HomeMy WebLinkAbout4363 AN ORDINANCE of the city of Bremerton, Washington
relating to the combined water and sewerage system of the
City, amending Ordinance No. 3887, as amended, declaring
the City's intention respecting borrowing for additional
system improvements, and declaring an emergency.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BREMERTON,
WASHINGTON, as follows:
Section 1. Section 1 of Ordinance No. 3887, as amended by
Ordinances Nos. 3948, 4015, 4053, 4147 and 4241, is further amended
to read as follows:
Section 1. It is found and declared that the public
health, welfare, safety and convenience require and it is in
the best interest of the inhabitants of the City that certain
water and sewerage system improvements be undertaken within
the City, and the City, therefore, specifies and adopts a
program or plan for the acquisition and construction of
additions and betterments to and extensions of the combined
water and sewerage system of the City to consist of the
acquisition, construction and installation of the improvements
described in Exhibit A, attached hereto and by this reference
made a part hereof.
There shall be included in the foregoing all necessary
tees, wyes, valves, pumps, couplings, connections, machinery,
equipment and appurtenances, together with all work as may be
incidental to and necessary to the foregoing acquisition,
construction and installation.
-1-
The City shall acquire all property, both real and
personal, or any interest therein, equipment, rights-of-way,
easements and franchises necessary to carry out such plans,
which are all as more particularly set forth in reports, maps,
plans and specifications prepared by the Utility's engineer
and the consulting engineers of the City.
The City may add or make such changes in the details of
such plans, either prior to or during the course of actual
constructions, which may be found necessary and desirable as
long as such changes do not substantially affect or changes
the main general parts of such plans or the services to be
rendered thereby.
Exhibit A of Ordinance No. 3887, as amended by Ordinances Nos.
3948, 4015, 4053 and 4147, is amended to add the improvements set
forth in Exhibit A of this ordinance.
Section 2. The City has financed the carrying out of parts of
the system or plan specified and adopted by Ordinance No. 3887, as
amended, by the issuance of the notes authorized by Ordinance No.
3887, as amended. All actions heretofore taken consistent with
Ordinance No. 3887, as amended, and this ordinance respecting the
financing of any part of such system or plan are ratified, approved
and confirmed.
Section 3. The City is in urgent need of construction the
improvements and has been advised that a favorable market exists at
this time for the sale of the notes resulting in lower interest
-2-
rates on the notes and a savings to the City and its rate payers.
Therefore, the City Council finds that sufficient urgency exists to
require that this ordinance take effect immediately upon its
passage and publication.
PASSED unanimously by the City Council of the City of
Bremerton, signed by the Mayor and attested by the City Clerk in
authentication of such passage this /~ day of
,
1992.
~TO~N', C~oun~cil President
LOUIS MENTOR, Mayor
ATTEST:
KATHLEEN L. McCLUSKEY, city Clerk
APPR~VED~AS TO FORM:
IAN/SIEVERS, cfty Attorney
-3-
Bremerton Municipal Utilities
EXHIBIT A
CAPITAL IMPROVEMENT PROgRaM 199Z-1994
The Bremerton Municipal Utilities' Water and Wastewater
Comprehensive Plans provide for the establishment of a Capital
Improvement Program for scheduled facilities improvements to the
major components of the water and wastewater systems.
The scheduled improvements, as defined in the Utilities
Comprehensive Plan and Capital Improvement Program, are necessary
to meet the requirements of the Federal Safe Drinking Water Act as
amended; the Federal Clean Water Act; the Washington State Growth
Management Act and the replacement of aged and failing Utility
infrastructure.
The schedule of improvements include enhancements and
protection of the Water Supply System; improvements to the Water
Transmission and Distribution Systems; improvements to the
Wastewater Treatment & Disposal Facilities; and to the Wastewater
Collection and Transmission Facilities and upgrade of the Utility's
general plant and infrastructure.
1992-1994 PROGRAM
A. Water Supply System Improvements - McKenna Falls
Supply and Treatment Facility
The upgrade of the existing McKenna Falls
facilities is consistent with the requirements of
the Surface Water Treatment Rule of the Safe
Drinking Water Act Amendments.
The overall project shall consist of modification
to the diversion structure; re-channeling of
settling basin and intake structure; improvements
to the water treatment facilities and the
installation of emergency power and instrumentation
and control equipment
These improvements, together with engineering and
allied construction costs, are estimated to be
approximately $1,456,500.
B. Water Supply System Improvements - Domsea Well
Development
The drilling and development of a large diameter
production well to replace the existing small
diameter wells located at the Utility Forestry
Operation Center well field on the Old Belfair Hi-
way.
The overall project shall consist of the drilling of
a production well, pump testing, installation of
pumping equipment and associated control and
chlorination equipment, and the connection to the
Water System.
These improvements, together with engineering and
allied construction costs are estimated to be
approximately $140,000.
C. Water Supply System Improvements - Silverdale Well
The development of an existing 12" diameter well
located adjacent to the Silverdale Mobile Home Park
along the South Central Valley Road.
