HomeMy WebLinkAbout4606 ORDINANCE NO.
AN ORDINANCE adopting 1997 amendments
to the Bremerton Comprehensive Plan.
WHEREAS, the City of Bremerton adopted its revised Comprehensive Plan by
Ordinance No. 4545 in February 1996; and
WHEREAS, requested and proposed amendments to the Plan were docketed in
accordance with an adopted procedure for amending the Plan once per year, were processed
through the Planning Commission public hearings in May and June, and were submitted for a
mandatory 60-day review by state agencies on June 11, 1996; and
WHEREAS, the Bremerton Pla.truing Commission, following its public study sessions
and hearings during May and June 1996, recommended City Council adoption of the proposed
amendments, as presented, subject to any adjustments that may be necessary as a result of public
testimony and comments from state agencies; and
WHEREAS, the Bremerton City Council conducted public hearings on these proposed
amendments on August 20 and 27, 1997 to accept additional public comments and to consider
the recommendations of the Planning Commission and state agencies; now therefore
THE CITY OF BREMERTON DOES HEREBY ORDAIN
Section 1. The Bremerton Comprehensive Plan Map is hereby amended in the West
Hills neighborhood south of Roosevelt Avenue to change the designation from "Utility (U)" to
"Medium Density Residential (MDR)", as shown in attached Exhibit "A", on a small portion of
a City reservoir site that has been surplussed and may be sold for residential development.
Section 2. The Comprehensive Plan Map is hereby amended on the east side of
Wheaton Way, north of Dibb Street, to change the designation of two lots from "School (S)" to
"General & Highway Commercial (C-G)", as shown in attached Exhibit "B".
Section 3. The Comprehensive Plan Map is hereby amended in the vicinity of the Auto
Center district to change the designation of four lots, consisting of about 22 acres, from "General
and Professional Office (C-P)" to "Industrial Park (IP)", as shown in attached Exhibit "C".
Section 4. The Comprehensive Plan Map is hereby amended to change the designation
of two small lots, comprising about one-third acre total area and located on the south side of
Broad Street from "General & Highway Commercial (C-G)" to "Medium Density Residential
(MDR)", as shown on attached Exhibit "D".
1997 Plan Amend. Ord. --- Page 1
Section 5. The text of the Comprehensive Plan is hereby amended to incorporated the
annual update of the Capital Facilities Program portion of the Capital Facilities Element, as
attached hereto as Exhibit "E".
Section 6. The Comprehensive Plan Map is hereby amended to expand the "Parks (P)"
designation north of Sheldon Boulevard and Thirteenth Street, south of Smith Cove, and to
expand the "High' Density Residential (HDR)" designation to include two additional lots on the
east side of Highland Avenue, as shown in attached Exhibit "F'.
Section 7. The Land Use Plan maps contained within the Comprehensive Plan are
hereby amended to eliminate the designation "Cemetery (C)" and change all areas currently
designated "C" to "Low Density Residential (LDR)", as shown in attached Exhibit "G".
Section 8. The text of the Comprehensive Plan is hereby amended to add descriptions
of the land use designations used on Plan map, as contained in attached Exhibit "H".
APPROVED by the City Council on the first reading this 27th
day of August ,1997.
PASSED by the Bremerton City Council this o?¢~, day of
fi'~VID F'XRR, P~resident
Bremerton City Council
APPROVED this ,,.~t~ day of ~~' ~ _/4'AY ,1997.
L~tNN HORTON, Mayor
ATTEST: /~) /
~A~'~LEE]~ McCLUSKEY, City Clerk
Published: ~_ ~ c~_ ~ -7
Effective: /O '- .~ 7' q 7
1997 Plan Amend. Ord. --- Page 2
Exhibit "A"
HARBOR HEIGHTS APARTMENTS --- Plan Amendment;
This amendment changes the designation of the area shown below from "Utility (U)" to
"Medium Density Residential (MDR)". All other portions of the site proposed for the Harbor
Heights Apartments development are currently designated "MDR". This amendment brings the
entire site under that designation and allows the surplus Utility land to become part of the
development.
Map
Amendment:
Area to be amended from "U" (Utility)
to "MDR" (Medium Density Residential) (~)
Area recently annexed to the Ci~.
Designated "MDR".
(MUlti-family/.2"~/'Residential)
1997 Plan Amend. Ord. --- Page 3
Exhibit "B"
BREMERTON SCHOOL DISTRICT --- Plan Amendment:
This Plan Map amendment will allow the School District to sell two lots of surplus property for
commercial development. The lots front on Wheaton Way and are adjacent to other commercial
properties to the north and south. The Plan designations of the two lots are changed from
"School (S)" to "General & Highway Commercial (C-G)".
C-G MDR
C-.P'
Change the Plan designation
on the subject property from
"S" to "C-G". LDR- l-DR
MU U
mR
1997 Plan Amend. Ord. --- Page 4
Exhibit ~C~
AUTO CENTER AREA INDUSTRIAL --- Plan Amendment;
This amendment applies to four lots (about 22 acres) located on the hillside above and to the
west of the Auto Center district. The property is currently planned and zoned for office
development. The amendment will change the designations of these lots from "General &
Professional Offices (C-P)" to "Industrial Park (IP)".
HI
IP.
The Plan designation of the shaded area
is changed from "C-P" to "IP"
r Rd.
P C-G
!
1997 Plan Amend. Ord. --- Page 5
Exhibit "D"
BROAD STREET RESIDENTIAL --- Plan Amendment:
This amendment changes the designation of two small lots from "General & Highway
Commercial (C-G)" to "Medium Density Residential (MI)R)". The lots are too small and too
far removed from Wheaton Way to be suitable for commercial development. With the recent
development of Broadmore Village, the west end of Broad Street has become a viable residential
neighborhood. This change is consistent with that trend.
MDR
E. Broad Street
C-G
LDR
1997 Plan Amend. ord. --- Page 6
Exhibit "E'
CAPITAL FACILITIES ELEMENT AMENDMENTS;
Bremerton Comprehensive Plan
CAPITAL FACILITIES
ELEMENT
Part 2 of 2: Capital Facilities Program
Prepared by:
BREMERTON PLANNING
Adopled: April 5, 1995
Revised: October 23, 1996
1997 Plan Amend. Ord. -- Page 7
Exhibit "F'
SOUTH SMITH COVE --- Plan Amendment:
1. This amendment changes the designation of lands along the north side of Sheldon
Boulevard and Thirteenth Street from "Mixed Use/PUD (MU)" to "Parks (P)". This will
achieve consistency with the master plan for the expansion of Evergreen Park and prevent
commercial or industrial development from disturbing documented soil contamination
areas immediately south of Smith Cove and north of Sheldon/Thirteenth.
2. The Plan designations on two lots on the east side of Highland Avenue are changed from
"Mixed Use/PUD (MU)" to "High Density Residential (HDR)".
NC Neighbmhood Convenience
~N ' LDR Low Density Residenlial
J~--~, ~J-//~x 'L/~~HI~R~ ~ McdiumDensityRcsidcntitl
High Density Residential
~ PROPOSED
__] ~ Current
__ HDR~
1997 Plan Amend. Ord. --- Page 8
Exhibit
REMOVAL OF "Cemetery" DESIGNATION --- Plan Amendment:
This amendment eliminates the designation "Cemetery (C)" from all Comprehensive Plan maps
to remove the potential for confusion and conflicts with zoning. This change affects only two
areas o£the City, as shown below, and will have no effect on the ability o£an existing cemetery
to expand in the future in accordance with the provisions o£ underlying zoning.
The Plan designation of all areas currently designated "Cemetery (C)" are hereby changed to
"Low Density Residential (LDR).
l,ocation Maps:
A: West Bremerton B: Central Bremerton
Land Use Plan Land Use Plan
1997 Plan Amend. Ord. --- Page 9
Exhibit
Land Use Designations
Land Use
DESIGNATION DESCRIPTION
LDR Low Density Residential: This designation includes existing and proposed
residential neighborhoods at densities of $ dwellings per acre or less. It is applied to
areas that don't have the levels of urban services needed for higher density development,
or that have terrain, sensitive areas (wetlands, creeks or shorelines), poor access, or
special amenities (views) .that are best protected through Iow density development.
Large lots are allowed in LDR zones, especially in areas without sewer service.
Developers are encouraged to cluster development on smaller lots in exchange for open
space through the PUD process lo make the best possible use of the site. Four Primary
Residential Zones are directly consistent with this Plan designation (SI:-I, SF-2, SF-3,
and DR). The Limited Parking Overlay (LPO) and Parks & Schools (PS) zones are also
consislent with all residential Plan designations. Small "secondary zones" may be
approved within larger residential developments to serve local needs for convenience
shopping, employment, education or recreation.
MDR Medium Density Residential:' This designation is applied to Ihe older higher-
density residential neighborhoods &Central Bremerton where lots are small and mixed
development is common or desirable. Other areas may be designaled MDR when
found to be suitable for the 8-18 units per. acre density level. Such areas are generally
near transportation corridors and shopping/employment concentrations, and have
adequate availability of urban services and facilities. MF and CBR are the primary
zones in lhis designation. They allow virtually all types of residential developmenl,
including single-unit homes and duplexes on small lois, multi-unit developments,
townhouses, and boarding houses. Limited mixed uses are permitled in these zones to
provide convenient services to neighborhoods without causing land use conflicts.
llDR iligh Density Residential: This designation allows the City's highest densities
(more than 18 units per a.cre) and is dire~:tly consistent with the "MR" zone which allows
tip to 44 units per acre. HDR areas are intended primarily for locations along major
transportation corridors, within and around the Central Business District and smaller
business districts, and where such development cat] take advantage of unique views or
such amenities as shorelines, recreational facilities, or access to ferries or buses.
Utilities, services and transportation must be adeqt, ate to serve lIDR development.
C-G General & Highway Commercial: This is the City's most intense
commercial designation. It provides for lhe "GB (General Business)" a,~d "SC
(Shopping Center)" zones, both of which are automobile oriented and designed for
application along highways and major arterial streets having high traffic volumes, direct
auto access, and maximum drive-by visibility. These locations are suitable for such
"heavy commercial" uses as shopping centers, major grocery stores, auto services, auto
repairs, motels, taverns, restaurants, adult entertainment, fast food, and large scale
retailers that require very large structures'and expansive parking. Most types of
businesses are permitted in these areas, along with office uses. Residential is permitted
as a secondary use.
1997 Plan Amend. Ord. --- Page 10
Land Use
DESIGNATION DESCRIPTION
C-P General & Professional Offices: This designation supports the "PO
(Professional Office)" zone. It's applied in locations that arc uniquely suitable for office
development, areas that have physical or Iocationai features that might be less suitable
for higher intensity uses, or areas in which office development might provide a buffer or
transition between two zones that might otherwise conflict. Office districts may consist
of a mixture of offices'and support services such as copy and computer services, office
machine repairs, or mail services. Light retail, such as a restaurant, book or stationery
store, art supplies store, delicatessen, or newspaper/magazine shop are usually
compatible with this district.
CBD Central Business District: This is downtown Bremerton. This desigation
supports a number of zone.s, including BE.(Business Core), GB (General Business), PO
(Professional Office), and the medium and high density residential zones MF and MR.
The URD (Urban Renewal Dislric0 is on the CBD waterfront. The CBD is intended to
provide a tnix of uses lhat includes retail at the slrect level of Ihe primary pedeslrian
slreels, with offices, apartments, sludio lofts, and other uses on the upper levels. The
downtown zones allow the highest residential densities in Ihe City with the fewest
development limitations. Residential zones (MF and MR) may be permilted on side
streets at densities up to 44 units per acre where it can be demonstrated that pedestrian
retail is less important tha.n close proximity of full time downtown residents. CBD
development should be designed to encourage walking, shopping, browsing, and the use
of public transit, bicycles and the ferry system to reduce the imports,ice of the private
automobile in this compact downtown environment.
NC Neighborhood Convenience: This designation supports the "NB
(Neighborhood Business)" Zone and is intended to provide small scale convenience
services and retail goods within small neighborhood service areas. This district is often
centrally located within neighborhoods and should minimize vehicular traffic and
encourage short-distance walking. It should not include businesses wilh regional
markets Ihat bring traffic from other areas. Neighborhood Convenience centers often
consist of small "Mom & Pop" markets and may also include such personal services as a
barber/beauty salon, day care center, neighborhood or senior center, and olher activities
Ihat might benefit the surrounding neighborhood.
MU Mixed Use/PUD: TI'Ils designation'is intended for areas Ihat are in transition,
usually from residential to commercial or industrial, or that arc in a transitional location,
such as between a residential neighborhood and a commercial district.' The "MX (Mixed
Usc)" zone is the primary zone and leans toward commercial development with
residential allowed as a secondary use. In cases where the MX zone doesn't provide the
needed flexibility, the MU Plan designation promotes mixed use developments through
Ihe PUD process. Single purpose developmenls that don't require a PUD and can't be
built within the paramete.rs of the MX zc~ne should not be designated MU.
1997 Plan Amend. Ord. --- Page 11
Land Use
DESIGNATION DESCRIPTION
tli lleavy Industrial: This designation is applied to the City's least sensitive areas
and areas most suitable for.large-scale industrial uses. It supports the "IG (Industrial
General)" and "MX (Mixed Use with industrial emphasis)" zones. Such uses include
manufacturing, warehousing, trucking operations, motor vehicle sales and service, large
open display lots, and are often accompanied by extensive outdoor stoi'age of supplies,
vehicles, heavy equipment, products, or other materials. Businesses that typically
generate noise, dust, odors, operate at late or odd hours, or that otherwise might not be
pleasant neighbors could expect to find a home in the HI district. This dislricl is placed
as close as possible to major highways, freeways, airports and rail lines, and as far as
possible from residential neighborhoods and other sensitive land uses.
IP Industrial Park: This designation supports the "IP (Industrial Park)" and "MX
(Mixed Use with light industrial emphasis)" zones. It is intended to provide areas for a
mix of office, wholesale, trade and distribution, bulk retailing, and light manufacturing
itl a Iow-density, campus-like environment. The dislrict should be designed to minimize
adverse impacts on adjacent areas and to present an attractive well-landscaped
appearance. Businesses located within an Industrial Park should be conlained within
buildings and have very little, if any, outdoor storage other than business-relaled vehicle
parking. All areas of the Industrial Park should be landscaped with grass, shrubs, trees,
elc., and all roads, driveways and parking areas should be paved. Preserved open space
areas might include such employee amenities as walking/jogging palhs or bike paths Io
encourage exercise or alternative commuting.
BP Business Park: This designation was designed for very unique situations. It
allows small and very uno§trusive businesses to locate within or adjacent to residential
neighborhoods. The primary zones are "BP (Business Park)", "PO (Professional
Office)", and "MX (Mixed Use witli business emphasis)". These zones allow a limited
variety of Iow-intensity commercial, office and manufacturing businesses thai are most
compatible with residential neighbors. Care should be taken to ensure that development
within the BP district is attractive, well-landscaped and an asset to Ihe neighborhood in
which it is located. This designation may also serve as a buffer or transitional district.
RE Resource Extraction: This designation is reserved for possible application lo
areas that may be identified as mineral resource sites of commercial s!gnificance that
should be protected from other types of development. The City has not used this
designation because all known mineral/gravel resource extraction sites within tile City
are already permitted, are in operation, and are zoned appropriately for industrial use.
The RE designation could be appliedas the long-range intent on lands that are in a
different short-term use. A phased zoning approach may work well in such a situation.
T 'Frausportation Facilities: This designation has been applied to major
Iransporlation facilities of regional siguificance, such as the ferry tcrminal and Kitsap
Transit's bus maintenance and storage facilities. It might also be applied lo locations
found to be uniquely suited for commuter parking lots, heliports, crc. There is no zone
that is specifically related to this Plan designation, but all commercial and industrial
zones are considered appropriate.
1997 Plan Amend. Ord. --- Page 12
Land Use
DESIGNATION DESCRIPTION
P or OS Parks or Open Space: All active public parks and recreation areas and major
passive open space areas are designated either "P (Park)" or "OS (Open Space)" on the
Comprehensive Plan maps. The primary zone is "PS (Parks & Schools)"
S School: All public schools arc designated "S" on the Comprehensive Plan and are
zoned "PS (Parks & Schools)". Private schools are not so designated but are included
~. within their host zone.
H llospital: Harrison Hospital and the Naval Hospital in Jackson Park are designated
"ti" on the Plan maps. This designation is intended to show the locations of these
facilities and not to determine their physical size. Hospitals are allowed in the "llC
(Health Care)", "GB (General Business)" and "BC (Business Core)" zones.
PW Public Works: This designation is intended to show the location of the City's
major public works facility on Oyster Bay Avenue. It does not determine the physical
size of that facility. Public Works facilities are allowed in the "lG (Industrial General)"
and "lP (Industrial Park)" zones.
U & UL Utilities & Utility Lands: The "U (Utilities)" designation shows the location of
the City's main Utilities and Engineering of]ices on Olympus Drive in East Bremerton.
Most utililies and their offices are permitted in other zones and don't require designation
on the Plan maps. The designation "UL (Utility Lands)" is applied to major areas that
are owned and operated by the City's Utility, primarily in areas west of Gorst.
WS Watershed: This designation is applied only to tile City's Union'River Watershed
that surrounds and protects tile reservoir behind Casad Dam. The related zone is "WS
(Water Supply)" which is a very restrictive zone intended to protect tile water resource.
Military This is a Iocational designation intended only to identify major military facilities such as
Puget Sound Naval Shipyard, Jackson Park and the Naval I lospital at Jackson Park.
These facilities are also designated according to their primary uses. O,dy PSNS has a
Plan designation but remains unzoned.
1997 Plan Amend. Ord. --- Page 13
Bremerton Comprehensive Plan
CAPITAL FACILITIES
ELEMENT
Part 2 of 2: Capital Facilities Program
Prepared by:
BREMERTON PLANNING
Adopted: April 5, 1995
Revised: October 23, 1996
Revised: September 1997
Bremerton Comprehensive Plan
ELEMENT H
CAPIIAL FACILITIES
Part 2 of 2: Capital Facilities Program
CONTENTS
Page
1. INTRODUCTION
A. AUTHORITY ............................................ CFP- 1
B. OVERVIEW ............................................. CFP- 1
C. DESCRIPTION .......................................... CFP-2
D. BACKGROUND .......................................... CFP-3
E. SCOPE ................................................ CFP- 3
F, PURPOSE AND INTENT ................................... CFP- 5
G. DEVELOPMENT AND AMENDMENT PROCESS ................ CFP - 6
2. CAPITAL FACILITIES PROGRAM {CFP)
A. OVERVIEW ............................................. CFP - 9
B. FIRE AND EMERGENCY MEDICAL SERVICES ................ CFP - 13
C. LAW ENFORCEMENT ................................... CFP - 20
D. MUNICIPAL ............................................ CFP- 27
E. PARKS & RECREATION .................................. CFP - 33
F. SANITARY SEWER ...................................... CFP - 43
G. SCHOOLS ............................................. CFP - 50
H. STORMWATER ......................................... CFP - 56
I. TRANSPORTATION ..................................... CFP- 61
J. WATER ............................................... CFP- 64
K. SIX-YEAR FINANCE PLAN ................................ CFP - 74
Capital Facilities Element
LIST OF FIGURES
Figure Page
CF-1 Capital Facilities Element Timeline ................................. CFP- 8
CF-2 Population Forecast: 1990-2012 .................................. CFP - 12
CF-3 Location of Fire Department Facilities .............................. CFP - 19
CF-4 Location of Police Department Facilities ............................ CFP - 26
CF-11 Location of Municipal Buildings and Parking Structures ................. CFP - 32
CF-5 Bremerton Park Facilities ........................................ CFP - 42
CF-6 Bremerton Sanitary Sewer System Service Area ...................... CFP - 49
CF-7 Bremerton School District ....................................... CFP - 55
CF-8 Bremerton Stormwater Drainage Basins ............................ CFP - 60
CF-9 Bremerton Arterial System ....................................... CFP - 63
CF-10 Bremerton Water Plan Service Area ............................... CFP - 73
Bremerton Comprehensive Plan
ELEMENT H
CAPITAL FACILITIES
Part 2 of 2 -- Capital Facilities Program (CFP)
1. Introduction
This Capital Facilities Program (CFP) document is the second part of the two-part document
that makes up the Capital Facilities Element of the Bremerton Comprehensive Plan.
A. Authority,
The State of Washington Growth Management Act of 1990 (GMA) requires that the City
of Bremerton develop a comprehensive plan which contains several elements, including
a "capital facilities plan element". The long-range Capital Facilities Plan and the short-
range Capital Facilities Program make up the capital facilities element required by the
GMA.
This Capital Facilities Element was developed under the direction of the City's Planning
Commission and adopted as an element of the City's Comprehensive Plan. The
element was developed pursuant to the authority conferred by the Washington State
Constitution; the Revised Code of Washington, Chapter 36.70A; and Chapter 2.12 of the
City's Municipal Code.
B. Overview
The Capital Facilities Element is organized into two documents, which contain the
following sections:
PART I- CAPITAL FACILITIES PLAN
1. INTRODUCTION -- Includes authority, overview, description, background, GMA
requirements, scope, purpose and intent, and development and amendment
process.
2. PLANNING FRAMEWORK -- Lists applicable GMA goals and regional policies
with which the Capital Facilities Element must be consistent.
3. CAPITAL FACILITIES PLAN -- A long-range policy plan containing guidelines
for capital improvements.
Capital Facilities Element - Part 2 CFP - 1 Capital Facilities Program
Introduction
PART fl - CAPITAL FACILITIES PROGRAM (CFP)
1. INTRODUCTION -- Includes authority, overview, description, background, GMA
requirements, scope, purpose and intent, and development and amendment
process.
2. CAPITAL FACILITIES Program (CFP) --Includes an inventory of capital
facilities, a forecast of future capital facility needs, and a six-year finance
program for capital facilities.
C. Description
The Capital Facilities Element will guide public decisions on the use of capital funds. It
will also indirectly guide private development decisions by providing a strategy of
planned public capital expenditures. The element consists of two parts: a long-range
Capital Facilities Plan and a short-range Capital Facilities Program (CFP).
· Part 1: The Capital Facilities Plan is a long-range policy plan containing the
City's main guidelines for capital improvements. It contains policies and
strategies for adequate public facilities and services, funding, programming,
maintenance, economic development and neighborhood revitalization, location
and design, and the urban growth area. The plan provides the long-range policy
guidance to develop and provide direction for the Capital Facilities Program
(CFP).
