Loading...
HomeMy WebLinkAbout4707 ORDINANCE NO. 6170 7 AN ORDINANCE adopting the 1999 amendment to the Bremerton Comprehensive Plan and Comprehensive Plan Map pursuant to RCW 36.70A. WHEREAS, the City of Bremerton has adopted its revised Comprehensive Plan by Ordinance No. 4545 in February 1996; and WHEREAS, the City of Bremerton amended it's revised Comprehensive Plan and Map by Ordinance No. 4606 in September, 1997 and by Resolution No. 2702 in August, 1999; and WHEREAS, RCW Chapter 36.70A permits the City's Comprehensive Plan and Map to be amended no more than once per year; and WHEREAS, the City has received the following Comprehensive Plan Map amendment applications: 1. The David and Roxanna Jones Amendment, which changes a portion of the Comprehensive Plan Map from "Mec~um and High Density Residential" 0VI/HDR) to "Business Park" (GB) as set out in Exhibit B rifled "Jones- 2711 Weaton Way, 2828 & 3231 Hemlock Street;" and 2. The Ghodrat and Lila Aflatooni Amendment, which changes a portion of the Comprehensive Plan Map from "Medium and High Density Residential" (MF) to "Health Care Center" (HCC) as set out in Exhibit C rifled "Aflatooni-804 Callahan Drive & 2802 Hemlock Street (Duplex at NE Comer);" and 3. The Merit Company Amendment, which changes a portion of the Comprehensive Plan Map from "Medium Density Residential" (MDR) to "General Business" (GB) as set out in Exhibit D rifled "Merit Company- Riddell Road, West of Almira Drive, 4220 Wheaton Way;" and WHEREAS, the City seeks to amend the Capital Facilities Element within the Comprehensive Plan as set out in Exhibit E rifled "Revisions, 1999 Bremerton Comprehensive Plan, Capital Facilities Element"; and WHEREAS, Comprehensive Plan amendments must be adopted by ordinance; and Page Z WHEREAS, the Bremerton Planning Commission held punic study sessions and meetings in January and February 2000, and after considering the staff report and the public comments received, recommended adoption of the proposed amendments; and WHEREAS, the City Council has received the report of the Planning Commission and additional public comments in open session; and WHEREAS, based on the reports and comments, the City Council finds the following: 1. The amendments are consistent with RCW Chapter 36.70A and will not result in Comprehensive Plan or regulation conflicts; and 2. Any changes in development or use potential effected by the amendments will not create significant adverse impacts on existing sensitive land uses, businesses or residences; and 3. The amendments can be accommodated by all applicable public services and facilities, including transportation; and 4. The amendments will help implement the goals and policies of the Comprehensive Plan; and 5. The amendments will have no substantive impacts beyond the City limits; and 6. The amendments will have no cumulative adverse impact; and WHEREAS, the City Council is concurrently passing, by separate ordinance, Official Zoning Map amendments consistent with these Comprehensive Plan and Comprehensive Plan Map amendments; now therefore THE CITY OF BREMERTON DOES ORDAIN: Section 1. Resolution No. 2752 is adopted by reference and incorporated herein. Section 2. The Comprehensive Plan Map is amended to change said Map as follows: A. The David and Roxanna Jones Amendment, which changes a portion of the Comprehensive Plan Map from "Medium and High Density Residential" (M/HDR) to "Business Park" (GB). Said Map Amendment affects property situated between Wheaton Way and Hemlock Street north of Callahan Drive. Specifically the property involved lies in the Northwest 1/4 Page of Section 12, Township 24 North, Range 01 East, W.M. and includes parcels found in the Plat of First Addition To Sheridan Park - Plat Number 3965, Block 000, lots 158-00, 159-00 and 160-00. Said Comprehensive Plan Map amendment is depicted in Exhibit B rifled "Jones-2711 Wheaton Way, 2828 & 3221 Hemlock Street," attached and incorporated herein; and B. The Ghodrat and Lila Aflatooni Amendment, which changes a portion of the Comprehensive Plan Map from "Medium and High Density Residential" (MF) to "Health Care Center" (I-ICC). Said Map Amendment affects the property situated in the northeast comer of Hemlock Street and Callahan Drive. Specifically, the property involved lies in the Northwest 1/4 of Section 12, Township 24 North, Range 01 East, W.M., and is described as Lot 164-00, Block 000, of the Plat of the First Addition To Sheridan Park, Plat Number 3965. Said Comprehensive Plan Map amendment is depicted in Exhibit C tifled "Aflatooni-804 Callahan Drive & 2802 Hemlock Street (Duplex at NE Comer)," attached and incorporated herein; and C. The Merit Company Amendment, which changes a portion of the Comprehensive Plan Map from "Medium Density Residential" (MDR) to "General Business" (GB). Said Map Amendment affects property lying adjacent to Wheaton Way, Riddell Road and Almira Drive. Specifically, the property involved lies in the Northwest ¼ of Section 1, Township 24 North, Range 01 East, W.M. and involves the north thirteen (13) acres of Tax Parcel Number 154 which is situated in the southwest comer of the intersection of Riddell Road and Almira Drive. Said Comprehensive Plan Map amendment is depicted in Exhibit D tiffed "Merit Company-Riddell Road, West of Almira Drive, 4220 Wheaton Way," attached and incorporated herein; and Section 3. The Capital Facilities Element is amended as set out in Exhibit E ritled "Revisions, 1999 Bremerton Comprehensive Plan, Capital Facilities Element," attached and incorporated herein. Section 4. The effective date of this Ordinance shall be ten (10) days from the date of passage and publication by the Mayor and City Council. APPROVED by the City Council of the City of Bremerton this ~/o~Jo day of _~o, ~A~ -) ,2000. Page Pa s~a.~.dby the City Council of the City of Bremerton this /~ day of ,2000. CAROL ARENDS City Council President APPROVED this ~. '~ day of WYx. ~_~ ,2000 LYNN HORTON Mayor ATTEST: KATHLEEN McCLUSKEY City Clerk \ .'~ · 5956-  ~ '~.,, '"" ~ ~:,1~' -- 'N~"'. <'~'''h x ~-- ~, .... , -- .... -' "- ,, ~,..~ HEMLOCK STREET kYM NO/¥:IH/~ 0E~:~ ':iA, la(] -IO IS:iM 'QYO~I -I-I:IQQla --- ANYd~O::::)/1~:11~! 'Q J. IEilHX:I DRA.~T REVISIONS 1999 Bremerton Comprehensive Plan E. CAPITAL FACILITIES ELEMENT- Capital Facilities Program Sanitary Sewer Stormwater Transportation Water 3. Comprehensive Plan Amendment and Rezones (specifically Capilal Facilities Plan) (PL99-0011). Lead Agency: City of Bremerton, Department of Community Development- Continued from January 18, 2000 meeting. Chairman Dingfield asked if any members of the Planning Commission had any conflict of interest or appearance of fairness on this issue. None were noted. Commissioner Dingfield asked the members of the public in attendance if they felt any members of the Planning Commission had any conflict of interest or appearance of fairness with this issue. None were noted. Mr. Jon Holan, Director of Community Development, noted that this amendment and rezone has been continued from two different meetings. There had been a meeting in December to talk about the site specific issues, and was continued to the January 4th meeting. There were four amendments/rezones approved at that meeting, but due to the length of the meeting the Capital Facilities portion was carried over to the January 18'h meeting. There was not a quorum at the January 18th meeting so it was continued to this meeting. Amendments/Rezones approved at the January 4, 2000 Planning Commission meeting were: Kitsap Way/Weslon Place (PL99-0011); 271 l Wheaton Way/2828 & 3231 Hemlock Street (PL99-0015); 804 Callahan Drive/2802 Hemlock Street (PL99-0087); Riddell Road, West of' Almira Drive - 4220 Wheaton Way (PL99-0088). Mr. Holan indicated