HomeMy WebLinkAbout1444 RESOLUTION NO.... [.~.~.....~......[ ........
RESOLUTION AUTHORIZING THE EXECUTION AND DELIVERY
OF A CONTRACT WITH PUGET SOUND POWER &
LIGHT COMPANY FOR FURNISHING
MUNICIPAL WATER PUlVlPING POWER
(Servic~ Furni,h~d)
WHEREAS, PUGET SOUND POWER & LIGHT COMPANY has
. TEN (10)
offered to furnish for a period o~ .................................................................... years,
upon the terms set forth in the following proposed form of contract, to-wit:
Page 1 of Resolution
Acct. No. 6081-6600.1
MUN 1C l PAL WATER PUMP lNG POWER CONTRACT
PUGET SOUND POWER & LIGHT COM?ANY0 herein called "Company," and the ...... ~5~...
BREMERTON (Town or
of ........................ , a municipal corporation of the State of Washington,
herein called "City," agree as
FIRST: This contract only covers power used in connection with the operation
of water distribution systems.
SECOND: DELIVERY - In consideration of the payments, and subject to the lim-
itations, herein stipulated the Company agrees for a period of .70. consecutive
and City agrees during said period to buy exclusively from the Company, at the
rates herein fixed, all electric power required to operate the City's water ~umping
plant or plants located and described as follows:
Sewage Lift Station Number 2 of the sewage disposal system located at 125 L~bo.
Metering Voltage: One Location - 240 volts
Transformer Rental: Yes - Two (2) - 3 KVA 7200-120/240 Transformers
Transformer Losses: To be added monthly because of secondary metering - 0.12 KW - 88 KWH.
Said electric power shall be three-phase, sixty cycle, alternating current
at approximately ..~ ..... volts. Company agrees to furnish not exceeding
...~. kilowatts but will furnish any additional amount required by the City if
it has the power available. The point of delivery shali be at the primary or 7200
volt side of the transformers installed at the above described location. Metering
point to be on a pole owned by the City and installed adjacent to the lift station.
THIRD: RATES - The City agrees, to pay the following rates, same being Schedul~
No. 40 of the Company's Electric Tariff A, filed with the Washington Utilities &
Transportation Commission:
Demand Charge -
~1.67 per month per kilowatt, or major portion thereof, of maximum demand.
Energy Charge -
0.66¢ per kilowatt hour for the first 25,000 kilowatt hours used per month.
0.56¢ per kilowatt hour for the next 25,O00 kilowatt hours used per month.
0.46¢ per kilowatt hour for the next 50,000 kilowatt hours used per month.
O.41¢ per kilowatt hour for ali over 100,000 kilowatt hours used per month.
Said rates are subject to change in accordance with the laws of the State of
Washington and whenever a new schedule of rates for the same service is made ef-
fective the City shall thereafter pay the new rates; provided, if the new rates
are higher than those herein fixed, the City shall be entitled to cancel this
contract.
All bills shall be payable within ten days from their date.
FOURTH: MEASUREMENT - Maximum demand, consumption and power factor shall be
measured by commercially accurate maximum demand, watt hour and power factor meters
furnished and installed by Company, suitable space for which shall be furnished by
the City; provided, maximum demand and power factor may at Company's option be
determined either by meters or by check of service.
The maximum demand for any month is understood to bertha average kilowatt demand,
or average ra;e of use measured in kilowatzs, during the l:ifteen minute interval in
which the consumption of electric energy is greater than during any other fifteen
minute interval in the month..
~I~ICIPAL ~TER PUHPING PO!~ER CONTRACT- PAGE 2
FIFTH: USE OF EQUIPHENT - Th~ City agrees to install and maintain in good con-
dition proper equipment for the use of such power and to save the Company harmless
from all liability for any loss or damage caused by such equipment to either party
hereto or to any person whomsoever; not to sell to others any electric power fur-
nished hereunder, nor use or permit others to use any of such power in any other
place or for any other purpose than to operate said plant.
City agrees to notify the Company before making any increase in the connected
)Dad and to operate its electric equipment so as not to impair the general service
rendered by Company to its other customers. If the CityZs use shall impair such
service to other customers, the City will, upon demand, install the proper appa-
ratus to prevent City's power factor from falling below 85 per cent, and Company
shall have the right to discontinue service to tho City until such apparatus is
installed.