· Part 2: The Capital Facilities Program (CFP) contains an inventory of existing
and proposed capital facilities, forecasts future needs for facilities, and identifies
deficiencies in capital facilities and the actions necessary to meet such
deficiencies. The program also provides the GMA-required six-year finance
plan. The finance plan contains funding and scheduling of individual projects for
all capital facilities including transportation and utility facilities. Detailed financial
plans of outside agencies and special districts are included by reference. The
CFP is under separate cover to facilitate an annual update of the six-year finance
plan.
The Capital Facilities Element is consistent with the other elements of the
Comprehensive Plan, as required by the GMA. Part I of the element -- the Capital
Facilities Plan -- contains goals, objectives, and policies which are consistent and
compatible with statewide planning requirements, goals and policies, with the regional
goals and policies adopted by the Puget Sound Regional Council under Vision 2020,
and with the Kitsap Countywide Planning Policy. Part 2 -- the CFP -- contains a six-year
work program to implement the Land Use, Housing, and Transportation Elements of the
Comprehensive Plan.
Capital Facilities Element - Part 2 CFP - 2 Capital Facilities Program
Introduction
D. Background
The Capital Facilities Plan and Program (CFP) differ from the City's previous
Capital Improvement Program (CIP). Previously, the scheduling of physical
improvements was based on anticipated available financial resources and on a
priority listing of capital improvement needs for a five year period. While some
projects in the ClP were incorporated into the Annual Budget, the ClP acted
merely as a "wish list" of projects, often with no identified funding sources.
In contrast, this Capital Facilities Plan sets policy direction for determining capital
improvement needs, evaluating proposed capital improvement projects,
establishing funding priorities, and guiding funding alternatives. The Capital
Facilities Program (CFP) contained in Part 2 of the element establishes level of
service standards for facilities and a financing plan for facility improvements
covering the entire six-year period.
Along with the Capital Facilities Element, the City's capital facilities planning
effort also involves preparation of a Capital Improvement Program and an
Annual Budget.
· Capital Improvement Program (CIP) - The City's Capital Improvement
Program is a six-year plan for spending public funds on capital facilities
and amenities needed to address, support and implement the City's
Comprehensive P/an and other adopted City plans and programs. The
CIP only covers City of Bremerton programs.
· Annual Budget - The City's annual budget authorizes expenditures for
all city expenses, including the acquisition or development of capital
facilities. The annual capital budget differs from the financing plan
contained in the Capital Facilities Program in that it covers only capital
projects receiving City funding.
E. Scope
The scope of the Capital Facilities Program (CFP) is city-wide and beyond. It
includes all areas within the incorporated city limits, as well as areas surrounding
the city which have been identified as Bremerton's urban growth area in
accordance with the Growth Management Act.
Public facilities and utilities include a variety of properties, improvements and
services often administered by governmental agencies for the general public.
Examples of public facilities include city administration buildings, parks and
recreational facilities, libraries and public schools. Utilities include electrical,
telecommunication, and refuse collection utilities. Certain facilities and utilities
are provided by the City of Bremerton, while others are provided by other
agencies, special districts, or companies. The Definitions section of this element
defines "capital facilities", "capital improvement project", and related terms.
Capital Facilities Element - Part 2 CFP - 3 Capital Facilities Program
Introduction
Transportation and circulation-related facilities are addressed in the
Transportation Element of the Comprehensive Plan. Public and private utilities
within the City are addressed in the Utilities Element.
The scope of the Capital Facilities Element extends from the general long-range
Capital Facilities Plan to the highly specific short-range Capital Facilities Program
(CFP).
For the City of Bremerton, the scope of the Capital Facilities Program (CFP) is:
fire and police protection; municipal buildings and parking structures; parks,
recreation facilities and open space; streets; schools; stormwater management;
and sewer and water distribution systems.
An inventory and analysis of certain publicly-owned capital facilities is provided in
the CFP. Table CF-1 (page CFP-9) lists types, descriptions and providers of
capital facilities specifically addressed by the CFP.
For the purposes of this CFP, the City of Bremerton uses the following definition
of a capital improvement project:
A project to create, expand or modify a capital facility. The project may
include design, permitting, environmental analysis, land acquisition,
construction, landscaping, site improvements, initial furnishings and
equipment. The project cost must exceed $35,000 in 1996 dollars.
Capital improvements are major projects or activities requiring the
expenditure of public funds over and above annual operating expenses.
They have a life expectancy of more than ten years and result in an
addition to the City's fixed assets and/or extend the life of the existing
capital infrastructure. Capital improvements do not include capital outlay
items such as equipment or vehicles. An exception for rolling stock could
be a purchase necessary to accommodate increased service capacity
due to population growth such as emergency medical service units or fire
apparatus. Examples are:
· Land or site acquisition;
· Building or structure acquisition, construction or major maintenance;
· Major repairs or renovations to the City's infrastructure (e.g.,
buildings, structures, etc.);
· Major site improvements;
· Utility installations or major replacements, repairs or improvements to
utilities;
· Street construction and improvements; and
· Major design and engineering efforts associated with identified capital
projects.
The Municipal Utilities and outside agencies (Bremerton School District, Port of
Bremerton, Kitsap Transit, etc.) work under their own definitions of capital
improvement projects which may or may not include such things as rolling stock.
Also, the City of Bremerton uses a somewhat different definition for its Capital
Capital Facilities Element - Part 2 CFP - 4 Capital Facilities Program
Introduction
Improvement Program (CIP), which includes projects costing $10,000 or more,
and does include rolling stock.
F. Purpose and Intent
The purpose of the shod-range Capital Facilities Program (CFP) is to establish
the City's work program for capital facilities for the next six years, to carry out the
intents and policies of the Capital Facilities Plan, Transportation Element, and
Utility Element, and to give further direction to implement the strategies of the
plans.
The Capital Facilities Plan and CFP make up the plan element that will bring the
rest of the Comprehensive Plan to life. It fulfills the GMA requirement to assure
that needed capital facilities will be financed. This requirement is the mechanism
to ensure that the growth envisioned in the plan can really happen. The
available capacity of public facilities will affect the type, amount and rate of
growth.
Because of the complexity of the relationships between land use and public
facilities and services, the Capital Facilities Plan and Program will lay a
foundation for the coordination and consistency of infrastructure plans and
programs, including those of transportation and utilities.
The Capital Facilities Element is a tool for coordination of the City's physical and
fiscal planning. It is a mechanism for ongoing communication and cooperation
between various City departments, and between the City, the County, and other
providers of public services.
The Capital Facilities Element promotes efficiency by requiring the City to
prioritize capital improvements for a longer period of time than the single budget
year. Long range financial planning presents the opportunity to schedule
projects so that the various steps in development logically follow one another
with regard to relative urgency, economic desirability, and community benefit. In
addition, the process of identifying adequate funding sources results in the
prioritization of needs, and allows trade-offs between projects to be evaluated
frankly. The Six Year Financial Program contained in the Element will guide
decisionmaking to achieve the community goals as articulated in the Vis/on for
Bremerton and Planning Goals Elements.
The purpose of the Capital Facilities Element is to:
· Serve as a guide for making decisions that will improve the quality of
facilities and services.
· Ensure the proper coordination and timing of the provision of adequate
facilities and services with land use development.
Capital Facilities Element- Part 2 CFP - 5 Capital Facilities Program
Introduction
· Coordinate and provide consistency among City plans for public facilities,
including transportation and utilities, and capital facilities plans of
regional, state and federal governments and plans of special districts
(e.g. schools, libraries, and port districts).
· Provide direction to facilities and infrastructure service providers to help
them meet the needs of existing and new development.
· Discuss locations and capacities of existing and proposed facilities.
· Maintain the quality of life by establishing level of service standards for
public facilities.
· Determine the financial resources available for capital facilities projects
and improvements.
· Document all capital projects and their financing.
· Provide direction for the provision of services in the City of Bremerton's
urban growth area.
· Ensure the timely provision of adequate facilities as required in the
Growth Management Act.
G. Development and Amendment Process
The Capital Facilities Element was developed by City of Bremerton Department
of Community Development staff with the assistance of numerous citizens and
city staff. A Parks and Recreation Capital Facilities Plan Subcommittee,
consisting of Planning Commission and Parks and Recreation Commission
members, along with Parks & Recreation Department staff, helped develop
parks-related material in Spring 1993. The Bremerton Planning Commission
Citizen Advisory Committee worked on the draft element during 1994. Finally,
the Planning Commission and City Council held several study sessions and
public hearings before the Comprehensive Plan was adopted in April 1995.
The Capital Facilities Program will be updated annually in conjunction with the
annual update of the City's Capital Improvement Program (CIP) and
development of the annual budget. The objectives and tasks will be reviewed to
determine what has been accomplished, and the strategies and activities of the
Capital Facilities Plan and Utility Element will be reviewed to determine what
future objectives should be undertaken. Tasks will then be formulated for the
chosen objectives. (See Figure CF-1 Capital Facilities Element Timeline.)
Proposed amendments to the program will receive detailed review by the
Planning Commission, and public hearing(s) will be held to solicit public
comment. The Commission will consider any such comments and make a
formal recommendation to the City Council. The Council will further review the
proposal, hold a public hearing for public comments, make modifications if
Capital Facilities Element - Part 2 CFP - 6 Capital Facilities Program
Introduction -
necessary, and adopt the proposed amendments as part of the Capital Facilities
Program. Revisions to the CFP may occur, at most, once a year and must be
considered concurrently with any other amendments proposed to the Bremerton
Comprehensive Plan.
Capital Facilities Element- Part 2 CFP - 7 Capital Facilities Program
Introduction
Relationship Among Capital Facilities Element's Policy Plan,
Capital Facilities Program, and City Budget
Policy Plans
January I c~ ~'~
Programs
April
Capital
through Programs ~ FacUlties
· S~lus /
Operating
Budget
Budget
Figure CF-I Capital Facilities Element Timeline
Capital Facilities Element- Part 2 CFP - 8 Capital Facilities Program
2. Capital Facilities Program (CFP)
An Inventory, Analysis, and Six-Year Financing Plan
A. Overview
The Capital Facilities Program (CFP) is a six-year document which provides the main support
for all actions that satisfy the policy intent of the long-range Capital Facilities Plan. This
Program contains an inventory of existing and proposed capital facilities; forecasts future needs
for facilities; and identifies deficiencies in capital facilities and the actions necessary to meet
such deficiencies. It also provides the GMA-required six-year finance plan to fund the needed
capital facility improvements and projects for the next six years.
The inventory presented in the Capital Facilities Program provides background information on
those capital facilities for which the City has a responsibility. It also summarizes new capital
improvement projects for the existing population, new capital improvement projects necessary
for the growth projected through 2000, and major repair, renovation, or replacement of existing
facilities.
The six-year finance plan contains funding and scheduling of individual projects for all capital
facilities including transportation and utility facilities. Detailed financial plans of outside
agencies and special districts are included by reference.
1. Types and Providers of Capital Facilities
The chart on the following page lists the types and providers of capital facilities
addressed by this Program. (Table CFP-'I Sections on each facility type follow in
alphabetical order.
The analysis of each type of capital facility includes:
· Inventory of Existing Facilities
· Forecast of Future Needs
· Level of Service Standards
· Need for Facility Capital Improvements
· Plans of Other Providers
· Planned Capital Improvement Projects
Capital Facilities Element - Part 2 CFP - 9 Capital Facilities Program
CFP Overview
Fire and City of Provides facilities that support the provision of
Emergency Bremerton Fire fire and emergency services.
Services Dept.
Law City of Provides facilities that support the provision of · Draft Bremerton Facilities
Enforcement Bremerton law enforcement services. Study, 1985
Police Dept.
Municipal City of Provides municipal buildings and parking · Draft Bremerton Facilities
Bremerton structures. Study, 1985
Parks City of Provides facilities for passive and active · Land Use Element
Bremerton recreational activities. · Parks & Recreation
Parks & Comprehensive Plan,
Recreation 1995
Dept.
Streets City of Provides streets, sidewalks, traffic controls, · Transportation Element
Bremerton and street lighting. · Six-Year Transportation
Dept. of Public Improvement Program
Works & (TIP), 1997
Utilities
Sanitary Sewer Bremerton Provides facilities used in collection, · Wastewater
Municipal transmission, storage, treatment or discharge Comprehensive Plan,
Wastewater of waterborne waste within most developed 1996
Utility portions of city and some surrounding
unincorporated areas.
Schools Bremerton Provides elementary and secondary facilities · Bremerton School District
School District for instruction in the several branches of Capital Facilities Plan: In
learning and study required by the Basic Support of the School
Education Code of the State of Washington. Impact Fee Program,
July 1992
Storm Water Bremerton Provides facilities that collect and transport · Ord. 4454
Management Municipal stormwater runoff. · Bremerton Stormwater
Stormwater Management Plan, 1995
Utility
Water Bremerton Provides supply of potable water from system · Water System
Municipal of surface water and wells. Service area Comprehensive Plan,
Water Utility includes developed portions of city and 1992
surrounding unincorporated areas. Utility
also contracts to provide water to additional
areas (Tracyton, Rocky Point, PSNS, and
Port of Bremerton airport and industrial park.
Capital Facilities Element - Part 2 CFP - 1 0 Capital Facilities Program
CFP Overview
2. Growth Assumptions
The CFP is based on the following population assumptions:
Year Population
1996 38,500
2001 41,893
2012 58,142
The 1996 population estimate was prepared by the Bremerton Department of
Community Development. Bremerton's population fluctuates regularly with shifts in
PSNS staff levels. The State Office of Financial Management (OFM) prepares quarterly
updates documenting changes in Navy population counts. This 1996 estimate
represents an average of recent OFM quarterly updates.
The year 2001 population forecast was prepared by the City. It represents continuation
of existing growth trends until at least year 2001. This forecast is based on the
assumption that the effects of Growth Management goals to promote infill in urban areas
will not be seen in the city until some interval after Kitsap County adopts policies and
regulations to limit sprawl in the unincorporated areas. This forecast is illustrated in the
chart on the following page.
The year 2012 population forecast was approved by the Kitsap Regional Planning
Council in 1995 for use by Kitsap County in complying with the Growth Hearings Board
order to revise the Kitsap County Comprehensive Plan.
Capital Facilities Element - Part 2 CFP - 11 Capital Facilities Program
E
%~'¢~ OSSoJgUI% (~610~) IfOUnOO 8u~uueld leUOJSa~ pun~ l~6nd -- ls~Joj .,SUeld 8u!ls!x9,.: ~-~
~gg'gs g~ ~ ~OC
9gL'SS Pt OtOg
SSZ'OS t t ZOOZ
gZZ'6¢ Ot 900Z
~Og'Zff 6 SOOg
~6g'Lff g LOOZ
~' L ~ k 000~
' LLZ'L~ ¢ 666L -
OZg'O~ E 966 ~
OO9'g~ 6~g'O~ ~ Z66 ~
~ OZ~'9~ ggL'O~ 966~
~aJGlenlov maJBIOd~ ~eeAueld ; JeaA;:;
B. Fire and Emergency Medical Services
The City of Bremerton Fire Department is responsible for providing emergency and non-
emergency fire, rescue and medical services. The capital facilities used by the Fire Department
include station buildings, emergency medical services (EMS) vehicles, fire trucks, fire engines
and fire boats. (See Figure CF-3)
1. Emergency Medical Services (Ems)
a. Inventory of Existing Facilities -- EMS
The City has three EMS vehicles. Two units (Medic #2 and Medic #3) each
cover half of the city, while one (Medic #2-A) is maintained as a reserve unit to
fill in as needed. Under the City's rotation policy, EMS units are replaced every
three years. Each time a new unit is added, the reserve unit is replaced by the
next oldest unit. (Table EM-I)
Medic #2 Callow Avenue to West Bremerton City Limits 1
Medic #3 Callow Avenue to Downtown to East Bremerton City Limits 1
Total Active Units = 2
Medic #2-A City-wide (replacement for #2 & #3) 1
Medic #3-A City-wide 1
Total Reserve Units = 2
Total Units= 4
Source: Bremerton Fire Department
b. Forecast of Future Needs -- EMS
(1) Existinq Demand
Between 75-80% of Kitsap County CenCom (Central Communications)
calls are for EMS. Over the last five years there has been a 5.4% per
year increase in CenCom calls. The number of EMS calls inside the city
has been increasing even though the population has not grown. This is
due to a combination of factors, including an aging population, a
Capital Facilities Element - Part 2 CFP - 13 Capital Facilities Program
Fire and Emergency-Medical Services
concentration of convalescent centers and retirement homes near the
hospital, and an economy in which people may tend to call for EMS to
avoid the expense of a doctor. Some 96% of the calls for service are
inside the city limits. The current response time is about 4.6 minutes for
all responses. There are deviations in some areas, such as the golf
course. These are handled through mutual aid agreements with other fire
districts.
(2) Level of Service (LOS)
The level of service for EMS facilities is a function of response time and
call volumes. These in turn are dependent on the number and location of
fire stations, the number of fire apparatus units, and the number of
firefighters available. The City is developing a LOS monitoring system
that measures EMS response time (time needed to respond to a call) and
call volumes (the number of calls received from different areas). In the
meantime, the need for EMS facilities can be estimated by monitoring
response times. The American Heart Association recommends a 4.0
minute EMS response time for Basic Life Support (BLS) and an 8.0
minute response time for Advanced Life Support (ALS). Past these
times, a heart patient's chance of survival goes down significantly.
· Current LOS = 4.6 minutes for BLS and ALS (or 3.3 minutes
90% of the time)
· Proposed LOS = 5.0 minutes for BLS 8.0 minutes for ALS
(3) Future Demand
Bremerton's population is expected to grow by 3,410 by year 2000, and
by an additional 16,590 by year 2014. CenCom projects a two-fold
increase in calls between 1992 and 2005. The City is expected to
continue to receive about half of these calls regardless of whether the
population increases. (Table EM-2)
Capital Facilities Element- Part 2 CFP - 14 Capital Facilities Program
Fire and Emergency_Medical Services
Table EM-2
Sixteen Year Need: EMS
Time Period Demand (Population) EMS units required ~_. LOS 5.0~8.0 minute
response times
Six-Year Need
1996 38,500 3
1997-2001 (new) 3,393 0
Total as of 2001 = 41,893 3
Sixteen-Year Need:
2002-2012 (new) 16,249 1
Total as of 2012 = 58,142 4
1996-2012 (new) 19,642 1
Source: Bremerton Fire Department
(4) Need for Capital Facility Improvements
The anticipated total need for year 2014 is four EMS units -- three active
EMS units and one reserve unit. Mutual aid agreements will satisfy other
needs.
(5) Plans of Other Providers
The September 1994 Kitsap County Draft Capital Facilities Element
recommends a five-minute response time (from time of call to first unit on
site) in urban areas, and a ten-minute response time in rural areas. To
provide this LOS, it recommends that stations be located within a five-
mile radius of each other, and that a 24-hour career staffed station be
located within 10 miles of all areas. It uses replacement schedules for
EMS/Aid units based on a five-year replacement cycle, unless otherwise
stated.
(6) Proposed Facilities
The City will need one additional EMS unit at Station #1 sometime within
the next five years. Existing EMS units are scheduled to be replaced
every three years. However, the replacement schedule may be moved
up to every two years if call volumes continue to increase.
c. Six-Year Financing Plan -- EMS
The six-year financing play for emergency medical service facilities is included in
Section J of this Capital Facilities Program.
Capital Facilities Element - Part 2 CFP - '15 Capital Facilities Program
Fire and Emergency-Medical Services
2. Fire Protection Services
a. Inventory of Existing Facilities -- Fire Protection
The City has three fire stations, one each located in west, central and east
Bremerton. The City also has one drill tower/boat house, which is due to be
demolished. There are seven fire apparatus and two specialty vehicles. Three
of six fire engines are reserve units, on stand-by to replace the three active units.
Although there are seven fire apparatus, three engines are not staffed. The
ladder truck, fireboat, and rescue crew are staffed by the Engine #1 crew.
(Table FP-f)
Table FP.1 , ~
Inventory of ExiSting FacilitieS:--Fire proteCtion :
BUildings ~ Size (square feet)
Fire Station No. 1 817 Pacific 15,346
Max Meigs Fire Station No. 2 5005 Kitsap Way 9,389
Ted Tillet Fire Station No, 3 3031 Olympus Drive 7,640
Total Buildings = 32,375
, Fire Apparatus Ser-¢ice Area
Fire Trucks
Ladder #1 I All of City Limits 1
Total Fire Trucks = 1
Fire Engines
Engine #1 Downtown Bremerton to Callow Avenue 1
Engine #1-A (Reserve) Same as Engine #1 1
Engine #2 Callow Avenue to West Bremerton City 1
Limits
Engine #2-A (Reserve) Same as Engine #2 1
Engine #3 East Bremerton to City Limits 1
Engine #3-A (Reserve Same as Engine #3 1
Total Fire Engines = 6
Total Fire Apparatus = 7
Specialty VehiCleS i
: .
Marine-20 Fireboat I Sinclair and Dyes Inlets 1
Total = 1
Capital Facilities Element- Part 2 CFP - 1 6 Capital Facilities Program
Fire and Emergency_Medical Services
b. Forecast of Future Needs -- Fire Protection
(1) Existing Demand
The City has three fire stations and four active fire apparatus serving
about 38,500 persons--approximately one station per 12,833 people,
and one fire apparatus unit per 9,625 people. The current response time
is about 5.44 minutes for both emergency and non-emergency calls. The
City has a Class 3 insurance rating based on manpower, water supply,
etc.
(2) Level of Service (LOS)
The need for fire protection facilities is a function of response time and
call volumes. These in turn are dependent on the number and location of
fire stations, the number of fire apparatus units, and the number of
firefighters available. Until the City's monitoring system can be further
quantified, fire facilities needs can be estimated by monitoring response
times.
· Current LOS = 5.44 minutes response time for both
emergency and non-emergency calls.
· Proposed LOS = 5.0 minutes response time.
(3) Future Demand
The projected population growth within the service area is for
approximately 3,393 new people by year 2001, and an additional 16,249
new people by 2014. (Table FP-2)
Table FP-2
Sixteen Year Need: Fire Protection Apparatus
Time Period Demand (Population) I Fire Protection Units Required(~ LOS 5.44 minute
I
response time
Six-Year Need
1996 38,500 3
1997-2001 (new) 3,393 0
Total as of 2001 = 41,893 3
Twenty-Year Need
2002-2012 (new) 16,249 4
Total as of 2012 = 58,142 7
1996-2012 (new) 19,642 4
Source: Bremerton Fire Department
Capital Facilities Element- Part 2 CFP - 17 Capital Facilities Program
Fire and Emergency-Medical Services
(4) Need for Capital Facility Improvements
The anticipated total need for year 2014 is seven fire apparatus. No
additional buildings will be needed.