that there have been two new Planning Commissioners appointed since the last discussion was held. He provided an overview of the site specific approvals that had been made. Mr. Holan stated that this is a yearly update to ensure the Comp Plan is current. Chairman Dingfieid asked if the plans and accommodations for the Port Blakely project were included. Mr. Holan stated that he believed that amendment was made last year. The water service boundary areas were added as part of that amendment. A motion was made by Commissioner Griggs and seconded by Commissioner Kosusko to approve the Capital Facilities Element (Capital Facilities Program) of the Comprehensive Plan Amendments (PL99-001 l). Chairman Dingfield asked for a vote from the Commissioners: Commissioner Boyd, yes; Commissioner Griggs, yes; Commissioner Kosusko, yes; Commissioner Moshay, yes; Chairman Dingfield, yes. Motion passes Planning Commission Meeting February 15, 2000 - Page 23 of 24 F. Sanitary Sewer Sanitary sewer facilities are provided by the Bremerton Department of Public Works and Utilities. A complete inventory, analysis of need, and capital improvements program are provided in the adopted Wastewater Comprehensive Plan (a.k.a. the "Wastewater Plan"). 1. Service Area The Wastewater Comprehensive Plan identifies a service area consisting of territory currently served by the Wastewater Utility, as well as areas adjacent to the city limits that are not now serviced but which could logically be served based on natural topography. The service area covers 13 drainage basins, of which five extend beyond the city limits into unincorporated county areas: Kitsap Lake, Tracyton Beach, Trenton Avenue, Sinclair Park, and Oyster Bay. The Utility provides sewage treatment to the sewered areas in the service area through direct service and through specific contractual agreements with the U.S. Navy and Kitsap County Sewer Distdct No. 1 (Navy Yard City). (Figure CF-4 Bremerton Wastewater System Service Area) The Port of Bremerton operates a public wastewater facility located in Olympic View Industrial Park (OVIP) on State Route 3 west of Gorst. The Port is exploring alternatives to provide this area with high level municipal sewer. The Port District has contacted Sewer Distdct #5, Kitsap County Public Works, and the City of Bremerton for improved sewer service and has no formally contracted sewer service. Preliminary Port discussions indicate they will seek service from Port Orchard/Sewer Distdct #5. 2. Inventory of Existinq Facilities The City sewerage system consists of sewage collection, transmission, treatment, and bio-solids utilization facilities. Included are more than 188 miles of gravity sewers, approximately 16 miles of pressure lines, and 33 pump stations. These facilities convey sewage to a secondary wastewater treatment plant located just south of West Hills, at the intersection of SR3 and SR304. Add~ Currently~ there are -I-6 15 active combined sewer overflow (CSO) sites located within the sewer collection system. One CSO site (OF-17973 was abandoned in July of 1999. Another site (OF-15'~ is anticipated to be abandoned in Seotember of 1999. reducing the number of active CSO sites to 14, Approximately 60 percent of the system is composed of combined sanitary and stormwater sewers. (Table SS-f) DRAFT CFP 1 12/23/99 Sanitaq/Sewer Bremerton Wastewater Treatment Plant (1) 1600 Oyster Bay Ave W (3) 10.1 mgd Collection System: Pipe vadous 204 miles Wastewater Lift stations various 33 350 Forest Enhancement Sites One & Two (2) Near Gold Mtn. Golf Course E0O acres (1) City of Bremerton Wastewater Comprehensive Plan, December 1995. (2) City of Bremerton 1993 Biosolids Report to Bremerton-Kitsap County Health District. (3) Average flow for maximum month per NPDES permit. (a) Wastewater Treatment Plant The existing wastewater treatment plant was designed to have a peak hydraulic capacity of 29.5 million gallons per day (mgd). Peak flows ~n excess of 25 mgd are typical during wet months. Normal dry weather peak flow capacity without storrnwater inflow is estimated at 8, 4.5 mgd. Current annual average and maximum monthly flows to the wastewater treatment plant are about 8~ 65 percent of the average annual and maximum monthly flows for which it was designed. It is estimated that 21 percent of the annual average flow and 44 percent of the maximum month flow is stormwater inflow. next sc,:er~! ~,'e~r: under the C!t¥'s CSO Reduct!cn P!cn, which we: ,-,~1~, ,1~{.~1 ~.,.~ I~ ~QO/_ ~1~ Once stormwater inflow is reduced, the treatment plant will have the ~pacity to se~e approximately 58,000 people. 1 Source: City. of Bremerton Wastewater Utility.: 8/98. DRAFT CFP 2 ~ 2/'23,/99 Sanita~ Sewer (b) Forest Enhancement Proqram - Biosolids Utilization The wastewater treatment plant produces approximately ¢we-millie~ gcllc,-,= 1.9 million dry pounds of anaerobically digested biosolids each year. Because biosolids have fertilizer and soil amendment value the City began an active land application program several years ago to utilize the benefits of this wastewater process by-product. Biosolids are used to enhance tree growth and, although the permitted area is substantially greater, biosolids are currently applied to 600 35q acres of Utility-owned forest land. Since June 1992, 100 percent of the biosolids produced at the treatment plant have been utilized in this beneficial manner. The objective of the City's forest enhancement program is to develop an environmentally sound method of using the resource value of biosolids in accordance with federal, state, and local regulations. 3. Future Needs a. Existinq Demand The Wastewater Plan estimates the 1990 population of the service area at 45,210, of which 38,140 were within the city limits and 7,070 outside the city. The plan estimates that approximately 37,000 persons within the service area were connected to the sewer system, leaving an unsewered population of 8,210.2 Kitsap County estimates that the total 1994 service area population was 46,928.3 The City estimates that the 1996 population is approximately 52,762.4 The average annual daily flow, including stormwater inflow, is approximately 6.0 mgd. As CSO separation occurs, the average flow will be reduced accordingly, s However. other storm system work is anticipated to increase flow to the Wastewater Treatment Plant. Minimum peak flow (peak flows occurring without storm water inflow) is estimated at 8 mgd. While the U.S. Navy is allocated 3.8 mgd, it is currently discharging only 1 mgd -- roughly equivalent to 10,000 population. (Table SS-2) 2 Source: Table 1., City ofBremerton Wastewater Comprehensive Plan, December 1995, p. A-2 (Estimate prepared in 1992). 3Source: Table SS-2. Kitsap County Capital Facilities Plan Sewer Facilities - 20-Year Population Allocation - CSF #1, Draft Kitsap County Comprehensive Plan, Part I1, April 1996, PG. 3-87. The County population estimate is for the total service area, and does not include an estimate of the sewered or unsewered populations. 4 The City population estimate is based on the Kitsap County population estimate for the unincorporated part of the sewer service area, along with the City estimate within the city limits. (See page CFP-9) 5Source: Table SS-2. Kitsap County Capital Facilities Plan Sewer Facilities - 20-Year Population Allocation - CSF #1, Draft Kitsap County Comprehensive Plan, Part II, April 1996, PG. 3-87. The County population estimate is for the total service area, and does not include an estimate of the sewered or unsewered populations. DRAFT CFP 3 12/23/99 Sanitar~ Sewer b. Level of Service (LOS) The capacity of existing sewer facilities to serve future needs is determined by comparing the gallons of effluent per day now approved by the State, the number of existing connections, and the number of new people to be served. The number of new people is converted into the number of new residential connections based on assumptions of the number of persons per household, and the number of gallons of effluent generated per capita per day (gpcd). The capacity can also be estimated based on an existing and planned LOS for sewer service. The calculation of the current LOS excludes stormwater inflow. (-~ the City's system experiences seine infiltration. In the past it is was not considered a major component of the flow. This is currently beina reevaluated as oart of the CSO Reduction Plan Uodate and Comprehensive Sewer Plan Update to be completed in 2000.'