Loading...
HomeMy WebLinkAbout3824 ORDINANCE NO. ~ ~ AN ORDINANCE establishing rates and charges for sanitary sewer service and repealing Ordinance 3809. THE CITY OF BREMERTON DOES HEREBY ORDAIN: SECTION 1. RATES AND CHARGES FOR SANITARY SEWER SERVICE. A. The charges and rates for sanitary sewer service shall be as hereafter provided, and shall be adequate to provide for the costs of bond redemption, bond interest charges, construction of new facilities, and maintenance and operation of the city sewer system. B. Sewer service charges are payable from the date the property is connected to the sewer. C. Sewer service charges will be levied on the basis of water metered to or wastewater metered from the premises. D. Each sewer bill shall consist of: 1.OPERATION AND MAINTENANCE CHARGES AND RATES. a. The minimum monthly charge for operation and maintenance shall be as follows: CUSTOMER CLASS MINIMUM CHARGE Single family 1.62/Account Multi-family 0.53/Account plus 1.09/Res.unit. Commercial 1 0.53/Account Commercial 2 0.53/Account PSNS Rate defined in service contract Jackson Park Rate defined in service contract East Park Rate defined in service contract KCSD#i Rate defined in service contract The minimum monthly charge for residential customers includes 200 cubic feet of wastewater per residential unit. b. The volumetric rate for operation and maintenance shall be as follows: CUSTOMER CLASS SEWER RATE Single family 0.54/HCF Multi-family 0.54/HCF Commercial 1 0.54/HCF Commercial 2 0.85/HCF PSNS Rate defined in service contract Jackson Park Rate defined in service contract East Park Rate defined in service contract KCSDgl Rate defined in service contract For residential customers the volumetric rate shall be applied to metered water in excess of 200 cubic feet per month per residential unit. In addition, the monthly residential charges, during June through November, shall not exceed the maximum monthly charge for the preceding December through May. 2. CAPITAL CHARGES AND RATES. a. The fixed monthly charge for capital costs shall be as follows: CUSTOMER CLASS MONTHLY CHARGE Single family 3.88/account Multi-family 3.88/Res/unit Commercial 1 3.88/account Commercial 2 6.12/account Minimum monthly charges shall include 200 cubic feet per month per account or residential unit as applicable. The fixed capital charge for customers outside the corporate limits of the city and KCSD#I shall be 1.15 times the corresponding charges shown above. b. The volumetric rates for capital cost shall be as follows: CUSTOMER CLASS SEWER RATE Single family 1.94/HCF Multi-family 1.94/HCF Commercial 1 1.94/HCF Commercial 2 3.06/HCF Volumetric rates shall be applied to metered water in excess of 200 cubic feet per month per account or residential unit as applicable. The volumetric rates for customers outside the corporate limits of the city and KCSD#I shall be 1.15 times the applicable rate shown above. SECTION 2. CONNECTION CHARGES. A. Connection charges shall be as follows: 1) Class A connections (sewers prior to 1/1/68) a. Single family dwellings - Five hundred eighty-six ($586.00) dollars per lateral service connection including inspection and permit fees; b. Multiple family dwellings - Fifty-two ($52.00) dollars per residential unit but not less than Five hundred eighty-six dollars ($586.00) per lateral service connection including inspection and permit fees; c. Commercial buildings - $.052 per square foot of floor space but not less than Five 2 hundred eighty-six dollars ($586.00) per lateral service connection including inspection and permit fees; d. Unoccupied property - No charges. 2) Class B connections (Sewers after 12/31/67 ) a. Single family dwellings - Fourteen dollars and ninety-four cents ($14.94) per construction front foot of property fronting on the sewer line but not less than five hundred eighty-six dollars ($586.00) per lateral service connection to the property; b. Multiple family dwellings - Fourteen dollars and ninety-four cents ($14.94) per construction front foot of property fronting on the sewer line or Fifty-two dollars ($52.00) per residential unit, whichever is greater, but not less than Five hundred eighty-six dollars ($586.00) per lateral service connection to the property; c. Commercial buildings - Fourteen dollars and ninety-four cents ($14.94) per construction front foot of property fronting on the sewer line or $.052 per square foot of floor space, whichever is greater, but not less than Five hundred eighty-six dollars ($586.00) per lateral service connection to the property; d. Unoccupied property - at the time that structures requiring sanitary sewer service are constructed on unoccupied property, the construction charge which is in addition to the late connection charge will be determined as provided in subparagraph a, b or c above. 