Loading...
HomeMy WebLinkAbout3171 O DINANCE NO. /7/ AN ORDINANCE adopting the Uniform Mechanical Code, 1973 Edition, and amending Section 304 thereof regarding fees. THE CITY OF BREMERTON DOES ORDAIN: SECTION 1. The Uniform Mechanical Code, 1~73 Edition, is hereby adopted by the City Council of the City of Bremerton and incorporated herein by reference as if fully set forth. SECTION 2. Section 304 of Chapter 1, Part I of the Uniform Mechanical Code, 1973 Edition, is hereby amended to read as follows: 1. For the issuance of each permit $ 1.00 2. For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 B.t.u's 4.00 3. For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance over 100,000 B.t.u's 5.00 4. For the installation or relocation of each floor furnace 4.00 5. For the installation or relocation of each suspended heater, recessed wall heater or floor mounted unit heater 4.00 6. For the installation, relocation or replace- ment of each appliance vent installed and not included in an appliance permit 2.00~. 7. For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling absorption, or evaporative cooling system, including installation of controls regulated by this code 4.00 8. For the installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 B.t.u's. 4.00 9. For the installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 B.t.u's to and including 500,000 B.t.u's 7.50 10. For the installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 B.t.u's to and including 1,000,000 B.t.u's 10.00 1 11. For the installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 B.t.u's to and including 1,750,000 B.t.u's 15.00 12. For the installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 B.t.u's 25.00 13. For each air handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto. Note: This fee shall not apply to an air handling unit which is a portion of a factory assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere 3.00 in this Code. 14. For each air handling unit over 10,000 cubic feet per minute 5.00 15. For each evaporative cooler other than portable type 3.00 16. For each ventilation fan connected to a single duct 2.00 17. For each ventilation system which is not a portion of any heating or air conditioning system authorized by a permit 3.00 18. For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood 3.00 19. For the installation or relocation of each domestic type incinerator 5.00 20. For the installation or relocation of each commercial or industrial type incinerator 20.00 21. For each appliance or piece of equipment regulated by this Code but not classed in other appliance categories, or for which no other fee is listed in this Code 3.00 APPROVED by the City Council on the first reading this /~day of October, 1974. PASSED by the City Council of the City of Bremerton, signed by the Mayor and attested by the City Clerk in authentication of such passage this j~ day of , 1974 _ O ct~ber~~ ATTEST~ ~ 3. C~ty Clerk