~ The proposed LOS is the existing county-wide average. · Current LOS = 97 gallons per capita per day (gpcd)6 · Proposed LOS = 100 gpcd c. Future Demand The May 1996 draft Kitsap County Capital Facilities Plan estimates that a total of 66,096 persons within the sewer service area will require sanitary sewer service by year 2012, an increase of 19,168 persons from 1992. The County plan estimates that this increase includes 1,111 persons that were not connected to the sewer system in 1992. (Table SS-2) Total Population 46,321 46,928 54,370 66,096 29.92% 19,168 - Sewered 45,210 NE NE 66,096 - Unsewered 1,111 NE NE 0 Source: Table SS-2, Draft Kitsap County Capital Facilities Plan, May 1996, pg. 3-87. The County allocation addresses years 1994 and 2000 (rather than years 1996- 2001) in order to comply with a Puget Sound Growth Headngs Board order. S"Executive Summary", City of Bremerton Sewer Comprehensive Plan, October 1991, p. 10. DRAFT CFP 4 12_/23/99 Sanitan/Sewer Therefore, the City has projected service area population figures for years 1996 and 2001 based on the County forecast. (Table SS-3) DRAFT CFP 5 12/23/99 Sanitary Sewer 1996 Service Area Population 52,762 58,000 5.28 1997-2001 New Population 2,128 3,110 0.21 Total 2001 Sewered 54,890 3,110 5.49 Population = ~!J j~ iii !J~ ~j~Jj ii iiijiji !J !ii:!ii~! !i il J~ ii iii il !i~i !J! ilJ ~Jj ij i~J~ i~J !Ji~iiiii iJ ii ii: ~i i:i:i: i:i :~:i:i: i:i:i: i:i:i: J:i:!: i:i:i: :i:i:J :J:i:~:i:i:J :i: i;J :i:J:i:i:J :J :i:::J:~:i:i:~: ~:i:~: :;i :J:i:: J:i :: :i:: i:i:i:i: i:i:i:~: i: :~: ~: ~:i :~ :~: ~:~:i;J:~:~:i:J:J:i: J;J:J:i:i:J: i:i ::::::::::::::::::::: ::: :::::: ::: :::: :: :::::: :::::::::2:: ::. :: :::;::::::;:: :::::;:::::; ::.::: ::¥ ::::::: :: :::::::2: ::::::::: :::;:::: ¥ :;; ::::: ::: :::::::::::::::::: ::: ;:: ::: :: 2001-2012 New Population (4) 11,206 (8,096) 1.12 Total 2012 Sewered Population 72,077 (14,077) 7.21 Total 1996-2012 Increase = 19,315 (4,986) 1.93 Notes: For the purposes of this projection, it is assumed that all persons within the service area will connect to the sewer system by year 2001. d. Need for Capital Facility Improvements The Wastewater Plan was developed for an ultimate service area population of 80,610. Therefore, planned improvements will be adequate to serve the projected 72,077 sewered population, provided there are no major industrial hookups. The City has participated in a feasibility study to sewer Gorst and the industrial properties in the vicinity of the Port of Bremerton and Anderson Creek. Sewedng all or a portion of these areas utilizing Bremerton's treatment facility are included as options. The results of this study may affect the need and timing for treatment plant expansion. The City has reviewed potential demands on the wastewater system from the light industrial/business park development of the Port Blakely property located westedy of Kitsap Lake. In performing this review, the City converted the anticipated demand of the light industrial/business park to its functional population equivalent. The population equivalent was added to anticipated demand for both the six and twenty year hodzon. Adequate reserve capacity was found to be available (with anticipated system improvements) to accommodate the project. e. Plans of Other Providers The Kitsap County Public Works Department Wastewater Division is in the process of preparing a County-Wide Wastewater Facility Plan. The draft plan DRAFT CFP 6 12_/23/99 Sanitar7 Sewer integrates the individual Wastewater plans within the county, and includes recommendations for expanding county facilities to serve projected needs. f. Proposed Facilities The City's 1996 Wastewater Plan recommends four types of improvements at the treatment plant to accommodate projected sewage flows at ultimate plan service area development and to solve some current and anticipated operational problems: · CSO treatment capacity- a hi(~h rate clarification orocess is oroposed to treat oeak hydraulic flows dudng storm conditions. This will provide heeded treatment capacitv for the plant as a CSO treatment facility.: · Infrastructure improvements -- repairs or replacements of existing sewer system facilities to restore structural integrity; · Regulatory requirements -- improvements needed as a result of new or modified codes, guidelines, or laws initiated from federal, state, and local government; · Growth and system extensions -- improvements resulting from new development or system extensions; · Other system improvements -- recommendations that contribute to the improved operation or function of the system but are not a result of infrastructure needs, regulations, or system growth. The Utility has acquired properties in the vicinity of the wastewater treatment facility for future plant expansion and buffer for odor management. The City is cc,",ducting com_~Dleted a study for reuse of wastewater treatment plant effluent in September, 1998. The purpose of the study is to determine the feasibility of reusing effluent for industrial use or land application, k~-Ceasible The altematives for reuse are being evaluated .............. f,~. ;'~"*;¢'"'~, *~'". ...... "';*~ racy ~.., ~.~ *~'"~" ...... · '1*~"""'; .... * ...... '~ implementation. The CSO reduction pan will identify additional improvements necessary to meet the regulatory requirements. The plan will show implementation of the improvements in accordance with the schedule dictated by the Department of Ecology consent decree and the court order. The City is actively pursuing grant and loan funding for these projects. The City's ability to obtain funding resources may affect its ability to implement the schedule. The Combined Sewer overflow Reduction Program will continue until the year 2007, specific projects will be developed and constructed in accordance with the attached schedule. Smaller projects will be undertaken throughout the system to reduce the combined sewer overflows as they are identified. These projects may include pipe rerouting, combined stormwater and sewer storage, overflow reduction modifications, pump station improvements, overflow structure modifications and increasing flow to the Wastewater Treatment Plant. DRAFT CFP 7 12./23/99 Sanitan/Sewer Detailed listings of the anticipated capital projects to be developed in the next six years are in the attached Capital Improvement program sheets. 4. Six-Year Financial Plan It is estimated that the existing sanitary sewer system has a total capacity of 8 10.1 million gallons per day (mgd), with approximately 3 mgd available capacity, which is sufficient to meet the total need of.5~ through the next six years, provided there are nc major new industrial demands. (This assumes provisions for peak stormwater treatment for wet weather flows through high rate clarification rcmc.;---I cf ~tc,,-m,,.;;ctcr from +~. ..... , ..... ,,.........* ....... , City's ) ~: ....... v ...... yecr.