HomeMy WebLinkAbout2528 RESOLUTION NO. ~i ,~' '~/? 1996-2001 SIX-YF~ TI~SPORTATION II4PRO~B}[ENT PROGI~ WHEREAS, THE CITY OF B~TON has reviewed the work accomplished under its Comprehensive Arterial Street Construction Program and determined current city Street needs, and WHEREAS, the City Council caused to beprepared a revised and extended Six-Year Transportation Improvement Program for the period January 1, 1996 to December 31, 2001, and after public hearing thereon approved the same at such hearing September 27, 1995 now therefore, BE IT RESOLVED that the revised and extended Six-Year Transportation Improvement Program 1996 to 2001 attached hereto as Exhibit A and Schedule is hereby adopted as the revised and extended Six-Year Transportation Improvement Program for the period January 1, 1996 to December 31, 2001. PASSED by the city Council of the city of Bremerton this of APPROVED this _~3~..'-.~ day of ~! .L~-~ ~ ~<_ 1995. ATTEST: Kathleen McCluskey, C~ty Clerk Ian Siege~s, City Attorney Lynn S. Horton, Mayor 1996-2001 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM SUMMARY CHANGES TO THE PLAN INCLUDE: ALL LOCAL PROJECTS (SAFETY, NON-MOTORIZED, TDM, EMERGENCY AND LOCAL SUPPORT) ARE INCLUDED IN "MAINTENANCE PROJECTS". LOCAL STREET OVERLAY PROJECTS HAVE BEEN PRIORITIZED USING THE CITY PAVEMENT MANAGEMENT SYSTEM. e KITSAP WAY RECONSTRUCTION, WESLON PLACE TO AUTO CENTER WAY DELAYED FROM 1995 TO 1996 DUE TO COORDINATING WITH STATE CONCERNING SR3 SOUTHBOUND OFFRAMP AND ENGINEERING STAFF SUPPORT OF UTILITY PROJECTS. llTH STREET RECONSTRUCTION, CHESTER AVENUE TO WARREN AVENUE DELAYED FROM 1995 TO 1996 DUE TO STATE TIB FUNDS BEING UNAVAILABLE. e MAJOR INVESTMENT STUDY FOR THE SR 303 CORRIDOR BETWEEN WARREN AVENUE BRIDGE AND BROWNSVILLE HIGHWAY. Se WERNER ROAD/LOXIE EGANS BLVD. IMPROVEMENTS STUDY WILL RECOMMEND SPECIFIC STREET IMPROVEMENTS IN THE STUDY AREA. 95038 Six Year Transportation Improvement Program In Order by County, Agency, City, TIP Year Priority, Funding Status Projects sepemted by County, Agency Printed 09/19/1995 6YRTIP.FRX SNV Rev: 2.01 05118195 Form Rev Date: 0412§/95 MPO . ALL Agency : Bmmerton County : Kitsap County 1996 to 2001 (Project Costs In Thousands of Dollars) Hearing Date Adoption Date Resolution Number Page Phase Data Func Project Imp Total Util Start Federal RAP,etc. Local/ CI Pri Identification Type Length Codes Date Fund Code Cost Code Cost State City Bremerton 01 4.000 / T O I Funding Secured Revision: 14 1 SR3/SR304 GORST'TO-BREMERTQN T.I.P. city 14 2 BREMERTON FERRY TERMINAL TO GORST HOV IMPROVEMENTS/RECONSTRUCTION OF THE CORRIDOR PE 1 / 1996 STP 675 0 2,380 RW 1 / 1996 STP(C) 657 0 6,510 CN 111996 0 0 11,647 PROJECT TOTAL 1,332 0 20,537 Bremerton 06 0.240 ~G I Funding Secured Revision: KITSAP WAY RECONSTRUCTION~ WESLON PLACE TO AUTO CENTER WAY PAVING, C&G, SIGNAL, CHAN., DRAIN, SW PE 111996 