(5) Plans of Other Providers
The September 1994 Kitsap County Draft Capital Facilities Plan
recommends a five-minute response time (from time of call to first unit on
site) in urban areas. To achieve this LOS it recommends that stations be
located within a five mile radius of each other to provide blanket coverage
throughout the county. The element uses replacement schedules for
most vehicles based on a 20-year replacement cycle, and for rescue
vehicles based on a 10-year cycle, unless otherwise stated.
(6) Proposed Facilities
(a) Buildings
The City, in partnership with several Fire Districts, plans to replace
the existing drill tower with a more suitable facility.
(b) Fire Apparatus
Because the City currently has seven apparatus, no additional
apparatus will be needed. However, the City will need to replace
its existing fire engines toward the end of the 20 year period, and
additional crews will be needed to staff all seven apparatus. No
change in the existing number of stations will be needed.
c. Six-Year Financing Plan -- Fire Protection
The six-year financing plan for fire protection facilities is located in Section K of
this Capital Facilities Program.
Capital Facilities Element - Part 2 CFP - 18 Capital Facilities Program
Fire and Emergency-Medical Services
1
Figure CF-3 Bremerton Fire Department Facilities
Capital Facilities Element - Part 2 CFP - 19 Capital Facilities Program
C. Law Enforcement
1. Inventory of Existing Facilities -- Law Enforcement
The capital facilities used by the Police Department are buildings and vehicles for patrol
officers, investigations officers and administrative staff. (Since the cost of vehicles is
less than the $35,000 capital facilities threshold, these costs are included in the City's
Capita//mprovement Program/CIP) and Annual Budget, but not in the Capita/Faci/ities
E/ement.)
The Police Department is currently spread out over four facilities in four different
locations. Administrative functions are concentrated in City Hall, convenient to the
Municipal Court. A new Community Resources office is located in a store front setting
next door to City Hall. However, the Patrol Division is housed in the West Precinct,
along with the Animal Control Division, and the Drug and Gang units are located in the
old Capital Hill Fire Station. (See Figure CF-4) (The City currently contracts with Kitsap
County for jail services.) (Table LE-1)
FaCility Name : :: ;:: : SiZ~ (sq?i}
City Hail/Police 239 Fourth Street 7,085
Community Resources 245 Fourth Street 1,400
West Precinct/Patrol Headquarters 4846 Auto Center Way 3,700
West Precinct/Animal Control 4846 Auto Center Way 450
Capital Hills Fire Station/Special Investigative Unit (SIU) 3001 Sixth Street 5,400
Total = 18,035
Sources: "Facilities Management Alternative Plans", Department of Public Works and Utilities, 2/14/94; and
Bremerton Police Department.
2. Forecast of Future Needs -- Law Enforcement
a. Existinq Demand
The City has 62 law enforcement officers operating out of approximately 18,000
square feet of buildings -- 290 square feet per officer (including support staff).
b. Level of Service {LOS)
The need for law enforcement facilities can be estimated by projecting the
number of officers that will be needed to serve the forecasted population, and
calculating the building space needed per officer. Currently, with 62 officers,
Capital Facilities Element - Part 2 CFP - 20 Capital Facilities Program
Law Enforcement
there is one officer per 615 persons.
There is no consensus on staffing levels for local police departments. The ratio
of both officers and total police employees to population size is significantly
related to crime rates. However, there are many variables that enter into crime
rates. Such standards have limited meaning because the actual number
required will vary depending on the size of a city, geographic region, and type of
city. Even cities of the same population size and type may differ widely in
staffing needs because of differences in demographics, socio-economic
characteristics, climate or other unique conditions. Washington State cities as a
whole have an average of 1.6 officers per 1,000 population. Bremerton's
staffing level is the same as the state average. Compared with available staffing
levels from several Washington cities, Bremerton's staffing level falls between
Yakima, which has a higher population, and Des Moines, which has a lower
population?
City Population Officers/1000
Seattle (1989) 531,400 3.06
Yakima 54,843 1.7
Washington average --- 'I. 6
Bremerton 38,500 1.6
Des Moines 21,330 1.5
Moses Lake 12,190 1.9
Poulsbo 5,415 2.3
The Police Department feels that its current staffing level is too Iow, given the
City's crime rate. The Department recommends that 70 officers could provide a
preferred level of service for the existing population. While the City's staffing
level is the same as the state average, it may be that escalating crime rates are
catching many cities short of staff.
Another difficulty in linking staff levels to population in Bremerton is that the
City's population fluctuates up and down with Navy population levels. For
example, Bremerton's population dropped from 38,142 in 1990 to a Iow of
35,920 in April 1994. In 1995 it climbed to 39,610, and in 1996 it is down again
to about 38,500. Police Department staffing levels need to take into account
these typical population fluctuations. The following table contrasts 1990 and
1996 levels of service for officers with the Department's preferred staffing level.
~ Source: Level of Service Standards: Measures for Maintaining the Quality of Community Life, Municipal
Research Services Center of Washington, Report No. 31, September 1994.
Capital Facilities Element- Part 2 CFR - 21 Capital Facilities Program
Law Enforcement
Table LE-2
Level of Service - Law Enforcement Officers
Year Population Officers Officers per 1,000 Population
1990 38,142 58 1.52
1996 38,500 62 1.61
P referred * 38,142 70 1.84
"Preferred LOS for Law Enforcement Officers is based on actual 1990 population.
Source: Bremerton Police Department.
The Police Department considers the existing building space to be inadequate
for the current staff level of 62 officers. The existing law enforcement facilities
are spread out in four different locations, and building space is not efficiently
designed for law enforcement purposes. This is particularly true at the Capital
Hill facility, which houses nine officers in 5,400 sq.ft. (600 sq.ft./officer). A more
accurate measure of the existing space per officer can be determined by omitting
the Capital Hill facility and staff from the calculation. Including the Capital Hill
facility and staff, the Current Level of Service is 290 square feet per officer.
Without that facility and staff, the Adjusted Current LOS is 238 sq.ft, per officer
(12,635 sq.ft. / 53 officers).
The proposed LOS is lower than the Current LOS, but higher than the Adjusted
Current LOS, assuming that the existing facilities will be replaced with a more
efficiently designed facility. The Proposed LOS assumes that new facilities will
be located in a remodeled existing building rather than in a new facility that could
be designed to meet law enforcement needs most efficiently.
· Current LOS = 290 square feet per officer
· Adjusted Current LOS = 238 square feet per officer
· Proposed LOS = 250 square feet per officer
c. Future Demand
The projected population growth within the City is for 19,642 new people by year
2012. At the current level of service for law enforcement officers, the City would
need 94 officers by year 2012 -- 32 additional officers. At the Police
Department's preferred staff level of service, the City would need 107 officers by
year 2012 -- 45 additional officers. (Table LE-3)
Capital Facilities Element - Part 2 CFP - :2:2 Capital Facilities Program
Law Enforcement
Table LE-3
Future Need -- Law Enforcement Officers
1996 2001 2012 Total New Population/Officers
1996-2012
Population 38,500 41,893 58,142 19,642
Officers (~ 1996 Officer LOS 62 67 94 32
Officers @ Preferred Officer 71 76 107 36
LOS
Source: Bremerton Department of Community Development.
d. Need for Capital Facility Improvements
To maintain existing staff levels to year 2012 at 250 sq.ft, per officer, the Police
Department would need 23,500 square feet -- an increase of 5,465 sq.ft, over 16
years. To maintain the Department's preferred officer level of service to 2012, it
would need 26,750 square feet -- an increase of 8,715 sq.ft. (Table LE-4)
Table LE~
FUture Need: Law Enforcement: BUilding Area (Square Feet)
: :
ScenariO* : 1996:ActUal 1996 Need 2001 Need 2012 Need 1996,2012 Increase
1996 Officer LOS 18,035 15,500 16,750 23,500 5,465
Preferred Officer LOS 18,035 17,500 19,000 26,750 8,715
* Staff levels per Table LE-3 @ 250 sq.ft./officer.
** 1996-2012 Increase = 2012 Need - 1996.
The following table shows the future need for Police Department building area by
year 2001 and by year 2012 at the proposed LOS of 250 sq.ft, per officer.
The year 2001 need is based on continuation of the 1996 Officer LOS
(1.61 officers per 1,000 population).
· The year 2012 need is based on a gradual increase in staff levels after
year 2001, with the goal of achieving the Preferred Officer LOS (1.84
officers/1000) by year 2012. (Table LE-5)
Capital Facilities Element - Part 2 CFP - 23 Capital Facilities Program
Law Enforcement
Table LE,5
Future Need: Law Enforcement Building Area
Time Period Demand (Population) Officers * Square Feet
Required (~ 250
sq.ft, per Officer
Six-Year Need:
1996 38,500 62 15,500
1997-2001 (increase) 3,393 5 1,500
Total as of 2001 = 41,893 67 17,000
S xteen year Need i
2002-2012 (increase) 16,249 40 9,750
Total as of 2012 = 58,142 107 26,750
Total 1996-2012 (increase) = 19,642 45 11,250
· 2001 Need = 1996 Officer LOS; 2012 need = Preferred Officer LOS
Source: Bremerton Department of Community Development
e. Plans of Other Providers
The May 3, 1996 draft Kitsap County Capital Facilities Plan addresses sheriff
facilities, as well as corrections, work release, and juvenile facilities to serve
county-wide needs. The CFP lists a current (1994) LOS for sheriff offices of 122
square feet per 1,000 population. The proposed LOS of 151 square feet per
1,000 population is 29 square feet per 1,000 population (24 percent) higher than
the County's current LOS. The proposed LOS requires an additional 7,780
square feet of space through the year 2000. The draft six year financing plan
lists two related projects to meet this need: expansion of the Sheriff
Administrative Office, and construction of a Silverdale Precinct Building.
f. Proposed Facilities
The City has been working to develop a City Facilities Management Plan. A
Facilities Management Alternative Plans study was prepared in February, 1994
to help plan for near- to mid-term facilities needs for various City departments.
The goal and objective of this plan are the following:
1. Consolidation of Departments to improve communication; coordination;
and streamline department management goals and objectives; and
2. Economics resulting in less property to maintain; centralize departmental
needs; and reduce department managers lost-time due to existing
decentralized departments.
Capital Facilities Element - Part 2 CFP - 24 Capital Facilities Program
Law Enforcement
Work on the facilities plan is currently on hold, pending finalization of downtown
waterfront redevelopment plans. One proposal under consideration would move
City offices to a new location to free up the present location for redevelopment.
The City is concerned about the rising costs of providing jail services. However,
there is no expectation that it would be cost-effective for the City to construct and
staff a new jail facility in compliance with State regulations. Therefore, the City
proposes to continue to contract with Kitsap County to provide jail services for
the foreseeable future.
3. Six-Year Financial Plan
The total need for year 2001 is estimated at 17,000 sq.ft, in one consolidated facility
designed for law enforcement needs. The existing 18,000 feet, while not efficiently
used, will accommodate this need, at least until other options can be examined. A
proposal to construct a new City Hall is discussed under Section I. Municipal Buildings.
The six-year finance plan for municipal buildings is listed in Section K under Other
Funds; Facilities Projects.
Capital Facilities Element - Part 2 CFP - 25 Capital Facilities Program
Law Enforcement
%.
I,
Figure CF-4 Bremerton Police Department Facilities
Capital Facilities Element - Part 2 CFP - 26 Capital Facilities Program
D. Municipal
1. Inventory of Existing Facilities -- Municipal
The inventory of existing municipal facilities includes general purpose buildings and
parking structures. (Table MB-I)
a, Municipal Buildings
The inventory of existing municipal buildings includes general city administrative
and court offices. Buildings which house specific governmental functions that
are connected with other capital facility planning areas (e.g. Fire and Emergency
Medical Services and Law Enforcement) are included in those sections of the
Capital Facilities Element. This inventory does not include Public Works &
Utilities Administration or Parks & Recreation Department buildings, which are
not addressed elsewhere in the CFP.
b. Parkinq Structures
The inventory of parking structures includes the underground City Hall parking
beneath City Hall Park and the City Parking Garage.
FaCility Name Locati°n : size:
General Government (Sq. Ft.)
1. City Hall (1) 239 4th Street 31,915
2. Permit Center 286 4th Street 10,000
Total General Government = 41,915
Parking Structures (Parking Stalls)
1. Underground Parking (City Hall) 225 4th Street **
2. Municipal Parking Garage 451 Washington Ave. 295
Total Parking Stalls = ..
Notes: (1) City Hall sq.ft. = 39,000 s,f, minus 7,085 s.f. used for Law Enforcement.
** To be determined.
Source: Public Works & Utilities Department, 7/97.
Capital Facilities Element- Part 2 CFP - 27 Capital Facilities Program
Municipal Buildings -
2. Forecast of Future Needs - Municipal
a. Municipal Buildings
Existing Demand
The need for municipal buildings can be roughly estimated by comparing
the building area (square feet) to the population served. The City has
41,915 square feet of general purpose municipal buildings serving
approximately 38,500 persons. (Table MB-2)
(2) Level of Service (LOS)
The current LOS for municipal buildings is based on the existing building
inventory (sq.ft.) divided by the City's 1996 population (38,500). To
continue the existing LOS, the City would need 3,457 additional square
feet by year 2001. (Table MB-2)
The proposed LOS is 64 sq. ft. per 1,000 population (8%) lower than the
City's current LOS. The proposed LOS is based on an assumption that
the City would be able to serve a larger population using a lower LOS if
space could be used more efficiently.2 (Table MB-3)
· Existing LOS: 1,089 sq. ft. per 1,000 population
(1.088701 per capita)
· Proposed LOS: 1,025 sq.ft, per 1,000 population
(1.025 per capita)
2 Level of Service for Administrative Facilities: "As communities grow, they generally must add staff and
acquire equipment to handle the additional workload. As a result, they will probably need additional space to house
new staff and equipment. Many city administration offices are crowded compared to their private sector
counterparts. For instance, Urban Land Institute 1988 date shows a national-wide average of 347 square feet per
employee. A 1988 Building Owner and managers survey on office space reports that employees in a production
office enjoyed an average of 305 sq. ff. while those in a headquarters office on the average occupied 374 sq. ft.
Note that these averages include accessory space such as restrooms, hallways and conference rooms (Macheski,
1991). A mini survey of comparable-sized cities conducted by Bainbridge Island found space per employee ratios
ranging from 75 to 210 sq. ft. per employee. A committee conducting an analysis of Bainbridge Island's
administrative office concluding that office space equaling 1149 sq. ft. per 1000 population and 365 sq ft per
employee should be provided. These recommendations covered space for city hall, police and public works
functions. Because city halls often serve as community centers in addition to housing office functions, the need for
public meeting facilities may increase the amount of space needed per employee. (Level of Service Standards:
Measures for Maintaining the Quality of Life, Municipal Research Services Center of Washington, September 1994,
Report No. 31, pg. 89)
Capital Facilities Element - Part 2 CFP - 28 Capital Facilities Program
Municipal Buildings -
Table MB-2
Future Needs Analysis: Municipal Buildings
Current LOS = 1,089 square feet per 1,000 population
(1) (2) (3) (4) (5)
Time period City population Sq.ft. required @ Sq.ft. available Net reserve or
1.088701 per capita deficiency
1996 Actual 38,500 41,915 41,915 0
1996-2001: Growth 3,393 3,457 0 -3,457
Total as of 2001 41,893 45,372 41,915 -3,457
(3) Future Demand
The projected population growth within the service area is for 3,393 new
residents by 2001. (Table MB-3)
(4) Need for Capital Facility Improvements
The proposed LOS would require an additional 4,503 square feet of
space by the year 2001. (Table MB-3)
· . Table'MB-3 '
LOS Capacity Analysis: MuniCipal AdministratiVe Offices· :i
Proposed LOS = 1' 025 square feet per 1 000 population
i
(1) (2) (3) (4) ' i5)
Time period City population Sq.ft. required @ Sq.ft. available Net: reserve or
1.025 per capita : deficiency
1997 Actual 38,500 39,463 41,915 2,453
1997-2002: Growth 3,393 3,478 (1,025) -4,503
Total as of 2001 41,893 42,940 42,940 0
Capacity projects: New City Hall
3. Proposed Municipal Facilities
a. Municipal Buildings
(1) Plans of Other Providers
No other agencies provide space that can be used for general municipal
purposes.
Capital Facilities Element- Part 2 CFP - 29 Capital Facilities Program
Municipal Buildings -
(2) Proposed Facilities
The City conducted a preliminary facilities study in '1985 to consider the
City's short-term and long-term facility needs. This study found that the
City's existing facilities were generally inadequate to meet the City's
current operating requirements, and that population growth would further
increase facilities needs. The most critical needs identified at that time
included: a substandard jail and crowded Municipal Court; dispersal of
City administrative activities to various facilities; the quality of City Hail;
and inadequate facilities for operational sections of Public Works.
Several changes have been made since 1985, including closure of the
jail, addition of the Permit Center, and construction of the new Oyster Bay
Public Works & Utilities Operations Center.
A follow-up Facilities Management Alternative Plans study was prepared
in 1994 to help plan for near- to mid-term facilities needs for various City
departments. Work on this study has been on hold, pending finalization
of downtown waterfront redevelopment plans.
Although the City does not expect to need additional capacity by 2001,
the City recognizes that it needs to continue facilities planning to further
consolidate activities and replace aging structures. There is considerable
expense in operating and maintaining the current obsolete facilities.
Communications, efficiency, and coordination are significantly more
expensive in the existing facilities. New construction and design
techniques would decrease operations and maintenance costs and
improve the efficient provision of city services. Therefore, the City
proposes to continue its on-going facilities study to focus on consolidation
of City administrative functions, with the possible inclusion of courts and
law enforcement functions, at one centralized site. If this can be done,
the City expects that the effective level of service can be increased
within the proposed LOS. Toward this end, the City is programming
funds for replacement of City Hall, the Permit Center, and some or all of
the facilities used by the Police Department (see Law Enforcement
section) with once consolidated facility in 2002.
b. Parkinq Structures
(1) Existincj Demand
(To be completed)
(2) Level of Service (LOS
(To be completed)
Capital Facilities Element - Part 2 CFP - 30 Capital Facilities Program
Municipal Buildings _
(3) Future Demand
(To be completed)
(4) Need for Capital Facility Improvements
The Sinclair Landing Association has determined a need for a large
parking structure in conjunction with the proposed Sinclair Landing
development in downtown Bremerton. The City has determined that
completion of the Sinclair Landing Project is critical to the future of the
City. For the project to be successful, adequate public parking will be
necessary. Therefore, the City proposes to purchase from the developer
the multi-stow Sinclair Landing Parking Structure, which will serve the
owners, employees and customers of the Sinclair Landing Project
including the multi-modal transportation center.
4. Six-Year Financial Plan
The six-year financial plan for municipal buildings is included in Section J of this CFP.
Capital Facilities Element - Part 2 CFP - 31 Capital Facilities Program
Municipal Buildings -
rn
ji
I,
Figure CF-5 Bremerton Municipal Buildings and Parking Structures
Capital Facilities Element - Part 2 CFP - 32 Capital Facilities Program
E. Parks and Recreation
The City of Bremerton provides a system of local parks (neighborhood and community parks),
regional parks, and open space parks. This system is managed by the City's Parks and
Recreation Department with the help of the Bremerton Parks and Recreation Commission. The
park system service area consists of all land within the incorporated city limits.
This parks and recreation capital facilities program reflects recommendations of the City of
Bremerton Parks & Recreation Comprehensive Plan, adopted in 1995, as updated by the City
Parks & Recreation Department.
1. Inventory of Park Lands
The following inventory lists local, regional, open space, and special use park lands.
a. Local Parks
To assist in analyzing service levels, local parks are divided into two categories:
neighborhood and community parks. Bremerton has 206 acres of local park
lands -- an increase of 1.05 acres since 1995.
(1) Neighborhood Parks
A neighborhood park is a combination playground and park designed
primarily for non-supervised, non-organized recreation activities. In
addition to their recreation value, neighborhood parks also provide a
source of open space and aesthetic quality in the neighborhood. They
are generally small in size (about 3-10 acres) and serve an area of
approximately one half mile radius. The City's neighborhood parks range
in size from less than one acre to more than 27 acres.
The City has 39 acres classified as neighborhood parks -- an increase of
three parks on 1.05 acres since 1995. The following table includes an
inventory of the City's 13 neighborhood parks. (Table PK-1)
Capital Facilities Element - Part 2 CFP - 33 Capital Facilities Program
Parks and Recreation
Table PR-1
Inventory of Neighborhood Parks
Map # Park Name Address Total Capacity
(Acres)
1 Forest Ridge Park Summit Avenue & I st Street 27.30
3 Kiwanis Playfield Between 4th & 5th at Veneta 3.00
32 McKenzie Basketball Court Juniper Court 0.02
5 Ninth Street Mini-park E. 9th & Shore Drive 0.02
33 Lower Roto Vista Park Elizabeth Street end 1.00
6 Roto Vista Park 17th & Warren Avenue 0.70
7 S.P. "Pat Carey Vista Tracyton Beach Drive 0.50
9 Smith Playfield 1198 Elizabeth 3,00
10 SR-3 Park Arsenal & Kitsap Way 3.80
34 Arvon Park Arvon Street 0.03
Total Neighborhood Park Acres = 39.37
(2) Community Parks
A community park is planned primarily to provide active and structured
recreation opportunities for young people and adults. In general,
community park facilities are designed for organized activities and sports,
although individual and family activities are also encouraged. Community
parks can also provide indoor facilities to meet a wider range of
recreation interests. Where there are no neighborhood parks, the
community park can also serve this function. Community parks serve a
much larger area and offer more facilities. They usually exceed 20 acres
in size and often have sport fields, water bodies, gardens, nature trails or
similar facilities as the central focus of the park. Their service area is at
least a 1-2 mile radius. The City's community parks range in size from
one third acre to 54 acres.
The City has 167 acres of community park lands. The following table
includes an inventory of these community parks. The list includes 149
acres of "community parks of regional significance". These are parks that
have traditionally served as local parks, but because of special features
such as waterfront access have taken on a regional role as well. For
example, while Bachmann Park is a very small waterfront park in the
Manette neighborhood, it has become a popular regional sailboard
launching site. These parks are listed as a subcategory of community
parks because they have been identified in the Kitsap Countywide
Comprehensive Park and Recreation Plan as parks with regional
significance which are eligible for countywide funding participation.
