMENTATION: Scenario 3 with the added requirement to initiate a cooperative City jCounty jState Wheaton Way jBrownsville Highway Corridor Study (SR-303) from Burwell to Waaga Way (this is the same as the MIS study of a third bridge crossing mentioned above) is recommended for adoption as the transportation element of the City's Comprehensive Plan. As shown in Table 9, the estimated revenue for Scenario 3 with the MIS for a third bridge crossing exceeds the estimated total improvement costs. Therefore, the transportation element complies with the GMA requirement to have transportation revenues exceed transportation improvement costs over a 20-year timeframe. If the Wheaton Way jBrownsville Highway Corridor Study results in a recommendation to proceed with design and construction of a third bridge crossing, the transportation element will be amended to include this project. A similar study is recommended for the Kitsap Way corridor; however, the costs for improving this corridor to seven lanes are included in the costs shown in Table 9. One of the requirements of a MIS is to consider "all reasonable alternatives for addressing identified transportation problems, including appropriate demand and systems management options." Some of the guiding principles for developing the alternatives to be analyzed in the MIS are: . Both physical and operating characteristics should be identified for each strategy. Institutional factors, alternative operational strategies, land use, pricing, parking policies, and funding strategies may also be important elements of the definition of alternatives. . The alternatives should be designed from the start in a fashion that avoids or minimizes adverse social, economic, and environmental consequences. Based on these guiding principles, the MIS for the Wheaton Way jBrownsville Highway Corridor would need to include alternatives that address demand management, including land use that affects travel demand in the corridor, as well as physical improvements such as adding a third bridge crossing. This is an important consideration for the City of Bremerton since land use development in the Kitsap County portion of this corridor has been a significant contributor to the capacity deficiencies in the City portion of this corridor. The MIS study process would provide a forum for WSDOT, Kitsap County, Kitsap Transit, and the City of Bremerton to address these land use issues in a cooperative manner. Alternative operational strategies that could be examined in the MIS would be to reserve the new bridge for transit or high-occupancy vehicle use only. Transportation - Page 53 The other important aspects of the transportation plan related to concurrency and implementation are the level of service standards and timing for improvements to be made. The level of service standards recommended for adoption as part of the transportation plan are: · LOS E or better on Kitsap Way from 11 th Street to SR 3 and on the Manette Bridge. · LOS F with a maximum volume/capacity ratio of 1.08 in the Warren Ave./Wheaton Way corridor from 11 th Street to the northern city limit in East Bremerton. . LOS D or better on all other arterial streets within the City. The level of service for each facility would be based on the peak hour link level of service using the methodology described earlier in the plan. The level of service standards establish the maximum threshold of congestion on each facility. This relates to the concurrency definition in the GMA that requires adequate public facilities (operating better than the LOS standard) to be'available when the impacts of development occur. "Concurrent with development" as applied to transportation means that "improvements or strategies are in place at the time of development, or that financial commitment is in place to complete the improvements or strategies within six years." Therefore, any development within the City or County that would cause a LOS standard to be exceeded could not be approved unless the financial commitment to improve the deficiency are in place within the required six-year timeframe. Level of service would need to be monitored annually to ensure that the LOS standards established would not be exceeded. To begin the plan implementation process, a transportation improvement program (TIP) for the first six years was developed. As required by the GMA, estimated revenues and expenditures need to balance. Table 10 summarizes the estimated transportation revenues and expenditures for the first six years of the plan. Transportation - Page 54 Table 10 Six-Year Funding and Projects (in thousands of dollars) - Transportation 1995 1996 1997 1998 1999 2000 Total Arterial Street Fund Revenue $300 $300 $300 $300 $300 $300 $1,800 Projects (expenditures) . Bremerton/Gorst $150 $150 $150 $150 - - .$600 . Kitsap Way at SR-3 $20 - - - - - $20 Interchange . Werner Road $5 - - $40 35 - $80 . Wheaton Way MIS - . $50 $100 $50 - - $200 . Operational, Safety, and $150 $150 $150 $150 $150 $150 $900 Other Improvements Total $325 $350 $400 $390 $185 $150 $1,800 Surplus or Deficit -25 -50 -100 -90 +115 +150 0 Transportation -- Page 55 Bremerton Comprehensive Plan HOUSING ELEMENT Prepared by: G BREMERTON PLANNING Adopted: April 5, 1995 Bremerton Comprehensive Plan ELEMENT G HOUSING CONTENTS 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1 2. GOALS, POLICIES AND STRATEGIES. . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 3 A. GROWTH MANAGEMENT GOAL #4 -- HOUSING. . . . . . . . . . . . . .. 4 B. KITSAP COUNTY-WIDE PLANNING POLICY. . . . . . . . . . . . . . . . . .. 4 C. THE VISION FOR BREMERTON . . . . . . . . . . . . . . . . . . . . . . . . . . .. 6 D. HOUSING GOALS, POLICIES AND STRATEGIES. . . . . . . . . . . . . .. 7 (1) Housing Condition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 7 (2) New Housing Development ......................... 9 (3) Affordable Housing .............................. 10 (4) Liveable Neighborhoods . . . . . . . . . . . . . . . . . . . . . . . . . .. 12 3. EXISTING HOUSING CONDITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 19 A. EXISTING HOUSING STOCK ............................... 19 (1) Age of the Housing Stock. . . . . . . . . . . . . . . . . . . . . . . . .. 19 (2) Owner-Occupied and Renter-Occupied Dwelling Units . . . .. 20 (3) Type of Dwelling Units ............................ 21 (4) Housing Affordability .............................. 23 (5) Condition of the Housing Stock ..................... 25 (6) Additions to Housing Stock Since 1990 . . . . . . . . . . . . . . .. 25 B. HOUSING RESOURCES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . .. 26 4. FUTURE HOUSING NEEDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 28 A. DEMOGRAPHIC PROFILE OF EXISTING POPULATION. . . . . . . . . . ., 28 (1) Population Trends ............................... 28 (2) Household Type and Size. . . . . . . . . . . . . . . . . . . . . . . . .. 31 (3) Age Composition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 33 (4) Household Income . . . . . . . . . . . . . . . . . . . . . . . . .. . . . .. 34 B. PROJECTED HOUSING NEEDS . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 36 (1) New Household Formations ........................ 36 (2) Adjusted Projections of Housing Needs. . . . . . . . . . . . . . .. 36 (3) Housing Type Mix ............................... 39 C. NEEDED PUBLIC FACILITIES AND SERVICES .................. 40 D. LAND AVAILABILITY ..................................... 40 E. HOUSING AFFORDABILlTY ................................ 42 (1) Kitsap County Needs Assessment and Affordability Plan ... 42 (2) Kitsap County Consolidated Plan .................... 42 (3) Kitsap County Housing Element ..................... 43 (4) Forecast of Affordable Housing Needs ................ 44 Tables G-1 G-2 G-3 G-4 G-5 G-6 G-7 G-8 G-9 G-10 G-11 G-12 G-13 G-14 G-15 G-16 G-17 G-18 G-19 G-20 List of Tables Page Housing Strategies ............................................ 15 Age of Housing in Bremerton and Kitsap County . . . . . . . . . . . . . . . . . . . . . . 19 Single Family Owner- and Renter-Occupied Units: 1990 ................ 20 Housing Units by Type: 1980-1990 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Housing Units in Structure: 1980 & 1993 ........... . . . . . . . . . . . . . . . . 22 Median Home Prices: 1988-1992 ................................. 23 Monthly Rent in Renter-Occupied Housing Units: 1990 ................. 24 Housing Condition (Buildings) ...... ~ . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 Housing Unit Change Since 1990 Census ~ . . . . . . . . . . . . . . . . . . . . . . . . . . 25 Emergency and Transitional Housing Facilities: Bremerton .............. 27 Historical Population Growth: 1940-1994 . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 City of Bremerton Population Estimate ............................. 30 Change in Household Types: 1980-1990 . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 Population and Household Size: 1990-2014 ......................... 33 Income: 1990 ............................................... 34 Projection of Bremerton Households by Income Group: 1990-2014 ........ 36 Projected Housing Unit Needs: 1994-2014 .......................... 39 Housing Unit Types: 1994-2014 .................................. 40 Residential Land Availability (Units) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 New Affordable Low Income Housing Needed by 2000 ... . . . . . . . . . . . . . . 45 List of Figures Figures Page G-1 Population Forecast: 1990-2014 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 Bremerton Comprehensive Plan ELEMENT G HOUSING " ,.. n'... ..... " ',"',". ", ,.... ........,..,' ',' .......,.,.,...-, , . ....... ....... ....... ,""'" ......"... .......'.... .. ,". "",' " .... ..........,.... Ht~ . ..'NfB(?JouC1]ON> This Housing Element ha$ been developed in accordance with. the Growth Management Act (GMA) to address the housing needs of the City of Bremerton. It represents the community's policy plan for the next 20 years. The GMA requires: A housing element recognizing the vitality and character of established residential neighborhoods that: (a) Includes an inventory and analysis of existing and projected housing needs; (b) Includes a statement of goals, policies and objectives for the preservation, improvement, and development of housing; (c) Identifies sufficient larid for housing, including, but not limited to, government-assisted housing, housing for low-income families, manufactured housing, multifamily housing, and group homes and foster care facilities; and (d) Makes adequate provisions for existing and projected needs of all economic segments of the community. The Housing Element has also been developed in accordance with adopted Kitsap County- wide Planning Policy, and has been integrated with all other planning elements to ensure consistency throughout the comprehensive plan. The Housing Element specifically considers the condition of the existing housing stock; the cause, scope, and nature of any housing problems; and the provision of a variety of housing types to match the lifestyle and economic needs of the community. This element examines special housing needs, such as low-and moderate-income family housing, foster care facilities, group homes, manufactured homes, government-supported housing, and historically significant housing. Housing - Page 1 The Housing Element includes the following sections: 1. INTRODUCTION 2. GOALS, POLICIES, AND STRATEGIES 3. EXISTING HOUSING CONDITIONS 4. FUTURE HOUSING NEEDS Additional background information is compiled in Appendix G of the Comprehensive Plan. The City's development regulations (zoning, building codes, etc.) establish how the development and construction of housing and other development will take place. The Housing Element establishes both long-term and short-term policies to meet the community's housing needs and achieve community goals. The Housing Plan in this element will guide decision making to achieve community goals as articulated in the Vision for Bremerton (Element B). Housing - Page 2 ).............../..... .....................>/..</..........(/E)...<..;............:.AN.... .}S.........r<<RA.............;..<..T....e;>G>>..(I....E<>..8.....\). ..../. . ..2....... GO>A.r.s ..~nf..ICI. ......9. ....... n .. . ... .. ... ....... .... ...............< ....... ... ~........f)~L ...... . ...../.<..~.H../ ...) > .....<..) ..i... This section discusses the plan for future housing in the City of Bremerton. The timing of development and provision of services are key components of this planning process. In addition to the discussion below, a Land Use Plan map, included in the Land Use Element, to illustrate the various land uses and growth management strategies. The analysis of existing conditions and projected needs in the previous section highlighted the areas of concern and opportunities for Bremerton. The Vision for Bremerton (Element B), along with the inventory and analysis contained in this element were used to create a plan. The goals and policies within the plan provide guidelines and positive actions. The plan for housing issues in the city of Bremerton are organized as follows: · Housing Goals: Housing goals are statements about the community's desired future. . They are ideals which may be difficult or impossible to attain, but they state the direction the community wishes to head. Goals describe desired or intended achievements. They describe concepts to be used in decision making. · Housing Policies: Housing policies are specific statements to guide actions, and imply commitment to these actions. They become the basis on which decisions will be made. Policies specify what should be accomplished to reach the housing goals. These policies either provide clear guidance for decision making when a situation arises, or provide clear responsibilities that will be implemented. The accomplishments under these policies can be used to measure progress toward the goals. · Housing Strategies: Housing strategies are statements of specific action the City will take to implement housing policy and accomplish its housing goals. A hierarchy of planning goals, policies and strategies follows, beginning with the Growth Management Act Housing Goal and the Kitsap County-wide Affordable Housing Policy, followed by Vision for. Bremerton goal statements, and culminating with local goals, policies and strategies. A. GROWTH MANAGEMENT GOAL #4 - HOUSING The Growth Management Act Housing Goal provides the foundation for the Housing Element goals and policies: Encourage the availability of affordable housing to all economic segments of the population of this state, promote a variety of residential densities and housing types, and encourage preservation of existing housing stock. Housing - Page 3 B. KITSAP COUNTY-WIDE PLANNING POLICY - AFFORDABLE HOUSING The Kitsap ,County-wide Planning Policy was adopted by the Kitsap County Board of Commissioners in August 1992, as required by the Growth Management Act to be used solely for establishing a county-wide framework from which county and city comprehensive plans are developed and adopted. Element E of the County-wide Planning Policy addresses Affordable Housing. The County-wide Affordable Housing Planning Policies are hereby incorporated into this Housing Element. Element E. Policies that Consider the Need for Affordable Housing and parameters for its Distribution. 1. The following definition of affordable housing relates to the county-wide planning policy: The term "affordable housing" shall refer to a wide range of housing types and costs to address existing and projected housing needs. For the purpose of the county-wide planning policy and comprehensive land use planning, the term affordable housing includes the following: i. Below Market Rate Housing shall mean housing intended for low and moderate income households. These income levels are further defined as follows: Low-income shall mean those households that have incomes that are below 80 percent of the county-wide median. Moderate-income shall mean those households that have incomes that are within he range of 80-115 percent of the county-wide median. ii. Market Rate Housing shall mean housing intended for households with incomes that are greater than 115% of the county-wide median. 2. The following policies relate to the process for determining and fuffllling housing needs, and the fair share distribution of affordable housing: a. The County and the cities shall inventory the existing housing stock consistent with the Growth Management Act and correlate with current population and economic conditions, past trends, and thirty year population and employment forecasts to determine short and long range affordable housing needs. b. Local housing inventories and projections shall be compiled under the coordination of the Kitsap Regional Planning Council to identify county-wide conditions and projected needs. Housing - Page 4 c. Based on the percentage share of the existing and forecasted county-wide population, projected county-wide below market rate housing needs shall be determined for each jurisdiction in order to disperse below market rate housing county-wide. Such needs shall be the responsibility of the appropriate jurisdiction and shall not be transferred to other jurisdictions without approval of the Kitsap Regional Planning Council. d. Each jurisdiction shall identify specific policies and implementation strategies to provide a mix of housing types and costs to achieve identified affordable housing goals. Affordable housing strategies shall encourage preservation, rehabilitation and redevelopment of existing neighborhoods as appropriate; provide for a range of housing types such as multi-family, and manufactured housing on individual lots and in manufactured housing parks; promote housing design and siting compatible with surrounding neighborhoods; and facilitate the development of below market rate housing in a dispersed pattern so as not to concentrate or geographically isolate low income housing in a specific area or community. e. Housing policies and programs shall address the provision of diverse housing opportunities to accommodate the elderly, physically challenged, mentally impaired, and other segments of the population that have special needs. f. Local governments, representatives of private sector interests and neighborhood groups should work cooperatively to identify and evaluate potential sites for affordable housing development and redevelopment. g. The County and the cities shall participate in housing authorities established to facilitate the production of low-income housing. Other means of supporting public housing agencies is encouraged through public land donations, guarantees or other provisions as appropriate. h.. Agencies with education and housing expertise shall implement early and continuous cooperative educational programs to provide general information on affordable housing issues and opportunities to the public including information intended to counteract discriminatory attitudes including information intended to counteract discriminatory attitudes and behavior related to below market rate housing. i. Mechanisms to help people purchase their own housing shall be encouraged. Such mechanisms may include low interest loan programs and "self-help" housing. Housing - Page 5 3. The following policies relate to development standards and fees: a. Local comprehensive plan policies and development regulations shall encourage and not exclude below market rate housing. b. Innovative regulatory strategies shall be developed and implemented to provide incentives for the development of affordable housing. Jurisdictions shall develop strategies which provide a wide range of opportunities for promoting the production of affordable housing through means such as lower utility hook-up fees and rates, density incentives, smaller lot sizes, zero lot line designs and a priority permit review and approval process. c. Policies and regulations shall encourage the production of affordable housing. The County and the cities shall incorporate a regular review of housing codes into affordable housing implementation strategies to assure that protection of the public health and safety remains the primary purpose for housing standards. d. Local governments are strongly encouraged to develop strategies that make allowances to alleviate the affect of impact fees on below market rate housing. C. THE VISION FOR BREMERTON The Vision for Bremerton (Element B) describes residential neighborhoods as they are pictured twenty years from now: Neighborhoods will continue to evolve, improve, and become more attractive, comfortable, and desirable. They will provide a greater variety of housing options, affordable to a larger share of the market, and will become stronger and more stable as the proportion of owner-occupants gradually increases. A. Bremerton will continue to provide homes for naval personnel and workers from all sectors of the local economy, retirees, Seattle commuters, and others. B. We will continue to strive for a variety and a good balance of housing opportunities for all economic and social segments of the community. C. We will see a greater emphasis on home ownership asa means of achieving a higher degree of neighborhood maintenance and pride, and to offer the American dream of home ownership to more Bremerton residents. Housing - Page 6 D. In order to achieve a higher level of home ownership, a greater emphasis will be placed on the provision of small, private, affordable single-family homes, both in new subdivisions and as "in-fill" within existing neighborhoods. Condominiums. and other forms of ownership will increase in popularity. E. Historic preservation will playa greater role in Bremerton's future as certain unique areas and structures are recognized for their historical value. F. Neighborhood quality, safety, stability, and affordability will be given increased consideration in all community improvement programs. G. Bremerton will support its neighborhoods through greater availability of community services and improved maintenance of streets and other public facilities. D. HOUSING GOALS. POLICIES AND STRATEGIES The Housing Goals, Policies and Strategies have been developed from the analysis of the existing conditions and projected needs contained in the Existing Housing Needs and the Future Housing Conditions sections of the Housing Element. They are intended to: . Establish local priorities for the use of resources; · Communicate local priorities and preferences to providers and consumers of housing; · Stimulate housing development or redirect development which is occurring to achieve local housing goals and address local needs; · Establish standards for housing development and preservation which will maintain the character and vitality of existing neighborhoods and the community; · Provide a framework for implementation plans for specific actions which will be taken to address housing needs. (1) HOUSING CONDITION GOAL: Preserve and enhance Bremerton's housing stock. Discussion: Part of Bremerton's .charm is its older housing stock, half of which was built before 1950. Many of these units are well maintained and in good condition, and give character and a sense of stability to the city. However, large numbers of these units will reach the end of their useful lives if not Housing - P~ge 7 rehabilitated soon. While the City's Housing Rehabilitation Program has been making good strides in helping lower income people upgrade their houses, it is not likely to have the financial capability to assist all homeowners who need help. Deteriorating commercial structures compound the problem, blighting surrounding areas, discouraging- redevelopment, and holding down the City's tax base. New strategies will be needed to turn the tide of deterioration into opportunities for revitalization of the City. Policies 1. Promote private and public efforts to provide adequate capital for private and public rehabilitation housing projects at competitive or favorable costs. 1.a. Facilitate rehabilitation of rental housing properties to improve the condition of the rental housing stock. 1.b. Facilitate rehabilitation of owner-occupied housing based on the credit-worthiness of the dwelling rather than credit-worthiness of the homeowner. 2. Promote private and public efforts to preserve the existing housing stock by maintaining sound units, rehabilitating substandard units, and replacing severely deteriorated units. 2.a. Promote maintenance of housing that is now in standard condition to prevent its deterioration to substandard condition. 2.b. Promote the rehabilitation of substandard structures when the cost of rehabilitation is less than the cost of replacement housing. This cost factor does not apply to housing designated as having historical/architectural significance. 2.c. Promote replacement of substandard structures which have excessive rehabilitation costs with new structures. 2.d. Require housing units to be maintained in a safe condition. 2.e. Require removal of unsafe housing and restoration of the site to a safe condition. 3. Promote private commitments to improvement of the housing stock by using public resources to remove or abate blighting influences within or near residential areas. 3.a. Demolish and/or redevelop deteriorated commercial structures. Give priority to those which contribute to the blight of residential areas. Housing - Page 8 3.b. Improve the visual quality of residential areas where needed. 3.c. Provide effective operation and maintenance of public services and facilities. 3.d. Promote financial assistance for essential repairs to substandard structures that provide housing for low and moderate income persons. Support private sector low-interest loan programs for such repairs, combined with public resources when available. 4. Promote rehabilitation and maintenance of existing multifamily rental housing in appropriate zoning districts. 5. Promote efforts to .identify, rehabilitate and preserve homes having historical/architectural significance. Give priority to such homes in City rehabilitation programs. (2) NEW HOUSING DEVELOPMENT GOAL: Provide a variety of housing types and densities to meet changing needs of Bremerton residents. Discussion: Most of Bremerton's housing stock was developed to meet the needs of households in days gone by. roday's housing needs are often vel}' different. Encouraging the development of new housing within developed areas presents a special challenge. Policies 1. Promote private and public efforts to provide adequate capital for private and public new housing projects at competitive or favorable costs. 1.a. Support a Letter of Credit program to expedite housing project start-up. 1.b. Adopt a City Community Re-lnvestment Act Plan which includes development incentives. 2. Support the private sector's efforts to meet changing housing demands and special housing needs. 3. Stimulate the production of new housing for all income, age, family type and ethnic groups. 4. Encourage the provision of adequate housing to meet the needs of short term residents, particularly for those in the lower income categories. Housing - Page 9 5. Promote housing opportunities that respond to the special needs of students, the military, households headed by females, the elderly, and the handicapped. 6. Support efforts to provide emergency and group housing. 7. Encourage the development of a full range of housing options for seniors in proximity to services and amenities. 7.a. Consider allowing retirement housing complexes in all residential zones subject to development standards ensuring compatibility with surrounding neighborhoods. 7.b. Encourage programs which allow seniors to remain in their homes as long as possible (e.g. home maintenance and repair, home health care, reverse mortgage programs, meal programs.) 8. Provide for integration of special needs housing within the community. 8.a. Allow residential care facilities, including foster care facilities, in all residential zones; Provided, that such facilities must comply with development standards that will assure compatibility with the surrounding neighborhood. (3) AFFORDABLE HOUSING GOAL: Provide Bremerton's fair share of affordable housing. Discussion: The City provides a. significantly higher share of affordable housing than most of the rest of Kitsap County. This unequal distribution creates a disproportionate burden on Bremerton, which must finance city services with a lower tax base. At the same time, the City recognizes that low income families need housing with access to city services and facilities. Policies 1. Promote access to safe and sanitary housing for all Bremerton residents regardless of their economic capabilities or special needs. 2. Provide the City's fair share of the county-wide need for affordable housing. 2.a. Work to shift the burden to provide affordable rental housing away from Bremerton to other areas in the County which are providing less than their fair share. 2.b. Accommodate a proportionate share of the total county-wide need for below market rate housing. Promote the conversion of Housing - Page 10 surplus below market rate housing units into affordable housing for moderate and higher income households to reduce the City's inventory of below market rate housing down to the county-wide percentage by year 2014.1 3. Maintain the existing public housing stock in good condition, while striving to increase the proportion of privately owned housing for lower income households. 4. Promote home ownership by low jmoderate income households. 4.a. Support low jmoderate income home buyers subsidy programs. 4.b. Increase the City's share of affordable owner-occupied units through conversion of rental units to owner-occupied units. 5.. Disperse affordable housing throughout the city to avoid concentrations in any particular area. 6. Give priority to publicly assisted family housing in privately owned developments which contain mixes of market-rate and below market rate units; or, if entirely subsidized, in small, neighborhood scale buildings. 7. Provide areas within existing neighborhoods for affordable housing without negatively altering the existing neighborhood character. 7.a. Allow Accessory units associated with, and subordinate to, existing or new single family dwellings in all residential zones. 7.b. Consider allowing residential infill development of vacant or underdeveloped parcels at somewhat higher densities than surrounding properties, with assurances that neighborhood compatibility and fit will be maintained through appropriate and flexible zoning and related techniques (e.g. development standards and architectural controls). 8. Encourage higher-income people to move into lower income areas without displacing lower-income people. 9. Encourage market rate housing developments which include units designated for affordable housing. 1 Example: If the percentage of the City's below market rate housing supply were projected to exceed the percentage of the year 2014 county-wide supply by 1,000 units, the City would encourage upgrading of 1,000 below market rate units to affordable housing for moderate and higher income households by year 2014. Housing - Page 11 10. Encourage affordable housing for families in single family dwellings and in small scale multi-unit buildings. 11. Locate publicly assisted housing in areas that will provide eligible households with wider locational choices. 12. Maintain a moderate cost per resident to support desired levels of public service. 12.a. Promote increased housing density to provide a broader customer base. (4) LIVEABLE NEIGHBORHOODS GOAL: Build strong, liveable neighborhoods where the American Dream of home ownership is possible for a majority of Bremerton residents Discussion: Bremerton's low proportion of owner-occupants (only 39%) tends to result in a minority of residents having a stake in maintaining the housing stock and upgrading the neighborhoods. A high proportion of renters can result in a high turnover of residents, which can undermine neighborhood stability and discourage increased homeownership. Policies 1. Define and monitor a housing inventory which is close to employment and public transportation, is moderately priced, and uses neighborhoods with unique characteristics as a method identity. 2. Maintain a leadership attitude which delivers responsive public actions in assuring personal security, code enforcement, and other public services. 2.a. Maintain a strong code enforcement program. 2.b. Establish programs to protect personal security. 2.b.i. Maintain effective crisis response. 2.b.ii. Improve neighborhood/police relations. 2.b.iii. Develop effective neighborhood crime defense mechanisms. 2.b.iv. Design and implement improved police response systems for "Iess'than crisis" situations. 2.c. Improve emergency preparedness. Housing - Page 12 2.c.i. Document and publicize the existing emergency preparedness system. 2.c.ii. Develop remedies to gaps in the existing emergency preparedness system. 3. Use neighborhood plans to outline public and private projects for each neighborhood. 3.a. Complete implementation of the Downtown Waterfront Urban Renewal Plan and the Downtown/Waterfront Rehabilitation Task Force (Leland Study) recommendations, with a focus on: new multi-family structures; rehabilitated and new second story dwellings; and single-family attached/townhouse dwellings. 3.b. Begin implementation of the Campus Evergreen Neighborhood Plan, with a focus on: new multi-family structures (Smith Cove); rehabilitation of single-family structures; and new small-lot single family dwellings. 3.c.. Begin implementation of the West Hills Plan, with a focus on: new single-family residential dwellirigs; rehabilitated single-family residential structures; new single-family attached dwellings; and new multi-family associated with commercial development along Highway 3. 3.d. Commence the neighborhood planning process in the Sheridan/ Harrison Hospital neighborhood, with a focus on: new multi- family senior housing structures; and rehabilitated single-family dwellings. 4. Upgrade and maintain levels of public services. 4.a. Implement the City's sanitary sewer, water, and storm water comprehensive plans. 4.b. Implement a six-year street plan and a street maintenance plan. 4.c. Implement the Parks and Recreation Comprehensive Plan. 4.d. Identify and maintain acceptable response times for fire, emergency medical, and police services. 5. Promote safe, attractive, liveable neighborhoods that will attract homeowners. . 6. Increase opportunities for home ownership within the City. Promote expanded home ownership opportunities for low and moderate inco.me households. Housing - Page 13 7. Phase the City's Capital Facilities Plan so as to strengthen and expand opportunities for home ownership. 8. Encourage affordable residential development in locations where development has been overlooked. 5. HOUSING PLANNING AND COORDINATION GOAL: Ensure coordinated, effective planning and management of housing programs. Discussion: It is critical to maximize the effectiveness of scarce public resources in improving housing opportunities in Bremerton and throughout the County. Policies 1. Eliminate unnecessary regulatory impediments to the development of affordable and special needs housing. consistent with the public health, safety and welfare. 2. Improve certainty in development regulations to the extent consistent with the public health, safety, and welfare. 3. Provide an expedited permit process. 4. Promote intergovernmental cooperation to achieve City housing goals. 4.a. Seek to enter into an intergovernmental agreement with Kitsap County to foster implementation of affordable housing goals. 5. Promote interagency cooperation to achieve City housing goals. 5.a. Seek cooperative relationships with other agencies to encourage the development of affordable housing within the communities. E. HOUSING STRATEGIES The following strategies are recommended actions to help achieve Bremerton's housing goals. Priority strategies are listed first, followed by other strategies that should be considered. An "X. in the Goal columns indicates which of the five Housing Goals each strategy will reinforce. (Table G-1) Housing - Page 14 ....')..U'::;~::I'~.~.:i~;':.;".y' ..... .. ... '.. . ,,-,.. ...... . . ...." . .... ........ .... ........ n' ..... . n' . ......... . ......... n.. ...... .,,,... .. .... . ....... .... .".. ... ... ....... . ,. . . .. ......... ,..... ....... . .. . . ..... ..., ..... .. . .... . .... ....... .... . ......... ... ..., .. ,-, .. ...... ..... .... ...... ",. ........... ...... ....... .Sft_tegy> u..... .. '" . . - . .", . . ... . . .... ".. ....... .... ..... ... prid.rtty flolJ~!hgStratlgi.s . x x x 1. Revise Develooment Standards: Modify site planning/building design requirements (setbacks, street widths, etc.) or allow performance based standards to increase flexibility in housing development. Reduce minimum site improvement standards (drainage, street, pavement, parking, etc.) to reflect .actual projected usage and needs. x x 2. Streamline Permit Process: Identify opportunities for procedural reform to further streamline City land use and development procedures. x x 3. Permit Mixed-Use Develooment: Revise the Zoning Ordinance to permit apartments and single-room occupancy (SRO) units in business districts; cOnsider permitting employee housing in industrial park districts. x X X 4. Encouraqe Infill Develooment: Develop incentives to encourage "infill" development of vacant sites in developed areas and redevelopment of existing sites. Give priority to programs providing financial assistance to support infill homeownership. X X X 5. Encouraqe Zero lot line Develooment: Continue to allow zero lot line development (houses sited on lot lines to maximize useable space on the other side) in planned developments (PUDs) and in most residential zones. X X 6. Encouraqe Cluster Subdivisions: Continue to allow clustered housing on smaller lots in PUDs in exchange for a set aside of permanent open space. X X X 7. Encouraqe Small lot Develooment: Continue to allow small lots in appropriate residential zones. X X 8. Encouraqe Planned Unit Develooments (PUDs): Continue to permit housing PUDs to give increased flexibility in the design of residential projects in exchange for higher density. Streamline the existing PUD process where consistent with Comprehensive Plan goals and policies. X X 9. Exemot Affordable Housinq from Imoact Fees: Assess impact fees for Market Rate Housing; waive impact fees for Below Market Rate Housing. Support higher impact fees in rural areas to provide an incentive for development of housing in urban areas. . .X X 10. Require Certificate of Occuoancv For New Occuoants: Require renewal of a Certificate of Occupancy when any unit becomes vacant to ensure compliance with health and safety codes. (The fee would be set to pay for the program.) Housing - Page 15 p1.<:..:2: ;..3\4\ X . . . .. ..., . ..... . ..... . .. . ...... ... -, . . ...... . n. .. . ....... .". ........ . . ... . . . . . . '. ...... . ....... . ....... .... ,.. . ..... ... ........ . . .... ... ..... . . 'n n. . ....... .... ...... . ....... . . .... . ...... ...... . ...... . . ....... . ....., 0.... .. ...... ,",. ...... i$trat~gy'i/ ....,. ...... '" ...... . ........ . .. ..... .... ....... .. .n' ... . . .......... .. ....... ........... . ...... .. . . . .. n. .. ..... . .... ........... . n_ . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . ... .. . . . . .?L.' . ./fabr..G!1/<>p..... . .........dusftngSti'i\!'gJes.?. '.': :.... 11. Revive Allevs: Encourage access to garages from' alleys to minimize auto impacts on residential streets. Allow narrower streets, one-way streets and smaller setbacks in new subdivisions which include alley access. X X 12. Develop Residential Desian Standards: Develop design standards for renovations and new construction to help preserve neighborhood character. Encourage useable front porches, open front yards, appropriate materials and roof pitch and other features to give warmth and character to houses. , , . 'n .. .. .n...... ...........,.. ... . -,-, . . . .. ... ".H.. n' . .. .,_..., '.' ()theI'FfoU~l'lg$tiategi"." ..... X X X 13. Expand Housina Rehabilitation,Proaram: Continue and expand the City's successful low-income housing rehabilitation program to rehabilitate owner- occupied housing units so as to increase the number of units rehabilitated. (Do not use scarce public resources for rental units.) Focus ,efforts on areas with higher than average numbers of deteriorating housing. 14. Strenathen Code Enforcement: Strengthen the City's pro-active Housing Code Enforcement Program to increase the number of units that are brought up to code or destroyed. Focus efforts on areas with higher than average numbers of deteriorating housing and commercial structures. X X X X X X 15. Consider Code Compliance Incentives: Consider establishing a voluntary program to inspect and identify housing with hazardous conditions and/or substantial, deferred maintenance, with incentives to participate. x x 16. Encouraoe Preservation of Historic Homes: Establish a historic preservation program to conduct an inventory of homes having historical/architectural significance and to assist owners in taking advantage of financial incentive . programs and grants for historic preservation. X 17. Develop In-Home Services for Seniors and Frail Elderlv: Promote supportive services to allow senior citizens to live in their own homes. X 18. Establish Youth Shetters: Promote shetters and transitional housing for homeless young people, including youth with drug and alcohol dependency problems. X 19. Suoport Housina for the Mentallv III: Support improved housing facilities and supportive services for the chronically mentally ill to provide opportunities to assist them to live normal lives in their communities. Housing - Page 16 ..n ... ..._ .. .. ....",... 'n....' . .... . ... . ...... .. ,.. .",..... p.. .... ..... ,., ............ .............. ....., . .. .n".. . n. .. .......... .......,. ......... ....... ",... ....... ......... .....,... . ......... ... n...... ....... ........ . ..... _" .... ...... ........ ...... .. . ... .. ......... .............. ..... .... . ......,. ....... .. ... . ... . ...... ......... ,. ... ......", ....... ",. ...... .................. ........... ... ". . '.' ..' '. . ......... '. ....... ................ ............... ... .........T. .....b.....l....~C:1.. ..................................... .... . .}} ..........{.{ ../..<'.' .... ..\i..... ............... .a te..~)... ....> i.."" '. ................ n. ...... . ......... .. ...... . ......... ........ ... ...... . . ......... ..... ................../\ · Housing'''Sttategies\>> ..' ...}i . ........,......:>>:.;.>>>;.;.;.;.;...'.;-: ".. ',' ;'.':' ....;...:.. ........;...;..<.;........ . ..... . . ..... .. ...... ...... .. . ........ . .. ... . ... ....... . .......... ..<~b~1 ....3............4 x x x x x x x x 20. Increase Housina for Victims of Domestic Violence: Support efforts to provide temporary shelter and transitional housing to victims of domestic violence. x 21. Establish Affordable Housina Goals: Work with the Kitsap Regional Planning Council to set long term housing goals by 1995 and work to meet them by the year 2010 through the accomplishment of five year housing development programs. x 22. Coordinate Evaluation of Proaress: Support a Kitsap Regional Planning Council evaluation of City and County progress toward meeting regionally adopted fair share housing goals on a two year cycle beginning in 1997. Support increasing land allocations for affordable housing in appropriate Urban Growth Areas if jurisdictions are not meeting their goals after each two year evaluation period. 23. Establish Voluntarv Inclusionarv Zonina: Provide development incentives to allow specified privileges'(e.g. density bonuses) if a certain portion of units in new housing developments are set aside to be affordable to low- and moderate-income homebuyers. Require that these units remain. affordable for a specified number of years by agreements entered into the chain of title by the owners. x 24. Deleaate Affordable Housina Responsibilitv: Rely on the Bremerton Housing Authority and other non profit organizations for the provision of affordable housing units. Require developers to cooperate with the Housing Authority by agreement in order to provide for fair share housing needs to simplify administration of any fair share housing conditions. x 25. Expand the Use of Existina Proarams: Support a voucher program that allows individuals and families to go to any number of available housing providers who then bill the program based upon services provided. 26. Leveraae Future CDBG Fundina: Consider borrowing against some portion of- the next five years of the City's allocation of the County's CDBG funds to leverage other public and private funds for use in developing affordable and special needs housing. . X 27. Strenathen Neiahborhood Viabilitv: Continue to work with residents and property owners to.develop neighborhood plans that identify opportunities to improve living conditions. Housing- Page 17 1.\23 .. ..... ...... ..... .......", . .... ...... .... "n", . ..... .. . .......... ..... ... . ... ......TableG;i1)>.. . ... . ...JtousirigStraf,gie~.. ........ ...... .. ,......... .. . ......... . ., ..... . .... .. ... .... .. .. .... .... ... . . .... .... ... ... ... ... ...... .. ",.,.. . .$tfat~gy ... X 28. Increase Neiahborhood Safety: . Continue to work with residents to reduce opportunities for crime in their neighborhoods. Support Neighborhood Watch, Safe Streets, and other programs which empower people to take control of their neighborhoods. x x 29. Increase Home Ownershio Oooortunities: Increase home ownership opportunities available to low and moderate income families through a variety of methods such as down payment subsidy, interest buy down, and self help housing programs. X 30. Use Housina Finance Commission Proarams: Provide assistance to first-time home buyers to help them access State Housing Finance Commission financing programs. X 31. Work Closelv with Private Lenders: Continue to encourage local banks to involve themselves in Community Reinvestment Programs. X 32. Market Bremerton: Produce a marketing video that touts Bremerton as a liveable city with affordable housing, convenient access to Seattle and the Olympic peninsula, and a high quality of life. x x x x x x x x 33. Reduce Reaulatorv Imoediments: Review land-use, zoning, and planning policies to reduce impediments to the development of affordable and special needs housing. Replace broad criteria with measurable standards where possible. x 34. Minimize Environmental Imoact Delavs: Revise environmental review - procedures to establish stated levels of development that will receive a Determination of Non-Significance (DNS) and those that will be required to complete an EIS, to allow developers to size or phase projects to minimize delays. x 35. Encouraae Innovative Develooment Techniaues: Consider establishing - development incentives that make innovative techniques for affordable housing at least "cost neutral". x 36. Provide Fee Abatements for Affordable Private Develooments: Reduce or eliminate impact and other fees in return for significant contributions to the City's supply of low and moderate income housing. Housing - Page 18 .......3.1...... ....i<ISTI.f4.G.....ROOS.,~G.......CQN.D.IJI.ONS................................................. This inventory describes the condition of the existing housing stock and various housing resources. The inventory is based on information and data drawn from several sources, including the U.S. Census, the 1990 Housing Bremerton strategy, and the Kitsap County 1995-2000 Consolidated Plan. A. EXISTING HOUSING STOCK Characteristics of the existing housing stock include the age, occupancy, type, affordability, and condition. (1) Age of the Housing Stock Bremerton has a significantly higher proportion of older housing units than Kitsap County. Nearly half (49%) of Bremerton's housing was built before 1950, while just one fourth (24%) of Kitsap County's housing was built before that time. Over one fifth (22%) of the housing units in Bremerton were built before 1940, compared with just over one tenth (13%) in the County as a whole. Correspondingly, Bremerton has a far lower proportion of newer housing than Kitsap County. Under one tenth (9%) of the housing units in Bremerton were built after 1979, compared with nearly one third (29%) in Kitsap County. (Table G-2) . ... .-, ... . . . .....- .....-..,...... .......... ".. . . . ..... ....... . ....., .. ' .. -... , ..", .. . ......., ,.. .. . ... .. .....1. .bl G............. .... . ......... . .. , .. ..... .. .... ..., . ........... ..:.... ...................a e .;2............ ........ . ...........:. ........:....:...... ...Age ofH6using ilfBremerton@nd I<Itaapcpunty(.......... . ,. . . .. . . " . Year Structure 8uilt . . .... ........... . . . ......._ . ........ n. n. "'" . . ... . .. .. .. .......... ...... ..., .. . '.. ....,... ...." . .. ....... . ... ..", ............,.. \.... ...Kilsap Co~my}.)i (.Joits Un.j.. . . . .. . . .. . . .. . ..Percent ... 29.2% 1980 - March 1990 Total Units = 1,445 6,598 4,243 3,424 15,710 9.2% 42.0% 27.0% 21.8% 100.0% 21,619 34,502 1950 - 1980 1940 - 1949 8,662 46.SOk 11. 7% 12.5% 100.0% 1939 or earlier 9,255 74,038 Source: 1990 Census Summary Tape File 3A, Table G-25: Sample Data. (a) Historically Significant Housing A drive around town confirms that Bremerton contains a large number of older homes. Some have been well maintained and restored -- Housing - Page 19 others need work. The Kitsap County Historical Society has furnished plaques for some of these homes, but the City is unaware of any inventory of historically significant housing that may have been compiled. The City's low interest loan program has helped to rehabilitate some of these homes. (2) Owner-Occupied and Renter-Occupied Dwelling Units The proportion of owner-occupied housing units declined somewhat in both Bremerton and Kitsap County between 1980 and 1990. There was a corresponding increase in renter-occupied housing during the same period. Owner-occupied housing in Bremerton decreased 9% (from 43% to 39% of all occupied units). Owner-occupied units in Kitsap County declined 4% (from 67% to 64% of total occupied units). However the proportion of owner- occupied housing in Bremerton is significantly lower than in Kitsap County as a whole. Renter-occupied housing units in BlI"emerton increased 7% (from 57% to 61% of all occupied units) in 1990. Renter-occupied units in Kitsap County increased 20% (from 30% to 36%). The proportion of renter-occupied housing in Bremerton is significantly higher than in Kitsap County as a whole. (See Appendix G) (a) Single Family Units A greater proportion of Bremerton's owner-occupied housing is single family than is the case in Kitsap County as a whole. Over nine out of ten (91%) Bremerton owner-occupied units are single family dwellings, compared with more than eight of ten (84%) Kitsap County dwellings. A slightly lower proportion of renter-occupied units are single family in Bremerton (38%) than in KitsapCounty (43%) as a whole. (Table G-3) . . - ... . .... ... n" . .... .' .., . ...........'.',.... ...................... ,',",'... .....-.-..... ........ . .... ...... . .... ... i~n8r~6~lipt.dUnita< .. ...... ......,'. ... ...........,.. ',.-.' ...... ,-. .. . nO<' n. ,'.... .. ... .. .. .. _.. n. ....".. ..... ..... " ." ... .. n' .. . .... ....... n. n ... .. '.,.".. .... ... n. ... .B.."ter.~()c:c~pi~Ori.ts}.. . .... ...n' ....... .. . . . n. n" ',' . ,-.' .".. . ;..;.....: . -, ,...,',., . :::::-.':.,' :.... '.: ::.... :::'. ,', "';.' ',' ":':':','.: .....................................................~ikll'..r:i~~I;...6Wh~r-...~h\bW.~~:tlp~~.~i.id....l)nit~;...~.99~............................ ... ...... .... .. On . ....... .. ... .. . 'I' . ".. ...... . ..... ... ... ........ ... .... . ,". -..:,' .", ::>'::':" . ...:. ":".>:._ ....:: :.;-;...... ....;. ..c. . ":'. ..;...... "." :.;:......... ...... ........... ..... . .. ..>>$ingl4t .. ... ....<Petcent\... T oiil . .. .Sirt~Je . .Perpeijl .. .. .J=ilmIIY<... · .... ...........>.. .. .. ........... .\F.mity<< . Bremerton 5,751 5,250. 37,381 91.3% 83.9% 8,967 24,737 3,396 10,632 37.9% 43.0% Kitsap County 44,530 Source: 1990 Census Summary Tape File 3A, Table G-10. Housing...; Page 20 (b) Vacancy Rates The 1990 Census reported that 6% of Bremerton's housing units were vacant, of which 3% were for rent and 1 % was for sale. Another 1 % was rented or sold but not occupied. (See Appendix G) According to the Fall 1994 Kitsap County Real Estate Trends Report, the county-wide apartment vacancy rate fluctuated from 1.8% in September 1992 to 5.5% in September 1994. This county-wide rate is strongly influenced by the arrival and departure of ships and their crews at the PSNS. This is evident particularly in West Bremerton where the vacancy rate dropped dramatically from 13.9% in March 1994 to 3.0% in September 1994. As of September 1994 the overall apartment vacancy rate in Bremerton (5.8%) is somewhat higher than the county as a whole (5.3%). At the same time there were no three bedroom apartment vacancies in West Bremerton.2 A market equilibrium vacancy rate is commonly estimated to be 5%. (3) Type of Dwelling Units The number of housing units within the city was estimated at 15,930 in April 1993. Of these, nearly two thirds (59%) are in one-unit structures and over one third (39%) are in multi-unit structures. The remaining (3%) are manufactured homes, trailers, or other special housing units (boats, etc.).3 (Table G-4) Single-family Multifamily Manufactured/Other Total Units = ... #: '" of T 0181 .. . ::It.;. 8,229 55% 9,190 6,525 44% 6,124 173 1% 379 14,927 1 ()()Ok 15,693 Type . ... . n" . . . . ..., . . , .. . , . ., ..n .. " .... '" .. , .. '. . ..'n'< . .... ....../TableG;;4 . ...... '. ....... .. ..HousinO:Units l)ytype:198O-1~90 .' . 1980.. 59% 39% 2% 100% Sources: 1980/1990 Census of Population and Housing, STF 1A; Puget Sound Regional Council; Kitsap Regional Planning Council. 2Source: Draft Kitsap County 1995-2000 Consolidated Plan, November 1995. 3rhe Census uses the term "mobile home or trailer" to refer to mobile homes to which no permanent rooms have been added. The Census does not distinguish between 'mobile homes' and .manufactured homes. (see Comprehensive Plan Glossary). Housing - Page 21 Since 1980 the number of single housing units has increased 3% (from 55% to 58%), while the amount of two-unit housing dropped 1%. The proportion of three- and four-unit housing stayed the same (7%), while the amount of housing containing five or more units increased 5% (from 17% to 22%). The amount of mobile homes, trailers and other housing types more than doubled (from 1% to 2.5%). (Table G-5) Other . . .. n>1980 Oiiits. 8,229 1,685 1,117 2,554 173 14,960 .. ........ Pel'cent , .. . .n', .. .. .n ... . ....... . . ..... .... . .. .. .j gg4>l.Irilta ...., ........ . " .. ......., ......... .". . . .. ",". .. .. . .. .. . .. ...~. ...-. ....... .. . . ... .. n....n... .... .. TableG~5. .....> .. . n ... HOU.n,g ..UnitsloStruC14r~;~98Q&199~ 5+ Units 7.5 17.1 9,368 1,555 1,168 3,577 407 16,075 58.3 9.7 7.3 22.3 2.5 100.0 1-Unit 2-Units 3 & 4 Units 55.0 11.3 Total 1.2 100.0 Sources: 1980 Census of Population and Housing; 1993 Washington State Office of Financial Management estimate updated by Bremerton Planning. (a) Group Housing Of 3,750 persons living in group quarters in Bremerton in 1990, 83% (3,114) lived in military quarters. An additional 17% (636) lived in institutions: 14.5% in nursing homes (544); 1.5% other institutions (58); and 0.9% in mental hospitals. Another 1 % lived in other noninstitutional quarters (39), and 0.1% were visible in street locales (4). (b) Manufactured Housing Manufactured housing is allowed on individual lots in four of Bremerton's eight residential zones, provided the units meet federal HUD construction standards as well as special zoning ordinance standards for width, roof pitch, foundations, exterior appearance, floor height, and floor area. Manufactured housing which does not meet zoning standards may be located in older manufactured home developments (often referred to as "mobile home parks") where these substandard units are "grandfathered". New manufactured homes developments are allowed as Planned Unit Developments (PUDs) in five residential zones. There are four manufactured housing developments in the City, three of which allow single-wide units. Housing - Page 22 According to the 1990 Census, about two thirds (64%) of Bremerton's 216 manufactured housing units are located inside manufactured home developments.4 Many of the remaining one third would have been installed on individual lots prior to adoption of zoning restrictions or prior to annexation.5 The 1993 Land Use Inventory found 132 manufactured units in developments. (4) Housing Affordability (a) Sinale Familv Housing Costs The lowest single family home costs in Kitsap County are in Bremerton; the highest costs are in Central Kitsap/Silverdale and in Bainbridge Island. (Table G-6) . , ".. .. . .., H.... n" .. . .... .... ....,. . . d.. "..".. ..... ....... ........ table.G-6 .......\........ . , ." . '" ..... .. "" ...".,...... ~tdianHqme Pri9":1$$~~~~ West Bremerton $40,000 $45,000 $54,000 $63,550 $74,300 85.8% East Bremerton $57,000 $63,000 $71,600 $80,000 $89,250 56.6% Central Kitsap $75,500 $78,495 $85,950 $105,000 $115,000 52.3% Kitsap County $72,500 $79,500 $88,700 $105,000 $115,900 59.go~ Source: Table 9, Kitsap County 1993 Housing Needs Assessment & Affordability Plan; from Multiple Listing Service in Kitsap County Real Estate Trends Report, Richards & Associates, Spring 1993. The contrast in single family home costs partly reflects a difference in the kind of homes sold in each area. Many home sales in Central Kitsap are of new homes, while most sales in Bremerton are of used homes. Used homes are often converted into rentals, which makes fewer houses available to first-time, low and moderate income buyers. (See Appendix G) 4"Manufactured housing" - housing built to the federal HUD code rather than the UBC - is allowed on any residential lot in town on which a "conventional" or "stick built" single family house can be built. Other mobile homes and travel trailers are only permitted in mobile home parks. (See "manufactured housing" in Comprehensive Plan Glossary.) 5rhe 1990 Census counted 216 "mobile homes/trailers" in the City. A 1990 City survey counted 138 units in manufactured homes developments. Because newer manufactured homes are built to federal HUD standards, it is unlikely that census takers would identify them as "mobile homes", (See the Comprehensive Plan Glossary for a definition of "manufactured home".) Housing - Page 23 (b) Value of Owner-Occupied Housing The average value of owner-occupied housing units in 1990 was significantly lower in Bremerton ($73,338) than in Kitsap County as a whole ($108,622). The average price asked for vacant-for-sale housing was 59% lower in Bremerton ($62,477) than in Kitsap ($99,571). (c) Monthly Rent The average monthly rent in 1990 was 21 % lower in Bremerton than in Kitsap County as a whole. Rent averaged $323 in Brel"l1erton compared with $391 in Kitsap County. The average rent asked for vacant-for-rent housing was 30% lower in Bremerton ($325) than in Kitsap ($421). (Table G-7) .... ..... ". .. .... '" ...... , .. ..... n. ........ . . ...., . . . "., n_ , ,,,..,. n. ........ n. .... ........... " ..,....., .... . .. ...... .. ..,.. .." .. ..... .......... .. . ........ . .... . ..... ..... .... .. ..... .....~t.tdn .. .. .kiylapCotin~.... ()\piff.,.nAA..)t ...-...... ... ....... .. ..... n.', ... . ........... n. ...... n' . ........ .... .. ..... n. . .. ,.. .... ...... .......... '. .. ..... ......., n... . n..'.... .... , . . ....... ..... _.... ".", ...... .......... ......... n. . .,-, , .......... ..... ... .. ....... n. . .?n>. .../n Tal:m- G-7/nHi ........ ............... ..... .. ..... ....Mqrith.IY>Rentin~'rite.r.~OccOPjt!dtlqusiriglJ"~~;199() Lower X, $246 $290 $44 17.SOk $329 $380 $51 15.5% $393 $477 $84 21.4% $323 $391 $68 21.1% Median Upper X Average Source: 1990 Census of Population Housing, Tables H32-H37. (d) Overcrowded Housing Bremerton has more overcrowded housing than Kitsap County or its other cities. In 1990 about 5% of Bremerton's housing had more than 1 person per room, compared with 3% in Kitsap County as a whole. (e) Criteria for Affordable Housing As a rule of thumb, housing is considered "affordable" if a household spends no more than 30% of its monthly income for total housing cost (including costs such as taxes, insurance, and utilities). It is difficult to obtain a mortgage if projected monthly housing costs exceed 30% of the family income. About one third of Bremerton (35%) and Kitsap County (34%) renters exceeded the 30% threshold. Of households with incomes under $10,000,70% in Bremerton and 72% in Kitsap were paying more than 30% of gross income. Housing - Page 24 (5) Condition of the Housing Stock Kitsap County Assessor's records attest that nearly one fifth (17.3%) of Bremerton's occupied single family housing is rated as being in fair, poor or very poor condition. Of the City's one- to four-unit housing structures, 15% (rated "fair") have only minor deficiencies. However, 2%, ("poor") have substantial deficiencies (e.g. cracked foundation or need new roof), while 0.3% are abandoned or of questionable habitability. (Table G-B) , _H.. . .. ...... ...,. ..... - .. .... . ...'...-......',.... .....-.'... . '." ......, . . ..... .... .. . -" .. -. . . .. .. . . . ".11. ........b.I.. G. ..*8. ...... ... . ... ... . .. . ...... .. ..... ..... ...:.'.':.:.,::.'.:... ::: .a. e: :.::::::..,::.>::...... ....,.::\. .: ....:.:H()U~ngCOrtditiOrl($q!(~J"gsj :::::.. .. .... .. .. ..... .... on.. .,....... . .......... " ..... .. ..... . . ........ _','.n .... ..... .. .... .. ...... . . ....... ..::+~~....:.:.::... ::...::: ...: :.:.GOOd: . ... :......:..:.::::.A~.g..:.:...:.....:....:..:.. \> .:..Fait::> ......:;.;:::::.I~~...:..... Single Family 673 6,169 1,222 Duplex 29 498 119 Triplex 0 6 6 Fourplex 0 21 5 Total Buildings = 702 6,694 1,352 Percent = 8% 75% 15% 188 26 8,278 5 ~2 o 13 o 194 o 27 26 8,969 2% 0% 100% Source: Kitsap County Assessor's Office, 12/94. (6) Additions to Housing Stock Since 1990 The City had 15,693 housing units in 1990. Between 1990-1994, 369 net new housing units were added to the City's housing stock (after subtracting demolitions), for a total of 16,062 housing units. (Table G-9) " '.. .... . .. , . ., , ..., .. >... .. . table G-9. . ......:. . :.... ,. ..., .. ,.. . .. ... n'" ... .....Housing Ul1itetlange Since 1 g9bC.risus . . .. . ... ". " .. . ., . . , . . ..,,, "'.. . .... ... . J990..>< ... 1990-19sMUu1900;;1994 n U..1994 N8tl~1994 New .. 1~~i994 .... Ho 8'ng U.".it.. ...:....:. .... .......... ..Unlt. 8. .. ............. .. New Unitsu . .M......O....bii. Ho.m.. .....:/:. :.. :. . ...An... ..n.. ex. ed:. .. ..:.......... .....