The City agrees to use reasonable diligence to protect the Company's property
from injury and Company shall have free access to al) parts of the premises where
its electricity is used, to inspect, repair, remove and replace its property.
SIXTH: SERVICE INTERRUPTIONS Company shall use reasonable diligence to furnish
uninterrupted service but shall ~ot be liable for any interruptions caused by
strikes and/or other labor disputes, accidents or acts of God, or by any cause by-.
yond the control of the Company, or by the necessity for making repairs or changes
in the Company's equipment and facilities, and the City waives and shall not assert
any claims against the Company for damages to the City caused by any suspension,
interruption, failure or curtailment of service by the Company under this agreement
attributable in any manner to national war emergency, including voluntary coopera-
tion by the Company in any method of operation or in any program recommended or
requested by civil or military authorities. No temporary interruption shall cancel
this contract.
SEVEIITH: The Company shall have the right to cancel this contract if any part
of the Company's property used for the rendition of this service is taken by em-
inent domain, or if such service can no longer be rendered by reason of franchise
expiration and the inability of the Company to secure a renewal thereof.
........... ......
Dated
^tt c rY oF
..,, .... .: .......... , ,
Witness: PUGET SOUND POWER & LIGHT COMPANY
/ ...... ~Z~,, VICE PRESIDENT
~850. 15
TRANSFORMER RENTAL CONTRACT
This Agreement Witnesseth:
That PUGET SOUND POWER & LIGHT COMPANY, as Lessor, has rented to
THE CITY OF BREMERTON
as Lessee, upon the terms hereinafter stated, the following electrical equipment, to-w/t:
Two (2) - 3 KVA 7200/120/240 Volt Transformers located
at Sewage Disposal Lift Station No. 2.
1. Said equipment shall be installed by the Lessor upon the said premises o£ the Lessee described in
that certain Mur~cj, p~...W~..t..e.~....~....u~..p..i..n..g ................... Power Contract between the parties hereto effective
..... ..0..c...t..°.b...e..r....7..,...!...9..6...9. .............................. and shall at all times be and remain the property o£ the Lessor and
shall not be removed from said premises without the Lessor's written consent and the Lessee agrees to
use reasonable care to protect said equipment from injury while in its possession.
2. The Lessee agrees to pay to Lessor upon demand the sum of $ None-renewal Contract
to cover costs of installation and further agrees to pay to the Lessor as consideration for the use of said
Regular
equipment the sum of $...3.,.24 ................................................ per month on the...B...i..1...1..i..n..g ......... day of each month.
3. This rental contract shall run for the same time as, and terminate with, the power contract above
mentioned; provided a breach by the Lessee of any of the terms hereof will entitle the Lessor to terminate
this rental contract upon five (5) days' written notice to the Lessee. At the expiration or termination hereof
Lessor may remove its equipment from the premises.
x
19.~...~.~
DATED
this
..... ............. day ........................... ,
CITY OF BREMERTON
PUGET SOUND POWER & LIGHT COMPANY, Lessor
VICE PRESIDENT
NOW, THEREFORE, BE IT RESOLVED by the ............... C01~.S.S~O~ ........................
(Council or CommJscion)
o£ the ............. .C.I...T~.. .............................................. of .................... .B..~..K.~).N ................................ that a
(City or Town)
contract be entered into with Puget Sound Power & Light Company for the furnishing: of
................................................. ~.~C.;..P.~..~.T..~...P.~.!.S...G....P.0.~ .....................................................
upon the terms above proposed, and that the Mayor be and he hereby is authorized
and directed to execute and deliver such contract on behalf and in the name o£ the
................................ CITY ........................................... and the Clerk be and he hereby is authorized
(City or Town)
and directed to attest such contract and to affix thereto the seal o~ the .......... .C.?..~...0.~ .........
........................................ .t}......~.. i~TOI~I ....
(City or To,tw~i)
Duly adopted this ............ 6~....'~ .............. day ..., 19..'.~_
ATTEST:
........ ..............
Page ............ of Resolution