~ under the CSO Reduction Plan. The six-year financial plan for sanitary sewer facilities is included in Section K of this CFP. It is a summary of the City's Six Year (-I-996-2OO-1- ~) Wastewater Capital Improvement Plan. Improvements are shown to be primarily Utility financed through reimbursable loans through 2002 2004, assuming Re limited grants will be available. Of the Non-Utility financed projects, most of the growth-related improvements are anticipated to be financed by special utility local improvement districts (ULIDs) or by developers directly. It is anticipated that roughly 20 percent of the expenditures beyond 2000 will be funded by non-utility sources of revenue. CFP Sewer 1998.doc DRAFT CFP 8 12_/23/99 H. Stormwater Stormwater facilities are provided by the Bremerton Department of Public Works & Utilities. The Stormwater Utility was formed by ordinance in 1994 as a funding source for the stormwater program mandated by the Puget Sound Water Quality Management Plan. The mission of the Program is to control flooding, enhance water quality, and protect sensitive habitat areas and local aquifers. A ~'~""+"'~ ~" 4997. The City adopted its Stormwater Management Plan in 1996. The City's stormwater service area is the City limits. There are 14 drainage basins located within the developed portions of Bremerton. These drainage basins closely conform to the limits of the sewer basins identified in the City's Wastewater Comprehensive Plan. Additional drainage basins within the Utility Owned Lands are also within the service area. '!. Inventory of Existing Facilities With the exception of a few more recent developments, the existing drainage system within the City can be characterized as a conveyance system of surface drainage swales and a series of pipes which collect and route drainage away from homes and businesses as shown Exhibit 4-1. The City has a storm drainage system with partial sewage separation, or a combined sewer system. Because the City's storm drainage system is inte(~ral to its sewer system in areas. work on one system may effect the other. The City is aoaressivelv pursuing a oroaram tn reduce combined sewer stormwater from the sewer system or improvino oumoin~ transmission and treatment capabilities for stormwater at the Wastewater Treatment Plant. The maiodtv of this work is shown in the Combined Sewer Overflow (CSO~ reduction Plarl and the sanitary sewer system planning documents, The City's adopted Combined Sewer Overflow (CSO) Reduction Plan will s~pcr=t~ ............................... ~ limit CSOs to no more than one per year per outfall. A number of natural drainage facilities exist in the Bremerton drainage system. These natural systems include swales, channels, creeks, ravines, and natural drainage ways that discharge directly to madne waters. The City is responsible for maintaining three detention facilities. These facilities are located near Loxie Eagans Blvd. & Arsenal Way, Oyster Bay Avenue 8, Loxie Eagans, and Ridgetop Circle & Monticola Drive (Holly Terrace West Addition). In addition: the City will accept responsibility, for maintenance of the Vortechnic,~ Filter (swid filter~ in the ferry terminal ~arkino lot constructed as part of the Bremerton Trans[~ortation Center project in late 1999. This filter serves the Pacific Avenue basin. In 1999 the City initiated a Droeram of annual inspections of private and City stormwater detention facilities, The City's stormwater conveyance system consists of approximately 52 miles of pipes ranging for 8" to ~ 154" in diameter. An estimated 60% 45% of the sanitary sewer system is composed of combined sewers which carry sanitary and stormwater flows. Bremerton currently has 14 developed drainage basins. The basins include those areas outside of the City limits that drain into the City and contribute runoff to some of the City's localized drainage problems. The City's stormwater basin area is approximately 8,564 acres feet. The majodty of undeveloped Utility Owned Land is not included in this inventory. (Table SW-~) DRAFT CFP 1 12/23/99 Stormwater 1. Anderson Avenue N. shores of W. Brem. - Port Wn. Narrows 400 2. Callow Avenue Central W. Brem. - Sinclair Inlet 650 3. Cherry Avenue E. Brem. NE of Warren Ave. Bddge - Port Wn. Narrows 250 4. East Park E. Brem. S of Sylvan Way - Port Wn. Narrows 330 5. Kitsap Lake W. Brem surrounding Kitsap Lake - Chico Bay 1,550 6. Oyster Bay NW part of W. Brem - Oyster Bay & Ostdch Bay 1,575 7. Pacific Avenue SE part of W. Brem incl. Ferry Terminal - Sinclair Inlet 150 8. Phinney Bay N central part of W. Brem - Phinney Bay 225 9. Pine Road W part of E. Brem. ~ Port Wn. Narrows 680 10. Sinclair Park SW portion of W. Brem- 1,400 11. Stevens Canyon E. Brem. in vicinity of Wheaton/Sylvan - Port Wn. 350 Narrows 12. Tracyton Beach Along W. edge of city limits in E. Brem - Port Wn. 60 Narrows 13. Trenton Avenue E part of E. Brem - Port Wn. Narrows & Port Orchard Bay 670 14. Warren Avenue Downtown Bremerton - Port Wn. Narrows 275 Total = 8,565 Source: City of Bremerton Draft Stormwater Management Plan. 2. Forecast of Future Needs a. Existing Demand Water Quality -- The City of Bremerton established a policy requiring detention facilities on development projects in 1980. The guidelines for sizing these facilities limited the runoff rate to 0.2 CFS/acre based on a 25-year storm event. Since 1994, the City has required all development to meet the requirements of the "Stormwater Management Manual for the Puget Sound Basin. Conveyance -- A complete analysis has not been performed on the City's existing storm drainage system to determine the capacity of the components. This analys~s will be conducted over the next five years as part of the proposed drainage basin assessments. DRAFT CFP 2 12/23/99 Stormwater b. Level of Service (LOS) Water Quality -- Development projects must meet the requirements of the "Stormwater Management Manual for the Puget Sound Basin", "or other technically equivalent manual adopted by the City of Bremerton, which includes providing water quality enhancement for 6-month, 24--hour storm and stream bank erosion control by releasing one-half of the predeveloped 2-yead24-hour duration rate dudng a 2- yead24-hour duration event, and matching predeveloped 10-year and 100-yead24 -hour duration runoff rates. Construction sites are also required to provide erosion and sedimentation controls for up to the 2-year storm event. The City anticipates adopting all or most of the Kitsao County Stormwater Manual f. asa technically equivalent manual) in late 1999= or eady 2000. This will allow the City to meet the Department of Ecoloav requirements while providin(~ consistency within the County. Conveyance -- Storm systems constructed as part of the City's CSO Reduction Plan will be designed to handle a 25-year storm. The City will be conducting drainage basin assessments as part of the storm water program. These assessments will include the identification of storm drainage conveyance system capacities. Based on the outcome of these assessments, a recommended level of service will be determined for existing systems. The drainage problems identified in the storm water capital program are based on conditions observed in the field and represent conveyance problems that occur annually. c. Future Demand Water Quality -- Development will be required to meet the Level of Service requirements defined above. Regional water quality facilities maybe identified in future drainage basin assessments. Conveyance -- The impact of additional impervious surfaces from development on the conveyance system will be mitigated by the limitations to the runoff rate to 0.2CFS/acre based on a 25-year storm. d. Need for Capital Facility Improvements The City's CSO Reduction Plan identifies construction of separate stormwater conveyance systems in the majodty of the City's drainage basins. These improvements will address most of the