HomeMy WebLinkAbout4147 CITY OF BREMERTON, WASHINGTON ~[~%~)') ORDINANCE NO. ~1~ AN ORDINANCE of the City of Bremerton, Washington, relating to the combined water and sewerage system of the City and amending Ordinance No. 3887, as amended. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, that Section 1 of Ordinance No. 3887, as amended by Ordinances Nos. 3948, 4015 and 4053, is further amended to read as follows: Section 1. It is found and declared that the public health, welfare, safety and convenience require and it is in the best interest of the inhabi- tants of the City that certain water system improve- ments be undertaken within the City, and the City, therefore, specifies and adopts a system or plan for the acquisition and construction of additions and betterments to and extensions of the combined water and sewerage system of the City to consist of the acquisition, construction and installation of the improvements described in Exhibit A, attached hereto and by this reference made a part hereof. There shall be included in the foregoing all necessary tees, wyes, valves, pumps, couplings, connections, machinery, equipment and appurtenances, together with all work as may be incidental to and necessary to the foregoing acquisition, construction and installation. The City shall acquire all property, both real and personal, or any interest therein, equipment, rights-of-way, easements and franchises necessary to carry out such plans, which are all as more particu- larly set forth in reports, maps, plans and specifi- cations prepared by the City Engineer and the consulting engineers of the City. The City may add or make such changes in the details of such plans, either prior to or during the course of actual construction, which may be found necessary and desirable as long as such changes do not substantially affect or change the main general parts of such plans or the services to be rendered thereby. Exhibit A of Ordinance No. 3887, as amended by Ordinances Nos. 3948, 4015 and 4053, is amended to read as does Exhibit A of this ordinance. ADOPTED by the City Council of the City of Bremerton, Washington, at a regular open public meeting thereof on the ~ day of February, 1988. PASSED by the City Council of the City of Bremerton, Washington, at a regular open public meeting thereof on the ~/-- day of N~rch, 1988. ATTEST: KATHhEER h. McCBUSKEY, City Olerk Director of Administrative Services PREPARED BY: Roberts & Shefelman ORDI~ND. 4147 PL]BLISH: 3/7/88 -- 2 -- Bremerton Municipal Utility CAPITAL IMPROVEMENT PROGRAM 1988-1992 The Bremerton Municipal Utility's Five-year Comprehensive Plan, adopted by City Council on December 12, 1982, recommends that a Capital Improvement Program be established for the scheduled replacement of major water transmission mains which originate at the Union River supply system and are the main sources of supply to the City of Bremerton. The Comprehensive Plan, as adopted, and made a part hereof by reference, calls for the replacement of the cited transmission mains due to their excessive age and condition, which have been cause for service failure on numerous oceaions. Further, scheduled highway system improvements by the Washington State Department of Transportation (SDOT) within the Sinclair Inlet vicinity mandate that the Bremerton Water Utility relocate and replace the existing aged water mains within the affected project area. Additionally, per the Wastewater Improvement Program, the Bremerton Municipal Utility proposes to provide for needed system improvements regarding major wastewater transmission mains and pump stations. THEREFORE, the City of Bremerton Municipal Utility proposes to make the following improvements, as scheduled below, to be in compliance with the recommendations of the Utility Improvement Programs, as well as the mandated requirements of the SDOT. 1988-1992 PROGRAM A. Installation of new transmission and supply water mains commencing at the intersection of Charleston Beach Road and Oyster Bay Avenue and proceeding northerly to a point one hundred twenty (120) feet north oI the intersection of Oyster Bay Avenue and "H" Street. The overall project consists of the installation of approximately five thousand and three hundred (5,300) lineal feet of new water mains at an approximate total cost of Five Hundred Thousand Dollars ($500,000.00). B. Replacement of the forty-year old steel transmission main commencing at Gorst Creek Pump Station and proceeding easterly to the intersection of the Old Belfair Valley Road and State Route 3. This overall project consists of the installation of approximately three thousand (3,000) lineal feet of new water main at an approximate total cost of Four Hundred Thousand Dollars ($400,000.00). C. Replacement of the forty-year old cast iron transmission main commencing approximately two hundred feet (200'1 north of the intersection of the Old Belfair Valley Road and State Route 3 to approximately four hundred feet (400') east of the intersection of State Route 3 and State Route 304. This overall project consists of the installation of approximately twelve thousand and six huDdred lineal feet (12,600 1.f.) of new water main at an approximate total cost of Six Hundred and Fifty Thousand Dollars ($650,000.00). D. Extension of an existing major transmission main from llth Street and Montgomery Avenue to 15th Street and Montgomery Avenue for system improvement. This overall project conoists of the installation of one thousand and five hundred ~1,500) lineal feet of new water main at an approximate total cost of One Hundred Seventy-Five Thousand Dollars ($175,000). E. Provide for necessary improvements to the Central Bremerton wastewater system. The Central Bremerton Wastewater Improvements Project includes wastewater improvements to serve the Central Bremerton area which consists of the downtown central business district and the Central Bremerton residential area. The project will include construction of a new pump station CE-6; a new pump atation CE-4; approximately 900 lineal feet of gravity sewers; and approximately 5300 lineal feet of pressure sewers. Project costs are estimated to be approximately $4.5 million including engineering~ administration~ and construction. F. Develop a sludge management program consisting of a long-term program for disposal/reuse of sludge from the City's wastewater treatment plant. The project will involve evaluation of sludge treatment and disposal/reuse options {including dewatering, composting, and land application), design of treatment and disposal/reuse facilities, and construction of such facilities. Project costs are estimated to be approximately $4 million and include engineering, construction, administration, and any required land purchase costs.