Loading...
HomeMy WebLinkAbout2005 RESOLUTION NO. 2005 WHEREAS, storm drainage currently constitutes one-third of the sewage treated by the Bremerton Wastewater Facilities; and WHEREAS, currently no mechanism exists to allocate the cost to these who contribute storm drainage to the Wastewater Facility system; and WHEREAS, there is concern by the Mayor and the Council that wastewater charges be fair and equitable, now, therefore, BE IT RESOLVED that the City of Bremerton needs a storm drain management system. BE IT FURTHER RESOLVED that a storm drain manage- ment system should be capable of maintaining existing storm drains and improving storm drainage systems in order that the City's wastewater facilities can adequately handle storm drainage. BE IT FURTHER RESOLVED that the City should conduct the necessary engineering work to determine the extent of the current problem with storm drainage; how best to manage a storm drain system; how to allocate costs to drainage users; and provide an interim report to the Council on these areas of study no later that the first Council meeting of June, 1984. PASSED by the City Council of the City of Bremerton this 11 day of January , 1984. BILL AMO E.L. STURDIVANT ROY MOSELY JIM ADRIAN CLYDE PACHEK ART ANDERSON PHIL DROUIN SPENCER HORNING RUSSELL JOHNSON M.G. DAWKINS, Mayor ATTEST: KATHLEEN L. McCLUSKEY, City Clerk