HomeMy WebLinkAbout03/23/66 March ~3, 1966
Regular meeting of the City Coul~cil of the City of Bremerton, Washington
was held in the Council Chambers of the City Hall at 10:00 o'clock A.M. ·
Pacific Standard Time, on Wednesday, March 23, 1966 with Com~aissioner Clark
presiding. Also present were the following: Com~nissioner Schoneman~ Ci~y
Attorney Fisher, City Clerk McGowan, Assistant Police Chief Henx~y, Water
Supt. Humble, Fire Chief Tillett, City Planner McConnell, and representatives
of the press and radio. Mayor Jarstad was out of town.
Meeting was called to ordwr -by Commissioner Clark and the invocation was
given by the Reverend Joh~ Sara, First Covenant Church.
City Clerk read the minutes of the previous meeting and they were approved
corrected.
City Clerk anno~ced it was the time and place set for a hca lng on LID
289 and the opening of bids for a fire alarm console unit.
Motion b? Mr. Schoneman and Mr. Clark the bids be opened first, carried
unanimously.
City Clerk opened a bid from the following: Bliss Gamewell Company,
certified check enclosed in the amount of $300,
Motion by M~ Clark and Mr. Schoneman the bid be referred to a committee
for study and award be made at the next council meeting, carried unanimously.
City Clerk announced it was the time and place set for a hearing on LID
289 confirming and adopting the assessment roll and that no written protests
had been received.
There was no one present who spoke in opposition to the LID
City Clerk read an 0rdin~nce adopting and confirming the as.~essment ~oll
for Local Imprvoement District No. 289 providing for the improvement of the alley
located in Block l, First Addition to Sylvan Park, as in said ordinance
described; providing for the I vying and assessing for the costs and empenses
thereof ~gainst the parcels for the ~ollection thereof; creating and establishing
a special fund therefor; and fixing the date for the issuance of 'am installment
note in payment thereof.
Motion by Mr. Schoneman and Mr. Clark the ordinance be approved for
passage and publication as Ordinance No. 2677, carried unanimously.
to
Mr. Schoneman reported the drain line work that Will eventually go/the
new reservoir is under way. The reservoir walls are in place and the tank will
be ready for testing in two weeks.~ Lift Stations 1S and 16 are above the ~rou~d.
Station 13 is not yet umder construction. The pipe ~s~ing by Schade and Sons,
Inc. is almost complected.
Motion by Mr. Clark and Mr. Schoneman to pay all bills that are approved by
a majority of the Commissioners, carried unanimously.
M~. Clark reported the City of Olympia has completed construction of a
new City Hall and he has received an invitation to inspect the ~building.
Motion by Mr. Clark and Mr. Schoneman to rescind action taken at the
meeting of March 17, with regard to the vacation of certain streets amd alleys
in the vicinity of Olympic College and instruct the City Attorney to prepare
the necessary resolution setting the date of hearing on the vacation,
carried unanimously.
Mr. Schoneman commented on the interest people have had in annexation to
the City and stated the emphasis has been on the need for sewers.
Regarding a request by Mr. Schol~meyer that a lease agreement betWeen
himself and the City could be executed with the provision that the effective
date be made retroactive to the time when negotiations for the lease ~ mmenoed~
Mr. Schoneman stated an ~reement had be~n made retroactive to August 18, 1968.
Motion by Mr, Sch nemam and Mr. Clark the les~ be approved on the basia
of the corrections made~ carried unanimously.
Mr. Pullman and Mr. Dressling approached the Council and complained of a
car dealer parking unlicensed automobiles 6n Vth Street and inconveniencing
visitors to their homes.
City Attorney Fisher replied that he h~s knowledge of the matter and will
be considering it as soon as possible.
Mr. Lloyd Dunning approached the Council as a member of the Cham~er
Commerce and stated he is a member of the Civic Affairs Committee and a
representative~'of the committee will be attending each Council meeting
seeking ~o assist in any way possible.
March 23, 1966 Con~t.
Th® following ~s a report to date on the Ostrich Bay-Oyster Bay sewerag®
Project. (as reported by resident engineer, John A. Peabody)
Schedule A-Sewers W. J. Schade Co.
March 8, 1966 Too much rain--no activity .
March 9, Crossing at Madrona Point Road, and Balazic property
March 10, 12 to 18" CIP inspected at above crossing
March 11, Crew doing.repair work on equipment
March 14, Testing 12 Cast Iron Beach Line
March 15, No activity
March 16, Some clearing near treatment plant
March 1V, Broke out a strip across Kitsap Way at foot of Oyster Bay Avenue--
Crew placed crushed rock at 4:30: at 7:30 P.M. the crushed rock
had been thrown out by traffic--street dept. had to replace black
top
March 15, Too much rain
March 21, Rain
Schedule B-Pumping Stations
Station No. 13
March 8, No activity through March 17
March 18, Mike Lewin worked till after dusk with Larry Dole preparing an out-
lay of the drainage system for surface water that drains from Oyster
Bay Ave. and Kitsap Way.
March 21, Metcalf-Gr~mm Co., sublet all drainage systems., and put side pipe
connections to the T and E Construction Co. (Metcalf-Grimm Co.,
Plumbing Contractors, were sublet by Del Guzzi)
Station No. 14
March 8, Some backfilling done: danger of cave ins is over
Station No. 15
March 8, All car enters and laborers quit by noon
March 9~ No activity thru March 18
March 18, Men setting rigging to pull sheet piles
March 17, Crane and foreman with pile buck crew pulling sheet piles
March 18, Still pulling sheet piling
March 21, About 75% of sheet pilings have been pulled
Pump Station No. 16
March 8, Work stopped because of rain; outside second lift of wall forms
ready for reinforcing steel
Schedule C-Chlorine Contact Chamber
March 8, No activity
Reservoir No. 15
March 8, Two welders and two boiler makers make up crew
March 9, Foreman, two welders and two boiler makers form crew
March 10, Much is accomplished with a small crew
March ll, A good weeks work done
March 14, Welders are hard to find at the present time--progress is not as
fast as could be
March 15, Still at it through March 17
March 18, First of knuckle plates placed
March 21, Tank will be ready for testing.on April 4
Meeting adjourned.
CITY CLERK
APPROVED