(Table PR-2)
Capital Facilities Element - Part 2 CFP - 34 Capital Facilities Program
Parks and Recreation
Table PR-2
Inventory of Community Parks
Map # Park Name Address Total Capacity
(Acres)
12 Bataan Park Sylvan & Olympus Dr 1.00
13 Blueberry Park Sylvan Way 8.90
14 City Hall Park 4th & Washington 0.30
18 Jarstad Park Old Belfair Highway 4.00
20 Manette Park & Senior Citizens Center 1140 Nipsic 2.60
24 Warren Avenue Playfield 11th & Warren Avenue 3.00
25 Wycoff Memorial Park 1st & Pacific Ave. (CBD) 0.02
Subtotal = 17.82
Community parks of RegiOnal Significance
11 Bachmann Park Shore Drive & Trenton 0.50
15 Eastpark & G. Jarstad Aquatic Center Magnusson Way & Homer Jones 17.50
16 Evergreen Park 14th & Park Avenue 8.00
19 Kitsap Lake Park Price Road 31.90
4 Lent Lane Park Lebo Boulevard 1.50
22 N.A.D. Marine Park Shorewood Drive end 27.50
21 N.A.D. Park (upper) 6002 Kitsap Way 54.00
8 Sheridan Park (lower) Lebo Boulevard & Clare Street 8.00
23 Sheridan Park Community Recreation 680 Lebo Boulevard 4.00
Center
Total Community Parks of Regional Significance = 148.90
Total Community Park Acres = 166.72
b. Regional Parks
Regional parks are recreation areas that serve an entire region. They are
usually large in size and often include areas of natural quality suitable for outdoor
recreation activities such as golfing, picnicking, boating, fishing, swimming,
camping and hiking. If located within an urban area, they sometimes offer a
wider range of facilities and activities which servee the entire region. The City's
regional parks range from two to 50 acres.
The City has 67 acres of regional parks. However, if the 149 acres of
"community parks of regional significance" are included (see Table PR-2), there
are 216 acres of City parks serving the local region. The following table includes
an inventory of the City's three regional parks. (Tab/e PR-3)
Capital Facilities Element- Part 2 CFP - 35 Capital Facilities Program
Parks and Recreation
Table PR-3
Inventory of Regional Parks
Map # Park Name Address Capacity (Acres)
:28 Bremerton Boardwalk Between 1st & 4th St. - downtown 2.00
waterfront
27 Lions Community Playfield Lebo at Hefner 15,00
29 Andy Pendergast Regional Park 1199 Union 50.00
Total Regional Park Acres = 67.00
c. Open Sp~
An open space park consists of undeveloped land primarily left in its natural
environment, with recreation uses as a secondary objective. It is usually owned
or managed by a governmental agency and may or may not have public access.
This type of land often includes steep hillsides, wetlands, large forested areas or
other similar spaces. In some cases, environmentally sensitive areas are
considered as open space and include wildlife habitats, stream and creek
corridors, forested areas or unique or endangered plant species. The City's
open space lands are often heavily wooded, and development, if any, is usually
limited to trails.
Bremerton has 55 acres of open space, including a cemetery. In addition, the
City maintains numerous beautification areas and pocket parks. The following
table includes an inventory of Bremerton open space park lands. (Table PR-4)
inventOry °f open sPeCe parks
Map # park Name Address size(Acres)
7 Eastpark Nature Area Wheaton Way at Magnusson 14.40
13 Ivy Green Cemetery Naval Avenue 13.00
31 Stephenson Canyon Between Lewis Lane & Willow :28.00
Beautification Areas/Pocket Parks various locations
Total Open Space Acres = 55.40
d. Special Use Facilities
The City-owned Gold Mountain Golf Course is located several miles south of the
developed pads of the City. It is listed separately from other park and recreation
facilities because it is an "enterprise" facility that is intended to pay for itself.
Generally, the development and operation of the golf course is financed with
Capital Facilities Element - Part 2 CFP - 36 Capital Facilities Program
Parks and Recreatio_n
user fees and other special enterprise revenues, including development and
operating agreements with concessionaires. The size of the facility will nearly
double, from 190 to 360 acres, with completion of the addition of a second 18
hole golf course.
Table PR-5
Inventory of Special Use Facilities
Map # Facility Name Address Capacity (Acres)
26 Gold Mountain Golf Course Old Belfair Highway 360.00
Total = 360.00
e. Total Park Lands
The City has a total of 691 acres of park lands, including the municipal golf
course. Without the golf course, the total is 220 acres. (Table PR-6)
summary Inventory ~ AIl pa~k Lands
TYpe Capaci~, (Acres)
Neighborhood Parks 39.37
Community Parks 166.72
Regional Parks 67.00
Open Space Parks 58.40
subtotal= 33149
Special Use Facilities 360.00
Total = 691.49
2. Forecast of Future Park Needs
a. Existing Demand
With 691 acres of park lands serving 38,500 residents, the City has 18.0 acres of
park lands per 1,000 persons (including the municipal golf course).. Without the
golf course, the City has only 8.6 acres of parks per 1,000 persons. (Table PR-
7)
Capital Facilities Element - Part 2 CFP - 37 Capital Facilities Program
Parks and Recreation
b. Level of Service (LOS)
The need for park lands can be estimated by comparing the number of existing
park acres per 1,000 persons with national standards. The National Recreation
and Parks Association (NRPA) recommends a total LOS of 15-20 acres per
1,000 persons for local and regional park lands.
The following table compares the Existing LOS (ELOS) and the LOS
recommended by NRPA. The overall City LOS is within the recommended range
if the municipal golf course is included. Without the golf course, the City LOS is
far below the NRPA recommendation. Compared to the NRPA guidelines, the
City has ample regional park lands but falls short in neighborhood, community,
and open space park lands. (Table PR-7)
Level of service (LOS): All park LandS
TYPe' AcreS
i ExiSting (2) Pr0P°Sed (3)i
Neighborhood (1) 39.37 1.25 1.0 1.25
Community 166.72 5 4.3 3.98
Regional 67.00 5 - 10 1.7 1.60
ODen Space 58.40 3.6 1.5 1.39
:
Subtotal= : 331~49; : ; 8;6;; :;
Special Use Facilities 360,00 - 9.4 8.59
Total Park Lands = 691.49 15 18.0 16.82
(1) The NRPA Neighborhood Parks LOS includes 0.25 to 0.5 acres mini-park.
(2) Existing LOS = Acres / 1996 Population x 1,000 (1996 pop. = 38.5).
(3) Proposed LOS = existing + new acres / 2001 pop./1000 (41.893).
The NRPA standards are intended for a "typical" community, and of course all
communities differ. For example, while the NRPA recommended LOS indicates
that Bremerton is deficient in open space parks, the City is surrounded by
thousands of acres of open water. Although water bodies may not fall within the
traditional meaning of "open space", nevertheless many Bremerton waterfront
parks provide visual and physical access to miles of open water that would be
difficult to quantify with a LOS. Likewise, distant mountain views visible from
many parts of the city add to the perception of open space.
The NRPA standards were shaped in the early part of this century.' Although
they have been adjusted over the years, they may not represent today's needs
and values. Accordingly, they are currently under review for possible revision.
They are best viewed as rough guidelines -- useful, but not absolute.
Capital Facilities Element - Part 2 CFP - 38 Capital Facilities Program
Parks and Recreation
The proposed LOS of 14.15 acres per 1,000 persons will be a decrease from the
existing LOS. This is because even though park acreage will be increased by
12.95 acres by year 2001, this acreage will serve over 3,000 more City
residents. A per capita version of the LOS is also listed for the purpose of
calculating park needs to serve forecasted population growth. (Table PR-7)
· Existing LOS = 18.0 acres per 1,000 persons
(0.0179607 acres per capita.)
· Proposed LOS = 16.82 acres per 1,000 persons
(0.0168164 acres per capita.)
c. Future Demand
The projected population growth within the City is for 19,642 new people by year
2012, for a total population of 58,142.
d. Need for Capital Facility Improvements
The proposed LOS would result in a need for 286 additional acres of park lands
by year 2012 -- a total of 978 acres. This goal may not be sustainable if the
City's population grows as projected. (Table PR-8)
Table PR-8 .
FUture Need: Parks
Time Period· Population ACres {~ 010~i68164 ~ CUrrent acres: Net rese~ve:°r
. per caPita I available deficiency
· i
Six-Year Need ·
1996 actual 38,500 647.43 691.49 44.06
1997-2001 (new) 3,393 57.06 44.06 -13.00
Total as of 2001 = 41,893 704.49 0.00 -13.00
Sixteen-Year N'eed ' ' ' '
2002-2012 (new) 16,249 273.25 0.00 -27'3.25
Total as of 2012 = 58,142 977.74 0.00 -977.74
1997-2012 (new) 19,642 330.31 44.06 -286.25
3. Proposed Park Facilities
a. Plans of Other Providers
The 1994 Kitsap Countywide Comprehensive Park and Recreation P/an
recommends that the various jurisdictions undertake a coordinated, countywide
Capital Facilities Element - Part 2 CFP - 39 Capital Facilities Program
Parks and Recreation
approach to facility development to meet present and projected park and
recreation land and facility needs. The plan proposes a county-wide LOS of
12.75 acres per 1,000 persons. Both the existing and proposed City LOS are
above the proposed County standard.
The county-wide plan recommends that Kitsap County park and recreation
agencies undertake a "strategic role" service approach where: a) the county
provides park and recreation facilities and programs that no other agency can or
is willing to provide; b) the county acts as a coordinator of local interests where
facilities are provided by many other agencies; and c) the county performs as a
facilitator where unique acquisition or development opportunities may occur that
could be implemented or operated by the local city or other agencies. Under this
strategy, the county will consider providing financial support for capital facilities
that have regional use benefits. Examples in Bremerton are: Bremerton
Boardwalk; Lions Field; Pendergast Regional Park; and Eastpark/Bremerton
YMCA.
The May 1996 draft Kitsap County Plan proposes a total LOS of 13.13 acres per
1,000 population for County-owned parks. This will require purchase of an
additional 1,730 acres by year 2012. The County expects the LOS to decrease
in future years, as park land acquisitions are completed. Expenditures will then
be concentrated on development following acquisitions.
b. Proposed City Facilities
The City's 1995 Parks & Recreation Comprehensive Plan proposes ~ adding
184 acres of park lands. The largest project is an 18-hole addition to the Gold
Mountain Golf Course (170 acres). The Golf Course is a high priority, as it
provides capital revenues for other city parks. The Plan also anticipates
acquisition of an additional 14 acres of local park lands (one of which has now
been acquired). (Table PR-8)
In addition to adding new park lands, the City recognizes that it needs to make
more intensive use of some existing park lands. For example, the City proposes
to develop a natural amphitheater on the hillside above the ninth green on the
Olympic course at Gold Mountain Golf Course.
The City recognizes the difficulty in maintaining the recommended LOS past the
year 2000. There are few large tracts of undeveloped land left within the
developed parts of the City today. As infill development continues there will be
even less vacant land, and land prices are likely to increase correspondingly.
These developments may make it impossible to meet typical acreage standards.
To continue to pursue a goal of providing opportunities for recreation and
enjoyment of open space in every neighborhood will be a particular challenge.
One option is a proposal to purchase approximately 275 acres of State DNR land
with timber in the area North of Riddell Road and East of SR 303. This project is
contingent on annexation of the surrounding area and the use of associated tax
revenue.
Capital Facilities Element - Part 2 CFP - 40 Capital Facilities Program
Parks and Recreation
The City will need to seek creative ways of adding park lands within developed
parts of the city where vacant land is scarce. For example, the City and School
District are exploring the possibility of shared use of school recreation lands.
Other solutions could include tree-lined "greenways" connecting park lands; and
rooftop gardens, landscaped public courtyards, or fees in lieu of open space in
high density areas. In the long run the City may need to develop LOS standards
which will better measure alternative park and recreation opportunities.
4. Six-year Financing Plan
The six-year financing plan for parks and recreation facilities is included in Section K of
this Capital Facilities Program.
Capital Facilities Element - Part 2 CFP - 41 Capital Facilities Program
F. Sanitary Sewer
Sanitary sewer facilities are provided by the Bremerton Department of Public Works and
Utilities. A complete inventory, analysis of need, and capital improvements program are
provided in the adopted Wastewater Comprehensive Plan (a.k.a. the "Wastewater Plan").
1. Service Area
The Wastewater Comprehensive Plan identifies a service area consisting of territory
currently served by the Wastewater Utility, as well as areas adjacent to the city limits
that are not now serviced but which could logically be served based on natural
topography.
The service area covers 13 drainage basins, of which five extend beyond the city limits
into unincorporated county areas: Kitsap Lake, Tracyton Beach, Trenton Avenue,
Sinclair Park, and Oyster Bay. The Utility provides sewage treatment to the sewered
areas in the service aree4C~rough direct service and through specific contractual
agreements with the U.S. Navy and Kitsap County Sewer District No. 1 (Navy Yard
City). (Figure CF-7 Bremerton Sanitary Sewer System Service Area)
The Port of Bremerton operates a public wastewater facility located in Olympic View
Industrial Park (OVIP) on State Route 3 west of Gorst. The Port is exploring alternatives
to provide this area with high level municipal sewer. The City has entered into an
agreement with Kitsap County to participate in a Gorst Area Sewer Feasibility Study,
which will examine alternatives for sewering the greater Gorst area, including the OVlP
and airport.
2. Inventory of Existing Facilities
The City sewerage system consists of sewage collection, transmission, treatment, and
bio-solids utilization facilities. Included are more than 188 miles of gravity sewers,
approximately 16 miles of pressure lines, and 33 pump stations. These facilities convey
sewage to a secondary wastewater treatment plant located just south of West Hills.
Additionally there are 16 combined sewer overflow (CSO) sites located within the sewer
collection system. Approximately 60 percent of the system is composed of combined
sanitary and stormwater sewers. (Table SS-l)
Capital Facilities Element - Part 2 CFP - 43 Capital Facilities Program
Sanitary Sewer
Table SS-1
Inventory: Wastewater Treatment Facilities
Facilities Address Capacity
Bremerton Wastewater Treatment Plant ('/) 1600 Oyster Bay Ave W (3) 10.1 mgd
Collection System: Pipe various 204 miles
Wastewater Liftstations various 34
Forest Enhancement Sites One & Two (2) Near Gold Mtn. Golf Course 600 acres
('/) City of Bremerton Wastewater Comprehensive Plan, May 1996.
(2) City of Bremerton 1993 Biosolids Report to Bremerton-Kitsap County Health District.
(3) Average flow for maximum month per NPDES permit.
(a) Wastewater Treatment Plant
The existing wastewater treatment plant was designed to have a peak hydraulic
capacity of 29.5 million gallons per day (mgd). Peak flows in excess of 25 mgd
are typical during wet months. Normal dry weather peak flow capacity without
stormwater inflow is estimated at 8 mgd. Current annual average and maximum
monthly flows to the wastewater treatment plant are about 80 percent of the
average annual and maximum monthly flows for which it was designed. It is
estimated that 21 percent of the annual average flow and 44 percent of the
maximum month flow is stormwater inflow. Stormwater will be reduced from the
system over the next several years under the City's CSO Reduction Plan.
Once stormwater inflow is reduced, the treatment plant will have the capacity to
serve approximately 58,000 people.
(b) Forest Enhancement Program -- Biosolids Utilization
The wastewater treatment plant produces approximately five million gallons of
anaerobically digested biosolids each year. Because biosolids have fertilizer and
soil amendment value the City began an active land application program several
years ago to utilize the benefits of this wastewater process by-product. Biosolids
are used to enhance tree growth and are currently applied to 600 acres of Utility-
owned forest land. Since June 1992, 100 percent of the biosolids produced at
the treatment plant have been utilized in this beneficial manner. The objective of
the City's forest enhancement program is to develop an environmentally sound
method of using the resource value of biosolids in accordance with federal, state,
and local regulations.
Capital Facilities Element - Part 2 CFP - 44 Capital Facilities Program
Sanitary Sewer
3. Future Needs
a. Existinq Demand
The Wastewater Plan estimates the 1990 population of the service area at
45,210, of which 38,140 were within the city limits and 7,070 outside the city.
The plan estimates that approximately 37,000 persons within the service area
were connected to the sewer system, leaving an unsewered population of
8,210.3
Kitsap County estimates that the total 1994 service area population was 46,928.4
The City estimates that the 1996 population is approximately 52,762?
The average daily flow, including stormwater inflow, is 6.0 mgd. As CSO
separation occurs, the average flow will be reduced accordingly? Minimum
peak flow (peak flows occurring without storm water inflow) is estimated at 8
mgd. While the U.S. Navy is allocated 3.8 mgd, it is currently discharging only 1
mgd -- roughly equivalent to 10,000 population. (Table SS-2)
b. Level of Service (LOS)
The capacity of existing sewer facilities to serve future needs is determined by
comparing the gallons of effluent per day now approved by the State, the
number of existing connections, and the number of new people to be served.
The number of new people is converted into the number of new residential
connections based on assumptions of the number of persons per household, and
the number of gallons of effluent generated per capita per day (gpcd). The
capacity can also be estimated based on an existing and planned LOS for sewer
service.
The calculation of the current LOS excludes stormwater inflow. (Although the
City's system experiences some infiltration, it is not a major component of the
flow.) The proposed LOS is the existing county-wide average.
3Source: Table 1., City of Bremerton Wastewater Comprehensive Plan, December 1995, p. A-2 (Estimate prepared
in 1992).
4Source: Table SS-2. Kitsap County Capital Facilities Plan Sewer Facilities - 20-Year Population Allocation - CSF
#1, Draft Kitsap County Comprehensive Plan, Part II, April 1996, Pg.. 3-87. The County population estimate is for the
total service area, and does not include an estimate of the sewered or unsewered populations.
SThe City population estimate is based on the Kitsap County population estimate for the unincorporated part of the
sewer service area, along with the City estimate within the city limits. (See page CFP-9)
6Source: Bremerton Wastewater Utility, 9/96.
Capital Facilities Element - Part 2 CFP - 45 Capital Facilities Program
Sanitary Sewer -
· Current LOS = 97 gallons per capita per day (gpcd)7
· Proposed LOS = 100 gpcd
c. Future Demand
The May 1996 draft Kitsap County Capital Facilities Plan estimates that a total of
66,096 persons within the sewer service area will require sanitary sewer service
by year 2012, an increase of 19,168 persons from 1992. The County plan
estimates that this increase includes 1,111 persons that were not connected to
the sewer system in 1992. (Table SS-2)
Table SS,2
KitsaP c°unty Ca pita! FaCilities Plan sewer FaCilities . 20~Year AllOCation ~
Population 1992 1994:2000 2012 1992~2012 20t2
: i i%change : inCrease
Total Population 46,321 46,928 54,370 66,096 29.92% 19,168
Sewered 45,210 NE NE 66,096
Unsewered 1,111 NE NE 0
Source: Table SS-2, Draft Kitsap County Capital Facilities Plan, May 1996, pg. 3-87.
The County allocation addresses years 1994 and 2000 (rather than years 1996-
2001) in order to comply with a Puget Sound Growth Hearings Board order.
Therefore, the City has projected service area population figures for years 1996
and 2001 based on the County forecast. (Table SS-3)
7"Executive Summaw", City of Bremerton Sewer Comprehensive Plan, October 1991, p. 10.
Capital Facilities Element- Part 2 CFP - 46 Capital Facilities Program
Sanitary Sewer
Table SS-3
Future Need: Sanitary Sewer
Time Period Demand Capacity Average Daily
(Population in City-County (Population) Demand ~ 100 GPCD
Service Area) (MGD)
Six-Year Need
1996 Service Area Population 52,762 58,000 5.28
1997-2001 New Population 2,128 3,110 0.21
Total 2001 Sewered Population = 54,890 3,110 5.49
Twenty-Year Need
2001-2012 New Population (4) 11,206 (8,096) 1.12
Total 2012 Sewered Population = 72,077 (14,077) 7.21
Total 1996-2012 Increase = 19,315 (4,986) 1.93
Notes: For the purposes of this projection, it is assumed that all persons within the service area will connect to the
sewer system by year 2001.
d. Need for Capital Facility Improvements
The Wastewater Plan was developed for an ultimate service area population of
80,610. Therefore, planned improvements will be adequate to serve the
projected 72,077 sewered population, provided there are no major industrial
hookups.
The City is participating in a feasibility study to sewer Gorst and the industrial
properties in the vicinity of the Port of Bremerton and Anderson Creek.
Sewering all or a portion of these areas utilizing Bremerton's treatment facility
are included as options. The results of this study may affect the need and timing
for treatment plant expansion.
e. Plans of Other Providers
The Kitsap County Public Works Department Wastewater Division is in the
process of preparing a County-Wide Wastewater Facility Plan. The draft plan
integrates the individual wastewater plans within the county, and includes
recommendations for expanding county facilities to serve projected needs.
f. Proposed Facilities
The City's Wastewater Plan recommends four types of improvements at the
treatment plant to accommodate projected sewage flows at ultimate plan service
area development and to solve some current and anticipated operational
problems:
Capital Facilities Element - Part 2 CFP - 47 Capital Facilities Program
Sanitary Sewer
· Infrastructure improvements -- repairs or replacements of existing sewer
system facilities to restore structural integrity;
· Regulatory requirements -- improvements needed as a result of new or
modified codes, guidelines, or laws initiated from federal, state, and local
government;
· Growth and system extensions --improvements resulting from new
development or system extensions;
· Other system improvements -- recommendations that contribute to the
improved operation or function of the system but are not a result of
infrastructure needs, regulations, or system growth.
The Utility will acquire properties in the vicinity of the wastewater treatment
facility for future plant expansion and buffer for odor management.
The City will be conducting a study for reuse of wastewater treatment plant
effluent. The purpose of the study is to determine the feasibility of reusing
effluent for industrial use or land application. If feasible alternatives for reuse are
identified, the City may pursue these alternatives toward implementation.
The combined sewer overflow reduction program will continue over the next six
years. The program includes completion of Callow Avenue Basin Priority 1 & 2
during 1997 and 1998. Reduction of overflows in the Anderson Cove Basin will
begin with completion of an engineering report in 1997. This will be followed by
final design and construction in phases from 1998 though 2001. Smaller projects
will be undertaken throughout the system to reduce combined sewer overflows
as they are identified. These projects may include pipe rerouting, combined
sewer storage, and overflow structure modifications.
4. Six-Year Financial Plan
It is estimated that the existing sanitary sewer system has a total capacity of 8 million
gallons per day (mgd), with approximately 3 mgd available capacity, which is sufficient
to meet the total need of 5.49 mgd through the next six years, provided there are no
major new industrial demands. (This assumes removal of stormwater from the system
over the next several years under the City's CSO Reduction Plan.)