~un. it's...:.:..:....::.:. :.:.:.:.:. AdCledu .....n.mOlished .uSpeciar units . Qnits< 15,693 283 -94 189 15 178 16,075 Sources: Washington Office of Financial Management (OFM) (4/94); City of Bremerton Building Department (4/94); Bremerton Planning. Housing - Page 25 B. HOUSING RESOURCES The Bremerton Housing Authority (BHA) is responsible for the development and management of housing under various state and federal subsidy programs. BHA also operates 604 of the 730 public housing units in Kitsap County. There are approximately 3,800 households on housing assistance waiting lists in Kitsap County. The City also has various ordinances relating to the construction and upkeep of housing. For example, the City has developed a pro-active code enforcement program. This program has been very successful within the limits of scarce staff and financial resources. (1) Public Housing There are 604 households living in the BHA's public housing units. Of these, 287 are elderly, disabled or handicapped households. The largest public housing project in Bremerton is West Park, which has 555 units. In addition there are 27 units for the elderly at Searle Street, and 21 units for families at Tara Heights. No losses from the public housing inventory are anticipated at this time. (2) Section 8 Existing Units Subsidy Program The BHA receives 988 HUD Section 8 housing certificates and vouchers. These are distributed to households with incomes at or below 50% of the City's median income. About 500 of the voucher and certificate holders live in units outside of the Bremerton city limits but within a 5 mile radius of the city. BHA cites the large number of substandard units in Bremerton as the reason so many Section 8 holders have to rent outside of the city. The substandard units cannot pass HUD's Housing Quality Standards. (3) Section 8 New Construction Another 265 Bremerton households live in Section 8 New Construction units, and 38 households live in the Pinewood Manor Section 202 facility. Several of these projects are privately owned and operated. The contracts on two Section 8 projects in Bremerton -- Charter House and The Firs -- expired in 1993. The remaining five contracts will expire between 1996 and 2003. These units could potentially be taken out of the assisted housing inventory. The City has no information that would suggest any of the owners will choose to opt-out of the contract by not renewing. The Tamarack Apartments in Bremerton have a federally-subsidized mortgage and are thus restricted in the level of rents they may charge. If the owners ever choose to prepay their mortgage, they will be free to charge any level of rent they choose. Housing - Page 26 (4) Emergency and Transitional Housing The need for emergency and transitional housing is a county-wide need. The Kitsap County 1993 Housing Needs Assessment & Affordability Plan states that recent figures for the number of households and individuals turned away from Kitsap County emergency shelters indicate that at least 160 additional adult and family shelter beds are currently needed. The Plan recognizes that the number turned away does not count everyone actually in need. In particular, the Plan states that these figures underestimate the shelter needs of youth who seek help from friends rather than shelters. (Table G-10) (a) Emergency Shelters There currently are approximately 100 emergency shelter beds in Kitsap County facilities for the homeless, of which about half are in Bremerton. (b) Transitional Housing The purpose of transitional housing is to give families time to attend to financial and other needs before moving into permanent housing. KCAP provides 14 units of such housing in Kitsap County, of which two units are in Bremerton. Kitsap Community Action Program (KCAP) KCAP Single men Families 11 9 S1. Vincent de Paul Salvation Army Women and small children 8 Families 2 " " " ' ",. " .. , '" . Tr8ns!Uon81Iiousin~f(21o 24 month " 818yS) ." KCAP Source: Kitsap County 1995-2000 Consolidated Plan, November 1994 draft. Housing - Page 27 ......4~................EotURE.....HQUSING......NEE6s This section of the Housing Element provides an assessment of housing needs in Bremerton, including both present needs and needs anticipated as a result of planned growth over the twenty year planning period. It presents a demographic profile of the existing population. It includes an evaluation of the extent to which the existing and projected market can provide housing at various costs and for various income levels. It contains. an estimate of the present and future extent of households which require assistance to obtain housing they can afford. It also identifies existing programs and policies to promote adequate housing for households which cannot afford housing in the existing market and evaluation of their effectiveness. A. DEMOGRAPHIC PROFILE OF EXISTING POPULATiON This section contains an analysis of City population and demographic trends. It is based on information collected in a more detailed City of Bremerton Community Profile, contained in comprehensive plan Appendix G. This analysis is important for a broad understanding of the community and to anticipate future needs. Population and household size are key factorsi.Jsed to estimate the number of new housing units which will be needed during the next twenty year period. Income and age information help identify the types of housing which will be in demand. (1) Population Trends (a) The Past 50 Years Bremerton's population grew from 15,134 to 38,142 between 1940 and 1990 - an average increase of 9~5% every decade. However, this does not tell the whole story. Between 1940 and 1945 the population . exploded by 169% (from 26,966 to 72,500) due to World War II activity at the Puget Sound Naval Shipyard (PSNS). By 1950 it had plummeted by 62% (to 27,678), from which it steadily increased over the next 40 years to 1990. Approximately one third of the County's total population lived in Bremerton between 1940 and 1970. Since 1970 the City has accounted for a shrinking percentage of the County's population. The City's growth rate has correspondingly dropped. Between 1960-1970 Bremerton's population increased by 22%. However, between 1970- 1980 the City grew by only 3%. Between 1980-1990, Bremerton's population grew by just 5%, while Kitsap County's population grew 35%. Since 1990 Bremerton's population has fluctuated, from a high of 38,990 in 1992, to a low of 35,023 in August 1993. The most recent estimates put Bremerton at 35,920 on April 1, 1994, adjusted to 39,556 on November 30, 1994 to reflect population annexed (444) and recent military population counts (3,192). (Table G-11) Housing - Page 28 .... ... ,. ..., ......... ....,... ..... ......... .. ..... ......... ... -.... .. .... ....... .. .. ..... ................Ht~~~~~j...~~;~:I~~~1~C~~~~~j.~;~................. ........ .. .... . . ..... ...,..,..,. .. .... . .. ........ .j94Q/Hiso/...... ... ........... ...... 1940 1950 1960 1970 1980 1990 $ince>i990... .. 1991 1992 1993 1994 2/28/95 Adjusted Pop. 15,134 34.1% 27,678 12,544 36.6% 26,681 -997 31.7% 35,307 8,626 34.7% 36,208 901 24.6% 20.1% 37,040 -1,102 18.9% 38,990 1,950 19.00fc:, 36,380 -2,610 17.3% 35,920 -460 16.9% 40,801 +4,881 n/a Sources: Washington State Office of Financial Management U.S. Census of Population and Housing, 1980, 1990 (b) Source of Population Changes A trend is emerging for Bremerton to attract new residents who find they can live in Bremerton and commute to Seattle more cheaply than they can live in the Seattle area. This has been reflected by a slow but steady gain in civilian population over the last several years, as measured by new housing construction and annexations. However, fluctuations in military populations are by far the greatest influence on Bremerton's population. Bremerton's population can go up or down by 5,000 people overnight with the arrival or departure of a large aircraft carrier at PSNS. Even though Bremerton gained civilian population in 1994, its overall population dropped due to a corresponding decrease in Navy population. (Because of this pattern, Bremerton's estimated population is adjusted quarterly to account for fluctuations in naval personnel.) Housing - Page 29 (e) Proiected Population Chanaes Several forecasts have been made projecting Bremerton's year 2010 population growth: · Continuation of the 1980-1990 year growth rate (5.3%) · Puget Sound Regional Council (PSRC) "Existing Plans" . PSRC "2010 Vision 2 (22 Centers)" . PSRC "2010 Vision 1 (14 Centers)" . Adopted Kitsap County-wide Planning Policies 42,325 44,959 48,764 49,305 58, 142 The adopted Kitsap County-wide Planning Policies established a "working population forecast" for the County of 91,254 new people by year 2010 (280,985 total population). Of this growth, 20,000 (19%) was allocated to Bremerton (58,142 total population). The Kitsap County Regional Planning Council (KPRC) recently approved a revision allocating 20,000 population to Bremerton by year 2014. The forecast of Bremerton's housing needs is based on this allocation in order to be consistent with the Kitsap County Comprehensive Plan. (Table G-12) .... .... ... . ..n.. .... ...., . . . 'n ...... .. . .... ... .. .. ....... . . ". .... ....... .. ". ...... .. "...... . . ... . . b .G.. ...... . ...... ..... .......... .............. . . ..... ... ".., .,. ...... ... '..... ....... .... .... :::::.. ....:.):Ta Ie. -12::::::...:/:::. :.:>....::'. .::.:.:(.. ::::..}:::. . .. . . .... . . ..., . . ...... .... ... . .. . ... . . ......... . ..... ..,........ .. C!lY:of Breme~oneOpula1!9il Es,!!m~le(< ...:.:::.. . . . .... ... ....... .... . ......... ........... ' .......,. . n. ..... . ....., .. .... ..... ..... .. ......... '..,.. .." ............ ....,... .1990:.. ..:<1994....... :<.<2000....... . ... . n' Population Change Percent Change 38,142 38,142 o 0% 41 ,552 3,410 SOA> 46,292 4,740 11% 58,142 11 ,850 26% Sources: Years 1990-2000 - Puget Sound Regional Council (PSRC) "Existing Growth with Urban Study Area" forecast (3/93). Years 1994, 2000-2014 - Kitsap Regional Planning Council (KRPC) forecast (5/94) The allocation of 20,000 of Kitsap County's expected population growth to Bremerton anticipates a major change in "business as usual". The population projection anticipates that strong Growth Management policies will direct the majority of future growth to areas where urban services and facilities already exist or can be efficiently provided. Therefore the City's growth rate is projected to remain fairly low for the first six years of the planning period -- 1.3% per year per the Puget Sound Regional Council (PSRC) "Existing Growth without Urban Study Area" forecast. After year 2000 the City's growth rate is expected to increase dramatically as the effects of growth management begin to be seen. Housing - Page 30 The Population Forecast chart on the following page shows the projected population growth curve -- a gradual increase from 1990 to 2000, then a sharp rise reflecting the impact of strong growth management policies. (Figure G-1) (2) Household Tvpe and Size (a) Household Type While the total number of households in the City increased by 5% between 1980-1990, the number of households consisting of unrelated persons increased by 15%. Although the number of family households increased slightly (2%), the proportion of family households actually dropped (from 61% to 60%) during that time. (See Table G-13) The total number of family households increased by only 2% between 1980 - 1990. However, there was a 10% increase in single parent families and a 12% increase in female headed families. (See Appendix G) .. .. ... . .. ..." ." .. .... ..... .... .. ...,..:....:1~:.:'.. Family Households Nonfamily Households Total Households = 8,637 5,430 14,067 8,785 5,933 14,718 148 503 651 2% 9% 5% Notes: Family households = 2 or more related persons. Nonfamily households = single person or unrelated persons. Source: Census of Population and Housing: 1980, 1990. (b) Household Size Bremerton experienced virtually no change in the average size of households between 1980 and 1990 (from 2.31 to 2.34 persons per household). Still, the household size is smaller in Bremerton than in Kitsap County (2.6 pph), where the household size declined slightly between 1980-1990 (from 2.8 to 2.6 pph). (See Appendix G) Housing - Page 31 55 z 50 0 .. ~ " c: :.'l ::l ::3 0 ll. .c: 0 I- 45 ll. 40 Population Forecast: 1990-2014 City of Bremertori, Washington 60 35 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 1991 1993 1995 1997 1999 2001 2003 2005 2007 2009 2011 2013 YEAR I_ PSRCIKRPy Forecast I Years 1990-2000: Puget Sound Regional Planning Council.Existing Plans. Scenario (10/93) Years 2000-2014: Kitsap Regional Planning Council allocation (5194) Figure G-1 - Population Forecast: 1990-2014 (c) Future Trends Trends for the decreasing size of households are expected to continue. Bremerton's average household size in year 2010 is expected to be 2.2 persons per household (PPH), based on Puget Sound Regional Council (PSRC) forecasts. The estimated average household size for year 2000 (2.27 PPH) is mid way between the actual 1990 household size (2.34 PPH) and the projected 2010 household size. Housing - Page 32 Approximately 10,000 new households are expected in the City by year 2014. For the purpose of this Housing Element, all of Bremerton's 20.,000 new people are expected to live in .households., rather than "group quarters.. (In 1990 nearly 10% of Bremerton's population lived in group quarters, a high number that reflected the City's large navy population.) (Table G-14) ...., ' . ..... . . . .... ,-.,. ... .. . , .... . n'"'' . .... . ....... . ........ .... ....... ..... ........ ... . .. .... .....,.. ... .. ..... . n.. ..n.n ..... ...... ...... .....,.. . .. . ....... .... .......... .... . ........, ... .. .. --...... .... ......,., ..... .. ........, ... . ....... ... .......... .. .. ............ ..... ....... .......... .. ......, .. ....... ...... .... .. ...... . n.. ...._......... . ".. ..... .. .. ..... .... .<\>}>><>.... .<?... ... .....181:)1eO-14/ .... .>?i)> ......q...... . .,.... p-,- ........."....... ........... . ..................... .. . ..>.... ...Pppqliitlon.6~ttotl$ehoj~~~e;'~Qt:~Q1~. . .......,.. . ,...... . ....,. .... ...... ...... ......... . .. .. ...... ... ..... .. ..... .... . . . ....... .... .. ...... ... ,.. .. n. ...... .... .,... ...... .. . ........., . .. n". n. ........ ,. .. ... ...1990>( . 2000>..... ............N.wn>~014 .. .?New.. ..Tot1ifNeW.< T etal Population 38,142 41,552 3,410 58,142 16,590 20,000 . Population in Group 3,750 3,750 0 3,750 0 0 Quarters . Population in Households 34,392 37,802 3,410 54,392 16,590 20,000 Total Households . 14,718 16,876 2,158 24,724 7,848 10,006 Average Household Size = 2.34 2.24 2.20 Sources: 2014 - Kitsap COllnty-wide Planning Policies, as amended. 2000 - Puget Sound Regional Council "Existing Plans" Forecast (10/93), adjusted for Bremerton City. (3) Age Composition Bremerton has a relatively young population, with 50% under age 30, compared to 44% for Kitsap County as a whole. It also has a greater proportion of seniors (over 65) and potentially frail elderly (75 and over) who may need special services. The age structure of the population is important because different age groups tend to demand different types of housing and supportive services. The proportion of children under 18 is lower in the City (24%) than in the County (28%). Still, between 1980-1990 there was an increase in the proportion of children under 15 (from 19% to 21 %) and persons age 35-44 (up 49%). This shows a trend of more young families locating in the city for affordable housing. The proportion of persons age 20 to 29 is much higher in the City (26%) than in Kitsap County as a whole (16%). This probably reflects Bremerton's high military population and its lower housing costs. Housing - Page 33 The proportion of seniors is also greater in the City (14%) than in the County as a whole (11%). The population of the city is aging, with an increasing number of persons over 75. The elderly require special consideration in planning housing, transit, and social services. At the same time, a larger retired population will contribute transfer'payment dollars, but will not require employment opportunities. The decline in young persons is probably related to fluctuations in naval personnel. These figures also reflect national trend$: the aging of the "baby boom" (ages 25-44 in 1990); the emergence of the "baby boomlet" - the children of baby boomers (ages 0-15); and the increase in Iqngevity (ages 75 + ). (See Appendix G) (4) Household Income The median household income in Bremerton was $22,610 in 1990. This was 9% less than the median household income in Kitsap County. However, median family income was 9% higher in Bremerton, and per capita income was 34% higher than in the County as a whole. Even though Bremerton household incomes are relatively low, its higher proportion of single or unrelated person households gives it a higher income per person. (Half of the households/families have a higher income than the median, and half have a lower income.) (Table G-15) .. n.. . . , . . ...TableG-t~ ... ... . I .... . ".1..9..9"0" .. ... ncol11e: ........ .. .. ... ...... .. .. 'n' ...., .... . ..., . .... n. ........... .... . .. .. ...... . ..... ....n n. n' . ...... n. .... ..... . . ......... ,.. ... ,....,. .. 'n ..... .. ...... ..... ......kit~~p eo~r.w . ...Brem~on }. .... .biff.~nce} . ...... .jit.i-CjhF/.... .... :::::):';::: \ .:..:~~~j~~:;O'=~'.~~~~~;;'::,:,-:-:: Median Household Income $24,740 $24,296 $8,493 $22,610 $26,423 $11,418 -2,130 2,127 2,925 -SOA, 9% 34% Median Family Income Per Capita Income Source: 1990 Census of Population and Housing - Summary Tape File 3. Income levels are an indication of the buying power of future households and are important in determining the type of housing needed for the projected population. Income levels affect the type of housing, the size of units, and the size of lots to plan for. The proportion of households in low, moderate and upper income groups is a basis for projecting numbers of housing units that need to be affordable to different income groups. The income categories used in this analysis are used in various federal and state assistance programs (listed below). All references to "low income" in this analysis include the "very low. and .extremely low" categories -- all incomes below 80% of the median income for Kitsap County. Housing - Page 34 . Extremely Low -- at/below 30% of median . Very Low -- between 31% - 50% of median . Low -- between 51 % - 80% of median . Moderate -- between 81% - 95% of median . Middle -- between 96% - 120% of median . High -- Greater than 120% of median The following discussions contrast low income persons and low income households in the City with those in Central Kitsap and- in the County as a whole. "Low income" refers to incomes less than 80% of the County median income. (a) Low Income Persons Overall, an estimated 49% (16,450) of the people in Bremerton households in 1990 were considered low income. In contrast, about 34% (57,141) of persons living in households in Kitsap County as a whole, and 22% (6,590) of Central Kitsap persons in households were considered low income.6 (See Appendix G) (b) low Income Households Half (7,341) of the households in Bremerton were estimated as low income in 1990. In contrast, 34% (23,762) of the households in the County, and 22% (2,517) of the households in Central Kitsap were below 80% of median income in 1990.7 (See Append!x G) These household figures are the basis for projecting numbers of housing units that need to be affordable to different income groups. The number and percent of low income households differs from the number and percent of low income population because household sizes vary among income groups and areas of the County. (c) . Proiections of Households by Income Groups . . If 1990 income distribution were to remain constant, the City would have over 13,000 low income households by year 2014. This would be an increase of nearly 6,000 low income households over the next 20 years. This projection assumes a decreasing family size (Table G-14), but does not take into account possible changes in age distribution, family type, or other variables. (Table G-16) . 6Source: Table 6, Kitsap County 1993 Housing Needs Assessment & Affordability Plan. 7Figure 2, Kitsap County 1993 Housing Needs Assessment & Affordability Plan, p. 9. Housing - Page 35 Low Income (80% of median 7,341 50% 9,275 12,137 13,214 and less) Moderate Income (81% to 3,348 23% 4,267 5,583 6,078 120% of median) Upper Income (over 120% of 4,048 27% 5,009 6,554 7,136 median) Total = 14,737 1 ()()O~ 18,551 24,274 26,428 Source: 1990 - Figure 2, Kitsap County 1993 Housing Needs Assessment & Affordability Plan 2000-2014 - Bremerton Planning B. PROJECTED HOUSING NEEDS This section projects the amount and type of housing that will be needed by 2000 and 2014 -- years 6 and 20 of the planning period -- based on trends in population size, household type, and other factors identified in the preceding section. (1) New Household Formations The City will need housing for 10,006 new households in the next 20 years. (Table G-13) . By year 2000 there will be 2,1.58 new households -- an average increase of 360 households per year over the next six years. · Between 2000-2014 there will be 7,848 new households -- an average increase of 561 households per year over 14 years. (2) Adiusted Projections of Housing Needs Roughly speaking, each projected new. household creates a need for one additional housing unit -- 10,006 new households will need 10,006 new housing units. However, this estimate needs to be adjusted to take into account the existing housing unit supply, vacancy rates, and housing conditions. (Table G-15) Housing - Page 36 (a) Housing Unit Supply As of 1994, Bremerton had 16,075 housing units for 14,718 households -- a surplus of 1,357 units.8 (Table G-4) Therefore the City will need 8,649 new housing units by year 2014. . By year 2000, the City will need 801 new units. . By 2014, the City will need an additional 7,848 units. (b) Vacancy Rate A healthy housing market requires about a 5% surplus of housing in order to provide reasonable housing choices.9 Therefore, the number of new housing units needed should be increased by 5%. To maintain a 5% vacancy rate by year 2014, an additional 432 units will be needed. . 40 units will be needed by year 2000. . An additional 392 units will be needed by 2014. (c) Replacement or Rehabilitation The Kitsap County Assessor's Office has rated the condition of 230 (2%) of Bremerton's single family, duplex, triplex and fourplex buildings as "very poor" (abandoned or of questionable habitability) or "poor" (substantial deficiencies). (Table G-7) This backlog of substandard housing will need to be replaced or rehabilitated in the next 20 years. In addition to these existing substandard units, additional units can be expected to become substandard each year. A rule of thumb is that, based on typical survival rates of existing housing stock, 2% of units at least 25 years old will become substandard each year.1O The estimate of units to be replaced or rehabilitated is based on the following assumptions: Bin 1990 there were 14,718 households in Bremerton. Since 1990 the number of households has ranged above and below the 1990 figure. Therefore, the number of households in 1990 is used for planning purposes, consistent with the Kitsap Regional Planning Council population forecast, which uses the 1990 population for 1994. (Table G-13) 9The 1994 surplus of 1,357 units represents a vacancy rate of 9.2%. This is consistent with the 1 ()Ok vacancy rate found by a State Office of Financial M'anagement (OFM) survey in April 1994. 10Small Communities Guide to Comprehensive Planning, Washington State Department of Community Development, June 1993, pg. 147. Housing - Page 37 · A backlog of 194 units rated "poor" or "very poor" must be rehabilitated or replaced in the next 20 years -- an average of 10 per year. · An additional 240 hou'sing units are expected to become substandard each year (2% of 11,990 units built before 1970).11 Therefore, the replacement or rehabilitation of 250 units per year will eliminate the current backlog of substandard housing and address the units becoming substandard between 1994 and 2014. · Of the 250 substandard units, 31 (12.2%) are expected to be unfeasible to rehabilitate, and therefore require replacement each year -- a total of 620 units over 20 years.12 (d) Projected Housing Unit Needs The City will need 8,837 net new housing units by year 2014 after adjusting for the existing housing unit supply, vacancy rates, and housing conditions. (Note that, while there will be 10,006 new households, fewer new housing units will be needed because of the current surplus of housing.) (Table G-t7) · A total of 947 new units will be needed by year 2000 -- 158 units per year for six years. · An additional 7,890 units will be needed by year 2014 -- 564 units per year for 14 years. 11 Source: 1980 U.S. Census of Population and Housing (figures not available from 1990 census). 12This forecast assumes continuation of the existing proportion (12.2%) of all substandard units (230 units) rated as 'very poor". 'Substandard units' are those classified as 'poor" or 'very poor" by the Kitsap County Assessor. Housing - Page 38 .. ." ...... ....... .... ...... ....... ..... ............... ...... . ........ ..... ...... ...... .. .... ...... . ..... ......... ......... ......2000.......... ....... .... ... .. ...... ..... ... ... ........ ... ... ....... .. :-:-::"':-::::::::::" . ..:.:.... . . . . . . . . . . . . . . ...... .. .. .. ....1~~~14.. . 16,075 24,724 ... .j:~~g~;,g~~1'~@Ji;il:;~~: 16,075 16,876 7,848 - Vacancy Rate Units (x 5%) -68 40 392 432 - Replacement Units (31/year) nja -186 -434 -620 Total SurplusjDeficit (Units) = 1,289 -947 -7,890 -8,837 UnitsjYear = nja -158 -564 -442 Source: Bremerton Planning (3) Housing Type Mix A gradual trend away from single family homes and towards multi-family housing can be expected in the future as older single family areas are converted to multi-family use, housing costs rise, and the population ages. While an increase in manufactured housing is anticipated, most units are expected to meet City requirements for location on individual lots. This forecast assumes a 5% increase in multifamily units (from 39% to 44%) a corresponding decrease in single family units (from 59% to 54%), and 1% (no change) in manufactured homes in developments by year 2014.13 (Table G-3) . Of the 8,837 new units needed by year 2014, the City will need 4,772 single family units, 3,888 multi-family units, and 88 manufactured homes in developments. (Table G-17) 13Manufactured housing which meets certain zoning ordinance standards is allowed on individual lots in four residential zones. Other manufactured housing is permitted in Manufactured Home Developments. (See "manufactured home" in Comprehensive Plan Glossary. Housing - Page 39 .... .... , ... .......... ... ... . .... ........,. ...... ..."...... ...... .... >< Multi~lamlly ... . .. .. . ..... .. ....... ... ... ". .. ....... .... ... ...".. ..... ..... .. . ...... ........ ..." ... .... ...... i..l1!nUfa~ut$dH()m..i<.. .......... <in l)eYejopmEtn~". 88 . .. . .....,. .. .... .. ..." .... .... . ... . ............., .............. .". ........ .., ., ..... ....", . ... . . ..... ....,. .... . . .. .......>... .Tabl.(t.1S...... ...i>....... . .... . .,... .. ....... .....Q~:#j.ingUni(j'.ypeS:j99~2d14.. Units 4,772 54% 3,888 Percent 44% 1% Source: Bremerton Planning. C. NEEDED PUBLIC FACILITIES AND SERVICES New residential units will need water, sanitary disposal, solid waste disposal, transportation, electric, gas and telecommunications services. In addition, existing facilities such as schools, fire protection and. police protection will need to be evaluated to ensure that they can handle the additional demand. The condition and capacity of public facilities and services is detailed in the Transportation Element and the Capital Facilities Element. The analysis of the capacity of public facilities and services has been adjusted to reflect the anticipated changes in housing. The schedule for financing such services is in the Capital Facilities Element. D. LAND AVAILABILITY This analysis examines all of the land that is available for residential land uses under the current zoning and development ordinances. . This provides an estimate of the City's ability to meet its housing needs. (1) Available Residential Land The 1994 Bremerton Comprehensive Plan Land Use Inventory and Build-out Analysis identified 2,906 acres of residentially zoned land within the City. Of this total, 1,566 acres (54%) is in residential use and 1,340 acres (46%) is vacant or underutilized -- developed at less than permitted densities. (2) Build~Out Capacity of Residential Land Over three fourths (76%) of the available land is zoned for single family use; 5% for duplex use; 17% for multi-family use; and 0.9% for manufactured home developments. There is also an undetermined capacity for residential development in several non-residential zones in which the number of units may be determined through design standards rather than density limits. We have estimated what we feel to Housing - Page 40 be a reasonable amount of residential development within those areas during the 20-year planning period. Since these are primarily commercial zones, residential will not be the "highest and best use" in most cases, and the estimates are not intended to reflect the maximum residential potential within these zones. In addition, there is an undetermined capacity for manufactured home developments, since these developments are allowed in five of the City's eight residential zones as Planned Unit Developments (PUDs). If developed at currently permitted densities, Bremerton can accommodate 13,162 new housing units -- 8,432 units on vacant land and an additional 3,500 units in non-residential zones and targeted redevelopment areas. . For purposes of this Comprehensive Plan, Bremerton has a residential capacity of 12,679 units, consisting of 6,999 single family units, 5,640 multi-family units, and a maximum of 40 manufactured homes in developments. (Additional manufactured homes developments can be permitted as PUDs.) (Table G-19) (3) Additional Residential Land Use Needs The available residential land is more than adequate to meet the projected housing need for single family and multi-family units. Although it falls short of the manufactured home development needs by 48 units, this need can be met under zoning ordinance provisions which allow manufactured home developments in four residential zones as Planned Unit Developments (PUDs). (Table G-19) . .- .. .. . . ." . . ".. ......., ",. . . . . ,.... ... , ,.. ........ .. . .. .... .... ... T" b' ..1.......0 19..... .. .... . . ..... ........ .. ....... Cl..ef . ~/<<'. ..... . . Fl~idential4\~cfAvail~billty (UnitS) ........ . ,. .... " .. . . .. ...n , ... . . ... .,.." . ...... .., ,., .... , . . 'Mi.dti~farriily .' '.' ManiJf!~ure<ftlorne. . . Total .in 04ih,elopmenta Capacity Demand Surplus/Deficit = 6,999 4,772 2;227 5,640 3,888 1,752 40 88 12,679 8,748 3,931 n/a* * NOTE: Since manufactured home developments are allowed as PUDs in five of the City's residential zones, they will be able to make use of the surplus capacity of residential land. Source: Bremerton Comprehensive Plan Land Use Inventory and Build-out Analysis, Bremerton Planning, 1994. Housing - Page 41 E. HOUSING AFFORDABILlTY The issue of housing affordability is a county-wide issue. The availability of affordable housing is a draw to lower income households. A lack of affordable housing can force people to live farther from their jobs than they might otherwise like. In Bremerton's case, the availability of a large stock office affordable housing has resulted in disproportionately larger numbers of low income people living in the City. In contrast, Bainbridge Island, where housing prices are much higher, has a much lower proportion of low income people. (However, it should be noted that Bremerton might have even more lower income households if more of its housing stock qualified for Bremerton Housing Authority HUD certificates and vouchers.) (1) Kitsap County Needs Assessment and Affordability Plan The Kitsap County 1993 Housing Needs Assessment and Affordability Plan identifies several affordable housing strategies, including: 1. Establish Housing Goals: Each jurisdiction should consider working with the Kitsap Regional Planning Council to set long term housing goals by 1995 and work to meet them by the year 2010 through the accomplishment of five year housing development programs. . . Our analysis of housing needs for 2010 presented two extreme options for determining 'fair shares.' One is working toward a uniform Dercentage of low income housing throughGut the County and cities and the other is maintaining the current percentages in each area. . . The latter continue the present inequality of housing burdens and opportunities among Kitsap communities while uniform percentage option ignores capabilities of many low income families, These families often make use of public and private social services but do not have dependable automobiles to reach service agencies and businesses. Thus any goals for distributing low-income housing more 'fairly,' should respect these families need for access to services and facilities in the cities. 14 (2) Kitsap County Consolidated Plan The Kitsap County Consolidated Plan has been developed to satisfy federal Department of Housing and Urban Development (HUD) requirements for participating in the Community Development Block Grant (CDBG) and HOME programs. The Consolidated Plan addresses three statutory goals, principally for low- and very low", and extremely low income residents: 1. Provide decent housing 2. Provide a suitable living environment 3. Expand economic opportunities 14Kitsap County 1993 Housing Needs Assessment & Affordability Plan, pg. 69. Housing - Page 42 The plan includes: an assessment of housing and homeless needs for the next five years; an analysis of Kitsap County's housing market; a discussion of the County's strategies, priority needs, and objectives for housing and community development activities; and an action plan that describes the activities Kitsap County will undertake to address priority needs during the next program year. The Consolidated Plan complements existing local planning policies which are under development in the County and all of the County's municipal jurisdictions as required by the State Growth Management Act. The plan lists the five general priority needs: 1. Increase the availability and afford ability of safe and decent rental housing for households earning 80 percent of median income or less. 2. Increase the supply of housing units available to homeowners through rehabilitation of substandard units and construction of new units. Assist first-time homebuyers to become owners. 3. Support a continuum of housing and related services for homeless people, and forestall further homelessness through prevention activities. 4. Promote a continuum of housing and related services for people with special needs such as frail elderly and persons disabled by sickness or injury. 5. Provide support, for non-housing activities, to communities and non- profit organizations for economic development, public facilities, public services, and planning activities which primarily benefit low income persons. (3) Kitsap County Housing Element The adopted Kitsap County Housing Element estimates additional. housing needs by year 2014 using straight-line projections from the Kitsap Regional Planning Council's countywide population forecast. The County forecast assumes no change in average household size, even though the trend has been downward for several decades. The Housing Element warns that "these projections are therefore slightly conservative since shrinking households would generate housing needs greater than the figures projected". The Element concludes: Overall, approximately 36,000 new housing units will be needed for the year 2014. Of this amount, approximately 23,000 will need to be owner- occupied, and approximately 13,000 will be renter occupied. Single family residences will be the bulk of the new units, with almost 25,000; multi-family will need approximately 7,000 units, and mobile units will need almost 5,000. . . Housing - Page 43 Approximately 12,500 units of the 36,000 total units for the year 2014 will need to be for low income households. If these housing units were added in proportion to where low income families currently live, most of it would be located in Bremerton, Port Orchard and Poulsbo. Conversely, if these units. were shared equally at the current county- wide proportion of low income families, 34 percent everywhere, most of the units would go into the unincorporated areas of the county and Bainbridge Island. In this scenario, Bremerton, Port Orchard and Poulsbo would actually lose low income households and housing. These two scenarios differ because unincorporated Kitsap and Bainbridge Island have lower proportions of low-income households than the county as a whole.15 Consequently, the Kitsap County Housing Element includes the following policies: 14. Allow and make provisions for its fair share of projected special needs and low and moderate income housing. The Housing Needs Assessment and Affordability Plan has identified areas in unincorporated Kitsap which should receive a higher percentage of low and moderate income households. 16 24. Participate in and support Kitsap Regional Planning Council process to identify and adoption of [sic] regional fair share - housing goals. Participate and support evaluation of these adopted fair share housing goals. (4) Forecast of Affordable Housing Needs The Kitsap County 1993 Housing Needs Assessment & Affordability Plan projects the need for affordable housing by year 2000 under two scenarios: 'current percentages" and "uniform percentage" (described above in section (1). Under the first scenario, Bremerton would need 2,050 additional affordable low income units; under the second, the City would have a surplus of 894 units -- a spread of 2,944 units. (Table G-20) 15Kitsap County Draft Comprehensive Plan, Part III, Housing Element, September 1994, pg. 21. 16rhis statement appears to refer to the Kitsap County 1993 Housing Needs Assessment and AHordability Plan statement: ....North and Central Kitsap and Bainbridge Island have lower proportions of low-income households than the county as a whole.. (- Pg. 37) Housing - Page 44 . ... . .... .. .. .... . .... .. ... .............. ...... .......... . ..... ... ... . .... ..... ... ..... .. .. .......... .. .... ... . ............ ..... ...... .................. ............. . .. .......... ... ........ . ............. ..... . ......... ........ . ..... . .. ...... . ... ... ...... ... . ...... . ...... .............. ........ ............ . .... ... ...... .. ....... .. ........ ... ....... . ..... .... ......... ....... .... ....... .n}. . ............. ..ii<.. ......>T.bJ.f(l.;20 . ..C .)i . . i.. ...<<}... . .... ..~_Aff9r~'~~~9,ilric~rheft9.9$iij9fJ.~idt;,Y>~09><... .. ...... ......... .. .... . ......... ....... .... ..... ...... .. .... ..... . ...... . .. ......... ..... ...... ...... ... ............. . . ................. . ............. . .... . ... . ........ . ....... ............... . . ,..... .. .... ..... ...... .. ... . .. ......... ... ....... ..... ....... .. ... ..... .. ~~~. ... . ..<4iW(~()f. . <..... ~!r.iI. (E}1"'~ .\ ...... <.ppp~(()y.< >m:~~'U:)~~~~) .>....... 1~<>fnC'lcnarl /~<~.::,!:i~n Current Percentage Uniform Percentage Difference = 2,050 -894 2,944 935 870 65 1,130 4,139 -3,009 4,115 4,115 o Source: Kitsap County 1993 Housing Needs Assessment & Affordability Plan, pp. 37-38. The first scenario would unfairly perpetuate the existing disproportionate concentration of low income housing in Bremerton. The second would call for upgrading of 894 units to moderate or upper income housing over the next six years -- an average of 149 units per year. While it stops short of endorsing the "uniform percentage" scenario, draft Kitsap County Housing Policy #14 appears to endorse the need for a higher percentage of low and moderate income housing in the unincorporated parts of North and Central Kitsap. Policy #24 indicates that the County will work with the cities through the KRPC process to determine regional fair share housing goals. ... Housing - Page 45 ... Housing - Page 46 .~ Bremerton Comprehensive Plan CAPITAL FACILITIES ELEMENT Prepared by: BREMERTON PLANNING Adopted: April 5, 1995 H Bremerton Comprehensive Plan ELEMENT H CAPITAL FACiliTIES Part 2 of 2: Capital Facilities Program CONTENTS Page 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1 A. AUTHORITY ............................................ .. 1 B. OVERVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . '. . . . .. 1 C. DESCRiPTION............................................. 2 D. BACKGROUND . . . . . . . . . . . . . . . . . . . . . ~ . . . . . . ~ . . . . . . . . . . . . . .. 4 E. SCOPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 4 F. PURPOSE AND INTENT ..................................... 6 G. DEVELOPMENT AND AMENDMENT PROCESS. . . . . . . . . . . . . . . . . . .. 7 2. CAPITAL FACILITIES PROGRAM (CFP) . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 8 A. FIRE AND EMERGENCY MEDICAL SERVICES. . . . . . . . . . . . . . . . . . . . . 10 B. LAW ENFORCEMENT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19 C. PARKS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 D. SANITARY SEWER. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .40 E. SCHOOLS ............................................... 51 F. STORMWATER ............................................ 61 G. TRANSPORTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66 H. WATER.................................................. 69 LIST OF TABLES Table Page CFP-1 Types and Providers of Capital Facilities ............................... 9 EM-1 Inventory of Existing Facilities -- Emergency Medical Services. . . . . . . . . . . . . .. 10 EM-2 Twenty Year Need: EMS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 12 EM-3 Six-year Funding and Projects -- EMS ........................ . . . . . . .. 13 FP-1 Inventory of Existing Facilities -- Fire Protection ......................... 15 FP-2 Twenty Year Need: Fire Protection Apparatus .......................... 16 FP-3 Six-year Funding and Projects -- Fire Protection . . . . . . . . . . . . . . . . . . . . . . . .. 18 LE-1 Inventory of Existing Facilities -- Law Enforcement ....................... 19 LE-2 Level of Service -- Law Enforcement Officers ........................... 21 LE-3 Future Need -- Law Enforcement Officers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 LE-4 Future Need: Law Enforcement Buildings ............................. 22 LE-5 Future Need: Law Enforcement Building Area .......................... 23 LE-6 Six-year Funding and Projects: City Hall/Fourth Street Building Improvements .. 25 LE-7 Six-year Capacity Balance Sheet: Law Enforcement. . . . . . . . . . . . . . . . . . . . . . 25 PK-1 Inventory of Local Parks ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 PK-2 Inventory of Regional Parks ....................................... 31 PK-3 Inventory of Open Space ......................................... 31 PK-4 Summary Inventory: All Park Lands . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 PK-5 Level of Service (LOS): All Park Lands . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 PK-6 Analysis of Local/Regional Park LOS ................................ 33 PK-7 Future Need: Parks ............................................. 34 PK-8 Year 2000 Recommended Level of Service: All Parks. . . . . . . . . . . . . . . . . . . . . 36 PK-9 Six-year Funding and Projects: Parks ................................ 37 PK-10 Six-year Capacity Balance Sheet: Parks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 SS-1 Inventory: Wastewater Treatment Facilities. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 SS-2 Bremerton Wastewater Treatment System Service Area Capacity ............ 41 SS-3 Comparison of City/County Estimates of Sanitary Sewer Service Area Population 43 SS-4 Comparison of City/County Estimates of Wastewater Treatment Plant Demand . . 44 SS-5 Future Need: Sanitary Sewer ...................................... 46 SS-6 Six-year Funding and Projects: Sanitary Sewer ......................... 48 SS-7 Capacity Balance Sheet Sanitary Sewer .............................. 49 SC-1 Inventory of Existing Facilities -- Bremerton School District . . . . . . . . . . . . . . . . . 52 SC-2 Bremerton School District Capacity (Summary) ......... ~ . . . . . . . . . . . . . . . 53 SC-3 Level of Service -- Bremerton School District ........................... 54 SC-4 Bremerton School District Population & School Enrollment . . . . . . . . . . . . . . . . . 55 SC-5 Enrollment Projections ........................................... 55 SC-6 Projected Facility Needs and Costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56 Bremerton Comprehensive Plan CAPITAL FACILITIES ELEMENT Part 1 of 2: Capital Facilities Plan Prepared by: BREMERTON PLANNING Adopted: April 5, 1995 Bremerton Comprehensive Plan ELEMENT H CAPITAL FACiliTIES Part 1 of 2: Capital Facilities Plan CONTENTS Page 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1 A. AUTHORITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1 B. OVERVIEW OF CAPITAL FACILITIES ELEMENT. . . . . . . . . . . . . . . . . . . . . . .. 1 C. DESCRIPTION ................................................ 2 D. BACKGROUND ............................................... 4 E. GROWTH MANAGEMENT ACT REQUIREMENTS. . . . . . . . . . . . . . . . . . . . . .. 5 F. SCOPE...................................................... 6 G. PURPOSE AND INTENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 7 H. DEVELOPMENT AND AMENDMENT PROCESS ; . . . . . . . . . . . . . . . . . . . . . .. 8 2. PLANNING FRAMEWORK. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 10 A. GROWTH MANAGEMENT ACT GOAL .................. . . . . . . . . . . .. 10 B. VISION 2020 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 10 C. COUNTY-WIDE PLANNING POLICIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 11 3. GOALS AND POLICIES ............................................. 13 A. GOAL...................................................... 14 B. ADEQUATE PUBLIC FACILITIES AND SERVICES. . . . . . . . . . . . . . . . . . . . .. 14 C. FUNDING FOR CAPITAL FACILITIES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 17 D. PROGRAMMING FOR CAPITAL FACILITIES ......................... 18 E. MAINTENANCE OF CAPITAL FACILITIES ........................... 21 4. IMPLEMENTATION STRATEGIES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 27 A. ADEQUATE PUBLIC FACILITIES AND SERVICES. . . . . . . . . . . . . . . . . . . . . . 28 B. FUNDING FOR CAPITAL FACILITIES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 C. PROGRAMMING FOR CAPITAL FACILITIES ......................... 29 D. MAINTENANCE OF CAPITAL FACILITIES ........................... 30 E. ECONOMIC DEVELOPMENT AND NEIGHBORHOOD REVITALIZATION ..... 30 F. CAPITAL FACILITIES LOCATION AND DESIGN ....................... 31 G. URBAN GROWTH AREA. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 H. IMPLEMENTATION STRATEGIES SUMMARY ........................ 31 LIST OF TABLES Table Page CF-1 Capital Facility Level of Service Standards - Long Term .................... 15 CF-2 Capital Facilities Plan Implementation Strategies Summary . . . . . . . . . . . . . . . . . . 32 LIST OF FIGURES Figure Page · Strategies...................................................... 27 · Plan/Program Relationship . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 Bremerton Comprehensive Plan ELEMENT H CAPITAL FACiliTIES Part 1 of 2 -- Capital Facilities Plan . . . '" .. .". . '1.~II\JTROPl..1CfION"" .' This Capital Facilities Plan document is the first of two documents that make up the CAPITAL FACILITIES ELEMENT of the Bremerton Comprehensive Plan. A. AUTHORITY The State of Washington Growth Management Act of 1990 (GMA) requires that the City of Bremerton develop a comprehensive plan which contains several elements, including a "capital facilities plan element". The long-range Capital Facilities Plan and the short-range Capital Facilities Program make up the capital facilities element requireq by the GMA. This CAPITAL FACILITIES ELEMENT was developed under the direction of the City's Planning Commission and adopted as an element of the City's Comprehensive Plan. The element was developed pursuant to the authority conferred by the Washington State Constitution; the Revised Code of Washington, Chapter 36.70A; and Chapter 2.12 of the City's Municipal Code. B. OVERVIEW OF CAPITAL FACILITIES ELEMENT The CAPITAL FACILITIES ELEMENT is organized into two documents, which contain the following sections: Part I - Capital Facilities Plan 1. INTRODUCTION -- Includes authority, overview, description, background, GMA requirements, scope, purpose and intent, and development and amendment process. 2. PLANNING FRAMEWORK -- Lists applicable GMA goals and regional policies with which the CAPITAL FACILITIES ELEMENT must be consistent. Capital Facilities Plan - Page 1 3. CAPITAL FACILITIES PLAN -- A long-range policy plan containing guidelines for capital improvements. Part II - Capital Facilities Program (CFP) 1. INTRODUCTION -- Includes authority, overview, description, background, GMA requirements, scope, purpose and intent, and development and amendment process. 2. CAPITAL FACILITIES PROGRAM -- Includes an inventory of capital facilities, a forecast of future capital facility needs, and a six-year finance program for capital facilities. C. DESCRIPTION The CAPITAL FACILITIES ELEMENT will guide public decisions on the use of capital funds. It will also indirectly guide private development decisions by providing a strategy of planned public capital expenditures. The element consists of two parts: a long-range Capital Facilities Plan and a short-range Capital Facilities Program. . Part 1 -- The Capital Facilities Plan is a long-range policy plan containing the City's main guidelines for capital improvements. It contains policies and strategies for adequate public facilities and services, funding, programming, maintenance, economic development and neighborhood revitalization, location and design, and the urban growth area. The plan provides the long-range policy guidance to develop and provide direction for the Capital Facilities Program. . Part 2 -- The Capital Facilities Program (CFP) contains an inventory of existing and proposed capital facilities, forecasts future needs for facilities, and identifies deficiencies in capital facilities and the actions necessary to meet such deficiencies. The program also provides the GMA-required six-year finance plan. The finance plan contains funding and scheduling of individual projects for all capital facilities including transportation and utility facilities. Detailed financial plans of outside agencies and special districts are included by reference. The CFP is under separate cover to facilitate an annual update of the six-year finance plan. The CAPITAL FACILITIES ELEMENT is consistent with the other elements of the Comprehensive Plan, as required by the GMA. Part 1 of the element -- the Capital Facilities Plan -- contains goals, objectives, and policies which are consistent and compatible with statewide planning requirements, goals and policies, with the regional goals and policies adopted by the Puget Sound Regional Council under Vision 2020, and with the Kitsap Countywide Planning Policy. Part 2 -- the CFP -- contains a six- year work program to implement the Land Use, Housing, and Transportation Elements of the Comprehensive Plan. Capital Facilities Plan - Page 2 Relationship Among Capital Facilities Element's Policy Plan, Capital Facilities Program, and City Budget April through July: . ..... .. . . . . Ay.~t. . . ... .... n.. .. n_""__" n. . n. .. ". .. ....-..--. o .. ... .... un..__ ....... .. n. . ..... . ....... ... n_ .. . u.. n_ ....... .... .. . n...... n' .. . . , . "... ..... . . . .. --.. .. .......... n .. ........., ... .. ..... ".. .... ...... "se... .. ...b........... . . .)\.ll.tem err) Policy Plans Land u. Plan Programs Budget Capital Fadllties Plan Agencies' Capital Improvement Programs . Invemariea . Service Level . Capacity . Funding . ConcurreDCY . Surplus I Deficits . Capital Budgeting ~ PIlb WIII:Z mo=iG 5cWOf $d>oOII Tnu& UbrII1 !'ire fIlMS Police a-;., 0. TeJepbClle w_ Se...,. ~Uon .. L.m4 Ute .k TrmIp<KUtIon . MIllIimoda1 . i!.ImramIo1II: . Pmltizl( Road. Trmwit ".3;... . ,".. . ..~..... .. .......... Capital Budget ( ) Capital Facilities Program Summary City's Operating Budget . Salaries Project Revenues " Expendltures Figure CFP-1 Capital Facilities Element Timeline Capital Facilities Plan - Page 3 D. BACKGROUND Making the most of limited financial resources for capital improvements is a challenge faced by cities everywhere. In every municipality, many different proposed capital improvement projects are competing for these funds. No community has enough money for all the capital projects it would like to undertake. Elected officials want to make cost effective decisions and at the same time ensure a high quality of life for the citizens they represent. Officials are concerned about the efficient use of existing capital infrastructure and achieving the optimum leverage from the investment of public dollars for capital improvements. Capital facilities planning presents the opportunity to evaluate community needs and financial resources together so that community improvements can occur logically, within the jurisdiction's ability to pay for these improvements. Capital facilities planning and programming involves the scheduling of necessary physical improvements for a community based on its needs, policies and priorities and on its overall financial capability. Capital facilities planning is a tool to help implement the overall objectives of the city. The strategic use of limited capital facilities funds can implement land use plans, generate desired development, improve neighborhoods, enhance livability, improve service delivery and maintain quality infrastructure. Capital facilities planning provides the necessary link between comprehensive planning and the allocation of capital dollars. It links fiscal planning and budgeting with land use planning, transportation planning, economic development, environmental protection, community housing improvement plans, and infrastructure development and improvement. In aging cities, planning for capital facilities also needs to include the replacement of older capital stock and the scheduling of facility maintenance. Historically, comprehensive plans have contained discussions of the costs and financing required to implement the plan's public works proposals. The concept of programming capital improvements developed out of the need to finance improvements by borrowing. While many communities have adopted both comprehensive plans and capital improvement programs, they have not commonly been linked in a formal way. Now the GMA has changed the way comprehensive planning will be done in Washington. The capital facilities, transportation and utilities elements reinforce the requirement that comprehensive plans prepared according to the GMA be realistic and able to be implemented. Requirements for setting level of service (LOS) standards, inventories and forecasts of existing and needed capital facilities, six-year financing plans, and concurrency all require a more complex level of planning than most communities have previously undertaken. The Capital Facilities Plan and Program (CFP) differ from the City's previous Capital Improvement Program (CIP). Previously, the scheduling of physical improvements was based on anticipated available financial resources and on a priority listing of capital improvement needs for a five year period. While some projects in the CIP were incorporated into the Annual Budget, the CIP acted merely as a .wish list" of projects, often with no identified funding sources. Capital Facilities Plan - Page 4 In contrast, this Capital Facilities Plan sets policy direction for determining capital improvement needs, evaluating proposed capital improvement projects, establishing funding priorities, and guiding funding alternatives. The Capital Facilities Program (CFP) contained in Part 2 of the element establishes level of service standards for facilities and a financing plan for facility improvements covering the entire six-year period. Along with the CAPITAL FACILITIES ELEMENT, the City's capital facilities planning effort also involves preparation of a Capital Improvement Program and an Annual Budget. . Capital Improvement Program (eIP) - The City's Capital Improvement Program is a six-year plan for spending public funds on capital facilities and amenities needed to address, support and implement the City's . Comprehensive Plan and other adopted City plans and programs. The CIP only covers City of Bremerton programs. . Annual Budget - The City's annual budget authorizes expenditures for all city expenses, including the acquisition or development of capital facilities. The annual capital budget differs from the financing plan contained in the Capital Facilities Program in that it covers only capital projects receiving City funding. E. GROWTH MANAGEMENT ACT REQUIREMENTS The CAPITAL FACILITIES ELEMENT must identify public facilities that will be required during the six years following adoption of the Comprehensive Plan (1995 through 2000). The plan must include the location and cost of the facilities and the sources of revenue that will be used to fund the facilities, and it must be financially feasible. Dependable revenue sources must equal or exceed anticipated costs. If the costs exceed the revenue, the City must reduce its level of service or otherwise reduce costs, or the Land Use Element must be modified to bring development into balance with available or affordable facilities. The GMA requires the capital facilities element to include at least the following: · Inventory -- An inventory of existing capital facilities owned by public entities, showing the locations and capacities of such facilities. · Future Needs -- A forecast of the future needs for such capital facilities. · Proposed Facilities -- The proposed locations and capacities of expanded or new capital facilities. · Six Year Financial Plan -- At least a six-year plan that will finance such capital facilities within projected funding capacities and clearly identifies sources of public money for such purposes. Capital Facilities Plan - Page 5 .' · Reassessment of Land Use Element -- A requirement to reassess the land use element if probable funding falls short of meeting existing needs, and to ensure that the land use element, capital facilities plan element, and financing plan within the capital facilities plan element are coordinated and consistent. The GMA requires that public facilities needed to support development shall be available at the same time as ("concurrent with") the impacts of such development. Concurrency management procedures must be developed to ensure that sufficient public facility capacity is available for each proposed development, or that development applications are denied when public facilities are not adequate to serve them. The GMA also requires that each comprehensive plan include a process of identifying and siting essential public facilities. Essential public facilities include those facilities that are typically difficult to site, such as airports, state education facilities and state or regional transportation facilities, state and local correctional facilities, solid waste handling facilities, and in-patient facilities including substance abuse facilities, mental health facilities and group homes...No local comprehensive plan may preclude the siting of essential public facilities. [RCW 36.70A.200] F. SCOPE The scope of the Capital Facilities Plan is city-wide and beyond. It includes all areas within the incorporated city limits, as well as areas surrounding the city which have been identified as Bremerton's urban growth area in accordance with the Growth Management Act Public facilities and utilities include a variety of properties, improvements and services often administered by governmental agencies for the general public. Examples of public facilities include city administration buildings, parks and recreational facilities, libraries and public schools. Utilities include electrical, telecommunication, and refuse collection utilities. Certain facilities and utilities are provided by the City of Bremerton, while others are provided by other agencies, special districts, or companies. The Comprehensive Plan Glossary defines "capital facilities", "capital improvement project", and related terms. Transportation and circulation-related facilities are addressed in the Transportation Element of the Comprehensive Plan. Public and private utilities within the City are addressed in the Utilities Element. The scope of the CAPITAL FACILITIES ELEMENT extends from the general long-range Capital Facilities Plan to the highly specific short-range Capital Facilities Program (CFP). Capital Facilities Plan - Page 6 For the purpose of the Capital Facilities Plan, capital facilities include all public facilities and services, including utilities, that are demanded of a government to carry out its functions or to provide service to its citizens. The goal, policies, strategies and activities of this plan are applicable to all capital facilities. Examples of capital facilities are: roads; public buildings; schools; parks; power, water and sewer systems; fire stations; libraries; and correction facilities. The entire collection of a jurisdiction's public facilities is sometimes referred to as its infrastructure. Capital improvements is a term used to refer to major capital expenditures needed to purchase, construct, replace, repair or rehabilitate such public facilities. The Capital Facilities Plan covers all public capital facilities, including federal, state, and City of Bremerton owned facilities as well- as those owned by the Bremerton School District, Port of Bremerton, Kitsap Transit, and Washington State Ferries. It also applies to facilities and services owned by non-public entities that provide a public service such as solid waste facilities, power, natural gas and telecommunications. G. PURPOSE AND INTENT The purpose of the long-range Capital Facilities Plan is to provide a comprehensive overview and set policy direction for capital improvements. The plan is intended to be used as a guide for making decisions that will ensure the adequate provision of facilities and services by local government and utility providers to meet anticipated needs, including meeting new demands caused by new growth and development. The Capital Facilities Plan and CFP make up the plan element that will bring the rest of the Comprehensive Plan to life. It fulfills the GMA requirement to assure that needed capital facilities will be financed. This requirement is the mechanism to ensure that the growth envisioned in the plan can really happen. The available capacity of public facilities will affect the type, amount and rate of growth. Because of the complexity of the relationships between land use and public facilities and services, the Capital Facilities Plan and Program will lay a foundation for the coordination and consistency of infrastructure plans and programs, including those of transportation and utilities. The CAPITAL FACILITIES ELEMENT is a tool for coordination of the City's physical and fiscal planning. It is a mechanism for ongoing communication and cooperation between various City departments, and between the City, the County, and other providers of public services. The CAPITAL FACILITIES ELEMENT promotes efficiency by requiring the City to prioritize capital improvements for a longer period of time than the single budget year. Long range financial planning presents the opportunity to schedule projects so that the various steps in development logically follow one another, with regard to relative urgency, economic desirability, and community benefit. In addition, the process of identifying adequate funding sources results in the prioritization of needs, and allows trade-offs between projects to be evaluated frankly. The Six Year Financial Program Capital Facilities Plan - Page 7 contained in the Element will guide decisionmaking to achieve the community goals as articulated in the Vision for Bremerton and Planning Goals Elements. The purpose of the CAPITAL FACILITIES ELEMENT is to: · Serve as a guide for making decisions that will improve the quality of facilities and services. · Ensure the proper coordination and timing of the provision of adequate facilities and services with land use development. · Coordinate and provide consistency among City plans for public facilities, including transportation and utilities, and capital facilities plans of regional, state and federal governments and plans of special districts (e.g. schools, libraries, and port districts). · Provide direction to facilities and infrastructure service providers to nelp them meet the needs of existing and new development. · Discuss locations and capacities of existing and proposed facilities. · Maintain the quality of life by establishing level of service standards for public facilities. · Determine the financial resources available for capital facilities projects and improvements. · Document all capital projects and their financing. · Provide direction for the provision of services in the City of Bremerton's urban growth area. · Ensure the timely provision of adequate facilities as required in the Growth Management Act. H. DEVELOPMENT AND AMENDMENT PROCESS The CAPITAL FACILITIES ELEMENT was developed by City of Bremerton Department of Community Development staff with the assistance of numerous citizens and city staff. A Parks and Recreation Capital Facilities Plan Subcommittee, consisting of Planning Commission and Parks and Recreation Commission members, along with Parks & Recreation Department staff, helped develop parks-related material in Spring 1993. The Bremerton Planning Commission Citizen Advisory Committee worked on the draft element during 1994. Finally, the Planning Commission and City Council held several study sessions and public hearings before the Comprehensive Plan was finally adopted in April 1995. Capital Facilities Plan - Page 8 The Capital Facilities Plan should be periodically reviewed concerning its content. Changing conditions and needs may result in amendments. Proposed amendments may include modifications, additions or deletions to the policies or implementation strategies. Proposed amendments to the plan will receive detailed review by the Planning Commission, and public hearing (s) will be held to solicit public comment. The Commission will consider any such comments and make a formal recommendation to the City Council. The Council will further review the proposal, hold a public hearing for public comments, make modifications if necessary, and adopt the proposed amendments as part of the Capital Facilities Plan. Revisions to the Capital Facilities Plan may occur, at most, once a year and must be considered concurrently with any other amendments proposed to the Bremerton Comprehensive Plan. The excellent City of Tacoma June 1993 Capital Facilities Plan is acknowledged as a primary resource in the preparation of this CAPITAL FACILITIES ELEMENT. Capital Facilities Plan - Page 9 Hi. <.