HomeMy WebLinkAbout1806 ORDINANCE NO. 1808~
AN O~{DIi'(ANCE specifying and adopting a system or plan I'or the making of
certain additions aha improvements to the sewer system of the City of Bremer-
ton, declaring the estimate~ cost thereof as near as may 0e and providing a
method for payment thereof and declaring an emergency.
WHEREAS, the City of Bremerton now owns and operates a sewer system for
the purpose oi' disposing of sewage from the City of Bremerton without aani-
tary treatment thereof; and
WttEREAS, the City of Bremerton b'y an~d through its consulting engineer,
James ~. Carey & Associates of Seattle, ~ashington, have been advised by the
Pollution Control Comm~ission of the State of Washington by letter dated Dec-
~mber 4, 1946 that a sewage pollution survey for the City of Bremerton defin-
itely establishes the degree of pollution of Sinclair Inlet; and
WtD~..REAS, the City of Bremerton after advertising for bids therefor re-
tained the said James W. Carey & Associates as consulting engineers for the
purpose of preparing preliminary engineering plans and stud%es of a proposed
sewage treatment system for the City of Bremerton and have now completed their
studies and made recon~endations; and
~a-EREAS~ the Washington State Development Board pursuant to Chapter 2~
of the Session Laws of 194~, has granted the City of Bremerton the s~a of
~480,6~0.17 to be used for the construction of a sewage treatment plant, to-
gether with pumping stations, interceptor sewer lines and submarine pipe line
and all necessary appurtenances thereof, and pursuant to said chapter of the
City of Bremerton has matched said grant in the sum of ~210,915.01~ making a
total available for said project of .~.~690,888.18; and
Wt{EREAS, the City Council of the City of Bremerton believes it advisable
to proceed at this time with the construction of a portion of the complete
project; now, therefore
THE CITY OF BRE},¢ERTON DOES ORDAIN:
Section 1. T~at the following described plan or system for additions to
and improvements of the existing sewer system of s aid City of Bremerton is
hereby proposed, speciI'ied and adopted, to-wit;
That a sewage treatment plant be constructed on the 1,~anette or East Brem-
erich side of Port Washington Narrows northwesterly from the existing ]¥fanette
Bridge, ~he specifications for which are more particularly set forth in the
plans and drawings of the consulting engineer in the office oi' the City Engin-
eer for the City of Bremerton.
That sewer lines from the east portion off Bremerton proper be collected
at the outfa£1 at the foot of ~ark Avenue an~-~ that a submarine pipe line be
constructed across Port Washington Narrows an¢~ thence northwest to the ~,~anette
sewage treatment plant in order that the flow of sewage so collected may be
pumped across sai~ narrows to the sewage treatment plant.
That an interceptor sewer be so constructed as to collect the flow from
East Bremerton (Nanette) at the south and west shores of Port Washington Nar-
rows and thence pumped or allowed to flow by gravity to t2~e ~anette sewage
treatment plant. Saim treatment plant is so mesigned as ~o provide for primary
treatment and shall consist generally of a grit chamber to remove sand, stones
and other heavy matter detrimental to the proper operation oI' theplant. Fol-
lowing the grit cham0er there shall be a combination bar screen an~ commin-
utor to shred ~the ~olids into I°ine material. The raw sewage will then go to
the settling tanks or clarifiers where solids will settle on the bottom o~~ the
tank and will then be automatically collected by means oi' scrapers into hop-
pers located on the ends of set~ling tanks~ and at proper intervals solids will
be automatically pumped into digest tanks. Solids will remain in the ~igest
tanks for approximately three months and at approximate intervals oi' three
months the sludge will be drawn off and either ~ried on b~ds or d~muped into
the effluent of the sewage treatment plant. After the solids have been removed
from the raw sewage, the liquid will be chlorinate~ and emptied into the out-
fall.
Section B. That the estimated cost oi~ constructing said ~ane~te sewage
treatment plant and ~he necessary pu~ping stations, outfalls, submarine line
and interceptor sewer lines is hereby fixed as near as may be in the sum of
$780~000.00. Of said amount, ~19,910.~, consisting of the ~rant from the
State Development Board and matching funds oI' dae City of Bremerton as herein-
above described, is available for payment of a portion oz° the cost oi' construc-
tion and ~he balance shall be provided by the City of Bremerton fzom other
funds available for such purpose, provided, however, that no general indebted-
ness shall be incurred by the City of Bremerton in the acquiring, construction,
maintenance or operation of such sewer system or sewage treatment plant.
Ordinance No. 1806 (Con't)
Section 3. The passage of this ordinance shall be without prejudice to
the right of due City Council or other Corporate authority to provide at a
later date for the construction of further additions, extensions or better-
ments/~c~ ........ , shall be considered as a part of and belonging to the water
works utility oi' the City of Bremerton and that the cost of construction there-
of and the maintenance and operation thereof may be ctmrgeable to the water
works utility oi' such city.
Section 4. This ordinance is necessary for the preservation of the pub-
lic health and sal'ety of the City of Bremerton and shall take effect immed-
iately upon passage,.~; ~ :
PASSED unanimously by the by the City Council of the City of Bremerton,
signed by the Nayor and attested by the City Clerk in authentication of such
passage this 29th day oZ' September, 19~8.
ATTEST: ~ayor
S~,~te of ¥/~ Zt':m ]