HomeMy WebLinkAbout4147 CITY OF BREMERTON, WASHINGTON ~[~%~)')
ORDINANCE NO. ~1~
AN ORDINANCE of the City of Bremerton,
Washington, relating to the combined water and
sewerage system of the City and amending Ordinance
No. 3887, as amended.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
BREMERTON, WASHINGTON, that Section 1 of Ordinance No. 3887, as
amended by Ordinances Nos. 3948, 4015 and 4053, is further
amended to read as follows:
Section 1. It is found and declared that the
public health, welfare, safety and convenience
require and it is in the best interest of the inhabi-
tants of the City that certain water system improve-
ments be undertaken within the City, and the City,
therefore, specifies and adopts a system or plan for
the acquisition and construction of additions and
betterments to and extensions of the combined water
and sewerage system of the City to consist of the
acquisition, construction and installation of the
improvements described in Exhibit A, attached hereto
and by this reference made a part hereof.
There shall be included in the foregoing all
necessary tees, wyes, valves, pumps, couplings,
connections, machinery, equipment and appurtenances,
together with all work as may be incidental to and
necessary to the foregoing acquisition, construction
and installation.
The City shall acquire all property, both real
and personal, or any interest therein, equipment,
rights-of-way, easements and franchises necessary to
carry out such plans, which are all as more particu-
larly set forth in reports, maps, plans and specifi-
cations prepared by the City Engineer and the
consulting engineers of the City.
The City may add or make such changes in the
details of such plans, either prior to or during the
course of actual construction, which may be found
necessary and desirable as long as such changes do
not substantially affect or change the main general
parts of such plans or the services to be rendered
thereby.
Exhibit A of Ordinance No. 3887, as amended by Ordinances Nos.
3948, 4015 and 4053, is amended to read as does Exhibit A of
this ordinance.
ADOPTED by the City Council of the City of Bremerton,
Washington, at a regular open public meeting thereof on the ~
day of February, 1988.
PASSED by the City Council of the City of Bremerton,
Washington, at a regular open public meeting thereof on the ~/--
day of N~rch, 1988.
ATTEST:
KATHhEER h. McCBUSKEY, City Olerk
Director of Administrative Services
PREPARED BY:
Roberts & Shefelman
ORDI~ND. 4147
PL]BLISH: 3/7/88
-- 2 --
Bremerton Municipal Utility
CAPITAL IMPROVEMENT PROGRAM 1988-1992
The Bremerton Municipal Utility's Five-year
Comprehensive Plan, adopted by City Council on
December 12, 1982, recommends that a Capital Improvement
Program be established for the scheduled replacement of
major water transmission mains which originate at the Union
River supply system and are the main sources of supply to
the City of Bremerton.
The Comprehensive Plan, as adopted, and made a
part hereof by reference, calls for the replacement of the
cited transmission mains due to their excessive age and
condition, which have been cause for service failure on
numerous oceaions. Further, scheduled highway system
improvements by the Washington State Department of
Transportation (SDOT) within the Sinclair Inlet vicinity
mandate that the Bremerton Water Utility relocate and
replace the existing aged water mains within the affected
project area.
Additionally, per the Wastewater Improvement
Program, the Bremerton Municipal Utility proposes to provide
for needed system improvements regarding major wastewater
transmission mains and pump stations.
THEREFORE, the City of Bremerton Municipal Utility
proposes to make the following improvements, as scheduled
below, to be in compliance with the recommendations of the
Utility Improvement Programs, as well as the mandated
requirements of the SDOT.
1988-1992 PROGRAM
A. Installation of new transmission and supply
water mains commencing at the intersection of
Charleston Beach Road and Oyster Bay Avenue
and proceeding northerly to a point one
hundred twenty (120) feet north oI the
intersection of Oyster Bay Avenue and "H"
Street. The overall project consists of the
installation of approximately five thousand
and three hundred (5,300) lineal feet of new
water mains at an approximate total cost of
Five Hundred Thousand Dollars ($500,000.00).
B. Replacement of the forty-year old steel
transmission main commencing at Gorst Creek
Pump Station and proceeding easterly to the
intersection of the Old Belfair Valley Road
and State Route 3. This overall project
consists of the installation of approximately
three thousand (3,000) lineal feet of new
water main at an approximate total cost of
Four Hundred Thousand Dollars ($400,000.00).
C. Replacement of the forty-year old cast iron
transmission main commencing approximately two
hundred feet (200'1 north of the intersection
of the Old Belfair Valley Road and State Route
3 to approximately four hundred feet (400')
east of the intersection of State Route 3 and
State Route 304. This overall project
consists of the installation of approximately
twelve thousand and six huDdred lineal feet
(12,600 1.f.) of new water main at an
approximate total cost of Six Hundred and
Fifty Thousand Dollars ($650,000.00).
D. Extension of an existing major transmission
main from llth Street and Montgomery Avenue to
15th Street and Montgomery Avenue for system
improvement. This overall project conoists of
the installation of one thousand and five
hundred ~1,500) lineal feet of new water main
at an approximate total cost of One Hundred
Seventy-Five Thousand Dollars ($175,000).
E. Provide for necessary improvements to the
Central Bremerton wastewater system. The
Central Bremerton Wastewater Improvements
Project includes wastewater improvements to
serve the Central Bremerton area which
consists of the downtown central business
district and the Central Bremerton residential
area. The project will include construction
of a new pump station CE-6; a new pump atation
CE-4; approximately 900 lineal feet of gravity
sewers; and approximately 5300 lineal feet of
pressure sewers. Project costs are estimated
to be approximately $4.5 million including
engineering~ administration~ and construction.
F. Develop a sludge management program consisting
of a long-term program for disposal/reuse of
sludge from the City's wastewater treatment
plant. The project will involve evaluation of
sludge treatment and disposal/reuse options
{including dewatering, composting, and land
application), design of treatment and
disposal/reuse facilities, and construction of
such facilities. Project costs are estimated
to be approximately $4 million and include
engineering, construction, administration, and
any required land purchase costs.