The overall project shall consist of the
installation of pumping equipment and associated
control and chlorination control equipment and the
connection to the water system.
These improvements, together with engineering and
allied construction costs, are estimated to be
approximately $60,000.
D. Water Supply System Improvements Alexander Lake Dam
Repair
The Alexander Lake Dam Repair Project provides for
repair of the existing earthen Dam located on Heinz
Creek.
The project shall consist of repair of the existing
Dam structure, modifications to the intake drainage
structure and the replacement of the overflow
structure.
These improvements, together with engineering and
allied construction costs, are estimated to be
approximately $275,000.
E. Water Supply System Improvements - Land Aoquisition
The land acquisition program provides for the
acquisition of land for the protection of the City
of Bremerton Municipal Water Supply.
The project shall consist of the acquisition of
lands located in the hydrological boundary of the
City of Bremerton's Union River and Gorst Creek
drainage basins. The acquisition of these lands
are consistent with the requirements of the Surface
Water Treatment Rule of the Safe Drinking Water Act
. Amendments.
The acquisition of lands, together with allied
construction costs, are estimated to be
approximately $3,550,000.
F. Water Storage - Clifton Road Reservoir
The project will provide for water storage
facilities in the Anderson Hill-Feigley Rd. service
area.
The project consists of the construction of a
500,000 gallon reservoir on Old Clifton Road
together with piping and valves, monitoring and
control system and connection to the Water
Distribution System.
These improvements, together with engineering and
allied construction costs, are estimated to be
approximately $650,000.
G. Water Transmission & Distribution Improvements -
Kitsap Lake Pump Station
The construction of a new valve and pump station to
be located at the Utility Forestry Operation Center
on the Old Belfair Highway adjacent to the Kitsap
Lake Transmission Main. The pump station is
designed to provide domestic water supplies to the
Utility water service zone.
The project shall consist of the construction of a
1300 gallon per minute pump station and control
valve station, together with related appurtenances
to include pumps, piping and valves,
instrumentation and control equipment and
associated structures.
These improvements, together with engineering and
allied construction costs, are estimated to be
approximately $825,000.
H. Water Transmission & Distribution System
Improvements - Snyder Avenue/Port Washinqton
Narrows Crossinq
The installation of a new 18" transmission main
across the Port Washington Narrows, replacing an
existing 12" abandoned transmission main between
West Bremerton and East Bremerton.
The overall project consists of the installation of
approximately 4900 feet of new transmission main
commencing at the terminus of an existing
transmission main at the intersection of Snyder
Avenue and 15th Street and proceeding north along
Snyder Avenue to 25th Street and thence across the
Port Washington Narrows and terminating at the
intersection of Sheridan Road and Lebo Boulevard
with the connection to an existing transmission
main.
These improvements, together with engineering and
allied construction costs, are estimated to be
approximately $1,250,000.
I. Water Transmission & Distribution System
Improvements - SR #3 Transmission Main
The replacement of an existing 24" diameter forty-
year old cast iron transmission main connecting the
water supply system to the City.
The overall project consists of the installation of
approximately 12,600 feet of new water main
commencing approximately two hundred feet (200')
north of the intersection of the Old Belfair Valley
Road and State Route 3 and continuing along State
Route 3 to approximately four hundred feet (400')
east of the intersection of State Route 3 and State
Route 304.
These improvements, together with engineering and
allied construction costs, are estimated to be
approximately $850,000.
J. Water Transmission and Distribution System
Improvements - Sherman Heiqhts Distribution Main
The project will provide for the separation between
the utility surface water transmission facilities
and the distribution, in order to provide for
increased CT values in response to the requirements
of the Surface Water Treatment Rule of the Safe
Drinking Water Act Amendment
The project consists of the installation of
approximately 11,150 ft. 8" and 12" D.I. Water Main
along the Sherman Heights Rd., Kent St. and 3rd
Ave., commencing approximately 2000 ft. south of
Roosevelt on 3rd Street and terminating at Sherman
Heights Road & SR #3.
These improvements, together with engineering and
allied construction costs are estimated to be
approximately $300,000.
K. Water Transmission and Distribution System
Improvements - Utility System Control & Monitorinq
Equipment Improvements
The Utility System Control and Monitoring Equipment
Improvements provide for upgrading and replacement
of the existing equipment to meet the regulatory
requirements for water quality monitoring and to
allow for expansion of the existing utility control
and monitoring system. The expansion is required
in order to meet the requirements of the 1986
Amendments to the Safe Drinking Water Act.
The project shall consist of design and
installation of a computer based control and
monitoring system to include Software procurement
and programming and the acquisition and
installation of the necessary hardware to support
the system.
These improvements, together with engineering and
allied costs, are estimated to be approximately
$250,000.
L. Wastewater Colleotion an4 Transmission System
Improvements - Oyster Bay Basin Interceptor
The Oyster Bay Basin Project will provide for the
replacement of an existing 10" Pressure Gravity
Sewer Main along the east margin of the Wastewater
Treatment Plant from C St. and Bayview Ave. to the
Wastewater Treatment Plant Headworks.