The six-year financial plan for sanitary sewer facilities is included in Section K of this
CFP. It is a summary of the City's Six Year (1996-2001) Wastewater Capital
Improvement Plan. Improvements are shown to be primarily Utility financed through
2002, assuming no grants will be available. Of the Non-Utility financed projects, most of
the growth-related improvements are anticipated to be financed by special utility local
improvement districts (ULIDs) or by developers directly. It is anticipated that roughly 20
percent of the expenditures beyond 2000 will be funded by non-utility sources of
revenue.
Capital Facilities Element - Part 2 CFP - 48 Capital Facilities Program
G. Schools
Bremerton School District #100C is located on the Kitsap Peninsula between Port Orchard Bay,
Dyes Inlet and Sinclair Inlet. The District is adjacent to the Puget Sound Naval Shipyard, and
its enrollment is directly related to the military population at the base. (See Figure CF-8
Bremerton School District)
The Bremerton School District provides public education in most parts of the City. The
exception is a small area in the vicinity of the Bremerton Watershed, which is served by South
Kitsap School District #402. The Jackson Park Naval Reservation is jointly served by the
Bremerton School District and Central Kitsap Public School District #401.
Only the Bremerton School District is included in this Capital Facilities Program, since such a
small fraction of city residents is served by the South Kitsap School District, and no school
facilities operated by that district are located within the city limits.
1. Inventory of Existing Facilities -- Schools
The Bremerton School District has seven elementary schools, one middle school, one
junior high school and one high school plus an alternative high school, the District also
administers a vocational skills center that serves six other school districts. The current
grade configuration in the District is based on grades K-5, elementary; grades 6-7,
middle school; grades 8-9, junior high; and grades 10-12, high school. The following
table lists the Bremerton School District's schools and their enrollment capacity. (Table
SC-l)
Capital Facilities Element - Part 2 CFP - 50 Capital Facilities Program
E. Schools
Table SC-1
Inventory of Existing Facilities -- Bremerton School District
School II Location I Existing Student Capacity
Elementary Schools (Grades K-5)
Armin Jahr 800 Dibb 481
Crownhill 1537 Bertha Ave. 528
Kitsap Lake 1111 Carr Blvd. 550
Naval Avenue 900 Olympic 484
Olympic View 2442 Perry 486
View R[~dge 3220 Wheaton Way 528
West Hills 520 National Ave So. 528
Total Elementary Permanent Facilities = 3,585
Total Elementary Interim (Portable) Facilities = 250
Total Elementary Permanent and Interim Facilities = 3,835
MiddlelJr. High SChools (Grades :6,9): ~
Mountain View Middle School 2400 Perry Ave. 810
Bremerton Jr. High 1300 E. 30th 1,115
Total Middle/Jr. High Permanent Facilities = 1,925
Total Middle/Jr. High Interim (Portable) Facilities = 115
Total Middle/Jr. High Permanent and Interim Facilities = 2,040
Bremerton High School JJ 1500 13th 1,275
Total Senior High School Permanent Facilities = 1,275
Total Senior High Interim (Portable) Facilities = 115
Total Senior High School Permanent and Interim Facilities = 1,390
Source: Bremerton School District No. 100C, 4/97.
2. Forecast of Future Needs -- Bremerton School District
a. Existing Demand -- Enrollment and Capacity
There were 6,463 students enrolled in Bremerton School District schools in
1996. Existing enrollment is shown in Table SC-3 (column 2).
Capital Facilities Element - Part 2 CFP - 51 Capital Facilities Program
E. Schools
b. Level of Service (LOS)
The Bremerton School District has established the standard size for schools as
550 for elementary, 1,000 for middle school/jr, high, and 1,250 for senior high.
The overall student to teacher ratio is set at 24 for elementary students and 32
for secondary schools. However, the district is concerned that the use of
average classroom size as a standard may be misleading, since classroom size
varies by program and contract provisions. The data for middle/junior high and
senior high schools overstate the actual capacity of those schools because they
are not adjusted for the "utilization" or "efficiency" factor that represents
classrooms not in use during some periods of instruction. These factors typically
reduce the theoretical capacities listed below by 10 to 15 percent. (Tab/e SC-2)
: : Level of Service: ,. Bremerton SChoOl District
Measu~e ,Elementary MiddleljrlHi~h seni°r High i
School Size (Students) 550 1,000 1,250
Classroom Size 24 32 32
Sources: Bremerton School District, 10/94; Kitsap County Comprehensive Plan, Part I1: Capital Facilities Plan,
12/23/96
c. Future Demand -- Enrollment Projections
The need for new schools is based on projected school enrollment. The
Washington State Superintendent of Public Instruction (SPI) provides enrollment
projections based on the "Cohort Survival Method? The school district
considers the SPI system useful, but inadequate to represent the unique growth
conditions of the Bremerton district. For example, 1992 enrollment forecasts
based on SPI projections predicted a school population of 8,370 in 1994 --2,185
higher than actual 1994 enrollment. The largest single factor in Bremerton
enrollment has historically been the fluctuation in naval population, which can be
difficult to predict very far in advance.
Table SC-3 compares current and future enrollment to the enrollment capacity of
the Bremerton School District.
The enrollment data (column 2) was derived from population forecasts provided
by Kitsap County used to develop the County's Comprehensive Plan (which are
based on official forecasts by the Office of Financial Management, State of
Washington).
8 The Cohort Survival Method uses historic patterns of student progression by grade level to measure the portion of
students moving from one grade level up to the next higher cohort or grade. This ratio or survival rate is used in
conjunction with current birth rates as a base for state-wide enrollment projections.
Capital Facilities Element - Part 2 CFP - 52 Capital Facilities Program
E, Schools
The existing capacity (columns 3 and 4) is taken from Table SC-l, and includes
existing permanent and portable facilities.
The net reserve or deficiency is the difference between enrollment and capacity.
The net reserve or deficiency in permanent facilities (column 5) is calculated by
subtracting enrollment from permanent capacity (column 3 minus column 2).
The net reserve or deficiency in all facilities (column 6) is calculated by
subtracting enrollment from both permanent and interim capacity (add columns 3
and 4, then subtract column 2). If capacity is less than enrollment, the district
has a "reserve" that can accommodate future enrollment. If capacity is less than
enrollment, the district has a "deficiency" which can be addressed by adding
capacity (see Table SC-4) or by changing the standard for level of service as
part of the annual amendment to the Comprehensive Plan.
~ Bremerton SChoOl District caPacitY Requirements:
(1 ) (2) (3) (4) (5) (6)
Net reserve or
deficiencies Net reserve or
Permanent permanent deficiencies all
Time Period Enrollment Capacity Interim Capacity facilities facilities
Elementaw Schools (K-5)
1996 Actual 2,938 3,585 250 647 897
1996-2002: Growth 722 -722 -722
Total as of 2002 3,660 3,585 250 -75 175
Capacity Projects -
None Scheduled **
Middle/Jr. High Schools (6-9)
1996 Actual 1,836 1,925 115 89 248
1996-2002: Growth 220 -220 -220
Total as of 2002 2,056 1,925 115 -131 28
Capacity Projects -
None Scheduled **
Senior High Schools (10-12)
1996 Actual 1,689 1,275 115 -414 -229
1996-2002: Growth 30 -30 -30
Total as of 2002 1,719 1,275 115 -444 -329
Capacity Projects -
None Scheduled **
"The capacity deficiency does not equal or exceed the capacity of an additional school. No new school for this grade level is included in the
District's 6-year Capital Facilities Plan. A replacement or modernization is required.
Capital Facilities Element - Part 2 CFP - 53 Capital Facilities Program
E. Schools
d. Plans of Other Providers
The Kitsap County Comprehensive Plan Capital Facilities Element projects
facility needs for all school districts in the County, including the Bremerton
School District. This element is a valuable resource for comparing class size,
school size, construction costs, etc. between districts.
3. Proposed Facilities
a. Elementary School Capacity Requirements
Through the year 2002, the Bremerton School District will not need any
additional permanent space for elementary students. Some existing space does
require replacement or modernization.
b. Middle School/Junior High School Capacity Requirements
Through the year 2002, the Bremerton School District will need additional
permanent space for 131 middle school/junior high school students. Since this
capacity deficiency does not equal or exceed the capacity of an additional middle
school or junior high school, the District does not include a new middle/junior
high school in its capital facilities plan through the 2002-03 school year. Some
existing space does require replacement or modernization.
c. Senior High School Capacity Requirements
By the year 2002, the Bremerton School District will need permanent space for
444 senior high school students. Since this capacity deficiency does not equal
or exceed the capacity of an additional senior high school, the District does not
include a new senior high school in its capital facilities plan through the 2002-03
school year.
d. Non-Capacity Requirements
This analysis of capacity does not address the need to modernize or replace
existing facilities, but the District has determined the need for such capital
projects, and they are included in the capital improvements projects and
financing plan listed below. (Table SC-4)
4. Six-Year Financial Plan
The Six-Year Financial Plan for Schools is included in Section K.
Capital Facilities Element - Part 2 CFP - ,54 Capital Facilities Program
H. Stormwater
Stormwater facilities are provided by the Bremerton Department of Public Works & Utilities.
The Stormwater Utility was formed by ordinance in 1994 as a funding source for the stormwater
program mandated by the Puget Sound Water Quality Management Plan. The mission of the
Program is to control flooding, enhance water quality, and protect sensitive habitat areas and
local aquifers. A draft Stormwater Management Plan was prepared during 1995 & 1996 and is
expected to be adopted in 1997.
The City's stormwater service area is the City limits. There are 14 drainage basins located
within the developed portions of Bremerton. These drainage basins closely conform to the
limits of the sewer basins identified in the City's Wastewater Comprehensive Plan. Additional
drainage basins within the Utility Owned Lands are also within the service area.
1. Inventory of Existinq Facilities
With the exception of a few more recent developments, the existing drainage system
within the City can be characterized as a conveyance system of surface drainage
swales and a series of pipes which collect and route drainage away from homes and
businesses as shown Exhibit 4-1.
The City has a storm drainage system with partial sewage separation. The City's
adopted Combined Sewer Overflow (CSO) Reduction Plan will separate stormwater
from the existing sewage collection system and limit CSOs to no more than one per
year.
A number of natural drainage facilities exist in the Bremerton drainage system. These
natural systems include swales, channels, creeks, ravines, and natural drainage ways
that discharge directly to marine waters. The City is responsible for maintaining three
detention facilities. These facilities are located near Loxie Eagans Blvd. & Arsenal Way,
Oyster Bay Avenue & Loxie Eagans, and Ridgetop Circle & Monticola Drive (Holly
Terrace West Addition). The City's stormwater conveyance system consists of
approximately 52 miles of pipes ranging for 8" to 54" in diameter. An estimated 60% of
the sanitary sewer system is composed of combined sewers which carry sanitary and
stormwater flows.
Bremerton currently has 14 developed drainage basins. The basins include those areas
outside of the City limits that drain into the City and contribute runoff to some of the
City's localized drainage problems. The City's stormwater basin area is 8,564 acre feet.
The majority of undeveloped Utility Owned Land is not included in this inventory. (Table
SW-~)
Capital Facilities Element - Part 2 CFP - 56 Capital Facilities Program
Stormwater
Table SW-1
Inventory of Capital Facilities: Storm Water Basins
Basin Name Location - D, ,rainage Acres
1. Anderson Avenue N shores of W. Brem. - Port Wn. Narrows 400
2. Callow Avenue Central W. Brem. - Sinclair Inlet 850
3. Cherry Avenue E. Brem. NE of Warren Ave. Bridge - Por~ Wn. Narrows 250
4. East Park E. Brern. S of Sylvan Way - Port Wn. Narrows 330
5. Kitsap Lake W. Brem surrounding Kitsap Lake - Chico Bay 1,550
6. Oyster Bay NW part of W. Brem - Oyster Bay & Ostrich Bay 1,575
7. Pacific Avenue SE part ofW. Brem incl. Ferry Terminal- Sinctair Inlet 150
8. Phinney Bay N central part ofW. Brem - Phinney Bay 225
9. Pine Road W part of E. Brem. - Port Wn. Narrows 680
10. Sinclair Park SW portion of W. Brem - 1,400
11. Stevens Canyon E. Brem. in vicinity of W. heaton/Sylvan - Port Wn. Narrows 350
12. Tracyton Beach Along W. edge of city limits in E. Brem - Port Wn. Narrows 60
13. Trenton Avenue E part of E. Brem - Port Wn. Narrows & Port Orchard Bay 670
14. Warren Avenue Downtown Bremerton - Port Wn. Narrows 275
Total = 8,565
Source: City of Bremerton Draft Stormwater Management Plan.
2. Forecast of Future Needs
a, Existing Demand
Water Quality -- The City of Bremerton established a policy requiring detention
facilities on development projects in 1980. The guidelines for sizing these
facilities limited the runoff rate to 0.2 CFS/acre based on a 25-year storm event.
Since 1994, the City has required all development to meet the requirements of
the "Stormwater Management Manual for the Puget Sound Basin".
Conveyance -- A complete analysis has not been performed on the City's
existing storm drainage system to determine the capacity of the components.
This analysis will be conducted over the next five years as part of the proposed
drainage basin assessments.
b. Level of Service (LOS)
Water Quality -- Development projects must meet the requirements of the
"Stormwater Management Manual for the Puget Sound Basin", which includes
Capital Facilities Element- Part 2 CFP - 57 Capital Facilities Program
Stormwater
providing water quality enhancement for 6-month, 24-hour storm and stream
bank erosion control by releasing one-half of the predeveloped 2-year/24-hour
duration rate during a 2-year/24-hour duration event, and matching predeveloped
10-year and 100-year/24 -hour duration runoff rates. Construction sites are also
required to provide erosion and sedimentation controls for up to the 2-year storm
event.
Conveyance -- Storm systems constructed as part of the City's CSO Reduction
Plan will be designed to handle a 25-year storm. The City will be conducting
drainage basin assessments as part of the storm water program. These
assessments will include the identification of storm drainage conveyance system
capacities. Based on the outcome of these assessments, a recommended level
of service will be determined for existing systems. The drainage problems
identified in the storm water capital program are based on conditions observed in
the field and represent conveyance problems that occur annually.
c. Future Demand
Water Quality -- Development will be required to meet the Level of Service
requirements defined above. Regional water quality facilities maybe identified in
future drainage basin assessments.
Conveyance -- The impact of additional impervious surfaces from development
on the conveyance system will be mitigated by the limitations to the runoff rate to
0.2CFS/acre based on a 25-year storm.
d. Need for Capital Facility Improvements
The City's CSO Reduction Plan identifies construction of separate stormwater
conveyance systems in the majority of the City's drainage basins. These
improvements will address most of the drainage problems identified. The City's
Draft Stormwater Management Plan identified three capital projects, not included
in the CSO Reduction Plan, necessary to improve conveyance system capacity.
e. Plans of Other Providers
The City and Kitsap County share responsibility for a number of drainage basins.
The water quality standards of the City and Kitsap County are consistent.
Coordination between the City and Kitsap County will required regarding the
downstream conveyance systems within these basins.
3. Proposed Facilities Improvements
The Draft Stormwater Plan identifies eleven existing flooding problems and recommends
solutions to alleviate these problems. Many of these drainage problems will be reduced or
eliminated by CSO sewer separation projects. A few will be addressed during annual
maintenance. (Table SW-2)
Capital Facilities Element - Part 2 CFP - 58 Capital Facilities Program
Stormwater
TableSW,2
Major Flood COntrol Capital lmProvemen,t Projects and Costs
Project # Basin Project Cost (1994 $)
CIP #1 Sinclair Park Upgrade piping and detention at Kean and Rogers St. 851,000
CIP #2 Stevens Canyon Piping improvements at Robin and Dibb Streets 170,000
CIP #3 Pacific Avenue Pipi0g ,improvements along, Park Avenue, 5th St to Burwell 250,000
Total = 1,271,000
Source: Draft Stormwater Management Plan
The Draft Stormwater Plan identifies a number of small capital projects that need to be
performed on an annual basis. The Draft Plan recommends that the City needs to implement a
series of storm drainage improvements over a multi-year planning period, and develop an
effective City-wide inspection and maintenance program. (Table SW-2)
4. Six-Year Financial Plan
The six-year financial plan for stormwater facilities is included in Section K.
Capital Facilities Element - Part 2 CFP - ,59 Capital Facilities Program
Stormwater
: ~ ~ ~--I--- o
1- - ~-- -=-"~
- I
· ~' ~ ~ _~ -~.
...~
I
: 2-: ".' . U ~
...... :_. :'. f - :(. -- ~= ,
~-'(
Figure CF-9 Bremerton Stormwater Drainage Basins
Capital Facilities Element- Part 2 CFP - 60 Capital Facilities Program
I. Transportation
This section is a summary of information contained in the Transportation Element of the
Comprehensive Plan.
1. Inventory of Existing Facilities
Bremerton's transportation system generally consists of streets, highways, sidewalks,
ferries, and public transit. The Transportation Element includes the following information
on existing facilities:
Streets and Highways
· Principal Arterials (See Transportation Element Table 1)
· Minor Arterials (See Transportation Element Table 1)
· Collector Arterials (See Transportation Element Table 1)
· Residential Streets (Not inventoried)
Mass Transit
· Kitsap Transit (See Transportation Element pg. 20)
· Washington State Ferries: Bremerton-Seattle (See Transportation Element pg. 20)
· Horluck Transportation Co.: Bremerton-Port Orchard (See Transportation Element pg. 20)
Source: Bremerton Comprehensive Plan Transportation Element"F"
2. Forecast of Future Needs -- Level of Service (LOS) Standard
Levels of Service (LOS) is an estimate of the quality and performance of transportation
facility operations in a community. The Transportation Element measures LOS by
calculating the volume to capacity ratio (V/C) of the midblock of a roadway, using a
range from A (free flow) to F (stop-and-go traffic).
(a) Current Level of Service
Almost all roadways in the City function at or better than LOS D. The following existing
roadway sections exceed or are close to exceeding a Level of Service D
(Volume/Capacity Ratio .90) threshold during the PM peak hour:
Capital Facilities Element - Part 2 CFP - 6'~ Capital Facilities Program
Transportation
Table TRi2
EXiStin Level of service ~ Transportation
street section ViC Ratio LOS
Burwell Warren to Naval 0.77 D
SR 304 Preble to Farragut 0.91 E
Kitsap Way Callow to SR3 0.87 D
Manette Bridge 0.89 D
Warren 11th to Bridge 0.8 D
Warren (Wheaton) Bridge to Callahan 0.99 E
Source: Table 1 -- Existing Corridor Level of Service, Transportation Element
(b) Recommended Level of Service (LOS)
The Transportation Element establishes the following level of service threshold
standards:
· Arterial Streets -- LOS D or better (v/c less than or equal to 0.9), with the
exception of the following:
· Wheaton/Warren Corridor -- Maximum LOS F with VIC threshold of
1.06
· Kitsap Way Corridor -- Maximum LOS E or better (VIC less than or
equal to 1.00
· Manette Bridge -- Maximum LOS E or better (V/C less than or equal
to 1.00)
The higher threshold in the above three corridors allows time to develop
strategies to address the corridor transportation needs. Transportation projects
in these corridors will have a goal to obtain a LOS D.
3. Six-year Financial Plan
The six-year financial plan for transportation facilities is included in Section K of this
Capital Facilities Program.
Capital Facilities Element - Part 2 CFP - 62 Capital Facilities Program
Transportation
O$TPJC~
1750 3500
SCALE JH FEET ........ c~c~s
Figure CF-'I0 Bremerton Arterial System
Capital Facilities Element - Part 2 CFP - 63 Capital Facilities Program
J. Water
The City of Bremerton Water Utility provides potable water for Bremerton and the surrounding
area. A complete inventory, analysis of need, and capital facilities program is provided in the
1992 City of Bremerton Water System Comprehensive Plan (also known as the Bremerton
Water Plan) adopted by the Washington State Department of Health in 1993 and the Bremerton
City Council in 1994. The next update of the Bremerton Water Plan is required by 1999.
1. Inventory of Existing Facilities
(a) Service Area
The Utility services approximately 58,000 residents in Bremerton (38,000) and
portions of Kitsap County (20,000), including the Gorst area and the western
portion of the Manette Peninsula. The service area includes the Olympic View
Industrial Park and the Bremerton National Airport. The Utility also is under
contract to provide water to the Tracyton and Rocky Point Water Districts. In
addition, the Utility contracts to supply water to the Puget Sound Naval Shipyard
(PSNS) and to the City of Port Orchard. The current service area includes
approximately 5,300 acres within the Bremerton City limits, and approximately
6,800 acres within unincorporated Kitsap County. (See Figure CF-? ?
"'Bremerton Water Plan Service Area".) The Kitsap County Coordinated Water
System Plan contains an Interlocal Agreement for Establishing Water Utility
Service Area Boundaries, but this agreement has not yet been submitted by
Bremerton.
(b) Facilities/Water Rights
The City of Bremerton Water Utility supply system consists of Union River
Reservoir behind the Casad Dam, 12 wells, 204 miles of water pipe, fourteen
pressure reducing stations, 16 water storage reservoirs, and 14 pump and
booster stations. (Table WA-l) Approximately 60 percent of the supply comes
from the 2,764 acre Union River watershed, which is 98 percent owned and
controlled by the City. Wells in several local aquifers supply groundwater to the
system. Current average daily demand is approximately 8 million gallons per
day (MGD).
There are six pressure zones in the system: East (E) 240, E 398 E 490, West
(W) 256, W 440, and W 517. These zones are designated by the overflow
elevations in Utility reservoirs. Plans are being made for two additional pressure
zones (W540 and W650).
Bremerton's water supplies consist of 10,689 primary acre-feet (1,408
supplementary acre-feet) of groundwater and a firm yield from the Union River of
3.8 MGD. Instantaneous rights include 40 cubic feet per second (cfs) (17,952
gpm) on the Union River watershed and 6350 gallons per minute (gpm)
groundwater. All water in use by the City has been properly appropriated
through certificates of water rights or claims. Historically used surface water
Capital Facilities Element - Part 2 CFP - 64 Capital Facilities Program
Water
claims are maintained for potential emergency and future use pending required
treatment.
Bremerton's Union River surface source is of such excellent quality that the City
is currently approved by the State Department of Health to remain unfiltered.
Sources are disinfected with chlorine. The water system control and alarm is
provided through a telemetry system. Updates to the telemetry system are
planned for 1997-99, including conversion to radio telemetry. Operation staff are
state certified, and the system is operated in compliance with all federal and
state regulations. (Table WA-l)
(c) Fire Flows
The Utility is generally capable of meeting Kitsap County Ordinance fireflows,
which are considered to be minimums for new construction. However the
Bremerton Water Plan recommends that fireflows be designed to meet the
significantly higher Insurance Services (ISO) Standards. Under peak hourly flow
conditions, a minimum of 30 psi (new mains) residual system pressure without
fire flows in water mains should be maintained to meet State Department of
Health standards.