drainage problems identified. The City's Stormwater Management Plan identified three capital projects, not included in the CSO Reduction Plan, necessary to improve conveyance system capacity. These stormwater mana<~ement plan also identified areas for further ana .l~sis that may result in additional future projects, as will discovery of new problem areas. e. Plans of Other Providers The City and Kitsap County share responsibility for a number of drainage basins. The water quality standards of the City and Kitsap County are consistent. Coordination between the City and Kitsap County will required regarding the downstream conveyance systems within these basins. f. Separation of Private Storm Connections to Sewer System DRAFT CFP 3 12/23/99 Stormwater In many areas roof; driveway, basement, foundation and parkin<~ lot drains am, directly connected to the sanitary, or combined sewer system. This contributes tn CSO events. In order to meet the CSO Reduction Program reouirements, the City will initiate a program to seoarate these connections from the sewer system so they are routed to a stormwater on.ly conveyance facility_ or infiltration area. The City will be workin_a to adopt an ordinance in late 1999 or ead.v 2000: to encourage orooerW owners to disconnect their pdvate storm connections from the sewer system., and allow provisions for City assistance ir~ that effort, a_. Endanoered Species Act and NPDES II Considerations In 1999: several salmon species were added to the Endanaered Soecies listinos as a threatened or endanoered soecies. In addition: NPDES III will require Bremertor~ to get a Stormwater Discharoe Permit. With these issues it is anticipated that water quality, standards will become more stdna_ent. This ma.v require modification~ to the ordinances and practices of the City when the new standards are known. 3. Proposed Facilities Improvements The Stormwater Plan identifies eleven existing flooding problems and recommends solutions to alleviate these problems. Many of these drainage problems will be reduced or eliminated by CSO sewer separation projects. A few will be addressed dudng annual maintenance. Because of the need to meet the PSA Consent Decree and Ecolo(~v Order on Consent re(~arding combined sewer overflow reductions, stormwater capital fundino is allocated to those projects, which meet those needs. Projects that address stormwater issues only are bein~ deferred unless other factors ('such as flood damage to properS, or grant funding opportunities) provide sufficient justification to address a specific issue. Sinclair Park Upgrade piping and detention at Kean and Rogers St. 1,000,000 ClP ~ Stevens Piping improvements at Robin and Dibb Streets 180,000 Canyon 170,000 CIP ~3 Pacific Piping improvements along Park Avenue, 5th St to 290,000 Avenue Bu~ell ....... Total = 1,470,000 Source: Dra~ Stormwater Management Plan The Stormwater Plan identifies a number of small capital projects that need to be performed on an annual basis. The Plan recommends that the City needs to implement a series of storm drainage improvements over a multi-year planning pedod, and develop an effective City-wide DRAFT CFP 4 12/23/99 Stormwater inspection and maintenance program. {:?aA~,SW-~ Further. the City needs to develoo a model and oerforTn a detailed analysis of the storm drainage system in several basins. This effort should identify additional future [~roiects. A detailed listin(3 of the pro.iects anticipated to bc developed in the next six .years is shown in the attached Six-Year Capital Improvement Plan. 4. Six-Year Financial Plan The six-year financial plan for stormwater facilities is included in Section K. CFP Stormw ter 1998.doc DRAFT CFP 5 12/23/99 I. Transportation This section is a summary of information contained in the Transportation Element of the Comprehensive Plan. 1. Inventory of Existin,q Facilities Bremerton's transportation system generally consists of streets, highways, sidewalks, ferries, and public transit· The Transportation Element includes the following information on existing facilities: Streets and Hic, lhways · Principal Arterials (See Transportation Element Table · Minor Arterials (See Transportation Element Table · Collector Arterials (See Transportation Element Table · Residential Streets /Not inventoried) Mass Transit · Kitsap Transit /See Transportation Element pg. 20) . Washington State Ferries: Bremerton- (See Transportation Element pg. 20) Seattle · Hoduck Transportation Co.: Bremerton-Port (See Transportation Element pg. 20) Orchard Source: Transportation Element "F" 2. Forecast of Future Needs -- Level of Service (LOS) Standard Levels of Service (LOS) is an estimate of the quality and performance of transportation facility operations in a community· The Transportation Element measures LOS by calculating the volume to capacity ratio (V/C) of the midblock of a roadway, using a range from A (free flow) to F (stop-and-go traffic). DRAFT Capital Facilities Program 1 12/23/99 Transportation (a) Current Level of Service The following existing roadway sections exceed or are close to exceeding a Level of Service D (Volume/Capacity Ratio .90) threshold during the PM peak hour: B u,"';:c!! We,~-~te44av~ 0.77 D Burwell Street Warren to Naval 0.77 D Cambrian Avenue Preble to Farragut 0.73 C Kitsap Way Callow to SR3 0.87 D Manette Bridge 0.89 D Warren/~venue 11th to Bddge 0.80 D Warren 0Nheaton) Bridge to Callahan Ddve 0.99 E Source: 1999 Field Measurements by Engineering Division (b) Recommended Level of Service (LOS) The Transportation Element establishes the following level of service standards: · Wheaton/Warren Corridor-- LOS F with V/C threshold of 1.06 DRAFT Capital Facilities Program 2 12/23/99 Transportation · Kitsap Way Corridor -- LOS E or better (VIC less than or equal to 1.00 · Manette Bridge -- LOS E or better (V/C less than or equal to 1.00) · All Other Arterial Streets -- LOS D or better (vic less than or equal to 0.9) (c) Existin,q and Anticipated Deficiencies Existing transportation deficiencies that have been identified from the level of service standards, as well as operational safety and other improvements include SR304 (Cambrian Avenue, Farragut Street, Callow Avenue, Bur'well Street and the ferry terminal area); SR303 (Warren Avenue and Wheaton Way); SR310 (Kitsap Way); the Manette Bridge; the Sheridan Road, Sylavan Way and Riddell Road approaches to Wheaton Way; the Wemer road area from Union Avenue to SR3; a southbound off-ramp from the Warren Avenue Bridge to Callahan Ddve and other miscellaneous channelization or traffic control improvements as warranted. Source: 1995 Bremerton Transportation Element. Subsequent to prepartion of the 1995 Transportation Element, additional deficiencies are anticipated to develop or become more problematic: 1. Arsenal Way/Patton Avenue from Lafayette Avenue to Loxie Eagans Boulevard - with improved connections from the Farragut Avenue intersection on SR304 to Rogers Street and Lafayette Avenue (part of the SR304 Transportation Improvement Project), an increased level of traffic is anticipated to use this access to the neighborhoods and SR3. This in combination with the existing land uses in the area (especially the schools adjacent to the corridor) and the potential for development in the area, an evaluation and project development of this corridor is appropriate. 2. Auto Center Way widening, Bruen Avenue to SR3 southbound on-ramp - this will extend a second southbound lane from Bruen Avenue to the SR3 southbound on-ramp to facilitate merging movements of Auto Center Way traffic from the Kitsap Way turn and turn lane storage from southbound SR3 on-ramp traffic. 3. State Street pedestrian concerns regarding Puget Sound Naval Shipyard personnel using the State Street gate and crossing Burwell Street at State Street have increased. City staff will evaluate this location for signal warrants. 