The Project will consist of the installation of
approximately 1100' of 27" Gravity Pressure sewer
main and the subsequent connection to the
Wastewater Treatment Plant Headworks Facilities.
These improvements, together with engineering and
allied construction costs are estimated to be
approximately $250.,000.
M. Wastewater Collection an4 Transmission System -
Improvements - Warren Ave. Basin Combined Sewer
Separation Project
The Warren Ave. Basin Project will provide for the
separation of the Combined Wastewater/Stormwater
System pursuant to the requirements of WAC 173-245,
within the Warren Ave. drainage basin, and the
replacement of several mains which are experiencing
structural failure.
The project will consist of the installation of the
various size sanitary and stormwater mains for the
separation of sanitary sewage and stormwater within
the basin and for the replacement of several large
diameter interceptor mains and outfalls located
along Park Ave., the modifications to Pump Station
CE-3, and the installation of instrumentation and
monitoring equipment associated with Overflow #13.
~ These improvements, together with engineering and
allied construction costs, are estimated to be
approximately $4,033,000.
N. Wastewater Collection an4 Transmission System
~mprovements - Callow Ave. Drainaqe Basin Combined
Sewer Separation Project
The Callow Ave. Basin Project will provide for the
separation of the combined Wastewater - Stormwater
System pursuant to WAC 173-245.
The project will consist of the installation of
various size sanitary and stormwater mains within
the Callow Ave. drainage basin. The project will
provide for separation of sanitary sewage and
stormwater within the basin, the elimination of
Pump Station WB-4, the relocation of Overflow #17
and the installation of instrumentation and
monitoring equipment associated with Overflow #17.
These improvements, together with engineering and
allied construction costs, are estimated to be
approximately $11,000,000.
O. Wastewater Treatment & Disposal Improvements -
Wastewater Solids Handlinq and Dewatering E~uipmen~
The acquisition and installation of sludge
dewatering equipment and appurtenances to provide
for dewatering of wastewater solids.
The project shall consist of the procurement and
installation of a centrifuge and associated
appurtenances to be located in the Solids Handling
facilities of the Wastewater Treatment plant.
These improvements, together with engineering and
allied construction costs, are estimated to be
approximately $500,000.
P. Wastewater Treatment and Disposal System
Improvements - Wastewater Treatment Plant Headworks
Facilities Improvements
The project will provide for improvement to the
Headwork Facilities of the Wastewater Treatment
Plant in order to reduce odor emissions associated
with operation of the facility.
The overall improvements shall consist of the
installation of a packed tower or atomized mist
type odor scrubber to replace the existing carbon
type odor scrubber, located in the Wastewater
Treatment Plant Intake/Headwork's Facilities.
These improvements, together with engineering and
other allied construction costs are estimated to be
approximately $250,000.
Q. wastewater Treatment & Disposal System Improvement
- Land Acquisition
The project shall consist of the acquisition of
lands adjacent to the Wastewater Treatment Plant to
provide for expansion of the treatment facilities
and to provide for a buffer between the Wastewater
Treatment Plant and adjacent properties for
mitigation of Wasterwater Treatment Plant
operations.
The acquisition of lands, together with allied cost
is estimated to be approximately $3,500,000.
R. Wastewater Treatment & Disposal System Improvements
- Wastewater Treatment Plant Landscaping
The project will provide for landscaping and
screening between SR#3 and the Wastewater Treatment
Plant to reduce the visual impact of the Wastewater
Treatment Plant to the surrounding residents.
This project shall consist of providing landscaping
and screening along the east margin of the
Wastewater Treatment Plant adjacent to SR#3. This
will include the acquisition of an Air & Space
Lease Agreement from the D.O.T., installation of an
irrigation system and the planting of trees and
shrubs to provide for landscaping and screening.
These improvements, together with engineering and
allied construction costs are estimated to be
approximately $100,000.
S. Wastewater Treatment & Disposal Facilities
Improvement - Wastewater Compost Storage Faeilities
Cover
The project will provide for improvements to the
dewatered sludge storage facility located on the
McCormick Sludge Disposal Site. (Site #1)
The project shall consist of providing a cover over
the existing facilities to provide for leachate
control and composting of municipal wastewater
solids.
These improvements, together with engineering and
allied construction costs are estimated to be
approximately $135,000.
T. Wastewater Treatment & Disposal System Improvements
- Wastewater Treatment Plant Gravity Thickener
The project will provide for improvements to the
gravity thickener at the Wastewater Treatment Plant
in order to reduce odor emission associated with
operations.
The overall improvements shall consist of covering
of the gravity thickener, together with the
installation of associated odor control equipment.
These improvements, together with engineering and
other allied construction costs, are estimated to
be approximately $420,000.
U. Water Supply Facilities Improvements - Machinery
Storage Facility
The project will provide for improvement to the
Forestry Operation Center for protection and
maintenance of equipment.
The project shall consist of the erection of a 40'
x 96' steel structure to provide cover and security
to Utility owned equipment associated with Forestry
and Wastewater Solids Disposal operations.
These improvements, together with engineering and
allied construction costs, are estimated to be
approximately $75,000.