Loading...
HomeMy WebLinkAbout03/07/49t28 March 7, 1949 Special meeting of the City Council of the City of Bremerton was held in the Mayor's Office, City Hall, at 10:O0 o'clock A.M., March 7, 1949. Mayor Kean, presiding; and Commissioner Haddon, Commissioner Wheaton, City Attorney, and City Engineer being present. Mayor Kean stated the purpose of the special meeting was to discuss a change order and have a general discussion relative to sewage disposal contract. Clerk read letter dated March 4, 1949, from James W. Carey & Associates, enclosing six copies of Change Order No. 1 in connection with the Sewage Treatment Plant and ~imp Stations. The copies of the Change Orders have been executed by JamesW. Carey & Associates, the engineers, and Hoagland-Findlay Eng. Co., the contractors. Clerk then read the Change Order No. 1, as follows: (1) Construct a new manhole $90.00; (2) Laying and removing 36' of 12" concrete pipe $222.40; (3) Break out new hole and plug existing hole in manhole $30.00; (4) Increase depth of manhole 6' at $30.00 per foot, $180.O0; (5) lower 12" concrete sewer line 18" for 918 feet at #2.2% per foot, $2,065.50; Grand Total, not including sales tax, $2,587.90..There was a note on the change order which states that it is contemp- lated that Pump Station No. 6 will be lowered 18" from that shown on drawings and the costs involved will be covered by a separate change order and determined when construction on Pump Station No. 6 is underway. Mr. Wheaton stated that the reason for the additional cost because of the change order was due to an obstruction being encountered in laying the sewer line in the navy yard and the line had to be lowered to avoid the obstruction. Motion by Mr. Wheaton and Mr. Kean to approve Change Order No. 1 in the total amount of $2,587.90, plus sales tax, carried. The Mayor commented that any proposed change orders in the sewage contracts should be studied carefully as he felt that an engineering firm had been hired to study the entire sewage project and their studies should have been complete. Mr. W~eaton explained in connection with Change Order No. 1 that the navy yard was the only part of the project that could not have been investigated but that any changes coming up outside of the navy yard and costing additional funds he would not favor. The Mayor said he was very concerned about the cost of the project and that change orders could be extremely costly on a project costing around a million dollars. A discussion was held on the responsibilities and authority of the position of City Engineer. No decision was reached but Mr. ~heaton said he and the City Engineer would confer on the matter and bring in a recommendation. Motion by Mr. Kean and Mr. Wheaton to adjourn, carried. City Clerk Approved: Mayor