HomeMy WebLinkAbout1442~832o 40 ~ ~-~.
RESOLUTION NO...~/.~..~...~
RESOLUTION AUTHORIZING THE EXECUTION AND DELIVERY
OF A CONTRACT WITH PUGET SOUND POWER &
LIGHT COMPANY FOR FURNISHING
K01tlClPAL t~ATER PUI/PII/O PO~ER
(Service l~trnished)
WHEREAS, PUGET SOUND POWER & LIGHT COMPANY has
oi~ered to furnish for a period of .................................................................... years,
upon the terms set forth in the following proposed form of contract, to-wit:
Page 1 of Resolution Acct. HO. 5480-350.
9763
MUN lC I PAL WATER PUMP I NG POWER CONTRACT
PUGET SOUND POWER & LIGHT COMPANY, here in cal I ed "Company," and the ... ~.~. ......
BItE~RTO~ (Town or City)
of ........................ , a municipal corporation of the State of Washington,
herein called "City," agree as follows:
FIRST: This contract only covers power used in connection with the operation
of water distribution systems.
SECOND: DELIVERY - In consideration of the payments, and subject to the iim-
itations, herein st~l~l,2~e Com~ny agrees for a period of..~.., consecutive
years, beginning ............... , l~ ...... , to reserve for and furnish to the City,
and City agrees during said period to buy exclusively from the Company~ at the
rates herein fixed, ali electric power required to operate the City's water pumping
Park Avenue.
Meterin~ Voltage: One Location - 240 volts
Transformer Rental: Yea - Three (3) 15 KVA 2400-120/240 volt transformers
Transformer Losses: To be added monthly because of secondary meterin$ - 0.90
Said electric power shall be three-phase, sixty cycle, alternating current
..Yd.. kilowatts but will furnish any additional amount required by the City if
it has the power aval]able. The point of delivery shall be at the primary or 2400
volt side of the transformers installed at the above described location.
point to be on a pole owned by the City and installed adjacent to the lift station.
THIRD: RATES - The City agrees, to pay the following rates, same being Schedule
No. 40 of the Company's Electric Tariff A, f~led with the Washington Utilities &
Transportation Commission;
Demand Charge -
, $1.67:permonth per kilowatt, or ma~or portion thereof, of maximum demand.
Energy Charge -
0.66¢ per kilowatt, hour for the first 25,000 kilowatt hours used per month.
0.56¢ per kilowatt hour for the next 25,000 kilowatt hours used per month.
0.46¢ per kilowatt hour for the next 50,000 kilowatt hours used per month.
0.41¢ per kilowatt hour for all over i00,000 kilowatt hours used per month.
Said rates are subject to change in accordance with the laws of the State of
Washington and~whenever a new schedule of rates for the same service is made ef-
fective the...City shall thereafter pay the new rates; provided, if the new rates
are higher,than those herein fixed, the City shall be entitled to cancel this
contract.
All bills shall be payable within ten days from their date.
FOURTH: MEASUREHENT - Haximum demand, consumption and power factor shall be
measured by commercially accurate maximum demand, watt hour and power factor meters
furnished and installed by Company, suitable space for which shall be furnished by
the City;'provided, maximum demand and power factor may at Company's option be
dete.rm'ihed'either by meters or by check of service.
The maximum demand'fo~ any month is understood to be the average kilowatt demand,
or average rate of use measured in kilowatts, during the fifteen minute interval in
which the consumption of electric energy is greater than during any other fifteen
minute interval in the month.
9763
...#832. l~:.
MUNICI~L ~TER PUMPING POI~ER CONTACT - PAGE 2
FIFTH: USE OF E~IPMENT - The City agrees to install and maintain in good con-
dition proper equipment for the use of such power and to save the C~pany harmless
from all liability for any loss or damage caused by such equipment to either party
hereto or to any person whosoever; not to sell to ott~ers any electric power fur-
nished hereunder~ nor use or permit others to use any of such power in any other
place or for any other purpose than to operate said plant.
City agrees to notify the Company before making any increase in the connected
load and to operate its electric equi~ent so as not to impair the general service
rendered by C~pany to its other cust~ers. If the City's use shali~Impair such
service to other customers, the City will, upon d~and, install the proper appa-
ratus to prevent City's power factor from falling below 85 per cent, and Company
shall have the right to discontinue servlce totheCity until such apparatus ls
installed.
