Loading...
HomeMy WebLinkAbout1475RESOLUTION AUTHORIZING THE EXECUTION AND DELIVERY OF A CONTRACT WITH PUGET SOUND POWER & LIGHT COMPANY FOR FURNISHING (Servfce WHEREAS,. PUGET SOUND POWER & LIGHT COMPANY has o/~ered.to furnish for a period Ten of .................................................................... years, upon the terms set forth in the following proposed form of contract, to-wit: Page 1 of Resolution 832.13 1-70 MUNICIPAL WATER PUMPING POWER CONTPJ~CT PUGET SOUND POWER & LIGHT COMPANy, herein called "Company~', and the City (Town or City) of Bremerton . , a muniCiPal corporation'of the State of Washington, herein called "City", agree as follows: FIRST: This contract covers only Power used in connection with the operation of water distribution systems. SECOND: DELIVERY - In consideration of the payments, and subject to the limi- tations, herein stipulated, the Company agrees for a period of 10 consecutive years, beginning July 12 ., 19 70 , to reserve for and furnish to the City, and City agrees during said period to buy exclusively from the Company, at the rates herein fixed, ali electric power required to operate the City's water ~umping. plant or plants located and described as follows: Anderson Creek Annex pumpzng statio= known as Well #7 located near the head of Sinclair Inlet in the Northeast quarter of the Southwest quarter of Section 33, Township 24 North, Range 1 East. Metering Voltage - One location - 12,500 volts TransfOrmer Rental - None The City of Bremerton is to furnish the necessary transformers for stepping the voltage down from 12,500 volts to meet its requirements. Said electric power shall be three-phase, sixty cycle, alternating current at approximately 12~500 volts. Company agrees to furnish not exceeding 200 kilowatts but will furnish any additional amount required by the City if it has the power available. The point of delivery shall be at the primary or12,500 volt side of the transformers installed at the above described location. THIRD: RATES - The City agrees to pay the following rates, same being Schedule No. 40 of the Company's Electric Tariff I, filed with the Washington Utilities & Transportation Commission: Schedules 80 & 81 Demand Charge - $1.67 per month per kilowatt, or major portion thereof, of maximum demand. Energy Charge - 0.66¢ per kilowatt hour for the first 25,000 kilowatt hours used per month. 0.56¢ per kilowatt hour for the next 25,000 kilowatt hours used per month. 0.46¢ per kilowatt hour for the next 50,000 kilowatt hours used per month. 0.41¢ per kilowatt hour for all over lO0,O00 kilowatt hours used per month. Said rates are subject to change in accordance with the laws of the State of Washington and whenever a new schedule of rates for the same service is made effective the City shall thereafter pay the new rates; provided, if the new rates are higher than those herein fixed, the City shall be entitled to cancel this contract. All bills shal) be payable within ten days from their date. FOURTH: MEASUREMENT - Maximum demand, consumption and power factor shall be measured by commercially accurate maximum demand, watt hour and power factor meters furnished and installed by Company, suitable space for which shall be furnished by the City; provided, maximum demand and power factor may at Company's option be de- termined either by meters or by check of service. The maximum demand for any month is understood to be the average kilowatt demand', or average rate of use measured in kilowatts, during the fifteen minute interval in which the consumption of electric energy is greater than during any other fifteen minute interval in the month. Acct. No. $185 0700.1 832.14 1-70 MUNICIPAL WATER PUMPING POWER CONTRACT - Page 2 FIFTH: USE OF EQUIPMENT - The City agrees to install and maintain in good con- dition proper equipment for the use of such power and to save the Company harmless from all liability for any loss or damage caused by such equipment to either, party hereto or to any person whomsoever; not to sell to others any electric power fur- nished hereunder, nor use or permit others to use any of such power in any other place or for any other purpose than to operate said plant. City agrees to notify the Company before making any increase in the connected load and to operate its electric equipment so as not to impair the general service rendered by Company to its other customers. If the City's use shall impair such service to other customers, the City will, upon demand, install the proper appara- tus to prevent City's power factor from falling below 85 per cent, and Company shall have the right to discontinue service to the City until such apparatus is installed. The City agrees to use reasonable diligence to protect the Company's property from injury and Company shall have free access to all parts of the premises where its electricity is used, to inspect, repair, remove and replace its property. SIXTH: SERVICE INTERRUPTIONS - Company shall use reasonable diligence to furnish uninterrupted service but shall not be liable for any interruptions caused by strikes and/or other labor disputes, accidents or acts of God, or by any cause beyond the control of the Company, or by the necessity for making repairs or changes in the Company's equipment and facilities, and the City waives and shall not assert any claims against the Company for damages to the City caused by any suspension, interruption, failure or curtailment of service by the Company under this agreement attributable in any manner to national war emergency, including voluntary coopera- tion by the Company in any method of operation or in any program recon~ended or requested by civil or military authorities. No temporary interruption shall cancel this contract. SEVENTH: The Company shall have the right to cancel this contract if any part of the Company's property used for the rendition of this service is taken by emi- nent domain, or if such service can no longer be .rendered by reason of franchise expiration and the inability of the Company to secure a renewal thereof. CITY OF BREMERTON Attes~,~ _ ~Clerk Wi tness: PUGET SOUND POWER & LIGHT COMPANY NOW, THEREFORE, BE IT RESOLVED by the ...... ..C.o..u,..n..c,..i.,1. ...................................... (Council or Commiosion) Bremerton o£ the ................... ,C..~y.. .................................... - -- - ..... 01~ ............................................................................ ~;l'la~ a (Cit~ or Town) contract be entered into with Puget Sound Power & Light Company for the furnishing of MUNICIPAL WATER PUPfPtNG POWER upon the terms above proposed, and that the Mayor be and he hereby is authorized and directed to execute and deliver such contract on behalf and in the name of the ......... .C..i.~Y.. ................................................................. and the Clerk be and he hereby is authorized (City or Town) and directed to attest such contract and to affix thereto the seal of the ........ .C.,.i.~E...°...f. ........... Bremerton (Ci~ or To~) Duly adopted this.i ..... ~., ..... .~..,.day o£ ........ ~~: .................. , 19......~.0 ............. ...... ..... ....... ........ Page ............ of Resolution