<>>>.....................N<il...>f\J......:.>....G/.......::<:.........:....RA.i\..>EW.........:.......<..::::e>< .. . . . .. ".2... . ..f.,1I.jA.. N ..F M .... RK ..... . , . . ~~ . ~.: . ... . :::;' . .,. ':", :::::. ... -,';' ','. . . ,', ;., ' .....'. ............. ..,... , . .. .....,.. ..... ..... ." ..... ....... ....., . . ,... ..... .... ." .. .... ...... .... ..... ... . ...... ... "' ....... .. n... n. . ...... . ......... . ..... ..... ... ... ....... '" ......... ... ... ........ . .......... .. . ..,....... ..... .;.....<.-... <...::.......... ....<;.<;:.:.:::. .... ';',,:' ';:::.:,:,::.:;:.>: ," ;:.... ....;...;;.;.:::;:.;......:.,'. . . ... . ............ ......... . . . ......... .. . n. .... ....... ................. ...... .~~R~i6.hiiJ~.'imd.C64rl.fy(;ciotdii/fit;JfJ The CAPITAL FACILITIES ELEMENT must address the necessary state, regional and county coordination. These provide the framework for the Capital Facilities Plan and Program. A. GROWTH MANAGEMENT ACT GOAL The Growth Management Act's Public Facilities and Services Planning Goal is to: Ensure that those public facilities and services necessary to support development shall be adequate to serve the development at the time the development is available for occupancy and use without decreasing current service levels below locally established minimum standards. B. VISION 2020 Vision 2020 is the regional long-range growth and transportation strategy for the central Puget Sound region. It was adopted in 1990 by the Puget Sound Regional Council (PSRC), a collective organization of the local jurisdictions in King, Kitsap, Pierce and Snohomish counties. It was updated in 1993 to incorporate multicounty planning policies in compliance with the Growth Management Act, to reflect current countywide planning efforts and to establish an integrated regional vision. Vision 2020 provides the framework for countrywide planning policies and local comprehensive planning efforts mandated by the Growth Management Act. The Vision 2020 plan supports a new order of more compact, people-oriented living and working places, thereby reversing trends that have created increased numbers of low-density, auto-dependent communities. The vision is for diverse, economically healthy, and environmentally sensitive communities that offer affordable housing for all economic segments of the population and are connected and served by a high- quality, efficient transportation system that emphasizes the movement of people rather than automobiles. The growth strategy of Vision 2020 identifies four types of central places toward which growth will be directed. The City of Bremerton has declared its desire to be classified as one of these centers: the "metropolitan center". Designation as a metropolitan center will require Bremerton to commit to higher employment and residential densities to support the regional rapid transit/passenger ferry system. Vision 2020 calls for cities and counties to commit to both the land use patterns that can achieve the compact centers concept and a reordering of transportation investment priorities Capital Facilities Plan - Page 10 The multicounty policies for Contiguous and Orderly Development and the Provision of Services are intended to give first priority to the provision of services and facilities in areas where growth is to be directed. They include: RF-3 Phase development of public facilities and services to achieve the adopted regional vision. RC-1 Coordinate regional facilities planning, financing and phasing in a manner which supports land use plans and the adopted regional vision. RC-2 Ensure that the type and level of services accommodate the adopted regional growth forecasts while supporting land use policies and the adopted regional vision. RC-3 Give high priority to protecting and enhancing the natural environment and the public health of residents when providing services and facilities. RC-4 In coordinating growth management for urban development with natural resource planning, promote urban development solutions that conserve water, energy, and land resources and protect air quality. RC-5 Integrate land use and transportation planning with healthy and human services planning to promote service delivery at affordable costs. C. COUNTY-WIDE PLANNING POLICIES The Kitsap COL/nty-wide Planning Policy contains policies relating to the provision of urban facilities and services, as listed below. 1. Urban Growth Areas Provision of Urban Services: Based on an over-view of experience State-wide, the Legislature concluded, "it is appropriate that urban services be provided by cities." Based on our experience here in Kitsap County with the services provided by the County, Fire Districts, Regional Library, Public Utility District, Ports, Water and Sewer Districts, we have found that in some cases it is also appropriate that urban services be provided by other entities in addition to cities. Citizens Should Decide: Urban governmental services should be provided by the governmental entities that can, as determined by the affected residents, provide those services in the most responsive manner at the lowest cost. Citizens should also be given the opportunity to review whether the consolidation of many of these services at a local or regional level might not lead to even more cost-effective and responsive service. Capital Facilities Plan - Page 11 2. Capital Facilities. The GMA requires counties and cities to coordinate the siting of county-wide and state-wide capital facilities to mitigate potential adverse impacts from the location and development of these facilities. The Washington State Office of Financial Management is responsible for identifying and maintaining a list of essential state public facilities that are required or likely to be built within the next six years. The County-wide Planning Policies includes policies for siting public capital facilities that are of a county-wide or state-wide nature. The policies include the following requirements: C.1.a. The County and the cities shall inventory existing capital facilities and identify needed facility expansion and construction. C. 1.b. From local inventory and analysis the Kitsap Regional Planning Council shall develop and maintain a list of public capital facilities needed to serve Kitsap county as a whole. These include, but are not limited to, solid and hazardous waste handling facilities and disposal sites, water and wastewater treatment facilities, regional water supply intertie facilities, regional education institutions, airports, local correctional facilities, in-patient facilities including hospitals and those for substance abuse and mental health, group homes and regional park and recreation facilities. C.2.a. When a public facility of a county-Wide or state-wide nature is proposed in Kitsap County, the Kitsap Regional Planning Council shall appoint a Facility Analysis and Site Evaluation Advisory Committee composed of citizen members selected by the member jurisdictions to represent a broad range of interest groups to evaluate proposed public facility siting. [Minimum evaluation guidelines are included.] Capital Facilities Plan - Page 12 ......a.t.............G0Ars.....~f\J.D.......I?~tICI.ES........................................................................................................... .... The Capital Facilities Plan is a long-range policy plan containing the City's main guidelines for capital improvements. It contains policies and strategies for adequate public facilities and services, funding, programming, maintenance, economic development and neighborhood revitalization, location and design, and the urban growth area. The plan provides the long- range policy guidance to develop and provide direction for the Capital Facilities Program (CFP). A Capital Facilities Goal states the general intent of the plan. Intent statements and policies provide guidelines and direction to achieve the City's Capital Facilities Goal and direct future development of capital facilities and services. ,~~:~~~~r?:~~!ci:~~!e!~~~~~!~~i~~t~~&1!~t~~~~~!~~1~A!11jib::; Intent statements consist of general discussion of issues and concerns that are addressed more formally in policies. The statement of intent provides an overall The Capital Facilities Plan addresses seven major policy areas: . Adequate Public Facilities and Services · Funding for Capital Facilities . Programming for Capital Facilities · Maintenance of Capital Facilities · Economic Development and Neighborhood Revitalization · Capital Facilities Location and Design . Urban Growth Area These seven policy areas have been approached from several directions. They must address the necessary state, regional and county coordination, they must address the capital facilities requirements of the Growth Management Act, and they must relate to other planning areas such as land use, transportation and utilities. They must also carry forward the capital improvement requirements of the City of Bremerton. Capital Facilities Plan - Page 13 A. .GOAL In accordance with the community's desire for quality capital improvements, it is the goal of the City of Bremerton to: Provide high quality, well maintained physical systems and facilities that serve the needs of the community, are available at the time of development to serve new growth, and are equitably distributed. B. ADEQUATE PUBLIC FACILITIES AND SERVICES Intent It is the intent of the City of Bremerton to provide adequate public facilities and services for both existing and new development. These facilities and services will be designed to meet the capital facility needs of the community and to support Bremerton's land use and development policies. The City recognizes that the provision of facilities and services is necessary in a community to provide for the health, safety and welfare of the community. Bremerton intends to provide the facilities and services necessary to meet community needs. These facilities and services are: potable water; sanitary sewer; storm-water management; law enforcement; fire protection; emergency medical service; roads; parks; and schools. Bremerton intends to provide these facilities and services concurrent with development impacts or within a reasonable time of such impacts. The City intends to monitor the level of service provided for such facilities and services on a regular basis to ensure they are adequate and that appropriate levels of capital resources are expended. Bremerton also intends periodically to review and monitor other facilities and services which play an important role in the quality of life for its citizens, and to make expenditures as needed. These facilities include: municipal buildings and parking facilities, port facilities, libraries; public assembly buildings. While these facilities are needed and desired in a community, the services they provide are not directly tied to existing population or growth. Level of service standards for such facilities are helpful as a management tool, but do not necessarily indicate the adequacy of the service or when additional capital investment is needed. Bremerton intends to allow essential public facilities to locate within.the city as appropriate. Certain types of the above-mentioned facilities are difficult to site because of their nature, but are still essential to the city, county, region or state. Many of these facilities are ones that serve an area or population larger than the city itself. In siting such facilities, the surrounding land uses, land use compatibility, the capital facility needs of the community and region, and financial considerations should all be reviewed. In the long term, approximately 20 years, Bremerton intends to achieve the level of service standards set forth in the following table. (Table CF-1) Capital Facilities Plan - Page 14 ::>'I@~9fl1C~Pl~If'~9i,iiY~iv~i6.(~.&lpl~~~~~r~.~~ijriitltffl i..9'~ija!~;hil~itj~}<..> ..... ..((,viigi$i~~i~irid~~~...ttos)\i.'.'. .......; Emergency Medical Services 4.0 minute response time for BLS 8.0 minute response time for ALS Fire 5.0 minute response time Law Enforcement 280 sq.ft. per officer - 0.0143 officers per capita) Parks - Local 1.7 acres per 1,000 persons - 0.0017 acres per capita) Parks - Regional 13.9 acres per 1,000 persons - 0.0139 acres per capita Parks - Open Space 1.4 acres per 1,000 persons - 0.0014 acres per capita Sanitary Sewer 100 gallons per capita per day (gpcd) Storm Water Management year, hour design storm * Schools - Elementary (K-5th) nla Schools - Middle (6th-8th) 1 school per 1,000 students Schools - High (9th-12th) 1 school per 1,250 students Streets - Wheaton Way /Warren Ave. Corridor LOS F with volumelcapacity (v Ic) ratio threshold of 1.06 Streets - Kitsap Way Corridor & Manette Bridge LOS E or better (vlc less than or equal to 1.00) Streets - Other Arterials LOS D or better (vlc less than or equal to 0.9) Water 100 GPCD (gallons per capitar per day) * NOTE: The City is in the process of developing a Stormwater Management Plan. A Stormwater Management LOS will be established after the City adopts the Stormwater Management Plan. However, the City may establish other levels of service in the interim. When designating level of service standards, Bremerton will consider the public health and safety, community goals and desires, funding resources available and possible phasing of standards to achieve the desired level of service. Because adopted level of service standards affect the amount of growth and development, the quality of public facilities and services, and the amount of taxes and impact fees, the City will establish reasonable standards that allow orderly growth and development and that are within the City's financial capacity. Capital Facilities Plan - Page 15 Policies The following policies are intended to assist in achieving the City's Capital Facilities Goal. 1. Public Facilities: Maintain level of service standards for each type of public facility and provide capital improvements needed to achieve and maintain the standards for existing and future populations. 2. Concurrency: Ensure that those public facilities and services necessary to support development will be adequate to serve the development at the time the development is available for occupancy or use, or within a reasonable time as approved by the City, without decreasing current service levels below locally established minimum standards. 3. Concurrent Provision of Services: Approve development only if adequate public facilities or services needed to serve the development are available at the time the demand for the facility or service is created or within a reasonable time as approved by the City. 4. Level of Service: Require new development to maintain the adopted level of service standard for any needed public facility or service. A development will have the option to pay the development's share of the cost to maintain the adopted LOS. 5. Service Levels and Costs: Continue to develop and maintain City services that ensure optimum service levels at reasonable costs to both existing and newly annexed areas. 6. Needs for Annexation Areas: Anticipate utility and other public service needs of possible future annexation areas through long-range planning, and when feasible develop utility capacities to meet these needs. 7. Growth Rate: Foster orderly, desirable growth in appropriate locations at a rate consistent with citizen desires and the provision of adequate services and facilities. 8. Concentrated Development: Promote the development of compact concentrated areas throughout the urban area to discourage sprawl, facilitate economical and efficient provision of utilities, public facilities and services, and expand transportation options to the public. 9. Sanitary Sewer Service Area: Extend the sanitary sewer service area only if the new area pays the costs of added capacity. 10. Regional Sewer Service: Encourage the formation of a regional METRO utility to provide sanitary sewer service to the Bremerton-Silverdale Urban Growth Area over the long term. Capital Facilities Plan - Page 16 11. Adopted LOS Standards: The City will use the LOS standards listed in Table CF-1 in reviewing the impacts of new development and redevelopment upon public facility provision. 12. Concurrency Management System: Subsequent to the adoption of the comprehensive plan, the City and/or developers will provide for the availability of public facilities and services needed to support development concurrent with the impacts of such development. The following facilities shall meet adopted Level of Service standards and be consistent with the Concurrency Management System: transportation, sewer, and water facilities. (See Element K -lmDlementation. Consistencv and Concurrencv. Pg. 14, Section B., Policy 1) 13. Subsystem LOS Standards: Develop subsystem standards as needed to measure separately how subsystems are performing. 13.a. Develop LOS subsystem park standards to determine whether specific neighborhoods are well served. 14. Reassessment of Land Use Element -- Periodically reassess the Land Use Element and other plan elements in light of the evolving capital facilities plan. 14.a. If the probable funding for capital facilities at any time is insufficient to meet existing needs, the plan elements will be reassessed. The process will include reassessment of: i. the Land Use Element; ii. projected funding capacities; iii. levels of service. 14.b. Take appropriate action to ensure the internal consistency of the Land Use and Capital Facilities elements as a result of such reassessment. 14.c. Pending applications for development will not be affected during such time as reassessment is being undertaken unless an emergency is declared by the City Council. C. FUNDING FOR CAPITAL FACILITIES Intent It is the intent of the City of Bremerton to provide funding for adequate public facilities and services for existing development and new growth. Bremerton will review its entire financial picture on a regular basis to ensure that knowledgeable and appropriate expenditures are made to meet the capital facility needs of the community. The City will review existing revenue sources and develop potential new sources to fund capital facilities needed for new growth, community revitalization and economic development, and for the maintenance of existing facilities. As new funding Capital Facilities Plan - Page 17 sources are established, Bremerton will research those sources and assess the feasibility of using them to fund capital facilities. Policies The following policies are intended to assist in achieving the City's Capital Facilities Goal. 1. Funding: Pursue all available funding sources for the development of capital improvement projects in order to optimally use limited City resources. 2. Rehabilitation: Increase the tax base by encouraging and supporting the rehabilitation and improvement of dilapidated and deteriorated areas of the City. D. PROGRAMMING FOR CAPITAL FACILITIES Intent It is the intent of the City of Bremerton to coordinate the selecting and budgeting of all capital projects and to review, update and modify capital projects on a regular basis in order to ensure the provision of adequate publiC facilities and services. The City will systematically review the community's capital facility needs and financial capacity, and to help make appropriate and informed decisions regarding capital facility projects. In reviewing capital facility needs, the needs of the county, region and state will also be considered. This systematic review must be consistent and contain all identified funded and unfunded capital projects. The City has limited resources to allocate among the several capital facility planning areas. By establishing the level of service standards for each of the capital facility planning areas and adjusting the available revenues, the City establishes the relative priorities among the types of facilities. Priorities also need to be considered and set for different capital improvements or projects within any given type of facility or service. These decisions will be made each time the City performs its capital facility programming. In general, revenues should be allocated in accordance with the following priority listing: 1. Repair, remodeling, renovation or replacement of obsolete or worn out facilities that contribute to achieving or maintaining standards for established levels of service. 2. New or expanded facilities that reduce -or eliminate deficiencies in levels of service for existing demand. 3. New facilities and improvements to existing facilities that eliminate public hazards not otherwise eliminated by facility improvements prioritized under 1 or 2 above. Capital Facilities Plan - Page 18 4. New or expanded facilities that provide the adopted levels of service for new development and redevelopment during the next six fiscal years. If the planned capacity of facilities is insufficient to serve all applicants for development permits, the projects should be scheduled to serve development in the following priority: a. previously approved permits for redevelopment; b. previously approved permits for new development; c. new permits for redevelopment; d. new permits for new development. 5. New facilities and improvements to existing facilities that significantly reduce the operating cost of providing a service or facility or otherwise mitigate impacts of facilitie.s on future operating budgets. 6. New facilities that exceed the adopted level of service standards for new growth by either providing excess capacity that is needed beyond the next six years or by providing higher quality facilities than usual city design specifications for the facility. 7. When applicable: facilities not described by 1 through 6 above, but which the City is obligated to complete by a written agreement executed prior to the adoption of this plan. Improvements that provide level of service standards beyond the adopted level may be constructed. However, such improvements must not make improvements needed to achieve or maintain the adopted level of service standard financially infeasible and must be consistent with the goals and policies of the Land Use Element. This review of capital projects and their funding should be performed at least annually as part of the City's budget process (1) to ensure an ongoing review of capital needs and (2) so that capital and operating budgets can be considered together. Allocations for capital improvements have frequently been reduced or eliminated in times of fiscal restraint because of operating costs. However capital improvements can no longer be put on the back burner because of Bremerton's intent to provide adequate public facilities and services to serve existing and new development and the Growth Management Act's concurrency requirement. In cases where actual revenue falls short of projected revenue, the City will review the capital facilities programming effort and reassess the Land Use Element. These will be adjusted to ensure that funding and needs are balanced by reducing the level of service standard; increasing the use of another revenue source; decreasing the cost, and therefore the quality, of the facility; decreasing the demand for the facility; or a combination of these actions. In the event that unexpected money becomes available through donations or grant programs, the City may use such funds for capital improvements. Because all of the projects in the Capital Facilities Program will already have a funding source, the City will maintain a "Capital Improvement Priority Needs" list. This list will contain Capital Facilities Plan - Page 19 unfunded capital improvement projects identified by the City Council, City departments, citizens and other governmental agencies. The City will choose projects for such unexpectedJunding from this Priority Needs list. The capital facilities selection and budgeting process will require coordination among City departments and other agencies which provide capital facilities and services, as well as coordination with other jurisdictions on the regional level. Coordination will also be required between the various elements of the Comprehensive Plan. It is especially important for the capital facilities element to be consistent with the land use, transportation and utilities elements. The City intends to provide this necessary coordination through the Capital Facilities Plan, the Capital Facilities Program, and the use of joint planning. Fiscal impacts is another issue concerning selection and budgeting of capital projects. Bremerton intends to consider the fiscal impacts of major public projects or projects involving the expansion of capacity or service areas when deciding what projects to develop and budget. Policies The following policies are intended to assist in achieving the City's Capital Facilities Goal. 1. Needs Assessment: Annually evaluate existing public facilities and community needs to determine necessary public improvements. 2. Plan Integration: Ensure that the Capital Improvement Program, the Annual Capital Budget and all associated capital facilities documents are compatible with the Growth Management Act. 3. Planning. Development and Coordination: Coordinate and cooperate with federal, state, regional and local jurisdictions, private industry, businesses and citizens in the planning and development of facilities affecting the community. 4. Uniformity of Regulations: Coordinate with the State, the puget Sound Regional Council and Kitsap County in an effort to provide a set of standardized codes and regulations relating to capital facilities and community improvement. 5. Planning. Design and Development: Support and encourage efforts for the cooperative planning, design and development of public facilities with other government jurisdictions' and with the private sector to maximize efficiency, reduce costs and minimize impacts on the environment. Capital Facilities Plan - Page 20 E. MAINTENANCE OF CAPITAL FACiliTIES Intent It is the intent of the City of Bremerton to maintain its capital facilities in order to protect the public's investment in these facilities. One way to ensure such maintenance is through a comprehensive maintenance program. Any comprehensive maintenance program should contain an inventory of existing facilities including their age, condition, extent of use, remaining useful life and maintenance history. This complete assessment of existing capital items helps in determining future major maintenance, repair and replacement needs, and is necessary to make good investment decisions. In order to choose between maintenance, repair, replacement or abandonment of an existing capital facility, it is necessary to know the condition and the rate of deterioration and compare this with the costs and needs for a new facility. Other advantages of routine preventative maintenance include the possible reduction or postponement of replacement costs and the avoidance of unexpected costs and emergency repairs. The maintenance and replacement of existing capital improvements must be considered first before planning for major investments in new facilities. The expected use, demand and future growth of the city needs to be compared to see jf the current capital facilities can meet the needs of the future. Bremerton intends to consider the maintenance, rehabilitation or reuse of existing facilities as one way to meet the capital needs of the population. The City will consider requests for maintenance and repair of capital investments and requests for new capital facilities concurrently, because maintenance or possible upgrade of existing facilities may be a viable method of meeting the community's needs. Evaluating both maintenance needs and requests for new facilities at the same time gives the City the entire capital needs picture. All the necessary information to make selection and expenditure decisions will be available, and decision makers can determine whether existing facilities can meet the community's capital needs or whether new facilities will be necessary. Finally, the City intends to consider the future maintenance and repair costs of new capital items when making selection and expenditure decisions on new capital facilities. It may be that a change in design or materials could result in future maintenance savings. If the City cannot pay for subsequent operating and maintenance costs of a facility, that facility should not be provided. Policies The following policies are intended to assist in achieving the City's Capital Facilities Goal. 1. Operational Efficiency: Encourage the development of capital improvement projects which improve the city's operational efficiency or reduce costs by increasing the capacity, use, and/or life expectancy of existing facilities. Capital Facilities Plan - Page 21 2. Cost/Benefit: Carefully evaluate potential benefits to be gained by the development of proposed capital facilities with the City's ability to operate and maintain such facilities. 3. Infrastructure: Develop and use programs to improve and maintain the physical infrastructure of the City. 4. Rehabilitation and Renovation: Encourage the maintenance, rehabilitation, and renovation of existing community facilities in order to maintain a high level of quality service and to prevent the deterioration of facilities. 5. Adaptive Reuse of Existing Facilities: Encourage the adaptive reuse of existing buildings as community facilities in recognition of scarce resources. F. ECONOMIC DEVELOPMENT AND NEIGHBORHOOD REVITALIZATION Intent It is the intent of the City of Bremerton to strategically use public funds to assist and encourage private investment and development that will foster economic diversity and viability and preserve quality neighborhoods. The City intends to allocate resources to strengthen the economic base, diversify industrial and commercial enterprises, increase employment opportunities, increase the income level of residents, and enhance and revitalize its neighborhoods. Economic development and neighborhood revitalization are both vital to a community's health and well-being, and they are directly related to the quality of life of the community's citizens. Capital improvements are one of the most direct ways that officials can influence the development of our city and its neighborhoods. It is perhaps the best method of transforming plans into reality. Therefore, linking economic development with capital facilities planning is essential. Providing quality . infrastructure is also crucial to a community's economic development and its neighborhood quality. As funds for capital expenditures become increasingly scarce, the City will be trying to achieve maximum leverage from its public investment. Most of the city's infrastructure is in place and its capacities established. However, the quality and type of infrastructure available is an important factor in a business's decision on where to locate originally and on whether to expand at an existing location or to move. It is also important to residents and potential residents. Because a deteriorating infrastructure may well be an economic deterrent, it is desirable for the City to maintain its facilities to both attract and retain private enterprise and residents. Therefore, Bremerton intends to emphasize the role that infrastructure and capital facilities play in the development of the city and the quality of its neighborhoods. > Policies The following policies are intended to assist in achieving the City's Capital Facilities Goal. Capital Facilities Plan - Page 22 1. Economic Improvements: Stress projects which stimulate the economy by . expanding employment opportunities, by strengthening the tax base or by encouraging private investment opportunities. 2. Improved City Image: Stress the development of capital improvement projects that promote tourism and convention trade. 3. Neighborhood Revitalization: Encourage capital improvements in areas in need of neighborhood revitalization. 4. Conservation. Preservation. and Revitilization: Emphasize capital improvement projects which promote the conservation, preservation or revitalization of commercial, industrial, and residential areas of the city. 5. Business Community: Initiate and encourage initiation of programs to improve and maintain the physical environment of the business community. 6. . Business Opportunities: Improve opportunities for new businesses and commercial developments to locate in a well-balanced system of competitive centers. 7. Services According to Area Needs: Recognize that the needs for public safety services may vary with the characteristics of the different neighborhoods and their residents, and provide services to neighborhoods at a level commensurate with the needs of each. G. CAPITAL FACILITIES LOCATION AND DESIGN Intent It is the intent of the City of Bremerton to provide public facilities and services that are equitably distributed throughout the community; that are located and designed to be safe and convenient to the people they serve; that provide flexibility of use and maximum efficiency; and that are compatible with adjacent uses and the environment. Siting of future facilities will become increasingly difficult as the available supply of land diminishes, and because in some cases public reaction to siting choices may be negative. The Growth Management Act requires local comprehensive plans to include a process for identifying and siting "essential public facilities" --.those facilities that are typically difficult to site. The Kitsap Countywide Planning Policies include a process and review criteria for the siting of facilities that are of a county-wide or state-wide nature. Bremerton will coordinate with other jurisdictions in the region to site essential capital facilities and will not exclude such facilities from its jurisdiction. The City will also work with surrounding jurisdictions to identify lands useful for public purposes, some of which would be appropriate for capital facilities. Because capital facilities may serve the community for long periods and become a part of the community, their design is important. The City intends to consider Capital Facilities Plan - Page 23 aesthetics in the design of all public facilities subject to public view. Facilities should be located and designed to create a minimum disturbance to the aesthetics, social interactions and urban design of the community. Public projects should provide for public access and should include elements for public use and enjoyment such as landscaping, furniture, art and lighting, where appropriate. Landscaping should be provided to beautify and screen areas and to improve compatibility with adjacent development. Landscaping should be designed to provide variety similar to that observed in the neighborhood with special consideration for drought tolerant plants to conserve water and help ensure plant survival. Naturally occurring land forms and ecosystems should be protected and enhanced where possible. Parking lots for public facilities should be limited in area and visual impact. Policies The following policies are intended to assist in achieving the City's Capital Facilities Goal. 1. Siting of Facilities: Consider land use compatibility, capital facility needs, and financial costs when siting essential public facilities. 2. Public Building Sites: Encourage the acquisition of building sites for public and quasi-public purposes to be of sufficient size to meet future as well as present needs. 3. Location and Design: Encourage community facilities to be located and designed to obtain maximum flexibility, utility and multiple use. 4. Convenience. Safety and Access: Locate community facilities so as to be convenient, safe, and close to the areas they serve, with access to arterial streets and public transportation. 5. Design Function and Maintenance: Encourage the design of community facility sites and structures in a manner which permits their intended functions to be performed safely, efficiently and effectively, and which minimizes ongoing maintenance costs. 6. Established Facilities: Permit expansion of established community facilities to allow for their continued usefulness, where appropriate, provided the neighborhood and area are not detrimentally affected. 7. Energy Conservation: Stress projects which are energy efficient or enhance energy conservation efforts by the City and its residents. Capital Facilities Plan - Page 24 H. URBAN GROWTH AREA Intent It is the intent of the City of Bremerton to become the primary provider of capital facilities and services within logical service areas in its Urban Growth Area (UGA) over time. Bremerton's urban growth area is to be an area surrounding the city that is characterized by urban growth. The adopted Urban Growth Area (UGA) extends roughly from the Bremerton Watershed to Silverdale.1 The Growth Management Act states that "it is appropriate that urban government services be provided by cities". The Kitsap County-wide Planning Policy states that "in some cases it is also appropriate that urban services be provided by other entities in addition to cities...Urban governmental services should be provided by the governmental entities that can, as determined by the affected residents, provide those services in the most responsive manner at the lowest cost. Citizens should also be given the opportunity to review whether the consolidation of many of these services at a local or regional level might not lead to even more cost-effective and responsive service". At present Bremerton provides water and sewer services in portions of the urban growth area outside the city. While the Bremerton Water Utility service area covers a large part of the adjacent UGA, the Sewer Utility service area extends only slightly beyond the city limits. These service areas are dependent upon facility capacity and upon drainage basin locations. When providing facilities and services, Bremerton provides the same level of service (LOS) standard in the urban growth area as it provides within the City limits. The City encourages other service providers within Bremerton's urban growth area to provide the same LOS standards that the City provides. For those facilities and services provided by the city in its urban growth area, Bremerton also performs the capital facility planning and programming through this CAPITAL FACILITIES ELEMENT. The City intends to jointly plan the provision of capital facilities and services for its urban growth area with Kitsap County, other jurisdictions and service providers. Such joint planning may be accomplished through the use of interlocal agreements, or "Urban Growth Management Agreements (UGMAs)". At the time of joint planning, Bremerton intends to review the capital facilities in the joint planning area, the level of service standards being provided, and any deficiencies or needed capital improvements. The City will work with the service providers and other jurisdictions to develop a service provision transition plan, as appropriate. Such plan should identify capital facilities and services to be included, and cover establishment of level of service measurement methods; goal level of service standards with target dates to phase in an increased level of service; and target dates to phase the transition of service from 1See related discussion in Land Use Element, Section D. Urban Growth Area Management. Capital Facilities Plan - Page 25 one provider to another. After annexation, Bremerton will strive to achieve the same level of service standard in its urban growth area as it provides within the city. Policies The following policies are intended to assist in achieving the City's Capital Facilities Goal. 1. Provision of Urban Services: The City of Bremerton should be the primary provider of urban services within its designated urban growth area. 2. Joint Planning: Coordinate planning with Kitsap County and other adjacent jurisdictions for land use development, transportation, and services within urban growth areas to ensure that development is orderly, compatible and sufficiently served, and consistent with City plans. Capital Facilities Plan - Page 26 .)ll.liEijrt;k~~rili;sN....B+bXffEi'SI>E..........Ct....."... . <....). 1;.>oorrtllili.,v..'~'.J~'.luq I ~..I... ..P. . .Q). .. ..... . The objectives for the provision of capital facilities and services that are outlined in the Capital Facilities Plan cannot be achieved through goals and policies alone. Goals and policies provide ongoing guidance, but action to achieve objectives can only be addressed through strategies. ... ..... .... . .. . ..... ....... ..... . _,... n. .... . . .. n.. . n.. n.. . n. ..... ...... ... .... ........... ....... ..... . ........... ........ ..... .. ...... .. ...... ... . ....... .... ...... ...... ..... .......... ............ ............ ........ ...... .. ......... ... ................. .. ...... . .... ........ ...... ........... ......... .................... ................... .. ....... ............... ....... .n .... ..... ......... ......... ......... n. 0" .......".. . ........ . ...... . ........... .... ..... ......... . .... ...... ...... ..... ......... ........... n' .... ....... . ........ . ..... . .. ... . ...... .... ........... ......... . ...... . . . . . . . . . . . .. ...... . . . . . . . . . . . . . . . . ... . , . . .. . . . ... . . . .. . . . . . . . . .. .. .. . . .. .... . ... . . . . . . ................... ............ ......... ............ .......... .... ..... .... .... ..... ............. ............. ..................... ............. ....... ..... ...... ............... ................ ............. .......... .... ...... ........ ..... ........... ........... .............................. ................... .... ..... ............. ............... ..... .. ...... .. ..... . . ............. . ..... .................. ....... .... ............. .......... ........... ...................... ........... .... ... . . . ......... ........ . ............ . ............ ..... ............ ........ ............. . .......... ... . ........ . ................ ................ .. ....... ....... .... ....... . ......... ........................ ......... .... ...... .. ............ ..... .......... ...... . .................. ... . ......... .................... ......... ...... . . ..... . ... ........... ......... . ................... .... ................. .... ..... ....... .... ..................... . ..... ..... . .... .... ............. ............ . ................ .................. ...... . .......... .................... ......... .......... .. . ...... ......... .. . ..... ............... ........... ....... ............ .............................. ....... f~11~l~;~~~lii~~'~~~\~~t~~mie.i~~91l~i;~~~b~~~~~~u .......... ............ .......... ....... . ...... ........".. .. .. . ..... ... . ............"................ .........t. . t.....u.u............. .. ... ......u.u.u............... ..... U. u.u... . . .. .. . .uu . .u. .... . ........ ......... .... . /!l. ra ~gyt.....:..:.........:..:....................,.... .. ...... . ......... . . The strategies range from general to specific and respond to both immediate and long-term needs. . ..... .., .... . ...... ..... ..-,. . ....... . . . .. .... ....... ....... .. ..... ".. .. ............ ... ... ....".."..... ...... ....... ...... ... ....... . .. ......... ........... ... ....... . ..... ".......... .... . . ......... ... ... .. .... ... ..... ..... .. . ... .... . .. ....... . .......... .... . ........ ......... ..... ... ... ... . .......... ...... ........... ..........-....... .....".. ....... . ""....... . ...... . . ........ . .... .... ........ ... ........ n' ........... ...... .. .. ..... ........ . t.>e\$ome r~cgmmerlQiid...strategj~~Q1~'II'~quJr~....~n.~*p~pditl.Jre .....::.........................~hTe~~r~~~~~~.~~~r~~~t~b~98~~~~~~~~~~t~~~t~~~~6th.;...:...:............ >\pf9c:edUf~$o(muH!9ipalregulan6hS;>u. .. u.U uu. u. .. ... .... . ...." . . ..... -.. ". . ...... ". .....". .......". . Strategies do not lend themselves to a listing by order of priority. They are all important enough to be implemented concurrently, although emphasis may be placed on one or more specific recommendations at a particular time. The Capital Facilities Program gives more specific direction regarding implementation. Over time, individual strategies or activities will be implemented through the six-year program. At that time, the specific strategy or activity will be developed into an objective, and further detail in the form of tasks will be provided. The relationship between the vision, goals, policies, strategies and activities of the Capital Facilities Plan and Capital Facilities Program is shown in the following diagram. Capital Facilities Plan - Page 27 Vision II ..... , ..... . _H , " . ..... ... ". , . . .....~R~G~~~......... ... . ... ... . .... ".n ...... n' . . ....... ... __. ----- . ...----. , _... n. _..__ _. "... ____n. " ...... .... .... . , -- ........ . __ . . ..._n__ . .. . ..... _n- o .. _._____. . ..... _n____.. .. .... ...... , .. ........... , . ----. Goals Policies Strategies Activities Objectives I Tasks The strategies are directed toward the seven policy areas: Adequate Public Facilities and Services; Funding for Capital Facilities; Programming for Capital Facilities; Maintenance of Capital Facilities; Economic Development and Neighborhood Revitalization; Capital Facilities Location and Design, and Urban Growth Area. They are set forth below with any accompanying activities. A. ADEQUATE PUBLIC FACILITIES AND SERVICES Strategy #A-1: Develop, implement and administer a concurrency management system to ensure provision of adequate public - facilities and services. Activities: 1. Maintain and update an inventory of all facilities, including the condition and capacity of the facilities. 2. Review and update level of service standards. 3. Regularly review capital facility needs and adjust the concurrency management system as necessary. B. FUNDING FOR CAPITAL FACILITIES Strategy #8-1: Continue to research and update available options to finance capital facility projects, improvements and maintenance and seek additional revenue sources. Activities: 1. Review existing sources of revenue available for funding of capital facilities. Capital Facilities Plan - Page 28 2. Identify potential new sources of revenue for funding of capital facilities. Include such sources in the Capital Facilities Program. 3. Establish an interdepartmental finance team to develop and explore different financial options to be used in capital facilities management and development. 4. Promote amendments to state law to provide additional or greater sources of revenue for capital facilities. 5. Identify ways to reduce the costs of capital facilities and improvements by utilizing new materials and technologies. Strategy #8-2: Establish a process to determine priorities for capital investment. 1. Use the interdepartmental finance team to assist in establishing such a process. 2. Define the scope and range of capital investments. 3. Review potential factors to use for determining priorities. 4. Establish capital facilities investment priorities. C. PROGRAMMING FOR CAPITAL FACILITIES Strategy #C-1: Establish and use a process to review and determine the selection and budgeting of all capital projects. Activities: 1. Review and update all components of such process at least biennially, including facility inventory, level of service standards, capital facility needs, and financial capacity analysis. 2. Develop a project tracking system to monitor capital project development and expenditure of funds on individual capital projects. 3. Develop a financial management system to monitor the expenditure of all capital facility resources. Use the interdepartmental finance team to assist in development of such system. 4. Develop procedures concerning analysis of fiscal impact of projects, including the detail of analysis required and when it is required. 5. Establish a capital facilities technical team to coordinate planning between City departments, outside agencies and special districts. Capital Facilities Plan - Page 29 6. Monitor the effect of capital expenditures on the Land Use Plan's growth and development concepts. Strategy #C-2: Evaluate various methods of balancing proposed capital projects and funding including lowering level of service standards, increasing revenue, reducing demand and creating service areas. D. MAINTENANCE OF CAPITAL FACILlTIIES Strategy #~ 1: Research and prioritize various maintenance approaches. Activities: 1. Identify maintenance options. 2. Prepare a cost/benefit analysis of the maintenance approaches. 3. Identify the consequences of deferred maintenance. E. ECONOMIC DEVELOPMENT AND NEIGHBORHOOD REVITALIZATION Strategy #E-1: Strengthen the link between capital facilities and services planning and economic development planning. Activities: 1. Address capital facility and infrastructure needs in the special area plans recommended in the Land Use Element. 2. Address capital facility and infrastructure needs in economic development plans. 3. Develop a process to identify and fund infrastructure improvements needed to . meet the economic development goals of the City. Involve the business community in these efforts. 4. Explore options to maximize the economic development and neighborhood revitalization impacts of capital facility improvements and expenditures. Capital Facilities Plan - Page 30 F. CAPITAL FACILITIES LOCATION AND DESIGN Strategy #F-1: Review the Zoning Ordinance as necessary to ensure adequate provisions to site essential public facilities and county-wide and state-wide facilities are included, as required by the Growth Management Act and the County-~ wide Planning Policies. Amend the code as necessary. G. URBAN GROWTH AREA Strategy #G-1: Conduct joint planning with Kitsap County and other jurisdictions within the county. Activities: 1. Coordinate with Kitsap County and other jurisdictions on the implementation of the County-wide Planning Policies. 2. Use interlocal agreements to resolve urban growth area issues. 3. Coordinate with Kitsap County and other jurisdictions on the identification of lands for publiC purposes including prioritizing the need for such lands. 4. LOS Consistency: Coordinate LOS standards with neighboring jurisdictions as needed to assure consistency. Strategy #G-2: Continue participation on all state, regional and local planning bodies necessary to achieve coordination of growth management goals and policies. H. IMPLEMENTATION STRATEGIES SUMMARY The following matrix summarizes the key recommended strategies and illustrates the implementation responsibilities of various City departments. These responsibilities generally tie into the following areas: legislative, administrative, regulatory, policy development, planning programmatic, and study. Capital Facilities Plan - Page 31 ......,. .. ...,... ........ ... ........,. . ... . """"", .. , . ., ...., . ..... ,- ........... ........ ................. ..... ...... .. .... ..".,. ..... .... ... ,.. ...... . .... ... "".. . . .. . . . . ... . . . . . . . .. . . .. ........ . . . . . . . . . . . . . . . . . . . . . ... . . .. . ........ . . . . . . . . .... . .. . .. . .. .... . . . .. .. . . .. .... '. ...... .. ........... .. ...... ... ................. ....... ..... ... ."... .... n...... .. ..... ..... ... '. ........ ..... .. ..... .... ',. .......... ................. ........ ................... ..,........................... ," ........", '.. ........ ", . ............... .............. ..... ......... ..... "' ......... ..... ............... ............ ..... ........... .. .,., ",'>",',','...>.. ., ."','."',,',.,',.. ,. '.., """'."'..'."',',.. ."""".""'""""'." .b.. ':C. . r= 2. Ca. "t.. ....I""F. "I"t" ,...>..> PI."'>...<.I ..,. ..1 . .... ...., .t.. t.'.... St. t'"'.......... S..... ... ."'<",,", . Y(t~> ~\",[.. . .pl CliO. .8ell le$ Ci" rlJP eme,n 81.on, ra egles ummary> Concurrency Management Financial Management Options Prioritize Capital Investment Capital Facilities Programming Balance Projects & Funding Prioritize Maintenance Options Maintenance Schedule . ........ ... .., . ,.". ....,. . .. ..... . ,... . . ,. . .. .. ......,..... .. '''''.. . ........... ....... ..... . . .... .. ..., ................. .... .. ...... '. .... ........ ...... ,,,... ........... ..... ..... ..... ..... . . ........ ...... . . ..... ....... ...., n. ,,,.. .... .... ..... ......... '''. .... ... .....,... . ..... .. . ....... .... ..... no ..... .... ........ ..... ........... . ..... ..... ...... . ........ .. ..... ..... . .".... . ....... . ,... .......... '. ........ ........ ..... ....... .,.. ...... .... ..... ......... ...... . ..... . ...... .... ,.............. ... .............. ., ...,. .. ......., ..., .....n.. ........ ... ..... ., u.f"Q~#latj~!L .f ~ijmjnj#t~tlv. ii()R~#i"t9.y . . ............ ~9UcY). . .)~l~nnj~ij.i ./~rPg~aipmatj~f ... ....~'#dy \ u i..? Development.. ... ..... . TREASURER DCD-LRP UTILITIES PUBWORKS PARKS TREASURER DCD-LRP UTILITIES PUBWORKS PARKS PUBWORKS UTILITIES PARKS PUBWORKS UTILITIES PARKS DCD-LRP DCD-BLDG UTILITIES PUBWORKS ATTORNEY TREASURER Capital Facilities Plan -- Page 32 TREASURER DCD-LRP UTILITIES PUBWORKS PARKS, TREASURER DCD-LRP PUBWORKS UTILITIES PARKS PUBWORKS UTILITIES PARKS TREASURER DCD-LRP TREASURER DCD-LRP PUBWORKS UTILITIES PARKS DCD r}.l/.........~n ...,."... gF..2&Jpjt~'fjCiliti~SPI~ri.riip!ihlJr1t~ti~riStr~l~gies~orbm~rYn. ... , .i> .. Tilb.e .. .. .. . .... ... ..... 0... . . '. .. .. .' ". n. ...'".,' ,. '...,.".,."..,..... .. .......... . n. .... .. , .. . n. .... .... ......-...,................... ,............ . ..... .... .... . d..... . ....... ....... ........ .. n. ... "' ..n . n.. ..... .... ",. ............ ....... .".... .... . . . d. ...... . ......... .... ... .......... .... .... . ... .. ........ .... ......n ..... ., ... ....... ... .. - . ....... ..... ......... " .. n... . ...... ....... ...... ..... ........ ..........~~nr. . .... ......."... -,-. -. . ." n. n. ...... .... .... o . .... .. ...... .... .. .... . ....... ... ..... ..... .. .... .....n .......... {nri...:...~..~'~i#!/ ,#~gi~!afjv~ ...Adi'1:1inj~~tiv. R~#lat~ij.'.... ............ . .... . .........'pr~ijn!#Q .........'f':rogfinuT,~lp .'..'.'...p..'Tn,.. ....",.. , ....... .. .. ...... ........ .. ..... .. .. .... ,.,}:,.....9.l.cY:.,..,...,,'..,.. "' ..... , .... ..... {n,. Deveiopment .. ... .... . .... Link with Economic DCD-LRP DCD-LRP Development DCD-CS DCD-CS Review Zoning Ord. DCD-LRP Requirements DCD-BLDG ATTORNEY Joint Planning DCD-LRP PUBWORKS UTILITIES PARKS ATTORNEY Coordination DCD-LRP Departments: ATTORNEY City Attorney TREASURER City Treasurer DCD-LRP Department of Community Development - Long-range Planning DCD-CS Department of Community Development - Community Services DeD-BLDG Department of Community Development - Building PUBWORKS Public Works Department ENGINEERG Public Works Department - Engineering UTILITIES Public Works Department - Utilities PARKS Department of Parks & Recreation Capital Facilities Plan - Page 33 . . . Capital Facilities Plan - Page 34 Bremerton Comprehensive Plan CAPITAL FACILITIES ELEMENT Part 2 of 2: Capital Facilities Program Prepared by: BREMERTON PLANNING Adopted: AprilS, 1995 Bremerton Comprehensive Plan ELEMENT H CAPITAL FACiliTIES CONTENTS Part 1 of 2: Capital Facilities Plan Page 1. INTRODUCTION ....... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. PLANNING FRAMEWORK .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 10 3. GOALS AND POLICIES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 13 4. IMPLEMENTATION STRATEGIES. . . . . . . . . . . . . . . . . . . . . . . . . . . .. 27 . . . Part 2 of 2: Capital Facilities Program 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. CAPITAL FACILITIES PROGRAM (CFP) ......................... 8 A. FIRE AND EMERGENCY MEDICAL SERVICES ............. 10 B. LAW ENFORCEMENT ............................... 19 C. PARKS .......................................... 28 D. SANITARY SEWER ................................. 40 E. SCHOOLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51 F. STORMWATER .................................... 61 G. TRANSPORTATION ................................. 66 H. WATER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69 Table Page SC-7 Six-year Funding and Projects: Schools. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57 SC-8 Capacity Balance Sheet: Elementary Schools ........................... 58 SC-9 Capacity Balance Sheet: Middle Schools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59 SW-1 Inventory of Capital Facilities: Storm Water Holding Basins. . . . . . . . . . . . . . . . . 62 SW-2 Major Flood control Capital Improvement Projects and Costs . . . . . . . . . . . . . . ~ 63 SW-3 Stormwater Facilities Small Project List ............................... 63 SW-4 Six-year Funding and Projects: Storm Water Management ................. 64 TR-1 Inventory -- Transportation Facilities .;........................... ~ . . . 66 TR-2 Existing Level of Service -- Transportation ............................. 67 TR-3 Six-year Funding and Projects -- Transportation . . . . . . . . . . . . . . . . . . . . . . . . . 68 WA-1 Inventory of Capital Facilities: Water Supply. . . . . . . . . . . . . . . . . . . . . . . . . . . . 71 WA-2 Existing and Potential Water Supply ................................. 75 WA-3 Future Need: Water ............................................. 75 WA-4 Six-year Funding and Projects: Water ................................ 78 WA-5 Capacity Balance Sheet: Water. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80 LIST Of FIGURES Figure Page CF-1 Capital Facilities Element Timeline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 CF-2 Location of Police and Fire Facilities .................................. 19 CF-3 Bremerton Park Facilities .......................................... 39 CF-4 Bremerton Wastewater System Service Area ............................ 50 CF-5 Bremerton School District .. . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . 60 CF-6 Bremerton Stormwater Drainage Basins . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65 CF-7 Bremerton Arterial System . . . . . . . . . . . . . . . . . . , . . . . . . . . . . . . . . . . . . . . . . . 69 CF-8 Water Plan Service Area ........................................... 82 Bremerton Comprehensive Plan ELEMENT H CAPITAL FACiliTIES Part 2 of 2 -- Capital Facilities Program (CFP) >i.....i@.....>}>..€)\H@(<.n...><)..>nn..>.....<..<\. ;<f....n . ..I'dTD ..n D1>1 nnTI ... N..nnn. .... ... .. .n. . ". ~)J~~~~~~?:.;:~:: .l~::.l~::n ';:~'.'.......' ....::~. . ::: ,'::J..:. "...:::~.;.;.;... . . ::::F:,:.:.,: .: :::.::<:': :.