4. Traffic calming measures - the City has initiated a program of providing traffic calming devices (speed humps, traffic circles, bulb outs, chicanes, etc.) throughout the city. To date this has been largely funded through CDBG funds, limiting its application to Iow income eligible areas. Expansion of this program throughout the city, as wee as use of other traffic calming devices (such as a radar speed trailer) are desirable. 5. Non-motorized improvements - non-motorized improvements are envisioned to by projects which facilitate pedestrian or bicycle access through the city. These include completion of the Burwell Hill Climb project (from Callow Avenue to Forrest Ridge Park) and other pedestrian access routes (such as 6~h Street from Cambdan Avenue to Meade Avenue, and 19th Street off of Wycoff Avenue). Other program needs include continuation of the Amedcan With Disabilities Act (ADA) Curb Cut Program, coordination with the County's Bike Ways Program and improvements to the City's bike system. 6. Preservation and miscellaneous - provide for funding of projects which improve the safety, operations, preservation and TDM aspects of the City DRAFT Capital Facilities Program 3 12/23/99 Transportation artedal system. This may also include support of street operations on the local and collector system, as well as other non-routine issues that may arise. 3. Proposed System Improvements 1. SR303 (Warren Avenue/Wheaton Way) - the City has allocated $200,000 of its county wide TEA-21 funding to the Washington State Department of Transportation to perform a Major Investment Study of this corddor from Burwell Street to SR3. This study will focus on existing and anticipated deficiencies, land use impacts and development of a plan that can provide guidance for development in the corridor, as well as projects to improve and maintain capacity of the corridor. 2. SR304 (Cambrian Avenue, Farragut Street, Callow Avenue, Burwell Street and the ferry terminal area) - In 1999 the City was successful in secudng approximately 15 million dollars in federal and state grants, for a total project fund (including asked development and construction costs) of approximately 39 million dollars. It is anticipated this funding will be sufficient to complete the SR304 portion of the project for which the City is responsible. Uncertainties in the effects of the salmon listings in accordance with ESA and actual right-of-way costs may modify the total construction estimate. The City is going forward with design and construction in 2000-2001, the Navy Yard Highway phase anticipated in 2001-2002, and the ferry terminal area improvements in coordination with the Bremerton Transportation Center project and anticipated redevelopment of that area. 3. SR310 (Kitsap Way) - improvements to Kitsap Way in the vicinity of St3 were completed in 1999. No further improvements are anticipated until the level of service or operational problems occur. 4. Manette Bddge replacement - the City and State concluded a public evaluation of alternatives for the Manette Bddge replacements. The Manette Bridge will be placed south of its existing structure with connections at the existing termini. No additional right-of-way is anticipated. The State is expected to fund construction of the bddge in the 2001-2003 biennium. 5. Widening of Sheddan Road, Sylvan Way and Riddell Road at their approaches to Wheaton Way - widening is not forecasted to started within the next six years. The City will continue to monitor these intersections for degradation of the level of service. These intersections will be included in the SR303 Corridor Study. 6. Wemer Road area improvements - the City has been successful in receiving grants from the Transportation Improvement Board (TIB) and the Federal Economic Development Administration (for stormwater improvements) and county wide TEA funds, as well as developer and property owner contributions for construction of improvements in this area. It is anticipated that construction will occur in 2000. 7. Warren Avenue southbound off-ramp to Callahan Ddve - this project lost the old Federal Aide Urban (FAU) funding which had been allocated to it. The funding was insufficient to complete the project. This project does not compete well for grants under the current cdteria for transportation funding. City staff will continue to pursue grant opportunities for this project and will include it in the SR303 Corddor Study. 8. Arsenal Way/Patton Avenue (from Lafayette Avenue to Loxie Eagans Boulevard) - the City is preparing to make grant applications for this project. Construction of this project is dependent upon receipt of grant funding. DRAFT Capital Facilities Program 4 12/23/99 Transportation 9. Auto Center Way widening (Bruen Avenue to SR3 southbound off-ramp) - the City is developing a conceptual plan for this improvement and anticipates making grant application funding for this work. Improvements will not occur without grant funding. 10. Preservation - as the City street network deteriorates, preservation improvements are becoming more necessanj. A mixture of local and state funds will be pursued to maximize preservation of the existing system. 11. Non-motorized, traffic calming and miscellaneous improvements - these improvements will be funded to the extent possible with City or outside funding. Detailed listings of the anticipated capital projects to be developed in the next six years are shown in the attached Capital Improvement Program sheets. 4. Six-year Financial Plan The six-year financial plan for transportation facilities is included in Section J of this Capital Facilities Program. CFP Transportation 1998.doc DRAFT Capital Facilities Program 5 12/23/99 J. Water The City of Bremerton Water Utility provides potable water for Bremerton and the surrounding area. A complete inventor~, analysis of need, and capital facilities program is provided in the 1992 City of Bremerton Water System Comprehensive Plan (also known as the Bremerton Water Plan) adopted by the Washington State Department of Health in 1993 and the Bremerton City Council in 1994. T~. .... *, ,,-,~.-*,- .-.~ *~... ~ .... ,-*.... ~^~-.*,.. C...,. ; ...... ;...~ ~.,. ~ OOO Uodate fOF the Water System Comprehensive Plan is currently underway and will be completed by the end of 1999. 1. Inventory of Existinq Facilities (a) Service Area The Utility services approximately 58,000 residents in Bremerton (38,000) and portions of Kitsap County (20,000), including the Gorst area and the western portion of the Manette Peninsula. The service area includes the Olympic View Industrial Park and the Bremerton National Airport. The Utility e~e-is-u,~,e~ has contracted to provide water with ooerations and maintenance services to the Tracyton and Rocky Point Water Districts. In addition, the Utility contracts to supply water to the Puget Sound Naval Shipyard (PSNS) and to the City of Port Orchard. The current service area includes approximately 5,300 acres within the Bremerton City limits, and approximately 6,800 acres within unincorporated Kitsap County. (See Figure CF-8 "Bremerton Water Plan Service Map".) The Kitsap County Coordinated Water System Plan contains an Intedocal Agreement for Establishing Water Utility Service Area Boundaries, and in addition, the City has service area agreements with North Perry, Silverdale, Sunnyslope, Rocky Point, and Tracyton water districts. In 1999= the Cit.v and the Port of Bremerton entered into an agreement to have the City own and operate the Port water system, (b) Facilities/Water Riqhts The City of Bremerton Water Utility supply system consists of Union River Reservoir behind the Casad Dam, 