HomeMy WebLinkAbout4718 AN ORDINANCE relating to the 2001 - 2006 Six-Year
Transportation Plan.
Wkereas, the City af Breme~an has reviewed the work accamplished under its
Camprehen~ive A~erial Street Oanstructian Pragram and determined current City street
need~; and,
~k~r~, the City Cauncil caused ta be prepared a re~i~ed and extended Six-
Year Transpa~atian Improvement Plan far the periad ~f Janua~ ~, 200~, ta December
3~, 2006, and a~er public hearing therean approved the same;
NOW, THEREFORE, THE CITY OF BREMERTON DOES HEREBY ORDAIN:
Section 1. That the revised and extended Six-Year Transpo~ation
Improvement Plan 2001-2006 and Schedule is adopted as the revised and e~ended Six-
Year Transpo~ation Improvement Plan for the period of Janua~ 1, 2001, to December
31,2006~
Section 2. Effective Date. This ordinance shall become effective ten days
after passage and publication.
APPROVED by the City Council of the City of Bmme~on this ~ day of
PASSED by the City Council of the City of Breme~on this~day of
CA,Ok ARfi~DS, Council ~resident
APPROVfiD by this day of ,2000.
kY~ HORIO~, Mayor
ATTEST:
~~ ~~ O ~ EFFEC~E DATE , ¢- 7- ~o _
~T~LEEN
McCLUSKEY,
City
Clerk
/
P~L ~ATION DATE ~., ~ ~- ~
0~[~NANCE NUMBER ~ ?/f ...
~ Washington State Department of Transportation Page ~Six Year Transportation Improvement Program
Agency: Bremerton From 2001 to 2006
Co. No.: 18 Co. Name: Kitsap Co.
Hearing Date: Adoption Date:
City No.: 0115 MPO/RTPO: PSRC Amend Date: Resolution No.:
ProJect Identification Project Costs in Thousands of Dollars Federally Funded
A. Federal Aid No. B. Bridge No. ~ ~= ~ Fund Source Information Expenditure Schedule Projects Only
'o ~ (Local Agency)
._~ ~ .~'~ C. Project Title eE>~z ~ ~§ -~ ~ .c(° Federal Funding R/VV
~ ~ ._o E D. Street/Road Name or Number ~ ~ ~ ,>, a.
,? ~- 7= E. Beginning MP or road E!~ding MP or road E ~6 .~ ~ Phase Federal Federal State 4th Required
- - ~- ~ .~ Start Fund Cost by Fund State Local Total Envir. Date
(mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd Thru Type (MM/YY)
F. Describe Work to be Done a_ 6th
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 1 P-STPF-TA96(058) 03 S 3.94 C PEr 6/1/1997 STP(U) 695 TPPI 6951 I 1390i 51 I ElS
RWj 1/1/1998 STP 6427 OTHERI 43991 J 10826 12O01
SR304 Transportation Improvement Project 04 G Yes
SR 3O4 02 P
,from: SR 3/304 Interchange to: Bremerton Ferry 06 S 12/99
HOV improvements/reconstruction of $R304 corridor 07 T
W Totals 7122 5094 12216 1205
14 2 STPF-0304(008) 03 P 2.1 C PE 6/5/2000 STP 43__9~_~)/! TPPI 621 I 456 2001 I ElS
RW 6/5/2000 STP TPPI 714J 8671 6158 25001 2658J
SR304 TIP - Downtown/Navy Higl~way Phase 04 S Yes
SR 304 02 G
from: Ferry Terminal/Porter to: Burwell St/SR 3 06 P 6/01
HOV improvements, widening, reconstruction, overlay, signal 07 T
and lighting W Totals 4971 776 867 6614 2700 2658
14 3 STPUS-0304(007) 04 S 0.7 C CNI 2/7/2000I STP(U) I 44931 TPPI 701J I 51941 2000i I I ElS
SR304 TIP - Stage lB-Gateway 07 G No
SR 3O4 06 P
from: Porter St to: Montgomery Ave 03 S 12/99
HOV improvements, oveday, widening, reconstruction, signal 02 T
and lighting W Totals 4493 701 5194 2000
PE 7/1/1998 UATAI 200l 15r 215l I J CE
17 4 01 S 0.865 P RW 2/1/1999 UATAI 1681 17J 185! J I Yes
West Hills CommercialNVerner Corridor Improvements 05 S CN 4/1/2001 STP(U) 1025 UATAI 8951 3041 22241 22241
Werner Road 12 T
from: Auto CenterWay to: Auto Center Blvd 07 1/00
Street widening, signal installation, street lighting, overlay 06