- ::.:>...;;.;.: ;.....: . This Capital Facilities Program (CFP) document is the first of two documents that make up the CAPITAL FACILITIES ELEMENT of the Bremerton Comprehensive Plan. A. AUTHORITY The State of Washington Growth Management Act of 1990 (GMA) requires that the City of Bremerton develop a comprehensive plan which contains several elements, including a "capital facilities plan element". The long-range Capital Facilities Plan and the short-range Capital Facilities Program make up the capital facilities element required by the GMA. This CAPITAL FACILITIES ELEMENT was developed under the direction of the City's Planning Commission and adopted as an element of the City's Comprehensive Plan. The element was developed pursuant to the authority conferred by the Washington State Constitution; the Revised Code of Washington, Chapter 36.70A; and Chapter 2.12 of the City's Municipal Code. B. OVERVIEW OF CAPITAL FACILITIES ELEMENT The CAPITAL FACILITIES ELEMENT is organized into two documents, which contain the following sections: . PART 1- CAPffAL FACIURES PLAN 1. INTRODUCTION -- Includes authority, overview, description, background, GMA requirements, scope, purpose and intent, and development and amendment process. 2. PLANNING FRAMEWORK -- Lists applicable GMA goals and regional policies with which the CAPITAL FACILITIES ELEMENT must be consistent. Capital Facilities Program (CFP) - Page 1 3. CAPITAL FACILITIES PLAN -- A long-range policy plan containing guidelines for capital improvements. · PART 11- CAPITAL FACIUT/ES PROGRAM (CFPJ 1. INTRODUCTION -- Includes authority, overview, description, background, GMA requirements, scope, purpose and intent, and development and amendment process. 2. CAPITAL FACILITIES Program (CFP) -- Includes an inventory of capital facilities, a forecast of future capital facility needs, and a six-year finance program for capital facilities. C. DESCRIPTION The CAPITAL FACILITIES ELEMENT will guide public decisions on the use of capital funds. It will also indirectly guide private development decisions by providing a strategy of planned public capital expenditures. The element consists of two parts: a long-range Capital Facilities Plan and a short-range Capital Facilities Program (CFP). · Part 1: The Capital Facilities Plan is a long-range policy plan containing the City's main guidelines for capital improvements. It contains policies and strategies for adequate public facilities and services, funding, programming, maintenance, economic development and neighborhood revitalization, location and design, and the urban growth area. The plan provides the long-range policy guidance to develop and provide direction for the Capital Facilities Program (CFP). · Part 2: The Capital Facilities Program (CFP) contains an inventory of existing and proposed capital facilities, forecasts future needs for facilities, and identifies deficiencies in capital facilities and the actions necessary to meet such deficiencies. The program also provides the GMA-required six-year finance plan. The finance plan contains funding and scheduling of individual projects for all capital facilities including transportation and utility facilities. Detailed financial plans of outside agencies and special districts are included by reference. The CFP is under separate cover to facilitate an annual update of the six-year finance plan. The CAPITAL FACILITIES ELEMENT is consistent with the other elements of the Comprehensive Plan, as required by the GMA." Part 1 of the element -- the Capital Facilities Plan -- contains goals, objectives, and policies which are consistent and compatible with statewide planning requirements, g"oals and policies, with the regional goals and policies adopted by the Puget Sound Regional Council under Vision 2020, and with the Kitsap Countywide Planning Policy. Part 2 -- the CFP -- contains a six- year work program to implement the Land Use, Housing, and Transportation Elements of the Comprehensive Plan. Capital Facilities Program (CFP) - Page 2 Relationship Among Capital Facilities Element's Policy Plan, Capital Facilities Program, and City Budget April through July: Policy Plans Land U. Plan Programs ...... Capital FadllUes Plan UtIIWes Plan .ADol,m . Loco1/ Rep:ml . 0001. a: PalIc1a .1mpI Agencies' Capital Improvement Programs . Inventories . Service Level . Capacity . PUDding . ConcurreDC)' . Surplus I DcficiU . Capital Budgeting Itao6a P8b W""" ~ Scwa $cbOOII ,...... J.jbra1 Pae / BloIS Pal'" . .... ... ':~:::::{::::~::::::\::}r::::I.: ..::::".:::. :."" Budget ~ Capital I Budget "t Project Revenues & Expenditures ) sr-;., Oaa T~ w_ ~ ~uon lloada Tr-m . Uad u.. a: TnIIIJICl'lIIIal . MII1~ . I'.miraaaIaIl . PImdilIc Capital Facilities Program Summary City's Operating Budget . Salaries . Malntainence . Operation . Capital Outlay Figure CFP-1 Capital Facilities Element Timeline Capital Facilities Program (CFP) - Page 3 D. BACKGROUND The Capital Facilities Plan and Program (CFP) differ from the City's previous Capital Improvement Program (CIP). Previously, the scheduling of physical improvements was based on anticipated available financial resources and on a priority listing of capital improvement needs for a five year period. While some projects in the CIP were incorporated into the Annual Budget, the CIP acted merely as a "wish list" of projects, often with no identified funding sources. In contrast, this Capital ~acilities Plan sets policy direction for determining capital improvement needs, evaluating proposed capital improvement projects, establishing funding priorities, and guiding funding alternatives. The Capital Facilities Program (CFP) contained in Part 2 of the element establishes level of service standards for facilities and a financing plan for facility improvements covering the entire six-year period. Along with the CAPITAL FACILITIES ELEMENT, the City's capital facilities planning effort also involves preparation of a Capital Improvement Program and an Annual Budget. . Capital Improvement Program (CIP) - The City's Capital Improvement Program is a six-year plan for spending public funds on capital facilities and amenities needed to address, support and implement the City's Comprehensive Plan and other adopted City plans and programs. The CIP only covers City of Bremerton programs. · Annual Budget - The C.ity's annual.budget authorizes expenditures for all city expenses, including the acquisition or development of capital facilities. The annual capital budget differs from the financing plan contained in the Capital Facilities Program in that it covers only capital projects receiving City funding. E. SCOPE The scope of the Capital Facilities Program (CFP) is city-wide and beyond. It includes all areas within the incorporated city limits, as well as areas surrounding the city which have been identified as Bremerton's urban growth area in accordance with the Growth Management Act. Public facilities and utilities include a variety of properties, improvements and services often administered by governmental agencies for the general public. Examples of public facilities include city administration buildings, parks and recreational facilities, libraries and public schools. Utilities include electrical, telecommunication, and refuse collection utilities. Certain facilities and utilities are provided by the City of Bremerton, Capital Facilities Program (CFP) - Page 4 while others are provided by other agencies, special districts, or companies. The Definitions section of this element defines .capital facilities., "capital improvement project., and related terms. Transportation and circulation-related facilities are addressed in the Transportation Element of the Comprehensive.Plan. Public and private utilities within the City are addressed in the Utilities Element. The scope of the CAPITAL FACIUTlES ELEMENT extends from the general long-range Capital Facilities Plan to the highly specific short-range Capital Facilities Program (CFP). . For the City of Bremerton, the scope of the Capital Facilities Program (CFP) is: city administration; fire and police protection; parks, recreation facilities and open space; streets; schools; stormwater management; and sewer and water distribution systems. An inventory and analysis of certain publicly-owned capital facilities is provided in the CFP. Table CF-3 (page -> lists types, descriptions and providers of capital facilities specifically addressed by the CFP. The City of Bremerton uses the following definition of a capital improvement project: A project to create, expand or modify a capital facility. The project may include design, permitting, environmental analysis, land acquisition, construction, landscaping, site improvements, initial furnishings and equipment. The project cost must exceed $35,000 in 1995 dollars. Capital improvements are major projects or activities requiring the expenditure of public funds over and above annual operating expenses. They have a life expectancy of more than ten years and result in an addition to the City's fixed assets and/or extend the life of the existing capital infrastructure. Capital improvements do not include capital outlay items such as equipment or vehicles. An exception for rolling stock could be a purchase necessary to accommodate increased service capacity due to population growth such as emergency medical service units or fire apparatus. Examples are: . Land or site acquisition; . Building or structure acquisition, construction or major maintenance; . Major repairs or renovations to the City's infrastructure (e.g., buildings, structures, etc.); . Major site improvements; . Utility installations or major replacements, repairs or improvements to utilities; . Street construction and improvements; and . Major design and engineering efforts associated with identified capital projects. Capital Facilities Program (CFP) - Page 5 The Municipal Utilities and outside agencies (Bremerton School District, Port of Bremerton, Kitsap Transit, etc.) work under their own definitions of capital improvement projects which mayor may not include such things as rolling stock. F. PURPOSE AND INTENT The purpose of the short-range Capital Facilities Program (CFP) is to establish the City's work program for capital facilities for the next six years, to carry out the intents and policies of the Capital Facilities Plan, Transportation Element, and Utility Element, and to give further direction to implement the strategies of the plans. The Capital Facilities Plan and CFP make up the plan element that will bring the rest of the Comprehensive Plan to life. It fulfills the GMA requirement to assure that needed capital facilities will be financed. This requirement is the mechanism to ensure that the growth envisioned in the plan can really happen. The available capacity of publiC facilities will affect the type, amount and rate of growth. Because of the complexity of the relationships between land use and public facilities and services, the Capital Facilities Plan and Program will lay a foundation for the coordination and consistency of infrastructure plans and programs, including those of transportation and utilities. The CAPITAL FACILITIES ELEMENT is a tool for coordination of the City's physical and fiscal planning. It is a mechanism for ongoing communication and cooperation between various City departments, and between the City, the County, and other providers of public services. The CAPITAL FACILITIES ELEMENT promotes efficiency by requiring the City to prioritize capital improvements for a longer period of time than the single budget year. Long range financial planning presents the opportunity to schedule projects so that the various steps in development logically follow one another, with regard to relative urgency, economic desirability, and community benefit. In addition, the process of identifying adequate funding sources results in the prioritization of needs, and allows trade-offs between projects to be evaluated frankly. The Six Year Financial Program contained in the Element will guide decisionmaking to achieve the community goals as articulated in the Vision for Bremerton and Planning Goals Elements. The purpose of the CAPITAL FACILITIES ELEMENT is to: . Serve as a guide for making decisions that will improve the quality of facilities and services. . Ensure the proper coordination and timing of the provision of adequate facilities and services with land use development. . Coordinate and provide consistency among City plans for public facilities, including transportation and utilities, and capital facilities plans Capital Facilities Program (CFP) - Page 6 of regional, state and federal governments and plans of special districts (e.g. schools, libraries, and port districts). . Provide direction to facilities and infrastructure service providers to help them meet the needs of existing and new development. . Discuss locations and capacities of existing and proposed facilities. . Maintain the quality of life by establishing level of service standards for public facilities. . Determine the financial resources available for capital facilities projects and improvements. . Document all capital projects and their financing. . Provide direction for the provision of services in the City of Bremerton's urban growth area. . Ensure the timely provision of adequate facilities as required in the Growth Management Act. G. DEVELOPMENT AND AMENDMENT PROCESS The CAPITAL FACILITIES ELEMENT was developed by City of Bremerton Department of Community Development staff with the assistance of numerous citizens and city staff. A Parks and Recreation Capital Facilities Plan Subcommittee, consisting of Planning Commission and Parks and Recreation Commission members, along with Parks & Recreation Department staff, helped develop parks-related material in Spring 1993. The Bremerton Planning Commission Citizen Advisory Committee worked on the draft element during 1994. Finally, the Planning Commission and City Council held several study sessions and public hearings before the Comprehensive Plan was adopted in April 1995. The Capital Facilities Program will be reviewed at least biennially concerning its content. The objectives and tasks will be reviewed to determine what has been accomplished, and the strategies and activities of the Capital Facilities Plan and Utility Element will be reviewed to determine what future objectives should be undertaken. Tasks will then be formulated for the chosen objectives. Proposed amendments to the program will receive detailed review by the Planning Commission, and public hearing(s) will be held to solicit public comment. The Commission will consider any such comments and make a formal recommendation to the City Council. The Council will further review the proposal, hold a public hearing for public comments, make modifications if necessary, and adopt the proposed amendments as part of the Capital Facilities Program. Revisions to the CFP may occur, at most, once a year and must be considered concurrently with any other amendments proposed to the Bremerton Comprehensive Plan. Capital Facilities Program (CFP) -,. Page 7 H .... . ........,....., .. ...... . . ." . ....., .... ... .... ..... .. ..... ... ........ ..... .. ...... .......... .... . .. ... . ......... ......... ...... ............. . . .... ...... ....... ...., .. . .... ... .. ,.. . . .............. ..... .. ........... ". . ...... ... ....... .... ...... .. ..... ...... . .... ...... . ... ................. ... ........ . ........ ........,. ..... .. . ........... .. .....-........ .. .......... ,.., ............... ..... ..... ....... ....... .. .2~CAeIIAJ.i<FAClgITIESF{ROG~M><(CFflr . The Capital Facilities Program (CFP) is a six-year document which provides the main support for all actions that satisfy the policy intent of the long-range Capital Facilities Plan. This Program contains an inventory of existing and proposed capital facilities; forecasts future needs for facilities; and identifies deficiencies in capital facilities and the actions necessary to meet such deficiencies. It also provides the GMA-required six-year finance plan to fund the needed capital facility improvements and projects from 1995 to 2000. The inventory presented in the Capital Facilities Program provides background information on those capital facilities for which the City has a responsibility. It also summarizes new capital improvement projects for the existing population, new capital improvement projects necessary for the growth projected through 2000, and major repair, renovation, or replacement of existing facilities. The six-year finance plan contains funding and scheduling of individual projects for all capital facilities including transportation and utility facilities. Detailed financial plans of outside agencies and special districts are included by reference. The chart on the following page lists the types and providers of capital facilities addressed by this Program. (Table CFP-1 Sections on each facility type .follow in alphabetical order. The analysis of each type of capital facility includes: · Inventory of Existing Facilities . Future Needs · Levels of Service . Need for Facility Capital Improvements · Plans of Other Providers . · Priorities for Capital Improvements . Planned Capital Improvement Projects Capital Facilities Program (CFP) - Page 8 'i:::iliiI;:::jm!!~.i'!i!~~ltaI:!;~lf~1r~Ilrlil'!~1iI~~II;;,:i!;l!iilA"""... ......... ....,..... ........ ..... ....., ...... ,;,;,;,:,;,:,"::,",;,;,:,;';';'.:: ..;.;.....;...;.......;.....:. f'.191!ltYTypip~~yi~!i. . Fire and Emergency . Services Law Enforcement Parks Streets Sanitary Sewer Schools Storm Water Management Water City of Bremerton Fire Dept. City of Bremerton Police Dept. City of Bremerton Parks & Recreation Dept. City of Bremerton Dept. of Public Works & Utilities Bremerton Municipal Wastewater Utility Bremerton School District Bremerton Municipal Stormwater Utility Bremerton Municipal Water Utility Provides facilities that support the provision of fire and emergency services. Provides facilities that support the provision of law enforcement services. Provides facilities for passive and active recreational activities. Provides streets, sidewalks, traffic controls, and street lighting. Provides facilities used in collection, transmission, storage, treatment or discharge of waterborne waste within most developed portions of city and some surrounding unincorporated areas. Provides elementary and secondary facilities for instruction in the several branches of learning and study required by the Basic Education Code of the State of Washington. Provides facilities that collect and transport stormwater runoff. . Provides supply of potable water from system of surface water and wells. Service area includes developed portions of city and surrounding unincorporated areas. Utility also contracts to provide water to additional areas (Tracyton, Rocky Point, PSNS, and Port of Bremerton airport and industrial park. Capital Facilities Program (CFP) - Page 9 ...}~pjjli~'ijt.~1~6{i))) . Land Use Element · Parks & Recreation Comprehensive Plan . Transportation Element · Six-Year Transportation Improvement Program (TIP) . Utilities Element . Draft 1992 Wastewater Comprehensive Plan . Bremerton School District Capital Facilities Plan: In Support of the School Impact Fee Program, July 1992 . Ord. 4454 · Water System Comprehensive Plan A. Fire and Emergency Medical Services The City of Bremerton Fire Department is responsible for providing emergency and non- emergency fire, rescue and medical services. The capital facilities used by the Fire Department include station buildings, emergency medical services (EMS) vehicles, fire trucks, fire engines and fire boats. (See Figure CF-1) 1. Emergency Medical Services (EMS) a. Inventory of Existing Facilities - EMS The City has three EMS vehicles. Two units (Medic #2 and Medic #3) each cover half of the city, while one (Medic #2-A) is maintained as a reserve unit to fill in as needed. Under the City's rotation policy, EMS units are replaced every three years. Each time a new unit is added, the reserve unit is replaced by the next oldest unit. (Table EM-1) " . ",' ....... ....'.. ," . . .... .." ,", .... .., -, . .. P. " .. n..' ...... _"... ...... ...... ". . " . n... .. .... .. .. . ......... . ..... ....... . .............. ... ........... ..)) ................ ....TableEMl1i...... .......HiLH??. ..... ........ ... ...... . . ..... ..... ,-. . .... .,... .... ...... n.. n. ... _H' ... . ....... ....... ...... ..... ..... ............ f.......... f.E..' f;....:.:.F ":.'lif ..........:..e .......... ..........Med. :."lS ......:.......... :...:....... .. nven ory 0 . XIS m9 }1.9.1 les.~H mergency .......... . 1CCi./ ..eI)'.Ices.) Medic #2 Medic #3 ... ..' Reserve' Units . Medic #2-A City-wide (replacement for #2 & #3) Total Reserve Units = Total Units= 3 Source: Bremerton Fire Department b. Forecast of Future Needs - EMS (1) Existing Demand Between 75-80% of Kitsap County CenCom (Central Communications) calls are for EMS. Over the last five years there has been a 5.4% per year increase in CenCom calls. The number of EMS calls inside the city has been increasing even though the population has not grown. This is due to a combination of factors, including an aging population, a concentration of convalescent centers and retirement homes near the hospital, and an economy in which people may tend to call for EMS to Capital Facilities Program (CFP) - Page 10 avoid the expense of a doctor. About half of the calls are inside the city. The current response time is about 3.3 minutes for all responses. There are deviations in some areas, such as the golf course. These are handled through mutual aid agreements with other fire districts. (2) Level of Service (LOS) The level of service for EMS facilities is a function of response time and call volumes. These in turn are dependent on the number and location of fire stations, the number of fire apparatus units, and the number of firefighters available. The City is developing a LOS monitoring system that measures EMS response time (time needed to respond to a call) and call volumes (the number of calls received from different areas). In the meantime, the need for EMS facilities can be estimated by monitoring response times. The American Heart Association recommends a 4.0 minute EMS response time for Basic Life Support (BLS) and an 8.0 minute response time for Advanced Life Support (ALS). Past these times, a heart patient's chance of survival goes down significantly. . Current LOS = 3.3 minutes for BLS and ALS . Proposed LOS = 4.0 minutes for BLS 8.0 minutes for ALS (3) Future Demand Bremerton's population is expected to grow by 3,410 by year 2000, and by an additional 16,590 by year 2014. CenCom projects a two-fold increase in calls between 1992 and 2005. The City is expected to continue to receive about half of these calls regardless of whether the population increases. (Table EM-2) Capital Facilities Program (CFP) - Page 11 Time Period .. ., . ... n'" .. .. n' " ....... .., ..... ..........., ........ .. , .... ...... ...... ....... . ...., .. .................<). ............T.~~le EM..2... .. ..rVientyYe~r NeEij;f:nEM$u.. . Demand (Population) ... ..... $ix~!!llr 1994* .. ... ..... ... .... . , ... ..... ..... ., .. ....twentY~Vear..Ne~ct/. . 2000-2014 (new) Total as of 2014 = 38,142 3,410 41 ,552 3 o 3 1995-2000 (new) Total as of 2000 = 1994-2014 (new) * 1994 Population per KCAP population forecast. Source: Bremerton Fire Department, 11 /94 16,590 58,142 20,000 4 (4) Need for Capital Facility Improvements The anticipated total need for year 2014 is four EMS units -- three active EMS units and one reserve unit. Mutual aid agreements will satisfy other needs. (5) Plans of Other Providers . The September 1994 Kitsap.County Draft Capital Facilities Element recommends a five-minute response time (from time of call to first unit on site) in urban areas, and a ten-minute response time in rural areas. To provide this LOS, it recommends that stations be located within a five-mile radius of each other, and that a 24-hour career staffed station be located within 10 miles of all areas. It uses replacement schedules for EMS/Aid units based on a five-year replacement cycle, unless otherwise stated. (6) Proposed Facilities The City will need one additional EMS unit at Station #1 sometime within the next 20 years. Existing EMS units are scheduled to be replaced every three years. However, the replacement schedule may be moved up to every two years if call volumes continue to increase. Capital Facilities Program (CFP) - Page 12 c. Six-Year Financing Plan - EMS (1) Six-Year Need The total need for year 2000 is three EMS units -- two active units and one reserve unit. Because the City currently has three units, no additional units will be required to meet the City's need for the next six years. However, three units will need to be replaced within that time. (This includes one unit scheduled to be replaced in 1994, which will not be available until 1995.) (2) Six-year Funding and Proiects The following chart contains the funding sources, capacity projects and non-capacity projects for the next six years. The last portion of the chart reflects the balancing of funding sources and money expended on projects. Any surplus or deficit is indicated. (Table EM-3) . . . ........:.:::.:..;.;.;..:;...;';... :':-.< ".;. ....:>>..:..... ',. :...:::::.:.:::;:;.::;..;......... .::;.- ....:.:;.:'.:;......:-....:::;:;:;:;.. ....;.;...;' "'';'..;.'.:\:' . ........./. i......TableEM;3./............./>i....\ ....i... . ...u$i)(iyearfqo~lqg~rid~roleCt$7~M$,( ..<i. ..... ................... . .. ..., .... .. . . ... n. ..... ....,.. n.. ............ ....... . .. .......,.... ..... . . ..., ..... ... . ............... ...... . . . ... ............ .... ...... n ....,.. ... .......... ...... .. . ........... . . . ......... . ....... .......... . .......... /<F@dingS8Jjicl~{i.. .....199~ ....<J996<H1997 .....(1~ ...i1999i}. 2@}..tr()l~if.". General Fund/EMS Levy /ALS Billings 95 o 95 o o 95 285.0 TOTAL SOURCES 95.0 0.0 95.0 0.0 0.0 95.0 285.0 . ...... ......., .. " ........ ....... ..... . ptojeei.<<)<. EMS Unit Replacement 95.0 ~Iandr 0.0 Note: All amounts are times $1,000 Sources: Bremerton Fire Department, 12/20/94; City Treasurer, 2/95 (3) Operating Costs The following chart reflects the six-year operating costs for the projects listed in the Six-year Funding and projects chart above. (Table EM-4) Capital Facilities Program (CFP) - Page 13 THIS CHART MAY BE COMPLETED AT A FUTURE TIME TO DETERMINE THE FULL COSTS OF PARKS FACIUTlES: NjA NjA NjA NjA NjA NjA NjA Note: All amounts are times $1,000 2. Fire Protection Services a. Inventory of Existing Facilities - Fire Protection The City has three fire stations, one each located in west, central and east Bremerton. The City also has one drill tower jboat house, which is due to be demolished. There are seven fire apparatus and two specialty vehicles. Three of six fire engines are reserve units, on stand-by to replace the three active units. Although there are seven fire apparatus, three engines are not staffed. The ladder truck, fireboat, and rescue crew are staffed by the Engine #1 crew. (Table FP-1) Capital Facilities Program (CFP) - Page 14 li'iFg~~!~;;~.'I:;ili"i~,lf~I~':liif~~~=_i~ll~;ii~l.t;lJ-'Wlwm n:~Jl*j.~y~#ffi~< Fire Station No. 1 817 Pacific 15,346 Drill Tower/Boat House (to be demolished) 5005 Kitsap Way 3027 Olympus Drive 14th & Sheldon Boulevard Total Buildings = 9,389 Max Meigs Fire Station No. 2 Ted Tillet Fire Station No.3 7,640 J,500 ........." .., H' ....,... ". ..... ~i~ Appttt8tu.(.... Fire Trucks . ....--. ..... ... . ...... 'n . ... .. ....... H..... .. .. ............. ........... ..n ...... ... no ......... ............. .. .... .... ... ............ . .. ...... . ......:.::.:.:<\.SeWi&iAre.<:/ ".. ..... p' ... .. ..... Ladder #1 All of City Limits Total Fire Trucks = Fire Engines Engine #1 Engine #1-A (Reserve) Engine #2 Downtown Bremerton to Callow Avenue Same as Engine #1 Callow Avenue to West Bremerton City Limits Engine #2-A (Reserve) Engine #3 Engine #3-A (Reserve Same as Engine #2 East Bremerton to City Limits Same as Engine #3 Total Fire Engines = 6 Support Vehicles .. .. .... ...... -. ... .. ......... .. ... . . S~eCial~y V.hicle~n ... Marine-20 Fireboat Total Support Vehicles = Total Fire Apparatus = o o '" 7 Rescue One Sinclair and Dyes Inlets City-wide Total = 2 '" In addition to the above, the Department has six support vehicles that will cost under $15,000 to replace, but no support vehicles costing more than $35,000 are planned. Source: Bremerton Fire Department, 10/94 Capital Facilities Program (CFP) - Page 15 b. Forecast of Future Needs - Fire Protection (1) Existing Demand The City has three fire stations and four active fire apparatus serving about 38,000 persons -- approximately one station per 12,667 people, and one fire apparatus unit per 9,500 people. The current response time is about 4.7 minutes. The City has a Class 3 insurance rating based on manpower, water supply, etc. (2) Level of Service (LOS) The need for fire protection facilities is a function of response time and call volumes. These in turn are dependent on the number and location of fire stations, the number of fire apparatus units, and the number of firefighters available. Until the City's monitoring system can be further quantified, fire facilities needs can be estimated by monitoring response times. . Current LOS = 4.7 minutes response time. . Proposed LOS = 5.0 minutes response time. . (3) Future Demand The projected population growth within the service area is for approximately 3,410 new people by year 2000, and an additional 16,590 new people by 2014. (Table FP-2) . ....... .... ., ,.. .. n... 'n " .... ......... .. . ...n... ............ ) ....)nriie · Perl()d .. . . . .. . H.,. .n.... .. . ".. '" , ..>./<..)(.......... .. ... .... ......<Tabl~FPi2......i(<....... ../................... . . .. . .. '" .. ." ....... .. . .n .." ....... ....,. . . ................<............... .............<nn.fw;rHyXet1rNe~d:Fife lPr6ie~ionAppar~tu$ . . ....... ...... . ... ...... ......... . .". n' .... ..... ....$ix~Ve.rNeeC:.i\.. 1994* 1995-2000 (new) Total as of 2000 = T~'~ty~viiaf.N.~~/ ./ . 2000-2014 (new) Total as of 2014 = 1994-2014 (new) 16,590 58,142 20,000 4 7 4 * 1994 population per adopted KRPC population forecast. Source: Bremerton Fire Department, 10/94 Capital Facilities Program (CFP) - Page 16 (4) Need for Capital Facility Improvements The anticipated total need for year 2014 is seven fire apparatus. No additional buildings will be needed. (5) Plans of Other Providers The September 1994 Kitsap County Draft Capital Facilities Plan recommends a five-minute response time (from time of call to first unit on site) in urban areas. To achieve this LOS it recommends that stations be located within a five mile radius of each other to provide blanket coverage throughout the county. The element uses replacement schedules for most vehicles based on a 20-year replacement cycle, and for rescue vehicles based on a 10-year cycle, unless otherwise stated. (6) Proposed Facilities (a) Buildings The City, in partnership with several Fire Districts, plans to replace the existing drill tower with a more suitable facility. (b) Fire Apparatus Because the City currently has seven apparatus, no additional apparatus will be needed. However, the City will need to replace its existing fire engines toward the end of the 20 year period, and additional crews will be needed to staff all seven apparatus. No change in the existing number of stations will be needed. c. Six-Year Financing Plan - Fire Protection (1) Six-Year Need The total need for year 2000 is three fire apparatus. Because the City currently has six fire apparatus, no additional fire apparatus will be required to meet the City's need for the next six years. (Table FP-2) (2) Six-year Funding and Projects The following chart contains the funding sources, capacity projects and non-capacity projects for the next six years. The last portion of the chart reflects the balancing of funding sources and money expended on projects. Any surplus or deficit is indicated. (Table FP-3) Capital Facilities Program (CFP) - Page 17 General Fund '1[[sl~~li.irF~ndr~g'1'~~b~~~~~#~~';i9il\CtiQ~j:i:<;'i':i:'i,:,'ii..' H.199~....1996>< .1~...1~.. .1~>. .2000i<J-bt~f/ 0.0 Bond Issue (1991) Bond Issue (New) 260.0 260.0 0.0 ..... Projects. Fire Apparatus Replacement 0.0 Replace Training Facility 260.0 260.0 TOTAL COSTS 0.0 260.0 0.0 0.0 0.0 0.0 260.0 >Salance Note: All amounts are times $1,000 (3) Operating Costs The following chart reflects the six-year operating costs for the projects listed in the Six-year Funding and projects chart above. (Table FP-4) THIS CHART MAY BE COMPLETED AT A FUTURE TIME TO DETERMINE THE FULL COSTS OF PARKS FACILITIES: .. .... . . "......... . . .... .. . ...., .. . .. .................. .> .... ..<. ...<.. ... <icibleFPi4i../ .\n ..\\ ? . . ..SI)(;OyearOp$ratingCost.;Flr~PrQ1~ptjdp .><. ...... .. . , . ... .. .. . .",. .. .... ..... .... ...... ' .... .., n.......... .... ...... . _, ..., ....... n. ....... ., . ., ....... .... ..... ........ . .... n. ... n. ..... .... n. .... d' .... ........... .... .. ...." .. ..... .......... ...... n...... ..... .......... ., ....... ......... ....... .... -,,, ........ ......... .......... .... n. ..... ........ ... .. d' ...... .... ...... .:::...:;~; -.:.::.. . : ..1~~.;:~~......,.::. . '::'\\\1998::}r/;:::: . <}:?)i99$f:/..: ::f. '>?~~;~i\::.2OQQ~:~:;~:: .r;:;: ::~{(.;i~f/t(ijar)j':::<;/::::: NjA NjA NjA NjA NjA NjA NjA Note: All amounts are times $1,000 Capital Facilities Program (CFP) - Page 18 ; :!/ .r:~ --1J.~ 1.........~ifQ-rP- ~:;l; ~'lIl~1!J1';:;:\L;;". ..~~,..:..o. "" !/~~;~....~~0rP-O r..~..... /'. ~ .. t ..-... J ~'.".. 1 00'" .... z. ~J, !~: 't~: :'~ ~l(l, ~ I~I:,,' ~ IVLiI' .~' ~ ......~~.. n ~ I 'I iil. . .'iif . ~ . L i , ~ il I . . ! "0-. I -".'- .. - " ''!$!:I! 'Im,i . ijL.ll..JL .1!U1'~'~ i! a.... - '..">--- :.Ji'" ~tJd~ "':"-=~' J' I fH -;--t,. .. _.....,~ :... . It ... -'..---.-.. 111,':' 11 11~IP.'I':: .~' ;~'B ."~' II'; .. ~-:: ' , 1:1a I ,,*,-,\Z ...... - t - . " I ~ 1.,11 I ~ ".. . . - ',.. .llWII'no. It' H".n. ~'! !.. I ~~~ ~ ~ -.. ~~:: __ -~ ~ ... ", ~'~ =---""~,,,,, .". 'jl!.. ';1 . - ., .'-' ...- '-'~f ! , -~M\r',,"";JII! lil'~:~I:;,U~i'~~~I-~j~'r; 1 ~.... ll'.\r '_ I. 1!'."hi'n n::1 .-' .-' .. .......-'~~. ' , ,I ~l I ._: ,:-':..' 1'j'II'l. '. '"'. :'.' ~,~ V. .~ ~.,.o~ . ~ ./ ~"'''. =~ : f!!!f-?.r; ~, · r>"" "'~:l i~ .... . ifr:'~;j,.1 ~~~ l ~ I"~- -Ii. I r. - j I' f " ! ',I ,,111~. ~ _ ~ !l...::................ _.,...ID~~,.q:Md. f.i1-1.:k'~ ~." !~Jty(;.,~- l-a~~:' '. ! ~IJ ~ i""~ 1;. II I~I ! ~~ ':.... ':" /,; II, II H.'. .I~I ~ . '.m J ....... h il\'i ~ -i1!l1Ifi W';,N.4"1 E ' if ~i )"11 .., : -""j;@ ;II~":. }.", -::::., ..'~_. 'I' "\'!/JL.-., +-".l..;." --~.. =y= -- :~ ;~. .. 'l' '11f! IJ ' ,..." "" ,.,,", .. J J J- ; J , ~ Q: .t,:;]1 'J. ~!. ~ JJ@!-": Vi ~.' . ....,. -I' . ,- ,_.' . "f '.. = w_ Ii' 'I,r;- ~ J ill:' (.o[ . . "'-':. lit '~"~l, ,- . ~ '.. ';, " I ":::. ~ .~;'~~:I n1'" ~ Y I _ ~.", ...!!, ~ " ~~'=. hi'HJ :>; 111 ;ilh~f _ " '.. ~;, ~ ;1';: ~ ~fo 7. 3 ~ ir.\ - If, .., ",., 2'< 'is/').- J :. - ';~ " . '. 1 'I'; '. ~ ~ = ~~'-1. '.... \ ~~"-I~ ir .~, 3 il:it-'~ t!:f !'l' j ~;~.;. ...! J j i D ..-. ..... .' '-n~ '~.~'l- ~.' -'- =-. .... :t ~ _ ) ;1 ....~" ........ ~ ~ -"n ... ". i r; ,. Ar ..- -" r- . e ;:po, .''''' U'!' . tf. ";~ t ,~ -'" . -'i I" N. 0 . . ;!".i. , /t, .. /:.,..Jl' .... '.-"""", .' ,. ;:! . I -~1'.g :k i' ,I. .if'./ .....-.-,...... . ." -,c;;,!!I'! l""''''''''''''.xl- 1== ~ -:~!;;( -'\.:,-" j' ._,.p ~.o;,,\ /~ - jI.'-.-': ...:..:-: .:.'. :;..:.. ,.':: '.-: .:'~ <'1 ~ '., '~Io<-:o' k, /~ - ., . --.. .... .. " grnJ,rl=f:~ rvr- ~.. r<>~< (~:.. ..~.'. ~;. ~ ....:.'rn:~a .:....-'ro=, ~.'::<.~ i!;~ '\ ~.., -......::;:-......'"'f~.--r: ., - =1-.'... :. "'-1' =!. = ~ il t;'" .:.. '-:." --,<:'j -;::: I .. ~ i~ 1J -.~'i~ I!r.. ~ ~ d~)r -' ~ ~ ~ J~;;:.! ~ .,,:.,\\ f!;!_.. ; '1' . ~~ . 1( r<-. .I,lJ-'l: ,'::,~ .-_. :'.::'~ /lj \\:"""""1," !.- . .,' . -il ....::... ~. .~ ;,;j&I:2'''' ~ -, I' I.J~ I, . ,~ . _=1 if :I~ li~~'-' I - -':::= ~p; ~ " .. l!i "'. i\! h . II>. ,._: ---I~ . 'Ill h -'Y .-. J. . ~~ OIl;. i':~~t i'...:J-,~ i~::.~ -~t" '-1 !'Ir~~.~..<'~~~ ; - --: ~ _d1:'ltl::::'~_: ,":. 1~: ';,T ~~"--v--"- 0:- "C:"~.~.2i- p' '-7.1.-- ...E:~' ~ o~.. /~ /"....~. . !~ ~. ~: It....~;.. .b(......- -.......... .. .. <" ... ,..~ ~ '" E >- t ~ . (~ -j ~ :;; J. ."'==" I ~ --- 0 ~ '-- ;';'''jjl! . Ji 1, .~. !i IH l' i II It- 'I'~ ~, ~",.a~J"~ 1 ,.....-~-;i*:...:.. _ ~ ......~JI !i 2 = , " Ii i" . '. I,. ~i . II. ~ . II: ; J ~ ~ ;: ~. . 01 ~ Ion to --;;: ,II! ~ ^ =~-: ;i.' ~ .. l. A'T - ~..:<.. 1'.._' .-'.. I jl=" ~~w~""'~""'~ ".F ,'II e"" '''~ 1-' I /I' I(fI ~..i:.{ ::.. '\ .-: J I.' ;;;..~I.,~ .. -.. E \ I OIL ~"- 'j,;iS,~'~'":,,,,,,, . ..,,p-niC11' ~ "fl~--':. ~.... -. -"d j . · 1"'1, ! I . ""'~!:::';-:9 r ~ -':',~, r:' . .ij' _...w ~_'P. J -- I . t--... ..........., ./ , (j 1'.1" ",-., '\. ' . ....., r.. ., ....... '.,--.' .. ~ - , -..- 'd. ;0 :1 .;' - "::'~i1 :~ -L1 " ..~ t\' ~ II, i;ii~ ~';']~~1t~)Jr~..." 9. ,k~.!-" ;P" ' _~~ ~~~~~~, . ,5 I . "---'" .... '-.' .........__....w. "', :':' "~" ~ iR -=-'J" ~ - J .'-."":", .-' , II k ..:.......~ $l ~ ~ ~:~ ~I~ i~!.'~ I! ,,:: ~Q':'~:~1.:v/ on ~ ..~ J- U l-,,", , ]. .__.: 'p.,i"l.tY t. .~ .. ....R\ ~ I I . 1'~\'\ 'J _. j ~ t . ,j 3 , ' , '._.../ .I! ~ I ~ ".~n!id:.-.\'-....... !\~ '. _l..__lj'..... ... ~ 3 , r 1 ...... J. ~. ~ -r::;;;; J~ L - ~" /j IS ." 1I1l1..~ -J } ~ " ~ ~-----1"~/../}tr J1' '.~....- ~ ~~I-:'~"-" ,~AiF . ..~.;.,,! : IJ;J ~, I ,1\ ~ XJ.iJ~ ~,... J -~. _I.~ .lara.no. wn' I~ l---' . ....,..,,,,,,,.......,,,, "1/il;.... //..",; -..~..,."..,...., ~ C/J CI) (J) :e CI) '0 :e tf '0 tf ~ CI) w .2 ......... o ~ a. u: ~a II ~ ~ '\.. '\, .,. ....,~, '\=J; ". ==- ~ 1== ~ ... I>l ~ ~ ~ Figure CF-2 Location of Police and Fire Department Facilities Capital Facilities Program (CFP) - Page 19 B. Law Enforcement 1. Inventory of Existing Facilities - law Enforcement The capital facilities used by the Police Department are buildings and vehicles for patrol officers, investigations officers and administrative staff. (Since the cost of vehicles is less than the $35,000 capital facilities threshold, these costs are included in the Annual Budget but not in the Capital Facilities Element.) The Police Department is currently spread out over three facilities in three different locations. Administrative functions are concentrated in City Hall, convenient to the Municipal Court. However, the Patrol Division is housed in the West Precinct, along with the Animal Control Division, and the Drug and Gang units are located in the old Capital Hill Fire Station. (See Figure CF-1) (The City currently contracts with Kitsap County for jail services.) (Table LE-1) ..".." , ." ". . "'"'' . .. .. . ......."...".. . .. . ...<FaClIItY'Name .. "",,,,,.. " "" . " "." ....'.',' 0, r. ..... Loeatt6n< ........ 239 4th Street .. . . . ., n. .. n. . .. " . . . "'" . ..... .... . . . - ,,,. . ..." .. ..... . n. . '." ",."" .........., .. "..... . . .. ... . .. ... . .. . . .............. . ..... . .... ....... ... . ~ ".Ib.. LE".1. ...... . . . .. . .,-" ... ". ..... .. . . . . .. . .,........"."" '. ." .. . . ... . ... .<>>> .... ....... .>)8 e ~. .......i>.. . ......> ...<Inveritoryof ~xistjrig Facilities.. ~ t..awt:nf(:)rcel'nent City Hall/Police 4846 Auto Center Way 7,085 3,700 450 5,400 Total = 16,635 West Precinct/Patrol Headquarters West Precinct/Animal Control Capital Hills Fire Station/Special Investigative Unit (SIU) 4846 Auto Center Way 3001 6th Street Source: .Facilities Management Alternative Plans., Department of Public Works and Utilities, 2/14/94 2. Forecast of Future Needs - Law Enforcement a. Existina Demand The City has 62 law enforcement officers operating out of over 16,600 square feet of buildings -- 268 square feet per officer (including support staff). b. Level of Service (LOS) The need for law enforcement facilities can be estimated by projecting the number of officers that will be needed to serve the forecasted population, and calculating the building space needed per officer. Currently, with 62 officers, there is one officer per 615 persons. Capital Facilities Program (CFP) - Page 20 There is no consensus on staffing levels for local police departments. The ratio of both officers and total police employees to population size is significantly related to crime rates. However, there are many variables that enter into crime rates. Such standards have limited meaning because the actual number required will vary depending on the size of a city, geographic region, and type of city. Even cities of the same population size and type may differ widely in staffing needs because of differences in demographics, socio- economic characteristics, climate or other unique conditions. Washington State cities as a whole have an average of 1.6 officers per 1,000 population. Bremerton's staffing level is the same as the state average. Compared with available staffing levels from several Washington cities, Bremerton's staffing level falls between Yakima, which has a higher population, and Des Moines, which has a lower population.1 38,142 21,330 12,190 5,415 Officers / 1000 3.06 1.7 1.6 1.6 1.5 1.9 2.3 City Seattle (1989) Yakima Washington average Bremerton Des Moines Moses Lake Poulsbo Population 531 ,400 54,843 The Police Department feels that its current staffing level is too low, given the City's crime rate. The Department recommends that 70 officers could provide a preferred level of service for the existing population. While the City's staffing level is the same as the state average, it may be that escalating crime rates are catching many cities short of staff. Another difficulty in linking staff levels to population in Bremerton is that the City's population fluctuates up and down with Navy population levels. For example, Bremerton's population dropped from 38,142 in 1990 to a low of 35,920 in April 1994. It has since climbed to 40,801 by February 1995 -- an increase of 4,881 in less than a year. Police Department staffing levels need to take into account these typical population fluctuations. The following table contrasts 1990 and 1995 levels of service for officers with the Department's preferred staffing level. , Source: Level of SeNiee Standards: Measures tor Maintaining the Quality ot Community Ute, Municipal Research Services Center of Washington, Report No. 31, September 1994. Capital Facilities Program (CFP) - Page 21 Officers . .... ,. .. .. ... ....... ..... . . '. . .. ... .,...... ."..".. .. .. '. ,... ".,... bflicers per 1;OOOPQPulattioni ... . .-- - -- .. .-.,- :.. '.-"', '".' -, .... ". ...... .... ,," .. . .. '"..., . . . ...............t~v~1....6f...servi.~~.....:a~~.~~~r~~~erit .Orii~eri.................. . 1990 58 Preferred * 70 1.5 1.6 1.8 1995 * 62 * Both 1995 and Preferred calculations assume an average population of 38,142, consistent with the adopted Kitsap Regional Council (KRPC) population forecast. Source: Bremerton Police Department, 12/94; City Treasurer, 2/95. The Police Department considers the existing building space to be inadequate for the current staff level of 62 officers. The existing law enforcement facilities are spread out in three different locations, and building space is not efficiently designed for law enforcement purposes. This is particularly true at the Capital Hill facility, which houses nine officers in 5,400 sq.ft. (600 sq.ft.jofficer). A more accurate measure of the existing space per officer can be determined by omitting the Capital Hill facility and staff from the calculation. Including the Capital Hill facility and staff, the Current Level of Service is 268 square feet per officer. Without that facility and staff, the Adjusted Current LOS is 212 sq.ft. per officer. The proposed LOS is lower than the Current LOS, but higher than the Adjusted Current LOS, assuming that the existing facilities will be replaced with a more efficiently designed facility. The Proposed LOS assumes that new facilities will be located in a remodeled existing building rather than in a new facility that could be designed to meet law enforcement needs most efficiently. . Current LOS = 268 square feet per officer . Adjusted Current LOS = 212 square feet per officer . Proposed LOS = 250 square feet per officer c. Future Demand The projected population growth within the City is for 20,000 new people by year 2014. At the current level of service, the City would need 95 officers by year 2014 -- 33 additional officers. At the Police Department's preferred level of service, the City would need 107 officers by year 2014 -- 37 additional officers. (Table LE-3) Capital Facilities Program (CFP) - Page 22 ~ll!!lill;l!i~;,!!!ll';1II~~~!!~!!~.II~;1m'lIllll1ltR!li,frE2- ................1.~6 .. ...........200tti.....~~.~ .............I~ijI~~wQ.tric~~i,~~Q1~i>/ 1995 Officers 38,142 62 70 41,552 68 58,142 95 107 20,000 33 37 Population * Preferred Officers 76 * 1994 population per adopted Kitsap Regional Planning Council (KRPC) forecast. Source: Bremerton Police Department, 12/94; City Treasurer, 2/95. d. Need for Capital Facility Improvements To maintain existing staff levels to year 2014 at 250 sq.ft. per officer, the Police Department would need 23,750 square feet -- an increase of 8,250 sq.ft. over 20 years. To maintain the Department's preferred level of service to 2014, it would need 26,750 square feet -- an increase of 9,250 sq.ft. (Table LE-4) . .. . . ...> ... ..................... ... . ... . ... ... . .. ............ ................................ .. .............................................. ..... .... ........ . ...... . .. ..... .. ~;:~ct~~?~ij~~~N~dt~~~~~~~~~i~~~~J~I~~~III~!lilllllllll~illll .... "".. . . .. .... ...... ................. Sceriarl9 * . ..... ........ ..j9~~Abtual ." ., "1995 Need " .~dd6>/20141995-~~i#t6~~iii 1995 Officer LOS 16,635 16,635 15,500 17,500 17 ,000 19,000 23,750 26,750 8,250 9,250 Preferred Officer LOS * Staff levels per Table LE-3 @ 250 sq.ft./officer. The following table shows the future need for Police Department building area by year 2000 and by year 2014 at the proposed LOS of 250 sq.ft. per officer. The year 2000 need is based on continuation of the 1995 Officer LOS (1.6 officers per 1,000 population). The year 2014 need is based on a gradual increase in staff levels after year 2000, with the goal of achieving the Preferred Officer LOS (1.8 officersj1000) by year 2014. (Table LE-5) Capital Facilities Program (CFP) - Page 23 "."". ". . . ........................................ . ...../>.. Tim.<P'ri~d/ . Ilii!li.,':l!,;;i~;;~;~ii;i'tii!li~~fj,~~~;~Yt1:~~~r'fe~~iE!~il~i.i~Y~"i..' . . .. "..".. . " .. ...... ...". .. ..... ".. "...... .. ". .......".... "" ... .......". " .. ...."......".. . .. .>$quat'.. F.it<Reqllired @. ~5Cl!q;~;P!.t ....... .. .... .... .. .. > Officer < .< . ..... ""....... .... .."... sQS;';.N~>//>>.. . .. .... . .. .". . 1994 * 1995-2000 (increase) Total as of 2000 = 38,142 3,410 15,500 1,500 . .'" .......'............, . ..... . . ....,. -. .. . .. ... ...." ..... ..... .. n Twenty..YearN~~I;f>\ 2000-2014 (increase) Total as of 2014 = Total 1994-2014 (increase) = * 1994 & 2014 population per KCAP population forecast. 16,590 58,142 20,000 9,750 26,750 11 ,250 e. Plans of Other Providers The Sheriff Facilities Plan of the Kitsap County Capital Facility Element bases its estimated facilities needs on county population forecasts and the present level of service of one commissioned deputy per 2,030 persons countywide or one deputy per 1,421 persons for the unincorporated areas. It aims to increase the number of officers per unit of population incrementally from year 2006 to year 2014 until the national standard of one officer per 1,000 people is reached: one officer per 1 ,200 persons by year 2006, and one officer per 1 ,000 persons by year 2014. Based on this LOS, the County will need 118 officers by year 2000, an increase of 13 officers from 1994. Facility needs are projected to be 170 sq.ft. per deputy, an incremental expansion of existing square footage (17,900 sq.ft.) to 36,040 sq.ft. in 2014. 1. Proposed Facilities The City is in the process of developing a City Facilities Management Plan. A Facilities Management Alternative Plans study was prepared in February, 1994 to help plan for near- to mid-term facilities needs for various City departments. The goal and objective of this plan are the following: 1. Consolidation of Departments to improve communication; coordination; and streamline department management goals and objectives; and 2. Economics resulting in less property to maintain; centralize departmental needs; and reduce department managers lost-time due to existing decentralized departments. Capital Facilities Program (CFP) - Page 24 One of the options under consideration includes selling the West Precinct building and the Fourth Street City Permit Cente~, and re-Iocating displaced City departments. Under this scenario, all police services would be consolidated downtown, either at City Hall or in two floors of the Fourth Street Building next door. In either case, there will need to be extensive remodeling of the existing facilities to meet the varying needs of law enforcement. Current work space per officer is very limited, and an expansion of this space will allow for better service to the citizens of this community. If two floors of the 245 Fourth Street Building are converted to Police Department facilities, the Department would have approximately 19,500 gross square feet (9,750 sq.ft.jfloor). This would provide a Building Area LOS of 287 sq.ft. per officer at the 1995 Officer LOS (or 257 sq.ft.jofficer at the Preferred Officer LOS) by year 2000. However this space would be deficient by year 2014, when it would provide only 205 sq.ft.jofficer at the 1995 Officer LOS (or 182 sq.ft.jofficer at the Preferred Officer LOS). The City is concerned about the rising costs of providing jail services. However, there is no expectation that it would be cost-effective for the City to construct and staff a new jail facility in compliance with State regulations. Therefore, the City proposes to continue to contract with Kitsap County to provide jail services for the foreseeable future. 3. Six-Year Financial Plan The total need for year 2000 is estimated at 17,000 sq.ft. in one consolidated facility designed for law enforcement needs. Remodeling of two floors (19,500 gross sq.ft.) of the 245 Fourth Street Building, or comparable space in City Hall, is expected to provide the necessary space for at least the next six years. a. Six-year Funding and Projects The following chart contains the funding sources, capacity projects and non- capacity projects for the next six years. The last portion of the chart reflects the balancing of funding sources and money expended on projects. Any surplus or deficit is indicated. (Table LE-6) It should be noted that the following six-year financing plan shows the total estimated cost to consolidate City offices in the Fourth Street Building and City Hall. Therefore, this cost is not exclusively the cost of providing law enforcement facilities. 2The City Permit Center, located at 286 Fourth Street, currently houses the Department of Community Development and the Engineering Department. The Engineering Department will be moved to the Public Works and Utilities Administration Center at 3027 Olympus Drive in spring 1995. Capital Facilities Program (CFP) - Page 25 "";""y~i~:~~inij~n~~r~~~~:d~~J~~~~~: ~.~n~ln~'Iji1~r~~.@~',."" ... . ......" ......... ... ..J995.. 1996 jgg7 >1sge .. .. 1999. . 2000 t~a( ... . 200 200.0 606 606.0 534 534.0 1 ,340.0 0.0 0.0 0.0 0.0 0.0 1 ,340.0 General Fund Bond Issue (new) Property Sale TOTAL SOURCES .. . ... Project~ .. Balance ... 0.0 Notes: All amounts are times $1,000 Source: City Treasurer, 2/95 b. Capacity Balance The following chart demonstrates how the projects to be developed over the next six years provide the required amount of capacity at the adopted level of service standard to meet the needs of the existing population and projected growth. (Table LE-7) . ...... . .. ..."... ...... ... . .... n..... . ......... ... ....... ............ .... ..... .. ....... .. . ...... .. .. .......... .......... '... ...... . .... n. . . ......... . ...... ...... .... ..... .... ... .. ..... . n. Sq:ft:C?~r,elJtiy<.... ..\...(N8t R.S8rvepdt................... . . .t\~.lIable~.)<. ....t:)'fic:I&~cy(sq:a:)/ ....... 1995 (Existing Need) 1995-2000 19,500 4,000 19,500 4,000 2,500 ..... .. ... .... . ..... Projecftt .. Remodel Fourth Street Building/City Hall . . .. . . . . ....... .. . " .... .... ....... ... ..... .... ." ...... .. ... ........ .<<Sq:Ffildd~d 19,500 2,500 Total as of 2000 = 19,500 '" LOS = 250 sq.ft. per officer. *'" Assumes availability of 2 floors of 245 Fourth Street Building or comparable space in City Hall. Capital Facilities Program (CFP) - Page 26 c. Operating Costs The following chart reflects the six-year operating costs for the projects listed in the Six-year Funding and projects chart above. (fable FP-4) THIS CHART MAY BE COMPLETED AT A FUTURE TIME TO DETERMINE THE FULL COSTS OF PARKS FACIUTIES: ..iliii~~~~:~rlf~!~I\It'~mM~~I!::!i::!lllllj!jl!I\\"\\1!,iiii,'Ii.j n. . . . .... . . ..... ,... ........ ... ...., , . ................... ......... ............... ......... ..... .. . ... ... .... .. ..... ...." .... ... ......... ............................... . .............. ...... .......... n.... .. ...... .... ...... .. ... .. ... ........ ".. ..... ...... ......... ........ ........., ...................... ......... ... . .. . . }}il99S....}.. ......)i998......).j991...... ... ...... ... . ..1998/ .i~H ........................~QQQ ....................[m~'./ NjA NjA NjA NjA NjA NjA NjA Note: All amounts are times $1,000 Capital Facilities Program (CFP) - Page 27 c. Parks The City of Bremerton provides a system of local parks (neighborhood and community parks), regional parks, and open space parks. This system is managed by the City's Parks and Recreation Department with the help of the Bremerton Parks and Recreation Commission. The park system service area consists of all land within the incorporated city limits. This parks capital facilities program draws upon several planning efforts. The program: . Updates and replaces the City's Interim Capital Improvement Plan: Parks and Recreation Facilities adopted in April 1992. The Interim CIP was adopted to allow the expenditure of special funding sources authorized by the Growth Management Act (GMA) for park purposes. . Builds upon the April 1993 Draft Capital Facilities Plan Element: Parks and Recreation Facilities developed by a joint Planning Commission/Parks Commission Capital Facilities Plan Advisory Committee. . Reflects preliminary recommendations of the draft Five Year Comprehensive Park & Recreation Plan, which will update the plan adopted in 1989. 1. Inventory of Park lands The following inventory lists local, regional, and open space park lands. Both the number of developed and undeveloped park lands is given. a. local Parks To assist in analyzing service levels, local parks are divided into two categories: neighborhood and community parks. (1) Neighborhood Parks A neighborhood park is a combination playground and park designed primarily for non-supervised, non-organized recreation activities. In addition to their recreation value, they also provide a source of open space and aesthetic quality in the neighborhood. They are generally small in size (about 3-10 acres) and serve an area of approximately one half mile radius. The City's neighborhood parks range in size from less than one acre to more than 27 acres. (2) Community Parks A community park is planned primarily to provide active and structured recreation opportunities for young people and adults. In general, community park facilities are designed for organized activities and sports, although individual and family activities are also encouraged. Community parks can also provide indoor facilities to meet a wider Capital Facilities Program (CFP) - Page 28 range of recreation interests. Where there are no neighborhood parks, the community park can also serve this function. Community parks serve a much larger area and offer more facilities. They usually exceed 20 acres in size and often have sport fields, water bodies, gardens, nature trails or similar facilities as the central focus of the park. Their service area is at least a 1-2 mile radius. The City's community parks range in size from one third acre to 54 acres. The following table includes an inventory of local parks, listed as neighborhood or community parks. Since not all local park lands are developed, both the number of developed and undeveloped park acres are listed. (Table PK-1) ... ... ..."" P' ......... . . n. .. ....... ... ....... .. .. .... .... ... .......:..><.<::..::x...>:..<<<:::::::::::::::::<<::<:.............:.<::<::.:..:.... .... :......... ....::.:.::.::::c.:c....... c...c.....<..:.:../>...::::::.::::::.:.c.::.>..>>:.:.:<::<::<:>::::>:.:<::::>c>:::..>>:<;';:::>.<<::<:: . ....... .... ...:.:.)..... . . c<c:::.:: ..: cC..>::::::::::::.::>.::..c:.:.:.c:.c:.:.::::::::.:::::.<::..c .:.... . ::: c:......... .. ....Tabf'fPI(..1. .:..<.::::<::.:.:.:.::....:.. ::::::..:::c......c c .:::c... c..::..:....}.//.::::...::::::.<:}:.: .. >:::;:. :=.::.:};;:::;::.: ...> : :>/<:~ri~~rii8fY..:6flo~~e~~~'.:..:..:....:'..:. ...:/ .:)::>/(</... . :....::.::. ../ . .. . . >:.>:..:...:... .:: ...: ..:.:.:.:...:. c.....ccc:.cc <<<.>:<<<<<. ~ :.)J . ..... . . . .. .... . ............/.M.:....~p#..:.:..:....r :":parkN~m.. .. Oeveloped. . UndeveloAAd ""Total .. .. ........ ......... ............ . . ......... ..: .:/: ...}} .: ..: l.)i;~re~l<<(~~~~~).. :<Acr~~ .c...cc. .cc............. . .. ............. . ... ...........: :..<....::: : <.:....c.. .. >.>.::: .:>..:.. ..>.:......:\).........:..........::. .;::;:::.:.::::.::::... ... :.::. .. :.. . :.: :..c ... .c.:::.:>>>: : ij~r.gij~rff~~park..\ . ,>.;< :<.?\>...... < ....})...::.:/ .\::... .:.:...:.. ..:.:: .:....;:: 7 C.P. .Pat Carey Vista Tracyton Beach Road 1 Forest Ridge Park 6th/Summit Ave 3 Kiwanis Playfield 4th/5thJVeneta 5 Ninth Street Mini-park E. 9th/Shore Drive 6 Roto Vista Park 17thJWarren 9 Smith Playfield 1198 Elizabeth 10 SR-3 Park Arsenal & Kitsap Way 0.5 0.5 27.3 3.0 0.02 27.3 3.0 0.0 0.7 3.0 0.7 3.0 3.75 3.8 Total Neighborhood Park Acres = /Comriiijriltypilfks.. : : .. ..( 12 Bataan Park Sylvan/Olympus Dr 13 Blueberry Park Sylvan Way 14 City Hall Park 4th & Washington 18 Jarstad Park Old Belfair Highway 20 Manette Playfield & 1140 Nipsic Senior Center 24 Warren Avenue Playfield 11th & Warren 25 Wycoff Memorial Park Pacific Ave/1st St (CBD) Total Community Park Acres = 37.27 0.00 /\ :.:... ..:.:.:' ...::.:..::.. : .).<:.:.:..:::::. ::"..:::.::..::. .:. 1.0 37.3 .......:.:..... 1.0 6.9 6.9 0.3 0.3 4.0 4.0 2.58 2.6 3.0 3.0 0.02 0.0 10.90 6.90 17.8 : ::.. ................. ............ ..: .....:: :T.~t;ri~~:fP.~kA6r~Q: :.. .......... : :: ~~Mt :: : :6.90:< . . ......... ...55;1< Capital Facilities Program (CFP) - Page 29 b. Regional Parks Regional parks are recreation areas that serve an entire region. They are usually large in size and often include areas of natural quality suitable for outdoor recreation activities such as golfing, picnicking, boating, fishing, swimming, camping and hiking. If located within an urban area, they sometimes offer a wider range of facilities and activities which serves the entire region. The City's regional parks range from two to 190 acres. The following table includes an inventory of the City's regional parks. The list of regional parks includes "local parks of regional significance". These are parks that have traditionally served as local parks, but because of special features such as waterfront access have taken on a regional role as well. For example, while Bachman Park is a very small waterfront park in the Manette neighborhood, it has become a prime regional sailboarding site. These parks are listed as a subcategory of regional parks because they have been identified in the May 1994 draft Kitsap Countywide Comprehensive Park and Recreation Plan as parks with regional significance which are eligible for countywide funding participation. (Table PK-2) c. Open Space An open space park consists of undeveloped land primarily left in its natural environment, with recreation uses as a secondary objective. It is usually owned or managed by a governmental agency and mayor may not have public access. This type of land often includes steep hillsides, wetlands, large forested areas or other similar spaces. In some cases, environmentally sensitive areas are considered as open space and include wildlife habitats, stream and creek corridors, forested areas or unique or endangered plant species. The City's open space lands are often heavily wooded, and development, if any, is usually limited to trails. The second table on the next page includes an inventory of Bremerton open space park lands. (Table PK-3) Capital Facilities Program (CFP) - Page 30 ........................ ...................... . ................... ................... ..... ...... >>J.>.>.>....<i..... ..... .... .. . .. ......... ......... ... ....... .. . ....... .. .......... ... ........ . ...... ..... ... ........ ... .............. ... . . ..... ....... . ....... ....... ............. ...................... .. ..................... .... . ........ ..... ... ........ . ........... ..................... . ................ ............. .. .. ......... . .... . ................ ........... Map ... .... .P.'tkN.~). Di~~lDp.~. Qijdeveloj)4ti:f fOliE . ................ .... ..)j ...(~~r..) .{A~'e.} ]A~~!~t # ... . ......... ... . .... 28 Bremerton Boardwalk Downtown waterfront, 1 st-4th 2.0 2.0 26 Gold Mountain Golf Course Old Belfair Highway 190.0 190.0 27 Lions Community Playfield Lebo at Hefner 15.0 15.0 29 Pendergast Regional Park Union & Werner 25.0 25.0 50.0 Total = 232.00 25.00 257.0 ... .. ....... .. ...\i<......... .:.:.. ......:> .. . . . .. . ............. ..... .. .... ..... .... .. ..... .....:.....<..i.... .. .. . .......... .. Localp_rk$ofRegionaISlgnlfical1c:i\. . .>......r ....... ..: ........ ..>.. 1 1 Bachman Park Shore Drive & Trenton 0.5 0.5 15 East Park Magnuson Way & H.Jones 1 7.5 17.5 16 Evergreen 14th & Park 6.0 6.0 19 Kitsap Lake Park Price Road 1 .8 30.12 31 .9 4 Lent Lane Park Lebo Boulevard 1 .5 1 .5 22 N.A.D. Marine Park Shorewood Drive end 27.5 27.5 21 NAD. Upper Park 6002 Kitsap Way 2.0 52.0 54.0 8 Sheridan Park, Lower Lebo & Clare 6.1 6.1 23 Sheridan Park Community 680 Lebo Boulevard 4.0 4.0 Recreation Center Local Parks of Regional Significance = 37.90 1 1 1 .12 149.0 ... ......H.. ... ... .. . ...... ......... ....... .. ........... . ....... . ......... ....... . . .... ..... .. .... ... .. ........... .... ... . . .. .............. ... ...... . .... ...... .. ..... . ...... .. . .......... . . ..... ...... . .. . ..... . .... ... ........ .. .. . . .. ..... . .. ......... . \.<: > ..... .. :.. :,.ota(Regi()na]ParkAcre~~) .....269 90" ....:.:.13Ett~ >.406.0.... > :<<. .:':':'>-::':':'::::~:' . \f .... .. ..... ..... .. .. .... . .. ...... .............. ....... ...... 11 13 31 Eastpark Nature Area Holly Terrace West Ivy Green Cemetery Stephenson Canyon ... ...... ... . .... ........ ..... ............. ....... ... . ........... ............ ........... ..... .. . ............ ........ .... ....... .......... .'Add..'i. .......... .... Wheaton Way at Magnuson Near Monticola Way (off Sylvan Way) Naval Avenue . -.... .. ..-. .... .-. . ...... .. ... . ....... ..... ..... ..... . .. .. ....... ...... ..... . . .......... .. ....... ... ......... .......... ...... ... .............. ... .......... . ............. .......... .. ....... ... ..................... T. ....b....J.......P....K............... ......... ... ............. ......... ............. .. .. ..