Loading...
HomeMy WebLinkAbout4718 AN ORDINANCE relating to the 2001 - 2006 Six-Year Transportation Plan. Wkereas, the City af Breme~an has reviewed the work accamplished under its Camprehen~ive A~erial Street Oanstructian Pragram and determined current City street need~; and, ~k~r~, the City Cauncil caused ta be prepared a re~i~ed and extended Six- Year Transpa~atian Improvement Plan far the periad ~f Janua~ ~, 200~, ta December 3~, 2006, and a~er public hearing therean approved the same; NOW, THEREFORE, THE CITY OF BREMERTON DOES HEREBY ORDAIN: Section 1. That the revised and extended Six-Year Transpo~ation Improvement Plan 2001-2006 and Schedule is adopted as the revised and e~ended Six- Year Transpo~ation Improvement Plan for the period of Janua~ 1, 2001, to December 31,2006~ Section 2. Effective Date. This ordinance shall become effective ten days after passage and publication. APPROVED by the City Council of the City of Bmme~on this ~ day of PASSED by the City Council of the City of Breme~on this~day of CA,Ok ARfi~DS, Council ~resident APPROVfiD by this day of ,2000. kY~ HORIO~, Mayor ATTEST: ~~ ~~ O ~ EFFEC~E DATE , ¢- 7- ~o _ ~T~LEEN McCLUSKEY, City Clerk / P~L ~ATION DATE ~., ~ ~- ~ 0~[~NANCE NUMBER ~ ?/f ... ~ Washington State Department of Transportation Page ~Six Year Transportation Improvement Program Agency: Bremerton From 2001 to 2006 Co. No.: 18 Co. Name: Kitsap Co. Hearing Date: Adoption Date: City No.: 0115 MPO/RTPO: PSRC Amend Date: Resolution No.: ProJect Identification Project Costs in Thousands of Dollars Federally Funded A. Federal Aid No. B. Bridge No. ~ ~= ~ Fund Source Information Expenditure Schedule Projects Only 'o ~ (Local Agency) ._~ ~ .~'~ C. Project Title eE>~z ~ ~§ -~ ~ .c(° Federal Funding R/VV ~ ~ ._o E D. Street/Road Name or Number ~ ~ ~ ,>, a. ,? ~- 7= E. Beginning MP or road E!~ding MP or road E ~6 .~ ~ Phase Federal Federal State 4th Required - - ~- ~ .~ Start Fund Cost by Fund State Local Total Envir. Date (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd Thru Type (MM/YY) F. Describe Work to be Done a_ 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 1 P-STPF-TA96(058) 03 S 3.94 C PEr 6/1/1997 STP(U) 695 TPPI 6951 I 1390i 51 I ElS RWj 1/1/1998 STP 6427 OTHERI 43991 J 10826 12O01 SR304 Transportation Improvement Project 04 G Yes SR 3O4 02 P ,from: SR 3/304 Interchange to: Bremerton Ferry 06 S 12/99 HOV improvements/reconstruction of $R304 corridor 07 T W Totals 7122 5094 12216 1205 14 2 STPF-0304(008) 03 P 2.1 C PE 6/5/2000 STP 43__9~_~)/! TPPI 621 I 456 2001 I ElS RW 6/5/2000 STP TPPI 714J 8671 6158 25001 2658J SR304 TIP - Downtown/Navy Higl~way Phase 04 S Yes SR 304 02 G from: Ferry Terminal/Porter to: Burwell St/SR 3 06 P 6/01 HOV improvements, widening, reconstruction, overlay, signal 07 T and lighting W Totals 4971 776 867 6614 2700 2658 14 3 STPUS-0304(007) 04 S 0.7 C CNI 2/7/2000I STP(U) I 44931 TPPI 701J I 51941 2000i I I ElS SR304 TIP - Stage lB-Gateway 07 G No SR 3O4 06 P from: Porter St to: Montgomery Ave 03 S 12/99 HOV improvements, oveday, widening, reconstruction, signal 02 T and lighting W Totals 4493 701 5194 2000 PE 7/1/1998 UATAI 200l 15r 215l I J CE 17 4 01 S 0.865 P RW 2/1/1999 UATAI 1681 17J 185! J I Yes West Hills CommercialNVerner Corridor Improvements 05 S CN 4/1/2001 STP(U) 1025 UATAI 8951 3041 22241 22241 Werner Road 12 T from: Auto CenterWay to: Auto Center Blvd 07 1/00 Street widening, signal installation, street lighting, overlay 06 