3) Class C Connections (Waterfront sewers after 12/31/67) a. Single family dwellings - Thirty-eight dollars and forty cents ($38.40) per waterfront construction front foot but not less than One thousand nine hundred twenty dollars ($1,920.00) for the first lateral connection and Five hundred eighty-six dollars ($586.00) for each additional lateral connection to the property; b. Multiple family dwellings - Thirty-eight dollars and forty cents ($38.40) per waterfront construction front foot or One hundred six dollars and seventy cents ($106.70) per residential unit, whichever is greater, but not less than One thousand nine hundred twenty dollars ($1,920.00) for the first lateral connection and Five hundred eighty-six dollars ($586.00) for each additional lateral connection to the property; c. Commercial buildings - Thirty-eight dollars and forty cents ($38.40) per waterfront construction front foot or $.107 cents per square foot of floor space, whichever is greater, but not less than One 3 thousand nine hundred twenty dollars ($1,920.00) for the first lateral connection and Five hundred eighty-six dollars ($586.00) for each additional lateral connection to the property; d. Unoccupied property - At the time that structures requiring sanitary sewer service are constructed on unoccupied property, the construction charge which is in addition to the late connection charge will be determined as provided in subparagraph a, b or c above. 4) Other Connection Charges. The connection charge for those sewer facilities that are not constructed by a local improvement district and not constructed by a private party as an extended service shall be established by special ordinance covering said facilities. 5) Connection charges shall be adjusted on January 1st of each year based on the Consumer Price Index for November of the year preceding for all items as reported in "Economic Indicators" prepared by the Council of Economic Advisers. The CPI for the rates herein published is 293.6 based on the report for November 1982. SECTION 3. CONSTRUCTION CHARGES. A. Construction charges shall be as follows: 1) Construction charges are payable from the date that sewer service is made available to occupied property, but no later than the date the sewer installation serving the property is complete and accepted by the city. 2) Construction charges for those sewer facilities not constructed by a private party as an extended service shall be estalished by a special ordinance covering said facilities. Starting and ending dates for the construction charges will be specified in the special ordinance. 3) Rates: a) Class A. sewer line connections, no charge; b) Sewer line connections to residential buildings with a total floor area of more than one thousand five hundred square feet are to be assessed a construction charge of three hundred dollars per residential unit contained in the building or three hundred dollars per one thousand five hundred square feet of floor area in the building, whichever amount is less; c) Class B and C sewer line connections other than those covered by subdivision (3) (b) of this subsection are to be assessed a construction charge of three hundred dollars; d) The construction charge for buildings outside the corporate limits of the city shall be one hundred fifty percent of the charges set out in this subsection; e) Any person who is presently paying a construction charge of Three dollars ($3.00) per month shall have an amount equal to fifty percent of the total construction charge paid prior to the ordinance codified in this subsection credited to the Three hundred dollar charge set out by this subsection. The balance of the Three hundred dollars may be paid in a lump sum or may be paid by continuing Three dollar monthly payments, of which fifty percent of each payment is to be applied to the construction charge, such payments to continue then until the sum of Three hundred dollars is paid in full. SECTION 4. OTHER CHARGES. A. Occupied properties that connect a sewer less than sixty days after its completion and acceptance by the city shall be charged, in addition to connection charges, any additional costs of street restoration, but are not required to pay an inspection fee. B. Unoccupied properties that connect a sewer more than sixty days after its completion and acceptance by the city shall be charged, in addition to connection charges, the costs of street restoration, a twenty-five-dollar inspection fee and a late charge of ten dollars per quarter not to exceed forty quarters. For purposes of this paragraph, quarters begin on the first day of January, April, July and October, and end on the last day of March, June, September and December. SECTION 5. REPEAL OF EXISTING RATE ORDINANCE. Ordinance 3809 is hereby repealed. APPROVED by the City Council on the first reading this ~ day of March, 1983. PASSED by the City Council of the City of Bremerton, Washington, signed by the Mayor and attested by the City Clerk in authentication of such passage this ~ day of March, 1983. MORRIE DAWKINS Mayor ATTEST: KATHLEEN L. McCLUSKEY City Clerk 5