>./.a . e' . ..3< .....:</.. . . ........... .-. ..... .. .. ....... . ....... ... .......... ....lriyentoryQf6periSp~e~t(..... ..... ...Mar/#< . .. 7 14.4 Between Lewis Lane & Willow 3.0 13.0 28.0 Beautification Areas/Pocket Parks various locations 1994 Open Space Acres = 58.4 Capital Facilities Program (CFP) - Page 31 d. Total Park Lands. The City has a total of 520 acres of park lands including the new Andy Pendergast Regional Park now under construction. Of these park lands, 28 percent are undeveloped (not including open space). (Table PK-5) ::\;:II!IIh;;;;(;$ummary.ln"ent~~I~~~~~&ndS (Acrlls).. ... .00000.'.0.0.0.......:000000.:00.00.:.. ::':<<0;.;.,. .......0.... ::.;0;0:.;.... o <'type' 0 HJi'iPlace12/31f94 Undeveloped TOtal Acres . .. ./ .... local 48.17 269.9 58.4 376.47 6.9 136.1 55.1 406.0 58.4 519.5 o ... .0. % Developed 87.4 66.5 100.0 72.5 Regional Open Space Total = 143.0 Note: Open space parks are listed as developed, since there are no plans for further development. 2. Forecast of Future Park Needs a. Existing Demand With 519.5 acres of park lands serving about 38,000 residents, the City has 13.6 acres of park lands per 1,000 persons. (Table PK-5) .. b. Level of Service (LOS) The need for park lands can be estimated by comparing the number of existing park acres per 1,000 persons with national standards. The National Recreation and Parks Association (NRPA) recommends a total LOS of 15-20 acres per 1,000 persons for local and regional park lands. The following table compares the Existing LOS (ELOS) and the LOS recommended by NRPA. According to the NRPA standards, the overall City LOS is just below the recommended range. Compared to the NRPA standards, the City has ample regional park lands but falls short in local and open space lands. (Table PK-5) Capital Facilities Program (CFP) - Page 32 . .. ......... ....... ......... ,,', . . ......... ....... ............. ......................... ....... . ....... ..... .... .........'................. .............................. . . . . . .. . . . . . . . . .. .. .. . . . . . . . . . . . .. ...... - . '. .. . . . . . . . . . . . . . . . . . . . . .. .. . . . . . . . . . . . . . . . . .. . . ... . . . ... . . . . . . . . . . . i~~'.<.Exi~!llgt6st .....~RPA'(jS(A~re.j1;0CJ6jprapo~~tQ~\ Local 55.1 1.4 6 - 10 1.7 Regional Open Space T etal = 406.0 58.4 519.5 10.6 1.5 13.6 5 - 10 3.6 13.9 1.4 16.9 15 - 24 Existing LOS = Acres /1990 Population x 1000 (1990 pop. = 38.142) The NRPA standards are intended to be used as a guide, realizing that local situations vary. If Bremerton's 149 acres of "local parks of regional significance (Table PK-2) are added to the 55 acres of local parks, the City has 204 acres of parks serving local needs -- only slightly below the NRPA recommendation. Further, subtracting these 149 acres from the total acres of regional parks still leaves the City's regional parks within the NRPA range. (Table PK-6) ...... ... " ......... .... ... ..... .. .. . ....... ... .. ...... .. . 0<-' .... ..... .. ... ...." . ..... .. .... . . dO... . .... ........ ....... .. n..... ... . .... H ., ......." . n. ............. . ...... n.. ......... ...." .................>//.. .)TablePK4){(<}>>.i).. .. .... .>(<4rialysi$ofLocitljR.'gIOn~rParki.O$u.. ... . "., ....... ......... ..... .....". .. ..." ....... .. . ...... , . . ........ ...."...."... ...... .. " .. .,,,..,...... ..., ..... . .......... ................ , ....... .. ... ~X1~ingA~~~;{ ... ....Existirlgl.OS) NJ:lPA>~bs (A6~s11,006 Pop;). Local 55.1 1.4 Local/Regionally Significant 149.0 3.9 Total = 204.1 5.4 6 - 10 5 - 10 Other Regional Parks 257.0 9.3 The NRPA standards are intended for a "typical" community, and of course all communities differ. For example, while the LOS indicates that Bremerton is deficient in open space parks, the City is surrounded by thousands of acres of open water. Although water bodies may not fall within the traditional meaning of "open space", nevertheless many Bremerton waterfront parks provide visual and physical access to miles of open water that would be difficult to quantify with a \:..OS. Likewise, unlike a "typical" community, distant mountain views visible from many parts of the city add to the feel of open space. Capital Facilities Program (CFP) - Page 33 The proposed LOS of 16:9 acres per 1,000 persons will bring City park lands within the overall NRPA standard. (Table PK-5) . Existing LOS = 13.6 acres per 1 ,000 persons, or 0.0136201 acres per capita. . Proposed LOS = 16.9 acres per 1,000 persons, or 0.0169305 acres per capita. c. Future Demand The projected population growth within the City is for 20,000 new people by year 2014, for a total population of 58,142. d. Need for Capital Facility Improvements The proposed LOS would result in a need for 463.1 additional acres of park lands by year 2014 -- a total of 982.6 acres. (Table PK-7) ".., -..'. -, ... .. ", .p'." -" .. .... .." ... ., ,"". T' "'bl ""'p' 'K' .' ',:,,"'.' :,........ ..... ... '" ..... .. ..-, .: '., a e" -7 .....::.':.. "'",', "./:. ':":"',,:.,,: .' futf,Jre.Need:p~r~s\.."""""" . .., ,,,......... . ... .., .. . ..... .... .. ...... . ..,.. .. .... .... .". .... ...... .. ... .... .. ...... .... . .. ......,. n' .. ...... on n. ........... .. ...... ...... ..... ...... . . . ..." ...... ..... .... .... n" ...... ...... ..... ..... ..., ,Acres rttquir~CI @1~;9 lj6t~!park8~re.iNtrtr'$etVepd .. "};ooo persoris/: .'. ...... :. ivailabl~? .... ...., '#ifid,ncy 1994 1995-2014 (new) Total as of 2014 = 38,142 20,000 58,142 644.6 338.0 982.6 519.50 -125.10 519.50 -125.1 -463.1 -463.1 * Since Bremerton's population has fluctuated between 36,000 to over 39,000 since 1990, its 1990 population of 38,142 is used for all calculations of Existing Level of Service (ELOS), consistent with the Kitsap Regional Planning Council's adopted population forecast. 3. Proposed Park Facilities a. Plans of Other Providers The 1994 Kitsap Countywide Comprehensive Park and Recreation Plan recommends that the various jurisdictions undertake a coordinated, countywide approach to facility development to meet present and projected park and recreation land and facility needs. The plan proposes a county-wide LOS of 12.75 acres per 1,000 persons. Both the existing and proposed City LOS are above the proposed County standard. Capital Facilities Program (CFP) - Page 34 The county-wide plan recommends that Kitsap County park and recreation agencies undertake a "strategic role" service approach where: a) the county provides park and recreation facilities and programs that no other agency can or is willing to provide; b) the county acts as a coordinator of local interests where facilities are provided by many other agencies; and c) the county performs as a facilitator where unique acquisition or development opportunities may occur that could be implemented or operated by the local city or other agencies. Under this strategy, the county will only assume direct responsibility for facilities that have regional use benefits. Examples in Bremerton are: Bremerton Boardwalk; Lions Field; Pendergast Regional Park; and EastparkjBremerton YMCA. The county~wide plan recommends a coordinated and shared countywide funding strategy to maintain the proposed LOS. It concludes that a feasible strategy.will consist of a combination of local revenues, a countywide growth impact fee, and a countywide park and recreation bond. Assuming local revenues remain steady, an impact fee of between 25-50% of projected costs and a bond at a rate between $0.0030 and $0.0045 per $1.00 valuation (annual payment between $28-$42 for a $100,000 house for 10 years) will be needed to maintain the proposed LOS. b. Proposed City Facilities The City's 1995 Parks & Recreation Comprehensive Plan proposes to add 184 acres of park lands. The largest project will be an 18-hole addition to the Gold Mountain Golf Course (170 acres). The Golf Course is a hfgh priority, as it provides revenues for other city parks. The Plan also anticipates acquisition of an additional 14 acres of local park lands. (Table PK-B) The City recognizes the difficulty in maintaining the recommended LOS past the year 2000. There are few large tracts of undeveloped land left within the developed parts of the City today. As infill development continues there will be even less vacant land, and land prices are likely to increase corre$pondingly. The City will need to seek creative ways of adding park lands within developed parts of the city where vacant land is scarce. For example, the City and School District are exploring the possibility of shared use of school recreation lands. Other solutions could include tree-lined Hgreenways" connecting park lands; and rooftop gardens, landscaped public courtyards, or fees in lieu of open space in high density areas. In the long run the City may need to develop LOS standards which will better measure alternative park and recreation opportunities. Capital Facilities Program (CFP) - Page 35 4. Six-Year Financing Plan a. Six-Year Funding and Proiects Under the proposed LOS it is projected that a total of 702 acres of. park lands will be needed to meet the total demand through the next six years -- an increase of 182.7 acres. (Table PK-8) il;::d'iii^i;'i;^:;,:;;^:~~~:~~\Wieo;~~~(~.i~~f\~;~~~bl!:i~rp~~~^^^^ ^ .. . . .... ....... ....' "'., .', ,,' ,...... ...... ...... ........ ...... .' "p ...kY............. ..... . .(6S:A~...pe.r . . "Existing ACi'&f . <TOt~( Ac~es ....... . ................................................(...s#O8'........n. 8y'...~.I..O....~.\... .... l' 000 P ,. .t' ... . ...................Req.<......u....r..e.....d....... '.' . ,) )..; . .. opu a Ion ..' '.' Local Total = 1.7 13.9 1.4 16.9 55.1 406.0 58.4 519.5 70.6 577.6 58.2 702.2 -15.5 -171.6 0.2 -182.7 Regional Open Space The Parks & Recreation Comprehensive Plan recommends a financial strategy based on the following: 1) A growth impact fee of 25% of the actual cost of maintaining the existing level of service (ELOS) standard. ($1,274,597 x 25% = $318,649) 2) A proposed citywide bond to raise between $1,294,785 and $3,499,951 of the cost of raising the level of service to the proposed (PLOS) standard. (Cost of raising LOS to PLOS = $3,078,317.) 3) The use of general funds, conservation futures, real estate excise taxes, intergovernmental grants, and other sources must remain the same as in recent years. If the amount of these monies declines, then the growth impact fee percentage assessment and/or the citywide bond amount and rate must be higher. The following chart contains the funding sources, capacity projects and non- capacity projects for the next six years. The last portion of the chart reflects the balancing of funding sources and money expended on project$. Any surplus or deficit is indicated. (Table PK-9) Capital Facilities Program (CFP) - Page 36 !!lljlljlklll:lillliilililllR'i~il.l~~tl'!lil ~~~:JJ!~ll\I'\;;C'" ",. ... ',. ". .:...:....:.:::::::::::::::.:::.:-:.: :.":;:;:::;:::;";::",. ...;.;:;:;:; .. ...........:-:.;.;....<<-.-....;. :-:>:.:-:::"::<::::;'::;'::::::::;", . ................ .'. <><<'uijdlri9$9l1rc~) .............../j.....J9961gg1...H1~) ......1~2(i)Q ...TQt~r.. General Governmental 1994 Revenue Bond (Golf Course) 5,000 Future Grants 600 100 Bond/Impact Fees Total Sources = 1,151 100 155 50 6,456 110 125 100 665 160 125 100 Golf Course Fund 112 Real Estate Excise Tax Roosevelt Trust Fund 1,000 100 100 o 5,000 1,900 2,132 1,370 780 550 ... ". ... .... ..)/( . ....".. .. ....... .... '. .... p.<,6j<;Cis<........:.......... .. ... .:... ...... ... ..........:.......... 935 1,150 1,325 675 1,191 11,732 .. .:.......\i.. .. .... ................ .:..>..:\. H)(.:.i> ill 5,000 Golf Course Expansion 2,500 2,000 500 25 500 15 250 0 15 1,151 600 60 115 50 25 300 20 20 15 5 Evergreen Park Blueberry Park Teen Center Pendergast Regional Park Neighborhood parks NAD Marine Park Kiwanis Field Kitsap Lake Park Stephanson Canyon Lent Lane East Park Nature Area Land Acquisition 316 100 125 100 350 125 100 550 125 100 525 265 15 1,751 361 625 60 490 20 50 180 36 50 50 300 20 1,050 Total Costs 3,751 2,930 1,490 1,225 170 796 10,362 'tj,;~:7~~ .,.. .//\".."~.~~":;~~:..,.,:I= .~: .~.". .'/If;'.:;:/ Note: All amounts are times $1,000, in constant 1994 dollars. Capital Facilities Program (CFP) - Page 37 20 475 15 10 120 5 15 654 396 (b) CaDacity Balance The following chart demonstrates how the projects to be developed over the next six years provide the required amount of capacity at the adopted LOS standard to meet the needs of the existing population and projected growth. (Table PK-10) .. ... ., ". . . . ". . .. . , ....... .., .." . .. ., .... . . -, ... .. '.. . ... . . . . ._, . ., .... , . parris<> 1994 1995-2000 (new) Total as of 2000 , ...... ... .. . .-. . .". .......n... ". . 'n .. ".. . ... .... . ".. "... .... . ... ... , ... _, .............. .. .-. ...., ..n ..... .... ...., .. ....... .... .., ... -'.. ........ .. ..... ......... >> .........ii~.lp!rkac::ht..{) \} ...ijet~is.fJ.~k)i ..i.) ..... .>a~aitabl~.) .....>.} ../"dt,i(:i!:ncy.}" 645.8 57.7 703.5 519.5 -126.3 519.5 -126.3 -184.0 -184.0 . . .. ProJeCt~.. Golf Course Expansion Evergreen Park Expansion Land Acquisition - Local . .. . ., .... .. . . . -, .... ... .. .... ... ..", . \..Acres.. ...... .... ..... .... .... .... Total as of 2000 = * 16.9 acres per 1,000 population = 0.0169305 acres per capita. 170.0 0.5 14.0 184.5 -14.0 -13.5 0.5 0.5 (c) Operating Costs {Optional} It may be useful to consider the impact of each completed capital improvement on the City's future operating budget. An analysis of operating costs is optional; it is not required by the Growth Management Act. The following chart could be used to reflect the six-year operating costs for the projects listed in the Six-year Funding and projects chart above. (Table PK-11) THIS CHART MA Y BE COMPLETED AT A FUTURE TIME TO DETERMINE THE FULL COSTS OF PARKS FACILITIES: . ........,. - ". _n. . n. . ". ... ... ...>)>TAfl~~p~i11~j*"Y~~rQ~~t;~n~'~b~.i..\r"". .......... ,. . , , .. .... ..... .. .... ... .. .... ...... ...... . . ......... .... .............. .............. . ... ... ......-. ........ ........ ....... .................... ................... ......... ...... ." ................ ... .'. .................... ..... ..' ..... ...................... .... ..... ................ ........................ .............. .... ....... ............................................. ..................... '" .... ... ...... ... ..... ..... ....... ........... .... ...... '" " . \j~......>\ ...<<l~(i .... ./...1997 /i ..19ge\).:}i9!i.......L~~2) N/A N/A N/A N/A _ N/A N/A Note: all amounts are times $1,000 Capital Facilities Program (CFP) - Page 38 () III "0 ~ !!!. 'TI III Q. ~ (D" Ul '"'0 .., o CO .., III 3 () 'TI ..:g I '"'0 III co CD f8 "T1 cO" c:: '"' (1) o 71 w CD '"' (1) 3 (1) ~ o ::::I "U Ql '"' '" "T1 Ql ~" ;::;: CD" o # . Par/(s and Facility Sites 1 - Bremerton Boardwalk 2 - Bremerton Municipal Swimming Pool 3 - Bremerton Sr Citizens Center 4 . Bachman Park 5 - Balaan Park 6 ~ Blueberry Park 7 . City Hall Park 8 - EastPark 9 - EaslPark Nature Area 10 -Evergreen park 11 -Forest Ridge Park 12 -Gold Mounlain Golf Course 13 -Holly Terrace West 14 -Ivy Green Cemetery 15 -Jars/ad Par/(" 16 -Kitsap Lake Park _ 17 -Kiwanis Park l 1 18 -Lent lane : 19 -Lions Field J 20 -Manetle Playfield II _" ).1 21 -N A.D. Mifine Pa"t~=i[ I 22 -NAD. P~rk i '~r"'~' =. 23 -Ninth Slreel Mini P~rk [' -='9' , \ 24 .Roto Vi~~ Park \'_ , 25 -Pal ca~y Vista 26 -Pende sl Re~ark (;7 I 27 -SmIth p ~. O'~~~:.'3" I I' \ 28 -Shenden p~rk~ ,.' _ I I! 29 -Sheriden C'jf" unity Cenler , '. \ ( ,_ 30-SR-3Par~;, ': r- ~ \ I ~ ( 31 -Stephens ~'Ca""on -t' "'_ J \ _, J ' , 32 -Warren A~nue flayfield dr t' ~ ~_j J,) 33 -Wycolf Me,!,ona Park ) r \ l~ J 'owned..,p",.'", by 'he utlflrt ,*"pl ~ ~ 'jr \\\~'" E(j:=>\~~='J~~ ~ I ~\ ~,~\ '~ , ""-< , '" ' BREMERTON SC~L ~:rRICT , lL .... SCHO , ~ tl ~ School Sites 11 , '\ A . Armin Jahr Elementary School B - Bremerton High School C . Bremerton Junior High School o - Bremerton Middle School E . Crown Hill Elementary School F . Frances Haddon Morgan School G - Haddon site H - Kitsap Lake Elementary School I .. Lincoln School J - Magnuson Community School K - Naval Avenue Elementary School l .. Otympic View Elementary School M .. View Ridge Elementary School N - Wesl Hills Elementary School BREMERTON PARKS & RECREATION PARKS AND FACILITIES led .j " Q/ .~. :-t: ~ ~ , \ , i'i ii: .. ~ " ~' CO ~ ;,:>: tt-l\Jf CtJt'~ S\~ LEGEND _ PARKS _ SCHOOL COUNCIL DISTRICT BOUNDARY :f: < Gold Mountain Gall Course (Old Bellair Hwy) 4D C I T Y < Jarstad Park (Garst) G) BREMERTON OF ~~ j// D. Sanitary Sewer Sanitary sewer facilities are provided by the Bremerton Department of Public Works and Utilities. A complete inventory, analysis of need, and capital improvements program are provided in the April 1992 Final Draft Wastewater Comprehensive Plan (a.k.a. the "Wastewater Plan"). This plan is due to be updated and adopted during the second quarter of 1995 after completion of SEPA (State Environmental Policy Act) environmental review. 1. Service Area The draft Wastewater Comprehensive Plan identifies a service area consisting of territory currently served by the Wastewater Utility, as well as areas adjacent to the city limits that are not now serviced but which could logically be served based on natural' topography. The Wastewater Plan estimates the population of the service area at 45,210, of which 38,140 are within the city limits and 7,070 outside the city. Approximately 37;000 people within the service area are connected to the system, The plan estimates that approximately 37,000 persons are connected to the sewer system, leaving an unsewered population of 8,210.3 The service area covers 13 drainage basins, of which four extend beyond the city limits into unincorporated county areas: Tracyton Beach, Trenton Avenue, Sinclair Park, and Oyster Bay. The Utility provides sewage treatment to the sewered areas in the service area through direct service and through specific contractual agreements with the U.S. Navy and Kitsap County Sewer District No.1 (Navy Yard City). (Figure 2-2 "Service Area'? 2. Inventorv of Existing Facilities The City sewerage system consists of sewage collection, transmission, treatment, and bio-solids utilization facilities. Included are more than 188 miles of gravity sewers, approximately 16 miles of pressure lines, and 31 pump stations. These facilities convey sewage to a secondary wastewater treatment plant located just south of West Hills. Additionally there are 16 combined sewer overflow (CSO) sites located within the sewer col/ection system. Approximately 60 percent of the system is composed of combined sanitary and stormwater sewers. (Table SS-1) 1"able 1., Final Draft Wastewater Comprehensive Plan, April 1992, p. A-2. Capital Facilities Program (CFP) - Page 40 i:i:1:ii'1"'1"1'~![;;~If,,!ii;~~~~G~:;N;il:r~t~j!:~~JI~,~CY1,1'~1 .. ......... .. . " ... .. ... ......... ....... '.,:.; . ,- ..., ........ .... :.}:':-' ':::/',:\ ><ir~~rn~~ffljm\ ... ... · .. .)<...<<A4iji"lt).>.> .J~a~lcitvH. ..... Bremerton Wastewater Treatment Plant (1) Forest Enhancement Sites One & Two (2) 1600 Oyster Bay Ave W Near Gold Mtn. Golf Course (3) 10.1 mgd 600 acres (1) City of Bremerton Final Draft Wastewater Comprehensive Plan, April 1992. (2) City of Bremerton 1993 Biosolids Report to Bremerton-Kitsap County Health District. (3) Average flow for maximum month per NPDES permit. (a) Wastewater Treatment Plant The existing wastewater treatment plant was designed to have a peak hydraulic capacity of 29.5 million gallons per day (mgd). Peak flows in excess of 25 mgd are typical monthly. Normal dry weather peak flow capacity without stormwater inflow is estimated at 8 mgd. Current annual average and maximum monthly flows to the wastewater treatment plant are about 80 percent of the average annual and maximum monthly flows for which it was designed. It is estimated that 21 percent of the annual average flow and 44 percent of the maximum month flow is stormwater inflow. Stormwater will be reduced from the system over the next several years under the City's CSO Reduction Plan. Once stormwater inflow is reduced, the treatment plant will have the capacity to serve approximately 58,000 people. With 9,242 existing connections serving approximately 37,000 people, the plant has the capacity to serve about 21,000 additional people (8,600 connections). (Table 55-2) Population .CaJ)a~ity . 58,000 23,868 ... .. .. ...... "'.' . ...'::',: ,'. <<".' :-',', .<<< ....'.;..:,. .......1994D~!Tlan~> . .... (1994Surph.iiij[)efleit ......'(,;;;:~t~~~rio~:~asi~\e;f;~f~:n~~~i~~~~;~~ A~~a~~ci~....'........, Connections * 37,000 9,242 21,000 8,642 Sources: Final Draft Bremerton Wastewater Comprehensive Plan, April 1992; Bremerton Dept. of Public Works (11/94). * Connections = Population capacity / 2.43 average persons per household size. (A change in average household size would change the number of possible connections.) Capital Facilities Program (CFP) - Page 41 (b) Forest Enhancement Program - Biosolids Utilization The wastewater treatment plant produces approximately five million gallons of anaerobically digested biosolids each year. Because biosolids have fertilizer and soil amendment value the City began an active land application program several years ago to utilize the benefits of this wastewater process by-product. Biosolids are used to enhance tree growth and are currently applied to 600 . acres of Utility-owned forest land. Since June 1992, 100 percent of the biosolids produced at the treatment plant have been utilized in this beneficial manner. The objective of the City's forest enhancement program is to develop an environmentally sound method of using the resource value of biosolids in accordance with federal, state, and local regulations. 3. Future Needs a. Existing Demand There are 9,242 existing connections, including several connections at the Puget Sound Naval Shipyard (PSNS), serving approximately 37,000 people in the service area. This includes several connections at the Puget Sound Naval Shipyard (PSNS). The average daily flow is 5.6 mgd. Minimum peak flow (peak flows occurring without storm water inflow) is estimated at 8 mgd. While the U.S. Navy is allocated 3.8 mgd, it is currently discharging only 1 mgd -- roughly equivalent to 10,000 population. b. Level of Service (LOS) The capacity of existing sewer facilities to serve future needs is determined by comparing the gallons of effluent per day now approved by the State, the number of existing connections, and the number of new people to be served. The number of new people is converted into the number of new residential connections based on assumptions of the number of persons per household, and the number of gallons of effluent generated per capita per day (gpcd). The capacity can also be estimated based on an existing and planned LOS for sewer service. The calculation of the current LOS excludes stormwater inflow. (Although the City's system experiences some infiltration, it is not a major component of the flow.) The proposed LOS is the existing county-wide average. . Current LOS = 97 gallons per capita per day (gpcd)4 100 gpcd5 . Proposed LOS = 4.Executive SummarY', City of Bremerton Sewer Comprehensive Plan, October 1991, p. 10. 5Kitsap County Draft Comprehensive Plan, Part III, October 1994, p. 176. Capital Facilities Program (CFP) - Page 42 c. Future Demand City and County estimates of future demand differ. (Tables 55-3 & 55-4) (1) County Estimate The Kitsap County Comprehensive Plan Capital Facilities element estimates 1994 population in the "Bremerton Area" sewer service area as 57,475.6 The County forecasts a 2014 service area population of 81,408 -- an increase of 23,933 persons. The element states, "The forecast provides sewer purveyors with a minimum population to plan for during the 20-year planning period." The County projects a need for an additional 9,031 connections by year 2014, which it estimates would exceed the capacity of the system by 1,914 connections.7 (Table 55-3) (2) City Estimate The City's Wastewater Plan estimates the 1994 service area population at 45,210, of which 16% are outside the city limits. All but 8,210 persons are connected to the sewer system. Assuming 100% of this unsewered population will connect to the system within the next 20 years, there is a remaining capacity to serve an additional 12,790 persons. The City estimates that the actual 2014 service area population will be 69,217 (rather than 81,408 as forecasted by the County). . ':. . .:. ::. '.': . ..::...... .'. ". 'T' bl ':'''55'' 3 '.' ..... .........:.; :. .. .:. ..,' . ..... l:l.... e: ..' "'". ...........:: .' ...... .'.: ,,:":' :....: ..:....: .;:..::.::.::..:...::.:.......;.:,:"/,} Comparison Of C:ity/CountyEstimates' of SaoitaryS~wetSer'lic~Ar~aPoptilation. '.':." , ... . . . I :..Source of Estimate County '" -.'" ." , . 1994 Population. ..., . ... ...... . .. ..... .. .... .. . -.. . ... .. . 2014PQPul.tion . '.:" .:....: ::3994..2014 Increaa~ .... .:.;:,:::'.:.: Difference = 57,475 45,210 12,265 81,408 23,933 City * 69,217 12,191 24,007 -74 Sources: City of Bremerton Final Draft Wastewater Comprehensive Plan, April 1992. Kitsap County Draft Comprehensive Plan Capital Facilities Element, October 1994, pg. 176. * 2014 population = 58,142 / 84% - Bremerton Planning. 6Table SF-2, Kitsap Draft Comprehensive Plan, Part III, p. 178. 758,000 capacity - 45,210 population = 12,790 remaining capacity. Capital Facilities Program (CFP) - Page 43 The City projects a year 2014 deficit capacity of 11,217 (compared with the County projection of a deficit capacity of 5,072). Table 55-4) .. '. .:.: :. :'.. .'. TableSS-4 . Compari~bn:of City/County Estimates of WastewatetTreatmen~ Plant Demand .: ....:..> .:': ." "(PopulatiOn). '> ii .:.... .' .:...... .:.:..}: /":,::"... . .. .. ....... ...:.'.. ..... .": .... .. . .. ..' ..::!) ..:.., :,.1994 Capacity.:::...' ....1994. Demand '. '2QOODemarid 2014 Demand ... T atal DefiCit ... puree 0 .'. .. :..:::> ::: 1!:stimate 01' Surplus County (1) 55,581 37,000 68,245 81,408 -5,072 City (2) 58,000 37,000 58,022 69,217 -11,217 Difference = -2,419 0 10,237 12,191 6,145 Sources: City of Bremerton Final Draft Wastewater Comprehensive Plan, April 1992. Kitsap County Draft Comprehensive Plan Capital Facilities Element, October 1994, pg. 176. (1 ) 1994 Capacity = 20,974 possible connections x 2.65 pph. Deficit Capacity = -1914 connections x 2.65 pph. (2) Year 2000 Demand = 85% of County estimate - Bremerton Planning. Year 2014 Demand (85% of County estimate) - Table SS-3. (3) Difference Between City and County Estimates These estimates of sewer system capacity differ for several reasons: (a) 1994 Population -- The County estimate of the existing service area population is 12,265 higher than the City Wastewater Plan estimate. The City estimate was based on a 1991 count of structures from aerial photos within actual service area boundaries, adjusted to match 1990 Census data. In contrast, the County estimate is based on the population of "transportation analysis zones" (T AZ's), which only roughly correspond with actual service area boundaries. (b) 2000 Population -- The County estimate of the 2014 -service area population is 12,191 higher than the City estimate. The City estimate assumes that within the city limits the population will increase by 20,000 (to 58,142), and that the population outside .the city will remain 16% (11,075) of the total service area population. Capital Facilities Program (CFP) - Page 44 (c) Household Size -- The average household size is used to calculate the number of connections to the system. The County estimate assumes an average household size of 2.65 persons per household (pph), the 1990 county-wide average. The City estimate assumes 2.43 pph, the 1990 service area household size as calculated in the City's Wastewater Plan.8 (d) Treatment Plant Design Capacity (Population) -- Due to a mistake in the City Wastewater Plan, the County lists the design capacity of the wastewater treatment plant as 55,300 rather than 58,000 population.9 (e) Sewer Facility Connections -- The County estimates the number of existing sewer connections at 13,858, while City records show that there are 9,242 existing connections.10 (1) Unsewered Population -- The County forecast does not recognize the existing unsewered population of 8,210. The City estimate is adjusted to add the existing unsewered population to the projected new population to be served. (4) 2014 Demand Both the City and County estimates identify a probable deficit sewer system capacity by year 2014. Depending on the methodology, the deficit will be approximately 5,000-11,000 persons within 20 years. (Table 55-4) (5) Six-year Forecast Over the next six years the City projects an increase of 10,237 persons within the service area. In addition, it is assumed that 30% (2,463) of the existing unsewered population will also hook up to the system by year 2000. In this case, there would still be a surplus capacity to serve 5,725 additional people in year 2000. (Table 55-5) 8Number of persons per dwelling unit = total number of dwelling units inside Bremerton City limits (15,690) / total population (38,140). 9Final Draft Wastewater Comprehensive Plan Appendix C, Figure 8 incorrectly lists the treatment plant capacity as 55,300 persons. Source: Bremerton Utility Department. 10Number of connections as of January 5, 1995, according to Bremerton Utility Department. Capital Facilities Program (CFP) - Page 45 ... ..-- ..... ,., . .. ...., ....... ." ....." .... , ... . .".. ...... ...., ." ." ...., ....... .................. ... n< T~bleSS~5n) .... ...... .. · Futute Neeci:$anitafySeYie{> .. . ...... ....,. .-- , Sbc-Yeai' Neecf 1994 Sewered Population Hookups for 30% of Unsewered Population (1) 1995-2000 New Population (2) Total 2000 Sewered Population = 37,000 2,463 21,000 18,537 3.70 MGD 0.25 MGD 12,812 52,275 5,725 5,725 1.28 MGD 5.23 MGD .. . "" . 1"w.nty~Year N,ed Hookups for 70% of Unsewered Population (3) 2000-2014 New Population (4) Total 2014 Sewered Population = Total 1994-2014 Increase = 5,747 -22 0.57 MGD 11,195 69,217 -11,217 -11,217 1.12 MGD 6.92 MGD 32,217 nja nja Notes: (1) 8,210 x 30%. (2) 58,022 - 45,210. (3) 8,210 x 70%. (4) 69,217 - 58,022. d. Need for Capital Facility Improvements The draft Wastewater Plan was developed for an ultimate service area population of 80,610. Therefore, planned improvements will be adequate to serve the projected 69,143 sewered population. (They would also be adequate to serve all but 798 of the County's projected "Bremerton Area" population of 81 ,408.) e. Plans of Other Providers The Kitsap County Public Works Department Wastewater Division is in the process of preparing a County-Wide Wastewater Facility Plan. The draft plan integrates the individual wastewater plans within the county, and includes recommendations for expanding county facilities to serve projected needs. 4. Proposed Facilities The Wastewater Plan recommends four types of improvements at the treatment plant to accommodate projected sewage flows at ultimate plan service area development and to solve some current and anticipated operational problems: Capital Facilities Program (CFP) - Page 46 · Infrastructure improvements -- repairs or replacements of existing sewer system facilities to restore structural integrity; · Regulatory requirements -- improvements needed as a result of new or modified codes, guidelines, or laws initiated from federal, state, and local government; · Growth and system extensions -- improvements resulting from new development or system extensions; · Other system improvements -- recommendations that contribute to the improved operation or function of the system but are not a result of infrastructure needs, regulations, or system growth. 5. Six-Year Financial Plan It is estimated that the existing sanitary sewer system has 8 million gallons per day (mgd) available capacity, which is sufficient to meet the total need of 5.23 mgd through the next six years. (This assumes removal of stormwater from the system over the next several years under the City's CSO Reduction Plan.) a. Six-year Funding and Proiects The following table is a summary of the City's Wastewater Comprehensive Plan projected implementation in 5-year increments, broken down by financing method (Utility versus Non-Utility). Improvements prior to the year 2000 are shown to be 84 percent utility financed, assuming no grants will be available. Of the Non-Utility financed projects, most of the growth-related improvements are anticipated to be financed by special utility local improvement districts (ULlDs) or by developers directly. Roughly 20 percent of the expenditures beyond 2000 are projected to be funded by non-utility sources of revenue. (Table $$-6) Capital Facilities Program (CFP) - Page 47 . . ..... . . ... <> ............ ..>... .... <Table SS:;'6 .. ... ...... .. .. Six;;year Fu ndlrigand Piojeets:sanitary ~E!\VE!r.. . . . .... .. .. . 19951996 1991<1998 1999 2000 total Utility Revenue Bonds 1994 11 ,000 Non-Utility Assessments (LID) 300 1 ,500 2,000 1,000 451 11,000.0 5,251.0 Sanitary Sewer Utility TOTAL SOURCES ProjeCts .... Treatment Plant 12,698 6,500 700 23,698.0 6,800.0 2,200.0 3,000 400 2,888 26,186.0 5,000.0 1,400.0 3,339.0 42,437.0 Surplus or Deficit Note: All amounts are times $1,000 Sources: Draft Bremerton Wastewater System Comprehensive Plan, Department of Public Works and Utilities, 3/21/95; City Treasurer, 2/95. 5,955 6,743 2,853 15,551.0 6,800.0 2,200.0 6,800 2,200 5,955.0 3,339 20,982.0 2,853.0 500.0 1,400.0 3,339.0 29,790.0 5,00 1,400 Collection System CSO Reduction TOTAL COSTS . Balance. b. Capacity Balance The following chart demonstrates how the projects to be developed over the next six years provide the required amount of capacity at the adopted level of service standard to meet the needs of the existing population and projected growth. (Table SS-7) Capital Facilities Program (CFP) - Page 48 e i!i~:i:kt~:ii;i";"c~~l~~::~'~n~~l>~~~~r~~I~,;~!i~,!i; 1994 1995-2000 . . . .... ... . ............ ... .. .... . .... '_.d.... 'n ....._,.., .... ..... ... ..... M8xilriJJilMonthDeman~ .......~equh~ed@ LOS).. 7.8 MGD 1.8 MGD 9.6 MGD n' 'n ..., ..... ......, . .. .. n_.'..... n.... ......... ... . n. ..,.. .. .......... . .. . ..... .... ..... ....... .. Facllity eurrently>N:8tReserve.) )i...Avliilaa.~ ......... ... (<Or[)~f!c:i&ncY) . ...H . ...... . . __ , ... .... ... .H.. ... . .............. ..........'..,. ....... .. ".... . }<"'\y elir!Pro)l:lc:ts>< ... .... .. . ........ .....,.. ..... ..... . '" 10.1 MGD 2.3 MGD Total as of 2000 .... Proj~~~1995th~OoOtJ>lri9teaseci~r;acitY H.. 10.1 MGD 0.5 MGD* Warren Avenue Stormwater Separation (1995) Callow Avenue Stormwater Separation (2000) ** ** Total as of 2000 = *** * Contracted Flows to PSNS are 3.1 MGD, which are not anticipated during six year term of finance plan. ** These two projects will eliminate some stormwater inflow to the wastewater system. *** Year 2000 total capacity is not quantifiable at this time. Source: Bremerton Department of Public Works and Utilities, 4/95. c. Operating Costs It may be useful to consider the impact of each completed capital improvement on the City's future operating budget. An analysis of operating costs is optional; it is not required by the Growth Management Act. The following chart may be used to reflect the six-year operating costs for the projects listed in the Six-year Funding and projects chart above. (Table SS-9) THIS CHART MAY BE COMPLETED AT A FUTURE TIME TO DETERMINE THE FULL COSTS OF WASTEWATER TREATMENT: .... . 1995...... N/A .. ... T~ble~S~~ .. .....Six-year..Operclti~g ~()$~S. N/A >..j997. N/A N/A .J999 N/A N/A N/A Note: All amounts are times $1,000 Capital Facilities Program (CFP) - Page 49 ~ -- ! r- r i ;1 I -..-..j 2.000 4,DOO -..- LEGEND Wastewater Comprehensive Plan Service Area Boundary ............ City limits Sewered Portions Of Basins Non-Sewered Portions of Basins !l".:.:.:.:.....".:.:.:.:.:.:..:...::. ........"............... :~~~~:1~t~*iJf~::~\ .. . Include in Service Area Only if Annexed ~ Figure CF-4 Bremerton Wastewater System Service Area Capital Facilities Program (CFP) - Page 50 E. Schools Bremerton Public School District #100C provides public education in most parts of the City. The exception is a small area in the vicinity of the Bremerton Watershed, which is served by South Kitsap School District #402. The Jackson Park Naval Reservation is jointly served by the Bremerton School District and Central Kitsap Public School District #401. Only the Bremerton School District is included in this inventory, since such a small fraction of city residents is served by the South Kitsap School District, and no school facilities operated by that district are located within the city limits. 1. Inventory of Existing Facilities - Schools The capital facilities used by the school district are elementary, middle, junior high, and high schools. The district also administers a vocational skills center that serves other school districts. The present school enrollment requires the use of 50 portable classrooms. Crownhill Elementary School is scheduled to be replaced after being destroyed by fire in 1993. In the meantime Crownhill students are being temporarily housed in 20 portables, and fourth and fifth grade students are bussed to another school. The current grade configuration in the district is based on grades K-5 (elementary); grades 6-7 (middle school); grades 8-9 Ounior high); and grades 10-12 (high school). Class size and student to teacher ratio vary by grade. The average class size inn the district is about 28 students per teacher (28: 1). The district seeks to maintain the following average class size ratios of students to classroom teachers: Grades K-3, 23: 1; Grades 4-5, 28: 1; Grades 6-8, 30: 1; Grades 9-12, 32: 1. Class size is dependent on availability of local levy funds, which must be provided by the voters every two years. (Table SC-1) School capacity is defined as the number of students a school is designed to accommodate, and includes only permanent facilities. Portables are used as temporary classrooms until new facilities are built, or used to accommodate enrollment fluctuations. Current square footage cannot be directly correlated with existing school capacity. School capacity is determined by the number of teacher stations, which is in turn determined by school design, the educational program, and State funding criteria. a. Existing Enrollment The school district has a total enrollment of nearly 6,700 individual students. This includes 486 students in the vocational skills center program and 152 students in the alternative high school program. Some students attend only half-time or part-time in the pre-school program, kindergarten, alternative school, or vocational center. This inventory counts individual students for its enrollment figures. Bremerton enrollment fluctuates significantly depending on homeportedjoverhaul ship movements. Capital Facilities Program (CFP) - Page 51 Elementary school students make up about 50% (3,273) of the total enrollment. The middle school and junior high school have a combined enrollment of 1,675 students. Bremerton High has about 1,237 students including the alternative high school students. Since the vocational skills center is a county- wide educational program, the inventory does not include its enrollment. The district administers the vocational program and has agreements with the other districts to serve their students. (Table SC-1) :':'.' I:"...... .. .... Table SC-1 I) . . '.:. '. '" Inv~ntory of Existing Facilities - B~emel1ohHSchool District. . ...:... H I...,,' School Existing Student Existing Surplus Student Capacity Enrollment Capacity Elementary (Grades K~5)' Armin Jahr - 800 Dibb 337 367 -30 Crownhill - 1537 Bertha Ave. 0 472 -472 Kitsap lake - 1111 Carr Blvd. 550 518 32 Naval Avenue - 900 Olympic 412 487 -75 Olympic View - 2442 Perry 486 513 -27 View Ridge - 3220 Wheaton Way 374 463 -89 West Hills - 520 National Ave So. 561 453 108 Total Elementary School Facilities = 2,720 3,273 -553 .. . : :",:" ,.. .. . s~ondary Schools (Grade$ 6~12) ,', . Mountain View Middle School - 2400 Perry Ave. 900 924 -24 Bremerton Jr. High - 1300 E. 30th 1,236 751 485 Bremert6hHlgh~Choot ~'150(r13th 1,500 1,237 263 Total Secondary Facilities = 3,636 2,912 724 Total School Facilities = 6,356 6,185 171 Note: Capacity figures do not include portable classrooms. Source: Bremerton School District No. 100C, 10/94. b. Existing Capacity Five of the seven elementary schools are over capacity. Only two elementary schools have room for more students -- West Hills and Kitsap Lake. Overall the elementary schools are over capacity by 553 students, or 22 classrooms. After replacement of Crownhill school, they will still be over capacity by 395 students, nearly the equivalent of a new school. Capital Facilities Program (CFP) - Page 52 The middle school, built in 1992, is already over capacity~ Four portable classrooms were added to begin the 94-95 school year. The junior high can house an additional 485 students. However, it is nearing forty years old, and is functionally inadequate in terms of technology, energy efficiency, ventilation, and classroom configuration. The high school can accommodate an additional 263 students. Fifty portable classrooms are required to accommodate current enrollment. Twenty of these are being used at Crownhill while awaiting State funding to replace the school. The developing need for a new elementary school in addition to the Crownhill replacement is apparent, as is a potential need for another middle school as larger elementary grades rise to the 6-7 level and population growth targeted for Bremerton begins to appear. The junior high and high schools still have some capacity for the near future. (Table SC-2) . . . ',' ... i .......'," ," ...... . .. .,' ,'..' . '. . .. ,'........ ....... ......., ........'..". .......'. . . ..) . ."'.":',' .( . ...... , ... ....." ........ .. "'n . ..... .. . .. ............ _,. .. . ..... ... ............ . ,'<'<<<':;;m~~~~~6ti6~JT~~*~i~CC~~~~~i~i~~~fu~rY)/ .. ... ':... ..... .. :.....:. ..:.<,.<:. ... . ::../. . .::.:.. .::.;:.:::0'. ."<" n" n' . .... .... .. ......... , . '. . .,....,..... P' .. .. ., "H' ..... n.......... ....... n.. ........... ......... . ... .... . ...... .. .......... . . . ... .... ....... ,".. .... .. ....,.. ...... ..... ........... . ..... ..... .. ....... .. ....... ................ ... ..... ...... ..... ..n .. .,. p',_,' .... . .... . .............,", . ...... .. ... ...... .. .... Additi6nalf~~djdCa~acitY... .... .......... .,.... ...... ................... $chc!>c>rl'vpcf> ......... . .. 1994$urplu$C;padty..... )99SSJtptUsCaptic#J. .. Elementary (K-5) -553 * 158 -395 Middle (6-7) -24 0 -24 Jr. -High (8-9) 485 0 485 Senior High (10-12) 263 0 263 Total = 171 158 329 * Crown Hill School is funded for replacement due to fire damage. ** Includes Bremerton Middle School (grades 6-7) and Bremerton Junior High (8-9) Source: Bremerton School District, 10/94. School officials also cite a need for supportive facilities -- a central food facility, a new administration building, a maintenance shop, and a bus barn. The district points out that it should be emphasized that any snapshot of facility requirements based strictly on current enrollment is subject to misinterpretation because of the fluctuating Navy population. Capital Facilities Program (CFP) - Page 53 2. Forecast of Future Needs - Bremerton School District a. Existing Demand - Enrollment There are 6,185 students in Bremerton's elementary, middle, and high schools. b. Level of Service (LOS) The Bremerton School District has established the standard size for schools as 550 for elementary, 1,000 for middle school/jr. high, and 1,250 for senior high. The overall student to teacher ratio is set at 23 for elementary students and 30 for secondary schools. However, the district is concerned that the use of average classroom size as a standard may be misleading, since classroom size varies by program and contract provisions. (Table SC-3) Measore. School Size (Students) 550 23 . n. . ".., '... .. .. ...... n. ., '.. . n. .." ..", .... .. . Middle/Jr.High 1,000 30 . .. n...' H, '.. ',",' .... ....:....".,. . . .. ......... T bl .SC 3... . ... ..,. ....... . .. a e ....:', . :<,..,.. ......:':..: .'..":.,,.:.. . . - . '.' . '.' .,.... .. .. level of.Service ~"Brem~rtonSchodIDistr.!r#\ .~Iementary Classroom Size 1,250 30 Source: Bremerton School District No. 100C, 10/94. c. Future Demand - Enrollment Projections The need for new schools is based on projected school enrollment. The Washington State Superintendent of Public Instruction (SPI) provides enrollment projections based on the .Cohort Survival Method".11 The school district considers the SPI system useful, but inadequate to represent the unique growth conditions of the Bremerton district. For example, 1992 enrollment forecasts based on SPI projections predicted a school population of 8,370 in 1994 -- 2,185 higher than actual 1994 enrollment. The largest single factor in Bremerton enrollment has historically been the fluctuation in naval population, which can be difficult to predict very far in advance. The Kitsap County Department of Community Development (DCD) has projected county-wide school enrollment based on the current percentage of student enrollment to population. The County estimates that the present Bremerton School District population is 56,786. Based on this estimate, the total enrollment (6,185) is 11% of the total district population. (Table SC-4) 11 The Cohort Survival Method uses historic patterns of student progression by grade level to measure the portion of students moving from one grade level up to the next higher cohort or grade. This ratio or survival rate is used in conjunction with current birth rates as a base for state-wide enrollment projections. Capital Facilities Program (CFP) - Page 54 1';;~";:;,:I~~i~i~'~;~\i1Il~~fl;lll~~i]jilliri~;#j;;jjijiji:jij:j::::Y; IIi ... " .... ..,. .... .. ... . +~~t~~"6f!ffiiM ............... ................ .............................. .................. ...... . ... ..... ........... ..... .... ....... ...... .............. ...... .... ..... ... ..... .......... ....... ... .... .............. ....... ............ ......... ... /[9taf~~pijl.19"....... . .... .. ............ ......... ............ .......... ..... ........ ....... /P,!r~irjfitg..r . . .. : .... ...... . . . ,. . ... : . ....... .... . . . . . . . . . , . . . . . . . ....... ........ 56,486 6, 1 85 1 1 % Source: Kitsap County Draft Comprehensive Plan, Part II I, September 1 994. County-wide, the percentage of enrollment to population averages about 18 percent, with Central Kitsap the highest (26%) .and Bremerton the lowest (11%). The County estimates that the Bremerton School District can expect 6,942 students in year 2000, and 8,710 students by 2014. (This estimate assumes that 18% of Bremerton's future population will be K-12 students. An assumption that students would continue to make up only 11 % of the population would lower the projected enrollment.) The School District points out that the difficulty with making accurate student projections is illustrated by the middle school projected year 2000 enrollment of 1,037 students. The October 1994 actual figure was 1,030, so the District is effectively six years ahead of the County projections already. (Table SC-5) . .. H'd .n. _.... . .", .... ..... . .... .., .... ".. ... ........ ... ..-......... . ... ...... ......... ... ............... ..... ......... .... ...... .... ................ .... .......... ...... ...... ... ..... ........ .... ........ ..... .............. ... . ....... ....... ... .......... ... ........ ... ........ ... . ..... ..... ............ ... ... ....... .... . . .......... .... ..... ...... ........... . ...... .... .... .. ......... ...T.. .. b.....r ..s.. C..... ............ ...... ............ .... ............ ........ . .............. ........ ..... . .... ...... .... ....... ......... ..... ............ .:/.::::. a e.. ...;;5.:.::, .}}:<> .}.::.:::::.:<}:..:: . .. ............. ..... ..... .......... .. ...... ... ........ .......... .... ....... "',.. ...l:rit9nrile~t.. prdl~(:#pij$...H< ............... . ... .... .. .... .. .. ......... ........ ........ ................ ...................... ..... . . .... ...... ...... .. ............ ................... ...... ......... ........ ........... . .... ..... . ..... ... .... ................. ..... . ....... ...... ...... ... .... .... .. ......... . ...... .... ...... . . .. ........ ..... .... .. . ...... . ....... .... ..... ............... ........... ... . ........... ... ............ . . .......... ........... ....... ...... ..... ........... .. <}Projea~d............ .:?..S~tpllJ.\ <~I'~J.9f'~) .....SHI.1d4.( .. Enrollment 2000 .... . .Capacity2QQo. .~rirollm~rrt2()14jCapicitY~o1A. Elementary 2,720 3,674 -954 4,609 -1,889 Middle 900 1,037 -137 1,301 -401 Jr. High 1,236 843 393 1,058 178 Senior High 1,500 1,388 112 1,742 -242 Total = 6,356 6,942 -586 8,710 -2,354 Sources: m Table SC-13, Kitsap County Draft Comprehensive Plan, Part III, September 1994, pg. SC-24. (2) Bremerton School District (10/94) d. Need for Capital Facility Improvements Based on County population projections alone, the Bremerton School District is expected to need one new elementary school by year 2000 (in addition to the Crownhill replacement), and an additional 4.4 elementary schools by year 2014. However the District feels that population projections alone do not accurately reflect the need for a new middle school by year 2000. The 1992 Bremerton Capital Facilities Program (CFP) - Page 55 School District Capital Facilities Plan recommends that new elementary and middle schools be constructed when demand exceeds supply by 10 percent. The projected year 2000 demand for middle schools will exceed the supply by 15%, but that level has already been reached in 1994. The need for a new middle school by 2000 remains a distinct possibility. Facility costs are based on average site acquisition/development and construction costs in the school district, excluding any site clean-up costs. The District cautions that the projected facility needs do not include any school modernization or replacement costs, nor do they include any costs for essential support facilities replacement, acquisition, or expansion. In addition, the District points out that environmental cleanup costs are becoming more burdensome. (Table SC-6) .... .. . .. .. .. . . . ..scllob(Type .. Elementary (K-5) * Middle (6-7) Jr.High (8-9) High (10-12) .. <Cost> .. .. . . ... .. ...... <...:. ::: ... : ::....... .. T.......b.....I...;.:.:.:S..C .....::.. .......<:::::.. ..... ... . ... .:.:.. a e. . 6.... :..:. .;.:;.Pf6j~ed FacilitYNe~dian~Costs.. .. . .... . ... .., ...."... " . .... ,..... ...""... ." ..... " . . ., ........... ".. ... ..... ......y,. ..... .....2000... ... .. . .<: ear ....... .. """ .... - .,,-. .. .., . .. .. .. .:<.:.:.. ..'(88r2014..;. $7.3M $13.7M 4.4 $32.3M 0.2 $5.4M N/A 21.0M N/A 37.7M * Projected needs do not include replacement of Crownhill Elementary School. Source: Bremerton School District, 10/94. e. Plans of Other Providers The Kitsap County Comprehensive Plan Capital Facilities Element projects facility needs for all school districts in the County, including the Bremerton School District. This element is a valuable resource for comparing class size, school size, construction costs, etc. between districts. For example, construction costs for a typical middle school in the Bremerton District ($13.7M) are mLlch lower than in the neighboring Central Kitsap District ($21.3M). 3. Proposed Facilities Based on outdated enrollment projections, the 1992 Bremerton School District Capital Facilities Plan proposes construction of High School #2 in 1993, Elementary #8 in 1994, Elementary #9 in 1997, High School #3 in 1999, and Elementary #10 in year 2000. The recently completed middle school is not listed. The 1992 plan is obviously outdated and overdue for an update. Capital Facilities Program (CFP) - Page 56 4. Six-Year Financial Plan The School District estimates it will need one new elementary school (in addition to the Crownhill replacement) and one new middle school by year 2000. If the City were to decide to collect Impact Fees to help offset the costs of schools needed to serve growth, Table SC-7, below would be necessary to document how those schools would be funded. At present the District points out that it has no approved levy, and the State match percent or timing is an unknown. a. Six-year Funding and Projects The following chart contains the funding sources, capacity projects and non- capacity projects for the next six years. The last portion of the chart reflects the balancing of funding sources and money expended on projects. Any surplus or deficit is indicated. (Table SC-7) THE FOLLOWING TABLE IS INCLUDED AS BACKGROUND INFORMATION. IT SHOULD BE COMPLETED IF THE CITY DECIDES TO COLLECT SCHOOL IMPACT FEES. . . . . .. .n .. ... ...... 'n ....... .. .. .. ...... . . ....... ....... .............. . ....Fij~ding.SQ(I~!~.. . State Match . ,. ...... '. q. .. .. ... ...... .... ...... .... '" '.._ 'n ...... ................. .... ..",... ... ... .... .. ....... . ..... .... ... .. ............., ,,,. ......",.... ..... j~tt........1 ~.......... .. .... ..1997. .1998. . .. n... ..... . ..... ....... . . . .... , . .... .. . ............ ....... . . .... ....... ... .... . ......... .. ....... .......' . ','. ........... . ..., .... ...... .......',. "." . .... ...... ....... . ......... . ..... ... ... ...... ........n.. ......................................~.i~-\'e~r....Fu~.~f~:~IRd~~:~IJ~$;... .J~hO.Olj......................... . TOTAL SOURCES ? ? ? ? ? ? ? ? ? 5,240 7,328 7,328 13,688 13,688 0 Future Levy Insurance Impact Fees .. .. ... . .<<.... ... .. . .... ... ...... .. ...... .. . .. Proje<:t~<. ...... ... Crown Hill School * 5,240 Elementary #8 Middle School #2 TOTAL COSTS o o . ,,,. Balancen Note: All amounts are times $1,000. Figures are in 1994 constant dollars. * Crownhill school replacement cost does not include any site acquisition/development costs. Capital Facilities Program (CFP) - Page 57 b. Capacity Balance The following charts demonstrate how the projects to be developed over the next six years provide the required amount of capacity at the adopted level of service standard to meet the needs of the existing population and projected growth. (1) Elementary Schools The construction of one elementary school by year 2000 will meet enrollment needs by year 2000. (Table SC-8) . . .~ear I pr()jects .." . . ,. . .".. '''' . , . . > School. ReqtJir.d* 7.6 0.7 ., . . . . .., ...... .... ...... .. .. . . .".. . ...,... ...... . . . . .... "' ..., ............ S~f1~ls Avaiiable..< ...... ...8et~!t&~tv~dt( ...... .......... .......p~frcl!.o~y) 7.0 0.0 .. d'" ... .... ....... . ..... ... . ... . . ,,,... '''' . .. . ... .. .. . .", , ...... ..... . ........... . ....... , ... n. ... .... .. ....... .......... .......... ........ .T bl......SC.....S. ... . . .. ........ '" .. . ... ...." , ... ... ... .. . .... ..... ..... . . . .... .... . ..... .<JI .e ... ~..) >>....... .... .>i . . i. ....}. . .eapa~ity Bali:ll'iceStleet:"Elementatj SchoOls 1994 -"" . (p~ojElCt$ .. Elementary #8 Total as of 2000 1.0 8.0 -0.3 0.3 * The capacity of new elementary schools is assumed to be 550 students. · Year 1994 Schools Required = 3273 (existing enrollment) - 2967 (existing capacity) /550 (students per school) + 7 (existing schools). · Year 2000 New Schools Required = 3674 (2000 enrollment) - 3273 (1994 enrollment) /550 students per school) (2) Middle Schools According to the following chart, the construction of one middle school by year 2000 would create a surplus of 0.9 middle schools by year 2000. However, the District justifies this need with its goal to begin construction of new middle schools when demand exceeds supply by 10 percent. (Table SC-9) Capital Facilities Program (CFP) - Page 58 ,,::::i:II~II!l,,!l:I:'I'::"I'lllltr;~.~~:,;~il~!il!.~I~~A~;i:II:::::::;lv~ll::I:"I:'"'"...."..... . ....';...>>>>>>>.<.;..-:........... .;..........:-.".......... . ,.".,.. .., ...,..".. .... ......:-.>>>...:.:;.,..:.:.....::;:::::;.;.;...;.>..:-.. ::;:::::;'.;"':'" ,';';';';',',', ...;...;.:;.;:;.... . .:.:::;.:.;:..........:....:>:::::::::;.;.:.;:.:::::::;:::;:;:;';'.:'.:;';:;';:;:;:;:;. Y!~tl<p.yJ~~.><~~hJ61iRij~tiWid~. ... .. ... ....$dh~oi.A*.ii.bli\?i~~~~s~r;;~rp;fl~.,6~y) 1994 1995-2000 (new) Total as of 2000 1.0 0.1 o 0.0 -0.1 " . ...... .....'.,', ... .........., ...... . ....... Proi~<:t$ . . Middle School #2 Total as of 2000 2 1.0 0.9 * The capacity of new middle schools is assumed to be 1000 students. · Year 1994 Schools Required = -24 (existing deficiency) j 1000 (students per school) + 1 (existing schools). · Year 2000 New Schools Required = 1037 (2000 enrollment) - 924 (1994 enrollment) j 1000 students per school) c. Operating Costs (Optional) It may be useful to consider the impact of operating costs of proposed new school facilities. Such an analysis is optional, and is not required by the Growth Management Act. The following chart may be used to reflect the six-year operating costs for the projects listed in the Six-year Funding and Projects chart above. (Table SC-1Q) THIS CHART MAY BE COMPLETED AT A FUTURE TIME TO DETERMINE THE FULL COSTS OF SCHOOL FACILITIES. NjA NjA >>1997'< NjA .H1~ NjA ,........ ... , .. . . .......q>i q . .'tible$C-1Q .Six~yeir (>pei'atii'lg<Cost${ NjA NjA NjA Note: All amounts are times $1,000 Capital Facilities Program (CFP) - Page 59 ." cO. r:: ... CD 0 ." . U1 m ... CD 3 CD ;:a. 0 :s en () n III =r "0 0 ::l' Q. e!.. 'TI C III g ![ ::l' (ii' ... III a -c a <0 ii3 3 0 'TI .3! I -c III <0 (I) 8 am. ~~'". '0" ,>" TRACY ON f !!l 5 ! ~ Riddell Rd CHICO " i 1. Bremerton High School lh I 2. Bremerton Junior High 3. Armon Jahr Elementary 4. Naval Avenue Elementary 5. Naval avenue Elementary 6. View Ridge Elementary Werner Rd 7. West Hills Elementary 8. Frances Haddon Morgan Children's Center School 9. Warren G. Magnuson Community School 10. Kitsap Peninsula Vocational Skills Center 11. Olympic View Elementary 12. Mountain View Middle School F. Stormwater f6~~!wi~iQ~ti~P.~d~~~~Of~~Y~I~plhgi$tb~@W~terMij~~~~tt.~nt.>> ,i~~~iijl&if~i~li1ii.~i~~;rjt ~pdjt~ln_la~~tamen~ffieht9P9ij cQmple~~Qrip1~h~flfi~!< ... .)> $~ormwij..rPlali~/.<<. ... . . ... .. ........ .. . ...... .... ......... ...... ................. n/) ..... The Stormwater Utility was formed by ordinance in 1994 as a funding source for the stormwater program. The mission of the Program is to control flooding, enhance water quality, protect sensitive habitat areas, and optimize the recharge of local aquifers. 1. Inventory of Existing Facilities With the exception of a few more recent developments, the existing drainage system within the City can be characterized as a conveyance system of surface drainage swales and a series of pipes which collect and route drainage away from homes and businesses as shown in Exhibit 4-1. The City has a storm drainage system with partial sewage separation. The City's newly adopted Combined Sewer Overflow (CSO) Reduction Plan will separate stormwater from the existing sewage collection system and limit CSOs to no more than one per year. A number of natural drainage facilities exist in the Bremerton drainage system. These natural systems include swales, channels, creeks, ravines, and natural drainage ways that discharge directly to marine waters. Bremerton currently has 14 holding basins. The basins include those areas outside of the city limits that drain into the City and contribute runoff to some of the City's localized drainage problems. The City's storm water facilities holding capacity is 8,564 acre feet. (Table SW-1) Capital Facilities Program (CFP) - Page 61 " .". - . ...... -.. .. -. ....... ..... ....." . d' ".._On. ....... ....... .... . _, 'n ..... n. .... .. n'" . ..." ... .,.., , . . ........ .. . . ....- ....., ........... ...... .............. . ........ .... .. ......,.... . .... ,....., . . . .... ...... ...., ... ..... ......... ......... ........... ......, . .... .. ... ........ n. ......, ......, .... ...., ...... ..., ....0.. ....... .... .... ..., ....... d' . ._..... n. ... n. ......... .. , . , ....,. ..... .... .. ..... ......., .. ............. ............. ....... ................T........bl. S"W... 1. ............... ...... ........... ...................... .... ............ .......... .... i}.. ... .... ............... .>>>8 .. e. . .~... ..i>"< . ).i .>..\>>< .. .... .. . ..... '" ..... ... ,. ... ... .. .... . .. .. .. .... .. ... . "' .... ..ll'lyent6rYofCapital..f~91!iiies~$iormWat!rI19IqirigB~sin. .i 1. Anderson Avenue 2. Callow Avenue 3. Cherry Avenue 4. East Park 5. Kitsap Lake 6. Oyster Bay 7. Pacific Avenue 8. Phinney Bay 9. Pine Road 10. Sinclair Park 11. Stevens Canyon 12. Tracyton Beach 13. Trenton Avenue 14. Warren Avenue .. ........ - ...... ..... . ..............-.... .".". ".................... .... ..................... . . '" ...... ....... .............. ....... . ... .. . ... ...... ............. ........ . .LOcat)~nAp...~~ljag~V . N. shores of W. Brem. - Port Wn. Narrows Central W. Brem. - Sinclair Inlet E. Brem. NE of Warren Ave. Bridge - Port Wn. Narrows E. Brem. S of Sylvan Way - Port Wn. Narrows W. Brem surrounding Kitsap Lake - Chico Bay NW part of W. Brem - Oyster Bay & Ostrich Bay SE part of W. Brem incl. Ferry Terminal - Sinclair Inlet N central part of W. Brem - Phinney Bay W part of E. Brem. - Port Wn. Narrows SW portion of W. Brem - E. Brem. in vicinity of Wheaton/Sylvan - Port Wn. Narrows Along W. edge of city limits in E. Brem - Port Wn. Narrows E part of E. Brem - Port Wn. Narrows & Port Orchard Bay ... . ..... .... .. . . .. .... .... ... . ........ ......... ..... .... ..... .. )(iC;:;..:~~ft~\.: 400 650 250 330 1,550 1,575 150 225 680 1,400 350 60 Downtown Bremerton - Port Wn. Narrows 670 275 Total = 8,564 Source: City of Bremerton March 1994 Draft Stormwater Management Plan. 2. Forecast of Future Needs a. Existing Demand (TO BE COMPLETED) b. Level of Service (LOS) Standard . Current LOS = _-year, _-hour design storm . Recommended LOS = _-year, _-hour design storm. c. Future Demand (TO BE COMPLETED) (TO BE COMPLETED) Capital Facilities Program (CFP) .,.. Page 62 3. ProDosed Facility Improvements The Draft Stormwater Plan identifies twelve existing flooding problems and recommends solutions to alleviate these problems. Many of these drainage problems will be reduced or eliminated by CSO sewer separation projects. A few will be addressed during annual maintenance. The Draft Plan recommends that the City needs to implement a series of storm drainage improvements over a multi-year planning period, and develop an effective City-wide inspection and maintenance program. (fable SW-2) ,:,;:il.l8~~~"~aptica~;~I~#~~lii~~I'iI~jaf&~I!~~~;IJj)ll!::I(Ilr~":I:I~'I,": . ..... .... ... . ...... ........... ....... ... n. ....... .... ... . ....". . ......... . . ..... ...... . .. ......... . .......... ... .... ........ .... ...... "/~roie~( ... .....c::O~(1~$)... ...... . . .., n. .. . . ... } Basiri ..... .... . ...... ....Projjtt# CIP #1 CIP #2 CIP #3 Sinclair Park Upgrade piping and detention at Kean and Rogers St. Stevens Canyon Piping improvements at Robin and Dibb Streets Pacific Avenue Piping improvements along Park Avenue, 5th St to Burwell Total = 851,000 170,000 250,000 1,271,000 Source: March 1995 Draft Stormwater Management Plan The Draft Stormwater Plan identifies a number of small capital projects that need to be performed on an annual basis. The small project list includes the annual stormwater utility contribution to the City's CSOjstormwater sewer separation program. Table SW-3) All All All All .... .. ." ...... . .... . .~rQj.~< .. Storm Utility's Contribution to CSO Projects Install/Upgrade/Replace Pipes and Culverts Upgrade Dedicated Private Systems Regrade Swales/Ditches .. ......... .......... .... .... .... . ... .....,. ......... n. .............. .. ......... . .. .............. n.. ........... "...... d.. .................... ... . . ........ ,.. ,.......... . . ... / . Aonuii tost > . ..... .... .. .. ..... . ...... ..... Total = $150,000 $35,000 $10,000 $30,000 225,000 Source: March 1994 Draft Stormwater Management Plan. Capital Facilities Program (CFP) - Page 63 4. Six-Year Financial Plan NOTE: THE FOLLOWING PROJECTED SIX-YEAR FUNDING PLAN NEEDS TO BE RECONCILED WITH THE DRAFT STORMWATER MANAGEMENT PLAN RECOMMENDATIONS, ABOVE. TOTAL COSTS 620 620 620 620.0 620 620.0 620 620.0 ..\<>>i>...i>................... . <>TableS'W-4>.. . ................ ........... ... . .............. ......>.. ....... .....>.. ..... .......Sbt.iyeafFuhdlngand ..PtOjects: Storm>!later Nlanag~merif> .......FJri~!ngSou~is\..i >.....J995<>1. ....>1991..............)998. . ......1999 .... ....2000/ User Rates TOTAL SOURCES . ,.,... . . ..' ..." .. . . .."... '" .. n. o ".... ....." , ..... ...>~roj.ct.><... . Various 160 160 . ,.. . '. ",. . . . . .' ..... .. p' ......... . .. >881. 8.>nce}<"'. ..>... . ..... Surplus or Deficit Note: All amounts are times $1,000 Source: City Treasurer, 2/95. Capital Facilities Program (CFP) - Page 64 ." cQ' c .., (1) 0 ." . en m .., (1) 3 (1) ::1 0 ::J en - 0 () .., III 3 "2. ~ ![ I>> - "TI (1) III .., g C ;::+ .., ai" I>> en -0 ::J a I>> (Q (Q (1) iil 3 m () I>> ~. "TI ::J ~ 0 I -0 III (Q (I) ffi U;I ~:NT OF srOIUIW,\1l.U SWU'i AUt:^ 11'11 Y I.u.rrrs EXTEIW soUfII ,'NI1 WRsn - DRAINAGE BASINS WITHIN THE BREMERTON STORMWATER STUDY AREA Illl-f'f 5\Ilrl).11t LEGEND IIASIH I!OIlN\)AHY o 2000 4000 I I SCALE IN FEET CIIY 11"'l/TS G" Transportation This section is a summary of information contained in the Transportation Element. 1. Inventory of Existing Facilities Bremerton's transportation system generally consists of streets, highways, sidewalks, ferries, and public transit. The Transportation Element includes the following information on existing facilities: .. ..Type Streets and Highways " Principal Arterials . Minor Arterials . Collector Arterials (See Transportation Element Table 1) (See Transportation Element Table 1) (See Transportation Element Table 1) (Not inventoried) . Residential Streets Mass Transit . Kitsap Transit (See Transportation Element pg. 20) . Washington State Ferries: Bremerton-Seattle (See Transportation Element pg. 20) . Horluck Transportation Co.: Bremerton-Port Orchard (See Transportation Element pg. 20) Source: Transportation Element "F" 2. Forecast of Future Needs - level of Service (LOS) Standard Levels of Service (LOS) is an estimate of the quality and performance of transportation facility operations in a community. The Transportation Element measures LOS by calculating the volume to capacity ratio 0J Ie) of the midblock of a roadway, using a range from A (free flow) to F (stop-and-go traffic). (a) Current level of Service The following existing roadway sections exceed or are close to exceeding a Level of Service D 0Jolume/Capacity Ratio .90) threshold during the PM peak hour: Capital Facilities Program (CFP) - Page 66 '''(;;;i,;:;~iiii:i;;'i:,:!;'ii:il:;~~I;~i=:lilll~i!~!l'il~1Ilr!!jij~~~l'li!;::':::;::::!:':::'i'H . . n' n"_ ,. . "... ... .............. ....... . ...., ....... 'n . "... ....... ..." .......... ........ . ..... .. ...... . .. ....,. . ..... ..... .... .... .... . ........ . ................. ........... .. ............ . ." ............. .... ........ ..... ............ .......... <$;8109.) .>.. .}<<.Vj~R~i())). Burwell Warren to Naval 0.77 o E o o Kitsap Way Manette Bridge Preble to Farragut Callow to SR3 0.91 0.87 SR 304 0.89 Warren 11th to Bridge Bridge to Callahan 0.80 0.99 o E Warren (Wheaton) Source: Table 1 - Existing Corridor Level of Service, Transportation Element (b) Recommended level of Service (lOS) The Transportation Element establishes the following level of service standards: . Wheaton/Warren Corridor -- LOS F with V IC threshold of 1.06 . Kitsap Way Corridor -- LOS E or better ~ IC less than or equal to 1.00 . Manette Bridge -- LOS E or better ~ IC less than or equal to 1.00) . All Other Arterial Streets -- LOS 0 or better (vi c less than or equal to 0.9) 3. Six-year Financial Plan The following chart contains the funding sources, capacity projects and non-capacity projects for the next six years for capital improvements to the road system and related systems. The last portion of the chart reflects the balancing of funding sources and money expended on projects. Any surplus or deficit is indicated. Capital Facilities Program (CFP) - Page 67 . ... ... .... ........... ... . ...... . ......... ......... ..... ......\.,...".... '...)"ii" ..?;~~~y.,....~:...~h~.~i~'9..~1~~~JJ.:~!C~;~~~P.~~ib~>.\..... .. ....... . ...'i).i . ..'.'...............'..,'..;...;...;.>:-:.;.;.:-:... .' . ..:: :>" . '.' ,",', ',. ....:.. ...... ...... . :.... : ,In,.::::',;;.::-,:::'?;:: ':.' ::: :;:.:: ",:,:..:.);j;;::.::/: ~ti;'diri~s66~e,ii>>1995 ....\1996..199'1 .>1998>....1999i..2()Q()// '.'''Tot~1 ..... Arterial Street Fund 300 300 300 300 300 300 1,800 Total Sources = 300 300 300 300 300 300 1,800 p'~oj.eu. . /...., "... . ..'...'.'.... ...... ...... " ........... ..'.....) ,... . ...,.... .. . ...... .......,.. BremertonjGorst 150 150 150 150 - - 600 Kitsap Way at SR-3 20 - - - - - 20 Interchange Werner Road 5 - - 40 35 - 80 Wheaton Way MIS - 50 100 50 - -- 200 Operational, Safety, & 150 150 150 150 150 150 900 Other Improvements Total Costs = 325 350 400 390 185 150 1,800 .. :.....} ...., ,..... .."'.>. . .. .. ... . "..... .,:.,.,.' Salinee ' .... .. .. .... ... ..,..:............ , .. ....... Surplus or Deficit = -25 -50 -100 -90 115 150 0 Note: All amounts are times $1,000 Source: Transportation Element Table 10 Capital Facilities Program (CFP) - Page 68 <$ ~~ ,~ OJ\'c_ ~~~ ----- ~~ ~ "0 ---... -'4}- '" '\ ~ >- ~ ,,~~;. -"~.~UT;"""F'" "\ ~ .;; I~ ~ \, ~ ItD 1= I \ I / PORT ORCHAAO ;;::y ~ - - - pgj.SlRiAN FfllRY ~ ~, ~ L.:-..., 'i. c: <'. c=:...\ r-- Parametrlx. Inc. CITY OF BREMER TON COtoAPREHENSlVE TRANSPORTATlON PLAN o t--=L 19 .:..---. 'II( I Ln ~RO ~ ~ ... i Z '---- ~ t:- Ii; r ~ rLJI o 1750 3500 SCALE IN FEET CHICO W,,"V LEGEND FREEWAY PRINCIPAL ARTE:RIALS ------- MINOR ItRTE:RIALS -.. - COtL.ECTORS Figure CF-7 Bremerton Arterial System Capital Facilities Program (CFP) - Page 69 H.Water The City of Bremerton Water Utility provides potable water for Bremerton and the surrounding area. A complete inventory, analysis of need, and capital facilities program is provided in the adopted 1994 City of Bremerton Water System Comprehensive Plan -- also known as the Bremerton Water Plan. 1. Inventory of Existing Facilities (a) Service Area The Utility services approximately 58,000 residents in Bremerton (38,000) and portions of Kitsap County (20,000), including the Gorst area and the western portion of the Manette Peninsula. The service area includes the Olympic View Industrial Park and the Bremerton National Airport. The Utility also is under contract to provide water to the Tracyton and Rocky Point Water Districts. In addition, the Utility contracts to supply water to the Puget Sound naval shipyard (PSNS) and to the City of Port Orchard. The current service area includes approximately 5,300 acres within the Bremerton City limits, not including PSNS, and approximately 6,800 acres within unincorporated Kitsap County. (See Figure "Bremerton Water Plan Service Map".) Areas of boundary uncertainty exist between. the Bremerton Utility and Sunnyslope Water District service areas. The Kitsap County Coordinated Water System Plan contains an Interlocal Agreement for Establishing Water Utility Service Area Boundaries, but this agreement has not been submitted by Bremerton. (b) Facilities/Water Rights The City of Bremerton Water Utility supply.system consists of Union River Reservoir behind the Casad Dam, 13 wells, 204 miles of water pipe, fourteen pressure reducing stations, 16 water storage reservoirs, and 14 pump and booster stations. Approximately 60 percent of the supply comes from the 2,764 acre Union River watershed, which is 94 percent owned and controlled by the City. Wells in four aquifers supply groundwater to the system. Current average daily demand is approximately 9 million gallons per day (MGD). There are six pressure zones in the system: East (E) 240, E 398 E 490, West (W) 256, W 440, and W 517. These zones are designated by the overflow elevations in Utility reservoirs. Bremerton's water supplies consist of 10,689 primary acre-feet (1,408 supplementary acre-feet) of groundwater and a firm yield from the Union river of 3.8 MGD. Instantaneous rights include 40 cubic feet per second (cfs) on the Union River watershed and 6350 gallor:1s per minute (gpm) groundwater. All water in use by the City has been properly appropriated through certificates of water rights or claims. Historically used surface water claims are maintained for potential future use pending required treatment. Capital Facilities Program (CFP) - Page 70 Bremerton's Union River surface source is of such excellent quality that the City is currently approved to remain unfiltered. All sources are disinfected with chlorine. The water system control and alarm is provided through a telemetry system. Operation staff are certified, and the system is operated in compliance with all federal and state regulations. (Table WA-1) (c) Fire Flows The Utility is generally capable of meeting Kitsap County Ordinance fireflows, which are considered to be minimums for new construction. However the Bremerton Water Plan recommends that fireflows be designed to meet the . significantly higher Insurance Services (ISO) Standards. A minimum of 20 pounds per square inch (psi) (existing mains) and 30 psi (new mains) residual system pressure in water mains supplying fire hydrants should be maintained to meet State Department of Health standards. (d) Capacity The current capacity of the water system is between 9.1 to 23.7 MGD. The capacity of the system with groundwater sources only is 9.1, while the capacity with groundwater and surface sources at current hydraulic capability is 23.7 MGD. The capacity varies because the Union River is used to supply the average day demands of the system. The daily supply can be varied between zero and 15.5 MGD as long as annual average or firm yield of the watershed and water quality limits are not exceeded. Note that not all sources can be l,Jsed to maximum capacity at the same time, due to limited hydraulic capacity of the transmission mains or water right conditions. For example, in December 1994 unusually heavy rains caused high turbidity and therefore the surface system was shut down for two weeks. During unusual events such as this or a drought, when surface supplies cannot be used, the City must depend solely on well supplies to meet demands. Capital Facilities Program (CFP) - Page 71 ........n .................. .... ..........<(. .... ..} ... .. .n........ TablewA-1,n ...........\ . ..... ... .. ....... ..rlnventoryofCapitilFFaeilitieg: Water SUpply .... . ...... .....i:c. .C.C.C.:.. i=~dmi~. .... ..Address ...... ..:..... . . . :..n. .:... .......: .. .nc,::nn:. ... . >/ <i. . ....i... . ..n . .. "Suffac~Wlit!fi..... .. .q... .. .. ......, " . '" ....... ... C.paeityn. . c.. . "., ........ .., , .. ... . "qllp~city(cfS) 40 Union River Watershed ~~o~lldwal;{}....::..... . 1. #2-R - Anderson Creek Well 2. #3 - Anderson Creek Well 3. #7 - Anderson Creek Well .. : .:. . ....::..c.....:. nnnn.. Surface Water Subtotal = 40.00 ..c....... .. . . . . ......ca.pacltY(gpm) .. 4. #8 - Anderson Creek Well 2380 Anderson Hill Rd SW 800 2380 Anderson Hill Rd SW 400 2731 State Highway 16 450 2651 State Highway 16 650 318 NW Firway lane 230 50 NE Vena Avenue 600 5853 Central Valley Road NE 270 6581 W. Old Belfair Highway 150 6581 W. Old Belfair Highway 760 8301 W. Old Belfair Highway 370 7061 W. Old Belfair Highway 300 8301 W. Old Belfair Highway 1,100 5. #9 - Bridle Ridge Well 6. #13 - Vena Well 7. #14 - East Zone 240 Well 8. #15 - Pistol Range Well 9. #17 - Pistol Range Well 10. #18 - Twin Lakes Well 11. #19 - Golf Course Well 12. #20 - Twin lakes Well 13. #21 - Silverdale Mobile Home Estates Well (pending application) 903 NE Saturn lane (Future produc on 500 gpm) 14. Gorst Well (pending application) Old Belfair Highway (Future produc on gpm) 6,080.00 Groundwater Sub-Total = ..". .. . .... .. ..... ..... .... .. . .. ...... . . ...pumpSfafions / ...cc...:... .. .. c... ....... . . . ......:.......:.:. . .....:::.......::.::.....,:,.. ....... .::......:::.:..\:::\:.....:" Total Water Supply (MGD) = 6,120.00 . ..... ....:. ........... . ............. .....PurriPingcapadif(g~~r 15. PS #1 - Gorst Creek (emergency supply only) Belfair Valley Road - Gorst Creek 16. PS #2 - Anderson Creek 2380 Anderson Hill Road N/A 2,250 400 800 17. PS #3 (not in use) 7061 Belfair Valley Road 18. PS #4 1335 Jones St. (West Brem.) 19. PS #11 844 Callahan Drive 20. PS #12 3029 Olympus Drive 21. PS #13 2929 Olympus Drive 22. PS #14 2101 Schley Blvd 23. PS #16 50 NE Vena Ave 1,400 950 500 825 1,250 Capital Facilities Program (CFP) - Page 72 . ... . .n ........ . . ......... ........ ... . .......... . ....... .......... . ........... ........... . ........ ....... .. ... ............. .......... ". ........... ................... 0' ........ .... ............ ... ................... ............ .................................. .. ............... ................ .................... .................. .... ............................... . ...... ................... ...... ......................... . ...... .................... .. ............. ....... ...... ....... ....... .. ............... . ..... ............. ........ . .................. ...... ........ ...... . -. .. . . . . . . . . . .. .. .... .. ......... ..... ... d. ............ ... .. ............ . ... .... ........ n' . .. ... .......... . . .... ... ................... ...... I~........... I~r n. . . . . . . . .....',. . u. n ..... ... n. .. ................. .......... . ........ ... .... .... .. .... . . ................. ............ . ..... ...... ... ......... . ...... ...... .., ... ............. ... ... .... .. . ..... ....... . .................. .............. .'. .' ........,....... .......... ..................................... .' ............ .........'............ .............. .. .......:.,.,.,.,.,.,.,......... ...::.....,.,..: . . .. .:..:....,....:... ... .:..::.'.'.\fabl.e..WA:j ,.,.,i/:/\,\\.::.:..:...::.(.;.;,i,:> .... i_8~~cc~alljifE~~ll!~;=\::C:~~~i[ii\:ccc))i;:C - Forestry Operations Center, Old Belfair Hwy 24. PS #17 Pump Station Sub-Total = . .' ....... .. ....... ........... .'. ............ .... .............................. ............... .... ........ ........................... .... ............,.. ....... ..,... , a~AA1!rpijmp$t!ti~6..?>: ,.. .. .... ..... . ...... . ...... ..... .... ............. .... . ..... ... ... .. .9.!P~~~y}: 1,500 .. ...:..:.::. .:.:)>/.H>:R~mplh~~P.~~~(~Pfuf 9,875.00 ..:.. ..:. 25. Booster Station #2 (backup only) 26. Booster Station #3 3201 Sixth Street 3000 17th Street 27. Booster Station #4 3301 First Street 28. Booster Station #5 589 Lebo Blvd Booster Pump Stations Sub-Total = 300 300 100 1,000 1,700.00 ...}.<,>: H .:n:. Pump Stations Total = 11,575.00 ::::.... .. ....,.:. .:".:::.. '. :::::'.' ..... i\ :.. . ........:.. ... $t(.)m.ge~p~S\tY(M@}( . ... .. .. ..... . .. .... ...... .... .. .. . ... ... ..... . ... ...... ... ... .. ..... ... .... ..RedNolrt,,;,.. A~WW~te~{}... 29. Union River Reservoir Union River Watershed 30. Twin Lakes Reservoir Gorst Creek Watershed 31 Res. #22 McKenna Falls 32. Anderson Creek #1 - Abandoned Anderson Creek Watershed 33. Anderson Creek #2 - Abandoned Anderson Creek Watershed ..., .... . .....,.... .,.. ... . .. . ...... ..... ., .. .......... .... .. .......... ......., .fhis....voi~~bIMnblrti~n Reservoirs (Raw Water) Total = .:>> ......,.,..: .:..,<..>.. .. ...:.. . ......... ..::.. . .............,.....:.... :....,., .:. H .. .... ..:: ...:.........,.,.: .<......:..... 34. Reservoir #4 4801 Roosevelt Blvd 3200 First Street 35. Reservoir #5 . Forest Ridge Park 36. Reservoir #6 5144 Francis Street @ Eden Road 7300 Werner Road 37. Reservoir #8 38. Reservoir #10 5785 Imperial Way SW, Pt. Orchard - Port of Brem. Industrial Park 39. Reservoir #11 844 Callahan Drive 40. Reservoir #12 3029 Olympus Drive 2929 Olympus Drive 1628 Hayward Avenue @ E. 17th 1925 Cheryl Street @ Forest Drive 41 Reservoir #13 42. Reservoir #14 43. Reservoir #15 44. Reservoir #16 260 Sugarpine - Tracyton Watershed 400 Ridge Lane NE @ Sandra Lane 45. Reservoir #17 Capital Facilities Program (CFP) - Page 73 1,350 390 0.1 NjA NjA 1,740.10 .H H~tqti,lge (M(3) 11.0 3.0 0.15 2.54 0.21 1.58 2.0 0.80 2.0 1.0 1.0 1.0 I;C/;// ... . ...;;. ..... ). '. . <</.. . He ...... }f.~jIitie~ . ..... ..... .... .... . .:....< ..<... .. ....:. ....... .... ..<.. .<... .... ..:......:.....\..../... :.:....:.:.... TableWA..;j . ....... ... .> )lhyeritdryofCaPital.Fil~ii,H~:Wat~t$.uPPIY<:/". .....<( \. t< ............ ........................ ... ........ ..... ...............:.....:. ... ...............(.... ......... .:..... ::......<..<....::...... .. . ............. . ......... .......\..<Acfdreq >/. ...... ..................t;!p~l(:ay.. 46. Reservoir #18 1925 NE Cheryl Street @ Forest Dr. 2628 Ash Street @ Cherry Ave 400 Ridge Lane NE @ Sandra Lane 2132 Lakehurst Drive - NAD Park 1.0 2.0 1.0 3.0 47. Reservoir #19 48. Reservoir #20 49. Reservoir #21 ,- ... . .. ,-,- ... .. rrah~n1ission M~in Piping 12" Water Mains .....<.... ...:..... .')'..< ....... Various Various Various Various Various Various Various Various Various Distribution Reservoir Total = 33.28 ../.. .<}.. ....... ..<.......:... ........... .........<cip~8i.W(~~1 45,720 36" Water Mains 4,000 30" Water Mains 1,981 28" Water Mains 18" Water Mains 11 ,750 5,869 55,193 1,705 44,708 30,222 27" Water Mains 24" Water Mains 20" Water Mains 16" Water Mains ... .. .. Transmission Main Piping = 201,148.00 ...<.. ./..... H.......................:... ...... ........ . ........ .. ..... .. ............... .<...............<..<... ...... . .... ....< .... . .<..... ...<..C#p~cifY(f~} 106,680 43,945 387,816 411,758 155,653 14,533 91,344 1,211,729.00 ... .. .. ." . . . . . . " . ..< Distribution Piping Sy~terYI 12" Water Mains .H." Various 1 0" Water Mains Various 8" Water Mains Various 6" Water Mains Various 4" Water Mains Various 3" Water Mains Various 2" Water Mains Various Distribution Piping System Sub-Total = Total Piping System = 1 ,412,877.00 Capital Facilities Program (CFP) - Page 74 2. Forecast of Future Needs (a) Existina Demand The average daily water system demand in 1993 was 7.73 million gallons per day (MGD) -- down from 9.35 million gallons in 1990. ~ Average Day Demand (MGD) 1990 9.35 1991 8.71 1992 8.48 1993 7.73 1994 8.29 Approximately 38 percent of the 1990 average daily demand came from the puget Sound Naval Shipyard, the largest single water user. Approximately 78 percent of the water demand is "in-City" demand, and 22 percent is outside the city limits. Average day demand is affected by the year's rain patterns and other factors -- for example, 1993 was a wet summer, resulting in less outside water use. However, the highest peak day ever recorded was during unusually low temperatures in December 1990 when pipes broke and customers ran water to prevent pipes from freezing. In 1992, Seattle's drought response media campaign affected Bremerton customers' water use, even though our reservoir was not experiencing a drought. Even though the City's population dropped by about 2,000 persons between 1990 and 1994, this change would have accounted for only 0.2 MGD. (b) Level of Service (LOS) Standard The estimated 1990 LOS is 106 gallons per capita per day (gpcd). The City's "Moderate Conservation Program" is expected to reduce domestic unit consumption by 3% by 1995, to 103 gpcd and by 6% by year 2000, to 100 gpcd. Domestic unit demands are then expected to remain constant through the year 2014. . Current LOS = 106 gallons per capita per day (GPCD). . Recommended LOS = 100 GPCD. (c) Future Demand The Bremerton Water Plan identifies needs for a 20 year planning period from 1990 to 2010. During that time it is expected that supply capacity to meet typical maximum day demands (MOD) will increase from 21.85 million gallons per day (mgd) in 1990 to 26.99 mgd by year 2010. (Table WA-2) The Water Plan demand projections were based on outdated population forecasts derived from a variety of sources, including past trends, the Kitsap County Department of Community Development, and the former puget Sound Capital Facilities Program (CFP) - Page 75 Council of Governments (PSCOG). Although the projections were not based on the Kitsap Regional Planning Council (KRPC) population forecast and subarea allocations, the KRPC allocations fall within the low to high range used to forecast water system demand. :.:':':. '................. ......:................. . . ..... ........ . ........ . i'''.. Water Source . . ....,. '" .. .... .. '. .............. "'" .. ...... . ". ",.'..' . .. ..::....:..:... :.:..:'. .:: ......b.....I:...: ..:...... . .. .. '.i}: '.: ....<E~isting~nd~~ot:~~~..~a'etSUpply ......, . '" ..... .. ... ... -.. . .... ..n... . ....... . "'::'. :.'. Dailysopply(mgdr': .......:..... · .:AhhuaISupply (~(?-fi) Existing Sources 9.1 - 23.7 11.0 - 12.2 20.1 - 35.9 13,460 - 16,565 7,470 20,930 - 24,035 Potential Sources Total Sources Source: Bremerton Water System Comprehensive Plan Table 8-7 . It is projected that if pending water rights certificates are secured, then no additional sources will be needed to meet the total demand through the next six years. However, future water sources will need to be secured to meet anticipated demands beyond year 2000. (Table WA-3) ..... . n' ... ... n' .. . ., ..... ....... ..... ... . .... . . ... ..... ...... .......... ..... .. ....... . ... ..... ........ .... . n.. . . .. ................ ... ....... ..... . ,,,. ....... ,,,........, .. 'bem.ikJ{Pop'ijlatiori:incitY~coiJnfy. . .:.:..... . . ......Servl9sArea)..} ..... .. ..., . ...... ...., , .... ..... .... ,." . ...., W.A...... ................. . . .... . .. ....... , .. .... .W~i~f/>...... .... .. ., ,.. - . .. ... ,......".", ....... .. ........... ...... ..... ....., ...... ........ ....... .............. .... ..... . ... ...... .......... . ..... ....... sG-YliiarNeed\ /<<<.' . .... ... ....... ... ..... ....... 1994 1995-2000 (new) Total as of 2000 i~riti.;y~~ji~iia\.>......\.... .... 2000-2014 Total as of 2014 18,366 89,704 1.84 12.17 Source: Bremerton Water System Comprehensive Plan, updated by Bremerton Water Utility Assumptions: 2000: Pop. X 103 gallons/capita + 3.2 MG for PSNS 2014: Pop. X 100 gallons/capita + 3.2 MG for PSNS Capital Facilities Program (CFP) - Page 76 3. Proposed Facility Improvements The Bremerton Water Plan recommends that an additional 0.7 mgd of groundwater supply should be developed by 1995 and a total of 1.4 mgd should be developed by year 2000. (Table WA-2) The Water Plan concludes that existing distribution system is capable of meeting typical system demands. Improvements in transmission and distribution mains are necessary to improve flows and pressures in certain areas and to replace undersized or sub-standard facilities. (a) Water Quality Meeting strict water quality standards is a primary objective of the City. Drinking water is regularly tested at the sources and in the distribution system. To continue to use the unfiltered Union River source, the City should continue to pursue either acquisition or controlling agreements over remaining private lands within the watershed, and should vigorously implement the Watershed Control Plan. Responsible operation of the entire water system is critical to maintaining compliance with the non-filtration status of the surface water treatment regulations. Even with these precautions, a drastic change in source quality or changes in regulations could require the City to provide filtration. Groundwater wells water quality will be ensured through a Wellhead Protection Program, to be implemented in 1995. (b) Storage With the exception of additional storage for fire fighting in the Industrial Park and Airport area, no additional storage is needed to meet current demand. Adding such storage is the responsibility of the Port of Bremerton. By year 2010 a total of 22.5 million gallons (MG) of system wide storage is expected to be required. The system currently has 34.3 MG of storage available, primarily in the lower elevation zones in the developed parts of the city. Prior to year 2010, additional storage will be required to serve two new West Bremerton zones south of Kitsap Lake and south of Gorst. Additional storage should also be provided north of the East Bremerton city limits in the vicinity of Fairview Junior High School. (c) Distribution System West Bremerton industrial/commercial areas have good fireflow capacity. Toward Jackson Park, fireflow capacity meets Kitsap County guidelines but is less than ISO recommendations for multi-family residential housing. Several improvements are needed to improve fireflow capacity in the East 398 Zone, west of the Brownsville Highway. Changing the shape of this long narrow zone Capital Facilities Program (CFP) - Page 77 service area by trading the northern part of the zone of the North Perry Avenue Water District in exchange for an equivalent part of their service area east of the central East Bremerton service area may be an economical way to improve service to both areas. Pump station capacity will need to be added to serve new west zones south of Kitsap Lake and south of Gorst. The Utility should continue to routinely replace small sub-standard water mains. Initial replacement projects should concentrate on mitigating low-pressure problems in the Sherman Heights area. The existing telemetry and control system will require upgrading and maintenance so the Utility can more efficiently control the water system. (d) Plans of Other Providers There are no other providers of potable water within the City. However, there are several nearby water districts, public utility districts and municipalities that may have interests in local surface and groundwater resources. These include: Silverdale Water District No. 16; North Perry Avenue Water District; Erland Point Water District; Sunnyslope Water District; City of Port Orchard Water District; and McCormick Woods development. Currently areas of boundary uncertainty exist between the Bremerton Water Utility and the Sunnyslope Water District service areas. An unclaimed area exists between the City Water Utility and the Erland Point Water District service areas. Unclaimed areas also exist south, east and west of the Utility's watershed. The Kitsap County Coordinated Water System Plan (CWSP), a regional water supply, transmission, and storage plan, is being developed by the Water Utility Coordinating Committee (WUCC) to comply with state law. The plan assesses water supply needs in Kitsap County and presents a program to provide water supply and service to users. The plan, expected to be adopted by the State Department of health in 1995, provides a process and strategy for existing water utilities to define their role in a program consistent with adopted land use policies and projected growth strategy. 4. Six-Year Financial Plan Under the proposed LOS it is projected that no additional water sources will be needed to meet the total demand through the next six years, providing water rights are secured on two wells which have already been drilled. (a) Six-year Funding and Proiects The following chart contains the funding sources, capacity projects; and non- capacity projects for the next six years. The last portion of the chart reflects the balancing of funding sources and money expended on projects. Any surplus or deficit is indicated. (Table WA-4) Capital Facilities Program (CFP) - Page 78 '>'!i1!j4\)\\':\::::L~!'!~;\tl'~~~I~~,~~t~i~ifil~atl1.1.;;!,\1W;1;;;~~'j ......~q~~ihg~dijt~i/ ..i~~. ..i1~<q991'~ii19; ..... ............~............@t~ir.. . . Current Utility Rates Contribution - Navy Cash Carryover 1,250 3,500 1,500 1,250 1,500 7,500.0 11,000.0 1,500.0 4,743.0 4,744.0 4,745.0 4,746.0 19,996.0 (.H...>........................<......~.}~ 198.0 1,250 1,500 1,250 1,500 1,250 1,500 1,250 1,500 TOTAL SOURCES 8,241.0 4,742.0 . .............. ... ................ ..........i.> .........................:. ............... .<................:.....:...... ... ph,jec#iH ..... ~.:<... .....:. ........ .'..<.:.. ..... Telemetry Equipment 148.0 50.0 Reservoir Rehabilitation Pump Sta.14 Replacemt. Anderson Ck. Well Abandonmt. 1 st St Transm. Main Domesea Well Devlpmt. Fairview Tank Trnsm. Main S.CtrI.Vly.Rd. Stor.Res. Sherman Hts. Main Replacemt. Twin Lakes Main Ext. Alder Bottom Well #23 Expansion 36" Main Gorst Fleet Purchases (above $351<) Biosolids Bldgs. Union R. Land Acquisition Various Equipment Bldg Remodel Well 21 Pump/Motor Subst. Main Replacemt. Schley Way Main Install. Austin Dr. Main Rplcemt. W. Kitsap Lk. Main Ext. 115.8 100.0 100.0 100.0 100.0 200.0 715.8 32.9 486.2 519.1 34.7 34.7 196.8 196.8 127.3 127.3 133.7 133.7 790.1 790.1 218.8 218.8 1,850.6 1,850.6 140.4 140.4 1,680 135 100 235.0 106.6 106.6 713.3 713.3 61.1 108.5 50 50 50 50 50 311.1 108.5 79.1 79.1 74.8 115.8 60.8 50.0 50.0 50.0 50.0 335.6 115.8 81.8 81.8 133.7 133.7 Capital Facilities Program (CFP) - Page 79 it(i,i'ii;i\:",,';c::',:;i;(,III*;~~;~~~~~~'::A~~;~:~~~r'i,,:, ......... '.. . '" .. ... ." . . ..~QijiiMuSb~~&ti>... ....199$\.. ....1996... ......1997 /199S.....)1999. .... .2006. ...) Tdtali NW 64th Main Install. 13th St Distr. Main 51.1 114.9 70.2 .68.3 50.0 50.0 50.0 50.0 50.0 50.0 418.3 250.0 350.0 51.1 114.9 High St Distr. Main Ohio St Distr. Main 70.2 Deteriorated Meters Upgrade TOTAL COSTS 68.3 300.0 Surplus or Deficit Notes: All amounts are times $1,000. Only capital facilities valued at $35,000 or more are included. Source: Bremerton Public Works & Utilities Department. ,.. .... -, . ..... . ......... ........ .. .. ...... ..... .. . ..... .. ......... ....... . ........ .......... ........... . Bilairice< ..... > ..... .n ...._.. (b) Capacity Balance The following chart demonstrates how the projects to be developed over the next six years provide the required amount of capacity at the adopted level of service standard to meet the needs of the existing population and projected growth. (Table WA-5) Capital Facilities Program (CFP) - Page 80 _J""!'::r;ji'IEI\\\"II:i!'lll.j~lliiRt~.II~i~1 t:l:iljl'!'i,,!"!;~,@i" " "" """ ................................................................. :. .......;.::;:;.;:;.;:::;:::...:;..:::...:::;:::::::::;:.:;'.:' ':'.:'::.;:;::.;":::::...;.:';..'.;':':.:;:::;:;:;:;:.". ;.:. .......;...;.;.:-:-:<::-:-:;:.;..;.::..:....::.;:-:;.::::::::::;:.:::..........;: ;:::;:......:...;:;:::::;:.....;::::::::::::.:;-.::.:::;:;:;:;:;.;":..... ,,;.'.;.;.', ........................~.:-.........r....l..........p,....~,.,':',jict,'.,>.., li,.'.... '. '..,.,..,..,.',..,.."A,..".,..".,.."~,..".,..,,.,.."9,..,,.,."....,..',..,.....,.....,..,0,.....::.'.'..,...~.'.',.~:.,..,p.'.....O.......T.....~..."~......OR...,..,.,,!Cl)P:.....,,:.....,...:...,.,..U.,.,..:..,1...~..'.!...~............199ie.iP..~J.tY(MGD) ".> NeiResii'iiQri ~ ~ ~ \~~ ' "PP" ",', · P 'c' ", . .pificj.6~Y(MijI:U? 1994 (1) 9.54 9.1 to 23.7 -0.44 to +14.16 1995-2000 (2) n/a n/a n/a Total as of 2000 (3) 10.34 P@J~#t~1~tO~OOOtdi~~~i~~t,piC;~y ~ . Well 21 Pump/Motor Gorst Well Pump/Motor/Piping 10.4 to 25.9 + 0.06 to + 15.56 Total as of 2000 = ..., . ........ ... . ... . ....... . ....." ....... .. .. .... .. .................. ...... .......... . ...... ...... ...... . .. .. .. .. ......... ......... ... . >#:pptdi.c.pilc~...(~Gb)i 500 gpm (est.) = 0.72 400 gpm (est.) = 0.58 900 gpm (est.) = 1.30 Notes: (1) 1994 pop. x 106 GPC + 3.2 PSNS. (2) Not applicable because of difference in LOS between 1994-2000. (3) 2000 pop. x 100 gpc + 3.2 PSNS. Source: Bremerton Public Works & Utilities Dept. (1/95) (e) Operating Costs It may be useful to consider the impact of each completed capital . improvement on the City's future operating budget. An analysis of operating costs is optional; it is not required by the Growth Management Act. The following table could be used to reflect the six-year operating costs for the projects listed in the Six-year Funding and projects chart above. (Table CF-5) THIS TABLE MAY BE COMPLETED AT SOME FUTURE TIME TO DETERMINE THE FULL COSTS OF SCHOOL FACILITIES: . .. .. ... ... . . . -, . ..." . ..... ...,-" . ... ........., . . n' .... .. .. .. ......... . . .. . . ......... ..... ........ ........ ..... .. . . . ....., . . ...,-,-,.' ...... .... ,. .. . ........ ...................... .T.......b...[.........W.A~............... ............ .' .. . ... " .. .... ..... . ...., . ........, .. ....... ....... . ....,. . ':.:.<::..{...:.: .:. '. .' . .........:..,...,:.:. '.:.: ..::.: a e.. :":".'.{,',::", .'. ......<.>..... :"':':""'" . .... ......,. . ... ...... ". .... ... .. "" ... . ...... .. . ........ ....... ...... '>C!:;ix~yeafOpefatiri9g9sts ........................ .........:........ . .... . '."-, ,,- . . . . . ........ .. ........... ... .. .. ....-.... .... ...., ... ... ........ . . ...... .....,..... iL1997}i .'. 1991f< .. '}1999 ( . .... .. . ... . . .......... . .. ,..... N/A NjA NjA N/A NjA .... . .... ... . . ... ........., .. ... ............ . ..... ....... ......2000............. . ..-... . . . ... ... ..-:.:' . ;:::;.-:.,.,.,',. ... . ..... .. . .. ..... N/A N/A Note: all amounts are times $1,000 Capital Facilities Program (CFP) - Page 81 i .------------t-- ---------------t Plin NO. I \ ; 1~CO r-----------------t---------------- ------ -------t---------------! : i RHODODIHDRO HlJcGHT9 1 t I ~ mT' I i../..d::...-t ..._..._...i : 1 : SCALE IN FEET! i ,-- n__ --------+-----------------1-----------------r--------------Of !~ ! f-J- ,I ; S1L'o'BlI:W.E I . IW~~D&. i - --t--------- --------t-- : : , , , , , , I ' LEGEND D ~ l1TLITY o DD D - BfBERTON WAlEA l1TLITY WA lEA SERVICE DlSTIlCT lJNClAlMED AfEAS SERVICE AREA UNDER DtSP\JTE I , I I __171_____ ---4-~- 1 I .C : I ~ . I '. j "I -----------+---------l--~~~~+~- " , I , I- I " ., " j I .) ......-.1 .......... W,QIIT ---- u___ ------u-mulmum-m-mj 7~=.--a-- ~l~....l.-i...,...--.8 ......... BREMERTON WATER PLAN SERVICE AREA MAP Figure CF-8. Water Plan Service Area Map Capital Facilities Program (CFP) - Page 82 Bremerton Comprehensive Plan UTILITIES ELEMENT Prepared by: BREMERTON PLANNING Adopted: April 5, 1995 I Bremerton Comprehensive Plan ELEMENT I UTiliTIES CONTENTS 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. GOALS AND POLICIES ......................................... 3 A. GROWTH MANAGEM ENT ACT GOALS ... . . . . . . . . . . . . . . . . . . . . . . 3 B. KITSAP COUNTY-WIDE PLANNING POLICY ...................... 3 C. UTILITIES GOALS AND POLICIES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 (1) Level of Service .................................. 3 (2) Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 (3) Resource Conservation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 (4) Timely Processes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 3. INVENTORY, ANALYSIS AND FUTURE NEEDS8 A. FEDERAL AND STATE LAWS/REGULATIONS . . . . . . . . . . . . . . . . . .. 10 B. NATURAL GAS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 11 C. ELECTRICAL UTILITIES ................................... 12 D. TELECOMMUNICATION SYSTEM. . . . . . . . . . . . . . . . . . . . . . . . . . .. 17 (1) Telephone. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 17 (2) Radio . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 18 (3) Cellular. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . .. 18 (4) Cable Television. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 19 LIST OF TABLES Tables Page UT-1 Utilities Facilities: Bremerton . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 UT-2 Existing Capacity: Electrical Utilities ............................. 14 UT-3 Projected Electrical Load Level: North Kitsap Subarea ................ 15 LIST OF FIGURES Figures Page UT-1 UT-2 UT-3 UT-4 Kitsap County, Washington, Utilities ............................. 21 Cascade Natural Gas Corporation Service Area . . . : . . . . . . . . . . . . . . . . . 22 Map 1 - Electrical Transmission System: Existing Facilities . . . . . . . . . . . . . 23 Map 2 - Electrical Transmission System: Proposed Facilities ........... 24 Bremerton Comprehensive Plan ELEMENT I UTILITIES .......I...~..............INTRODmCTIQjN ..... ................................ ....... .. . .. . .. .... . This Utilities Element has been developed in accordance with Section 36.70A.070 of the Growth Management Act (GMA) to address the utility services in the City of Bremerton and the adjacent urban growth area. The GMA requires: A utilities element consisting of the general location, proposed location, and capacity of all existing and proposed utilities, including, but not limited to, electrical lines, telecommunication lines, and natural gas lines. The Utilities Element represents the community's policy plan for growth over the next 20 years. The element describes how the goals in the other plan elements will be implemented through utility policies and regulations, and is an important element in implementing the comprehensive plan. The Utilities Element has also been developed in accordance with adopted Kitsap County- wide Planning Policy, and has been integrated with all other planning elements to ensure consistency throughout the comprehensive plan. The Utilities Element specifically considers the general location, proposed location, and capacity of all existing and proposed utilities. The ,element also identifies general utility corridors. The Utilities Element includes: . INTRODUCTION . GOALS AND POLICIES . INVENTORY, ANALYSIS AND FUTURE NEEDS Utilities -- Page 1 The Urban Growth Area (UGA) boundary was selected in order to ensure that urban services - will be available to all development. This includes the provision of utility facilities. The City recognizes that planning for utilities is the primary responsibility of the utility providers. However, the City will incorporate plans prepared by the providers into its comprehensive planning efforts in order to identify ways of improving the quality and delivery of services provided in the City and its designated urban growth area boundary. All development requiring urban services will be located in the UGA, and will have these services extended to them in a timely and financially feasible manner. The Utility Plan in this element will guide decision making to achieve the community goals as articulated in the Vision for Bremerton (Element B). Utilities -- Page 2 . .... .. ........ .. ..... ....... ...... . .. .. .. ...... ......... .. ................ ..... .... .... .. . ..... . ... ....... . .'. .................. ......... ..... .... ..... . '.' ..... ............. .... ....... ...... .... .... ......... ............ ... ... ........ . .... . .... ..... . . ......... .. ........ . ....... ..... .... . <~~GOAtSmD<mO[IGIEs. .../>. .. ............ A. GROWTH MANAGEMENT ACT GOALS The Growth Management Act Public Facilities and Services goal is related to the provision of utilities: Ensure that those public facilities and services necessary to support development shall be adequate to serve the development at the time the development is available for occupancy and use without decreasing current service levels below locally established minimum standards. B. KITSAP COUNTY-WIDE PLANNING POLICY The adopted Kitsap County-wide Planning Policies for Capital Facilities include .reference to utilities: The multiple use of corridors for major utilities, trails and transportation rights- of-way is encouraged. C. UTILITIES GOALS AND POLICIES The Utilities Goals and Policies have been developed from the analysis of the existing conditions and projected needs contained in the Utilities Element. (1) LEVEL OF SERVICE GOAL: Facilitate the development and maintenance of all utilities at the appropriate levels of service to accommodate anticipated growth. Policies 1. Coordinate city land use planning with utility providers', planning. 1.a. Adopt procedures by 1996 that encourage providers to utilize the Land Use Element and Urban Growth Area in planning future facilities. 2. . Utilize maps of existing and proposed utility facility corridors to determine consistency of such designations with the elements of the comprehensive plan. NOTE: The map designation for proposed utility facilities applies to a general utility corridor or area rather than a specific alignment or site. Utilities -- Page 3 3. Assure that the comprehensive plan designates areas available for the location of utility facilities. 4. Ensure that all elements of the Comprehensive Plan (and implementing development regulations) are consistent with, and do not otherwise impair the fulfillment of, the public service obligations imposed upon the utility provider by federal and state law. 5. Provide for efficient, cost effective and reliable utility service by ensuring land will be available for the location of utility lines, including locations within transportation corridors. 5.a. Allow for various utility facilities, such as transformer stations, repeater stations, pumping stations, etc. to be permitted as appropriate to serve growth. 6. Recognize that utilities have an obligation to serve and provide the same level of service to all customers. 7. Recognize that decisions regarding utility corridors and facilities cannot be made solely on the basis of local considerations if multi-jurisdictional or regional interests would be affected. 7.a. Strive to coordinate and cooperate with other jurisdictions in the implementation of multi-jurisdictional utility facility additions and improvements. Effort should include coordination of procedures of land use decisions for consistency. 8. Establish the level of service for City utilities in the Capital Facilities Element of the Comprehensive Plan. (2) DESIGN GOAL: Facilitate the provision of utilities that are environmentally sensitive, safe and reliable, aesthetically compatible with surrounding land uses, and available at reasonable economic costs. Policies 1. Minimize visual impacts of antennas and towers on surrounding neighborhoods and other view-sensitive areas such as parks. 1.a. Encourage siting of antennas and. towers in industrial and commercially designated areas and near transportation and utility corridors. Utilities -- Page 4 1.b. Encourage shared sites and towers to minimize the need for new towers. 1.c. Develop guidelines to evaluate visual impacts of antennas and towers on view corridors"vistas and adjacent properties on a case-by-case basis. 2. Appropriately place utility facilities on public rights-of-way, and encourage undergrounding of existing and new utility lines. 2.a. Encourage undergrounding of all new distribution and communication lines in accordance with applicable rates, regulations and tariffs. 2.b. Encourage undergrounding of new transmission lines if and when the WUTC changes its rates, regulations and tariffs in such a manner as to allow equitable distribution of undergrounding costs across its rate base. 2.c. Cooperate with the formation of local improvement districts (LIDs) to underground utility lines. 3. Encourage utilities to use new/improved technology to enhance the quality of their service when these changes are cost effective and consistent with the provider's public service obligations. (3) RESOURCE CONSERVATION GOAL: Protect non-renewable resources to benefit present and future generations. Policies 1. Facilitate and encourage conservation of resources to delay the need for additional facilities for electrical energy and water resources and achieve improved air quality. 2. Facilitate the conversion to cost-effective and environmentally sensitive . alternative technologies and energy sources. 3. Support development of a widespread gaseous fuel infrastructure to provide more options to reduce vehicular pollution. 3.a. Convert city vehicles to use cleaner fuels as feasible. 3.b. Strive to achieve significant reductions in use of electric energy in City facilities. Utilities -- Page 5 4. Encourage the joint use of utility corridors, provided that such joint use is consistent with limitations as may be prescribed by applicable law and prudent utility practice. 4.a. Encourage the joint use of utility corridors for non-motorized trails in conjunction with regional greenways plans. 5. Require utility facilities to be designed, constructed and used in a . manner which minimizes incompatibility with surrounding land uses. 5.a. Require utility facilities to be fully enclosed in buildings/ structures where appropriate. (NOTE: Not applicable to utility lines and poles.) 5.b. Require utility buildings and structures to be aesthetically compatible with the area in which they are placed, and landscaped and screened accordingly. (NOTE: Not applicable to utility lines and poles.) S.c. Promote replacement of existing cross-sound overhead utility lines with submarine cable or other less visible alternatives. 6. Permit new utility projects in all zoning districts as a conditional use. Consider the following when reviewing proposed utility projects: 6.a. Comprehensive plan designation for surrounding area; 6.b. Direct, indirect and cumulative environmental impacts; . 6.c. Potential health impacts; 6.d. Compatibility with surrounding area; 6.e. Visual/aesthetic impacts, including screening and architectural compatibility; 6.t. Impacts on surrounding property values; 6.g. Costs. 4. TIMELY PROCESSES GOAL: Process permits and approvals for utility facilities in a fair and timely manner and in accord with development regulations which encourage predictability. Policies 1 . Promote co-location of new public and private utility distribution facilities in shared trenches and coordination of construction timing to minimize construction-related disruptions and reduce costs of utility delivery. Utilities -. Page 6 2. Provide timely, effective notice to utilities to encourage coordination of public and private utility trenching activities for new construction and maintenance and repair of existing roads. 3. Encourage provision of efficient, cost effective and reliable utility service by ensuring land will be made available for the location of utility lines, including location within transportation corridors. 4. Promote the extension of distribution lines to and within the Urban Growth Area. 4.a. Coordinate land use and facility planning to allow eventual siting and construction of natural gas distribution lines within rights-of- way which are being dedicated or within roads which are being constructed or reconstructed. 5. Ensure that all maintenance, repair, installation, and replacement activities by utilities are consistent with City critical areas ordinances. 6. Encourage communication between the City of Bremerton, the WUTC and utilities regulated by the WUTC regarding planning for adequate utility services. 7. Encourage system design practices intended to minimize the number and duration of interruptions to customer service. 8. Formulate, interpret and apply development regulations so as to allow the timely development of utility facility additions and improvements. Utilities -- Page 7 ......~.~..........].~.~I~.By;.......~~~~x~I~......AN.~.......fOIP.8E.......~.~.~.P~................................................. The inventory presented in this element provides information useful to the planning process. It does not include all of the data or information that was gathered, but has presented the relevant information in an organized and useful format. Additional data is listed in the bibliography and can be obtained at the City. The inventory summarizes general information pertaining to existing utility service systems in the City. Many public and private agencies are involved in regulating, coordination, production, delivery, and supply of utility services. This section of the element identifies utility providers as well as the legislation regulating the utility. An analysis of future utility needs is also included. The inventory includes: . Natural Gas . Electrical . Telecommunications The inventory and analysis of the following additional utilities is located in the Capital Facilities Element: . Water . Sewer A summary of utility facilities included in the element is provided on the following page. (Table UT-1) Utilities -- Page 8 ............. .. .....) .....r..ribJiOt;1C}.................... .:.pijj,~',.f.iplt.itit.:.rem~"()k.< . ........ .. n. ....... . ........ ............ .... ............ ........... ............ ....... ....... . n. ... .......... ............... .... ......... ........... ......... .......... ........... . ............ .. ................ .... ........... .......................... .................. .................... ....................................................................... ijtlltty.> .. ...PtoVl~i~ .... .~*t8tjhgp~P.aw\~..M~~pi~.~iji<f Natural Gas Cascade Natural Gas Corp. (CNG) Electrical Puget Power Telecommunications 17,000 users in Kitsap service area in 1994. Peak demand is c. 1,950,000 therms/day. North Kitsap subarea .(includes Bremerton) has 445 Mega Volt Amperes (MVA's) capacity. Power utilization factor is at 70.5 % of capacity. Plans to triple distribution capacity to area over 3 years. Is mandated to expand capacity as demand develops. Plans to increase capacity to 484 MVA's by 2020. . Telephone US West ................................................. ....n............................................. .....n........................................................... .................................................................. 77,000 customers in Kitsap County. Maintains routes at 85% capacity; installs additional facilities when exceed 85%. . Radio ................................................. ................................................... .................................................................. .................................................................. Public sector com- munications serve law enforcement agen- cies, fire depts. etc. Emergency broadcast network has links throughout county. Expansion of 911 system in near future. . Cellular Cellular One ................................................. ................................................... .................................................................. .................................................................. US West New Vector Group 2 cell sites in Bremerton area: East Bremerton & Kitsap Lake. 2 cell sites in Bremerton area: West Hills & Silverdale. Plans 4 additional cell sites in Kitsap County - none in Bremerton area. Plans 8 additional cell sites in Kitsap during next 1-3 years -- none in Bremerton area. . Cable TV TCI Cable ................................................. ................................................... ...............................................................n. .................................................................. Falcon Cable Has potential to serve 15,156 households Serves 10,000 customers within City. > 2,000 households - Kitsap Lake area. Utilities -- Page 9 Plans for 4% annual growth rate. Plans to continue to meet demand. A. FEDERAL AND STATE LAWS/REGULATIONS (1)Revised Code of Washington and Washington Utilities and Transportation Commission . Utilities and transportation are regulated in Washington by the Washington Utilities and Transportation Commission (WUTC). The WUTC, composed of three members appointed by the governor, is empowered to regulate utilities (including, but not limited to, electrical, gas, irrigation, telecommunications, and water companies). State law (WAC 480-120) regulates the rates and charges, services, facilities, and practices of utilities. Any change in customer charges or service provision policy requires WUTC approval. The WUTC requires gas providers to demonstrate that existing ratepayers will not subsidize new customers. Thus, historically, gas main extensions have not been planned in advance but have been initiated only when sufficient customer demand is manifest. The WUTC regulations, are, therefore, inconsistent with the GMA's concurrency goals. (2) Federal Energy Regulatory Commission The Federal Energy Regulatory Commission (FERC) is an independent five- member commission with the U.S. Department of Energy. FERC establishes rates and charges for the interstate transportation and sale of natural gas, for the transmission and sale of electricity, and the licensing of hydro-electric power projects. In addition, the Commission establishes rates or charges for the interstate transportation of oil by pipeline. (3) Natural Gas Policy Act of 1978 The central theme of the National Gas Policy Act (NGPA) is encouragement of competition among fuels and suppliers across the country. As a result, natural gas essentially has been decontrolled. The NGPA also contained incentives for developing new natural gas resources and a tiered pricing structure aimed at encouraging the development of nation-wide transmission pipelines. The result of the Act has been that many consumers are now paying less for natural gas than they were in 1980. (4) Northwest Power Planning Council The Northwest Power Planning Council (NWPPC) focuses on the generation of electricity; however, its policies have implications for gas too. The NWPPC, in its recently released power plan, has directed the region to develop cogeneration as an energy resource and hydro-firming as a power back-up system. · Cogeneration is the use of heat, as a by-product of power generation, for industrial processes or for space and water heating. Natural gas is often used as a fuel source for cogeneration. Utilities -- Page 10 . Hydnrfirming is the back-up of the region's intermittent excess spring hydro generation with gas-fired combustion turbines to provide back-up if hydro-electric power is insufficient. (5) 1991 Clean Air Amendments The passage of the Washington State Clean air Act in 1991 indicates a state intent to promote the diversification of fuel sources for motor vehicles. This is in response to a need to both reduce atmospheric emissions and reduce the nation's reliance on gasoline for strategic reasons. This Act promotes the use of alternative fuels by requiring 30% of newly purchased state government vehicle fleets to be fueled by alternative fuel by July 1992 (increasing by 5% each year). It also studies the potential and encourages the development of natural gas vehicle refueling stations. B. NATURAL GAS Cascade Natural Gas Corporation (CNG) builds, operates and maintains natural gas facilities serving Kitsap County. CNG is an investor-owned utility serving customers in sixteen counties in the State of Washington, as well as parts of Oregon. The Pacific Northwest receives its natural gas from the Southwest United States and Canada. Natural gas is supplied to the entire region via two interstate pipeline systems. The Pacific Gas Transmission Company (PGT) and Northwest Pipeline Corporation (Northwest) each owns and operates its respective regional pipeline network that supplies natural gas to Washington, Oregon and Idaho. (See Map 1) Natural gas can be stored in two ways. First, it can be pressurized and then injected into underground geologic structures which are suitable for gas storage. This is done at Jackson Prairie Gas Storage located south of Chehalis. This gas is used to supplement the region's gas supply in colder weather. Secondly, natural gas can be stored by cooling it to -258 Fahrenheit, where it becomes a dense liquid and can be stored in storage tanks. Such a storage facility exists in Plymouth, Washington. The Cascade Natural Gas supply and transport system begins at the "gate station", the delivery point of natural gas from the upstream interstate pipeline to CNG's system. Gate stations normally include metering stations, odorizing stations and pressure reduction stations. High pressure lines transport gas to district regulators throughout CNG's service area. Pressure reduction stations are installed at the point of delivery of natural gas from the high pressure transmission lines to the lower pressure distribution systems. (1) Existing System The Cascade Natural Gas service area includes all of the City of Bremerton and the adjacent unincorporated areas. Gas is not available at this time to all areas inside the service area. (See Figure UT-1) Utilities -- Page 11 Connections to CNG's distribution system are initiated by customer demand and requests. As of January 1994 there are over 17,000 users of natural gas in CNG's service area. According to CNG studies completed in 1991, current peak demand is approximately 1,950,000 thermsjday. (2) Proposed System The location, capacity, and timing of these improvements depend on opportunities for expansion and on how quickly the Bremerton area grows. There are usually several possible routes to connect different parts of the system. The final routes taken will depend on right-of-way permitting, environmental impact, and opportunities to install gas mains with new development, highway improvements or other utilities. CNG has an active policy of expanding its supply system to serve additional customers. The maximum capacity of the existing distribution system can be increased as required by one or more of the following: (a) Increasing distribution and supply pressures in existing lines; (b) Adding new distribution and supply mains for reinforcement; (c) Increasing existing distribution system capacity by replacement with larger sized mains; or (d) Adding district regulators from supply mains to provide additional intermediate pressure gas sources to meet the needs of new development. Customer hook-up to the distribution system is determined by the WUTC pursuant to its rules. Connection to the system is driven by demand. this means that connections cannot be planned in advance; rather, connections are initiated by customer requests. CNG's 20-year plan is to continue developing distribution systems and services to meet growth at lowest possible costs. Planned improvements include adding distribution elements when needed. Specific improvements in the Bremerton area include a 10-inch looping line. Existing distribution capacity will be tripled over the next three years with installation of a 37.5 mile long 16" line alongside the existing 8" line that brings supplies to the area from the south. C. ELECTRICAL UTILITIES puget Sound Power and Light (Puget Power) serves Kitsap County with electrical power. Power is moved through transmission lines, and voltage is lowered at transmission substations. Voltage is further lowered (stepped down) at distribution Utilities -- Page 12 stations located in neighborhoods, and carried over distribution lines toward homes and businesses. (1) Existing System There are two main access points for receiving power in Kitsap County: at Kitsap Bonneville Power Administration (BPA) 230/115 kiloVolt (Kv) Transmission Station located north of Gorst; and Command Point Cable Station 115 Kv line in Fragaria through underwater cables originating from puget Power's O'Brien station in Kent. Puget Power has divided Kitsap County into North and South subareas for planning purposes. Bremerton is in the North Kitsap subarea, which extends northward of Sinclair Inlet. From the Kitsap BPA station, 115 Kv delivery feeds into Puget Power's South Bremerton, Bremerton, and Valley Junction (east of Silverdale) 115 Kv switching stations. Power then flows from these switching stations through transmission lines to serve subarea distribution substations. Three 115 Kv transmission lines carry power north into west Bremerton and Silverdale areas. Two of these lines, the BPA Kitsap-Valley Junction and the South Bremerton-Valley Junction lines terminate at the Valley Junction Switching Station. The third line continues north past Poulsbo to the Foss Corner switching substation, which serves the northern section of the county. The existing electrical system within the city consists of the following: · Transmission Substation: South Bremerton · Distribution Substations: Bremerton; Sheridan; Rocky Point. Retired stations: Wycoff; Hewitt; Manette. · Transmission Lines (115kV): South Bremerton-Valley Junction; Bremerton-Foss Corner; South Bremerton-Bremerton; O'Brien-South Bremerton; Bremerton-US Navy PSNS-BPA Kitsap. · Transmission Lines (Below 115kV): Presently de-energized -- Manette Tap (66kV). · Other utilities with facilities in Bremerton: Bonneville Power Administration. (2) Existing Capacity The 230/115 Kv transformers at the BPA Kitsap Switching Station are approaching their capacity. The power utilization factor of all distribution substations is at 70.5 percent in the North Kitsap subarea, with South Kitsap at nearly 75 percent utilization. The utilization factor is a comparison of current peak system load in Kitsap County during the winter heating season, divided by the design capacity of the substations in the County. The following table illustrates the capacity used during peak winter loads at Bremerton area distribution substations and in the North Kitsap subarea as a whole: Utilities -- Page 13 . - . ..." .. . . ..... , ... ..,.... ..... .... . . ..... ., ......... '_n.. .... n. . .n'" ..... ........... _,.. . . .... .. .... .. ..... ..... . .......... .. ....... . ...........n . ......... .... .. ..... n. ..' .. ...... ........ ,. ... .......,. .,...... .......rn .... . TabliJ)" ';2.. ,"<.}i. ni i(i .'. .\. Existi~g'capA9ity:il,c;tri~t9~iHtl~(. . .... n. ......... ....... .... .. .... .... .. ...... .. ........ ....... ....n'. . ........... . ... . ........ .......... ......... .. ..... n. ........... ............... "....... ....... ....... ,......... ". ,-" .... .. ....... ... .... . .....,. .)./:..c..a....~8.t..y.....:......(......M.....V).. )/..nn W' to d (MVA) .....................(~:~J:.~j1...~.