Totals 1025 1263 336 2624 2224 Supercedes previous editions ~ Washington State Department of Transportation Page 2Six Year Transportation Improvement Program Agency: Bremerton From 2001 to 2006 co. No.: 18 Co. Name: Kitsap Co. Hearing Date: Adoption Date: City No.: 0115 MPO/RTPO: PSRC Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded A. Federal Aid No. B. Bridge No. ~Ece ~ =~ ~ ~ Fund Source Information Expenditure Schedule Projects Only (Local Agency) ~ ~ C. Project Title =~ o e>.e ~ Federal Funding RJVV o ~ -r.-~ -~ ~, o '- ._ E D. Street/Road Name or Number~,~ ~ ~ ~ n '~ ~ ._ ~ Phase Federal Federal State 4th Required ,,= ~- ;~ E. Beginning MP or road - Ending MP or road _E ~ ~ .~ Start Fund Cost by Fund State Local Total Envir. Date (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1 st 2nd 3rd Thru Type (MM/YY) F. Describe Work to be Done n 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 5 S PE J 7/7/1999 J J 4ooJ J 400J J 800 400J J J SR 303 Bremerton to Silverdale Transportation No SR 303 from: Burwell St to: SR 3 Document deficiencies and identify altemative strategies for ~mproving transportation characteristics of the SR 303 corridor Totals 4oo 4o0 8oo 4oo 19 6 07 S AL J 1/1/2001 J J I I I 900l 900J J I J Miscellaneous (Local Program Support) 06 No City Wide from: N/A to: N/A Projects to improve safety and operations Totals 90O 9OO PE 1/1/2001 OTHER J 72J 481 9oJ j 17 7 05 P o.2 S CN 1/1/2002 OTHER J 288J 72J 3601 J J Auto Center Way Improvements 06 No Auto Center Way 07 from: Bruen Ave to: SR 3 onramp 12 Widen roadway to provide dedicated lurn lane for SR 3 onramp Totals 360 90 450 17 8 05 P 0.3 PE I 1/1/2°°~ I I I I I lol lol lol I I Arsenal Way/Patton Ave. Safety Improvements 06 No Arsonal Way, Patton Ave 07 from: Loxie Eagans Blvd to: Lafayette Ave. 12 Safety improvements including curb and gutter, sidwalks, lighting, roadway widening, and intersection improvements Totals 10 10 10 Supercedes previous editions ~--~ Washington State Department of Transportation Page 3Six Year Transportation Improvement Program Agency:Bremerton From 2001 to 2006 Co. No.: 18 Co. Name: Kitsap Co. Hearing Date: Adoption Date: City No.: 0115 MPO/RTPO: PSRC Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded A. Federal Aid No. B. Bridge No. ~ ~ ~ Fund Source Information Expenditure Schedule Projects Only -o ~ (Local Agency) ~ ~- O '--~ ~ ._o'~' ~E C. Project Title >=.cE ~ ~= _" o~ n'= Federal Funding P-JW D. Street/Road Name or Number [~ ~ ~ ~ .~ -~ Phase Federal Federal State 4th Required ~_ ~- ~' E. Beginning MP or road Ending MP or road E State Local Total Envir. Date - _ t- = .~ Start Fund Cost by Fund 1st 2nd 3rd Thru (mm/dd/yyyy) Code Phase Code Funds Funds Funds Type (MM/¥Y) F. Describe Work to be Done n 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 9 01 P O.2 PEI 1/1/2003 I I I I J 301 30 Construct Warren Ave. Off-ramp 12 No Warren Avenue from: Sheridan Ave to: Callahan Drive Future project for access considerations Totals 30 30 14 10 06 p AL I 1/1/2001 I I ~01 I I 101 601 I 601 I Visitor/Tourist Informational Signs No SR304, SR310, SR303, other arterials from: to: Install tourist informational, areas of interest, and directional signs throughout the City Totals 50 10 60 60 14 11 12 P .15 PEI 1/1/2000 I I I I I 201 201 Lower Wheaten Way Realignment 02 No Wheaten Way from: Callahan Dr to: Sheridan Rd Realign Wheaten Way to north south configuration Totals 20 20 20 Supercedes previous editions