The City agrees to use reasonable diligence to protect the C~pany's property
fr~ Injury and Company shall have free access to ail parts of the premises where
its electricity is used, to inspect, repair, remove and replace its property.
SIXTH: SERVICE INTERRUPTIONS _ C~pany shall use reasonable diligence to furnish
uninterrupted service but shall not be liable for any interruptions caused by
strikes and/or other labor disputes~ accidents or acts of God, or by any cause by-
yond the control of the Company, or by the necessity for making repairs or changes
in the Companyls equipment and facilities, and the City waives and shall not assert
any claims against the C~pany for damages to theCity caused by any suspension,
interruption, failure or curtailment of service by the C~pany under this agreement
attributable in any manner to national war ~ergency, including voluntary coopera-
tion by the Company in any method of operation or in any program recommended or
requested by civil or military authorities. No t~porary interruption shall cancel
this contract.
SEVENTH: The C~pany shall have the right to cancel this contract if any part
of the Company's property used for the rendition of this service is taken by em-
inent d~ain, or if such service can no longer be rendered by reason of franchise
expiration and the inability of the Company to secure a renewal thereof.
Dat~ this ................ day of. ~ ..... , .
CZ~ OF ~~0~
Attest: ..........................................
City Clerk Mayor
~ltness: PUGET SOUNO PO~ER & LIGHT C0MPANY
/~8 50. 1 5
TRANSFORMER RENTAL CONTRACT
This Agreement Witnesseth:
That PUGET SOUND POWER & LIGHT COMPANY, as Lessor, has rented to
TitE CITY OP EREHERTON
as Lessee, upon the terms hereinafter stated, the following electrical equipment, to-wit:
Three (3) 15 KVA 2400--120/240 volt transformers Zocated
at Sewage Disposal Lift Station No. 4.
1. Said equipment shall be installed by the Lessor upon the said premises of the Lessee described in
that certain ..... ltun£cip, al,..l~a~;.elcl~lp, tllg ..................Power Contract between the parties hereto effective
$~ptember 24, 1969
........................................................................ and shall at all times be and remain the property of the Lessor and
shall not be removed from said premises without the Lessor's written consent and the Lessee agrees to
use reasonable care to protect said equipment from injury while in its possession.
2. The Lessee agrees to pay to Lessor upon demand the sum of $....N...°..u..e...-.R...e..n...e..~..a..~....c..°...u.~.a..c..~ ..............
to cover costs of installation and further agrees to pay to the Lessor as ~,onsi~eration for the use of said
~egu~ar
equipment the sum of $ ..... ~.0..:..8..3. ........................................... per month on the...B..l..1..~.i...n.$ ......... day of each month.
3. This rental contract shall run for the same time as, and terminate with, the power contract above
mentioned; provided a breach by the Lessee of any of the terms hereof will entitle the Lessor to terminate
this rental contract upon five (5) days' written notice to the Lessee, At the expiration or termination hereof
Lessor may remove its equipment from the premises.
DATED this ..... ~...~. ' ............. day o ......................... , 19..'..~.~
TI~ CITY OF BREHERTON
.................................................................................................... , Lessee
PUGET SOUND POWER & LIGHT COMPANY, Lessor
ON VICE PRESIDENT
~832 40 ~-~ ~
COMMISSION
NOW, THEREFORE, BE IT RESOLVED by the ................................................................
(Council or Commission)
c'r 'l~f BRSHERTON
of the ................................................................... oI ......................................................................... that a
(City or Town)
contract be entered into with Puget Sound Power & Light Company for the furnishing of
NIDIICIPAL IgATER PUI~PING PO~R
upon the terms above proposed, and that the Mayor be and he hereby is authorized
and directed to execute and deliver such contract on behalf and in the name of the
CITY
................................................................................. , and the Clerk be and he hereby is authorized
(City or Town)
and directed to attest such contract and to affix thereto the seal of the ............. C.!...T~.. .............
BREHERTON
(City or Town)
Duly adopted this ....... ................... day of ....
~ Mayor.
/ // / Cl~erk.
Page ............ of Resolution