~~..............:..:....... Bremerton North Kitsap Subarea Total Loads = Utilization Factor = 70.5% 50 20 20 20 20 445 22.7 Rocky Point #1 Rocky Point #2 Sheridan #1 19.8 6.6 20.3 17.1 313.8 Sheridan #2 MVA = Mega Volt Amperes Source: Puget Power. Since only two 230-115 Kv, 280 MVA transformers at the SPA Kitsap Switching Station serve all of Kit~ap County, the capacity of these transformers is a measure of their ability to serve the connected load. Using planning guidelines from Puget Power, the system is designed so one of these large transformers can be taken out of service without causing customer outage. The electrical system can be expanded as the area load develops. If additional loads do not develop, or develop more slowly than anticipated, the construction timing of individual projects is simply extended so that the overall plan completion date is deferred. If the electrical load stops growing altogether or decreases, no further construction would be necessary, except for facility maintenance and replacement needs. Likewise, if the load develops faster than anticipated, the timing of the construction of the projects can be accelerated. (3) Projected Needed Capacity Puget Power's 2020 Electrical Facilities Plan for Kitsap County predicts a projected load level in Mega Volt Amperes (MVA's) of 483.7 for North Kitsap and 163.3 for South Kitsap by year 2020. Puget Power's long-range plans are based on electrical growth projections anticipated for the years 2010/2020 and beyond. County population projections produced by the state Office of Financial Management (OFM) are used to determine new load growth for the next 20 years. Puget Sound Regional Council (PSRC) population and employment forecasts are used for load growth beyond 20 years. Projected load is calculated as the existing load, minus conservation reductions, minus demand side management, plus the forecast of new load. Utilities -- Page 14 The population and employment forecasts and their distribution produced by the PSRC are used to reflect land use activities, which in turn are used to develop a model for forecasting new load. The location of the population and employment increases is determined by the cities and counties. In Kitsap County, the population and employment is broken down into PSRC Forecast Analysis Zones (FAZ's). Using these resources, Puget Power predicts a 223.1 MVA total load growth in the North Kitsap subarea. (Note: Capacity is measured by MV A, which measures energy, whereas Kvmeasures voltage.) .... . n' ... . ...... . . .loadlevei .. .... . ...... .... ..... ...... ....... .. ..... . ............ ........ .. .. ..... P' ................. . ....... . ......... .......... .. ...... .... ........ ...... . ............ ......... .. ... . ............ . ..... ..... . . ...)~~i$P.Jioi~ct.d .load.la'ii~I(I4V4). }........... 313.8 -21.8 -31.4 + 223.1 . ......... .. ..,... . .......... . ..... n... ..... ..... . .. .. . . .. ........ . ...... . ..... ......,.. ...... ... .... .. . ... .... .... ...... .. .. .... .......... ...... . ... .... ..... .. .. . ........ . ...... . ...T.............b......I.... .UT. ....3...... . .. .............. .........:....:..... .......:.....:..:::..:.... ... .... ....... .. . .. n.. ,........... ......... n. ... . . ......... .......... ....... .. .. .>..< .. .. . . . ....\i. . ... .. .....Cl. e.. .........~..ii.i...... ..::::..:.... . . . ...pr(jject$d: ~[ectrl~J]..padLeyel:NorttiKlt~p$.4,~~rea ... .. . Existing load Minus Conservation Effects (6.9%) Minus Demand-Side Management Effects (10%) Plus Total Expected load Projected load level = Source: Puget Power (4) Proposed .system Puget Power has identified system and transmission improvements required to serve the forecasted load growth. Based on these system improvements, North Kitsap subarea utilization factor will maintain or slightly increase, and South Kitsap's will drop. Many improvements are in progress or planned for the future; others have been identified as future improvements to meet the growth demand. (a) System Improvements in Progress · Westsound Transmission Reliability (Submarine Cable) -- on hold. · South Bremerton-Foss Corner Right-of-Way Acquisition -- Right-of-way segments between the South Bremerton Switching Substation and Bangor will be acquired. These segments are the missing gaps that were not included in the BPA Kitsap-Bangor Line right-of=way purchased from the Bonneville Power Administration in 1986. Future transmission improvements will. include purchasing a right-of-way from Bangor to the Foss Corner Switching Station. These improvements will provide a transmission route from South-to-North Kitsap for a future 230 Utilities -- Page 15 kV transmission system link between the South Bremerton and Foss Corner Switching Stations. · South Bremerton-Foss Corner 230kV Line -- A transmission right-of-way will be acquired from Bangor northeast to the Foss Corner Switching Station, and a 230 kV transmission line will be constructed between South Bremerton and the Foss Corner Switching Station. The major portion of this line will be constructed on a right-of-way parallel to the Kitsap-Bangor SPA Line, which was purchased from the BPA. This will become the 230 kV transmission link through Kitsap county that ties the South Bremerton Switching Station to the BPA Fairmount Transmission Substation in Jefferson County via the Foss Corner Switching Station. · BPA Kitsap-South Bremerton 115kV /s30kV Line -- A new 115/230 kV transmission line will be constructed between BPA's Kitsap Transmission Station and Puget Power's South Bremerton Station. The line will be built on an existing transmission line right-of-way and replace an existing 66 kV transmission line (not energized). This project will provide significant reliability and capacity improvement for Bremerton and Kitsap County. (b) Future Transmission Improvements · Bremerton Substation Additions -- These additions will provide better protection for the Bremerton Switching Station 115 kV bus and reduce the exposure to faults on the South Bremerton-Valley Junction 115 kV Line. The line would be broken into two segments -- the South Bremerton-Bremerton 115 Kv line and Bremerton-Valley Junction 115 kV line -- and terminates on separate breakers at the Bremerton Switching Station. These additions should be scheduled for construction after the Bremerton-Winslow 115 kV Line is built. · North Kitsap 230kV Plan -- In the short term, this project will provide an interconnection with Tacoma City Light to the south, which will provide another power source with a flow of 130 MV A at 115 kV to the Kitsap region. However, under emergency operating conditions, additional capacity would be available. In the long term it will stiffen the total Puget Power transmission system by connecting a future Hansville Cable Station near Point No Point via two parallel Puget Sound submarine cables from the Double Bluff Cable Station on Whidbey Island. Two 230 Kv overhead transmission lines would extend to the Foss Corner Switching Station, with one continuing south to BPA Kitsap where BPA's 230 kV system continues on to BPA Olympia. This would include a 230 kV tie between BPA Kitsap and South Bremerton Substation to interconnect with the Henderson Substation. By having the 230 kVat Foss Corner, Puget would be making a system connection with the BPA Fairmount via its proposed Jefferson County 115/230kV Conversion and Hood Canal Cable projects and the planned Foss Corner-Salisbury Point #2 line. Initially, when the Utilities -- Page 16 Jefferson County and Hood Canal projects are energized at 115kV, between 40-50 MW could be made to flow from the north into North kitsap County, in order to provide backup for the BPA Kitsap banks in the case of one failing. A South Bremerton-Foss Corner 230 Kv Line is one component of this plan. . Sedgwick-South Bremerton #3 115/230kV Line and Sunnyslope Substation -- A new 115/230 kV transmission line will serve the Sunnyslope Substation with a high, side loop-through. This line and substation will be converted to 230 kV when the Lagoon-Sedgwick 115/230 kV Line is converted to 230 kV. . Henderson-South Bremerton 230kV Conversion -- The Lagoon- Sedgwick 115/230 kV Line and the Sedgwick-South Bremerton #3 115 kV Line will be converted to 230 kV around the year 2000-2002. The converted 230 kV line will bypass Sedgwick Switching Station and be renamed as the Henderson-South Bremerton 230 kV Line. (c) Future Distribution Substations . Werner -- This is one of eight new substations being considered for serving forecasted load growth in the North Kitsap subarea. The Werner Substation would serve new developments in the area south of Kitsap Lake and the west end of Werner Road. A loop-through of the South Bremerton-Bremerton 115 kV Line will be needed. D. TELECOMMUNICATION SYSTEM Telecommunications is the transmission of information by wire, radio, optical cable, electromagnetic energy, or other similar means. For the purposes of this element, telecommunications include telephone, radio communication, cellular telephone and cable television. Telecommunications is often referred to as the medium for the "information highway". Telecommunication service is regulated by the WUTC, and is subject to various federal laws and regulations administered by the Federal Communications Commission. The telecommunications industry is required to provide service upon demand. Local laws and rules also exist with which telecommunication providers must comply, such as those governing land use and public rights of way. (1) Telephone Bremerton is served by US WEST Communications, which has the largest service area in Kitsap County. US WEST's goal is to maintain its routes at 85 percent capacity. When usage exceeds 85 percent, additional facilities are planned, budgeted and installed. US WEST regularly evaluates the capacity of its facilities. Utilities -- Page 17 US WEST has approximately 77,000 access lines in Kitsap County. The projected growth rate in the service area for the next three years is approximately 4 percent per year. There is the possibility that this rate could change because of new service offerings. Forecasting beyond three years in a county and telecommunications environment with so much potential for change is very difficult. There are many projects planned to meet the projected growth. Some of these will increase capacity, while others will provide new service capabilities. The capacity increases include additional fiber optic and copper infrastructure in key growth locations, while new service capabilities include new switching technology in central offices and at remote locations. (2) Radio Radio communication forms an integral part of an established communications system within Kitsap County. Public sector communications provides services for law enforcement agencies, municipalities, interagencies, fire departments, search and rescue organizations, the American Red Cross, departments of emergency management, Puget Power, medical administration, and maritime enterprises. An emergency broadcast network has been in place for many years with links throughout the county. Alternative emergency communications exist which are designed to supplement or replace existing public safety communications during times of emergencies or disasters. Emergency communications may include the use of local radio stations and HAM operators who provide a link to federal and state emergency management personnel during emergencies or disasters. (3) Cellular Cellular calls use signals to and from mobile phones. Cellular calls are routed by a series of low-powered transmitting antennas through a central computer called the Mobile Telephone Switching Office (MTSO), which connects the call to its destination. Transmitting antennas are located at "cell sites", and their coverage areas are known as "cells". A network of strategically placed antennas allows a "handing off" of the signal as the carrier of the phone travels. Capacity overload and cellular system expansion is a response to several factors: an increase in the number of customers residing within a designated area; a shift in traffic volumes affecting cellular users; or a record of service inadequacies such as dropped calls or poor quality sound. In these cases, additional antennas are then planned, with site selection influenced by topography and other engineering constraints. The Bremerton Area is served by two cellular providers: Cellular One and US WEST - New Vector Group. Utilities -- Page 18 (a) Cellular One Cellular One has over 100 cell sites in Western Washington, with six in Kitsap County, including two in the Bremerton area: East Bremerton and Kitsap Lake. Cellular One plans to construct four additional cell sites in Kitsap County during the next one to three years in order to increase and enhance coverage. No new sites are planned for the Bremerton area. (b) US WEST New Vector Group US WEST New Vector Group has approximately 100 cell sites in Western Washington, with six in Kitsap County, including two in the Bremerton area: West Bremerton and Highway 3 north of Gorst. US WEST New Vector Group plans to construct eight additional cell sites in Kitsap County during the next one to three years in order to increase and enhance coverage. No new sites are planned for the Bremerton area. (4) Cable Television Cable television service is delivered to customers through a complex series of electronic components and many miles of cable installed throughout the community~ A central collection point, called a "headend", receives signals by satellite, microwave or broadcast antennas and converts them to VHF frequencies that correspond to those in the tuner of a television set. Cable television companies are regulated by the Cable Television Consumer Protection and Competition Act of 1992 and enforced by the FCC. Cable companies must enter franchise agreements with local governments, who regulate service rates according to FCC guidelines and formulas. The City has a "non-exclusive" franchise which allows any qualified cable television company to construct, operate and maintain a cable television system by use of City-owned rights-of-way. At the present time Bremerton is served by two providers: TCI and Falcon. The current franchise agreements expire in May 1995, and the City is in the process of negotiating renewal agreements for the next five or ten years. The franchise provides for: bi- directional cable connections to Olympic College and City Hall; a minimum of 29 channels with capability of 35; one institutional channel; addressable equipment; one public access channel with the ability to expand based upon usage. The City has a Cable Communications Advisory Committee to advise the City on optimal utilization of the cable communications system. Utilities -- Page 19 (a) TCI Cable TCI's service area includes the entire county and has the potential to serve 15,156 households. Within the city TCI serves approximately 10,000 customers. TCI plans for an approximate 4 percent annual growth rate in its service area. (b) Falcon Cable The Falcon Cable service area includes the entire county and serves 17,700 subscriber households. Within the city Falcon serves less than 2,000 customers in the Kitsap Lake area, Jackson Park and PSNS. Since Falcon has been providing cable service for less than two years, it is currently meeting demand rather than planning for an annual growth rate. Utilities -- Page 20 ( I n ~/ / -) "%>0= J ~-;-~ \; 0 ~Q, / ~ /~/ ( rJ ( ( j, ! 0) ) l \_~) ~ KITSAP COUNTY Washington UTILITIES ~ Idd o r-\ )\~ f , (\ ! ~ 1 \ ) i \ L/ / \ f "--) ( ) c\f r- ,I PTI Communications Unitei:l',TtJfPbone Compaay us. w... CtU'Site!J e EB us. .Wtst NewVK10r Group Cellulu One IV , ( ) ) Cueade NaNni GD Serna. Aru PrlDcipal Arterlll!J Mlaor Arterials Ftlderal Iodiu Keen.doll! l r /l1 , , ( /"_J G y-/ Q o o -<- f'. \... f'. N -,- (j (~ / I ( J) " <x ~ ... Figure UT-1 Kitsap CoonI}' Department of CommuniI}' Development ~ ""'"..nll................ _.._-~-- v ,. ~ ,. C> '" c Cl '" o c:: i . ..... . . -' . : -- . . Pou ... ., .. ~ ... .. ... '- . ,v : : ~ -.f ~ ~ y . . , y ",-' ~,-+- ,'- .... - ~ Lynden Everson Ferndale ...... .......... Deming....: BELLINGHAM; Acme: ....-: Sedro- : Anacortes Woolley: , . ~glOn laC~:'''' MOUNT Oak Harbor V ERN 0 N ~...\ . . Arlinglo~.. . . . . Keyport : IISEATTLE Gorst Manche~ter Port Ord'lard . Belfair Sunnyslo,~ HoqUlam .' ~cCle~7.' helto.'2" Elma .. ..- Montesano '. .' ABERDEEN .t- . . . . . LONG VIEW: ... ';Castle Rock ~!<elso ~Kalama ';Woodland \ Madrash Metolius,( , ~ Redmond J.p . .11 .... rj!'levl e BEND I ~o ~ .~ Sunriver ~." <f?~ LaPinee.! -<..<..'b' GilChri~ 011-'" Crescenv " I t I Q..~ ~hemult I I WENATCHEE 4::::! East Wenatchee ". ....:., Moses lake ! Selah .' Quincy ~Wheeler : J{YAKIMA OtheIlV:\o.... ./ ." Union G~\"Moxee .:., / wapato~~ ..' I Toppen~sh ~ ~NNYSIDE ..... J ZIllah . .' Granger ". Rich/and ~Pasco.... '" Grandview ..f~sser ~/. .Bu/t)!lnk WALLA KENNEWICas.A COllegeWALLA Patterson! '. '~inley Pia ~ PI mouth It :..' . y ..... .aUmatllla Mllt.tn-:Freewater .................. .l-i8T,ston.- Irrigon:;' "':"Weston Boardman _ - 00lta '. Athenl]: ,. Stanfield t..... Mission 'pENDLETON .....,. Pilot Rock '. . ..... t"E."f~~l A.BERD~N ~NGYIEW . . . . '~~ ;:---',:, .. Oregon" ," : ..... "".' .~ .;....:-~. ..;.-~.,.... ;.--;~:::~::.::J / .~ BEND'" / / ") ~. /' ....,. / ~.' / .... ( $ . /4. / .... BAKE CI~1 ) .::;:..... .:' ONTARIO .~ ; . -. - ,. I . ~"-". . '- ._i:~ ~ ~;".-, - - ~""t: ~~ ,;-.... ;.~, . .:... . :. .'--..;.. Cascade Natural Gas Corporation Service Area . .... - --- I....... Communities served by Cascade Natural Gas Cascade Natural Gas District Office Cascade Natural Gas Laterals Pacific Gas Transmission Company Line Northwest Pipeline Corporation Line Utilities -- Page 22 ',I I' I :)! I, I ! j /' it ' .'" " -,---- ~- / ----~- I I' i C =: ;:::;: (D" (/) ""U n> co (I) I\) (..) ____I \. Map 1 ELECTRICAL TRANSMISSION SYSTEM EXISTING FACILITIES CITIES OF BREMERTON & PORT ORCHARD lHIW EXlS1tt 1RAI&'Srn It[S IHOW II$V m 2m 51 A 1m; fUI1 000 . . TR~ . '" IlSTmJT~ 0l1fR' fociily owned/oporol'd by ulitly other lhan PLoj,t P,weL Note< It" I11<\l !<he."hcoly deplCls laciihes owned and 'l'etoltd by P"J,I Pow~ <1'0' ...cl other uliilies, Acloo Idly Iocolions ."y 001 hove beer held checked <1'0 ."y 6f1er Irom lho.. deplCled ThIS m", ."y nol depicl 01 locOlies belonglllll 10 olher uliihes, for !LIther .lor."lion conlact Rilo Persloc 01 (1116)461-3570 Pugel Sotnd Power & l'lill Co" P,O 80. 970J4 OIIt-tl< Bel,,,,, WA 98009-9754 ~ ~ LlJ'd Pb-ni~ as ~cy!llf) May 1994 Itllloscde III ".lulMmM4IU c ~ ;::+ (5" (/) " i )) 1/ ./' J ,; --------;- . , "'U D> co (l) I\) ~ L .,' ~11 f //1 WI' ~' I r::' / / '--, t I \, 4 ..It..... (l>!III'~;1'" -1 f, ,/~/ Map 2 ELECTRICAL TRANSMISSION SYSTEM PROPOSED F A ClLITI ES CITIES OF BREMERTON & PORT ORCHARD If(Dl) D1.lTN:; T~ [J{S ffia'OStD IIlOW 11.'j(V 100 -------. 231)<V -------. STATm fUll 'fUll TRANS S\l1T01 Ell . '" TR~ . 4 [)sT~lW 0 OTIfR foeirly owned/operated by ulility ollrer thon Puge! Power onfR Nole< lhls m~ scherootlcaly depicts foci~lies owned and operated by Puget Porer end seJed olher ul~hes Adud facility bcolions may not hove been field checked ood may differ. If an those depICted. ThiS m~ may nol depict 01 fac~llies bebflgmq to olher ulib'tles. Proposed lacaihes. 500Wl1 on Ihls mop 5chemolic~y depIct genera IocatlOOS orO possibl' o"r'I<nls based on flecllleo Syslem <lemcrrd 1000ecasls ood OCf &/bjecl to chooge ~s forecasts Ire updaled I Proposed ohgrrnents appearaD;j alop eXlsl~ troosmlSslOll h/'lfs ndicate the rebuilding of lnose locl~lies for "l'lher irlOfTlllllron eooloel Rita Perstoe al (206)462-3570 Puce! Sourd Power & lJQlrI Co, P.O, Bo, 97034 oaC-111 BeI,vue, WA 98009-9734 m ~ Lend ftrt1ifI'J GIS ffWYD!lm fkly 1994 f<rttom Bremerton Comprehensive Plan ENVIRONMENTAL MANAGEMENT ELEMENT Prepared by: BREMERTON PLANNING Adopted: April 5, 1995 J Bremerton Comprehensive Plan ELEMENT J ENVIRONMENTAL MANAGEMENT CONTENTS 1. INTRODUCTION.......................................... 1 '2. CRITICAL LANDS and SHORELINES .......................... 1 A. Water-oriented Land Uses . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 B. Lands Adjacent to Shorelines ........................ 2 C. Urban Lands (Shorelines) ........................... 3 D. Public Access . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 E. Hazard Reduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 F. Shorelines of Statewide Significance ................... 5 G. Housing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 6 H. Shoreline Area Capital Facilities. . . . . . . . . . . . . . . . . . . . . . . 6 I. Utilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 J. Transportation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 K. Conservation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 L. Agriculture & Aquaculture ... . . . . . . . . . . . . . . . . . . . . . . . . 8 M. Wetlands. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 N. Aquatic Habitats. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 O. Economic Development ............................ 9 P. Recreation and Open Space Linkages. . . . . . . . . . . . . . . .. 10 a. Natural Resources ............................... 11 3. AIR QUALITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 11 4. WATER QUALITY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 13 '5. ENERGY CONSERVATION GOALS & POLICIES. . . . . . . . . . . . . . . .. 14 A. Mixed Use Policies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 14 B. Urban Infill Policies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 14 C. Pedestrian and Commuter Convenience ............... 14 D. Streets, Parking & Transportation Facilities. . . . . . . . . . . . .. 15 E. Telecommuting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 15 F. Housing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 16 G. Capital Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 16 H. Recycling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 16 I. Utilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 16 6. HISTORIC PRESERVATION ................................ 17 / ~ Bremerton Comprehensive Plan ELEMENT J ENVIRONMENTAL MANAGEMENT . ."." .:.::;:;".:;:;":> ..<:......;','.,. . :' "<::::":;::{::.>::. .:. 1. .....HINfRdbLJGTION............ The Growth Management Act, our Countywide Planning Policies, our 1986 Comprehensive Plan, and other planning guidelines and requirements contain an abundance of environmental considerations. These are woven into the goals and policies of all major Plan elements, as well as into the implementing regulations. Because of the extensive nature of environmental goals and policies, and their importance to the City's Comprehensive Plan, most have been placed in this new (optional) Plan element, the Environmental Management Element. This will allow these issues to be addressed more directly, will help to ensure consistency among policies, will expedite the environmental review of Plan policies, and will make the Plan easier to amend when necessary. . . .. -, . . . n.' .... . -, , , . ..... ...... , .. . .... " . .. ..n. o . " ".. _.. . . . . . .... n' 2.CRITICA[.. r:ANDSanCt SHOREI;INES Bremerton's Shoreline Master Program, which was mandated by the Shoreline Management Act of 1971, includes goals, policies and regulations relating to development in all shoreline areas within Bremerton's jurisdiction. The program is continually monitored for effectiveness and periodically updated, as necessary. These regulations are, in most cases, well- coordinated with the City's Zoning Ordinance and other regulations. When occasional conflicts arise, the more restrictive takes precedent. The Critical Lands Ordinance, adopted on March 1, 1993, is closely related and similar in many ways to the provisions of the Shoreline Master Program. The Critical Lands Ordinance applies primarily to inland areas. It takes over where the SMP leaves off and defines those natural and environmentally sensitive areas that are to be protected from the adverse impacts of new growth and development. And it includes the standards and requirements necessary to achieve the desired protection. The following Comprehensive Plan goals and policies shall be used to guide land use and development decisions, and also considered in revisions to the Master Program, Critical Lands Ordinance, and other City regulations that may affect the Bremerton environment. Most of the following goals and policies were developed by City staff. They were designed primarily to help implement the Comprehensive Plan. They will also ensure consistency Environmental Mgmt. - Page 1 between related regulations, and will help the City meet the requirements of the Growth Management Act. Many of these goals and policies address specific areas of concern that are of particular interest to State agencies reviewing our Plan for GMA consistency. Specific references are provided for goals and policies borrowed from other sources. BZO = SMP = CLO = BCP = Bremerton Zoning Ordinance (1988) Bremerton Shoreline Management Program (1988) Bremerton Critical Lands Ordinance (1993) Bremerton Comprehensive Plan (1986) A: WATER-ORIENTED LAND USES: GOAL: Reserve appropriate shoreline areas for water-oriented uses and to discourage non-water-oriented uses in the shoreline. Policies: A-1 Accommodate preferred shoreline uses (water-dependent, -related, and -enjoyment uses) while protecting and preserving shoreline resources and avoiding hazardous or sensitive areas. A-2 Encourage existing non-water-oriented commercial and industrial uses to relocate to non- waterfront property whenever feasible. A-3 Restrict over-water commercial and industrial uses to those which are water-dependent or water- related and provide public access where appropriate; A-4 Recognize the unique suitability of certain areas to accommodate preferred shoreline uses such as deep water ports. A-5 Discourage sprawl and inefficient use of urban shoreline areas. A-6 Encourage renovation and reuse of under-utilized or obsolete uses and structures. A-7 Implement water-oriented use policies through application of the Shoreline Master Program, through consistent provisions in the Zoning Ordinance, and enforcement of other development codes. B: LANDS ADJACENT TO SHORELINES: GOAL: Encourage uses, densities and development patterns that are compatible with shoreline uses and resource values and that reinforce the policies of the Shoreline Management Act and Bremerton's Shoreline Master Program. Policies: B-1 Consider the compatibility of proposed upland uses with those allowed in each adjacent shoreline environment and with the purpose and intent of the environment designation. Environmental Mgrnt. - Page 2 B-2 Minimize shoreline impacts from residential development on upland .view" property; Le., stormwater run-off, septic drainfield seepage, intensification of risks from geological instability, etc. B-3 .Adjacent lands. policies shall be implemented through zoning, subdivision, short-plat and other land use ordinances, and through mechanisms such as the Capital Facilities Plan and budget. C: URBAN LANDS (Shorelines)~ .GOAL: Protect both the economic viability and resource values of urban shorelines. .Policies: C-1 Protect and preserve natural and/or critical areas throughout the developed urban environment and recognize that Shoreline of Statewide Significance priorities also apply within our urban area. C-2 Use long-range regional economic projections to help determine the amount of shoreline to be reserved for preferred water-oriented urban uses in subsequent Plan revisions. C-3 Allow limited mixed-use development (including open space and recreational useS/facilities) to help sustain the economic viability of the urban shoreline. C-4 Encourage revitalization and restoration of Bremerton's urban waterfronts. .C-5 Ensure adequate access, utilities and public services to serve existing shoreline needs and planned Mure development. C-6 Promote aesthetic and view protection through sign control regulations, appropriate siting and screening requirements, protection of view corridors, and the use of architectural standards. C-7 Implement urban shoreline policies through the City's Waterfront Access Plan, Downtown Waterfront Urban Renewal Plan, the Zoning Ordinance, the Shoreline Master Program, and other applicable development codes. GOAL: COMMERCIAL DEVELOPMENT: Encourage adequate commercial development of the kind that can be integrated with the shoreline environment and can benefit from a shoreline location. (SMP) Policies: Specific poliices regarding commercial development in shoreline locations are provided in Chapter 5 of the Bremerton Shoreline Master Program. GOAL: INDUSTRIAL DEVELOPMENT: Encourage the development of ports and industrial areas that are water-related or water-dependent where they will have a minimal adverse impact on established uses. (SMP) Environmental Mgmt. - Page 3 Policies: 0: PUBLIC ACCESS: GOAL: GOAL: GOAL: Policies: Specific policies regarding industrial development in shoreline locations are provided in Chapter 5 of the Bremerton Shoreline Master Program. . Protect and enhance the rights of the general public to enjoy the physical and aesthetic qualities of the shoreline, while allowing controlled development consistent with the public interest. (SMP) Plan, provide and maintain a comprehensive system of public access, designed to provide safe, abundant access to shoreline recreational areas, while preventing trespass onto private properties. (SMP) Encourage water-oriented shoreline uses and activities that provide an opportunity for substantial numbers of the public to enjoy city shorelines. (SMP) . Protect and enhance shoreline visual and physical access consistent with Shoreline Management Act and Public Trust Doctrine principles. Restrict public access to sensitive areas that may include fish or wildlife habitat, unique vegetation, or other lands that might be easily damaged by unnecessary public access or use. 0-1 Protect areas with unique and/or fragile geological or biological characteristics from inappropriate public access and use through access and use regulations. 0-2 Acquire suitable lands for permanent public access to shorelines, when available and feasible. 0-3 Assure that development, uses and activities on or near the shoreline do not impair or detract from the public's access to the water or shoreline. 0-4 Enhance and preserve public views. 0-5 Reserve publicly owned shorelines for water-dependent uses or for public recreational uses and/or protected open space whenever possible. 0-6 Preserve, maintain and enhance public access and views afforded by shoreline street ends, public utilities, and rights-of-way whenever feasible. 0-7 Separate or clearly delineate public and private space to avoid unnecessary user conflicts. 0-8 Ensure that docks and other in-water developments have only minimal impacts on public use. 0-9 Implement shoreline public access policy primarily through applications of the City's Comprehensive Parks Plan, the Shoreline Master Program, the Waterfront Access Plan, and urban renewal activities. Environmental Mgrnt. - Page 4 0-10 Work toward the integration of the Shoreline Master Program, Critical Lands Ordinance, Zoning Ordinance, and SEPA provisions to streamline the permitting process, avoid unnecessay duplication and confusion, and ensure regulatory consistency. * Additional policies and regulations pertaining to public access, view protection, and related matters are contained in Chapter 4 of the Bremerton Shorelines Master Program. E: HAZARD REDUCTION: GOAL: Evaluate coastal hazards and the impacts of erosion and sea level rise on coastal resources and proposed development. GOAL: Reduce inland hazards through the careful regulation and monitoring of development projects in or near environmentally or geologically sensitive or hazardous areas. Policies: E-1 Review local comprehensive flood hazard management plans and state and federal policies to assure their consistent applic;ation in shoreline areas and adjacent lands. E-2 Prohibit most types of physical development, fill, or encroachments into floodways, frequently flooded areas, highly erodible areas, and critical areas. E-3 Implement these policies through the local flood hazard reduction ordinance, the Critical Lands Ordinance, building codes, zoning and subdivision requirements, and the Shoreline Master Program. F: SHORELINES OF STATEWIDE SIGNIFICANCE: GOAL: Manage designated Shorelines of Statewide Significance according to the order of preferences for use established in RCW 90.58.020. Policies: F-1 Protect and preserve wetlands and riparian corridors associated with Shorelines of Statewide Significance. F-2 Require the use of best management practices for all commercial timber cutting and reforestation in shoreline areas. F-3 Incorporate aesthetic values into a general enhancement of shoreline areas whenever possible. F-4 Evaluate the short-term economic gain or public convenience of other development relative to the long-term and potentially costly impact to the natural shoreline. F-5 Restrict or prohibit development that would interfere with the shoreline ecology or irretrievably damage shoreline resources. F-6 Use the policies contained in the City's Shoreline Master Program to protect Shorelines of Statewide Significance. Environmental Mgmt. - Page 5 G: HOUSING: GOAL: Permit residential development in shoreline areas and in the vicinity of other critical or sensitive lands only at densities that can be properly served by needed utilities and roadways and only when within the "carrying capacity" of the site or general location. Policies: G-1 Prohibit development in critical areas as necessary to preserve and protect shoreline resources, wildlife and fish habitat, natural stream corridors', and other environmentally sensitive areas. G-2 . Reduce allowed densities within sensitive areas, or allow density transfers to more suitable sites through the City's Planned Unit Development (PUD) or other process. G-3 Ensure that urban level residential development is provided with sewer and water services throughout the City and surrounding "urban area" to help control the proliferation of individual septic drainfields and private water systems. G-4 Encourage the use of Planned Unit Developments and clustering of development to help protect natural features, preserve open space, minimize physical impacts, and reduce the costs of utilities and roads. G-5 Require adequate setbacks, buffers, and open space as needed for shoreline development to protect vegetation, natural features, views, and other aesthetic characteristics. G-6 Ensure that these and additional housing policies contained in the Housing Element are implemented through zoning, the Capital Facilities Plan, various housing plans and programs, and through the application of development standards and codes. H: SHORELINE AREA CAPITAL FACILITIES: GOAL: Plan for the provision or extension of capital facilities in shoreline areas in accordance with existing and planned shoreline uses and the carrying capacity of the shoreline ecosystem. Policies: H-1 Assure that the Capital Facilities Plan Element adequately provides for implementation of the goals, objectives, and policies of the Comprehensive Plan and Shoreline Master Program as they pertain to new growth and development in shoreline areas. (Appropriately locating, timing and designing capital facilities to seNe desired shoreline uses and densities and assuring compatibility with upland land uses and densities.) H-2 Avoid the inappropriate provision/extension of capital facilities into open space, resource lands, critical areas, and natural or rural areas which are relatively free of human influence and/or intolerant of human uses. H-3 The Capital Facilities Plan shall be implemented through the capital budget and subsequently, through project-specific designs, specifications and work plans, prior to actual construction. Environmental Mgmt. - Page 6 . '-. -, I: UTILITIES: GOAL: Locate public utility facilities to accommodate existing and future uses and activities while protecting the ecology and resources of shorelines and other sensitive areas. Policies: 1-1 Locate utilities and rights-of-way outside shoreline and critical areas whenever possible. 1-2 Place utility lines underground in shoreline areas whenever possible. In all cases, require that they be located where they will best preserve the natural landscape and vegetation and minimize conflicts with present and planned land uses. , 1-3 Encourage joint use of utility corridors. .1-4 Protect the water, shoreline, and other critical areas from contamination and degradation during utility construction, installation, operation and/or maintenance. .1-5 Utility policies shall be implemented primarily through the Capital Facilities Plan Element, the CIP, zoning (and site plan review), and through other existing regulations. J: TRANSPORTATION: GOAL: Provide adequate access to planned development while preserving and protecting undeveloped, environmentally sensitive areas, and natural shoreline areas. Policies: J-1 Minimize soil erosion and water quality degradation through proper roadway construction and maintenance practices within shoreline areas. J-2 Allow only those roadways that are related to and necessary for the support of permitted uses and activities to be located within shoreline or critical areas. J-3 Encourage common access roadways whenever possible: J-4 Encourage joint use of transportation corridors for utilities purposes. J-5 Design City circulation patterns and parking facilities to direct vehicular traffic away from shorelines and critical areas wherever possible. J-6 Encourge low-impact transportation and access opportunities through the provision of bicycle and pedestrian trails. J-7 Retain and improve road ends and other area rights-of-way for public access. J-8 Encourage biofiltration, groundcover maintenance, and other ways of managing roadside vegetation and drainage, while discouraging the use of herbicides and other chemical applications. Environmental Mgmt. - Page 7 J-g Transportation policies are located throughout the Comprehensive Plan and also in the Shoreline Master Program, the Capital Facilities Plan, the Comprehensive Parks Plan, the Six-year Transportation Plan, and others. Policies are implemented through the zoning, grading and subdivision ordinances, other development regulations, etc. K: CONSERVATION: GOAL: Maintain and restore riparian vegetation in shoreline areas and on tributary streams which affect shoreline resources. Policies: K-1 Avoid disturbance of, and adverse impacts to, fish and wildlife habitat (including spawning, nesting, rearing and migratory routes) through proper location, design, construction and management of all uses and activities in riparian areas. K-2 Require distrubed areas that remain following construction be either landscaped or promptly replanted with native vegetation. K-3 Ensure that the City's minimum requirements for extensive clearing and grading address species removal, replanting, irrigation, erosion, sedimentation control, and other methods of riparian corridor protection. K-4 Conservation policies shall be implemented through the provisions of the City's Shoreline Master Program, Critical Lands Ordinance, and various existing development codes and requirements. L: AGRICULTURE & AQUACULTURE: GOAL: AGRICULTURE: Preserve the quality of the agricultural shoreline inasmuch as such lands are important private open space systems. (SMP) Policies: Specific policies related to this agricultural goal are contained in Chapter 5 of the Bremerton Shoreline Master Program. GOAL: AQUACULTURE: Encourage aquaculture in suitable areas, while minimizing adverse Impacts on water resources, aquatic wildlife communities, navigation, and views. (SMP) Policies: Specific policies related to this aquaculture goal are contained in Chapter 5 of the Bremerton Shoreline Master Program. Environmental Mgmt. - Page 8 M: WETLANDS: GOAL: Preserve and protect wetland ecosystems to minimize wetland degradation and assure that there is no net loss of wetland acreage, values and functions. Policies: M-1 Prohibit wetland alterations unless it can be shown that the impact is unavoidable and necessary, and that the resultant impacts are effectively mitigated, as provided for in the City's Critical Lands Ordinance. M-2 Provide greatest protection to wetlands of exceptional resource value. M-3 Assure that the wetlands protection provisions of the Critical Lands Ordinance remain consistent with those in the Shoreline Master Program. M-4 Wetlands policies are generally implemented through the Shoreline Master Program, Critical Lands Ordinance, and various other development regulations. N: AQUATIC HABITATS: GOAL: Preserve and protect aquatic habitats, including salmon and steel head habitats, salt water fish and shellfish habitats, and important marine vegetation. Policies: N-1 Direct new development away from important aquatic habitats such as areas used by salmon and steelhead, kelp beds, eelgrass beds, surf smelt spawning beds, Pacific herring spawning beds, Pacific sand lance spawning beds, rock sole spawning beds, rockfish settlement and nursery areas and ling cod settlement and nursery areas. N-2 Look for these kinds of habitats whenever reviewing a development proposal that may have an adverse impact on these kinds of resources. 0: ECONOMIC DEVELOPMENT - Shorelines: GOAL: Reserve adequate shoreline area for water-oriented commercial and industrial development based on reasonable long-range regional economic projections. Policies: 0-1 Areas suitable for deepwater shipping and other port facilities shall be viewed as limited and unique resources within Bremerton and the surrounding Urban Growth Area. ' Environmental Mgrnt. - Page 9 0-2 Accommodate, whenever possible, preferred water-oriented industrial and commercial uses when suitably located and designed for minimal environmental impact. 0-3 Encourage the continuation of existing port and industrial activities. 0-4 Encourage mixed use developments that include open space and public physical and visual access to the waterfront, where appropriate. 0-5 Provide, through the City's Capital Improvements Program, the public facilities that will be needed for future shoreline uses in advance of the need. 0-6 Implement economic development policies through the City's Downtown Waterfront Urban Renewal Plan, the Zoning Ordinance, Economic Development Council plans and activities, etc. P: RECREATION AND OPEN SPACE L1NKGAGES: GOAL: Reserve appropriate areas for parks, land- and water-oriented recreational facilities, and public access points that foster public recreational use or aesthetic enjoyment of shorelines and other natural and scenic areas. Policies: P-1 Improve public access to shorelines, while preserving and protecting critical areas and unique or valuable open space areas. P-2 Locate, design and operate parks and recreational facilities in ways that will ensure compatibility with shorelines and other natural areas. Include steep slopes, wetlands, and other unique features as passive or aesthetic components of the design of parks and recreation areas. P-3 Plan for and encourage the development of linear linkages between shorelines, parks, and other public areas and recreational facilities. P-4 Consider pedestrian trails and walkways, bikeways, easements, view corridors, viewpoints, and scenic drives as components of the overall linkage system. P-5 Consider wildlife migration patterns and interjurisdictional connections when establishing and maintaining major open space linkages. P-6 Implement recreation policies through the Comprehensive Parks Plan, Waterfront Access Plan, Shoreline Master Program, Capital Facilities Plan/budget, and special plans and programs. GOAL: MARINAS: Encourage marinas in areas which will have the least negative impact on water quality, marine life, visual or physical access to the shoreline, or the residential use of property. (SMP) Policies: Specific policies and regulations pertaining to marinas are contained in the Bremerton Shoreline Master Program. Environmental Mgmt. - Page 10 Q. NATURAL RESOURCES: GOAL: FOREST MANAGEMENT: Enhance forest productivity, while protecting the shoreline environment. (SMP) Policies: Specific policies and regulations pertaining to forest management practices are contained in Bremerton's Shoreline Master Program. GOAL: MINING: Minimize mining on the shoreline. Policies: Specific policies and regulations pertaining to the removal of sand, soil, gravel or other naturally- occurring materials from shorelines areas are contained in Chapter 5 of the Bremerton Shoreline Master Program. . ...... .. , ...... .... ,. .,....... ,". ,. .- . ..........','.'.' .' .' .,' ..., 3. ...AIR<QtJALITY The air we breathe is vital to our lives and well-being, but we often take its quality for granted. Washington's "State of the Environmenf' report, a product of the Environment 2010 program initiated in 1988, announced that air pollution is the greatest environmental threat to public health. The combined efforts of a number of programs have reduced some of the more common pollutants, but serious air quality problems persist in several areas, including heavily populated areas in the Puget Sound basin. Unfortunately, our population growth and growth in the use of motor vehicles are growing faster than our ability to keep up with air pollution controls. Carbon monoxide, ozone, and toxic air-borne pollutants are growing rapidly in our environment. It is especially bad during winter months when woodstove smoke hangs low in the valleys or over our community. The small particulates carried by wood smoke are one of the largest health concerns and threaten the health or lives of those with respiratory problems. More than fifty tons of toxic chemicals, such as benzene, toluene, xylene, formaldehyde and chloroform, are emitted into Washington's air each year. About 70 to 90 percent of all these toxic air pollutants come from such daily activities as driving our automobiles, heating with woodstoves, and outdoor burning. These are also activities that we can control to some extent through regulation and personal habits, and that can also be altered through good comprehensive planning. Probably the greatest impact our Plan can have on air quality is through implementation of the plans and policies of the Land Use and Transportation Elements. Through good planning we can Environmental Mgmt. - Page 11 gradually reduce the need for long-distance travel, reduce the number of single-occupant vehicles on the roads, increase transit ridership, etc. . The following goal was developed by City staff and the policies that follow were based in part on a March 1993 PSAPCA publication entitled "Local Growth Management Strategies to Protect and Enhance Regional Air Quality". GOAL: To provide for needed urban growth and development while ensuring that it is best sited, oriented, clustered, and otherwise designed to promote air quality objectives and policies. Air Quality Policies: 1. Promote and support public education efforts aimed at reducing activities that result in air pollution, especially transportation-related pollution. 2. Support the air pollution abatement and prevention activities of the Puget Sound Air Pollution Control Agency (PSAPCA), including the requirements of federal and state clean air acts. 3. Collaborate with other jurisdictions and agencies in ways that will leverage federal and state programs and funding that promote clean air protection and enhancement. 4. Consider the air quality implications of new growth and development when designing urban growth areas, when considering annexations, when making Comprehensive Plan and zoning changes, and when planning street and utility line extensions. 5. Consider the adoption of new development controls or guidelines designed to avoid or mitigate adverse cumulative air quality impacts prior to project approval. 6. Plan and zone for higher density housing, clustered commercial activities, high-intensity transportation corridors, new local job opportunities, home occupations, and other community design options that will reduce travel needs while promoting public transit. 7. Promote energy efficient infill development throughout Bremerton while discouraging urban sprawl in unincorporated rural areas of Kitsap County. 8. Consider adjustments to development regulations and guidelines that will promote the use of .c1ean. alternative forms of domestic use fuels, such as natural gas, while discouraging the use of wood as a heat source. 9. Promote and implement transportation demand and systems management actions designed to reduce vehicle emissions by lowering the number of miles traveled by single occupancy vehicle (SOV), reducing traffic congestion, improving the efficiency of existing roadways (HOV lanes, . enhanced signalization, etc.), and increasing public transportation levels of service. 10. Establish and implement a commute trip reduction ordinance and program for City of Bremerton employees. Environmental Mgmt. - Page 12 ':'::":::':':':::::';::';:;';'::;'::" ............: "':::""" " :'::;,::,,: ,.., .;.;,.; <1~WArER~WP;~'fJY:.... Water defines our state better than any other resource, especially in Bremerton and Kitsap County. Bremerton residents look at or otherwise relate to water, shorelines, bridges, ferries, etc., every day. Water appears to be abundant here and, like the quality of our air, we sometimes take it for granted. Although we have water all around us, it is a fairly sensitive resource and one that is being seriously threatened by pollution or over-use throughout much of the state. Washingtonians use 2.4 trillion gallons of water every year. Although most of it (76%) is used for agriculture, we are finding seasonal and other water shortages in many areas, including our own county. Bremerton is very fortunate in having the only surface water source (reservoir) in this county while most residents rely solely on groundwater. But, as we continue to grow, the quantity of available fresh water, as well as its quality, will become increasing concerns. The Capital Facilities Plan Element addresses the City's future water supply and distribution, while this section will offer policies related to maintaining water quality. Since water is a limited resource, we can't afford to squander it, misuse it, or allow it to become polluted. Implementation of the Comprehensive Plan and related land use and development regulations can help ensure the quality of our water. GOAL: Protect the quality and quantity of surface and ground water by minimizing land clearing, soil disturbance and non-point runoff affecting water quality, erosion and sedimentation. Water Quality Policies: 1. Carefully locate all uses and activities to minimize adverse impacts. 2. Use effective site planning, setbacks and buffers, construction timing and practices, bank stabilization, bie-engineering, and erosion and drainage control .methods both during and after construction. 3. Ensure the restoration of degraded shorelines, gravel extraction sites, and other damaged areas to arrest the processes of erosion, sedimentation and flooding. 4. Conduct dredging and filling activities in ways that will minimize the introduction of suspended solids, leaching of contaminants, or the disturbance of habitats. 5. Implement water quality_policies through detailed procedures included in the City's Shoreline Master Program, Critical Lands Ordinance, and other development requirements. Environmental Mgmt. - Page 13 .....!i~>. .iENERGYCONSERVATION)GOALS. ANID. PQll€IES{... The Washington State Energy Office (WSEO) produced the document entitled "Energy and the Growth Management Act" in 1994 to assist jurisdictions in the incorporation of energy and the conservation of energy into their Comprehensive Plans. Bremerton's Comprehensive Plan does not include a separate Energy Element. However, many of the suggested energy policies are being included in this Environmental Management Element for now, since the wise and efficient use of energy resources is an important environmental management concern. It's very possible that these will eventually be included in a separate Energy Element which will provide greater detail on the current status, energy needs, options, and conservation opportunities and programs. ENERGY GOAL: Incorporate efficient energy conservation strategies into all aspects of City growth and development. A. Mixed Use Policies: A-1 Encourage integration of housing and commercial/office uses in the Central Business District, the Manette Business District, the Charleston Business District, and other locations determined to be suitable for mixed use development. A-2 Develop incentives and development guidelines that will encourage mixed use development. A-3 Adopt mixed use zoning that will encourage a mix of residential, commercial, and/or office uses in key locations. A-4 Apply mixed use zoning in areas near transit routes and terminals, along major transportation corridors, in the CBD and smaller commercial districts, and in targeted redevelopment areas that are suitably located. B: Urban Infill Policies: B-1 Emphasize Bremerton's many opportunities for "infill" development as ways to provide cost- effective, affordable, and energy efficient housing and new businesses, utilizing existing utilities, streets, parks, schools, and other community services and facilities. B-2 Achieve compact, energy efficient, and higher density residential intill by encouraging the utilization of existing small vacant lots, the use of innovative development and subdivision design, the addition of accessory units, and the use of clustering techniques. B-3 Develop additional incentives within the City's development codes that will encourage residential intil!. C: Pedestrian and Commuter Convenience: C-1 Encourage development and community design that will favor the pedestrian and offer greater convenience within comfortable walking distances of most homes. Environmental Mgmt. - Page 14 C-2 Plan and zone for higher residential densities within 1/4 mile of neighborhood centers that include grocery stores, postal facilities, banks, schools, recreation areas, child care, and other goods and services that residents generally need on a regular basis. C-3 Allow highest residential densities along major transportation corridors, in the vicinity of transit stations or multimodal terminals, within the CBO, and within smaller business districts to maximize the levels of potential transit usage and pedestrian travel. C-4 Adopt development guidelines that ensure safe and convenient pedestrian access between residential and commercial areas of the City. C-5 Integrate small convenience shops and personal services into major employment centers and near park-and-ride lots (within 1/4 mile) to provide streamlined services for commuters which will, in turn, reduce the need for additional vehicular trips. Such uses might include convenience markets, postal facilities, restaurants, dry cleaners, banks, child care centers, etc. C-6 Allow small shops and personal/professional services to be within convenient walking distance of neighborhoods and within one-quarter mile of transit terminals or routes. C-7 Consider the development of a citywide master plan for pedestrian facilities and amenities, particularly in higher-density areas and areas undergoing redevelopment, as a viable travel mode alternative. . C-8 The City shall continue and expand programs aimed at alternative ways to commute to work in order to reduce traffic congestion, lost time, and energy inefficiency. 0: Streets. Parking & Transportation Facilities: 0-1 Ensure a citywide network of interconnecting walkways and bikeways (where safe and feasible) to directly connect major origins and destinations. 0-2 Include energy efficiency as a criterion in the design of streets and walkways. 0-3 Consider the energy implications of trees when landscaping parking areas and streets, including their cooling effects and ability to filter the sun and wind. 0-4 Promote bicycling as a non-polluting energy efficient mode of transportation by including bicycle facility considerations in all major street and bridge projects, in new subdivision design, and in new commercial and industrial developments - for both employees and patrons. 0-5 Structure the rates of parking lots to encourage carpools and van pools and to discourage long- term parking for single-occupant vehicles. 0-6 Reduce the amount of required off-street parking when commute alternatives exist. 0-7 Encourage carpooling/vanpooling by offering such incentives as a guaranteed ride home to cover emergency or late working hour situations. 0-8 Increase energy efficiency through adjustments to the timing of traffic signals. E. Telecommuting: E-1 Establish home-based telecommuting work programs whenever feasible. E-2 Ensure that City zoning allows for home-based telecommuting businesses. Environmental Mgrnt. - Page 15 E-3 Encourage the expansion of telecommunication linkages between jurisdictions, especially for such applications as GIS data access, mapping, permitting, and sharing information. F. Housing: F-1 Look for ways in which the City's development codes can be adjusted to better encourage the construction of smaller, compact, energy-efficient affordable housing. F-2 Maximize the efficiency of existing City infrastructure by encouraging in-fill development and accessory dwellings (where permitted) on existing small lots throughout the City. G. Capital Facilities: G-1 Include energy (and water) efficiency and conservation provisions in all capital facilities projects. G-2 Consider the cost and energy conservation advantages of retrofitting major facilities with energy and water saving devices such as more efficient indoor and outdoor lighting, inmproved heating, more efficient air conditioning systems, water system leak detection and pump efficiency testing, .low-flow plumbing fixtures, and energy- and water-efficient landscaping. G-3 Use life cycle costing in major purchase and construction decisions. G-4 Review and adjust, as necessary, the operation of the sewage treatment plant to achieve maximum water and energy efficiency. (Wastewater treatment consumes a major portion of a community's energy - about 25 percent in many cities.) G-5 Consider the inclusion of an "Energy Conservation Element' in a forthcoming update of the City's Comprehensive Plan. H. Recycling: H-1 Promote waste recycling, curbside recycling, yard waste programs, and similar activities that will save energy and resources and which will extend the life of the regional landfill. H-2 Adjust zoning requirements to include adequate space for the separating and storage of recyclable materials, particularly in multi-family residential, commercial and industrial developments. I. Utilities: 1-1 The City shall cooperate with local utilities companies in planning ahead for the siting or expansion of needed utilities in locations where they will be most energy-efficient with the least impact on the natural environment or on the existing urban environment. 1-2 Use a regional siting process for dealing with major utilities and facilities having regional importance. Environmental Mgmt. - Page 16 ...e...iL.l..iS1rOR............I14hR........r;S<.e)R}.VuurAT-ION...........).... ........... ........ .. . U.': -..;<:::.>;:0 .~::.~:._..::..... v:::r:.. .......~.... .:.:;.1:\ I.....P ......<.;.... Bremerton has a long and colorful history, much of it related to its military ties and Puget Sound Naval Shipyard's more than 100 years of service to the fleet. Historic preservation is an important tool that is often used in the protection and enhancement of a community's special attributes. One of the goals of the Growth Management Act is to -Identify and encourage the preservation of lands, sites, and structures that have historical, cultural, and archaeological significance. - To assist jurisdictions in these efforts, the State Office of Archaeology and Historic Preservation (OAHP) has developed a technical guide outlining the preservation process and tools. That guide will be helpful to the City in undertaking an inventory of historical sites and structures and in establishing a formal preservation program. The following policies are just the beginning of the historical preservation process and will be built upon in coming years. HISTORIC PRESERVATION GOAL: Preserve archeological and historical sites which are of public and scientific interest. (SMP) Preservation Policies: 1. Consider the development of an historic preservation program that responds to the unique needs and character of the Bremerton community, and that includes an historic preservation ordinance to help implement the program. 2. Consider historic buildings as opportunities to meet affordable housing needs, alternative living or work arrangements, or other unique and creative adaptations. 3. Look for ways to include historic properties or buildings for recreational, entertainment, educational or cultural uses. . 4. Use interpretive signs, displays or markers to help explain the community's history and uniqueness. 5. Look for ways to combine historic preservation tax incentives with housing tax credits and grant programs in packaging financially successful housing projects. 6. Consideration should be given to the National Historic Preservation Act of 1966 and Chapter 43.51, RCW, which provide for protection, rehabilitation, restoration, and reconstruction of districts, sites, buildings, structures, and objects significant in history, architecture, archeology or culture; also see RCW 27.53, which makes it unlawful to disturb any archeological site without permission. (SMP) ... Environmental Mgmt. - Page 17 Bremerton Comprehensive Plan IMPLEMENTATION, CONSISTENCY and CONCURRENCY ELEMENT Prepared by: BREMERTON PLANNING Adopted: AprilS, 1995 K Bremerton Comprehensive Plan Element K IMPLEMENTATION, CONSISTENCY and CONCURRENCY CONTENTS 1. INTRODUCTION.......................................... 1 2. AMENDING THE COMPREHENSIVE PLAN .......... . . . . . . . . . . .. 1 A. Continuing Evaluation .................. . . . . . . . . . . . . ., 1 B. Timing of Amendments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1 C. Emergency Consideration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 D. Criteria for Approval ................................. 2 3. IMPLEMENTATION OF THE PLAN. .. . . . . .. . . . . . . . . . . . . . . . . . . . 3 A. Zoning Ordinance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 B. Subdivision Ordinance ............................... 4 C. Shoreline Management Program ... . . . . . . . . . . . . . . . . . . . . . 4 D. Downtown Waterfront Urban Renewal Plan. . . . . . . . . . . . . . . . . 5 E. Waterfront Access Plan ................... . . . . . . . . . . . . 5 F. West Hills Area Plan ................................. 6 G. Campus/Evergreen Neighborhood Plan . . . . . . . . . . . . . . . . . . . 6 H. Utilities Plans ................................,..... 6 I. Comprehensive Parks Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 J. Other Plans, Standards and Regulations . . . . . . . . . . . . . . . . . . . 7 4. URBAN GROWTH POLICIES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 A. Countywide Urban Growth Policy. . . . . . . . . . . . . . . . . . . . . . . . 7 B. City Comments on County Draft Compo Plan ............... 8 C. Urban Growth Management Agreement. . . . . . . . . . . . . . . . . . . 9 D. Annexation Policies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 10 5. MEETING CONSISTENCY REQUIREMENTS . . . . . . . . . . . . . . . . . . .. 12 A. Internal Consistency ................................ 12 B. Interjurisdictional Consistency ......................... 12 6. CONCURRENCy......................................... 14 A. Definition ........................................ 14 B. Application .............................. . . . . . . . .. 14 Bremerton Comprehensive Plan ELEMENT K IMPLEMENTATION, CONSISTENCY and CONCURRENCY . . . . . 