(d) Capacity
The current capacity of the water system on an annual average is 12 million
gallons per day (MGD). The daily capacity of the system with groundwater
sources only is 8.7, while the capacity with groundwater and surface sources at
current hydraulic capability is 21.5 MGD.
The capacity varies because the Union River is used to supply the average day
demands of the system. The surface supply can be varied between zero and
15.5 MGD as long as annual average firm yield of 3.8 MGD and water quality
limits are not exceeded. Note that not all sources can be used to maximum
capacity at the same time, due to limited hydraulic capacity of the transmission
mains or water right conditions.
Capital Facilities Element - Part 2 CFP - 65 Capital Facilities Program
Water _
Table WA-1
r , Inventory of Capital Facilities: Water Supply
Facilities J Address I Capacity
Surface Water Hydrau!ic Capacity MGD):
/
Union River I Watershed 15.5
Surface Water Subtotal = 15.50
GroundWater' Capacity (gpm)
1. #2-R - Anderson Creek Well 2380 Anderson Hill Rd SW 800
2. #3 - Anderson Creek Well 2380 Anderson Hill Rd SW 400
3, #7 - Anderson Creek Well 2731 State Highway 16 450
4. #-8 - Anderson Creek Well 2651 State Highway 16 650
5. #9 - Bridle Ridge We.!l 318 NW Firway Lane 230
6. #13 ~ Vena Well 50 NE Vena Avenue 600
7. #14 - East Zone 240 Well 5853 Central Valley Road NE 270
8. #15 - Pistol Range Well 6581 W, Old Belfair Highway 150
9. #17 o Pistol Range Well 6581 W. Old Belfair H!ghway 760
10. #18 - Twin Lakes Well 8301 W. Old Belfair Highway 370
11. #19 - Golf Course Well 7061 W. Old Belfair HighwaY 300
12. #20 - Twin Lakes Well 8301 W. Old Belfair Highway 1,100
13. #21 - Silverdale Mobile Home Estates Well 903 NE Saturn Lane (500)
(pending application) ...... Future productio,n =
14. Gorst Well (pending application) Old Belfair Highway (400)
Future product!on =
Current Groundwater Sub-Total (gpm) = 6,080,00
Current Groundwater Sub-Total (MGp) = 8.70
; , pUmPing CapacitY,, , (gPm).
15. PS #1 - Gorst Creek (emergency supply only) Belfair Valley Road - Gorst Creek N/A
16. PS #2 - Anderson Creek 2380 Anderson Hill Road 2,250
17. PS #3 (not in use) .... 7061 ,Belfa!r,Valley Road .... 400
18. PS ¢4 1335 Jones St:, (West Brem.) 800
19. PS #11 844 Catlahan Drive 1,400
20. PS #12 3029 OI,.ympus Drive ,,,950
21. PS #13 2929 Olympus Drive 500
22. PS #14 2101 Schley Blvd 825
23. P~ #16 50 NE Vena Ave 1,250
24. PS #17 Old Belfair Hw~ 1,,500
Capital Facilities Element - Part 2 CFP - 66 Capital Facilities Program
Water
Table WA-1
Inventory of Capital Facilities: Water Supply
Facilities I Address Capacity
Pump Station Sub-Total = 9,875.00
Booster'Pump Stations Pump!,n(,] Capacity (gpm)
25. Booster Station #2 (backup only) 3201 Sixth Street 300
26. Booster Station #3 3000 17th Street 300
27. Booster Station #.4 3301 First Street 100
28. Booster Station #5 589 Lebo BIvd 1,000
Booster Pump Stations Sub-Total = 1,700.00
Pump Stations Total = 11,575.00
·. ,.~t°~'e Capacity
(MG)
29. Union River Reservoir Union River Watershed 1,350
31. Res. #22 McKenna Fails 0.1
32. Anderson Creek #1 - Abandoned Anderson Creek Watershed N/A
33. Anderson Creek #2 - Abandoned Anderson Creek Watershed N/A
Reservoirs (Raw Water) Total = 1,350.10
34. Reservoir ~ 4801 Roosevelt Blvd 11.0
35. Reservoir #5 3200 First Street (Forest Ridge Park) 3.0
36. Reservoir #6 5144 Francis Street @ Eden Road 0.15
37. Reservoir #8 7300 Werner Road 2.54
38. Reservoir #10 5785 Imperial Way SW, Pt. Orchard- 0.21
Port of Brem. Industrial Park
39. Reservoir #11 844 Callahan Drive 1.58
40. Reservoir #12 ,3,029,01y, mp,u,s Drive 2.0
41. Reservoir #13 2929 Olympus Drive 0.80
42. Reservoir#14 1628 Hayward Avenue,@,,E. 17th , 2.0
43. R,eservoir #15 1925 Cheryl Street @ Forest Drive 1.0
44. Reservoir #16 260 Sugarpine - Tracyton Watershed 1.0
45. Reservoir #17 400 Ridge Lane NE @ Sandra Lane 1.0
46. Reservoir #18 1925 NE Cheryl Street @ Forest Dr. 1.0
47. Reservoir #19 2628 Ash Street @ Cherry Ave 2.0
48. Reservoir #20 400 Ridge L, ane' ,NE @ Sandra Lane 1.0
49. Reservoir #21 2132 Lakeh,u, rs! Drive - NAD Park 3.0
Capital Facilities Element - Part 2 CFP - 67 Capital Facilities Program
Water
Table WA-1
,, Inventory of Capital Facilities: Water Supply
Facilities .I Address Capacity
Distribution Reservoir Total = 33.28
Transmission Main Piping! ......... Capacity (Fe,,et)
12" - 36" Water Mains I Various 201,148
Transmission M, ain Pi,ping = 201,148.00
Bistribufion Piping System capacity (Feet):
2" - 12" Water Mains Various 1,211,729
10" Water Mains Various 43,945
8" Water Mains Various 387,816
6" Water Mains Various 411,758
4" Water Mains Various 155,653
3" Water Mains Various 14,533
2" Water Mains Various 91,344
Distribution Piping System Sub-Total = 1,211,729.00
Total Piping System = 1,412,877.00
2. Forecast of Future Needs
(a) Existing Demand
The average daily water system demand varies depending on weather
conditions, but averages about 8.1 million gallons per day (MGD).
Year Average Day Demand (MGD)
1990 9.35
1991 8.71
1992 8.48
1993 7.73
1994 8.29
1995 7.89
1996 7.43
Approximately 33 percent of the average daily demand comes from the Puget
Sound Naval Shipyard, the largest single water user. Approximately 78 percent
of the water demand is "in-City" demand, and 22 percent is outside the city
limits. Average day demand is affected by the year's rain patterns and other
factors -- for example, 1993 was a wet summer, resulting in less outside water
use. However, the highest peak day ever recorded was during unusually Iow
Capital Facilities Element - Part 2 CFP - 68 Capital Facilities Program
Water
temperatures in December 1990 when pipes broke and customers ran water to
prevent pipes from freezing. In 1992, Seattle's drought response media
campaign affected Bremerton customers' water use, even though our reservoir
was not experiencing a drought.
(b) Level of Service (LOS) Standard
The estimated 1990 LOS is 106 gallons per capita per day (gpcd). The City's
Conservation Program" is expected to reduce domestic unit consumption by 3%
by 1995, to 103 gpcd and by 6% by year 2000, to 100 gpcd. Domestic unit
demands are then expected to remain constant through the year 2014.
· Current LOS = 106 gallons per capita per day (GPCD).
· Recommended LOS = 100 GPCD.
(c) Future Demand
The Bremerton Water Plan identifies needs for a 20 year planning period from
1990 to 2010. During that time it is expected that supply capacity to meet typical
maximum day demands (MDD) will increase 26.99 mgd by year 2010. (Table
WA-2)
The Water Plan demand projections were based on outdated population
forecasts derived from a variety of sources, including past trends, the Kitsap
County Department of Community Development, and the former Puget Sound
Council of Governments (PSCOG). Although the projections were not based on
the Kitsap Regional Planning Council (KRPC) population forecast and subarea
allocations, the KRPC allocations fall within the Iow to high range used to
forecast water system demand.
Existing and potential Water SupPly
Water Source : DailY SUPPLY (mgd) : :
Annual SuPPly (ac,fi)
Existing Sources 9.1 - 23.7 13,460 - 16,565
Potential Sources 11.0- 12.2 7,470
Total Sources 20.1 - 35.9 20,930 - 24,035
Source: Bremerton Water System Comprehensive Plan Table 8-7
It is projected that if pending water rights certificates are secured, then no
additional sources will be needed to meet the total demand through the next six
years. However, future water sources will need to be secured to meet
anticipated demands beyond year 2000. (Table WA-3)
Capital Facilities Element - Part 2 CFP - 69 Capital Facilities Program
Water
Table WA-3
Future Need: Water
Year Demand (Population in City-County Service Avg, Day Demand
Area) MGD
Six-Year Need
1994 * 56,701 9.04
1995-2000 (new) 9,686 4.20
Total as of 2000 * 66,387 13.24
T~venty-Year Need
2000-2012 11,764 4.38
Total as of 2012 78,151 ,, 17.62
Sources: Bremerton Water System Comprehensive Pian, updated by Bremerton Water Utility
· 1994 & 2000 demand - from Kitsap County Comprehensive Plan, December 23, 1996
Assumptions: 2000: Pop. X 103 gallons/capita + 3.2 MG for PSNS
2014: Pop. X 100 gallons/capita + 3.2 MG for PSNS
3. Proposed Facility Improvements
The Bremerton Water Plan recommends that an additional 0.7 mgd of groundwater
supply should be developed by 1995 and a total of 1.4 mgd should be developed by
year 2000. (Table WA-2) The City has two additional wells drilled and awaiting water
rights. Current regulatory and legal uncertainty at the State level precludes processing
of water rights applications except under emergency conditions.
The Water Plan concludes that existing distribution system is capable of meeting typical
system demands. Improvements in transmission and distribution mains are necessary
to improve flows and pressures in certain areas and to replace undersized or sub-
standard facilities.
(a) Water Quality
Meeting strict Federal and State water quality standards is a primary objective of
the City. Drinking water is regularly tested at the sources and in the distribution
system.
To continue to use the unfiltered Union River source, the City should continue to
pursue either acquisition or controlling agreements over remaining private lands
within the watershed, and should vigorously implement the Watershed Control
Plan. Responsible operation of the entire water system is critical to maintaining
compliance with the non-filtration status of the surface water treatment
regulations. Even with these precautions, a drastic change in source quality or
changes in regulations could require the City to provide filtration.
Capital Facilities Element - Part 2 CFP - 70 Capital Facilities Program
Water
lb) Storage
Storage needs include the E398 zone and the Industrial Park and Airport area,
no additional storage is needed to meet current demand. Adding such storage is
the responsibility of the Port of Bremerton. By year 2010 a total of 22.5 million
gallons (MG) of system wide storage is expected to be required. The system
currently has 34.3 MG of storage available, primarily in the lower elevation zones
in the developed pads of the city.
Prior to year 2010, additional storage will be required to serve two new West
Bremerton zones south of Kitsap Lake (W650/and south of Gorst (W540).
Additional storage should also be provided north of the East Bremerton city
limits.
lc) Distribution System
West Bremerton industrial/commercial areas have good fireflow capacity.
Toward Jackson Park, fireflow capacity meets Kitsap County guidelines but is
less than ISO recommendations for multi-family residential housing. Several
improvements are needed to improve fireflow capacity in the East 398 Zone,
west of the Brownsville Highway. Changing the shape of this long narrow zone
service area by trading the northern part of the zone of the North Perry Avenue
Water District in exchange for an equivalent part of their service area east of the
central East Bremerton service area may be an economical way to improve
service to both areas. Pump station capacity will need to be added to serve new
west zones south of Kitsap Lake and south of Gorst. The Utility should continue
to routinely replace small sub-standard water mains. Initial replacement projects
should concentrate on mitigating Iow-pressure problems in the Sherman Heights
area. The existing telemetry and control system will require upgrading and
maintenance so the Utility can more efficiently control the water system.
(d) Plans of Other providers
There are no other providers of potable water within the City. However, there
are several nearby water districts, public utility districts and municipalities that
may have interests in local surface and groundwater resources. These include:
Silverdale Water District No. 16; North Perry Avenue Water District; Erland Point
Water District; Sunnyslope Water District; City of Port Orchard; and McCormick
Woods development. An unclaimed area exists between the City Water Utility
and the Erland Point Water District service areas. Unclaimed areas also exist
south, east and west of the Utility's watershed.
The Kitsap County Coordinated Water System Plan (CWSP), a regional water
supply, transmission, and storage plan, was developed by the Water Utility
Coordinating Committee (WUCC) to comply with state law. The plan assesses
water supply needs in Kitsap County and presents a program to provide water
supply and service to users. The plan, expected to be approved by the State
Department of Health, provides a process and strategy for existing water utilities
to define their role in a program consistent with adopted land use policies and
projected growth strategy.
Capital Facilities Element - Part 2 CFP - 71 Capital Facilities Program
Water
4. Six-Year Financial Plan
Under the proposed LOS it is projected that no additional water sources will be needed to meet
the total demand through the next six years, providing water rights are secured on two wells
which have already been drilled.
The City pays for capital facilities through charges for service, but also through Timber Sales
and other non-revenue receipts. The six-year financial plan for water facilities is included in
Section K of this Capital Facilities Program.
Capital Facilities Element - Part 2 CFP - 72 Capital Facilities Program
Water
LEGEND
~ ~E~C~ WAFER
BREMERTON WATER PLAN
'-"' '
.... ,..,.-,-,,.,,," SERVICE AREA MAP
} I '*'-"" ,.,,...
Figure CF-11 Water Plan Service Area
Capital Facilities Element - Part 2 CFP - 73 Capital Facilities Program
K. Six-Year Finance Program
1. Introduction
A six-year finance program for capital facilities is one of the requirements of the Growth
Management Act. The six-year finance program for all capital facilities addressed in this
Capital Facilities Program (CFP) is consolidated into this section.
Under the City's annual comprehensive plan review process, the Capital Improvement
Program (CIP) and CFP are developed together by City staff. Both are based on the
various plans for transportation, sewer, water, etc., which in turn are based on the City's
Land Use Element.
2. Projected Revenue and Expenses
The tables in this six-year finance program are excerpted from the summary tables of
the CIP. Additional details are contained in the body of the CIP. The contents of the
tables are as follows:
Summaries
· Total CIP
· Water
· Wastewater
· Storm Water
· Transportation
· Engineering
· Parks
· Golf
· General Fund
· Other Funds
Sources of Funding
· Parks and General Government Projects
Plans for Other Agencies
· Bremerton School District
Capital Facilities Element - Part 2 CFP - 74 Capital Facilities Program
Six-Year Finance Program
CITY OF BREMERTON CAPITAL. IMPROVEMENT PROGRAM
t997 - 2002 PROGRAM
SUMMARY. TOTAL CIP:
PRIOR 1997 1998 1999 2000 2001 2002!
SOURCES OF FUNDS
General Governmental 62.0 190.8 358.2 428.8 327.6 403.7 205.7
Grants o CDBG 0.0 140.0 10.0 10.0 10.0 10.0 10.0
Gmr~ . ~ 0.0 314.9 3,879.0 419.0 300.0 0.0 0.0
Wate~ 198.0 1,899.5 3,071.8 5,18g.3 3,813.5 2,55~.3 1,461.3
Wa~tawa~' 6,884.5 2,889.5 3,2~.0 1,705.0 1,641.0 1,743.0 4,943.0
Stormwat~ 0.0 128.0 70.0 150.0 67.0 60.0 50.0
G. O. Bo~da - Votad 314.6 0.0 0.0 0.0 5,800.0 0.0 0.0
G.O. Boad~: Non-Vo~l 234.5 0.0 2,000.0 2,500.0 2,500.0 0.0 0.0
Revem~e Bonds. 0.0 0.0 2,0(X).0 10,000.0 0.0 0.0 10,550.0
Artm~ Str~,~ 101 157.6 402.7 396.0 329.5 263.0 160.0 150.0
R~ml Estate Excl~ Tax 109 0.0 377.0 204.0 50.0 1,050.0 50.0 50.0
P~ ~ Facility 112 0.0 88.0 98.0 148.0 275.5 9g.0 102.0
Pendecgaat Pa~k 308 0.0 30.0 0.0 0.0 0.0 0.0 0.0
Gold Mtn Golf ~ 407 0.0 6~3.0 113.0 116.0 11g.0 123.0 427.0
Equip. Rental Reserve 510 0.0 352.3 926.0 488.5 660.7 658.1 239.0
Roo~v~ Capital ~ 622 0.0 200.0 0.0 200.0 300.0 0.0 150.0
TIB(UATA) 1,252.5 2,965.2 3,556.5 1,230.8 0.0 0.0 0.0
FAUS 0.0 0.0 64.0 176.0 0.0 0.0 0.0
WSDOT 624.5 338.0 200.0 159.8 0.0 0.0 0.0
ISTEA. 45.4 2,839.1 2,196.5 1,077.0 0.0 0.0 0.0
County/State/Fed 166.5 135.0 220.0 235.5 133.0 10.0 0.0
Navy 0.0 0.0 0.0 0.0 0.0 0.0 O.O
Stree~ Vacation 8.5 0.0 0.0 0.0 0.0 0.0 0.0