Totals 1025 1263 336 2624 2224
Supercedes previous editions
~ Washington State Department of Transportation Page 2Six Year Transportation Improvement Program
Agency: Bremerton From 2001 to 2006
co. No.: 18 Co. Name: Kitsap Co. Hearing Date: Adoption Date:
City No.: 0115 MPO/RTPO: PSRC Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. Federal Aid No. B. Bridge No. ~Ece ~ =~ ~ ~ Fund Source Information Expenditure Schedule Projects Only
(Local
Agency)
~ ~ C. Project Title =~ o
e>.e ~ Federal Funding RJVV
o ~ -r.-~ -~ ~, o
'- ._ E D. Street/Road Name or Number~,~ ~ ~ ~ n
'~ ~ ._ ~ Phase Federal Federal State 4th Required
,,= ~- ;~ E. Beginning MP or road - Ending MP or road _E ~ ~ .~ Start Fund Cost by Fund State Local Total Envir. Date
(mm/dd/yyyy) Code Phase Code Funds Funds Funds 1 st 2nd 3rd Thru Type (MM/YY)
F. Describe Work to be Done n 6th
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 5 S PE J 7/7/1999 J J 4ooJ J 400J J 800 400J J J
SR 303 Bremerton to Silverdale Transportation No
SR 303
from: Burwell St to: SR 3
Document deficiencies and identify altemative strategies for
~mproving transportation characteristics of the SR 303 corridor Totals 4oo 4o0 8oo 4oo
19 6 07 S AL J 1/1/2001 J J I I I 900l 900J J I J
Miscellaneous (Local Program Support) 06 No
City Wide
from: N/A to: N/A
Projects to improve safety and operations
Totals 90O 9OO
PE 1/1/2001 OTHER J 72J 481 9oJ j
17 7 05 P o.2 S CN 1/1/2002 OTHER J 288J 72J 3601 J J
Auto Center Way Improvements 06 No
Auto Center Way 07
from: Bruen Ave to: SR 3 onramp 12
Widen roadway to provide dedicated lurn lane for SR 3 onramp
Totals 360 90 450
17 8 05 P 0.3 PE I 1/1/2°°~ I I I I I lol lol lol I I
Arsenal Way/Patton Ave. Safety Improvements 06 No
Arsonal Way, Patton Ave 07
from: Loxie Eagans Blvd to: Lafayette Ave. 12
Safety improvements including curb and gutter, sidwalks,
lighting, roadway widening, and intersection improvements Totals 10 10 10
Supercedes previous editions
~--~ Washington State Department of Transportation Page 3Six Year Transportation Improvement Program
Agency:Bremerton From 2001 to 2006
Co. No.: 18 Co. Name: Kitsap Co. Hearing Date: Adoption Date:
City No.: 0115 MPO/RTPO: PSRC Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. Federal Aid No. B. Bridge No. ~ ~ ~ Fund Source Information Expenditure Schedule Projects Only
-o ~ (Local Agency)
~ ~- O
'--~ ~ ._o'~' ~E C. Project Title >=.cE ~ ~= _" o~ n'= Federal Funding P-JW
D. Street/Road Name or Number [~
~ ~ ~ .~ -~ Phase Federal Federal State 4th Required
~_ ~- ~' E. Beginning MP or road Ending MP or road E State Local Total Envir. Date
- _ t- = .~ Start Fund Cost by Fund 1st 2nd 3rd Thru
(mm/dd/yyyy) Code Phase Code Funds Funds Funds Type (MM/¥Y)
F. Describe Work to be Done n 6th
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
00 9 01 P O.2 PEI 1/1/2003 I I I I J 301 30
Construct Warren Ave. Off-ramp 12 No
Warren Avenue
from: Sheridan Ave to: Callahan Drive
Future project for access considerations
Totals 30 30
14 10 06 p AL I 1/1/2001 I I ~01 I I 101 601 I 601 I
Visitor/Tourist Informational Signs No
SR304, SR310, SR303, other arterials
from: to:
Install tourist informational, areas of interest, and directional
signs throughout the City Totals 50 10 60 60
14 11 12 P .15 PEI 1/1/2000 I I I I I 201 201
Lower Wheaten Way Realignment 02 No
Wheaten Way
from: Callahan Dr to: Sheridan Rd
Realign Wheaten Way to north south configuration
Totals 20 20 20
Supercedes previous editions