Loading...
HomeMy WebLinkAbout3671 E/LED FOR REGORD ORDINANCE NO, 3671 PIONEER NAT'L. TITLE INS. CB. APR Z2 1982 ~8:0Q AN ORDINANCE the and amending use area maps of Ordinance No, 1792 - ~exton) 8HERRiL HUFF KITSAR COUN~ AUDI~R THE CITY OF BREMERTON DOES ORDAIN: D£~ ~ ~ __ <SECT'ION 1: That the use and area maps of Ordinance No. 1792 be and~hereB~' are amended in conformity with Title IV, Chapter I thereof as follows: The North 50 feet of Lot 2 and the South 42 feet of Lot 3 of Bayview Addition to Bremerton, situate in Kitsap County.. be and the same hereby is reclassified from Commercial (C) and Residential-Two ~R~2~ to Business~-Two (~B~2) subject to the follow- ing conditions': 1. This rezone is sUbject to the various requirements contained in the Bremerton Area Plan, the Bremerton Zoning Ordinance, the Uniform Building Code and other applicable laws and regulations. It is the responsibility of the developer ~o assure compliance with the applicable provisions contained therein. 2. The site shall be developed essentially the same as the site plan labeled "Exhibit B" except as modified to meet conditions of approval listed herein. 3. Any changes, revisions or additions which constitute a significant departure from the approved site plan shall require approval of the Planning Commission, subject to appear to the City Council within ten ~0) days. 4, GENERAL: a. Occupancy of the building shall be limited to lower traffic generating office uses; medical and dental uses may be allowed if adequate parking is provided per city ordinance. b. Approval of the subject zone reclassification is con- tingent upon approval of all Shoreline Management permits and a change in the Shoreline designation from Urban Residential to Urban Commercial which requires State approval. 5. Prior to the issuance of any grading permits the developer shall: a. Submit a soil or geologic analysis by a licensed soils engineer. b. Provide plans indicating compliance with Engineering Department standards for erosion controll. 6. Prior to the issuance of any building permits the developer shall submit and obtain approval of responsible City de- partments for a site plan which includes: a. Compliance with the Shoreline Management Master Program b. Compliance with all fire codes and ordinances. c. Sanitary sewer service hookup in accordance with Engineering Department requirements. d. Installation of a storm water drainage system to the Port Washington Narrows in accordance with Engineering Department requirements. 8204120056 e. Plans for erosion control, storm water detention and controlled outflow which meet Engineering Department require- ments. f. On-site parking relocated outside the front yard setback per Zoning Ordinance requirements. g. Indication that adequate bicycle parking shall be provided for customers and employees of the development. h. Indication that the final architectural design maintains a residential character through use of features which tend to mini- mize the. Scale of the building, subject to Planning Department approval~ i. Signing which_ is limited to one ground mounted sign not to exceed 23 square feet and five feet in height. Sign lighting must be from a source other than the sign face, must be directed solely at the sign face and may not illuminate any adjacent use. j. Detail for site lighting which does not flood light any building face and which indicates that parking area lighting is low intensity and does not exceed six feet in height. k.~ Landscaping as follows: 1. Along street frontage; an area no less than 10 feet in width planted with evergreen and deciduous shrubs and ground cover, planted so that the ground will be covered within three years. 2. In front yard setback and outside of the side yard setbacks (~n order not to screen water views) evergreen and deciduous trees, a-minimum of 12' high, planted at intervals no greater than 20' on center. L. Prior to issuance of an occupancy permit the developer shall: 1. Repair or replace the existing sidewalk, curb and gutter fronting the subject property along Highland Avenue subject to Engineering Department approval. 2, Grant a public access easement along the face of the slope and over the tidelands of the subject property. 3. Show compliance with. all above listed conditions of approval~ APPROVED by the City Council on the first reading this 22nd day of December, 1981. PASSED by the City Council of the City of Bremerton, signed by the Mayor and attested by the City Clerk in authentica- tion of such passage this 2~th day of December, 1981. ATTEST: K~THLEEN~ L"." ~4ANDIOi'- City' Cl~rk R[[L249 1459 8204120055