Othe~ 8.5 3,243.7 239.0 888.5 73.0 292.0 50.0
GRAND TOTAL 9,957.1 17,196.7 =,869.0 !25,521.5 17,13:3.3 6,165.1 18,398.0
IINFRASTRUCTURE PROJECTS ! 5,993.5 I 12;95~.5 I 15,575.5 ] 21,861.5 I 6,939.0 ] 4,954.0 ] 6,363.0]
[FACILITIES' PROJECTSI I I[ 2,930.5 I 3,516.6 I 5,148.2 I 4,946.5 I 10,345.0 J 854.5 I 11,425'0 J
IEQUIPMENT&VEHIcLES I 657.51 1,117.21 1,810.3I 1,176.1 1 1,343.31 1,°97-sl 810.0J
[GRAND TOTAL I 9,581.5 [17,592.3 I 22,534.0 I 27,984.1 I 18,~7.3 J S,90~.1 t 18,398.0 J
[DIFFERENCES SOURCES LESS USES J 375.6 I (395'6}l 335.0 ! (2,462.6)1 (1,494.0)[ (741.0)l 0.0 I
Capital Facilities Element - Part 2 CFP - 75 Capital Facilities Program
Six-Year Finance Program
CITY OF BREMERTON CAPITAL IMPROVEMENT PRO(31~M
1997 - 2002 PROGRAM
SUMMARY. WATER
PRIOR 19971 1998 1999 2000 2001 2002
SOURCES OF FUNDS
Gene~ Gov~nmental 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Grar~ - CDBG 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Gm,'~ - Other 0.0 0.0 2,835.0 315.0 0.0 0.0 0.0
Wate¢ 198.0 1,899.5 3,070.5 5,188.0 3,790.0 2,555.0 1,460.0
Wastewater 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Slorrnwatm' 0,0 0.0 0.0 0.0 0.0 0.0 0.0
G.O. Bof~ls - Voted 0.0 0.0 0.0 0.0 0.0 0.0 0.0
G.O. Bonds: Non-Voted 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Revenue Bond~. 0:0 0.0 0.0 0.0 0.0 0.0 0.0
Arterial Stre~ 101 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Real Estate Ex¢~ Tax 10g 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Pml~ Capital Facility 112 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Pendergasl Park 308 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Gold Mtn Golf Course 407 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Equip. RentaJ Reserve 510 0.0 0.0 0.0 0.0 · 0.0 0.0 0.0
Roo~velt Capi~ A~se( 6'22 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TIB(UATA) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FAUS 0.0 0.0 0.0 0.0 0.0 0.0 0.0
WS0OT 0.0 0.0 0.0 0.0 0.0 0.0 0.0
ISTEA. 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Courtly/Stale/Fed 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Naw 0.0 0.0 0.0 0.0 0.0 0.0 0.0
S~'e~ Vacation 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Other 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL SOURCES 198.0 1,89~.5 5r905.5 5,503.0 3,790.0 2,555.0 1,460.0
INFRASTRUCTURE PROJECTS
IN98WA01 WATER SYSTEM FLUORIDATION 54.5 300.5
UTILWA18 SR//3 TRANSMISSION MAIN SYSTEM IMPROVEME 25.0 50.0 2,500.0 2,000.0 -
UTILWA23 E398 ZONE TRANSMISSION MAIN & STORAGE ' . 103.0 930.0
UTILWA83 WARREN AVENUE BRIDGE MAIN
UTILWA51 WEST 540 ZONE DEVELOPMENT 210.0 20.0 1,0(X).0 2,133.0
UTILWA47 WEST 650 ZONE DEVELOPMENT I I ~,o i ~.o I 1,~.o I I I I
UTILWA48 RESERVOIR SEISMIC IMPROVEMENTS J I 40.0 1 2~.o I I 240.0 1 =40.0 1 ~o.o I
UTILWA84 WATER MAIN REPLACEMENT PROGRAM '1 I ~.0 I ~.0 I ~.0 I ~.0 I 250.0 I ~0.0 I
UTILWA2 SILVERDALE MOBILE ESTATES WELL · 75 0
UTILWA45 DOMSEAWELL DEVELOPMENT 90.0
UTILWA72 PINE RD. MCWILLIAMS TO WELL 21 27.0 180.0
SUB-TOTAL 35.0 1,599.5 5,130.5 4,858.0 3,665.0 2,230.0 1,360.0
FACILmES PROJECTS
SUB-TOTAL 2~.0 1 175.0 I 315.0 1 855.0 I 125.0 1 3~.o I loo.o I
Capital Facilities Element - Pad 2 CFP - 76 Capital Facilities Program
Six-Year Finance Pragram
CITY OF BREMERTON CAPITAL IMPROVEMENT PRO<3RAM
1997 - 2002 PROGRAM
SUMMARY. WATER
EQUIPMENT & VEHICLES
SUB-TOTAL J 137.0 1 ~25.0 1 12~.0 1 125.0 1 0.0 0.0 0.0
LGRAND TOTAL I 198.0 J 1,899,5 I 5,570.5 I 5,838.0 J 3,790.0 I 2,555.0 J 1,480.0 I
[OIFFERENCE SOURCES LESS USES ' I 0.0 J · 0.0 I 335.0 I (335.0)J 0.0 I 0.0 I 0.0 I
Capital Facilities Element - Part 2 CFP - 77 Capital Facilities Program
C! - 'iF BREMERTON CAPITAL IMPROVEMENT PROC. ~ M
1997 - 2002 PROGRAM
S U M MARY - WASTE'WATER
PRIOR 1997 19981 1999 2000 2001 20021
SOURCES OF J~UNDS
General Govemrnental 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Grant~- CDBG 0.0 0.0 0.0 0.0 0.0 0.0 0,0
Grant~ - Other 0.0 0.0 104.0 0.0 0.0 0.0 0.0
Water 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Wastewatar 6,88~.5 2,889,5 3,26g.0 1,705,0 1,634.0 1,743.0 4,943.0
Stomtwater 0.0 0.0 0.0 0.0 0.0 0.0 0.0
G.O. Bonds - voted 0.0 0.0 0.0 0.0 0.0 0.0 0.0
G.O. Bonds: Non-Voted 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Revenue Bonds. 0,0 0.0 0.0 0.0 0.0 0.0 0.0
Aderial Slzee{ 101 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Real Estate Excise Tax 109 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Parks Capital Facility 112 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Pendergast Perk 308 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Gold Mtn Golf Course 407 0.0 0.0 0,0 0.0 0.0 0.0 0.0
Equip. Rental Resen, e 510 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Roosevelt Capital Asset 622 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TIB(UATA) 0.0 0,0 0.0 0.0 0.0 0.0 0.0
FAUS 0.0 0.0 0.0 0,0 0.0 0.0 0.0
WSDOT 0.0 0.0 0.0 0.0 0.0 0.0 0.0
ISTEA. 0.0 0.0 0.0 0.0 0.0 0.0 0.0
County/Slate/Fed 0.0 0.0 0.0 0,0 0.0 0.0 0.0
Naw 0.0 0.0 0.0 0,0 0.0 0.0 0.0
Street, Vacation 0.0 . 0.0 0.0 0.0 0.0 0.0 0.0
Other 0.0 3,'100.0 0,0 0.0 0.0 0.0 0.0
TOTAL SOURCES 6,884.5 5,989.5 3,373.0 1,705,0 1,634.0 1,743.0 4,943.0
INFRASTRUCTURE PROJECTS
INgTWW ANDERSON COVE BASIN CSO SEPARATION PROJ 30,0 35.0 115.0 755,0 764.0 758.0
IN98WW CSO DETENTION STRUCTURES 250.0 250.0 250.0
UTILWW I CALLOW AVENUE DRAINAGE BASIN CSO PROJ 3,522.0 4,035.0 2,059.0 400.0 3,790.0
IN97WW I WERNER ROAD SEWER EXTENSION 104.0
UTILWW ~ SEWER MAIN REPLACEMENT PROGRAM 100.0 220.0 220.0 220.0 220.0 220.0 220.0
INg8vvw INVERTED SIPHON ISOLATION VALVES 15.0 100.0
UTILWW OYSTER 8AY BASIN INTERCEPTOR 23.0 50,0 503.0
IN!~SVV~/ PORT WASHINGTON NARROWS INVERTED SIPHON 230.0
I
SUB-TOTAL I 3,675.0 4,2<30.0 2,763.0 1,325.0 1,234.0 1,4:28.0 4,743.0
FACILITIES PROJECTS
IUTILVV/PUMP STATIONS IMPROVEMENT PROGRAM 339.5 164.5 160.0 160.0 160.0 275.0 160,0
FA97¥/W WWTP PROPERTY ACQUISITIONS 1,080.0
UTILWW WW'TP FRONTAGE IMPROVEMENTS 25.0 80.0
UTILWW NEW ROOF ON CONTROL BUILDING 15.0
UTILWW WW'T'P ODOR CONTROL & HEADWORKS MODIFIC 2,565,0 200.0
SUB-TOTAL 2,904.5 1,444,5 200.0 240.0 160.0 :275.0 160.0
EQUII~MENT & VEHICIi. E$
UTILWW TELEPHONE SYSTEM UPGRADE 10.0
UTILWW VIBRATION ANALYSIS PACKAGE 15.0
EQ98W EMERGENCY POWER SUPPLY 20.0 20.0 20.0 20.0 20.0 20.0
UTILWW OIGESTER RENOVATION 60.0
UTILWW SCADA SYSTEM AND CONTROLS 250.0 150,0 150.0 50.0 :~0.0 20.0 20.0
UTILVVW VEHICLE PURCHASE 55.0 20.0
UTILWW AUTOMATIC POWER SWITCH GEAR 50.0
EQ98W WASTEWATER TREATMENT SOLIDS MANAGEMENT 170,0
UTILWW METHANE BOILER j 50.0
UTILWW BUBBLE TYPE DIFFUSERS IN THE AERATION BASIN 20,0 200.0
I
SUB-TOTAL I 305.0 255.0 410~0 140.0 240.0 40.0 40.0
Capital Facilities Element - Part 2 CFP - 78 Capital Facilities Program
Six-Year Finance Program
CITY OF BREMERTON CAPITAL IMPROVEMENT PROGRAM
1997 - 201]2 PROGRAM
SUMMARY - WASTE'WATER
! IORANO TOTAL 6,884.5 5,989.5 3,373.0 1 ~,70~.0 1 ~,63~.0 1 4,743.0 j 4,9~.3.0 j
lO,F.~eRe~ce SOURCES LeSS USeS I 0.0 I 0.0 I 0.0 I 0.0 I 0.0 I 0.0 I 0.01
Capital Facilities Element - Part 2 CFP - 79 Capital Facilities Program
Six-Year Finance Program
CITY OF BREMERTON CAPITAL IMPROVEMENT PROGRAM
1997 - 2002 PROGRAM
SUMMARY - STORM WATER
'PRIOR 1997 1998 1999 20(X) 2001
SOURCES OF FUNDS
~ Govemmentel 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Grants. COBG 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Grarffs - Othe¢ 0.0 0.0 430.0 0.0 0.0 0.0 0.0
Water 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Wastewat~ 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Stom~watm' 0.0 128.0 70.0 150.0 60.0 60.0 60.0
G.O. Bood~ - VD(ed 0.0 0.0 0.0 0.0 0.0 0.0 0.0
G.O. Bor~ls: No~.Voted 0.0 0.0 0.0 0.0 0.0 0.0 0.0
RJvenue Bonds. 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Arterial Stre~ 101 0.0 0.0 0.0 0,0 0.0 0.0 0.0
Real Estate F..xctse Tax 109 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Parks Capital Facility 112 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Pendergast Park 308 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Gold Mtn Go~' Course 407 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Equip. Rental Reserve 510 0.0 0.0 0.0 0,0 0.0 0.0 0.0
Roo~avelt Capitat Ass~ 622 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TIB(UATA) 0.0 0.0 0.0 0.0 0.0 0,0 0.0
FAUS 0.0 0.0 0.0 0.0 0.0 0.0 0.0
WSDOT 0.0 0.0 0.0 0.0 0.0 0.0 0.0
ISTEA. 0,0 0.0 0.0 0.0 0.0 0.0 0.0
Co~ntyIState/Fed (EDA) 0.0 0,0 0.0 0.0 0.0 0.0 0.0
Navy' 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Str~ VacaOo~ 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Oth~ 0.0 0.0 0.0 0.0 0.0 0,0 0.0
TOTAL SOURCES 0.0 128.0 500.0 150.0 60.0 60.0 60.0
INFRASTRUCTURE PROJECTS
STORM03 ~STORM DRAINAGE MAIN REPLACEMENT PROGRAM 60.0 60.0 60.0 60.0 60.0 60,0
SUB-TOTAL 0.0 128.0 500.0 150.0 60.0 60.0 60.0
lGRANOTOTAL I 0.01 .~2,.01 ~.01 ~SO.01 ~o.01 r,O.01 "0.01
[DIFFERENCES SOURCES LESS USES [ 0,01 0.0 I 0.0 I 0.0l 0.0 I 0,0 I 0.0 I
Capital Facilities Element - Part 2 CFP - 80 Capital Facilities Program
Six-Year Finance Pr;>gram
CITY OF BREMERTON CAPITAL IMPROVEMENT PROGRAM
1997 - 2002 PROGRAM
SUMMARY - TRANSPORTATION
,, 'PRIOR "19971 1998i 1999 2000 2CO1 2002
souF~c~ oF F~NDS
General Governmental 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Gtanf~ - CDBG 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Grant- - Other 0.0 0.0 260.0 10.4,0 0.0 0.0 0,0
Walm' 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Was~ewate~ 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Stomwvater 0.0 O.0 0,0 0.0 0.0 O.0 0.0
G.O. Bond~ - Voted 0.0 0.0 0.0 0.0 0.0 0.0 0.0
G.O. Bonds; Non-Voted 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Revenue Bends. 0.0 0.0 O.0 0.0 O.0 O.0 0.0
Acterial Street 101 157,6 401.7 396.0 329.5 263.0 160.0 150.0
Real Est,ale Excise Tax 109 0.0 0.0 0.0 0.0 0.0 0.0 0.0
P~ks Capita{ Facility 112 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Pendergast Park 308 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Gold Mtn Goll' Course 407 0.0 · 0.0 0.0 0.0 0.0 0.0 0.0
Equip. Rental Reserve 510 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Roosevelt Capital Aa.set 6'22 0.0. 0.0 0.0 0.0 0.0 0.0 0.0
TIB 1,252.5 2,965.2 3,556.5 1,250.8 0.0 0.0 0.0
FAUS 0.0 0.0 64.0 176.0 0.0 0.0 0.0
WSDOT 624.5 338.0 200.0 159.6 0.0 0.0 0.0
ISTEA. 45.4 2,839.1 2,196.5 1,077.0 0.0 0.0 0.0
CountylStateJFed 166.5 135.0 220.0 235.5 133.0 10.0 0,0
Navy 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Stree{ Vacation 8.5 0.0 0.0 0.0 0.0 0.0 0.0
Other 8,5 143.7 239.0 18.5 40.0 275.0 0.0
TOTAL,,,SOURCES 2,263.5 6,822.7 7,13,2:0 3,350.9 436.0 445.0 150.0
INFRASTRUCTURE PROJECTS
TRANS4 l SYLVAN WAY OVERLAY - OLYMPUS TO WHEATON I 20.0 ] 20,~ .0
TRANS6 IKJTSAPWAY RECONSTRUCT-WESLON TO AUTO I 55,0{ 8SC.0 I 20.0
TRANS7 JSR3/SR304 BREMERTON FERRY TERMINAL TO GO~ 2,200.0 I 5,57c,7 I 6,243.0 I 4,704.5 I 1,600.0 ] 78~.0 I
TRANS5 IWARREN AVENUE SOUTHBOUND OFFRAMP TO CALLAHAN I r>4.0 176.0
INg7AS0tlKEAN & UNION IMPROVEMENTS I I 120.0 33.0
TRANS8I$R303 CORRIDOR - MAJOR INVESTMENT STUDY I ] I 150.0 300.0 150.0
SUB-TOTAL [ 2,283.5I 8,8~.7 7,132.0 5,478.5 I 1,930.0 [ 1,186.0 I 150.0
GRANOTOTAL '"l 2'283'5l 6,8:22'71 7'i32'01 5,478:5 I 1,930.0 [ 1'186.0 I 150.0]
[OIFFERENCES SOURCES LESS USES J (20.O)J 0.0 I 0.0 [' (2,i~7.6)J {i,494.0)1 (741.01[ 0.0 J
Capital Facilities Element - Part 2 CFP - 8'1 Capital Facilities Program
Six-Year Finance Program
CITY OF BREMERTON CAPITAL IMPROVEMENT PROGRAM
1997 - 2002 PROGRAM
SUMMARY. ENGINEERING
PRIOR 1997 199~ 1999 2000 2001 2002
SOURCES OF FUND,~
General Governmental 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Grants - CDBG 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Grants - Other 0.0 14.9 0.0 0.0 0.0 0.0 0.0
warm- 0.0 0.0 0.0 0.0 0.0 0.0 0.0
W~st. ewater 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Stoo'rwvate¢ 0.0 0.0 0.0 0.0 0.0 0.0 0.0
G.O. Bonds - Voted 0.0 0.0 0.0 0.0 0.0 0.0 0.0
G.O. Bonds: Non-Voted 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Revenue Bo~ls. 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Adedal Stree1101 0.0 1.0 0.0 0.0 0.0 0.0 0.0
Real E~tate Excise Tax 109 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Parks Capital Facility 112 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Pendergast Park 308 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Gokl Mtn Go~f Course 407 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Equip. Rental Reserve 510 0.0 0.0 0.0 0.0 0.0 0.0 0.0
R~ve~l Capital Asset 622 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TIB(UATA) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FAUS 0.0 0.0 0.0 0.0 0.0 0.0 0.0
WSOOT 0.0 0.0 0.0 0.0 0.0 0.0 0.0
ISTEA. 0.0 0.0 0.0 0.0 0.0 0.0 0.0
County/State/Fed 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Navy 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Stree~ Vac~tk~n 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Other 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL SOURCES 0.0 15.g 0.0 0.0 0.0 0.0 0.0
EQUIPMENT & VEHICLES
SUB-TOTAL 0.0 15.9 0.0 0.0 0.0 0.0 0.0
IGRANO TOTAL I o.o I lS.91 o.o I o.o I o.o I o.o I o.o I
IOIFFERENCES SOURCES LESS USES j 0.0 I 0.0 I 0.0 I 0.0 I 0.0 I 0.0 I 0.0 I
Capital Facilities Element- Part 2 CFP - 82 Capital Facilities Program
CITY "~ BREMERTON CAPITAL IMPROVEMENT PROGRA~
1997 - 2002 PROGRAM
SUMMARY - PARKS
PRIOR 1997! lg°~ 1999 2000 2001 2002
'SOURCES OF FUNDS
Gef~'al Governmental 0.0 34.5 0.0 0.O 0.0 0.0 0.0
Grants - CDBG 0.0 80.0 10.0 10.0 10.0 10.0 10.0
Gran(J, - Ol~ef 0.0 300.0 2,50.0 0.0 300.0 0.0 0.0
Water 0.0 0.0 0.0 0.0 0.0 0.0 0.0
W~ewalef 0.0 0.0 0.0 0.0 0.0 0.0 0.0
~ Stormwater 0.0 0.0 0.0 0.0 0.0 0.0 0.0
i G.O. Bond~ - Voled 0.0 0.0 0.0 0.0 5,600.0 0.0 0.0
~ G.O. 8ond.~: NomVmed 0.0 0.0 2,000.0 2,500.0 0.0 0.0 0.0
Revenue BorKl~. 0.0 0.0 0.0 0.0 0.0 0.0 550.0
Arterial Stree~ 101 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Real Eslate Excise Tax 109 0.0 327.0 154.0 0.0 0.0 0.0 0.0
Parks Capital Facility 112 0.0 88.0 96.0 148.0 275.5 99.0 102.0
Pe~lergast Pa~ 308 0.0 30.0 0.0 0.0 0.0 0.0 0.0
Gold Mtn Golf Course 407 0.0 154.0 0.0 0.0 0.0 0.0 0.0
Equip. Rent, al Re~rve 510 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Roo~avell Capital Assel 622 0.0 200.0 0.0 200.0 300.0 0.0 150.0
TIB(UATA) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FAUS 0.0 0.0 0.0 0.0 0.0 0.0 0.0
WSDOT 0.0 0.0 0.0 0.0 0.0 0.0 0.0
ISTEA. 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Coup/Slate/Fed 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Navy 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Street Vacation 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Other 0.0 0.0 0.0 870.0 33.0 17.0 50.0
TOTAL SOURCES 0.0 1,213.5 2,510.0 3,728.0 6,518.5 12~.0 862.0
FACILITIES PROJECTS
FAg7OF0 PICNIC TABLES & PARK BENCHES REPLACEMENT
mARK17 J RRIGATION PROJECTS
BALL FIELD IMPROVEMENTS
UNIDENTIFIED & EMERGENCY PROJECTS
GLEN JARSTAD AQUATIC CTR - ADA ADAPTATION
MANET'I'E PARK- RESTROOM REHABILITATION
PLAYGROUND EQUIP. REPAIR & REPLACEMENT
LIONS PARK - TENNIS COURT REHAB
WARREN AVENUE PLAYFIELD - RESTROOM & LIGHTING
iPENDERGAST PARK- UNIDENTIFIED & EMERG PROJ
!PURCHASE & DEVELOP HADDON SCHOOL SITE J
EVERGREEN PARKJ .
KJTSAP LAKE PARK- PARK BOAT/TRAILER
SENIOR CITIZENS CENTER HVAC
SENIOR CITIZENS CENTER - EXTERIOR PAINT & CARPET REPL.
VARIOUS NECESSARY ADA IMPROVEMENTS
LIONS PARK- DOCK REPAIR
SHERIDAN RECREATION CTR - ELECT. UPGD
PAT CARRY VISTA - SHORELINE REHABILITATION
PENDERGAST REGIONAL PARK- LIGHTS
PENDERGAST REG. PARK FIELDS 4,5, & 6 CONST.
9TH STREET MINI-PARK - SHORELINE REHABILITATION
GLEN JARSTAD AQUATIC CTR - ROOF REPAIR J
JARSTAD AQUATIC CENTER - PUBLIC ACCESS ENHANCE
NAD PARK- DEMOLISH HOUSE, CREATE PICNIC AREA
WARREN AVENUE PLAYFIELD J
MANE'I-rE - DEVELOP.- PLAYFIELD REHABILITATION
BLUEBERRY PARK- DEVELOPMENT J
I
JARSTAD AQUATIC CENTER - LOCKER ROOM IMP.
GLEN JARSTAD AQUATIC CENTER - FALSE CEILING
GLEN JARSTAD AQUATIC CENTER - FAC. UPGD.
=Ag7OF2 NAD PARK- RESTROOM RENOVATION
N.A.D. MARINE PARK- DEVELOPMENT
PARKS & RECREATION COMMUNITY CENTER
SENIOR CENTER - OFFICE & RECEPTION AREA EXPAN.