STP 45 0 10 RW 111996 0 0 0 CN 1/1996 STP 410 0 85 ALL 1 / 1996 0 0 0 PROJECT TOTAL 455 0 95 Total 3,055 7,167 11,647 21,869 Expenditum Schedule (Local Agency Use) 1st 2nd 3rd City Bremerton 07 0.500 J J Funding Secured Revision: 14 3 SYLVAN WAY RESI]~-- OLYMPUS DRIVE TO WHEATON WAY RESURFACE PE RW CN Total 55 0 495 0 55O PE RW CN 4th-6th PE 100 0 0 0 RW 50 50 0 0 CN 0 100 150 0 Total 150 150 150 0 55 0 0 0 0 0 0 0 495 0 0 0 550 0 0 0 City Bremerton 14 4 PE 1/1996 0 RW 111996 0 CN 111996 0 ALL 111996 0 PROJECT TOTAL 0 01 0.210 ~ T I Funding Secured WARREN AVENUEOFFRAMFr SHERIDAN RD TO CALLAHAN CONSTRUCT NEW OFF RAMP PE 1 / 1996 STP(C) 44 CN 611996 STP(C) 176 RW 611996 0 ALL 1 / 1996 0 ALL 1 / 1996 0 PROJECT TOTAL 220 0 40 0 0 0 150 0 0 0 190 Revision: 0 Total 40 0 150 0 190 PE RW CN Total 44 176 0 0 0 220 40 0 0 0 0 0 0 0 150 0 0 0 190 0 0 0 0 20 24 0 0 0 176 0 0 0 0 0 0 20 200 0 Utilities Legend Gas P Power TTelephone O Other CableTV S Sewer WWater 6YRTIP.FRX S/W Rev: 2.01 05/18/95 Form Rev Date: 04/26/95 MPO . ALL Agency : Bremerton County : Kitsap County 1991J tO ZUU1 (Project Costs in Thousands of Dollars) Hearing Date Adoption Date Resolution Number Page Phase Data Func Project Imp Total Util Start __ Federal RAP,etc. Local/ CI Pri Identification Type Length Codes Date Fund Code Cost Code Cost State City Bremerton 06 o.19o J Funding Secured 14 5 11TH STREET RECONSTRUCTION CHESTER AVE TO WARREN AVE city 16 6 mty 00 7 City 14 8 Revision: 0 RECONSTRUCT AND STABILIZE ROADWAY PE 1 / 1996 RW 1 / 1996 CN 111996 PROJECT TOTAL Total 0 0 0 0 0 0 0 0 0 0 350 350 0 0 350 350 Expenditure Schedule (Local Agency Use) 1st 2nd 3rd PE 0 0 RW 0 0 CN 350 0 4th-6th 0 Bremerton 04 0.475 J ! Subjectto Selection Revision: 0 Werner Rd/Loxie vl~-dTl~provements Union Ave to National Ave. Improvments to street incl. widening, access control, traffic signalization, and channelization; pend. study results. P E 111998 0 0 20 C N 111998 0 0 55 PROJECT TOTAL 0 0 75 Bremerton 07 0.000 [ J Planning Purposes Revision: 0 MAINTENANCE PROJECTS-- CITY WIDE SAFETY, NON-MOTORIZED, TDM, EMERGENCY, & LOCAL PROGRAM SUPPORT (PER PMS) PE 111996 0 0 300 CN 111996 0 0 600 PROJECT TOTAL 0 0 900 Bremerton 31 0.000 j I Planning Purposes Revision: 0 SR303 CORRIDOR SR303 WARREN AV BRIDGE TO BROWNSVILLE HWY Total 350 0 MAJOR INVESTMENT STUDY 2O 55 75 300 600 900 PE 111997 0 0 600 600 CN 111997 0 0 0 0 PROJECT TOTAL 0 0 600 600 TOTAL for the Agency of Bremerton 2,007 0 22,747 24,754 TOTAL for the County of Kitsap County 2,007 0 22,747 24,754. 2,007 0 22,747 24,754 GRAND TOTAL PE 0 0 2O 0 RW 0 0 0 0 CN 0 0 55 0 Total 0 0 75 0 PE RW CN Total PE RW CN Total 50 0 100 150 50 0 100 150 150 0 0 150 50 0 100 150 300 0 0 300 150 0 3OO 450 150 0 0 150 Utilities Legend G Gas P Power T Telephone O Other C Cable TV S Sewer WWater 6YRTIP.FRX S/W Rev: 2.01 05/18/95 Form Rev Date: 04/26/95