HomeMy WebLinkAbout2563 ORDINANCE NO. , .~, .~ ~
AN ORDINANCE providing for the appropriation of funds for
which insufficient appropriations were made ~ the 1963
budget and declaring an emergency.
THE CITY OF Br~E~IERTON DOEB ORDAIN:
Section 1. That the appropriation in the 1963 budget for Arterial
Street construction, as added to by an emergency appropriation under Ord-
inance No. 25~, is insufficient to pay the costs of work being accom-
plished and planned for the remainder of the year on the llth Street Pro-
ject, and that an additional appropriation of ~20~000.00 will be required.
S. ep.t.i, qn 2.. There is hereby appropriated to the 1963 Arterial
Street Fund b~dget the sum of $20,000.00.
S.e.c.t.i. on 3' In order to provide re~:ired matching funds, there
is hereby appropriated in the City Street Fund the sum of $5,000.00 for ~
transfer to the Arterial Street Fund as city matching.
Section I~. That an emergency exists and is hereby declared to
exist and the foregoing appropriations are made for the present preser-
vation of the public peace, health, safety and welfare of the City of
Bremerton and are necessary to carry on and expedite the construction
of the llth Street project~ and this ordinance shallbe in effect im~2d-
lately following passage and publication.
APPROVED on first reading this 2~h day of September, 1963.
PASSED unanimously by the City Council of the City of Bremerton~
signed by the Mayor and. attested by the City Clerk in authentication of
such passage this 2nd day of October, 1963.
H.- O; DOI~STAD,- MA'~OR
ATTWST:
E. H. T'. McGOWAN~ ~C~TY CLERK
STATE OF ¥~ASHINGTON :
: SS
CO~INTY OF KITSAP :
FReD S. SCHO~, being first duly sworn upon oath, deposes and
·
says: that he is the duly elected, 'qualified and acting Commissioner of
~blic Works and Utilities for the City of Bremerton. That prior to the
adoption of the 1963 budget it had been determined that the l!th Street
project, in several staEes, would require approxi~tely four ~ars to
complete. .~fter the adoption of the budget and considerable more plan-
ning and engineering it was determined that if the unit was completed
as a single project that there would be considerable saving of money to
the Cdty and convenience to the public. That an emergency appropriation,
in addition to the emergency appropriation made ~ Ordinance No. 2554~ is
necessary to accomplish this savir~g and convenience to the public, vd~ich
could not have been reasonably foreseen at the time of the adoption of
the budget.
~ S. SCHDNEM~N, Commissioner of
Public Works and Utilities
SUBSCRYB~D AND ~¥ORN TO before me this 25th day of September,
1963. ~i,
N6ta~-~?~b!ic ~n rand ~r %he State
of Washington, residing at Bremerton