1. INTRODUCTION All elements of the Comprehensive Plan must be consistent with each other. The Plan itself must be consistent with other plans since those plans and their inherent policies will affect growth and development within the City of Bremerton for years to come. In addition to the consistency rule, the City must develop a program that will ensure "concurrency", or the provision of certain types of utilities and services in a timely manner when they are needed to serve new development. Implementation, or "making the Plan happen", is vital to its success and is a major consideration that will be addressed in this element to help ensure coordination and consistency. . . . .. . . .. ., ,. , , ... 2. AMENDING THE COMPREHENSIVE]?LAN.. '.' A. Continuing Evaluation Following adoption of the Revised Comprehensive Plan and related development regulations, the City shall continually monitor their effectiveness and document needed amendments. B. Timing of Amendments (1) The Comprehensive Plan shall be amended no more frequently than once per calendar year. That process shall be scheduled so that any changes that have financial implications can be included in the City's fall budget process. The amendment process shall generally conform to the following schedule: Implementation - Page 1 . Spring: May & June: July: Neighborhood meetings, as necessary. Planning Commission Public Hearing(s). City Council Public Hearing(s). . . (2) All amendment proposals shall be considered concurrently (in a package) by the Planning Commission and the City Council so that their cumulative effects can be ascertained. . (3) Provisions for the joint City jCounty consideration of Plan amendments of mutual concern within the Urban Growth Area shall be included in the Urban Growth Management Agreement (UGMA), or other appropriate agreement. C. Emergency Consideration The Comprehensive Plan may be revised or amended outside the normal schedule if findings are adopted to show that the amendment was necessary, due to an emergency situation of a neighborhood- or community-wide significance and not a personal emergency on the part of a particular applicant or property owner. Plan and Zoning amendments related to annexations may be considered during the normal annexation process and need not be coordinated with the annual Plan Amendment schedule. The nature of any emergency and proposed amendment shall be explained to the City Council's Growth Management Committee, which shall decide whether or not to allow the proposal to proceed ahead of the normal amendment schedule. D. Criteria for Approval Each component of a Plan Amendment package shall be reviewed and approved only if it meets all of the following criteria: (1) The proposal is consistent with the provisions of the Growth Management Act and will not result in Plan or regulation conflicts; and (2) The proposal will change the development or use potential of a site or area without creating significant adverse impacts on existing sensitive land uses, businesses, or residents; and (3) The proposed amendment can be accommodated by all applicable public services and facilities, including transportation; and (4) The proposal will help implement the goals and policies of the Bremerton 'Comprehensive Plan; and (5) If the proposal could have substantive impacts beyond the City limits, it has been sent to Kitsap County for review and comment. Implementation - Page 2 .... n.' ... _, . ....... .. .. . .. . on . ,... ................. ..".. .... .... . .. .., .. ... .... .H .. .... ................,'...'.....................................,.,..... ..' '. .......,.........,..'. ". ..... ..... ,..... ....,..".... ". .." . .. .............. ..... .......... . n.. ......... . . . .......... ..... . 3 tl..iinIE. .liIE....k.frA 'J.J.1"\ KI0" . ..F>;rH........ i~(p..... .fA'>.......\ .. . .. ... IV~FL IVI. I~..II"\ ....'"'l[~ ..... . .....] 1:::..... LI"\~.l....... A number of implementation "tools" will be used to implement the Comprehensive Plan. Each of these must be "consistent" with the Plan and with its leading goals and policies. These tools include, but are not limited to: A. Zoning Ordinance Current Status: The Zoning Ordinance is the City's primary land development code. It contains the basic requirements for density, building set-backs, building height, landscaping, off-street parking, fences, landscaping, lot coverage, and includes lists of specific types of land uses that may be permitted in each zoning district throughout the City. It also provides the requirements for Site Plan Review, Rezones, Variances, Special Use Permits, Special Exceptions, Appeals, public notification procedures, and other processes related to development. The Zoning Ordinance was revised in 1988 to be consistent with the City's 1986 Comprehensive Plan. The general land use categories of the Comprehensive Plan intentionally allow for a variety of zones, provided they are consistent with the overriding Plan designation and the goals and intent of the Plan. Policies: (1) Zoning district descriptions and requirements shall be reviewed and fine-tuned, as necessary, to ensure consistency with all Comprehensive Plan designations. (2) During the process of Zoning Ordinance review, the City shall look for ways to provide development incentives where needed to direct population and new development to the most appropriate locations. Possibilities may include density bonuses, reduced development requirements, reduced City standards for some public improvements, or the offering of new development options such as "accessory dwellings". (3) As the major city within its Urban Growth Area, Bremerton shall continue to encourage mutual collaboration with Kitsap County on the development of an urban zoning program that is mutually consistent and that can be applied throughout the UGA. Implementation - Page 3 B. Subdivision Ordinance Current Status: The City of Bremerton has a Short Subdivision Ordinance for the processing of land divisions consisting of four lots or fewer. However, larger subdivisions have always been governed by the provisions of State law, as contained in the RCW. That procedure has been used for decades, but Jacks some key components of the development process that are needed, including specific procedures related to the dedication of right-of-way, installation of needed utilities, sidewalks, curbs and gutters and other public improvements, dedication of land for parks or open space consistent with this Plan and the Parks Master Plan, and other details. Policies: (1) The City of Bremerton shall develop and adopt a subdivision ordinance that will include procedures for short-platting as well as road standards, other development design standards, and specific requirements for public improvements. (NOTE: Since this is neither mandated nor necessary for Plan implementation, it should be treated as a high priority project following completion of the mandated Comprehensive Plan.) c. Shoreline Management Program Current Status: Bremerton adopted a shoreline permit system and compiled a shoreline inventory in 1972, following State passage of the Shoreline Management Act of 1971. The City adopted its first shoreline master program in 1976. That SMP was amended several times, including major amendments in 1989 and 1992. Development along our shorelines is now monitored by the State Dept. of Ecology and regulated through substantial development permits, conditional use permits and variances in accordance with the SMP. It has been determined that proposed amendments to the Comprehensive Plan that are needed to comply with the GMA will not erode the effectiveness of the Shoreline Management Program and immediate adjustments are not necessary to ensure consistency with the Comprehensive Plan and state planning goals. Policies: (1) The City of Bremerton shall continue to monitor the effectiveness of its Master Program and initiate amendments as necessary to keep the program up-to-date and consistent with the City's Comprehensive Plan. Implementation - Page 4 D. Downtown Waterfront Urban Renewal Plan Current Status: The DWURP was adopted in 1989 to guide renewal efforts along the waterfront of downtown Bremerton, generally north of the ferry terminal and east of Washington Avenue. The Plan contains a Land/Water Use Plan which designates specific types of uses and establishes planning criteria, lists of permitted uses, building controls, and other special controls. Implementation of this Plan relied on the creation of separate development strategies after working closely with local and CBD area property owners. The next phase was developed in 1993 in the form of the "Waterfront/CeO Revitalization Implementation Study" which included design guidelines and a conceptual development plan for the waterfront and Central Business District that would be consistent with both the DWURP and the Comprehensive Plan. Policies: (1) Continue to work toward implementation of the Urban Renewal Plan, as already scheduled, with the next phases of the downtown/waterfront redevelopment process. (2) Ensure that all ferry terminal and service improvements that may be proposed by the Dept. of Transportation and Washington State Ferries are consistent with adopted local waterfront and CBD plans. E. Waterfront Access Plan Current Status: This Plan was adopted in August 1990 as a policy document and an action plan related to the identification and development of a system of public accessways to the shorelines with the City of Bremerton. It continues to help guide other planning activities as well as land use and development decisions in shorelines areas of the City. Policies: Eight Waterfront Access Objectives and fifteen specific access policies are included in this document. All were found to be consistent with the Comprehensive Plan goals and with statewide planning goals, and all are related to the following primary goal of the Waterfront Access Plan: .Provide a comprehensive system of safe and abundant access to City shorelines, while protecting private properties from adverse impacts. · Implementation - Page 5 F. West Hills Area Plan Current Status: This "neighborhood plan" was adopted in February 1990. At that time the West Hills area was unincorporated and adjacent to the City limits. This plan was prepared primarily to look at land use, transportation/circulation, and capital facilities infrastructure conditions and needs prior to a possible annexation. It provided area property owners with some degree of City commitment by establishing pre-annexation Plan and Zoning designations. Since 1990, most of this area has been annexed to Bremerton. This area plan was adopted as part of the City's Comprehensive Plan. All recommendations contained within this Plan have since been integrated into the revised Comprehensive Plan to ensure consistency. G. Campus/Evergreen Neighborhood Plan Current Status: This neighborhood plan covered a 270 acre neighborhood in central Bremerton and was adopted in December 1992 as an element of the City's Comprehensive Plan. This plan will continue to guide local development and redevelopment efforts, as well as influence discussions and decisions involving public facilities, services, street improvements, parks, shoreline access, and other issues. Since this plan was adopted as part of the City's Comprehensive Plan, there are no conflicts with goals, policies or recommendations. H. UTILITIES PLANS The City's Department of Public Works and Utilities is responsible for the following major system plans. Each is being coordinated with the land use and development proposals of the Comprehensive Plan, and particularly with the Capital Facilities Plan Element, to ensure consistency. A more specific discussion of these systems is included in the Capital Facilities Plan Element. (1) Water System Comprehensive Plan (2) Wastewater Comprehensive Plan (3) Combined Sewer Overflow Reduction Plan Implementation - Page 6 I. Comprehensive Parks & Recreation Plan Current Status: The Comprehensive Parks & Recreation Plan (CPRP) is developed and . administered by the City's Department of Parks and Recreation. The plan has recently undergone its five-year revision, with consultant assistance. It is now before the City Council for approval and is expected to be adopted prior to adoption of the Citywide Comprehensive Plan. Parks and open space considerations addressed in the CPRP are included in the Land Use, Capital Facilities, and other elements of the Comprehensive Plan. The two plans are, and will remain, consistent with each other. J. Other Plans. Standards and Regulations The City recognizes the need to remain aware of all the other plans, development standards, and regulations that will come and go. We will continually strive to maintain consistency between our Comprehensive Plan and regulations and all others that may affect our area or jurisdiction. We will also review and comment on draft plans and regulations as to how they might affect our own. , ... . . , . , . , ... . ,,' -' .... - .... '., . .. 4. .. .URBANJ GRdWTH.80IJCIE$ All lands within the City of Bremerton are also within an Urban Growth Area, as officially designated by Kitsap County following an analysis of urban land needs, land capacity, ability to provide urban municipal services, consideration of the City's UGA proposals, and other factors. In accordance with the Growth Management Act, Bremerton (the only incorporated city within the UGA) shall be the primary provider of urban services. However, since a considerable portion of the UGA is already served by Kitsap County and special districts, the process of transition is expected to be gradual over a period of many years. A. COUNTYWIDE URBAN GROWTH POLICY: "Policies to Implement RCW 36. 70A.11 0 Relating to the Establishment of Urban Growth Areas" were adopted as Element A of the Kitsap Countywide Planning Policies in August, 1992. Those policies guided our Plan revisions. The Comprehensive Plan is consistent with the CPPs in the following ways: Implementation - Page 7 (1) Based on a detailed Land Use Inventory and Build-out Analysis, it has been determined that Bremerton's Comprehensive Plan and Zoning can accommodate new and infill development sufficient to house the 20,000 population that was allocated to the City for its 20-year planning period. (2) Bremerton has planned for and is currently providing a full range of urban services within its current City limits and in some cases beyond. (3) Annexation policies pertain only to lands within the Urban Growth Area and assume that all such lands are encouraged to urbanize and to either annex to their adjacent city or incorporate as new communities. (4) Both the City and County have conducted land use inventories. Both are capable of computer/GIS storage and ready access, although the City's inventory was not absorbed into the Countywide GIS system. (5) In response to the "Urban Growth Management Agreement" mandate of the Countywide Planning Policies, Bremerton has entered into some discussion with Kitsap County and also drafted an early version of a UGMA. The focus of that early work was to clarify the process of annexation and to begin to establish urban level development standards that will ensure development and utility design consistency throughout the UGA. Kitsap County and its jurisdictions are now discussing service agreements, as required by SSB 5038. Some of those agreements may be integrated into the the UGMA, which is considered an important tool for implementation and coordination. B. CITY COMMENTS ON COUNTY DRAFT COMPREHENSIVE PLAN During the development of the County and City Comprehensive Plans, the staffs of each jurisdiction met periodically, attempted to share draft documents, and commented constructively on each others' work whenever possible. Not all differences were resolved during this ongoing process. During Kitsap County's Comprehensive Plan public hearings, Bremerton offered oral and written comments that included the following recommendations to help ensure Plan coordination and consistency: (1) Work together to develop a joint City/County build-out analysis of land use and population for each UGA, based on common GIS data and procedures. (2) Work together to develop a clear and coordinated analysis of public facilities and services that will be needed over the next 20 years, and a related financial plan. (3) Ensure the integrity of UGAs by not providing the urban facilities and services that would allow continued growth outside UGAs. Implementation - Page 8 (4) Consider the concept of "current use zoning" for rural areas that would include the recognition of active resource production areas. (5) Adjust development codes and impact fees to ensure that new development in rural areas pays its "actual share" of the public costs involved. Also, work with cities to develop UGA development incentives. (6) Allow some additional time prior to Plan adoption to allow for local coordination of Plans and consistency reviews. (7) Establish a clear definition of "urban". (In reference to some areas outside UGAs that are proposed for densities up to 8 DU / Acre.) (8) Keep the "FCC" (Fully Contained Community) symbol off the Countywide Land Use Plan map. Bremerton suggested that sufficient land is available within cities and UGAs and, therefore, FCCs should be discouraged until there is a clear need for additional urban land beyond established UGAs. (9) Bremerton disagreed with a "market factor" of 2.5 or 1.75 and felt that the 20-year land supply within the Comprehensive Plan is sufficient. A 1.75 market factor would extend the planning horizon to 35 years instead of 20. (10) Requested that the City and County collaborate in the development of the new County Zoning Ordinance, especially as it pertains to Urban Growth Areas. Kitsap County adopted its new Comprehensive Plan and Zoning Ordinance on December 29, 1994. C. URBAN GROWTH MANAGEMENT AGREEMENT The Countywide Planning Policies identified a critical need to coordinate the planning and growth activities of all jurisdictions within established Urban Growth Areas. To accomplish this, we would develop an "Urban Growth Management Agreement" (UGMA) that would contain at least the following provisions, as outlined in the Countywide Planning Policies: (1) Description of the annexation process. (2) Public involvement in the development of the UGMA and annexation process. Adoption of annexation policies. (3) Establish a method of determining appropriate compensation to the County (if any) for major construction projects undertaken by the County within an annexation area. Implementation - Page 9 (4) Establish a method for sharing net revenues, and services and expenses (if appropriate) in annexations of significantly developed areas. (5) Consider pre-annexation agreement issues related to the provision of urban governmental services. (6) The UGMA shall designate level of service (LOS) standards. (7) Establish a process for review and comment by other jurisdictions on Compo Plan and zoning changes as well as development proposals. (8) Identify common and consistent development and construction standards to be applied throughout the UGA. (9) Identify services to be provided in the UGA, the reasonable purveyors, and the terms under which the services will be provided. D. ANNEXATION POLICIES Annexation is a means of meeting community needs and is also the process through which the City grows. Since its incorporation, Bremerton has grown from a very small community to a City that today contains about 23 square miles of area. This expansion was accomplished through a series of about 90 individual annexations. The following will establish definitive objectives and policies as the City's official position on the process of annexation. These will then provide the guidance that is needed to review and evaluate specific annexation requests. The following annexation policies are consistent with similar policies and objectives that were adopted by the City (Resolution 2361) on September 11, 1991. The format has been altered slightly, but the content is unchanged. Annexation Policy: It is the policy of the City of Bremerton to promote~pjanned community growth through annexation within our Urban Growth Area (UGA). Obiective A: To utilize uniform criteria in evaluating annexations. Policv A-1 Evaluate all annexations on the bases of both their short- and long-term community impacts on. . . Implementation - Page 10 Policy A-2 Obiective B: Objective C: Policy C-1 Policy C-2 Obiective 0: Policy 0-1 Policy 0-2 (a) Levels of service for existing City services, and (b) Projected revenues and expenditures for services in annexation areas. Support only those annexations that do not diminish the City's current levels of service over the long term. (a) Annexation shall take place only after the City is satisfied that revenues for needed resources and capacity can be made available to the existing and new areas in a manner that will be cost effective over the long term. (b) The City will require staff to prepare a report assessing the probable short- and long-term financial, economic, political and social impacts of annexations. To consider annexations that best meet the growth goals and policies of the City and region. To consider annexations that preserve established neighborhoods and community identities. Adopt land use controls in newly annexed areas that favor the positive characteristics of those neighborhoods. Encourage and provide opportunities for maximum citizen participation in governmental planning and decision-making processes. To cooperate with Kitsap County and other jurisdictions in addressing areawide comprehensive planning, zoning, and service provision to areas outside its corporate limits but within the Urban Growth Area. Cooperate with Kitsap County and other jurisdictions to establish uniform road, development, and utility standards within adopted Urban Growth Areas. Participate in the planning for areas outside City boundaries but within the Urban Growth Area to ensure that City and County Comprehensive Plans and related implementation policies and ordinances are compatible. Implementation - Page 11 . .. ." . :.. ~. ..:.. .. . . ... .... . . .... . .. . '. .. .. .. . .... . ..... . ... . 5.MEBTING<CONSISTENCY Rt;Ql.JIREMETSlTS ..... A. INTERNAL CONSISTENCY To be effective, each element of the Comprehensive Plan must be consistent with all other elements, policies, maps, and recommendations. This is "internal consistency" within the Plan itself. When this is achieved, the land uses that are indicated on the Plan and Zoning Maps will be adequately accommodated on the ground with the roads, public facilities and services they will need. Internal consistency was developed gradually during the preparation of the Plan. Because new findings or alterations in one element often caused changes in others, all elements of the City's Plan had to be brought along together rather than independent of each other. The on-going process of Plan review and amendment will also involve multiple elements because of these interrelationships. Policy Bremerton shall undertake a complete review of its Comprehensive Plan at five-year intervals, beginning in 1999. Policy Bremerton shall provide opportunities for annual Plan amendments that include the following provisions: (1) Requests for Plan amendments will be accepted at any time. (2) Staff will begin processing all amendments during the fourth quarter of each year and prepare them for City Council adoption during the first quarter of the following year. Policy The City will work with Kitsap County to 'establish a joint City jCounty amendment process for Comprehensive Plan designations and Zoning within the Urban Growth Area, and particularly within those areas that are served by City utilities or other services. B. INTERJURISDICTIONAl CONSISTENCY Bremerton's Comprehensive Plan must also be consistent with those of surrounding jurisdictions within our region. The adopted Countywide Planning Policies are the primary guide to achieving regional consistency. Those policies have been used and referred to throughout this Plan. Achieving interjurisdictional consistency is an ongoing process that is not expected to be fully realized with the first round adoption of local and county plans for the following reasons: (1) Inconsistent Work Scheduling: Local jurisdictions have attempted to meet, discuss problems and concerns, coordinate programs, and follow a regional Implementation - Pag~ 12 work schedule. Unfortunately, it was not possible for all local jurisdictions to adapt to the same production schedule for a number of reasons. As a result, each jurisdiction developed its own schedule and proceeded at its own pace, using the Countywide Planning Policies as the primary guide to regional consistency. Since some cities have completed their plans well ahead of Kitsap County, it's impossible to accurately judge the final level of consistency. (2) Inadequate Time and Resources: Planning jurisdictions have had about three years in which to develop new comprehensive plans that are consistent with the Growth Management Act. The GMA was borrowed, in part, from several other states and was an entirely new program for Washington. Many of the concepts were not well thought out, not fully developed, and not tested. The "bottom-up" process could not adjust quickly and develop the necessary tools to deal with "top-down" mandates that required local jurisdictions to do things that weren't easily done, technically or politically. Three years to complete plans of this complexity, not to mention the implementation regulations, has proven insufficient for many jurisdictions. Consistency is probably not leading their priority lists. (3) Slow Resolution of Difficult Issues: A few important countywide issues have been resolved enroute to Plan production. Among them were population allocations, protection of sensitive areas, and some regional transportation issues. Several issues will remain unresolved at the time of Plan adoption. These may include some or all of the following: (a) Identification and protection of agricultural and forest resource lands. (b) Defining "Urban" and "Rural" and setting acceptable density, development, and service standards for each. (c) Establishing Final Urban Growth Areas that achieve GMA objectives. (d) Developing Urban Growth Management Agreements (UGMA), as directed in our Countywide Planning Policies to guide development and coordination of utilities and services within Urban Growth Areas. (e) Establishing countywide annexation policies that encourage the annexation of urban lands and the provision of municipal services by cities rather than through the continued growth of special service districts and County-provided utility systems. Some of these issues are much larger than our ability to fit them all comfortably into our Comprehensive Plans. Some may have to be decided at the State level, possibly through follow-up legislation. In any case, Bremerton will continue to discuss and work on them following Plan adoption and through subsequent Plan reviews and amendments. Implementation - Page 13 ..... ..-.. . . . ... _n ".........'... .. .. ..'...... ... <6~.<CONCORRENGY A. DEFINITION "Concurrency" means that the public facilities and services needed to maintain level of service standards adopted in the Comprehensive Plan are available simultaneous to, or within six years of, development approval or construction. B. APPLICATION Washington's concurrency requirements aim primarily at transportation planning, although each Plan should also designate other public facilities that it feels are important enough to include in the Concurrency Management System. Policy In addition to transportation facilities, Bremerton's Concurrency Management System shall apply to its sewer and water utilities. The concept of Concurrency is based on the maintenance of specified Levels of Service (LOS). Thus, an appropriate LOS was established for each type of facility that will be included in the concurrency system. Obviously, some facilities were of a regional nature and their LOS influenced by regional considerations. In addition to consideration of regional plans, Bremerton's LOS also reflects reasonable expectations, local priorities and our visions for the future. WAC 365-195-835 required. our concurrency management system to set forth the procedures and processes that would be used to determine whether relevant public facilities have adequate capacity to accommodate a proposed development. The system identifies the responses to be taken when it is determined that capacity is not adequate. The term "adequate capacity" refers to the maintenance of concurrency. The City's Concurrency Management System provides a strategy for dealing with situations in which a proposed new development would cause levels of service to fall below the adopted standard. Denial of the project is statutorily required, but only in the area of transportation facilities, but may occur as a result of other deficiencies. Policy A project denial, based on inadequate transportation, water, or sewer LOS will be an emergency action and will be followed by amendments to the Plan, development regulations, or physical facilities to correct the situation or provide reasonable and effective alternatives. Policy An alternative system, such as septic system or well, may be approved on an interim basis within City service areas when public sewer or water services are not yet available. Policy The City shall establish and maintain a capacity monitoring system that will show how much of the City's water, sewer and transportation Implementation - Page 14 capacity is being used at anyone time, and which can be projected to test the probable impacts of proposed new developments. Policy Based on the City's population allocations, build-out analysis, Comprehensive Plan, Zoning, and other factors, available capacity may be preassigned to specific areas of the community and plans and regulations adjusted accordingly to achieve the most efficient and reasonable balance. Policy Bremerton may reserve portions of available capacity if necessary to achieve planning goals or specific land use objectives, or to ensure that certain areas will have their needed capacity when development occurs. This might be done by: (1) Setting aside a portion of available or anticipated capacity for specified types of development that have been identified as important to meet defined community needs (perhaps jobs, economic development, industry, etc.); or (2). Adopting a first-come, first-served system of allocation, dedicating capacity to applications in the order received (the current procedure); or (3) Adopting a preference system giving certain categories or . specified types of development preference over others in the allocation of available capacity. (Areas within the City might have priority over areas outside the City. Infill or redevelopment areas might have priority over other new development.) For additional information about transportation concurrency, refer to Section V, Part C (Concurrency Management and Implementation) of the Transportation Element. ... 6-A:IMPLE.E-K Implementation - Page 15 Bremerton Comprehensive Plan GLOSSARY Prepared by: BREMERTON PLANNING Adopted: April 5, 1995 GLOSSARY Terms commonly used in comprehensive planning under the Washington Growth Management Act Acronyms Adequate Public Facilities Annexation Available Public Facilities Build-out Capital Facilities Program Capital Facility Capital Improvement Carrying Capacity City Comprehensive Plan Concurrency Consistency Coordination Critical Areas Density Density Bonus Development Permits Development Regulations Domestic Water System Downzoning Ecosystem Elements, of Comprehensive Plans Environmental Buffer Financial Commitment Five-year Comprehensive Water Plan Fully Contained Communities Geographic Information System Geologically Hazardous Areas Greenbelt Growth Management Act (GMA) Growth Planning Hearings Board Home Occupation Infill Development Infrastructure Land Use Inventory Level of Service Local Improvement District (LID) . . .... . . . . .. . . CO NTENT.S Master Planned Resorts Natural Resource Lands Neighborhood Open Space Parcel Pedestrian Pocket Planned Unit Development (PUD) Private Open Space Public Facilities Public Services Public Open Space Public Service Obligations Public Services Rural Sanitary Sewer Systems Service Connection Six-year Finance Plan Six-year Street Plan Solid Waste Handling Facility Special Assessment District Special Purpose District Transfer of Development Rights (TDR) Transportation Facilities Transportation LOS Standards Town Urban Urban Governmental Services Urban Growth Urban Growth Area Urban Growth Area Boundary Urban Growth Management Agreement (UGMA) Urban Sprawl User Fees Utilities or Public Utilities Utility Local Improvement District (ULlD) Utility System Development Fee Vesting Village Glossary .-- Page 1 Acronyms: BACON BANANA ISTEA LULU NIMBY NI MFYE NIMTO NOPE TAZ Bremerton Area Council of Neighborhoods Build Absolutely Nothing Anywhere Near Anyone Intermodal Surface Transportation Efficiency Act Locally Unwanted (or undesirable) Land Use Not In My Back Yard Not In My Front Yard Either Not In My Term of Office Not On Planet Earth Transportation Analysis Zone (Also: KTAZ = Kitsap Trc;l.nsportation Analysis Zone) Adequate Public Faciltiies: Facilities which have the capacity to serve development without decreasing levels of service below locally established minimums. [WAC 365-195-210] Annexation: The process most commonly involves the bringing of an unincorporated land area into the jurisdiction of an adjacent incorporated city. It is also possible for one city to annex another, although this is rare. Most annexations are initiated by a petition signed 'by the owners of the properties involved. The annexing city may then choose the most appropriate method of annexation. The most common methods used in Washington are the 75 Percent Petition Method and the Election Method. Available Public Facilities: The circumstance that facilities or services are in place or that a financial commitment is in place to provide the facilities or services within a specified time. [WAC 365-195-210] Build-out: The sum of all existing development within a specified area and the development potential of all underdeveloped and vacant lands, within the parameters of existing or proposed development regulations. An optional method of determining build-out, which is especially applicable to older urban areas, is to assume total redevelopment and not include existing development patterns. Capital Facilities Program: A six-year financing plan for capital expenditures to be incurred each year. Capital Facility: A structure, improvement, piece of equipment or other major asset, including land that has a useful life of at least ten years. Capital facilities are provided by or for public purposes and services including, but not limited to; airport; City administration/public buildings, fire and rescue, law enforcement, parks, recreational facilities, open space, roadways, sanitary sewer systems, schools, solid waste facilities, stormwater facilities, transit (including ferries), and water distribution systems. Glossary --- Page 2 Capital Improvement: A project to create, expand or modify a capital facility. The project. may include design, permitting, environmental analysis, land acquisition, construction, landscaping, site improvements, initial furnishings and equipment. The project cost must exceed a pre-determined amount, set by the City. Carrying Capacity: The limits of growth and development within a specified area, as determined by the availability of potable water, sewage treatment capacity, transportation limitations, legal limits on the amount of pollutants and waste materials which may be discharged into the environment, or other factors that will define the limits to growth. ~ A large important town, usually incorporated, within which the highest densities and intensities of land use are accommodated by the full provision of utilities and other urban level services. Cities are often characterized by high volumes of traffic, rush hour congestion, local and regional governmental services, neighborhood parks and schools, specialized or higher educational opportunities, concentrated shopping and financial districts, and designated industrial centers. The city also usually serves as a regional center for culture and entertainment. Comprehensive Plan: As defined in the Growth Management Act of 1990, a Comprehensive Land Use Plan is "a generalized coordinated land use poliqy statement of the governing body of a county or city that is adopted pursuant to this chapter." Comprehensive plans are legal documents adopted by local officials establishing policies that will guide the future physical development of their communities and regions. They will be used by local officials, planning commissions, private firms and individuals when making decisions about land use, capital improvements programming, and the enactment of development regulations and related growth management legislation. Zoning and other development regulations must be consistent with the Comprehensive Plan. Periodic update and revision is required to assure that the plan adequately provides for growth, while reflecting community desires and changed conditions. Concurrency: Following adoption of the comprehensive plan, jurisdictions are required to prohibit development approval if the development causes the level of service on a transportation facility to decline below the standards adopted by that jurisdiction, unless transportation improvements or strategies to accommodate the impacts of development are made "concurrent with the development". This means that the improvements or strategies will be in place at the time of development, or that a financial commitment is in place to complete the improvements or strategies within six years. Consistency: No feature of a plan or regulation is incompatible with any other feature of a plan or regulation. The Comprehensive Plan must be consistent with other plans within our area and must also be internally consistent with itself. Internal "elements" of the Plan must not conflict with each other. Coordination: Consultation and cooperation among jurisdictions, neighborhoods, organizations and/or others involved in comprehensive planning. Glossary --- Page 3 Critical Areas: Natural areas and ecosystems, including (a) wetlands; (b) areas with a critical recharging effect on aquifers used for potable water; (c) fish and wildlife habitat conservation areas; (d) frequently flooded areas; and (e) geologically hazardous areas. Density: In land use planning, density is the term used most often to describe the degree to which residential development is concentrated. Residential density is usually expressed as the numbers of dwelling units per acre of land. For example, a one hundred acre area containing 300 dwellings would have a density of three dwellings per acre, calculated by dividing the number of dwellings by the total acreage. This is "gross" density. "Net" density is determined by using the acreage total after all undevelopable areas (streets, open space, wetlands, etc.) are removed. The U.S. Census Bureau defines rural density as 200 persons per square mile or about one dwelling per ten acres. . Density Bonus: Incentives offered by a local jurisdiction that are designed to encourage the provision of affordable housing, open space, or other amenities or improvements having a public benefit, in exchange for approval of a residential density that is higher than otherwise allowed by the zoning ordinance on that particular site. Development Permits: Any active order or permit granting, denying, or granting with conditions an application for a land development approval including, but not limited to; building permits, variances, special use permits, subdivision plats, planned unit developments, and site plans. Development Regulations: Any controls placed on development or land use activities by a county or city, including, but not limited to, zoning ordinances, official controls, planned unit development ordinances, subdivision ordinances, and binding site plan ordinances. Domestic Water System: Any system providing a supply of potable water which is deemed adequate pursuant to state law for the intended use of a development. [WAC 365- 195-210] Downzoning: A change in the designation of a property or area to a zone that allows less intense development than allowed under the previous zoning, or that alloWs only developments of a lesser value. In Bremerton, a change from "General Business" zoning to "Neighborhood Business" would reduce the number of land use options and would, therefore, be considered a downzone. Although sometimes viewed as a negative action, downzoning is often justified when needed to meet changing community or neighborhood needs. Ecosystem: A community of living organisms interacting with one another and with their physical environment, such as a rain forest, pond, or estuary. An ecosystem, such as Puget Sound, can be thought of as a single complex system. Damage to any part may affect the whole. Puget Sound can also be thought of as the sum of many interconnected ecosystems such as rivers, wetlands and bays. Glossary --- Page 4 Elements. of Comprehensive Plans: The text of the Comprehensive Plan document addresses goals, objectives, principles and standards, as well as more specific project proposals and recommendations needed to implement the Plan. This text is divided into chapters, or "elements", each of which deals with a specific issue. The Growth Management Act currently requires all comprehensive plans to have, at a minimum, the following elements: (a) Land Use Element, (b) Housing Element, (c) Capital Facilities Plan Element, (d) Utilities Element, and (e) Transportation Element. In addition, the County Plan must have a Rural Element. Environmental Buffer: A strip of land, in its natural form and vegetation, designed to provide a margin of environmental safety along streams and shorelines, or around wetlands. Although some recreational use may be suitable within a buffer, the primary objective is environmental protection. Financial Commitment: Identified public or private funds, or combination thereof, that are sufficient to finance the necessary public facilities that will serve a new development. Five-year Comprehensive Water Plan: The Washington State Department of Social and Health Services (DSHS) requires all water utilities with 1 ,000 or more service connections to evaluate their current and future needs, prepare comprehensive water plans, and update the plans every five years. Those plans must be approved by DSHS. Fully Contained Communities: The County may establish a process to authorize the creation of new "fully contained communities", located outside initially designated urban growth areas. The population allocation for such communities will come from the County's "urban" population allocation and the design and siting must address specific criteria, including (a) new infrastructure and impact fees, (b) transit-oriented site planning and traffic demand management programs, (c) buffers, (d) a mix of uses to provide a balance of jobs, housing and services, (e) affordable housing, (f) environmental protection, (g) growth containment regulations, (h) mitigation of any impacts on designated resource lands, and (i) protection of critical areas. Geographic Information Systems: A manual or automated system that is capable of organizing, storing, analyzing, and retrieving geographically-related (mapped) information in a manner that will support sound decision-making regarding the management of community or regional resources. Increasingly, the term is applied to computerized systems which combine comput~rized mapping with automated land use date files. Geologically Hazardous Areas: Areas that, because of their susceptibility to erosion, sliding, earthquake, or other geological events, are not suited to the siting of commercial, residential, or industrial development consistent with public health or safety concerns. Greenbelt: A linear strip of land consisting largely of its natural vegetation. A greenbelt may be provided for recreational purposes as an element of the parks system, or to protect an environmentally sensitive area such as a stream corridor or wildlife Glossary --- Page 5 migration route. Greenbelts can be useful in connecting neighborhoods, providing pedestrian or bikeway linkages, dividing urban areas from rural or natural resource lands, or for separating incompatible land uses such as an industrial district from a residential neighborhood: (Also see: Environmental Buffer) Growth Management Act (GMA): This legislation forms the basis for statewide comprehensive planning in Washington and is generally considered to include the combination of Substitute House Bill No. 2929 (Effective July 1, 1990); Reengrossed Substitute House Bill No. 1025 (Effective July 16, 1991); and any subsequent amending or follow-up legislation. Growth Planning Hearings Board: A three-member board appointed by the Governor for the purpose of hearing and determining petitions alleging either: (a) That a state agency, county, or city is not in compliance with the requirements of the Growth Management Act or related laws pertaining to plans, regulations and amendments, or (b) that the twenty-year growth management planning population projections adopted by the Office of Financial Management should be adjusted. A petition may be filed by the state, a county, a city, or a person who has either participated in the matter being reviewed or has been certified by the Governor. Home Occupation: A non-residential business activity that is carried out for monetary gain within a residence and within a residential zone. The home occupation must be secondary to the residential use and conducted in accordance with performance standards contained in the Bremerton Zoning Ordinance. Infill Development: Development of vacant skipped-over parcels of land in otherwise built- up areas. Infill development is generally associated with cities and other "urban" areas as a way of containing energy costs and minimizing the costs related to the extension of new utilities or services into newly developing areas further away. Infill opportunities provide an alternative to development in less suitable areas and often help strengthen older urban neighborhoods. Infrastructure: Streets, water and sewer lines, and other public facilities that are basic and necessary to the functioning of urban areas. land Use Inventory: A study of how land is currently being used within a particular area, such as a neighborhood, community or region. The inventory can catalog the types, distribution, and intensities of land uses and activities. Major categories might include residential, commercial, industrial, public, etc., each of which may be further subdivided to provide'more specific information. The Land Use Inventory is one of the first and most important basic tasks in land use planning and provides information that is essential to the development of a Comprehensive Plan. Level of Service (LOS): A quantifiable measure of the amount of public facility that is provided. Typically, measures of levels of service are expressed as ratios of facility capacity to demand (Le., actual.or potential users). Glossary --- Page 6 Local Improvement District (LID): A special area formed by a local jurisdiction within which property is assessed to pay for specific improvements. Each parcel's assessment can be no greater than the amount by which that property is benefitted by the improvements. Revenue raised through assessments may be applied directly to improvement costs or pledged for payment of debt service on bonds issued to pay for improvements. (See: "Special Assessment District" and "Utility Local Improvement District") Master Planned Resorts: A self-contained and fully integrated planned unit development, in a setting of significant natural amenities, with primary focus on destination resort facilities consisting of short-term visitor accommodations associated with a range of developed on-site indoor or outdoor recreational facilities. Other residential uses may be included, but only if they are integrated into and support the on-site recreational nature of the resort. Natural Resource Lands: Agricultural, forest and mineral resource lands that are not already characterized by urban growth and that have long-term significance for the commercial production of food or other agricultural products, timber, or the extraction of minerals (including gravel, sand, and valuable metallic substances). Neighborhood: Neighborhoods exist in both urban and rural settings. The physical size of a neighborhood usually shrinks as the urban density increases until some central city neighborhoods are perceived (by their occupants) as being as small as a single block. A neighborhood is generally an area that has an important feature or quality to which its residents relate. The neighborhood is usually identified by, or contained within, specific physical features such as a major highway, a river or shoreline, the limits of a valley, etc. Neighborhoods often include a school, park or other type of center at which gatherings and activities can take place. The design and function of a neighborhood is not always limited to residential uses, but must also deal with commercial, industrial, or other uses that are important to the community, but not necessarily compatible in all ways. Open Space: Any area which provides physical or visual relief from the developed environment. It may consist of lands that are improved or unimproved, and public or private. Within the urban environment, open space may include linear streetscapes, view corridors, shoreline areas, mini-parks, pedestrian corridors, and areas reserved or used for stormwater retention, drainage, wetland protection, etc. Parcel: A continuous quantity of land, in single ownership or under single control, and usually considered a unit for the purposes of development. Pedestrian Pocket: An integrated mixed-use development that may include a combination of residential, commercial and other uses designed to be pedestrian efficient while also having multi modal features such as direct access to mass transit, bikeways, peripheral parking, etc. A pedestrian pocket may be designed as a neighborhood within an existing city or as the development around a transportation node, such as along a transit or freeway route. Pedestrian pockets may have very high residential densities, but must also remain physically compact to retain the pedestrian emphasis. Glossary --- Page 7 Planned Unit Development (PUD): A permitting process that encourages innovative design while allowing code requirement flexibility, the combining of approval processes and site plan review, and that can be used for a variety of residential, commercial, industrial or mixed-use developments. The PUD process is also used to allow density transfers, clustering, TDR programs, and bonuses for creative design or in exchange for features with community or public benefits. Private Open Space: Privately owned lands, including forests and agricultural lands may be considered private open space, as well as unbuildable lands, such as steep slopes or wetlands. Private open space can be preserved for the benefit of the general public through donation to land trusts, through tax incentives, through public purchase of development rights, or through outright purchase of the land. Such areas might also be retained in their present "natural resource" use or environmentally sensitive or critical nature through development regulations. Public Facilities: Facilities provided for the benefit of the general public including streets, roads, highways, sidewalks, street and road lighting systems, traffic signals, domestic water systems, storm and sanitary sewer systems, parks and recreational facilities, and public schools, and other public buildings. Public Service Obligations: Obligations imposed by law on utilities to furnish facilities and supply service to all who may apply for and be reasonably entitled to service. [WAC 365-195-210] Public Services: Services provided for the benefit of the general public, including fire protection and suppression, law enforcement, public health, education, information, recreation, environmental protection, development assistance/permitting, etc. Public Open Space: Open land held by the public, for the use of the public, and which may include traditional public parks, areas for active or passive recreation, waterfront/shoreline areas, greenbelts, environmental buffers, scenic road corridors, or other open space applications. Public Services: Government-provided services for the benefit of the general public, including fire protection and suppression, law enforcement, public health, education, recreation, environmental protection, and others. Rural: Rural areas, for purposes of planning in Kitsap County, consist of all areas not determined to be "urban". Rural areas are typically unincorporated, although it is not uncommon for a city to contain areas that meet the definition of rural and are not yet needed to accommodate urban development. Thus, some pockets of "rural development" will likely exist within cities and within defined Urban Growth Areas. Such areas may be targeted for preservation (if unique in some way) or for future urban development. In addition to large lots, low-density development, and general lack of urban level services, a rural environment should be expected to include commercial or industrial activities that are natural resource related (agriculture, logging, recreation,gravel eXtraction, etc.), as well as small-scale rural services and schools that do not require urban governmental services or utilities. Glossary --- Page 8 Sanitary Sewer Systems: All facilities, including approved on-site disposal facilities, used in the collection, transmission, storage, treatment or discharge of any waterborne waste, whether domestic in origin or a combination of domestic, commercial or industrial . waste. [WAC 365-195-210] Service Connection: A utility connection or hook-up between the main line and the service recipient; more specifically, a connection between a house, another building or lot to the main utility line which is typically located in the street, alley or easement. Six-year finance Plan: A six-year program for capital expenditures to be incurred each year. Six-year Street Plan: Washington State law requires that each city and county develop a six-year plan for the repair and reconstruction of streets, roads, and bridges. The plan is updated annually and a copy is filed with the Secretary of Transportation. Solid Waste Handling Facility: Any facility for the transfer or ultimate disposal of solid waste, including land fills and municipal incinerators. [WAC 365-195-210] Special Assessment District: Districts which utilize compulsory levies made against certain properties to defray part or all of the cost of a specific improvement or service deemed to primarily benefit those properties; e.g., Local Improvement Districts (LIDs) and Road Improvement Districts (RIDs). Special Purpose District: Any sewer district, water district, fire protection district, drainage improvement district, drainage and diking improvement district, flood control zone district, irrigation district, metropolitan park district, drainage district, or public utility district engaged in water distribution is considered a Special Purpose District. (RCW 36.93.020(2)) . Town: A relatively concentrated group of houses and other private and public buildings, larger than a village but smaller than a city. A village is considered "urban", would be within an Urban Growth Area, and would be expected to provide a full range of utilities and services within its area. It also may provide a variety of products and services to its surrounding service area and is often the center of activity and commerce for its rural region when located some distance from a city. Transfer of Development Rights (TOR): A program intended to allow the transfer of the "right" to a particular type or density of development (usually residential density), as allowed by current development codes, from a property that is important as a natural resource or critical area or as open space, to another property that is more suitable for the type of development proposed. A TOR program generally includes rural "sending" areas and urban "receiving" areas where higher densities are acceptable. Transportation Facilities: Capital facilities related to air, water or land transportation, such as streets and highways, rail, rapid transit, multimodal terminals, airports and ferry facilities. Bikeways and pedestrian walkways are also considered to be transportation facilities. Glossary m Page 9 Transportation Level of Service Standards: A measure which describes the operational condition of the travel stream and acceptable adequacy requirements. Such standards may be expressed in such terms as speed and travel time, freedom to maneuver, traffic interruptions, comfort, convenience, geographic accessibility and safety. [WAC 365-195-210] Urban: Physical development that makes intensive use of land for buildings, other structures, and impermeable surfaces to such a degree as to be incompatible with the continued use of that land for natural resources, and which typically requires a combination of urban governmental services (see following definition). Urban Governmental Services: Services that are typically needed and provided in urban areas and that are historically provided by cities, but also often provided by counties or special districts in the case of designated unincorporated Urban Growth Areas. Such services include, but are not limited to; neighborhood parks, sewer, water and storm drainage facilities, public sidewalks, street cleaning, full-time professional fire and police protection, frequent public transit services, and other services common to urban areas or provided for the convenience of urban area residents. Electricity, telephone, cable television, natural gas, basic roads, and some other services that are common throughout both urban and rural areas should not be used as criteria for distinguishing urban areas from rural areas. Urban Growth: Growth that is characterized by the types and intensities of development that makes intensive use of land for the location of buildings, other structures, and impermeable surfaces to such a degree as to be incompatible with the primary use of such land for the protection of food, other agricultural products or fiber, or the extraction of mineral resources. The provision of "urban governmental services" as infrastructure needed to accommodate new growth is also considered "urban growth". Urban Growth Area: An area designated by the County, after consultation with affected cities, within which urban growth will be encouraged and supported with urban level services. The County's urban growth areas must include sufficient areas and densities to accommodate the County's projected urban growth over the succeeding 20-year period. Planning and provision of needed services and infrastructure within the UGA will be coordinated through the provisions of the Urban Growth Management Agreement (UGMA) between the County and affected city. Urban Growth Area Boundary: The boundary or line separating the urban growth area from adjacent rural areas where urban growth is restricted. Urban Growth Management Agreement (UGMA): In order to clearly define jurisdictional expectations and responsibilities within established Urban Growth Areas, Urban Growth Management Agreements (UGMA) will be entered into by Kitsap County and each of its cities. The contents will vary according to the needs of each jurisdiction, but will focus on important urban growth issues, including (a) annexation procedures, (b) provision and coordination of needed public services and utilities, including consistent standards, (c) cost/revenue sharing and other fiscal disparities, and (d) designation of levels of service standards for transportation facilities. Glossary --- Page 10 \ Urban Sprawl: Scattered, poorly planned urban development that occurs particularly in urban fringe and rural areas and frequently invades land that is important for environmental and natural resource protection. Sprawl typically manifests itself in one or more of the following patterns: (1) leapfrog development - when new development is sited away from an existing urban area, bypassing vacant parcels that are closer to the urban area and more suitable for development; (2) strip development - when large amounts of commercial, retail, and sometimes multifamily residential development are located in a linear pattern along both sides of a major arterial and which typically access that arterial directly; and (3) large expanses of low-density development of a single type, such as residential, industrial; etc. The State of Florida determined that residential densities between one unit per 10 acres and 2 units per acre constitute sprawl and cautions that this type of development .promotes an inefficient and unattractive use of developable land, and frequently destroys significant environmental and natural resources." User Fees: Charges for services provided (rendered) and which are intended to recover the capital and operating costs associated with the level of usage. Utilities or Publie Utilities: Enterprises or facilities serving the public by means of an integrated system of collection, transmission, distribution, and processing facilities through more or less permanent physical connections between the plant of the serving entity and the premises of the customer. Included are systems for the delivery of natural gas, electricity, telecommunications services, water, and for the disposal of sewage. [WAC 365-195-210] Utility Loeallmprovement District (ULlD): A ULlD is created only for improvements to sewer, water, and other utilities, and differs from a LID in that all assessment revenues must be pledged for payment of debt service of bonds issued to finance the improvements. (See: "Special Assessment District" and "Local Improvement District") Utility System Development Fee: A charge imposed at the time of connection for water, sewer, or drainage services which is designed to represent the proportionate share of the cost of the capital system benefitting the connection. Some utilities refer to this as a "connection charge". Vesting: When a property owner has the right to proceed with development, his project is considered to be "vested". Land in Washington can be developed consistent with the building permit, zoning, and subdivision regulations in effect at the time a "fully completed" application is submitted (RCW 19.27.095 and 58.17.033). Village: A grouping of houses in a rural area, smaller than a town and usually having few, if any, urban level utilities (sewer or water systems). A village is considered a "rural" . form of development and is not located within an Urban Growth Area. Similar development that is within a designated urban area and included within a UGA will usually fall into the definition of "Urban Sprawl". Villages generally have electricity, telephone, and often cable television, as well as limited rural commercial or industrial enterprises related to the types of commerce found in the surrounding areas (farms, forests, etc.). (Also see: "Town" and "City") Glossary --- Page 11