Capital Facilities Element - Part :2 CFP - 83 Capital Facilities Program
Six-Year Finance Program
CITY OF BREMERTON CAPITAL IMPROVEMENT PROGRAM
1997 - 2002 PROGRAM
SUMMARY - PARKS
Pt~IOR "'1997 19981 1999t 20(X}l ~::~I t 2002
,FA97GF1 SENIOR ClTtZ. ENS CENTER- ROOF
!FAgTOF2 LIONS FIELD - SHELTER
FA97OF2 REHAB TENNIS COURTS 10,0
FA97OF2 LIONS FIELD- PARKING LOT RENOVATION 30.0
IFA97OF1 KITSAP LAKE PARK- PHASE III DESIGN 50.0
FA97OF1 LENT LANE -MASTER PLAN - DEVELOPMENT 150.0
!FAgBOFO PENDERGAST PARK PHASE III - RV CAMPGROUND 550.0
SUB-TOTAL 0.0 1,157,5,. j 2,507.0 3,693.0 6,488.5 116.0 843,0
EQUIPMENT & VEHICLES
EQB8PK0 PURCHASE TWO' 15 PASSENGER VANS 30.01
EQ97GF0 GLEN JARSTAD AQ. CTR - CHEM DISINFECT. SYS 5.0
EQgBPK0 PARKS MISCELLANEOUS 5.0 8.0 5.0
EQ97OFO GLEN JARSTAD AQ. CTR - WATER SLIDE 6.0
EQg7OF0 MISCELLANEOUS EQUIPMENT -INFIELD MACHINE 10.0
EQg7OF0 SENIOR CITIZENS CENTER - UPGRADES 3.0 12.0 4.0
EQg7GF0 PARKS & RECREATION COPY MACHINE 15.0
EQg7GFO GLEN JARSTAD AQ. CTR - DEHUM. SYS. REPAIRAJPGD. 30.0
EQg7GFO GLEN JARSTAO AQ. CTR - BOILER TUBE REPAIR I 10.0,
EQgaPKD ADMINISTRATION - CHAIR AND TABLE REPLACEMENT 10.0
SUB-TOTAL 0.0 56.0 3.0 35.0 30.0 10.0' 19.O
[GRAND TOTAL ,., 0.0 1,213.5 2,510.0 3,728.0 6,518.5' "126.0 862.0
[DIFFERENCES SOURCES LESS USES
Capital Facilities Element - Part 2 CFP - 84 Capital Facilities Program
Six-Year Finance Program
CiTY OF BREMERTON CAPITAL IMPROVEMENT PROGRAM
1997 - 2002 PROGRAM
SUMMARY - GOLF
{ PRIOR 1997 1998 1999 2C(X) I 2001 2002
ISOURCES OF FUNO~;
C.-,er-,e~al Governmental 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Gran{s - CDBG 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Grants - Other 0.0 0.0 0,0 0.0 0.0 0.0 0.0
Water 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Wastewater 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Stormv,'ater 0.0 0.0 0.0 0.0 0.0 0.0 0.0
G.O. Bonds - Vo[ed 0.0 0.0 0.0 0,0 0.0 0.0 0,0
G.O. Bonds: Non-Voted 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Revenue 8oods. 0.0 0,0 2,000.0 0.0 0.0 0.0 0.0
Arterial Street 101 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Real Estate Excisa Tax 109 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Parks Capital Facility 112 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Pendergast. Park 30~ 0.0 0.0 0,0 0.0 0.0 O.0 0.0
Gold Mtn C~f Course 407 0.0 509.0 113,0 116.0 119.0 123.0 427.0
Equip. Rental Ree~rve 510 0.0 0.O 0.0 0.0 0.0 0.0 0.0
Roosevelt Capital Asse{ 622 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TIB(UATA) 0.0 0,0 0.0 0.0 0.0 0.0 0.0
FAUS 0.0 0.0 0.0 0.0 0.0 0.0 0.0
WSOOT 0.0 0.0 0,0 0.0 0.0 0.0 0.0
ISTEA. 0.0 0.0 0.0 0.0 0.0 O.0 0.0
CounyStale/Fed 0.0 · 0.0 0.0 0.0 0.0 0.0 0.0
Navy 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Street, Vacatk~ 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Other 0.0 0.0 0.0 0.0 * 0.0 0.0 0.0
TOTAL SOURCES 0.0 509.0 2~113.0 116.0 119.0 123.0 427.0
FACILITIES PROJECTS
FA97OF1 MTN GOLF COURSE - NEW CLUB HOUSE 2,0~30.0I
SUB-TOTAL . 0.0 2,000.0 0.0 0 0.0 300.0
EQUtPMENT& VEHICLES
SUB-TOTAL ] 0.0 lO9.O! 113.01 116.01 119.oI 123.o! 127.0J
[GRAND TOTAL I ~i0[ 509.01 2,113.01 116,01 119.01 123.01 ~427.0J
[.DIFFERENCES SOURCES LESS USES [ '~10I 0,0 [ 010I 0..01 0:0 ] 0.0I 0101
Capital Facilities Element- Part 2 CFP - 85 Capital Facilities Program
Six-Year Finance PrDgram
CITY OF BREMERTON CAPITAL IMPROVEMENT PROGRAM
1997 - 2002 PROGRAM
SUMMARY o GENERAL. FUND
PRIOR 1997 1998 1999 20001 2001 2~32
iSOURCE$ OF FUNDS
I ~1 Geverrm'~rfml 62.0 148.0 358.2 42B.B 327.6 403.7 205.7
i Gr~nt~ - CDBG 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Gran~ . Other 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Wate~ 0.0 0.0 1.3 1.3 23.5 1.3 1.3
Wastewate~ 0.0 0.0 0.0 0.0 7.0 0.0 0.0
Ston~w3ter 0.0 0.0 0.0 0.0 7.0 0.0 0.0
G.O. ~ - Vo~ed 0.0 0.0 0.0 0.0 0.0 0.0 0.0
G.O. Bood~: No~.-Vo(ed 234.5 0.0 0.0 0.0 0.0 0.0 0.0
Revenue Bonds. 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Artedal Stree~ 101 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Real E~ate Excise Tax 109 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Pmd~ Cal:~al Facility 112 0.0 0.0 0.0 0.0 0.0 0.0 0.0
P~c~rg~ Pall( 308 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Go~d Mtn Golf Coum~ 407 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Equip. Re~al Resecve 510 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Roo~evel Capital Ass~ 6'22 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TIB(UATA) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FAUS 0.0 0.0 0.0 0.0 0.0 0.0 0.0
WSDOT 0.0 0.0 0.0 0.0 0.0 0.0 0.0
ISTEA. 0.0 0.0 0.0 0.0 0.0 0.0 0.0
County/State/Fed 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Navy 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Streel Vacation 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Other 0.0 0,0 0.0 0.0 0.0 0,0 0.0
TOTAL SOURCES 296.5 148.0 359.5 430.1 365.1 405.0 207.0
FACILITIES PROJECTS
FAS7GF11FAC~UTmS PLAN I I =5.01 ~'= I 1~.51 9.51 ~25.01 =.0 I
FAg7GF1 JPAINT FIRE STATIONS 2 1 3
' 7.5
SUB-TOTAL 0.0 25.0 12~.2 158.5 71.5 138.5 22.0
EQUIPMENT & VEHICLES
POLICE1 JPATROLVEHICLE REPLACEMENT SCHEDULE J J 75.0 I ~25.01 ~25.01 ~25.0 I 125.0 ~35.0 I
GENSATICOMPUTERS I 2~s.s I ~2~.o I I I I I I
PSFIRE3 IDEVELOP & IMPLEMENT EMERGENCYOPER. CTR. I I I 10.0 I I I I I
EQ98GF0~REPLACEMENTOF FIRE HOSE I I I ~o.ol I ~o.ol I ~o.ol
PSFIREI/COMMERCIALWASHER/DRYER I I I 1~.5 I I I I I
POLICE 4~MOBILE DATA TERMINALS I I I 3~.81 ~.sl ~0.6] 42.7l I
EQg8GFC~COMPUTER TECHNOLOGY UPGRADES I I I ,o.o I ,o.o I ~o.o I ,o.o I ~o.o I
PSFIREllEMERGENCYGENERATORS'FIRESTA2&3 I I I I ~7.01 I I I
"SF,R~-21RAD,O EQUIPMENT UPDATE I I I I 5~.o I I I 1
EQg7GF0~SURVEY EQUIP. PURCHASES- ENGINEERING DIV. I I I I I 28 0 I I I
PSFIRE2ILIFE-PAKCARDIAC MONITOR/DEFIBRILATOR I ' I "1 I I I lzo I I
EQg7GF0JFURNISHINGS FOR COUNCIL CHAMBER I I I I I I 6.8 I I
EQ98GF0JREPLACEMENTOFSCBABREATHINGAPPARATUSI' J ' '1 I I '1
SUB-TOTAL J 2~5.S t' 204.0 I ~3.3 I 271.6 I 2~3.6 ! 26~.S I ~.01
JGRANOTOTAL I 2~5.51 Z~.01 35g-Sl ~.11 355,~1 '~-01 207.01
JOIFFERENCES SOURCES LESS USES I 81.0 I IB1.0)l 0.0 I 0.0 I 0.0 I 0.0 I 0.0 I
Capital Facilities Element - Part 2 CFP - 86 Capital Facilities Program
Six-Year Finance Program
CITY OF BREMERTON CAPITAL IMPROVEMENT PROGRAM
15~T- 2002 PRO~RAM
SUMMARY. OTHER FUND8
SOURCES OF'FUND~ .......
~ ~ o.o s.3 o.o o.o o.o o.o o.o
Grm~ - CDBG 0.0 80.0 0.0 0.0 0.0 0.0 0.0
Gran'm - Other 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Water 0.0 0.0 0.0 0.0 0.0 0.0 0.0
W~tevv~u~ 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Stomrwate¢ 0.0 0.0 0.0 0.0 0.0 0.0 0.0
G.O. Bondl - Voted 314.8 0.0 0.0 0.0 0.0 0.0 0.0
G.O. Bond~: Non-Vo~cl 0.0 0.0 0.0 0.0 2,500.0 0.0 0.0
Revenue Bond~. 0.0 0.0 0.0 s. 0,000.0 0.0 0.0 10,000.0
Arterial S~'eot 101 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Re~l E~ta ~ T~x 109 0.g 50.0 50.0 50.0 1,0~.0 50.0 50.0
Park~ ~ Facility 112 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Penderga~ P~rR 308 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Go~ ~ Golf Coume 407 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Equip. Renal Re~fve 510 0.0 352.3 926.0 488.5 880.7 858.1 239.0
Roosevelt Cap#~ A~e< 822 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TIS(UATA) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FAUS 0.0 0.0 0.0 0.0 0.0 0.0
WSDOT 0.0 0.0 0.0 0.0 0.0 0.0 0.0
ISTEA. 0.0 0.0 0.0 0.0 0.0 0.0 0.0
County/State/Fed 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Navy 0.0 0.0 0.0 0.0 0.0 0.0 0.0
S~ee~ Vac~don 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Othee 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL SOURCES ,.. 314.8 470.6 976.0 10,538.5 4,210.7 708.1 ,10z269.0
INFRASTRUCTURE PROJECTS
INg7OF0 ICONTINGENCY FOR UNIO' INFRASTRUCT' PROJEC TS150'01 ,ol
SUB-TOTAL I 0.0 118.3 50.0 10,C50.0 50.0,, 50.0 50.0,
FACILITIES PROJECTS
FAgBOF0 INEW CITY HALL 3,500.0
FAgBOF0 iSINCLAIR 0.0., 0.0,, 0.0 3, ,5~.0 0.0,
31 10,000.0
SUB-TOTAL 4.6
EQUIPMENT & VEHICLES
[GRAND TOTAL ',, "' .[ 4, ,0.0 [ 7,85.2,,[ 976.0 [ 10,~.5"'1 4,2io.7J 708.1 [lO',28~.'o-]
[DIFFERENCES SOURCES LESS USES [ , 3~4.6 I (3~4.8)[ 0.0 I ' 0.0 j 0.0 [ ,0.0 I O,O.J
Capital Facilities Element- Part 2 CFP - 87 Capital Facilities Program
CITY OF BREMERTON
1997 - 2002 CAPITAL IMPROVEMENT PROGRAM
SOURCES OF FUNDING - PARKS AND GENERAl. GOVERNMENT PROJECTS
1997: 1998 1999 2000 2001 2002'
GENERAL FUND FUND 001,
ADA Curb Cut Pro, ram 2.0
K3tsap Lake Boat/Trailer 5.0
Traffic Calming and safety devices 6.3
Senl,~' Center HVAC i 14.5
Administration - Purchase two 15 passencjer vans j 15.0
Facilities Plan J 25.0 12.6.2 [ 158.5 59.5 125.0 22.0 '
Computer~ 12-'9.0
Patrol Vehicle Replacement 75.0 [ 12.5.0 ~25.0 125.0 125.0 135.0 ·
Develop & Implement Emerg. Op. Cir. j 10.0
Replacement of fire hose 10.0 10.0 10.0
Commercial Washer/DP/er 11.5
Computer Teohnolo~ Upgrades 38.7 38.7 73.5 38.7 38.7
Emergency Generators Fire Sra. 2 & 3 17.0
Survey Equip. - Engineering Division 7.0
Air Condiflonin(,,1 Fire Station 2 & 3 12.0 5.0
Llfe-Pak 10 Cardiac Mon/Defib 12.0
Furnishings for Council Chamber 6.8
Paint Fire Station 2 & 3 7.5
Replacement of SCBA breathing apparatus 40.0
~,VAILABLE 271.8 250.0 250.0 250.0 250.0 250.0
NET THIS YEAR 0.0 (71.4) (8g.2) (37.0)i (111.0) 44.3
NET CUMULATIVE 0.0 ~71.4/ /160.6/ I197.611 (308.61 (264.3)
PARKS CAPITAL FACILITY FUND 112
Irrigation Proiecta 8.0 8.0 8.0 8.0 8.0 8.0
Playground Equipment Repair & Replacemenl 15.0 0.0 10.0 I 0.0 10.0 $ 0.0
Ball§eld Improvements 10.0 10.0 15.0 I 0.0 10.0 10.0
Picnic Tables & Park Benches 5.0 5.0 5.0 5.0 5.0 5.0
Unidentified & Emer~eno7 Projects 10.0 10.0 10.0 10.0 10.0 10.0
Misc. Ec[uiP. - Infield Machine 10.0
Lions Park - Tennis Court Rehab. 20.0
Parks Miscellaneous 5.0 8.0 5.0
Glen Jarstad AC[. Ctr.- Chem. S~tem 5.0
Senior Citizens Cente~- Upgrades 3.0 12.0 4.0
Senior Center- Extedor Paintincj & car~et replacement 5.0 5.0
Lions Park. Dock Repair 15.0
Pat Carey Vista - Shoreline Rehabilitation 25.0
Sheridan Recreation Center Elect. Up~d. 15.0
Parks & Recreation Copy Machine 15.0
9th SIre~t Mini-Park - Shoreline Rehabilitalion 15.0
Jarstad Ac[uatlc Cent~- Public Areas Enhancement 20.0
Glen Jaratad AC[. Ctr.- Roo[ Repair 30.0
Manette- Develop - Pla~field Rehabilitation 150.0
Jarstad Ac[uatic Cenler - Locker Room Improvements 10.0
Glen Jamtad AC[. Cir. - False Ceilin~ Insp. & Rep. 10.0
Glen Jarstad Ac[uatlc Center- Facility UFx:jrades 14.5
NAD Park Restroom Renovation 13.0
Glen Jaratad Ac[. Ctr.- Dehum. S~tem 30.0
Glen Jarstad Ac[. Ctr.- Boiler Tube RepI. 10.0
Lions Field Shelter 13.0
Senior Citizens Center- Office & Reception Area F_.~an. 13.0
Senior Citizen Cfi. - Roof Repair 20.0
Parka Tennis Courts Resur/acln~ 10.0
Lions Park - Parldnc~ Lot Renovalion 30.0
Administralion - Chair & Table replacement 10.0
..................... · .......-...............-.-.-,......-...<.......-.. ...... ,' · :-"-.~ .......... ~- ...:..;~...~:~?~.w¥,v. :.;...:.:..,_..~,~,~,..
^VAILA8LE , 88.0 74.0 t 65.2 265.5 194.6 25~, ~,0
Capital Facilities Element- Part 2 CFP - 88 Capital Facilities Program
CITY OF BREMERTON
1997 -2002 CAPITAL. IMPROVEMENT PROGRAM
SOURCES OF FUNDING - PAR, KS AND GENERAL GOVERNMENT PROJECTS
REAL ESTATE EXCISE TAX FUND 109
Infrastructure Contincjenc.~ 50.0 50.0 50.0 ,50,0 50.0 50,0
Administration - Purchase two 15 ,oassenc~er 'rahs 15.0
Haddon School Site - L,and Purchase 150.0
Haddon Schoot Site - Oevelopmenl,, t ,225.0
Glen Jaratad Aej. Ctr.- Waler Siiae 6.0
AVAILABLE 270.0 337.4 350.5 364.0 378.0 406.8
ROOSEVELT FIELD ASSET~ FUND 622
EVergreen Park 435.0
NAD Park - Demolish house & create' picnic area 100.0
Warren Avenue Pla~ield 100.0
NAD Madne Park- Development 300.0
Lent Lane - Master Plan & Development 150,0
AVAILABLE 140.0 75.0 75.0 75.0 75.0 75.0
G,O, BONDS~ VOTED
Parks & Recreation Commun~ Cen't'er 5,600.0
G, Ot BONOS; NON-VD,TED
Pendergast Park - Lights I'or Athletic Fields 250.0
Pendeq]ast Park Fields 4, 5 & 6 Construction 1,750.0
Blueberry Pad( - Development 500.0 ,,.
Evergreen, Park Project 2,000.0
,REVENUE BONDS ,
Pen, der~ast Park Phase III - RV Cam]:~round 55~,.0
CEN-COM BQND LEVY
Mobile Data Terminals 36.8 38.6 40.6 42.7
Radio Equipment Update 5~.0
IA(;
Evergreen Park 300.0"'
pendergast Park - LIcjhts 250.0 ,.
NAD Madne Park 300.0
DONATIONS/MATCH/U,NKNQWN
Irri~Jatlon Projects 33.0
Lions Field Shelter 17.0
~c~Sap Lake Park - Phase 111 O~si~]n .... 50.0
Capital Facilities Element - Part 2 CFP - 89 Capital Facilities Program
Six-Year Finance Prpgram
CITY OF BREMERTON
1997 . 2002 CAPITAL IMPROVEMENT PROGRAM
SOURCES OF FUNDING - PARKS AND GENERAL GOVERNMENT PROJECTS
i ~ 9971 19981 19991 ~ 2OOll :~:)2!
BLOCK GRANT
G~en Jamtad Aq. Cts. ADA Adair. 12.3
Trafl'~c Calimln(~ and safet~ devices 50.0
ADA Curb Cut Pro, ram 10.0
Various A DA Improvements 10.0 10.0 10.0 10.0 10.0
Maneffs Park- Restroom Rehabilitation 14.4
Warren Pla~letd - Restroom Rehab & pla~eld li(~hlin~ 23.9
Haddon Schoo{ Si~e 29.4
D.O.Ei eRANT
Evergreen Park Project 870.0
DII.r REBATI~
qadar Speed Notlflcallon Tralle~ 14.9
WATE RJWASTEWATEFUSTOR MWATER
Survey Equipment - Eng. Division 21.0
Capital Facilities Element- Part 2 CFP - 90 Capital Facilities Program
Six-Year Finance Program
CITY OF BREMERTON CAPITAL IMPROVEMENT PROGRAM
1997 - 2002 PROGRAM
INFRASTRUCTURE SUMMARY
CIP ID # DESCRIPTION
General Governmental
Grants - CDBG
Granta - EDA
Water
Wastewater
Stormwater
G.O. Bonds - Voted
G. O. Bonds - Non-Voted
Revenue Bonds
Arterial Sb'ed 101
Real Estate Excise Tax 109
Parks Capilal Facility 112
Pendergast Park 308
Gold Mtn Golf Course 407
Equip. Rental Reserve 510
Roosevelt Capital Asset 622
TIB(UATA)
FAUS
WSDOT
ISTEA
County/Stata/Fed
Navy
Street Vacation
Other
TOTAL SOURCES
WATER UTILITY
UTILWA87 12' DISTRIBUTION WATER MAIN
IN98WA01 WATER SYSTEM FLUORIDATION
UTILWA18 SR #3 TRANSMISSION MAIN SYSTEM IMPROVEME
UTILWA27 PUMP STA #14 REPLACEMENT & 12" TRANS. MAIN
UTILWA23 E396 ZONE TRANSMISSION MAIN & STORAGE
UTILWA83 WARREN AVENUE BRIDGE MAIN
IN97WA01 12. DIST. WATER MAIN - SHOREWOOD DR TO RES
UTILWA5t WEST 540 ZONE DEVELOPMENT
UTILWA47 WEST 650ZONE DEVELOPMENT
UTILWA,48 RESERVOIR SEISMIC IMPROVEMENTS
UTILWA84 WATER MAIN REPLACEMENT PROGRAM
UTILWA89 CORROSION CONTROL TREATMENT FACILITY
UTILWA2. SILVERDALE MOBILE ESTATES WELL
UTILWA64 18' SHERMAN HEIGHTS TRANSMISSION MAIN
UTILWA45 DOMSEAWELL DEVELOPMENT
UTILWA72 PINE RD. MCWILLIAMS TO WELL 21
UTILWA21 36' MAIN EXTENSION
SUB-TOTAL
WASTEWATER UTILITY I
IN97WW01 ANDERSON COVE BASIN CSO SEPARATION PROJ 30.0I 35.0I 115.0I 755.0I 764.0I 758.0
INg8WW02 CSO DETENTION STRUCTURES I I 250.01 = 0.01 250.01 I
UTILWWg CALLOW AVENUE DRAINAGE BASIN CSO PROJ I I
3 ,~2.01 4,035.01 2,05g.01 I 400.0 3,790.0
UTILWW20 SEWER MAIN REPLACEMENT PROGRAM - 00.0- 220.0 220.0 220.0 220.0 220.0 220.0
UTILWW17 OYSTER BAY BASIN INTERCEPTOR 23.0 r-"O.0 '
IN98WW01 PORT WASHINGTON NARROWS INVERTED SIPHON ·
SUB-TOTAL I 3,§75.01 4,290.01 2,763.01 1,325.01 1,234.01 1,428.0J 4,743.0
Capital Facilities Element - Part 2 CFP - 91 Capital Facilities Program
Six-Year Finance Program
CITY OF BREMERTON CAPITAL IMPROVEMENT PROGRAM
1997 - 2002 PROGRAM
INFRASTRUCTURE SUMMARY
c,P,O# JOESCR,PTION I PRIOR I 1997l 19981 19991 2°°°I" 2001J 20021
STORMWATER UTILITY
STORM0t' KEAN STREETIRO~ERS STREET STORM DRAINAGE 68.0 430.0
STORM03 STORM DRAINAGE MAIN REPLACEMENT PROGRAM 60.0 60.0 60.0 60.0 60.0 60.0
STORM02 EAGLE AVENUE STORM DRAINAGE 10.0 90.0
SU B-TOTAL 0.0 128.0 500.0 150.0 60.0 60.0 60.0
TRANSPORTATION
TRANS1 [MISCELLANEOUS 150.0 150.0 150.0 150.0 150.0 150.0
TRANS4 iSYLVAN WAY OVERLAY - OLYMPUS TO WHEATON 20.0 ' 203.0
TRANS6IKiTSAP WAY RECONSTRUCT - WESLON TO AUTO 55.0 890.0 20.0
TRANS7 SR3/SR304 BREMERTON FERRY TERMINAL TO GO 2,200.0 5,579.7 6,243.0 4,704.5 .1,600.0 786.0
TRANS3 WERNER ROAD/LOXIE F_..AGANS BLVD. IMPROVEM 8.5 40.0 35.0
TRANS5 WARREN AVENUE SOUTHBOUND OFFRAMP TO ~ALLAHAN 64.0 176.0
INg7AS01 KEAN & UNION IMPROVEMENTS 120.0 33.0
TRANS8 SR303 CORRIDOR - MAJOR INVESTMENT STUD? 150.0 300.0 .150.0
INg7AS02 'RODGERS STREET CONSTRUCTION 345.0 80.0
IN98AS01 AUTO CENTER WY, BRUEN AVE TO SR3 SB ON RAMP 30.0 250.0
I
SUB-TOTAL I 2,283.5 6,822.7 7,132.0 5,478.5 1,930.0 1~186.0 150.0
OTHER FUNDS
INgTOF01 CONTINGENCY FOR UNID. INFRASTRUCT. PROJECTS 50.0 50.0 50.0 50.0 50.0 50.0
IN97OF02 TRAFFIC CALMING & SAFETY DEVICES 56.3
INgSGF01 ADA CURB CUT PROGRAM 12.0
IN98PK02 ILLAHEETRUST LANDS- PURCHASE 10,000.0
SUB-TOTAL 0.0 118.3 50.0 10,050.0 50.0 50.0 50.0
JGRANO TOTAL I 5.993.5 1 12,958.5 1 15,575.5 12i;661.5 1 s,939:01 4,954.01 6,363.1~ I '
Capital Facililies Element - Part 2 CFP - 92 Capital Facilities Program
Six-Year Finance Program
Capital Projects and Financing Plan
Table SC-13 presents Brcmcrton School's six-year plan for capital improvement projects; h~cluding sources
of public money within the projected funding capacities that constitute the probable funding of District's
capital improvement projects.
In 199 i, the voters of the Bremcrton School District authorized a $17 nfillion boud issue. That program is
now complete. The District docs not anticipate r~qucsting addiiional voter authorization before 1998. The
District uses a citizens review conunittee to identify future, capital projecls for rccosmnendation to the
District's Board of Directors.
Table SC-13. Bremerton School District Capital Projects and Financing Plan ($000)
Cost/Revenue 199.__.~7 1998 .1999. 200__..~0 2001 2002 Total
Non-Capacity Proiect
1. Administration Building 1,350 1,350
2. Maintenance & 1,200 1,200
Transportation Building
(Replacement)
3. Brcmerton Jtmior High " 15,~)00 15,000
(Replacement)
4. Olympic View Elementary
(Replacement) 8,000 8,000
Total Cost 1,350 24,200 25,550
Local Funds* 1,350 1,350
Local Bond Funds 24,200 24,200
State Match
Impact Fees 20. 20. 20. 20. 20 80.
Total Reveuues 1,370 20. 24,220 20. 20 20. 25,630
Balance 20. 20. 20. 20. 20 20. 80.
*Local Funds it~clude revenue from property leases tu~d surplus properly sales.
Sourcc: Bremcrton School District
Thc District anticipatcs only linfitcd cligibility for Statc match'ing fimds. Thc actual rcccipt of state matching
funds is difficult to predict because o£statc funding shortfalls, hnpact fcc rcvcnuc forecasts arc consistent
wifl~ past income from new residential development (the District has $2,888 in its hnpact, fee account at the
beginning of 1997).
Capital Facilities Element - Pad 2 CFP - 93 Capital Facilities Program