Loading...
HomeMy WebLinkAbout3809 ORDINANCE NO. ~%0 % AN ORDINANCE amending Ordinance No. 3634, § 1 and § 2, relating to rates and charges for sanitary sewer service. THE CITY COUNCIL OF THE CITY OF BREMERTON DOES HEREBY ORDAIN: Sections 1 & 2 of Ordinance No. 3634 shall be amended to read as follows: 15.04.550 RATES AND CHARGES. (a) The rates to be charged for sanitary sewer service shall be as hereinafter provided, and shall be adequate to provide for the costs of bond redemption, bond interest charge, maintenance and operation of the city sewer system, and replacement and extensions to the system. (b) Sewer Service Charges. (1) Sewer service charges are payable from the date the property is connected to the sewer. (2) Sewer service charges will be levied, when possible, on the basis of water metered to the premises. The minimum monthly sewer service charge shall be as follows Tap Size Cubic Feet Metered Minimum Monthly Sewer Service Charge 5/8 & 3/4 inch 500.00 3.85 1 inch 888.89 6.84 1 1/2 inch 2,000.00 15.40 2 inch 3,555.56 27.38 , 3 inch 8,000.00 61.60 4 inch 14,222.22 109.52 6 inch 32,000.00 246.40 8 inch 56,888.89 438.04 10 inch 88,888.89 684.44 12 inch 128,000.00 985.60 In addition to the minimum monthly sewer service charge, a charge of .008 cents per cubic foot shall be made for water metered in excess of the amount specified above. (3) The mayor may establish a ceiling on sewer service charges to commercial premises when the user substantiates to the satisfaction of the mayor that a significant portion of the water metered to the premises is not returned to the sewer system. (4) Sewer service charges, which billings are produced during June through November, shall not exceed the charge based on the largest bimonthly consumption of water during the immediately preceding period from December to May. (5) Those premises served by the Bremerton sewer system, but not served by the Bremerton water system, shall pay a monthly sewer service charge as follows: City residents ................... $4.00 per month County residents ................ $6.00 per month (c) Connection charges will be determined by the city engineer on the basis of the following: (1) Class A Connections. a. Single family dwellings - Two hundred seventy-five dollars per lateral service connection including inspection and permit fees; b. Multiple family dwellings - Twenty-five dollars per residential unit but not less than two hundred seventy-five dollars per lateral service connection including inspection and permit fees; c. Commercial buildings - $.025 per square foot of floor space but not less than two hundred seventy-five dollars per lateral service connection including inspection and permit fees; d. Unoccupied property - No charges. (2) Class B Connctions. a. Single family dwellings - Seven dollars per construction front foot of property fronting on the sewer line but not less than two hundred seventy-five dollars per lateral service connection to the property; b. Multiple family dwellings - Seven dollars per construction front foot of property fronting on the sewer line or twenty-five dollars per residential unit whichever is greater but not less than two hundred seventy-five dollars per lateral service connection to the property; c. Commercial buildings - Seven dollars per construction front foot of property fronting on the sewer line or $.025 per square foot of floor space, whichever is greater, but not less than two hundred seventy-five dollars per lateral service connection to the property; d. Unoccupied property - at the time that structures requiring sanitary sewer service are constructed on unoccupied property, the construction charge which is in addition to the late connection charge will be determined as provided in subparagraph a, b or c above. (3) Class C Connections. a. Single family dwellings - Eighteen dollars per waterfront construction front foot but not less than nine hundred dollars for the first lateral connection and two hundred seventy-five dollars for each additional lateral connection to the property; b. Multiple family dwellings - Eighteen dollars per waterfront construction front foot or fifty dollars per residential unit, whichever is greater, but not less than nine hundred dollars for the first lateral connection and two hundred seventy-five dollars for each additional lateral connection to the property; c. Commercial buildings - Eighteen dollars per waterfront construction front foot or five cents per square foot of floor space, whichever is greater, but not less than nine hundred dollars for the first lateral connection and two hundred seventy-five dollars for each additional lateral connection to the property; d. Unoccupied property - At the time that structures requiring sanitary sewer service are constructed on unoccupied property, the construction charge which is in addition to the late connection charge will be determined as provided in subparagraph a, b or c above. (4) Other Connection Charges. The connection charge for those sewer facilities that are not constructed by a local improvement district and not constructed by a private party as an extended service shall be established by special ordinance covering said facilities. (5) Connection charges shall be adjusted on January 1st of each year based on the Consumer Price Index for November of the year preceding for all items as reported in "Economic Indicators" prepared by the Council of Economic Advisers. The CPI for the rates herein published is 137.6 based on the report for November 1973. (d) Construction Charges. (1) Construction charges are payable from the date that sewer service is made available to occupied property, but no later than the date the sewer installation serving the property is complete and accepted by the city. (2) Construction charges for those sewer facilities not constructed by a private party as an extended service shall be established by a special ordinance covering said facilities. Starting and ending dates for the construction charges will be specified in the special ordinance. (3) Rates. a. Class A. sewer line connections, no charge; b. Sewer line connections made subsequent to the passage of the ordinance codified in this subsection to residential buildings with a total floor area of more than one thousand five hundred square feet are to be assessed a construction charge of three hundred dollars per residential unit contained in the building or three hundred dollars per one thousand five hundred square feet of floor area in the building, whichever amount is less; c. Class B and C sewer line connections other than those covered by subdivision (3)(b) of this subsection are to be assessed a construction charge of three hundred dollars; d. The construction charge for buildings outside the corporate limits of the city shall be one hundred fifty percent of the charges set out in this subsection; e. Any person who is presently paying a construction charge of three dollars per month shall have an amount equal to fifty percent of the total construction charge paid prior to the ordinance codified in this subsection credited to the three hundred dollar charge set out by this subsection. The balance of the three hundred dollars may be paid in a lump sum or may be paid by continuing three-dollar monthly payments, of which fifty percent of each payment is to be applied to the construction charge, such payments to continue then until the sum of three hundred dollars is paid in full. (e) Other charges. (1) Occupied properties that connect a sewer less than sixty days after its completion and acceptance by the city shall be charged, in addition to connection charges, any additional costs of street restoration, but are not required to pay an inspection fee. (2) Unoccupied properties that connect a sewer more than sixty days after its completion and acceptance by the city shall be charged, in addition to connection charges, the costs of street restoration, a twenty-five-dollar inspection fee and a late charge of ten dollars per quarter not to exceed forty quarters. For purposes of this paragraph, quarters begin on the first day of January, April, July and October, and end on the last day of March, June, September and December. APPROVED by the City Council on the first reading this ~--~/ day of ~4_~.~~-~~' , 1982. PASSED by the City Council of the City of Bremerton, signed by the Mayor and attested to.~y the City Clerk in authentication of such passage this~dg~ of December, 1982. GENE NELSON~ Mayor - ATTEST: KATHLEEN L. MANDIO City Clerk 4