HomeMy WebLinkAbout2598 RESOLUTION NO. 2598
CITY SIDEWALK ACCESS RAMP PROGRAM
WHEREAS, the American's with Disabilities Act (ADA) establishes requirements for
providing access to individuals with disabilities, and;
WHEREAS, the City has street crossings where the sidewalk has a curb constructed such
that is a barrier to access the sidewalk for some individuals, and;
WHEREAS, the City has limited funds available for improvement to sidewalk access,
and;
WHEREAS, the City desires to establish a prioritization of general areas and specific
locations for construction of sidewalk access ramps (or curb cuts) when funds become available,
and;
WHEREAS, City staff worked with the City Disability Action Committee to establish a
Citywide prioritization of areas for providing sidewalk access ramps and identified specific ramp
locations within the highest ranked priority area, and;
WHEREAS, the City has secured Community Development Block Grant (CDBG) funds
for initial sidewalk access improvements,
NOW, THEREFORE be it resolved by the City Council of the City of Bremerton:
1. That the "Bremerton American with Disability Act Sidewalk Access Ramp Program"
attached hereto is the City program for prioritizing areas to receive sidewalk access ramps
when funds are available.
APPROVED this 20th day of May, 1997
That the prioritization of specific access ramps in the Harrison Hospital Corridor area as
shown in Attachment 2 are acceptable for use of CDBG funds for construction.
PASSED by the City Council of the City of Bremerton this 14th day of 1997.
David Farr, President
Bremerton City Council
APPROVED this 20 day of May, 1997.
.
LYNN S. HORTON
Mayor
ATTEST:
Kathleen L.McCluskey
97203A/bk
BREMERTON
AMERICAN WITH DISABILITY ACT
SIDEWAI,K ACCESS RAMP PROGRAM
ATTACHMENT 1
Currently the City of Bremerton addresses American with Disabilities Act (ADA) sidewalk
compliance as part of a major street improvement, facility construction project, or new private
development. The City has recently received a Community Development Block Grant in the
amount of $10,000 to develop a priority and ranking scheme for placement of sidewalk access
ramps and to construct approximately fourteen sidewalk access ramps or curb cuts within the
highest priority area of the City.
Public Works and Utilities staff in conjunction with the City Disability Action Committee
(DAC), have developed a citywide priority and a ranking schedule for installation of sidewalk
access ramps. Listed below is a summary of the results of the DAC and Public Works staff
efforts and discussions to date on this issue.
PRIORITIZATION
DAC has identified and prioritized the following areas within the City for sidewalk access ramps.
These areas are listed in order of importance, with the first area designated as top priority,
followed by those of decreasing importance.
1. The Harrison Hospital Corridor and the surrounding health care institutions.
2. The Olympic College and high school area.
3. Other school locations to be identified with DAC and school staff input.
4. The downtown business district area.
5. Major arterial street or residential streets to be identified with DAC.
The Harrison Hospital Corridor was selected as the top priority due to the following factors:
1. Existence of medical facilities.
2. Close proximity to nearby stores and shopping areas.
3. Proximity to the Senior Center and convalescent homes.
4. Existence of established bus routes within the area.
5. Residential area.
6. Absence of both handicap and general parking which enhances a pedestrian mode of
transportation.
HARRISON HOSPITAL CORRIDOR SIDEWALK ACCESS RAMP CONSTRUCTION
Beginning in the top priority area, the Harrison Hospital Corridor, Public Works staff walked the
area and identified all the locations in need of curb cuts as well as all the existing curb cuts.
Once identified, Public Works and the DAC ranked each proposed ramp location as either a
priority construction or an optional construction. Ramps which completed the connection of all
of the above factors in a single area were ranked as priority construction. ;rhe remaining ramps
identified within the survey were ranked as optional. Both the priority, optional ramps, and
existing ramps were shown upon a street map of the area.
After City Council review of the ADA sidewalk access ramps program, construction of the
identified priority ramps within the highest prioritized area would occur. The current funding
under this grant would provide for construction for most of the priority ramps located in the
hospital corridor.
FUTURE SIDEWALK ACCESS RAMP CONSTRUCTION
As future funding becomes available for sidewalk access ramps, the remaining priority and
optional ramps within the highest priority area would be constructed. Once all ramps identified
for construction within an entire priority area is completed, the above procedure of surveying the
area, identifying existing ramps, identifying and ranking priority and optional ramp locations,
would be completed for second priority area identified.
After completion of the first and second priority areas is complete, identification of specific
priority schools will need to be performed by Public Works staff, DAC members and school
staff. Consideration to other "new" priority areas will also be considered at that time.
The ADA sidewalk access ramps would be designed and installed to City specifications,
constructing as many ramps as funding will provide. Construction of these ramps is anticipated
to be completed by City crews. It is expected that the ~mded ramps under this particular grant
would be completed, within six months.