12 production wells, 204 miles of water pipe, fourteen pressure reducing stations, 16 water storage reservoirs, and 14 pump and booster stations. (Table WA-l) Approximately C~ 65 percent of the supply comes from the 2,764 acre Union River watershed, which is 98 percent owned and controlled by the City. Wells in several local aquifers supply groundwater to the system. Current average daily demand is approximately 8 million gallons per day (MGD). There are six pressure zones in the system: East (E) 240, E 398 E 490, West (W) 256, W 440, and W 517. These zones are designated by the overflow elevations in Utility reservoirs. Two additional pressure zones (W540 and 650) are currently being designed. Construction on the W650 zone is scheduled to begin in -1-989 2000, with the W540 zone scheduled to begin in 2001. Both zones include pump DRAFT CFP 1 12/23/99 stations and reservoirs. Bremerton's water supplies consist of 10,689 pdmary acre-feet (1,408 supplementary acre-feet) of groundwater and a firm yield from the Union River of 3.8 MGD. Instantaneous dghts include 40 cubic feet per second (cfs) (17,952 gallons per minute-gpm) on the Union River watershed and 6350 gpm groundwater. All water in use by the City has been propedy appropriated through certificates of water dghts or claims. Historically-used surface water claims are maintained for potential emergency and future use pending required treatment. Bremerton's Union River surface source is of such excellent quality that the City is currently approved by the State Department of Health to remain unfiltered. Sources are disinfected with chlorine. The water system control and alarm is provided through a telemetry system. Updates'to the telemetry system are planned for 1997-99, including conversion to radio telemetry. Operation staff are state certified, and the system is operated in compliance with all federal and state regulations. (Table WA-l) For compliance with the EPA Lead and Couper rule: the City has constructed a Corrosion Control Facility that injects caustic soda (NaOH) into the water entednn the water system at Reservoir No.4. This facilitv beaan operation in March of 1999. Fluoridation of the water system was considered as part of this project., but by a vote of the people: was not implemented, used ct the four wa!! sites. (c) Fire Flows The Utility is generally capable of meeting Kitsap County Ordinance fire flows, which are considered to be minimums for new const~ction. However the Bmmedon Water Plan recommends that fire flows be designed to meet the significantly higher Insurance Se~ices (ISO) Standards. Under peak houdy flow conditions, a minimum of 30 psi (new mains) residual system pressure without fire flows in water mains should be maintained to meet State Depadment of Health standards. (d) Capaci~ The current capacity of the water system on an annual average is 12 million gallons per day (MGD). The daily capacity of the system with groundwater sources only is 8.7, while the capacity with groundwater and su~ace sources at current hydraulic capability is 21.5 MGD. DRAFT CFP 2 12/23/99 Water The capacity vades because the Union River is used to supply the average day demands of the system. The surface supply can be vaded between zero and 15.5 MGD as long as annual average firm yield of 3.8 MGD and water quality limits are not exceeded. Note that not all sources can be used to maximum capacity at the same time, due to limited hydraulic capacity of the Unior~ River transmission mains or water dght conditions. DRAFT CFP 3 12/23/99 Water Union River Watershed 15.5 Surface Water Subtotal = 15.50 1. ~r2-R - Anderson Creek Well 2380 Anderson Hill Rd SW 800 2. #3 - Anderson Creek Well 2380 Anderson Hill Rd SW 400 3. #7 - Anderson Creek Well 2731 State Highway 16 450 4. #8 - Anderson Creek Well 2651 State Highway 16 650 5. ~9 - Bridle Ridge Well 318 NW Firway Lane 230 6. #13 - Vena Well 50 NE Vena Avenue 600 7. #14 - East Zone 240 Well 5853 Central Valley Road NE 270 8. #15 - Pistol Range Well 6581 W. Old Belfair Highway 150 9. #17 - Pistol Range Well 6581 W. Old Belfair Highway 760 10. #18- Twin Lakes Well 8301 W. Old Belfair Highway 370 11. #19 - Golf Course Well 7061 W. Old Belfair Highway 300 12. ~r20 - Twin Lakes Well 8301 W. Old Belfair Highway 1,100 13. ~r21 - Silverdale Mobile Home Estates 903 NE Saturn Lane (500) Well (pending application) Estimated Future production = 14. Gorst Well (pending application) Old Belfair Highway (400) Estimated Future production = Current Groundwater Sub-Total (gpm) = 6,080.00 Current Groundwater Sub-Total (MGD) = 8.70 15. PS #1 - Gorst Creek (emergency supply Belfair Valley Road - Gorst Creek N/A only) 16. PS #2 - Anderson Creek 2380 Anderson Hill Road 2,250 17. PS #3 (emergency use only) 7061 Belfair Valley Road 400 18. PS #4 1335 Jones St. O/Vest Brem.) 800 19. PS #11 844 Callahan Drive 1,400 20. PS #12 3029 Olympus Drive 950 DRAFT CFP 4 12/23/99 Water 21. PS #13 2929 Olympus Ddve 500 22. PS #14 2101 Schley Blvd 825 23. PS #16 50 NE Vena Ave 1,250 24. PS #17 Old Belfair Hwy 1,500 Pump Station Sub-Total = 9,875 ..................... \ ...... i,, .... II ................... 25. Warner Booster Station ~ 5881 Warner 50 26. Booster Station #3 3000 17th Street 300 28. Booster Station 05 589 Lobe Blvd ~ nn 29. Ha~horne Booster Station ~ 4490 Ha~horne Ave West 120 30. Booster Station ~7 1527 Cook Rd SW 60 Booster Station ~10 5785 Imoedal Way SW 3.695 Booster Pump Stations SubTotal ~ ! ,~30 Pump Stations Total = 1_.. ~_ ,~ ~ nn~ ~,,.~.cn~ 29, Union River Rese~oir (behind Casad Union River Watemhed 1,350 Dam) 31. Res. ~2 McKenna Falls Head Tank 0.1 Rese~oirs (Raw ~ate0 Total = 1,350.10 ::::::::::::::::::::::::::::::: ::: ::::::.::~ ::: :~:: ::::::~: :::::::::::::::::::::::::::::::::::::::~: :~: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :~:~:~: :: :: 34. Rese~oir ~ 4801 Roosevelt elvd ~ ~ .0 35. Rese~oir ~5 (~) 3~00 First Street (Forest Ridge 3.0 Park:) 36. Rese~oir ~ 5144 Francis Street ~ Eden Road 0.15 DRAFT CFP 5 12/23/99 Water 37. Reservoir #8 7300 Werner Road 2.54 38. Reservoir #10 (2 Tanks) 5785 Imperial Way SW, Pt. 0.21 Orchard - Port of Brem. Industrial Park 39. Reservoir #11 844 Callahan Ddve 1.58 40. Reservoir #12 3029 Olympus Ddve 2.0 41. Reservoir #13 2929 Olympus Ddve 0.80 42. Reservoir #14 1628 Hayward Avenue ~ E. 17th 2.0 43. Reservoir #15 1925 Cheryl Street ~ Forest Drive 1.0 44. Reservoir #16 260 Sugarpine - Tracyton 1.0 Watershed 45. Reservoir #17 400 Ridge Lane NE @ Sandra 1.0 Lane 46. Reservoir #18 1925 NE Cheryl Street ~ Forest 1.0 Dr. 47. Reservoir #19 I 2628 Ash Street ~ Cherry Ave 2.0 48. Reservoir #20 400 Ridge Lane NE @ Sandra 1.0 Lane 49. Reservoir ~r21 2132 Lakehurst Drive - NAD Park 3.0 ~istdbution Reservoir Total = 33.2~ 12"- 36" Water Mains Vadous 20-1-¢48 Transmission Main Piping = 2" - 12" Water Mains Vadous 1,211,729 45.781 10" Water Mains Various 8" Water Mains Various 3~7,~!~ 7" Water Mains Vadous 703 6" Water Mains Various 4! ! 114.378 4" Water Mains Various 3" Water Mains Vadous 16.658 2" Water Mains Various DRAFT CFP 6 12/23/99 Water Distribution Piping System Sub-Total = ~ Total Piping System = ~., ,~o, ,-,~.~?'~, .-~nn 2. Forecast of Future Needs (a) Existinq Demand The average daily water system demand vades depending on weather conditions, but averages about 8.1 8.2 million gallons per day (MGD). Yeast Average Day Demand (MGD) 1990 9.35 1991 8.71 1992 8.48 1993 7.73 1994 8.29 1995 7.89 1996 7.43 1997 7.42 7.67 1998 8.20 Approximately 33 percent of the average daily demand comes from the Puget Sound Naval Shipyard, the largest single water user. Approximately 78 percent of the water demand is "in-City" demand, and 22 percent is outside the city limits. Average day demand is affected by the year's rain patterns and other factors -- for example, 1993 was a wet summer, resulting in less outside water use. However, the highest peak day ever recorded was dudng unusually Iow temperatures in December 1990 when pipes broke and customers ran water to prevent pipes from freezing. In 1992, Seattle's drought response media campaign affected Bremerton customers' water use, even though our reservoir was not experiencing a drought. (b) Level of Service (LOS} Standard ........ ,~,.,, ~,,, ~, ...... ,~nn ,,, ~r~n ~_~,'-~ Domestic unit demands are then expected to remain constant through the year 2014. · 1990 LOS = 106 gallons per capita per day (GPCD) 100 · Current LOS = 103 GPCD _. o ....... '~-"~ LOS - DRAFT CFP 7 12/23/99 Water (c) Future Demand The 1992 Bremerton Water Plan identifies needs for a 20 year planning period from 1990 to 2010. During that time it is expected that supply capacity to meet typical maximum day demands (MDD) will increase 26.99 mgd by year 20'10. (Table WA-2) The 1999 Update to the Water System Comprehensive Plan will update the Water System Plan demand projections. Existing Sources 9.1 -23.7 13,460- 16,565 Potential Sources 11.0 - 12.2 7,470 Total Sources 20.1 - 35.9 20,930 - 24,035 Source: Bremerton Water System Comprehensive Plan Table 8-7 The 1992 Water System Plan kt-is projects that if pending water dghts certificates are secured, then no additional sources will be needed to meet the total demand through the next six years. However, future water sources will need to be secured to meet anticipated demands beyond year 2000. (Table WA-3) I 1994 * 56,701 9.04 1995-2000 (new) 9,686 4.20 Total as of 2000 * 66,387 13.24 2000-2012 11,764 4.38 Total as of 2012 78,151 12.17 Sources: Bremerton Water System Comprehensive Plan, updated by Bremerton Water Utility · 1994 & 2000 demand -from Kitsap County Comprehensive Plan, December 23, 1996 Assumptions: 2000: Pop. X 103 gallons/capita + 3.2 MG for PSNS 2014: Pop. X 100 gallons/capita + 3.2 MG for PSNS DRAFT CFP 8 17_J23/99 .Water 3. Proposed Facility Improvements The Bremerton Water Plan recommends that =,'*, =ddltlc,-,=! 0.7 mgd of g, v.nd ...... ~-~.~.,j ............... ~...~ by ........ a total of 1.4 mgd should be developed by year 2000. (Table WA-2) The City has two =dditi=,-,=l wells ddlled and awaiting water dghts. Current regulatory and legal uncertainty at the State level precludes processing of water dghts applications except under emergency conditions. The Water Plan concludes that existing distribution system is capable of meeting typical system demands. Improvements in transmission and distribution mains are necessary to improve flows and pressures in certain areas and to replace undersized or sub-standard facilities. (a) Water Qualify Meeting strict Federal and State water quality standards is a primary objective of the City. Ddnking water is regularly tested at the sources and in the distribution system. To continue to use the unfiltered Union River source, the City should continue to pursue either acquisition or controlling agreements over remaining pdvate lands within the watershed, and should vigorously implement the Watershed Control Plan. Responsible operation of the entire water system is critical to maintaining compliance with the non-filtration status of the surface water treatment regulations. Even with these precautions, a drastic change in source quality or changes in regulations could require the City to provide filtration further treatment such as ozonation or filtration. The City has reviewed and evaluated potential water treatment plant sites in the City's system. A site has been located near Reservoir No. 4 on Washington State Military Department property. The City has begun discussions with the State Military Department regarding acquisition of the property. Groundwater wells water quality will be ensured through a Wellhead Protection Program, implemented in 1996. (b) StoraRe Storage needs include the E398 zone and the Industrial Park and Airport area, no additional storage is needed to meet current demand. By year 2010 a total of 22.5 million gallons (MG) of system wide storage is expected to be required. The system currently has 34,3 MG of storage available, pdmadly in the lower elevation zones in the developed parts of the city. In 1996 the City formally took over the Port of Bremerton Reservoir. Two additional pressure zones (W540, and 650) are currently being designed. Construction on the W650 zone is scheduled to begin in 1999, with the W540 zone scheduled to begin in 2001. Both zones include pump stations and reservoirs. Prior to year 2010, additional storage will be required north of the East Bremerton city limits. DRAFT CFP 9 12/23/99 Water (c) Distribution System West Bremerton industrial/commercial areas have good fire flow capacity. Toward Jackson Park, fire flow capacity meets Kitsap County guidelines but is less than ISO recommendations for multi-family residential housing. Several improvements are needed to improve fire flow capacity in the East 398 Zone, west of the Brownsville Highway. Pump station capacity will need to be added to serve new west zones south of Kitsap Lake and south of Gorst. The Utility should continue to routinely replace small sub-standard water mains. Initial replacement projects should concentrate on mitigating Iow-pressure problems in the Sherman Heights area. The existing telemetry and control system will require upgrading and maintenance so the Utility continue to improve control the water system. (d) Plans of Other Providers There are no other providers of potable water within the City. However, there are several nearby water districts, public utility districts and municipalities that may have interests in local surface and groundwater resources. These include: Silverdale Water District No. 16; North Perry Avenue Water District; Erland Point Water District; Sunnyslope Water Distdct and City of Port Orchard Water District. .......... Unclaimed service areas also exist south, east and west of the Utility's watershed. The Kitsap County Coordinated Water System Plan (CWSP), a regional water supply, transmission, and storage plan, was developed by the Water Utility Coordinating Committee (WUCC) to comply with state law. The plan assesses water supply needs in Kitsap County and presents a program to provide water supply and service to users. The plan provides a process and strategy for existing water utilities to define their role in a program consistent with adopted land use policies and projected growth strategy. The Water Utility Coordinatino Council has be(~un to City :-' ~'~-'~,'""'--' +-' plo,-, ~'-- +~'~ update te the CWSP. re) Seismic Improvements A Water System Earthquake Vulnerabilit.v Assessment was com[~leted in March 1997, which looked at the system vulnerabili~ due to seismic events. The study recommended several improvements to the storage reservoirs., pump stations. transmission mains and the Oasad Dam intake structure. Implementation of these improvements will be done on a programmatic nature with a funding allowance on an annual basis. A detailed listing of the or¢jeCs anticipated to be developed in the next six years is shown in the attached Capital Im______provement Plan sheets. 4. Six-Year Financial Plan Under the proposed LOS it is projected that no additional water sources will be needed to meet the total demand through the next six years, providing water fights are secured on two wells which have already been ddlled. The City pays for capital facilities through charges for service, but also through Timber Sales and DRAFT CFP 10 12/23/99 Water other non-revenue receipts. The six-year financial plan for water facilities is included in Section 3 of this Capital Facilities Program. CFP Water 1998.doc DRAFT CFP 1 1 12/23/99